HomeMy WebLinkAboutPermit 0109-M - Southcenter Mall - Squire ShopCITY OF TUKWILA (7
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -W* 18.4-9 BUILDING PERMIT
f
Work to be done HVAC
Site Address 852 SOUTHCENTER MALL uite enant SQUIRE SHOP
Building Use RETAIL Assessors Account # N/
Property Owner CENTER RIDGE CORP Phone N 246 -7400
Address 633 SOUTHCENTER MALL TIIKWIIA, WA Zip gRIRR
Contractor CASCADE AIR CONDITIONING_ HASCAAC1g7C$ 1 Pho e # 784 -3135
Address 1544 N.W. BALLARD WAY S.EATIIiFI, WA (' () n TP 98107
PERMIT # D /d9 -"1
Control # 89 -005 -M
/A1
FOR BUILDING PERMIT ONLY
Approved for
Issuance By:
Sq. Ft.
s`i`t FT.
Office
Storage/
Warehouse
Retail
Other
Occ.
Load
Znd Fl.
-3rd Fl.
Total
INV
Fire Protection: [] Sprinklers [] Detectors
Zoning Type of Construction
Special Conditions
w. J
Fees
Date:/--
sq. ft. @
1st Fl. S
sq. ft. @ 2nd Fl. $
sq. ft. @ other S
sq. ft. (0 other $
Total Valuation of Construction S 12,500
Bldg. Permit Fee
Plan Check Fee
Demolition
Surcharges
Other
Other
TOTAL
Receipt # 75g'/ S. 24.00
Receipt #75-(.3'4/
Receipt I S
Receipt I S_
Receipt M S
Receipt N S
w -
$ 30.00
FUR SIGN PERMIT ONLY
❑ Permanent [] Temporary
❑ Single Face [] Double Face [] Wall Mounted [] Free Standing ❑ Other
Building face Setbacks: Front Side Side Rear
Square Footage of each sign face Total square footage of sign
Special Conditions
THIS PERMII VECUMES NULL ANU VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR MURK IS •,YEMJEO OR
A8ANDONEU FUR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK 15 COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW Tad SAME TO RE TRUE AND CORRECT. ALL PROVISIONS OF LAWS ANU JuotssNCE5
GOVERNING THIS TYPE OF WORK WILL RE•COMPLIED WITH WHETHER SPECIFIED HEREIN DR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIvE To
VIOLATE U*....CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCK LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
Signed
Date / -V-Sr7
LICENSED CONTRACTORS DECLARATION
I hereby affirm that I M ensed u der provisions of the lusiness and Professions Code, and •y license is in full force and effect.
Contractor (signature)
Date I.3 / —t t
OWNER - BUILDER DECLARATION
( ) I. as owner of the property, or •y employees, with wages as their sole canonisation, will do the work,
offered for sale.
I ) I, as owner of the
Owner (signature)
and the structure Is ^n, - .'n?o or
property. an exclusively Contracting with licensed contractor's to construct the project.
Oats
CITY OF TUKWILA
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 - 1541 BUILDING PERMIT
Work to be done HVAC
Site Address 852 SOUTHCENTER MALL
Building Use RETAIL
Property Owner CENTER RIDGE CORP
Address 633 SOUTHCENTER MALL
Contractor CASCADE AIR CONDITTONINr
Address 1544 N.W. BAI LARIZ WAY
PERMIT f G /6 -�
Control 0 89 -005 -M
Suite 0 Tenant SQUIRE SHOP
Assessors Account li N/A
Phone N 246 -7400
FUR BUILDING PERMIT ONLY
Approved for
TIIKWTI A, WA
4CASCAAf.197rR
SEATTLE,-WA
Issuance By: -1. %,. ,
Zip 9R1RR
Phone 0 784 -3135
lip 48107
Date: / 7
Sq. Ft.
Office
Watrehous!
Retail
Other
IOcc.
Load
1st Fl.
2nd Fl.
'3rd Fl.
