HomeMy WebLinkAboutRes 1212 - 1993-1998 Transportation Improvement Program ILA N
190$
CITY OF TUKWILA
WASHINGTON
RESOLUTION NO. 1212 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM, AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a Comprehensive
Street Program and thereafter periodically modified said Comprehensive Street Program by
resolution, and
WHEREAS, the City Council has reviewed the work accomplished under said program,
determined current and future City street and arterial needs, and based upon these findings has
prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar
years, and
WHEREAS, a public hearing has been held on the said Six -Year Transportation
Improvement Program.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, DO HEREBY RESOLVE AS FOLLOWS:
Sectio 1. Pro=m A dopted, The Six -Year Transportation Improvement Program for
the City of Tukwila, as revised and extended for the ensuing six (6) calendar years (1993 -1998,
inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this
reference as if fully set forth, which program sets forth the project location, type of improvement
and the estimated cost thereof, is hereby adopted and approved.
Sectio 2. FilinLpf Pro gram• The City Clerk is hereby authorized and directed to file
a copy of this resolution, together with the exhibit attached hereto, with the Secretary of
Transportation and the Transportation Improvement Board of the State of Washington.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Special meeting thereof this day of 1992.
Allan Ekberg, Council President
ATTEST /AUTHENTICATED:
Nane E. Cantu, City Clerk
APPROVED AS TO FORM:
W 4�� I/0/t
OFFICE OF TI CITY ATTORNEY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number 11�5?
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
CITY /COUNTY CITY OF TUI :WILA HEARIN& DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION N0. 1212
F;
June 23, 1992
Page 1
U; PROJECT COSTS 10 THOUSANDS OF DOLLARS FEDERAL
p h C N;
.R F A A D; OBLIGATION PLAN
1 U JO R 1;
0 NC OF R 0; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
TA W TOTAL 0 FOR ALL FUNDING TYPES 1ST 4TH
15 CO WORK V S; TOTAL
PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T; THRU THRU
N AK CODE R A; ;4TH,5TH; UATA
N LOCAL rIA :FEDERA 3RD 6TH
A S T 1ST 200 3RD ;e 6Tii L
0 L 5' X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
4 S; 1943 1994 1995 96 -98 YEARS YEARS
01 WEST VALLEY HWY (SR 181) 8 S. 180TH STREET 84 -0040 16 2 ABDF 0.42 X P 01,600 $1,600 $220 $1,280 $100 P.E.
W. Valley Hwy S. 180th R/W
Short-tere signal codification, channelization, bridge widening. COSTT. $100
1 1 TOTAL $100 $0
t. i 02 SOUTIICENTER BOULEVARD 85 -RW02 16 1 AODF 0.28 X F $5,200 04,150 $9,350 01,937 $3,121 14,286 P.E. $250
68th Ave. 5. Grady Way Bridge R/W $520
Widen to 5 lanes on new alignment with new bridge over GreenRiver, structure COSTT. $451 $3,065
undercrossing 1 -405 rasps, new signal and channelization at Interurban Ave.
1 TOTAL $451 03,835
03 EAST MARGINAL WAY SOUTH 90 -0002 14 2 ABDF 1.93 X P 05,000 04,900 09,900 06,400 $3,500 P.E. 00
Boeing Access Rd North City Limit RIO $0
Design and construct widening, drainage, traffic signals, utility CONTT. 00
undergrounding, lighting, sidewalks, including Boeing Access Rd. intersection.
t TOTAL 00 00
04 SOUTHCENIER PARKWAY /STRtTNDER BLVD 84-0019 16 2 ABDO 0.20 X F $170 0170 $17 0153 P.E.
Southcenter Parkway 500 feet east RIO
Design and construct safety and capacity improvements including signal and CONTT. 0153
channelization modifications for additional left turn lane on Strander,
sidewalk, lighting
1 TOTAL $153 00
05 PACIFIC HIGHWAY /SOUTH 13200 STREET 14 6 A8011 0.20 X F $170 1170 $17 $153 P.E.' 120
Pac Hwy 37th R/W
4.„ Design and construct signal, channelization, and east approach. CONTT. $133
1 TOTAL $153 $0
06 ANDOVER PARK WEST 88-01004 17 2 ME 0.40 X P $60 $1,263 $1,323 $313 01,010 P.E.
W Tukwila Parkway Strander Blvd R/W
Design and construct widening to 5 lanes including paving, drainage, curb and COSTT.
gutter, sidewalks, channelization,signal codification, lighting, signing.
