HomeMy WebLinkAboutUtilities 2015-02-10 Item 2B - Update - Commercial Business District Sanitary Sewer Rehabilitation (Andover Park West to Andover Park East Sewer Repair)w,q City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, PE, Senior Program Manager DATE: February 6, 2015 SUBJECT: CBD Sanitary Sewer Rehabilitation /APW to APE Sewer Repair 2013 Project No. 91140203 Project Update ISSUE Provide an updated status of the CBD Sanitary Sewer Rehabilitation & Andover Park W to Andover Park E Sewer Repair Projects. BACKGROUND Two separate contracts were awarded last year that are related to the CBD Sanitary Sewer Rehabilitation Project. One project will repair a collapsed sewer line and install a manhole in Andover Park East and the second project will install 2,440 feet of Cured -In -Place -Pipe (CIPP) sewer lining within a portion of the Commercial Business District (CBD). Both projects are part of an effort to extend the life of deteriorating sewer lines within the CBD. ANALYSIS The R.L. Alia Company has repaired 66 feet of the collapsed sewer pipe near the railroad tracks between APW and APE. After the line was repaired, the pipes were cleaned and video inspected to determine the condition of the sewer pipes within the vicinity of the repair site. The existing sewer lines outside of the repair area were found to have leaking gaskets at some of the joints and damaged bottom portions where the pipe had deteriorated (videos of the sewer line between APE and APW will be shown at Committee). Alia is now preparing for the insertion of a manhole in Andover Park East south of Strander Blvd. Michels Corporation will be performing the work of installing the CIPP sewer lining and is currently cleaning and inspecting the sewer lines. The gasket leaks (noted above) will need to be repaired prior to the insertions of the new sewer liner. A change order is currently being prepared for Michels, but the cost is not known at this time. RECOMMENDATION Information only. W: \PW Eng \PROJECTS W- SW Projects \CBD Sewer Rehabilitation (91140203)\ Info Memo UC Project Update 020615 gl.docx Description Qtr Dept Action or Briefing Status Andover Park West /Strander New Water Main Closeout with the TUC Transit Center 3 PW A 58th Avenue South Water Main Replacement Bid award 4 PW A Macadam Road South Water Upgrade Design contract PW A Fort Dent Sewer Relocation Design contract (301 Fund) 1 PW A Andover Park E Water Main Replacement Sewer Component 2 PW A Road Component 2 PW A Annual Sewer Repair Program Bid award 2 PW A CBD Sanitary Sewer Rehab Bid award 2 PW A Closeout 3 -4 PW A CBD Sewer Repair Update & Closeout 1 PW B Sewer Lift Station #2 Upgrades Bid award 2 PW A Sewer Repair West of Strander Blvd Bridge Bid award 3 PW A Andover Park East Sewer Replacement Design consultant 4 PW A Annual Small Drainage Program Bid award 2 PW A 2016 program design contract 4 PW A NPDES Annual update 3 PW B E. Marginal Way S Stormwater Outfalls Construction Grant acceptance 4 PW A East Marginal Way 5 Storm Pipe Replacement Construction Status update & Closeout 4 PW B Tukwila 205 Levee Certification Phase 1 Funding Options (per Budget work shop) 2 PW B Chinook Wind Design consultant PW A OTHER Water Asset Management Briefing 4 PW B King County Grant for Recycling Assistance - DCD 1 DCD A Briscoe Desimone Levee Update — City of Kent 1 PW B Zayo Franchise Agreement 1 PW A Utility Comprehensive Plan Review 1 -4 PW B Standard Reports /Briefings Frequency Dept. Facility Tours As needed PW Waste Management Update Annual PW Committee Work Plan 2X Council, Staff 9