HomeMy WebLinkAbout99-110 - Philip Environmental Services Corporation - City Hall Parking Lot ExpansionAG (40-/10 (c)
CITY OF TUKWILA
UNILATERAL CHANGE ORDER NO. 4
Sheet 1 of 1
DATE: 5/1/2000 BUDGET NO.: 302/00.594.190.63.03
PROJECT NO.: 95-BG01 CONTRACT NO.: 99-110
PROJECT NAME: CITY HALL PARKING LOT EXPANSION
TO: Philip Environmental Services - Contractor
You are hereby directed to make the herein described changes to the plans and specifications or do the
following described work not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" and Contractor are not prejudiced; and
C. All claims against the "Owner" which are incidental to or as a consequence of this
change are waived.
CHANGE: Add $18,4232.93 to revised contract amount. This additional compensation is
considered full settlement for the re -design and re -staking impacts, in addition
to previous time extension change orders allowing Contractor to complete
with time allotted.
PER STANDARD SPECIFICATION SECTION 1-04.4, THIS CHANGE ORDER IS BEING ISSUED
UNILATERALLY AS THE CITY'S GOOD FAITH EFFORT TO PROVIDE A FAIR AND EQUITABLE
SETTLEMENT, ABSENT THE CONTRACTOR'S CONCURRENCE.
Original Contract (with tax) $ 535,007.04 APPROVED BY THE CITY OF TUKWILA
Previous Change Orders $ 16,650.68 Date �1 1 - JO J oZe90O
This Change Order (with tax) $ 18,422.93 By 1 �vVVQ&f
V Mayor
REV. CONTRACT AMOUNT $ 570,080.65
ORIGINAL: Contractor (2 of 2)
cc: Finance Department (w/encumbrance)
Construction Inspector
Construction Engineer
file: 95-BG01
ORI�INALS
• DATE: 1/26/2000
�a qP-/I0U)
Sheet 1 of 1
CITY OF TUKWILA
CONTRACT CHANGE ORDER NO. 2
BUDGET NO.: 302/00.594.190.63.03
PROJECT NO.: 95-BG01 CONTRACT NO.: 99-110
PROJECT NAME: CITY HALL PARKING LOT EXPANSION
TO: Philip Environmental Services - Contractor
You are hereby directed to make the herein described changes to the plans and specifications or do the
following described work not included in the plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued.
Conditions: A. The following change, and work affected thereby, are subject to all contract
stipulations and covenants;
B. The rights of the "Owner" and Contractor are not rejudiced; and
_.__, C . r, e C X ?ie.*? se S eta Y
CHANGE: Reroute power source to 6300 building panel L1 and provide all changes
outlined on attached revised Illumination & Traffic Improvement Plan (sheet 13 of 13). The
breakdown of this Lump Sum change order price is shown on attached Exhibit A.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree,
if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise
be noted above, and perform all services necessary for the work above specified, and will accept as full
payment therefore the prices shown above and below.
ACCEPTED: Date 2 " �e' od Contractor PS C. -
By
Original Contract (with tax)
Previous Change Order
This Change Order (with tax)
REV. CONTRACT AMOUNT
Title "-I./ l%%s141,e—
$ 535,007.04 APPROVED BY THE CITY OF TUKWILA
$ 1,570.10 Date (Vo/ (I e) ����
$ 15,080.68 Boo) NA IIAU�u th
Mayor
$ 551,657.82
ORIGINAL: Contractor (2 of 2)
cc: Finance Department (w/encumbrance)
Construction Inspector
Construction Engineer
file: 95-BG01
p:\projects\95bg01\construction\change order no. 2 electrical
Qr-dora
ORIGINALS
EXHIBIT 'A'
Change Order 2
CITY HALL PARKING LOT EXPANSION
Original Lump Sum Ilumination and Electrical:
45, 300.00
ADDED SERVICE RUN PER NEW PLAN
through landscape to 6300 building panel L1
$ 9,250.00
ADDED J -BOXES & WIRE
provide handholes for future conduit in place
$ 5,540.00
CREDIT FOR NOT TIEING INTO 65TH POWER:
120' of 1" with2#4
$ ($903.55)
SUBTOTAL CHANGE ORDER NO. 2 PRICE:
$ 13,886.45
SALES TAX @ 8.6%
$ 1,194.23
TOTAL CHANGE ORDER NO. 2 PRICE:
$ 15,080.68
•
/1 P-iI(a)
CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 1 DATE: 11/23/99
SHEET 1 OF 1 PROJECT NO.: CONTRACT NUMBER: 99-110
PROJECT NAME: CITY HALL PARKING LOT EXPANSION
To: Philip Environmental Services Corporation, Contractor. You are hereby directed to make the herein
described changes to the plans and specifications or do the following described work not included in the
plans and specifications on this contract:
NOTE: This change order is not effective until approved by the "Owner".
