INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Mike Cusick, PE, Senior Program Manager
DATE: February 6, 2015
SUBJECT: CBD Sanitary Sewer Rehabilitation /APW to APE Sewer Repair 2013
Project No. 91140203
Project Update
ISSUE
Provide an updated status of the CBD Sanitary Sewer Rehabilitation & Andover Park W to
Andover Park E Sewer Repair Projects.
BACKGROUND
Two separate contracts were awarded last year that are related to the CBD Sanitary Sewer
Rehabilitation Project. One project will repair a collapsed sewer line and install a manhole in
Andover Park East and the second project will install 2,440 feet of Cured -In -Place -Pipe (CIPP)
sewer lining within a portion of the Commercial Business District (CBD). Both projects are part
of an effort to extend the life of deteriorating sewer lines within the CBD.
ANALYSIS
The R.L. Alia Company has repaired 66 feet of the collapsed sewer pipe near the railroad tracks
between APW and APE. After the line was repaired, the pipes were cleaned and video
inspected to determine the condition of the sewer pipes within the vicinity of the repair site. The
existing sewer lines outside of the repair area were found to have leaking gaskets at some of
the joints and damaged bottom portions where the pipe had deteriorated (videos of the sewer
line between APE and APW will be shown at Committee). Alia is now preparing for the insertion
of a manhole in Andover Park East south of Strander Blvd.
Michels Corporation will be performing the work of installing the CIPP sewer lining and is
currently cleaning and inspecting the sewer lines. The gasket leaks (noted above) will need to
be repaired prior to the insertions of the new sewer liner. A change order is currently being
prepared for Michels, but the cost is not known at this time.
RECOMMENDATION
Information only.
W: \PW Eng \PROJECTS W- SW Projects \CBD Sewer Rehabilitation (91140203)\ Info Memo UC Project Update 020615 gl.docx
Description
Qtr
Dept
Action or
Briefing
Status
Andover Park West /Strander New Water Main
Closeout with the TUC Transit Center
3
PW
A
58th Avenue South Water Main Replacement
Bid award
4
PW
A
Macadam Road South Water Upgrade
Design contract
PW
A
Fort Dent Sewer Relocation
Design contract (301 Fund)
1
PW
A
Andover Park E Water Main Replacement
Sewer Component
2
PW
A
Road Component
2
PW
A
Annual Sewer Repair Program
Bid award
2
PW
A
CBD Sanitary Sewer Rehab
Bid award
2
PW
A
Closeout
3 -4
PW
A
CBD Sewer Repair
Update & Closeout
1
PW
B
Sewer Lift Station #2 Upgrades
Bid award
2
PW
A
Sewer Repair West of Strander Blvd Bridge
Bid award
3
PW
A
Andover Park East Sewer Replacement
Design consultant
4
PW
A
Annual Small Drainage Program
Bid award
2
PW
A
2016 program design contract
4
PW
A
NPDES
Annual update
3
PW
B
E. Marginal Way S Stormwater Outfalls Construction
Grant acceptance
4
PW
A
East Marginal Way 5 Storm Pipe Replacement Construction
Status update & Closeout
4
PW
B
Tukwila 205 Levee Certification Phase 1
Funding Options (per Budget work shop)
2
PW
B
Chinook Wind
Design consultant
PW
A
OTHER
Water Asset Management Briefing
4
PW
B
King County Grant for Recycling Assistance - DCD
1
DCD
A
Briscoe Desimone Levee Update — City of Kent
1
PW
B
Zayo Franchise Agreement
1
PW
A
Utility Comprehensive Plan Review
1 -4
PW
B
Standard Reports /Briefings
Frequency
Dept.
Facility Tours
As needed
PW
Waste Management Update
Annual
PW
Committee Work Plan
2X
Council, Staff
9