HomeMy WebLinkAboutPermit L92-0088 - GREENBERG FARROW ARCHITECTURE - HOME DEPOT DESIGN REVIEWl92-0088 6810 south 180th street
home depot design review
John W. Rants, Mayor
Department of Community Development Rick Beeler, Director
STAFF REPORT to the BOARD OF ARCHITECTURAL REVIEW
HEARING DATE:
PROJECT:
APPLICANT:
REQUEST:
LOCATION:
ACREAGE:
ZONING:
COMPREHENSIVE
PLAN
DESIGNATION:
SEPA
DETERMINATION:
STAFF:
ATTACHMENTS:
Prepared 1/20/93
-Jani arY 28, 1993
L92 -0088: HOME DEPOT, USA, INC.
Greenberg/Farrow Architects
Board of Architectural Review approval to convert a
former warehouse /distribution facility to a home
improvement retail warehouse. The proposal includes
the demolition of a portion of the existing warehouse
building, the expansion of the front parking lot and the
designation of two building pads for future construction.
Former Frederick & Nelson Distribution Center 6810 S.
180th Street
19.65 Acres
CM, Industrial Park
Light Industrial
L92 -0090, MDNS issued 1/12/93
Carol Proud
A. Applicant's Submittal
B. Color board (to be submitted at hearing)
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
Staff Report to the
Board of Architectural Review
BACKGROUND
1. State Environmental Policy Act
L92 -0088: Home Depot, USA
Page 3
A mitigated determination of nonsignificance (MDNS) was issued for the proposal
on January 13, 1993. Anticipated adverse impacts identified during environmental
review were additional vehicle trips to the site and aesthetic issues associated with
development of the future building pads.
Mitigating measures include establishing a private access easement along the eastern
property line constructed to modified City standards and the option to dedicate the
easement to the City as demand warrants, contributing funds for future street
improvements, and obtaining BAR approval for development of the future building
pads.
2. Shoreline Master Program
Approximately 1,160 linear feet of the eastern property line abuts the Green River.
The first 40 feet of the shoreline zone is designated as a river environment and is
developed with a public trail. Trail parking for 10 vehicles is also located in a portion
of the river environment.
The proposed eastern road and portions of the garden center will be located in the
low impact environment.
Site improvements in the shoreline environment include widening and adding
landscaping area and building an access road with curbing and sidewalks. Since these
improvements exceed the threshold for exempt construction activities the applicant
must obtain a shoreline substantial development permit. Shoreline review and permit
approval is an administrative procedure conducted by the Department of Community
Development with final review and approval administered by the Washington State
Department of Ecology.
Staff reviewed the proposal in light of shoreline use regulations (TMC, Section 18.44),
the policies of the Tukwila Shoreline Master Program and the relevant provisions of
the Washington State Shoreline Management Act.
Specifically, policies related to providing opportunities for the public enjoyment of
the shoreline are applicable to this proposal. As a result, a small picnic area for
public or customer use will be required adjacent to the Christensen trail parking lot.
The proposal meets the relevant shoreline use regulations. Additional screening will
be required adjacent to the rear loading bays.
Staff Report to the L92 -0088: Home Depot, USA
Page 2
Board of Architectural Review
FINDINGS
VICINITY /Si'l'l; INFORMATION
Project Description: The applicant proposes to convert a former
warehouse /distribution facility into a retail warehouse. Approximately half of the
existing building will be demolished. The remaining 149,585 square feet will be
remodeled. A 28,535 square foot garden center will be constructed adjacent to the
east side of the building.
Exterior building changes include new paint, addition of a front entry tower and
loading bay canopy, an extended arcade along the front of the building and a
colonnade wrought iron fence surrounding the garden center along the east side of
the building.
Site improvements include expanding the front parking lot, repaving and restriping
the existing lot, adding raised sidewalks along the parking lot edges and installing
additional perimeter and interior landscaping.
Site Description: The subject property is approximately twenty acres in size and
abuts S. 180th Street to the south, S. Saxon Drive to the north, the Green River to
the east and developed property to the west. Approximately five acres located at
the north end of the property adjacent to S. Saxon Drive will remain undeveloped.
The topography of the site is flat and is currently developed with a 270,000 square
foot building with associated paved parking and maneuvering areas.
S. 180th Street at this location is a five lane minor arterial and provides the primary
access to the site. The eastern driveway is aligned with Sperry Drive S. and is a
signalized intersection. An additional access driveway abuts the west side of the
property. No direct access to the site is provided from S. Saxon Drive.
Surrounding Land Uses: The project is surrounded by recreational, commercial and
industrial park uses. Christensen Trail abuts the east side of the subject property at
the top of the Green River levee. A separate parking lot with 10 stalls dedicated to
the City for trail use is located at the southeast corner. An industrial/office park is
located to the south and the Costco retail warehouse is located directly north.
\?
Staff Report to the
L92 -0088: Home Depot, USA
Board of Architectural Review Page 4
DECISION CRITERIA
Board review criteria are shown below in bold, along with the applicant's response
and staff's summary of relevant facts.
General Review Guidelines (FMC 18.60.050)
1. Relationship of Structure to Site.
(A) The site should be planned to accomplish a desirable transition with the streetscape and to
provide for adequate landscaping and pedestrian movement;
(B) Parking and service areas should be located, designed and screened to moderate the visual
impact of large paved areas;
(C) The height and scale of each building should be considered in relation to its site.
Applicant's Response
"Part of the existing building will be removed to allow additional landscaping, and
existing landscaping are left undisturbed as much as possible. Additional landscaping
are provided along the existing Christensen Trail. Parking lot landscape provided at
one tree per five stalls far exceeds the City standard at one tree per ten stalls. The
height of the existing building remains unchanged. Architectural elements such as
entrance tower, canopy /arcade, and colonnaded decorative fencing are incorporated
to enhance the existing building."
Staff Response
A new sidewalk will be constructed along S. 180th Street. Five foot wide raised
sidewalks will also be installed on both sides of the interior parking lot from 180th
street to the store entrance. Landscape areas are provided along both side yards, the
front yard and interior landscape islands in the parking lot.
Parking and service areas are separated. Delivery loading bays are located at the
rear of the building. Customer parking is located at the front of the building. Front
yard landscaping and interior landscaping are specifically designed to screen parking
areas. Rear loading bays are screened by the garden center fence and landscaping
provided next to the loading area.
The site plan is similar to the former warehouse /distribution use. The remodeled
building will be set back further from S. 180th Street with nearly double the amount
of parking area provided next to the building. Except for the entry tower and pick -up
door facades, the height will remain the same.
Staff Report to the
Board of Architectural Review
2. Relationship of Structure & Site to Adjoining Area.
L92 -0088: Home Depot, USA
Page 5
(A) Ilarmony in texture, line and masses is encouraged;
(B) Appropriate landscape transition to adjoining properties should be provided;
(C) Public buildings and structures should be consistent with the established neighborhood
character,
(D) Compatibility of vehicular and pedestrian circulation patterns and loading facilities in terms of
safety, efficiency and convenience should be encouraged;
(E) Compatibility of on -site vehicular circulation with street circulation should be encouraged.
Applicant's Response
"Existing building will be enhance by new color scheme, accent tile elements, and
emphasized sense of arrival with a entry tower and colonnade. Existing landscaping
will be increased to enhance the Green River environment. Customer and service
vehicular circulation will be separated at opposite end of site to insure safety ".
