Loading...
HomeMy WebLinkAboutPermit 6941 - Rhone-Poulenc - Meal Bin Demolition�� 'r �, KIET ?DULEMC qt1 BULDN PERMT (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Dept. of Community Development- Building Division 6300 Southcenter Boulevard, Tukwila VVA 98188 (206) 431 -3670 BUILDING PERMIT NO. LogLidi DATE ISSUED: 3 • j %1 3;hiJl :y ut' yi1c', �h'wuk7���4rJ:r4.•r,y: r.,; .,..... "i11%!hn ?,:ii>•!J ad.r.•;.t+r.:Jt SITE ADDRESS PROJECT NAME/TENANT 9229 E Marginal. Wy S 0.!!.. fvg;i+ iii,,(,. :"i;`&1 3.44� DESCRIPTION BUILDING PERMIT FEE PLAN CHECK FEE.• <' BUILDING SURCHARGE OTHER:>;:>:::,:.;: ;;<::': AMOUNT RCPT. ## DATE .30.00 4159 11 -15 -91 TOTAL:-' <: .0 PLAN CHECK NO.: 91 -468 y n.ti,r'.• SUITE Dr. c-,:itiy49i-plosii.. VALUE OF CONS1 RUCTIDN 26,300.00 Rhone- Poulenc Meal Bin II ASSESSOR ACCOUNT# 542260 -0010 TYPE OF U New Building i♦ Addition f♦ Tenant Improvement (commercial) (X] Demolition (building) L Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) 0 Other: DESCRIBE WORK TO BE DONE: Demolition of existing building excluding floor slab.. PROPERTY OWNER Rhone - Poulenc (PHONE 764 -4474 ADDRESS 9229 East Marginal Way South, Tukwila, WA IZ1P 98109 CONTRACTOR ADDRESS Olshan Demolishing Company, Inc. PHONE 800- 874 -3366 P.O. Box 925628, Houston, TX ZIP 77292 WA. ST. CONTRACTOR'S LICENSE # OLSHADC099Nid EXP. DATE 8/08/92 ARCHITECT PHONE ADDRESS SQUARE OCC. SQUARE FEET LOAD FEET TOTAL SQUARE FEET TOTAL OCC. LOAD TOTAL TYPE OF CONST.: N/A UBC EDITION (year) 1988 I SETBACKS: N- S - E- W- FIRE PROTECTION: QSprinklers Q Detectors Q N/A UTILITY PERMITS REQUIRED? O Yes 0 No (through public Works) ZONING: BAR /LAND USE CONDITIONS? Shorelines -OK E Yes 0 No CONDITIONS (other than thoso noted on or attached to permit/plans) APPROVED FOR ISSUANCE BY: BUILDING OFFICIAL DATE: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions'of lay and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. SIGNATURE: DATE: 3 -- 5 PRINT NAME: �.g/,?,/z• l .��'ir�SCi / COIv1PANY: This permit shall become null and:vo#d if the work rs not commenced: within 180 days from the date of .•.issuance, or :.1f.the •work is:suspended orabaridoned for.:a period of`.180 days:from the last:inspectlon CERTIFICATE OF OCCUPANCY NO. DATE ISSUED: PLAN CHECK NUMBER q -q(og t BUILDING ERM1T APPLICATION TRACKING PROJECT NAME SITE ADDRESS onv - PU1Q.flC SUITE NO. a. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) FLOOR::: SQUARE E OCC. LOAD SQUARE ET OCC. OA' SQUARE F 3 OCC. O • SQUARE OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC, LOAD :TOTAL DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. • •I•er Ikt PARTM BUILDING - initial review -R FIRE RtVED;:: UIREIVIE CONSULTANT: Date Sent - 1 1-15 -9 ) IMEN Date Approved - _.(ROUTED).__ INIT: PLANKING „L 1■7' PUBLIC WORKS 0 OTHER INIT: r{Zf // INIT_�r INIT: 7/ FIRE PROTECTION: Sprinklers FIRE DEPT. LETTER DATED: ZONING: Detectors INSPECTOR: BAR/LAND USE CONDITIONS? REFERENCE FILE NOS.: MINIMUM SETBACKS: N- UTILITY PERMITS REQUIRED? PUBLIC WORKS LETTER DATED: BUILDING - final review REVIEW COMPLETED 3/3/ INIT: rli�► TYPE OF CONSTRUCTION: UBC EDITION (year): PERMIT NO. CONTACTED DATE READY DATE NOTIFIED BY: (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING fl/ 3RD NOTIFICATION BY: 08/17/90 CiTY OF TUKWILA Department of Community Development - Building Division BPERMIT APPLICATION vvv vvu a..vv.. avl L IJSv 7Gi I!.4 r IJf VJ IQ 7V1 % �7V 1Vf! (206) 431 -3670 `+v{, :iis.E� r }• ; , <!:. }::; �. >; . �, oU >< .. •. - :< F/ i' v,.0 i � ' i aL••: :. ;', >;;;/f:,•r ry: p lui '!r• :.f X..:; '.'; %; fr? cl� f. r, maw ::. p .Fr,? r. Y,• Ili• ,;I?!S. :: ' <'r c0' . r: r< • 'C: }Y. , ':'Y%r'A•r:'•y/r{r•'< /.Wr /f /,.{!. : /.:x'%ri4r�� ?fr PLAN CHECK NUMBER / Ali .. ..: �. � ,dP� r�,a r�oN.. nnusr � . ...•. 3 .. : � .. .. n, ....,..:! :. ..... • ... •....... . .:. ,. ...; ..... A I� .:;.FILLED.'. 7'' C (3 MF'L E T Y :;:.... ... � • .. �Y.,. . _., r {:m "� r•. H'. % 1'�' . .. �: f,< I t � : .... ; m < .m $ ✓ /::c'r;`x`•,YY' 5`> };!<Y ?• �;?:;Y.: '.10. :Yi: ".5$.'y.? : '';< i ; err, ; ;'F %f Y;.. }f;;:r : ty`?3 ?IM , •,v,:' /,4.S.. n.. r...Y.'h� >{f..:.$ ? <.'l.:i :'i�i ?r }v ?`: ^'n'�$i; %::•::; ?:!... ... :.?. :rif.Jpv,{r % � ?.�r. ? <':: <,Yi }: Y......... . :•.:G' }�f? i? �i' +$ +•:i %> :.�.t�: ?. H I:,. .vp•.: �: n::..v:::..;Y;.. i }y ?b:in....... f .. . r................ r................ .r� ::. n.;t,,`•Iy,.r..Sbf.: }i:$: • . M I$ : ,:?. r ,: >Y }• � r:4�ry.;�.;; .: � ;r:n�:!:: >.:+;i:t'i,:;' ?C�::i: ,: ; Y:;:<::; >;:< :.;i:. ; % ?Y ?:. :: '::'•;?.:.;:::?•.?:!:•: :rr nS�.e �i4!v::t<w �:i�.r; :: .r :.:::: :,: < ::::,,:•;; �•:::.! {;,: r ::.Y.t +.•j:if,.Y+i:• }: ..:• <r•:::•... .:.. ?....... ??....., •: r,.::..; .{::: ? : � ?. , .:...�,_...: :.:•Y.....'C.A�TAL:.;.. -. , r...: }:.:: •Y;; ? ? ?!::•Y:ei� <: < ?••.•r:! ?•;: SITE ADDRESS SUITE # 9229 East Marginal Way South ,_ VALUE OF CONSTRUCTION - $ 26,300 PROJECT NAME/TENANT Rhone - Poulenc 4 ASSESSOR ACCOUNT # . 542260 -0010 , TYPE OF • New Building • Addit On • Tenant Improvement (commercial) 11 Demolition (building) WORK: 0 Rack Stora.e 0 Reroof 0 Remodel residential 0 Other: DESCRIBE WORK TO BE DONE: .., Demolition of the Meal Bin excluding floor slab , BUILDING USE (office, warehouse, etc.) Manufacturing NATURE OE BUSINESS: Closed industrial plant. WILL THERE BE A CHANGE IN USE? ' No Yes 1f Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: 8,418 Tenant Space: Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? Q No 0 Yes IFYES, EXPLAIN: PROPERTY OWNER P E 764 -4474 ADDRESS 9229 East Marginal Way South, Tukwila, WA ZIP 98109 CONTRACTOR Olshan Demolishing A Brand Company PHONE713/867 -9200 ADDRESS 2707 North Loop West, Suite 200, Houston, TX ZIP77008 WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT NA PHONE ADDRESS ZIP PRINT NAM Lew Her ADDRESS 9229 E. Marginal Wa South CONTACT PERSON Lew Herr CIiY/ZIP TukwilazWA 98109 PHONE 206/764 -4474 APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Buliding counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION • Vaivatbn for n6w constnrdbn and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3870 prior to submitting application. in all cases, a valuation amount should be entered by the applicant. This figure wilt be reviewed and Is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT It the applicant is other than the owner, registered archilect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this • permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued wfthin 180 days following the date of application shall • expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION EXPIRES DATE APPLICATION ACCEPTED • 11- -15 -a1 SUBMITTAL CHECKLIST COMMERCIAL 09.4.1 t itAf ;* Na .o�e.Mf:each. aWct .0.06. eted building pecrrdt eppllcadon >ARCessor:?Acoount Num,.'. . ' o sots (2) o the t IoWln f laatiais` truowratcalculadon a; stem meet:: >........:: 911•!.;•'911•5411" Ip ok►ted buUdn pornjlk appucazian Sono; Ai :o sci Acoou t N t e f :`•:'sots °o%con t JctiQ by a Washl gtan Stale Ikon ed bye. Washington State licensed eopi tds9.4 . Overall building plan > « i:Use;of ad ac t', ton WaH) tat < :iaysraU. cGrrleristQns of butldlnp "or:z• Floor pla i►:of prop sed. t ant .Aece ` <`? < gss > 8 tva!Is'to':t�edernolished<<;i Grotla< aec�tonu showiat} Walt coat +ttvc nand method of attachment for fCbor $nd selling : :`:rat''catcuie lions s"fampod `:` °a.WashIr t Sta a pca sa $ti itch.:: . ..:::::::.::::::. ::.::':::::.: R.,::, bY.:::'.;<: :....:: :n:•:..,:..:'...::: :::,. eng moor may t o;t gixitad if ?? lrucfu al wo:rk.ts o ba ckrne (2 t tits I 1f a) nyydli>XivoticlaAbe.dolts,:aubm t saparatout111typarmtt.: • a�plkidot'a :i:v #:ir sa'st %iir:.v.+ >r:r�i >rXi: :; •:r f> ri3. ANTENN I A,TEWTE DI:BE( <> : a plo d ylkz i:a pesmltr ppIk Assot ay A4ZoUS N F i> :r ' culatlana ortipii nor Sr d storage G: X> i> G: Yii::` iC+. n+.++.. i.. .. +:.Jnr... :...+....:,+ : : %�tif�` :•iii : : : :: RESIDENTIAL { :i % :iji ! ' : :'•E /'g 5' / /. // is is 'S, i'i >i <'iti >' %'zi <'i' " i ;' %iy6' %;ii '4 � 3•,' + :rc ': .t4EW SINGL,E.fAMILY DWEWNG6 /ADDIT10 r4: Riii ,3•.,"f ;' %f4 / 3.'•k;i':,ir; y +i %i`X, :2`• >i :'s >.'a ;. mglated bcil ng pormit tip 1104g0:1' (one.. ►i" w d' locatiq j of to satellite d s it al atelifto: >iilsh &lit ri t l�od :of;`itttuohrt art >> r ` i :•.'•�i•::`•: <;:' %�' :iii :::.;�:::;: •i . <.;. <.ii & h 'toa St tQ.Gcenso oc►a atamp�x! by A:�N...::1nA .::.:.::::..:.. :.:..:. enn{neor ma pF,�IDF.N17Ak. 01). ....., .. ptittalll fiooi la * Bufldi ;eteavatl ?