HomeMy WebLinkAboutPermit 0239-M - Morgan Design,. .
;.,,•;.: -
. . . .
. . .
. . . . .
. . ... . . . . . ,
, . .
. . .
. . . . .
. .
... . .. . . „ .
. .
,.• • .• • .•
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433-1849
MECHACAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
MECHANICAL
PERMIT NO. 0039-X)
DATE ISSUED:
1--5 -90
AMOUNT
It'
.Unit(it) Fee
9.IS 0
TOTAL 30.00 sji
Plan Check Reference I 89-141-M
PROPERTY OWNER:
Koll Business Center
'PHONE:
SITE ADDRESS: 1044 industry Dr
601 Strander Roulevard, Tukwila, WA
SUITE NO.
PROJECT NAME/TENANT: Morgan Design
Chinook Heating & A/C
VALUE OF WORK: $ 5,000.00
TYPE OF WORK:
OD New/Addition CD Modifications
A •il. I .. Of O. - .
CD Repair
•
. •,4
Other:
ed.
i ; . •■ •
WA. ST. CONTRACTOR'S LICENSE NO. CHINOHA11OBC
'EXPIRATION DATE:
1-03-91
PROPERTY OWNER:
Koll Business Center
'PHONE:
ADDRESS:
601 Strander Roulevard, Tukwila, WA
ZIP: gimp
CONTRACTOR:
Chinook Heating & A/C
,
!PHONE: 431-0988
ADDRESS:
15512 20th S.W.
1ZIP:
98166
WA. ST. CONTRACTOR'S LICENSE NO. CHINOHA11OBC
'EXPIRATION DATE:
1-03-91
FIRE PROTECTION:
1988
Sprinklers Detectors X N/A
CONDITIONS (other than noted on or attached to permit/plans):
APPROVED FOR
ISSUANCE BY:
BUILDING
OFFICIAL
DATE: ?■0
I hereby certify that I have read and ex ined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance or work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE:
PRINT NAME: icfia y cTe:,
DATE: /
COMPANY: /-7/,./,€)(,)(9 res' /7'--* V /7(:-
INSPECTION RECORD (call for Inspection* et 'toot 24 twos I adva )* • • •
DATE DATE(S)
APPROVED INSPECTOR CORRECTION NOTICE ISSUED
REQUIRED INSPECTIONS PHONE NO.
1 - Rough-in/Vents/Ducts
2 - Fire Final
3- Planning Final
4 -
5 - Mechanical
433-1849
575-4404
433-1849
433-1849
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries
This permit shall become null and void if the work is not commenced wlthin'i.180days from the
issuance, or lithe work is suspended or abandoned for Inspec
MECHANICAL PERMIT APPLICATION TRACKING
PLAN CHECK
NUMBER
TA-1 L1 I-m
PROJECT NAME
`gymnr5 an iL9
SITE ADDRESS
I
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
............:.....
BUILDING -
initial review
O FIRE
O PLANNING
O OTHER
Q REIINT!
1- Iq -c o cxo ULfAN1: Date Sent
(ROUTED)
'FIRE PROTECTION:
INIT:
Date Approved -
[) Sprinklers [ )Detectors (14 N/A
INSPECTOR:
FIRE DEPT. LETTER DATED:
INIT:
ZONING: IBARA.AND USE CONDITIONS? [ )Yea Di) No
SCREENING REQUIRED? f Yes ( No
REFERENCE FILE NOS.:
INIT:
BUILDING -
final review
1 -1,-90
UMC EDITION (year):
INIT: 1 ele:8
REVIEW COMPLETED
PERMIT NO.
CONTACTED
DATE READY
DATE NOTIFIED
Gwr
PERMIT EXPIRES
2nd NOTIFICATION
AMOUNT OWING : • O�
3RD NOTIFICATION
BY:
init.
BY:
(init.)
BY:
0913OIM
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
MECHAI SAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out and attached to this application.
PLAN CHECK
NUMBER eC1 - (4 1 m
APPLICATION MUST BE FILLED OUT COMPLETELY
FEES (for staff use only)
►•r.
