Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D96-0087 - KING COUNTY DEPT OF METROPOLITAN - SUSPENDED CEILING
City of Tukwila �.. (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 DEVELOPMENT PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 734060 -0421 Address: 12100 EAST MARGINAL WY S Suite No: Location: Category: ACOM Type: DEVPERM Zoning: Const Type: Gas /Elec.: Units: 001 Setbacks: North: Water: 125 Wetlands: Permit No: Status: Issued: Expires: D96 -0087 ISSUED 12/17/1996 06/15/1997 Occupancy: UBC: 1994 Fire Protection: SPRINKLERED .0 South: .0 East: .0 West: .0 Sewer: VAL VUE Slopes: N Streams: Contractor Licence No: MAGNOCI132DF OCCUPANT OWNER CONTRACTOR CONTACT KING COUNTY DEPT OF METROPOLITAN 12100 EAST MARGINAL WY S, TUKWILA, WA METRO ACCOUNTS PAYABLE SO.BASE 5432- 50706D50304, 821 2ND AVE, SEATTLE WA 98104 MAGNOLIA CONTRACTORS, INC. Phone: 206 - 284 -4600 4211 24TH AV W, SEATTLE WA 98199 CLOYD JACKSON Phone: 206 684 -1706 801 SECOND AVENUE, SEATTLE, WA 98104 **************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: DEMO EXISTING SUSPENDED•CEILING AND REPLACE WITH NEW SUSPENDED SYSTEM. **************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ 30,000.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: Fire Loop Hydrant: No: Size(in): .00 Flood Control Zone: Hauling: Start Time: Land Altering: Cut: Landscape Irrigation: Moving Oversized Load: Start Time: End Time: Sanitary Side Sewer: No: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Water Main Extension: Private: Public: r**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 655.84 r**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** End Time: Fill: Permit Center Authorized Signature:_ atiago ate : I @ t (° I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performap.c)e of work. I m authorized to sign for and obtain this development perm Signature: Date: _,l Print Name:jt1556LL G je &' This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address: 12100 EAST MARGINAL WY S Permit No D96 -0087 Suite: Tenant: Status: ISSUED Type: DEVPERM Applied: 12/04/1996 Parcel #: 734060 -0421 Issued: 12/17/1996 *** * * * * * ***•k *'k•k*•k k* k * * * ** k * ** *-k *•k * * * ** k * * •k * *'k *'k *•k *•k * * * *•k *•k* * *•k k *'k* k* k *'k :Y k* k Permit Conditions: 1. No changes will be made to the plans unless approved by the Architect or Engineer and the .Tukwila, Building Division. 2. Electrical permits shall ,be obtained, through the Washington State Division of ,Labor; and Industries and :,all electrical work will be inspected by that agency (248-G630). 3 All mechanical work shall be under separate permit issued by the City of Tukw i l a 4. All permits; inspection ` records, and approved plans `:shall be available at the lob site prior' to the start "of any con- struction.: These .documents are to be maintained and avail- able until final inspection approval is granted.", 5. Any new 'ceiling grid and light fixture installation is required to;meet lateral bracing requirements for Seismic Zone =1. 6. All ,construction to be done in conformance with approved plans. and requirements of the Uniform Building Code ( 1994" Editi`on) as amended Uniform Mechanical Code (1994 'Edition), and Washington State Energy; Code `;(1994.Edition). 7. Validity of Permit. The issuance: of a" permit or approval of plans, specificeti;ons,' and "'computations shall not be con- strued to be . :a permit tor, or an approval of any violation o-f any of the provisions ;'of the building .code or of any other ordinance of the jurisdiction. ,".No :`permit presuming to give authority,to violate or cancel the provisions of this code.'sha11 Abe valid. CITY OF r' IKWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Commercial / Multi - Family Tenant Improvement / Alteration Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Project Name/Tenant: S&YTI &4S 1.11/14-C- IZCf�fif3 /j /TAT7D xi V 1 of Co tr ction: 1 Q) ❑ Multi- family ❑ Warehouse ❑ Hospital ❑ Motel /Hotel ❑ Office ❑ Other W--T J 605 -PA-(2__ LISP #-TC. -, Site Address: City State/Zip: to l e() 03-57- /M(24/N/3-L_ w V S. 7-01a LA wth Tax Parcel Number: 73146ka o - 0 4a 1 ❑ Multi- family ❑ Warehouse Hospital ❑ MoteUHotel ❑ Office Property Owner: J y uU co. P&-P6QT -416. X of m Rb POL LT11 w 56eatEs Phone: AB LI . 1706 • Street Address: City State/Zip: en/. 2' i4v6 56,67t wt.. gAibq Fax #: 684 - 13'1`-t Existing fire protection features: asprinklers . . automatic fire alarm ❑ none ❑ other (specify) Contact Person: M P-. C-I---D VP S P c 5t) Phone: 6Rci - 11 66 Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no Attach list.of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets Street Address: City State/Zip: X01 7 A-1,16- SEi-7T1& W 4 gI IN Fax #: LA 4 - 13 77 Contractor: mF4Nal_u CC.NjAJC. Phone: a8y -4600 Street Address: City State/Zip: 42-11 .a.4 TH A -V W Seq-ttl e- lei 94i1q6 Fax #: 7-$4 -'4 i !e. Architect: K c fyl 1 7.1C, Phone: LI 43 5-3 et Street Address: City State/Zip: j4 (ri I T al-W-. -TtL -& wf. ' 161 Fax #: L- y3 53 7? Engineer : BELL-eV/ Phone: Phone: y 4 2 d Street Address: City State /Zip: 9 I �1 151 Fr\JC— SCf -IT1 ' A 5 e L( Fax #: 4q3-37a_ Description of work to be done: DEvrto C- t5T7ug sosPbop& «Lr t_ii /Z-PL wl T1f Pew 5t�sP&(Vt) 5L 4 Existing use: ❑ Retail ❑ Restaurant ❑ Church ❑ Manufacturing ❑ SchooUCollege /University ❑ Multi- family ❑ Warehouse ❑ Hospital ❑ Motel /Hotel ❑ Office ❑ Other W--T J 605 -PA-(2__ LISP #-TC. -, Proposed use: ❑ Retail ❑ Restaurant ❑ Church ❑ Manufacturing ❑ School /College /University ❑ Multi- family ❑ Warehouse Hospital ❑ MoteUHotel ❑ Office Other Eil2t) 605 I A42,- DISP#TC t Will there be a change of use? ❑ yes no If yes, extent of change: (Attach additional sheet if necessary) I Will there be rack storage? ❑ yes ill, no Existing fire protection features: asprinklers . . automatic fire alarm ❑ none ❑ other (specify) Building Square Feet: 52.004 ttr2- existing Area of Construction: (sq. ft.) t, 000 Z Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no Attach list.of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets APPLICANT REQUEST FOR PUBLIC WORKS SITE/CIVIL PLAN REVIEW OF THE FOLLOWING: (Additional reviews may be determined bythe Public Works Department) ❑ Channelization /Striping ❑ Curb cut/Access /Sidewalk ❑ Flood Control Zone ❑ Hauling ❑ Land Altering 0 Cut cubic yds. 0 Fill cubic yds. ❑ Landscape Irrigation ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension 0 Private 0 Public ❑ Water Meter /Exempt #: Size(s): 0 Deduct 0 Water Only ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: ❑ Miscellaneous Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit Is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Dale application accepted: Date application expires: Application tabby: (initials) CTPERMIT.DOC 7/9/96 ALL COMMERCIAL /MULTI -FAI' Y TENANT IMPROVEMENT /ALT a TION PERMIT APPLICATIONS MUSE SUBMITTED WITH THE FOLL ING: • ALL DRAWINGS TO BE STAMPED BY WASHINGTON STATE LICENSED ARCHITECT, STRUCTURAL ENGINEER OR CIVIL ENGINEER ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED N/A SUBMITTED ❑ ❑ Complete Legal Description ❑ ❑ Metro: Non - Residential Sewer Use Certification if there is a change in the amount of plumbing fixtures (Form H -13). Business Declaration required (Form H -10). Five (5) sets of working drawings, which include : ❑ ❑ Site Plan (including existing fire hydrant location(s) 1. North arrow and scale 2. Property lines, dimensions, setbacks, names of adjacent roads, any proposed or existing easements 3. Parking Analysis of existing and proposed capacity; proposed stalls with dimensions 4. Location of driveways, parking, loading & service areas 5. Recycle collection location and area calculations (change of use only) 6. Location and screening of outdoor storage (change of use only) 7. Limits of clearing /grading with existing and proposed topography at 2' intervals extending 5' beyond property's boundaries 8. Identify location of sensitive area slopes 20% or greater, wetlands, watercourses and their buffers (change of use only) 9. Identify location and size of existing trees that are located in sensitive areas and buffer (TMC 18.45.040), of those, identify by size and species which are to be removed and saved 10. Landscape plan with irrigation and existing trees to be saved by size and species (exterior changes or change of use only) 11. Location and gross floor area of existing structure with dimensions and setback 12. Lowest finished floor elevation (if in flood control zone) 13. See Public Works Checklist for detailed civil /site plan information required for Public Works Review (Form H- 9). ❑ ❑ Floor plan: show location of tenant space with proposed use of each room labeled ❑ ❑ Overall building floor plan with adjacent tenant use; identify tenant space use and location of storage of any hazardous materials; dimensions of proposed tenant space. ❑ ❑ Vicinity Map showing location of site ❑ ❑ Rack Storage: If adding new racks or altering existing rack storage, provide a floor plan identifying rack layout and all exit doors. Show dimensions of aisles, include dimensions of height, length, and width of rack. Structural calculations are required for rack storage eight feet and over. ❑ ❑ Indicate proposed construction of tenant space or addition and walls being demolished ❑ ❑ Construction details ❑ ❑ Sprinkler details - details of sprinkler hangers, specifically penetrations in structure, i.e., roof; size of water supply to sprinkler vault with documentation from contractor stating supply line will meet or exceed sprinkler system design criteria as identified by the Fire Department. ❑ ❑ Washington State Non- Residential Energy Code Date shall be noted on the construction drawings. ❑ ❑ SEPA Checklist - if intensification of use (check with Planning Department for thresholds). ❑ ❑ Attach plans, reports or other documentation required to comply with Sensitive Area Ordinance or other land use or SEPA decisions. ❑ ❑ Food service establishments require two (2) sets of stamped approved plans by the Seattle -King County Department of Public Health prior to submitting for building permit application. The Department of Public Health is located at 201 Smith Tower, Seattle, WA or call (206) 296 -4787. (Form H -5) ❑ ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If no contractor has been selected at time of application a copy of this license will be required before the permit is issued OR submit Form H -4, "Affidavit in Lieu of Certificate of Contractor ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND / AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: /� 6a, ,e_aL ��,fp 8I GFL Date: /L v96 Pri %/e _� Gf /,� Phone? t, , ax #!il©/ 69,.4,5 dress , / /L/ 190 61,57.74 u w V 5. TozwiLA- w�, City /State /Zip CTPERMIT.DOC 7/9/96 *** A****** Ith**** * * *k***k ** **k** * **** *Ai4 k* * * **** * *:4 *A * *Aik4**k* *k* CITY OF TUKWILA. WA TRANSMIT *hA•* * * *kk * * * * **k ** * * *k k •e ** * *• * * *A* * * * * * *Ak:k*!, *•ktit * *,k** TRANSMIT Number: 89600517 Amount: 256.59 12/04/96 14:34 Payment Method: CHECK Notation: RUSSELL KELLERSB Init: SLD Permit No: D96-0087. Type: DEt4,,,PERM DEVELOPMENT PERMIT Parcel No: 734060.0421 4o. Site Address: 12100 EASx1;.MARGINAL,�WY S "fatal Fees: 655.84 This Payment 256.59 Total ALL Pmts: 256.59 Balance: 399.25 ***** A* k***** k**** k* kk************ *•k * * * *k *k * * * * ** ** *k *A * * **k * *kk Account Code Description Amount 000/345.830 PLAN CHECK - NONRES 256.59 7746 12/04 9617 TOTAL 256.59 4 * * **4t *:h *** *k * *kic k * * ****k * *kk *kk* *k * *k * ***h ***** * *A *k *k *kkkkk TRANSMIT **TY ** � ***kI** WA AF `4r *•kk *h * * * * * *kA * * * *h;t ** k* k * *k• A• * **** * * * *•:l•k * * *;4k4* * *+* * * * *k* TRANSMIT Number: 89600521 Amount: 399.25 12/17/96 08:35 Payment Method: CHEC1. Notation: MAGNOLIA CONTRAC Init: SLB OF Permit No: D96• -0087 Tune: DEVPEIM DEVELOPMENT PERMIT Parcel No: 734060 -0421 Site Address: 12100 EAST MARGINAL WY a Total Fees: 655.84 This Payment 399.2; Total ALL Pints: 655.84 Bal arice: .00 *** k*** kk**** k** kh* k** k* k*******k* k *k * * * * * * * *k*k * * *k ** * *h *•kh ** ** Account Code 000/322.100 000/386.904 .Description BUILDING •- NONRES STATE BUILDING SURCHARGE Amaurit 394.75 4.50 %70 12/17 9617 TOTAL 399.25 r''`: ;1 yi. iq�1NYw;1pY��4��4'yu,rx, C.. City of Tukwila Fire Department Project Name John W. Rants, Mayor TUKWILA FIRE DEPARTMENT FINAL APPROVAL' FORM Thomas P. Keefe, Fire Chief XV\ AIL - C)134 ✓ Permit No. Lc))''' 1 ekC U 5o\ Jr, f Address \ Z \ U.) _A+ (\ r '�� �� R 4 s Suite # C" Retain current inspection schedule Needs shift inspection Approved without correction notice ?2.. Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authorized Signature fl\ Date FINALAPP.FRM T.F.D. Form F.P. 85 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.4404 • Fax (206) 575-4439 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 1 -3670 Project: Op . pb N r ELlan Type of in lion: r Address: r 01 CO E .i i,144 -tp,CoQ S. Date calla , IQ_ —C 1 Special instructions: U . • \ t ...y_ , -t.3a P . ` _,, , Date wante. • a.m. ' quIs er ,r r ` rme -trial tam- Approved per applicable codes. Corrections required prior to approval. MENTS: r- Inspector; Date: 611 ti $42.00 REINSPECTION FEE REQUIRED. Prior to inspec ion, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 'INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206) 431 -3670 PIQ 13 BA i �` l Type o pelt 6 666re ii►V `! Ott Ot MAC tNAL wYs Date called: .5 _21_ c1' Special instructions: Date wanted: — 1 / p' 2.jC1-'4 •� '' Requester: - ■.A.4`) Phone No.: 90 i — oci..311 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: r7 $42.00 REINSPECTION . FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. Receipt No.: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit 011,0 -101 PERMIT NO. (206) 431 -3670 Paittro B1A5 e ii Type "uryspect(!, ri-I N el • StA.4 P g.--� >1,1 . eii-i v.i),2 kcEP7^ 1L-- itlyreg: o At A ' ., , ,,+ j�1!`� SDate called: 3_(o_ G,-7 9 Lt 0- 1- 9.Acv.._wt i =`s ADA, Fl.4c .014---- .Su?f 6,1- 'Special instructions: Date wanted: 3 _' `_ p.m. Requester: ?AksS G ■,. ,-a-olst s Phone No.: 10101_ 0931 n Approved per applicable codes. Corrections required prior to approval. COMMENTS: iMAIVI — ie) ' 1--4't'g---- • StA.4 P g.--� >1,1 . eii-i v.i),2 kcEP7^ 1L-- 14' a\--- VEC'S % 1 t,L LJ WIkt-ii- - t„Alc,t1 4 L s 9 Lt 0- 1- 9.Acv.._wt i =`s ADA, Fl.4c .014---- .Su?f 6,1- (mu-- be 1 r4-5-1-444-v17 ,j--- LA 0 IS t).1 s1aat. , VIA A c t:,. =32 11/s t S. 3� .,- �--- -ro euecnu (AL_ 017'11.41./A-1., G ■,. ,-a-olst s n Inspector: Date: "44(77 n fee $42.00 REINSPECTION FEE REQUIRED. Prior to ins p ec e must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. [Receipt No.: Date: _A.,. .214/ A/ INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 -0 r n, mo-� , PERMIT NO. is (206) 431 -3670 bus 121 :e� Typeinsp� fA✓ roje mr ew1 - wi S Date called: _04 97 Special instructions: Date wanted: Z ...2t5....9.7 a.m. Requester: g Phone No.: Cio r _ 0i 3L1 approved per applicable codes. Corrections required prior to approval. J j COMMENTS: Inspector: Date: $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 befrocri PERMIT NO. (206) 431 -3670 Pr 'e� ' 1AAs T 1 We3T k,,,) 3 LI (3 (i's) ► 1-1 c t.-IN S, , - Type of gpton: cs.a.3 too otts,roc L W 1 Date called: 2__ 19 ..c1.-7 Special instructions: eti,L vaG,. (= iA -.,,44 61L T% CL _ i rJ R4.11.4) Date wanted:. _ Za 97 p.n.,. Requester: Russ Phone No.: 901- c Approved per applicable codes. klCorrections required prior to approval. COMMENTS: , PS 4�(� w- j -1 '°5 ..- 5 ( 1 We3T k,,,) 3 LI (3 (i's) ► 1-1 c t.-IN S, , - J 1 S c....n Li OCT s,,‘PP»- w „2. . 2 tSUt z L P- 4-0•^- 1-46 4t-i F'0111k (Uri I t-) c.,”- i"K , J N Y)S Gi2-'O uPPoa..;' 1,4 10..,.. eti,L vaG,. (= iA -.,,44 61L T% CL _ i rJ R4.11.4) CA O'• Ate. s C11.—=toiNa-ksow,s _ Cw Fi4.11.7,-1411Jc7 W 1 t.L. A-4Z a4A\ tt- / ti Seer- rt1.t3 . Inspector: Date: $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206) 431 -3670 Projector` 57A. / Type of inspecti•/ ,% �r Address: , , ... Date called: /ry _12, Special instructions: Date wanted: f y a.m. 7 i Requester: K //�� eii-lj Phone No.: Approved per applicable codes. Corrections required prior to approval. Inspector: Date: $42.00 REINSPECT! • N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. Receipt No.: Date: P. 1. Y+' aVt innsncxex .�vtMY,n.+.YrwetM4xtswWftY t W. 4-w v. ✓wn- Arn✓.** /(0+101**■ SECTION 09510 ) ACOUSTICAL CEILING ) = PART 1 GENERAL ) 1.01 SUMMARY ) ) ) 1.02 REFERENCES ) ) ) ) 1.04 SUBMITTALS A. Provide Contractor's method of removal and installation of ceiling system in writing. B. Provide affidavit stating that ceiling installer is experienced in the trade for at least 5 years. ) C. Provide shop drawings showing ceiling layout and installation method. D. Submit two 12 -inch by 12 -inch samples of ceiling material for approval. ) 1.05 PRODUCT HANDLING ) ) ) ) 1.06 ENVIRONMENTAL CONDITIONS ) ) PART 2 PRODUCTS ) ) ) ) A. Tie work of this Section consists of furnishing all labor, materials and equipment required for removal and installation of acoustical ceiling lay -in panels and support system as shown on Drawings and as specified herein. A. This Section incorporates by reference the latest revisions to ASTM and the following documents. They are part of this Section as specified and modified. In case of a conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail. 1. CISCA - Ceiling and Interior Systems Contractor's Association 2. FedSpec SS -S -1188 - Sound Controlling (Acoustical) Panels and Tiles 3. UBC - UBC Standard 47 -18 A. Protection: Use all means necessary to protect the materials of this Section before, during, and after installation, and to protect the work and materials of all other trades. B. Replacements: In the event of damage, due to Contractor's operations, immediately make all repairs and replacements necessary to the approval of the Engineer and at no additional cost. A. Do not install acoustical ceilings until dust generating activities have terminated and overhead mechanical work is completed, tested and approved. B. Permit wet work to dry prior to commencement of installation. 2.01 ACOUSTICAL CEILINGS A. Acceptable manufacturers for lay -in panels: 1. Armstrong Cork Company. 0����c0 CITY OF TUKWILA G��QQR�v 6DEC q 9 4 1996 1ti 19 fit. ,» PER CENTER T/M2 -96 09510-1 2. 'Or equal" systems by the following manufacturers: a. Celotex Corporation b. Conwed Corporation c. United States Gypsum Company. B. Suspension Systems (ACT -1): 1. Systems shall conform to ASTM C 635, intermediate duty, with all components from one manufacturer. a. Exposed tee system: Exposed tee grid shall be spaced to fit lay -in panels. Use prelude XL intermediate -duty system as manufactured by Armstrong or equal. b. Main and cross members: Double -web construction, 1 -1/2 -inch high with rectangular top bulb and 15/16 -inch bottom. Flange with prefinished steel capping in white color. c. Wall molding: Hemmed angle molding with prefinished exposed flanges in white color. d. Hanger wire: ASTM A 641 minimum 12 -gage, galvanized, soft annealed, mild steel wire. e. Wire ties: ASTM A 641,18 gage, galvanized, annealed steel wire. • C. •Suspension system for gypsum wallboard subceiling: 1. Use 1 -1/2 -inch, 16 -gage, C R channels and ASTM C 645 metal furring channel, suspended on 8 -gage wire hanger. Provide wall angle runners, cups, etc. as required to install finish ceiling system. D. Acoustical lay -in panels (ACT -1): 1. Size: Existing panels are 24 -inch by 48 -inch. All new panels shall be 24 -inch by 48 -inch and shall meet Federal Specification SS -S -1188 Type III Class A carrying UL, Inc. label, LR Grade 1. Non -fire rated: Minimum 5/8 -inch thick. 