HomeMy WebLinkAboutPermit 6940 - Rhone-Poulenc - Maintenance Building DemolitionR:110
P LE-Hc.
BULD1W PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept, of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO.
DATE ISSUED:
!s`�w;fc�:',�.r ,ry f7r�,•.•,.?�� +':� ., . �' �i` �f `j�.'.•rSY.�i'���.�'�nn:.n•%tf.
,p-d• ',( Sys. `{lvro�cQ.:• •1t, � : • }.• • .;s. 4prtJs��''!:��
.1f�41%1.;•�..�,Yt1...:.Yb cr {s.�. k. w.. f i�.. .•�..�t�7"�'L''r;.•7�ct ?.".::
SITE ADDRESS
.;;�v "�. , j��j�s4�' �,'.% �irl�rkf�. �. 3' i" r' r+ 1! iS! s' .���.�,�: "11'n.r���`A:?.� ;r�•+� fii!^'• ��i ':4i`;�v „��u1.:;'�ia.i ?•�,i
r' 9
DESCRIPTION
BUILDING PERMIT FEE
PLAN :CHECK FEE
BUILDING SURCHARGE
OTHER
AMOUNT RCPT #
30.00. 4160
DATE
11= 15.91
PLAN CHECK NO.:
91 -467
9229 E Margincl Wy S
���g • t �tri'��i 4!+'v,�y'I 5:�+�N J4” 5 a �4. +f?� -Y3.',� ' ri.:•.^,.. �,
y� {{j�'.,j �'�1 t• M''t�l
tnrTr,., h{•^�a�rc.�{�!'t• \t?_;.ir�. .. /:.�3.l::r. � !,i� .!!b�,•.i•';,. .e";:2 /,�h..:ii i�'.'< .. ,•.�i
SUITE #
PROJECT NAME/TENANT
Rhone- Poulenc (Maintenance Bld
g)
j VALUE OF CONSTRUCTION - $ 71,900.00
ASSESSOR ACCOUNT #
1 542260 -0010
TYPE OF (New Building Zj Addition Li Tenant Improvement (commercial) (J Demolition (building) U Grading/Fill
WORK: (] Rack Storage O Reroof Q Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Demolition of existing building excluding floor slab.
PROPERTY OWNER
Rhone - Poulenc
PHONE
764 -4474
ADDRESS
CONTRACTOR
9229 East Marginal Way South, Tukwila, WA
IZJP 98109
Olshan Demolishing Company, Inc.
PHONE 800- 874 -3366
ADDRESS
P.O. Box 925628, Houston, TX
ZIP 77292
WA. ST. CONTRACTOR'S LICENSE # OLSHADC099NW
EXP, DATE
8/08/92
ARCHITECT
'PHONE
ADDRESS
!ZIP
pp. x ��COtiJIP, k11 C
1
FLOOR
SQUARE
FEET
OCC.
LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC,
FEET LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
TOTAL '`
TYPE OF CONST.: N/A UBC EDITION (year) 1988
SETBACKS: N- S- E- W-
FIRE PROTECTION: Sprinklers Q Detectors 0 N/A
UTILITY PERMITS REQUIRED? ® Yes ❑ No (Public Works)
ZONING:
BAR /LAND USE CONDITIONS?
Shorelines -OK GD Yes Q No
CONDITIONS (other than those noted on or attached to permit/plans)
/
APPROVED FOR
ISSUANCE BY:
!iau'e
BUILDING
OFFICIAL
DATE; -! 4)
I hereby certify that I have read and xamined this permit and know the same to be true and correct. All provisions of lav
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
SIGNATURE:
PRINT NAME: G,,ge,'t/
DATE:
3--s 7S
COMPANY: j2,4//t/6---
This permit shall become null and void if 'the work isnot commenced within •180 days from the date of
:issuance, or if the work is suspended or abandoned for. a period of 180 days from the last inspection
CERTIFICATE OF
OCCUPANCY NO.
DATE ISSUED:
UI/1W"JU
or BUILDING HERMIT
APPLICATION TRACKING
PROJECT NAME __..
Ror- P
PLAN CHECK
NUMBER
qi- -L
SITE ADDRESS
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE OCC.
FEET LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
(
TOT• AL
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
PAITIVI •
ROV
M BUILDING -
initial review
li-l5-41
M FIRE
PLANNING 9
CONSULTANT:
UIR
Date Sent
EMEN
Date Approved -
JROUTED1
FIRE PROTECTION: —TT Sprinklers
FIRE DEPT. LETTER DATED:
1)43.11-
INIT:
j Detectors
INSPECTOR:
/ ; /t'/ ED /4-Z2$ss- ZONING:
REFERENCE FILE NOS.:
BAR/LAND USE CONDITIONS?
)Yes
PUBLIC
WORKS
INIT
// /9/
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
INIT:
PUBLIC WORKS LETTER DATED:
s-
Yes
BUILDING -
final review
:3/V
INIT: t -�
TYPE OF CONSTRUCTION:
UBC EDITION (year):
REVIEW COMPLETED
PERMIT NO.
CONTACTED
DATE READY
DATE NOTIFIED
BY:
(init.)
PERMIT EXPIRES
2nd NOTIFICATION
3RD NOTIFICATION
BY:
(Init.)
BY:
(Init.)
AMOUNT OWING
BUILDINu PERMIT
APPLICATION
CITY OF TUKWILA
Department of Community Development - Building Division
vvVV Vvuil/vQ/I&GI uvuwra►v, 1 unrnIq rrl7 ,7v 1 UV
(206) 431 -3670
,:. : ;: C V i I; - Q x ` F- 6
3,, li OU ''' . t„
5..a:. . 0 -: ` i
film~
%r!os a%
1 UIt OIN PEPMIT En
Z :..:
PLAN CHECK
NUMBER �
m
P C' EC ! : , 9 r M-
SSIEWSRM
MA:
(U 1LD 1NMSURC HAl4r{
1fi %W ;{M
%f
4 '% S%4 N
':..v '" '' . .L:1CA7_ I O Nv . . .„.,M sr-BE
...:: : ...
F.1 D OMPLETE Y
: • ::;: 'i: ::}iym. :i: ir?}/if :.: : /i
F
bm,,:i iin
Li i:o
y: $?:6
. :.L ...
i4 1M �Ni:
/rrFx
Y E Y?f
?535i r
r!%r '?•.: : i
C4O:f: !
:
SITE ADDRESS SUITE #
9229 East Marginal Way South
VALUE OF CONSTRUCTION - $ 71,900
PROJECT NAME/TENANT
Rhone- Poulenc 4+
ASSESSOR ACCOUNT # .
542260 -0010 •
TYPE OF • New Building • Addit On L1 Tenant Improvement (commercial) Et Demolition (building)
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE: „
Demolition of the Maintenance Building, excluding floor slab ,
BUILDING USE (office, warehouse, etc.)
Manufacturing
NATURE OF BUSINESS: Closed industrial plant. •
WILL THERE BE A CHANGE IN USE? ' No Yea 1 Yes, new building requirements may need to be met. Please explain:
SQUARE FOOTAGE - Building: 23,000 Tenant Space: Area of Con struction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
a No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER Rhone- Poulenc
PHONE 764 -4474
ADDRESS 9229 East Marginal Way South, Tukwila, WA
ZIP 98109
CONTRACTOR Olshan Demolishing A Brand Company
PHCNE713 /867 -9200
ADDRESS 2707 North Loop West, Suite 200, Houston, TX
ZIP77008
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT NA
PHONE
ADDRESS
ZIP
tt
'• � ' � ��: ::Fi %<: ; ! ':. 4: 'i i!' '' !:: ;. ;' � > "• 'i .. � ' :L:' '' yip .. .;t+ ,.. ir,, ., :... , �j+;
:: Iv, •I« R O MI.... It.S' IR.A ' .. I: ?FI AN�1.N C1VYbT .. I •SA y.
.TN: '�' H .;. U
.• :•�i': :i� : :�lM.��k: �� :�.�f`i..., : :..k :.: L:!G: .i��. :n .,.'}�� :; .: +#`� F n:.;.: A.; ,?,....y;.;. .:.N ".F.
.;;.:L, i::. .,FY
��'. �kU�Ll�► t�1�.; :It���i��...,�tNn��l�.1� %iE����3,:f';�..,J��p��f ICS [�.y ?"1`�lit� l�i��K9�1'1:`,►: ,. �',•.��... i : :,�,,j,,.,
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE %�, ,
A x/47.34
DA1 E
11 -15 -91
PHONE 206/764 -4474
PRINTN • •' Lew "err •
ADDRESS 9229 E. Marginal Way South
CIT.�21P Tukwila, WA 98109
CONTACT PERSON Lew Herr
PHONE 206/764 -4474 'r
APPLICATION SUBMITTAL In orderto ensure that your application Is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at
the Building counter which provide more detailed information on application and plan submittal requirements.
Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION • Valuation for new constnuctbn and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting
application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and Is
subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT if the applicant is other than the owner, registered architect/engineer, or contractor
licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this
permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall
expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition).
No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3870.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
5,_ otca.
COMMERCIAL
N w c QMMERQIAL $UU.QIU0B/ADDtTI0N$
gpmptotsd buildlnq permit application (one for each at vccure
SUBMITTAL CHECKLIST
•
�ISQaaor >AcQQUnL Num
pf the folbv4 •
QMMERC1A4 TENANT 1MPROYSMENTS
Completed bupditt: , pamix application (onu
wo (2) sat$ of Go isbi ctlon.
