HomeMy WebLinkAboutPermit 6941 - Rhone-Poulenc - Meal Bin Demolition��
'r
�,
KIET
?DULEMC
qt1
BULDN PERMT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept. of Community Development- Building Division
6300 Southcenter Boulevard, Tukwila VVA 98188
(206) 431 -3670
BUILDING
PERMIT NO.
LogLidi
DATE ISSUED:
3
• j %1 3;hiJl :y ut' yi1c', �h'wuk7���4rJ:r4.•r,y: r.,; .,.....
"i11%!hn ?,:ii>•!J ad.r.•;.t+r.:Jt
SITE ADDRESS
PROJECT NAME/TENANT
9229 E Marginal. Wy S
0.!!.. fvg;i+ iii,,(,. :"i;`&1 3.44�
DESCRIPTION
BUILDING PERMIT FEE
PLAN CHECK FEE.• <'
BUILDING SURCHARGE
OTHER:>;:>:::,:.;: ;;<::':
AMOUNT RCPT. ## DATE
.30.00 4159
11 -15 -91
TOTAL:-' <:
.0
PLAN CHECK NO.:
91 -468
y n.ti,r'.•
SUITE
Dr. c-,:itiy49i-plosii..
VALUE OF CONS1 RUCTIDN
26,300.00
Rhone- Poulenc Meal Bin II ASSESSOR ACCOUNT# 542260 -0010
TYPE OF U New Building i♦ Addition f♦ Tenant Improvement (commercial) (X] Demolition (building) L Grading/Fill
WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
Demolition of existing building excluding floor slab..
PROPERTY OWNER
Rhone - Poulenc
(PHONE
764 -4474
ADDRESS
9229 East Marginal Way South, Tukwila, WA
IZ1P 98109
CONTRACTOR
ADDRESS
Olshan Demolishing Company, Inc.
PHONE 800- 874 -3366
P.O. Box 925628, Houston, TX
ZIP 77292
WA. ST. CONTRACTOR'S LICENSE # OLSHADC099Nid
EXP. DATE
8/08/92
ARCHITECT
PHONE
ADDRESS
SQUARE OCC. SQUARE
FEET LOAD FEET
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
TOTAL
TYPE OF CONST.: N/A UBC EDITION (year)
1988 I
SETBACKS: N- S - E-
W-
FIRE PROTECTION:
QSprinklers Q Detectors
Q N/A
UTILITY PERMITS REQUIRED?
O Yes 0 No
(through
public Works)
ZONING:
BAR /LAND USE CONDITIONS?
Shorelines -OK E Yes
0 No
CONDITIONS (other than thoso noted on or attached to permit/plans)
APPROVED FOR
ISSUANCE BY:
BUILDING
OFFICIAL
DATE:
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions'of lay
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit.
SIGNATURE:
DATE: 3 -- 5
PRINT NAME: �.g/,?,/z• l .��'ir�SCi / COIv1PANY:
This permit shall become null and:vo#d if the work rs not commenced: within 180 days from the date of
.•.issuance, or :.1f.the •work is:suspended orabaridoned for.:a period of`.180 days:from the last:inspectlon
CERTIFICATE OF
OCCUPANCY NO.
DATE ISSUED:
PLAN CHECK
NUMBER
q -q(og
t BUILDING ERM1T
APPLICATION TRACKING
PROJECT NAME
SITE ADDRESS
onv - PU1Q.flC
SUITE NO.
a.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
FLOOR:::
SQUARE
E
OCC.
LOAD
SQUARE
ET
OCC.
OA'
SQUARE
F 3
OCC.
O
•
SQUARE
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC, LOAD
:TOTAL
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
•
•I•er Ikt
PARTM
BUILDING -
initial review
-R FIRE
RtVED;::
UIREIVIE
CONSULTANT: Date Sent -
1 1-15 -9 )
IMEN
Date Approved -
_.(ROUTED).__
INIT:
PLANKING
„L
1■7' PUBLIC
WORKS
0 OTHER
INIT:
r{Zf //
INIT_�r
INIT:
7/
FIRE PROTECTION:
Sprinklers
FIRE DEPT. LETTER DATED:
ZONING:
Detectors
INSPECTOR:
BAR/LAND USE CONDITIONS?
REFERENCE FILE NOS.:
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
PUBLIC WORKS LETTER DATED:
BUILDING -
final review
REVIEW COMPLETED
3/3/
INIT: rli�►
TYPE OF CONSTRUCTION:
UBC EDITION (year):
PERMIT NO.
CONTACTED
DATE READY
DATE NOTIFIED
BY:
(init.)
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
fl/
3RD NOTIFICATION
BY:
08/17/90
CiTY OF TUKWILA
Department of Community Development - Building Division
BPERMIT
APPLICATION
vvv vvu a..vv.. avl L IJSv 7Gi I!.4 r IJf VJ IQ 7V1 % �7V 1Vf!
(206) 431 -3670
`+v{, :iis.E� r }•
; , <!:. }::; �. >;
. �, oU ><
.. •.
-
:< F/ i' v,.0
i � ' i
aL••: :.
;', >;;;/f:,•r ry: p lui
'!r•
:.f X..:; '.'; %; fr?
cl� f. r,
maw ::.
p .Fr,? r.
Y,• Ili• ,;I?!S.
:: ' <'r c0' . r: r< • 'C: }Y.
, ':'Y%r'A•r:'•y/r{r•'<
/.Wr /f /,.{!. : /.:x'%ri4r�� ?fr
PLAN CHECK
NUMBER / Ali
.. ..: �. �
,dP� r�,a r�oN.. nnusr � .
...•. 3 .. : � .. ..
n, ....,..:! :. ..... • ... •....... . .:. ,. ...; .....
A I�
.:;.FILLED.'. 7'' C (3 MF'L E T Y :;:....
... � • .. �Y.,. .
_.,
r {:m
"� r•. H'. %
1'�' . ..
�: f,<
I t � : .... ; m < .m
$ ✓ /::c'r;`x`•,YY' 5`> };!<Y
?• �;?:;Y.: '.10.
:Yi: ".5$.'y.?
: '';< i ; err, ; ;'F
%f Y;.. }f;;:r
: ty`?3 ?IM
, •,v,:' /,4.S.. n.. r...Y.'h� >{f..:.$ ? <.'l.:i :'i�i
?r }v ?`: ^'n'�$i; %::•::; ?:!... ... :.?.
:rif.Jpv,{r %
� ?.�r. ? <'::
<,Yi }: Y.........
. :•.:G' }�f? i? �i' +$ +•:i %>
:.�.t�: ?.
H I:,. .vp•.: �: n::..v:::..;Y;.. i }y ?b:in....... f
.. . r................ r................
.r�
::. n.;t,,`•Iy,.r..Sbf.: }i:$:
• . M I$ : ,:?. r ,: >Y
}• � r:4�ry.;�.;; .:
�
;r:n�:!:: >.:+;i:t'i,:;' ?C�::i:
,: ; Y:;:<::; >;:<
:.;i:. ; % ?Y ?:.
:: '::'•;?.:.;:::?•.?:!:•:
:rr nS�.e
�i4!v::t<w �:i�.r; :: .r
:.:::: :,: < ::::,,:•;;
�•:::.! {;,: r ::.Y.t +.•j:if,.Y+i:• }:
..:• <r•:::•... .:.. ?....... ??.....,
•: r,.::..; .{::: ? : � ?.
, .:...�,_...: :.:•Y.....'C.A�TAL:.;..
-. , r...: }:.::
•Y;; ? ? ?!::•Y:ei� <: < ?••.•r:! ?•;:
SITE ADDRESS SUITE #
9229 East Marginal Way South ,_
VALUE OF CONSTRUCTION - $
26,300
PROJECT NAME/TENANT
Rhone - Poulenc 4
ASSESSOR ACCOUNT # .
542260 -0010 ,
TYPE OF • New Building • Addit On • Tenant Improvement (commercial) 11 Demolition (building)
WORK: 0 Rack Stora.e 0 Reroof 0 Remodel residential 0 Other:
DESCRIBE WORK TO BE DONE: ..,
Demolition of the Meal Bin excluding floor slab ,
BUILDING USE (office, warehouse, etc.)
Manufacturing
NATURE OE BUSINESS: Closed industrial plant.
WILL THERE BE A CHANGE IN USE? ' No Yes 1f Yes, new building requirements may need to be met. Please explain:
SQUARE FOOTAGE - Building: 8,418 Tenant Space: Area of Construction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
Q No 0 Yes IFYES, EXPLAIN:
PROPERTY OWNER
P E 764 -4474
ADDRESS 9229 East Marginal Way South, Tukwila, WA
ZIP 98109
CONTRACTOR Olshan Demolishing A Brand Company
PHONE713/867 -9200
ADDRESS 2707 North Loop West, Suite 200, Houston, TX
ZIP77008
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT NA
PHONE
ADDRESS
ZIP
PRINT NAM
Lew Her
ADDRESS 9229 E. Marginal Wa South
CONTACT PERSON
Lew Herr
CIiY/ZIP TukwilazWA 98109
PHONE 206/764 -4474
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at
the Buliding counter which provide more detailed information on application and plan submittal requirements.
Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION • Vaivatbn for n6w constnrdbn and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3870 prior to submitting
application. in all cases, a valuation amount should be entered by the applicant. This figure wilt be reviewed and Is
subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT It the applicant is other than the owner, registered archilect/engineer, or contractor
licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this •
permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued wfthin 180 days following the date of application shall •
expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined In Section 304(d) of the Uniform Building Code (current edition).
No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION EXPIRES
DATE APPLICATION ACCEPTED
• 11- -15 -a1
SUBMITTAL CHECKLIST
COMMERCIAL
09.4.1 t itAf ;* Na
.o�e.Mf:each. aWct
.0.06. eted building pecrrdt eppllcadon
>ARCessor:?Acoount Num,.'. .
' o sots (2) o the t IoWln
f laatiais`
truowratcalculadon a; stem
meet:: >........::
911•!.;•'911•5411" Ip
ok►ted buUdn pornjlk appucazian Sono;
Ai :o sci Acoou t N t e f
:`•:'sots °o%con t JctiQ
by a Washl gtan Stale Ikon
ed bye. Washington State licensed eopi
tds9.4 .
Overall building plan
> « i:Use;of ad ac t', ton WaH) tat
< :iaysraU. cGrrleristQns of butldlnp "or:z•
Floor pla i►:of prop sed. t ant .Aece ` <`? <
gss > 8
tva!Is'to':t�edernolished<<;i
Grotla< aec�tonu showiat} Walt coat +ttvc nand method of
attachment for fCbor $nd selling :
:`:rat''catcuie lions s"fampod `:` °a.WashIr t Sta a pca sa
$ti itch.:: . ..:::::::.::::::. ::.::':::::.: R.,::, bY.:::'.;<: :....:: :n:•:..,:..:'...::: :::,.
eng moor may t o;t gixitad if ?? lrucfu al wo:rk.ts o ba ckrne (2 t tits
I 1f a) nyydli>XivoticlaAbe.dolts,:aubm t saparatout111typarmtt.:
•
a�plkidot'a
:i:v #:ir sa'st %iir:.v.+ >r:r�i >rXi: :; •:r f> ri3.
