Loading...
HomeMy WebLinkAboutPermit 0020-M - Seatle Rendering WorksCITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 - BUILDING PERMIT Work to be done Site Address Building Use Property Owner Address Contractor Address HVAC PERMIT # -60_70 Control # RR -007 -M 5795 S 130TH PI Suite if Tenant SEATTLE RENDERING WORKS MFG Assessors Account # N/A RON JOHNSON Phone # 937 -4074 4222 S.W. 107TH SEATTLE, WA Zip 98055 ROSIFR FNFRGY SYSTSM #BOSLEI -256' Phone f 481 -4747 WOODE / � U WA - , ip 98072 . • II/,r ,,Z,/ 14211 N.F_ 193RD PL FOR BUILDING PERMIT ONLY S q • Ft. sst Fl . Office Storage/ e Ware hous Retail Other Occ. Load . 2nd F1. 3rd F1. Total Fire Protection: [] Sprinklers [] Detectors Zoning Type of Construction Special Conditions sq. ft. @ 1st F1. sq. ft. @ 2nd F1. sq. ft. @ other sq. ft. @ other $ Total Valuation of Construction $ 100,000.00 Bldg. Permit Fee Plan Check Fee Demolition Surcharges Other Other TOTAL Receipt # .23z3 Receipt # Receipt # Receipt # Receipt # Receipt # 116 00 S 145.00 FOR SIGN PERMIT ONLY 0 Permanent (] Temporary C1 Single Face [] Double Face [] Wall Mounted [(Free Standing [] Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABAN00NEU FUR A PERIOD OF 100 DAYS AT ANY TIME AFTER WORK 1S COMMENCED. I HEREBY CERTIFY THAT VE R 0 AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TV s WORK L BE C' •LIED WIT • NETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. 5igned, Date LICENSED CONTRACTORS DECLARATION 1 hereby affirm that 1 am licensed under provisions of the Business and Professions Code, and my license is in full force and effect. Contractor (signature) Date OWNER- BUILDER DECLARATION ( ) 1, as owner of the propert employees, with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ( ) 1, as owner of opert . s tracts ith licensed contractor's to construct the project. Owner (signatur Date CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 - /84q BUILDING PERMIT Work to be done Site Address Building Use Property Owner Address Contractor Address PERMIT# -6o,2 -AI Control 0 Rq -007 -M 57(5 S 110TH P1 uite enant._ SEAIL E RENDERING WORKS MFG Assessors Account 0 N/A RON JOHNSON_ Phone 0 937 -4074 4222 S.W. 107TH SEATTLE, WA Zip 98055 RO 1FR_FNFRGY SYSTSM IBOSLEI -256 Phone if 481 -4747 ip 98072 14211 N 1921E1 PL FOR BUILDING PERMIT ONLY Sq. Ft. sR FT. Office `Storarehoage/ use W Retail Other Occ. Load Znd Fi. 3rd F1. Total Fire Protection: ❑ Sprinklers ❑ Detectors Zoning Type of Construction Special Conditions sq. ft. @ sq. ft. @ sq. ft. @ sq. ft. @ 1st F1. $ 2nd F1. $ other $ other $ Total Valuation of Construction $ 100,000.00 Bldg. Permit Fee Receipt #232.1 $ 116.00 Plan Check Fee Receipt 0 $ 29.00 Demolition Receipt @ $ Surcharges Receipt 0 $ Other Receipt 0 $ Other Receipt 0 $ f 01'AL $ 145.00 FUR SIGN PERMIT ONLY ❑ Permanent ❑ Temporary ['Single Face [] Double Face ❑ Wall Mounted [] Free Standing ❑ Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions THIS PERNII BECUNES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT CONIENCED WITHIN 180 DAYS. OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONEU FUR A PERIOD OF 180 DAYS AT ANY TIME AF )ER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT VE R ANO,ERAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS ANO ORDINANCES GOVERNING THIS Tv ' WORK L BE C'.' IED WIT THEM SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR THE 1 �, �, OTHER STATE ON LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Signed +�,,���� Date LICENSED CONTRACTORS DECLARATION 1 hereby