BASIC PERMITS :FEE
UNIT(S) • FEE; '' : •:
PLAN • CHECK,: FEE
OTHER:
TOTAL:: -`
SITE ADDRESS
SUITE #
_,E l t/E1
VALUE OF CONSTRUCTION - $
cpcD CD
PROJECT NAME/TENANT
c7* ID 4: / �u
TYPE OF WORK:
New /Addition 0 Modifications 0 Repair 0 Other:
DESCRIBE WORK TO BE DONE:
/4/ c -r/ z-L- N 4 i �2
e."( 7, c),(1
:NUMBER OF:UNITS
r/z //-A(E Yc O qG U /9 / Lc:, -`t lo oacJ
/S T.— 5
5
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
C7csl�,�
WILL THERE BE A CHANGE IN USE ? No 0 Yes IF YES, EXPLAIN:
WILL THERE B STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING ? No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER K U .8u 5 //v S
ADDRESS
PHONE
L01 3'ronck -2r OD* 104-d) K w i
CONTRACTOR C i ., / ��� vx9 K /lc- -7--/
ADDRESS j5�� - -�-c�
.4 /c
WA. ST. CONTRACTOR'S LICENSE # ant /"./O / / p 6c
ARCHITECT
ADDRESS
717
l (Jot,' ZIP %ic%c
¶PONE,_0�
ZIP9 cy.7 6 F,
EXP. DATE/ _ 3 _
PHONE
ZIP
BUILDING OWNER
OR
AUTHORIZED
AGENT
PRINT NAME
ADDRESS / 2- _ 7 $ c-t-J
DATE
/ z - - -s ci
PHONE c/3 / d 9 a
CITY /ZIP j ij76(
CONTACT PERSON �� ��� S PHONE ,� O 7
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detaiIud Infoimatiun on application and plan submittal requirements. Application and
plans must be complete in order to be acceoted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is Issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
11 you have any questions about our process or plan submittal requirements,
lease contact the De - artment of Communit Develo • ment at 433 -1849.
DATE APPLICATION ACCEPTED
�" j�c]j
DATE APPLICATION EXPIRES
(4,-Q9 -90
Oy29/I1
s &MITTAL CHE C c LI. T
MECHANICAL
Completed mechanical permit application (one for each structure or tenant)
El Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
El Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
MECHAN"' SAL PERMIT
FEE WORKSHEET
VIII Vr I VIAWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206)
206 433 -1849
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTIONS - Complete the worksheet,
indicating the number of units being installed
' Jr► each category, multiplied by the unit cost
;Then tally.the subtotal column highlighted at
the bottom of the. Worksheet. At time of
submmal, staff will calculate the remaining fees,'
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
BASIC FEE
$15.00
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
x
4
Installation or relocation of each suspended heater, recessed wall heater
or floor - mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
X
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
t
X
X00
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and Including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
, 9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
X
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6,50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
SUBTOTAL (unit fee)
6)4. OD
PLAN CHECK PEE ; aa;o
14.00
GRAND TOTAL
$ 30,'00
C
,y
Plan Check 089-141-MA Morgan Design
1044 Industry Dr 4tE
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER
1.. No changes will be made to the plans unless approved by
• the Tukwila Building Division.
Plumbing permit shall be obtained through the King
County Health Department and ,plumbing will be inspected
•• •
by that agency, includi,ng_al_l_ogis plging (296-4732). .
ROVE D
. Electrical permit shall be obtained through the
. Washington State Divi.ion of 'Labor and Industries and
ill electrical work will be inspected by that agency
4. (e72-'-6363).
All permits', inspection records, and approved plans'
Shall be posted at the Job site prior to the start of,_
any construction.
N Any exposed insulations backing material to have Flame
Spread Rating of 2 or less, and material shall bear
identification showing the fire 'performanCe: rating
• thereof. ;
6.. All construction to be done in conformance with
approved plans .and requirements .the Uniform Building.
Code. (19e5 Edition), Uniform Mechanical :Code (1955
Edition), WaShignton State Energy Code .(19B9 Edition). •
7. Each single, system providing heating or cooling air in
excets of 2000 CFM shall be equipped with autoMatic
shutoff per U.M.C. Section 1009 (a) and (b)
S. Validity of permit. The Issuance ,. of a permi or ..
approval of plans, specifications and computations:
shall not be construed to bp :a permit
approval ofiainyviolatiOn.onyofie.:oi-Ovissionsof,
this' code or of any :other;-':ordAnance. of the..
jurisdiction. No permi-i.orpsumirigtp_giviva4thorItor
'",''tcilat,e or cancel the previsions*Of:thiS
'If }�'f jj'��.� iA�I E` j,' �{, ��, �iGn�c�' i1K:.i:'�1(L►�N1{�1Yf�4d7➢16�II MY1i�Cr4M rNaw..wa.r+r.w..... r.. �....