2. Noise control: NCR rating 0.50 -0.60 range. 3. Color: Factory- applied washable white matte paint finish. 4. Panel type: Armstrong - white, non - directional, minaboard 755, fissured, non -rated or similar. 5. Tile edges: Square. E. Acoustical ceiling tile (ACT -2): 1. Size shall be 12 -inch by 12 -inch and shall meet ASTM E 1264 Type III Class A UL labeled non -fire rated with a minimum of 1/2 -inch thick beveled edge TAG for staple or glue -up installation over gypsum wallboard subceiling. 2. Noise control: NRC rating shall be between 0.50 to 0.60. 3. Color: Factory applied washable white matte paint finish. 4. Panel type: Armstrong- White, Minatone Fissured 714, non -rated or equal. PART 3 EXECUTION 3.01 REMOVAL AND INSTALLATION OF CEILING SYSTEM A. Install suspension system in accordance with UBC Standard 47 -18 and ASTM C 636. B. See mechanical drawings for location of piping, ductwork and terminal units. Coordinate removal of existing ceiling system with mechanical work. C. Contractor shall protect and shall maintain functional use of all existing fights, HVAC grilles and speakers that will remain in place. D. All damaged lights, HVAC grilles and speakers due to Contractor's operations shall be replaced with new to match existing. Engineer will solely determine which elements are considered damaged. 09510 -2 T/M2 -96 • 3.02 SURFACE CONDITIONS 3.03 INSTALLATION EXPOSED GRID SYSTEM E. Install the grid system and ceiling board to line and true level, symmetrical to rooms and spaces. All suspended ceiling system work shall be done according to CISCA. A. Inspection: Prior to work of this Section, the Contractor shall carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this work may properly commence. Coordination: Contractor to install ceiling support system to fit around mechanical and electrical systems and equipment as required. Make necessary adjustments in wire hanger locations to accomplish this work. C. Discrepancies: In the event of discrepancy, immediately notify the Engineer. Do not proceed in areas of discrepancy until all such discrepancies have been fully resolved. A. The exposed grid system shall be directly -hung installed in accordance with ASTM C 636. Deflection of any component shall not exceed 1/360 of the span. B. Install finish surfaces level and true within 1/8 -inch per 12 feet of surfaces in any direction. C. Hang main tees spaced 24 inches 0.C. with hanger wires spaced not over 48 inches along the length of the tees. D. Maximum runner rotation from plumb not to exceed 2 degrees. E. Attach cross -tees to main tees at 48 inches 0.C. F. Provide perimeter angle moldings at intersection of ceiling panels and all vertical surfaces. G. Laterally brace ceiling areas exceeding 144 square feet in accordance with UBC Standard 47 -18. H. For other requirements see Paragraph 3.03 below. 3.04 INSTALLATION LAY -IN PANELS A. Layout - Plan each layout to match adjacent existing ceiling. B. Orient each panel in the same direction to produce a uniform direction of pattem. C. Install after major above - ceiling work is complete. Coordinate the location of hangers with other work. Ensure the layout of hangers are located to accommodate fittings and units of equipment which are to be placed after the installation of ceiling grid system. D. Where ducts or other equipment prevent the regular spacing of hangers, reinforce the nearest adjacent hangers and related carrying channels as required to span the required distance. E. Hang independently of walls, columns, ducts, pipes and conduit. Where carrying members are spliced, avoid visible displacement of the longitudinal axis or face plane of adjacent members. Hangers shall not pass through mechanical or electrical ductwork. F. Do not support fixtures from or on main runners or cross runners if weight of the fixture causes the total dead Toad to exceed the deflection capability. In such cases, support fixture loads by 09510-3 T/M2.96 supplementary hangers located within 6 inches of each comer, or support the fixtures independently. G. Fit acoustic lay -in panels in place, free from damaged edges or other defects detrimental to appearance and function. Fit border units neatly against abutting surfaces. Install lay -in panels level, in uniform plane and free from twist, warp and dents. I. Do not install fixtures so that main runners and cross runners will be eccentrically loaded. Where fixture installation would produce rotation of runners, provide stabilizer bars. • J. Adjust any sags or twists which develop in the ceiling system(s) and replace any part which is damaged or faulty. 3.05 INSTALLATION OF GYPSUM WALLBOARD SUBCEILING A. Conform strictly to applicable requirements of the manufacturer's standard specifications. Screw apply board to metal furring. Where ceiling abuts differing wall materials, install approved metal edge trim. B. Taping is not required on gypsum wallboard surfaces that are behind acoustic tile ACT-2. 3.06 CLEANUP A. Completely remove all fingerprints and traces of adhesives or soil and damage from the surfaces of acoustical materials, using only those cleaning materials recommended for that purpose by the manufacturer of the material being cleaned. Replace damaged or marred units as directed by the Engineer. END OF SECTION City of Tukwila Fire Department Fire Department Review Control #D96 -0087 (512) John W. Rants, Mayor Thomas P. Keeje, Fire Chief December 6, 1996 Re: King County Department of Metro Services - 12100 East Marginal Way South Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and /or recognized by The City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1742) Maintain sprinkler protection during the demo phase of this project. One ceiling tile shall remain in place at each sprinkler head location to act as a heat collection or an alternate method of heat collection may be used if approved by the Fire Marshal. All sprinkler systems, fire hydrant systems, standpipe systems, fire alarm systems, portable fire extinguishers, and other fire - protective or extinguishing systems or appliances shall be maintained in an operative condition at all times and shall be replaced or repaired when defective. All repairs and servicing shall be made in accordance with recognized standards. (UFC 1001.7.1) Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575-4404 • Fax (206) 575-4439 City of Tukwila John W Rants, Mayor Fire Department Page number 2 Thomas P. Keefe, Rre Chief Maintain sprinkler coverage per N.F.P.A. 13. Addition /relocation of walls, closets or partitions may require relocating and /or adding sprinkler heads. 