Loading...
HomeMy WebLinkAboutPermit B93-0108 - BARGHAUSEN RESIDENCE - MASTER BEDROOM AND HALLWAYBARGHAUSEN REMODEL B93-0108 City of 7iukwi16. , (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 BUILDING PERMIT Permit No: B93 -0108 Type: B -BUILD Category: ASFR Address: 16440 53 PL S Location: Parcel #: 779640 -0140 Zoning: Type Const: V -N Gas /Elec: ELEC Wetlands: Water: TUKWILA Contractor License No.: SILVEHI104C3 TENANT OWNER CONTRACTOR CONTACT Status: ISSUED Issued: 05/20/1993 Expires: 11/16/1993 Type of Occupancy: DWELLING Slopes: Y Sewer: TUKWILA BARGHAUSEN REMODEL 16440 53 PL S, TUKWILA, WA 98168 BARGHAUSEN THOMAS A 16440 53 PL S, TUKWILA, WA 98168 SILVERSTAR HOMES 18215 72 AVENUE SOUTH, KENT, WA 98032 DANIEL B. GOALWIN 18215 72 AVENUE SOUTH, KENT, WA 98032 • Phone: 206 251 -6222 Phone: 206 251 -9488 Phone: 206 251 -6222 ***** *k ** ** **** ****• *** *** **** * *** * ***** * * * **** *•k**** ******* **** *fir *** ***•kk** Permit Description: ADDITION TO EXISTING MASTER BEDROOM, ADD HALLWAY Units: 001 Buildings: 001 Fire Protection: DETECTORS UBC Edition: 1991 SETBACKS Front: .0 Back: .0 Left: .0 Right: .0 Valuation: 16,800.96 Total Permit Fee: 301.50 * * *• ***** k******************************** * * * * * * * * * * *•k * * * * * ** * * * * ** *** ** 41, rm t Center Authori d Signature �> y Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this ping permi - -� — Date: -- ,� 03 Tit 1 e :. /451 f,KY This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Signature: Print Name: fK MP" sex: F' fiCW,isbSY!tTir7:i!rwaG:"':w,+A n tVA,A`, 1wltM1r�ffC'',r'�,s`�,z,"!,1' F9:v,���k"f!:!1»; 1°• S�';M,7:a'ax.;�„��4'�atr�tu�wt�, ,.. �;1,'�!,4+at:txtn'Lr:,.�1, z w 6 -I U0 U0 CD uJ J= w0 gQ N =d w z� zI- L1.1 w n O - O F- WW H 17- LL'O wz U= O~ z CITY OF TUKWILA Address: 16440 53 PL S Permit No: B93 -0108 Tenant: BARGHAUSEN REMODEL Status: ISSUED Type: B -BUILD Applied: 03/23/1993 Parcel #: 779640 -0140 Issued: 05/20/1993 *• k** k*k**************• kQ• k*** k•kk****-k*****k *kkkkk*kkk*•kl kkkkk ******k•kk**kkk* Permit Conditions: 1. No changes will be made, to:the plans unless approved by the Tukwila Building Division, 2. Electrical permit shall be obtained. through the Washington State Division of Labor a'nd`Industries and all electrical work will be.inspected by that agency (248- 6657). • 3. All permits, .inspection_records,.and approved plans shall be maintained available at the job site prior to the start of any construction. These documents are to be maintained available until final inspection approval is granted. 4. Any exposed insulations backing material shall have a Flame Spread Rating of 25 or less, and material shall bear identi- fication showing the fire performance rating thereof. 5. All new windows to be installed shall have a tested U -value of 0..58 (or less) and shall bear the manufacturers label. 6. A11 c•onstruction to be done in.conformance with approved plans, and requirements of the Uniform Building Code (1991 Edition) as amended by the Washington State Building Cod, Uni:fo`rm Mechanical Code (1.991 Edit;ion), and Washington State Energy Code (1991 Second Edition). 7. Validity . of Permit:. The issuance of a permit or approval . of plans, specifications and computations shall not be con - strued to be a permit for, or an. approval of,•any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit' presuming to :,give authori,tyor violate or cancel the provisions of this code shall bee valid. it`i zf.A7 '�?�rett !b7tw" kYY..al a samideeogsfiXdYRIG z z rew 6U 00 w J F=- rnw wo �Q =d � w z= H zo w w U � O D- o e - - w W LL- 0 W • = O 1- z BUILDIN PERMIT APPLICATION CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER - c)/0 iiir.'or.:: '•Yh 'r: : iY .•5:1ff;.::'• /:i/i %����• ',•.'..: ` 7.::%1.,:.`::r %f: DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE PLAN CHECK FEE / W. CO SO BUILDING USE (office, warehouse, etc.) � - -c BUILDING SURCHARGE 5�i SQUARE FOOTAGE - Building: . ia(),{ , Tenant Space: Area of Construction: 0, ./S;,L- OR HAZARDOUS MATERIALS IN THE BUILDING? WILL THERE BE STORAGE OR USE OF FLAMM • BLE, COMBUSTIBLE No ❑ Yes IF YES, EXPLAIN: OTHER: TOTAL - )1,5 ) SITE ADDRESS SUITE # / &��o 63 /-1 /-- ep e,e��t VALUE OF CONSTRUCTION - $ (, ',,, c & di,„1 O PROJECT NAME/TENANT /e: -/ 94-e', AZki ASSESS• - • CCOUNT # , :•• i : 'trirrr''/7' "V 779m49-710 (commercial) ❑ Demolition (building) ❑ Other. TYPE F ❑ New Building N. Addition ❑ Tenant Improvement WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) DESCRIBE WORK TO BE DONE: G ea( /0 Xis / /'44 4,e�vcvOit �r/ vet v • ✓�2 c� iu vZ BUILDING USE (office, warehouse, etc.) � NATURE OF BUSINESS: A_ requirements may need to be met. Please explain: WILL THERE BE A CHANGE IN UST-?-21 No ❑ Yes If Yes, new building SQUARE FOOTAGE - Building: . ia(),{ , Tenant Space: Area of Construction: 0, ./S;,L- OR HAZARDOUS MATERIALS IN THE BUILDING? WILL THERE BE STORAGE OR USE OF FLAMM • BLE, COMBUSTIBLE No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER r iewea A 2,�� /ee,e5e fr PHONE ZS-� (.z7 Z 6 ADDRESS / q3rcl i r, ��! /(fit IZIP PHONE � � CONTRACTOR cJl1(.,C/15h°y! ���/ 2., —L, - hke..