1 TOTAL $0 00
07 PACIFIC HIGHWAY SOUTH (HWY 991 90 -0)405 14 2 ABDF 0.80 X P $40 03,000 03,040 $640 $2,400 P.E.
Boeing Access Road South 116th Way A/D
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, COAST.
utility undergrounding.
1 TOTAL $0 $0
EXHIBIT A
1
L..
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1978
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION N0. 1212
June 23, 1992
Page 2
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P N C N;
R F A A D; OBLIGATION PLAN
I U JO R I;
NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
1 TA W TOTAL 0 FOR ALL FUNDING TYPES 1ST UN
IS CO WORK V S; TOTAL
PROJECT IDENTIFICATION /DESCRIPTION OF WORK 0S lR L14GT14 E T; THRU THRU
N AY, CODE R A; ;4TH,5TH; UATA
N A S T; 1ST 2ND 3RD ;k 6TH LOCAL TIA ;FEDERAL;; 3RD 6TH
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
S; 1993 1994 1995 96-98 YEARS YEARS
08 PACIFIC HIGHWAY SOUTH (HWY 99) 91-RW03 14 2 ABDF 2.71 X P 8200 99,200 $9,400 $4,400 $5,000 P.E.
S. 116th Way S. 152nd R/W
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, COAST.
utility undergrounding.
I TOTAL 10 $0
09 9ULT1-li0DAL TRANSFER STATION 91 -90107 12 T X P 1150 $2,000 $2,150 $1,150 $1,000 P.E.
Interurban Avenue and Grady Way R/W
Design report and financing alternatives far site in City. COAST,
1 TOTAL 1D 10
10 SOUTH 156TH STREET 1 ABDF 0.30 X P $50 $600 $3,000 $3,500 $7,150 13,575 $3,575 P.E.
West Valley Highway SW 16th St (Renton) 9/01
Design and construct new 5 -lane arterial including paving, curb and gutter, COAST.
drainage, sidewalks, lighting
1 TOTAL $0 $0
11 TRAFFIC SIGNAL INTERCONNECT SYSTEM 88-90102 6 1 10.00 0 F $50 $380 $370 $370 $1,170 91,170 P.E.
All traffic signals 9/01
Design report, design 6 install signal interconnect systee w /master controller. COAST.
1 TOTAL 90 90
12 SOUTHCENTER PARKWAY 87 -RWO3 16 6 HIK 1.00 X P 0400 $200 $400 $1,000 $200 1800 P.E. 8118
5. 168th S. 180th St. R/W
Design and construct traffic signals, pedestrian crossings, and combine COIfST. $682
driveways.
1 TOTAL 9800 9D
13 42ND AVENUE BRIDGE /SOUTHGATE CR. (S. 13390 ST.) 92- 9011319 4 LARD 0.10 X P 9100 1750 9850 1170 $680 P.E. $48
S, 133rd Street R/W
Design and construct bridge including sidewalks COAST, 9632
1 TOTAL 1680 10
14 PACIFIC NIGH01AY BRIDGE (OU01AMISH) 92 -RW11 14 4 LA90 0.10 X P $250 91,500 91,575 13,325 9665 92,660 P.E. 9250
Duwaaish River R/01
Reconstruct to 6 lanes including curb and gutter, sidewalk, drainage, COAST. $2,410
channeliaation, lighting, signs, trail.
I TOTAL $2,660 10
:1
CITY /COUNTY CITY OF TUKWILA HEARIN& DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
COUNTY NO. 17 RESOLUTION N0. 1212
F'
0 U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
p N C N;
R F A A D; OBLIGATION PLAN
0 1 U JO R 1;
0 NC OF R N; EXPENDITURE PLAIT
1 R CL R Y G; SOURCE OF FUNDS
O I TA W TOTAL 0 FOR ALL FUNDING TYPES 1ST 4TH
T IS CO WORK V S; TOTAL
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T; THRU THRU
q E N AK CODE R A; ;4TII,SIH; UATA
N A S T; 1ST 2ND 3RD ;b 6TH LOCAL T1A ;FEDERAL;; 3RD 6TH
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
O.
