HomeMy WebLinkAboutPermit 6507 - Poirier Residence - RemodelPOIRIER JOANNE
EXPIRED
6507
IL E
(POST WITH INSPECTION CARD AND PLAN'
IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
)ept. of Community Development- Building Division
'300 Southcenter Boulevard, Tukwila WA 98188
206) 431 -3670
BUILDING
PERMIT NO.
).ATE ISSUED:
„3',+t , ,:: . ,ail;” y,4.1
.'k ><. A'Y,;.'C,: �t'£:`t5y,i�i:
DESCRIPTION
s,.iz .L.;'.31,:`
"ti�..��L�,ti� "�'it.:;
AMOUNT
RCPT #
_..., i''"
.��.rr.r .
DATE
BUILDING PERMIT FEE
171.00
6405
3-01-91
PLAN CHECK FEE
111.00
6405
3-01-91
BUILDING SURCHARGE
4.50
6405
3- 01--91
OTHER:
TOTAL -
286.50
PLAN CHECK NO.: 91 -089
O,IEC- S FINRORM:A.TION
SITE A ' DRESS 13413 43 Av S SUIT # VALUE OFCONSTRUCTION - $ 16,000.00
3ROJECTNAME/TENANT Poirier, Joanne ASSESSOR ACCOUNT # 734060 -1012
TYPE OF LjNew Building LrAddition Li Tenant Improvement (commercial) U Demolition (building) LJ Grading/Fill
WORK: ❑ Rack Storage ❑ Reroof :c Remodel (residential) ❑ Other:
DESCRIBE WORK TO BE DONE:
Remodel an existing structure built as multi- family into a single- family
residence. New stairways, doorways, structural modifications, etc.
R•` -. -.6rf =
Joanne Poirier.
.. •
246 -4171
t‘.DDRESS 13405 43rd Avenue South, Tukwila, WA
ZIP 98168
3ONTRACTOR
Owner
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT
Jan Noorda
PHONE
ADDRESS 929k S.W. 152nd Street, Seattle, WA
ZIP 98166
ISE
'LGOR
SQUARE
FEET
OCC.
LOAD
SQUARE OCC.
FEET LOAD
SQUARE OCC. SQUARE
FEET LOAD FEET
OCC.
LOAD
SQUARE
FEET
OCC.
LOAD
TOTAL
SQUARE FEES
TOTAL
OCC. LOAD
roTAL
TYPE OF CONST.: v_N UBC EDITION (year) 1988
SETBACKS: N - S - E-
W-
FIRE PROTECTION: urn Sprinklers ❑ Detectors x0 N/A
UTILITY PERMITS REQUIRED? ❑ Yes
❑x No
Ip bli9Worksl
ZONING:
BAR/LAND USE CONDITIONS?
❑ Yes
OD No
. ONDITIONS (other than those noted on or attached to permit/plans)
APPROVED FOR
ISSUANCE BY:
I hereby certify that I have read and examinied this permit and know the same to be true and correct. All provisions of Iav
and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit
does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and obtain this building permit. r
.±c r`
SIGNATURE:
PRINT NAM E:
This permit shalt become null and void if the work is not commenced within 180 days from the date of,
issuance, or if the work is suspended or abandoned for a period of 180 days from the last Inspection
DATE: - j — %/ -.',
COMPANY: ; FL�E:1-1/
CERTIFICATE OF
OCCUPANCY NO.
•
DATE ISSUED:
a712521"
Z
~ W
6
00
co o
J I
H
t°w
w0
=0
W
Z=
H
F— O
Z
W
2j
0
O (12-
o �
W W
I
uO
W
.. Z
O ~
z
1.717 Vim
•
yaw vina
lin. ail
sl IBM
PLAN CHECK
NUMBER
CI-0A9
PROJECT NAME
SITE ADDRESS
BUILDING PERMIT
APPLICATION TRACKING
1L -11. "7 I--I�
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION
(to be filled out by Plan Checker)
SQUARE OCC.
FEET LOAD
SQUARE
FEET
COG.
LOAD
SQUARE
FEET
TOTAL
FEET
TOTAL
OCC. LOAD
DEPARTMENTAL REVIEW
"X" In box indicates which departments need to review the project.
ARTMEI
BUILDING - I_Ct I
initial review
3- S -9l �.
(ROUTED)
lUIFIEIVIE I
CONSULTANT: Date Sent -
INMEN
Date Approved -
O FIRE
N. PLANNING 3- 8 -91e.
INIT:
FIRE PROTECTION: [ -) Sprinklers O Detectors O N/A
FIRE DEPT. LETTER DATED:
INSPECTOR:
c/
ZONING: h--.1
INIT:
O PUBLIC
WORKS
INIT:
REFERENCE FILE NOS.:
bL 1BAR/LAND USE CONDITIONS? [ )Yes [ ] No
MINIMUM SETBACKS: N-
UTILITY PERMITS REQUIRED?
S-
Yes
PUBLIC WORKS LETTER DATED:
O OTHER
INIT:
(, BUILDING G 3727/gi
!LA
final review 70./ INIT:
REVIEW COMPLETED
TYPE OF CONSTRUCTION:
UBC EDITION (year):
I' 3
PERMIT NO.
-
CONTACTED
-)--(\n
DATE READY
DATE NOTIFIED
3-- ca� -R 1
BY:
(init.)�
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
0
3RD NOTIFICATION
BY:
(init.)
z
w
ce
00
W
J F-
F-
M
WO
2
J
LL
= W
zF-
HO
Z F-
W • W
U�
O-
O I--
WW
LI z
U=
O ~
z
BUILDIN3 PERMIT
APPLICATION
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
DESCRIPTION
AMOUNT
RCPT #
DATE
BUILDING PERMIT FEE
1....
i,- -i,,'" : >, r
.,.. , ••;:, :,
i
PLAN CHECK
NUMBER
PLAN CHECK FEE
BUILDING SURCHARGE
1
. APPLICATION MUST BE .
-r ;.:' 'FILLED: OCIT C•OMPLE.TEL •
�`.
OTHER:
TOTAL
,i
t.,
,,.
SITE ADDRESS SUITE #
VALJJE OF CONSTRUCTION - $
PRO. vz. �` - EN,ANT� ,�L .Mc�> L.
:Oe- Nit QS. ,-1 o tt4.t 14 _ X01 iZ t . ,
ASSESSOR ACCOUNT #
17'4 C76,6,7 - ■ c;71 -
TYPE OF JNew Building U Addition U Tenant Improvement (commercial) Demolition (building)
WORK: 0 Rack Storage 0 Reroof ef-g Remodel (residential) 0 Other:
DESCRIBE WORK TO BE DONE:
,ta lLe.1 -4,ad (C.) LS.36.•Ne.t. 44-1 t -TI 1-A A - - -t-tguct-'
SU l LT A..e'-'7 F't ULT I -- �� t L.-t' i 4 -t-rc1 A.. -S ► tJct L.. E--.4..d-it ' L- 12 C5 ‘ ,i:=ErilGt~ ,
Ci- / -61-05.4 14WA-:•ff7 , 47 L V A-Y 4, 1 -� 1-42 -L - o 6z.A1/41_. tm o --'t I G,t�. rt Cf..) 'S �T-G
i
BUILDING USE (office, warehouse, etc.)
1 C Le ',.6.„1-it, k. Ly 'E,S 1 •rD •,fs e.'E.
NATURE OF BUSINESS: We.,
WILL THERE BE A CHANGE IN USE? U No 12<Yes IF YES, EXPLAIN: A5 1-A cs-T- ,6.-15cv f__
761.3C..UP - 7 c t. , c„Ar2 .e .z r - )
SQUARE FOOTAGE - Building: 58(2. ( c. ssfenant Space: Area of Construction:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING ? No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER �OAvJNE. 'PO k lZ.t S.R.