�. o a:: all iiliiin a. otitlonl! <tiucturat iraittri plan i%Q6h!ctt9�i!$itU.'ti.6f Ci9 f;Cariipleted'UHD(ty`po iI PPI t> tins „shbwing.j ttl . •' :•.r' :' :'SYii % ? : ;i » : >;!�1�i1�l1 �8i(%�f1i3Qnr4. <� ails.. >Grotadtu >St uctu(al> •aming an¢ptarss mrtsfbe #uGfrtl ed C•Y :CLJ'v :4Yn ?YYil: ri•:iw`•+i:: Yw• r ''ir :t•.•:fY :(4 :V+:i4:• :friL.42� .°41.449' u plan and udltty slto plan may ba aomb/ned Sva r porm/t application and choCkllst far apo fflo ubmltta1 roqulraments: bona! topgpraphlcul apd salts Infarrr�atlop may its toquirad ll unlgue :.: JriBPaclttxT and slgrt -; PLAN CHECK NUMBER gi-L-Ros ROUTING UTILITY PROJECT TRACKING LIECKLIST PROJECT NAME Rho rw2.. -- Po vt -e.nc. SITE ADDRESS �aau mwra�r�c�� wus SUITE NO. - PA • •''S RECEIVED TYPE OF REVIEW D• ROUT- 0 TO PWD DAT • • S APPROVED DATE RES B. REQUESTED COMMENTS [HS —C11 0.2mo Li -(S-tl la-.tt_al Curb Cut/Access /Sidewalk Fire Loop /Hydrant Flood Zone Control PERMITS REQUIRED ilX PERMITS PERMIT NUMBER APPROVED PLAN /LETTER DATE ISSUED Channelization /Striping /Signing Curb Cut/Access /Sidewalk Fire Loop /Hydrant Flood Zone Control Grade /Fill P 0 9a -00 gq 3- a(40-9 3'?�-ai-)- Hauling Landscape Irrigation Moving an Oversized Load Sanitary Side Sewer Sower Main Extension (private) Sewer Main Extension (public) Storm Drainage D—O 13 & 1d% 1 '_4l 3 4 Water Main Extension (private) Water Main Extension (public) Water Meter (exempt) Size: No.: ❑ Deduct OWater Only Water Meter (permanent) Size: No.: Water Meter (temporary) size: No.: Other: Other: CONDITIONS OF PERMIT ISSUANCE OR FINAL SIGN -OFF OF PROJECT CITY OF TUKWILA Central Permit System - Engineering Division 6300 Southcenter Blvd., Tukwila, WA 98188 Phone: (206) 433 -0179 r UTILITY PERMII" APPLICATION PLAN CHECK NUMBER: q ..... .......................... 'J C.T ' >' « > Site Address: INFORMATION ' Name of Project: Property Owner: Rhone- Poulenc Street 9223 East Marginal Way South 9229 East Marginal Way South, Tukwila, WA Rhone - Poulenc Plant Demolition Phone No.: 206/764 -4474 Cit /State/Zi•: Tukwila, WA 98209 Phone No.: Cit /State/ZI : Phone No.: 713/867 -9200 Engineer: Street Address: Contractor: Olshan Demolishing A Brand Company Street Address: 2707 North Loop West, Suite 200, Houston, TX Cit /State/Zip: 77008 King Count Assessor Account Number: 542260 -0010 O Channelization/Striping/Signing ❑ Curb Cut/Access/Sidewalk ❑ Fire Loop/Hydr. (main to vault) — No.: Sizes: ❑ Flood Zone Control ❑ Grade/Fl cubic yards ❑ Hauling O Landscape Irrigation ❑ Moving an Oversized Load O Sanitary Side Sewer -- No.: ❑ Sewer Main Extension Private ❑ Public ❑ ❑ Storm Drain ❑ Street Use ❑ Water Main Extension Private ❑ Public ❑ ❑ Water Meter / Exempt: — No.: Sizes' Deduct ❑ Water Only ❑ ❑ Water Meter/ Permanent — No • Sizes• ❑ Water Meter / Temporary: — No.: Sizes• ❑ Other: Name: Rhone - Poulenc Street 9229 East Marginal Way South ■111111~ Phone No.: 206/764 -4474 City/State/Zip: Tukwila, WA 98109 Name: Rhone - Poulenc Street 9229 East Marginal Way South ® Water ® Sewer ❑ Metro ❑ Standb ❑ Multiple- Family Dwelling No. of Units: ® Commercial/Industrial ❑ Hotel ❑ Motel ❑ Office ❑ Retail ❑ Duplex ❑ Tri lex ❑ Warehouse ❑ Manufacturing Phone NO.: 206/764 -4474 City /State/Zip: Tukwila, WA 98109 ❑ Apartments ❑ Other: ❑ Condominiums ❑ Church ❑ Hos • ital ❑ School/Coliege /Universit ❑ Other: ❑ New Building ❑ RemodeV Square footage of original building space: Square Addition '` "''''`F'' ""' '' ""' "' "` ` Footage• • Square footage of additional building space: King County Assessor's valuation of existing structures: $ 785,800.00 Valuation of work to be done: $ 294,500 • ....... <I►EREBY :.EIS:. i. . . ..:,. ,.:<::::.. � ::.::::::.::.....G..:::::: Fl..l"Y:�:::.: .. �, ... v .. {:.......:... y. t,:.: ,..:... {a < .:.; ..::...:::.... .....:....IMO ..AP�?��AT�� OMAN �!`. � � >.... .. < • :,:(9`t> .:.v; 1.�TREC'►'�< Applicant/Authorize • , ' �`' / Agent Signature: / Contact Person (print name): Lew Herr Air Print Name: Lew - •,r Address: 9229 East Marginal Way South Date: 11 -15 -91 Phone: Tukwila, WA Phone: 206/764 -4474 Date Application Accepted: `.1 15_ q I Date Application Expires: 15 09/18/90 SUUM17TAL CHECKLIST. >.; All site plans shall be provided in one submittal for review by the Public Works Department. Six (6) sets of plans stamped by a licensed engineer are required along with this application completed and signed by the applicant's representative. The following information is necessary for Public Works Department evaluation and approval of site plans: • All utility construction is to meet the City of Tukwila Standards • Indicate scale of drawing and show north arrow • Identify location by address or distance to nearest intersection CURB CUT /ACCESS /SIDEWALKS/ CHANNELIZATION/STRIPING/SIGNING O Dimensions O Type of surfacing - asphalt, crushed rock, etc.(and thickness) O Percent of scope or runoff direction O Size of curb cuts/location O Vehicular and pedestrian traffic facilities, including signing and striping, wheel chair ramps, curb cuts FIRE LOOP /HYDRANT O Type of pipe O Size of pipe/location O location and type of all valves O Type of bedding and backfill materials /percent compaction O Distance from structures, storm and sewer facilities at minimum separation O Location and size of thrust blocking FLOOD ZONE CONTROL (Requirements are under Flood Ord. No. 1462 and can be obtained from the Public Works Dept.) O Lowest finished floor elevation O Contours and elevations per National Geodetic Vertical Datum LAND ALTERING (CLEARING, GRADE AND FILL) O Contour map (2' Intervals) showing existing and proposed contours O Estimate of yardage, both cut and fill O Erosion control plan HAULING O Copy of Certificate of insurance coverage (minimum $1,000,000) O $2,000 bond made out to the City of Tukwila for property damages caused by activities O Route map LANDSCAPE IRRIGATION O Location of DSHS approved double check valve O Type of pipe - copper, high density molecular plastic, ductile O Size and depth of pipe O Size of meter O Location and elevation of meter box (water meter - permanent and exempt). Clearly show whether tap 1s on main or domestic service O Location and type of tap O Type of bedding and backfill materials/percent compaction MOVING AN OVERSIZED LOAD O Copy of Certificate of insurance coverage (minimum $1,000,000) O $5,000 bond made out to the City of Tukwila for property damages caused by activities O Business License with City of Tukwila O Route map SANITARY S1tc SEWER O Type of pipe. - concrete, PVC, etc. O Size of pipe/location O Percent of slope on pipe/length of run • O Connection point(s) to public O Location of cleanout(s) and test Tee(s) O Type of bedding and backfill material/percent compaction O Invert elevations at structures and Junctions SEWER MAIN EXTENSION O Type of pipe - concrete, PVC, etc. O Size of pipe/location O Percent of slope on pipe/length of run O Connection point(s) to public O Location of cleanouts O Type of bedding and backfill material/percent compaction STORM DRAINAGE (including existing topography and proposed grading and surfacing) O Type of pipe O Size of pipe O Percent of slope/length of run O Location of ail structures O Square footage of area to be drained, including roof area O Becring material for pipe O Invert or flow line elevations STREET USE O Complete description of proposed activity O Map with address and outline of limits of activity relative to public right -of -way and easements O Proposed traffic control/detour (per Manual of Uniform Traffic Control Devices) O Proposed schedule (times and dates) WATER MAIN EXTENSION O Type of pipe O Size of pipe O Hydrant type and locations O Valve type and locations O Connection point(s) to existing system O Type of connection - live tap, tee, etc. O Location and size of thrust blocking O Size and location of mains, including elevations (profile) WATER METER - EXEMPT O Diagram of domestic system/tie in of exempt meter O Number /account for existing domestic meter O Size and type of material of meter and service O Site address WATER METER - PERMANENT O Type of pipe - copper, high density molecular plastic, ductile O Size and depth of pipe O Size of meter O Location and elevation of meter box (water meter - permanent and exempt) O Location and type of tap O Type of bedding and backfill materials/percent compaction WATER METER - TEMPORARY O Address and hydrant location O Size of meter O Estimate of quantity and schedule After the Public Works Department has completed their review and the plans are approved, the applicant will be notified by letter concerning the necessary permits and requirements; an approved set of plans will accompany the letter.: ' if the plans are not approved, the applkant will be notified by letter of necessary resubmiltal requirements: ( INSPECTION RECORD C Retain a copy with permit (qLfl PERM' NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 431-3670 , roe h3 Nra, — PO 1) l_p n L. ype o nspe. Address: cvzz; g ri\04.3. uj ti6 Date Called: Special Instructions: `) L.Qu.) :er■r• 1(09, - Lit-110 Date Wanted: am. 8 Requester: R an — cm 1.00 • Rime No.: L Soo Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: ' ((Ai, G (k)ci-Jts —fo • 0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspectIon, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. IRempt No.: Date: INSPECTION- RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Project: op ►••1►•. �•U 'a. Type of Inspection: 14-- ►' ■ r . ress: q 4aq F YlAa rg rvo t,u 'ate Ca le.: 3- 5-4D . Special Instructions: Date Wanted: /� 3 -10- q,D aC5 p.m, Requester: tJ111: 6.911- r1 Phone No,: 1 lo14 - LI I-15 Approved per applicable codes. COMMENTS: ' ❑ Corrections required prior to approval. 