�tructural,caIGulatfona stamped by a Washlnpton State Ilcen.
.:::.......... ::..:...... .
ort :tamped by a :Washington State license. an
Energy calctttations stamped by a Wastiyloton Stata tkens
6. • • Inoeror architect
1pgal;des .p, s ><
,Warking.draw nga;::stam
;`arct►ftact; i hct Include;
.::P.
leb
• Ari►ttectutrat drawings
�.Stru; drawings
► Eievadons
s <z: ►t f thaw(rtps
�+Camptated udutY petmtt app�catiori,;'
SIx': 5 ;;suts'`;o1 :;csvil:dtu tnpl
69 of adjacent: ;cannon wall} toff
yoraU do onslens of bttltding or s
er�int.apa�e
•
d patterns. ;i
sec�fone nhowinQ wall cons4vt t on an
:..;;:::..';::ii..: attaohment.fQr:ffoor and ceiling,
;:or>s ••�sd
Wash n
�:.❑ Struoluret aaicufail t4snp GY :.... G
:::- on�(naos tnay:be required if strupturai work:tt<
NO E, ff an}�ydJrry ti�a is la }p ;ba, dpne, avbmlt ear
rfcli.8tlif: ana,} y } r
;anpfei til(dtti ril
I:A& &�SLQK,PiGQOIi _t.fa.......
:.Off of: tfia permlL`>
ANTENNAISA'f l i lT. E DISHE.£ ':<•
"fafasl bbut t;H. .
11�I..•:r: :W1.I1 .+�amty n.:: p%
i1�e! �� : +'::��r•.•,': ::; }ri;�:i:: +.4:: isi:.?::::{{:: � >.{ {i { :i:Si� }f;i::i: +�:Y:::t:::
r4rr:' Y
f $trijal rol. celculatfnii imam
;:, enpinG r`.(rud •••• a'SoM
%ffY i< ir%{. tiC' i$::} rirv� :viirri:•'�'i:i`•i... +9SiiRYS IN'ii:::{•i'r }ii i::`vr': �':
RESIDENTIAL
taco lcen
:; 91i :,plan;(ahoY+0 p.bWldup;iuld.
Y%Fi }Y'i:•i � i'•ii:.r;:; .<i ?'j•: rirr,.i ��:Y:C:YS +ri: �r:.:iiii;: j:: �' %.::
A.tt►Its A�ritat %la%sataflho :t si<h and
ii:{: ::}} :Y: }: {v: ::. {.r n {'i { :YF : : : : : :Y ? >i%s; >l.
?. mciQSUraf catcuktdorss stammped b
i:•rir.:r:. >: +rYi! {i.• .• :} v.: •} Yx;; Y}:{+.•: ririfil.•. Y• r,;:}.'.; { {.; {. }:.;,•.iY::.: +:::+;�;:i; :r .:i::5:
F:;NEW Sift LE'aFAMil..Y DWEi.> NG&ADDIT101
` i .Flatsd:b ilt ng ormlt appllaadocc (one fora
ai . autptK
.l9saysot {1409
_.n,oar;ma
1.0.[NT1A.004449..: ..t.8.:::.::::
DbM�1w • t:
PLAN CHECK
NUMBER
ROUTING
PROJECT NAME
UTILITY PROJECT
TRACKING t,rIECKLIST
Rhon-Q. - PU-ric_.
SITE ADDRESS
SUITE NO.
DATE PLANS
RECEIVED
TYPE OF REVIEW
DATE ROUTED
TO PWD
DATE PLANS
APPROVED
DATE RESUB.
REQUESTED
COMMENTS
11-16- 41
.no
a -1s_ct1
la i t-al
Curb Cut/Access /Sidewalk
Fire Loop /Hydrant
Flood Zone Control
Grade /Fill
IOU gar' -00er
3 - c.1.fo-9a --
3-.30• -
PERMITS REQUIRED
11r1
PERMITS
PERMIT
NUMBER
APPROVED
PLAN /LETTER
DATE
ISSUED
Channelization /Striping /Signing
Curb Cut/Access /Sidewalk
Fire Loop /Hydrant
Flood Zone Control
Grade /Fill
IOU gar' -00er
3 - c.1.fo-9a --
3-.30• -
Hauling
Landscape Irrigation
Moving an Oversized Load
Sanitary Side Sewer
Sewer Main Extension (private)
Sewer Main Extension (public)
X
Storm Drainage
5' 01a qa
to r ttct I
3--q a
Water Main Extension (private)
Water Main Extension (public)
❑ Deduct
Water Meter (exempt) size: No.: ❑Water Only
Water Meter (permanent) Size: No.:
Water Meter (temporary) Size: No.:
Other:
Other:
CONDITIONS OF PERMIT ISSUANCE OR FINAL SIGN -OFF OF PROJECT
CiTY OF TUKWILA
UTILITY PERMIT APPLICATION
Central Permit System - Engineering Division
6300 Southcenter Blvd., Tukwila, WA 98188
Phone: (206) 433 -0179
PLAN CHECK
NUMBER: 9 ( -• L4 W)
Site Address:
9229 East Marginal Way South, Tukwila, WA
>�PIFORMATI,O.N Name of Project:
Rhone - Poulenc Plant Demolition
Property Owner: Rhone - Poulenc
Street 9221 East Marginal Way South
Phone No.: 206/764 -4474
City /State/Zip: Tukwila, WA 98209
Engineer:
Street Address:
Phone No.:
Contractor: Olshan Demolishing A Brand Company
Cit /State/Zi :
Phone No.: 713/867 -9200
Street Address: 2707 North Loop West, Suite 200, Houston, TX
Cit /State/Zi •: 77008
King County Assessor Account Number: 542260 -0010
ERMI:T:
U ES'
❑ Channelization/Striping/Signing
❑ Curb Cut/Access/Sidewalk
❑ Fire Loop'Hydr. (main to vault) – No.: Sizes:
❑ Hood Zone Control
❑ Grade/HI cubic yards
❑ Hauling
❑ Landscape Irrigation
❑ Moving an Oversized Load
❑ Sanitary Side Sewer– No.:
❑ Sewer Main Extension
Private ❑ Public ❑
® Water
Name: Rhone - Poulenc
Street 9229 East Marginal Way South
Name: Rhone - Poulenc
Street 9229 East Marginal Way South
® Sewer ❑ Metro ❑ Standb
❑ Si • le -FamII Residential
❑ Storm Drain
❑ Street Use
❑ Water Main Extension
Private ❑ Pubic ❑
❑ Water Meter / Exempt: – No.: Sizes:
Deduct ❑ Water Only ❑
❑ Water Meter/ Permanent – No • Sizes•
❑ Water Meter/ Temporary: – No.: Sizes•
❑ Other:
Phone No.: 206/764 -4474
City /State/Zip: Tukwila, WA 98109
Phone No.: 206/764 -4474
City /State/Zip: Tukwila, WA 98109
❑ Multi • le -Famii Dweili
No. of Units:
® CommerciaVindustrial
❑ Hotel ❑ Du s lex
❑ Motel
❑ Office
❑ Retail
❑ New Building
Square
❑ Tri iex
❑ Warehouse
❑ Manufacturing
❑ • .artments
❑ Condominiums
❑ Other:
❑ Church
❑ Hos • ital
❑ SchooVCollege /University
❑ Other:
❑ Remodel/ Square footage of original building space:
" "`"'�'�'' "� "' Foota e• Addition Square footage of additional building space:
King County Assessor's valuation of existing structures: $ 785,800.00 Valuation of work to be done: $ 294,500
09/18/90
..� '°3Ri"T?R€
Applicant/Authorized Or 44(i,
i!:l •!, : ,
Contact Person
•iii 1 -I1 : Lew Herr
�
Print Name: Lew Herr."'
err' —
Address: 9229 East Marginal Way South
Date: 11 -15 -91 Phone:
Tukwila, WA Phone: 206/764 -4474
Date Application Accepted: 1— 15 _. Ct I
Date Application Expires: 5 �'
09/18/90
r
SUBMITTAL CHECKLIST.::;
All site plans shall be provided in one submittal for review by the
Public Works Department. Six (6) sets of plans stamped by a
licensed engineer are required along with this application
completed and signed by the applicant's representative.
The following information is necessary for Public Works
Department evaluation and approval of site plans:
• AU utility construction is to meet the City of Tukwila Standards
• indicate scale of drawing and show north arrow
• Identify location by address or distance to nearest Intersection
CURB CUT /ACCESS /SIDEWALKS/
CHANNELIZATION /STRIPING/SIGNiNG
O Dimensions
O Type of surfacing - asphalt, crushed rock, etc.(and thickness)
O Percent of slope or runoff direction
O Size of curb cuts/location
O Vehicular and pedestrian traffic facilities, including signing and
striping, wheel chair ramps, curb cuts
FiRE LOOP /HYDRANT
O Type of pipe
O Size of pipe/focation
O Location and type of all valves
O Type of bedding and backfill materials /percent compaction
O Distance from structures, stone and sewer facilities at minimum
separation
O Location and size of thrust blocking
• FLOOD ZONE CONTROL (Requirements are under Flood Ord.
No. 1462 and can be obtained from the Public Works Dept.)