�r r `, ADDRESS /g- 7ZNa Ae .5;ezi 4 / iaf ZIF30 5 2 WA. ST. CONTRACTOR'S LICENSE # v/L V6// le4G EXP. DATE ,c Z�� /9// ARCHITECT i\/14 PHONE / ADDRESS ZIP HEREBY : CERTIFY: THAT 1; HAVE = AD: AND'EXAMIN D: •THIS;;APPLICATION;AND. KNOW: THE SAME TO BE <TRUE'.AND: CORRECT; 'AND' .:AM • UTHORIZED' T AAPPLY FOR THIS;:P.ERMIT, BUILDING OWNER OR AUTHORIZED AGENT SIGNATUR , �A' c_.- --L_____\"__ DATE 5/2-3 jI 3 PHONE / 2� / 6Z z Z PRINT NAME / Jaw / /�. e'= .6CC2�l�L ADDRESS/ ,is 2" �e . i CITY/ZIP Z. Aa 3Z CONTACT PERSON c / .4e / / / e /Ar PHONE0.s ./_vZZ Z APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for acti;ab _,i 'ad not exceeding 180 days upon written request by the applicant as defined in Section 304( )rof ode (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED yR 2 3 1993 DATE APPLICATION EXPIRES - 9:j 03/ 16/01 z �Z CL w JU 000 W= F- LL w0 u_ Q 1. a in z= w1- • w U� O — CI— LL! uj • ci LI Z w U= O ▪ 1- z L COMMERCIAL SUBMITTAL CHECKLIST NEW. COMMERCIAL BUILDINGS /ADDITIONS Completed building permit application (one for each structure) 'Assessor Account Number Two sets (2) of the following :Specifications. Structural: calculations stamped by a Washington State licensed, .,engineer. Soils report stamped by a: Washington State licensed engineer :Topographical survey. El .Energy calculations stamped by a Washington State licensed . engineer or.architect [Legal description Working drawings, stamped by a Washir.gton State licensed architect,: which. include: •:Site elan • ..Architectural drawings Structural drawings Mechanical drawings • Elevations .: • .7 Civil drawings Landscape plan Completed utility permit application one for entire project) Six (6) sets of civil drawings NOTE .See Utility permit application and checklist for specific utility submittal requirements } RACK STORAGE Completed building permit application Assessor Account Number wo (2) sets of plans which include Building•floor plan showing Entire space where racks will be located. • Exit 'doors • Dimensions: of all aisles :Tenant space floor plan showing rack storage layout, aisles and exits •• . • NOTE Include dimensions of racks (height :width and length).; aisles:. and exit ways on plan.. • :Structural calculations stamped by a Washington State license engineer (rack storage 8` and over) RESIDENTIAL COMMERCIAL TENANT IMPROVEMENTS Completed building permit application (one for each structure or tenant) Assessor Account Number Two (2) sets of construction plans, which include: Site plan • Location of tenant space • Existing and proposed parking • Landscape plan (if applicable, i.e., change of use).:: Overall building plan .. • Tenant location • Use of adjacent (common wall) tenant •.Overall dimensions of building or square footage Floor plan of proposed tenant space. • Tenant space plan with use of each room labelled.. • Exit doors, egress patterns: • • New walls, existing wall, and walls to be demolished: Construction: details • Cross sections showing wall construction and method of :.attachment for floor and ceiling Structural calculations stamped by. a Washington State licensed engineer may be required if structural work is to be:done •(2 sets) NOTE :: /1 any utility work is to be done; submit separate utility permit :application and. plans REROOF. • Completed building permit application (one! for each structure Assessor Account'Number Narrative describing` existing roof, material being removed, an' material being installed NOTE: .A certification letter is required prior to final inspection and sign- off of the permit it ANTENNA/SATELLITE'DISHES Completed building permit application. Assessor Account Number :• Two (2) sets'of.plans which include Site Plan - (showing building and location of antenna/satellite • Detalis.antenna/satellite dish and method:of attachment: Structural calculations stamped by a <Washington State license engineer may be required EW .SINGLE - FAMILY.: DWELLINGS /ADDITIONS:' Completed building permit application one for.each'structure RESIDENTIAL: REMODELS Legal description;; Assessor Account Number: wo sets (2) of. working; drawings which.include :: Site plan a>~. ion plan show.closesthydranrbcation: Foundation plan • tndude access. to building; showing • Floor . plan width and length of access:): • Roof plan •• •Buildingelevations(all views • Building cross- section tnictural; framing plans Washington`StateEnergy Code data onipleted utility permit applicati' Six (6) sets of site plans showing titilitiec`. NOTE: Building site plan and utility site plan may be combined.: See utility. permit application and checklist for specific submittal requirements. Additional topographical and soils information maybe required if unique site; conditions Completed building .permit application: Assessor :Account Number: one for each structure Two (2) sets`of working drawings; whichi include: • Site plan • 'Foundation. plan Floor plan Roof plan Building elevations (all views Building cross - section Structural framing plans NOTE if any utility work is to be done provide utility permit application:. and plans must be submitted. : REROOFS Completed building permit application Assessor. Account Number Narrative, describing existing roof, material being removed, and, material being installed.. :. `' • NOTE: A certification letter is required prior to final inspection and •sign: •`: off of the permit,. 