HomeMy WebLinkAboutReg 2015-03-02 COMPLETE AGENDA PACKETTukwila City Counci/ Agenda
• ❖ REGULAR MEETING ❖
Jim Haggerton, Mayor Counci /members: • :- Joe Duff ie • :- Dennis Robertson
David Cline, City Administrator Allan Ekberg • :- Verna Seal
Kate Kruller, Council President Kathy Hougardy De'Sean Quinn
Monday, March 2, 2015; 7:00 PM • Ord #2469 • Res #1857
1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / ROLL CALL
2. SPECIAL
Introduction and swearing in of two police officers:
PRESENTATION
• Charles Sagui/
• Chris Backus
Bruce Linton, Deputy Police Chief.
3. APPOINTMENTS
a. Confirm the appointment of Adrienne Banks to Position #2 on the
Pg.1
Arts Commission, with a term expiring December 31, 2018.
b. Confirm the appointment of Nandina Cengic to the Student
Pg.1
Representative position on the Arts Commission, with a term expiring
at the end of the 2015 school year.
4. CITIZEN
At this time, you are invited to comment on items not included on this agenda
COMMENT
(please limit your comments to five minutes per citizen). To comment
on an item listed on this agenda, please save your comments until the issue is
presented for discussion.
5. CONSENT
a. Approval of Minutes: 2/17/15 (Regular Mb
AGENDA
b. Approval of Vouchers.
c. Accept as complete the East Marginal Way South Overlay and Repair
Pg.9
Project (contract #14 -030) with Miles Construction, Inc. of Tacoma;
authorize release of performance bond, subject to the standard claim and
lien release procedures (final cost of project: $1,418,169.39). (Reviewed
and forwarded to Consent by Transportation Committee on 2117115.)
d. Accept as complete the 2014 Overlay and Repair Program (contract
Pg. 17
#14 -089) with Miles Construction, Inc. of Tacoma; authorize release of
retainage bond, subject to the standard claim and lien release procedures
(final cost of project: $978,020.75). (Reviewed and forwarded to
Consent by Transportation Committee on 2117115.)
6. UNFINISHED
a. An ordinance amending Ordinance Nos. 2375 §5 and 2303 §3 (part),
Pg.25
BUSINESS
as codified at Tukwila Municipal Code Section 19.12.030, to update the
Sign Code to expand exceptions to permit the display of street banners
in the City.
b. An ordinance amending Ordinance No. 1995 §1 (part), as delineated in
Pg.31
Attachment A to Ordinance No. 1995 and codified at Tukwila Municipal
Code Section 11.12.030, regarding payment for street frontage
improvements.
c. Council consensus on the SCA (Sound Cities Association) item regarding
Pg.37
the 2015 -2018 Committee to End Homelessness Draft Strategic Plan.
(continued...)
REGULAR MEETING
Monday, March 2, 2015
Page 2
7. NEW BUSINESS
a. Council motion designating an Acting Council President for the March 9,
Pg.59
2015 Committee of the Whole meeting.
b. Discussion and potential decision regarding the addition of language in
Pg.61
Council e -mails noting in part that "e -mail communication is subject to
public disclosure."
S. REPORTS
a. Mayor
b. City Council
c. Staff - City Administrator Report
Pg.63
d. City Attorney
e. Intergovernmental
9. MISCELLANEOUS
10. EXECUTIVE SESSION
11. ADJOURNMENT
Tukwila City Hall is wheelchair accessible.
Reasonable accommodations are available at public hearings with advance notice to the
City Clerk's Office (206- 433 -1800 or TukwilaCityClerk @TukwilaWA.gov). This notice is available at
www.tukwilawa.gov, and in alternate formats with advance notice for those with disabilities.
Tukwila Council meetings are audio /video taped.
HOW TO TESTIFY
If you would like to address the Council, please go to the podium and state your name and address clearly for
the record. Please observe the basic riles of courtesy when speaking and limit your comments to five
minutes. The Council appreciates hearing from citizens but may not be able to take immediate action on
comments received until they are referred to a Committee or discussed under New Business.
COUNCIL MEETINGS
No Council meetings are scheduled on the 5th Monday of the month unless prior public notification is given.
Regular Meetings - The Mayor, elected by the people to a four -year term, presides at all Regular Council
Meetings held on the 1 st and 3rd Mondays of each month at 7:00 p.m. Official Council action in the
form of formal motions, adopting of resolutions and passing of ordinances can only be taken at Regular
Council meetings.
Committee of the Whole Meetings - Council members are elected for a four -year term. The Council
President is elected by the Council members to preside at all Committee of the Whole meetings for a
one -year term. Committee of the Whole meetings are held the 2nd and 4th Mondays at 7:00 p.m.
Issues discussed are forwarded to the Regular Council meeting for official action.
GENERAL INFORMATION
At each Council meeting citizens are given the opportunity to address the Council on items that are not
included on the agenda during CITIZENS COMMENTS. Please limit your comments to 5 minutes.
Special Meetings may be called at any time with proper public notice. Procedures followed are the same as
those used in Regular Council meetings.
Executive Sessions may be called to inform the Council of pending legal action, financial, or personnel
matters.
PUBLIC HEARINGS
Public Hearings are required by law before the Council can take action on matters affecting the public interest
such as land -use laws, annexations, rezone requests, public safety issues, etc. Section 2.04.150 of the
Tukwila Municipal Code states the following guidelines for Public Hearings:
The proponent shall speak first and is allowed 15 minutes for a presentation.
2. The opponent is then allowed 15 minutes to make a presentation.
Each side is then allowed 5 minutes for rebuttal.
4. Citizens who wish to address the Council may speak for 5 minutes each. No one may speak a second
time until everyone wishing to speak has spoken.
5. After each speaker has spoken, the Council may question the speaker. Each speaker can respond to the
question, but may not engage in further debate at this time.
6. After the Public Hearing is closed and during the Council meeting, the Council may choose to discuss
the issue among themselves, or defer the discussion to a future Council meeting, without further public
testimony. Council action may only be taken during Regular or Special Meetings.
COUNCIL AGENDA SYNOPSIS
Meeting Date
Prepared by
Ma is r view
Council review
03/02/15
CT
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ BidAxard
At Date
❑ Public Hearing
Mtg Date
❑ Other
g Date
Aft
SPONSOR ❑ Council ® Mayor ❑ HR ❑ DCD ❑ .Finance E] Fire ❑ IT ❑ P&'R ❑ Police ❑ PIYI
SPONSOR'S Appointments of Adrienne Banks and Nandina Cengic to the Arts Commission
S UNINL�RY
RVVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: N/A COMMITTEE CHAIR: N/A
RECOMMENDATIONS:
SPONSOR /ADNIIN. Confirm Appointments
COMMI'l -IT "I. N/A
COST IMPACT/ FUND SOURCE
EXPI NDITURE REQUIItED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
1/05/15
ITEM INFORMATION
ITEMNO.
3
STAFF SPONSOR: MAYOR HAGGERTON
ORIGINAL AGENDA DA'I'S:
AGFINDA ITEM TI'T'LE Appointments to the Arts Commission
CA'T'EGORY ❑ Discussion
Mtg Date
® Motion
Mtg Date 3/02/15
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ BidAxard
At Date
❑ Public Hearing
Mtg Date
❑ Other
g Date
Aft
SPONSOR ❑ Council ® Mayor ❑ HR ❑ DCD ❑ .Finance E] Fire ❑ IT ❑ P&'R ❑ Police ❑ PIYI
SPONSOR'S Appointments of Adrienne Banks and Nandina Cengic to the Arts Commission
S UNINL�RY
RVVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: N/A COMMITTEE CHAIR: N/A
RECOMMENDATIONS:
SPONSOR /ADNIIN. Confirm Appointments
COMMI'l -IT "I. N/A
COST IMPACT/ FUND SOURCE
EXPI NDITURE REQUIItED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
1/05/15
MTG. DATE
ATTACHMENTS
3/02/15
Informational Memorandum dated February 13, 2015
2
City of Tukwila Jim Haggerton, Mayor
6200 Southcenter Boulevard
Tukwila, WA 98188 -2544
INFORMATIONAL MEMORANDUM
TO: CITY COUNCIL�,G
FROM: MAYOR HAGGERTON
DATE: FEBRUARY 13, 2015
SUBJECT: APPOINTMENTS TO THE ARTS COMMISSION
ISSUE
There are several vacancies on our Arts Commission. I am recommending appointment to the following
positions as outlined below:
Arts Commission
Position #2: I have attached the application of Adrienne Banks for your consideration. Ms. Banks is a
member of the Pacific Northwest Writers Association, the North West African American
Museum, the Onyx Fine Art Collective and the Rainier Beach Art Walk Planning
Committee as well as a Tukwila resident. She will bring valuable experience to the Arts
Commission. I am recommending that Ms. Banks be appointed to Position #2 recently.
Her term will expire on December 31, 2018.
Student Representative: I have attached the application of Nandina Cengic for your consideration. Ms.
Cengic currently attends Foster High School. She has a wide variety of interests and
enjoys volunteering in our community.
If you have any questions regarding these applications or appointments, please let me know by noon on
Monday, February 23, 2015.
RECOMMENDATION
I am recommending the appointments /reappointments as listed above at the March 2, 2015 Council
Meeting.
Phone: 206 - 433 -1800 • Email: Mayor @TukwilaWA.gov • Website: TukwilaWA.gov
3
J�`ti IL4 k,
ti 4s
4 � .
o z
c�
�• o
1908
Tukwila City Hall
6200 Southcenter Blvd
Tukwila, WA 98188
Phone: (206) 433 -1800 Fax: (206) 433 -1833
Application f(
BOARDS AND
RECEIVED
Email: BoardsCommsC@- tukwilawa.gov
Website: www.tukwilawa.gov
r Appointment
COMMISSIONS
Please complete the ENTIRE application form. Applicants may attach a cover letter and /or a resume
totaling no more than three pages. DATE: 10/15/14
NAME Banks
Last
ADDRESS:
Street
MAILING ADDRESS (if
Adrienne
First
City
L.
Will]
an—
Zip
HOME PHONE. CELUMOBILE PHONE: Same
EMPLOYER: Self employed E -MAIL
Please check all that apply to you within the City of Tukwila limits:
F-1 Resident ® Business Owner /Representative
❑ School District Representative ❑ High School Student
I wish to be considered for appointment to the following board or commission (check all that apply):
COMMISSIONS:
•
Arts
•
Civil Service
•
Equity & Diversity
•
Parks
•
Planning
BOARDS 8r. COMMITTEES:
• Community Police Advisory
• Human Services
• Library
• Sister Cities
❑ Lodging Tax
❑ Pool Advisory (TMPD)
❑ Other /Special Committee: I'm applying for the Arts Commission Board
HAVE YOU PREVIOUSLY SERVED ON ONE OF THESE BOARDS OR COMMISSIONS? ❑ Yes 8 No
If "yes ", please list:
AVAILABLE TO ATTEND MEETINGS: B Daytime 8 Evenings
Please contact me regarding other City of Tukwila volunteer opportunities (check box): ❑
FOR CITY USE ONLY: Lc-�Dj INT ERVIEW DATE: APPOINTED: yI Yes El No TERM EXPIRES: 1 1Y
Boards & Commissions Application for Appointment Page 1
5
Professional /Community Activities (organizations, clubs, service groups, etc): I'm a member
of the PNWA (pacific northwest writers association. NAAM(north
west African American museum). Onyx Fine Art Collective
Rainier Beach Art Walk Planning Committee
Hobbies /interests: Swimming, writing, playing the Organ.