ANTENN I A,TEWTE DI:BE( <>
: a plo d ylkz i:a pesmltr ppIk
Assot ay A4ZoUS N F i> :r '
culatlana
ortipii nor Sr d storage
G: X> i> G: Yii::` iC+. n+.++.. i.. .. +:.Jnr... :...+....:,+ : : %�tif�` :•iii : : : ::
RESIDENTIAL
{ :i % :iji ! ' : :'•E /'g 5' / /. // is is 'S, i'i >i <'iti >' %'zi <'i' " i ;' %iy6' %;ii '4 � 3•,' + :rc ':
.t4EW SINGL,E.fAMILY DWEWNG6 /ADDIT10
r4: Riii ,3•.,"f ;' %f4 / 3.'•k;i':,ir; y +i %i`X, :2`• >i :'s >.'a ;.
mglated bcil ng pormit tip 1104g0:1' (one..
►i" w d' locatiq j of to satellite d s
it al atelifto: >iilsh &lit ri t l�od :of;`itttuohrt art >> r ` i
:•.'•�i•::`•: <;:' %�' :iii :::.;�:::;: •i . <.;. <.ii
& h 'toa St tQ.Gcenso
oc►a atamp�x! by A:�N...::1nA .::.:.::::..:.. :.:..:.
enn{neor ma
pF,�IDF.N17Ak. 01). ....., ..
ptittalll
fiooi la
* Bufldi ;eteavatl
?�.
o a:: all
iiliiin
a. otitlonl!
<tiucturat iraittri plan
i%Q6h!ctt9�i!$itU.'ti.6f Ci9
f;Cariipleted'UHD(ty`po iI PPI
t>
tins „shbwing.j ttl .
•' :•.r' :' :'SYii % ? : ;i » : >;!�1�i1�l1 �8i(%�f1i3Qnr4.
<� ails.. >Grotadtu
>St uctu(al> •aming
an¢ptarss mrtsfbe #uGfrtl ed
C•Y :CLJ'v :4Yn ?YYil: ri•:iw`•+i:: Yw• r ''ir :t•.•:fY :(4 :V+:i4:• :friL.42�
.°41.449' u plan and udltty slto plan may ba aomb/ned Sva
r porm/t application and choCkllst far apo fflo ubmltta1 roqulraments:
bona! topgpraphlcul apd salts Infarrr�atlop may its toquirad ll unlgue :.:
JriBPaclttxT and slgrt -;
PLAN CHECK
NUMBER
gi-L-Ros
ROUTING
UTILITY PROJECT
TRACKING LIECKLIST
PROJECT NAME
Rho rw2.. -- Po vt -e.nc.
SITE ADDRESS
�aau mwra�r�c�� wus
SUITE NO.
-
PA • •''S
RECEIVED
TYPE OF REVIEW
D• ROUT- 0
TO PWD
DAT • • S
APPROVED
DATE RES B.
REQUESTED
COMMENTS
[HS —C11
0.2mo
Li -(S-tl
la-.tt_al
Curb Cut/Access /Sidewalk
Fire Loop /Hydrant
Flood Zone Control
PERMITS REQUIRED
ilX
PERMITS
PERMIT
NUMBER
APPROVED
PLAN /LETTER
DATE
ISSUED
Channelization /Striping /Signing
Curb Cut/Access /Sidewalk
Fire Loop /Hydrant
Flood Zone Control
Grade /Fill
P 0 9a -00 gq
3- a(40-9
3'?�-ai-)-
Hauling
Landscape Irrigation
Moving an Oversized Load
Sanitary Side Sewer
Sower Main Extension (private)
Sewer Main Extension (public)
Storm Drainage
D—O 13 &
1d% 1 '_4l
3 4
Water Main Extension (private)
Water Main Extension (public)
Water Meter (exempt) Size:
No.:
❑ Deduct
OWater Only
Water Meter (permanent) Size:
No.:
Water Meter (temporary) size:
No.:
Other:
Other:
CONDITIONS OF PERMIT ISSUANCE OR FINAL SIGN -OFF OF PROJECT
CITY OF TUKWILA
Central Permit System - Engineering Division
6300 Southcenter Blvd., Tukwila, WA 98188
Phone: (206) 433 -0179
r
UTILITY PERMII" APPLICATION
PLAN CHECK
NUMBER: q
..... ..........................
'J C.T ' >' « > Site Address:
INFORMATION ' Name of Project:
Property Owner: Rhone- Poulenc
Street 9223 East Marginal Way South
9229 East Marginal Way South, Tukwila, WA
Rhone - Poulenc Plant Demolition
Phone No.: 206/764 -4474
Cit /State/Zi•: Tukwila, WA 98209
Phone No.:
Cit /State/ZI :
Phone No.: 713/867 -9200
Engineer:
Street Address:
Contractor: Olshan Demolishing A Brand Company
Street Address: 2707 North Loop West, Suite 200, Houston, TX
Cit /State/Zip: 77008
King Count Assessor Account Number:
542260 -0010
O Channelization/Striping/Signing
❑ Curb Cut/Access/Sidewalk
❑ Fire Loop/Hydr. (main to vault) — No.: Sizes:
❑ Flood Zone Control
❑ Grade/Fl cubic yards
❑ Hauling
O Landscape Irrigation
❑ Moving an Oversized Load
O Sanitary Side Sewer -- No.:
❑ Sewer Main Extension
Private ❑ Public ❑
❑ Storm Drain
❑ Street Use
❑ Water Main Extension
Private ❑ Public ❑
❑ Water Meter / Exempt: — No.: Sizes'
Deduct ❑ Water Only ❑
❑ Water Meter/ Permanent — No • Sizes•
❑ Water Meter / Temporary: — No.: Sizes•
❑ Other:
Name: Rhone - Poulenc
Street 9229 East Marginal Way South
■111111~
Phone No.: 206/764 -4474
City/State/Zip: Tukwila, WA 98109
Name: Rhone - Poulenc
Street 9229 East Marginal Way South
® Water ® Sewer ❑ Metro ❑ Standb
❑ Multiple- Family Dwelling
No. of Units:
® Commercial/Industrial
❑ Hotel
❑ Motel
❑ Office
❑ Retail
❑ Duplex
❑ Tri lex
❑ Warehouse
❑ Manufacturing
Phone NO.: 206/764 -4474
City /State/Zip: Tukwila, WA 98109
❑ Apartments ❑ Other:
❑ Condominiums
❑ Church
❑ Hos • ital
❑ School/Coliege /Universit
❑ Other:
❑ New Building ❑ RemodeV Square footage of original building space:
Square Addition
'` "''''`F'' ""' '' ""' "' "` ` Footage• • Square footage of additional building space:
King County Assessor's valuation of existing structures: $ 785,800.00 Valuation of work to be done: $ 294,500
•
.......
<I►EREBY :.EIS:. i. . . ..:,.
,.:<::::.. � ::.::::::.::.....G..:::::: Fl..l"Y:�:::.: .. �,
...
v .. {:.......:... y. t,:.: ,..:... {a < .:.; ..::...:::....
.....:....IMO ..AP�?��AT�� OMAN �!`. � � >.... .. < • :,:(9`t> .:.v; 1.�TREC'►'�<
Applicant/Authorize • , ' �`' /
Agent Signature: /
Contact Person
(print name): Lew Herr
Air
Print Name: Lew - •,r
Address: 9229 East Marginal Way South
Date: 11 -15 -91 Phone:
Tukwila, WA Phone: 206/764 -4474
Date Application Accepted: `.1
15_ q I
Date Application Expires: 15
09/18/90
SUUM17TAL CHECKLIST. >.;
All site plans shall be provided in one submittal for review by the
Public Works Department. Six (6) sets of plans stamped by a
licensed engineer are required along with this application
completed and signed by the applicant's representative.
The following information is necessary for Public Works
Department evaluation and approval of site plans:
• All utility construction is to meet the City of Tukwila Standards
• Indicate scale of drawing and show north arrow
• Identify location by address or distance to nearest intersection
CURB CUT /ACCESS /SIDEWALKS/
CHANNELIZATION/STRIPING/SIGNING
O Dimensions
O Type of surfacing - asphalt, crushed rock, etc.(and thickness)
O Percent of scope or runoff direction
O Size of curb cuts/location
O Vehicular and pedestrian traffic facilities, including signing and
striping, wheel chair ramps, curb cuts
FIRE LOOP /HYDRANT
O Type of pipe
O Size of pipe/location
O location and type of all valves
O Type of bedding and backfill materials /percent compaction
O Distance from structures, storm and sewer facilities at minimum
separation
O Location and size of thrust blocking
FLOOD ZONE CONTROL (Requirements are under Flood Ord.
No. 1462 and can be obtained from the Public Works Dept.)
O Lowest finished floor elevation
O Contours and elevations per National Geodetic Vertical Datum
LAND ALTERING (CLEARING, GRADE AND FILL)
O Contour map (2' Intervals) showing existing and proposed contours
O Estimate of yardage, both cut and fill
O Erosion control plan
HAULING
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $2,000 bond made out to the City of Tukwila for property damages
caused by activities
O Route map
LANDSCAPE IRRIGATION
O Location of DSHS approved double check valve
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter
O Location and elevation of meter box (water meter - permanent and
exempt). Clearly show whether tap 1s on main or domestic service
O Location and type of tap
O Type of bedding and backfill materials/percent compaction
MOVING AN OVERSIZED LOAD
O Copy of Certificate of insurance coverage (minimum $1,000,000)
O $5,000 bond made out to the City of Tukwila for property damages
caused by activities
O Business License with City of Tukwila
O Route map
SANITARY S1tc SEWER
O Type of pipe. - concrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run •
O Connection point(s) to public
O Location of cleanout(s) and test Tee(s)
O Type of bedding and backfill material/percent compaction
O Invert elevations at structures and Junctions
SEWER MAIN EXTENSION
O Type of pipe - concrete, PVC, etc.
O Size of pipe/location
O Percent of slope on pipe/length of run
O Connection point(s) to public
O Location of cleanouts
O Type of bedding and backfill material/percent compaction
STORM DRAINAGE (including existing topography and
proposed grading and surfacing)
O Type of pipe
O Size of pipe
O Percent of slope/length of run
O Location of ail structures
O Square footage of area to be drained, including roof area
O Becring material for pipe
O Invert or flow line elevations
STREET USE
O Complete description of proposed activity
O Map with address and outline of limits of activity relative to public
right -of -way and easements
O Proposed traffic control/detour (per Manual of Uniform Traffic
Control Devices)
O Proposed schedule (times and dates)
WATER MAIN EXTENSION
O Type of pipe
O Size of pipe
O Hydrant type and locations
O Valve type and locations
O Connection point(s) to existing system
O Type of connection - live tap, tee, etc.
O Location and size of thrust blocking
O Size and location of mains, including elevations (profile)
WATER METER - EXEMPT
O Diagram of domestic system/tie in of exempt meter
O Number /account for existing domestic meter
O Size and type of material of meter and service
O Site address
WATER METER - PERMANENT
O Type of pipe - copper, high density molecular plastic, ductile
O Size and depth of pipe
O Size of meter
O Location and elevation of meter box (water meter - permanent and
exempt)
O Location and type of tap
O Type of bedding and backfill materials/percent compaction
WATER METER - TEMPORARY
O Address and hydrant location
O Size of meter
O Estimate of quantity and schedule
After the Public Works Department has completed their review and the plans are approved, the applicant will be notified
by letter concerning the necessary permits and requirements; an approved set of plans will accompany the letter.: '
if the plans are not approved, the applkant will be notified by letter of necessary resubmiltal requirements:
( INSPECTION RECORD C
Retain a copy with permit
(qLfl
PERM' NO
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 431-3670 ,
roe
h3 Nra, — PO 1) l_p n L.
ype o nspe.
