HomeMy WebLinkAboutPermit 6212 - Bitzig Residence - Garage(Tuij@,ty
(wig4eD)
15P�ala.
.
BUILDI3 PERMIT
(POST WITH INSPECTION CARD AND PLANS
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Dept. of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDING
PERMIT NO. Loa I a
DATE ISSUED:
SITE ADDRESS
FEES. ..
RCPT #
DATE
BUILDING PERMIT FEE
108.00
1168.
(A• 1'Gi0
9 -05 -90
PLAN CHECK FEE
70.00
1361
BUILDING SURCHARGE
4.50
HOZ-
cl_. "t '95
OTHER:
ADDRESS
ZIP
• CODE'.`.COMPLIANCE.,
TOTAL -
182.50
APPROVED FOR
ISSUANCE BY:
USE ,.
PLAN CHECK NO.: 90 -376
PROJECT ,•INFORMATION%
SUITE #
VALUE OF CONSTRUCTION - $
9,123.00
4049 S 128 St
PROJECT NAME/TENANT Bitzig, Chris & Terry ASSESSOR ACCOUNT # 734060- 0744 -0
TYPE OF ❑ New Building 0-Addition (J Tenant Improvement (commercial) U Demolition (building) LJ Grading/Fill
WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ® Other: Garage reconstruction
DESCRIBE WORK TO BE DONE:
Reconstruct garage from ,another site on a new foundation.
PROPERTY OWNER Chris & Terry Bitzig
PHONE 246 -4773
ADDRESS 4049 South 128th Street, Tukwila, WA
ZJP 98168
CONTRACTOR
Elliott Bay Construction
PHONE 878_1410
ADDRESS
2311 Kent Des Moines Road, Seattle, WA
ZIP 98198
WA. ST. CONTRACTOR'S LICENSE # ELLIOBF119PB
EXP. DATE 10 -02 -90
ARCHITECT
PHONE
ADDRESS
ZIP
• CODE'.`.COMPLIANCE.,
:...
APPROVED FOR
ISSUANCE BY:
USE ,.
/
/
/
/
/
FLOOR _a-
W
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
TOTAL
'
TYPE OF CONST.: v_N UBC EDITION (year) 1988
SETBACKS: N _ S _ E-
W _
FIRE PROTECTION:
❑Sprinklers ❑ Detectors x❑ N/A
UTILITY PERMITS REQUIRED? Yes
❑
No (through
® Public Works
ZONING:
BAR /LAND USE CONDITIONS?
❑ Yes 0 No
CONDITIONS (other than those noted on or attached to permit/plans)
Ilk
n�
APPROVED FOR
ISSUANCE BY:
��
i I N ' ��' r' BUILDING
-� OFFICIAL MM.
DATE _
h t be true and correct
All provisions of lav
I hereby certify that 1 have read and examined this permit and know t e same o
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this perm'
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or e rformance of liar authorized to sign for and obtain this building permit.
•
SIGNATURE:
PRINT NAME: eilie/ S`T(�9 � i ► IT 21 -G COMPANY:
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
CERTIFICATE OF DATE ISSUED:
OCCUPANCY NO.
z
�Z
000
CO
CO LL1
__
H
WO
�<
I- ▪ W
z=
I- 0
Z I—
W
0• 0
O -
O I—
W W
I —
L I-
- 0
Z
W
U=
O ~
z
CITY OF TUKW LI A "le-
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILDUG PERMIT
APPLICATION
:: ... ..........
..APPLICATJON'.MUST • 8E•
F!LLEt7 'OU7" :CUMPLETEL 1�
SITE ADDRESS
4 -04q
PROJECT NAME/TENANT
CHRiS ► c e y
TYPE OF U New Building U Addition
WORK: ❑ Rack Storage ❑ Reroof
SUITE #
DESCRIBE WORK TO BE DONE:
RQ cOt\ --) WuCT F-RO►'Yl A► Hey s
VALUE OF CONSTRUCTION - $
ASSESSOR ACCOUNT #
�73�fo Coo - cflLf Li- 0
U Tenant Improvement (commergial) U..pemoiition (building)
❑ Remodel (residential) Other' : e c O - f:∎_c- e tv
BUILDING USE (office, warehouse, etc.)