15 51ST AVENUE BRIDGE/GILLIAN CREEK (5. 154th St.) 92- 8111217 4 LABG 0.10 X P $80 $920 $1,000 $200 1800 P.E. $64 3
a South 154th Street R/W
Design and construct bridge replacement with sidewalks CONST. $736
4 TOTAL $800 10
16 16TH AVE. S. BRIDGE 89 -RW08 14 4 L 0.01 X P $200 1200 $200 P.E.
16th Ave. 5. bridge north pier R/W
Design of pier repair. CO1131.
t TOTAL $0 SO
17 HIf111ER BLVO 84 -RWO7 1 ABOF 0.38 X P $2,400 $1,950 $4,350 $4,350 P.E.
Southcenter Parkway Andover Park West R/W
New 4 -lane street w /traffic signals at' SC Parkway and Andover Park West. CONST.
Construct paving, drainage, curb and gutter, sidewalks, lighting, signals.
t TOTAL $0 $0
18 SOUTH 168TH STREET 84-RWO8 1 ABDF 0.39 X P $25 $75 $350 $350 $800 $800 P.E.
Southcenter Parkway Andover Park West RIW
New 4-lane street including r -o -w acquisition and new signalat Andover Park CONST.
West.
1 TOTAL $0 $0
19 WEST VALLEY HIGHWAY (SR 181) 84 -81131 14 2 A80F 0.42 X P $47 1230 $300 $577 $577 P.E.
1 -405 Strander Blvd. R/W
Widen frog 6 to 7 lanes with signal modifications e 2 inter-sections. COSTT.
t TOTAL $O $0
20 SOUTH 158TH STREET (LONGAC855 DRIVE) 84-8013 19 4 ABU 0.10 X P $235 $235 $235 P.E.
West Valley Highway Nelsen Place R/W
Install curb and gutter, sidewalk, drainage on existing 4 -lane street. CONST.
4 TOTAL $0 $0
21 BRIDGE RAILS AND 600808AIL5 4 L P $262 $262 $52 $210 P.E. $17
Various bridge locations in City R/W
Repair and replace bridge rails and approach guardrails CONST. $193
1 TOTAL $210 10
1
51X YEAR TRANSPORTATION 1HPROVEHENT PR06RAH 1993 TO 1998
June 23, 1992
Page 3
S; 1993 1994 1995 96 -98 YEARS YEARS
L
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1993 to 1998
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION NO. 1212
June 23, 1992
Page 4
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS 11 FEDERAL
P M C N;
R F A A 01 OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y 6; 1 SOURCE OF FUNDS 11
1 TA W TOTAL 0 1 FOR ALL FUNDING TYPES 1 1ST 1 4TH
T IS CO WORK V S; TOTAL
Y PROJECT IDENTIFICATION /DEEESCRIPTION OF WORK OS LR LNGTH E T; THRU 1 THRU
H AY. CODE R A; 1 ;41H,5TH; 1 UATA 1 ;1 1
N
A I, 1 L LOCAL L rte :FEDERAL:: 390 6TH
1 2ND 39 "v k 6TH LOCAL L n n r ^•ALL L
0 L S 0 U; YEAR YEAR 1 YEAR YEARS FUNDS FUNDS FUNDS FUNDS 11
S1 1993 1 1994 1 1995 96 -98 1 1 1 1; YEARS YEARS
22 SOUTH 130TH PLACE 89-RW21 19 6 ABDH 0.50 X P $150 $150 $15 $135 P.E. $22
56th Ave. 50th Place 5. R/W
Design and construct safety improvements. COSTT. 1113
4 TOTAL $135 10
23 ANDOVER PARK EAST RR XING SIGNAL 87-R1410 lb 6' IK 0.10 P $150 $150 115 $135 P.E. $20
Strander Blvd Treck Drive R/W
Design and construct railroad crossing signal CONST. 1115
1 TOTAL 1135 $0
24 MARTIN LUTHER KING WAY (old SR 900) 92-9010 14 4 ABDF 0.10 P $188 $188 $188 P.E.
Bceing Access Road North City Limit R/W
Design and construct pavement rehabilitation including drainage, curb and CONST.
gutter, sidewalks 1 TOTAL 10 $0
25 BRIDGE PROGRAM 89-RW1b 4 L X P $325 1425 $160 $675 $1,585 $1,585 P
Existing bridges in City.