Qualifications as related to this position: BA. U. of W. and BA Art Institute of Seattle
I've been an artist for over 27 years in the pacific northwest. I've shown
and exhibited my art in many venues. I won awards for my paintings.
I've lectured in a variety of places.
Other comments /additional information for consideration:
I would love to help with the development of the visibility of visual
Arts in the Tukwila area. Actually I'm willing to help out whether I'm
needed.
com. apple .idms.appleid.prd.30375a5770666
e6f3244796678424d36317a767341773d3d' _r-
Applicant's Signature
10/15/14
Date
Note: Upon submission, all information on this form becomes public record. For further clarification regarding this application or
more information regarding the boards or commissions, please call (206) 433 -1800.
Boards & Commissions Application for Appointment Page 2
1.1
9) City Of Tukwila RECEIVED
Tukwila City Hall, Email: BoardsCommsa- tukwilawa.gov
6200 Southcenier Blvd Website: www.tukwilawa.gov
Tukwila, WA 98188
Phone: (206) 433 -1800 Fax: (206) 433 -1833
Application for Appointment
BOARDS AND COMMISSIONS
Please complete the ENTIRE application form. Applicants may attach a cover letter and /or a resume
totaling no more than three pages.
DATE: (/�IOZ�Z o�
NAME: C �NG� I G N A N D I Na
Last First M.I.
ADDRESS
Street ity Zip
MAILING ADDR
HOME PHONE:
EMPLOYER:
Please check all that apply to you within the City of Tukwila limits:
• Resident ❑ Business Owner /Representative
• School District Representative FQ1 High School Student
I wish to be considered for appointment to the following board or commission (check an that apply):
C
MMISSIONS:
IV
Arts
•
Civil Service
•
Equity & Diversity
•
Parks
•
Planning
BOARDS & COMMITTEES:
•
Community Police Advisory
•
Human Services
•
Library
•
Sister Cities
•
Lodging Tax
•
Pool Advisory (TMPD)
Other /Special Committee:
HAVE YOU PREVIOUSLY SERVED ON ONE OF THESE BOARDS OR COMMISSIONS? ❑ Yes C" No
If "yes', please list:
AVAILABLE TO ATTEND MEETINGS: ❑ Daytime ❑ Evenings
Please contact me regarding other City of Tukwila volunteer opportunities (check box): ❑
FOR CITY USE ONLY:
tNTEitV1EW BATE APPOINTED: )(Yes 11 No _ TEitM EXPIRES
7
Professional /Community Activities (organizations, clubs, service groups, etc):
V�Gr2airy she i�zr� l.�brgr� CoinG�l �-
F&rter Ll b ra rV lygl2 oh aQ #Vn*rzr cf'o t✓i Ley
Nu4war V0161wfeeY-
Ale I ,qh bars G 4,-e- lt2 A."I tti G /ire �-T-
Hobbles/interests: g e v! 01 l 46 ; WO-( r( 1 %' �Z /191 Al - 1 n 9
f blS,' WOrty- ar701 1?11tf-r1%70/) j fe0nlr;
ro a r h A-P a r �-T, Y0.2 q, pho tog rgp�Y;
1 e arnin abokt vas oc-,f T 641,4 fu-r(f d-
Qualifications as related to this position: / t V e aoo e 17wm e r o a
V0 /U,ntQ�-'r OChVI f! e(f Iq bo{-i Me ro,,1%
In � a rrd (!'CA00/ re/ ay/n _9 to a�rtrtr
°pa Gbrnmkw14 jAvol veyr 2i7t, 0461h oT
plan�r�� die- MC-k' g����� h�l�°1/�� �'a
1e- wdrl d 8 60k /L11,62 7 - of f FoW 611-braly.
Other comments /additional information for consideration:
n /dz /►�
ApplicanYs Signature Date
Upon submission. all information on this form becomes public record. For furtf►er dariHcation rega�ng this application or
mare irrforrnation regardirsg the boards a commisslons, please cal the Volunteer Program Office at (206) 768.2822.
City of Tukwila Volunteer Program — Application for Appointment Boards & Commissions Page 2
COUNCIL AGENDA SYNOPSIS
Meefin Date
Prepared by .1
Ma rs 4 view
Council review
03/02/15
BG
❑ Resolution
1:1
Mt
,g Date
❑Ordinance
Mtg Date
❑BidAxard
F
Aft g Date
❑Public Hearing
F g
Mtg
g Date
-10
F ther
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ❑ PWI'
SPONSOR'S The contract with Miles Construction of Tacoma, WA is complete for the Overlay & Repair -
SUNINL\RY East Marginal Way South Project. This project included overlay and pavement upgrades to
East Marginal Way South between South 81"t Place and South Norfolk St. Three change
orders were issued and under-runs totaled ($312,051.93). Council is being asked to accept
and finalize the contract with Miles Construction in the amount of $1,418,169.39.
Ri3A1IEVVI,,D BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. F-1 Planning Comm.
DATE: 02/17/15 COMMITTEE CHAIR: JOE DUFFIE
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
CONINIFI-IT"I" Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
ExPENDri'uiu," Ri,"QUIRJ,"D AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,418,169.39 $1,825,941.08 $0.00
Fund Source: 104 ARTERIAL STREET FUND
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/02/15
ITEM INFORMATION
ITEM NO.
5-C.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DXIT: 03/02/15
A(,,I,"Nl),\ I'ri,"m Trn,i," Overlay & Repair - East Marginal Way South
Project Completion and Acceptance
CATEGORY ❑ Discussion
Mtg Date
Z Motion
Mtg Date 03102119
❑ Resolution
1:1
Mt
,g Date
❑Ordinance
Mtg Date
❑BidAxard
F
Aft g Date
❑Public Hearing
F g
Mtg
g Date
-10
F ther
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ❑ PWI'
SPONSOR'S The contract with Miles Construction of Tacoma, WA is complete for the Overlay & Repair -
SUNINL\RY East Marginal Way South Project. This project included overlay and pavement upgrades to
East Marginal Way South between South 81"t Place and South Norfolk St. Three change
orders were issued and under-runs totaled ($312,051.93). Council is being asked to accept
and finalize the contract with Miles Construction in the amount of $1,418,169.39.
Ri3A1IEVVI,,D BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. F-1 Planning Comm.
DATE: 02/17/15 COMMITTEE CHAIR: JOE DUFFIE
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
CONINIFI-IT"I" Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
ExPENDri'uiu," Ri,"QUIRJ,"D AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,418,169.39 $1,825,941.08 $0.00
Fund Source: 104 ARTERIAL STREET FUND
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/02/15
MTG. DATE
ATTACHMENTS
03/02/15
Informational Memorandum dated 02/13/15
State of WA Depart of Revenue Notice of Completion 14-030
Minutes from the Transportation Committee meeting of 02/17/15
0
10
City of Tukwila
Jim Haggerton, Mayor
TO:
Mayor Haggerton
Transportation Committee
FROM:
Bob Giberson, Public Works Director
BY:
Dave Sorensen, Project Manager
DATE:
February 13, 2015
SUBJECT:
Overlay and Repair - East Marginal Way S
Project No. 91210406, Contract No. 14 -030
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of performance bond.
BACKGROUND
The Notice to Proceed for Contract No. 14 -030 with Miles Construction Inc., of Tacoma, Washington
was issued on April 13, 2014 for the Overlay and Repair - East Marginal Way S Project. Construction
included pavement repairs and an asphalt overlay of East Marginal Way S, between S 81 st PI and S
Norfolk St. The overlay project included new pavement markings, pedestrian safety upgrades, and
storm water improvements.
ANALYSIS
Construction was physically completed by July 15, 2014. Three change orders were executed and
they were either no cost or a credit to the City. Paving technology and operation efficiencies reduced
required quantities of hot mix asphalt which resulted in the majority of cost savings. The net result at
project completion recognized savings in the amount of $312,051.93. No retainage was withheld by
the City for this project as there was a Contractor Performance Bond and Federal grant funds.
The total budget for the Overlay & Repair - East Marginal Way S Project was $1,825,941.08 and
included a 5% contingency. The City received $993,308.44 in Federal grant funds for the project.
Construction Contract Amount $1,738,991.50
Change Order Nos. 1 — 3 (8,770.18)
Under -runs (312,051.93)
Total Amount Paid 1.418.169.39
RECOMMENDATION
The Council is being asked to formally accept and authorize release of the performance bond, subject
to standard claim and lien release procedures, for the Overlay and Repair - East Marginal Way S
Project with Miles Construction in the final amount of $1,418,169.39 and consider this item on the
Consent Agenda of the March 2, 2015 Regular Meeting.
Attachment: Notice of Completion
WAPW Eng\PROJECTS\A- RW & RS Projects \EMW Overlay & Repair (91210406) \CN \Projec1 Control\Pre Closeout \Closeout Docs to TC \Info Memo -Overlay EMW Closeout 02 -13 -15 - sb.docx
11
12
Date: 12/4/14
ST rt
t:
Yf�� lBH9 ;l
❑ Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 602 - 870 -349
Name & Mailing Address of Public Agency Department Use Only
City of u wl a Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number: 91- 6001519
Notice is hereby given relative to the completion of contract or project described below
Project Name
I Contract Number
Job Order Contracting
VNo
East Marginal Way Overlay and Repair (Project No. 91210406)
14 -030
❑ Yes
Description of Work Done /Include Jobsite Address(es)
HMA Overlay installation on East Marginal Way from South 81st Place to South Norfolk Street
Federally funded transportation project? L1(J Yes ❑ No (if yes, provide Contract Bond Statement below)
Contractor's Name
E -mail Address
Affidavit ID*
Miles Resources, LLC
1545793
Contractor Address
Telephone #
400 Valley Ave NE Puyallup, WA 98372
253 - 383 -3585
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
❑ Retainage Bond U Contract /Payment bond (valid for federally funded transportation projects)
Name: Liberty Mutual Insurance Company
JBond Number: 023028024
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
4/14/14
9/16/14
Were Subcontracters used on this project? If so, please complete Addendum A. WYes ❑ No
Affidavit ID* - No L &I release will be granted until all affidavits are listed.