1
14
•
Total
Fire Protection: ❑ Sprinklers ❑ Detectors
Zoning Type df Construction
Special Conditions
Fees
sq. ft. A
sq. ft. e
sq. ft. @
sq. ft. A
Total Valuation of Construction S 12 500
Bldg. Permit Fee Receipt N 7,/v S 24.00
Plan Check Fee Receipt # 7 —s-om S � nn
Demolition Receipt 0 S
Surcharges Receipt N S
Other Receipt N S
Other Receipt N S
1st Fl. $
2nd Fl. $
other $
other $
I TOTAL
S 30.00
FUR SIGN PERMIT ONLY
❑ Permanent [] Temporary
❑ Single Face ❑ Double Face [I Wall Mounted ❑ Free Standing ❑ Other
Building face Setbacks: Front Side Side Rear
Square Footage of each sign face Total square footage of sign
Special Conditions.
THIS PERMIT BECOMES NULL AND VOID IF WORK 00 CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION UR MURK IS . ;%(4)(0 OR
ABANOONEU FUR A PERIOD OF 180 DAYS AT ANY TINE AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KIM THE SAME TO K TRUE AND CORRECT. ALL PROVISIONS Of LAWS AhU JRONAhCES
GOVERNING WORK WITH WHETHER SPECIFIED INA GRANTING WT NOT PRESUME U y 1,'40RITy TO
VIOLATE CANCEL THE PROVISIONS OF ANY OTHER STATE IOC LLW RGULATINGCOTRUCTION ON THE PERFORMANCE OFC,,StauCTION.
' Signed
Oat., / —c3/ 27
LICENSED CONTRACTORS DECLARATION
I hereby affirm that I M ' ense/ uu der provisions of the 'witness and Professions Code, and sty license Is in full force and effect.
Contractor (signature) �!dH Date i'—/—gel
OWNER- BUILDER DECLARATION
property, or ny employees, with wages as their sole compensation, rill do the work, and the structure
property, M esClYttvely contracting with licensed contractor's to construct the project.
Date
( ) 1, as owner of the
offered for sale.
( ) I, as owner Of the
Owner (signature)
,s n, ,
;age Or
d3U'. 9Sf' : IO11. i11fY1'iilSC.tlMllek�SOltklY+Pu� zGfo�.xw�.'cwanu+n.v+w..rr•
aEY OF TUKWILA
Building Division
&2n0 Southcenter Boulevard'
Tukwila, Washlnaton. 98188:
(206) 433 -1849
...,..............,,.,,,,,. ..........ww- r..w.wwwx.r +avxr..
INSPECTION RECORD
PERMIT #
Date
Type of Inspectio
Site Address 2 jam.
Requestor -L ( la&Y
Special Instructions
to Wanted _ .3
Project
Phone
bye.
3:30
a.m.
Inspection Results /Comments:
Inspector.
Date
...,...�..a,.«...... -... .-..-. �. ee. r. w_.- w,.......' w,.,..,.........,. ..«. .............. ......�. -..L. r.. w+ n• nw+. �., a. o. �naxlt+ etawiMAx� ,YRL'nlnikr3.CM'JiAK:::
�,.I' TT OF TUKWILA
Building Division
A200 Southcsnter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
Type of Inspection.
Site Address
Requestor
Special Instructions
INSPECTION RECORD
PERMIT #
Date -elf'
Date Wanted
Project .9.47wi%*46 9
Phone #
r 10.
Inspection Results /Comments: ,,& a/
Inspector
Date .
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF. THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER O to 9 - M
1. No changes will be made to plans unless approved by Architect and
Tukwila Building Department.
• Electrical work to be inspected by State Electrical Inspectors and all
required electrical permits obtained through that agency.
• All permits to be posted at job site prior to start of any
construction.
▪ Any exposed insulation backing material to have Flame Spread
Rating of 25 or less.
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1985 Edition), Uniform.
Mechanical Code (1985 Edition), Washington State Energy Code (1986
Edition), and Washington State Regulations for :Barrier Free
Facility (1986 Edition).