2. Accumulation of combustible waste material is prohibited during the demolition phase of this project. Remove and properly dispose of all waste material prior to the close of the working day and as often throughout the day as needed. This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Prevention Bureau cc: TFD file ncd Headquarters Station: 444 Andover Park East . Tukwila, Washington 98188 • Phone: (206) 575:4404 • Fax (206) 575-4439 ■ -r DETACH TO DISPLAY CEIIIIFICATE --4 4 DEPARTMENT OF LABOR AND INDUSTRIES I THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A 111 • • .. ■•• • • • CCIIST.— •C ONT •GENER'AL.- • • •• -• • •• 5. • ••' • • • . STATE OF WASHINGTON . int-GSM/1TO NOWA • ; FIROTPI, • 1-.11.2 gFucrave,rifr MA6,3'40E1.41 OlifRAt tont.; `I 42 11 P.:411-1* AVE 14 SEATTLE- WA - 96199 . • .r1 • C62.5462•00313.921. ..... zzzzz L. DETACH TO DISPLAY CERTIFICATE • • • 5 S w LL 0 6 CI • a • EAST BASE LOCATION • RENTON tes) SOUTH BASE LOCATION TU . LA mat 667 KE T " AN K CO. r / PtERCE CO VICINITY MAP 0 1 2 3 4 5 TYPICAL SECTION AND DETAIL NUMBERING SYSTEM (1) THE SECTION IS CUT ON DRAWING M203 s SECTION NUMBER M207 DRAWING ON WHICH SECTION APPEARS (2) ON DRAWING M207 THIS SECTION IS IDENTIFIED SECTION SCALE: SECTION NUMBER DRAWING ON WHICH SECTION WAS TAKEN (3) DETAILS ARE CROSS— REFERENCED IN A SIMILAR MANNER, EXCEPT THAT DETAILS ARE IDENTIFIED BY LETTER RATHER THAN BY NUMBER. SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL CfELECTRICAL 0 PLUMBING IitGAS PIPING CITY OF TUKWILA BUILDING DIVISION SHEET DWG NO O. P :M.; TITLE • DRAWING INDEX A GENERAL MAINTENANCE /OPERATIONS BUILDING HVAC REHABILITATION 1 GO1 .SCiNIT( MAP & DRAWING iNDFX 2 G02 SOUTH BASE LOCATION MAP & SITE PLAN 3 503 EAST BASE LOCATION MAP & SITE PLAN 4 504 ARCHITECTURAL NOTES ABBREVIATIONS & LEGEND 5 505 Ii- UCIURAL GENERAL NOTES 6 506 "JPI)CTURA) ABBREVIATIONS & LEGEND 7 507 MECHANICAL ABBREVIATIONS. LEGEND & GENERAL NOTES 8 G08 ELECTRICAL ABBREVIATIONS & LEGEND TYPICAL DETAILS MAINTENANCE /OPERATIONS BUILDING HVAC REHABILITATION 9 10 11 12 13 14 15 16 17 18 TD01 T002 TD03 TD04 T005 TDO5A TD06 TD07 TD08 TD09 TYPICAL TYPICAL TYPICAL TYPICAL TYPICAL T1PICAL TYPICAL TYPICAL T(PICAL TYPICAL ARCHITECTURAL DETAILS ARCHITECTURAL DETAILS ARCHITECTURAL DETAILS STRUCTURAL DETAILS STRUCTURAL DETAILS STRUCTURAL DETAILS MECHANICAL DETAILS MECHANICAL DETAILS ELECTRICAL DETAILS ELECTRICAL DETAILS SHEET DWG NO. NO. DRAWING TITLE SOUTH BASE MAINTENANCE /OPERATIONS BUILDING HVAC REHABILITATION 19 5 1 1 SITE PLANS AND SECTIONS 20 M11 EQUIPMENT SCHEDULES 21 M12 EQUIPMENT SCHEDULES 22 M13 CONTROL SCHEMATICS 23 M14 CONTROL SCHEMATICS 24 M 15 SCHEMATICS & DETAILS 25 E 1 1 DEMOLITION ONE -LINE DIAGRAM 26 E12 ONE -LINE DIAGRAM SOUTH BASE MAINTENANCE BUILDING HVAC REHABIUTATION 27 A101 DEMOLITION ROOF PLAN 8 --A10 @LAN, 29 A103 FIRST FLOOR DEMOLITION & CEILING PLANS A104 UPPER LEVEL DEMOLITION & CFIIIN; PLANS 1796 -0 REVISIONS NO CHANGES SHALL BE MADE TO THE SCOPE OF WORK WITHOUT PRIOR APPROVAL OF TUKWILA BUILDING DIVISION. NOTE REVISIONS WILL REQUIRE A NEW PUN SUBMITTAL AND MAY INCLUDE ADDITIONAL PLAN REVIEW FEES. THIS MUST TIMES DUR IT NO.. OF APPR• • T INSP TU PLANS JOB AT ALL NSTRUCTION. 'INTIL N APPROV BUILDING D TOF •M INAL E FILE -Inderstand that the Plan_GI1e5Sapprovals are _,;D1ect:o errors and omissioq and approval of ,I;, does not authorize theme IJ5lation of any . ogled coda or oronanoe. Roeipt of con-‘ app d � i�. lodged. rte.. • / �•J /// 1/411i, Sy Date Permit No. PERMIT D101 DEMOLITION PARTIAL FIRST FLOOR PLAN 32 D102 DEMOLITION FIRST FLOOR PLAN 33 D103 DEMOLITION UPPER LEVEL PLAN 34 D104 DEMOLITION ROOF PLAN 35 M101 FLOOR PLAN AREA A - 36 M102 FLOOR PLAN AREA B 37 M103 FLOOR PLAN AREA C 38 M104 FLOOR PLAN AREA D M105 NOT USED 39 M106 UPPER LEVEL FLOOR PLAN AREA A 40 M107 'UPPER LEVEL FLOOR PLAN AREA B 41 M108 UPPER LEVEL FLOOR PLAN AREA C 42 M109 UPPER LEVEL FLOOR PLAN AREA D 43 M110 ROOF PLAN 44 M111 PARTIAL PLANS & SECTIONS 45 M112 SECTIONS & DETAILS 46 M113 SECTIONS & DETAILS 47 E101 DEMOLITION FIRST FLOOR PLAN 48 E102 DEMOLITION ROOF PLAN 49 E103 FIRST FLOOR PLAN 50 E104 ROOF PLAN 51 E105 SCHEDULES & DETAILS SOUTH BASE OPERATIONS BUILDING HVAC REHABILITATION 151 . DEMOLI4SQNROn LAN OF PLAN A 2 AIR PLAN, ELEVA •N & S A153 DEMOLITION REFLECTED CEILING PLANS A154 REFLECTED CEILING PLANS =56 D151 DEMOLITION FIRST FLOOR PLAN 5 54 ASS 57 D152 DEMOLITION SECOND FLOOR & ROOF PLANS 58 M151 FIRST FLOOR PLAN 59 M152 SECOND FLOOR & ROOF PLANS 60 M 153 SECTIONS & DETAILS 61 E151 DEMOLITION SECOND FLOOR PLAN 62 E152 FIRST FLOOR PLAN 63 E153 SECOND FLOOR & ROOF PLANS 64 E154 SCHEDULES & DETAILS SHEET DWG NO. NO. EAST BASE MAINTENANCE /OPERATIONS BUILDING HVAC REHABILITATIO DRAWING TITLE ® r r 65 C21 SITE PLANS & SECTIONS 66 M21 EQUIPMENT SCHEDULES 67 M22 EOUIPMENT SCHEDULES 68 M23 CONTROL SCHEMATICS 69 M24 CONTROL SCHEMATICS 70 M25 SCHEMATICS & DETAILS 71 E21 DEMOLITION ONE -LINE DIAGRAM 72 E22 ONE -LINE DIAGRAM EAST BASE MAINTENANCE BUILDING HVAC REHABILITATION 73 A201 DEMOLITION ROOF PLAN 74 A202 ROOF PLAN 75 A203 FIRST FLOOR DEMOLITION & CEILING PLANS ' 76 A204 UPPER LEVEL DEMOLITION & CEILING PLANS 77 02u i DE1IOLITIU:'-I PARTIAL FIRST ;;L501' P LAN & NOTES-.y_ 78 D202 DEMOLITION FIRST FLOOR PLAN 79 D203 DEMOLITION UPPER LEVEL PLAN 80 D204 DEMOLITION ROOF PLAN 81 M201 FLOOR PLAN AREA A 82 M202 FLOOR PLAN AREA B 83 M203 FLOOR PLAN AREA C 84 M204 FLOOR PLAN AREA D M205 NOT USED 85 M206 UPPER LEVEL FLOOR PLAN 86 M207 UPPER LEVEL FLOOR PLAN 87 M208 UPPER LEVEL FLOOR PLAN 88 M209 UPPER LEVEL FLOOR PLAN 89 M210 ROOF PLAN 90 M211 PARTIAL PLAN & SECTIONS 91 M212 SECTIONS & DETAILS 92 M213 SECTIONS & DETAILS 93 94 95 96 97 98 AREA AREA AREA AREA E201 DEMOLITION FIRST FLOOR PLAN E202 DEMOLITION ROOF PLAN E203 FIRST FLOOR PLAN E204 ROOF PLAN E205 SCHEDULES & DETAILS E206 MEZZANINE PLAN & SECTIONS EAST BASE OPERATIONS BUILDING HVAC. REHABIUTATION 99 A251 100 A252 101 A253 102 A254 103 A255 A B C D DEMOLITION ROOF PLAN & ROOF PLAN STAIR PLAN, ELEVATION & SECTION SCREEN WALL ELEVATION & DETAILS DEMOLITION REFLECTED CEILING PLANS REFL.ECTED CEILING PLANS 104 0251 DEMOLITION FIRST FLOOR PLAN 105 D252 DEMOLITION SECOND FLOOR & ROOF PLANS 106 M251 107 M252 108 M253 109 E251 110 E252 111 E253 112 E254 FIRST FLOOR PLAN SECOND FLOOR & ROOF PLANS SECTIONS & DETAILS DEMOLITION SECOND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR & ROOF P A IY 2wnA SCHEDULES & DETAILS NOV 