Inspect, evaluate, design, and contruct repairs and replacements. 42nd CONST.
Ave.(Duwamish River), etc.
1 TOTAL $0 $0
26 STREET OVERLAY AND REPAIR PROGRAM 5 ODE X P $690 $750 $750 $2,250 $4,440 $4,440 P.E.
Various city streets. R/W
CONST.
TOTAL 10 $0
27 COD SIDEWALKS 85-RWO5 9 AGN X F $375 $375 $375 $1,125 $1,125 P.E.
ti L Various 080 streets. R/W
Design, construct, and acquire easements for sidewalks on Southcenter Pkwy, COSTT.
Andover Park W. k E., W. Valley Hay, BakerBlvd, Strander Blvd, Minkler Blvd,
S. 1BOth
4 TOTAL $V 10
28 PEDESTRIAN PATHS 9 ABDN X P 4430 $400 $125 $955 $955 P.E.
R/W
Various locations
Design and construct ped paths in various locations CONST.
1 TOTAL $0 $0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
a
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY NO. 1320 ADOPTION DATE 06/22/92
tJ COUNTY N0. 17 RESOLUTION NO. 1212
June 23, 1992
Page 5
F;
to, U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N,
R F A A D; OBLIGATION PLAN
I U JO R I;
0 NC OF R 4U EXPENDITURE PLAN ii
R LL R Y G;
SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES 1ST 4TH
T IS CO WORK V S; TOTAL
Y PROJECT IDENTIFICATION/DESCRIPTION OF WORK 05 LR LOTH E T; THRU THRU
N AK CODE R A; ;4TII,5TI1; UATA
A S T; 1ST 2ND 3R0 ;d 6TH LOCAL TIA ;FEDERAL;; 3RD 61H
0 L 5 X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
l- S; 1993 1994 1995 96 -90 YEARS YEARS
29 42ND AVENUE S. AND 40TH AVENUE S. 90 -8015 11 4 ABDF 1.93 X P $1,000 41,000 11,000 $3,000 $6,000 $6,000 P.E.
i., S. 160th St. S. 13Ist Way CDNST.
Design and construct paving, drainage, curb and gutter, sidewalks, lighting,
utility undergrounding. Coordinate City of SeaTac. TOTAL $O $0
30 INTERSECTION IMPROVEMENTS 6 HIJK X P $170 4170 $170 4510 $1,020 $1,020
P.E.
R/W
Various City locations. CDNST.
Design and construct improvements and new signals. Andover Park East Baker,
Andover Park East Treck. TOTAL $0 $0
31 TRAFFIC CONTROL UPGRADES 6 HUN X P $115 $115 $115 $345 $690 $690 P.E.
R/W
Various intersections. COOT.
Design and construct left turn signals at various intersec Lions, f TOTAL $0 $0
32 SOUTH 178TH STREET 88 -8007 16 1 ABDF 0.46 X P $90 $470 $560 $560 P.E.
R/W
Southcenter Parkway I -5 CDNST.
Widen to 5 -lanes on new alignment with paving, curb and gutter, sidewalks,
drainage, street lights. f TOTAL $0 $0
L 33 INTERURBAN AVENUE SOUTH 81 -1018 14 2 ABDF 0.30 X P $200 $1,000 $1,200 $400 $800 P.E. $134
Southcenter Blvd. 6rady Way CRNSi. $666
Design and construct safety and capacity improvements, TOTAL $800 $0
34 STRANDER BLVD. EXTENSION 1 ABOF 0.28 X P $5 $7,000 $7,005 $3,505 $3,500 P.E.
XTENSION A6-RW03 R/W
W. Valley Hwy (5.11. 181) Oakesdale (Renton) COOT. New 5 -lane arterial with separated grade crossing railroad tracks. (joint
project w /Renton) I TOTAL $0 $0
35 VALLEY SIGNAL COORDINATION 92-9001 6 1 P $25 425 $5 $20 P.E. 420
West Valley Highway and South 180th Street R/W
Design report for interagency signal coordination on West Valley Highway and S. COOT.