GeIRAGC.
NATURE OF BUSINESS:
Cdr' OO Lt r•J OAT I U kv
WILL THERE BE A CHANGE IN USE? (,X No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 590 Tenant Space:
Area of Construction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? No ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER
ADDRESS 4049 S _
sue. TLW (>-)it,q ! -
CONTRACTOR :•"•e +7..9 ?o o tER C f'✓ LL i OT.
ADDRESS
PHONEE�6,_4 -/.-I 3
ZIP( (
PHONE vs -1410
311 e_ t- - -r of n e Rd 'Smite
WA. ST. CONTRACTOR'S LICENSE # - _: 10 E3
ARCHITECT
ADDRESS
L_ -ED SVI1d1�f�
ZIPCf7)l9S.
EXP. DATE 0- � J
PHONE
ZIP
IEREBY CERTIFY THAT I H,
UE AND,CORREC.T, :ANO 1
BUILDING OWNER
OR
AUTHORIZED
AGENT
' ;READ AND EXAMINED THIS APPLICATION:,
Y' u QR:1_ZED TO LY;I OR Tl f( PERMIT:'
ADDR3S+
7--/AN) 5 I � n�
CONTACT PERSON
C/ -7/R .S
DATE-, S—_ 5?0
PHONE
a46--773
CITY/ZIP
- ruKtutcA }8 /6R
PHONEa 16-4 77,E
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Unif
Building Code (current edition). No application shall be extended more than once.
!f you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
07 /06/00
z
~ w
Et U
O 0
cn
J
F-
U)LL
w 0
CCZI
= w
zr...
w F-
• w
UC)
O I-
wW
0
o
w z
O 1-
z
L i
L1 l!
rat,3v as,
Ci
DESCRIPTION
AMOUNT
RCPT #
DATE
BUILDING PERMIT FEE
i t]4 p{3,
PLAN CHECK FEE
10. 0
1 (v j
61-- 5_'ic)
BUILDING SURCHARGE
Li ,r5t)
OTHER:
TOTAL -
ND, 0
DESCRIBE WORK TO BE DONE:
RQ cOt\ --) WuCT F-RO►'Yl A► Hey s
VALUE OF CONSTRUCTION - $
ASSESSOR ACCOUNT #
�73�fo Coo - cflLf Li- 0
U Tenant Improvement (commergial) U..pemoiition (building)
❑ Remodel (residential) Other' : e c O - f:∎_c- e tv
BUILDING USE (office, warehouse, etc.)
GeIRAGC.
NATURE OF BUSINESS:
Cdr' OO Lt r•J OAT I U kv
WILL THERE BE A CHANGE IN USE? (,X No U Yes IF YES, EXPLAIN:
SQUARE FOOTAGE - Building: 590 Tenant Space:
Area of Construction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? No ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER
ADDRESS 4049 S _
sue. TLW (>-)it,q ! -
CONTRACTOR :•"•e +7..9 ?o o tER C f'✓ LL i OT.
ADDRESS
PHONEE�6,_4 -/.-I 3
ZIP( (
PHONE vs -1410
311 e_ t- - -r of n e Rd 'Smite
WA. ST. CONTRACTOR'S LICENSE # - _: 10 E3
ARCHITECT
ADDRESS
L_ -ED SVI1d1�f�
ZIPCf7)l9S.
EXP. DATE 0- � J
PHONE
ZIP
IEREBY CERTIFY THAT I H,
UE AND,CORREC.T, :ANO 1
BUILDING OWNER
OR
AUTHORIZED
AGENT
' ;READ AND EXAMINED THIS APPLICATION:,
Y' u QR:1_ZED TO LY;I OR Tl f( PERMIT:'
ADDR3S+
7--/AN) 5 I � n�
CONTACT PERSON
C/ -7/R .S
DATE-, S—_ 5?0
PHONE
a46--773
CITY/ZIP
- ruKtutcA }8 /6R
PHONEa 16-4 77,E
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Unif
Building Code (current edition). No application shall be extended more than once.