Staff Response
The project is re- development of an existing site and building, therefore, line and
massing are similar to the previous use. Proposed architectural features will break
up the existing roof line of the front facade.
The landscape strip adjacent to the shoreline will be widened as a result of the
reconfigured access driveway. Additional landscape material will be planted
providing transition to adjoining properties.
Vehicles access the site from two driveways on S. 180th Street. The eastern access
driveway will be constructed to modified street standards with curbing and sidewalk
provided along the full length of the developed portion of the site.
3. Landscape and Site Treatment.
(A) Where existing topographic patterns contribute to beauty and utility of a development, they
should be recognized, preserved and enhanced;
(11) Grades of walks, parking spaces, terraces and other paved areas should promote safety and
provide an inviting and stable appearance;
(C) Landscape treatment should enhance architectural features, strengthen vistas and important
axes, and provide shade;
(D) In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating
steps should be taken;
(E) Where building sites limit planting, the placement of trees or shrubs in paved areas is
encouraged;
(F) Screening of service yards and other places which tend to be unsightly should be accomplished
by the use of walls, fencing, planting or combinations of these. Screening should he effective in
winter and summer,
Staff Report to the L92 -0088: Home Depot, USA
Board of Architectural Review Page 6
(G) In areas where general planting will not prosper, other materials such as fences, walls, and
pavings of wood, brick, stone or gravel may be used;
(H) Exterior lighting; when used, should enhance the building design and the adjoining landscape.
Lighting standards and fixtures should be of a design and size compatible with the building and
adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and
brilliant colors should be avoided.
Applicant's Response
"Existing landscape are left undisturbed as much as possible. All grade slope will be
maintained at a safe level. The landscape is organized in a formal axis to create a
sense of order, arrival and progression. Planting will be protected by curb or planters.
Landscape are provided at building perimeter, at the canopy arcade to create a sense
earthiness. Lighting will be directed to the internal to avoid spillage to adjacent site."
Staff Response
All finished grades of the site will be relatively level, sidewalks will be raised with
handicap access, parking stalls are all standard size with 25 foot wide vehicle
driveways. A curved side walk is proposed adjacent to the eastern driveway.
Interior landscaping includes extended islands at the end of the parking rows and
diamond shape islands interspersed at five stall intervals throughout the lot. All
interior landscaping islands have raised curbs. The garden center will be screened
by an eight foot high fence with five feet of foundation landscaping.
4. Building Design.
(A) Architectural style is not restricted, evaluation of a project should be based on quality of its
design and relationship to surroundings;
(B) Buildings should be to appropriate scale and be in harmony with permanent neighboring
developments;
(C) Building components, such as windows, doors, eaves, and parapets, should have good proportions
and relationship to one another. Building components and ancillary parts shall be consistent with
anticipated life of the structure;
(D) Colors should be harmonious, with bright or brilliant colors used only for accent;
(E) Mechanical equipment or other utility hardware on roof, ground or buildings should be screened
from view;
(F) Exterior lighting should be part of the architectural concept. Fixtures, standards and all exposed
accessories should be harmonious with building design;
(G) Monotony of design in single or multiple building projects should be avoided. Variety of detail,
form and siting should be used to provide visual interest..
Applicant's Response
"The existing building will be aesthetically enhanced by the addition of an entry tower
Staff Report to the L92 -0088: Home Depot, USA
Page 7
Board of Architectural Review
element and a colonnade arcade. the building is accented with color and geometric
shapes. The arcade roof is further divided to solid and void allowing daylight to
create shadow play and airiness. A triangular element at the entry and exit tower
breaks the horizontality and providing an anchoring effect. The garden center
fencing articulates the order of landscape."
Staff Response
The proposal includes arcade, entry tower, fence, exit doors and loading bays that are
proportional with the 25 foot height of the structure. The entry tower will provide
a single focal point for entry to the building and the exit doors will be integrated with
the front facade of the building. The walls will be painted a single light color and the
canopy and columns a contrasting darker color. The accent bands, metal roof trusses
and open metal frames will be painted with bright colors.
HVAC units and satellite dish will be setback from edge roof beyond pedestrian view
from the parking lot, street and top of trail.
5. Miscellaneous Structures & Street Furniture.
A. Miscellaneous structures and street furniture should be designed to be part of the architectural
concept of design and landscape. Materials should be compatible with buildings, scale should be
appropriate, colors should be in harmony with buildings and surroundings, and proportions should
be to scale.
B. Lighting in connection with miscellaneous structures and street furniture should meet the
Applicant's Response
Utility enclosure are designed as part of the building structure evoking the same
architectural language as the building.
Staff Response
Staff agrees with applicant's response.
CONCLUSIONS
General Review Criteria
1. Relationship of Structure to Site.
The Relationship of structures to the site is appropriate, given the former and proposed
uses. Service areas are appropriately located and screened to minimize their impact. Parking
Staff Report to the
Board of Architectural Review
L92 -0088: Home Depot, USA
Page 8
lot landscaping moderates the large expanse of pavement. Proposed 15 foot front yard
landscape strip provides transition to the streetscape. Circulation patterns are appropriately
designed.
2. Relationship of Structure & Site to Adjoining Area.
Since the project is a remodel of an existing building, mass of the structure will remain the
same. Enhanced architectural features will provide harmony in texture and line. New
sidewallcs, front -yard and shoreline landscaping will provide appropriate transition to
adjoining properties and neighborhood. The separation of service and customer activities
provide safe and efficient circulation throughout the site.
The eastern private access easement developed to public street standards and the signalized
intersection will insure compatibility with street circulation. Additional screening of loading
activities at the rear of the building for adjacent trail users could be improved by providing
a berm in conjunction with the proposed landscaping area adjacent to the loading bays.
3. Landscaping and Site Treatment
It is apparent that considerable thought and detail has been applied to the landscaping and
site treatment for this project. The applicant has provided a high quality landscape plan.
Proposed landscape exceeds minimum code requirements in most areas and more than
adequately buffers paved areas, providing screening and adding visual interest to the project.
An oversight would be the lack of side yard landscaping provided along the western property
line. The code requires a minimum of five foot strip be provided along the entire length of
the developed portion of the property. A minor revision to improve pedestrian circulation
would be to realign the curving sidewalk adjacent to the eastern access driveway and place
it parallel to the curb edge. Functionally, this would allow easier exiting from parked cars
and visually would give the appearance of a street scape.
4. Building Design
The applicant has provided a variety of detail with variation of color scheme, roof line,
texture and material. The contrasting design of the entry tower with its higher elevation
provides a focal point for entering the building. The wrought iron fence with alternating
columns surrounding the garden center will provide a more traditional or classic appearance
than typical screening for outside storage areas and also provides a layering effect by
breaking up the long expansive wall at the east side of the building. The proposed color
scheme is consistent with design criteria. Exterior lighting fixtures are functional but
unobtrusive and are compatible with the building design.
�.�
".
•
Staff Report to the L92 -0088: Home Depot, USA
Board of Architectural Review
5. Miscellaneous Structures & Street Furniture.
Page 9
The applicant will provide design and furnishings that meet Park Department standards and
are compatible with adjacent shoreline public amenity. Since the proposal is an auto -
oriented use no other furnishings are provided.