PHONE 2..16,_.4 1--1 I
ADDRESS I qS - -11 31?-2? r��e.. 'Sc. - Tu Kw \ LA. , '.& ,
ZIP ctg 1 ea
CONTRACTOR -S-.. L. 'P Nth A 1=o -N1.,, ��)
PHONE
ADDRESStf_
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT _4,44-.1 t- Q 742. ;A
PHONE
ADDRESS Ct2R7_ S; I S-V -57. r - rm..�, v-44, .
ZIP 9 al bCn
BY PERTIF.y THAT.I i. REAR:AND. 1MINE P:iT II APPI IgiN :iQAi
TRUE AND;::CORRECT AN13:1;Afiti AUT; :. :.
- > l-HD , IZEI�;TQ► >AAPLI�:F�JR.:THtS> PERM
t;6 ILDING OWNE )
SIGNA E _
-i
DATE
--ca F---- 9/'
OR
AUTHORIZED
AGENT
PRINT Ni ME ,10A4,1 fit_ 1 121 E�
PHONE
ADDRESS 119 prj _ -A3F37 , t:;:..
CITY /ZIPJ gq(LA 9. St6e,
CONTACT PERSON 14 Q.ppt„ /4ktT� -,
PHONE :2--i.6,,_14,‘ \ 1
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts
are available at the Building counter which provide more detailed information on application and plan submittal
requirements. Application and plans must be complete in order to be accepted for plan review.
VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of
Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to
submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Building Division to comply with current fee schedules.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitations. The building official may extend the time for action by the applicant f�IIE''
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of.thbCOhifo
Building Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements, please
contact the Department of Community Development Building Division at 431 -367
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIRES
o7,O6,20*
z
w
tY 2
000
cu)nw
J=
t--
w
w0
pc =< I
=W
Hw
z�
►=o
w~
U
O-
0H
W W
"-- o
wz
U=
F-
0
z
COMMERCIAL
SUBMITTAL CHECKLIST
NEW COMMERCIAL BUILDINCISADDMONS
ri Completed building permit application (one for each structure
LiAssessor Account Number
Two sets (2) of the following:
1-1 Specifications
ElStructural calculations stamped by a Washington State licensed
engineer .. .
• • • •• ••• • • •-•••• • • • • • •
Soils report stamped by a Washington State licensed engineer • •
[—I Topographical. survey ...
flEnergy calculations stamped by a WashingtenStatelIcenseci:.:::::::::::-„...:.:
• engineer or architect • • . :
Ell] LOgOJ description : •
fl t Working drawings, stamped by a Washington State iicensed
... anotritect,.which include: s••••. .
„ • • Architectural drawings
. . • Structural drawings
• • Mechanical drawings .
-• • •••• • Elevations
. • : • : • Civil drawings
: • . • • Landscape plan
••••••." •
Completed utility permit application (one for entire
Six (6) sets of civil drawings • ••••' • . •••.'•••••••::•. • :•••• • ••
NOTE: See utility permit application and checklist * sped& . .
submittal requirements. . ••• ••• • . • . • • .•• •
• • •• • • •
RACK STORAGE
Compieted building permit application •:::•••••• : ••••• •
:Assessor Account Number
• •. ••
:••:::::::.::::•Twer(2) eets of plans, which
::.•
•:Building floor :plan shoaing::::::
• • ::.: s .
Entire space.wherataoloitill
•• Exitdoor
• Onionskins' of
• • • all aisles
.: anent ripacefloorPlanahoalng:na4t:a....
". --•:•••":::•••••••••••••••••••••
NOTE: InCluddcfmensionS
and ways on pits?, • •: •
• ":.: :• • :" .." : : . • •• ..„
Struct.inal calculations stamped by a War State I�nsed
engineer, (rack .storage and
RESIDENTIAL
COMMERCIAL TENANT IMPROVEMENTS
E Completed building pemilt application (one for each structure or
tenant)
E Assessor Account Number
Two (2) sets of construction plans, which include:
fl Site plan
• Location of tenant space
• Existing and proposed parking
E Overall building plan
• •
••
• Tenant location
• Use of adjacent (common wall) tenant
: • • • Overall dimensions of building or square footage • •
Floor plan of proposed tenant space •
• • Tenant space plan with use of each room labelled.
• Exit (ben). egress patterns.
• • New walls, existing wall, and wails to be demolished.
Construction details
• Cross sections showing wall oonstruction and method of
attachment for floor and ceiling. • : • • • •
Structure; calculations stamped by a Washington State licensed
engineer may be required if structural work is to be done (2 sets) •••••
NOTE: If any utility waft Is t o be done, submit separate utility permit
sop/lost/art and plans. •
• : • •
REROOF • . .
Completed bulking perm
EAssessor Account Number •
It application (one for each stnicture)
Narrative desaibing existing roof, rticrtedal being removed, and • : „
materiel being installed.: • • •••• • : • .• •••.: • • .
..• .• :.• : • •.• •• .: • :...•
NOTE: A COrtifluatkin letter is required prior to final inspection and sign,
off of the permit... . • • ...• • : • • ..• •: • •• • . • ••• • • ..:•':•••
•.• .: • • . .
: • ::•• •
"•••••
" hUildirita •••••••••• .
::.coMPOt°0•• • ••::••• • • • .
. • ••••
•-• „ •
..............
Assessor Aoco
•
Two (2) Sets of plena, Which includk:asa.
NEW
fl SINGLE-FAMILY DWEWNG$/ADDfflONB
j
Completed building permit application Ions for eacII
dosc1ptlon : • .e
'Assessor Account Number
'sbletpeilOY„
If teer,:ntaibe, requlrad
• : .
h 01 entenna/satsliite dish)
methOil'of attachment
Washington State icensed
••••-•
1 • . 1 • • • • •
RE8IOENTIAL REMODELS
Ufl
...
10 (2) sets of working c
Site' plan
Fo
9oorplan framing pians
• eill°ndTEPla•ne must be submittal • •
• • • stniaturoaljauiR:idN/dtkor::: appl: tcation,
wcirk is r° be d°°°
REROOFS
•
Completed buildng permit application (one for each
ASS414$0i,Account Number •
Narrative 'describing existing roolimetedal being removed, and
• material being
NOTE: A certilleationletter is required prior to finel inspectidnand
off al the permit : .y .•::•••• :•-•,..•••••• •
BUILDING ~ EfiMAT
INSPECTh)N RECORD
(Post with Building Permit in conspicuous place)
CITY OF TUKWILA
Department of Community Development - Permit Center
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
SITE ADDRESS:
13413 43 Av S
BUILDING Lc'
PERMIT NO.
DATE ISSUED:
SUITE NO.:
PROJECT:
Poirier, Joanne
-q1
CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE
"X"
REQUIRED INSPECTIONS
PHONE
DATE
APPROVED
INSPECT.
INITIALS
DATE(S)
CORRECTION NOTICE ISSUED
1 Footings
431 -3670
2 Foundation
431 -3670
3 Slab and/or Stab Insulation
431 -3670
4 Shear Wall Nailing
431 -3670
5 Roof Sheathing Nailing
431 -3670
6 Masonry Chimney
431 -3670
X
7 Framing
431 -3670
8 Insulation
431 -3670
9 Suspended Ceiling
431 -3670
10 Wall Board Fastening
431 -3670
11
12
13
14 FIRE FINAL Insp:
575 -4407
15 PLANNING FINAL
431 -3670
-
16 PUBLIC WORKS FINAL
431 -3670
17 BUILDING FINAL
431 -3670
(INSPECTOR COMMENT SECTION ON REVERSE)
INSPECTION PROCEDURES AND REQUIREMENTS
All approved plans and permits shall be maintained available on the site in the same location.