CITY OF TUKWILA
Building Division
6200 southeenter Boulevard MECHANICAL PERMIT APPLICATION
Tukwila, Washlnotnn amiss
(206)- 433 -1849
?5-2
Site Address 6007/ GENTLER /Y) CU..-(.
Project Name /Tenant»SQL) I R&—. '/Y P
Valuation of work /Z,, OO
Property Owner eftetkei7 COY 0 .
Address 69g6 501Anicenitai
Appl i canteASCA DE /}(Q ccIUDiTioNIA1 .
Address /54y N14-) BALLJ' RD LAY
CONTROL# 0 Oo5 nl-
e/A,YTgg Suite# Floor#
Assessors Account # tAli /-
Phone at-l(p -IL/00
Zip QM8
LpAt1L d LTV) Phone 7841—t?/,75-
Zip ' %D7
Architect /Engineer
Address Zip
Contractor G4.. AIR eiA/ O% T/Ujl%OLicense #C,.',.Se/MC /q %C Phone y -�/�3�
Address /5'L/4w1/1'41 sAti./,'& 4144Y, ! Zip 98/d7
Describe work to be done 'L4 . itwr ♦ . .; G. Oa./ _, /4_
j.NST79Lc. N ' PaG-7"I Rte J /1LS'0- faerhaVA Er/5`rl /N 9R O/V/7-
Phone
Indicate the type of equipment to be installed, rating /size of equipment, and number of each:
TYPE RATING /SIZE NUMBER
r;/4RROZ /0 7 .-3• o/2
Two (2) sets of plans must be submitted meeting the application requirements of Section 302(b)
and (c), 1985 Uniform Mechanical Code. Roof -top equipment work requires submission of building
elevations.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND
CORRECT AND THAT I HAVE THE PROPERTY OWNER'S AUTHORIZATION TO DO THIS WORK.
Applicant /Authorized Agent (signature)
Mot.. Date 1267- 1
(print name) %.i4lf e)44,676/
Contact Person (please print) pAck. oz6a/ Phone? 949 s /LKS'
OFFICE USE ONLY
►Q'cL /-a5--87
FEES: Basic Permit Fee (000/322.100) $ 15,00 Receipt# -7:P9te Date Paid t_ 3,_1-9
Unit Fee (000/322.100) „x,00 Receipt# •95Sy Date Paid , 31 - Y,
Plan Check Fee (000/345.830) (a on Receipt# -7; I4 Date Paid / 3 r _ 5-7
Other ( / ) Receipt# Date Paid
TOTAL (OWES: $ 30, 00 )
TRACKINQ
DEPT. ATE IN DATE I5DT
BLDG
PLNG
COMMENTS
Approved for Issuance
/ -3o -SI
Approved (Initials)
M1.':...,. ,.,.... .
t43 Vita)' 11/416W aellwaug) .,! /67 tC,T,'' .
, .Th /c Row- r i:"-JJ 156-£161 AHU I
Nal/ Aoa rhyme) Cam.. N�' F.,Fi k ache
/5T/ ,q 2p C3-r�ylN L
0.41.1h. � „M,e.>o.
REH0 VV £X /gT // WA/ C? N,64
GP „4/ / /- Ftaovio,, New i"
coNop..dkrra p13,41/4 ,erne
ex/ g rl/'f 41•/11 -1 exfsr/,
cc I cW /TAr . s72110,17*
,a r 5w c w P; O, anir
-7 /'-Er
, ,j.s.*..t$..'
a✓ Lek rs►.a
•0►
.1„4/P/...
5T /C J!►'SA
INA' r/6 T
OuCT --�--
7.761,47* ra . fiuC ;/
24x/2" ,_--
AIR' tAcwpt,i1A GApccI' t4,
'R »QO‘(2E. Ptu OMATIC>
45 . taad K4(b)
gx /577/4 f1.4.a17O '
U/la! / Jar MOu /Jri,1y
PAN-P7 ✓ -.k
i :Xrl r 5/ Ee wc.4T /Obi
X/ 7 /NCB 4NVa - -
CLEAit/ 08AL:4/N1
-)tii5771.14 FAN Wile
g :MMVE1
EX/ 57 11./ 156,41 /
F,5tX4I -ANC
3000 CFM
-;c /l -..fir 24°
ro ,x/ 9T //14 42"X/ '
F /Lc.o 'vec Y
t 4CT $ /ZE - LQG47i'
1. Mechanical contractor shall be responsible for prorer rough -i'n
and coordination of mechanical components with other trades
and shall maintain architectural elements and finishes.