In conclusion, The Home Depot project meets the Design Review criteria with the addition
of a minor modification to sidewalk alignment, additional berming adjacent to the rear
loading bay and sideyard landscaping per minimum code requirements as previously
discussed.
RECOMMENDATIONS
Staff recommends that the Home Depot project be approved, subject to the following
conditions:
1. The applicant shall realign the proposed curved sidewalk parallel to the curb line of
the eastern access driveway.
In addition to the proposed landscaping, the applicant shall provide a berm with a
minimum three foot height and 3 to 1 sideslope adjacent to the rear loading bays at
the northeast corner of the building.
3. The applicant shall provide a minimum 5 foot landscaping along the entire length of
developed portion of the western property line.
IAZ-0088
RECEIVED
JAN 1 91993
COMMUNITY
DEVELOPMENT
NC.
GAG FARROW
171141 ATOM Nom
and Rix*
CAUNINA VD 14
MY 714406.7440
Loan. J. Fs M041k.T
A.O�I�G711� RANI
THE HOME DEPOT
6810 S.180th STREET
TUKW ILA, WASH 1 NGTON
DEVELOPMENT PLAN
JANUARY 1993
GREEteERG. FA ow
y
71MfiWM°
10.1171•410,4*-
LAINI4M,MINO MOINIR
Ma 11110111112' sumo.
-ow: mu num flux
Mak Int Wan
1-1
1 •
nu+. Mai PIPPO
FUNS NINO MIDI PIO OM
n PM moan ••2 '
cnItunu ILlaaNID Lana
PPM CUL Ma
PO 11-
aka =Papa RAM
S-3
.r-r
sunup warp pa Oa In, a34
also mall SO ma Man /Iwo
aan maw
111111=111171•1=11.1. IEZENNO
VESTIBULE VESTIBULES
1.17-1=rra—All. •
_ __ _ _ _ _ _ _ _ _
OPEN CANOPY ABOVE OPEN CANOPY ABOVE
SOUTH ELEVATION IWITH PARTIAL FLOOR PLAN) SCALE: 1,11* • r•o*
Mat man Rom K Inc MU
vsgerrwirmoviror wrffigrirwrirliv
, .111111111111111111111111111111111111 111, 111111 1 1 1 111111111111111111,111111 1
MINIM =id I i I
vror.r.«. '"
EAST ELEVATION SCALE: 1/16' c-0*
eri; •
NORTH ELEVATION SCALE 916•- r-cr
THE HOME DEPOT
TUKWILA, WA
S. 180TH ST. AND JAMES CHRISTENSON RD.
GouratFEeiow
91088.02
ELEVATIONS
12/23/22
W-18g OD
In wan K mall maw MUM I 111111.01.1M
-t
• ' ' '." . • • ' ' ' " "
WEST ELEVATION SCALE 1/16• .1.-0'
=
3.2
1M13. Ed la
AlCt
-1/4-1 it
• .4
1/11R, • • -11N1
tp
IVP.1?-11111,M1AR
-of
THE HOME DEPOT
TUKWILA, WASHINGTON
GREENBERG FARROW
91088
1/11/93
THE HOME DEPOT
TUKWILA, WASHINGTON
GREENBERG FARROW
-•• ..• •
I -• • .
91088 1/11/93
SAXON DRIVE
SOUTH IeOth STREET
SITE PLAN
SECTION 1-1
SECTION M5
.,1
f
U.
- -r MANN
olor woo
1_ 1.«
0001 Adm. 1.00 N.4.11•AMMOMAY 1.74
1 .....rr Y.
za'.."
JSILT1014 A A
51,c1101.1 D•D
eCC1 C -e
THE HOME DEPOT
TUKWILA, WA
GEUJEUG PJ1uQY
v.
NOME DEPOT
SALES AREA
SITE SECTION
r•.r•r,
.Oa o. rain..
WOG III ITYPJ
MW WWII.
= Yi =IYII .IM
•�--- RMKINO AREA —
NOME DEPOT
{ALES MEA
_ au 11.1
.TAMES CNNSTENSEN RO.
tiI
r‘7.
SITE SECTION
zL LE
�L I WAMWOTON 'D
7191E MINE {PM
3 00- ITO UROELP wARENOUSE.
BUILDING SIGNAGE WWII»
1111
S•111' SIGN • 310 W
3411' CAN WON • 174 SF
4. J 1
1101 �1111'I�
WALL SIGN WWII r
IONNTED TOWARD WEST lour/ NWTJ
44IS• sax • »1M
PYLON SIGN r.tiT
f. W WI.
1S STN smart
--- -- .
amity
W ELDING SECTION AND
S WLDNNO SUMAC! PON
THE HOME DEPOT
TUKIIIILA, MMORNDTON
G
Nr,NN..G FAU V
I.
aIIYI. III
R PALETTE
THE HOME DEPOT U.S.A., INC.
TUKW I LA, WASH 1 NGTON
Weisman Design Group
2329 East Madison Ave
Seattle, WA 98112
tir PIVOG
SP I
GREENBERG FARROW
wortm■ 1/..N.14
Alt(1 411 01‘,1C7
HOME DEPOT USA,, NC. 91000
SOUTH 10011,1 JAMES C114STE■IFIN ROAD
T1B:M9.LA, WASEIC K. TON
T UKWILA
FLOOR MAN
11,11.W14ARY
TOMO slyi 14014. CB 1.44..7.11,40
rolamra r0,11
EXISTING Y
THE HOME DEPOT U.S.A., INC.
TUKWILA, WASHINGTON
G ARROW
01111•411110 *NOW
IMO MIN •
IL n «mss..._
t1saMw. MOMS,
if' H
U r. •
CO5T CO
;ii
m
m
z
-N-
if 1 a1 •... •
>1,
if: HI
141
SOUTH 180TH STREET
TOPOGRAPHIC SURVEY FOR
HOME DEPOT U.S.A. INC.
PROJECT LOCATION
1'011tlll fMEDM1fCII £ NUM TU WLA II■IbMOT0SI
81—TA
O—pft E'.
m
RUSH. ROED L HITCHING$. INC.
CM ENGINEERS • IMO &AVETORS
1.11011•01•4 141/ •4110.1 OA NW
Pr.wi•
MIDGE
I,IIP
Nu ,
I (4 11 E1 {.;:6I Itil
1 "i ''I!ieppa;adiris 1
ib> t�iaJ h iIIILI
11
ilk
L.
GREENBERG FARROW
GAROEWG FARROW MOADCMf WXY ORA1W
17941 Rum ROM
lid Roan
PAO, CAIFORU tti14
1$ 714-9987444
FM 714 - 9887440
Worn J. FNpow MoIT CT
AR4i SC lli RJWN6
THE HOME DEPOT U.S.A., INC.
TUKWILA, WASHINGTON
EXIST ING V IEWS James Christsnssn Rood
GREENBERG FARROW
FAMOW A110ATCM6 WCOIPORATW
17941 RTCN ROAD
aid 8.0011
INK CMPC 1A 91714
111 714-899 -7444
FA% 714-689 -7440
tAWY. J. FA.1OW AAWT3CT
AR6ITSC1Ui RA N1G
r
THE HOME DEPOT I.S.A., INC.