Conditions: A. The following change, and work affected thereby, are subject to all
contract stipulations and covenants.
B. The rights of the "Owner" are not prejudiced; and
C. All claims against the "Owner" which are incidental to or as a consequence
of this change are waived.
CHANGE: Add new contract pay item number 46 "Testing and Disposal of Hazardous Waste for
Building Demolition", in the amount of $1,445.76, plus tax, as total lump sum payment for
attached invoice coveringpaint and building material in relation to demolition of old shack
from north property line of parking lot site.
We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if
this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise
be noted above, and perform all services necessary for the work above specified, and will accept as full
payment therefore the prices shown above and below.
Original Contract (without tax) $ 492,640.00
Previous Change Order
This Change Order (without tax) $ 1,445.76
REV. CONTRACT AMOUNT $ 494,085.76
Contractor
Title cj�,tj.`a.q. . /4,45,...4.„.. e
APPROVED BY THE CITY OF TUKWILA
0 Date
kfro
B)Licrs) c_
AYOR
N
ORIGINAL: Contractor (2 of 2)
CC: Finance Department (w/encumbrance )
Construction Inspector
Construction Engineer
File: 95-BG01-12
ist 6EZ
ORI6tNAL3
PHILIP SERVICES
INDUSTRIAL SERVICES GROUP
RECE C'U
NOV 0 8 1999
Tumvil-A
QUBUG WORKS
November 4, 1999 Invoice Number 62900103
City of Tukwila
6300 Southcenter Blvd. Suite 100
Tukwila, WA 98188
Attn: Scott Moore
Ref: Demolition disposal
Dear Scott,
As promised here is a copy of the charges for disposal of the paint and building material removed
from the old shack. I have added a 20% margin.
I have also enclosed chain of custody and waste manifest for your files to show the debris was
disposed correctly
Cost $1,204.80
Margin 1.2
Sxb�tal $1,445.76
Totftl $1,S741-1-0—,
We appreciate you business.
Remit to :
Philip Services Corp.
PO Box 3552
Seattle, WA 98124
Philip Environmental Services Corporation
A Wholly -Owned Subsidiary of Philip Services Corp.
P.O. Box 3552 • Seattle, WA 98124 0 955 Powell Ave. SW • Renton, WA 98055
Phone (425) 227-0311 • (888) 9PHILIP • FAX (425) 227-6191
decreased in accordance -with -the -Contract Documents. - - T - - -
As evidence of good faith, (check one)' id bond or 0 cash, 0 cashier's check, 0 certified check, or 0
postal money order made payable to the City of Tukwila equal to five percent :(5%) of the Total Bid
Price is attached hereto. Bidder understands that, should this offer be accepted_by Owner within ninety
(90) -calendar _days after_ .#he -day .of Bid Opening and the Bidder_fails_or refusessto enter into an _
Agreement and 1umish=the-required -performance bond and liability insurance=within ten=(iO)=calendar-
days after Notice of -Award, the Contract shall be null and void and the Bid. Deposit or 'Bond
-accompanying this Proposal shall be forfeited and become the property of -Owner as liquidated
- damages, all as provided for in the Bid Documents. _
Bidder shall complete the Physical Work in all respects within eighty four (84) calendar days from the
date of written Notice to Proceed. If the work is not completed within this timeperiod, Bidder shall pay
liquidated damages to Owner as specified in Section 1 -08.9 -Of the Standard. Specifications for—every
• -calendar day work is not physically complete after the expiration of the -Contract-time stated -above. In
_. addition, Bidder shall compensate Owner for actual engineering__ inspection and supervision costs and
any other legal fees incurred -by Owner as a result of such delay.