affirm that I mm licensed under provisions of the Sustness and Professions Code, and my license is in full force and effect. Date Contractor (signature) OWNER- BUILDER DECLARATION ( ) 1, as owner of the propert employees, with wages as their sole compensation, will do the work, and the structure Is not intended or offered for sale. ( ) 1, as owner of ��► 1 tract' - ith licensed contractor's to construct Ni t project. Owner ( signatur I :>sa Date CITY OF TUKWILA Building Division Tukwila,,tWashingtonul98188 (2216) 433 -1849 C ''..-. iNSPECTION RECORD'w,�',.,��..�,�x E:) PERMIT # � /i% Date Jr 1.1? - �g Type of Inspect •n i=4Lielyl V Date Wanted 5/ag/8'$ a.m. p.m. Site Address -y<� Q Project e'p� )0 C(p�,/%'J Requestor 4I1� Phone # aCj2 _01 ors? g' 1 Special Instructions qa ,0 Inspection Results /Comments: Inspector Date Pr( CITY OF TUKWILA Building Division 6200 Southc.nter Boulevard Tukwila, Washington 98188 006) 433 -1849 Type of Inspection Site Address .579' - Requestor Special Instructions INSPECT QN RECORD PERMIT # Date /3-5/ Date Wanted 4-1.34-1 S. /307 Z. Project Uj Zte /fit ► Ks" -y747 Phone # dY' c=a9 V.2 :2 cY. „i' 1311-7: nA,tir- Inspection Results /Comments:.p,2 d a Inspector %`�"�1rl �Cl/Lt�/ . Date` ��1 ater ITY OF TUKWILA;• Building Olvision 6200 Southcenter Blvd. Tukwila, WA 881p8 433.1.845 1 ,/ Job Address The following items are found to be in violation of. Ordinance and shall be corrected. I, 6'?! ;4s 11 .v Yl -'. (1/9.4 ,;i IS i' ■t��� /// (/ PC , . ;" 4n�r f:'/',! *I!eye•ay' ,/i. /s, P,r € / .0 /7S'e,4i 2 /4..5 Ade'e ,.. !'?e.rr ., t G i;•fr 47449,1*' td.H,r 44 IP- signed :Building 011icia /Insp otor BAKER COMMON TIESILA -213- ( FOP1M P.2 MAN( CTURERS' DATA REPORT FOR ALL TYF( rfF BOILERS EXCEPT WATERTUBE AND ELECTRIC w As Required by the Provisions o1 the ASME Code Rules P. E12 ' ^ia ^utaclureo t>,c�nc cart f, ied by Herc les Powar Erb, r L s ASP, _ 102.23 Menutaelured for Baker Commodities 2 1?VIM. A. ++1 drl.lre/♦ Ut Mantrlat I4'O.1 INaM! anti AtI4De'► 41 purchs ser 1 3 Locat,onof lnitenatlon 5795 So. 130th Place, Seattle . Washington IName Ind alsctrHO 90 ter rvo 1259 WH- 125 -900 1146 veer 9�tu 198$m IAN/ A yrndl bn+ !My! rl)riemsg Not +htf Board No 1 TypeWaste Heat NR r alt t 5 The Chemical and 1)hyS+C11 11+h(ler1,71s M all 04,1% Meat Ilh• rnllu,IFlttpnl) of rndlrr•dr sgr!I',I C,1Ln'ts of trip ASME BAILER AND PRt.1IgE VES$ t. CODE ins design, I:ons,•rrtl t fn Anti wQrkmJritrhp cunforrrl • to ASME HurrS, Sacl.on 1, O — and AptlMd4 to , JJ.7► . (Yew +pets) Manufacturers' Partial Data Reports pfopelly Idenlnla0 an signed by Comm sston*a Inspectors ire attrrchad 101 the following items of this report. N/A INene 0l pail rt9m nufnonufnolr m19r s norm. and ,deri4y IN venal n n 6, Bolter $htits or Grvms No. . Dld 47 QD Lengtn 24p ON Lingo 7. $hell Plates A285C .375 IF or a*eh Shalt or Drum stet! Malarial 5peclltc0tton No k grade, nominal Ihrcknestl 8. Ldnpltudln &l Jo,ntls) Welded Joint EIIIc,ency isurro ,,, Welded) 9 Meads N/A 1AS compared to Sown's' IMellrtel Spab,l,tel,on No Th.tkMU Pfal, O +then E!!' ^t0,d•l Rad,u' of Otahl 10, Orrlh Jolntls1 Welded No of Snell Cowles ISatmt *I', Weleattl SA285C- .375 Tube Boles 2.015611 la a . , IMat'I SaeC., Grade, Thickness) ID+a 1 139 SA11SA Straight )Nat'l Soot 0racial lEtraranl or Deno 0 t 2" Lenop, 24011 Gauge _ I $d 111 Venous, pwt me. 4 min 1 191 thick '110 11, Tube Sheet 12, Boiler TuOes N. 13 Furnace No Typt N/A Site - Length, each notion Total 100 OrW■M► tPiatn, Adamson, Ring Runfo/cap, Co+tugeted, Gr.lrntb,nea 