1. FOOTING - When survey stakes and forms are set and rebar is tied in place.
2. FOUNDATION - When forms and rebar are in place.
3. SLAB - If structural slab or if understab insulation is required.
4. SHEARWALL NAILING - Prior to cover.
5. ROOF SHEATHING NAILING - Prior to cover.
6. MASONRY CHIMNEY - Approximately midpoint.
7. FRAMING - After rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place.
8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic
ventilation points clear.
9. SUSPENDED CEILING • Fasten diffusers, lights and seismic bracing.
10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G).
11
12.
13.
14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements.
15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements.
16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements.
17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete.
OTHER AGENCIES:
Plumbing (including gas piping) — King County Health Department — 296 -4732
Electrical — Washington. State Department of Labor and Industries — 277 -7272
A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by
contacting the Department of Community Development, Building Division at 431 -3670. Although rrot
required, a meeting of this type can often eliminate problems, delays and misunderstandings as the
project progresses.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
6,5c)'7
PERMIT NO.
(206) 431- 670
Project:( 1^ _
�/ Q G H ", /'�c7 i f—O,�
ype o nspection: '�� C
� " J
Date Called:
Address:
Special Ins ructions:
Date Wanted:
Requester:
Phone No.:
c Approved per applicable codes.
COMMENTS: •
❑ Corrections required prior to approval.
S ,(/J /-4 sty
/ad-rl /C.
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection.
IReceipt No.:
Date:
a�4 `I;?� da4.',;lf
Um
'.,r,4 iii" • ;,?_s
Z
W
arL
00
N0
co w
J
H
CO
Wo
2
u.
=W
1--=
Z F.
F- O
Z
W
W
U C)
O-
W w
t-r-
O
wz
0
—
O~
Z
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
(o50 -1
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670
Project:
QpirleY i \004111
Type of Inspection u c,eVE
Address; 13� l.3 / 13 p�v c„
"t 1 \ �/
Date Called:
_t
'9 , 9 a
Special Instructions:
Q‘ \\0 t A ,D 5\042
Date Wanted:
�p 21.5)`--91
�"" 63 p.m.
Requester:
0-barn
Phone No.:
Q Ll ,o . / 1 l --)
❑ Approved per applicable codes.
❑ Corrections required prior to approval.
COMMENTS:
PLC 4 L k/ eex/ -Y\
s t _5 to
/� rL,6.t - / /,..7.-0,- 4,-, 0
eL-i --p,.
6.4e-e-43/ fl i ,L '"'`', `tom 4 p A
,-...--,,,41-0-7.0.-.
/ ..- 1�4 7
G!t -cv �i-t i-- /
;iia
s-..7 / 4-7 , 2 L'L'" py11"FG4t. & Ameese
‘,--h7 cGl
1--- .' /e2,2- J,--)7 e /--!. --eA:
17-toe,--/ le-e ,, !� $/ /9 /jG/25b►
az,' -76- C /`7 . per ` % e-e/
,"'1.
,c [ --1 t to eAle,/ r p A [..i-e/C �,1-
- s
b n, k ,/ /,.z,7 ./ 7L4,3
ti,1
1 Lj V &-+`4- 2 /,
IInspector:
Date:
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at'. A,F,+h�.
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
IReceipt No.:
Dale:
tai
z
I- w
6
00
cn
w=
�w
w0
gQ
I' a
�w
z=
H
I- 0
Z I—
w
w
0—
0 t-
ill w
LI O
U=
0~
z
L
guoh
1• ge17I r.?. UT I /SN - c i - ` RECCf1 /CG
!? r. , ,I o�.}�l !.1 s I tz I ig i2.. CITY OF TUK VVILA
f o _ 12 1 ) -1 V, s? Lvs . Lv p '1 AK
t
-11 J I l) w,1/4, e71 DMIr EN TE R
Jame.: L- ft. t-117 I-1 Li .60 T— tT
Existing Legal Description
The East half of the South half of the North half of Tract
64, Riverside Interurban Tracts, according to the plat
thereof recorded in Volume 10 of Plats, page 74, records of
King County, Washington;
EXCEPT the East 101.03 feet thereof.
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property as
created by King County Short Plat No.1083050, as recorded
under Recording Number 8504080746.
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 7807280945 and No.
8302240491.
Situate in the County of King, State of Washington.
Proposed Legal Descriptions
-n-1122
1324:u r4T D
Parcel A
The West 87.30 feet of the East 188.33 feet of the East half
of the South half of the North half of Tract 64, Riverside
Interurban Tracts, according to the plat thereof recorded in
Volume 10 of Plats, page 74, records of King County,
Washington;
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property as
created by King County Short Plat No.1083050, as recorded
under Recording Number 8504080746.
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 8302240491.
Situate in the County of King, State of Washington.
Parcel B
The East half of the South half of the North half of Tract
64, Riverside Interurban Tracts, according to the plat
thereof recorded in Volume 10 of Plats, page 74, records of
King County, Washington;
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property as
created by King County Short Plat No.1093050, as recorded
'under Recording Number 8504080746.
EXCEPT the East 188.33 feet thereof.
Situate in the County of King, State of Washington.
' SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 7807280945.
z
W
U O
c
co w
W
� u.
w O
g
co
=d
▪ W
Z�
F- 0
Z LLJ
w
U 0
O -
O H
wW
H-
z
W
O~
z
C17'Y OF TUKWILA
6200 SOUTIICENTEb' BOULEVARD, TUKWILA. 11'ASUL1'G7Y)4V 98188
Plan Check #91 -089: Poirier, Joanne
13413 43 Av S
1710,17: # K.'06) •1331800 Cary 1.. lan(usrn. Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME P THE APPROVED
PLANS UNDER TUKWILA BUILDING PERMIT NUMBER �(% Q .
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296- 4722).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
4. All mechanical work shall be under separate permit
through the City of Tukwila.
5. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
6. Any exposed insulations
Spread Rating of 25 or
identification showing
thereof.
backing material to have Flame
less, and material shall bear
the fire performance rating
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition), and
Washington State Energy Code (1990 Edition).
The north property line building setback remains non-
existing and therefore non - complying with Building Code
or Zoning Code requirements. Approval of this permit, in
no way constitutes an approval of this existing non-
complying condition. Final inspection approval will be
conditioned upon a resolve of this situation by the
proposed manner noted on plans, or by an alternate
method, to be submitted to the Building Divsion for
approval.
,f 8.
'74#n�t4:¢ �.ai tryC�r,� �4h`ntnrwCr.�Yrt{� �r,.iY..,,Y`,7tc!4�emr l '$�S_.'.,..,rx�71i<;+4;N:.5; <e4 �1�'s�"i+. ' ti; i�3: a, �• j,: YnNt-; ntr' �y��^ Ei+ 1! :xw;.a.rrk`9hih�':tw�.l.p,;,l,� ;�Ti'3dHn.r.. a;y� Ptq,yF"}xi!k
z
w
�U
00
to 0
W_
CO Li_
w0
g<
(nom
a
1- w
z=
t- O
w~
0u)
o-
0 I-
wW
1-
LLz
ui
=
o F'
z
Poirier, Joanne
Page 2
9. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
z
~w
re 00
co
0
WI
W O
=• d
I- W
z�
�O
Z
U • 0 co
0—
CI F--
W W
H
u. O
Z
o
W
H
O~
z
(05,3--)
CITY OF TUKWILA
6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188
+:i.... et :�4:�.iieY? rl!'; $b:∎".4"
PHONE # (206) 433.1800 Gary L. VanDusen, Mayor
MEMORANDUM
TO: Viki
FROM: � ha 11-e- -BQ Q
Z
W
it
00
co o
WI
H.
U) Ll.
w0
2
g
DATE: TYY\ Q I u a
SUBJECT: Id 1 I n tr o \ TX-En fl t o i o n Z w
P-e.Y or YY1 D 1-Q_.