3_ Inspector: /0-97 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. �P. Date: HL NE "POULENC I FINE ORGANICS DIVISION SEATTLE, WASHINGTON PLANT 9229 E. Marginal Way South - P.O. Box 80963 • Seattle, Washington 98108 - Telephone (206) 764.4450 18 June, 1992 City of Tukwila Public Works Department 6300 Southcenter Boulevard Tukwila, WA. - 98188 Attention: Mr. Greg Villanueva RE: Demolition Permits: No.. 6936 - Vanillin Building No. 6937 - Extractor Building No. 6939 - Control Building No. 6940 - Maintenance Building No. 6941 Meal ,Bin Storage: Area No. 6942 - Storage Shed No. 6943 - RCRA Storage Shed No. 6944 - Larox Building .Dear Mr. Villanueva: This will confirm our discussion in which we stated that all utilities and process drainage associated with the above permits have beeen capped and /or plugger in con- formance with the stated permit requirements. Rhone - Poulenc, Inc. retains possession of the property and is responsible for all maintnenance thereon, including the integrity of all utilities. It should be noted that all surface drainage from the site is directed to Metro after testing for com- pliance with Metro standards. This will also confirm the withdrawal of permits for the demolition of the Change Room Building and The Distribution. Center Warehouse have been withdrawn. The Compressor Building - Permit No. 6938, is on hold pending Rhone - Pulenc, Inc. verification of the disposition of the compressors contained therein. If you have any questions regarding these proceedings please do not hesitate to call me. Sincerely, ewis B. Herr Project Manager (PRHONE POULENC '71" ; ;TA'r*Y!,rg..2:17.t ?',3'n'"77.I ,7"2'4 ^.`G:,'. "?rY;r'n;it"`..., ;; gtr. :'. "P'C'.?.t TP.1*^;v!:7s 4********* k************************ *********•**k****•k****** ****** TRANSMIT CITY OF 1'UKWI:LA1 WA **/ i** h******** ***k*•* * * *** *'k ** ********** ** ** **fir ****** *k *. *** *k* * ** TRANSMIT Number: 92000242 Amount:. 55.50 03/30/92 14:49 Permit No PWi2 008'' Type: PW °LA LAND ALTERING PERMIT Parcel No: 542260 -0010 Site Address 9229 EAST MARGINAL WY S Payment Method: CHECK Notetiori: CH2M HILL Iriit: DLM ** h****************** k**** * ** * * ***k *k* *** **k *k* ********** *fir ** *k* Account. Code Description Paid 000/322.100 BUILDING '-' NONRFS 000/345.830 PLAN CHECK - NONRES k02 Total (This Payment): 55.50 Total Fees: Total All Payments: Balance: 55.50 55.50 .00 • , Lvtrt*K S�ti- �y�;v�•ra'+'zxry ^.,rr,:�`�:� GENERA GENERA GENERA GENERA .GENERA GENERA GENERA GENERA TOTAL '2.50 15.00 64.50 22.50 43.50 22.50 33.00 22.50 246.00 CHECK( 246.00 CHANGE 0.00 8387A000 11:51 LAND ALTERING Permit No: PW92 -0089 Status: ISSUED Project: RHONE - POULENC Address: 9229 EAST MARGINAL WY S Location: Parcel #: 542260 -0010 Wetlands: Scopes: X Watercourse: Issued: 03/30/1992 Approval Letter: 03/26/1992 Expires: 09/26/1992 OWNER RHONE - POULENC ING•� : 3�. •u � �� _ Phone: (206)754 -4450 C/O GAIL E. ,MMQR:R " "P 0. BOX 80963' ';.'•S :EATTLE WA , 98108 CONTACT BERT MILLER=C.H2M HILL = K, ea: : '';.,..N * *•k * * * * * * * * * *'k *•k ** i k•k*4 1141* ° ft �h *k1 •k *** *•kadi :*k *-re* •tk":�k* *'A** * *•k * *k•k•k• *A* Additional DesC;r/ip�t�io.r:h; y �t� s'�s 1 � ' 43 , A; .tij14 MEAL BI/7„,/ S• ORA,CE BL .,G- PCB ,s#0 91 468 'r +.� 0 r, c, �..• ,`i; w A l' L Grading /Fi 11 /,(,Yards) -Cu €: ,.Q �, i�11 : V66 Td'tai �"; 166 t, a ?Y r °v;i \.\,,c,',. fir' 4 41 Permit ;F,ele , 33:00\0' .r'''' Account N'a,,. 000/5322 r,` 0 Plan Check le. rr N 1.0. + ; 22 Account No ' 00023'45.830 o't'her L" N ,. ���` Account No ,00"0 - 386.904` Total ee�•- a r RI) 5`5:'5.0•- . .Valuation • �} 00�c'j e `W,..•. k, r yy % r i> c* �k vim k k * * •k * * * •k * * *k * * * * * * *. *r * *k* : *�fn *kk�ar * * * * *. *• *'Ar'k:)k! k * *: kdrkk * *- . *: * *'* y * *,kk * * * * *k *; * * *. *"i * *k' *. � qty f • �• »y;+ 4er 1 ��`` ! 1 hereby !c,ertify that 1 „h.ave`•r�:ea`d 'etnd e. a.minerii th�i's per mit "and�``kn:ow '-F to be true and corrNC H k' i °” .r..;ie same sit+ 4, ..�AY1s1,,,p' o `s i o is �,d , )140 an,ci ord i nantes�,,go,0rnti` g this work wil,be complied ,wit,li, wl:i'est•�ta s edified•- tie;r'ein or not;. The gr •an.tin of this peri'1:ti does'no't p''r•esume ",�t,o g' p 4,1 g ( + auth.elt•f lo,'v i of ate or canes 1 tote 5�` i s•y.. tic "1....- , -'^';r 1 � � '1. +� �` . i=�:.i y provisionszof-'anyy other= s:ta,t•e;o.r ,loea \', i•aws--- regulating cons'truconlor; the performan�e` of worF: 7 I a•m;a.ut.ti.orized' to�•�s,,i;gnrfor ^.;,and obta,i'n:'th Ts Lan {d Altering p,er�mi;tV:} Th i�'s permit shall bec'orge nu'l 1;.,.arid --Vi d if tl'e .w,prK' 'i' s not i' ,Y commenced \'w'•l,,th:i >n��''1'80 `days from the date 'obi ° -i u.a)ce or i f thap;,= orlr:� 5 t y. J sZ4 g, } L , t r 47 w; . } suspended E a b a rt d o�n a ds for` a period of � l "•8 Cl �•d a y s� f r o'nr n t h e. `� 1 a,s�t�- •3•i4rr s p e �c�t c a n. THE APPLICA 1 MU "T NQIIFLY THE CITY INSFPEC1I,C�R OF COMENCEMENT AND CON(PLETION OF WORE' AT LE '''�' 2 "HOUR 'IN DVANC .(FOR AN IF SFE�CTFI "ON CALL 4334 -0179 • Signature:_ w'1 � ^ :� ","-- (.1N -c., aF,t efi 4. ,f:/,,,, a * * * * * * * * *•k ** ** ** '.•***** ` J *•k'k•k *•k**k' *SM .*;• k�* xktk *• *'Jtk•k•k ***•k•k*,7�'kk " *•k J * *•k•k * *k **'k'k'k* N. APPROVED FOR ISS AWE,: JAP -'- Issued By:_ -a `� _ ' i±, ° , �; ) Date: uthori zed Fermi t, YL.e0.ter StgnaTt9u4' **• k* * * * * * * **•k * * * * * * * * * *•k ** *'kki ikc**» *.+Iy kt; xk. ik�' k %k'k *** * * *** **•k * ** * *'k ** * * *•k* I hereby certify that the permit`.,ho•i.:d:ec :,:w.hasa --name and address appears on this record has satisfactorily met the standards.and conditions for this project approved herein. Final Inspection Approved By: Inspector Signature Date: BUILDII.3 PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 BUILDING (Pq PERMIT NO. "C DATE ISSUED: 3 5 -9a SITE ADDRESS: 9229 E Marginal Wy S SUITE NO.: PROJECT: Rhone - Poulenc (Meal Bin Building) CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATES) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear WaII Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 8 Insulation 431 -3670 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre -Demo 431 -3670 12 13 14 FIRE FINAL Insp: 575 -4407 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar Is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Departrnent for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. Oa14/20 March 26, 1992 City of Tukwila Department of Public Works John W. Rants, Mayor Ross A. Earnst, P. E., Director Burt Miller CH2M Hill, Inc. 777 108th Avenue N.E. Bellevue, WA 98009 -2050 SUBJECT: Rhone - Poulenc Demolition (Meal Bin Storage Bldg., PC # 91 -468) 9229 East Marginal Way South Utility Permit Approval Dear Mr. Miller: The Public Works Department has reviewed and hereby approves your application for a utility permit for the subject project. Please contact the Permit Coordinator at 431 -3672 to have the following permit prepared for pickup: Land Altering Permit (Permit Fee = $55.501 This fee was calculated using 166 cubic yards of fill as the measure of land altering activity. The permit fee breaks down as follows: Plan Review Fee = $22.50 Permit Fee = 33.00 Total $55.50 This permit covers work that is a part of the demolition project for the subject building. We have your overall site plan on file. If you have any questions or need clarification on any issue, please call me at 433 -0179. Sincerely, John