Contract Amount
Additions ( + )
Reductions (- )
Sub -Total
Amount of Sales Tax 0.0
$ 1,738,991.50
$ 320,822.11
$ 1,418,169.39
Liquidated Damages $ - 1,200.00
Amount Disbursed $ 1,419,369.39
Amount Retained $ 0.00
(If various rates apply, please send a breakdown)
$ 1,418,169.39 TOTAL $ 1,418,169.39
TOTAL
NOTE: These two totals must beequal
Comments:
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name:
Email Address:
Department of Revenue Washington StareDepanment of
CPublic Works Section Labor & Industries
(360) 704 -5650 Contract Release
PWC @dor.wa.gov (855) 545 -8163, option # 4
ContractRelease @LNI. WA.GOV
REV 31 0020e (4/28/14) F215 -038 -000 04 -2014
Title:
Phone Number:
AW Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360) 902 -9450
publicworks@esd.wa.gov
13
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No Lail release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavid ID*
Cascade Channel & Grouting
601 - 426 -821
526621
Chandler Construction
600 - 624 -758
525973
Garrison Creek Landscaping
602 - 461 -104
529161
Highmark Concrete Contractors
603- 004 -408
540008
MT Electric, Inc.
601 - 289 -414
540672
Northwest Traffic, Inc.
602 - 140 -049
527478
0 Bunco Engineering
602 - 045 -762
525102
Reece Trucking
602 - 893 -954
524074
Evergreen Concrete Cutting
601 - 605 -667
523270
R &D Trec
603 - 118 -291
519819
Miles Sand & Gravel Company
171 - 004 -760
524356
Bilbrey Construction
603 - 002 -155
524512
PGH Excavating, Inc.
602 - 716 -918
524194
Olson Bros Trucking
601 - 102 -280
522984
Heinrichs Trucking
275 - 005 -110
523009
Eversons Econovac
601 - 443 -326
522895
T. Barger Dirtworks
602- 812 -806
530296
For tax assistance or to request this document in an alternate format, please call 1- 800 - 647 -7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (04/28/14) F215- 038 -000 04 -2014
14
City Of Tukwila
• Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes
February 17, 2015 — 5:30 p.m. — Foster Conference Room, 6300 Building
PRESENT
Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy
Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischmak, Pat Brodin, Derek
Speck, Dave Sorensen, Gail Labanara, Laurel Humphrey
CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:20 p.m
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Project Completion: East Marginal Way South Overlay and Repair
Staff is requesting Council approval of project completion and release of performance bond to
Miles Construction in the amount of $1,418,169.39 for the Overlay and Repair — East Marginal
Way South Project. The project was physically completed on July 14, 2014 and constructed
pavement repairs and an asphalt overlay including pavement markings, pedestrian safety
upgrades and storm water improvements. Cost savings in the amount of $312,051.93 were
largely due to paving technology and operation efficiencies. The City received $993,308.44 in
Federal grant funds. UNANIMOUS APPROVAL. FORWARD TO MARCH 2, 2015 REGULAR
CONSENT AGENDA.
B. Project Completion: 2014 Overlay and Repair Program
Staff is requesting Council approval of project completion and release of the retainage bond to
Miles Construction in the amount of $978,020.75 for the 2014 Overlay and Repair Program.
This project provided hot mix asphalt paving at eight locations in the City and overlay of a
portion of the parking lot at Fort Dent Park as well as other street improvements. Construction
was completed on November 7, 2014, included two change orders, and realized cost savings of
$104,773.25. UNANIMOUS APPROVAL. FORWARD TO MARCH 2, 2015 REGULAR
CONSENT AGENDA.
C. Proposed Budget Amendment: 53rd Avenue South (South 137th Street — South 144' Street)
Staff provided an overview of a revised funding plan for the design of projects associated with
531 Avenue South. The City was unsuccessful in receiving grant funding in 2014 and the
Council gave direction to proceed with City funding for design in order to make the project
shovel ready and more attractive for grant funders. Revised CIP pages for the 53rd Avenue
South (South 137th — South 144th Street) Residential Street, Water, Sewer Rehabilitation, and
53rd Avenue South Surface Water Drainage System were included in the Committee packet,
and these changes will be presented for Council approval during the budget amendment
process that will occur in June 2015. Of particular note, recent investigation of the 53rd Avenue
South sewer main revealed that full replacement is not required, and $7 million in the out years
has been removed in the revised CIP page. Staff is meeting with the Transportation
Improvement Board to further discuss and evaluate how to be more successful for grant
funding in the next cycle. INFORMATION ONLY.
15
16
COUNCIL AGENDA SYNOPSIS
----------- - - - - -- Initial'
Meeting Date Prepared by A ayor review Council review
03/02/15 BG C
ITEM INFORMATION
ITEM NO.
5.D.
CAS NUT\IBF.R: FfAFF
SPONSOR: BOB GIBERSON
03/02/15
A(, FIND,\ trj,"m Trri.i," 2014 Overlay & Repair Program
Project Completion and Acceptance
C'%rI1I.,('ORy ❑ Discussion
Ali
,g Date
Motion
Alt
,g Date 03102115
E Resolution
Mt
,g Date
❑ Ordinance
Mt
,g Date
❑ BidAward
Mt g Date
❑ Public HeannSE
MiS Date
Other
Mt g Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD E] Finance ❑ Fire ❑ IT ❑ P&R ❑ Police E PW'
SPONSOR'S The contract with Miles Construction of Tacoma, WA is complete for the 2014 Overlay &
SUMMARY Repair Program. This contract improved the roadway at eight locations throughout the City
and a portion of the parking lot at Fort Dent Park. Construction began July 11, 2014 and
was completed on November 7, 2014. Two change orders were issued for $13,000.00 and
under-runs credited ($104,773.25). Council is being asked to accept and finalize the
contract with Miles Construction in the amount of $978,020.75.
Ri-,1N1I171WT'1I) BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
F-1 Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 02/17/15 COMMITTEE CHAIR: JOE DUFFLE
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
COININIFI-11" Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
Expi,"NIATURE Ri,'QUIRI-1'D AMOUNT BUDGETED APPROPRIATION REQUIRED
$978,020.75 $1,123,283.70 $0.00
Fund Source: 104 ARTERIAL STREETS (PG 18, 2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
03/02/15
MTG. DATE
ATTACHMENTS
03/02/15
Informational Memorandum dated 02/13/15
State of WA Department of Revenue Notice of Completion 14-089
Minutes from the Transportation Committee meeting of 02/17/15
17
IN
City of Tukwila
Jim Haggerton, Mayot
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director 16A,
BY: Dave Sorensen, Project Manager
DATE: February 13, 2015
SUBJECT: 2014 Overlay and Repair Program
Project No. 91410401, Contract No. 14 -089
Project Completion and Acceptance
ISSUE
Accept contract as complete and authorize release of retainage bond.
BACKGROUND
The Notice to Proceed for Contract No. 14 -089 with Miles Construction Inc., of Tacoma,
Washington was issued on July 11, 2014 for the 2014 Overlay and Repair Project. This overlay
project provided hot mix asphalt (HMA) paving at eight locations throughout the City and overlay
of a portion of the parking lot at Fort Dent Park. The street improvements included; paving;
removing and replacing concrete curbs, gutters, sidewalks and ADA ramps; installing traffic loops
and junction boxes; adjusting surface utilities to grade; and installing roadway channelization.
ANALYSIS
Construction was physically completed on November 7, 2014. Two change orders were executed
to include additional work for electrical junction boxes and a time extension. Asphalt quantities
and pavement repairs were less than expected and the major factors in a cost savings of
$104,773.25. No retainage was withheld by the City for this project as there was a contractor
retainage bond.
The total budget for the 2014 Overlay & Repair Project was $1,123,283.70 and included a 5%
contingency, which was not expended on this project.
Construction Contract Amount $1,069,794.00
Change Order Nos. 1 — 2 13,000.00
Underruns (104,773.25)
Total Amount Paid $ 978,020.75
RECOMMENDATION
The Council is being asked to formally accept and authorize the release of the retainage bond,
subject to standard claim and lien release procedures, for the 2014 Overlay and Repair Project
with Miles Construction in the final amount of $978,020.75 and to consider this item on the
Consent Agenda of the March 2, 2015 Regular Meeting.
Attachment: Notice of Completion
WAPW Eng \PROJECTS A- RW & RS Projects\Annual Overlay & Repair Programs\2014 Overlay & Repair Program (91410401) \Construction \Contractor\Pre Closeout \Closeout Docs to TC \Project Closure Docs to TC \Info Memo -
2014 Overlay Closeout 02 -13 -15 - sb.docx 19
20
(3)
❑ Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: 12/19/14 Contractor's UBI Number: 171 - 004 -760
Name & Mailing Address of Public Agency Department Use Only
City of u wl a Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number: 91- 6001519
Notice is hereby given relative to the completion of contract or project described below
Project Name
Contract Number
114-089
Job Order Contracting
2014 Overlay Program Project No. 91410401
Amount Retained $
El Yes YNo
Description of Work Done /Include Jobsite Address(es)
Hot mix asphalt (HMA) overlay of up to eight sites, all within the City of Tukwila
Federally funded transportation project? ❑ Yes LYJ No (if yes, provide Contract Bond Statement below)
Contractor's Name
E -mail Address
Affidavit ID*
Miles Resources, LLC
1534782
Contractor Address
Telephone #
400 Valley Ave NE, Puyallup WA 98372
1253-383-3585
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
R Retainage Bond ❑ Contract /Payment bond (valid for federally funded transportation projects)
Name: Liberty Mutual Insurance Company
113ond Number: 023028481
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
5/28/2014
7/11/2014
11/7/2014
Were Subcontracters used on this project? If so, please complete Addendum A. Wyes ❑ No
Affidavit ID* - No L &I release will be granted until all affidavits are listed.
Contract Amount
Additions ( + )
Reductions (- )
Sub -Total
Amount of Sales Tax 0.0
(If various rates apply, pleaW send a breakdown)
11-A� TOTAL
Comments:
$ 1,069,794.00
$ 13,000.00
$ 104,773.25
$ 978,020.75
$ 978,020.75
NOTE: These two totals must be
Liquidated Damages $
0.00
Amount Disbursed $
978,020.75
Amount Retained $
0.00
TOTAL $ 978,020.75
INote: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name:
Email Address:
Department of Revenue Washington State Deparunem of
CPublic Works Section Labor & Industries (360) 704 -5650 Contract Release
PWC @dor.wa.gov (855) 545 -8163, option # 4
ContractRelease @LNI. WA. GOV
REV 31 0020e (4/28/14) F215 -038 -000 04 -2014
Title:
Phone Number:
A Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360) 902 -9450
publicworks@esd.wa.gov
21
Addend urn A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L &I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavid IDx
Cascade Channel & Grouting
601 - 426 -821
548043
Ground Up Road Construction
602 - 790 -246
550410
Highmark Concrete Contractors
603- 004 -408
550178
Northwest Traffic, Inc.
602 - 140 -049
543275
Petersen Brothers, Inc.