U 180th Street. Coordinate with WSDOT, Kent, Renton TOTAL 420 $O
S1X YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION N0. 1212
F;
I— U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D; OBLIGATION PLAN
I U JO R I;
0 NC OF R 6; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA W TOTAL 0 FOR ALL FUNDING TYPES IS 1ST 4TH
T IS C0 WORK V S; TOTAL
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK 05 LR LNGTH E T; THRU THRU
0 AY, CODE R A; ;4TH,5TH; UATA
H A 5 T; 1ST 2ND 3RD ;k 6TH LOCAL TIA ;FEDERAL',; 3RD 6TH
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
L S; 1993 1994 1995 96 -98 YEARS YEARS
36 SOUTH 13380 STREET 17 2 ABDF 0.50 X U $1,465 $1,465 $1,465 P.E.
S. 134th st. S. 130th St. R/W
Design and construct widening including paving, drainage, curb and gutter, CONST.
sidewalks, lighting, channelization
37 57th AVENUE SOUTH (SOUTHCENTER PARKWAY) 84 -RW37 16 2 ABDF 0.50 X P $300 $400 $1,200 $1,900 $963
S. 180th St. South City Limits
Design and construct widening to 4 or 5 lanes including paving, drainage, curb
and gutter, sidewalks, channelization, lighting, utility undergrounding.
38 INTERURBAN TRAIL 9 ADLN 1.00 P 0700 $7000 $140
Strander Boulevard Fort Dent Park
Design, acquire Right -of -way, and construct trail including bridge crossing
Green River.
01,000 $1,000 $1,000
3? SOUTH 180TH STREET PEDESTRIAN UNDERPASS
S. 180th St. between UPRR 72nd Anenue
Design and construct pedestrian underpass
40 RIVERTON CREEK RUNOFF ENHANCEMENT
Duwamish River Pacific Highway
Water quality and fisheries enhancement
4 Atl0 0.10 XP
9 B P $450
41 EAST MARGINAL WAY SOUTH 89-RW05 14 2 ABDF 0.40 X P
Boeing Access Rd. 5. 112th Street
Reconstruct to 5 -lanes with curb, gutter, sidewalk, drainage,landscape, and
illumination.
t 42 SOUTH 1.34TH STREET 84-RW27 19 2 ABDF 0.23 X U
S. 133rd St, 48th Ave. S.
Design and construct widening to lanes including paving, drainage, curb and
t~ gutter, sidewalks, channelization, lighting, signing.
$450 690
$350 0660 $1,010 $1,010
$30 $200 $230 $230
June 23, 1992
Page 6
1 TOTAL $0 $0
$937 P.E. $38
R/W
CONST. $600 $300
t TOTAL $638 $300
$560 P.E. $80
R/W $20
COAST. $460
1 TOTAL $560 $0
P.E.
R/W
CONST.
I TOTAL $0 $0
$360 P.E. $2?
R/W
CONST. $331
t TOTAL $360 $O
P.E.
R/W
CONST.
1 TOTAL $0 $0
P.E.
R/W
CONST.
I TOTAL $0 00
June 23, 1992
1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Page 7
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY NO. 1320 ADOPTION DATE 06/22192
COUNTY N0. 17 RESOLUTION N0. 1212
F; II
II
u U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
p M C N;
R F A A D: OBLIGATION PLAN
I U JO R I;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS II
i, I TA W TOTAL 0 FOR ALL FUNDING TYPES 1ST 4TH
1 IS CO WORK V 5; TOTAL
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T; THRU THRU
N AK CODE R A; ;4TfI,5TH; UATA
'r A S T; 151 2ND 380 ;46 619 LOCAL TIA ;FEDERAL;; 3RD 6TH
L 5 X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
5; 1993 1994 1995 96 -98 YEARS YEARS
43 SOUTH 180TH STREET 16 6 HIK 0.60 X U $9 $113 $122 1122 P.E.
L Southcenter Parkway Andover Park West R/W
Left and right turn modifications, access improvements that may include CONST.
signaliaation.
I TOTAL $0 $0
44 NELSEN PLACE 88-RWO5 19 4 ABOF 0.11 X U 125 $280 0305 1305 P.E.
5. 156th St. 5. 158th St. R/W
c Design and construct widening including paving, drainage, curb and gutter, C0051.
sidewalks, lighting.
I TOTAL 10 10
45 SOUTH 152ND STREET 19 4 ABU 0.25 X U $40 1460 1500 1500 P.E.
42nd Avenue South Pacific Highway South R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONST.
utility undergrounding.