2. General: All work shall be installed in Complete accordace
with local health department requirements. Provide all
mechanical work in accordance with Uniform Mechanical Code
Uniform Building Code, and Uniform Plumbing code,;_ National
Fire Protection Association .13 (latest edition). Washington
State Energy Code, and further.requirements of the `local
build'
ing, mechanical, plumbing, fire and health officials.
year commenting be guaranteed parts. and labor for one full
3. All work shall '
y g date of final acceptance in writing.
Ductwork', shill be 'construc'ted of galvanized sheet metal
materials, gauges and details.as,'recommended in ,SMACNA HVAC
Duct .Construction. Standards Metal and Flexible Manual..
Flexible ductwork wall be 11mited to 'five "feet `in- length and
just
prior to diffusers pr ,gril,las, . suppoitecl every three ";feet
as'- recommended`in the SMACNA IJVACDCSM &FI4 manual'.
5. Contractor , `shall submit six copiee of ' catalog' cuts , with
specific`in'formation regarding fixtures and equipment proposed
and shall, not purchase,, or install any equipment or materials
until approval of same 'is received in writing from' Owner.
6. PERMITS: Paid for and obtained by'the Contractor.' Submit
,copies of= 's'igned, approved permits to the Owner's
T. Cutting nand,iPatching: All construction materials damaged . g or
cut into' during the 'installation' of this work muet>,be, repaired
or 'replaced with m ' kis of . like kip and e int as
origal ls by skilled labor ex erienced in t h at
P i building trade.
8. Penetrations of fire rated elements must' be made Bauch as to
retain' fire' rating. (Include Fire Dampers and access doors
where, necessary when crossing fire walls, ceilings, etc With
ductwork).
mgric HANNX CAL
MARK ITEM
CU--1 Condensing
Unit
7EQt7x P'MzTTT
MFR'MODEL
Existing
HC -1 Duct
Coil
1 °23M8H. TC, % 7Kwb 8 , 65EER
e6MBH ;SC@ 86 F/67 Fwb EAT,
b /a "liq, 1= �3 /8 "g1s,,
732 lb. oper.' weight, •
203- 230V•=lph -60Hz
3000cfm .5" Sp
(Refurbish co11, blower
wheel bearings)
10Kw, 26 x 14 ", 2 stage
208V- 3pb -6OHz , w/4 ,V :.;.
switch, thermal cutouts,
airflow switch and fuses.
!,;1/42/1v rim,//FlenitirM v
9. Record Drawings: Record field changes on record drawing print
set prior to each pay request.
10. Clean • u Continuall` remove apparatus,
P - y ' equipment, debris,
cuttings, crates, cartons, etc:' from site and dispose of in
approved waste sites: as directed by Owner. Carefully clean
diffusers, grilles, thermostats, etc.
11. Substitution nf Materials 'shall' be made'` only with written'
a
_ --=t oV /per /CM W-
�8V -5 A asocir
424/ TC0 /4. !y
577 26',(1.1"
' z.7 z.7 wav .
ACV- 471 Ale 3l. /
CUAM CV] -1441q9 V
eV/\Tlt4i To cer r
1 f RDI/ /t7o r"' 04r
C) RA/ /it/A8
J c7P,Qf // .
/ -17-/E/2,004W:47- t
L.f�
c4VE6p) 7'C7
Ex /5T / //6 4//U =/
' WIT = 't4iii
eQv 7 . vo)
14ifiing . ^4fipait t nfv. shai c lih X2 C mar d,r
'in 'Shipment prior :'to "1 installation. paint- `. inside of ` all'°'
diffusers and,griilea flat':.black.