O Lowest finished floor elevation
O Contours and elevations per National Geodetic Vertical Datum
LAND ALTERING (CLEARING, GRADE AND FILL)
O Contour map (2' intervals) showing existing and proposed contours
O Estimate of yardage, both cut and fill
O Erosion control plan
HAULING
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $2,000 bond made out to the City of Tukwila for property damages
caused by activities
O Route map
LANDSCAPE IRRIGATION
O Location of DSHS approved double check valve
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter
O Location and elevation of meter box (water meter - permanent and
exempt). Clearly show whether tap is on main or domestic service
O Location and type of tap
O Type of bedding and backfill materials/percent compaction
MOVING AN OVERSIZED LOAD
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $5,000 bond made out to the City of Tukwila for property damages
caused by activities
•
O Business License with City of Tukwila
O Route map
SANITARY SIDt. SEWER':
O Type of pipe - concrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run
O Connection points) to public
O Location of cleanout(s) and test Tec(s)
O Type of bedding and backfill material/percent compaction
O Invert elevations at structures and junctions
SEWER MAIN EXTENSION
O Type of pipe - concrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run
O Connection point(s) to public
O Location of cleanouts
O Type of bedding and backfill material/percent compaction
STORM DRAINAGE (including existing topography and
proposed grading and surfacing)
O Type of pipe
O Size of pipe
O Percent of slope/length of run
O Location of all structures
O Square footage of area to be drained, Including roof area
O fleeting material for pipe
O Invert or flow line elevations
STREET USE
O Complete description of proposed activity
O Map with address and outline of limits of activity relative to public
right -of -way and easements
O Proposed traffic control/detour (per Manual of Uniform Traffic
Control Devices)
O Proposed schedule (times and dates)
WATER MAIN EXTENSION
O Type of pipe
O Size of pipe
O Hydrant type and locations
O Valve type and locations
O Connection point(s) to existing system
O Type of connection - live tap, tee, etc.
O Location and size of thrust blocking
O Size and location of mains, including elevations (profile)
WATER METER - EXEMPT
O Diagram of domestic system/tie In of exempt meter
O Number /account for existing domestic meter
O Size and type of material of meter and service
O Site address
WATER METER - PERMANENT
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter
O Location and elevation of meter box (water meter - permanent and
exempt)
O Location and type of tap
'O Type of bedding and backfill materials/percent compaction
WATER METER - TEMPORARY
O Address and hydrant location
O Size of meter
O Estimate of quantity and schedule
After the Public Works Department has oompletecrilieir review and the plans aro approved, the applicant will be notified
by letter concerning the necessary permits and requirements; an approved set of plans will accompany the letter.
If the plans are not approved, the applicant will be notified letter of necessary resubmmal requirements: ��
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
(ogLI 0
PERMIT No.
(206) 431-Y670
e
Po]ect: Rhona_ ' �nc,
Type of Inspect t no.I
Address: q E morg1 n lay U��S
Date Called: _ a
Special Instructions:
1 , \: -4Y
tQ `� - 1-1 0
Date Wanted: (_ ---�
151" I �qc� am. (p.m.�
Requester: R art " �H m wit
Phone
153' 5000
Approved per applicable codes.
❑ Corrections required prior to approval.
COMMENTS: '
Pf4A.q- — Su
10l t c t of■N- S a- Y9 .4--R -0
❑ . $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
1,
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
.1111.-4
(206) 431-3'67
Project:
tv'orN-e. - PaU1-enc-,
77p7OTWilon: r,
4-e_ - beinee
Address:
qZQC) c.- MoNyvxt U,Jj
Date Called:
5-qo
Special Instructions:
Date Wanted:
3- io-qa cDp.m.
Requester:
1
LOor r e-wr161y)
Phone No.:
te. Approved per applicable codes.
D Correction's required prior to approval.
COMMENTS: •
Inspector:
Date:
o $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Kr TN Tip F.:
Date:
Vwxi H:4' }YNi'i,('� �i'A•S .-47V7 ��q.Y.(11t4W7,5`"�1j 7 .,
********************************** * * * *, * * * * * * * * * ** * * * * * * * * * * * * * **
CITY OF:.TUKWILA, WA TRANSMIT
******;************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * ***
TRANSMIT Number: 92000243 Amount: 66.00 03/30/92 11 :50
Permit No: PW92 -0008 Type: PW -LA LAND ALTERING PERMIT
Parcel No: 542260-0010
Site Address; 9229 EAST MARGINAL WY S
Payment Method: CHECK Notation: CH2M HILL Init: DLM
********************************* * * * * * * * * * * * * * * * * * * * * ** * * * * * * * **
Account Code
000/322.100
000/345.830
Description •
BUILDING - RES
PLAN CHECK - RES
Total (This Payment):
• Total Fees:
Total All Payments.
Balance:
66.00
66.00
.00
Paid '
43.50
22.50
66.00
ir
City of Tukwila
Department of Public Works
March 26, 1992
Burt Miller
CH2M Hill, Inc.
777 108th Avenue N.E.
Bellevue, WA 98009 -2050
John W. Rants, Mayor
SUBJECT: Rhone - Poulenc Demolition (Maintenance Building
PC # 91 -467) 9229 East Marginal Way South
Utility Permit Approval
Dear Mr. Miller:
Ross A. Earnst, P. E., Director
)
The Public Works Department has reviewed and hereby approves your .
application for a utility permit for the subject project.
Please contact the Permit Coordinator at 431 -3672 to have the
following permit prepared for pickup:
Land Altering Permit (Permit Fee = $66.00)
This fee was calculated using 217 cubic yards of
fill as the measure of land altering activity. The
permit fee breaks down as follows:
Plan Review Fee = $22.50
Permit. Fee = 43.50
Total $66.00•
This permit.. covers work that is a part of the demolition project for
the subject building. We have your overall site plan on file.
If you have any questions or need clarification on any issue, please
call me at 433 -0179.
Sincerely,
John A. Pier•j•7, P.E.
Associate En ? neer
cf: City Utilities Inspector
Permit Coordinator•
Development File: Rhone- Poulenc
JAP /amc
amc:12:rhone2
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665
cH ®NE• POL1LENC
FINE ORGANICS DIVISION
SEATTLE, WASHINGTON PLANT
9229 E. Marginal Way South - P.O. Box 80963 - Seattle, Washington 98108 - Telephone (206) 764-4450
18 June, 1992
City of Tukwila
Public Works Department
6300 Southcenter Boulevard
Tukwila, WA. - 98188
Attention: Mr. Greg Villanueva
RE: Demolition Permits:
No.. 6936 - Vanillin Building
No. 6937 - Extractor Building
No. 6939 - Control Building
No. 6940 Maintenance Building.
No. 6941 -'Meal Bin Storage Area
No. 6942 - Storage Shed
No. 6943 - RCRA Storage Shed
No. 6944 - Larox Building
Dear Mr. Villanueva:
This will confirm our discussion in which we stated that all utilities and process
drainage associated with the above permits have beeen capped and /or plugger in con-
formance with the stated permit requirements.
Rhone - Poulenc, Inc. retains possession of the property and is responsible for all
maintnenance thereon, including the integrity of all utilities. It should be noted
that all surface drainage from the site is directed to Metro after testing for com-
pliance with Metro standards.
This will also confirm the withdrawal of permits for the demolition of the Change
Room Building and The Distribution Center Warehouse have been withdrawn.
The Compressor Building - Permit No. 6938, is on hold pending Rhone - Pulenc, Inc.
verification of the disposition of the compressors contained therein.
If you have any questions regarding these proceedings please do not hesitate to call nee.
Sincerely,
ewis B. Herr
Project Manager
('HONE POULENC
rrr•..vaw
'r ' 1 m I - Te3)
V
I ' P MovE VgITI N4 1I LDI H i Ai E. f3
r rlNI4
o I cs1.-p cfg., F'Luq F NETFAmoNS -
11 I
:SON') A19-IAI: (' cure:, e6.e,
- --1-- -t- - - -- .1''IME TEF.. 4647 swap w/
' To 171 [ pI JNI GC-
10 f'r-.€- Ir{I:-fE. . fzetrfa
t2rys,11415, 1-IN CUR w/
.cup r 4 rim -ro nclsT
617 4,4-1 PRA-MI5 .
12'
IyT IrarzY
Pi u4aie rRPs -
15e CaPFtst,
r�l
0.
1 SX ' M
... rxYdNS (N?)
-0'-XIS't ING.,...,
TIZ FIT
Eju iaG 4 K Dr-Alamie
to �e K.elt4 R,aTia.l. 1-
APPRtVED PER PUBLIC WORKS
Exl'prluli 37,
Pizra,u,Ae 'io 13e
r-EA L Sipe, LETTER DATED /4/1/ q
NORTH
NOT TO SCALE
Eannig
NO.
DATE
REVISION
.Rhone — Poulenc, Inc.
.Seattle. Plant Site
.SLAB DRAINAGE PLAN
FIFITENA,wz. pUILDf�tf.._...
SHEET
OF 1
1
DATE 11/1 ,3/9I
PROJ.
NO.
111:34P> Jrne44516. Le-OrX=4-12
G-f=7 177
(17.10. nWY t 7 )
1
1 ,I
(I t
4 c Aoe-2
--r:7 ko.31=r--
-6.Dew_
•
(V7it
.-15;7
BUILDt3 PERMIT
INSPECTION RECORD
(Post with Building Permit In conspicuous place)
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO. (CL3
DATE ISSUED:
SITE ADDRESS:
9229 E Marginal Wy S
SUITE NO.:
PROJECT:
Rhone - Poulenc (Maintenance Buildir
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PH
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre —Demo
431 -3670
12
13
14 FIRE FINAL insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar Is tied in place.
2. FOUNDATION - When forams and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses. 00,14=
g
Permit No:
Status:
Project:
Address:
Location:
Parcel #:
Wetlands:
Scopes:
LAND ALTERING
PW92 -0088
ISSUED
RHONE - POULENC
9229 EAST MARGINAL WY S
542260 -0010
X
Watercourse:
OWNER RHONE- POULENC IN•G Y_.