01 Stareol Seams Tvoe man Spec , Grant, Th,tenessl 14, S,aybolts No. N/A Si. : 10.em ',+al 1 Spec Clew! site Tenu +t, rat :.tae; Pitch N/A Mai. AWP 1MO1. ants Vert.l 15. Stays of Braces Loeet,on *hove tweet 11'1 R.N. soave tvGak Ie) P,M. below *Noes (ti! R,M, halew (Vkrht (el Through stitys (II Oom• braces Material sicK Nu Twos No Soot Mae Paean Tow 1,411 Aft, Arra 10 0a titsrw Maw. AW.P. os+ 1111111111111=FEM 1=1111•111110111110111111.111 INIMOIONMIOOMMI MIN= OOMOMININUMMON 16 Other Pars' 1 N/A 2 3 __ -. VElj s *ante Ov. :••at.nr t Dom* 80 Ia P,n,nta, ate I 2. .. w.... 3. fMat Sim • Qrene, Srre, Maiarlel Thiatnel', k+, .s ✓, +CI ouloINc3 tEPr. 110/771 Ina. tom 1EUOrrr66) may 06 obt*Inbd from the Order peps„ 345 E. 47th St . New York, N.Y CITY Q 'TUKWIL4 JA-N- 24+3t38-- iiS- BAKER COMMODITIESILA -213' 17. ()otology ,sal Stearn Form P.2 IBeoki 1 - 4"- 300# SORF Flg. INO , S•re. end l y0t! Ic► BlOwott 2 1+}11 3000# Scr Cplg. !e Tyre INo Sr . and Location! (el Manholes' No 1 Site (() Handhotes No 5 _ Sao P. 03 lb) Safety Vnrve 2 1+}” 3000# Scr, Coupling (No $rn, one Tyoel Id) FNd 1 2" 3000# Scr. Coupling 11 X 15 3X 4 tNp , Soso. Iva*, ono LoCal'0nl Top Center line LoCelrOn Loearron Shell 18. PutrfJ,e Plug W wad; N/A INo , Diem , Location, *Mrs Swim, 19 aptly, supports' No --2 Type Saddles Welded iii @ldefi 20 Max AWP ISenrllnt, Loos, Lutist IBotta0 or 125 pit Baud On PG 27 Heeling Surface 13 !Cone pat aortic, FO,mula! vVeloeol b6 so ft 21. Shop HyO'ottal.c Tess 187 olio CERTIFICATE OF COMPLIANCE We ctrl,Iy the ttaternentt on this data report 10 be corrocl CiNri D „e January, 1988 stoned Hercules Power EQt. by 21300 IMenurltturerl S IA `Q� riled Reo,esanttla, t)v+ C,' 'hc,le of Aulho,r/aI.Qn NA 10 use the IAI of ISI Symbol ee. (Total! , June 17, 10 89 Hercules Pow I IC E. OF SHOP INSPECTION BOILER MADE BY _ 4 �• t at Los Angeles, CA I, the undersigned holding 1 valid commK,0n ratted by Iher Nelmmnal Board oI Boller and Nitwit Vessel Inspectors Indio !' d Site 01 . Prov,nce oe California end *Motored by H • $ . B . I . BII . TM � nl onnecticut ha*. Mtplcled pant of that borne. (gloried 10 as date items ' 6- —8— — —1 —18— — '£f and have tfltrn,nad Menutecwrer's Partin; Pats Reports for (terns end state Met, to the belt of my knowledge and belief, the manutecru,Iq no constructed Ih.s gprlar aA aCCO',1 : (School of the ASME BOILER AND PRESSURE VESSEL CODE. By s'Bono Ihrs bert.ltcal• neither the lntosclol nor hot employ., notes any wa renly, enpretted or u deacnbed on Ihas Manularlurtr's Data Report Furthermore, ne.,her the Inspector not tit employer till!! be ,•,, pert0nd! .nav(y of 0+0(er(y dar'r,Jge or a toss 01 any stand a,.t•n4 from or connpelpd walk that rnlpeelIon Di1e January, 1988 Commtls+ons lnspetlor Nall board. SING, t►ov,nce tn7 CERTIFICATE OF COMPLIANCE W certify that rr.; assembly c( all 1 :tot of this bO,Ier ;0n1ormt with the lrounemenes oI SECT' PRESSURE VESSE, CODE • Noe 4 !mss {eMUaar 1 Our Cerl.tacate O14Auth0ruer hr ti' „_•,,_ 10 VW Ito. 1A1 of 1St ._.....r._ -- ...._._ y AND •aulh0,rted 'r1110,414MNvee) — ....