OR1'1NAE
72ev.
19
-
.-
- A bid must be received on all items. If any are left blank or -represent $0.00, the bid will be disqualified. -
Rev. 1998- -
P-9
BID SECURITY
Bid Deposit: The undersigned Principal hereby deposits a Bid Deposit with the City of Tukwila in
the form of a cash deposit, certified or cashier's check, or postal money order in the amount of
dollars ($ ).
AL SERVICES CORPORATION
PHILIP ENVIRONMENT
Bid Bond: The undersigned (Principal),
BndAMERICAN CASUALTY COMP)1 • • ` Sure are held and firmlybound unto the
P PINFYiv IA
(Surety),
City. O Tukwila (Owner) in the penal sum of 5% OF BID AMOUNT
dollar's ($ 5% OF BID AMOUNT ), which for the payment of which
Principal and Surety bind themselves, their heirs, executors, administrators. successors and
assigns, jointly and severally. The liability of Surety under this Bid Bond shall be limited to the
penal sum of this Bid Bond.
Conditions: The Bid Deposit or Bid Bond shall be an amount not less than five percent (5%) of
the total bid, including sales tax and is submitted by Principal to Owner in connection with a
Proposal for City Hall Parking Lot Expansion, Project No. 95-BG01, according to the terms of the
Proposal and Bid Documents.
Now therefore,
a. If the Proposal is rejected by Owner, or
b. If the Proposal is accepted and Principal shall duly make and enter into an Agreement with
Owner in accordance with the terms of the Proposal and shall fumish a bond for the faithful
performance of said Project and for the payment of all persons performing labor or fumishing
materials in connection therewith, with Surety or Sureties approved by Owner, and shall in all
other respects perform the Contract created by the acceptance of said Proposal,
then this Bid Security shall be released; otherwise it shall remain in full force and effect and
Principal shall forfeit the Bid Deposit or Surety shall immediately pay and forfeit to Owner the
amount of the Bid Bond, as penalt}I'and liquidated damages, .
The obligations of Surety and its Bid Bond shall be in no way impaired or affected by any extension
of time within which Owner may accept bids; and Surety does hereby waive notice of any such
extension.
Signed and dated this
29TH day of JUNE
PHILIP ENVIRONMENTAL SERVICES CORPORATION
Principal
Signature of Arized •fficlal
Title
Name and address of local office of
agent and/or Surety Company:
19 99
AMERICAN CO ANY'OF READING,
SuFe y
By
Attorney In Fact (A. ach Po r of Attorney)
PAMELA K. RIFE
39 BROADWAY
SUITE 2302
NEW YORK, NY IODUb
Surety companies executing bonds must appear on the current Authorized Insurance List in the State of
Washington per Section 1-02.7 of the Standard Specifications.
Rev. 1995
06/29/99 TUE 16:37 [TX/RX NO 8369]
P-10
NON -COLLUSION AFFIDAVIT
STATE OF WASHINGTON )
) ss.
COUNTY OF KING ) .
The undersigned, being first duly sworn, on oath states that the person, firm, association,
partnership, joint venture, or corporation named_ in the Bid Proposal has not, either directly or
indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action
in restraint of free competitive bidding in connection with the City of Tukwila project named City Hall
Parking Lot Expansion, Project No. 95-BG01.
Signed and sworn t� before me on this
c
day of
/74, (Sem mice s
ame of Fi
ignature of Authorized Official
-Signat re:of_Notar-y-_ublic.in a .r•J or the Sfattee of Washington
My appointment expires: 6--/0 / / 9 9
SEAL
,nT11
'�a,,7.._..���•�':•-411
- Rev. 1998-
_