41111111 CITY OF TUKWILA _ g Department of Corr;., 'unity Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Building Permit Application PLAN CHECK NUMBER 1393- PR JECT NAME ( f Ac �PrU.SE 0c E. L SITE ADDRESS f (p #-O I) C5 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPARTMENT ' DATE IN DATE APPROVED REQUIREMENTS / COMMENTS BUILDING - initial review ' Z3�3 730/1:13K. (ROUTED) CONSULTANT: Date Sent - Date Approved - BY: (init.) O FIRE BY: (init.) FIRE PROTECTION: [ j Sprinklers J Detectors LJ N/A FIRE DEPT. LETTER DATED: INSPECTOR: INIT: LANNING 3f 113 (ZONING: E1 AR/LAND USE CONDITIONS? 'Yes No REFERENC FILE NOS.: / j INIT: MINIMUM SETBACKS: N- S- E- W- OPUBLIC � WORKS / ,,L.yt /p„. UTILITY PERMITS REQUIRED? ( ) Yes U No PUBLIC WORKS LETTER DATED: , ! INIT: I O OTHER INIT: BUILDING - final review of +WW • 02 lib o TYPE OF CONSTRUCTION: 04 04 CERT. OF OCCUPANCY? Oyes XNo UBC EDITION (year): 199 1 IINI .. � dial 5 BUILDING • FFICIAL ;.: • INIT: / .. REVIEW COMPLETED AMOUNT OWING:�k 11 l $'.Q CONTACTED vim 1 , 1P7�1 t? Ci BY: (init.) _WD DATE NOTIFIED 2nd NOTIFICATION BY: (init.) 3RD NOTIFICATION BY: (init.) 01/08/93 FFF * * *:k ** k:k ***4 *:k * * * *k k *:k * * ** * * * * *4k *** hh** **k *:k *•k *•k•A ** k k *k *•A ** A* k* CITY OF TUKWILA, WA TRANSMIT ***4*•k*kk•k***** *4** * *k:1 *4k•kk**•A *, k ***k****:k***k****4 **4•k**k**4* TRANSMIT Number: 94000512 Amount: 180.00 05/0.1/9 / x.40 Permit No 893-0108 Type: 0 -BUILD BUILDING PERM Parcel No: 779640-0140 Site Address: 16440 53 PL 5 Payment Method: CHECK Notation: BARGHAUSEN, TOM Init: DLM ** k•*** k• k** k* k************** **** *kA* ***** * *** * *•k * *•k *A*kk* * * *k * ** Paid Account Code Description 000/322.100 BUILDING •- RES Total (This Payment): Total•Fees: Total All Payments: Balance: • ;:haUi zAia'.i:�.e�oYS idrtirlt}ii"�'4�+"C 481.50 481.50 .00 180.00 180.00 GENERA 180.00 TOTAL 180.00 CHECK 180.00 CHANGE 0.00 1667A000 0908 '•idi" �3ff5� i5A. 'mssE .t•= , g�LkR;�Rr�!"v XF z ~ W 6 -JU UO NO J F- N u. WO u-Q co = Ci �w z= I— O I- w U� O - o ff U L"O w z U= O I•- z ..r. c.r1m.4-•kv:K•r, rrr„rfi!a „arwr T^ fit•' ,. :, tie -' ***** *****•k** **** ********k* ** ****;l * *4***h*** ** ****** * ** * *4 *•k ** ** CITY OF 1'UKWILA, WA TRANSMIT * ** * ** * * ** * ** *** * *: ************** * ** ** ** * * * * * ** *** * *** * * * ** *4 * ** TRANSMIT Number: 93000624 Amount: 184.50 05/20/93 12:16 Permit No: B93-0108 Type: B--BUILD BUILDING PERMIT Site Address: 16440 53 PL S Payment Method: CHECK Notation: T. BARGHAUSEN IntlEapi 0 *•*** ** * **•k* * ** * ***•k * ***** heir*** **** *** *** ** * ********* ** *fie *** ***fie* Paid 180.00 4.5() 184.50 Account Code 000/322.100 000/386.904 Description BUILDING - RES STATE BUILDING SURCHARGE Total (This Payment): Total Fees: Total All Payments: Balance: 301.50 301.50 .00 GENERA 180.00 GENERA 4.50 TOTAL 184.50 CHECK 184.50 CHANGE 0.00 0880A000 15:00 z I- Z w QQ � —.1 C.) 00 (/)O W LUX W 0 ga co I �w z I-0 z 1- W • W O • N CI 1- ww 1- O w z 0 I z ***•**********•*• k********•*: k*********• ********k**** *****k**** **k *h:k* CITY OF TUKWILA, WA TRANSMIT *** ** ***** * ** **** * ** *** ** *** ******** * **h•****•. .fk******k*** **** **•* TRANSMIT Number:. 93000364 Amount: 117,00 03/23/93,�,)�. 15 Permit No B93 -0108 Type: B -BUILD BUILDING PER fZ'i�Y/ ` Site Address: 16440 53 PL 5 Payment Method: CHECK Natation: DANIEL GOALWIN Init: SAO ** ** * * * * * * * **4 *** * * * * * * * * *** **** *fir ***•kit * * * *• *• * *•k *A •k* *** *•k *** * ** *•k Account Code 000/345 . 830 Description PLAN CHECK - RES Total (This Payment): Total Fees: Total All Payments: Balance: 301• . 50 117.00 184.50 Paid 117.00 117.00 ;:t,k.,r,h..�,+:. • !:i�! ,`i=�9 •irr•k7iiu c�Yu�y ,i„1; 'r.i:ghlrrlcud ifi4{4hid'adtiv414f +:a avkiz'.ia:ii li 4d:a`l:i GENERA 117.00 TOTAL 117.00 CHECK 117.00 CHANGE 0.00 9i.17A000 17.16 4 Z W ce JU 00 co 0 J= W • O LLQ =a 1.. W z= I- Z I— W W U� O D. O H WW z 1— uO z U= O z Oct 03, 1994 City of Tukwila John W. Rants, Mayor Department of Community Development Rick Beeler, Director DANIEL B. GOALWIN 18215 72 AVENUE SOUTH KENT, WA 98032 RE: BARGHAUSEN REMODEL Dear Permit Holder: i Our records indicate that on Nov 16, 1994, one hundred and eighty days will have passed with no inspections having been called for under Tukwila Building Permit Number B93 -0108. Unless you call for an inspection, or obtain a written extension from the Tukwila Building Official prior to that date, your above referenced permit will become null and void on Nov 16, 1994. If your project has been