600 - 072 -474
531860
Transportation Systems, Inc.
602 - 726 -209
546042
Evergreen Concrete Cutting, Inc. (Sub to Miles)
601 - 605 -667
546887
Combined Cutting Contractors
601 - 439 -180
523197
Evergreen Concrete Cutting, Inc. (Sub to Transpsortation Systems)
602 - 726 -209
530007
Briar Group, Inc.
602 - 110 -282
546586
Heinrich's Trucking
275 - 005 -110
533635
For tax assistance or to request this document in an alternate format, please call 1- 800 - 647 -7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (04/28/14) F215 -038 -000 04 -2014
22
City of Tukwila
• Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes
February 17, 2015 — 5:30 p.m. — Foster Conference Room, 6300 Building
PRESENT
Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy
Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischmak, Pat Brodin, Derek
Speck, Dave Sorensen, Gail Labanara, Laurel Humphrey
CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:20 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Project Completion: East Marginal Way South Overlay and Repair
Staff is requesting Council approval of project completion and release of performance bond to
Miles Construction in the amount of $1,418,169.39 for the Overlay and Repair — East Marginal
Way South Project. The project was physically completed on July 14, 2014 and constructed
pavement repairs and an asphalt overlay including pavement markings, pedestrian safety
upgrades and storm water improvements. Cost savings in the amount of $312,051.93 were
largely due to paving technology and operation efficiencies. The City received $993,308.44 in
Federal grant funds. UNANIMOUS APPROVAL. FORWARD TO MARCH 2, 2015 REGULAR
CONSENT AGENDA.
B. Project Completion: 2014 Overlay and Repair Program
Staff is requesting Council approval of project completion and release of the retainage bond to
Miles Construction in the amount of $978,020.75 for the 2014 Overlay and Repair Program.
This project provided hot mix asphalt paving at eight locations in the City and overlay of a
portion of the parking lot at Fort Dent Park as well as other street improvements. Construction
was completed on November 7, 2014, included two change orders, and realized cost savings of
$104,773.25. UNANIMOUS APPROVAL. FORWARD TO MARCH 2, 2015 REGULAR
CONSENT AGENDA.
C. Proposed Budget Amendment: 53rd Avenue South (South 137th Street — South 144th Street)
Staff provided an overview of a revised funding plan for the design of projects associated with
531 Avenue South. The City was unsuccessful in receiving grant funding in 2014 and the
Council gave direction to proceed with City funding for design in order to make the project
shovel ready and more attractive for grant funders. Revised CIP pages for the 53rd Avenue
South (South 137th — South 144th Street) Residential Street, Water, Sewer Rehabilitation, and
53rd Avenue South Surface Water Drainage System were included in the Committee packet,
and these changes will be presented for Council approval during the budget amendment
process that will occur in June 2015. Of particular note, recent investigation of the 531 Avenue
South sewer main revealed that full replacement is not required, and $7 million in the out years
has been removed in the revised CIP page. Staff is meeting with the Transportation
Improvement Board to further discuss and evaluate how to be more successful for grant
funding in the next cycle. INFORMATION ONLY.
23
24
COUNCIL AGENDA SYNOPSIS
---------- - - - - -- Initials
Meeliq Dale
Prepared by
Ma s review
ou repi e w
02/23/15
BM
❑ Resolution
Mt g D ie
Z Ordinance
At g Dale 312115
03/02/15
F-1 Public Fleariq
At g Date
Adlln C��
SPONSOR ❑ Council Z Mayor E]HR ❑ DCD [:].Finance ❑ Dire ❑ IT [:] P&R E] Police ❑ PIFI
SPONSOR'S Many cities use banners in their downtown areas to promote events and activities, both
SUNEMARY private and public events. These events are either tied to community building or promoting
tourism within the City. Economic Development is exploring installing banners in the
Southcenter area of the City.
Ri,,.virW;i) iw ❑ cow Mtg. Z CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. [:] Parks Comm. [:] Planning Comm.
DATE: 2/9/15 COMMITTEE CHAIR: SEAL
V
EXPE?,NDITURI? REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0 $0 $0
Fund Source: N/A
Comments.- NIA
MTG. DATE
RECORD OF COUNCIL ACTION
02/23/15
ITEM INFORMATION
ITEM NO.
6.A.
—7
7FA FF SPONSOR: BRANDON MILES
2/23/15
A(,, LINDA DA ITi .m Ti,i'LE Amending Title 19 of the TMC to permit banners within the right of way.
CATEGORY Z Discussion
AS Date 2123115
❑ Motion
Al g Dale
❑ Resolution
Mt g D ie
Z Ordinance
At g Dale 312115
❑ BidAxard
MI g Date
F-1 Public Fleariq
At g Date
❑ Other
Mt Date
SPONSOR ❑ Council Z Mayor E]HR ❑ DCD [:].Finance ❑ Dire ❑ IT [:] P&R E] Police ❑ PIFI
SPONSOR'S Many cities use banners in their downtown areas to promote events and activities, both
SUNEMARY private and public events. These events are either tied to community building or promoting
tourism within the City. Economic Development is exploring installing banners in the
Southcenter area of the City.
Ri,,.virW;i) iw ❑ cow Mtg. Z CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. [:] Parks Comm. [:] Planning Comm.
DATE: 2/9/15 COMMITTEE CHAIR: SEAL
RECOMMENDATIONS:
SPONSOR /ADMIN. Mayor's Office/Economic Development
Comm""'T"E, Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
EXPE?,NDITURI? REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0 $0 $0
Fund Source: N/A
Comments.- NIA
MTG. DATE
RECORD OF COUNCIL ACTION
02/23/15
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
2/23/15
Informational memorandum dated 2/2/15
Ordinance
Minutes from the Community Affairs and Parks meeting of 2/9/15
3/2/15
Ordinance
25
26
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NOS.
2375 §5 AND 2303 §3 (PART), AS CODIFIED AT TUKWILA
MUNICIPAL CODE SECTION 19.12.030, TO UPDATE THE SIGN
CODE TO EXPAND EXCEPTIONS TO PERMIT THE DISPLAY
OF STREET BANNERS IN THE CITY; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Tukwila recognizes that signs are an
important component of the built environment and assist in way- finding, advertising and
personal expression for Tukwila businesses, property owners and residents; and
WHEREAS, regulation of signage is needed in order to preserve and protect the
public welfare, preserve and enhance the appearance of the built environment, control
visual clutter, protect private and public property, and ensure the orderly movement of
motorized and non - motorized forms of transportation; and
WHEREAS, on August 16, 2010, the Tukwila City Council adopted a new,
comprehensive Sign Code for the City of Tukwila, which is codified in Title 19 of the
Tukwila Municipal Code; and
WHEREAS, the City Council desires to use street banners to promote events and
activities in the City that will draw tourists from outside of the City;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. TMC Section 19.12.030 Amended. Ordinance Nos. 2375 §5 and 2303
§3 (part), as codified at Tukwila Municipal Code (TMC) Chapter 19.12.030, "Exceptions
— Sign Permits Not Required," are hereby amended to read as follows:
19.12.030 Exceptions — Sign Permits Not Required
The following shall not require issuance of permits by the City. The exception is only
from the need to obtain a permit and shall not be construed as relief from compliance
with other requirements of this title. The provisions of this section shall be narrowly
W: Word Processing \Ordinances \Sign Code - Display of street banners 2 -24 -15
Page 1 of 3
BM:bjs
27
construed so as to effectuate the purposes of this title, as enumerated in TMC Section
19.04.020.
1. Repainting of an existing sign when there is no other alteration. This
exception shall not be interpreted to allow the changing of copy or face changes on an
existing sign.
2. Refacing, panel change or copy change on existing conforming, monument
signs that have valid Tukwila sign permits as permitted by TMC Sections 19.20.030
(13)(7), 19.20.040 (6), or 19.32.075.
3. Temporary signs and decorations customary for holidays, such as
Independence Day and Thanksgiving, erected on private property. Signs may only
contain non - commercial speech.
4. Temporary window signs, subject to the limitations of TMC Section
19.24.080.
5. Traffic signs and /or markings installed by the City of Tukwila, King County
or Washington State Department of Transportation for the purpose of regulating,
warning or directing traffic. Signs may be installed within the right -of -way or on private
property, with the permission of the property owner. All signs installed under this
exception shall meet the requirements of the Manual on Uniform Traffic Control Devices
for Streets and Highways, current edition, published by the U.S. Department of
Transportation.
6. Signs typically installed on utilities and wireless communication facilities
denoting danger or other safety information, including emergency contact information.
7. Political campaign signs, subject to the limitations of TMC Section
19.24.090.
8. Temporary signs installed at City parks. All signs shall be approved by the
Tukwila Director of Parks and Recreation and shall meet the requirements of this code.
9. Land use notice boards per TMC Section 18.104.110.
10. Text or graphics on umbrellas located in outdoor seating or plaza areas.
11. Up to four directional signs per premises where there is a need to direct
vehicular traffic. Freestanding signs may be up to three feet in height and two square
feet per face or a total of four square feet for all faces. Flush- mounted building signs
may be up to three square feet in size.
12. The following exceptions are specific to properties developed with
residential uses in residential zones:
a. Each residential property shall be permitted one 1.5- square -foot,
building- mounted plaque; and
W: Word Processing \Ordinances \Sign Code - Display of street banners 2 -24 -15
Page 2 of 3
BM:bjs
W.
b. Each residential property shall be permitted one 6- square -foot banner
or rigid sign that is temporary in nature; and
c. Temporary incidental signs may be displayed with no restrictions from
sunset on a Friday (or the day preceding a designated holiday) until sunset on the
following Sunday (or the Monday following a Sunday if the Monday is a designated
holiday). No individual sign may exceed six square feet in size. It is intended that this
subsection shall apply to garage sale and real estate "open house" signs, however
content of the sign is not restricted.
13. Display of up to three flags, each on individual flag poles, per premise.
Content of the flags is not regulated.
14. Banners within the City's right -of -way, located on City -owned light poles,
City -owned street light signal poles, or hanging above the right -of -way when approved
by the Director of Public Works or designee.
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors, references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section /subsection numbering.
Section 3. Severability. If any section, subsection, paragraph, sentence, clause
or phrase of this ordinance or its application to any person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be
published in the official newspaper of the City, and shall take effect and be in full force
five days after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12015.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Jim Haggerton, Mayor
Filed with the City Clerk :_
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing \Ordinances \Sign Code - Display of street banners 2 -24 -15
BM:bjs
Page 3 of 3
r�i
30
COUNCIL AGENDA SYNOPSIS
------------------------------ Iiiitiali - --------------------------------- I ITEMNO.
Meelin
,g Date
Prepared �y
Mayor's review
CPU review
02/23/15
DCS
FIResolution
A t g Date
E Ordinance
Mt g Dale 312115
03/02/15
DCS
❑ Other
M1 g Date
SPONSOR ❑ Counal E Mayor ❑ HR ❑ DCD [] Finanre [:] Fire [:1 IT ❑ P&R ❑ Police ❑ PWI
SPONSOR'S The Council is being asked to consider and approve amendments to TMC 11.12.030
SUM,Nl,\RY regarding street frontage improvements.
