Loading...
HomeMy WebLinkAboutPermit D96-0046 - INTERIM PERSONNELCity of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 DEVELOPMENT PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 359700 -0221 Address: 6100 SOUTHCENTER BL Suite No: 235 Location: Category: AOFF Type: DEVPERM Zoning: PO Const Type: Gas /Elec.: Units: 001 Setbacks: North: Water: N/A Wetlands: Contractor Licence No: .0 South: .0 Sewer: N/A Slopes: Y Permit No: Status: Issued: Expires: D96 -0046 ISSUED 10/23/1996 04/21/1997 Occupancy: OFFICE UBC: 1994 Fire Protection: AUTO. FIRE ALARM East: .0 West: .0 Streams: OCCUPANT INTERIM PERSONNEL 6100 SOUTHCENTER BL, TUKWILA, WA 98188 OWNER CENTERPLEX Phone: 206 246 -9986 6100 SOUTHCENTER BL STE 150, TUKWILA WA 98188 CONTACT JONATHAN POOL Phone: 206 246 -9985 6100 SOUTHCENTER BLVD #150, TUKWILA, WA 98188 k**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: MOVE PART OF A SUITE TO ANOTHER SUITE. k**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ 500.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N Water Main Extension: N Private: N Public: N k**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 39.15 k**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Date: 10 ‘dr;16 Permit Center Authorized Signature:_ I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Signature:. Date:Z' -r /214 Print N ame:_'. y _ 1.,.sLn§11 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address: 6100 SOUTHCENTER BL Suite: Tenant: Type: DEVPERM Parcel #: 359700 -0221 *• kk****• k*** k•k*****' k* k*• kk** kk*• kk** k**k• k- k*** k* k•k kkk•k •k* ***Akk•k*kk•k**•kk•k**kk•kkk Permit Conditions: 1. No changes will be made to the plans unless approved by the Architect or Engineer and the ...Tukwila Building Division. 2. Electrical permits shall be obtained through the Washington State Division of Labor. and Industries and all electrical work will be inspected by that agency (248-6630). 3. All mechanical work shall be under separate permit issued by the City of :Tukwila. 4. All permits, inspection records, and approved plans shall be available at the job site prior to the start of any con - struction. These documents are to be maintained and avail- able until final inspection approval is granted: 5. Any new` :ceiling grid and °,light fixture installation is requjred to meet lateral bracing requirements for Seismic Zone 3. 6. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 7. All construction to be done . in conformance with approved,: plans and requirements of the Uniform Building Code (1994: Edition) as amended, Uniform Mechanical Code (1994 Edition),: and Wash ington State Energy, Code (1994 Edition) . 8. Validity ' "of Permit. The - issuance`of a permit or approval of plans, specifications, and 'computations shall not be con- strued to be a permit for or an approval ';of, any violation of any of the provisions of the building code or of any other ordinance of the iurisdiction.- No permit presuming to give.authori ty to violate or cancel the provisions of this::..' code,shall be valid. 9. VENTILATION IS REQUIRED FOR ALL NEW ROOMS AND SPACES OF NEW OR EXISTING BUILDINGS IN CONFORMANCE WITH THE UNIFORM BUILDING CODE AND THE WASHINGTON STATE VENTILATION, AND INDOOR AIR 'QUALITY CODE, CHAPTER 51 -13 WAC. Permit No: D96 -0046 Status: ISSUED Applied: 10/16/1996 Issued: 10/23/1996 CITY OF 7'IKWILA Permit Center` 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Commercial / Multi - Family Tenant Improvement / Alteration Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. 39.15 Project Name/Tenant: ,� , , ,. ,�6 1-?)c- r Zi. r'11,, ( ,Ci ^, {i� G�Q('t� jc?1�1 Value of Construction: , -/!J(.1 Site Address: {}- 1�, r` 6l )S,-), (y(f'1''t ( vivil9f ,r-- f1 �f, City Sj a /Zip: 2_J,, t.ti v',10 VI . I�r 1 Tax Parc 1 Number( 65y70o-'�J�� Property Owner: �-• (,, l- i. r 1 , {.k Building Square Feet: -2 r.) 0 2 7 existing Area of Construction: (sq. ft.) 4 {' Phone: ,---) / �� L —!i L — / r Street Address: Gico I4:ri COMMERCIAL/MULTI -FOILY TENANT IMPROVEMENT /A RATION PERMIT APPLICATIONS MU T BE SUBMITTED WITH THE FOL OWING: ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Five (5) sets of working drawings, which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11. Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- 9). ❑ ❑ Floor plan: show location of tenant space with proposed use of each room labeled ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. ❑ ❑ Vicinity Map showing location of site ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of rack. Structural calculations are required for rack storage eight feet and over. ❑ ❑ indicate proposed construction of tenant space or addition and walls being demolished ❑ ❑ Construction details ❑ ❑ Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. ❑ ❑ Washington State Non - Residential Energy Code Date shall be noted on the construction drawings. ❑ ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. ❑ ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Certificate of Contractor ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER A AUT ORIZED,A, GENT: Signature: �, n nll4 . .! /•tir , ; ;��-7) ( ") D Date: If, or.. ! (../„., Print name: ( ( ? ?��, � ��• / � �� -� P Phone: . J(_ r' (5 _? F Fax #: 2/4__ 9( - Address f,,':t7 - - 7,<.. \ ;V, `% ! ! ; f f i 3 '> 4r ; / t :' alt' - -C...'6 C City /State /Zip. -, tiolo Gn A I1\'r1 r, .L � /,`i 2il A CTPERMIT.DOC 7/9/96 '*** fi*** til** A * * * * * * * * * * * *k * * *A ** *A * * *fi *k * * ** ***14.0* * * * * * * * * *s: ** *' 4 TRANSMIT CI ry OF TUKWILA. IAA �` *A* * * * *fi *d * * * * *:l * * *A *•k ** kAW144*****A*****i*-A*AA****A****k** TRANSMIT Number: R9G00496 Amount: 39.15 10 /16 /96 13:49 Payment Method: CHECK Notation: CE:NTERPLEX brit: SL.0 Permit No:. 1)96.-0046 Type: DEVPERM DEVELOPMENT PERMIT Parcel No : 35970070221 Site Address: 6100' ;;0UTHCENI ER BL 'total Fees: 39.15 • This Payment 39.15 Total ALL Pints:;:' 39.15 Balance: .00 A* 4******•* 4* 4********4**, 4* 4* 4****: t ***44**4 *fifi***4****fi**4*4**4•** Account Code 000/322.100 000 /345.830 000/386.904 Description BUILDING - NC1blRES PLAN CHECK - NONRE5 STATE BUILDING SUPCHAPGE Amount 21.00 13.65 4.50 4Q82 10/17 9617 TOTAL 146.36 C) INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECO Retain a copy with p Project: ..11 011/4..1 Type of inspection: t_C745 Address: 1 t1 `t3 8 Lo ►1 -I � vl ` g Date called: Li 1 G Special instructions: Date wanted: r L Z3_' fg p.a.m. m. Requester : / 2667 A C�1�: ri ` ,,_ s Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 03M .?rti /vokrii 5v(A14 ji/±317 Inspector: Date: 12.3/m $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 3 C INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 70 Project: -- / /747 �} l ei,� T,gpe of insi6F'. �---" Address:i/� Date called: Special instructions: Date wanted: a.m. Requester: Phone No.: KApproved per applicable codes. COMMENTS: ze ions required prior to approval. 11 Inspector: Date: $42.00 REINSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431-3670 a ect: Type rispkrj • ''75b Sc svd 0 Date cant ‘C) 6 S ecial instructions: Ctiee4r 14)61' IS OA-) • fiCYA-,1 ( Date walittl:,1 Li ,9z. a.m. 0"1" R ester: A . 1 4) k) IVe ISO &..) Phone No.:2 LiC,...,_ 7 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1 ILE AA- . Inspector: Date: / $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: ■ 4. Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 { INSPECTION RECORD Retain a copy with permit' PERMIT NO. (206) 431 -3670 Project:r f i m Type of inspection: Address: (,, I0D ">; i nt(4. Date called: 1 `6-'q co So Special instructions: SI S.)1tQ- 1 \aS Date wanted: I { I i -la 9 „ Requester: (� n� 4 Phone No.: ' 1( t1 _,•. CJc]cti Approved per applicable codes. Corrections required prior to approval. COMMENTS: / 1 1 Bill/ A C C..0 —S.S 710 k A c AS 1 )t -14)13 t 7i " X. '' w A t.L. t5(IA C • MEJ `— R.a -w., 4C1 t S APP( vt i . C-40/44- / /4.3rtc : Czi--t c-TO (L. G5 3t` -rt► IW 3& th.I.STI 13G wm -t... l■ Inspector: Date: +, / /,L /1 (-� $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: City of Tukwila Fire Department TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Project Name 714 _;C< >� ���^ ��'C.5 Q-A-Iv -A Address fl, ( () 5( , c_ A-ec- Retain current inspection schedule Needs shift inspection John W. Rang, Mayor Thomas P. Keefe, Flee Chief Suite # "s35 Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authorized Signature Ilh-1 Date FINALAPP.FRM T.F.D. Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575 -4404 • Fax (206) 575 -4439 O CD 0 CTh CD .4, o o 3 P-> w tiZ nx Z' - c, N _,(5,?,,, R w ✓ 0 w N N N O �t -1 .g E Pet. ,C3 3 q co 3 a C3i 7 =,, g v D ° _ ci Q w a° o » nD. b fl... N 2 A R O N R- il. E. U1 3 (0 l_T O tJ CO 01 t 'h w O tl, C. sd m0 0 N • ca DI7UR,, c0 o. ncrw w S n-s,yCD o n; vs co c7 Ul co i t—+ n -v �< d ^'t -art • t N %I _, • N O • c7 C d - _ o z ii Fn �x --c5 8 cl) ....c 0 .. . ,, fr � - m o a • o CD• rr czn ii CD (001:1) gale 1-,OM ,MaL,- *s.aMa EIe1fW'w.Nf..,wNJYN.LLY :unri uAttras.tay.:i rxx 06.:144 aluw»Krrdc. �_.. roperty Line Construction /Occupancy Note: Centerplex A i5 of Type V -1 hour construction. Centerplex B i5 of Type V -N construction. Both buildings have Group B, Division 2, occupancies. Parking Note: Site i5 required to have stalls for parking of 69 vehicles according to total interior area of buildings. Actual number of vehicle stalls = 102. Fire Alarm System Note: Smoke detectors and audible and visible fire alarm signaling devices shall be provided, zoned, controlled, and monitored as provided by Tukwila Ordinance 1646, technical specification 4.28 of 28 CFR Part 36 Appendix A, and applicable provisions of WAC 51- 20 and WAC 51 -24, in conformance with plans to be approved by Tukwila Fire Prevention Bureau. Space Use Note: All rooms in floor plan not otherwise labeled shall be used for general office purposes. Rubber base 1/2" 0 eyebolt with 1" 0 washer, nut at top and bottom 12 gauge wire hanger, fasten to structure above @ 8'0" O.C. FILE COPY i understand that the Plan Check approve sublect to errors and omissions and apprc plans does not authorize the violation o adopted coda or ordinance ca ordinance. Receipt tr aetur's cop; of approved plans Metal track ceiling system i 4 By ux Date c Existing suspende Permit Ro. t drywall partit 2" x 4" 25 ga. steel studs g 24" O.C. with R -11 sound Batt insulation, covered with 1/2" sound board 1 side & 5/8" type "X" GW5 each side Track attached with screws to lightweight concrete & plywood subfloor @ 24" O.C. Existing glued -down carpet (optionally under partition) Existing floor ew partition detail (no Scale) CM( aROVED APP RED C1 2 2 1996 n� ��U�1..►1 Inters 1 e hanger, tructure above FILE COPY RPLE I understand that the Plan Check approvals are sutitect to errors and omissions and approval of plans does not authorize the violation o�fc ny ,>da tor' coda 17or I ordinance. ved plans acknowledges actor's copy Isv ald Existing suspendei ceiling system el studs 24" nd batt insulation, sound board 1 side WB each side hod with ghtweight l ywood 4" O.C. glued -down carpet ly under partition) • Scale) cY r /11 ' Date L3 _ II 11 t t- ooL drywall partition OF APP OCj 22 1996 BUILDING DIVISION Inri A, 2nd -Floor (1:200) Suite 235 (office) Suite 225 (office) 11 11 Work Site (1:100) SEPARATE PERMIT REQUIRED FC.. ECHANIC j\L ELECTRIC: 0 PLUMBING GAS PIPING CITY OF TUKWIL/ BUILDING DIVISION Demolish 4 drywall partitions • CITY RECEIVED WILA OCT 1 6 1996 PERMIT CENTER er5onnel = xpn5ion Delko°0046 City of Tukwila ..., �...,............. �.....K..r....wc,n.m�r.*+a.+.v. >r.�r w..e.w ................ John W. Rants, Mayor Fire Department Thomas P. Keefe, Fire Chief October 21, 1996 Fire Department Review Control #D96 -0046 (510) Re: Interim Personnel - 6100 Southcenter Blvd., Suite #150 Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. The total number of fire extinguishers required for your establishment is calculated at one extinguisher for each 3000 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 10B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (NFPA 10, 3 -1.1) Extinguishers shall be installed on the hangers or in the brackets supplied, mounted in cabinets, or set on shelves (NFPA 10, 1 -6.9), and shall be installed so that the top of the extinguisher is not more than 5 feet above the floor. (NFPA 10, 1 -6.9) Extinguishers shall be located so as to be in plain view (if at all possible), or if not in plain view, they shall be identified with a sign stating, "Fire Extinguisher ", with an arrow pointing to the unit. (NFPA 10, 1 -6.3) (UPC Standard 10 -1) Clear access to fire extinguishers is required at all times. They may not be hidden or obstructed. (NFPA 10, 1 -6.5) 2. No point in an unsprinklered building may be more than 150 feet from an exit, measured along the path of travel. (UBC 1003.4) Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 575-4439 wl City of Tukwila Fire Department Page number 2 John W. Rants, Mayor Thomas P. Keefe, Fire Chief Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. Exit doors shall not be locked, chained, bolted, barred, latched or otherwise rendered unusable. All locking devices shall be of an approved type. (UFC 1207.3) Obstructions, including storage, shall not be placed in the required width of an exit, except projections as permitted by the Building Code. Exits shall not be obstructed in any manner and shall remain free of any material or matter where its presence would obstruct or render the exit hazardous. (UFC 1203) Storage under exterior or interior stairways shall not be permitted unless such space is protected on the enclosed side by one hour fire- resistive construction and sprinklered where required. (UFC 1210.3) Exit hardware and marking shall meet the requirements of the Uniform Fire Code. (UFC 1207.1 - 1212.8) 3. Maintain square foot coverage of detectors per manufacturer's specifications in all areas including: closets, elevator shafts, top of stairwells, etc. (NFPA 72, 5- 1.3.4) All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #1742) (UFC 1001.3) When the control panel is located inside a room, the door to the room shall have a sign with one -inch letters which reads "Fire Alarm" or "Fire Alarm Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax (206) 575 -4439 City of Tukwila John W. Rants, May Fire Department Page number 3 Thomas P. Keefe, Fire Chi Control ". (City Ordinance #1742) 4. H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #1742) H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main supply -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (UMC 608) Duct smoke detectors shall be capable of being reset from the alarm panel. (City Ordinance #1742) 5. Dedicated fire alarm system circuit breaker(s) shall be equipped with a mechanical lockout device. (NFPA 72 (1- 5.2.8.2)) 6. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 7. Fire doors, fire windows and fire dampers shall have a label or other identification showing the fire protection rating. Such label shall be approved and shall be permanently affixed. (UBC 713.3) When fire resistive floor or floor ceiling assemblies are required to prevent the vertical and horizontal spread of fire and smoke, the assembly shall be maintained. (UBC 710.2) Your street address must be conspicuously posted on Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) S75 City of Tukwila Fire Department Page number 4 John W. Rants, Mayor Thomas P. Keefe, Fire Chief the building and shall be plainly visible and legible from the street. Numbers shall contrast with their background. (UFC 901.4.4) In order to provide you with the fastest police and fire protection under emergency conditions, please post your suite, room or apartment number in a conspicuous place near the main entry door. Numbers shall contrast with their background. (UFC 901.4.4) Accumulation of combustible waste material is prohibited during the demolition phase of this project. Remove and properly dispose of all waste material prior to the close of the working day and as often throughout the day as needed. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, 51a The Tukwila Fire Prevention Bureau cc: TFD file ncd Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone (206) 5754404 • Fax (206) 5754439 L"iT.YS.i+: 1T4 01Rrdc.110ZIAWIC 1 'zA"A^.%tr+i'IiuxeW411+21eCte 010 47SnR. t�fltlLal711ew+ en. TC9l4U�sRKKN DWM.iCkx�SM9:atJatx4Af:C�cw C City of Tukwila FILE COPY John W. Rants, Mayor Department of Community Development Steve Lancaster, Director October 21,1996 Mr. Jonathan Pool Centerplex 6100 Southcenter Boulevard, Suite 150 Tukwila, Washington 98188 Dear Mr. Pool: SUBJECT: Development Permit Application Number D96 -0046 Interim Personnel 6100 Southcenter Bl, #320 This letter is to inform you that your permit application received at the City of Tukwila Permit Center on October 16, 1996, was reviewed at the October 17, 1996, plan review meeting. Your application was determined to be complete. Your permit has begun the plan review process, you will be notified of any required corrections or when your plan is approved. If you have any concerns or questions please contact me at the City of Tukwila Permit Center at (206) 431 -3672. Sincerely, L-1°.,a600,72 Kelcie J. Peterson Permit Coordinator D96 =00461 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 0313665 CITY OF TUKWILA Permit Center 6300 Southcenter Boulevard, Suite 100, Tukwila, WA 98188 Telephone: (206) 431 -3670 H -4 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON COUNTY OF KING ) )- ss. --3-av Y,m) PO 0 , states as follows: 1. I have made application for a building permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. 'I understand that prior to issuance of a building permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. 13 , and will therefore not be performed by a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. AFFCONT.DOC 5/29/96 LICANT Signed and sworn to before me this �/ "4 \ day of Oc7 oe'( , 19 96 / / 1 NOTARY P • � IC in an''d,11for the State of Washington, residing at 4r','e -j Gt/ County. Name as commissioned: L. Luna, My commission expires: 6 -9--00 18.27.090 Exemptions. This chapter 'I not apply to: 1. An authorized representative of the United States Govemment, the State of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale or installation of any finished products, materials, or articles of merchandise which are not actually fabricated into and do not become a permanent fixed part of a structure; 6. Any construction, alteration, improvement, or repair of personal property, except this chapter shall apply to all mobile /manufactured housing. A mobile /manufactured home may be installed, set up, or repaired by the registered or legal owner, by a contractor licensed under this chapter, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by, one or more contracts, the aggregate contract price of which for labor and materials and all other items is less th.n $500, such work, or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division AFFCONT.DOC 5/29/96 of the operation is made into contracts of amounts less than $500 for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he is a contractor, or that he is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner who contracts for a project with a registered contractor; 12. Any person working on his own property, whether occupied by him or not, and any person working on his residence, whether owned by him or not but this exemption shall not apply to any person otherwise covered by this chapter who constructs an improvement on his own property with the intention and for the purpose of selling the improved property; 13. Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 14. A licensed architect or civil or professional engineer acting solely in his professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his license; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his sole compensation; 16. Contractors on highway projects who have been prequalified as required by chapter 13 of the Laws of 1961, RCW 47:28:070 with the department of transportation to perform highway construction, reconstruction; or maintenance work.