completed please call for final. If you are actively working on it please notify our office. If you have any questions or need further information.to obtain an extension on your permit, please call the Tukwila Building Divison at 431 -3670. Sincerely, She( lie Bates /Sylvia dsby Permit Technicians Department of Community Development 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431 -3670 • Fax (206) 431-3665 'sk''SIS?i. .F`A- a a :44i1itOdszlw'lf'ita'k+a" mSv,gfr,r,. WIT,,, z Z 00 CO cn w 1 �LL w0 H 0- CI f- ww � u O wz = F. z Ms. Denise Millard City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES May 2, 1994 RE: Building Permit Extension for Barghausen Remodel Dear Ms. Millard: Pursuant to your letter of April 15, 1994, I am pleased to enclose a check in the amount of $180 to extend the above - referenced permit. I understand this will be the final extension for this permit. If the work is not started, we will resubmit the application again for a new review. Thank you. Respectfully, �JC Thomas A. Barghausen, P.E. President TAB /ps 055 enc: As Noted cc: Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. RECEIVED MAY 0 51994 DEVE OPMENT 18215 72ND AVENUE SOUTH KENT, WA 98032 (206) 251 -6222 (206) 251 -8782 FAX .,. 9.:Si6 ii: ;.ba1�;.'.•X i ij:N +diti s:i�.�irt+ :+z47'�%'i�F1r, . + ti, `� u,� ;�r Nt- u�.�S{is15. ^�G,�i.4 `�llsst�1!LCRS'�e26114: ".'�:'�' 1�3. iw�'? fr`. ti��+`f' Si1: ��t.. yY .,' « °,�...�1�t5�t':d,"ir�?'�� z ~ w cQQ� JU 00 W J = • LL W O 2 �a =a w z� I- O z w W O ▪ Y2 . oI- wW • 0. O uiz 0 22 t= O~ z City of Tukwila John W Rants, Mayor Department of Community Development Rick Beeler, Director April 15, 1994 Mr. Thomas Barghauscn Barghauscn Engineering 1821572AVS Kent, , WA 98032 Dear Mr. Barghausen: Our records indicate a request for extension was granted November 19, 1993. Your request for an additional six month extension will be granted under the following conditions: 1. A fee of $180.00 is required for this extension. 2. This extension will expire November 16, 1994. No further extensions shall be granted. 3. If work is not commenced within 180 days or your project is abandoned you must apply for new permit. Resubmittal of plans, application and fees will be required. If you have any questions or concerns please contact me at 431 -3672. Sincerely, ,&ZG'e /7. Denise Millard DLM/dlm 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665 z re w QQ= J0 00 0 CO Ill a= w0 LQ 2d H w z= F- 0 w~ • w U 0 O N O H W W' u-O wz 0= O ~ z CITY OF TUKWILA Id: MISC120 Keyword: UACT User: 1672 Comments regarding an Activity Permit No: B93 -0108 Tenant: BARGHAUSEN REMODEL Status: ISSUED Address: 16440 53 PL S 04/15/94 BUILDING PERMIT Line User Id Text 1 1671 REVISED ENERGY CALCS SUBMITTED 5 -14 -93 BY DANIEL GOALWIN. 2 1672 LETTER MAILED REQUESTING EXTENSION DATED 10- 19 -93. DUE 3 1672 TO FINANCIAL REASONS. ONLY ONE EXTENSION IS GRANTED NO OTHER 4 1672 EXTENSIONS WILL BE ALLOWED THIS PERMIT HAS BEEN MOVED BACK 5 1672 TO EXPIRE IN MAY ON THE 16TH 1994. SEE FILE FOR LETTER. DLM Enter Option: A =Add, C= Change, D= Delete, I= Inspect Up /Down= Select, PgUp /PgDn(F2) =Page, F3 =First 12, ESC =Exit -to& Ms. Denise Millard Permit Coordinator Department of Community Development City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES April 11, 1994 RE: Extension for Barghausen Remodel Permit No. B93 -0108 Dear Ms. Millard: Pursuant to your letter of April 5, 1994, I would like to request another 6 -month extension for the above - referenced building permit application. We need to wait until the dry summer months to begin work on this project because of the potential for rain damage while the remodel is ongoing. Please let me know if a fee is required for this extension. Thank you for your consideration. Respectfully, Thomas A. Barghausen, P.E. President TAB /ps 051 cc: Mr. Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. RECEIVED APR 1 2 1994 COMVIIVIUNITY DEVELOPMENT 18215 72ND AVENUE SOUTH KENT, WA 98032 (206) 251 -6222 (206) 251 -8782 FAX QQ� JU 00 co UJ J �. w0 �w zI I- 0 zH w uj U� aF- w w. H1- U. 0 wz 0E- z Apr 05, 1994 City of Tuk v la John W. Rants, Mayor Department. of Community Development Rick Beeler, Director DANIEL B. GOALWIN 18215 72 AVENUE SOUTH KENT, WA 98032 RE: BARGHAUSEN REMODEL Dear Permit Holder: Our records indicate that on May 16, 1994 one hundred and eighty days will have passed with no inspections having been called for under Tukwila Building Permit Number B93 -0108. Unless you call for an inspection, or obtain a written extension from the Tukwila Building Official prior to that date, your above referenced permit will become null and void on May 16, 1994. If your project has been completed please call for final. If you are actively working on it please notify our office. If you have any questions or need further information to obtain an extension on your permit please call the Tukwila Building Divison at 431 -3670. Sincerely, Denise Millard Permit Coordinator Department of Community Development 