RrIVIF,W1,11) BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 2/17/15 COMMITTEE CHAIR: DUFFIE
RECOMMENDATIONS:
SPONSOR /ADMIN. Mayor's Office & Public Works
Comm""'T�"`, Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
ExPi,"NDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG. DATE
RECORD OF COUNCIL ACTION
2/23/15
ITEM INFORMATION
31
STAFF SPONSOR: DEREK SPECK
2/23/15
A(,, I -'IN DA ITi ",,\I Ti,i,j,i Street Frontage Improvements
CATEGORY E Discussion
AIIS Date 2123115
N Motion
Mig Date 312115
FIResolution
A t g Date
E Ordinance
Mt g Dale 312115
E] Bid Award
Mt g Date
❑ Public Hearing
Mt g Date
❑ Other
M1 g Date
SPONSOR ❑ Counal E Mayor ❑ HR ❑ DCD [] Finanre [:] Fire [:1 IT ❑ P&R ❑ Police ❑ PWI
SPONSOR'S The Council is being asked to consider and approve amendments to TMC 11.12.030
SUM,Nl,\RY regarding street frontage improvements.
RrIVIF,W1,11) BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 2/17/15 COMMITTEE CHAIR: DUFFIE
RECOMMENDATIONS:
SPONSOR /ADMIN. Mayor's Office & Public Works
Comm""'T�"`, Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
ExPi,"NDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG. DATE
RECORD OF COUNCIL ACTION
2/23/15
Forward to next Regular Meeting
MTG. DATE
ATTACHMENTS
2/23/15
Informational Memorandum dated 2/13/15
Ordinance in draft form
Minutes from the Transportation Committee meeting of 2/17/15
3/2/15
Ordinance
31
32
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AMENDING ORDINANCE NO. 1995
§1 (PART), AS DELINEATED IN ATTACHMENT A TO
ORDINANCE NO. 1995 AND CODIFIED AT TUKWILA
MUNICIPAL CODE SECTION 11.12.030, REGARDING PAYMENT
FOR STREET FRONTAGE IMPROVEMENTS; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, public street frontage improvements such as water, sewer, surface water
drainage, curbs, gutters, sidewalks, driveways, streets and other infrastructure are
necessary to support development; and
WHEREAS, the City requires developers to construct street frontage improvements
or to provide a payment -in -lieu; and
WHEREAS, in some instances it may be in the City's best interest to allow the
property owner to proceed with construction prior to constructing the improvements or
paying the payment -in -lieu;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. TMC Section 11.12.030 Amended. Ordinance No. 1995 §1 (part), as
delineated in Attachment A to Ordinance No. 1995 and codified at Tukwila Municipal
Code Section 11.12.030, "Street Frontage Improvements," is hereby amended to read
as follows:
11.12.030 Street Frontage Improvements
(See TMC Title 17 for further detail)
A. The installation of street frontage improvements is required prior to issuance of
a certificate of occupancy for new construction, other than single - family homes, or prior
to final approval for subdivisions and 5 -9 lot short plats and Planned Residential
Developments. For additions and remodels to existing buildings, see TMC Section
11112. U07 0.
W: Word Processing \Ordinances \Street Frontage Improvements 2- 24- 15.doc
DS:bjs Page 1 of 3
33
B. Complete street frontage improvements shall be installed along the entire
frontage of the property at the sole cost of the permittee as directed by the Director.
Street frontage improvements may include curb, gutter, sidewalk, storm drainage, street
lighting, traffic signal equipment, utility installation or relocation, landscaping strip, street
trees and landscaping, irrigation, street widening, and channelization. Beyond the
property frontage, the permittee shall provide ramps from the new sidewalk or walkway
to the existing shoulder, and pavement and channelization tapering back to the existing
pavement and channelization as needed for safety.
C. When (due to site topography, city plans for improvement projects, or other
similar reasons) the Director determines that street frontage improvements cannot or
should not be constructed at the time of building construction, the property owner shall,
prior to issuance of the building permit, at the direction and discretion of the Director:
1. Enter into an agreement to pay to the City an amount equal to the property
owner's cost of installing the required improvements. At the direction and discretion of
the Director, the property owner shall be required to provide a bond or other financial
security for its payment obligation. The property owner shall provide documentation
satisfactory to the Director that establishes the cost of the materials, labor, and
quantities; or
2. Record an agreement which provides for these improvements to be
installed by the property owner by a date acceptable to the Director; or
3. Record an agreement to not protest a local improvement district to improve
the street frontage.
D. If, at a time subsequent to the issuance of a building permit, a local
improvement district is established that includes the property for which the building
permit was issued, the property may be considered in the compilation of the local
improvement district assessment with the appropriate amount of costs of construction
expended by the developer.
E. The Director under either of the following conditions may waive the requirement
for installation of frontage improvements:
1. If adjacent street frontage improvements are unlikely to be installed in the
foreseeable future; or
2. If the installation of the required improvement would cause significant
adverse environmental impacts.
Section 2. Corrections by City Clerk or Code Reviser. Upon approval of the
City Attorney, the City Clerk and the code reviser are authorized to make necessary
corrections to this ordinance, including the correction of clerical errors; references to
other local, state or federal laws, codes, rules, or regulations; or ordinance numbering
and section /subsection numbering.
W: Word Processing \Ordinances \Street Frontage Improvements 2- 24- 15.doc
Page 2 of 3
DS:bjs
I
Section 3. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to any person or situation should be held to be
invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 4. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force five days
after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of 12015.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Jim Haggerton, Mayor
Filed with the City Clerk:_
Passed by the City Council:
Published:
Effective Date:
Ordinance Number:
W: Word Processing \Ordinances \Street Frontage Improvements 2- 24- 15.doc
DS:bjs
Page 3 of 3
35
IM
COUNCIL AGENDA SYNOPSIS
--------- - - - - -- Initial r
Meelin
,g Dale
Prepared by
Ma re iezv
Council review
03/02/15
LH
❑ Resolution
A1 g Dale
[:] Ordinance
Ai g Date
❑ Bid Axard
A/ g Dale
F-1 Pub&' Hearing
Alt
,g Dale
❑ Other
Aft
,g Date
SPONSOR Z Council ❑ Mayor ❑ HR ❑ DCD E]Finance ❑ .17ire E:1 17' ❑ P&R ❑ Police ❑ PWI
SPONSOR'S Council President Kruller is seeking discussion and consensus on the following issue which
SUMMARY will be acted upon at a future SCA PIC meeting: 1) Committee to End Homelessness Draft
Strategic Plan. For more information, refer to the Public Issues Committee 2/11/15
packet, item 7: http://records.tukwilawa.gov/WebLink8/l/doc/255249/Electronic.aspx
Rj,"\, I I I) BY Z cow Mtg. F-1 CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte F-1 Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPON,soR/Ai)mIN. Council President
CoMMI'I'1']'1'I;.
COST IMPACT / FUND SOURCE
ExPi,"NDITURE, Rl--"nUIRFID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG.
RECORD OF COUNCIL ACTION
ITEM INFORMATION
ITEM NO.
6-C.
I
37
STAFF SPONSOR: LAUREL HumPHREY
I ORIGINAL AGENDA D,\'I'I,,: 2/23/15
A(; FN DA Pn,"m Til,j,i,, Discussion on Sound Cities Association (SCA) Public Issues Committee (PIC) Item:
Committee to End Homelessness Draft Strategic Plan
CATi,"(;oRy Z Discussion
At g Date 03102115
❑ Motion
AV Dale
❑ Resolution
A1 g Dale
[:] Ordinance
Ai g Date
❑ Bid Axard
A/ g Dale
F-1 Pub&' Hearing
Alt
,g Dale
❑ Other
Aft
,g Date
SPONSOR Z Council ❑ Mayor ❑ HR ❑ DCD E]Finance ❑ .17ire E:1 17' ❑ P&R ❑ Police ❑ PWI
SPONSOR'S Council President Kruller is seeking discussion and consensus on the following issue which
SUMMARY will be acted upon at a future SCA PIC meeting: 1) Committee to End Homelessness Draft
Strategic Plan. For more information, refer to the Public Issues Committee 2/11/15
packet, item 7: http://records.tukwilawa.gov/WebLink8/l/doc/255249/Electronic.aspx
Rj,"\, I I I) BY Z cow Mtg. F-1 CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte F-1 Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPON,soR/Ai)mIN. Council President
CoMMI'I'1']'1'I;.
COST IMPACT / FUND SOURCE
ExPi,"NDITURE, Rl--"nUIRFID AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG.
RECORD OF COUNCIL ACTION
MTG.
ATTACHMENTS
3/2/15
Committee to End Homelessness Draft Strategic Plan
37
w
c
Attachment A to
0
T.
Address the causes of homelessness by ensuring accountability of cities, county, state and federal
government to address community -level determinants of homelessness.
Making Homelessness Rare requires the rigorous use of data to understand, and make transparent, the
causes and remedies to homelessness.
Making Homelessness Rare requires clarity on the role of partner systems in reducing homelessness,
and changes needed in policy and investments to stem the flow of people who become homeless.
Making Homelessness Rare requires an unwavering commitment to work across system boundaries,
and to hold ourselves and partners accountable for making lasting changes.
lain de Jong with OrgCode published a blog in October 2014, The Homeless Service System Was Never
Intended to Solve All Housing Problems. De Jong makes the case that the causes of homelessness are
complex, and the solutions to homelessness (making it rare) must be shared. Rising poverty and
unemployment, reductions in state and federal funding and the fraying of the safety net, racism and the
effects of disproportionality, lack of affordable housing and criminalization of people who are homeless,
all contribute to increased rates of homelessness.
The Journal of Public Affairs published New Perspectives on Community -Level Determinants of
Homelessness, a 2012 study of predictive factors for community's rates of homelessness. (An overview
of the findings is available to non - subscribers here.) Addressing these determinants, by their nature,
requires commitment from cross - system partners. Findings include:
• Housing Market Factors: An increase in rent of $100 correlates with a 15% increase in metropolitan
homelessness. Local Trend: Seattle rents fastest rising in the nation, per Seattle Times, Sept 2014.
• Economic Conditions: Poverty and unemployment rates are positively associated (correlate) with rates
of homelessness. Local Trend: Poverty in King County on the rise per Seattle Times, May 2013.
• Safety Net: The extent to which social safety net programs (with specific reference to mental health
funding) provide adequate assistance can impact the chances that households will experience
homelessness. Local Trend: Washington State ranks 47 out of 50 in per capita access to psychiatric
beds per Washington State Institute for Public Policy, 2009.
• Transience: While in- migration may be positively associated with strong labor markets, it may also
increase the vulnerability of homelessness of those less well- suited to compete in these arenas. Local
Trend: Seattle is a city of newcomers, per Seattle Times October, 2014.