TUKW I LA, WASHINGTON
EXISTING V IEWS Viols From West
GREENBERG F,ow
QwYB10 FAMOW Ar H1iCr1N Np[.POIUTm
17941 RTO4 ROAD
2,81 Roll
M+., CALPO.N /2714
n 714-039-7444
FAX 714.889 -7440
Wan. J, FN.ow Ara-rtscr
Anciascrum R+wao
THE HOME DEPOT U. ''.A., I NC.
TUKWILA, WASHINGTON
k`IS1 /NGVIC-WS Saxon Drive
GREENBERG FARROW
G+Wd1G FMK1w AAOfT CTUIe )NXXIPOL Tit
17941 FITUi NO 4
2nd Rnon
WK. CMJ C t4A 92/i •
III 711•B99 -7444
FAX 714-999-7110
LAM'. J. FANgw Pw. ni .T
AAQHFTSCILPS RNKG
993
City of Tukwila
Department of Community Development
Mr. Francis Chu
Greenberg Farrow
17941 Fitch Road
Second Floor
Irvine, CA 92714
Subject: Home Depot - Proposed Exterior Modification
Dear Francis:
John W. Rants, Mayor
Rick Beeler, Director
In response to your letter of February 19, 1993, the Department of Community Development can
administratively approve the Porte - Cochere proposed to extend from the canopy over the driveway on the
south face of the building.
This letter also serves as a statement of approval for the Porte - Cochere as shown on the drawing dated
12/23/92 and as described in your February 19 letter which indicates materials, colors and accents would
be architecturally compatible with the design approved by the Board of Architectural Review (L92- 0088).
The administrative approval is based upon the following:
1. The Port- Cochere would not significantly alter the visual appearance of the south elevation;
2. The Port- Cochere would provide weather protection to customer vehicles during loading;
3. The structure would not interfere with vehicle maneuvering areas.
Feel free to contact me at 431 -3663 if you have further questions concerning this matter.
Sincerely,
Denni Shefrin
Associate Planner
cc: File #L92 -0088 (Design Review)
Mark Miller
. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
•:
17941 Frio >•v)
SEcnNr 11 uc )R
CAUfc)RNIA 9271.4
TN 714- 833 -7444
FAx 714- 83:3 -74 -4o
LARRY J. FARROW, ARCFIIIECT
ARCHITECTURE • PLANNING
RECEIVED
FEB 2 21993
COMMUNITY
DEVELOPMENT
On behalf of Home Depot U.S.A., Inc., we request an administrative approval of
an elevation /site plan modification for the above referenced project. The Home
Depot propose to provide a Porte - Cochere extending from the canopy over the
driveway that shelters customers from severe weather while loading bulky
merchandise into their vehicles.
We have architecturally integrated the Porte - Cochere with the low canopy arcade,
utilizing the same architectural elements such as the accent band and tiles. It
is intended to blend in with the low canopy so that it does not create confusion
with the main entrance element or affect the elevation as approved by the BAR on
1/28/93.
We request an administrative approval so that we may incorporate these changes
on our Building Permit Application. Please note that this elevation /site plan
modification request shall be considered as a separate agenda. The decision on
this modification shall in no way delay our Building Permit Application. If you
shall require additional prints of the site plan and elevations, I delivered them
on Wednesday, February 17, 1993, or have any questions, please call me.
Sincerely,
GREENBERG FARROW ARCHITECTURE
E�
Franp- s—Chir
FC:kkc
FC93019
cc: Jeff Nichols, Home Depot
Mark Miller, Mark Miller Consultants, w /encl.
File /91088.02 /Planning
M,MRpueD 3)41q3
0.
GREENBERG FARROW ARCHITECTURE INCORPORATED ATLANTA Los ANGELES NEW YORK
City of Tukwila
John W. Rants, Mayor
Department of Community Development Rick Beeler, Director
NOTICE OF DECISION
tJarivary 29 `99.3'
Francis Chu
Greenberg Farrow Architecture
17941 Fitch Road, 2nd Flr.
Irvine, CA 92714
RE:• Notice of Decision by the Board of Architectural Review
File Number: L92- 0088' (HOME DEPOT, USA, INC.)
This is to confirm that the Board of Architectural Review (BAR)
approved the project's design as presented on January 28, 1993.
The BAR also adopted the findings, conclus$ons and conditions
contained in the Staff Report dated January 1, 1993.
Any changes to the specific design approved by the BAR•will require
BAR approval. This includes any significant changes to the site
that may arise as a result of the pending SEPA appeal before the
Tukwila City Council. Minor, incidental changes may be
administratively approved by the Director of Community Development.
The decision of the Bar is not final until the appeal period has
elapsed, which is ten calendar days after the above date of the
decision. Appeals must be filed in writing to the City Clerk by
5:00 p.m. on the final day of the appeal period. Where the final
day of an appeal period falls on a weekend or holiday the appeal
period will be extended to 5:00 p.m. on the next work day.
If you should have any questions regarding this project please feel
free to write or call.
Sincerely,
Carol Proud
Associate Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax. (206) 431-3665
+.:,.
�, ;.
L92 -0088: Home Depot, USA, Inc.
CONDITIONS
1. * The applicant shall realign the proposed curved sidewalk
parallel to the curb line of the eastern access driveway.
2. In addition to the proposed landscaping, the applicant shall
provide a 'berm with a minimum three foot height and 3 to 1
sideslope adjacent to the rear loading bays at the northeast
corner of the building.
3. The applicant shall provide a minimum 5 foot landscaping along
the entire length of the developed portion of the western
property line.
City of Tukwila
John W. Rants, Mayor
Department of Community Development Rick Beeler, Director
PLANNING COMMISSION
MINUTES
`s`JANUARY.'28, -1993
The meeting was called to order by Chairman Malina at 8:00 p.m. Members present were
Messrs. Malina, Haggerton, Meryhew and Flesher. Representing the staff were Jack Pace,
Carol Proud and Sylvia Schnug.
ELECTION OF OFFICERS:
JIM HAGGERTON MOVED TO NOMINATE VERN MERYHEW FOR TILE CHAIRMAN
OF THE 1993 PLANNING COMMISSION. MR. FLESHER SECONDED THE MOTION
AND THE MOTION WAS UNANIMOUSLY APPROVED.
JACK FLESHER MOVED TO NOMINATE JERRY KNUDSON FOR THE VICE
CHAIRMAN OF THE 1993 PLANNING COMMISSION. MR. HAGGERTON SECONDED
THE MOTION AND THE MOTION WAS UNANIMOUSLY APPROVED.
There were no citizen's comments.
With regard to the minutes of December 15, 1992; George Malina said that although he
wasn't at that meeting, he would have to concur with the other members of the Commission
regarding the Hearing Examiner topic. He went on to say that he would send a letter to
Allen Ekberg stating the Commission's direction regarding the hearing examiner system.
Jim Haggerton thanked the Planning Commission Secretary for the amount of detail which
is included in the Planning Commission minutes. The minutes are better now than they have
been in years past.
Mr. Meryhew agreed with Mr. Haggerton's comments.
MR. MALINA MOVED TO APPROVE THE MINUTES OF DECEMBER 15, 1992; MR.
HAGGERTON SECONDED THE MOTION AND THE MOTION WAS UNANIMOUSLY
APPROVED.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
Planning Commission Minutes Page 2
January 28, 1993
L92 -0088: Home Depot, USA, Inc.