�.....,_. , Symbol exports CERTIFICATE CP FIELD ASSEMCl,'.' ',:SPECTION 1, the undeotrp. -1:; .7ldrng a valid comm.ss on rssued Lay the Naironjl Beard of . -lid Pra 11We VlteeI J andbr the State or Province of and empluyed by of have compared the ltelarnante an this Manutacterat's Data Primo( wren t -e detCrIC-FO liar., and state that. the parts referred to 1' r41a deml not ,tugged an Ili /Certifiable of Shop (ntpeCtlon nave bar,• inspected by Tit And that to the best oI my knowledge end bitsel the Manufacturer andfor Me assembler hes constructed Ind assembled this boiler rn act °rdane, wash theepplruble *actions al Ott ASME BOILER AND PRESSURE VESSEL+ CODE. the delct,tsed body wet rnlpeoIecf and subrected to a hydrostatic tett of "„_ ,, , iurr ey signing this Certificate nelihvi the Inspector hot he employer nukes a i, ' +urrAmy, eip,ttttd Or ,mpl,id, conc*ntng the belle, descnblld in this Meatulaclura "s Dale R001011 Pwehe.rnure, itenher the Inti)ectz.,, no, hat employer (hell be liable an any manse, for any pttrtonn+ injury of p'oprv+y damage of a loss of xny %Mna pftmq lawn w Connected wash tilts msoecion pate Commrss•At +s -- Intni � etof Nei • by ' t Flat. 16(9,10,C. anti No WAC 197 -11 -970 DETERMINATION OF NONSIGNIFICANCE Description of Proposal INSTALL NEW INCINERATOR /WASTE -HEAT BOILER Proponent SEATTLE RENDERING WORKS Location of Proposal, including street address, if any 5795 S. 130TH PLACE SEATTLE, WA 98188 Lead Agency: City of Tukwila File No. EPIC -30 -87 (RE: 87- 3 -UCU) The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement ,EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. n �c There is no comment period for this DNS D This DNS is issued under 197 -11- 340(2). Comments must be submitted by . The lead agency will not act on this proposal for 15 days from the date below. Responsible Official Rick Beeler Position /Title Plannin. Director Phone 433 -1846 Address 6200 Southcenter Bouleva d T ,, 98 '8 Date .13 i i� Signature You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written appeal stating the basis of the appeal for specific factual objections. You may be required to bear some of the expenses for an appeal. Copies of the procedures for SEPA appeals are available with the City C1irkfaed uxALA lanning Department. JAN 2`71983 O1,1I11A .1; FM.ONS FORMULA FOR rCULATING MECHANICAL FEES Basic Fee + Unit Fee(s) + Plan Check Fee Basic Fee $15.00 Unit Fee -P_er Unit Fee Schedule, Plan Check Fee`. 25 %'3f total of basic fee and unit fee TOTAL TAKE NO. 34- MECI!1AMICAL MEIIMIT P111 Pent* Itwatece I . For the issuance of each permit 2. For issuing each supplemental permit UM Fee Schedule 1. For the installation or relocation of each faced -air or pevity -type furnace or Winn including ducts and vents attached to such appliance, up to and including 100.000 Btu/h 9.00 2. For the installation of relocation of each finead -air or parity -typo furnace or berms:. including ducts and vents attached to such appliance over 100,000 BtWh 11.00 ✓ 3. For the installation or relocation of each floor furnace, including vent 9.00 4. For the installation or relocation of each suspended lamer, recessed wall hew or flommouneed trait heeler 9.00 S. For the itwallation, relocation or replacement of each applieaa vest installed and not included in an appliance permit 4.50 6. For the repair of, alteration of, or addition to each having appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evapora- tive cooling system, including installation of controls regulated by this code . 