1 TOTAL 10 $0
46 NORFOLK STREET 1 ABDF 0.61 X U $100 $1,150 $1,250 $1,250 P.E.
East Marginal West Marginal (5R 99) R/W
Design and construct paving, drainage, curb and gutter, sidewalks, lighting, CONS%
bridge crossing Green River.
1 TOTAL $0 $0
47 TUKWILA PARKWAY 84 -0018 1 ADFG 0.25 X U $50 150 $50 F.E.
Andover Park East West Valley Highway R/W
k Design report for new 5-lane arterial w /bridge across Green River. CONST.
1 TOTAL 10 $0
49 STRANDER BOULEVARD BRIDGE TRAIL 17 9 LNO P $250 $250 $50 1200 P.E. 130
Str ander Boulevard at Green River R/14
Design and construct.bicycle /pedestrian trail on existing bridge or new CONST. 1170
structure over Green River
V
t TOTAL 1200 00
T'
49 MUL[JURISDICTIONAL DEPOSITORY 9 T P $100 1500 $600 $120 $48 P.E. $50
Green River Valley 8/11 $250
0 Develop multiiurisdictional site(s) for deposit of street sweepings and catch CONST. 1180
basin cleanings prior to ultimate disposal
1 TOTAL 1480 $0
F:
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P 1 C N;
8 F A A D; OBLIGATION PLAN
I U JO R 1;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
Li 1
TA N TOTAL G FOR ALL FUNDING TYPES 1ST 9TH T IS CO WORK. V S; TOTAL ,1
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK 0S LR LNGTH E T; THRU THRU
N AY. CODE R A; ;41H,5TH: UATA
H
A 5 T: 1ST 2ND 311D '1; 6TH LOCAL TIA ;FEDERAL;; 3RD 6TH
0 L 5 X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
S; 1993 1994 1995 96 -98 YEARS YEARS
50 MINER PARK WEST 84 -8122 17 2 ADOF 1.00 X U $1,500 $1,500 $300 11,200 P.E.
Strander Blvd 5. 1801h Street R/N
Design and construct widening to 5 -lanes including paving, drainage, curb and CONST.
gutter, sidewalks, channelization,signalslighting, signing 1 TOTAL SO SO
51 SOUTHGATE CREEK RUNOFF ENHANCEMENT 9 B P $350 $350 $70 $280 P.E. $22
Duwtamish River South 133rd Street 11/1 CO /1T. 5258
Water quality and fisheries enhancement 1 TOTAL 5280 $0
52 SOUTHCENTER BLVD 16 2 08OF 0.20 X U 11,500 $1,500 $300 $1,200 P.E. 196
L. 61st Ave Macadam Rd R/N
Design and construct widening to 7-lanes COSTT. $1,104
I TOTAL $0 $1,200
53 STRAIIDER BOULEVARD 84 -R432 17 3 ABDF 0.50 X U $500 $500 $100 5400 P.E.
Andover Park West Nest Valley Highway 13/1
Design and construct widening to 5 lanes including paving, drainage, curb and CONST.
gutter, sidewalks, lighting. 1 TOTAL $O 40
54 SOUTH 100TH STREET/ANDOVER PARK NEST' 16 6 ABOF 0.10 X U $81 $81 581 P.E.
R/1
Intersection CON51.
Design and construct signal modifications and widen legs to intersection to
accomodate turn lanes
t TOTAL $0 $0
55 SOUTH 143RD FLACE 84-8128 19 4 ABDF 0.19 X U
$249 1249 $249 F.E.
Interurban Avenue Duwamish River 8/4
Design and construct widening including paving, curb and gutter, sidewalks, CONST.
lighting. t TOTAL 10 $0
L, 56 SOUTH 143RD STREET 84 -RW25 19 4 ABDF 0.20 X U 5411 5411 $411 P.E.