!f you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -3670.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
07 /06/00
z
~ w
Et U
O 0
cn
J
F-
U)LL
w 0
CCZI
= w
zr...
w F-
• w
UC)
O I-
wW
0
o
w z
O 1-
z
L i
L1 l!
rat,3v as,
Ci
COMMERCIAL
SUBMITTAL CHECKLIST
NEW COMMERCIAL BUILDINGS/ADDITIONS
F-7 Completed building permit application (one for each structure)
riAssessor Account Number
Two sets (2) of the following:
ri Specifications
riStructural calculations stamped by a Washington State licensed
. engineer
riSoils report stamped by a Washington State licensed engineer
•
Topographical survey
Energy calculations stamped by a Washington State licensed
engineer or architect
11 Legal description
17 Working drawings, stamped by a Washington State licensed
" architect, which include: *
• Site plan
I I
• Architectural drawings
• Structural drawings
• Mechanical drawings
• Elevations
• Civil drawings
• • Landscape plan
Completed utility permit application (one for entire project)
riSix (6) sets of civil drawings • • .
NOTE: See utility permit application and checklist for specific utility
submittal requirements. : • • • •
COMMERCIAL TENANT IMPROVEMENTS
Completed building permit application (one for each structure or
tenant)
• Assessor Account Number
Two (2) sets of construction plans, which include:
ri Site plan
• Location of tenant space
• Existing and proposed parking
n Overall building plan
• Tenant location
• Use of adjacent (common wall) tenant
• Overall dimensions of building or square footage
n Floor plan of proposed tenant space
• Tenant space plan with use of each room labelled.
• Exit doors, egress patterns.
• New walls, existing wall, and walls to be demolished.
r7Construction details
• Cross sections showing wall construction and method of
attachment for floor and ceiling.
11 Structural calculations stamped by a Washington State licensed
engineer may be required if structural work is to be done (2 sets).
NOTE: If any utility work is to be done, submit separate utility permit
application and plans.
SACK STORAGE
cE Completed building permit epplication
fl] Assessor Number . .
NOTE: !ncIuc arpd dintensions . of racks (heigItt,:wrdtll..!ndlppgtft):..,q1slos....::::::,...•
exit ways op plan.' ••• :•
. .
StrUcbrral:calcUlatioris stamped by'a Washington State Iicensed
engineer (rack storage 8" and
• , . : , . . :•.:.
RESIDENTIAL
. .. . .... . . . . .. . . „. .
. . . .
NEW SINGLE-FAMILY DWELLINGS/ADDIflOPls
..-11 Completed bUUding 'permit application (one for each structure)
---14001.deicription • •••• '•.: • •
As3essor Account Number
•
Two:Sets:(2):of...working drawings, :Which
• ...... •
•
Site
• '''"•••••••••••,::: • • ....•...•
-...• ••• ••
REROOF
n Completed building permit application (one for each structure)
n Assessor Account Number
[1 Narrative describing existing roof, material being removed, and
material being installed. :
NOTE: A certification letter is required prior to final inspection and sign...
off of the permit.
. .
ANTENNA/SATELLITE DISHES
Completed building permit application . •
n Assessor Account Number
Two (2) sets of plans, which include:
• .
E Site Plan (showing building and location of antenna/satellite dish)
• . • • :
n Deballs antenna/satellite dish and method of attachment :.
Structural calculations stamped by a Washington State licensed •-•••
engineer may be requited • •
;•••••• elevations• (all,
.. . •:BUilding cross-section
•..
framing plans.
Washington • 6iat6 Energy Codo data
• .. . . . •••• ••••••••: •••'•••••••••••.' • ••:•.'•.• • ••••••:
Completed utility permit
• .• • • • • .
" • ••••. • ••• • ••••••• • ." •••• •••••
•:Six'. sets of site plans showing utilities ':••••'•••••:••••••••..:•:: •••••••:•;••••• ::•••••••:••••••••••:••••,::•••••••::::-.•::•••••••••.••••
:„ ••••• •••• ::••• • •: •••• : • •• •.• • •• ••••••••••••••••• • ••.:.
Building site plan and utility site plan may •::'
uo.Tity.permit application and checklist for specific submittalrequirements....:
. • . . • ..