9.00 7. For the installation or relocation of each Wilmot eomptemor to and including three horsepower, or each absorption system to and including 100,000 Bluth 9.00 B. For the inwllatioa or relocation of each bailer a gs rover three horsepower to and including IS horsepower, or each aheorptimi system over 100,000 Btulh and including 500.000 Btulh 16.50: 9. For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each @beorptise sows over 300,000 BtWh to and including 1.000.000 BtWh 22.50 10. For the installation or relocation of each boiler Of commoner miff 30 horsepower to and including 50 hosepower, or for each absmption spews ovsf 1.000.000 BtWh to and including 1.750,000 BtWh 33.50 11. For the installation ar relocation of each boiler or whigeretian eonnpresaor horsepower, or each absorption system over 1.750,000 Btteh 12. For each ainarliiag tame to and including 10,000 cubic feet per minute, including ducts attached thereto 6.50 Ni ttta This fee shall not apply to an air-handling unit which is a portion of a factory- assembled appliance, cooling unit. evaporative cooler or absorption unit for which a permit is required elsewhere in this code. 13. For each ai_Madliteg unit over 10,000 cfm 11.00 14. For each svaparati's cools, other than portable type 6.50 13. For each veatilet0 he connected to a single dun 4.50 16. For each ventilation system which is not a portion of any heating or airconditioning system atntbomtad by a permit 6.50 17. For the installation of each hood which is served by mechanical sshaust. including'- the ducts for such hood 6.30 IS. For the installation or relocation of each donaeatie -type inciammor 11.00 19. For the installation or relocation of each commis' or indusuial•ty, factor 20. For each appliance or piece of equipment regulated by this code but het r.lassed in other appliance categories, or for which no other fee is listed in this code.... 6.50 City(- Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 STAFF REPORT to the Planning Commission Prepared January 19, 1988 HEARING DATE: January 28, 1988. FILE NUMBER: 87- 3 -UCU: Seattle Rendering Works APPLICANT :. Seattle Rendering Works REQUEST: Unclassified Use Permit to install an incinerator and . waste -heat boiler to reduce odor emissions from the site. LOCATION: 5795 South 130th Place. ACREAGE: 11.9 acres COMPREHENSIVE PLAN DESIGNATION: Light Industrial. ZONING DISTRICT: SEPA DETERMINATION:' Determination of Non - significance issued on January 13, 1988 (A) Narrative, Description of Proposed Air Pollution. Control System and Operation (8) Picture of Typical Air Pollution Control System (C) Site Plan (D) Elevation STAFF REPORT to the to Planning Commission FINDINGS 8 -UCU: Seattle Rendering Page 2 VICINITY /SITE INFORMATION 1. Existing Development: The applicant's manufacturing plant processes waste - meat and fish by- products which are rendered into feed meal. The adjacent property to the east is Burlington Northern Railroad. The remaining portion of the property is bounded on the north, west, and south by the Duwamish River. 2. Terrain: The buildings are located on flat terrain with the remaining prop- erty sloping to the river. 3. Vegetation: The site has a few deciduous and evergreen trees with black- berry-bushes along the river banks. BACKGROUND Unclassified Use Permits are for the regulation of uses of such unusual, unique or large -scale characteristics. Seattle Rendering Works received previous City approval for improvement of portions of their site. The latest occurred in'' September 1987, when the City approved a permit to build a 12' by 42' metal - frame lean -to addition to the existing processing building. The lean -to was built to enclose a container washing area. Now, an odor emission control system is proposed in response to continuing problems with odors during the summer months. This proposal was approved by Puget Sound Air Pollution Control Agency as an appropriate method to reduce the odors. Following the public hearing, the Planning