Interurban Avenue Duwamish River R/W
Design and construct widening including paving, curb and gutter, drainage, CONST.
sidewalks, lighting 1 TOTAL 10 S0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
C1TY /COUNTY CITY OF TUKWILA HEARING DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
001011Y N0. 17 RESOLUTION N0. 1212
June 23, 1992
Page 8
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
CITY /COUNTY CITY OF TUKNILA HEARING DATE 06/08/92
CITY N0. 1320 ADOPTION DATE 06/22/92
ct COUNTY N0. 17 RESOLUTION N0. 1212
June 23, 1992
Page 9
p U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
p M C tl;
8 F A A D: OBLIGATION PLAN
G, I U JO R I;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
4 I TA 8 TOTAL 0 FOR ALL FUNDING TYPES 1ST 410
I IS CO 8081 V S: TOTAL
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK OS LR LNGTH E T; THRU THRU
L N AK CODE R A; ;4TII,STfi; UATA
N A S T; 1ST 2ND 3RD' :c 6TH LOCAL TIA :FEDERAL:: 3RD 610
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
U S; 1993 1994 1995 96 -98 YEARS YEARS
57 TRECK DRIVE EXTENSION 87 -1806 19 1 ABDF 0.11 X U $421 $421 $421 P.E.
4.. Andover Park West exist. Treck Drive RIO
Design and construct new 3 -lane street on new alignment including paving, COAST.
drainage, curb and gutter, sidewalks, lighting.
1 TOTAL $0 $0
59 SOUTH 140TH STREET 84 -8826 19 4 ABDF 0.11 X U $179 $179 $179 P.E.
Interurban Avenue Duwanish River RID
1, Design and construct widening including paving, curb and gutter,'drainage, COAST.
sidewalks, lighting
I TOTAL 10 $0
59 GATEWAY DRIVE BRIDGE (Duwanish River) 85 -8801 1 ABDF 0,40 X U $2,836 $2,836 $567 $2,269 P.E. 8160
Gateway Drive 50th Place S. R/O
New 4 -lane arterial w /bridge crossing the Duwaeish River. CONK. $2,109
1 TOTAL $0 $2,269
60 SOUTH 151ST STREET 87-8808 19 3 ABDF 0.10 X U 1155 1155 $155 P.E.
51st Ave. S. 52nd Ave. S. RIO
Design and construct street widening including paving, drainage, curb and COSTT.
gutter, sidewalks, lighting.
t TOTAL $0 $0
4, 61 SOUTH 144TH STREET 84 -R829 19 4 ABDF 0.11 X U 1179 $179 1179 P.E.
Interurban Ave. Duwamish River RIO
Design and construct widening including paving, curb and gutter, drainage, CONTT.
sidewalks, lighting
t TOTAL $0 $0
62 51ST AVENUE MACADAM ROAD 42ND AVENUE 17 4 ABDF 1.80 X 0 1100 13,250 13,350 $3,350 P.E.
Interurban Avenue SR 518 RIO
Design and construct paving, curb and gutter, drainage, sidewalks, lighting, COSTT.
utili ty undergrounding
4
t TOTAL 10 $0
63 INTERURBAN AVENUE SOUTH 84-1806 14 4 ABDF 1.36 X P $5,5 15,500 $4,400 11,100 P.E.
S. 139th St. Southcenter Blvd. RIO
4 Design report, right- of-way,and reconstruction of 5 -lane improvements including CONS!.
paving,curb and gutter, sidewalks, utility undergrounding, lighting,landscaping,
t TOTAL 10 10
F;
U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
P M C N;
R F A A D; OBLIGATION PLAN
1 0 JO R I;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
l.. 1 TA N TOTAL 0 FOR ALL FUNDING TYPES 1ST 4TH
T IS CO WORK: V S; TOTAL 1
Y PROJECT IDENTIFICATION/DESCRIPTION OF WORE: 0S LR LOGTH E T; THRU THRU
N AK CODE R A; :4011,5TH: DATA
R A S T; 15T 2ND 1 3RD ;k 61H LOCAL T1A ;FEDERAL;; HID 6TH
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
S; 1993 1994 1995 96 -98 YEARS ;YEARS
Tukwila Parkway S. 180th St. R/W
Design and construct widening to 5 -lanes including paving, drainage, curb and CONST.
gutter, sidewalks, channelization, sig- nals, lighting, signing.
t TOTAL $0 $0
65 SOUTH 154TH STREET 16 2 ABDF 0.60 X U $1,800 $1,800 61,800 P.E.
L A/N 52nd Ave. Pacific Highway CONST.
and construct widening including paving, curb and gutter, sidewalk,
lighting, 1 TOTAL $0 $0
66 42ND AVENUE BRIDGE TRAIL 17 9 LNO P 6250 $250 650 1200 P.E. $30
42nd Avenue at Duwamish River R/W
5.., Design and construct bicycle /pedestrian facility an existingbridge or new CONST. $170
structure over Duwamish River.