• ..:•••
Ackitional topographical and soils information may be required if unique
site conditions.
RESIDENTIAL REMODELS .
. .
nCompleted building permit application (one for each structure)
Assessor Account Number • :
Two (2) sets of working drawings, which include:
• Site plan • . •
• Foundation plan : • . s•
• Roof plan
• Building elevations (all views)
.• • Building cross-section
. : • Structural framing plena • • • ••• :••••••••.:*'1,.
NOTE: If any utility work Is to be done provide utility permit application
arid plans must be submitted. . • • : •.•
REROOFS
. n Completed building permit application (one for each Structure) .
r1Assessor Account Number
n Narrative describing existing roof, material being removed, and
material being installed.. . • .
NOTE: A certification letter is required prior to final Inspection and
off of the permit. • . •
z
< •
• Z
Ct
w
2
_J 0
W 0
co a
co w
W I
_J F-
u) u_
Lu 0
2
g
• <
a
Z
I-0
Z
LLI uj
Ca
0
O Q
O 1—
u j
• 0
LI 0
Z
w CO
0
O • 1—
z
PLAN CHECK
NUMBER
T1/4) (0
PROJECT NAME
SITE ADDRESS
BUILDING PERMIT
APPLICATION TRACKING
t LZt3, Circe
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE
FEET
occ.
LOAD
SQUARE
FEET
ocC.
LOAD
SQUARE
FEET
occ.
LOAD
SQUARE
FEET
oCC. SQUARE
LOAD FEET
ocC.
LOAD
TOTAL
SQUARE FEET
TOTAL
OCC. LOAD
...................
TOTAL
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
..
; >AFtTlVlE
BUILDING - cpc
initial review (ROUTED)
UI1f....
CONSULTANT: Date Sent - Date Approved -
O FIRE
INIT:
FIRE PROTECTION: [) Sprinklers (j Detectors j ) N/
INSPECTOR:
FIRE DEPT. LE I I tR DATED:
O PLANNING
INIT:
ZONING:
REFERENCE FILE NOS.:
IBAR/LAND USE CONDITIONS? ( )Yes J No
O PUBLIC
WORKS
INIT:
MINIMUM SETBACKS: N- S- E- W-
UTILITY PERMITS REQUIRED? Oyes____4 No
PUBLIC WORKS LETTER DATED:
O OTHER
BUILDING -
final review
INIT:
9 -(" ci a INIT:
TYPE OF CONSTRUCTION:
UBC EDmON (year):
f Ct83
REVIEW COMPLETED
PERMIT NO.
-
CONTACTED
'‘(�����^
I I
CI[': 6ef_lrira-asi
DATE READY
DATE NOTIFIED
c1 ` /
(L�'
�
1 1'
BY.
(init.).
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
1
) Q . 5 D
3RD NOTIFICATION
BY:
init.
z
• z
w
6
O 00
U)
(/) W
W
H
U) W
WO
2
uQ
D
I
W
ZI
h0
Z I-
w
• w
O .• CL)
O I-
W W
I
0
..z
w
o1-
z
INSPECTION NO.
INSPECTION RECORD
Retain a copy with perrnit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
PERMIT NO.
(206) 431 -3670
Project•
�` "7r, 1 i3 7-.,
Type oflnspection: �'
�.- .-5 • ))
Address: ��
t50 /�
Date Called: /
Special Instructions:
��0
Dale Wanted:
44 "Z-" 7 2_ a"
Requester:
Phone No.:
❑ Approved per applicable codes.
Corrections required prior to approval.
COMMENTS: MPeLyf.
re s5o,,,.6/, V°'
� S
e.,4 c��a
de-7 C., ',GAN, 4—.1e /5- ,c,..4-cc27-0e-
V
Inspector:
Date:
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
4' ittli gihtwittet iat,t0Ndadiff,a S :.- J.ar::�,�....i.��:�w�..�rY� :.._.�7'36:.x'��...^'r�>••••
at- 1,,111.:. • 6MI.r..y, r. . `yy,V.!.{r,,'r}.i fLI:,,f 3.,:gn'.57+4 iPjftrti'i ?Y {1"i
Z
W
CC 2
6
00
� O
W• I
H
U) LL
w0
2QQ
LL<
co
_e5
F...W
Z�
1- 0
Z
W
• w
0
o1-
W W
Li- z
W
U=
O ~
Z
INSP5CTION RECORD'
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd..#100, Tukwila, WA 98188
Project:
Address: L/0 V? s. /-
Special Instructions:
/'��
Type of Inspection:
Cox
(206) 431 -3670
Date Called:
Date Wanted:
Requester:
Phone No.:
❑ Approved per applicable codes.