:abi�5�iilT. •.':ivlkiniiysh`l : ?rW�V4'P .' .is;'C'e`i:iR'K4i v.Pl,Ctn ' ". �tia:WULf i1
1-0
Zt-
W w
0
ON
0 t-
wW
lL 0
Z
W
co
O~
Z
PLAN REVIEW COMMEN 1'S
Plan Check No.:l 1 `ON Project:i I4W V) I YiO'
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
g•• n (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced 11 over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or Tess, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition)
-E' dit70R) .
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
z
~ w
00
U)O
cnw
J =
1-
U) LL.
w0
LL Q
=a
�w
z=
F-
w~
O-
0H
wW
1-
w z
U=
O~
z
1. Footings
2. Foundation
3. Slab /Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
X7.
Framing
x8.
Insulation
9. Suspended Ceiling
X10.
Wall Board Fastening
11.
12.
13.
14. Fire Final
X
15. Planning Final
16. Public Works Final
>‹,
17. Building Final
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
g•• n (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced 11 over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or Tess, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition)
-E' dit70R) .
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
z
~ w
00
U)O
cnw
J =
1-
U) LL.
w0
LL Q
=a
�w
z=
F-
w~
O-
0H
wW
1-
w z
U=
O~
z
\‘)
(z17(;) Z4La-Lo1l1
.@1 ;air u " +�Sftl9xi 1 >`44,NaVG
cc
w
ut y z
-i IP+ ILI
al 1+
CC
U.1
U ,S* 4 Q •
H
�W
I
00
iuYVsr 3wak visit 41004;11U s'6' bVisiastf 6'x
co o
WW
J
Z O
LWW
U�
N
0E—
W
1--
LL.Z
U=
01"
z
t-
4
X
[UxRATIO
0
'
I
V
iNk
tf\
1
•
R VALUES
FRAMING
•
W •
• •
1i1 ■p
121 U0 = TOTAL LINES 14, 15, 16, 17, 19, 20
GROSS AREA
RATIO 1)
0
•
1;.0
NN
e
4.!
0
W
4
o
\`
—IN
17-
1-..-
c.r,
...
, N
00
.
Cr
‘‘:It
2
20 CAVITY 14)12OI•gi
10 8 m T
113 GROSS MALL
j'4
3
•-•
ti
A
6-4-1
T
O
(17 OTHER (Specify) i
Q Cr
O
.a-
La-
rr-ll
w
CC
I
T
1
•
R VALUES
FRAMING
•
W •
)-(1X— 1
0
♦
�Vq
•
1;.0
12 U = 1/R TOTAL
44 2
OU
tFA
:AT
IIN
IA
JRF
IR
kL
=
.a -p
C 1 C
•r
4 44
O 41 0
c
aa r Cl
A r-- .D
2° E
0
•••• o 0
4-1 40
ns /r a i°
as a� . W in
•� w c 0
..0 d' Q t O •
1- . • 1- 1- - •-
. a1
&D /0 E .. 1- b L •� 1-°
¢ Cl b Ol r1 13 !Q
r
-1 ro 01 v 4- O 0
_1 in 1- C c Z N
`= o �° '- :° v' 0 0 <
1-- al 1 - • 4- 4- O
1111 U. • • -.NN•r
J +0J b 0 .- 1 Cl 41 Cl Cl 1
1 1 1- Ql eep�0 qG
c3 vi fu < ili sr rci
al
J i... to G N 0.Q L 1A •-•-1 rf • 1
CL 10 O •r• us C 0 W •
10 0 N CV N
a L E v1 C L 1 c
W py C9 10 r« - Ql M C/ a/ a1 R
C C C C r Q 01 b 0 •r 0. CG
r0 1.• L. E C1 c
N 4.-1 •r +1 L 'I rr-•r r- r +I
1- r
o Z �'' 111
/L al 1.-. +) 4-10 +l 0)
w 0 400 c W 4- 10 •� O u Q1
V1 •1- OC 0 .G •r- •r •r- j7
W 0 4) 4L r- ¢ •r.. 0 al 10 9D
pc•r C E • r c1'- C C TB
41 •• VI CQ C7 • IJ •r •• •r- •r in
Sr 40 l II..r' O E
Cl co as E
al .-• r- f- ' O
.n n1 O' 0 al Q? 0 104-- .- -r -rr-
1 - Cl
•r C 0.CC •� r-+ = 10 40 40 40
rI'0 r -rU.(j ;-u 0 > >>� > 4)
4) r W .- tip 0 0 W •r- •r . . .0
O OC 10 r- 4- 4- •u 4) +s 4 '0
OM •■•• o- = W W O •r .0 In in in S
d w 01 0 1– 0 ••- ••-• ••- 0 ••
0 V Cr <p q ¢ .1cz� Li in W W_w - 00
W la*Ce 413J ;Ft' 4:2 -
J¢�¢ 0�0�
�rn ¢ 01¢ " ' ' ••-
•r .-4 ) - � N-4 .1-.. = w w
.4
1N/1 b ►hr 01 W ti N 44 N _! J
cc •r- a .� . •� C .r- .0 t •0: ¢
CD 10 JU.UJJC.D TI1-- F -1^1-• F--1-
-.-
r• Nre) V 101.0P 00 0) c CV
r-. 4-4 •-4 r-. ••-4
i�"- "jY4{�{�2 ",+o'if''kNV:i'�'4'tfi P�sro:S,. <�;Gc�r'rY:P;f1,:!?r. r:v,'re3 ,, t,t.:;wnci .��v,.71ct��;� %3'��.�'�;. "i `. ''u„ �r -n , ; <t•.
PERMITCENTER
Z
1
re W
00
CO
J
w0
�j
= w
Z �..
Z0
W
0
oI-
w w
I— H
w Z
0
Z
J
CC
0
ry
o
NONN
0
0
p
��
o
O
in
tk•
R VALUES
FRAMING
.--...
in
•-•
kO
0
N
al
r-1
Ross AREA
RATIO 1)
0
•
Q
E-
°
2c
tM
CC
Q
ri
vs
•5
h'
•
VV
N
1=.
1 5 CAVITY a)INSULATION
1 6 b) AIR SPACE
1 7 INSIDE SURFACE `/Zetwi3.
N
119 FRAMING ._ 13) 1 oZ•5
20 CAVITY f4)S�Bt
e/��
W
z
r-+
_.1
G
1~
N
NJ 1-
S
113 GROSS WALL
_j
OZ
3
r1
`
\
O
A
r-1
r-
•r
qU
-
S
c
r-
117 OTHER (Specify) 1
118 OPAQUE WALL
cD
b-1
u
a
N
0
N
0
CC
L}
ac
R VALUES
FRAMING
CD
Ji
g =
Q
E-
°
2c
tM
CC
Q
ri
2 OUTER SURFACE YzI T-►t
1 3 OUTER SHEATHING
VV
N
1=.
1 5 CAVITY a)INSULATION
1 6 b) AIR SPACE
1 7 INSIDE SURFACE `/Zetwi3.
1 8 AIR FILM INSIDE
9 OTHER a)
110 (Specify) b)
O
.--1
1
.•-r
w
-
1-
r1
112 U = 1/R TOTAL
.a
la
c 1 c
oaaa 0 Ill
4 = .a
•714- >1
O E to
O •r• O
•r- 0
ns go
1- L 1-
a •LU
N.0 n J N
ct s
1- ^ a 1-- 1- - •-
a
1/1 • • wG 1 `O rrn
r•a ~ N C -
O
1....- 1-
a Q a M '0 c4 L. 0 a. L x r1 .-I C
1d a) '°
N J a s
al N 1- O C C �_ LO 4- U
VP O/i.- •-•.r L O O
S
4-
4--
F- IT 1 • 01
r-1 (NJ N O
.
1 u'1 t!.