C/0 GAIL E, ,MORR�2; -
CONTACT BERT MILL,ER';50- - HILL=,,
Issued: 03/30/1992
Approval Letter: 03/26/1992
Expires: 09/26/1992
b. BOX ti8C'16:
Phone: (206)764 -4450
ATTLE WA , 98108
• k***• k• k• k• k *•k *•k *•k * ** *i****•k'` *pct' *•kkk'kkirkk*k•k *• kq•k;,•k•k•kk
Additional Des,c''r.` ;i-p"tion:',�� ''j
MAINTENAN' B0G=PC # 91- .467', �`a _,
ivy ' ;.,' `
- ) d
s
Grading /F111 4Ard)Cut:
;3
Permit 'e x It° 4,,GJ/��� it;\
,y ,� d 4jy ,�•�4!La +fir `,
Plan Check, ee : <,;0 ,,f 22...50 '\, �,+'
hYr`k *_•k * *•k* * * * * * ** * * *•k*
ti
111 217To;t'a 1. ;; 217
i
Account Na: 000 /.322;•1�00
r N, Account No:'�, 00V/�345.860
0: 'her:, �,t r '` .. #!1' Account No 4000 /.386.1NT,
Total i�'�eSi: 44 4< 66:00•...,.,..r,J .,,.Valuation: Y,,
** *•k **•k * *rk�' *IGc * *'�`51t�, *: of **"k * * ** t t 1. l',:00'i,o, ***********
4� t «h , .tk 1 * *I 1, * * *k;,/1 k` k. ** k* k ** ** t74
I hereby td�prt1fy that I�11 „ave -r ;ead a(nd exa'``mli eii this per rnit' an,d'{�n.owt; e same
to be trueiUand corr^eo;t•... A1.1 <;,p}�oVi�sioris;of #16w and ordinances;;g.:overri "ng this
.�.�
work will' �(�{{,��//e 7compl iedl,wit,h, when e ; specifaied..,he ein or not'. The bra�rting of
this pernr1114t doe;s4not 0r•6urne t'o_.cA46 autho pit•$' "toy violate c�.r canc,el �t;Iie
provision of� a:ary other at ror 1'S' i 1•aw•s.�.,t egu�Tatin construction. dr the
performa4c'�e of waY'k: I a�ii•<au' h�`.o' ize °d to /) 9n for,- ..andgobta�in ,et ii�S L ,i!ifd
Altering pe mit ;. `This permit shall become nu'll/an'd._.lroid ifs} the worki;s not
comrnenced qv3 tv6A0 'LO''days from the dat'e ro ''-i s:sua.nce,or i t'''the..w'ark »'i'd
sus ended �'u'r��t abar�rdanek' for a period of 1`8 i d` IK p "c5r
p U.l �, d� p 1 0•, °days�sfrorii� the° last;. inspeu.tion.
� J � . . r
THE APPLICAN MUS ,1. +, �` ` ,t1
\ � �rLLT NOTIFfY, THE CITY INa`P9EG �aRf OF I.OM�NCEMENT AND L�OMPLETION
OF WORK AT A81t724 ,HOLIR:, DVAIV V '
, FOR AN,JNSPECTrON CALL 433' =11179
1► ' _- •«'e -...,, /.` ' fir ' •
4 w 1 t.e�: * ,,,:, ,
Signature;"}_'0,�
****************N,4”*
APPROVED FOR ISSUANCE:
*�ir(i * * •k k •k * * k� *r* �S *i *.� *0,�* k •k'•k�•k * * * * •k k k 1L* 'k '* * {r'k'c.�fr k * * •k •k * •k •k •k * * •k * *
J A P } `'''+'
Issued By:/ �`� i _,b Date: _/r/ t.._ . ✓� /
Authorized P e 9,. f er t e :;'girt n'; rt�`�i rl'e ,,.�,g,'.�''
**• k' k****** k * * ** **** * * *** *•.kYi"rk;$��G�kY *:f••k:k.,11(+4lc irk„ fy' k* k1r= ��l�iit`• vrilf ;fi'k�* * * ** **** **k **k* *** * ****
't`A l."'C'444,04..;:::;-.
o r a ne and address. appears .on
I hereby certify that the permit•= h:nw�l;,�t�.r�'�,.+�t pp
this record has satisfactorily met the standards and conditions.for this
project approved herein.
Final Inspection Approved By:
Inspector Signature
Date:
CHE7NE- POULENC I( :E.
ORGANIC CHEMICALS DIVISION
9229 E. Marginal Way South - P.O. Box 80963 - Seattle, Washington 98108 - Telephone: (206) 764 -4450
March 2, 1992
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington - 98188
Attention: Mr. Duane Griffin
Building Department
Subject: Demolition Permits for Rhone - Poulenc, Inc. Seattle Plant
TA, . -71
_.'MAR 0 2 199Z
PLANNING DEPT.
9229 East Marginal Way South, Seattle, Washington
Dear Mr. Griffin:
In response to your discussions with Mr. Ryan Daugherty, CH2M HILL, Inc. we are providing
the following confirmations:
1. Rhone- Poulenc, Inc, wishes to withdrawal two applications for demolition permits for
the following structures at its Seattle Plant:
a. Distribution Center (D.C.) Warehouse
b. Change Building
Along with the Administration Building and the Laboratory Building, Rhone - Poulenc,
Inc. plans to leave these facilities intact to support future cleanup operations at the plant.
In keeping with our applications, Rhone- Poulenc, Inc. does wish to pursue demolition
permits for the remainder of the building structures on the plant site.
2. As stated in your discussions with Mr. Daugherty, the storm drainage outfall to the
Duwamish River is no longer in use. Storm drainage from the plant is now collected,
tested, and diverted to Metro. We are attaching a copy of the approval letter from Metro,
dated August 26, 1991. This letter confirms Metro's knowledge and approval of the
collection, testing, discharge procedures being followed by the plant for sanitary and
wastewater discharges from the plant.
3. In regard to your concern about the protection of backfill in pits, Rhone- Poulenc, Inc.
plans to have the contractor protect such areas that are exposed to rainfall during the
#PRHINE POULENC
period between placement of fill and placement of the final cover material.
4. Rhone- Poulenc has reviewed the letter from the Washington State Department of
Ecology (a copy is attached) and will comply with the three conditions stated therein for
demolition, i.e.,
a. Site drainage will continue to be diverted to Metro unless other provisions are
made by or approved by the Environmental Protection Agency in compliance with
the forthcoming consent decree or a change in policy by Metro.
b. All due care will be taken by the contractor to avoid disruption of site paving,
slabs, ground cover, soils, and groundwater.
c. All appropriate precautions will be taken to monitor and prevent the dispersion .
of dust and airborne particulate matter. The plant fire water system will remain
operational and will be used if necessary to prevent the dispersion of dust.
Our schedule for demolition, pending issuance of the final demolition permits, is to commence
demolition work on Monday, March 9, 1992 and to complete all work by June 1, 1992.
We appreciate the care and concern shown by the City of Tukwila during the development and
review of the demolition permits for the Seattle Plant and look forward to working with the City
staff during the course of soils and groundwater cleanup at this site.
Sincerely,
Lewis B. Herr
Project Manager
Rhone- Poulenc, Inc.
).' •
; ‘yl
V NY
Nor 1416 iona
•A t vs
STATE OF WASHINGTON
EPARTMENT OF ECOLOGY
90 - 160th Ave S.E. • Bellevue, Washington 98008.5452 • (206) 649-7000
February 13, 1992
Mr. Duane Griffin
Department of Community Development
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Dear Mr. Griffin:
Thank you for your consideration in involving the Department of Ecology
(Ecology) is assessing potential impacts of building demolition at the
Rhone Poulenc site on historic site contamination.
Ms. Martha Turvey (Elliott Bay Action Team) and I have reviewed plans
and available information. We feel the demolition of above -grade
structures at the site can proceed without adversely affecting
contamination at the site under the following conditions.
1. All surface drainage at the site continues to be discharged
to the METRO Sanitary Sewer System;
2. Demolition activities do not disturb the integrity of paving
and /or building floor slabs, and underlying soils (including
soil and groundwater hydraulic/hydro logic conditions); and
3. All airborne emissions, e.g., dust fumes, mists, vapors, be
monitored and controlled as necessary.
Although this may not be the appropriate time to address this issue, we
would seek to encourage or advise that a full remedial investigation to
determine site status under the Model Toxics Control Act (MTCA) (Chapter
70.105D RCW), and MTCA regulations (Chapter 173 -340 WAC) be completed by
Rhone Poulenc within the year. Such an assessment would not be
guaranteed by the Hazardous Waste action being taken by Tom Post of
E.P.A., as different standards apply. A condition of the local permit
requiring substantive compliance with MTCA Remedial Investigation (R.I.)
requirements at the site, to include reporting such R.I. results to the
City and to Ecology has been used successfully in the past to accomplish
that end. A time limit, usually 9 - 12 months, is often appropriate to
such a condition.
•
Mr. Duane Griffin
February 13, 1992
Page 2
If you have any questions, please feel free to call for clarification or
to arrange a meeting. I appreciate the opportunity to work with you and
the City of Tukwila.