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 4313670 • Fax (206) 431-3665 Ms. Denise Millard, Permit Coordinator City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 CIVIL ENGINEERING, LAND PLANNING, SURVEYING, ENVIRONMENTAL SERVICES October 19, 1993 RE: Building Permit No. B93 -0108 - Barghausen Residence Remodel 16440 53rd Place South, Tukwila, Washington Dear Ms. Millard: On behalf of Mr. Tom Barghausen, the owner of the residence, I am formally requesting an extension on Building Permit No. B93 -0108. The owner still intends to perform the remodel once economic factors allow. Would you please extend the permit the maximum of 180 days, which I believe is May 16, 1994.F)' tip). }t_ 101 If you have any questions, comments or need any additional information, please feel free to contact me at (206) 251 -6222. DBG /sm C.385 Daniel B. Goalwin Architect /Project Manager RECEIVED OCT 2 1 1993 COMMUNITY DEVELOPMENT 18215 72ND AVENUE SOUTH KENT, WA 98032 (206) 251 -6222 (206) 251 -8782 FAX z w 000 N 1• _ cn u. w0 Id _ z�. t— 0. Z F- w w U O O C O 1- w• w I- LL. z ui O z Oct 07, 1993 City of Tukwila John W. Rants, Mayor Department of Community Development Rick Beeler, Director DANIEL B. GOALWIN 18215 72 AVENUE SOUTH KENT, WA 98032 Dear Permit Holder: Our records indicate that on Nov 16, 1993 one hundred and eighty days will have passed with no inspections having been called for under Tukwila Building Permit Number B93 -0108. Unless you call for an inspection, or obtain a written extension from the Tukwila Building Official prior to that date, your above referenced permit will become null and void on Nov 16, 1993. If your project has been completed please call for final. If you are actively working on it please notify our office. If you have any questions or need further information to obtain an extension on your permit please call the Tukwila Building Divison at 431 -3670. Sincerely, Denise Millard Permit Coordinator Department of Community Development 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431 -3665 C;`..'f:!'.�sr?`ti'' Yip:' 7ji>.. '.� +w °r::r:i1r,;;t.�u?t.SYt'!. :�;� /.',r�a,•,Ir,to.,ta� z • w ce .J U O 0 u) o • w wJ = w • 0 u. cr)� Ec 1- w z = z0 U.1 • w O • N c u-- wW - 0 wz U= O z CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * `~ REVUE ON SUS a TTAL * * DATE 5/ ///9 3 RECEIVED CITY OF TUKWILA MAY 1 4 1993 PERMIT CENTER PROJECT NAME 25749 47.1,, /� )+J�GPI`,e" 4 8 %3 ' 42,40g ADDRESS CONTACT PERSON ARCHITECT OR ENGINEER PHONE Z 5I -6.7 z PLAN CHECK/PERMIT NUMBER 'eIevo TYPE OF REVISION: ) If € -Gc /lush ) f'ek u ~' '���'S'L® y 1.e & -/ 17" it ,.� V,t VA/ /9 3— SHEET NUMBER(S) G' S "Cloud" or highlight all a rea ons and date revisions. SUBMIT IIbD TO: MMONS Wag) 'Do►Nleyr Fiau.GI compt9 NAVE MGR AREA < 760 'SF 3{-},d,.L E ,ZS,W DOED • Pco 1 DEt AT I. (MPRa0EM6tt'[S (312,2, MpDE ID 741. -a F -ASTI Nc Cc-co 9,400(A CompoN5A(TE -1-Wo) 4cbEFIGIA ES IN 140.0 AooMON z. V0f4 CuAFORmnmic AvDtrioN 4 uw/pyrDEp exis-t-cccct cm) Rawki 514aLc. cizt4OE AN �E-teloci ZzXner a2 -0-E0.T z.oss (oAt cg is G 744-E. cJ N I M pg-0cJED i= aclSTit� 12-LicLott\ti . WITA-It-E.-74DDiTioN V1_24,&oftrz3 Comeil tit)/ 4-4416 Ce5Pg, .H4i/u5D ctwiL 1 c&awis 83 %C�•e' z+N. rJ.Co. wio CAUL THERMAL PERFORMANCE CRITERIA AREA TABLE 4.2U TOTAL UoxAo FLOOR Exist. 2025 .055 111.37 Prev. Add. 452 .055 24.86 New Add. 258 .055 14.19 CEILING /ROOF Exist. 2025 .035 70.87 Prev. Add. 452 .035 15.82 New Add. 258 .035 9.03 WALL . Exist. 2916 .203 591.95 Prev. Add. 700 .203 142.10 New Add. 692.5 .203 140.58 1084.77 SF i" �AS; t• kt.:' fv" iCt�2��a� +ut'ah7;til��.da�1'.tit X ' r "ti:et„ MAR 2 3 1994 M.136 [DBG /cbjl Z w J0 0 0 NO J= �w w0 maw' a D. 2d w Z� I— 0 Zi-- w • w O co 0- 0— W W HI- -0 W .. Z U= 0 Z -2- .;h1..- `ttiNWOxr. * AlgiNPO 4401i'■,;:,f on- V:t40a,' ?4AR 2 3 193 M.I36 [DBG /cbj] DESIGN CRITERIA Assume Existing Area from Original Plan lAREA I TABLE 4.2U f TOTAL Uo x Ao [ (Exist) 813.55 SF FLOOR Prev. Add. 452 .05 22.6 New Add. 258 .05 12.9 CEILING /ROOF Prev. Add. 452 .033 14.92 New Add. 258 .033 8.51 WINDOWS Prev. Add. 102.5 .58 59.45 New Add. 116.0 .58 67.28 GLASS DOOR Prev. Add. 18 .58 10.44 New Add. -0- -0- -0- WALLS Prev. Add. 579.5 .05 28.98 New Add. 576.5 .05 28.83 TOTAL Uo x Ao Added 253.91 SF TOTAL COMBINED 1067.45 SF -2- .;h1..