Loading...
HomeMy WebLinkAboutSpecial 2015-01-26 Item 2B - Contract Supplement #1 - Sewer Lift Station #4 with Systems Interface for $9,310COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Ma or's review Council review 1/26/15 BG ITEM INFORMATION ITEM NO. SpecialMtg 2.B. 55 STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 1/26/15 AGENDA ITEM TITLE 2014 Annual Sewer Repair Program -Sewer Lift Station No. 4 Supplemental Agreement No. 1 with Systems Interface CATEGORY 0 Discussion Mtg Date E Motion Mtg Date 1/26/1kg E1Resolution Date Ordinance Mtg Date El Bid Award Mtg Date D Public Hearing Mtg Date Lil Other Mtg Date SPONSOR • Council • Mayor LI HR 111 DCD 1111 Finance LI Fire LI IT LJ P&R LI Police I PIP- SPONSOR'S Systems Interface is the consultant for the design of the electrical updates to Sewer Lift SUMMARY Station No. 4 as part of the 2014 Annual Sewer Repair Program. As a result of unforeseen Puget Sound Energy design requirements, Supplemental Agreement No. 1 is needed. Budget from the 2015 Annual Sewer Repair Program will be used. Council is being asked to approve System Interface's Supplement No 1 to Contract No. 14-090 for $9,310.00. REVIEWED BY III COW Mtg. 0 CA&P Cmte fl F&S Cmte 111 Transportation Cmte Cmte Eil Arts Comm. Parks Comm. ID Planning Comm. COMMITTEE CHAIR: KATE KRULLER I Utilities DATE: 12/01/14 RECOMMENDATIONS: SPONSOR/ADMIN. COMMI Public Works Department Approval; Forward to Regular Consent Agenda 'TEE Unanimous COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $9,310.00 $0.00 ./._ $0.00 Fund Source: 402 SEWER FUND (PAGE 70, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 1/26/15 MTG. DATE ATTACHMENTS 1/26/15 Informational Memorandum dated 11/26/14 Supplemental Agreement No. 1 to Contract No. 14-090 2015 CIP, page 70 Minutes from the Utilities Committee meeting of 12/01/14 55 56 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, PE, Senior Program Manager DATE: November 26, 2014 SUBJECT: 2014 Annual Sewer Repair Program /Sewer Lift Station #4 Project No. 91440201 Contract No. 14-090 Supplement Agreement No.1 ISSUE Approve Supplement No.1 with Systems Interface, Inc. for extra work incurred related to design changes from Puget Sound Energy (PSE). BACKGROUND The design of electrical upgrades to Sewer Lift Station No. 4 began in January 2014. During an inspection of the sewer lift station, it was determined that the existing motor control panel was also in need of replacement. Additional coordination and work was required by Systems Interface Inc. to address the PSE changes. FISCAL IMPACT The original design contract expired on May 31, 2014 and Contract No. 14-090 was then processed to proceed with the design. This supplement No. 1 to Contract No. 14-090 for the unforeseen PSE design requirements will be funded by the 2015 Annual Sewer Repair Program. Contracts Budget Original Contract (#14-002) $ 18,907.00 2014 Annual Sewer $ 75,000.00 Supplement No. 1 18,500.00 2015 Annual Sewer 75,000.00 Second Contract (#14-090) 7,043.00 Supplement No. 1 9,310.00 Total $ 42,303.00 Total $150.000.00 RECOMMENDATION Council is being asked to approve Supplemental Agreement No. 1 with Systems Interface Inc. for $9,310.00 for additional design services for Sewer Lift Station No. 4 and consider this item on the Consent Agenda at the January 20, 2015 Regular Meeting. Attachments: Supplemental Agreement No. 1 Page 70, 2015 CIP W:\PW Eng PROJECTSA- SW ProjectsI2014 Annual Sewer Repair (91440201)1Sewer Lift Station No. 4 (91440201)\SUPP 1 Info Memo Consultant Agreement SYSTEMS INTERFACE 11714.doc 57 58 SUPPLEMENTAL AGREEMENT NUMBER 1 to CONSULTANT AGREEMENT NUMBER 14-090 THIS SUPPLEMENTAL AGREEMENT is entered into between the City of Tukwila, Washington, herein-after referred to as "the City", and Systems Interface, Inc hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on, July 2, 2014 and identified as Agreement No. 14-090. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Scope of Services, provide extra engineering services to address changes required by PSE during the upgrade approval process for the installation a new motor control center for Lift Station No.4 located 6790 Todd Blvd. See Exhibit A from Systems Interface Inc. dated November 28th, 2014. Payment, shall be amended as follows: Payment for the work provided by the Consultant as part of this supplement shall be made and the total amount of payment to the Consultant for this work shall not exceed $16,353.00 without express written modification of the Agreement signed by the City. Time for Performance, is amended to change the number of calendar days for a completion date of July 31, 2015 with a total of 389 days DATED this day of , 2014. CITY OF TUKWILA CONSULTANT Jim Haggerton, Mayor (W:Projects/04sw08/Supplmental Agreement 1 APS) By: Printed Name: (4)12,09r 9 00W-telt_ Title: \I Le- eiZt-S t 59 Systems Interface 1916 220th Street SE*Suite M102* Bothell, Washington g8$21-74V6 • USA * Tel: 425.4B 1225 Fax 425.4812115 ° Mike Cusic City of Tukwita O9OO8outhcenNerBlvd Suite 100 Seattle, Washington 98188 November 28th, 2014 Re: Scope Changes #2 to existing Lifts Station No.4 Professional Engineering Services, On-Call Electrical Engineering Contract Hi Mike, Thank you for the opportunity to provide additional Engineering services for the City of Tukwila