A. Piero P.E. Associate Eng neer cf: City Utilities Inspector Permit Coordinator Development File: Rhone - Poulenc JAP /amc amc:12:rhone3 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433.0179 • Fax (206) 4313665 CHONE-POULENC ORGANIC CHEMICALS DIVISION 9229 E. Marginal Way South - P.O. Box 80963 - Seattle, Washington 98108 - Telephone: (206) 764 -4450 March 2, 1992 City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington - 98188 Attention: Mr. Duane Griffin Building Department MAR 0 2 1992 1 PLANNING Subject: Demolition Permits for Rhone - Poulenc, Inc. Seattle Plant 9229 East Marginal Way South, Seattle, Washington Dear Mr. Griffin: In response to your discussions with Mr. Ryan Daugherty, CH2M HILL, Inc. we are providing the following confirmations: 1. Rhone- Poulenc, Inc. wishes to withdrawal two applications for demolition permits for the following structures at its Seattle Plant: a. Distribution Center (D.C.) Warehouse b. Change Building Along with the Administration Building and the Laboratory Building, Rhone - Poulenc, Inc. plans to leave these facilities intact to support future cleanup operations at the plant. In keeping with our applications, Rhone- Poulenc, Inc. does wish to pursue demolition permits for the remainder of the building structures on the plant site. 2. As stated in your discussions with Mr. Daugherty, the storm drainage outfall to the Duwamish River is no longer in use. Storm drainage from the plant is now collected, tested, and diverted to Metro. We are attaching a copy of the approval letter from Metro, dated August 26, 1991. This letter confirms Metro's knowledge and approval of the collection, testing, discharge procedures being followed by the plant for sanitary and wastewater discharges from the plant. 3. In regard to your concern about the protection of backfill in pits, Rhone- Poulenc, Inc. plans to have the contractor protect such areas that are exposed to rainfall during the 'RHONE POULENC period between placement of fill and placement of the final cover material. 4. Rhone- Poulenc has reviewed the letter from the Washington State Department of Ecology (a copy is attached) and will comply with the three conditions stated therein for demolition, i.e., a. Site drainage will continue to be diverted to Metro unless other provisions are made by or approved by the Environmental Protection Agency in compliance with the forthcoming consent decree or a change in policy by Metro. b. All due care will be taken by the contractor to avoid disruption of site paving, slabs, ground cover, soils, and groundwater. c. All appropriate precautions will be taken to monitor and prevent the dispersion of dust and airborne particulate matter. The plant fire water system will remain operational and will be used if necessary to prevent the dispersion of dust. Our schedule for demolition, pending issuance of the final demolition permits, is to commence demolition work on Monday, March 9, 1992 and to complete all work by June 1, 1992. We appreciate the care and concern shown by the City of Tukwila during the development and review of the demolition permits for the Seattle Plant and look forward to working with the City staff during the course of soils and groundwater cleanup at this site. Sincerely, Lewis B. Herr Project Manager Rhone- Poulenc, Inc. " e. (?,) > c? .D J' Nor ►Lyso •A1I 'na t)..1 STATE OF WASHINGTON EPARTMENT OF ECOLOGY 190 - 160th Ave S.E. • Bellevue, Washington 98008.5452 • (206) 649-7000 February 13, 1992 Mr. Duane Griffin Department of Community Development City of Tukwila 6300 Southcenter Boulevard Tukwila, WA 98188 Dear Mr. Griffin: Thank you for your consideration in involving the Department of Ecology (Ecology) is assessing potential impacts of building demolition at the Rhone Poulenc site on historic site contamination. Ms. Martha Turvey (Elliott Bay Action Team) and I have reviewed plans and available information. We feel the demolition of above -grade structures at the site can proceed without adversely affecting contamination at the site under the following conditions. 1. All surface drainage at the site continues tv be discharged to the METRO Sanitary Sewer System; 2. Demolition activities do not disturb the integrity of paving and /or building floor slabs, and underlying soils (including soil • and groundwater hydraulic/hydro logic conditions); and 3. All airborne emissions, e.g., dust fumes, mists, vapors, be monitored and controlled as necessary. Although this may not be the appropriate time to address this issue, we would seek to encourage or advise that a full remedial investigation to determine site status under the Model Toxics Control Act (MTCA) (Chapter 70.105D RCW), and MTCA regulations (Chapter 173 -340 WAC) be completed by Rhone Poulenc within the year. Such an assessment would not be guaranteed by the Hazardous Waste action being taken by Tom Post of E.P.A., as different standards apply. A condition of the local permit requiring substantive compliance with MTCA Remedial Investigation (R.I.) requirements at the site, to include reporting such R.I. results to the City and to Ecology has been used successfully in the past to accomplish that end. A time limit, usually 9 - 12 months, is often appropriate to such a condition. Mr. Duane Griffin February 13, 1992 Page 2 If you have any questions, please feel free to call for clarification or to arrange a meeting. I appreciate the opportunity to work with you and the City of Tukwila. Norman D. Peck Investigator Toxics Cleanup Program Northwestern Regional Office NDP:gm cc: Dan Cargill, UBAT Supervisor Ryan Daugherty, CH2M -Hill Tom Post, EPA, RCRA Compliance Martha Turvey, EBAT, Ecology File: Rhone Poulenc (MTCA) Monsanto Chemical Co. CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 December 11, 1991 Lew Herr 9229 East Marginal Way South Tukwila, WA 98109 PHONE # (2061 433.1800 Gary L. VanDusen, Mayor SUBJECT: Rhone - Poulenc Plant Demolition (Meal Bin Storage Bldg., PC # 91 -468) 9229 East Marginal Way South Utility Permit Application Dear Mr. Herr: The Public Works Department has reviewed the drainage plan and supplemental information submitted for the above project and hereby approves the plan for the proposed work. Please contact Denise Millard, Permit Coordinator, at 431 -3672 to have the following permit prepared for pickup: Storm Drain Modification (Inspection Fee = $15.00) This permit will provide for inspection of the proposed work by the City Utilities Inspector, Greg Villanueva (433 - 0179). You are referred to other City agencies including the. -- Building and Planning, Divisions and the Fire Department, Seattle City Water, METRO and appropriate utility franchises for other requirements and approvals which may affect the commencement of this work. Enclosed is an approved copy of the drainage plan for your files. If you have any questions, please call me at 433 -0179. Sincerely, John A. Pier.. P.E. Associate. En. neer Public Works Department xc: Burt Miller, CH2M Hill Greg Villanueva, City Utilities Inspector (w /copy of approved plan) Permit Coordinator Development File: Rhone- Poulenc Read File Enclosure: a/s ide —1 grub .T?eaii tayg• Rpt - 'to 13E CAPPED ti 4�yt��1� pr�i►an4te T R�rnt iu Op .ara.At_ c l'FST2 W/ AW c D(ItNoR APs • • OP FWz)F . LE,&4 p. tom' -.I N S (T'fr) AU. CAP` w/ P.zr Far WELL CO VC rOVC %.c 1u r. •C. ---iii r' -1 Egoti L ?c4 c- peaiNaciE - To 8� LLZp 6x :T. it H pi2m4 w� r'1 iL. colEfZ , . SIP 4 FILL-H4/ • i I�iIN� �Io 12÷-rimisi Pet-NS1-1-FeNc.H DrJN. GaP w/ . GAP of; Pu r 5L.&e, i NETF me d.irsIG£ - 'f i 11145 I NIo'E. ��cIS71Ny eLAe, 11CLU7I144 Cot. WM1i ' APPROVED PER PUBLIC WORKS- -fCo P 4i , t'tow// ID E Al ic o6 -Q . -1 o a CKJ N LETTER DATED /d. it gl P 4M Iz. Farm. PF NNAr5 IW U c•UF�u w/ r--GLI Z 4 rips -To EXISTINq '1.c1 t F H PI Pi r+y mint NORTH NO. GATE REVISION .Rhone— Poulenc, Inc. ,.Seattle .Plant Site • .SLAB DRAINAGE PLAN r557,L ".