'
13 The contractor shall provIde all blocking, curbs, sleepers;
and penetrations em required.
14.. All °, equipment ..shall ; be ,-isolated, from �" the structure ''; by
vibration isolators and from `- the ductwork ° by : FLEXIBLE
CONNECTIONS: 'Requirements: Waterproof, air tight, heat
resistant, neoprene coated fabric, 32 ounce. Ventglae, Elgen.
15. Location of equipment shall be reviewed and approved by the
Owner prior to installation.
16. The ''contractor shall :perform' an on -site Operation and
Instruction Demonstration "for the Owner. or !Owner's agent,
describing the -'location and operation `of all equipment
'including controls and demonstrating that the system meets
the proposed designoonditions.
17. 'Final certification shall be b' Owner's agent, contractor
Shall :be 'responsible for r adjustment, start up. and general
balancing prior';to final certification, and prior to balancing
and occupancy by Owner, ;tesst and adjust, fan, ,,dampers,
temperature controls, etc.,?for proper operation," Recheck all
equipment and systems after certification is`complets to
confirm operation' of` all systems'is ".fn accordance" with plans
and specifications.
18. Conflicts: Should conflict. occur, - either mechanical or
electrical, due -to substitution of fixtures,' equipment'or
materials ' from those which' the' mechanical ` design ` is based,
the Contractor is responsible for all costs,` incurred. Any
redesign :required shall '' be. ' at .,the Contractor's expense.
Redesign: and /or" modification to. the`. contract documents will
be by'Walnut "Hills Engineering'on a time And materials basis
and paid for`by the Contractor.
19. F'LEnaLE DUCT.,- Requirements: UL, approved, 'complete with
aluminum flexible interior liner,`1" insulation and exterior
vapor,
barrier." United Sheet. Metal, or
Johns- Mantti lira equal ` to Cievaf lex models as follows:
'Low; Velocity: SFV
20. WIRING'General: install in accordance with requirements of
the National'Electric Code. All' wiring shall be ;provided by
Li
: //3OV /O &.,410W /2 "0.
r icr -SON T
7_ x/ 6. l7/N
(r rP)
WILA
FILE COPY `. .
inderstand "that the Plan Chock approvals are
sublecf'tn errors a;id omissiof3 and approvai'of.
plans does" not oi, ^ncrir, tlye vloiatiof of any ,
edapfezl cc a Pc-ceipt of contractor's
copy of approved plans acknowlcti ed,
Q,�.n �,� r,;
it No. !. .,:.
."4..04 .,. v. ......cr leaWraeg3 "'Wa4a+'�..VaaWi?i.:. 'i;'�yJ � '''' ��` �. �%: �' �,. �iih`!- 7-+ �k��fi,a!•!;wns*- Ye!wr!,yw� ==�s
I1 II1111 11Ii1II II1 !hIrli,Ili11111hI1JI,I1'II''II hIl'hII IIi11111II'I
,G THS INC• 1 2
•
>:•4P Win,
`p. ti •:r
la-kw te yfi
: Y •o L.i.b •�i
I:
I II1II1I` 111111 111111l illI 11I1I III1[1I1IIi1III {I IIII wI
f ,t0 ....
:microfilmed document i5' less, clear `C an this
P,-- ► , i t 'is , due to the quality` of the original document
' �. +. , 'G, ' 6++s« s .airs .,s, ,I .. ,7 ' rd's..
a 2i4,.yaw; w+wuaJa. 1. 5l. *IL "ff £il (l `' t. G 9 s 7 e L ' ww o
.al.:.; .,. ,;i „,,®, w» u. ,.:, ;:: M " :.� ,: , . 'ir, y -�" .,;. • ,. , ; .
Bill linnIIIIIIIiilliiiiIIIIIIft iIIIII�Ii nliuii,iiInil1Inilliii��iiilii � Ii1l0111iill ��iIIIII 01111i(il1i�Iliikrilini1i1�i�I� I :I' l�nu IHimiliIil i oliliiiri iIi�rill' 11(1.06 (1ml