Carol Proud presented the staff report. Carol entered into the record the staff report. She
also referred to Attachment "A" of the staff report. The site is approximately 20 acres,
located on the north side of S. 180th St. It's currently developed with a 270,000 sq. ft.
warehouse building, formerly the Frederick & Nelson Retail Distribution facility.
The property is next to the Green River and the Christianson Trail, therefore Shoreline
Master Program approval is required for any redevelopment of this property. The south
side of the property fronts the Costco warehouse facility. There are two driveways for the
property off of S. 180th. The eastern driveway is a signalized intersection that aligns with.
Sperry Drive.
As a result of environmental review of this project, there are a few mitigating measures that
were attached to the project. These deal with the applicant providing a 30' wide private
access easement along the eastern property line that extends from S. 180th to Saxon Drive.
Another condition requires that this easement be constructed to comply with modified City
standards and that they are going to provide raised sidewalks, curbs, etc. along the property
line. Also, at some future date, as traffic demand warrants, there is an option that if the
City so desires, the applicant will turn the easement over to the City at no cost.
The SEPA decision has been appealed by a local property owner. The issue they felt wasn't
adequately addressed in SEPA, has to do with the increase in traffic. They felt the traffic
study didn't address a few issues with regard to traffic flow and how to control the increase
in traffic. The applicant has agreed to pay nearly $250,000 in impact fees associated with
the proposal. Appeal will be heard by the City Council on February 16, 1993.
The applicant is providing additional landscape areas along the eastern property line. They
are also proposing to pull back the edge of the paved roadway so there will be less of an
asphalt surface next to the shoreline area. The applicant is providing a small patio /picnic
area next to the Christianson Trail property. Sidewalks will be increased and a direct
pedestrian path will be added to the patio area.
The loading doors have been moved to the north side of the building and additional
screening has been provided. The remodel of the building will include tearing down nearly
1/2 of the building which will increase the amount of parking area. To mitigate the
additional parking, the landscape islands along the parking rows will be a diamond shape
and have enhanced landscaping. Separated pedestrian pathways through the site will be
added along the western property line.
Mr. Meryhew asked if there was a sidewalk along the south side of 180th.
Staff said that there is a sidewalk. Deliveries will be made on the east side of the property
f ..
Planning Commission Minutes
January 28, 1993
and separated from customer traffic. There are two undeveloped building pads on the south
side of the property. As a result of SEPA, any development of those pads will have to come
before the Board of Architectural Review for design approval.
Page 3
The existing building is a concrete /tilt -up, with a very flat roof. The applicant has added
considerable detail. They've added contrasting, bright colors, and an entry tower that breaks
up the roof -line and provides a focal point for customers coming into the site.
They've also added an arcade that will stand out about 6 -8 feet and will break up the
continuous line of the front facade. On the .east side of the building, the applicant has
proposed a garden center that will be approximately 28,000 sq. ft. Around the garden center
will be columns and wrought iron fencing. Next to that will be 5 feet of landscaping.
Staff recommends approval of the project subject to a few conditions:
1. Providing additional berming or screening next to the loading bay;
2. Straightening the alignment of the sidewalk adjacent to the eastern access isle to
provide more of a street look next to the parallel parking;
3. Adding 5 feet of sideyard landscaping along the western property line.
In conclusion, staff has tried to look at the long term effects of this project by identifying
traffic and circulation needs. 'It's staff's understanding that the applicant agrees to all of the
recommendations and staff has appreciated the willingness that Home Depot has displayed
in working with the City to resolve a few difficult issues with regard to traffic and shoreline
issues.
Mr. Malina asked if the applicant has provided a maintenance /irrigation plan for the
additional landscaping.
Staff said that it was their understanding that they would be including an irrigation system
that will run the full length of the parking rows and be on a timer.
Mr. Malina asked if they have provided staff with a maintenance schedule or maintenance
plan.
Staff said that they have not submitted a maintenance plan as yet but it should be included
with the building permit submittal.
Mr. Malina asked if the satellite dish on the roof would be screened.
Staff said that the satellite would be located far enough back that it will not be seen by
anyone on the ground.
Planning Commission Minutes Page 4
January 28, 1993
Mr. Malina asked what will happen to the two vacant pads until they are developed.
Staff indicated that the western pad is currently completely landscaped and was formerly a
picnic area for the former employees. That pad will be cleaned up and trimmed and will
remain as is. The eastern pad will be planted with sod until a tenant can be found.
Mr: Malina asked if the Commission would be reviewing the signage for this project.
Staff' indicated that they have.. submitted for signage and it meets the criteria of the Sign
:Code:
Mr. Haggerton asked if anything special was going to be done at the western entrance.
Staff said that the Public Works Department will require a "right in and "right out" only at
that entrance.
Mr. Malina asked if the Fire Department has any problems with the turn- around or fire
access for the project.
Staff stated that the Fire Department has reviewed the project and they are in complete
concurrence. They will be requiring that certain areas be striped for fire access only.
Mr. Meryhew asked if there will be access to Costco from this project.
Staff said that there is not access at this time, however in the future that may change.
Mark Miller, 10801 Main Street, Suite 100, Bellevue:
Mr. Miller introduced the project team and said that they would answer any questions the
Planning Commission may have.
Mr. Malina asked if they have provided a maintenance plan for the landscaping.
Mr. Weisman said that this project will be designed using water conserving plants and water
conserving irrigation system. The amount of lawn will be minimized because it is the biggest
water user and the first thing to turn brown during a draught. The soils will be improved
so that there is water holding capability in the soil.
Mr. Malina asked if they would be making recommendations as far as what is planted in the
two vacant pads until they are developed.
Mr. Weisman said that if a user is not chosen for the pads by the time this project is
developed, they will use a rough seeding method to provide erosion control and
Planning Commission Minutes
January 28, 1993
sedimentation control. The landscaping that is done there will be consistent with the rest
of the project.
Page 5
Mr. Malina asked what they plan to do if some of the plants die.
Mr. Weisman said that all of the landscape material will have a one year guarantee and they
will be involved in site observation as the material is installed. A punch list will be
completed to verify that materials have been installed correctly and are receiving adequate
water.
Mr. Meryhew said that most of the conditions required of staff have to do with landscaping
and asked if they have any problems with those conditions.
Mr. Nichols said they do not have a problem with those conditions and they can easily be
incorporated into the existing landscape plan.
Mr. Haggerton said that he was concerned with the traffic congestion at the west entrance.
Mr. Malina asked if a traffic study has been completed.
Sherman Gong, Entranco Engineers:
He stated that a traffic study has been completed and was submitted as part of the
application.
Jack Pace clarified that the SEPA Official's decision is being appealed to the City Council,
not the findings of Entranco Engineers.
Jim Haggerton asked if this project diminished the amount of parking available for the trail.
Staff said that it does not, and the project exceeds the parking requirements.
Vern Meryhew closed the. public hearing at 8:45 p.m.
Vern Meryhew said that his biggest concern deals with traffic congestion.
Mr. Malina said his concern deals with truck delivery times. He said that he worries about
the safety of semi - trucks turning into the site during peak traffic. He went on to say that
he hoped the Code Enforcement Officer could monitor the truck traffic if it poses a problem
in the future.