1 41996 CITY RE OCEIVED F TUKWILA DEC 0 4 1996-. PERMIT CENTER -. PERMIT CENTER No. REVISION BY DATE KCM, Inc. 1917 First Avenue Seattle, Washington 98101 A D lava O /Y SIONAL4` _ r /47 J • :::::KE2,. `IFS METRO • King County Dept. of Metropolitan Services RECOMMENDED: SCALE: AS NOTED APPROVED: CONTRACT NO: T/M2 -96 GENERAL MAINTENANCE /OPERATIONS BUILDING HVAC REHABILITATION:,: VICINITY MAP & DRAWING INDEX: IreA A _ 114.11 A 8 c p E f n 0 SEE NOTE 4 & 5 TYP SEE NOTE 7 TYP ( Li—TrI 0 A 4 4 0 I NO CEILING WORK REQUIRED IN THESE ROOMS REMOVE & DISPOSE OF EXISTING CE LING PANELS & CEILING SUSPENSION SYSTEM. EXISTING LIGHTS AND SPEAKERS SHALL BE STORED FOR REUSE. SEE NOTES 1 THRU 3. FIRST FLOOR DEMO REFLECTED CEILING PLAN CA SCALE: 3/32" = 1' -0" J GENERAL NOTES – DEMOLITION: 1- SOUTH BASE SHALL REMAIN IN OPERATION DURING CONSTRUCTION. CONTRACTOR SHALL SUBMIT ITS PLANS AND SCHEDULE OF WORK IN WRITING TO THE ENGINEER FOR WRITTEN APPROVAL PRIOR TO COMMENCEMENT OF ITS WORK. 1 - ❑ ACT-1 TYP, SEE ACTZ2 TYP, SEE 1 _ I tigb -o0S7 2. SEE SPECS FOR CONSTRUCTION CONSTRAINTS 3. CONTRACTOR MUST PROTECT ALL AREAS OF ITS OPERATION IN THE INTERIOR OF MAINTENANCE BUILDING AT SOUTH BASE FROM DUST. CONTRACTOR MAY USE 6 MIL POLYETHYLENE SHEETS SECURED IN PLACE FOR DUST TIGHTNESS FOR PROTECTION OF WORK STATIONS, EQUIPMENT, CARPET AND OTHER FURNISHINGS. GREAT CARE MUST BE EXCERCISED TO PROTECT ALL EQUIPMENT & FURNISHINGS. ALL DAMAGED ITEMS DUE TO CONTRACTOR'S OPERATIONS MUST BE REPLACED IN KIND. 4. CONTRACTOR SHALL IDENTIFY ALL DAMAGED LIGHTS, EXIT LIGHTS, & SPEAKERS TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. REMOVE & STORE ALL EXISTING & IN GOOD CONDITION LIGHTS & SPEAKERS DURING CONSTRUCTION FOR REINSTALLATION. PROVIDE TEMPORARY LIGHTING AS REQUIRED. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. 5. DUE TO CONTRACTOR'S OPERATIONS. ALL DAMAGED LIGHTS & SPEAKERS SHALL BE REPLACED W/ NEW TO MATCH EXISTING, AT NO ADDITIONAL COST TO OWNER. 6. SEE CEILING PLAN B FOR NEW WORK. 7. SEE MECHANICAL DRAWINGS FOR DEMOLITION OF PIPING, DUCT WORK, GRILLES AND TERMINAL UNITS. 8. PROTECT SPRINKLERS IN PLACE. 9. CONTRACTOR SHALL MEASURE CEILING HEIGHT PRIOR TO DEMOLITION & KEEP RECORD FOR INSTALLATION OF NEW CEILING. 0 TD03 TD03 LEGEND EXIST RECESSED 2X4 FLUORESCENT LIGHT FIXTURE Q EXIST SURFACE MOUNTED 2X4 FLUORESCENT LIGHT FIXTURE O EXIST 1X4 SURFACE MOUNTED FLUORESCENT LIGHT FIXTURE ® EXIST SHOP FLUORESCENT LIGHT FIXTURE W/ PROTECTION GRILLE EXIST 2X2 FLUORESCENT LIGHT FIXTURE 0 EXIST CAN LIGHTS ® I7I HVAC GRILLES 0 EXIST SPEAKERS SHADED AREAS INDICATES LIMITS OF CEILING DEMOLITION CEILING Sc CEILING SUSPENSION SYSTEM ,SEE NOTES 1 THRU 4. N 1. 2. 3. 4. 5. 6. FIRST FLOOR REFLECTED CEILING PLAN O SCALE: 3/32" = 1' -0" CONSTRUCTION NOTES; CONTRACTOR SHALL CAREFULLY INSPECT WORK OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH WORK IS COMPLETE PRIOR TO INSTALLATION OF SUSPENSION SYSTEMS AND CEILING PANELS. ALL WALLS SHOWN IN THE PLAN ARE EXISTING. ANY DAMAGE TO EXISTING WALLS OR HOLES LEFT EXPOSED TO VIEW DUE TO CONTRACTOR'S OPERATIONS MUST BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. INSTALL ALL LIGHTS & SPEAKERS WHICH WERE STORED FOR REUSE. REPLACE DAMAGED LIGHTS AND SPEAKERS WITH NEW MATCHING IN KIND. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. PROVIDE ACCESS PANELS FOR ACCESS TO MECHANICAL EQUIPMENT IN ACT -2 ACOUSTICAL TILE AREA. SEE MECHANICAL DRAWINGS FOR LOCATION AND SIZE. CONTRACTOR TO MATCH EXISTING CEILING HEIGHT UNLESS OTHERWISE DIRECTED BY ENGINEER. AFTER INSTALLATION OF CEILING, CONTRACT- OR SHALL REINSTALL ESCUTCHEON ON SPRINKLER HEADS, SPEAKERS AND OTHER CEILING MOUNTED FIXTURES TO PROVIDE FINISHED CEILING. KCM KCM, Inc. 1917 First Avenue Seattle ,Washington 98101 DESIGNED: Streeter /Dermanis & Associates Architects, AIA Seattle, WA IJ DRANK: CHECKED, AM PD KEY PLAN METRO King County Dept of Matropolltan.Servioe* SCALE: AS NOTED SOUTH BASE MAINTENANCE BUILDING HVAC REHABILITATION< No. FIRST FLOOR ._ DEMOLITION & CEILING PLANS. A Y 8 C D A 8 C E F G H NO CEILING DEMO REQUIRED IN THIS AREA I EXIST SMOKE VENT SHAFTS TO REMAIN TYP SEE NOTE 4 8b 5 TYP I.; SEE NOTE 7 TYP CEILING & LIGHTS TO REMAIN II i~iri �1 �I1'V.f'N.1 REMOVE & DISPOSE OF EXISTING CEIUNG PANELS & CEILING SUSPENSION SYSTEM. EXISTING LIGHTS AND SPEAKERS SHALL BE STORED FOR REUSE. SEE NOTES 1 THRU 3. MEZZANINE DEMO REFLECTED CEILING PLAN SCALE: 3/32" = 1' -0" GENERAL NOTES — DEMOLITION; SOUTH BASE SHALL REMAIN IN OPERATION DURING CONSTRUCTION. CONTRACTOR SHALL SUBMIT ITS PLANS AND SCHEDULE OF WORK IN WRITING TO THE ENGINEER FOR WRITTEN APPROVAL PRIOR TO COMMENCEMENT OF ITS WORK. 2. SEE SPECS FOR CONSTRUCTION CONSTRAINTS 3. CONTRACTOR MUST PROTECT ALL AREAS OF ITS OPERATION IN THE INTERIOR OF MAINTENANCE BUILDING AT SOUTH BASE FROM DUST. CONTRACTOR MAY USE 6 MIL POLYETHLENE SHEETS SECURED IN PLACE FOR DUST TIGHTNESS FOR PROTECTION OF WORK STATIONS. EQUIPMENT, CARPET AND OTHER FURNISHINGS. GREAT CARE MUST BE EXCERCISED TO PROTECT ALL EQUIPMENT & FURNISHINGS. ALL DAMAGED ITEMS DUE TO CONTRACTOR'S OPERATIONS MUST BE REPLACED IN KIND. 4. CONTRACTOR SHALL IDENTIFY ALL DAMAGED LIGHTS, EXIT LIGHTS & SPEAKERS TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK. REMOVE & STORE ALL EXISTING & IN GOOD CONDITION LIGHTS & SPEAKERS DURING CONSTRUCTION FOR REINSTALLATION. PROVIDE TEMPORARY LIGHTING AS REQUIRED. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. 5. DUE TO CONTRACTOR'S OPERATIONS, ALL DAMAGED LIGHTS & SPEAKERS SHALL BE REPLACED W/ NEW TO MATCH EXISTING, AT NO ADDITIONAL COST TO OWNER. 6. SEE CEILING PLAN B FOR NEW WORK. 7. SEE MECHANICAL DRAWINGS FOR DEMOLITION OF PIPING, DUCT WORK, GRILLES AND TERMINAL UNITS. 8. PROTECT SPRINKLERS IN PLACE. 9. CONTRACTOR SHALL MEASURE CEILING HEIGHT PRIOR TO DEMOLITION & KEEP RECORD FOR INSTALLATION OF NEW CEILING. LEGEND ® EXIST 2X4 FLUORESCENT LIGHT FIXTURE ® EXIST 1X4 FLUORESCENT LIGHT FIXTURE ® EXIST 2X2 FLUORESCENT LIGHT FIXTURE O EXIST CAN LIGHTS ® Z HVAC GRILLES 0 EXIST SPEAKERS SHADED AREAS INDICATES LIMITS OF CEILING DEMOLITION Pei IL X X ' GWB CEILING I� NEW SMOI,CE VENT SHAFT 'FRAME INISHAFT W/ MIL ;I; STUDS & ;CWB TO MATH OTHER SHAFT IN III CORRIDOR! c I:i!IIii 111111111 111E111111 11111u11!1 1110111-11 gIIIII "" 1111111111111.111E1111111111 � ■: °al "'saaeuoua ACT -1 fiCT -2 SEE SCE ! '• 1 TD03 TD NEW CEILING & CEILING SUSPENSION SYSTEM. EXISTING RELOCATED UGHTS. SEE NOTES 1 THRU 4. N MEZZANINE REFLECTED CEILING PLAN SCALE: 3/32" = 1' -0" CONSTRUCTION NOTES 1. CONTRACTOR SHALL CAREFULLY INSPECT WORK OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH WORK IS COMPLETE PRIOR TO INSTALLATION OF SUSPENSION SYSTEMS AND CEILING PANELS. 