Commission will make a recommendation to the City Council regarding the proposed project. The City Council may or may not hold a public hearing, but shall consider the planning commission recommen- dation at a regular council meeting. DECISION CRITERIA The applicable Zoning Code criteria are listed below in bold, followed by . pertinent findings of fact. Zoning Code Section 18.66.060 - Criteria, Unclassified Use Permit 1. The proposed use will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity. Residents surrounding this site experience continual problems with odors from this plant, particularly in the summer months. The current air pollu- tion control system does not have the capacity to treat the existing volumes of odors produced. As noted in Attachment A: STAFF REPORT to the r Planning Commission 81 ACU: Seattle Rendering Page 3 "The odorous fumes and vapors that are presently being scrubbed and con- densed in a venturi scrubber and burned in the existing boiler will be relocated to the proposed incinerator for 99% incineration. "The vapors that are presently being ducted to the E.R.C. scrubber will be processed in the wet vapor condenser that is part of-this project with the exception of the vapors from the yellow grease system. They are low inten- sity odors and can be easily processed in the E.R.C. scrubber." 2. The proposed use shall meet or exceed the same standards for parking, land- scaping, yards and other development regulations that are required in the district it will occupy. In a separate permit process (87- 2- 0R/87 -7- EPIC), the applicant received approval to improve the existing gravel parking lot and provide additional landscaping. The proposed incinerator and waste -heat boiler as shown by Attachments C and 0 will comply with setback, parking and other Zoning Code regulations. 3. The proposed development shall be compatible generally with the surrounding land uses. As noted in Attachment A, the proposal is expected to reduce odors emitted from the existing operation. This increases the compatibility of the plant with adjacent neighborhoods. 4. The proposed use shall be in keeping with the goals, objectives, and poli- cies of the comprehensive land use policy plan. Applicable Comprehensive Plan Objective /Policy Objective 5: Policy 1: Strive to improve the qualities of the air to a level condu- cive to a healthy, clean environment. Recognize, encourage and support the efforts of authorized agencies involved in the regulation and control of air pollution. The objective and policy are aimed at improving air quality so that it is fit to breathe and smell, and is not visible. The applicant's proposal complies with the intent of the plan by reducing the odors that are cur- rently being emitted from the plant. The applicant worked with the Puget Sound Air Pollution Control Agency to gain approval of the proposal. 5. All measures shall be taken to minimize the possible adverse impacts which the proposed use may have on the area in which it is located. As noted in previous findings, the proposed incinerator and waste -heat boiler is intended to reduce the odors from the existing plant operations. STAFF REPORT to the Planning. Commission . (I'.' CONCLUSIONS i- UCU:.Seattle Rendering Page 4 1. The applicant is responding to a long - standing issue of odors coming from the 'plant. This equipment, together with locating it towards the railroad tracks, will not be materially detrimental to the public welfare. . The proposed equipment will be located in a structure