All partners will be needed to these local determinants of homelessness.
February 11, 2015
1.1
the February 11, 2015 PIC Agenda Item 7
Fewer people exit institutions
directly to homelessness
No cities have policies that
criminalize homelessness
Our community creates more
housing affordable to those making
30% of AMI
More people are prevented from
becoming homeless overall
Stop exiting people to
homelessness from other systems,
including foster care, mental
health, chemical dependency, and
criminal justice.
1.2 Change policies that criminalize
living on the streets
1.3 Increase access to mainstream
supports
1.4 Create more affordable housing
1.5 Prevent people from becoming
homeless
Item 7: CEH Draft Strategic Plan Introduction Page 24 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 1.1: Stop Exiting people to homelessness from other systems, including
foster care, mental health, chemical dependency, and criminal justice.
Basis: Need, Data and Effectiveness
Housing problems, including homelessness, are common among individuals leaving
institutions such as jails, foster care, treatment programs and hospitals. One in five people
who leave prison become homeless soon thereafter, if not immediately (NAEH Re- Entry.)
More than one in five youth who arrive at a youth shelter come directly from foster care.
Participants tend to have limited or low incomes, and, often due to criminal or credit history,
lack the ability to obtain housing through the channels that are open to other low- income
people.
Addressing discharge policies that exit people into homelessness, particularly those that
affect single adults would drive down homelessness in King County. Non - chronically homeless
single adults comprise the great majority of people who are homeless in King County (9,200
annually.) Research by Dennis Culhane indicates that 24.4% of single adults become homeless
upon discharge from an institution, with nearly 70% of those exiting jails or treatment
facilities. Halving the number of single adults discharged into homelessness by jails or
treatment facilities could reduce the number of homeless single adults in King County by 800
each year. (9,200 x .25 x .70 x .50 = —800)
A proven discharge strategy is provision of subsidized housing with associated support
services. Washington State initiated the Earned Release Date (ERD), Housing Voucher
Program which pays $500 per month for up to three months in rent assistance for individuals
exiting corrections. A recent study conducted by Washington State University found that
offenders who receive housing vouchers commit fewer and less— violent crimes than
offenders who don't, and cost savings are more than double what was projected.
More examples of prisoner re -entry programs are described by the NAEH .
Refugees are also at risk of homelessness upon termination of supports. Refugees resettled in the United States under the Refugee Act of are eligible for
cash assistance (up to eight months through DSHS), case management (three months, provided by Voluntary Agencies, or VOLAGS) and English
language training. The original duration of benefits under the Refugee Act was 36 months, which more closely matches the time -frame necessary for a
majority of refugees to obtain economic self- sufficiency and social stability. As noted in a 2009 report on Refugee Resettlement in Washington,
significant numbers of refugees are passing the time period for assistance without obtaining self- sufficiency.
February 11, 2015
Back to Top of GOAL 1: MAKE HOMELESSNESS RARE
Item 7: CEH Draft Strategic Plan Introduction Page 25 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
1.1.A
1.1.B
Stop exiting people into homelessness or otherwise extend progra
supports. Expand and enhance local programs, and advocate for
necessary funding. Examples of 2015 efforts:
Local:
• Enhance local re -entry programs, such as King County's Criminal
Justice Initiative (CJI) and Familiar Faces
• Enhance and expand evidence -based programs (Drug, Mental
Health, Veterans Courts). Explore options to recapture a portion
cost savings, to support participants' housing & re -entry supports
• Actively support City of Seattle Office of Immigrant and Refugee
Affairs five point action plan, particularly items One (Strengthen
Language Access) and Two (Expand Access to ESL Programs).
State:
• Expand state discharge programs such as the Earned Release Date
(ERD) Housing Voucher Program
• Fund Peer -to -Peer supports within Medicaid - funded substance
abuse programs, emphasizing a Recovery Model to supports
• Pass the Homeless Youth Act (2015)
• Expand Foster Care to 21 (youth with documented medical needs)
• End Midnight Release from jails and prisons.
Federal:
• Extend the length of time and resettlement resources for
refugees, particularly ESL learning and employment services
• Advocate with DOL for increased funding for employment among
young adults exiting from the foster care system.
Complete planning for Youth at Risk of Homelessness (YARH)
planning grant, apply for funding, and implement policy
recommendation.
2016 $ + * *
2015 $ +++ * *
2015 $ +++ *
2016 $ +++ * *
2015 $ ++ * *
2015 $ + * *
2015 $ +
2016 $ ++ * *
2017 $ +++ * *
2017 $ +++ * *
Funding status for this portion (RARE)
is based on CEH staff knowledge of
cross - system partners
Funding partially available through
Communities of Opportunity.
CJI and alternative courts reliant
on renewal of MIDD
Uncertain
Uncertain
On 2015 Legislative Priority
On 2015 Legislative Priority
Uncertain
On 2015 Legislative Priority
Uncertain
Uncertain
Uncertain
UWKC,
WACHYA
2015 $ $ +
* *
Partially available, cannot be
achieved without new funding
1.1.0
Establish a Secure Detox Facility. Support King County Mental Health
and Substance Abuse (MHCADSD) efforts to establish a Secure Detox
facility to engage individuals in recovery services.
KC
MHCADSD
2015 $ + + * *
Capital funds needed
1.1.D
Provide professional development / cross - training to partner
systems. Establish role and protocol for conducting housing
assessment as part of discharge policies.
CEH
2015
* *
Major resources needed
Time and Political Will
1.1.E
Influence the workplan(s) of the Interagency Council on
Homelessness (ICH) and Washington State Department of Commerce
Affordable Housing Advisory Board's (AHAB) on discharge planning,
criminalization and affordable housing development.
ICH
AHAB
2015 $ + + * *
Major resources needed
Time and Political Will
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 26 of 124
N Strategy 1.2: Change policies that criminalize living on the streets
Basis: Need, Data and Effectiveness
Policies that criminalize homelessness are costly and rarely result in housing stability or decrease
in homelessness in the community. Penalizing people experiencing homelessness tends only to
exacerbate mental and physical health problems, create or increase criminal records, and result
in the loss of key personal documents that make it even harder for people to exit homelessness.
A 2013 report, Factors Associated with Adult Homelessness in Washington State delivered to the
Bill & Melinda Gates Foundation, reflects that Individuals with a history of incarceration were 7.6
times more likely to report experiencing adult homelessness. Significant research documents
that those with criminal history are also more likely to be unemployed, the second highest
predictor of homelessness. Reducing criminalization, and policies that unnecessarily create a
criminal history, is an important step in making homelessness rare.
1.2.A Repeal or mitigate local ordinances that criminalize people for being
homeless or impose harsh penalties. Examples include ordinances
against Camping / Loitering / Trespassing on public property; Body
odor or bathing in public places; Incurring excessive parking tickets.
1 1.2.B
1.2.0
Attachment A to the February 11, 2015 PIC Agenda Item 7
Back to Top of GOAL 1: MAKE HOMELESSNESS RARE
TBD 2015
Policy development. Investment
within local system requires
time and political will
Implement key strategies from the United States Interagency Council
report on criminalization, Searching Out Solutions: Constructive
Alternatives to the Criminalization of Homelessness particularly
expansion or establishment of alternative sentencing options.
Replicate or enhance models such as:
• King County and Seattle Mental Health Courts
• King County Drug Diversion and Family Treatment Court
• King County and Seattle Veterans Court
• King County Crisis Diversion Center,
King
County and
Seattle
Courts
Retention of existing programs
reliant on renewal of MIDD
Expansion cannot be achieved
without new funding.
Establish and advance local, state and federal agenda items to reduce
criminalization or the effects of criminalization:
Local:
• Actively support the renewal of the Mental Illness Drug Dependency
Sales Tax, the proceeds of which support interventions that divert
people from jails, hospitals and courts and other expensive systems.
State:
• Ban the Box — Adopt Fair Hiring Policies to Reduce Unfair Barriers to
Employment of People with Criminal Records
• Establish Certificate of Restoration.
Federal:
• Identify criminalization regulations that impede housing options.
Policy development. Investment
within local system requires
time and political will
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 27 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 1.3: Increase access to mainstream supports
Basis: Need, Data and Effectiveness
Beginning in 2000, the US Department of Housing and Urban Development
(HUD) has targeted its McKinney -Vento Act funding more exclusively to
housing- focused activities (as opposed to supportive services.) This policy
decision presumed that mainstream programs such as Medicaid, TANF and
General Assistance could cover the gap resulting from the change. In 2010,
HUD Office of Policy Development and Research commissioned a study by
national experts on Strategies for Improving Homeless People's Access to
Mainstream Benefits and Services.
The study identified three groups of barriers to accessing mainstream services and three categories of mechanisms communities could use to
reduce these barriers.
. Structural barriers affect homeless individuals and families who face unique structural obstacles because, by definition or circumstance, they
do not have the ready means of communication, transportation, regular address, and documentation that most mainstream programs require.
Smoothing mechanisms such as street outreach, transportation, coordinated entry or co- location of services reduce structural barriers and
address problems at the street level.
. Capacity barriers result from the inadequacy of available resources; funding may be finite or capped. While harder to address, Expanding
mechanisms, typically through additional resources, can increase overall capacity, and many communities found that a heightened awareness
of capacity barriers, and joint messaging of the need for increased capacity, helped to expand resources at the local level.
. Eligibility barriers are program rules that establish criteria and time limits for who may receive the benefit. Many eligibility restrictions are
embedded in federal policy and cannot easily be influenced at the local level. Changing mechanisms alter eligibility but not overall capacity,
while prioritization can help to target services towards those most vulnerable.
It is not surprising that people who are homeless in King County experience each of these types of barriers. Examples:
Structural Barriers:
• King County is one of the largest counties in the nation, with 39 incorporated cities, 2,307 square miles (twice the size of Rhode Island),
making coordination and transportation across the region challenging.
Capacity Barriers
• Washington ranks 47th in the nation in psychiatric beds per capita. Source: (Washington State Institute for Public Policy, 2009)
• Statewide, flexible non - Medicaid mental health funding from the state general fund has been reduced by $33.2 million (27 %) since 2009.
exacerbated by concurrent elimination of state hospital beds. Source: King County MHCADSD /Behavioral Health.
Eligibility Barriers:
• The US Department of Veterans Affairs and King County are to be commended for allocating millions of dollars in new resources through
its VASH and SSVF programs and Veterans and Human Service Levy respectively. However, receipt of these important resources can be
dependent on a veteran's discharge status, length of time spent on active duty, and VA- determined disability.
February 11, 2015
Back to Top of GOAL 1: MAKE HOMELESSNESS RARE
Item 7: CEH Draft Strategic Plan Introduction Page 28 of 124
1.3.A
Reduce Structure Barriers
Establish Memorandum of Agreement with cross - system partners *, setting goals
to provide cross - training, reduce barriers, increase co- enrollment, and otherwise
increase access to services across systems. See example strategies below.