Norman D. Peck
Investigator
Toxics Cleanup Program
Northwestern Regional Office
NDP :gm
cc: Dan Cargill, UBAT Supervisor
Ryan Daugherty, CH2M -Hill ✓
Tom Post, EPA, RCRA Compliance
Martha.Turvey, EBAT, Ecology
File: Rhone Poulenc (MTCA) Monsanto Chemical Co.
w
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
December 11, 1991
PHONE # (2061433.1800
Lew Herr
9229 East Marginal Way South
Tukwila, WA 98109
SUBJECT: Rhone - Poulenc Plant Demolition (Maintenance Building,
PC " #.91 -467) 9229 East Marginal Way South
Utility Permit Application
Dear Mr. Herr:
Gary L. VanDascn, Mayor
The Public Works Department has reviewed the drainage plan and
supplemental information submitted for the above project and hereby
approves the plan for the proposed work.
Please contact Denise Millard, Permit Coordinator, at 431 -3672 to
have the following permit' prepared for pickup:
Storm Drain Modification (Inspection Fee = $15.00.)
This permit will provide for inspection of the
proposed work by the City Utilities Inspector,
Greg Villanueva.(433- 0179).
You are referred to other City agencies including the- and
Planning Divisions and the Fire Department, Seattle City Water, METRO
and appropriate utility franchises for other requirements and
;'approvals which may affect the commencement of this work.
Enclosed is an approved copy of the drainage plan for your files. If
you have any questions, please call me at 433 -0179.
Sincerely,
John A. Pier , P.E.
Associate E neer
Public Works Department
xc: Burt Miller, CH2M Hill
Greg Villanueva, City Uti,lities Inspector (w /copy, of
approved plan)
Permit Coordinator
Development File: Rhone- Poulenc
Read File
Enclosure: a/s
FE9 -27 -1992 14:09 FROM RHONE — POULENC
1 16:METRO • -
Munidpality of Metropolitan Seattle
TO 9- 4625957 P.02
Exchange Building • 821 Second Ave. 0. Seattle, WA 93104 -1598
August 26, 1991
Mr. R. L. Ferguson
Rhone-Poulenc Inc.
P.O. Box 80963.
Seattle, Washington 98108
Dear Mr. Ferguson:
Thank you for your letter requesting changes to wastewater
sampling and reporting procedures. You propose to collect
and analyze samples of wastewater batches since at this
stage of plant closure wastewater is being collected and
released on a batch basis. In addition, you propose to
collect daily samples of sanitary waste being discharged
from the plant to ensure this waste stream is not being
contaminated with residual copper.
I approve your request to change wastewater sampling and
reporting procedures. Effective September 1, 1991, Rhone -
Poulenc will conduct their wastewater monitoring in the
following manner:
Batch Release
{2)
o Prior to any discharge from an industrial wastewater
collection tank, the contents will be sampled and
analyzed for copper, FOG and pH to ensure they meet
discharge limits.
o During discharge to Metro a grab sample shall be
collected prior to the Metro Sump and analyzed for
copper, FOG and pH.
Sanitary Discharge
o A grab sample shall be taken daily from the Metro Sump
and analyzed for pH.
o Daily samples also shall be used to make a monthly
composite'to be analyzed for copper. A portion of each
daily sample shall be retained for analysis if the
copper content of the composite sample exceeds 3.0 ppm.
FEED 27 -1992 .14:09 FROM RHONE— POULENC
Mr. R. L. Ferguson
August 26, 1991
Page 2
TO 9-462595? P.03
Reporting
Batch Release and Sanitary Discharge analyses results shall
be submitted to Metro on a monthly basis. Analyses results
of samples collected during each month shall be submitted
not later than the fifteenth day of the month following
sample collection. Self monitoring reports shall be
submitted to Metro, 322 West Ewing Street, Seattle,
Washington 98119.
If you have any questions, please call me at 684 -2329.
Sincerely, �{
d(-ur i c- ei"'c- ---
Bruce R. Burrow
Industrial Waste Investigator
Environmental Programs
BRB:mwr
cc: Doug Knutson, Dept. of Ecology
DEMOLITION PLAN DATA SUMMARY
Rhone — Poulenc, Inc. I Seattle Plant Site
L
BUILDING �Ialvl�MaiYlc�. - UIUlnq
1
BUILDING AREA 16, s.�
BUILDING STRUCTURAL SYSTEM
Foundation
Ground Floor
Second Floor
Wall Framing
Roof Structure
Roofing
SOLID WASTE DATA
Cav
Cc-ACo sIa(o
OA
RECEIVED
CITY ()F TI IKWILA
NOV 15 WI
PERMITCENTEF?
ce-verde, bloG�, �� ce� i•nv%1ioa,
Rani •r ., e ckCric*
Material Quantity
OrAce.e c.,oY}e. IO i Cane 0,400 e.A
.I ili�j •f5.5,000110
(i rt) framcl5+• ass - 2100016
yy�� c �x. re % cm 71f 1.250110
(11r f 1a' e M \4 ei(s MN42•
SURFACE DRAINAGE
Existing
System
System
After
Demolition
HEALTH & SAFETY
JegJe.rt eometteL �4-
s
6,611 • *el
0
Destination
p(e 1 4J15�0 611
•frovecl d 05x,1
01(011(.. �0
eicl5:51l✓1`� ��rm
UYQ ;vIc1±
ec 1✓'ec4 dY'a,Vgc t0 evnine4e.
in1c�. Direc{ c�vc�rvq1��eT vi c✓rb�vlc�
41r1,y. Sijr4ur� draingc€ aPeer do vnoli ,
contr L M' Q--)14.541A1 drainage 421oui.
i%.0 lcio;1 l wa6 nok ue do- .cr�aa�n _c¢v►� ai'ee ....
v 1 c . �, cm1 U. c w i 5 rT %�
e tt rg ter. ' ilagq e 1's k evfz<ie
All work performed by RPI forces or contractor forces will
be accomplished under RPI SAFETY AND CONDUCT GUIDELINES FOR
CONTRACTORS. Contractors will be responsible for performing
their work in compliance with OSHA /WISHA, and all other
rules, regulations and requirements governing safety,
convenience and the performance of the work. All work shall
be in compliance with the regulations, ordinances and .
requirements of the permits issued by the agencies having
jurisdiction of the site and the work.
II__ II-- ry �
See. a 4rAchrye iT is far re-c7c(iol liras
'Err "
1✓xlhi .U1 611..Ci FEEDER'
le itst41T8D 4
e-AFf D .
rr
- T
WNG pC1 -ft1- P.-1- IIWIN Aeosie., std
_ J._._ , L'XI9 ING -p IeMAIN
O t u6-P es 4 N51FATiot�t5
J
qil t
Exlr.gzin►alrar�Y
tee 'WAS r1Nh -
i CAFF-tsr).
I rct241 ii 19-0 —r ch1I @ =4
- -- L-t - - --1 wr mi w/
- - .-i TO 17112-fcr Nfr e--
• 1° P teM-R . IZa.I-IE
VMAINAGG Ii-IN Cutz1✓ w/
.e,CtIFf R 4 PIpt; TO Exis-i
?f J'1 DF4V N .
V
)(mNG
PAvINq
H
I *1 Cr r
to (1e M.Aii4 OfeiewnomAL
IN`TAU- CIUNVf 4IL Fr Au
aF F 5ED SLAB
® NORTH
Exltrl■ca
PgAlkwie i 13e
F1u.ep
NOT TO SCALE
*MEW
MINN
r
NO.
DATE
REVISION
Rhone- Poulenc, Inc.
.Seattle_ Plant Site
SLAB DRAINAGE PLAN
1 RFI IENANGE.
SHEET
OF 1
DATE 11/15/91
PROJ.
NO.
PACIFIC
IRON &
METAL
A GLANT PACIFIC COMPANY
ulshan Demolishing
9229 East Marginal Way South
Seattle, WA. 98108
August 15,1 991
Attention Mr. Tim Barker
Dear Mr Barker
�TfHMENTr.° j� I 4,-P3
In consideration of the sale or transfer of all the non ferrous scrap metal for
recycling purposes, generated from your demolition project at the above address, as
outlined in our letter to you dated August 15, 1991, a value based upon its being
used as scrap for remelting purposes has been established, the undersigned
represents to Olshan Demolishing Inc, and Rhone - Poulenc Inc, as follows:
The property covered by this agreement will be used only as scrap for
recycling purposes and for remelting, either in its existing condition or
after further preparation, unless the undersigned is released from this
warranty in writing.
All obligations of the undersigned under this warranty shall expire (5) years
Pacif c Iron inri Meta . ompany
Jay 5 err off, purchasing manager
Notarized b i.9kez- j1 ✓ Date 2-,A77-
Printed on Recycled Paper
.■;iy. • "` =' ^. 7 • Seattle. Washington 98121 • Telephone (206) 628 -6232 • FAX (206) 628 -6252
nom
SEATTLE IRON &METALS CORP.
2966 11th AVE S.W., P.O. BOX 3793 • SEATTLE, WASHINGTON 98124
(206) 682-0040 • FAX: (206) 623.1231
r;palers and tinkers...
IRON AND STEEL SCRAP • NONFERROUS METALS • STEEL PRODUCTS • DISMANTLERS
Mr. Don Schulick
Mr. Tim Barker
Olshan Demolishing
2707 N Loop West #200
Houston, Texas 77008
August 26, 1991
SCRAP WARRANTY
Seattle Iron & Metals Corporation warrants all scrap metal
received from Olshan Demolishing will be sold only as scrap
for remelt,_ in condition not fit for reuse.
AT /lf
w
institute of Scrap
flecYcan9
Industries, Inc.