Lift Station No.4 Scope of Work Change Request. Systems Interface proposes to provide provide the City with on-caII electrical engineering services for the scope of work changes now required. These additions to scope include the extra work incurred by design suggestions and changes from PSE during the upgrade approval process. Work was also added in order to coordinate the service application with PSE as well as participating in on-site visits with PSE. Additional Deliverables will include: Coordination with PSE throughout the service upgrade application process, including mutipIe requests for additions to the application Design change requests from PSE Time spent participating in and conducting on-site meetings with the PSE engineer to go over plans and their implementation Below is a suggested budget for Professional Eng services: Task: Electrical Engineering Services De cr"" ion R Rate/hr E Est.Hrs T Total Pno'eot En"inaer(deoign. switchover planning, site visits, etc) 9 98 9 95 $ $9.310 Original Contract 7 7,04� New Contract $ $ 6,353 We propose that we bill on a Time and Material basis with a Not-To-Exceed Professional Services contract. Systems Interface will invoice only for actual time spent on the project and not exceed the maximum ontract value, while guaranteeing to provide all agreed upon scope of work items. We would invoice on a monthly basis with timecard and expense information attached, Dehvery of design documents will be coordinated with the City of Tukwila. Please caII with any questions or concerns. Sincerely, Systems Interface Inc. Marcus J. Lee-Chin, PM Project Manager 60 Page 1 of 1 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Sewer Repair Program Project No. Varies Reduce sewer line infiltration and inflow (I & I) through groundwater intrusion or storm events as a DESCRIPTION: result of damaged deteriorating systems or unopposed connections. Include small repairs and capital maintenance. JUSTIFICATION: Decrease treatment, discharge, and pumping costs. STATUS: Annual program is determined after pipeline TV inspection reports are completed. MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system. COMMENT: Ongoing project, only one year actuals shown in first column. FINANCIAL Through Estimated in $000's 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 15 15 Land (R/W) 0 Const. Mgmt. 16 16 Construction 303 200 75 200 200 200 200 200 200 1,778 TOTAL EXPENSES 334 200 75 200 200 200 200 200 200 1,809 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 334 200 75 200 200 200 200 200 200 1,809 TOTAL SOURCES 334 200 75 200 200 200 200 200 200 1,809 2015 - 2020 Capital Improvement Program 70 61 62 UTILITIES COMMITTEE Meeting Minutes Monday, December 1, 2014 — 5:15 p.m. — Foster Conference Room City of Tukwila Utilities Committee PRESENT Councilmembers: Kate Kruller, Chair; Allan Ekberg, Kathy Hougardy Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischmak, Gail Labanara, Pat Brodin, Mike Cusick and Laurel Humphrey CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:20 p.m. • PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Supplemental Agreement: 2014 Annual Sewer Repair Program/Sewer Lift Station #4 Staff is seeking Council approval of Supplement No. 1 with Systems Interface Inc. in the amount of *$9,310.00 for additional design services for Sewer Lift Station No. 4. The design of electrical upgrades to Sewer Lift Station No 4 began in January 2014 and an inspection revealed the need to replace the motor control panel. Funding for this project comes from the 2014 and 2015 Annual Sewer Repair Program. UNANIMOUS APPROVAL. FORWARD TO JANUARY 20, 2015 REGULAR CONSENT AGENDA. B. Contract: Revisions to Comprehensive Water Plan Staff is seeking Council approval of a contract with Carollo Engineers in the amount of $15,132.00 for final revisions to the Comprehensive Water Plan. Initial comments from the Department of Health (DOH) were incorporated into the Water Comprehensive Plan adopted by the Council on July 21, 2014 via Resolution 1834. It was then sent back to DOH for final approval, but a different reviewer was assigned who then requested additional changes to the body of the text. The new contract with Carollo Engineers provides funding for work to address the reviewer's comments as well as printing costs. Funds are available from the Water Fund's Ending Fund Balance. The Committee noted the inefficiency of responding to additional DOH changes following Council approval and printing, and staff confirmed that Municipal Water Law requires legislative body approval prior to DOH approval. Council discussion led to the conclusion that it would be good to learn if other jurisdictions encounter difficulties with this sequence of events and if so, it may be worth bringing forward for legislative change. UNANIMOUS APPROVAL. FORWARD TO JANUARY 12, 2015 COMMITTEE OF THE WHOLE. III. MISCELLANEOUS Committee Chair Kruller complimented staff on the Cascade Safe Routes to School trail that was recently paved. She then inquired if weather would impact the new vault installation and the final paving and staff informed Committee that the vault is expected next week and the final phase is weather dependent. Meeting adjourned at 5:48 p.m. Next meeting: TBD Committee Chair Approval Minutes by LH. Reviewed by GL. 63