MR. MALINA MOVED TO APPROVE L92 -0088: HOME DEPOT, BASED UPON THE
FINDINGS, CONCLUSIONS AND RECOMMENDATION OF THE STAFF REPORT; AND
.rF . .^+a« .
• •
•
Planning Commission Minutes Page 6
January 28, 1993
CONTINGENT UPON THE CITY COUNCIL'S RESOLUTION OF THE SEPA APPEAL.
MR. FLESHER SECONDED THE MOTION AND THE MOTION WAS UNANIMOUSLY
APPROVED.
Mr. Meryhew called for a ten minute recess.
After reconvening, Jack Pace provided a presentation on Community Image and staffs field
trip to Burnaby, Canada.
Mr. Meryhew adjourned the meeting.
Prepared By,
Sylvia Schnug, Administrative Secretary
GREENBERG FARROW
TRANSMITTAL
PROJECT
TO
.+.....wwwewwrwNHer wN IMM* 111, f1.10,13$4.1,21.11,1411MMi2
17941 FITCH ROAD
SECOND FLOOR
IRVINE, CALIFORNIA 92714
TEL 714-833-7444
FAX 714 - 833 -7440
• LARRY f. FARROW, ARCHITECT
ARCHITECTURE • PLANNING
The Home Depot DATE
po 1 1 .25:92
Tukwila, Wash. BY
City of Tukwila Planning Department
6300 Southcenter Blvd., #100
Tukwila, WA 98188
Attn: Carol Proud
WE ARE SENDING YOU THE FOLLOWING
QUANTITY
(7) Seven Sets Each
DATES
SHEET NUMBERS
SIZE
a. "LUMARK" wall pak
250w on bldg. walls
70w on truck loading wall
b. "McGRAW EDISON" parking lot
400w at 25' -0" above finish grade
ACTION REQUESTED
** Exterior lighting fixtures for your information.
GREENBERG FARROW ARCHITECTURE INCORPORATED
J E Francis
V ENCLOSED
O SEPARATE COVER
O MAIL
Ciri111"-EXPRESS
O MESSENGER
O BY HAND
O BLUEPRINTER
O YOUR FAX NUMBER
PRINT
O ORIGINAL
O REPRODUCIBLE
O SHOP DRAWING
O SPECIFICATION
O SAMPLE
O CORRESPONDENCE
O MODEL
O RENDERING
O PHOTOGRAPH
O CADD DISC
RECEIVED
NOV 3 01992
COMMUNITY
DEVELOPMENT
DO NOT SCALE DRAWINGS
` �k;• 1��: i4" �' �il:< �!:, ti:'sr:wa'.xi:��..,........::�r, u,,,.j;e�s::,:.�o;.., ,.....,.. -�
t-
z
0
J
—J
WAL-PAK
Wall Mount
Ordering Information
Catalog Number Logic
Applications
Wal -Pak provides efficient
Illumination in a rugged
die -cast aluminum housing
for lasting performance.
Easy to install, Wal -Pak
complements any
environment and is ideal
for loading docks,
underpasses, offices,
vehicle ramps and schools.
d AO WATT
HPS /MH /MV
Dimensions
15
10 +h
»I144
1
Lamp
TIM*
Refractor
Product Lamp
Family Wattage/Base Y
HP =HPS W- Borosilicate Glass L =WaI -Pak 50=50W /Mogul
MH =Met. Hal. P= Polycarbonate 70 =70W /Mogul
MV =Merc. 75=75W /Mogul
100 =100W /Mogu
150 =150W /Mogu
175 =175W /Mogu
200 =200W /Mogu
250 =250W /Mogu
400=400W /Mogu
Catalog' Lamp' Lamp Ballast Net. WL
Number Type Wattage Type (Lbs.)
HPWL -50 HPS 50 HPF 32
HPWL -70 HPS 70 HPF 35
HPWL -100 HPS 100 HPF 35
HPWL -150' HPS 150 HPF 35
HPWL -200 HPS 200 HPF 35
HPWL -250 HPS 250 HPF 37
HPWL -400 HPS 400 HPF 42
MHWL -175 MH 175 HPF 33
MHWL -250 MH 250 HPF 36
MHWL -400 MH 400 HPF 39
MVWL -50 Merc. 50 HPF 33
MVWL -75 Merc. 75 HPF 33
MVWL -100 Merc. 100 HPF 33
MVWL -175 Merc. 175 HPF 33
MVWL -250 Merc. 250 HPF 33
1 Add desired voltage to end of catalog number 120, 208, 240, 277 or 480 Volt.
2 Standard lamp is mogul base. Not included.
3 Uses S•55 (55 Volt) lamp only.
LUMARK
120 =120
2r:- r
240=2
277 -
4:r-
I
Y
RECEIV
NOV 3 0199
COMMUNIT
DEVELOPME
•••
?:.
pesign Features
34" NPT threaded hub
High power factor ballast with Class H
Insulation. Minimum starting temperature
is -40°C for HPS and -20°C for MH
Rugged die-cast aluminum housing is
finished in dark bronze polyester
powder coat enamel
Field-adjustable mogul base screw-shell
socket provides two beam patterns
Lena assembly hinged at bottom for easy
installation and relamping
Stainless steel captive screw
Closed-cell, gas-filled high-temperature
silicone gasket—UL listed for
wet locations
Impact-resistant borosilicate prismatic
glass or polycarbonate refractor
Mounting plate detail
Photometrics
WL-1
Catalog Number HPWL-250
250-Watt LIPS
30,000-Lumen Clear Lame
VILA
Catalog Number MHWL-250
2504Natt Metal Halide
19.500.1umen Clear Lamp
—
I C.
Access
43/40
Outlet Bo.
2 3/is•
4. to bottom of
housing
Three Afel• OW.
M Holes
5
4
3
2
0
mnsil
mom
amPram,
imommiri
Imme-L°
5 4 3 2 1 1 2 3 4 5 2
2 3 4 5
6
5
Footcandle Table
Mounting
Height A BC DE
4 10' 000 4 00 2 00 1 00 050
15' 5.: 71 0 89 0 44 017
3
20' ; 00 1 00 0 50 0 20 0 10
2 75' 00 5b4 03? 016 006
2
6
Footcandle Table
Mounting
Height A BC DE
4 10 5 00 6 00 2.00 1 00 050
15' 154 7 / 089 044 0 1 /
20' 00 1 00 0 50 0 25 0 10
2 75' ' 21; 1) 64 03? 0 16 0 06
0
LUMARK
r-
0
-1
85
McGRAW - EDISON
70 -400 Watt
S Architectural Area Light
I II
Concourse III is the most versatile, functionally
designed, universally adaptable outdoor lighting
available. Through a variety of mounting styles,
it offers a family of low profile sharp cutoff
luminaires that make optimum use of today's
high output HID sources.
Uniform in appearance and compact in size, this
single piece soft - cornered cast aluminum
housing offers the designer a unique
opportunity in lighting flexibility for all outdoor
applications. Enhancing natural landscapes as
well as cityscapes, Concourse III brings
outstanding performance and style to
walkways, parking lots, roadways, loading
docks, building areas, and any security lighting
application.
Design Features
Designed for single or multiple units on square
or round poles, side or top mounting with low to
high level lighting, perimeter or median patterns
of light, undirectional or multidirectional rotation
of optical distribution, mast arm or architecturally
.- 14 lib' --.