- `ttiNWOxr. * AlgiNPO 4401i'■,;:,f on- V:t40a,' ?4AR 2 3 193 M.I36 [DBG /cbj] ENERGY CODE COMPLIANCE REPORT FOR: Additions for Tom &.Sandy Barghausen Lot 14, Silverview Ring County, Washington PROJECT DESIGNER: REPORT PREPARED BY: Felix L. Touza, P.E. & S Consulting Engineers 175 E. Olive Ave. # 202 Burbank, CA 91502 (818) 841 0303 Job Number: Date: 5/13/1993 RECEIVED CITY OF TUKWILA MAY 1 4 1993 PERMIT CENTER The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. z w UO UD UW F=- W LL. WO LL j. co = i- _ W Z O w w O ▪ — O I- ww IL. ~O li l z • U O I-; O z WASHINGTON STATE ENERGY CODE COMPONENT PERFORMANCE APPROACH ANALYSIS FORM Residential Occupancies Based on Table 5 -1 of chapter 55 -11 WAC (Washington Energy Code) For climate Zone 1, Heating with fuels other than electrical Project: Addition to Tom & Sandy Barghausen's Residence Compliance based on Section 101.3.2.1 WAC Conditioned Floor Area: Component/ Assembly Name GLAZING Exercise Room Windows 2nd Flr Addtn Windows Max. Allowed glazing: (15% of Addtn.Flr.Area) Existing Windows Glass removed by Ex.Rm. Glass rem'd by 2ndFlr.A WALLS Excess glazing( >15% CFA) Existing Walls Exercise Room Walls Walls removed by above 2nd Fl. Addtn Walls Walls removed by above DOORS Main Entry Door CEILINGS /ROOFS Existing Roof Skylight Exercise Room Roof 2nd Fl. Addtn Roof 2025 SF Existing 452 SF First Addition 258 SF Second Addition 710 SF Total Additions EXISTING PLUS CODE - COMPLYING ADDITION Area U -Val. UxA 120 - -- - -- 264 - -- - -- 107 0.650 69.23 813 0.580 471.54 -6 - -- - -- -78 - -- - -- 278 0.062 2916 0.059 551 0.062 -230 0.059 344 0.062 -260 0.059 33 0.400 2021 0.035 24 0.580 452 0.034 258 0.034 FLOORS Existing floor 2025 0.049 Exercise Room floor 452 0.041 2nd F1. Addtn floor 258 0.041 >pv-Ivh?m7ltm kii ra 17.21 172.04 34.16 -13.57 21.33 -15.34 3.3.2 70.74 13.92 15.37 8.77 99.23 18.53 10.58 EXISTING PLUS NON - COMPLYING ADDITION U -Val. UxA Total Area(Ao): 9957 Tot.0 *A: 1006.92 Standard Uo: 0.1011 Proposed Uo: 0.0966 Standard Uo> Proposed Uo: Building Complies n;gur�+ kJ.th 0.5800 0.5800 0.5800 0.5800 0.5800 0.0590 0.0590 0.0590 0.0590 0.0590 0.3870 0.0350 0.5800 0.0350 0.0290 0.0000 0.0000 0.0000 Tot.0 *A: ck i.'`"#�. �.. iepf ,,.1+ _4 . s.a�,. G >K, uyNIiie 69.60 153.12 471.54 -3.48 -45.24 172.04 32.51 -13.57 20.30 -15.34 12.77 70.74 13.92 15.82 7.48 0.00 0.00 0.00 962.21 1 z w ce JU 0 co CJ J = �LL w o 2 LLj PROPOSED CONS`T'RUCTION ThSEMBLY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Date: 5 /13/1993 COMPLY 24 User 2936 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U- VALUE Construction Components Assembly Name: R -19 Resdn'tl Wall Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Framing Material: Wood Framing Spacing: " O.G. Framing Percent: 15.0 % Absorptivity: 0.70 Roughness: Stucco, Wood Shingles Th R -Value Fr (in) Cavity Frame outside Air Film 1. Siding, Wood Shingles 7 1/2" Exposure 2. Plywood 3. Insulation, Mineral Fiber, R- -17.8 4. Gypsum or Plaster Board 5. 6. 7. 8. 9. Inside Air Film 0.17 0.750 0.87 0.500 0.62 * 5.500 17.80 0.500 0.45 0.17 0.87 0.62 5.45 0.45 0.68 0.68 Unadjusted R- Values ADIYUSTMENT Piet PRAM /NG (1 /20.59) x (0.85) + (1 / 8.23) x (0.15) = 0.059 Weight: 8.1 lb /sgft Heat Capacity: 2.55 ;;;;• " • tAl'ii4ri3i �iFtattiex'�'y'G 20.59 8.23 TOTAL U -VALUE TOTAL R -VALUE = .r.�14C3 �'dY' £: 'e?l "y7 :`St'diYi'nII 4 3'4kikS,` S '1 £Q. 1. b"' Snr 0.059 = = = == 16.81 z ~ 1 w r QQL JU 00 CO 0 W = H WO 2 1— W Z F- O Z f— W W U � O N H W w H I- - O wz U - H z PROPOSED CONSTRUCTION ASSEMBLY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & s Consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 COMPONENT DESCRIPTION Sketch of•Construction Assembly ASSEMBLY U- VALUE Construction Components Assembly Name: R -30 Shingle Roof Assembly Type: Roof Assembly Tilt: 22 deg (Tilted Up) Framing Material: Wood Framing Spacing: " O.C. Framing Percent: 10.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R -Value Fr (in) Cavity Frame Outside Air Film 1. Roofing, Wood Shingles 2. Membrane, Vapor - Permeable Felt 3. Plywood 4. Insulation, Mineral Fiber, R -30 5. Gypsum or Plaster Board 6. 7. 8. 9. Inside Air Film 0.17 0.750 0.94 0.010 0.06 0.625 0.77 * 9.250 30.00 0.625 0.56 0.17 0.94 0.06 0.77 9.16 0.56 0.61 0.61 Unadjusted R-- Values ADJUSTMENT FOR FRAMING (1 /33.12) x (0.90) + (1 /12.27) x (0.10) = Weight: 9.5 lb /sgft Heat Capacity: 2.95 0.035 33.12 12.27 TOTAL U -VALUE = TOTAL R -VALUE = !UtitfiiFv,�•.TMSf: ic•?ifi':?t tAVVIIVAMISIV 0.035 28.31 z ~ w re JU 00 U) 0 J = H U) u_ w0 2 �_ (f)d =w I- _ Z_ 1- 0 Z 1- (11 W 0 0- 0 1- ww u' O w ..z co 01— z PROPOSED CONSTRUCTION ASSEMBLY Project Name: Additions for Tom & Sandy Barghausen ;Date: 5/13/1993 Documentation: J & S Consulting Engineers Inc. ;COMPLY 24 User 2936 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U -VALUE Construction Components Assembly Name: R-38 Shingle Roof Assembly Type: Roof Assembly 'tilt: 22 deg (Tilted Up) Framing Material: Wood Framing Spacing: " O.C. Framing Percent: 10.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R -Value Fr (in) Cavity Frame Outside Air Film 1. Roofing, Wood Shingles 2. Membrane, Vapor - Permeable Pelt 3. Plywood 4. Insulation, Mineral Fiber, R -38 5. Gypsum or Plaster Board 6. 7. 8. 9. Inside Air Film 0.17 0.750 0.94 0.010 0.06 0.625 0.77 * 11.500 38.00 0.625 0.56 0.17 0.94 0.06 0.77 11.39 0.56 0.61 0.61 Unadjusted R- Values ADJUSTMENT FOR PRAMING (1 /41.12) x (0.90) + (1 /14.50) x (0.10) _ Weight: 10.3 lb /sqft Heat Capacity: 3.22 0.029 41.12 14.50 TOTAL U -VALUE _ TOTAL R- -VALUE _ 0.029 34.74 PROPOSED CONSTRUCTION ASSEMBLY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U--VALUE Construction Components Outside Air Film 1. Insulation, Mineral Fiber, 2. Plywood 3. Flooring, Carpet and Fibrous 4. 