Address: cvzz; g ri\04.3. uj ti6
Date Called:
Special Instructions: `)
L.Qu.) :er■r•
1(09, - Lit-110
Date Wanted:
am. 8
Requester: R an — cm 1.00
•
Rime No.: L Soo
Approved per applicable codes.
0 Corrections required prior to approval.
COMMENTS: '
((Ai, G (k)ci-Jts
—fo
• 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspectIon, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
IRempt No.:
Date:
INSPECTION- RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Project: op
►••1►•. �•U 'a.
Type of Inspection:
14-- ►' ■
r . ress:
q 4aq F YlAa rg rvo t,u
'ate Ca le.:
3- 5-4D .
Special Instructions:
Date Wanted:
/�
3 -10- q,D aC5 p.m,
Requester:
tJ111: 6.911- r1
Phone No,:
1 lo14 - LI I-15
Approved per applicable codes.
COMMENTS: '
❑ Corrections required prior to approval.
3_
Inspector:
/0-97
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
�P.
Date:
HL NE "POULENC I
FINE ORGANICS DIVISION
SEATTLE, WASHINGTON PLANT
9229 E. Marginal Way South - P.O. Box 80963 • Seattle, Washington 98108 - Telephone (206) 764.4450
18 June, 1992
City of Tukwila
Public Works Department
6300 Southcenter Boulevard
Tukwila, WA. - 98188
Attention: Mr. Greg Villanueva
RE: Demolition Permits:
No.. 6936 - Vanillin Building
No. 6937 - Extractor Building
No. 6939 - Control Building
No. 6940 - Maintenance Building
No. 6941 Meal ,Bin Storage: Area
No. 6942 - Storage Shed
No. 6943 - RCRA Storage Shed
No. 6944 - Larox Building
.Dear Mr. Villanueva:
This will confirm our discussion in which we stated that all utilities and process
drainage associated with the above permits have beeen capped and /or plugger in con-
formance with the stated permit requirements.
Rhone - Poulenc, Inc. retains possession of the property and is responsible for all
maintnenance thereon, including the integrity of all utilities. It should be noted
that all surface drainage from the site is directed to Metro after testing for com-
pliance with Metro standards.
This will also confirm the withdrawal of permits for the demolition of the Change
Room Building and The Distribution. Center Warehouse have been withdrawn.
The Compressor Building - Permit No. 6938, is on hold pending Rhone - Pulenc, Inc.
verification of the disposition of the compressors contained therein.
If you have any questions regarding these proceedings please do not hesitate to call me.
Sincerely,
ewis B. Herr
Project Manager
(PRHONE POULENC
'71" ; ;TA'r*Y!,rg..2:17.t ?',3'n'"77.I ,7"2'4 ^.`G:,'. "?rY;r'n;it"`..., ;; gtr. :'. "P'C'.?.t TP.1*^;v!:7s
4********* k************************ *********•**k****•k****** ******
TRANSMIT
CITY OF 1'UKWI:LA1 WA
**/ i** h******** ***k*•* * * *** *'k ** ********** ** ** **fir ****** *k *. *** *k* * **
TRANSMIT Number: 92000242 Amount:. 55.50 03/30/92 14:49
Permit No PWi2 008'' Type: PW °LA LAND ALTERING PERMIT
Parcel No: 542260 -0010
Site Address 9229 EAST MARGINAL WY S
Payment Method: CHECK Notetiori: CH2M HILL Iriit: DLM
** h****************** k**** * ** * * ***k *k* *** **k *k* ********** *fir ** *k*
Account. Code Description Paid
000/322.100 BUILDING '-' NONRFS 000/345.830 PLAN CHECK - NONRES k02
Total (This Payment): 55.50
Total Fees:
Total All Payments:
Balance:
55.50
55.50
.00
•
, Lvtrt*K S�ti- �y�;v�•ra'+'zxry ^.,rr,:�`�:�
GENERA
GENERA
GENERA
GENERA
.GENERA
GENERA
GENERA
GENERA
TOTAL
'2.50
15.00
64.50
22.50
43.50
22.50
33.00
22.50
246.00
CHECK( 246.00
CHANGE 0.00
8387A000 11:51
LAND ALTERING
Permit No: PW92 -0089
Status: ISSUED
Project: RHONE - POULENC
Address: 9229 EAST MARGINAL WY S
Location:
Parcel #: 542260 -0010
Wetlands:
Scopes: X
Watercourse:
Issued: 03/30/1992
Approval Letter: 03/26/1992
Expires: 09/26/1992
OWNER RHONE - POULENC ING•� : 3�. •u � ��
_ Phone: (206)754 -4450
C/O GAIL E. ,MMQR:R " "P 0. BOX 80963' ';.'•S :EATTLE WA , 98108
CONTACT BERT MILLER=C.H2M HILL = K, ea: : '';.,..N
* *•k * * * * * * * * * *'k *•k ** i k•k*4 1141* ° ft �h *k1 •k *** *•kadi :*k *-re* •tk":�k* *'A** * *•k * *k•k•k• *A*
Additional DesC;r/ip�t�io.r:h; y �t� s'�s 1 � ' 43 , A; .tij14
MEAL BI/7„,/ S• ORA,CE BL .,G- PCB ,s#0 91 468 'r +.� 0 r, c, �..• ,`i; w A l' L
Grading /Fi 11 /,(,Yards) -Cu €: ,.Q �, i�11 : V66 Td'tai �"; 166
t, a ?Y r °v;i \.\,,c,',.
fir'
4 41
Permit ;F,ele , 33:00\0' .r'''' Account N'a,,. 000/5322 r,` 0
Plan Check le. rr N 1.0.
+ ; 22 Account No ' 00023'45.830
o't'her L" N ,. ���` Account No ,00"0 - 386.904`
Total ee�•- a r
RI) 5`5:'5.0•- . .Valuation • �} 00�c'j
e `W,..•. k, r yy % r i> c* �k vim
k k * * •k * * * •k * *
*k * * * * * * *. *r * *k* : *�fn *kk�ar * * * * *. *• *'Ar'k:)k! k * *: kdrkk * *- . *: * *'* y * *,kk * * * * *k *; * * *. *"i * *k' *.
� qty f • �• »y;+ 4er 1 ��`` !
1 hereby !c,ertify that 1 „h.ave`•r�:ea`d 'etnd e. a.minerii th�i's per mit "and�``kn:ow '-F
to be true and corrNC H k' i °” .r..;ie same
sit+ 4, ..�AY1s1,,,p' o `s i o is �,d , )140 an,ci ord i nantes�,,go,0rnti` g this
work wil,be complied ,wit,li, wl:i'est•�ta s edified•- tie;r'ein or not;. The gr •an.tin of
this peri'1:ti does'no't p''r•esume ",�t,o g' p 4,1 g
( + auth.elt•f lo,'v i of ate or canes 1 tote
5�` i s•y.. tic "1....- , -'^';r 1 � � '1. +� �` . i=�:.i y
provisionszof-'anyy other= s:ta,t•e;o.r ,loea \', i•aws--- regulating cons'truconlor; the
performan�e` of worF: 7 I a•m;a.ut.ti.orized' to�•�s,,i;gnrfor ^.;,and obta,i'n:'th Ts Lan {d
Altering p,er�mi;tV:} Th i�'s permit shall bec'orge nu'l 1;.,.arid --Vi d if tl'e .w,prK' 'i' s not
i' ,Y
commenced \'w'•l,,th:i >n��''1'80 `days from the date 'obi ° -i u.a)ce or i f thap;,= orlr:� 5
t y. J sZ4 g, } L , t r 47 w; . }
suspended E a b a rt d o�n a ds for` a period of � l "•8 Cl �•d a y s� f r o'nr n t h e. `� 1 a,s�t�- •3•i4rr s p e �c�t c a n.
THE APPLICA 1 MU "T NQIIFLY THE CITY INSFPEC1I,C�R OF COMENCEMENT AND CON(PLETION
OF WORE' AT LE '''�' 2 "HOUR 'IN DVANC .(FOR AN IF SFE�CTFI "ON CALL 4334 -0179 •
Signature:_ w'1 � ^ :� ","-- (.1N -c., aF,t efi
4.
,f:/,,,, a
* * * * * * * * *•k ** ** ** '.•***** ` J *•k'k•k *•k**k' *SM .*;• k�* xktk *• *'Jtk•k•k ***•k•k*,7�'kk " *•k J * *•k•k * *k **'k'k'k* N. APPROVED FOR ISS AWE,: JAP -'-
Issued By:_ -a `� _ ' i±, ° , �; ) Date:
uthori zed Fermi t, YL.e0.ter StgnaTt9u4'
**• k* * * * * * * **•k * * * * * * * * * *•k ** *'kki ikc**» *.+Iy kt; xk. ik�' k %k'k *** * * *** **•k * ** * *'k ** * * *•k*
I hereby certify that the permit`.,ho•i.:d:ec :,:w.hasa --name and address appears on
this record has satisfactorily met the standards.and conditions for this
project approved herein.
Final Inspection Approved By:
Inspector Signature
Date:
BUILDII.3 PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING (Pq
PERMIT NO. "C
DATE ISSUED:
3 5 -9a
SITE ADDRESS:
9229 E Marginal Wy S
SUITE NO.:
PROJECT:
Rhone - Poulenc (Meal Bin Building)
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATES)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Slab Insulation
431 -3670
4 Shear WaII Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
X
11 Pre -Demo
431 -3670
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar Is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11.
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Departrnent for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
Oa14/20
March 26, 1992
City of Tukwila
Department of Public Works
John W. Rants, Mayor
Ross A. Earnst, P. E., Director
Burt Miller
CH2M Hill, Inc.
777 108th Avenue N.E.
Bellevue, WA 98009 -2050
SUBJECT: Rhone - Poulenc Demolition (Meal Bin Storage Bldg.,
PC # 91 -468) 9229 East Marginal Way South
Utility Permit Approval
Dear Mr. Miller:
The Public Works Department has reviewed and hereby approves your
application for a utility permit for the subject project.
Please contact the Permit Coordinator at 431 -3672 to have the
following permit prepared for pickup:
Land Altering Permit (Permit Fee = $55.501
This fee was calculated using 166 cubic yards of
fill as the measure of land altering activity. The
permit fee breaks down as follows:
Plan Review Fee = $22.50
Permit Fee = 33.00
Total $55.50
This permit covers work that is a part of the demolition project for
the subject building. We have your overall site plan on file.
If you have any questions or need clarification on any issue, please
call me at 433 -0179.
Sincerely,
John A. Piero P.E.