Sincerely
SEATTLE IRON & METALS CORPORATION
Adam Thomas
NERAL METALS
OF TACOMA, INC.
,r( Institute of Scrap
j Recycling
Industries, Inc.
1902 Marine View Drive
Tacoma, Washington 98422
Phone (206) 572 -4000 •
August 27, 1991
Rhone Poulenc Inc.
9229 E. Marginal Way
Seattle, WA 98108
Attn: Mr. Tim Barker
Dear Tim:
M� M I
In accordance with our telephone conversation of August 26, 1991 and our Purchase
Order number 6382, dated August 27, 1991, General Metals of Tacoma, Inc. submits
the following:
General Metals of Tacoma, Inc. is one of the largest ferrous scrap processors in
the Northwest. We cut and process all scrap material at our Tacoma facility.
All scrap material which is purchased by General Metals of Tacoma from Rhone
Poulenc will be sold by General Metals for remelting into new steel.
No material from Rhone Poulenc Inc. will be sold as anything other than scrap for
smelting or remelting purposes.
KK /ds
Tug
Ar44 THIS
1991
• etx0 a
puBL,
0 • =
..s isst, N.*:*
�IO
NOTAR,'VASN\ %%S
WU TELEX:((g7435
Respectfully submitted,
GENER4L<E ALS OF TAC J, INC.
en Kushin
Industrial Purchasing Coordinator
• FAX: (206) 572 -0316
SAFETY AND HEALTH
RECEIVED
CITY nr TI IKWILA
NOV 15 V41
PERMIT CENTER
Owner agrees that, during the performance of the Work, where employees of
Contractor and /or employees of subcontractors of Contractor are working on the
Construction Site in an area required by Occupational Safety and Health Act
Regulations, to be designated as a "Regulated Area" or other similarly intended
designation where special controls and /or monitoring are required because of the
presence or potential presence of certain chemicals or conditions therein, if
requested by Contractor and agreed to by Owner, it will, as agent for Contractor,
(1) provide said employees with respirators; (2) undertake necessary monitoring
of said employees and area, (3) provide the required training for said employees
in applicable hazards, and (4) supply information and data to Contractor for
maintaining appropriate records; all as required by said Regulations and all at
Owner's expense. However, it is understood that Contractor will provide or cause
to be provided medical surveillance and any other service or equipment as
required by Occupational Safety and Health Act Regulations, for said employees
during the performance of the Work in said area.
The above undertaking by Owner in no way constitutes the transfer to, or
assumption by Owner of, any of Contractor's or its subcontractor's duties and
obligations under Federal, State or local laws or regulations, including by not
limited to the above described regulations; no liability to Contractor, any of
its employees or other person, firm or corporation will thereby be assumed by
Owner; and Contractor agrees to save Owner harmless, to the extent valid and
enforceable under applicable law, from any and all liability, penalties and
claims of whatever kind, including, but not limited to claims of Contractor or
any of its employees, agents, vendors or subcontractors, or of governmental
agencies, based on Owner's failure or alleged failure to comply with any Federal,
State or local law or regulation, or based on any act or omission of Owner, its
employees or agents, in performing any of the above services.
Contractor shall take all necessary precautions to protect employees of
Contractor, employees of its subcontractor and employees and facilities of Owner
from hazards arising in the course of the performance of this Contract or in
connection with Owner's operations or chemicals located at or adjacent to the
Construction Site.
Contractor shall comply with, and shall cause its employees and all
subcontractors to comply with (1) all Rhone - Poulenc Safety and Health Regulations
and Requirements which are furnished to Contractor by Owner and (2) all
applicable laws and governmental rules and regulations relating to health and /or
safety. In the event that Contractor fails to so comply or to cause such
compliance, Rhone - Poulenc may suspend all or any part of the Work on which
Contractor or his subcontractor is engaged, until Contractor proves to Owner's
satisfaction that Contractor has corrected said failure. Contractor shall not
be entitled to any extension of time or compensation or damages by reason of, or
in connection with, such work stoppage.
-2-
Contractor shall review all safety and health regulations and requirements which
it is obligated to comply with hereunder and any applicable hazards which it is
obligated to protect against hereunder, prior to the performance of the portion
of the Work which is applicable thereto. Contractor shall notify Owner how said
regulations, requirements and hazards will be communicated to, and enforced with,
its employees and all subcontractors.
Contractor shall include in all of its subcontracts involved in the performance
of the Work at the Construction Site, the provisions of the Appendix, with
subcontractor being obligated to Contractor to the same extent as Contractor is
obligated to Owner. However, such provisions in the subcontracts shall not
relieve the Contractor of its obligation to assure compliance with the provisions
of this Appendix for all aspects of the Work.
Rhone- Poulenc Safety and Health Regulations and Requirements include the
following and may include others which are unique to a particular Rhone - Poulenc
location. Where Contractor believes any Safety or Health Regulation or
Requirement is not applicable, a written variance (per Plant Procedure) to
deviate there from must be received from Owner's management representative at the
location of the Work, prior to initiating the Work.
1. Location Work Permits
Work permits shall be obtained by the Contractor, and signed by an
authorized Rhone - Poulenc supervisor to confirm his acceptance of
precautions specified for the following operations:
a. Use of ignition sources in restricted areas.
b. Entering of vessels or confined spaces.
c. Opening process equipment.
d. Performing electrical hot work.
e. Making excavations and trenches.
f. Moving radioactive sources.
g. Performing pipe "hot tapping ".
h. Operating heavy equipment around electrical power lines.
2. Master Card Procedure
The Master Card Procedure for tagging and locking critical equipment
isolation points shall be followed by the Contractor prior to commencement
of work on such equipment.
-3-
3. Location Safety and Health Rules
All location safety and health rules 'furnished by Owner to Contractor
shall be adhered to by the Contractor.
4. Personnel Protection Equipment
Personnel protective equipment shall be provided by the Contractor as
follows:
a. Hard hats and industrial grade safety glasses with permanently
attached side shields and safety shoes shall be worn at all times.
b. Chemical splash goggles and hearing protection shall be worn in
posted areas.
c. Respiratory protection, harnesses and lifelines, and other necessary
protective equipment will be worn based on location regulations and
OSHA requirements and furnished by Contractor as needed.
d. Respirators shall fit snugly against the face. Persons wearing
beards shall be clean shaven where respirator makes a facial seal.
5. Caution Regarding Asbestos - Containing Materials
Should Contractor encounter any type of insulation or other product that
they suspect may contain asbestos during assignments, cease work
immediately. Notify the responsible plant supervisor in order to obtain
accurate identification of the material including sample analysis, if
necessary. Some typical questionable areas (but not limited to) include
cable insulations, pipe coverings, ceiling tiles, wallboard, blown -in
insulation,.boiler/powerhouse block insulations and drilling or cutting
through transite. Unless absolutely sure that a material is asbestos -
free, notify plant representative you're working with and cease work
activity until all questions are resolved.
6. Emergencies
Contractors shall be trained in those emergency procedures which directly
affect their own employees' personal safety and health. In the event of
an emergency (fire, explosion, vapor cloud, spillage, or related hazards)
arising in the immediate vicinity, Contractor agrees that it shall cause
its employees to leave the area immediately and remain at a safe distance
until the emergency is over.
7. Safe Tools
Scaffolds, stages, rigging equipment, electrical tools, ladders, hoists,
and other tools, machinery or equipment used in the Work shall meet
specifications of 'ANSI and the Occupational Safety and Health
Administration for such items employed in the Construction industry.
-4-
8. Accidents
The Contractor will be responsible.. for investigating all accidents
involving its employees and reporting all details to Owner's safety
representative at the location of the Work. When such accident
investigation is complete, the contractor will provide such Rhone - Poulenc
representative with a copy of the completed injury report. The Contractor
is also responsible for compliance with the Occupational Safety and Health
Administration requirements for reporting or communicating injuries.
9. Safety and Health Program
Contractor shall maintain its own safety and health programs. However, it
may be necessary at times for the Rhone - Poulenc representative to make
recommendations to assure protection of Rhone- Poulenc employees.
10. Contractor shall review with all of its employees assigned to the Work,
prior to their commencing any of the Work, all safety and health
regulations, requirements and programs applicable to the Work, and
Contractor shall cause its subcontractors to make such a review with their
employees.
11. Special Rules for Harmful Exposure
Contractor represents that it is familiar with the Occupational Safety and
Health Administration Regulations concerning harmful exposure to toxic•
substances, and is capable of providing, and will, unless and to the
extent otherwise agreed to in writing by Owner, provide respirators and /or
other protective equipment exposure monitoring; .medical surveillance;
employee training; record keeping and other services, to the extent
required by said regulations in connection with the Work.
EXTRACTOR BUILDING*
EXTRACTOR BUILDING :. - ±400 $Q: FT.
CMU BUILDING SINGLE STORY.
POST - DEMOLITION SLAB TO ADJACENT'
EXISTING PAVING
RCRA STORAGE SHED *
RCRA STORAGE, SHED;,= ±2,500 SQ. FT
UNENCLOSED STEEL FRAME WITH METAL.,
ROOF. POST - DEMOLITION SLAB TO DRAIN
TO EXISTING TRENCH DRAINS.
CONTROL ROOM *
CONTROL ROOM: = ±600 SO. FT.
,SINGLE-STORY CMU BUILDING. POST -;
DEMOLITION SLAB TO DRAIN TO
FORMER ROOF LEADERS,
VANILLIN BUILDING.