❑ Corrections required prior to approval.
COMMENTS:
IP Or
are
1,6%, .t' CYf.•iif,.6:$414i1 *%.==.4:47i'h5v4w . `ia".�oc..iw, ti
J
ro"
?/
Grta(,J�-
Date:
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
ecept No.:
Date:
rtme .±i!r;"{ x.; ni N^r;R!2!['. f? S!•".ie`.t'N' ! nt , ^1F,!.2 .. ;, ...
Z
W
6
jU
00
tn�
-I_
F-
U)W
W0
u
co
=d
I-W
Z=
�- O
Z I—
w
• w
U�
O —
o �
W W
..z
w
O~
z
CITY OF TUKWILA
Building Department
6300 Southcenter Boulevard
Tukwila, WA 98188
(206) 431 -3670
Type of Inspection —tom n. •
Site Address -4.014q S
Requestor 311
Special Instructions /3-e---1
INSPECTION RECORD
PERMIT #11-
Da to
Date Wanted 61, 7'q O
Project
Phone # (-
exta,-s FP-a .b.t.ute •
a.m.
Inspection Results /Comments:
"—a -.4".4j,c .041 p
4/'
!9lih csL Gt T `r GY�I 4_ v
Inspector
.:: ss4Ati ¢:ti- '8s',��ic�tz!'dSt�aa«ss: �6;��.4tiki:wwd�'�U4 i+<f.
Date
Z
Z
~ W
D`L
J V
U0
111
H
W0
cn
1_W
Z =
1— 0
WF—
W
U�
o-
oF-
WW
1-
wz
co
0
z
t-
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUK11ILA, II :I SHWGTON 98188
Plan Check #90 -376: Bitzig, Chris
4049 S 128 St
1 Wm. u em, 433.18nu
Garti L. t'an/lnsin, .lhyur
THE FOLLOWING COMMENTS APPLY TO AND BECOME ART OF THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER(4147)0-
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and
all electrical work will be inspected by that agency
(277- 7272).
3. All permits, inspection records, and approved plans
shall be posted at the job site prior to the start of
any construction.
4. All construction to be done in conformance with
approved plans and requirements of the Uniform Building
Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington State Energy Code (1989 Edition),
and Washington State Regulations for Barrier Free
Facility (1989 Edition).
5. Notify the City of Tukwila Building Division prior to
placing any concrete. This procedure is in addition to
any requirements for special inspection.
6. All wood to remain in placed concrete shall be treated
wood.
7. Validity of Permit. The issuance of a permit or
approval of plans, specifications and computations
shall not be construed to be a permit for , or an
approval of, any violation of any of the provisions of
this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or
violate or cancel the provisions of this code shall be
valid.
z
W
re
6U
00
U) 0
J
H
w0
Li.Q
is
�w
z=
zI-
w
w
U�
0-
o
ww
wz
o
0I-
z
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
BUILD'NG PERMIT
INSPECTION RECORD
(Post with Building Permit in conspicuous place)
SITE ADDRESS:
4049 S 128 St
BUILDING r �
PERMIT NO.