Attachment A to the February 11, 2015 PIC Agenda Item 7
1.3.A
(example)
1.3.B
* those systems most needed / typically accessed by people who are homeless,
including employment, criminal justice, healthcare /behavioral health, education
Reduce Structure Barriers example: Implement Employment -Based Strategies
• Become a part of planning for the roll out of WIOA (Workforce Innovation and
Opportunity Act) at the state and local level
• Establish cross - system leadership (e.g., CEH Director on WIOA Board, WDC
Director on CEH Interagency Council)
• Provide training and professional development to cross - system staff
• Target enrollment within WIOA- funded programs cohort groups who are often
disproportionality homelessness. Examples:
o Single Adults: recently disabled
o Families: young parents with young children, immigrants & refugees
o YYA: recently exited foster care, couch surfing, non - engaged youth
o Vets: non -VA eligible veterans with disabilities.
Increase Capacity:
Assure availability of critical services frequently needed by a homeless cohort,
such as treatment on demand for individuals with acute mental health and
behavioral health needs. Actively support 2015 King County MHCADSD Behavioral
Health legislative priorities
Employment
Behavioral
Health
Criminal Justice
Education
DSHS, DVR,
Others
Seattle /KC WDC
KC Employment
Programs
All King County
WorkSource
programs
WA State DSHS
and DVR
Realignment
of existing
funds,
prioritization
for services
Realignment
of existing
funds,
prioritization
for services
• Support King County efforts to open two new evaluation and treatment (E &T)
facilities in 2015 for people with mental health disabilities
• Restore to fiscal year 2014 levels the major cuts to state flexible non - Medicaid
funding for mental health ($20.4 million statewide) and state non - Medicaid
substance abuse funds ($10.8 million statewide), to avoid further degradation
of the behavioral health system of care
• Revise the Institutions for Mental Disease (IMD) exclusion rule to exempt
acute -care stays of 30 days or less as it relates to facility -bed size.
• Increase availability of medically- assisted opiate treatment services ($2M
annually).
King County
MHCADSD
Unfunded
(Mostly
Medicaid
funds)
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 29 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 1.4: Create More Affordable Housing
- Basis: Need, Data and Effectiveness
Rising Rents
Erosion in renter incomes over the past decade coupled with a surge in
demand for rental housing has pushed the number of households paying
excessive shares of income for housing to record levels. (Harvard Joint Center
for Housing Studies, Source: America's Rental Housing: Evolving Markets and
Needs, 2013. These trends are mirrored in the Puget Sound, as shown in the
chart to the right.
A 2012 review of multiple studies found that a median rent increase of $100
was associated with a 15% increase in homelessness among adults. Source:
Journal of Urban Affairs, New Perspectives on Community -Level
Determinants of Homelessness. An overview of the findings is available for
non - subscribers of the Journal here.
Availability of affordable housing
In January 2015, the State of Washington will release a report titled the State
of Washington Housing Needs Assessment, which will evaluate the changing
relationship between housing supply and demand across the State including King County. In particular the report will document the lack of affordable
housing for lower- income households and how lower- income renters are cost burdened. CEH will use this upcoming report to inform our affordable
housing strategies in the final strategic plan. Similarly, staff to the King County Growth Management Planning Council identified a countywide need for
affordable housing of:
• 30% and below (very low) 12% of total housing supply
• 30 -50 %AMI (low) 12% of total housing supply
• 50 -80% of AMI (moderate) 16% of total housing supply
Loss of existing affordable housing stock
- CEH will also use the upcoming State of Washington report to inform our strategies regarding the loss of existing affordable housing in King County.
Policy Changes Needed
The provision of housing affordable to very -low income households will only be fulfilled with inter - jurisdictional cooperation and public subsidies, as
noted by the multiple planning councils and initiatives identified in the strategies below.
It will be critically important to engage the federal government. As reported by the Center on Budget and Policy Priorities, federal housing spending is
poorly matched to need, and tilted toward well -off homeowners, leaving struggling low- income renters without help. In fact, renters received less than
one - fourth of federal housing supports, and only about one in four low- income families eligible for rental assistance receives it.
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 30 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 31 of 124
~
~�`0�
�� ~
� -
������-
~-'
~
��
w - ^ `
��� ~.�� �
m�
���
.� °'
—�r
-_�^��
�_
��`�-
==
1.4A
1.4.B
Close the gap ofXX,OOO housing unhsin King County available to households bdow
3O��A&4|. Advocate for aggressive a�ordab|ehousing goa|s,creativepo|icyand|and
use regulations. Identify liaisons to track, influence, suppo�and monitor regional
� �
plans and initiatives. Examples:
• King County Urban [onso�iumand the Conso�ium'sStrategic Plan
Kin�County
Consortium
City
KC DCHS
Seattle OH
ARCH, PSRC,
Others
City and County
Councils
WA State
Leg
Commerce
Federal Gov't:
HUD, VA, HHS
Others
2015
2015
and
beyond
- $ $
$
���
---
+
+++
������
������
New
Resources
needed to
expand rate
of
development
New
Res»«rces
Resources
needed to
expand rate
of
development
• Local cities' Comprehensive Plans (due summer 2015)
• Seattle Mayor's Housing Affordability and Livability Agenda (due 2015)
• VISION 2040, Puget Sound Regional Council's Growth Management PIan
• Other as identified.
Each year, establish and advance a federal, state and Iocal agenda aimed at
increasing affordabte housing. Exampte of opportunities:
Local
• Seattle Linkage Feeds, Seattle Housing Levy
• lncentive Zoning in Suburban Cities
• Seattle and King County each have reports due in 2015 to their respective Council
on Housing A�ordabi|ity
�
State�
• Fund the VVashingtonState Housing Trust Fund
• Preserve and Strengthen the Housing and Essential Needs (HEN)Program
• Make Housing Bonds Effective Now
• lnfluence the state-level roll-out of the National Housing Trust
Federal:
• NAEH states that changes in federal policy and funding are needed to end
homelessness, including provision of 37,000 PSH vouchers to end homelessness
among chronically homeless single adults by 2016.
1.4.0
Sustain units of affordable housing, whose affordability is set to expire by 2017.
TBD
For profit and
non-profit
developers
2015
���
---
+++
������
New
Resources
Needed
(State Needs Assessment report to be complete Jan 2015, from which we can
determine King County numbersj
1.4.D
Increase acces among vutnerabte poputations to existing affordabte housing
projects. Secure agreements for access within publicly funded affordable housing and
market rate housing to households placed through Landlord Liaison Program (LLP), or
otherwise reduce screening criteria to remove all but regulatory -required screening
criteria.
TBD
For profit and
non-profit
developers
2015
$
+ + +
** *
New
Resources
needed to
expand
development
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 31 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 1.5: Prevent people from becoming homeless
Basis: Need, Data and Effectiveness
Homelessness prevention strategies such as financial or legal assistance, housing stabilization or other interventions can help households resolve a
housing crisis that would otherwise lead to homelessness. The USICH reports that innovative practices are emerging that target and coordinate
stabilization and prevention supports towards those most likely to become homeless without assistance. Examples include:
Providing diversion assistance to households seeking shelter. Some communities have found they can help many households who would
otherwise enter shelter maintain their current housing situation or, when that is not possible, quickly relocate to an alternate housing option.
Using shelter data to match prevention targeting to the profiles of people who are actually experiencing homelessness. Communities have
analyzed HMIS data and adjusted prevention program targeting criteria to mirror the profile of shelter residents.
o Philadelphia - Researchers learned that families living in certain neighborhoods were at much higher risk of entering homeless shelters, and
used this data to target outreach and assistance strategies to reach households living in these neighborhoods.
o Alameda County (CA) targeted resources to those who 'look like' a typical shelter resident — those staying with friends and family, staying in
hotels and motels, receiving TANF, or losing their housing subsidies, or people with other risk factors in addition to rent arrears.
Discharge planning: Many communities work with hospitals, treatment facilities, foster care, VA Medical Centers, jails, and prisons to connect
people exiting institutions are at high risk of homelessness with housing stabilization services. (See CEH Strategic Plan 2.0, Strategy 1.1)
Based on a critical review of local combined with national research, King County should target prevention resources based on the following:
Assure an active focus on disproportionality
• People of color make up 31% of King County general population, while comprising 64% of people who are homeless. (Source: 2010 US Census, and
Seattle /King County One Night Count)
Target Young Adult services to LGBTQ and Youth of Color acknowledging that ^'40% homeless youth in identify as LGBTQ. Source: YYA
Comprehensive Plan, 2013)
Strategically time and /or locate interventions
• Most youth who run away from home return home relatively quickly. Prevention supports that connect a young adult to friends, family or other
stable situation can make that return safe and sustainable. (Source: YYA Comprehensive Plan, 2013)
The Health and Human Services Transformation Initiative includes place -based strategies, located in Communities of Opportunity, neighborhoods
in King County that rank lowest on an index of the social determinants of health (including housing), where targeted investments will have the
greatest impact.
Target services towards those that mirror a shelter population
• Risk factors for homelessness among veterans is associated with vets who are younger, enlisted with lower pay grades, diagnosed with mental
illness, TBI, MST or other disability. Source: Homeless Incidence and Risk Factors for Becoming Homeless in Veterans, May 2012
February 11, 2015
Back to Top of GOAL 1: MAKE HOMELESSNESS RARE
Item 7: CEH Draft Strategic Plan Introduction Page 32 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
1.5.A
Support investment of local resources in communities where the need and
opportunity for gain is greatest, working with the Health and Human Services
Transformation Initiative, Communities of Opportunity.
King County
Communities of
Opportunity
Best Starts
for Kids Levy
on the ballot
2015
1.5.B
11.5.0
Direct each CEH initiative to research (as necessary) and integrate prevention
strategies, recognizing that strategies can be highly dependent on client typology.
Strategies must:
• Have an explicit focus on addressing disproportionality.
• Be based on data and emerging research specific to the variances of each
population and initiative
• Incorporate rigorous data and analysis as part of implementation to test and
refine targeting efforts.
• YYA Initiative
• FHI Initiative
• SA AG
• KC RVI
I Realignment
of existing
** I funds,
prioritization
for services
Actively share identified prevention strategies with regional partners to influence and
target prevention and stabilization efforts towards those most likely to become
homeless.
CEH Data &
Evaluation
Advisory Group
Suburban Cities
Realignment
of existing
funds,
prioritization
for services
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 33 of 124
c
asses
e
To make homelessness Brief and One -time, we must align funding and programs to support
the strengths and address the needs of people experiencing homelessness.
VEf
Making Homelessness Brief requires ensuring that for those who do become homeless it is a
brief episode. Shortening the length of time families and individuals are homeless reduces
trauma and also creates capacity in our crisis response system for others in need. In 2013,
households spent an average of 141 days in our crisis response system, far above CEH's goal of
20 days. For this reason we must realign housing and services to prioritize connecting people
with housing as rapidly as possible.