which will comply with zoning code regulations. ▪ Air quality should improve, in keeping with the Comprehensive Plan. The proposal complies with the five review criteria for an Unclassified Use Permit. RECOMMENDATIONS Based on the 'above Findings and Conclusions, Planning staff recommends that the Planning Commission approve the request for an Unclassified Use Permit to build' an incinerator and waste -heat boiler. (22/87-3-UCU) ATTACHMENT A NARRATIVE DESCRIPTION OF PROPOSED AIR POLLUTION CONTROL SYSTEM AND OPERATION The control system will be in two parts. System No. 1 will collect the hot moist vapors and systtem No. 2 will collect the dry hot fumes. The wet vapor system will collect approximately 4600 cubic feet of vapors per minute and at an average temperature of 184 degrees fahrenheit. These vapors will be transported by ducting to an air to air condenser that will be installed as part of this project. This condenser will have 806 square feet of bare tubing. The tubes are one inch in diameter and have ten aluminum fins per inch and they are two and one quarter inches outside diameter. The hot wet vapors will pass through the tubes, ambient air will be pulled across the outside of the tubes, cooling them as the heat from the hot vapors passes through the wall of the tubes and into the aluminum fins where it will than be transferred into the ambient air as it passes over the fins. It is planned to cool the vapors down to 100 degrees Fahrenheit. As this happens water will be condensed from the vapors. This water will be piped to the water treatment system for processing. The non - condensibles, (the air that will not condense anymore) some 600 cubic feet per minute, at maximum conditions, will be ducted to the proposed incinerator where they will be incinerated along with the fumes from system No. 2. The fumes from systeju No. 2 approximately 2600 cubic feet per minute (at maximum conditions) will pass through a cyclone. The cyclone will separate the majority of the particulate matter prior to-entering the incinerator. The incinerator will be installed first as there will be a 10 to 12 week lead time on the boiler. The incinerator is presently in preparations for installation and will be on job site, in Seat- tle, by November 18. It is designed to incinerate 5000 cubic of air per minute from 80 degrees Fahrenheit to 1200 degrees Fahren- heit and retain the vapors at 1200 degrees for at least .3 seconds before exhausting them through the stack to the atmo- sphere. Phase No. 2 will be to install the new waste heat bcgi; kecii; i m6,1L J AN 2 '7 1908. . The stack gases (hot incinerated air) will then pass through the waste heat boiler, which is a shell and tube heat exchanger. The hot stack gases from the incinerator will pass through the inside . of the tubes. The tubes will be inside a cylindrical shell. Water will be pumped into the shell and flow around the tubes where the heat from the stack gases will be transferred into the water and be heated until it becomes steam. The stack gases will enter the waste heat boiler at 1200 degrees Fahrenheit and discharge to the atmosphere at 450 degrees Fahrenheit. There will not be any fume or vapor generating equipment added to . the plant operation as part of the project. There will be changes made in how the vapors and fumes are processed as listed and described below. 