5. 6. 7. 8. 9. Inside Air Film 6 Assembly Name: R -19 Floor(F.19.2x8.16) z Assembly Type: Floor = H Z Assembly Tilt: 180 deg (Horizontal Floor) c JU Framing Material: Wood 0 0 cnw Lux Framing Spacing: O.C. O.C. co u_ Framing Percent: 10.0 % w 0 Absorptivity: 0.70 Roughness: Stucco, Wood Shingles �0 zI- Th R- Value. LLJ Fr (in) Cavity Frame O • S2 0.17 0.17 01_ R -19 * 6.000 19.00 5.94 w w 0.625 0.77 0.77 2 Pad 0.250 2.08 2.08 • Z w U= O F- 0.92 0.92 Unadjusted R- Values 22.95 9.89 ADJUSTMENT FOR FRAMING (1 /22.95) x (0.90) + (1 / 9.89) x (0.10) = 0.049 TOTAL U -VALUE = 0.049 Weight: Heat Capacity: 1.27 TOTAL R -VALUE = 20.27 3.9 lb /sgft A z PROPOSED CONSTRUCTION ASSEMBLY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U -VALUE Construction Components Outside Air Film 1. Softwood, Douglas Fir -Larch 2. 3. 4. 5. 6. /. 8. 9. Inside Air Film Assembly Name: Solid Wood Door z Assembly Type: Door 1 z w Assembly Tilt: 90 deg (Vertical) � Framing Material: None 0 0 co LU Framing Spacing: " O.C. _I Ill F- a) w Framing Percent: 0.0 % w O 2 Absorptivity: 0.70 g Q Roughness: Glass, Paint on Pine H z= 1- O Z I- Th R -Value w Fr (in) Cavity Frame 0 o ON 0.17 0.17 at- 1.750 1.73 1.73 w w 11 0 .Z U= 0 O ~ 0.68 0.68 Unadjusted R- Values 2.58 2.58 ADJUSTMENT FOR FRAMING (1 / 2.58) x (1.00) + (1 / 2.58) x (0.00) = 0.387 TOTAL U -VALUE = Weight: 5.1 lb /sgft Heat Capacity: 1.99 TOTAL R -VALUE = 0.387 2.58 z HVAC ZONE HEATING & COOLING LOAD SUMMARY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. ;Date: 5/13/1993 i ;COMPLY 24 User 2936 HVAC ZONE DESCRIPTION HVAC Zone Name: Heating System Name: Cooling System Name: System Multiplier: Fan Schedule: Peak Load Method: Relative Humidity: SPACES IN THIS ZONE Existing Residence Exercise Room Addition to 2nd Story Whole House YORK B2CH060A06 1 All On Load Calcs COINCIDENT 50 % COOLING PEAK HEATING PEAK SENSIBLE LATENT (Jan 12am) (Jan 12am) (Jan 12am) 67997 (Aug 2pm) 12571 (Aug 2pm) 10156 (Aug 2pm) TOTAL SPACE LOAD 90724 40458 8184 13918 4158 928 530 62560 5616 Duct Gains & Losses: 9072 6256 Return Air Lighting Gain 0 TOTAL SYSTEM LOAD 99796 SYSTEM OUTPUT AT DESIGN CONDITIONS 55330 68816 5616 46430 18627 NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no safety factor, and the HVAC contractor should oversize by a reasonable margin to account for variations in weather conditions and the pick -up capacity required to bring the zone to temper- ature as a result of a setback thermostat. Those responsible for final equipment selection should note that Sensible and Latent Cooling Loads are indicated to allow for accurate comparison with manufacturer's output data. vfit,,.;:,.tt 11.514 .I'i'li t? i ?4%i "ent' f•1;4`�cwF:J « +��i" r),Xa}.�i+ "y; ,b'yh�, � i1t S'Sit ° ?attt},".!ty*.m.I.'Y 3}Sl:Ytai i� z ~ w 6 00 co Ww J F w • 0 u. =• d z1._ I- 0 z I- LL' w Uo 0— o- wW u. O wz U2 P. _ O~ z RESIDENTIAL SPACE HEATING LOAD SUMMATW Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Space Name: Date: 5/13/1993 COMPLY 24 User 2936 Design Indoor Dry Bulb Temperature: Design Outdoor Winter Dry Bulb Temperature: Design Temperature Difference: Conduction R -19 Resdn'tl Wall Solid Wood Door Double Clear (NR Std) Double Clear (NR Std) R -30 Shingle Roof R -19 Floor(F.19.2x8.16) Infiltration: 1.00 x 0.018 x Ventilation: 1.072 x Heating AirFlow: Existing Residence Area U -Value 2916.0 x 0.0595 33.0 x 0.3872 740.0 x 0.8800 73.0 x 0.7200 2025.0 x 0.0353 2025.0 X 0.0493 2025 sf x 9.0 ft x 0.50 AC 2025 sf x 20.0 cfm / 100.0 x x x x 68 F 27 F 41 F �ru NIP .. T. 41.0 41.0 41.0 41.0 41.0 41.0 x 41.0 x 41.0 = TOTAL HOURLY HEAT LOSS FOR SPACE Btu /hr 7113 524 26699 2155 2933 4095 6676 17802 67997 67997 Btu /hr / (1.07 x 37 F DeltaT)] 1714 cfm RESIDENTIAL SPACE COOLING LOAD SUMMARY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 Space Name: Existing Residence Design Indoor Dry Bulb Temperature: 78 Design Outdoor Summer Dry Bulb Temperature: 82 Design Temperature Difference: 4 Conduction R -19 Resdn't1 Wall Solid Wood Door Double Clear (NR Std) Double Clear (NR Std) R -30 Shingle Roof R--19 Floor(F.19.2x8.16) Infiltration: 0.00 x 0.018 x 2025 sf Ventilation: 1.072 x 2025 sf Solar Gain Orient. *Double Clear Double Clear Internal Gain (NR Std) North (NR Std) North Lighting Equipment Occupants Latent Gain Equipment Occupants Infiltration: Ventilation: Op Frac. 1.00 0.00 1.00 Area 2916.0 33.0 740.0 73.0 2025.0 2025.0 F U -Value DETD Btu /hr x 0.0592, x 5.1 = 885 x 0.3872 x 5.1 = 65 x 0.8800 x 4.0 = 2605 x 0.7200 x 4.0 - 210 x 0.0353 x 25.5 = 1824 x 0.0493 x 0.0 = 0 x 9.0 ft x 20.0 cfm Shaded Area SGF 0.0 x 15 + 0.0 x 15 + Area x 2025.0 x 2025.0 x 2025.0 x 0.50 AC x 4.0 - 0 / 100.0 x 4.0 = 1737 Unshaded Area SGF SC 740.0 x 15] x 0.55 = 6105 73.0 x 15] x 0.88 = 964 Heat Gain Cony. x 3.000 x 0.000 x 225 x x 3.413 3.413 100 TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE Op Frac. Area Heat Gain Cony. 0.00 x 2025.0 X 0.000 x 3.413 1.00 x 2025.0 x 225 / 100 0.00 x 0.018 x 2025 sf x 9.0 