+!LL +) i-1L Ornrna
14 (v-4 r 44 • a 8 a x
LN J ▪ i. N ▪ C N o. • ri •-, .-I
Q a 14 O •r N O O Q . O O N a n! ! N
G (CI .- /0 r Q O •C O.CC
'0 s. L. E a¢ ro C C C L
W -O .W U. C7 14 Gl •r ••1... •r {1
- r r r
O •> �' 11 CG N .-+ > +' O C C C aLi
•r >1 O O O +1
1-- v .d `= •.- c •o -0 N 'p b
0 •r 111 2 rM-4 .� •. 10 4 4) 4i 41 11-
LL a 1-4 a 4-1 +1 vl
w 9-0 #(11- dam- cl]. 044r 000.J4!
-a •r •r •r
W 0 4) LL .- - 0 41 10 -a c � +-1
x •► C E
i-• +1 •r N 2 ca • • *jai .r ""..r.."- VI
1- b��► -4 1...^ 0 a a a E
1- O a :r..* . -1 .- L > > O
N al 0- C N et i N rl4- r'r --r-r-
r 0 a •r c CC ¢ r- a b ■0 •0 14
•p •p r •r u. (� n3 'O 'O > > a +"
7 ^ r 0•r a
Q›. ¢N L/ -o• >C
� L Wr N 0 0 a•r•. -a•r
93 CG 10 r 4- 4- 14 43 49 V7
(43 J O C 4-) �
O•C Q 7 Q'=I41 1.4.4 4 -4 •4-.0 N N N
LAI 4/ M O 1-- r- •r'•r -r 4) 3 . 2
p CC»C� J4.d 0
d 1 a c.DaC'4 cyy›•� -{;¢ao
N 'O r1 H 1- .� H N -a a O I w J
6-4 41 (/1 •r• N N N
0> >•CC/0 >yy x
CD13 ••- Q•r•r CG•r.0 L LL 4C
c� • v J 4- U J -.J c9 -u 1- 1-- 1-- 1-- O 1- 1--
.-a N M •cJ IJ• kO f` co O1 O •-4 r-+
r 4--'1
¢ RttitNIV4):`.:1 1,,))," `,.W i_ "'.f ,<�.y..G?•,,'.A', ":'cT .;t<x 1:
�;�1;,,.\ .n .. •;at;s,�f•i7?Y'!F- .�.7
z
w
cc 6
00
Ill I
F"
• lL,
W D
u-
`—a
= W
z1..
WO
• C)
O • I-
W W
2
U. 8
lllz
U=
O ~
z
j LA r•
\-)
)
<0) a s
f`
0 v_
ti
2
t
U0 CALCULATIONS FOR FLOORS AND ROOF- CEILING
)(
>.‘
4- 4- 4- 4-
•r• sr"
uuuu
v, v,
ffi Lc,c,
vs- tca
F-4 r-4
18 OPAOUEFLOOR
11R FRAMING
CV
a) INSULATION
r.
I0
TOTAL LINES 1
1:4
0
Lai
1.4
0-4
5
00
■■■
ce
1-
0
C7t
0
r-i
4.4
12 U = 1/R TOTAL
cc
ti
0
ff
c)
,-,
a
x
=
i
z..
.
0
r.)
0
•
1U VALUE
CS)
N
.
•
R VALUES
FRAMING
in
6
21 U0 s TOTAL LINES 14, 15, 16, 17, 19: 20
GROSS AREA
RATIO 11
.
...5
•••■•
**
'..)
*A
to:,
.....
sr
—a
CC
•674C
1 2 OUTER SURFACE 4 , .t...
3 OUTER SHEATHING 4 t ' -
i.
!..$
....).
r
cm
5 CAVITTY a) INSULATION 3"
6 b) AIR SPACE
‘76
8 AIR FILM INSIDE
9 OTHER a)
-ROOF - CEILING
HEATING
13 GROSS ROOF -CEIL.
14 SKYLIGHT
15 ROOF SCUPPER
..--1
ti
.r—
(j
CU
C1
...-
LL
I—
1.0
I17 OTHER (Specify)
;
e--•
IL L. .J
.)
N 14—
0
L Co
LIJ
i 0
Cl.
CO
CD
=
x
cc
CT
120 CAVITY
4/1
,..]
cc
z..
.
CS)
N
.
•
R VALUES
FRAMING
.
1-.
.
...5
—
ROOF - CEILING
HEATING
to:,
.....
sr
—a
CC
•674C
1 2 OUTER SURFACE 4 , .t...
3 OUTER SHEATHING 4 t ' -
i.
!..$
....).
r
cm
5 CAVITTY a) INSULATION 3"
6 b) AIR SPACE
7 INSIDE SURFACE Yee
8 AIR FILM INSIDE
9 OTHER a)
{10 (Specify) b)
1 RT = TOTAL LINES I -10
112 U = 1/R TOTAL -
) 1-
z
Z
w
_J C.)
00
u) 0
W
=
u j 0
g
<
(.0
I a
1- In
z
I-0
z 1—
11.1
0 (2)-
1-
w
0
1—
— 0
Z
Cf)
0 }-
Z
U0 CALCULATIONS FOR FLOORS AND ROOF- CEILING
METER-MUM
TABLE A - JOIST
'.1
: • i )
• ' ... •
.1..••••
1.
LI , • .
r.i. --...... ..3;
1--- I.T •.+..
i...7
i
(...'
%... a.
I
cr
kJ I
1.1.1
,F....'
>•-
0
0
(.9
L.)
•7-1 - I."
CD
o
w
W-4 Ce
L.L. 41(0
8 S "
cc
Kr
ROOF SCUPPER
LC)
0
1,1
■■••••.
L • C•1
• *- -4
IskN
Cr
)•••
c■I
LC)
TOTAL LINES 14
1
.--4
0•11
4717/_) INc7--3"c3
( cir W) 2 12 1 "2/0 71-"(\Q
z
w
6
c.)
00
(0
w
WI
uj 0
g
<
11-1
Z
I— 0
Z
O (12
O 1—
E11 w
u.
—
O • (I)
o 1—
z
-
0
isN
—0
l'l
0
R VALUES 1
FRAMING
.
T
NI-
,
1--
ROOF - CEILING
HEATING_
1 1 AIR FILM OUTSIDE
1 2 OUTER SURFACE -1 °rte
1 3 OUTER SHEATHING
1 4 FRAMING 274-4 19\-1,A GricesA
1 b CAVI•TY a) INSULATION
1 6 b) AIR SPACE
1 7 INSIDE SURFACE let..'
1 6 AIR FILM INSIDE
�lI RT = TOTAL LINES 1 -10
4717/_) INc7--3"c3
( cir W) 2 12 1 "2/0 71-"(\Q
z
w
6
c.)
00
(0
w
WI
uj 0
g
<
11-1
Z
I— 0
Z
O (12
O 1—
E11 w
u.
—
O • (I)
o 1—
z
O
X
°
0
0
0
4
Y�
1\
1
0
0
to
N
1
tole;
ib
z-
tko
'T\. !')
0
°
c
J
N
23 FLOOR
24 CEILING-
ROOF
25 TOTAL
O
14--
!--
OPAQUE 1)
REA RAT I O
Q
illEV
ii
O
O
_
N O
CI
g
rn N
,4\
p O
O
W
0
0--
QC
8 JLa.
ii v
N N
Ln
N
TABLE .A - STUD FRAMING
10
03
•
O
•
a
N
O
•
1[)
O
N
41c`ar;trrwtrol3,�y.'s4+� ✓r,i�c� pis {.c�rdlt� �'t #*F '!'.+1� ru.��aar.Fxt�Y� `: "• *^', i.w��.n.,ic �C;��.
STUD SPACING
Q~
,/ ∎,/
AILAN
U VALUE
%WAIN
A I WI
]griairi
IM.