Associate Eng neer
cf: City Utilities Inspector
Permit Coordinator
Development File: Rhone - Poulenc
JAP /amc
amc:12:rhone3
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665
CHONE-POULENC
ORGANIC CHEMICALS DIVISION
9229 E. Marginal Way South - P.O. Box 80963 - Seattle, Washington 98108 - Telephone: (206) 764 -4450
March 2, 1992
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington - 98188
Attention: Mr. Duane Griffin
Building Department
MAR 0 2 1992 1
PLANNING
Subject: Demolition Permits for Rhone - Poulenc, Inc. Seattle Plant
9229 East Marginal Way South, Seattle, Washington
Dear Mr. Griffin:
In response to your discussions with Mr. Ryan Daugherty, CH2M HILL, Inc. we are providing
the following confirmations:
1. Rhone- Poulenc, Inc. wishes to withdrawal two applications for demolition permits for
the following structures at its Seattle Plant:
a. Distribution Center (D.C.) Warehouse
b. Change Building
Along with the Administration Building and the Laboratory Building, Rhone - Poulenc,
Inc. plans to leave these facilities intact to support future cleanup operations at the plant.
In keeping with our applications, Rhone- Poulenc, Inc. does wish to pursue demolition
permits for the remainder of the building structures on the plant site.
2. As stated in your discussions with Mr. Daugherty, the storm drainage outfall to the
Duwamish River is no longer in use. Storm drainage from the plant is now collected,
tested, and diverted to Metro. We are attaching a copy of the approval letter from Metro,
dated August 26, 1991. This letter confirms Metro's knowledge and approval of the
collection, testing, discharge procedures being followed by the plant for sanitary and
wastewater discharges from the plant.
3. In regard to your concern about the protection of backfill in pits, Rhone- Poulenc, Inc.
plans to have the contractor protect such areas that are exposed to rainfall during the
'RHONE POULENC
period between placement of fill and placement of the final cover material.
4. Rhone- Poulenc has reviewed the letter from the Washington State Department of
Ecology (a copy is attached) and will comply with the three conditions stated therein for
demolition, i.e.,
a. Site drainage will continue to be diverted to Metro unless other provisions are
made by or approved by the Environmental Protection Agency in compliance with
the forthcoming consent decree or a change in policy by Metro.
b. All due care will be taken by the contractor to avoid disruption of site paving,
slabs, ground cover, soils, and groundwater.
c. All appropriate precautions will be taken to monitor and prevent the dispersion
of dust and airborne particulate matter. The plant fire water system will remain
operational and will be used if necessary to prevent the dispersion of dust.
Our schedule for demolition, pending issuance of the final demolition permits, is to commence
demolition work on Monday, March 9, 1992 and to complete all work by June 1, 1992.
We appreciate the care and concern shown by the City of Tukwila during the development and
review of the demolition permits for the Seattle Plant and look forward to working with the City
staff during the course of soils and groundwater cleanup at this site.
Sincerely,
Lewis B. Herr
Project Manager
Rhone- Poulenc, Inc.
"
e.
(?,) > c? .D J'
Nor ►Lyso
•A1I 'na
t)..1
STATE OF WASHINGTON
EPARTMENT OF ECOLOGY
190 - 160th Ave S.E. • Bellevue, Washington 98008.5452 • (206) 649-7000
February 13, 1992
Mr. Duane Griffin
Department of Community Development
City of Tukwila
6300 Southcenter Boulevard
Tukwila, WA 98188
Dear Mr. Griffin:
Thank you for your consideration in involving the Department of Ecology
(Ecology) is assessing potential impacts of building demolition at the
Rhone Poulenc site on historic site contamination.
Ms. Martha Turvey (Elliott Bay Action Team) and I have reviewed plans
and available information. We feel the demolition of above -grade
structures at the site can proceed without adversely affecting
contamination at the site under the following conditions.
1. All surface drainage at the site continues tv be discharged
to the METRO Sanitary Sewer System;
2. Demolition activities do not disturb the integrity of paving
and /or building floor slabs, and underlying soils (including
soil • and groundwater hydraulic/hydro logic conditions); and
3. All airborne emissions, e.g., dust fumes, mists, vapors, be
monitored and controlled as necessary.
Although this may not be the appropriate time to address this issue, we
would seek to encourage or advise that a full remedial investigation to
determine site status under the Model Toxics Control Act (MTCA) (Chapter
70.105D RCW), and MTCA regulations (Chapter 173 -340 WAC) be completed by
Rhone Poulenc within the year. Such an assessment would not be
guaranteed by the Hazardous Waste action being taken by Tom Post of
E.P.A., as different standards apply. A condition of the local permit
requiring substantive compliance with MTCA Remedial Investigation (R.I.)
requirements at the site, to include reporting such R.I. results to the
City and to Ecology has been used successfully in the past to accomplish
that end. A time limit, usually 9 - 12 months, is often appropriate to
such a condition.
Mr. Duane Griffin
February 13, 1992
Page 2
If you have any questions, please feel free to call for clarification or
to arrange a meeting. I appreciate the opportunity to work with you and
the City of Tukwila.
Norman D. Peck
Investigator
Toxics Cleanup Program
Northwestern Regional Office
NDP:gm
cc: Dan Cargill, UBAT Supervisor
Ryan Daugherty, CH2M -Hill
Tom Post, EPA, RCRA Compliance
Martha Turvey, EBAT, Ecology
File: Rhone Poulenc (MTCA) Monsanto Chemical Co.
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
December 11, 1991
Lew Herr
9229 East Marginal Way South
Tukwila, WA 98109
PHONE # (2061 433.1800
Gary L. VanDusen, Mayor
SUBJECT: Rhone - Poulenc Plant Demolition (Meal Bin Storage Bldg.,
PC # 91 -468) 9229 East Marginal Way South
Utility Permit Application
Dear Mr. Herr:
The Public Works Department has reviewed the drainage plan and
supplemental information submitted for the above project and hereby
approves the plan for the proposed work.
Please contact Denise Millard, Permit Coordinator, at 431 -3672 to
have the following permit prepared for pickup:
Storm Drain Modification (Inspection Fee = $15.00)
This permit will provide for inspection of the
proposed work by the City Utilities Inspector,
Greg Villanueva (433 - 0179).
You are referred to other City agencies including the. -- Building and
Planning, Divisions and the Fire Department, Seattle City Water, METRO
and appropriate utility franchises for other requirements and
approvals which may affect the commencement of this work.
Enclosed is an approved copy of the drainage plan for your files. If
you have any questions, please call me at 433 -0179.
Sincerely,
John A. Pier.. P.E.
Associate. En. neer
Public Works Department
xc: Burt Miller, CH2M Hill
Greg Villanueva, City Utilities Inspector (w /copy of
approved plan)
Permit Coordinator
Development File: Rhone- Poulenc
Read File
Enclosure: a/s
ide
—1
grub
.T?eaii tayg• Rpt -
'to 13E CAPPED
ti
4�yt��1�
pr�i►an4te T
R�rnt iu Op .ara.At_
c l'FST2 W/ AW c D(ItNoR
APs •
• OP FWz)F
. LE,&4 p. tom' -.I N S
(T'fr)
AU. CAP` w/ P.zr Far WELL
CO VC
rOVC
%.c
1u
r. •C.
---iii
r' -1
Egoti L ?c4 c-
peaiNaciE - To
8� LLZp
6x :T. it H pi2m4
w� r'1 iL. colEfZ , .
SIP 4 FILL-H4/ •
i I�iIN� �Io
12÷-rimisi
Pet-NS1-1-FeNc.H
DrJN. GaP w/ .
GAP of; Pu r 5L.&e,
i NETF me d.irsIG£
- 'f i 11145
I NIo'E. ��cIS71Ny
eLAe,
11CLU7I144 Cot. WM1i '
APPROVED PER PUBLIC WORKS- -fCo P 4i , t'tow// ID E Al ic o6 -Q . -1 o a CKJ N
LETTER DATED /d. it gl P 4M Iz. Farm. PF NNAr5 IW U
c•UF�u w/ r--GLI Z 4 rips -To EXISTINq
'1.c1 t F H PI Pi r+y
mint
NORTH
NO.
GATE
REVISION
.Rhone— Poulenc, Inc.
,.Seattle .Plant Site •
.SLAB DRAINAGE PLAN
r557,L ".�!faE �iTLt7fNC1
•
NOT TO SCALE
SHEET
OF
1
1
OATE 11/15/91
PROD.
NO.
FEB -27 -1992 14:09 FROM RHONE - POULENC
1ga "'METRO
Municipality of Metropolitan Seattle
Exchange Building • 821 Second Ave.
August 26, 1991
Mr. R. L. Ferguson
Rhone - Poulenc Inc.
P.O. Box 80963
Seattle, Washington 98108
TO 9- 4625957 P.02
Seattle, WA 98104 -1598
Dear Mr. Ferguson:
Thank you for your letter requesting changes to wastewater
sampling and reporting procedures. You propose to collect
and analyze samples of wastewater batches since at this
stage of plant closure wastewater is being collected and
released on a batch basis. In addition, you propose to
collect daily samples of sanitary waste being discharged
from the plant to ensure this waste stream is not being
contaminated with residual copper.
I approve your request to change wastewater sampling and
reporting procedures. Effective September 1, 1991, Rhone -
Poulenc will conduct them wastewater monitoring in the
following manner:
Batch Releasq
o Prior to any discharge from an industrial wastewater
collection tank, the contents will be sampled and
analyzed for copper, FOG and pH to ensure they meet
discharge limits.
o During discharge to Metro a grab sample shall be
collected prior to the Metro Sump and analyzed for
copper, FOG and pH.
Sanitary Discharge
o A grab sample shall be taken daily from the Metro Sump
and analyzed for pH.
o Daily samples also shall be used to make a monthly
composite'to be analyzed for copper. A portion of each
daily sample shall be retained for analysis if the
copper content of the composite sample exceeds 3.0 ppm.
1
FEB-27-1992 14:09 FROM RHONE - POULENC
Mr. R. L. Ferguson
August 26, 1991
Page 2
TO 9- 4625957 P.03
Reporting
Batch Release and Sanitary Discharge analyses results shall
be submitted to Metro on a monthly basis. Analyses results
of samples collected during each month shall be submitted
not later than the fifteenth day of the month following
sample collection. Self monitoring reports shall be
submitted to Metro, 322 West Ewing Street, Seattle,
Washington 98119.
If you have any questions, please call me at 684 -2329.
Sincerely,
Bruce R. Burrow
Industrial Waste Investigator
Environmental Programs
BRB : mwr
cc: Doug Knutson, Dept. of Ecology
r
•
•
1
1,1cop: p4.456 Agez. Geo(z7,-47 r6r- foe-- 42,D0 aza, vett,t->
e-17.
( (17
1 '
\ •
Are, C-P
1
7 6,r1-1P4 ct,,e49
447'
..4),c717r&
1,04,0' 'IP" pd. •
,,xv7-rt
- -
• ■
V■Ce-A6 •
1›. -
•
.1
DEMOLITION PLAN DATA SUMMARY
Rhone—Poulenc, Inc. Seattle Plant Site
BUILDING `Lq Sclokicie, �t111dfY1
BUILDING AREA 6r4b 4 f
BUILDING STRUCTURAL SYSTEM
Foundation C�.ollcre�
RECEIVED
r,ITY OF Ti IKWIIA
NOV 1 5 i991
PERMIT CENTER
Ground Floor Conc_re�C, -6
Second Floor NA..