VANILLIN BUILDING ±10,560 SQ. FT
HIGH-BAY:BUILDING. STEEL FRAME AND
MASONRY. STRUCTURE WITH MASONRY
MEZZANINE. S 'EFL AND TRANSTITE
•SIDING. TRA N STITE SIDING TO BE w.
REMOVED yDURING (ASBESTOS R„E 111OVAL.
1. EXISTING EQUIPMENT' Rl'S TO.BE
BACKFILLED AND CAPPED WITH_ A/C'
PAVEMENT. '
2. SAFETY RAILS TO BE INSTALLED AT
RAISED SLAB AREA, .
MOLITION SLABS TO DRAIN,TQ
FORMER ROOF LEADERS` & EXISTING
PAVING
DISTRIBUTION CENTER WAREHOUSE *
DISTRIBUTION ER WAREHOUSE: = ±23,000 SQ. FT.
MASONRY WALLS TO APPROX, 12', STEEL WITH
WINDOWS ABOVE,
EXISTING SCALE I TO BE FILLE
1. S P T ,
T BE SLOPED TO DRAIN TO
.POST DEMOLITION SLAB TO
FORMER :ROOF LEADERS
SAFETY HANDRAILS TO BE INSTALLED AT EDGES OF
RAISED SLAB,
•
Upland Zone
SEPA Checklist
- Demolition Permit
='in "cludlna
Utility Permit M
- `BuIftfU Perrti
FIre.Protectlon'Demo P�
Certlflca "te of Int'uran'. e
.''Bond
H2'ulin'g Permit
CHANGE ROOM: ±2,700 SO,` FT. •
SINGLE -STORY MASONRY BVILDING;WITH
DOUBLE ROOF, TEES. -POST- DEMOLITION
SLAB TO DRAIN TO EXISTING!GRADE
N a9•' S 54-vv 14 7O V' 6 -S 2 ,3'40 59' E
t4e7 i'RFJM 'NT rat ,,.NE BE'WEIN
C+_'•A't(1N (;.AIMS Q. FRANC -I', M. NA
ANA '.(", NRI IAe, A'.pEl.' xi•r. EAST:
ttNl. Of SEC 3f 'AP,24N,R ;4E WM
CE COR, tS 0 T' N. OF PROPERTY LINE
RECORD LOCA,•.l)N
6• Wass $ANILep,
SEvvL•R E ("ACE MAIN.
05 3.10
cHLOERIINL
6Y wAU[y
`Ob-1 . • I i tOO.:Ni+
ll TA -OwER
Q ,■C • PUMPS
vL DI \
OvERHEAO —
•OA0 P., AT FORM
DIRT
A SNHAL
Plv& (iPS
..2H
SloR' h'
MASt..NU' 9•'.0IN(a COT'ON•.
WOOD
• PL
9• h BUMnf-R
,•,i .. ASP /. 4 ., •
•
/9.r' ,
Q; 561,38tDEED) 5',3,55; CA;';C
EAST .' ,/ 544.99KCALC 54282,.(GLE.D)
PA "NT MARK 11EaPHUNE t
.4AS:
SLRVILE
•0,1 Rr•RFAINO APPROXIMAfE1;
,C AMC RA
ASPHA..T
MEAL BIN
MEAL SIN = ±8,418 . FT.
±15' HIGH CIP CONC °' ETE WALLS WITH ±8'
STEEL FRAMEWORK BOVE. "TRANSTITE"
SIDING PANELS AT UP " ER LEVEL EXTERIOR
REMOVED DURING AS ESTOS REMOVAL.
POST- DEMOLITION SLA DRAINAGE, TO
SLAE'PERIMETER & PI-ED TO FORMER
ROOrLEADERS
1, DEEP WELL AT
SOU H WALL TO BE
BACKFILLED AND CA - PED WITH A/C
PAVING.
2. EXISTING BASEMENT. 0 BE BACK-
FILLED AND CAPPED TH A/C PAVING
AT EXTERIOR AREAS.
'TANK
• tHa
PIv ' t. a u'c.s
c o-4
WV-N.
TANKS,
•Arms
• •`I 7ch
m y i NUMEROUS 'Ai
.4.v -1 16 OV!,RIIEAD PIPE
o (n I COMP&r4 !HIS .r ►EA -
N V
0 ASP.IA_T
a V
C.WALL
tc6
'SVFN co C7TIIAR
0
4 C7•• VAJLTS
tgSOMH --•0 (.
yPIV '6a
•(Vt
Hum EROUS *ANA
AAtn OvCRNEAr)'- F.pC.
COMPLE) AREA
SC A LE . ,..,.6
'- A9a,g00NE: C
RC,' • • • •
l0' --.-•- .ti •
• -
L:.
c.o
TANKS
COMPRESSOR BUILDING ±1,600 SO. FT.
HIGH -BAY BUILDING. STEEL FRAME WITH
;'. STEEL SIDING. POST-DEMOLITION SLAB
' ' GR
PT '
( -''L_, TO DRAIN TO EXISTING: GRADE
.
r' B` x000 !' P T f' � •f°
1 BUMPER 11--
., ,.1..:.J ('P T *.'T.:—.1,
Ai�P s
P. P - .t PP I D •I ,.�PAI'T "'MARG�tC.&S;
Gh
r.O:
LAROX BUILDING
LAROX BUILDING: ±11
±3 STORY STEEL FRA
STEEL SIDING. POST-
DRAINAGE TO EXISTIN
PtVT
13 SQ. FT
E BUILDING WITH
MOLITION SLAB,
GRADE;
GP ••• 1 pPP
I `_ ININIINIIIItINM
•
L E!
P • RI V •
B'
7Cw
RAILROAD
!�O- SSMHy..
SSMW,O - P
Lo' `
AS PHA
GRAVE.
rENCE, Col* '2.6' S`6`'2,i E.'•OF
PROP. - CORNER ,
5 A'1: WALK •
BR,S)+
BRUSH
36 4. ?E!
MAPLE': •••
" .
) /44
A 4
f • ', L V
r �.r t
�,(' 3y. A','.
STORAGE SHED
STORAGE SHED: = f1,500 SQ.` FT.
SINGLE -STORY STEEL AND WOOD
FRAME WITH TRANSTITE SIDING..'
TRANSTITE SIDING TO BE REMOVED
DURING ASBESTOS REMOVAL. ., -1
POST DEMOLITION SLAB TO DRAIN
TO EXISTING PAVING
Pier, Zone
gEPA;Checklist
• Shorellnes`Permit
- DemeUtiiity l td Permit Permit including
,.q,
BuiIdir a Permit
Shoreline Zone
- SEPA Checklist
Shorelines Permit
_:. Demolition Permit including:
Utility Permit •
Building Permit
Fire Protection Demo.` Permit
Certificate of Insurance Iry
Bond,
Hauling Permit
MAINTENANCE BUILDING
MAINTENANCE BUILDING: = ±9,624 SQ. FT
1 STORY CMU /CIP
CONCRETE COMBINATION
WITH STEEL FRAME AND TRANSTITE SIDING
ABOVE. TRANSTITE SIDING TO BE
REMOVED
DURING ASBESTOS REMOVAL, POST-
DEMOLITION SLAB TO DRAIN TO FORMER
ROOF LEADERS. SAFETY RAILINGS TO BE
INSTALLED AROUND PERIMETER OF
BUILDING SLABS AND ADJACENT RAISED
SLAB. r.
W (40'1 7,
FENCE CO'N 2.0' N
OF PROP. LINE
PLO
GATE
DESCRIPTION
IHAr PORTI0N'OF I'HA:TS 1?AVD 2 bF THE )IFAOiTWS� 4CCORDING,TO ;NT
PAIt*I`rIO` rMAi', J'• PART LW CH! FRANCIS MC NATC DONATION LAND CLAIM
NQ. '3A' "FI.F.D' +IN KING COU4'ry SJPERit)R COURT CAUSE NO. X120091, AND
OF •. THE' ABANDONED ^'.;8ED OF rHF.3^,:D'JaAMISH :'RIVER; c ALL LOCATED 'IN
SECTION 33, '' TOWNSHIP; 24 NORTH, RANGE..' 4 EAST, W.M., IN KING
COUNrY, , WASHINGTON ANDI.ALL, LYING;; WESTERLY • OF THE, W S'p £RLY MARGINS
OF/,,EAST. MARGINALL WAY `SOUTH AND -ALSO WESTERLYai3OF3.THE PARCEL;': OF
LAND' ADJOINING EAST MARGINAL WAY WHICHYWAS'ICON'.PEYED•4TO'GREAT
NORTHERN RAILWAY COMPANY`BY DEED ::,RECOKDE'D';CINDER FILE`NUMBL'R
4784819 ;;LYING EASTERLY OFrHE EASTERLY MARGIN OF THE RIGHT OF
WAY OFi':> COMMER ,CIAL;; WATERWAY 'DISTRICT NO.,;,1 ID'JWAMISM WATERWAY);
LYING;SOUTHERLY;OFFHE" HEREINAFTER DESCRIBED " - "LINE A"; AND LYING
NORTHERLY OF rHE`HIREINAFTER DESCRIBED ; "LINE /B : '
N 89' 27' 59" v,
.1494
.Cq H •,`j ..t ,
VA •• :L t4 ••,OR'
LEGEND:'.;
LINE A :1
BEGINNING ON THE WESTERLY ORE ,or EAST° :MARGINAL WAY' sOUTH, W ICH
POINT BEARS NORTH .;;89 '115'54 "'WEST 2470.01 FEET,. ALONG THE ,DONATION
CLAIM LINE. AND SOUTH'S( 40'59 ".,.EAST 648.77'FEETeALONG THE
WESTERLY LINE'. 0I EAST.MARGINA(. WAY SOUTH FROM THE INTERSECTION OF
:THE' BETWEEN ,THE `DONATION CLAIMS`OF FRANCIS MC NATT AND HENRY
VAN ASSF.LT WITH THE ,EAST "LINE :OF SECTION 33, TOWNSHIP 24 NORTH,
RANGE1 EAST, W.M...IN KING COUNTY, WASHINGTON; RUNNING THENCE
WEST 1574.72 FEET ITOTHE'/ ^EASTERLY LINE, OF COMMERCIAL WATERWAY NO.