193,4'
6 114' (Square Pole)
6 318' (Round Pole)
5 5,8'
styled mounting brackets, metal halide or high
pressure sodium lamp types, Concourse Ill is the
most completely coordinated lighting concept in
the industry.
7Wo spring -steel quick release latches on housing for
easy opening, closing or complete removal of door
without the use of tools.
Porcelain screw shell type lamp socket with spring-
", loaded center contact. (Metal halide supplied with
position- oriented mogul base.)
9
One - piece, die-cast aluminum housing features
aesthetically pleasing soft -corner design.
Architectural dark bronze polyester powder coat
finish.
Closed cell gas - filled high temperature silicone
gasketing. Completely seals optical system from dirt,
bugs, or other foreign material.
One -piece hydroformed finished aluminum reflectors
provide five different optical distributions and sharp
cutoff control.
Universal mounting clamp concealed In housing fits
1 112' to 2 318. O.D. horizontal tenons without
requiring adapters or rearrangement of component
parts. Provides a +6 ° vertical leveling adjustment.
Easily removable high power factor multi-tap HID
ballast._ (standard) ,, Y
Integral hinges'pnvent door'roaking and optimlzse •
• sealing capabilities. Lens is thermal shock and •
Impact - resistant clear tempered glass.
OW/UNill
DEVELOPMENT
Photometrics
CS -1
Catalog Number CS7252
250 -Watt HPS Design 20
30,000 Lumen Clear Lamp
4
3
2
0 1 2 3
4
2
4
Lateral and, Longitudinal
istance in Units of Mounting Heights
CS -2
Catalog Plumber CS7253
250 -Watt HPS Design 22
30,000 Lumen Clear Lamp
•
CS-3
Catalog Number CS7252
250 -Watt HPS Design 30
30,000 Lumen Clear Lamp
i ova K
FASINKON
4 3 2
0
2 3
0
2
3
4
4
CS -4
Catalog Number CS7254
250 -Watt HPS Design 40
30,000 Lumen Clear Lamp
MEM
_A' WM.
ii mi'®
!LINEW
4 3
2 1 0
2
3
4
2
3
4
5
CS -5
Catalog Number CS7255
250 -Watt HPS Design 50
30,000 Lumen Clear Lamp
4 3 2
0
2
4
4
Footcandle Table for
Isofootcandle Charts
Select mounting height and read across for
isofootcandle values of each isofootcandle line.
Mounting Isofootcandle Line
Height A B C D E
15' 6.6 3.3 1.4
20' 3.7 1.9 0.8
25' 2.4 1.2 0.5
30' 1.7 0.8 0.3
Lamp Proration
For 400 Watt clear HPS multiply footcandle
readings by 1.67.
0.6
0.3
0.2
0.1
0.3
0.2
0.1
0.1
CS -6
Catalog Number CS7152
250 -Watt Metal Halide Design 20
23,000 Lumen Clear Lamp
IrfAMANIMI
4 3 2
0
2 3
4
3
2
0
2
3
4
4
CS -7
Catalog Number CS7153
250 -Watt Metal Halide Design 22
23,000 Lumen Clear Lamp
Argramiik
uffrarommow
4 3 2
0
2 3
4
4
CS -8
Catalog Number CS7152
250 -Watt Metal Halide Design 30
23,000 Lumen Clear Lamp
■/ %'es'\.
menttsal
IMPAILINFANK
ra iTM II ED
4 3 2
0
2 3
4
3
2
3
4
4
CS -9
Catalog Number CS7154
250 -Watt Metal Halide Design 40
23,000 Lumen Clear Lamp
IMO
MM. Falb
IIL���,1
4 3 2
0
2
3
0
3
4
5
4
CS -10
Catalog Number CS7155
250 -Watt Metal Halide Design 50
23,000 Lumen Clear Lamp
4 3 2
0
2 3
4
Footcandle Table for
Isofootcandle Charts
Select mounting height and read across for
isofootcandle values of each isofootcandle line.
Mounting
Height
Isofootcandle Line
A B C D E
15' 5.5 2.8 1.4 0.5
20' 3.1 1.6 0.8 0.3
25' 2.0 1.0 0.5 0.2
30' 1.4 0.7 0.3 0.1
Lamp Proration
For 400 Watt clear Metal Halide multiply footcandle
readings by 0.65.
0.3
0.2
0.1
0.1
BOARD OF ARCHITECTURAL REVIEW
iECEIVED DESIG L REVIEW
NOV 1 31992 APPLICATION
CITY OF TUKWILA COMMUNITY
DEPARTMENT OF COMMUNITY DEV 'ALIRMENT
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3680
FOR STAFF. USE ONLY E7/
r, File Number: Q 006S
L12 Q'1 tern P
0 .�A Receipt Number:
1. BRIEFLY DESCRIBE YOUR PROPOSAL: CONVERT AN EXISTING VACANT WAREHOUSE INTO
A HOME IMPROVEMENT RETAIL WAREHOUSE WfIH AN UUIuUOR GARDEN CENIER AND LUMBER AREA.
RECONFIGURE PARKING FOR TWO FUTURE RETAIL PADS.
2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and sub-
division; or tax lot number, access street, and nearest intersection)
6810 S. 180 TH STREET, TUKWILA, WA
Quarter:
Section: Township: Range:
(This information may be found on your tax statement)
3. APPLICANT:* Name:
Address: 17941 FITCH ROAD, 2ND FLR, IRVINE, CA 92714
Phone: 71 4/833 -744
�' Si ture: L L Date: J(
The applicant is t ,� person whom the staff will contact regarding the application, and
to whom all notices and reports shall be sent, unless otherwise stipulated by applicant.
(RFENBERG FARROW ARCHITECTURE
4. PROPERTY Name:
OWNER
AFFIDAVIT OF OWNERSHIP
HOME DEPOT USA, INC
Address: 601 S. PLACENTIA AVE., FULLERTON, CA 92631
714/738 -5200
Phone:
I /WE,[signature(s)] %
gle;,/uA
swear that I/ r1 .i�- th;�wner(s) or contract purchaser(s) of the property involved
in this applic• ti• an• hat the foregoing statements and answers contained in this
application are true and correct to the
best of my /our knowledge and belief. Date: /1--
BOARD OF ARCHITECTURAL REVIEW
DESIGN REVIEW APPLIC/' TION Page 2
CRITERIA
The following criteria will be used by the BAR in its decision - making on your proposed project.
Please carefully review the criteria, respond to each criterion (if appropriate), and describe how
your plans and elevations meet the criteria. If the space provided for response is insufficient,
attach additional response to this form.
1, RELATIONSHIP OF STRUCTURE TO SITE
A. The site should be planned to accomplish a desirable transition with the streetscape and to
provide for adequate landscaping, and pedestrian movement.
B. Parking and service areas should be located, designed, and screened to moderate the visual
impact of large paved areas.