Wall Framino C�oric re •te waas 40 -1-ISf .1.eQ( karvte qLove>
Roof Structure ``L-kd &rank:.
Roofing AltAcd lcc,oq
SOLID WASTE DATA
1C�}tllb:, d- Carl
all et: •33
VJG, 'y 4 f rlcifS
Quantity Destination
250 ,P,oKd ,I�(orl �ii-c
53,c27O I (e4)f`l
1,000 IL, rovtd dls',osl c1i�e.
2' I 16. . AFT roved ci iS�o aI 4.ide
SURFACE DRAINAGE
Existing "cam /� (eaLex canr1�c+ a4 graae. do 4arm o. c1c e �y�4e fl.
System I /
System
After g'[
Parinid -e,r• 1.?IrecF d
rya dra i
rule a
lll�lric wur, /14 u J f
ot,L tr 60,45 I S
Demolition
HEALTH & SAFETY
10 �111e� �1d exi
e �o
ATv.Co, sR Wwl
e �� co( (� at
raingre 1-6E4 curb In 1 ercic
d�vv.o,
cells tsf f w/ AcIsd-tnci ra oS
Prow44inc1. lUp e4KCAVc 1.1m ,( c'ovljac1 wll"\
•
�d 110 (111111 demtoII 'Ilan
siorrn c air\..
draivlagp. an- -low.
J
haz.�rYi$.
'. .Y. ordiA,LL risk. 6xree ci
All work performed by RPI forces or contractor forces will
be accomplished under RPI SAFETY AND CONDUCT GUIDELINES FOR
CONTRACTORS. Contractors will be responsible for performing
their work in compliance with OSHA /WISHA, and all other
rules, regulations and requirements governing safety,
convenience and the performance of the work. All work shall
be in compliance with the regulations, ordinances and
requirements of the permits issued by the agencies having_
jurisdiction of the site and the work.
e
all PAM & W or recynnti Rrn1S
. 1,t.1h 4AUsi't -`f
�P-tt n4 e P9 ' -1 Eq -
-fo GAPPec
u
5)(1“ 0 �7 -foer�
REMAIN
..066M-41" 10 M RAW 4
C %PFD w/ PUV, G EX IOR
PEAS•
CAF' UNUer€v PQ'F
LEP f,Gi t4
( -rYP.) •
irris
- Al P
NORTH
1
E1fIhfINE1 Fgct.6 -i p
9e41r4ACie - To
8� f u.eD
exK. 1P H 1 N5
-w M"t'L. Cc EK, h
i UIP 4 FIU-4/
I I11NG 'ro Mr 1/641,1
J• 'fb -( Nc4-1
t2FLys4tN . CAP w/ .
CAP ePF PLUG 5L
f NE KAll fit GUTFAGE
CP 1 f H GTir■I N5
I love. �xlSTING
P%ul1.DlNG -ovr-
INC.UVING COME. WMU-
CAP {P AP-EA. w/ A-T FE-Q. To Pf N
` O ( ItI .. 11 O /IDS cow: amp-,
'
�LA6 etRIM fZ. FCCITE Nt E. "ThRU
C.A4Fit, w/ `�GIjFPeR 4 PIPt:• 10 XI.511Nq
'-ifc1 t*N Pinr4'
1011111.1
INININ
CIEM
NO.
DATE
REVISION
NOT TO SCALE
.Rhone - Poulenc, Inc.
.Seattle .Plant Site •
.SLAB DRAINAGE PLAN
.61NR�aE:- �Itl:.t�INC -1_
SHEET l
1
OF 1
DATE II /13! 9I
PROJ.
NO.
PACIFIC
IRON &
METAL
A GLANT PACIFIC COMPANY
Olshan Demolishing
9229 East Marginal Way South
Seattle, WA. 93103
August 15,1991
Attention Mr. Tim Barker
Dear Mr E,ark.er•
A1`■61-ME441- 1,7P•
In consideration of the sale or transfer of all the non ferrous scrap metal for
recycling purposes, generated from your demolition project at the above address, as
outlined in our letter to you dated August 15, 1991, a value based upon its being
used as scrap for remelting purposes has been established, the undersigned
represents to Olshan Demolishing Inc, and Rhone- Poulenc Inc. as follows:
The property covered by this agreement will be used only as scrap for
recycling purposes and for remelting, either in its existing condition or
after further preparation, unless the undersigned is released from this
warranty in writing.
All obligations of the undersigned under this warranty shall expire (5) years
/
Pac i f c Iron n 'i Meta f ompany
Jay 5 .err off , purchasing manager
Notarized by
Date i-
Printed on Recycted Paper itq
• r-%` 07;j1 • . .' i • Seattle: Washington 98124 • Telephone (206) 628 -6232 • FAX (206) 628-6252
SEATTLE IRON & METALS CORP.
2956 11th AVE S.W., P.O. BOX 3793 • SEATTLE, WASHINGTON 98124
(206) 682-0040 • FAX: (206) 623-1231
dealers and brokers...
IRON AND STEEL SCRAP • NONFERROUS METALS • STEEL PRODUCTS • DISMANTLERS
Mr. Don Schulick
Mr. Tim Barker
Olshan Demolishing
2707 N Loop West #200
Houston, Texas 77008
A T cHr1
August 26, 1991
SCRAP WARRANTY
Seattle Iron & Metals Corporation warrants all scrap metal
received from Olshan Demolishing will be sold only as scrap
for remelt,
AT /lf
enUMIOR
in condition not fit for reuse.
In tiWtoc4Scrap
RocychN
___ hndu tries,
Sincerely
SEATTLE IRON & METALS CORPORATION
Adam Thomas
-‘Z./
% Institute of Scrap
�jr Recycling
manno industries, Inc.
Rhone Poulenc Inc.
9229 E. Marginal Way
Seattle, WA 98108
Attn: Mr. Tim Barker
Dear Tim:
.NERAL METALS -1-, +1me-1-1.4A,
OF TACOMA, INC.
MMI
1902 Marine View Drive
Tacoma, Washington 98422
Phone (206) 572 -4000 '
August 27, 1991
Gioup
In accordance with our telephone conversation of August 26, 1991 and our Purchase
Order number 6382, dated August 27, 1991, General Metals of Tacoma, Inc. submits
the following:
General Metals of Tacoma, Inc. is one of the largest ferrous scrap processors in
the Northwest. We cut and process all scrap material at our Tacoma facility.
All scrap material which is purchased by General Metals of Tacoma from Rhone
Poulenc will be sold by General Metals for remelting into new steel.
No material from Rhone Poulenc. Inc. will be sold as anything other than scrap for
smelting or remelting purposes.
KK /ds
SWORVO
THIS
1991
• • 7 r" �'1
p1J •
r •
•
•
• O.
NOTAR�O WASI-00os��,
Respectfully submitted,
GENE -',METALS OF TACK, INC.
en Kushin
Industrial Purchasing Coordinator
WU TELEX:( 7435 • FAX: (206) 572 -0316
SAFETY AND HEALTH
RECEIVED
CITY OF TI 1KWIl.A
NOV 1 5 Mi
PERMIT CENTER
Owner agrees that, during the performance of the Work, where employees of
Contractor and /or employees of subcontractors of Contractor are working on the
Construction Site in an area required by Occupational Safety and Health Act
Regulations, to be designated as a "Regulated Area" or other similarly intended
designation where special controls and /or monitoring are required because of the
presence or potential presence of certain chemicals or conditions therein, if
requested by Contractor and agreed to by Owner, it will, as agent for Contractor,
(1) provide said employees with respirators; (2) undertake necessary monitoring
of said employees and area, (3) provide the required training for said employees
in applicable hazards, and (4) supply information and data to Contractor for
maintaining appropriate records; all as required by said Regulations and all at
Owner's expense. However, it is understood that Contractor will provide or cause
to be provided medical surveillance and any other service or equipment as
required by Occupational Safety and Health Act Regulations, for said employees
during the performance of the Work in said area.
The above undertaking by Owner in no way constitutes the transfer to, or
assumption by Owner of, any of Contractor's or its subcontractor's duties and
obligations under Federal, State or local laws or regulations, including by not
limited to the above described regulations; no liability to Contractor, any of
its employees or other person, firm or corporation will thereby be assumed by
Owner; and Contractor agrees to save Owner harmless, to the extent valid and
enforceable under applicable law, from any and all liability, penalties and
claims of whatever kind, including, but not limited to claims of Contractor or
any of its employees, agents, vendors or subcontractors, or of governmental
agencies, based on Owner's failure or alleged failure to comply with any Federal,
State or local law or regulation, or based on any act or omission of Owner, its
employees or agents, in performing any of the above services.
Contractor shall take all necessary precautions to protect employees of
Contractor, employees of its subcontractor and employees and facilities of Owner
from hazards arising in the course of the performance of this Contract or in
connection with Owner's operations or chemicals located at or adjacent to the
Construction Site.
Contractor shall comply with, and shall cause its employees and all
subcontractors to comply with (1) all Rhone - Poulenc Safety and Health Regulations
and Requirements which are furnished to Contractor by Owner and (2) all
applicable laws and governmental rules and regulations relating to health and /or
safety. In the event that Contractor fails to so comply or to cause such
compliance, Rhone - Poulenc may suspend all or any part of the Work on which
Contractor or his subcontractor is engaged, until Contractor proves to Owner's
satisfaction that Contractor has corrected said failure. Contractor shall not
be entitled to any extension of time or compensation or damages by reason of, or
in connection with, such work stoppage.
-2-
Contractor shall review all safety and health regulations and requirements which
it is obligated to comply with hereunder and any applicable hazards which it is
obligated to protect against hereunder, prior to the performance of the portion
of the Work which is applicable thereto. Contractor shall notify Owner how said
regulations, requirements and hazards will be communicated to, and enforced with,
its employees and all subcontractors.
Contractor shall include in all of its subcontracts involved in the performance
of the Work at the Construction Site, the provisions of the Appendix, with
subcontractor being obligated to Contractor to the same extent as Contractor is
obligated to Owner. However, such provisions in the subcontracts shall not
relieve the Contractor of its obligation to assure compliance with the provisions
of this Appendix for all aspects of the Work.
Rhone - Poulenc Safety and Health Regulations and Requirements include the
following and may include others which are unique to a particular Rhone- Poulenc
location. Where Contractor believes any Safety or Health Regulation or
Requirement is not applicable, a written variance (per Plant Procedure) to
deviate there from must be received from Owner's management representative at the
location of the Work, prior to initiating the Work.
1. Location Work Permits
Work permits shall be obtained by the Contractor, and signed by an
authorized Rhone - Poulenc supervisor to confirm his acceptance of
precautions specified for the following operations:
a. Use of ignition sources in restricted areas.
b. Entering of vessels or confined spaces.
c. Opening process equipment.
d. Performing electrical hot work.
e. Making excavations and trenches.
f. Moving radioactive sources.
g. Performing pipe "hot tapping ".
h. Operating heavy equipment around electrical power lines.
2. Master Card Procedure
The Master Card Procedure for tagging and locking critical equipment
isolation points shall be followed by the Contractor prior to commencement
of work on such equipment.
r •
.r,
-3-
3. Location Safety and health Rules
All location safety and health rules'furnished by Owner to Contractor
shall be adhered to by the Contractor.