�!faE �iTLt7fNC1 • NOT TO SCALE SHEET OF 1 1 OATE 11/15/91 PROD. NO. FEB -27 -1992 14:09 FROM RHONE - POULENC 1ga "'METRO Municipality of Metropolitan Seattle Exchange Building • 821 Second Ave. August 26, 1991 Mr. R. L. Ferguson Rhone - Poulenc Inc. P.O. Box 80963 Seattle, Washington 98108 TO 9- 4625957 P.02 Seattle, WA 98104 -1598 Dear Mr. Ferguson: Thank you for your letter requesting changes to wastewater sampling and reporting procedures. You propose to collect and analyze samples of wastewater batches since at this stage of plant closure wastewater is being collected and released on a batch basis. In addition, you propose to collect daily samples of sanitary waste being discharged from the plant to ensure this waste stream is not being contaminated with residual copper. I approve your request to change wastewater sampling and reporting procedures. Effective September 1, 1991, Rhone - Poulenc will conduct them wastewater monitoring in the following manner: Batch Releasq o Prior to any discharge from an industrial wastewater collection tank, the contents will be sampled and analyzed for copper, FOG and pH to ensure they meet discharge limits. o During discharge to Metro a grab sample shall be collected prior to the Metro Sump and analyzed for copper, FOG and pH. Sanitary Discharge o A grab sample shall be taken daily from the Metro Sump and analyzed for pH. o Daily samples also shall be used to make a monthly composite'to be analyzed for copper. A portion of each daily sample shall be retained for analysis if the copper content of the composite sample exceeds 3.0 ppm. 1 FEB-27-1992 14:09 FROM RHONE - POULENC Mr. R. L. Ferguson August 26, 1991 Page 2 TO 9- 4625957 P.03 Reporting Batch Release and Sanitary Discharge analyses results shall be submitted to Metro on a monthly basis. Analyses results of samples collected during each month shall be submitted not later than the fifteenth day of the month following sample collection. Self monitoring reports shall be submitted to Metro, 322 West Ewing Street, Seattle, Washington 98119. If you have any questions, please call me at 684 -2329. Sincerely, Bruce R. Burrow Industrial Waste Investigator Environmental Programs BRB : mwr cc: Doug Knutson, Dept. of Ecology r • • 1 1,1cop: p4.456 Agez. Geo(z7,-47 r6r- foe-- 42,D0 aza, vett,t-> e-17. ( (17 1 ' \ • Are, C-P 1 7 6,r1-1P4 ct,,e49 447' ..4),c717r& 1,04,0' 'IP" pd. • ,,xv7-rt - - • ■ V■Ce-A6 • 1›. - • .1 DEMOLITION PLAN DATA SUMMARY Rhone—Poulenc, Inc. Seattle Plant Site BUILDING `Lq Sclokicie, �t111dfY1 BUILDING AREA 6r4b 4 f BUILDING STRUCTURAL SYSTEM Foundation C�.ollcre� RECEIVED r,ITY OF Ti IKWIIA NOV 1 5 i991 PERMIT CENTER Ground Floor Conc_re�C, -6 Second Floor NA.. Wall Framino C�oric re •te waas 40 -1-ISf .1.eQ( karvte qLove> Roof Structure ``L-kd &rank:. Roofing AltAcd lcc,oq SOLID WASTE DATA 1C�}tllb:, d- Carl all et: •33 VJG, 'y 4 f rlcifS Quantity Destination 250 ,P,oKd ,I�(orl �ii-c 53,c27O I (e4)f`l 1,000 IL, rovtd dls',osl c1i�e. 2' I 16. . AFT roved ci iS�o aI 4.ide SURFACE DRAINAGE Existing "cam /� (eaLex canr1�c+ a4 graae. do 4arm o. c1c e �y�4e fl. System I / System After g'[ Parinid -e,r• 1.?IrecF d rya dra i rule a lll�lric wur, /14 u J f ot,L tr 60,45 I S Demolition HEALTH & SAFETY 10 �111e� �1d exi e �o ATv.Co, sR Wwl e �� co( (� at raingre 1-6E4 curb In 1 ercic d�vv.o, cells tsf f w/ AcIsd-tnci ra oS Prow44inc1. lUp e4KCAVc 1.1m ,( c'ovljac1 wll"\ • �d 110 (111111 demtoII 'Ilan siorrn c air\.. draivlagp. an- -low. J haz.�rYi$. '. .Y. ordiA,LL risk. 6xree ci All work performed by RPI forces or contractor forces will be accomplished under RPI SAFETY AND CONDUCT GUIDELINES FOR CONTRACTORS. Contractors will be responsible for performing their work in compliance with OSHA /WISHA, and all other rules, regulations and requirements governing safety, convenience and the performance of the work. All work shall be in compliance with the regulations, ordinances and requirements of the permits issued by the agencies having_ jurisdiction of the site and the work. e all PAM & W or recynnti Rrn1S . 1,t.1h 4AUsi't -`f �P-tt n4 e P9 ' -1 Eq - -fo GAPPec u 5)(1“ 0 �7 -foer� REMAIN ..066M-41" 10 M RAW 4 C %PFD w/ PUV, G EX IOR PEAS• CAF' UNUer€v PQ'F LEP f,Gi t4 ( -rYP.) • irris - Al P NORTH 1 E1fIhfINE1 Fgct.6 -i p 9e41r4ACie - To 8� f u.eD exK. 1P H 1 N5 -w M"t'L. Cc EK, h i UIP 4 FIU-4/ I I11NG 'ro Mr 1/641,1 J• 'fb -( Nc4-1 t2FLys4tN . CAP w/ . CAP ePF PLUG 5L f NE KAll fit GUTFAGE CP 1 f H GTir■I N5 I love. �xlSTING P%ul1.DlNG -ovr- INC.UVING COME. WMU- CAP {P AP-EA. w/ A-T FE-Q. To Pf N ` O ( ItI .. 11 O /IDS cow: amp-, ' �LA6 etRIM fZ. FCCITE Nt E. "ThRU C.A4Fit, w/ `�GIjFPeR 4 PIPt:• 10 XI.511Nq '-ifc1 t*N Pinr4' 1011111.1 INININ CIEM NO. DATE REVISION NOT TO SCALE .Rhone - Poulenc, Inc. .Seattle .Plant Site • .SLAB DRAINAGE PLAN .61NR�aE:- �Itl:.t�INC -1_ SHEET l 1 OF 1 DATE II /13! 9I PROJ. NO. PACIFIC IRON & METAL A GLANT PACIFIC COMPANY Olshan Demolishing 9229 East Marginal Way South Seattle, WA. 93103 August 15,1991 Attention Mr. Tim Barker Dear Mr E,ark.er• A1`■61-ME441- 1,7P• In consideration of the sale or transfer of all the non ferrous scrap metal for recycling purposes, generated from your demolition project at the above address, as outlined in our letter to you dated August 15, 1991, a value based upon its being used as scrap for remelting purposes has been established, the undersigned represents to Olshan Demolishing Inc, and Rhone- Poulenc Inc. as follows: The property covered by this agreement will be used only as scrap for recycling purposes and for remelting, either in its existing condition or after further preparation, unless the undersigned is released from this warranty in writing. All obligations of the undersigned under this warranty shall expire (5) years / Pac i f c Iron n 'i Meta f ompany Jay 5 .err off , purchasing manager Notarized by Date i- Printed on Recycted Paper itq • r-%` 07;j1 • . .' i • Seattle: Washington 98124 • Telephone (206) 628 -6232 • FAX (206) 628-6252 SEATTLE IRON & METALS CORP. 2956 11th AVE S.W., P.O. BOX 3793 • SEATTLE, WASHINGTON 98124 (206) 682-0040 • FAX: (206) 623-1231 dealers and brokers... IRON AND STEEL SCRAP • NONFERROUS METALS • STEEL PRODUCTS • DISMANTLERS Mr. Don Schulick Mr. Tim Barker Olshan Demolishing 2707 N Loop West #200 Houston, Texas 77008 A T cHr1 August 26, 1991 SCRAP WARRANTY Seattle Iron & Metals Corporation warrants all scrap metal received from Olshan Demolishing will be sold only as scrap for remelt, AT /lf enUMIOR in condition not fit for reuse. In tiWtoc4Scrap RocychN ___ hndu tries, Sincerely SEATTLE IRON & METALS CORPORATION Adam Thomas -‘Z./ % Institute of Scrap �jr Recycling manno industries, Inc. Rhone Poulenc Inc. 9229 E. Marginal Way Seattle, WA 98108 Attn: Mr. Tim Barker Dear Tim: .NERAL METALS -1-, +1me-1-1.4A, OF TACOMA, INC. MMI 1902 Marine View Drive Tacoma, Washington 98422 Phone (206) 572 -4000 ' August 27, 1991 Gioup In accordance with our telephone conversation of August 26, 1991 and our Purchase Order number 6382, dated August 27, 1991, General Metals of Tacoma, Inc. submits the following: General Metals of Tacoma, Inc. is one of the largest ferrous scrap processors in the Northwest. We cut and process all scrap material at our Tacoma facility. All scrap material which is purchased by General Metals of Tacoma from Rhone Poulenc will be sold by General Metals for remelting into new steel. No material from Rhone Poulenc. Inc. will be sold as anything other than scrap for smelting or remelting purposes. KK /ds SWORVO THIS 1991 • • 7 r" �'1 p1J • r • • • • O. NOTAR�O WASI-00os��, Respectfully submitted, GENE -',METALS OF TACK, INC. en Kushin Industrial Purchasing Coordinator WU TELEX:( 7435 • FAX: (206) 572 -0316 SAFETY AND HEALTH RECEIVED CITY OF TI 1KWIl.A NOV 1 5 Mi PERMIT CENTER Owner agrees that, during the performance of the Work, where employees of Contractor and /or employees of subcontractors of Contractor are working on the Construction Site in an area required by Occupational Safety and Health Act Regulations, to be designated as a "Regulated Area" or other similarly intended designation where special controls and /or monitoring are required because of the presence or potential presence of certain chemicals or conditions therein, if requested by Contractor and agreed to by Owner, it will, as agent for Contractor, (1) provide said employees with respirators; (2) undertake necessary monitoring of said employees and area, (3) provide the required training for said employees in applicable hazards, and (4) supply information and data to Contractor for maintaining appropriate records; all as required by said Regulations and all at Owner's expense. However, it is understood that Contractor will provide or cause to be provided medical surveillance and any other service or equipment as required by Occupational Safety and Health Act Regulations, for said employees during the performance of the Work in said area. The above undertaking by Owner in no way constitutes the transfer to, or assumption by Owner of, any of Contractor's or its subcontractor's duties and obligations under Federal, State or local laws or regulations, including by not limited to the