-
14--
!--
OPAQUE 1)
REA RAT I O
illEV
M
O
4. J .-4
0
13 GROSS WALL
'.
g I
s
3 []
.i. 1/1
4-
•r
U
CD
N
w
x
O
. to
17 OTHER j Decify)
18 OPAQUE WALL
19 FRAMING
20 CAYITY
R VALUES
CAVITY
R VALUES
FRAMING
CD
V1JH
Z 8
1 1 AIR FILM OUTSIDE
2 OUTER SURFACE
CD
z
=
W
N
ce
W
w
0
M
1 4 FRAMING
1 5 CAVITY a) INSULATION
1 6 b) AIR SPACE
1 7 INSIDE SURFACE
8 AIR FILM INSIDE
�-
rtl
w
O►
110 (Specify) b)
�1 RT - TOTAL LINES 1 -10
112 U - 1/ R TOTAL
z
�W
00 0
co 0
co cu
W=
wo
L Q
_ d
F. W
z=
O
0
0—
C1 H
WW
1-
uiu)
U=
O~
z
\-6
•
F.t:i.11l it .6�z� �i ?. �i;;•r`1?.% i,1,V iar'�Lt Sd;�Hfal?:n'.:;:l:t�;�::9.: iiAi ru+>�.iu9iZ,
N
0
o
a
z
i U
a.
9
3i3 *. • l2lztkli {iY 7Aw F. Yr _'�4FFt't;.r.�rc4''44.A ;;
Q • •
H�.
W
QQ • �
JU
O 00
W
I—
U) LL
w0
u. a
co
=a
z�
1.0
W
I-
o1-
W• W
-
U-
�o
O 92
wZ
z
PLAN REVIEW
PLAN CHECK
NUMBER
CITY OF TUKWILA
Department of Community Development - Building Division
Phone: (206) 431 -3670
�t -081
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: •JOANNE -- - ES. " MC .L �iPa E.L, Ai C.C1r a
ADDRESS: 44-3 � J
DATE: �c%
OCCUPANCY GROUP -R-- '51%j„E, F . ?.E6
TYPE OF CONSTRUCTION v
LOCATION ON PROPERTY Rj
BUILDING HEIGHT /# OF STORIES 2.
. G3
S N
•'
FLOOR AREA
OCCUPANT LOAD
5'62 tjr'
11
EXITING REQUIREMENTS 01K,
DETAILED REQUIREMENTS
OCCUPANCY
TYPE OF CONSTRUCTION
PART V, CHAPTER 23, U.B.C.
'K
W.S.E.C. l / Ar%„gA".
CHAPTER 51 -10, W.A.C. 14 .74-
PREPARED BY:
'Ny+�.,'*i'S'x`4».nr{,:;r��!ra aE �jn' �r.+>.: �ro-tnw�, �; i�tr• �,'�;}»rIG'.SY�,.*ts'C�r"WC' ?r; t�k; mrh*;;.���sr.avn rrr.,;rH�"f;:rtnrrs:.; +n^z,�.. ^7 +m,
DATE:
/s/
Z
�z
w
JU
0
UU
J
H
N L
W0
2
u-Q
d
I— W
Z=
I— 0
Z I-
LL!
W
U 0
O N
wW
z
w
U=
o�
Z
9008150799
43rd Avenue So.
N I'36'41" E
1 ospho // pav ing /
103.83'
N
xa-.1 o 4
—
w ml •
J - -- -
V
Q
Nk
kkIN
k0
W
X J
w
N 01
i ci i4
M
a• O •
N of cn
.w co
J/
/1
m
2/ a;
a
tD 0 An
0 W
\ � et
p w
\� .ii:/1
z...
o o \. // 1 —
Ol
tL o co
4 o
ca 0
�1 W u)
w M 0 pi M °°
1� ItN Q I Nac
am \�) wu
\ p
� o k o) M
77;75027 kW-40W v 1 —
.� -` 1 IV
— 103.83' • —. 1,
S r09'50" W
land Surveyor's Certificate:
This Boundary line Adjustment /Lot Consolida-
tion correctly represents a survey" made by
me the or under 1 r n . late onf 5 5k with
the req .rema�� ;� �p o�� late S � t ute.
Name:
Date:
Certificate Mo. L c37.Z63
* A lot consolidation does not require a survey
of the perimeter unless the lines are adjusted.
(29 /BLA.MAP)
7/ 790
NO TL Elevations assumed datum
Map on File in Vau1tNORTH
Direction:
r
o 1. �
Scale: / 40'`YZ`P �o�• wWiy O( s
ter: ��
ti • ISI �. cp
LAW
Stamp:
Page
of
Z
= 1-
l- Z
rt w
6
00
co
=
H
WO
2QQ
LLQ
c
Id
I- W
Z=
WI-
W
0
N
CD
WW
1-
w op
-I
O~
Z
City of Tukwila Lot Line Adjustment
Existing Legal Descriptions
Parcel A
Lot 1, King County Short Subdivision No. 1083050, as
recorded under Recording Number 8504080746.
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property •es
created by King County Short Plat No.1083050, as recorded
under Recording Number 8504080746.
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 7807280945 and No.
8302240491.
Situate in the County of King, State of Washington.
Parcel B
Lot 2, King County Short Subdivision No. 1083050, as
recorded under Recording Number 8504080746.
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property as
created by King County Short Plat No.1083050, as• recorded
under Recording Number 8504080746.
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 7807280945 and No.
8302240491.
Situate in the' County of King, State of Washington.
Proposed Legal Descriptions
Parcel A:
The East 101.03 feet of the East half of the South half of
the North half of Tract 64, Riverside Interurban Tracts,
according to the plat thereof recorded in Volume 10 of
Plats, page 74, records of King County, Washington;
Together with and Subject to an easement for ingress, egress
and'utilities over the South 30 feet of said property as
created by King County Short Plat No.1083050, as recorded
under Recording Number 8504080746.
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No.8302240491.
Situate in the County of King, State of Washington.
Parcel B:
The East half of the South half of the North half of Tract
64, Riverside Interurban Tracts, according to the plat
thereof recorded in Volume 10 of Plats, page 74, records of
King County, Washington;
EXCEPT the East 101.03 feet thereof.
Together with and Subject to an easement for ingress, egress
and utilities over the South 30 feet of said property as
created by King County Short Plat No.1083050, as recorded
under Recording Number 8504080746. •
SUBJECT TO easements and conditions of instruments recorded
under King County Recording No. 7807280945 and No.
8302240491.
Situate in the County of King, State of Washington.
r
z
Ce
00
U0
J
H
w
J
u.<
=d
�_.W
Z F=.
I— O
Z I—
W
w
U�
O (
W W
2
I— H
u. O
WZ
U co
— _
O I"
Z
CITY Or TUKWILA X0561
PRE - APPLICA fION PROCESS
MEETING ATTENDANCE RECORD
PRE - APPLICATION FILE NO. PRE - APP - 009 -90
PROJECT. Joanne Poirier
MEETING DATE. 3 -08-90 TIME. 2:30 SITE ADDRESS. 13413 43 Av S
March 9, 1990
CHECKLIST MAILED TO CONTACT PERSON (date):
INITIALS' SLB
STAFF PRESENT
_X_.
Building (433 -1851)
Fire (575 -4407)
Planning (433 -1849)
Public Works (433 -0179)
O Parks & Rec. (433 -1847)
Police (433 -1806)
n Permit Center (433 -1851)
Other ( - )
NAMES /TITLES
Bob Ben -di _ .o, P1 an. Checker
Nick Olivas, Fire Marshal
Rick Beeler, Director; Darren Wilson, Assistant Planner
Phil Fraser, Senior Engineer
Tom Kilburq, Crime Prevention
APPLICANT /REPRESENTATIVES PRESENT
Contact Person:
Name Joanne Poirier Company /Title Owner
Address 13405 42nd Avenue South, Tukwila, WA Zip 98168 Phone 242 -4171
Others Present:
Name Mark Poirier Company /Title
Address 13411 43 Avenue South, Tukwila, WA
Name Jan Noorda Company /Title
Zip 98168
Architect
Phone 243 -8885
Address 9291 S.W. 152nd Street, Seattle, WA Zip 98166 Phone 246 -6111
Name Company /Title
Address Zip Phone
Name Company /Title
Address Zip Phone
Name Company /Title
Address Zip Phone
Application forms, plan submittal handouts and other reference materials are enclosed for
your use. If you should have any questions regarding the permit process or would like
additional forms sent to you, contact the Permit Center at 433 -1851.