4. Personnel Protection Equipment
Personnel protective equipment shall be provided by the Contractor as
follows:
a. Hard hats and industrial grade safety glasses with permanently
attached side shields and safety shoes shall be worn at all times.
b. Chemical splash goggles and hearing protection shall be worn in
posted areas.
c. Respiratory protection, harnesses and lifelines, and other necessary
protective equipment will be worn based on location regulations and
OSHA requirements and furnished by Contractor as needed.
d. Respirators shall fit snugly against the face. Persons wearing
beards shall be clean shaven where respirator makes a facial seal.
5. Caution Regarding Asbestos - Containing Materials
Should Contractor encounter any type of insulation or other product that
they suspect may contain asbestos during assignments, cease work
immediately. Notify the responsible plant supervisor in order to obtain
accurate identification of the material including sample analysis, if
necessary. Some typical questionable areas (but not limited to) include
cable insulations, pipe coverings, ceiling tiles, wallboard, blown -in
insulation,.boiler/powerhouse block insulations and drilling or cutting
through transite. Unless absolutely sure that a material is asbestos -
free, notify plant representative you're working with and cease work
activity until all questions are resolved.
6. Emergencies
Contractors shall be trained in those emergency procedures which directly
affect their own employees' personal safety and health. In the event of
an emergency (fire, explosion, vapor cloud, spillage, or related hazards)
arising in the immediate vicinity, Contractor agrees that it shall cause
its employees to leave the area immediately and remain at a safe distance
until the emergency is over.
7. Safe Tools
Scaffolds, stages, rigging equipment, electrical tools, ladders, hoists,
and other tools, machinery or equipment used in the Work shall meet
specifications of ANSI and the Occupational Safety and Health
Administration for such items employed in the Construction industry.
-4-
8. Accidents
The Contractor will be responsible.. for investigating all accidents
involving its employees and reporting all details to Owner's safety
representative at the location of the Work. When such accident
investigation is complete, the contractor will provide such Rhone - Poulenc
representative with a copy of the completed injury report. The Contractor
is also responsible for compliance with the Occupational Safety and Health
Administration requirements for reporting or communicating injuries.
9. Safety and Health Program
Contractor shall maintain its own safety and health programs. However, it
may be necessary at times for the Rhone - Poulenc representative to make
recommendations to assure protection of Rhone- Poulenc employees.
10. Contractor shall review with all of its employees assigned to the Work,
prior to their commencing any of the Work, all safety and health
regulations, requirements and programs applicable to the Work, and
Contractor shall cause its subcontractors to make such a review with their
employees.
11. Special Rules for Harmful Exposure
Contractor represents that it is familiar with the Occupational Safety and
Health Administration Regulations concerning harmful exposure to toxic
substances, and is capable of providing, and will, unless and to the
extent otherwise agreed to in writing by Owner, provide respirators and /or
other protective equipment exposure monitoring;, medical surveillance;
employee training; record keeping and other services, to the extent
required by said regulations in connection with the Work.
AlliWWW1111W
ANORRIPWWWWWIMMOMM111211111111211ft
EXTRACTOR BUILDING; = ±400 SO. FT.
,
CMU BUILDING SINGLE STO6Y.
POST-DEMOLMON SLAB TO ADJACENT1
!EXISTING PAVING
RCRA STORAGE SHED *
KRA STORAGE SHED: = ±2,500 $0. FT
UNENCLOSED STEEL FRAME WITH METAL
ROOF. POST-DEMOLITION SLAB TO DRAIN
TO EXISTING TRENCH DRAINS,
CONTROL ROOM: 7:1600 Sat FT.
siNpi.O.Topy CMU BukLDINp. POST-.
DEMOLITION SLAB TO DRAIN TO ..
FORMER ROOF 'LEADERS. •
VANILLIN BUILDING *
- VANILLIN BUILDING;;= ±10,560 SQ. FT.
;
HIGH-BAY BUILDING. STEEL FRAME AND
MASONRY STRUCTURE WITH MASONRY
MEZZANINE. 6TEgL. AND TRANSTITE
SIDING. TRANSTITE SIDING TO BE
REMOVEDVURING ASBESTOS REMOVAL.
; 1. EXISTING EcitnpmENT PITS TO BE
BACKFILLED AND CAPPED' W$TH A/C
PAVEMENT
2. SAFETY RAILS TO BE INSTALLED AT
RAISED SLAB AREA.
POST-DEMOLITION SLABS TO DRAIN TO
IFbRrR ROOF LEADERS 'EXItTING
PAVING
I .
DISTRIBUTION CENTER WAREHOUSE *
DISTRIBUTION CENTER WAREHOUSE: = ±23,000 SO. FT.
MASONRY WALLS TO APPROX. 12', STEEL FRAME WITH
WINDOWS ABOVE.
1. EXISTING SCALE PIT TO BE FILLED.
POST-DEMOLITION SLAB TO BE SLOPED TO DRAIN TO
FORMER ROOF LEADERS.
'SAFETY HOIDRAILS TO BE IN6TALLEb AT EDGES OF
RAISED SL.
Uplal'i)d Zone •
- SEPA,ChebkliSt
- Demolition Permit
- Utility •
- •
jr
- Fire Protection Derno Permit
- Certificate Of`InStirari e
'Bond
- Hauling' Perrnit
WEST
CHANGE ROOM: = ±2,700 acteFT.-- •
SINGLE-STORY MASONRY BUILDING WITH
DOUBLE ROOF TEES. POST-DEMOLITION
•SLAB TO DRAIN TO EXISTING RADE
•
N a9.1t. Seth 1470 CO S 2340 59'E
ERR 77 r"I70M IN/ e)g .NE SU:Aft:EN
CPLNA''CIN CLAIMS OF rRANL15 MA
AND .4Crztr /AN AS:JEl.. ir,.4 EAST
ofiE of SEC .13 'NP 24 N R 4 1. W
-.RECORD tQCATON
6 CAST /RON 'bANITARY
SEWER FORCS. kiAoN
ShA..L
E A •ST
DIRT
..6FNCE COR O.I. N.8 2.0
OF PROP. CORNL.
1C-111P
+.00; NC, ',RAYS
FENCE 1.2 N. OF
/4'5.
• 0 _ _ SeRvILE
PROP. LINE
/0 // 561 36 (DEED) 563.55 CAL:C ) .../NDR6ROuND APPROXIMATE) 7;
• • 7"C w
u r7*.s P'L 1.
. • ,ALIN 00 BUMPS P , • •
PudifillotriVt.
MEAL BIN *
SOMH DMH
-TANK
C.B
MEAL BIN = ±8,418 Q. FT.
±15' HIGH CIP CONC ETE WALLS WITH ±8'
STEEL FRAMEWORK BOVE. "TRANSTITE"
SIDING PANELS AT UP ER LEVEL EXTERIOR
REMOVED DURING AS ESTOS REMOVAL,
POST,DEMOLITION PLA DRAINAGE, TO
SLAB PERIMETER & PI ED TO FORMER'
ROOF LEADERS
, ,
i. DEEP WELL A'T SOU 1H WALL TO BE
BACKFILLED AND CA PED WITH A/C
PAVING.
2. EXISTING BASEMENT 0 BE BACK-
FILLED AND CAPPED
AT EXTERIOR AREAS.
P V
Qom PL. rt
TowER
NUMEROUS S 'AN' •
6 OVERHEAD D PIP t. a
OMPLI A THIS AREA
f
00 00
tr• F H "",c
P4PER. VAULT)
IELEC.BOX) C
1 4.
GP ,
- ^ e
GRAss
7r:SDr.414.--0
.A•
--"kvvy
VALVE
1. CB
er 'tANKS'
ci &PIPES
• h rntjt.! '
TANKS
ASPHALt
CI T
WOOD 11; T
COMPRESSOR BUILDING: = ±1,600 SO. FT.
HIGH-BAY BUILDING. STEEL FRAME WITH
STEEL SIDING. POST-DEMOLITION SLAB ,
TO DRAIN TO EXISTING' GRADE I 1,
vAjut
,NE -Di S.+
1 N MX-Ria:e.;CSI
)it
LAROX BUILDING: ±1 113 SO. FT.
±3 STORY STEEL FRA E BUILDING WITH
STEEL SIDING. POST- MOLITION SLAB
DRAINAGE TO EXISTIN 'GRADE
ssmo-0-"'
AC WALK
'GRAvEL.
-6,6'mApa
FENCE COP 2.6 •
. a 2.4
. •
s FENCE CO. 2.0 N
or PROP. LINE •
flmcitlt
A- 'A > 7 V
a r
Pier Zone
SEPA Checklitt
- Shorelines Permit
- Dernolitibri" Permit including:
Utility Permit
Building Permit
Fire Protection Demo. Permit
Certificate Of Insurance
Bond
- Hauting,Perrnit
- Corps of Engineers Permit for Work in Navigable Waters
- Washington State Department of Fisheries HPA Permit
horeline Zone
SEPA Checklist
Shorelines' Permit
- Demolition Permit including:
Utility Permit
Building Permit.,
Fire' Protection Demo. Perrni
Certificate of Insurance
'Bond
- Hauling Permit ,
STORAGE SHED
STORAGE SHED:.= ±1,500 SO. FT.
SINGLE-STORY STEEL AND WOOD "
FRAME WITH TRANSTITE SIDING: V'
,TRANSTITE SIDING TO BE REMOVED
DURING ASBESTOS REMOVAL.'"
POST-DEMOLITION SLAB TO DRAM -
ITO] EXISTING ;PAVING .
MAINTENANCE BUILDING_ *
MAINTENANCE BUILDING; = ±9,624 SO. FT. •
1 STORY CMU/CIP CONCRETE COMBINATION
WITH STEEL FRAME AND'TRANSTITE SIDING
ABOVE. TRANSTITE SIDING TO BE REMOVED
DURING ASBESTOS REMOVAL. POST-
DEMOLITION SLAB TO DRAIN TO FORMER
ROOF LEADERS. SAFETY RAILINGS TO BE
INSTALLED AROUND PERIMETER OF
BUILDING SLABS AND ADJACENT RAISED
SLAB.
DESCRIPTION,
r
IHAT'
PORTION 'OF 'TRACTS I .No2 OF THE MEADOWS, ACCORDING TO rife.
min NON MA,' OV PART, OF THE FRANCIS M:IgNATT DONATION cLAND CLAIM
, NO. '38 FILED LINI(ING COl•NTY'SUPERIOR COURT CAUSE NO. 120091. AND
OF , THE ABANDONED BEI) OF ;NE DUWAM ESN: RIV,ER, ALL ' LOCATED
.,3, TOWNSHIP 24 NORTH,' RANGE'-4 'EAST, N.H., IN KING
WASHINGTON AND ALLYING wESTERLY,„Qt` THE, WESTERLY MARGINS
0.F. EAST MARGINAL WAY SOUTH AND ALSO WESTERLY 'OF THE PARCEL-0F
• LAND ADJOINING EAST MARGINAL_ WAY ,WHICH. WAS ,CONVEYED'TO GREAT '
NORTHERN RAILWAY COMPANY BY 'DEED RECORDED UNDER FILE NUMBER
1784818; LYING EASTERLY OF THE EASTERLY :I4ARGIN OF THE RIGHT CF
WAY,OF,COMMERCIAL wATERWAY DISTRICT NO 1 .(DUWAMISti I4ATERWAY);
' 'LYING SOUTHERLY OF THE HEREINAMR'OESCRIBE0 "LINE A"; AND LYING
NORTHERLY OF rim HEREINAFTIOT DESCR 'BED "L I GE
890 2T 50"NA
LINE Pi
6N THE wESTERLY LINE(OF EAST 'MARGINAL WAY ,,SOUTH, WHICH
POINT BEARS NORTH 89'1554" WEST 2470.01 FEET ALONG THE DONAT/ON.