1 TOTAL $0 $200
67 OXBOW INTERCHANGE 90 -9408 14 1 ABDH 0.50 X P $8,700 68,700 $8,100 P.E.
SR 49 and Norfolk Extension 11/6
Design and construct southbound on and off ramps to SR 99. CO5ST.
I TOTAL 60 $0
68 SOUTH 180TH STREET PR OVERPASS 87-RW09 14 1 ADFG 0.20 X 0 $9,230 $9,230 64,615 $4,615 P.E.
S. 180th (5W 43rd) 8 UPRR -BURR wing. R/W
New separated grade crossing of existing RR tracks (joint project w /P.enton). CONST.
6 TOTAL $0 SO
69 SOUTH 168TH STREET 84 -9635 1 ABDF 0.17 X U $373 $373 $373 P.E.
Andover Park West Andover Park East R/W
Design and construct new 4 -lane street including right -of- way acquisition, COAST.
paving, drainage, curb and gutter, sidewalk,lighting.
TOTAL $0 $0
70 SOUTH 144141 STREET 17 2 ABDF 0.30 X U $500 $500 $500 P.E.
Pacif is Highway Military Road R/W
Design and construct widening,•drainage, curb and gutter, sidewalk, lighting, CONST.
utili ty undergounding.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
CITY /COUNTY CITY OF TUKWILA HEARING DATE 06/00/92
CITY 610. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION N0. 1212
64 ANDOVER PARK EAST 16 2 ABDF 1.39 X U
June 23, 1992
Page 10
$2,060 $2,060 $412 $1,648 P.E.
F;
4. U; PROJECT COSTS IN THOUSANDS OF DOLLARS FEDERAL
p H C N;
R F A A D; OBLIGATION PLAN
I U JO R I;
0 NC OF R N; EXPENDITURE PLAN
R CL R Y G; SOURCE OF FUNDS
I TA 1 TOTAL 0 FOR ALL FUNDING TYPES 1ST 41H
T IS CO WORi; V s: TOTAL I.
Y PROJECT IDENTIFICATION /DESCRIPTION OF WORK 05 LR LOOM E T; TURU THRU
4. 0 AK. CODE R A; ;4TII,5iti; UATA
N TIA FEDERAL:: 3RD 6TH
A S T, 1ST 2ND 3RD ;6 6TH LOCAL !FEDERAL::
0 L S X U; YEAR YEAR YEAR YEARS FUNDS FUNDS FUNDS FUNDS
S; 1993 1794 1975 96 -78 YEARS YEARS
71 HINY.LER BLVD 1 ABDF 0.50 X U $7,000 S7,000 $3,500 63,500 F.E. 1
4. 1
West Valley Highway Oakesdale RIO
Design and construct new 5 -lane arterial with bridge cross- ing UPRR k BURR CDNST.
4. tracks.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998
CITY /COUNTY CITY OF TUKWILA HEARIN& DATE 06/08/92
CITY NO. 1320 ADOPTION DATE 06/22/92
COUNTY N0. 17 RESOLUTION N0. 1212
72 ANDOVER PARK WEST /HIH1LER RR XING
Andover Park West at Hinkler Blvd
Install railroad crossing signal.
73 STRANGER BLVD /SBTH AVE. 16 6 IIIK 0.10 X U
New intersection
Design and construct new traffic signal, channelization.
74 58TH AVENUE SOUTH 84 -R034
Slrander Blvd S. I68th Street
New 4 -lane street with new signal 2 Strander Blvd.
75 COMMUTE TRIP REDUCTION
Various locations
Review parking policies
17 6 1 0.10 X 0 $148 $148 $148
1 ABDF 0.26 X U
B T P $25
$155 $155 $155
11,525 11,525 $1,525
125 15
June 23, 1992
Page 11
t TOTAL $O $0
P.E.
R/W
CONST.
1 TOTAL SO 10
P.E.
RIO
C0N5T.
1 TOTAL $0 $0
P.E.
R/W
COAST.
1 TOTAL 10 60
620 P.Er. 120
R/W
CONK.
t
TOTAL 120 $0