(PREAPP2, 1/90)
3w't}ke':e?�bJSh,: r411a:: JWAt:4 iC ",04,41W is
;a'q+.",wv ?�'; .'.WNY..6'4•;15 , YkiRIT011110
riV m 5,: Wti2?2 }» ,,r11,t ,, °.:th?ttk'i'?n�?'h. Ytj, •'iR�e*lyF 3F4iW M
z
w
J U
00
• LU
J
1—
U)
w0
�LLL'
_• CI
w
Z
�— O
zr
w
w
U �
0-
0 )-
w
Li.
O
wz
UD.
O 1-
z
CITY OF TUKWILA
PRE - APPLICATION CHECKLIST
PRE - APPLICATION FILE NO
PRE -APP- 009 -90
PROJECT:
Joanne Poirier
MEETING DATE 3-08-90 TIME 2:30 SITE ADDRESS: 13413 43 Av S
BUILDING DIVISION
Im 1. Comply with the Uniform Building Code, 1988 Edition.
• 2. Comply with the Uniform Mechanical Code, 1988 Edition.
Ej 3. Comply with the Washington State Energy Code. Provide energy calculations stamped by a
Washington State licensed architect or engineer (see attached format).
O 4. Comply with Washington State Barrier Free Code, 1989 Edition.
IS 5. Apply for and obtain the following Building Division permits and approvals through the Permit
Center:
Z(Building Permit _Rack Storage
Mechanical Permit Demolition (Building)
_Grading /Fill Permit XOther y -QicAL
C1 6. All applications and plan submittals must be complete in order to be accepted by the Permit w
Center for plan review. Use the Plan Submittal Checklist provided on the reverse of the applica- o:
tion forms to verify that all the necessary materials and information has been supplied.
•
7. Construction drawings must be stamped by a Washington State licensed architect. u) cn
• LLI
J=
H
� u.
w0
9. A boundary and topographic survey prepared by a Washington State Registered Land Surveyor must be
submitted as part of the Building Permit application.
u.
?
plans. 10 Temporary erosion control measures shall be included on lans.
allowed until erosion control measures are in place. y, no site work will be =
0 11. Rockeries are not permitted over 4' in height. Retaining structures over 4' in height must be
engineered retaining walls, and requires a permit. w O
w
Q 12. Rack storage over 8' high must be designed for Seismic Zone 3. A Washington State structural v o
engineers stamp will be required on plans and structural calculations submitted for rack storage o
over 8' high.
Q w
13. Construction documents shall include special inspection requirements as specified in Sections t=-
302(c) and 306 of the Uniform Building Code. Notify the Building Official of testing lab hired 0 0
by architect or owner prior to permit issuance date. The contractor may not hire the testing
lab. aim
[� 14. Demolition permits are required for removal of any existing buildings or structures. 0
C1 8. Structural drawings and calculations must be stamped by a Washington State licensed structural
engineer.
O 15. Comply with UBC Appendix Chapter 35, Sound Transmission Control (R -1 occupancy group).
Q 16. Obtain approvals and permits from outside agencies:
ELECTRICAL PERMIT /INSPECTIONS are obtained through the Department of Labor and Industries
(872- 6363).
IS PLUMBING PERMIT /INSPECTIONS are obtained through King County Health Department (Inspections:
(296 -4767, Permits: 296 - 4727).
0 KING COUNTY HEALTH DEPARTMENT must approve and stamp plans for restaurants and food service
facilities prior to submittal to the Tukwila Building Division (296- 4727).
0 FIRE PROTECTION SYSTEMS plans are reviewed through the Tukwila Fire Department (575- 4404).
[l 17.
Q 18.
Q 19.
Q 20.
Checklist prepared by (staff):
Date 3 -j - clQ
If you should have any questions regarding the permit process or would like to obtain additional forms
and handouts, contact the Permit Center at 433 -1851.
(PREAPP6, 1/90)
CITY OF T'JKWILA
PRE - APPLICATION CHECKLIST
PRE - APPLICATION FILE NO PRF- APP - (109 -90 PROJECT• Joanne Poi ri er
MEETING DATE.
3 -08 -90
TIME 2:30
SITE ADDRESS: 13413 43 Av S
FIRE DEPARTMENT - Construction Information
Q 1. The City of Tukwila has adopted the 1988 Uniform Fire Code. This and other
nationally recognized standards will be used during construction and operation of
this project. (TMC 16.16.120)
Q[ 2. Fire hydrants will be required. (City Ord. #729)
D 3. Required fire hydrants shall be approved for location by the Fire Department,
approved for purity by the Water Department, and fully in service prior to start
of construction. A fire hydrant must be no further than 150 feet from a struc-
ture; and no portion of a structure to be over 300 feet from fire hydrant. (UFC
10.301 and City Ord. #729)
Q 4. Automatic fire sprinklers are required for this project. Sprinkler systems to
comply with N.F.P.A. #13. Sprinkler plans shall be submitted to Washington State
Surveying and Rating Bureau, Factory Mutual or Industrial Risk Insurers for appro-
val prior to being submitted to Tukwila Fire Marshal for approval. Submit three
(3) sets of sprinkler drawings. This includes one for our file, one for company
file, and one for the job site. (City Ord. #1528)
Q 5. Maximum grade is 15% for all projects.
Q 6. Hose stations are required. (City Ord. #1528)
z
w
JU
UO
W
t-
Q 7. A fire alarm system is required for this project. (City Ord. #1528) Plans shall w
be submitted to the Tukwila Fire Marshal for approval w o
pp , prior to commencing any
alarm system work. Submit three (3) sets of complete drawings. This includes one g
for our file, one for company file, and one for the job site.
cnD
Q 8. Special installations of fixed extinguisher systems, fire alarm systems, dust w
collectors, fuel storage, etc. require separate plans and permits. Plans to be z E
submitted to the Fire Marshal prior to start of installation. (UFC 10.301) I— O
z�-
0
W
9. Portable fire extinguishers will be required in finished buildings per N.F.P.A. ? o
#10. (Minimum rating 2A, 10 BC) U
Q 10. Buildings utilizing storage of high piled combustible stock will require mechani- iw
o
w
cal smoke removal per Section 81 of the 1988 UFC. _ ▪ 0
1i O
gi 11. During construction, an all- weather access will be required to within 150 feet of
Wu)
U
Q 12. No building will be occupied, by people or merchandise, prior to approval and
inspection by Fire and Building Departments.
DK 13. Adequate addressing is required. Number size will be determined by setback of
building from roadway. Four inch numbers are minimum. Numbers will be in color
which contrasts to background. (UFC 10.208)
Q 14. Designated fire lanes may be required for fire and emergency access. This
requirement may be established at the time of occupancy and /or after the facility
is in operation. (UFC 10.207 as amended)
Q 15. Special Fire Department permits are required for such things as: storage of
compressed gas, cryogens, dry cleaning plans, repair garages, places of assembly,
storage of hazardous materials, flammable or combustible liquids or solids, LPG,
welding and cutting operations, spray painting, etc. (UFC 4.101)
Q 16. Fire Department vehicle access is required to within 150' of any portion of an
exterior wall of the first story. Fire Department access roads in excess of 150'
require a turn around. Fire Department access roads shall be not less than 20'
wide with an unobstructed verticle clearance of 13'6 ".
El 17. Adequate fire flow availability will need to be demonostrated for this project.