ft x 0.50 AC x -0.8 1.072 x 2025 sf x 20.0 cfm / 100.0 x -0.8 TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 20734 0 4556 40458 Btu/hr 0 4556 -0 -366 4158 Cooling AirFlow: 40458 Btu /hr / [1.07 x 23 F Delta'r)) = 1641 cfm RESIDENTIAL SPACE HEATING LOAD SUMMARY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 Space Name: Exercise Room Design Indoor Dry Bulb Temperature: Design Outdoor Winter Dry Bulb Temperature: Design Temperature Difference: Conduction R -19 Resdn'tl Wall Double Clear (NR Std) Double Clear (NR Std) R-38 Shingle Roof R -19 Floor(F.19.2x8.16) Infiltration: 1.00 x 0.018 x Ventilation: 1.072 x 'Heating AirFlow: 452 sf 452 sf 68 F 27 F 41 F Area U -Value TD Btu /hr 579.0 x 0.0595 x 41.0 = 1412 103.0 x 0.8800 x 41.0 3716 18.0 x 0.7200 x 41.0 = 531 452.0 x 0.0288 x 41.0 = 533 452.0 x 0.0493 x 41.0 914 x 9.0 ft x 0.50 AC x 41.0 = 1490 x 20.0 cfm / 100.0 x 41.0 = 3974 TOTAL HOURLY HEAT LOSS FOR SPACE 12571 12571 Btu/hr / [1.07 x 37 F DeltaT)) = 317 cfm RESIDENTIAL SPACE COOLING LOAD SUMMARY Project Name: Additions for Tom & Sandy Harghausen Documentation: J & S Consulting Engineers Inc. 1Date: 5/13/1993 i ;COMPLY 24 User 2936 Space Name: Exercise Room Design Indoor Dry Bulb Temperature: 78 Design Outdoor summer Dry Bulb Temperature: 82 Design Temperature Difference: 4 Conduction R -19 Resdn'tl Wall Double Clear (NR Std) Double Clear (NR Std) R -38 Shingle Roof R -19 Floor(F.19.2x8.16) Infiltration: 0.00 x 0.018 x 452 sf Ventilation: 1.072 x 452 sf Solar Cain Orient. Double Clear Double Clear Internal Gain (NR Std) North (NR Std) North Lighting Equipment Occupants Latent Gain Equipment Occupants Infiltration: Ventilation: Op Frac. F F F Area U -Value DETD Btu /hr 579.0 x 103.0 x 18.0 x 452.0 x 452.0 x x 9.0 ft x 20.0 cfm Shaded Area SGF 1.00 x 0.00 x 1,00 x 0.0 x 15 + 0.0 x 15 + Area X 0.0595 0.8800 0.7200 0.0288 0.0493 x 5.1 = 176 X 4.0 - 363 x 4.0 = 52 x 25.5 = 332 x 0.0 = 0 0.50 AC x 100.0 x 4.0 - 0 4.0 = 388 Unshaded Area SGF SC 103.0 x 153 x 0.55 = 850 18.0 x 15] x 0.88 = 238 Heat Gain Conv. 452.0 x 3.000 x 3.413 452.0 x 0.000 x 3.413 452.0 x 225 / 100 TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE Op Frac. Area Heat Gain Conv. 0.00 x 452.0 x 0.000 x 4.413 1.00 x 452.0 x 225 / 100 0.00 x 0.018 x 452 sf x 9.0 ft x 0.50 AC x -0.8 1.072 x 452 sf x 20.0 cfm / 100.0 x -0.8 Cooling AirFlow: .:2t4,,S-;; sly z '0:,44',, ihr1 .;;l V UN',.'i4a4n.Si +J.:t TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 4628 0 • 1017 8184 Btu /hr 0 • 1017 -0 • -82 928 8184 Btu /hr / [1.07 x 23 F DeltaT) ] = 332 cfm Iu z 1 w ct 3_ 00 - t- cu. w0 2 g< I z z1- w U� O - • H wW • O wz U= O~ z RESIDENTIAL SPACE HEATING LOAD SUMMARY Project Name: Additions for Tom & Sandy Barghausen Documentation: J & S Consulting Engineers Inc. Date: 5/13/1993 COMPLY 24 User 2936 Space Name: ' Z Design indoor Dry Bulb Temperature: 68 %27 F Design Outdoor Winter Dry Bulb Temperature: 41 F F-w Design Temperature Difference: Waa z JU Conduction Area U -Value TD Btu /hr U0 - - -- 16 629.0 X 0.0792 x 41.0 = 2042 N z R -13 ShearWall(W2x4. ) Double Clear (NR Std) 116.0 x 0.8800 x 41.0 _ 4185 w o R -42 Shingle Roof 258.0 x 0.0273 x 41.0 = 288 258.0 x 0.0493 X 41.0 522 5 R -19 Floor(F.19.2x8.16) u. Infiltration: 1.00 x 0.018 x 258 sf x 9.0 ft x 0.50 AC x 41.0 = 851 = w Ventilation: 1.072 x 258 sf x 20.0 cfm / 100.0 x 41.0 = 2268 F._ zi._ TOTAL HOURLY HEAT LOSS FOR SPACE 10156 Z 1-0 w Heating AirFlow: 10156 Btu /hr / (1.07 x 37 F DeltaT)] = 256 cfm D 0 0I- wW ~E= �O aim U= 0 I- z Addition to 2nd Story RESIDENTIAL SPACE COOLING LOAD SUMMARY Project Name: Additions for Tom & Sandy Sarghausen Documentation: J & S Consulting Engineers Inc. bate: 5/13/1993 COMPLY 24 User 2936 Space Name: Design Indoor Dry Bulb Temperature: Design Outdoor Summer Dry Bulb Temperature: Design Temperature Difference: Conduction R -13 ShearWall(W2x4.16) Double Clear (NR Std) R -42 Shingle Roof R -19 Floor(F.19.2x8.16) Infiltration: 0.00 x 0.018 x 258 sf ventilaticn: 1.072 x 258 sf Addition to 2nd Story 78 F 82 F 4 F Area U-Value DETD 629.0 x 0.0792 x 5.1 116.0 x 0.8800 x 4.0 258.0 x 0.0273 x 25.5 258.0 x 0.0493 x 0.0 x 9.0 ft x 0.50 AC x x 20.0 cfm / 100.0 X Shaded Solar Gain Orient. Area SGF Double Clear (NR Std) West [ 0.0 x 15 Internal Gain Lighting Equipment Occupants Latent Gain Equipment occupants Infiltration: Ventilation: 4.0 4.0 Unshaded Area SGF SC Btu /hr 254 408 179 0 0 221 + 116.0 x 73) X 0.55 = 4657 Op Frac. Area Heat Gain Conv. 1.00 x 1.00 x 1.00 x 258.0 258.0 258.0 x 0.457 x 3.413 x 8.000 x 3.413 x 225 / 100 TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE Op Frac. Area Heat Gain Conv. 1.00 1.00 0.00 x 0.018 x 258 1.072 x 258 x 258.0 x 0.000 x 3.413 x 258.0 x 225 / 100 sf x 9.0 ft x 0.50 AC x -0.8 sf x 20.0 cfm / 100.0 x -0.8 TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 403 7044 581 13918 Btu/hr 0 581 -0 -47 Cooling AirFlow: 13918 Btu /hr / (1.07 x 23 F DeltaT)j = 564 cfm 530 z ce w QQ� JU O 0 co J z F- w 0 d 1- w z= w1- U• � O - O E- w W 11O wz U= 0 z