above described regulations; no liability to Contractor, any of its employees or other person, firm or corporation will thereby be assumed by Owner; and Contractor agrees to save Owner harmless, to the extent valid and enforceable under applicable law, from any and all liability, penalties and claims of whatever kind, including, but not limited to claims of Contractor or any of its employees, agents, vendors or subcontractors, or of governmental agencies, based on Owner's failure or alleged failure to comply with any Federal, State or local law or regulation, or based on any act or omission of Owner, its employees or agents, in performing any of the above services. Contractor shall take all necessary precautions to protect employees of Contractor, employees of its subcontractor and employees and facilities of Owner from hazards arising in the course of the performance of this Contract or in connection with Owner's operations or chemicals located at or adjacent to the Construction Site. Contractor shall comply with, and shall cause its employees and all subcontractors to comply with (1) all Rhone - Poulenc Safety and Health Regulations and Requirements which are furnished to Contractor by Owner and (2) all applicable laws and governmental rules and regulations relating to health and /or safety. In the event that Contractor fails to so comply or to cause such compliance, Rhone - Poulenc may suspend all or any part of the Work on which Contractor or his subcontractor is engaged, until Contractor proves to Owner's satisfaction that Contractor has corrected said failure. Contractor shall not be entitled to any extension of time or compensation or damages by reason of, or in connection with, such work stoppage. -2- Contractor shall review all safety and health regulations and requirements which it is obligated to comply with hereunder and any applicable hazards which it is obligated to protect against hereunder, prior to the performance of the portion of the Work which is applicable thereto. Contractor shall notify Owner how said regulations, requirements and hazards will be communicated to, and enforced with, its employees and all subcontractors. Contractor shall include in all of its subcontracts involved in the performance of the Work at the Construction Site, the provisions of the Appendix, with subcontractor being obligated to Contractor to the same extent as Contractor is obligated to Owner. However, such provisions in the subcontracts shall not relieve the Contractor of its obligation to assure compliance with the provisions of this Appendix for all aspects of the Work. Rhone - Poulenc Safety and Health Regulations and Requirements include the following and may include others which are unique to a particular Rhone- Poulenc location. Where Contractor believes any Safety or Health Regulation or Requirement is not applicable, a written variance (per Plant Procedure) to deviate there from must be received from Owner's management representative at the location of the Work, prior to initiating the Work. 1. Location Work Permits Work permits shall be obtained by the Contractor, and signed by an authorized Rhone - Poulenc supervisor to confirm his acceptance of precautions specified for the following operations: a. Use of ignition sources in restricted areas. b. Entering of vessels or confined spaces. c. Opening process equipment. d. Performing electrical hot work. e. Making excavations and trenches. f. Moving radioactive sources. g. Performing pipe "hot tapping ". h. Operating heavy equipment around electrical power lines. 2. Master Card Procedure The Master Card Procedure for tagging and locking critical equipment isolation points shall be followed by the Contractor prior to commencement of work on such equipment. r • .r, -3- 3. Location Safety and health Rules All location safety and health rules'furnished by Owner to Contractor shall be adhered to by the Contractor. 4. Personnel Protection Equipment Personnel protective equipment shall be provided by the Contractor as follows: a. Hard hats and industrial grade safety glasses with permanently attached side shields and safety shoes shall be worn at all times. b. Chemical splash goggles and hearing protection shall be worn in posted areas. c. Respiratory protection, harnesses and lifelines, and other necessary protective equipment will be worn based on location regulations and OSHA requirements and furnished by Contractor as needed. d. Respirators shall fit snugly against the face. Persons wearing beards shall be clean shaven where respirator makes a facial seal. 5. Caution Regarding Asbestos - Containing Materials Should Contractor encounter any type of insulation or other product that they suspect may contain asbestos during assignments, cease work immediately. Notify the responsible plant supervisor in order to obtain accurate identification of the material including sample analysis, if necessary. Some typical questionable areas (but not limited to) include cable insulations, pipe coverings, ceiling tiles, wallboard, blown -in insulation,.boiler/powerhouse block insulations and drilling or cutting through transite. Unless absolutely sure that a material is asbestos - free, notify plant representative you're working with and cease work activity until all questions are resolved. 6. Emergencies Contractors shall be trained in those emergency procedures which directly affect their own employees' personal safety and health. In the event of an emergency (fire, explosion, vapor cloud, spillage, or related hazards) arising in the immediate vicinity, Contractor agrees that it shall cause its employees to leave the area immediately and remain at a safe distance until the emergency is over. 7. Safe Tools Scaffolds, stages, rigging equipment, electrical tools, ladders, hoists, and other tools, machinery or equipment used in the Work shall meet specifications of ANSI and the Occupational Safety and Health Administration for such items employed in the Construction industry. -4- 8. Accidents The Contractor will be responsible.. for investigating all accidents involving its employees and reporting all details to Owner's safety representative at the location of the Work. When such accident investigation is complete, the contractor will provide such Rhone - Poulenc representative with a copy of the completed injury report. The Contractor is also responsible for compliance with the Occupational Safety and Health Administration requirements for reporting or communicating injuries. 9. Safety and Health Program Contractor shall maintain its own safety and health programs. However, it may be necessary at times for the Rhone - Poulenc representative to make recommendations to assure protection of Rhone- Poulenc employees. 10. Contractor shall review with all of its employees assigned to the Work, prior to their commencing any of the Work, all safety and health regulations, requirements and programs applicable to the Work, and Contractor shall cause its subcontractors to make such a review with their employees. 11. Special Rules for Harmful Exposure Contractor represents that it is familiar with the Occupational Safety and Health Administration Regulations concerning harmful exposure to toxic substances, and is capable of providing, and will, unless and to the extent otherwise agreed to in writing by Owner, provide respirators and /or other protective equipment exposure monitoring;, medical surveillance; employee training; record keeping and other services, to the extent required by said regulations in connection with the Work. AlliWWW1111W ANORRIPWWWWWIMMOMM111211111111211ft EXTRACTOR BUILDING; = ±400 SO. FT. , CMU BUILDING SINGLE STO6Y. POST-DEMOLMON SLAB TO ADJACENT1 !EXISTING PAVING RCRA STORAGE SHED * KRA STORAGE SHED: = ±2,500 $0. FT UNENCLOSED STEEL FRAME WITH METAL ROOF. POST-DEMOLITION SLAB TO DRAIN TO EXISTING TRENCH DRAINS, CONTROL ROOM: 7:1600 Sat FT. siNpi.O.Topy CMU BukLDINp. POST-. DEMOLITION SLAB TO DRAIN TO .. FORMER ROOF 'LEADERS. • VANILLIN BUILDING * - VANILLIN BUILDING;;= ±10,560 SQ. FT. ; HIGH-BAY BUILDING. STEEL FRAME AND MASONRY STRUCTURE WITH MASONRY MEZZANINE. 6TEgL. AND TRANSTITE SIDING. TRANSTITE SIDING TO BE REMOVEDVURING ASBESTOS REMOVAL. ; 1. EXISTING EcitnpmENT PITS TO BE BACKFILLED AND CAPPED' W$TH A/C PAVEMENT 2. SAFETY RAILS TO BE INSTALLED AT RAISED SLAB AREA. POST-DEMOLITION SLABS TO DRAIN TO IFbRrR ROOF LEADERS 'EXItTING PAVING I . DISTRIBUTION CENTER WAREHOUSE * DISTRIBUTION CENTER WAREHOUSE: = ±23,000 SO. FT. MASONRY WALLS TO APPROX. 12', STEEL FRAME WITH WINDOWS ABOVE. 