DATE ISSUED: Q, _ 90
SUITE NO.:
PROJECT:
Bitzig, Chris & Terry
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
R
1 Footings
431 -3670
X
2 Foundation
431 -3670
3 Slab and/or Slab insulation
431 -3670
4 Shear Wall Nailing
431 -3670
R
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
16 PUBLIC WORKS FINAL
431 -3670
X
17 BUILDING FINAL
431 -3670
(INSPFCTnR CnMMPNT .SFrTInN nN PFI /-PQ1
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if underslab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although not
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
05/17/90
z
~ w
CZ
00
CO 0
J =
H
N LL
W 0
u-a
=• a
I- U-1
Z=
I- O
Z
W
w
Ucl
off'
W W
wz
ui
P
1-
z
PLAN CHECK
NUMBER
"X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
X7
Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
11
12
13
14 FIRE FINAL Insp:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
.Z17
BUILDING FINAL
PROJECT: `—� i (�VS
THE FOLLOWING COMMENTS APPLY T AN Ef:OME PART OF THE APPROVED PLANS UNDER
�TUUKWW�ILLA BUILDING PERMIT NUMBER .) - ' �,
if..T) No changes will be made to the plans unless approved by the
"�J Architect and the Tukwila Building Division.
O2 Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency,
including all gas piping (296- 4732).
i<E1 Electrical permit shall be obtained through the Washington State
�/ Division of Labor and Industries and all electrical work will be
�
inspected by that agency (B72- 6363).
/-
l 41 All mechanical work shall be under separate permit through the
City of Tukwila.
ICJ
All permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
When special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O
O7 All structural concrete to be special inspected (Sec. 306, UBC).
O8 All structural welding to be done by W.A.B.O. certified welder and
special inspected (Sec. 306, UDC).
OAll high - strength bolting to be special inspected (Sec. 306, UBC).
10 Any new ceiling grid and light fixture installation is required to
meet lateral bracing requirements for Seismic Zone 3.
I1
21
Partition walls attached to ceiling grid must be laterally braced
if over eight (8) feet in length.
Readily accessible access to roof mounted equipment is required.
Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
Professional Engineer.
Any exposed insulations backing material to have Flame Spread
Rating of 23 or loss, and material shall bear identification
showing the fire performance rating thereof.
Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
A statement from the roofing contractor verifying fire retardancy
of roof Witt be required prior to final inspection (see attached
procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington Stae Regulations for Barrier Free
Facility (1989 Edition).
All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made
by calling King County Health Department, 296 -4787, at least three
working days prior to desire inspection date. On work requiring
Health Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency an the job site.
Fire retardant treated wood shall have a flame spread of not over
23. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
All spray applied fireproofing as required by U.B.C. Standard No.
43 -8, shall be special inspected.
All wood to remain in placed concrete shall be treated wood.
OAll structural masonry shall be special inspected per U.B.C.
Section 306 (a) 7.
5 Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a permit for , or an approval of, any violation of any of the
provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or violate or
cancel the provisions of this code shall be valid.
Z
• Z
rt w
Q �
i0
co 0
O 0
W W
J
lL
WO
<
U.2
=d
W
Z=
I— O
Z
ui
U�
O —
(3 F_
W W
H
LL. O
Z
Luc
0
Z
Plan Review
PROJECT
ADDRESS
DATE
tioget
PLAN CHECK
NUMBER
OCCUPANCY GROUP I 1 GG,rc.,ce
TYPE OF CONSTRUCTION.
LOCATION ON PROPERTY 'G l EAsZ 2.c1'
.ct ' Soo-n+ 0 1(.
BUILDING HT. / NO. STORIES _. C)NJE,
FLOOR AREA 5 9
OCCUPANT LOAD N A
EXITING REQUIREMENTS, Q l(
•
DETAILED REQUIREMENTS
OCCUPANCY
TYPE OF CONSTRUCTION
PART V, CHAPTER 23, U.B.C.
W.S.E.C.
k
CHAPTER 51 -10, W.A.C.
NOTES:
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT
PLANNING DIVISION
prepared by: ,
z
a•
~ w
fx
0.i (9
00
(00
• UJ
J
2w
w 0
�Q
=• d
�w
z�
E- 0
zr
w
0
O -
• 1_
w w
=
F-
/A:O
w
Z
U=
O • ~
z
/28 74,
4eod P /u9 ToaF
,goch
t ,
a9r
SO I
0
SURVEY OF:
The west 60' of the Nfe of Tract
SEPARATE
PERMIT AND
APPROVAL
REQUIRED
EX
�C3'S�L-r lo• eL�
4049 S. MCP" ST. � SPEcTIO
"
FILE COPY
I understand that the Plan CheckJ . J provals are
subject to errors and omissions �, i s and n,i anprc.;,; ; ,; ,;C
plans does not authorize the violation of arty
adopted code :r+ iflance. N ecei t of con-
tractor's cop ve -tans ac,
�v d N e ' �.