CLAIM LINE P.ND SOUTH '23•4059" EAST 648.77 FEET ALONG THE
;WESTERLY LINE OF EAST MARGINAL WAY SOUTH FROM THE INTERSECTION OF
.,THe LINE BETWEEN -THE DONATION CLAIMS;.'OF FRANCIS MC NAT' AND HENRY
VAN ASSELT WITH THE,EAST.LINE OF SECTION 33, TOWNSHIP 24 NORTH, •
RANGE,,4 EAST, W.M., IN KING COUNTY, WASHINGTON; RUNNING. THENCE
WEST 1574.7? FEET,'TO'THE EASTERLY LINE 'OF COMMwRCIAL WATERWAY NO.
1; THENCE SOUTH '15100103" EAST .ALONG 'SAID, EASTERLY LINE 237.76
FEET .TO THE TRUE POINT'OF BEGINNING OF SAID "LINE--A"; THENCE EAST
1053.10,7FEET; THENCE SOUTH 23'02'00" EAST 46.03 FEET; THENCE EAST
561.38 FEET TO THE WESTERLY MARGIN OF EAST MARGIFAL WAY SOUTH* AND'
TEE TERMINUS OF SAID "LINE A"; o ,
BEGINNING ON THE WESTERLY MARGIN'OP,EAST,,"..sr.,RGINAL%WAY 'SOUTH AT A
POINT WHICH BEARS NORTH 8915'54" WEST A DISTANCE OF 2470.01 'FEET '.
ALONG.THE DONATION.CLA.IM LINE' AND SOUTH 2340'59' EAST A DISTANCE
OF.11374.17 FEET ALONG THE WESTERLY MARGIN OF EAST MARGINAL WAY
' SOUTH FROM THE INTERSECTION OF THE LINE BETWEEN THE DONATION,
,CLAIMS OF FRANCIS MC NAT? AND HENRY VAN ASSELT WITH THE EAST LINE '
'OF SSCTION 33, TOWNSHIP, 24 NORTH, RANGE' 4- EAST, N.M.' IN KING
COUNTY, WASHINGTON, SAID' POINT BEING AT THE' INTERSECTION OF THE
.,WESTERLY MARGIN ()F EAST MARGINAL WAY SOUTH WITH THE NORTH LINE OF
VAN !)E VANTER STOCK FARM TRACT AND,THR TRUE POINT OF BEGINNING OF
SAID "LINE Ii"; 'THENCE NORTH ,'8427150" WEST A DISTANCE.OF 14.94,
FEET; THENCE,NORTN 86!5459" WEST' A'DISTANCE,TOF 486:97 F,'EET;
THENCE NORTH 8417' 04-'1 WEST A DISTANCE Or,r117:'00„ FEET; THENCE
SOUTH ,83°57'56" .WEST A DISTANCE ,OF, 119.00 FEET; ,THENCE.SOOTH •
; 1040'29' WEST ALDISTANCE'OF 110.173 FEET; THENCE SOUTH,61•33'40''..,
.• WEST'A DISTANCE OF 840.02 FEET. TO „THE,EASTERLY LINd'OF,THE RIGHT
..OF WAY ,OF COmMERCIAL, WATERWAY DISTRICT,NO.,.1 AND TRC.,TERMINUS, OF SMD "LINE B.
-TOGETHER, WITHI'NE RICH r TO, CROSS oTHE PARCEL CONVEYED TO GREAT •
-NORTHERN RAILWAY COMPANY AS RESERVFIr- (N OF.F.D.WECORDEO UNDER FILE NUMBER • .
. . ,
LEGEND :
A.C.•
*.ASPHAL,TIC*(.70NCRE
surtrAcF
t.8. ATCH BAST
C. . cohicerr; RAMP
C , CONCRETE WALK
C.WALL .CoNC.RETE WALL
D.I. DRAIN INLET '
E.V. ELECTR IcAL
• EilSTI NG SURV SY
• mONUMF.NT
FENCE LINt.. ,
I.H. FIRE RYDRAN r
-G- GAS MAIN
G.P. GUARD POST
aUT WIRE OR CABI.E
, INTERCEPT CATCH BASIN
.0.1.-';INTEFICEPT DRAIN INI.ET
OVERHEAD POWER-WIREI
P• • POWER1 :TRANSFORMER
',PROCESS.' MANHOLE;
STORM DkiN
,SANITARY -'SEWER'
r•••=0- ' STREET ,LIGHT.
--1---- TELEPHONE .WIRE
• •
TELEPHONE CONDO! r
ott -TELEGRAPH' •'
'TEST HOLE
, O.K. ovERI(EAD LAVE LINE
PIPES' WITH SUPPORT COLL'MNS
PP tI,OWER POLE „
PARKING StAT.L
OR SPACE
crty 10FIMODik
APPROVEt.
H 1992
S NOTED
' BlIILDING DIVISION
TELEPHONE. SENTRY
Ilat:N:ti nitAtN
:urit,t-ry -,ii"..,:es
MANHLII.E , " •
rits ER IAN
AA' ER STEli
li 4ATER '&AL.VE
,..QATER'VALVVOR
METER CHAMBER .
I unclerskthd . that the Plart'cheOk aOproVale are
vbiect; tO:errors-anci:Offiiapieris and approval of -
plans does not authorize' The violation, of siw*.
adoi*cilcode or 'Ordnance. Receipt of contreZ-'torie
copy of approved plans acknoweded. ' .
" •
... . .. ;:.
Permit No
CERTIFICATION:
SURVEY IDENTIFICATION NO.:
REGISTERED LAND SURVEYOR NO.:
SURVEYOR'S ADDRESS & COMPANY:
PL. PLANTER
,
POST. INDICATOR
VALVE
86181.01
22333
BUSH, ROED & HITCHINGS, ' INC.
2009 MINOR AVENUE EAST
SEATTLE, WASHINGTON 981-02
(206) 3,23-4144
RHONE-POULENC
STEWART TITLE COMPANY OF
WASHINGTON, INCORPORATED
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH
,
tIT 'tIS ,,. BASED WERE MADE IN ACCORDANCE WITH "MINIMUM STANDARD DETAIL
'REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURvEYS, " JcANTLY ESTAB-
LISHED AND ADOPTED BY ALTA AND ACSM IN 1988; AND MEETS THE ACCU-
RACY REQUIREMENTS OF A CLASS "A" SURVEY, AS DEFINED THEREIN AND
INCLUDES ITEMS (2 & 9) OF TX-E 3 THEREOF. °' . ..)
i _ . 1 / I -
AREA
REMARKS
PERMIT RECORD
COMPRESSOR BUILDING
uj VANILLIN BUILDING
g CONTROL ROOM
i; EXTRACTOR BUILDING .
775 RCRA STORAGE SHED
a. DISTRIBUTION CENTER WAREHOUSE
DATE ISSUED
• 1,600 SO. FT
± 10,560 SQ. FT.
± 600 SQ. FT.
± 400 SQ. FT.
•+ 2,500 SQ. FT. •
± 23,000 SQ. FT.
± 2,700 SQ. FT
41,400 SQ. FT.
POI LAW
MEAL BIN
LAROX BUILDING
MAINTENANCE BUILDING
STORAGE SHED ‘-
TOTAL SHORELINES DEMOLITION
AREAS GIVEN ARE APPROXIMATE GROUND COVERAGE OF
POST-DEMOLITION "FOOTPRINT."
* POST DEMOLITION SLAB DRAINAGE FOR INDIVIDUAL STRUCTURES
HAVE BEEN REVISED, SEE DETAILED SLAB DRAINAGE PLANS
' 1 ' '
IriFirittirritriripirrippliptt imp
, • 21
THE ABOVE CERTIFICAMISiASED‘IPON' WORK PREPARED IN
WITH GENERALLY ACCEPTED PROFESSIONAL SURVEY PRACTICE. WE MAKE NO
0THER WARRANTY, EITHER EXPRESSED OR IMPLIED. , .
LD REPORT REFER/Ea:
THIS SURVEY WAS CONDUCTED ACCORDING TO ThE ABOVE DESCRIPTION,
FURNISHED BY STEWAR" TITLE COMPANY OF WASHINGTON, INCOIRPORATED,
COMMITMENT NO 137029, DATED FEBRUARY 1, 19 q1 . THE EASEMENTS
SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT.
NOTE: EASEMENTS CREATED OR RESCINDED AFTER THIS DATE ARE NOT
'SHOWN OR NOTED HEREON.
Figure 2H
ContraptorAccess and Work-Areas-
_
for Meal Bin
-
RHONE-POULENC INC.
EAST MARGINAL WAY SO. PLANT
.,,A•AA.
I 1 '1 I 1 I •I E l I 11.1 11 1 1 1 I I 1. 111 I I 1 IT I
41
o.18;
IANIcs '
-i'ANKs. •
"Aro(5..
.,.•
6' C.WALL
00 00
tr• F H "",c
P4PER. VAULT)
IELEC.BOX) C
1 4.
GP ,
- ^ e
GRAss
7r:SDr.414.--0
.A•
--"kvvy
VALVE
1. CB
er 'tANKS'
ci &PIPES
• h rntjt.! '
TANKS
ASPHALt
CI T
WOOD 11; T
COMPRESSOR BUILDING: = ±1,600 SO. FT.
HIGH-BAY BUILDING. STEEL FRAME WITH
STEEL SIDING. POST-DEMOLITION SLAB ,
TO DRAIN TO EXISTING' GRADE I 1,
vAjut
,NE -Di S.+
1 N MX-Ria:e.;CSI
)it
LAROX BUILDING: ±1 113 SO. FT.
±3 STORY STEEL FRA E BUILDING WITH
STEEL SIDING. POST- MOLITION SLAB
DRAINAGE TO EXISTIN 'GRADE
ssmo-0-"'
AC WALK
'GRAvEL.
-6,6'mApa
FENCE COP 2.6 •
. a 2.4
. •
s FENCE CO. 2.0 N
or PROP. LINE •
flmcitlt
A- 'A > 7 V
a r
Pier Zone
SEPA Checklitt
- Shorelines Permit
- Dernolitibri" Permit including:
Utility Permit
Building Permit
Fire Protection Demo. Permit
Certificate Of Insurance
Bond
- Hauting,Perrnit
- Corps of Engineers Permit for Work in Navigable Waters
- Washington State Department of Fisheries HPA Permit
horeline Zone
SEPA Checklist
Shorelines' Permit
- Demolition Permit including:
Utility Permit
Building Permit.,
Fire' Protection Demo. Perrni
Certificate of Insurance
'Bond
- Hauling Permit ,
STORAGE SHED
STORAGE SHED:.= ±1,500 SO. FT.