1. There will be a 5000 cubic feet per minute incinerator installed with full intentions of adding to it a waste heat boiler. The odius fumes and vapors that are presently being scrubbed and condensed in a venturi scrubbe and burned in the exist- ing boiler will be relocated to the proposed incinerator for a 99% incineration. The vapors that are presently being ducted to the E.R.C. scrubber will be processed in the wet vapor condenser that is part of the new project, with exceptions of the vapors from the yellow grease system. These vapors contain low intensity odors and can be easily processed in the E.R.C.. scrubber. Two stainless steel vapor recovery systems will be in- stalled, one for hot wet vapors and the second one for dry hot fumes. An air to air condenser will. be installed to condense the hot wet vapors. The non - condensibles (air that will not'. condense any further) will be ducted to the incinerator and and waste heat boiler. The E.R.C. vapor scrubber will continue,.to operate for the purpose of scrubbing any scavenger odors and to provide; vapor scrubbing, for the yellow grease system. ATTACHMENT B TYPICAL ., POLLUTION CONTROL SYSTEM CITY „IAN 6 F- ar.. I 1 - • ",:::. �--'A 1 1 g CC ATTACHMENT C 44 '•� :t: 1 I1 i n, 2 0 z m 1 0 0 3 2 1< •1 V r •ik , t. , • 1 1: 1 if•.••It 1 I\I 3• 1 $ 1 1 1 11 SEATTLE RENOERNKi WORKS RAMS 111r1IrI11 IWRt1, fro. 1111 WORM ROHR. NNM4 r /Y1USTOR Nits 1 111114 MIN 1WNIM SOY Vas MAMBA; MINN 1.MI S40•S U IOCATwl1 P:.ANI PNOfOI *O WAITI -1110 MOILS, AND INCINUATOM L. MIIAI.MMLF4I 11 *. GI+I NI 14 IE'i-..00- i0e,o1C;IJ FS"( IVA Leg couefueR futraioNsixifQ. www METAL Ou Lo 00117114e./ merAL pc444 1 DE Oz-votir yoNa. OUlup, __MeTAL cuRTINIO rivog ELEVAT1 0 012•414 I 14(.9 .L.T. 16101 cAufeb Ogabiel .1■•■■•, ke:Pwr *LeVilirld) kJ kicrT 5:2R coNgaztrAlcakl, 11.1-rEi.rr 41444 11°* WASTE .HEAT BOILER . WIWI for SEATTLE RE • „. 8 tr. Tukwila, Sa, Washino Boulevard' MECHANICAL PERMIT APPLICATION Tukwila, Washlnotnn 011188 (206) - 433 -1849 CITY OF TUKWILA• Building Division CONTROL# $g'G(1frY) Site Address ,-17 95 <(,) �`���� S� -r�,w Suite# Floor# Project Name /Tenant - Q -\- ;'r;LD c2,IJG Valuation of work /0 p/ /-)c, O , 0-0 Assessors Property Owner -: F )63 9s,A3NciA2r 0( i orq Address . / 2 o /:47,-)1A, `,_z ,A c. )l10rs Applicant Address / L( �) N' / 9 Architect /Engineer Address Contractor G - `' License# Account Phonejn-r/A 87 Zip Phone Z /' / -L /7 L /e7 Zip l 8? 7`r ._ Phone kt \1300c) t Address / �a )/ , - / ?3 ,I'j WOOCA/k V1 g )1,0ps Describe work to be done " -c �1r.�a� �n n � T"� S"c7-Z\ t�'a"- i"i'���� Zip Phoneq / - q'?(r) Zip9n)70 BLDG cca� 'pprove' or ssuance gat Approved (Initials) PLNG ' ;m it 4 /3)._12,u 7� pe.t nii-- `795 A \ \12 . }A � L ug Indicate the type of equipment to be installed, rating /size of equipment, and number of each: TYPE . . m R t 'DA. � is - C10'1) F,R .S- a.,Z'�/ DD C) / Two (2) sets of plans must be submitted meeting the application requirements of Section 302(b) and (c), 1985 Uniform Mechanical Code. Roof -top equipment work requires submission of building elevations. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CURRECT AND THAT I HAVE THE PROPERTY ER' UTHORIZATION TO 0 THIS WORK. Applicant /Authorized Agent (signaturelv�� QZ-- Date / a �C (print name) ) j2 (fl ,J 3 �V4 Contact Person (please print) 4F----4, •,r - g. Phone " / -6/-702 O OFFICE USE ONLY FEES: Basic Permit Fee (000/322.100) $ /5.07) Receipt# .23..3 Date Paid 3- -- - Unit Fee (000/322.100) j o /,C,7Z) Receipt# Date Paid Plan Check Fee (000/345.830) Zq,C7D Receipt# Date Paid Other ( / ) Receipt# Date Paid- TOTAL J [ ', 00 (OWES: $ ) ti,S! Ob ) TRACK ' 7 P" 1 1111 [110111 /3)._12,u 7� pe.t nii-- `795