1. EXISTING SCALE PIT TO BE FILLED. POST-DEMOLITION SLAB TO BE SLOPED TO DRAIN TO FORMER ROOF LEADERS. 'SAFETY HOIDRAILS TO BE IN6TALLEb AT EDGES OF RAISED SL. Uplal'i)d Zone • - SEPA,ChebkliSt - Demolition Permit - Utility • - • jr - Fire Protection Derno Permit - Certificate Of`InStirari e 'Bond - Hauling' Perrnit WEST CHANGE ROOM: = ±2,700 acteFT.-- • SINGLE-STORY MASONRY BUILDING WITH DOUBLE ROOF TEES. POST-DEMOLITION •SLAB TO DRAIN TO EXISTING RADE • N a9.1t. Seth 1470 CO S 2340 59'E ERR 77 r"I70M IN/ e)g .NE SU:Aft:EN CPLNA''CIN CLAIMS OF rRANL15 MA AND .4Crztr /AN AS:JEl.. ir,.4 EAST ofiE of SEC .13 'NP 24 N R 4 1. W -.RECORD tQCATON 6 CAST /RON 'bANITARY SEWER FORCS. kiAoN ShA..L E A •ST DIRT ..6FNCE COR O.I. N.8 2.0 OF PROP. CORNL. 1C-111P +.00; NC, ',RAYS FENCE 1.2 N. OF /4'5. • 0 _ _ SeRvILE PROP. LINE /0 // 561 36 (DEED) 563.55 CAL:C ) .../NDR6ROuND APPROXIMATE) 7; • • 7"C w u r7*.s P'L 1. . • ,ALIN 00 BUMPS P , • • PudifillotriVt. MEAL BIN * SOMH DMH -TANK C.B MEAL BIN = ±8,418 Q. FT. ±15' HIGH CIP CONC ETE WALLS WITH ±8' STEEL FRAMEWORK BOVE. "TRANSTITE" SIDING PANELS AT UP ER LEVEL EXTERIOR REMOVED DURING AS ESTOS REMOVAL, POST,DEMOLITION PLA DRAINAGE, TO SLAB PERIMETER & PI ED TO FORMER' ROOF LEADERS , , i. DEEP WELL A'T SOU 1H WALL TO BE BACKFILLED AND CA PED WITH A/C PAVING. 2. EXISTING BASEMENT 0 BE BACK- FILLED AND CAPPED AT EXTERIOR AREAS. P V Qom PL. rt TowER NUMEROUS S 'AN' • 6 OVERHEAD D PIP t. a OMPLI A THIS AREA f 00 00 tr• F H "",c P4PER. VAULT) IELEC.BOX) C 1 4. GP , - ^ e GRAss 7r:SDr.414.--0 .A• --"kvvy VALVE 1. CB er 'tANKS' ci &PIPES • h rntjt.! ' TANKS ASPHALt CI T WOOD 11; T COMPRESSOR BUILDING: = ±1,600 SO. FT. HIGH-BAY BUILDING. STEEL FRAME WITH STEEL SIDING. POST-DEMOLITION SLAB , TO DRAIN TO EXISTING' GRADE I 1, vAjut ,NE -Di S.+ 1 N MX-Ria:e.;CSI )it LAROX BUILDING: ±1 113 SO. FT. ±3 STORY STEEL FRA E BUILDING WITH STEEL SIDING. POST- MOLITION SLAB DRAINAGE TO EXISTIN 'GRADE ssmo-0-"' AC WALK 'GRAvEL. -6,6'mApa FENCE COP 2.6 • . a 2.4 . • s FENCE CO. 2.0 N or PROP. LINE • flmcitlt A- 'A > 7 V a r Pier Zone SEPA Checklitt - Shorelines Permit - Dernolitibri" Permit including: Utility Permit Building Permit Fire Protection Demo. Permit Certificate Of Insurance Bond - Hauting,Perrnit - Corps of Engineers Permit for Work in Navigable Waters - Washington State Department of Fisheries HPA Permit horeline Zone SEPA Checklist Shorelines' Permit - Demolition Permit including: Utility Permit Building Permit., Fire' Protection Demo. Perrni Certificate of Insurance 'Bond - Hauling Permit , STORAGE SHED STORAGE SHED:.= ±1,500 SO. FT. SINGLE-STORY STEEL AND WOOD " FRAME WITH TRANSTITE SIDING: V' ,TRANSTITE SIDING TO BE REMOVED DURING ASBESTOS REMOVAL.'" POST-DEMOLITION SLAB TO DRAM - ITO] EXISTING ;PAVING . MAINTENANCE BUILDING_ * MAINTENANCE BUILDING; = ±9,624 SO. FT. • 1 STORY CMU/CIP CONCRETE COMBINATION WITH STEEL FRAME AND'TRANSTITE SIDING ABOVE. TRANSTITE SIDING TO BE REMOVED DURING ASBESTOS REMOVAL. POST- DEMOLITION SLAB TO DRAIN TO FORMER ROOF LEADERS. SAFETY RAILINGS TO BE INSTALLED AROUND PERIMETER OF BUILDING SLABS AND ADJACENT RAISED SLAB. DESCRIPTION, r IHAT' PORTION 'OF 'TRACTS I .No2 OF THE MEADOWS, ACCORDING TO rife. min NON MA,' OV PART, OF THE FRANCIS M:IgNATT DONATION cLAND CLAIM , NO. '38 FILED LINI(ING COl•NTY'SUPERIOR COURT CAUSE NO. 120091. AND OF , THE ABANDONED BEI) OF ;NE DUWAM ESN: RIV,ER, ALL ' LOCATED .,3, TOWNSHIP 24 NORTH,' RANGE'-4 'EAST, N.H., IN KING WASHINGTON AND ALLYING wESTERLY,„Qt` THE, WESTERLY MARGINS 0.F. EAST MARGINAL WAY SOUTH AND ALSO WESTERLY 'OF THE PARCEL-0F • LAND ADJOINING EAST MARGINAL_ WAY ,WHICH. WAS ,CONVEYED'TO GREAT ' NORTHERN RAILWAY COMPANY BY 'DEED RECORDED UNDER FILE NUMBER 1784818; LYING EASTERLY OF THE EASTERLY :I4ARGIN OF THE RIGHT CF WAY,OF,COMMERCIAL wATERWAY DISTRICT NO 1 .(DUWAMISti I4ATERWAY); ' 'LYING SOUTHERLY OF THE HEREINAMR'OESCRIBE0 "LINE A"; AND LYING NORTHERLY OF rim HEREINAFTIOT DESCR 'BED "L I GE 890 2T 50"NA LINE Pi 6N THE wESTERLY LINE(OF EAST 'MARGINAL WAY ,,SOUTH, WHICH POINT BEARS NORTH 89'1554" WEST 2470.01 FEET ALONG THE DONAT/ON. CLAIM LINE P.ND SOUTH '23•4059" EAST 648.77 FEET ALONG THE ;WESTERLY LINE OF EAST MARGINAL WAY SOUTH FROM THE INTERSECTION OF .,THe LINE BETWEEN -THE DONATION CLAIMS;.'OF FRANCIS MC NAT' AND HENRY VAN ASSELT WITH THE,EAST.LINE OF SECTION 33, TOWNSHIP 24 NORTH, • RANGE,,4 EAST, W.M., IN KING COUNTY, WASHINGTON; RUNNING. THENCE WEST 1574.7? FEET,'TO'THE EASTERLY LINE 'OF COMMwRCIAL WATERWAY NO. 1; THENCE SOUTH '15100103" EAST .ALONG 'SAID, EASTERLY LINE 237.76 FEET .TO THE TRUE POINT'OF BEGINNING OF SAID "LINE--A"; THENCE EAST 1053.10,7FEET; THENCE SOUTH 23'02'00" EAST 46.03 FEET; THENCE EAST 561.38 FEET TO THE WESTERLY MARGIN OF EAST MARGIFAL WAY SOUTH* AND' TEE TERMINUS OF SAID "LINE A"; o , BEGINNING ON THE WESTERLY MARGIN'OP,EAST,,"..sr.,RGINAL%WAY 'SOUTH AT A POINT WHICH BEARS NORTH 8915'54" WEST A DISTANCE OF 2470.01 'FEET '. ALONG.THE DONATION.CLA.IM LINE' AND SOUTH 2340'59' EAST A DISTANCE OF.11374.17 FEET ALONG THE WESTERLY MARGIN OF EAST MARGINAL WAY ' SOUTH FROM THE INTERSECTION OF THE LINE BETWEEN THE DONATION, ,CLAIMS OF FRANCIS MC NAT? AND HENRY VAN ASSELT WITH THE EAST LINE ' 'OF SSCTION 33, TOWNSHIP, 24 NORTH, RANGE' 4- EAST, N.M.' IN KING COUNTY, WASHINGTON, SAID' POINT BEING AT THE' INTERSECTION OF THE .,WESTERLY MARGIN ()F EAST MARGINAL WAY SOUTH WITH THE NORTH LINE OF VAN !)E VANTER STOCK FARM TRACT AND,THR TRUE POINT OF BEGINNING OF SAID "LINE Ii"; 'THENCE NORTH ,'8427150" WEST A DISTANCE.OF 14.94, FEET; THENCE,NORTN 86!5459" WEST' A'DISTANCE,TOF 486:97 F,'EET; THENCE NORTH 8417' 04-'1 WEST A DISTANCE Or,r117:'00„ FEET; THENCE SOUTH ,83°57'56" .WEST A DISTANCE ,OF, 119.00 FEET; ,THENCE.SOOTH • ; 1040'29' WEST ALDISTANCE'OF 110.173 FEET; THENCE SOUTH,61•33'40''.., .• WEST'A DISTANCE OF 840.02 FEET. TO „THE,EASTERLY LINd'OF,THE RIGHT ..OF WAY ,OF COmMERCIAL, WATERWAY DISTRICT,NO.,.1 AND TRC.,TERMINUS, OF SMD "LINE B. -TOGETHER, WITHI'NE RICH r TO, CROSS oTHE PARCEL CONVEYED TO GREAT • -NORTHERN RAILWAY COMPANY AS RESERVFIr- (N OF.F.D.WECORDEO UNDER FILE NUMBER • . . . , LEGEND : A.C.• *.ASPHAL,TIC*(.70NCRE surtrAcF t.8. ATCH BAST C. . cohicerr; RAMP C , CONCRETE WALK C.WALL .CoNC.RETE WALL D.I. DRAIN INLET ' E.V. ELECTR IcAL • EilSTI NG SURV SY • mONUMF.NT FENCE LINt.. , I.H. FIRE RYDRAN r -G- GAS MAIN G.P. GUARD POST aUT WIRE OR CABI.E , INTERCEPT CATCH BASIN .0.1.-';INTEFICEPT DRAIN INI.ET OVERHEAD POWER-WIREI P• • POWER1 :TRANSFORMER ',PROCESS.' MANHOLE; STORM DkiN ,SANITARY -'SEWER' r•••=0- ' STREET ,LIGHT. --1---- TELEPHONE .WIRE • • TELEPHONE CONDO! r ott -TELEGRAPH' •' 'TEST HOLE , O.K. ovERI(EAD LAVE LINE PIPES' WITH SUPPORT COLL'MNS PP tI,OWER POLE „ PARKING StAT.L OR SPACE crty 10FIMODik APPROVEt. H 1992 S NOTED ' BlIILDING DIVISION TELEPHONE. SENTRY Ilat:N:ti nitAtN :urit,t-ry -,ii"..,:es MANHLII.E , " • rits ER IAN AA' ER STEli li 4ATER '&AL.VE ,..QATER'VALVVOR METER CHAMBER . I unclerskthd . that the Plart'cheOk aOproVale are vbiect; tO:errors-anci:Offiiapieris and approval of - plans does not authorize' The violation, of siw*. adoi*cilcode or 'Ordnance. Receipt of contreZ-'torie copy of approved plans acknoweded. ' . " • ... . .. ;:. Permit No CERTIFICATION: SURVEY IDENTIFICATION NO.: REGISTERED LAND SURVEYOR NO.: SURVEYOR'S ADDRESS & COMPANY: PL. PLANTER , POST. INDICATOR VALVE 86181.01 22333 BUSH, ROED & HITCHINGS, ' INC. 2009 MINOR AVENUE EAST SEATTLE, WASHINGTON 981-02 (206) 3,23-4144 RHONE-POULENC STEWART TITLE COMPANY OF WASHINGTON, INCORPORATED THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH , tIT 'tIS ,,. BASED WERE MADE IN ACCORDANCE WITH "MINIMUM STANDARD DETAIL 'REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURvEYS, " JcANTLY ESTAB- LISHED AND ADOPTED BY ALTA AND ACSM IN 1988; AND MEETS THE ACCU- RACY REQUIREMENTS OF A CLASS "A" SURVEY, AS DEFINED THEREIN AND INCLUDES ITEMS (2 & 9) OF TX-E 3 THEREOF. °' . ..) i _ . 1 / I - AREA REMARKS PERMIT RECORD COMPRESSOR BUILDING uj VANILLIN BUILDING g CONTROL ROOM i; EXTRACTOR BUILDING . 