By
Date `'1_•� _
Permit No.
4), Riverside Interurban Tracts.
RECEIVED
CITY OF TUKWILA
ELE,c-reicAL
S E P 5 1990
PERMIT CENTER
LEGEND
NEW STAKE
HUB
MON.
TACK
E.X. STAKE
- :+'fit ;"My^?:4e''^�.'+''ii'•wa
O
•
•
SURVEY
FOR
• 13 I T Z I is
DRAWN BY
4.-1
CHECKED BY
DATE
AAIROE i ASSOCIATES s
455 So. 152nd St.
SCALE
PI' 14
JO. NO.
is6� •
REF.
z
~ w
ce
JU
00
co
J
WO
in �
0
=
I.. = W
z
t•-
1--
ZF-
W
0—
C1 I_
W W
U-O
wz
—I
0F'
z
k.
!l31N331Iw!!3d
0661 5 d 3
V1IMminl 3O Al
Q3A1333H
CD
C/1
Cil
CD
OG
U
Q
U_
." : -L;:
' 3tdbLili7tiiM:7'Jdti�
ng
z
�w
LLI
U0
ui
J H
N
w0
�Q
1- w
z
0
z1-
w
U�
o�
W W
LI-0
wz
U=
0~
z
»31N33iIV 3d
O66t g d3S
"NMI dOAi
a3N33 I ID
ti
(C001\\ CA
a3S
p66� d
11\M0.
J
w
J
c6
•
g n
k
›.1
i
4
z
w
0
NO
W W
J
S
WO
u. Q
a
W
Z=
F- O
Z
W
U• �
O-
O H
WW
r
u' O.
WZ
O -
O F-
z
t.
113.1.N30 Wind
06616 d3S
V'1IM)Inl AO AID
a3A133311
3E1
W
Z
0
LL
S
1—
Cif
:? iw^11L'[L't�336i�Tsii'�1i.�.dt� biiiC> 311"V+ lPX15Y'Ckm vilsiiSJ' g14,1i4QillNty. •u`M1 q i�C4M '
z
w
wdd�
JU
00
W
WO
2
J
= W
Z I-
I- O
Z 1-
W
w
Uc
O -
O H.
wW
H--
- O
WZ
O —
H H
O
z
831N33 iIW!!3d
0661 5 r!
"Minl �O £U
a3n1303a
.fs1.1. S1' :x"ii'.�5:k'w2'i+`M
14r
z
�W
1 U
00
W
W U_
w0
= w
o
w
0
0—
0H
ww
1- --
wz
.0
0 H
z
831N33.LMa d
0661 5 d a S
NIIM)Inl dO H AJJ )
a3AI33
A
v
IwJ
1
L
1.
c6
069,
040. Wr3
1
k
<1
n 1
.i+;.::E«r,..irl ii. ah.A` : y;; t. :.'•`.L`iYCIi.«i'ui %l .ttf1111 • Yc`iu•.'"'•44••¢
TRFAVII mranSll f
FOOTIN% WITH
z
�Z
W
QQ• �
JU
O 0
co in
w=
wo
U- Q
=a
�w
Z=
H 0
W~ Lij
0• —
� F-
wW
WZ
• CO
O F-
Z
li31N33 11Wind
0661 5 d
V1IM)ifll AO Al10
03A1333!!
z
~
Z
Z
JU
00
CO w
J F
NLL
w0
u Q
N
2 Ci
w
Z�
I- O
Z
w
U�
O N
111 u
H H
U. — O
O -
O ▪ ~
z
GLOBE -WE:5 9 OUT 4
TAKEN BY
NUMBER, SUBDIVISION OR NAME DATE
__fges 14?einit (P.D1 a
TAKEN BY
NUMBER, SUBDIVISION OR NAME DATE
TAKEN BY
NUMBER, SUBDIVISION OR NAME
DATE