C. The height and scale of each building should be considered in relation to it site.
RESPONSE:
PART OF THE EXISTING BUILDING WILL BE REMOVED TO ALLOW ADDITIONAL LANDSCAPING,
AND EXISTING LANDSCAPING ARE LEFT UNDISTURBED AS MUCH AS POSSIBLE. ADDITIONAL
LANDSCAPING ARE PROVIDED ALONG THE EXISTING CHRISTENSEN TRAIL. PARKING LOT
LANDSCAPE PROVIDED AT 1 TREE PER 5 STALLS FAR EXCEEDS THE CITY STANDARD
AT 1 TRFF PFR 10 STAIIS_
THE HEIGHT OF THE EXISTING BUILDING REMAINS UNCHANGED. ARCHITECTURAL
ELEMENTS SUCH AS ENTRANCE TOWER, CANOPY /ARCADE, AND COLONADED DECORATIVE
FENCING ARE INCORPORATED TO ENHANCE THE EXISTING BUILDING.
2. RELATIONSHIP OF STRUCTURE AND SITE TO ADJOINING AREA
A. Harmony in texture, lines, and masses is encouraged.
B. Appropriate landscape transition to adjoining properties should be provided.
C. Public buildings and structures should be consistent with the established neighborhood
character.
D. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of
safety, efficiency and convenience should be encouraged.
E. Compatibility of on -site vehicular circulation with street circulation should be encouraged.
RESPONSE:
EXISTING BUILDING WILL BE ENHANCED BY NEW COLOR SCHEME, ACCENT TILE ELEMENTS,
AND EMPHASIZED SENSE OF ARRIVAL WITH A ENTRY TOWER AND COLONADE.
EXISTING LANCSCAPING WILL BE INCREASED TO ENHANCE THE GREEN RIVER ENVIRONMENT.
CUSTOMER AND SERVICE VEHICULAR CIRCULATION WILL BE SEPARATED AT OPPOSITE
END OF SITE TO INSURE SAFETY.
BOARD OF ARCHITECTURAL REVIEW
DESIGN REVIEW APPLIC'TION
Page 3
3. LANDSCAPE AND SITE TREATMENT
A. Where existing topographic patterns contribute to beauty and utility of a development, they
should be recognized and preserved and enhanced.
B. Grades of walks, parking spaces, terraces, and other paved areas should promote safety and
provide an inviting and stable appearance.
C. Landscape treatment should enhance architectural features, strengthen vistas and important
axis, and provide shade.
D. In Locations where plants will be susceptible to injury by pedestrian or motor traffic,
mitigating steps should be taken.
E. Where building sites limit planting, the placement of trees or shrubs in paved areas is encour-
aged.
F. Screening of service yards, and other places which tend to be unsightly, should be accom-
plished by use of walls, fencing, planting or combinations of these. Screening should be
effective in winter and summer.
G. In areas where general planting will not prosper, other materials such as fences, walls, and
pavings of wood, brick, stone, or gravel may be used.
H. Exterior lighting, when used, should enhance the building design and the adjoining land-
scape. Lighting standards and fixtures should be of a design and size compatible with the
building and adjacent area. Lighting should be shielded, and restrained in design. Excessive
brightness and brilliant colors should be avoided.
RESPONSE:
EXISTING LANDSCAPE ARE LEFT UNDISTURBED AS MUCH AS POSSIBLE. ALL
GRADE SLOPE WILL BE MAINTAINED AT A SAFE LEVEL. THE LANDSCAPE IS ORGANIZED
IN A FORMAL AXIS TO CREATE A SENSE OF ORDER , ARRIVAL AND PROGRESSION.
PLANTING WILL BE PROTECTED BY CURB OR PLANTERS. LANDSCAPE ARE PROVIDED
AT BUILDING PERIMETER, AT THE CANOPY ARCADE TO CREATE A SENSE OF
EARTHINESS.
LIGHTING WILL BE DIRECTED TO THE INTERNAL TO AVOID SPILLAGE TO
ADJACENT SITE.
4. BUILDING DESIGN
A. Architectural style is not restricted, evaluation of a project should be based on quality of its
design and relationship to surroundings.
B. Buildings should be to appropriate scale and be in harmony with permanent neighboring de-
velopments.
. • BOARD OF ARCHITECTURAL REVIEW
DESIGN REVIEW APPLIC.PTION Page 4
C. Building components - such as windows, doors, eaves, and parapets - should have good pro-
portions and relationship to one another. Building components and ancillary parts shall be
consistent with anticipated life of the structure.
D. Colors should be harmonious, with bright or brilliant colors used only for accent.
E. Mechanical equipment or other utility hardware on roof, ground or buildings should be
screened from view.
F. Exterior lighting should be part of the architectural concept. Fixtures, standards and all ex-
posed accessories should be harmonious with building design.
G. Monotony of design in single or multiple buildings projects should be avoided. Variety of
detail, form, and siting should be used to provide visual interest.
RESPONSE:
THE EXISTING BUILDING WILL BE AESTHETICALLY ENHANCED BY THE ADDITION
OF AN ENTRY TOWER ELEMENT AND A COLONADE ARCADE. THE BUILDING IS
ACCFNTF!) WITH COLOR AND GEOMETRIC SMAPES.THE ARCADE ROOF IS FURTHER
DIVIDED TO SOLID AND VOID ALLOWING DAYLIGHT TO CREATE SHADOW PLAY
AND AIRINESS. A TRIANGLAR ELEMENT AT THE ENTRY AND EXIT TOWER BREAKS
THE HORIZONTALITY AND PROVIDING AND ANCHORING EFFECT. THE GARDEN
CENTER FENCING ARTICULATES THE ORDER OF THE LANDSCAPE.
5. MISCELLANEOUS STRUCTURES AND STREET FURNITURE
A. Miscellaneous structures and street furniture should be designed to be part of the architec-
tural concept of design and landscape. Materials should be compatible with buildings, scale
should be appropriate, colors should be in harmony with buildings and surroundings, and
proportions should be to scale.
B. Lighting in connection with miscellaneous structures and street furniture should meet the
guidelines applicable to site, landscape and buildings.
RESPONSE:
UTILITY ENCLOSURE ARE DESIGNED AS PART OF THE BUILDING STRUCTURE EVOKING
THE SAME ARCHITECTURAL LANGUAGE AS THE BUILDING.
.
•
i .
I 7.
tj
1
s
0
4.
er
■
%E
\w
0 0 Q 0 a
ER ' IQI iu E®ogo
aIneni.efUIaalI'a a
.,tia4
00
410,
ii.
K
mita
91
1w
111/
.9 ai
%I a
0 R,
1119 9
\w
•9
ill' Ark,
lei AM.
win ON;
iRi /R•.
■9 ■/ \I
1117..
.9 .9
Amu
INF
•1111• oar
119
1
t^.
\ I
•1
1111r
7 •
C.
•
\/
•P
w/
w .
vw
ai,
;IV `MP Mir
gilk
\w
•w
rib
•-.
fI
•
000;
0
•
• 1l
4 '
1 \ •
• • • •
00007
.yY
,.Mr...,•w...1N o•r .4•11A1104014'
N 8711•70' W
M aYS17• w
371.5/'
imam ur1•wor_
O r WM%
Mom mum
0•4i.non 041.11
•
r
VIM •
wr
r
ow • r
1•11.•
•
•
n•111••■ Mae
NMI .
HOME 0ICT 1C Nfw
ti MAiNOTpI IIOM
1110LL
TUKwu_Q
MILSONMY
IMMO NIB MINN. el Pia IMO
eu1t. s1110u1411,
1■
SOUTH 180th STREET
SAXON DONE •
0
0
0
0
1
3
•
.
SAXON DINE