775 RCRA STORAGE SHED a. DISTRIBUTION CENTER WAREHOUSE DATE ISSUED • 1,600 SO. FT ± 10,560 SQ. FT. ± 600 SQ. FT. ± 400 SQ. FT. •+ 2,500 SQ. FT. • ± 23,000 SQ. FT. ± 2,700 SQ. FT 41,400 SQ. FT. POI LAW MEAL BIN LAROX BUILDING MAINTENANCE BUILDING STORAGE SHED ‘- TOTAL SHORELINES DEMOLITION AREAS GIVEN ARE APPROXIMATE GROUND COVERAGE OF POST-DEMOLITION "FOOTPRINT." * POST DEMOLITION SLAB DRAINAGE FOR INDIVIDUAL STRUCTURES HAVE BEEN REVISED, SEE DETAILED SLAB DRAINAGE PLANS ' 1 ' ' IriFirittirritriripirrippliptt imp , • 21 THE ABOVE CERTIFICAMISiASED‘IPON' WORK PREPARED IN WITH GENERALLY ACCEPTED PROFESSIONAL SURVEY PRACTICE. WE MAKE NO 0THER WARRANTY, EITHER EXPRESSED OR IMPLIED. , . LD REPORT REFER/Ea: THIS SURVEY WAS CONDUCTED ACCORDING TO ThE ABOVE DESCRIPTION, FURNISHED BY STEWAR" TITLE COMPANY OF WASHINGTON, INCOIRPORATED, COMMITMENT NO 137029, DATED FEBRUARY 1, 19 q1 . THE EASEMENTS SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT. NOTE: EASEMENTS CREATED OR RESCINDED AFTER THIS DATE ARE NOT 'SHOWN OR NOTED HEREON. Figure 2H ContraptorAccess and Work-Areas- _ for Meal Bin - RHONE-POULENC INC. EAST MARGINAL WAY SO. PLANT .,,A•AA. I 1 '1 I 1 I •I E l I 11.1 11 1 1 1 I I 1. 111 I I 1 IT I 41 o.18; IANIcs ' -i'ANKs. • "Aro(5.. .,.• 6' C.WALL 00 00 tr• F H "",c P4PER. VAULT) IELEC.BOX) C 1 4. GP , - ^ e GRAss 7r:SDr.414.--0 .A• --"kvvy VALVE 1. CB er 'tANKS' ci &PIPES • h rntjt.! ' TANKS ASPHALt CI T WOOD 11; T COMPRESSOR BUILDING: = ±1,600 SO. FT. HIGH-BAY BUILDING. STEEL FRAME WITH STEEL SIDING. POST-DEMOLITION SLAB , TO DRAIN TO EXISTING' GRADE I 1, vAjut ,NE -Di S.+ 1 N MX-Ria:e.;CSI )it LAROX BUILDING: ±1 113 SO. FT. ±3 STORY STEEL FRA E BUILDING WITH STEEL SIDING. POST- MOLITION SLAB DRAINAGE TO EXISTIN 'GRADE ssmo-0-"' AC WALK 'GRAvEL. -6,6'mApa FENCE COP 2.6 • . a 2.4 . • s FENCE CO. 2.0 N or PROP. LINE • flmcitlt A- 'A > 7 V a r Pier Zone SEPA Checklitt - Shorelines Permit - Dernolitibri" Permit including: Utility Permit Building Permit Fire Protection Demo. Permit Certificate Of Insurance Bond - Hauting,Perrnit - Corps of Engineers Permit for Work in Navigable Waters - Washington State Department of Fisheries HPA Permit horeline Zone SEPA Checklist Shorelines' Permit - Demolition Permit including: Utility Permit Building Permit., Fire' Protection Demo. Perrni Certificate of Insurance 'Bond - Hauling Permit , STORAGE SHED STORAGE SHED:.= ±1,500 SO. FT. SINGLE-STORY STEEL AND WOOD " FRAME WITH TRANSTITE SIDING: V' ,TRANSTITE SIDING TO BE REMOVED DURING ASBESTOS REMOVAL.'" POST-DEMOLITION SLAB TO DRAM - ITO] EXISTING ;PAVING . MAINTENANCE BUILDING_ * MAINTENANCE BUILDING; = ±9,624 SO. FT. • 1 STORY CMU/CIP CONCRETE COMBINATION WITH STEEL FRAME AND'TRANSTITE SIDING ABOVE. TRANSTITE SIDING TO BE REMOVED DURING ASBESTOS REMOVAL. POST- DEMOLITION SLAB TO DRAIN TO FORMER ROOF LEADERS. SAFETY RAILINGS TO BE INSTALLED AROUND PERIMETER OF BUILDING SLABS AND ADJACENT RAISED SLAB. DESCRIPTION, r IHAT' PORTION 'OF 'TRACTS I .No2 OF THE MEADOWS, ACCORDING TO rife. min NON MA,' OV PART, OF THE FRANCIS M:IgNATT DONATION cLAND CLAIM , NO. '38 FILED LINI(ING COl•NTY'SUPERIOR COURT CAUSE NO. 120091. AND OF , THE ABANDONED BEI) OF ;NE DUWAM ESN: RIV,ER, ALL ' LOCATED .,3, TOWNSHIP 24 NORTH,' RANGE'-4 'EAST, N.H., IN KING WASHINGTON AND ALLYING wESTERLY,„Qt` THE, WESTERLY MARGINS 0.F. EAST MARGINAL WAY SOUTH AND ALSO WESTERLY 'OF THE PARCEL-0F • LAND ADJOINING EAST MARGINAL_ WAY ,WHICH. WAS ,CONVEYED'TO GREAT ' NORTHERN RAILWAY COMPANY BY 'DEED RECORDED UNDER FILE NUMBER 1784818; LYING EASTERLY OF THE EASTERLY :I4ARGIN OF THE RIGHT CF WAY,OF,COMMERCIAL wATERWAY DISTRICT NO 1 .(DUWAMISti I4ATERWAY); ' 'LYING SOUTHERLY OF THE HEREINAMR'OESCRIBE0 "LINE A"; AND LYING NORTHERLY OF rim HEREINAFTIOT DESCR 'BED "L I GE 890 2T 50"NA LINE Pi 6N THE wESTERLY LINE(OF EAST 'MARGINAL WAY ,,SOUTH, WHICH POINT BEARS NORTH 89'1554" WEST 2470.01 FEET ALONG THE DONAT/ON. CLAIM LINE P.ND SOUTH '23•4059" EAST 648.77 FEET ALONG THE ;WESTERLY LINE OF EAST MARGINAL WAY SOUTH FROM THE INTERSECTION OF .,THe LINE BETWEEN -THE DONATION CLAIMS;.'OF FRANCIS MC NAT' AND HENRY VAN ASSELT WITH THE,EAST.LINE OF SECTION 33, TOWNSHIP 24 NORTH, • RANGE,,4 EAST, W.M., IN KING COUNTY, WASHINGTON; RUNNING. THENCE WEST 1574.7? FEET,'TO'THE EASTERLY LINE 'OF COMMwRCIAL WATERWAY NO. 1; THENCE SOUTH '15100103" EAST .ALONG 'SAID, EASTERLY LINE 237.76 FEET .TO THE TRUE POINT'OF BEGINNING OF SAID "LINE--A"; THENCE EAST 1053.10,7FEET; THENCE SOUTH 23'02'00" EAST 46.03 FEET; THENCE EAST 561.38 FEET TO THE WESTERLY MARGIN OF EAST MARGIFAL WAY SOUTH* AND' TEE TERMINUS OF SAID "LINE A"; o , BEGINNING ON THE WESTERLY MARGIN'OP,EAST,,"..sr.,RGINAL%WAY 'SOUTH AT A POINT WHICH BEARS NORTH 8915'54" WEST A DISTANCE OF 2470.01 'FEET '. ALONG.THE DONATION.CLA.IM LINE' AND SOUTH 2340'59' EAST A DISTANCE OF.11374.17 FEET ALONG THE WESTERLY MARGIN OF EAST MARGINAL WAY ' SOUTH FROM THE INTERSECTION OF THE LINE BETWEEN THE DONATION, ,CLAIMS OF FRANCIS MC NAT? AND HENRY VAN ASSELT WITH THE EAST LINE ' 'OF SSCTION 33, TOWNSHIP, 24 NORTH, RANGE' 4- EAST, N.M.' IN KING COUNTY, WASHINGTON, SAID' POINT BEING AT THE' INTERSECTION OF THE .,WESTERLY MARGIN ()F EAST MARGINAL WAY SOUTH WITH THE NORTH LINE OF VAN !)E VANTER STOCK FARM TRACT AND,THR TRUE POINT OF BEGINNING OF SAID "LINE Ii"; 'THENCE NORTH ,'8427150" WEST A DISTANCE.OF 14.94, FEET; THENCE,NORTN 86!5459" WEST' A'DISTANCE,TOF 486:97 F,'EET; THENCE NORTH 8417' 04-'1 WEST A DISTANCE Or,r117:'00„ FEET; THENCE SOUTH ,83°57'56" .WEST A DISTANCE ,OF, 119.00 FEET; ,THENCE.SOOTH • ; 1040'29' WEST ALDISTANCE'OF 110.173 FEET; THENCE SOUTH,61•33'40''.., .• WEST'A DISTANCE OF 840.02 FEET. TO „THE,EASTERLY LINd'OF,THE RIGHT ..OF WAY ,OF COmMERCIAL, WATERWAY DISTRICT,NO.,.1 AND TRC.,TERMINUS, OF SMD "LINE B. -TOGETHER, WITHI'NE RICH r TO, CROSS oTHE PARCEL CONVEYED TO GREAT • -NORTHERN RAILWAY COMPANY AS RESERVFIr- (N OF.F.D.WECORDEO UNDER FILE NUMBER • . . . , LEGEND : A.C.• *.ASPHAL,TIC*(.70NCRE surtrAcF t.8. ATCH BAST C. . cohicerr; RAMP C , CONCRETE WALK C.WALL .CoNC.RETE WALL D.I. DRAIN INLET ' E.V. ELECTR IcAL • EilSTI NG SURV SY • mONUMF.NT FENCE LINt.. , I.H. FIRE RYDRAN r -G- GAS MAIN G.P. GUARD POST aUT WIRE OR CABI.E , INTERCEPT CATCH BASIN .0.1.-';INTEFICEPT DRAIN INI.ET OVERHEAD POWER-WIREI P• • POWER1 :TRANSFORMER ',PROCESS.' MANHOLE; STORM DkiN ,SANITARY -'SEWER' r•••=0- ' STREET ,LIGHT. --1---- TELEPHONE .WIRE • • TELEPHONE CONDO! r ott -TELEGRAPH' •' 'TEST HOLE , O.K. ovERI(EAD LAVE LINE PIPES' WITH SUPPORT COLL'MNS PP tI,OWER POLE „ PARKING StAT.L OR SPACE crty 10FIMODik APPROVEt. H 1992 S NOTED ' BlIILDING DIVISION TELEPHONE. SENTRY Ilat:N:ti nitAtN :urit,t-ry -,ii"..,:es MANHLII.E , " • rits ER IAN AA' ER STEli li 4ATER '&AL.VE ,..QATER'VALVVOR METER CHAMBER . I unclerskthd . that the Plart'cheOk aOproVale are vbiect; tO:errors-anci:Offiiapieris and approval of - plans does not authorize' The violation, of siw*. adoi*cilcode or 'Ordnance. Receipt of contreZ-'torie copy of approved plans acknoweded. ' . " • ... . .. ;:. Permit No CERTIFICATION: SURVEY IDENTIFICATION NO.: REGISTERED LAND SURVEYOR NO.: SURVEYOR'S ADDRESS & COMPANY: PL. PLANTER , POST. INDICATOR VALVE 86181.01 22333 BUSH, ROED & HITCHINGS, ' INC. 2009 MINOR AVENUE EAST SEATTLE, WASHINGTON 981-02 (206) 3,23-4144 RHONE-POULENC STEWART TITLE COMPANY OF WASHINGTON, INCORPORATED THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH , tIT 'tIS ,,. BASED WERE MADE IN ACCORDANCE WITH "MINIMUM STANDARD DETAIL 'REQUIREMENTS FOR ALTA/ACSM LAND TITLE SURvEYS, " JcANTLY ESTAB- LISHED AND ADOPTED BY ALTA AND ACSM IN 1988; AND MEETS THE ACCU- RACY REQUIREMENTS OF A CLASS "A" SURVEY, AS DEFINED THEREIN AND INCLUDES ITEMS (2 & 9) OF TX-E 3 THEREOF. °' . ..) i _ . 1 / I - AREA REMARKS PERMIT RECORD COMPRESSOR BUILDING uj VANILLIN BUILDING g CONTROL ROOM i; EXTRACTOR BUILDING . 775 RCRA STORAGE SHED a. DISTRIBUTION CENTER WAREHOUSE DATE ISSUED • 1,600 SO. FT ± 10,560 SQ. FT. ± 600 SQ. FT. ± 400 SQ. FT. •+ 2,500 SQ. FT. • ± 23,000 SQ. FT. ± 2,700 SQ. FT 41,400 SQ. FT. POI LAW MEAL BIN LAROX BUILDING MAINTENANCE BUILDING STORAGE SHED ‘- TOTAL SHORELINES DEMOLITION AREAS GIVEN ARE APPROXIMATE GROUND COVERAGE OF POST-DEMOLITION "FOOTPRINT." * POST DEMOLITION SLAB DRAINAGE FOR INDIVIDUAL STRUCTURES HAVE BEEN REVISED, SEE DETAILED SLAB DRAINAGE PLANS ' 1 ' ' IriFirittirritriripirrippliptt imp , • 21 THE ABOVE CERTIFICAMISiASED‘IPON' WORK PREPARED IN WITH GENERALLY ACCEPTED PROFESSIONAL SURVEY PRACTICE. WE MAKE NO 0THER WARRANTY, EITHER EXPRESSED OR IMPLIED. , . LD REPORT REFER/Ea: THIS SURVEY WAS CONDUCTED ACCORDING TO ThE ABOVE DESCRIPTION, FURNISHED BY STEWAR" TITLE COMPANY OF WASHINGTON, INCOIRPORATED, COMMITMENT NO 137029, DATED FEBRUARY 1, 19 q1 . THE EASEMENTS SHOWN OR NOTED HEREON RELATE TO THIS COMMITMENT. NOTE: EASEMENTS CREATED OR RESCINDED AFTER THIS DATE ARE NOT 'SHOWN OR NOTED HEREON. Figure 2H ContraptorAccess and Work-Areas- _ for Meal Bin - RHONE-POULENC INC. EAST MARGINAL WAY SO. PLANT .,,A•AA. I 1 '1 I 1 I •I E l I 11.1 11 1 1 1 I I 1. 111 I I 1 IT I 41 o.18;