Cig 18. €A 4/4e/ C'evi ,/// via 7yu /Quve[�Jrc�tTL `f.(e �itc G �i1, tu6- 7
Checklist prepared by (staff): Date �//40'0
the building. (UFC 10.207)
�' �s.. uu.♦. X.�r�;N §{�r,.7�+4�1"h""l:i�k+.r T .r.g4,,yor.:
CITY OF T!:IKWILA
PRE - APPLICATION CHECKLIST
PRE - APP - 009 -90
MEETING DATE. 3 -08 -90
PROJECT. Joanne Poirier
SITE ADDRESS. 13413 43 Av S
FIRE DEPARTMENT - Inspections
1. Underground fire line from vault
to riser
a. Thurst block and rodding
b. Type of pipe
c. Depth of cover
d. Flush
e. Hydrostatic test
f. Fire Dept. approved plans
g. Materials and test certi-
ficate
[J 2. Overhead sprinkler piping
a. Hydrostatic test
b. Trip test
c. Alarm system monitoring
test
d. Fire Dept. approved plans
e. Sprinkler head location
and spacing
[I 3. Underground tank
a. Locaton
b. Distance between tanks
c. Distance to property line
d. Depth of cover
e. Vent piping, swing joints,
fill piping, discharge
piping
f. Anchoring
g. Hydrostatic test
h. Separate Fire Dept.
approved plans
5. Fire alarm
a'. Acceptance test
b. Fire Dept. approved plans
[� 6. Hood and duct inspections
a. Installation
b. Trip test
Checklist prepared by (staff):
(PREAPP4, 1/90)
[[ 7.
Spray Booth
a. Location
b. Fire protection
c. Ventilation
d. Permit
8. Flammable liquid room
9.
a. Location
b. Fire protection
c. Permit
Rack storage
a. Permit
b. Mechanical smoke removal
c. Rack sprinklers
d. Aisle width
[[ 10. Fire doors and fire dampers
a. Installation
b. Drop testing
Zi 11. Fire final
a. Fire Dept. access
b. Bldg. egress and occupancy
load
c. Hydrants
d. Bldg. address
e. Fire protection systems
(1) Halon systems
(2) Standpipes
(3) Hose Stations
(4) Fire Doors
(5) Fire Dampers
(6) Fire Extinguishers
12. Other
a.
b.
c.
d.
e.
f.
g.
Date d3/
z
F- w
IX W2
wi0
O 0
to o
ww
N LL
wo
g a
=• o
�w
z =
1- 0
wH
• w
U �
o.
o1—
w
I -- • o
wz
U -
P=
O 1—
z
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
PRE - APPLICATION CHECKLIST
PLANNING DEPARTMENT (land use)
FOR STAFF USE ONLY
Pre -app File # PRE- APP - 009 -90 Project Name:
Meeting Date 3 -08 -90 Time 2:30 Site Address:
Zoning 8-4 5172
Joanne Poirier
13413 43 Av S
LAND USE INFORMATION
1. Compliance with the Zoning Code (Title 18).
621/2. Obtain the following permits /approvals:
(applications attached)
,Boundary Line Adjustment
_ - Building Site Improvement Plan
Comprehensive Plan Amendment
- Conditional Use Permit
_ - Design Review
Design Review - Interurban
Environmental (SEPA)
Planned Mixed Use Development
Planned Residential Development
Rezone
_ - Shoreline Management Permit
Shoreline Management Permit Rev.
✓Short Subdivision
- Subdivision
- Unclassified Use
_VVari ance, for 5elbAck A0414p
. Proposed use complies with zoning? Yes No
. Structure meets setback requirements? Yes No
Q 5. Proposal meetings minimum parking space standards? Yes No
[� 6. Roof -Top mechanical equipment screened? Yes No
Q 7. Site plan complies with landscape requirements. _ Yes No
8 • Refu< <s e Cp, EvF co-kic4 9 Zara
Q 9 • 64-0 ,ep♦r -1, 444,
Er 10.
[[ 11.
Q 12.
Q 13.
Q 14.
Q 15.
Q 16.
Q 17.
Q 18.
[�
19.
Q 20.
Checklist prepared by (staff): ileer7 ����rayt� Date 4_1/00
z
~ w
6
0- 0
uJ
W- I
(/)LL
Wo
2
(od
H =
1—o
w ~
• w
o • -
O H
w w
u.o
wz
U=
O I'
z
CITY OF TUKWILA
PRE - APPLICATION CHECKLIST
PRE - APPLICATION FILE NO PRE- APP- 009 -90
MEETING DATE.
3 -08 -90 TIME 2 :30
PROJECT• Joanne Poirier
SITE ADDRESS. 13413 43 Av S
PUBLIC WORKS DEPARTMENT
❑ 1. Apply for and obtain the following permits /approvals through the City's Permit Center:
Center
❑ 2.
[[ 3.
❑ 4.
❑ 5.
❑ 6.
a7.
❑ 8.
❑ 9.
❑ 10.
• 11.
_ Channelization /Striping /Signing
_ Curb Cut /Access /Sidewalk
Excavation (public)
—
Fire Loop /Hydrant (main to vault)
Flood Zone Control
- Hauling (2,000 Bond, Cert. Ins.)
- Landscape Irrigation
_ - Moving an Oversized Load
Sanitary Side Sewer
Sewer
- Sewer
- Storm
- Water
_ - Water
_ Water
_ Water
Water
- Other
Main Extension (private)
Main Extension (public)
Drainage
Main Extension (private)
Main Extension (public)
Meter (exempt)
Meter (permanent)
Meter (temporary)
Hauling Permit required prior to start of any hauling of
($2,000 bond, $1,000,000 certificate of insurance, route
required).
All applications and plan submittals must be complete in order to be accepted by the Permit
Center for plan review. Use the Plan Submittal Checklist provided on the reverse of the
application forms to verify that all the necessary materials and information has been
supplied.
Water and sewer assements may apply and will be determined during the utility plan review
process.
material on public right -of -way
map and $25.00 permit fee
Provide sidewalks per Ordinance #1158, #1217 and #1233, or obtain waiver.
Provide Hydrological - Geotechnical analysis.
Provide erosion control plan as part of grading /fill permit application.
Identify building elevation above 100 year flood elevation per FIRM maps (use NGVD datum and
recognized bench marks).
Provide traffic analysis /trip generation study for
Provide developers agreement for
Provide the following easements and maintenance agreements 3; (1, .r 1 t c jS1Ki\L (0 71 0
AS iv L i s t 1 t" r PL A1, S
❑ 12. Provide water /sewer availability letters or certificates from districts serving your deve-
lopment.
[[ 13. Obtain Metro Waste Discharge permit or approval (684 - 2300).
❑ 14. Complete Industrial Waste Survey and return to Metro (self addressed and stamp
provided).
[( 15. Review the following City Studies when designing your project and preparing your
plan submittal:
❑ 16.
❑ 17.
o 18.
❑ 19.
o 20.
Checklist prepared by (staff) : `� ` _ Date 3 ° 8
If you should have any questions regarding the permit process or would like to obtain additional
forms and handouts, contact the Permit Center at 433 -1851.
(PREAPP5, 1/90)
5"�'ieji�''. iAs'.i:d :i � >.!f.Ga- ,:,� +T yt +. .�F : <f;nx•.��,�.o �',A�r .;iq::�LS'Y:t:Y�':..hL"M*.4: 3 ".`Y �.`15'k }w ..: n'7'.•1 '�i l':1 'AX ^Z:Y•: ... Y,: 1'Ni ?Fti`ip'.4.'LG'(`1: +;N�1; +a :4ar;.�..n °t^
z
w
6
JU
00
N
W• I
F-
U) LL
ua 0
1Q
a
I--w
Z=
I— 0
Z~ uj
UQ
0 l—
WW
F- HIL
z
ui
U=
0
z