SINGLE-STORY STEEL AND WOOD "
FRAME WITH TRANSTITE SIDING: V'
,TRANSTITE SIDING TO BE REMOVED
DURING ASBESTOS REMOVAL.'"
POST-DEMOLITION SLAB TO DRAM -
ITO] EXISTING ;PAVING .
MAINTENANCE BUILDING_ *
MAINTENANCE BUILDING; = ±9,624 SO. FT. •
1 STORY CMU/CIP CONCRETE COMBINATION
WITH STEEL FRAME AND'TRANSTITE SIDING
ABOVE. TRANSTITE SIDING TO BE REMOVED
DURING ASBESTOS REMOVAL. POST-
DEMOLITION SLAB TO DRAIN TO FORMER
ROOF LEADERS. SAFETY RAILINGS TO BE
INSTALLED AROUND PERIMETER OF
BUILDING SLABS AND ADJACENT RAISED
SLAB.
DESCRIPTION,
r
IHAT'
PORTION 'OF 'TRACTS I .No2 OF THE MEADOWS, ACCORDING TO rife.
min NON MA,' OV PART, OF THE FRANCIS M:IgNATT DONATION cLAND CLAIM
, NO. '38 FILED LINI(ING COl•NTY'SUPERIOR COURT CAUSE NO. 120091. AND
OF , THE ABANDONED BEI) OF ;NE DUWAM ESN: RIV,ER, ALL ' LOCATED
.,3, TOWNSHIP 24 NORTH,' RANGE'-4 'EAST, N.H., IN KING
WASHINGTON AND ALLYING wESTERLY,„Qt` THE, WESTERLY MARGINS
0.F. EAST MARGINAL WAY SOUTH AND ALSO WESTERLY 'OF THE PARCEL-0F
• LAND ADJOINING EAST MARGINAL_ WAY ,WHICH. WAS ,CONVEYED'TO GREAT '
NORTHERN RAILWAY COMPANY BY 'DEED RECORDED UNDER FILE NUMBER
1784818; LYING EASTERLY OF THE EASTERLY :I4ARGIN OF THE RIGHT CF
WAY,OF,COMMERCIAL wATERWAY DISTRICT NO 1 .(DUWAMISti I4ATERWAY);
' 'LYING SOUTHERLY OF THE HEREINAMR'OESCRIBE0 "LINE A"; AND LYING
NORTHERLY OF rim HEREINAFTIOT DESCR 'BED "L I GE
890 2T 50"NA
LINE Pi
6N THE wESTERLY LINE(OF EAST 'MARGINAL WAY ,,SOUTH, WHICH
POINT BEARS NORTH 89'1554" WEST 2470.01 FEET ALONG THE DONAT/ON.
CLAIM LINE P.ND SOUTH '23•4059" EAST 648.77 FEET ALONG THE
;WESTERLY LINE OF EAST MARGINAL WAY SOUTH FROM THE INTERSECTION OF
.,THe LINE BETWEEN -THE DONATION CLAIMS;.'OF FRANCIS MC NAT' AND HENRY
VAN ASSELT WITH THE,EAST.LINE OF SECTION 33, TOWNSHIP 24 NORTH, •
RANGE,,4 EAST, W.M., IN KING COUNTY, WASHINGTON; RUNNING. THENCE
WEST 1574.7? FEET,'TO'THE EASTERLY LINE 'OF COMMwRCIAL WATERWAY NO.
1; THENCE SOUTH '15100103" EAST .ALONG 'SAID, EASTERLY LINE 237.76
FEET .TO THE TRUE POINT'OF BEGINNING OF SAID "LINE--A"; THENCE EAST
1053.10,7FEET; THENCE SOUTH 23'02'00" EAST 46.03 FEET; THENCE EAST
561.38 FEET TO THE WESTERLY MARGIN OF EAST MARGIFAL WAY SOUTH* AND'
TEE TERMINUS OF SAID "LINE A"; o ,
BEGINNING ON THE WESTERLY MARGIN'OP,EAST,,"..sr.,RGINAL%WAY 'SOUTH AT A
POINT WHICH BEARS NORTH 8915'54" WEST A DISTANCE OF 2470.01 'FEET '.
ALONG.THE DONATION.CLA.IM LINE' AND SOUTH 2340'59' EAST A DISTANCE
OF.11374.17 FEET ALONG THE WESTERLY MARGIN OF EAST MARGINAL WAY
' SOUTH FROM THE INTERSECTION OF THE LINE BETWEEN THE DONATION,
,CLAIMS OF FRANCIS MC NAT? AND HENRY VAN ASSELT WITH THE EAST LINE '
'OF SSCTION 33, TOWNSHIP, 24 NORTH, RANGE' 4- EAST, N.M.' IN KING
COUNTY, WASHINGTON, SAID' POINT BEING AT THE' INTERSECTION OF THE
.,WESTERLY MARGIN ()F EAST MARGINAL WAY SOUTH WITH THE NORTH LINE OF
VAN !)E VANTER STOCK FARM TRACT AND,THR TRUE POINT OF BEGINNING OF
SAID "LINE Ii"; 'THENCE NORTH ,'8427150" WEST A DISTANCE.OF 14.94,
FEET; THENCE,NORTN 86!5459" WEST' A'DISTANCE,TOF 486:97 F,'EET;
THENCE NORTH 8417' 04-'1 WEST A DISTANCE Or,r117:'00„ FEET; THENCE
SOUTH ,83°57'56" .WEST A DISTANCE ,OF, 119.00 FEET; ,THENCE.SOOTH •
; 1040'29' WEST ALDISTANCE'OF 110.173 FEET; THENCE SOUTH,61•33'40''..,
.• WEST'A DISTANCE OF 840.02 FEET. TO „THE,EASTERLY LINd'OF,THE RIGHT
..OF WAY ,OF COmMERCIAL, WATERWAY DISTRICT,NO.,.1 AND TRC.,TERMINUS, OF SMD "LINE B.
-TOGETHER, WITHI'NE RICH r TO, CROSS oTHE PARCEL CONVEYED TO GREAT •
-NORTHERN RAILWAY COMPANY AS RESERVFIr- (N OF.F.D.WECORDEO UNDER FILE NUMBER • .
. . ,
LEGEND :
A.C.•
*.ASPHAL,TIC*(.70NCRE
surtrAcF
t.8. ATCH BAST
C. . cohicerr; RAMP
C , CONCRETE WALK
C.WALL .CoNC.RETE WALL
D.I. DRAIN INLET '
E.V. ELECTR IcAL
• EilSTI NG SURV SY
• mONUMF.NT
FENCE LINt.. ,
I.H. FIRE RYDRAN r
-G- GAS MAIN
G.P. GUARD POST
aUT WIRE OR CABI.E
, INTERCEPT CATCH BASIN
.0.1.-';INTEFICEPT DRAIN INI.ET
OVERHEAD POWER-WIREI
P• • POWER1 :TRANSFORMER
',PROCESS.' MANHOLE;
STORM DkiN
,SANITARY -'SEWER'
r•••=0- ' STREET ,LIGHT.
--1---- TELEPHONE .WIRE
• •
TELEPHONE CONDO! r
ott -TELEGRAPH' •'
'TEST HOLE
, O.K. ovERI(EAD LAVE LINE
PIPES' WITH SUPPORT COLL'MNS
PP tI,OWER POLE „
PARKING StAT.L
OR SPACE
crty 10FIMODik
APPROVEt.
H 1992
S NOTED
' BlIILDING DIVISION
TELEPHONE. SENTRY
Ilat:N:ti nitAtN
:urit,t-ry -,ii"..,:es
MANHLII.E , " •
rits ER IAN
AA' ER STEli
li 4ATER '&AL.VE
,..QATER'VALVVOR
METER CHAMBER .
I unclerskthd . that the Plart'cheOk aOproVale are
vbiect; tO:errors-anci:Offiiapieris and approval of -
plans does not authorize' The violation, of siw*.
adoi*cilcode or 'Ordnance. Receipt of contreZ-'torie
copy of approved plans acknoweded. ' .
" •
... . .. ;:.
Permit No
CERTIFICATION:
SURVEY IDENTIFICATION NO.:
REGISTERED LAND SURVEYOR NO.:
SURVEYOR'S ADDRESS & COMPANY:
PL. PLANTER
,
POST. INDICATOR
VALVE
86181.01
22333
BUSH, ROED & HITCHINGS, ' INC.
2009 MINOR AVENUE EAST
SEATTLE, WASHINGTON 981-02
(206) 3,23-4144
RHONE-POULENC
STEWART TITLE COMPANY OF
WASHINGTON, INCORPORATED
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH
,
tIT 'tIS ,,. BASED WERE MADE IN ACCORDANCE WITH "MINIMUM STANDARD DETAIL
'REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURvEYS, " JcANTLY ESTAB-
LISHED AND ADOPTED BY ALTA AND ACSM IN 1988; AND MEETS THE ACCU-
RACY REQUIREMENTS OF A CLASS "A" SURVEY, AS DEFINED THEREIN AND
INCLUDES ITEMS (2 & 9) OF TX-E 3 THEREOF. °' . ..)
i _ . 1 / I -
AREA
REMARKS
PERMIT RECORD
COMPRESSOR BUILDING
uj VANILLIN BUILDING
g CONTROL ROOM
i; EXTRACTOR BUILDING .
775 RCRA STORAGE SHED
a. DISTRIBUTION CENTER WAREHOUSE
DATE ISSUED
• 1,600 SO. FT
± 10,560 SQ. FT.
± 600 SQ. FT.
± 400 SQ. FT.
•+ 2,500 SQ. FT. •
± 23,000 SQ. FT.
± 2,700 SQ. FT
41,400 SQ. FT.
POI LAW
MEAL BIN
LAROX BUILDING
MAINTENANCE BUILDING
STORAGE SHED ‘-
TOTAL SHORELINES DEMOLITION
AREAS GIVEN ARE APPROXIMATE GROUND COVERAGE OF
POST-DEMOLITION "FOOTPRINT."
* POST DEMOLITION SLAB DRAINAGE FOR INDIVIDUAL STRUCTURES
HAVE BEEN REVISED, SEE DETAILED SLAB DRAINAGE PLANS
' 1 ' '
IriFirittirritriripirrippliptt imp
, • 21
THE ABOVE CERTIFICAMISiASED‘IPON' WORK PREPARED IN
WITH GENERALLY ACCEPTED PROFESSIONAL SURVEY PRACTICE. WE MAKE NO
0THER WARRANTY, EITHER EXPRESSED OR IMPLIED. , .
LD REPORT REFER/Ea:
THIS SURVEY WAS CONDUCTED ACCORDING TO ThE ABOVE DESCRIPTION,
FURNISHED BY STEWAR" TITLE COMPANY OF WASHINGTON, INCOIRPORATED,
COMMITMENT NO 137029, DATED FEBRUARY 1, 19 q1 . THE EASEMENTS
SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT.
NOTE: EASEMENTS CREATED OR RESCINDED AFTER THIS DATE ARE NOT
'SHOWN OR NOTED HEREON.
Figure 2H
ContraptorAccess and Work-Areas-
_
for Meal Bin
-
RHONE-POULENC INC.
EAST MARGINAL WAY SO. PLANT
.,,A•AA.
I 1 '1 I 1 I •I E l I 11.1 11 1 1 1 I I 1. 111 I I 1 IT I
41
o.18;