2. 3. 4. 5. ALL WALLS SHOWN IN THE PLAN ARE EXISTING. ANY DAMAGE TO EXISTING WALLS OR HOLES LEFT EXPOSED TO VIEW DUE TO CONTRACTOR'S OPERATIONS MUST BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. INSTALL ALL LIGHTS & SPEAKERS WHICH WERE STORED FOR REUSE. REPLACE DAMAGED LIGHTS AND SPEAKERS WITH NEW MATCHING IN KIND. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. PROVIDE ACCESS PANELS FOR ACCESS TO MECHANICAL EQUIPMENT IN ACT -2 ACOUSTICAL TILE AREA. SEE MECHANICAL DRAWINGS FOR LOCATION AND SIZE. CONTRACTOR TO MATCH EXISTING CEILING HEIGHT UNLESS OTHERWISE DIRECTED BY ENGINEER AREA SHOWN CITY QF QP.T UKW DEC t9 P8a91!f ,CENT` 6. AFTER INSTALLATION OF CEILING, CONTRACT- OR SHALL REINSTALL ESCUTCHEON ON SPRINKLER HEADS, SPEAKERS AND OTHER CEILING MOUNTED FIXTURES TO PROVIDE FINISHED CEILING. 008 REVISION BY DATE KCM KCM, Inc. 1917 First Avenue Seattle ,Washington 98101 Streeter /Dermanis & Associates Architects, AIA Seattle, WA A 8 C 7 D KEY PLAN DESIGNED: IJ DRAWN: CHECKED: AM PD RECOMMENDED: APPROVED: METRO King County Dept. of Metropolitan, Se SCALE: AS NOTED CONTRACT NO. T /M2 -96 SOUTH BASE MAINTENANCE BUILDING HVAC REHABILITATION UPPER LEVEL DEMOLITION & CEILING PLANS A 8 �rl .. r.n s % om/m imi r AAim s • s' iJ r // J r r r ►. sI , I I Iid I I L A M %I A i I Al r irXilj %/ I /f!t% /d%OIK, // —_ t s_/a�//-i/ i'— J iai21i2:02ii ir 'ii %/. %% :Ail I Ri /B /s.I PWI /llssis /•ssil Isirs/.ISSiISI! 1 i . / / % / / % /� /' J %/ / . ' / // , % / v% %% %/ Jam/ , I 1 /r p r�� � / ri.��i mss. t f%/J'/ %/►�� /// /.iJv� Aim im„ ii'i �. i :war sPy avArAr em.o s' iii ji : .: �1JYb Oiii /ii�i//i-r _ri/.ir... 7�ri7 - - .riIKIII .Oiiiii /Iiis�Mr� IAIIM sA'��oi�Jt r� '� % /Jm /fm % % /.' %MI,' /,,%/r�� ; s //s // %rAv ..r 1 / //- ��./ /lls�, �O // -sue..— r /sue ►IVsJ7s� rLi:ISLIs /TIAFsAWoIVANIF MAW /sae mss= ^ s e. =o.~ rus. asps sm 00 �,a6 ` — r / i/ I , / r I�� ��/ r �►/ —/� �� � ..r �/ �„ i ijp)S / rlI II I!}r rI f/ Ms��L %7J1• /i�rssililsL�t //rs�t� �t� /I������s.•ai��rrL ����; /� /J,�JII /�flr..�J Foss- -- = .----- -'is- --- ---.vim y_ „i rs ..rir i� ' %ii'� ► ' ' fi/%rf Isis_ iie■il rJ�.n,Friri�,� ■■��t ��•Jr� %�.� I'�fl� ~► r�� /� %' I, /� %/ WE b t■■t■■ I ■■■.1 �� „�� r1II. / /IV��U..f:1Jt i /�� '// / ►r.. .:Ttt��■ 1■rM ■L t Om. Iii■∎iiisir/.J/.i. 1 �._ �//�� f.7 T, 1■ l leil .... ./ IL / %��I N;1 ..■,I I d� %� /��: /��1 % /j %T �r I r F■ ■ ■■ ■ ■ ■.r ►■% // ►.� iri.ON% 21111 ire J% 1 s 1 %/?j!_' /' `I f / O /ff f■I��Fi... —,, %J • -- / / J :- tilt■,!!!!. /UI.s������� I rr__4 ��r ///'// /I /, j� '1p I ���,I , n ice, • r,-- -ems ����� •s.MS'J/s %li�'4i.�I7�iri / r i.���4G'I :7s� ?.1/1�,.— ,7.� /'-S //�1 if M r /'r ' tang/ ►1�i•I /III■, .,��/i,��i, /i'��111,J'��;1���/ I�1 I/�, �mumi ■■r.. ;inamA, --40-.4142 riJ rars�,_iisi. -J f / ,'f IS�. ` /��� % %.....r... ,.,,�' I % %AM %%% /% .�' A %. 0.t rl . dtr 1M :1—oir4,374-ia' WWW21WWW MO / c�►,■/��.�r.r� •r��rn■.ii ■�' . �// //% "//��- //�/rI I irei/�`ios�.►>./7iloi 1/ 4//.'/1/� . ......, .I. J.�...% 1r./ J; /i / %FIP %91 `�I�t /r /% // I %.E.I%. ■ III '.■, /IL / %� I t• 1', 4 j mow,. ►0..,..,..�. ..�..�. %,. J// / // %/J%I� / / /. ?.t�/�/'60 40 0,4, � w_sJ: ,. ■ ■..�.. ■%..:>,'. rr /.��•r.:� : sip= =ate• ��,••- � -� -�e! !1 6 /.� �1/ ski ���/I /�/ / . © / %I. /. %II. /�_�f. ii._ �u . r _ ���lr ` r /�' // /' '' { /�1 :W#.! A4 Jil'i ., ..,v .�i�- .a%�J i ��� /' % /�� /'' %���I / %JI �Li�1 , /r,'� ►iii; Freero �ir5 r ► iar1.d t .■f.■ , w■.- r..� iii —.,Iii,„,2, r r r 1 - . I comer �I.11il•i��-.ii� .%r.R/ ►� l= iii�'r7♦7w(�/i,/' /' �I �1• J �;�� _� ,/ �i / J/ /.iiit% %J %���I►i.��.r� 'i��� _.�J+`Ji/��s��l��►1V/ Rini �Ala II NINON C —. -1 0 -- - - - -1— EXISTING CEIUNG & LIGHTS TO REMAIN SEE NOTE 4 & 5 I SEE NOTE 7 ' /' fii'//. igp I /.•/ / 4r A/ MPOI — —� I ; mon . ///0 1 • %� III :,. %z i / /.1� iii. . //� r J4!, DISPATCH AREA SEE NOTE 2 Ag NMI 404 &� / /I/� /liAr•i/ 1.WArAY.r��. MAW UMW /• rrp r- i / //-' /// ViMP-Wir //. i" //./II' //%S %IW! /.SE' /di 40/ AraCOng946 eireATA 'eft FOLDING PARTITION TO REMAIN REMOVE & DISPOSE OF EXISTING CEILING PANELS & CEILING SUSPENSION SYSTEM. EXISTING LIGHTS & SPEAKERS SHALL BE STORED FOR REUSE. SEE NOTES 1 THRU 3. t7%-coz7 - FIRST FLOOR DEMO REFLECTED CEILING PLAN AO SCALE: 1/8” = 1' -0" LEGEND EXIST SURFACE MOUNTED FLUORESCENT LIGHT FIXTURE ED EXIST 2X4 FLUORESCENT LIGHT FIXTURE 0 EXIST 1X4 FLUORESCENT LIGHT FIXTURE 0 EXIST 2X2 FLUORESCENT LIGHT FIXTURE O EXIST CAN LIGHTS 0 EXIST HVAC GRILLES O EXIST SPEAKERS SHADED AREAS INDICATE LIMITS OF CEILING DEMOLITION SEE DRAWING A151 FOR ROOF PLAN OVER FIRST FLOOR 0 DEMOLITION NOTES: 1- SOUTH BASE SHALL REMAIN IN OPERATION DURING CONSTRUCTION. CONTRACTOR SHALL SUBMIT ITS PLANS AND SCHEDULE OF WORK IN WRITING TO THE ENGINEER FOR WRITTEN APPROVAL PRIOR TO COMMENCEMENT OF ITS WORK. 2. WORK IN DISPATCH AREA SHALL BE LIMITED TO HOURS BETWEEN 8:00 PM TO 4:00:. 3. CONTRACTOR MUST PROTECT ALL AREAS OF ITS OPERATION IN THE INTERIOR OF OPERATIONS BUILDING AT SOUTH BASE FROM DUST. CONTRACTOR MAY USE 5 ML POLYETHYLENE SHEETS SECURED IN PLACE FOR DUST TIGHTNESS FOR PROTECTION OF WORK STATIONS, EQUIPMENT, CARPET AND OTHER FURNISHINGS. GREAT CARE MUST BE EXCERCISED TO PROTECT ALL EQUIPME & FURNISHINGS. ALL DAMAGED ITEMS DUE TO CONTRACTOR'S OPERATIONS MUST BE REPLACED IN KIND. 4. CONTRACTOR SHALL IDENTIFY ALL DAMAGED LIGHTS, EXIT LIGHTS, & SPEAKERS TO THEE= ENGINEER PRIOR TO COMMENCEMENT OF WORK. REMOVE & STORE ALL EXISTING & IWOO DF CONDITION LIGHTS & SPEAKERS DURING CONSTRUCTION FOR REINSTALLATION. -' PROVIDE TEMPORARY LIGHTING AS REQUIRED. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. 5. DUE TO CONTRACTOR'S OPERATIONS, ALL DAMAGED LIGHTS, EXIT LIGHTS & SPEAKERS 'S BE REPLACED W/ NEW TO MATCH EXISTING, AT NO ADDITIONAL COST TO OWNER. 6. SEE CEILING PLAN ON DRAWING A154 FOR NEW WORK. 7. SEE MECHANICAL DRAWINGS FOR DEMOLITION OF PIPING, DUCT WORK, GRILLES AND TERMINAL UNITS. 8. PROTECT SPRINKLERS IN PLACE. 9. CONTRACTOR SHALL MEASURE CEILING HEIGHT PRIOR TO DEMOLITION AND KEEP RECOR FOR INSTALLATION OF NEW CEIUNG. %i ►/ war �/ ma'am s ■i "i ill r r.iitg101a / / r p %gL /iL■IId pqmprivprpr PrOppprr, wird/I:rip %llV� rdiii'v u l %O�ll ahem %%r% / f,• i/.2 ed. , I /./445•Ji�i,�G- J►.riw/J•, PPPPPr ∎'/AJ'Ifil /►mir /.. e /Ar•./. /./ /. /J/. �1 / /.I /I54re .!t %00%ip p o r //e/ %, 909,�a���S �r %%:I/t!