I);b'THENCE/SOUTH 5 '(101OO" EAST ALONG SAID: EASTERLY LINE 237.76
FEET ./TO THE TRUE' POINT OF' BEGINNING OF SAID "LINE`:A" ;`.`THENCE EAST •
1053.10 FEET; ,THENCE SOUTH 23'02'00,' EAST: / 46.03 FEET; 'THENCE 'EAST
561.38 FEET 'CO .THE wE$TERLY MARGIN OF EAST MARGINAL WAY SOUTH AND
THE TERMINUS OF SAID 'LINE A ";,
LINE Bhl.;.
tM� ,,; Orr •' .,;,
BEGINNING ON THE WESTERLY MARGIN OF EAST MARGINALd WAY SOUTH AT A
POINT WHICH BEARS NORTH"89'15'54 ":WEST A DISTANCE ;OF:2470.01 FEET
ALONG THE OONAT[ONyyCLAIM LINE" AND SOUTH 23'40'59" EAST A DISTANCE
.''OFgg'',,•1374.17'FEET (ALONG THE WESTERLY MARGIN OF EAST MARGINAL WAY
,SOUTH 'PROM 'THE INTERSECTION OF THE LINE BETWEENITHE:,DONATION
CLAIMS OF FRANCIS NC NATT AND HENRY.VAN ASSELT WITH THE EAST LINE
;OF;;;SECTION$33, 'TOWNSHIP :24 NORTH, ° RANGE '4 EAST," W•M.).''IN KING
COUNTY, WASHINGTON, SAID POINT BEING AT THE INrEP.SECT[ON OP THE
WESTERLY MARGIN OF EAST MARGINAL WAY SOUTH;, WITH THE NORTH LINEOF
VAN DE VANTER'STOCK FARM .TRACT AND THE'TP.UE,POINT OF BEGINNING OF
-SAID 'LINE 13"; THENCE NORTH 84'27'50 "f WEST 'A DISTANCE+OF,r14.94
FEET; ":THENCE NORTH 86'54'59" WEST A 'DISTANCE Or ` 486.97' PEET:
THENCE' NORTH 84•17.04" WEST A DISTANCE OF 117`30' FEET THENCE'
SOUTH 83'57'56' WEST A DISTANCE OF 119.00` FEET; : :THENCE SOUTH
70''40'29 "'; WEST A'' DISTANCE' OF 110.173' FEET ;,±„THENCE SOUTH 61'.33'40"
,,wesT'A .DISTANCE OF 840.02 FEET, To'THE /EASTERLY LINE OF THE'' RIGHT
'OF' WAY OF _COMMERCIAL WATERWAY DISTRICT NO.'`I AND'; THE TERMINUS: OF
ASPHALTIC CONCRETE
SURFACE''
CLEAyuu r •
C.H. CONCRErF'•RAMP
C... • CONCRETE WALK:
C',WALI Cl7NCRETE%ALL
D.I. -DRAIN ,INLET
,
E.V. ELECTRICAL VAULT
EXISTING 'SURVEY
MONUMENT.
--A— -- FENCE "Gi me
FIRE HYDRANT
•-G -- GAS MAIN
G.P. GUARD post
4---- GUY. WIRE. OR CABLE
IC8 INTERCEPT CATCH BASIN
'INTERCEPT DRAIN INLET
O H. l)VERHEA :)' AVE E LINE
-=- o - -o-- •PIPES KITH SUPPORT COLCMNS
POWER POL
PARKIR NG ;SPACE 'STALL
0
NOk rHFRNR RAILWAYHCO•MPANY AS RESERVEl1H IN :WED RECORDED UNDER FILE;-
NUMBER 41;14818.
PL PLANTER
P 1,V.'POST INDICATOR
VALVE
OVERHEAD, PCWER WIRE.;''
POWER a TRANSFORMER
PROCESS' MANHOLE
STORM DRAIN
SANITARY SEwF-R
STREET 'LIGHT
TFI..PHONE •19E
;rFLEPHONE CON)'UIr
OR TELEGRAPH
r.11. rEST HOLE
T.S. TELEPHONE SENTRY
T.D. TNr.NCH; OItA:N
LMLCTY ACCESS
MANHOLE
WATER MAIN
+:M WATER METBR
W. V.
�ITY F
u OILA
APPROVED
A
MAR i'99
Pr AS NOTED
t` FILE-COPY;
1 ehderstand that the Plan Check approvals are
r
subject to errors and'oitiilssions and approval''of
r�'Iar s does' not authorize the violation of , any
P
• , ted. code or ordinence:'' Reeei t'of "coitracivr'
` y of approved plans ackrtbwledged,
CERTIFICATION:
SURVEY IDENTIFICATION .NO.:
REGISTERED ." LAND SURVEYOR ' NO.:
SURVEYOR'S ADDRESS &" "COMPANY:
WATER "VALVE:
NATER''VALvi; :slot
MErep CHAMMER
•
Date
w
.^
Perriilt 'No._ ... .. . .
86181.01
22333
BUSH, ROED &,HITCHINGS, INC.
2009 'MINOR AVENUE EAST
SEATTLE, WASHINGTON 96102
TELEPHONE:
CERTIFIED TO:
RHONE.,-POULENC
STEWART'TITLE COMPANY OF
WASHINGTON, INCORPORATED'
IT ':IS V ;t,
"THIS.BASED °`WERExI?ApE�N THIS MAP OR PLAT AND THE SURVEY ON WHICH
IN "MINIMUM STANDARD DETAIL
REQUIREMENTS ;FOR A AM LAN ACCORDANCE RVEYS, JOINTLY ESTAB-
LISHED NAND ' ADOPTED BY ALTA AND `ACSM IN 1908; 'WAND. MEETS THE14.CCU-
' RACY " OF A CLASS ` "A" SURVEY, AS DEFINED "THEREIN AND
`
INCLUDES ITEMS REQUIREMENTS (2 & 9) OF E ` 3 THEREOF. "
F' ire :Protection' °Demo. Permit
LOA: � . W..
rt ficete of Insurance;
Bond
•
'Hauling Permit
• Corps'of Err.' inners Permit for Work in Navigable � gable Waters
W!eshingtoh State Department of Fisheries HPA Permit
DEMOLITION PERMIT SUMMARY
STRUCTURE
AREA
REMARKS
COMPRESSOR BUILDING
VANILLIN BUILDING
CONTROL` ROOM
EXTRACTOR BUILDING
RCRA STORAGE SHED
DISTRIBUTION CENTER WAREHOUSE
CHANGE ROOM
PERMIT RECORD
DATE ISSUED
± 1,600 SQ. FT..
• 10,560 SQ. FT..
± 600 SQ. FT.
t 400 SQ. FT.
± > 2,500 SQ. FT
f' , 23,000 SQ. FT.
± 2,700 SQ. FT.
41,400 SQ. FT.
LAST BUILDING TO BE DEMOLISHED
MEAL BIN
LAROX BUILDING
MAINTENANCE BUILDING
STORAGE SHED
TOTAL SHORELINES DEMOLITION
41,400 SQ. FT.
AREAS GIVEN ARE APPROXIMATE GROUND COVERAGE OF
POST-DEMOLITION "FOOTPRINT:":_
* POST DEMOLITION SLAB DRAINAGE F"OR INDIVIDUAL STRUCTURES
HAVE BEEN REVISED,' SEE DETAILED SLAB bRAINAGE'PLANS
ST A. HITCHINGS, P.L.S. NO. 2333
THE ABOVE 'CERTIFICATE ;IS BASED 'PON WORK PREPARED IN ACCORDANCL'
WITH GENERALLY ACCEPTED`, PROFESSIONAL SURVEY PRACTICE. WE MAKE NO
OTHER - WARRANTY, EITHER EXPRESSED OR'IMPLIED.:
TITLE REPOR' REFERENCE:
THIS SURVEY WAS CONDUCTED ACCORDING TO TIE
ABOVE bESCR'IPZ`ION,
FURNISHED BY STEWART TITLE COMPANY OF WASHINGTON,'INCOtPORATED,
COMMITMENT NO. 137029, DATED FEBRUARY 1, 1991. THE EASEMENTS
SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT.
NOTE: OR EASEMENTS CREATED
NOTE: OR RESCIN!�ED' AS'TE`R THIS DATE ARE NOT
NOTED HEREON.
Figure 2J
Coptractor Access and Work Areas
for Maintenance Building
Fi ��' - POiJLENC INC.
EAS1 MARGINAL. WAY SO. PLANT
• RECEIVED
611 OF Toot IL.A
,1 5 1991
PERMIT CENTER
111,1' '11'1'11 IITII� `r111111`'11r�rrrjrlilrlr.
148.18'. + '
HI �i � it k P � 0 I �i r(l HMI
is x
x' T
T, '
'zrt�'''ii° .
d01 6
. d
6 8
JM. 1
8,R �
�L. 9
9 9
9. �
1 fti. .
� �
� F
F4r� .
Y
Y k
k ,
..