CITY OF TUKWILA
Building Division
6200 Southc.ntsr'Boulevard
Tukwila, Washington 98188
(206) 433 -1849
Type of Inspection /5//"/7e-
Site
Address /Oy9 2n4's2
Requestor
Special Instructions
C- P. �7trn�S
vxwaww...�.r.r�. w w.... w. a.. �+ s...+ w. �« ww. r... wu. r.. vs.. r. rwwnM/^ �' w' ng4rU1Mw1Y7:.' t, A4: tU�l MPl !C.Sf4Y4Y5'lYtlki�V'11:iY'YA3.`
INSPECTION RECORD 7,(074104
i
PERMIT # 00143?-07
Date o2 // �y0
Date Wanted 02//3/P0 a.m.0
Project /7/04-74-7
Phone # y3 / ^
Inspection Results /Comments:
/Pk)
Tkts".� cer -ei , � rQ Q /.mss s/c-
a�1 .7Ccess Apo i. 4"W /P6/ (9',ak
Inspector
Date
BI/ Business Center
Tukwila -Phase V
BUILDING 34
1036=1052 Industry Drive
Tukwila, Washington
Total Area 18,300 S.F.
CITY:OF TUKWILA
APPROVED
JA t 9 1990
8 {LDING D VISION
•
•
s EL C reis
P-44.1.1
to a
�lc00 01q Ic.oq
g0� OOe RTC) Al APT
ot'S
LUkla:H7 730
JN IT -to SET
vEe.
CITY OF TU
APPRO
B HIDING DIVISION • TENANT IMPROVEMENTS:
•- Eifilff. 14a,4 t1
.61
New 6&'j', fituhrof
will, Nev.-144a
Alai?
Alcw 61/? , f,tw I d
.311)(7° Soli4 ul.t
!mid- her
Ow 1/4 Aria
nlile a!'x6 °uifi
'y'1 eh, *Inapt
if 1,.jA
C/wroohi.
PAidiC Nv1 G
l to) r - e�le�. u
It Pte. ehirtud
•Vfrarti'v■• 4
474A
.a-JD
Scale" r
RECEIVED
CITY OF TUKWILA
DEC 2 9 1989
• •• PERMIT CENTER
PATRICK N. BODEN NC.
12507 UMW Rd. 1100
•Mvus. WA 01005
• x01)155.1515
PLAN CHECK
NUMBER
1
"X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
8 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11
12
13
14 FIRE FINAL lnsp:
15 PLANNING FINAL
18 PUBLIC WORKS FINAL
_17 BUILDING FINAL
PROJECT: a
THE FOLLOWINS COMMENTS APPLY `f0 AND BECOME PART OP THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER
(FYI No changes will be made to the plans unless approved by •44--. 1J�� the Tukwila Building Division,
Plumbing permit shall be obtained through the King County Health
{{{{V//V/N���•///�� Department and plumbing will be inspected by that agency,
�� including all gaspiping(296- 4732).
( /J Electrical permit shall be obtained through the Washington State
�� Division of Labor and Industries and all electrical work will be
inspected by that agency (872- 6363).
O
All mechanical work shall be under separate permit through the
Cjty of Tukwila.
O
All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
When special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit nuober of the project being
inspected.
�7 All structural concrete to be special inspected (Sec. 306, UBC).
OAll structural welding to be done by W.A.B.O, certified welder and
special inspected (Sec. 306, UBC).
OAll high - strength bolting to be special inspected (Sec. 306, USC).
f0 Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
11 Partition walls attached to ceiling grid must be laterally braced
if over eight (81 feet in length.
12 Readily accessible access to roof mounted equipment is required.
l3 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
13A7 Any imposed insulations backing material to have Flame Spread
V� Rating of 23 or less, and material shall bear identification
showing the fire performance rating thereof.
11
Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
16 A statement from the roofing contractor verifying fire retardancy
of rook will be required prior to final inspection (see attached
orocedure).
20
All construction to be done in conformance
requirements of the Uniform Building Code
Mechanical Code 11911 Edition), Washinnton
Edition),
with approved plans and
(1911 Edition), Uniform
State Energy Code (1989
All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing..
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296 -4717, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the Job site.
Fire retardant treated wood shall have a flame spread of not over
25. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
Notify the City of Tukwila luilding Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
21 All spray applied fireproofing as required by U.S.C. Standard No.
43-1, shall be special inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special inspected per U.S.C.
Section 306 (a) 7.
Validity of Psroit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
previsions of this cede or of any ether ordinance of the
jurisdiction. No permit presuming to give authority or violate or
cancel the provisions of this cede shall be valid.