/ 1, ' ■01 r∎ 404444 � / i /s/�i/y� /n ardor ► ► i 111 llailliyi�/'%''il■ifdra lidei� �'/i%4Eff MIME I / it .' ► I' P,/./7iI./%I.,'% Ig2E OW /A'�/N01 %'V /S /I'' I1.111.10V MIA/ :a- - :-- s '/ Iii ,/ �O 1 , /,ar ��3r / or °F0 — I•— • —• —•4i — �O vEp pppOR DE.0 12 1996 B171tU1NG ONIS101, AREA SHOWN SECOND FLOOR DEMO REFLECTED CEILING PLAN n SCALE: 1/8" = 1' -0" MAINTENANCE BUILDING ECEIVED F TLI KEY PLAN KCM, Inc. 1917 First Avenue Seattle ,Washington 98101 Streeter /Dermanis & Associates Architects, AIA Seattle, WA IJ 'DRANK: CHECKED: AM PD RECOMMENDED: METRO King County Dept. of Metropolitan Services SCALE: AS NOTED SOUTH BASE OPERATIONS BUILDING HVAC REHABILITATION REVISION CONTRACT NCx T/M2 -96 A 9 G A 8 c 0 E F 0 H Hill I♦I♦_MI MIMIM M MI MI MI 4 4 4 EXISTING CEILING & LIGHTS TO REMAIN ( 111111 . I Mi.►5iniir•MEMEME►=/.MINI `~�I ---- MINIIMMINIMMINI— 1ti IIIIIIMIIIIIIIIIIIVIIMMIIIIIIIIIINIM IIIIiiiliui ..• 1 IMN MI INEpiNM IIMNM 1IIIME MNNM fit__ i�l___11•__ 1__' / ■E ►t1V'■.■�►1 .1' I { 1 i���%s�M��■.i�.■i� t I /d■■ ►_till■ – IW I =_ =rtl= = =�.E_ . , AEI . ■►_1•Q. 1 ,•111 ®11111 IMMO ii MI tom NNW Inn 1 ■r■■ 0 ■ ■•■1111■! 11 ■ ■ill M � ®ggill1111M1 I�I [vir lErTrl r.1rr7H1p111 ■Gl^1{ ��, -�� ` \ 1:3•111:1111111 II Midi, I =. Irr■r liar ills •Q ■ ■ ■ ■ ■ ■ ■■ • ■ ■ ■7 1���I�I�1 . Iliad= ■t■ D ■i ■1�1 ■: - ■_ ■_ ■ ■i1 ■_■ ■III �� ■'1I ■ -�_ ®n .�� ����_��� \Il 1 l�= rsss. Isms .11■■ �� ■ V.u� -- libili U ! II ,........, ■■ : : : :: i ■.: , = ■��II $ .....■. _ ..... — X111 ILJ■11:_ 1' I I ■ ■■ ■■ ■ ■u. 1■■■■ 1. -��— n 1 ►mot 1..■...... •v....... :u _ I�� ■ ■� ■ ••••o■, ■■� ■1i■urr I ��.1�n j ►mot ►1 : : : : : : : :: .111 : : : : : :.1'�. _ 11I 11 "_..r___ ■ : : : : :: ■ ■ ■ ■ ■■ ,limo ►5.,� n l �.. • :::::............... ;:::1:1. =M0 1A=- =- 1 1 1I= ....t 1,. '� .�.�,�,- �f.�..� .1.1�i�11111Miia = "►-1 41H111111111 InginatIMW NIAIIIMIIIIIR 1 FIRST FLOOR REFLECTED CEILING PLAN DISPATCH AREA SEE NOTE 6 FTU -103 SCALE: 1 /8" = V-0" I I D96 -00:7 LEGEND FfffACOUSTICAL CEILING " TILE ACT -1 -1 24 24" X 48" X 5/8" •••••••■ ■■■rrrr■ ■rrrrr•• •••••••• ACT -2 12" X 12" X 1/2" 2X4 FLUORESCENT LIGHT = 1X4 FLUORESCENT LIGHT ® 2X2 FLUORESCENT LIGHT 0 CAN LIGHTS • SUPPLY AIR DIFUSER • RETURN AIR GRILLE 0 RELOCATED SPEAKERS FIXTURE FIXTURE FIXTURE ACT -1 7YP, SEE ! i TD03 ACT -2 TYP, SEE rTh TD03 o-- 18 SEE DRAWING A151 • CONSTRUCTION NOTES - 1. CONTRACTOR SHALL CAREFULLY INSPECT WORK OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH WORK IS COMPLETE PRIOR TO INSTALLATION OF SUSPENSION SYSTEMS AND CEILING PANELS. 2. ALL WAILS SHOWN IN THE PLAN ARE EXISTING. ANY DAMAGE TO EXISTING WALLS OR HOLES LEFT EXPOSED TO VIEW DUE TO CONTRACTOR'S OPERATION MUST BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. 3. INSTALL ALL LIGHTS & SPEAKERS WHICH WERE STORED FOR REUSE. REPLACE DAMAGED LIGHTS AND SPEAKERS WITH NEW MATCHING IN KIND. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. 4. PROVIDE ACCESS PANELS FOR ACCESS TO MECHANICAL EQUIPMENT IN ACT -2 - ACOUSTICAL TILE AREA. SEE MECHANICAL DRAWINGS FOR LOCATION AND SIZE, 5. CONTRACTOR TO MATCH EXISTING CEILING HEIGHT UNLESS OTHER WISE DIRECTED BY ENGINEER. 6. WORK IN DISPATCH AREA SHALL BE LIMITED TO HOURS BETWEEN 8:00 PM TO 4:00 AM DAILY. 7. AFTER INSTALLATION OF CEILING, CONTRACTOR SHALL REINSTALL ESCUTCHEON ON SPRINKLER HEADS, SPEAKERS AND OTHER CEILING MOUNTED FIXTURES. = "= TO PROVIDE FINISHED CEILING. FOR ROOF PLAN OVER FIRST FLOOR 'AI II I I 1 '1' 1 L• CEILING & CEILING SUSPENSION SYSTEM. SEE NOTES 1 THRU 4 Ns. REVISION BY DATE KCM KCM, Inc. 1917 First Avenue Seattle .Washington 98101 Streeter /Dermanis & Associates Architects, AIA Seattle, WA V A 8 V C T D 1:111:11.111i 1111111111111111 111111111111i1 LIIIIII111111111111111111 1a11■81 1�1■�11 II�IIIu l ►'1'�ii _111 1� ■IINIH1�11�11 ,1.1'■1■Iri�'■Iu l■i■1i ..._ I. ■■.I .11►r 1 -111 1■..,rr ■ ■■ i ■ ■ ■I 111 1E111 Ir ■rrr ■r ■// ■ ■■1 00V MO\ OEC AREA SHOWN P.IIt 01 ^lGO1 \1.,10P1 ECEIVEO."- CITY VCF -TUKW DEC 0 4'16 PERMIT CENT SECOND FLOOR REFLECTED CEILING PLAN SCALE: 1/8" = 1' -0" DESIGNED DRANK: AM IJ CHECKED: PD SCALE. AS NOTED KEY PLAN RMIT C m•n T R 0 King County Dept of Metropolitan Services SOUTH BASE OPERATIONS BUILDING HVAC REHABILITATION DATE. -.'• FE REFLECTED CEILING PLANS • G • I r 1" BS 0 —� 1►r1 Q- 0 01 0 Ex. L [ xlE 1 0 ® 0• 0 0 1 \^ 0® i• 0 0 0 0 1 1 .1 , ► Ia FIRST FLOOR REFLECTED CEILING PLAN DISPATCH AREA SEE NOTE 6 FTU -103 SCALE: 1 /8" = V-0" I I D96 -00:7 LEGEND FfffACOUSTICAL CEILING " TILE ACT -1 -1 24 24" X 48" X 5/8" •••••••■ ■■■rrrr■ ■rrrrr•• •••••••• ACT -2 12" X 12" X 1/2" 2X4 FLUORESCENT LIGHT = 1X4 FLUORESCENT LIGHT ® 2X2 FLUORESCENT LIGHT 0 CAN LIGHTS • SUPPLY AIR DIFUSER • RETURN AIR GRILLE 0 RELOCATED SPEAKERS FIXTURE FIXTURE FIXTURE ACT -1 7YP, SEE ! i TD03 ACT -2 TYP, SEE rTh TD03 o-- 18 SEE DRAWING A151 • CONSTRUCTION NOTES - 1. CONTRACTOR SHALL CAREFULLY INSPECT WORK OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH WORK IS COMPLETE PRIOR TO INSTALLATION OF SUSPENSION SYSTEMS AND CEILING PANELS. 2. ALL WAILS SHOWN IN THE PLAN ARE EXISTING. ANY DAMAGE TO EXISTING WALLS OR HOLES LEFT EXPOSED TO VIEW DUE TO CONTRACTOR'S OPERATION MUST BE PATCHED AND FINISHED TO MATCH ADJACENT SURFACES. 3. INSTALL ALL LIGHTS & SPEAKERS WHICH WERE STORED FOR REUSE. REPLACE DAMAGED LIGHTS AND SPEAKERS WITH NEW MATCHING IN KIND. SEE SPEC SECTION 16500 FOR DETAILED INFORMATION. 4. PROVIDE ACCESS PANELS FOR ACCESS TO MECHANICAL EQUIPMENT IN ACT -2 - ACOUSTICAL TILE AREA. SEE MECHANICAL DRAWINGS FOR LOCATION AND SIZE, 5. CONTRACTOR TO MATCH EXISTING CEILING HEIGHT UNLESS OTHER WISE DIRECTED BY ENGINEER. 6. WORK IN DISPATCH AREA SHALL BE LIMITED TO HOURS BETWEEN 8:00 PM TO 4:00 AM DAILY. 7. AFTER INSTALLATION OF CEILING, CONTRACTOR SHALL REINSTALL ESCUTCHEON ON SPRINKLER HEADS, SPEAKERS AND OTHER CEILING MOUNTED FIXTURES. = "= TO PROVIDE FINISHED CEILING. FOR ROOF PLAN OVER FIRST FLOOR 'AI II I I 1 '1' 1 L• CEILING & CEILING SUSPENSION SYSTEM. SEE NOTES 1 THRU 4 Ns. REVISION BY DATE KCM KCM, Inc. 1917 First Avenue Seattle .Washington 98101 Streeter /Dermanis & Associates Architects, AIA Seattle, WA V A 8 V C T D 1:111:11.111i 1111111111111111 111111111111i1 LIIIIII111111111111111111 1a11■81 1�1■�11 II�IIIu l ►'1'�ii _111 1� ■IINIH1�11�11 ,1.1'■1■Iri�'■Iu l■i■1i ..._ I. ■■.I .11►r 1 -111 1■..,rr ■ ■■ i ■ ■ ■I 111 1E111 Ir ■rrr ■r ■// ■ ■■1 00V MO\ OEC AREA SHOWN P.IIt 01 ^lGO1 \1.,10P1 ECEIVEO."- CITY VCF -TUKW DEC 0 4'16 PERMIT CENT SECOND FLOOR REFLECTED CEILING PLAN SCALE: 1/8" = 1' -0" DESIGNED DRANK: AM IJ CHECKED: PD SCALE. AS NOTED KEY PLAN RMIT C m•n T R 0 King County Dept of Metropolitan Services SOUTH BASE OPERATIONS BUILDING HVAC REHABILITATION DATE. -.'• FE REFLECTED CEILING PLANS • G •