Making Homelessness One -Time requires ensuring that homelessness is a one -time
occurrence, and those we support to move to permanent housing do not become homeless
again and return to our crisis response system. Currently 85 percent do not return to
homelessness within two years, while 15 percent return to homeless. CEH's goal is that only 5
percent return to homelessness.
A well- functioning 'system' is essential to making homelessness a brief and one -time
occurrence. King County needs a clear, consistent, and targeted approach that quickly and
compassionately assesses household's needs and provides tailored resources to people
experiencing a housing crisis.
Through research and experience we now know which intervention types are needed in our
continuum to address homelessness. Our understanding of the needs and strengths of people
experiencing homelessness, combined with our understanding of the housing and services that
work, must now be applied to realign our housing and services into an effective system. This
requires the entire funder and provider community to embrace an approach that focuses on
safety, matching, immediate placement into permanent housing, and supporting stability.
February 11, 2015
Attachment A to the February 11, 2015 PIC Agenda Item 7
Is People experiencing homelessness get the right
service strategy with the right intensity of services
s
More people are served by existing programs
People are homeless for shorter periods of time
Housing measures are improved (obtain /maintain
permanent housing)
s
Work with all CEH partners (funders and providers) to:
2.1 Address crisis as quickly as possible.
2.2 Assess, prioritize and match with housing and
supports
2.3 Realign housing and supports to meet needs of
people experiencing homelessness in our
community
2.4 Create employment and education opportunities
to support stability
Item 7: CEH Draft Strategic Plan Introduction Page 34 of 124
01
Strategy 2.1: Address crisis as quickly as possible
Basis: Need, Data and Effectiveness
In a well- functioning crisis response system, we would not expect to be able to prevent all crises
that lead to homelessness - there will always be a need to provide short -term support to people
experiencing crisis and living unsheltered in our community. People need a safe and secure place to
stay during their crisis so they can focus on the pressing need at hand: locating permanent housing.
Attachment A to the February 11, 2015 PIC Agenda Item 7
Long-Term h i
Traditionally emergency shelter, as well as non - traditional interim survival mechanisms such as car
camping and tent encampments, has played an important role in our community. However despite
our current capacity of over 2,000 shelter beds and the high level of funding towards these
interventions, it's not enough.
We expect to see increased performance through the realignment of our homelessness response
system through efficiencies that move people out of homelessness as quickly as possible. In the
short -term, however, we simply need more options for those who are living on the streets. Interim
survival mechanisms (such as legal encampments and car camping) provide an option for some, and should be linked to service provision focused on
moving people quickly into shelter or long -term housing.
A strategy we have employed to make the experience of homelessness brief in King County is prioritizing those that had been "stuck" in shelter the
longest for permanent housing placement. Mostly men with a median age of 56, "Long -Term Shelter Stayers" used a majority of our emergency system's
capacity while only making up about a quarter of the total shelter population. Now we are moving these "Long -Term Shelter Stayers" to permanent
housing, while freeing up capacity in our shelters for others. In 2013, 85 people who were staying 180 days or more in shelter the year before moved to
permanent housing. This frees up at least 15,300 "bed nights" for new shelter users.
Ter s
but consume
Back to Top of GOAL 2: MAKE HOMELESSNESS BRIEF and ONE -TIME
2.1.A
Ensure shelter capacity to meet the needs of the community,
including the preservation of existing shelter and increasing capacity
to meet specific needs by population and region.
2015
$$
+ *
Partially available, cannot be
achieved without new revenue
Support non - traditional shelter models that create pathways to
housing, including interim survival mechanisms and community -based
strategies such as host homes.
Ongoing
$ +
Available /Existing funding &
partnerships with faith community
Create a flexible financial assistance fund for outreach and shelter
staff that can be used to emphasize a creative "what will it take" 2016 $
approach to get people on a pathway into housing.
+ **
Sources of revenue not identified
Support long -term shelter stayers to move to more stable housing
through access to permanent housing with supports to transition into
housing and onto mainstream services.
Ongoing
+ **
Utilize existing stock as possible.
Resources may be needed for
private market subsidies and
transition services
2.1.E
Increase support and public education for crisis response needs,
including interim survival mechanisms to create pathways to housing
that bring people out of the elements.
2016 $
+ **
Could be accomplished with little
new cost
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 35 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 2.2: Assess, prioritize and match with housing and supports
Basis: Need, Data and Effectiveness
If a person does become homeless, we must work to make their experience brief. Entering the crisis
response system is traumatic for families, and costly for the overall system. For this reason, we are
adapting services to prioritize connecting people with housing quickly.
Realigning our homeless assistance services into an effective crisis response system requires a network of
providers who have embraced the approach that focuses on immediate placement into permanent
housing. USICH provides the following framework to shift from a program- centered to a client- centered
system. The three "A's ": 1) Access; 2) Assessment; and 3) Assignment of Intervention.
• Accesses to a Community -Wide Response System When a housing crisis occurs, how do people access
help? Can assistance be provided to avert (or minimize) trauma associated with housing loss? Locally we have developed coordinated
entry /engagement systems for families and youth /young adults, we are continuing to refine those models and implement new ones for single adults.
• Assessment Exactly how much help each household actually requires can be difficult to determine. While the process may be a bit different for highly
vulnerable unsheltered individuals than it is for families and unaccompanied youth experiencing homelessness, effective communities still use a
common tool to assess needs and prioritize placement into housing often in the form of a vulnerability index or other prioritization tool.
• Assignment of Intervention While much of the new approach is focused on permanent housing, interventions may vary, and the goal remains to
provide the least expensive intervention that solves homelessness for each household. Some households may need only a short -term intervention
(using the rapid re- housing model, or a lighter -touch diversion intervention), while others may require an ongoing subsidy to remain stably housed
(coordinated through local housing authorities or affordable housing partners). Still others will need an ongoing subsidy with wraparound services in
permanent supportive housing. Services are associated with each type of intervention, but the level and duration will vary for each household.
One way we have begun testing this new "least expensive" approach is through a shelter diversion project for families. By diverting entry to shelter, we
increase the availability of shelter and housing for those who are most vulnerable. This model works for those who can find an alternative option with
minimal support, short -term assistance is offered, such as conflict resolution with landlords, shared housing options, and financial assistance. In the first
nine months of the Family Shelter Diversion Protect 33% of families were successfully diverting
from shelter or were still in progress of exploring options outside of shelter.
This approach is also being adapted locally to serve specialized populations. LifeWire's Housing
Stability Program tested the approach that some survivors of domestic violence could avoid
homelessness and shelter stays with assistance to stay in their existing housing or find new
housing. During the first year, their shelter turn -away rate dropped from 1:30 to 1:8, 50% were
able to stay in their own housing and 31% successfully moved into long -term housing without
having to go to shelter. Youth and young adults often return home to parents or relatives
quickly. New and ongoing programs are providing in -home support to families and youths to
prevent or quickly end their episode of homelessness.
Back to Top of GOAL 2: MAKE HOMELESSNESS BRIEF and ONE -TIME
Re-unificat on
r
February 11, 2015
MOnthS
Item 7: CEH Draft Strategic Plan Introduction Page 36 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
2.2.A
2.2.B
2.2.0
Ensure there is a coordinated assessment system which can assist in
appropriately identifying and prioritizing candidates for the right
housing intervention. Access to housing should be consolidated, while
access points and approaches may vary by subpopulation. The system
shall by client focused and shall: (i) be easily accessible, (ii) utilize a
standardized assessment tool, (iii) include community supported
prioritization of the most vulnerable, and (iv) allow for re- assessment
and movement within the system to accommodate changing needs.
Determine best practices in providing housing focused case
management services during the interim period between assessment
and housing placement, including the opportunity to provide diversion
type services and connections for homeless youth and young adults
with family where safe and appropriate.
Adopt Housing First practices (admission criteria doesn't exclude
based on income, disability, treatment compliance, criminal histories,
etc.) while ensuring capacity to provide adequate level and type of
services to the target population.
2015
$$
++
**
2016
2015
$ ++
**
Partially available, cannot be
achieved without new funding
Partially available, cannot be
achieved without new funding
Changes in policy could be
accomplished with little new
cost; reallocating existing
resources
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 37 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
Strategy 2.3: Realign housing and supports to meet needs of people experiencing homelessness in our community
Basis: Need, Data and Effectiveness
We have learned a great deal about what programs work best for each of the
homeless populations (typology). We now need to take a system level approach to
realign our resources to create the right mix to meet the needs of families and
individuals, move them into permanent housing faster, and connect them to
community supports to maintain housing stability. Perhaps the most significant
systems shift will be retooling the existing homeless system to one that provides an
array of homeless interventions that best match the needs of people experiencing
homelessness. This will result in freeing up more intensive (and expensive)
interventions for individuals that need them, while also allowing us to serve many
times more people, more quickly.
The potential is great. Based on national data and typical costs, there is the
potential to successfully rehouse up to five times as many people with a rapid re-
housing type approach compared to transitional housing, with equal or better
housing retention outcomes. For example, one study in Georgia (Georgia State
Housing Trust Fund, 2013) indicates families are less likely to return to
homelessness if they receive rapid re- housing assistance than if they stay in
transitional housing.
10000
9500
4000
3500
3000
2500
20,00
1500
1000
500
EveiEeni
Response
sing
Trent - Base- on research
Long-term Reit-resolved
housing
family initiative has already begun a system realignment process and the
youth / young adult system is developing the framework to scope the ideal housing continuum for young people.
Having the right mix of housing and services is the first step, a well- functioning system also requires:
• A housing pathway is offered as quickly as possible for individuals and families experiencing homelessness
o Rapid re- housing resources
o Permanent Support Housing available for those that need it
• Supportive services and connections to the community -based supports people need to keep their housing and avoid returning to homelessness
o Services should be client- centered and focus on promoting housing stability (intensity and duration of services are tailored to the individual)
o Ensuring equitable access and outcomes for those vulnerable individuals and families that are disproportionately impacted by homelessness by
offering services which are culturally appropriate, tailored and responsive to their needs. For example, the Youth and Young Adult system is
currently building a framework to address the needs of disproportionality of youth of color and youth that identify as LGBTQ
• Increased affordable housing opportunities
o Landlord engagement in the private market
o Access to subsidized public housing and nonprofit housing that is not set -aside for homeless
o Creative alternative (less expensive) housing options such as shared housing, boarding houses, host homes, traditional SROs, etc.
Back to Top of GOAL 2: MAKE HOMELESSNESS BRIEF and ONE -TIME
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 38 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
2.3.A
2.3.B
2.3.0
2.3.D
2.3.E
2.3.F
2.3.G
2.3.H
2.3.1
Realign homeless housing stock and services based on typology and
needs throughout the system; funders in partnership with providers
to determine (i) jf we have the right mix of housing and services and
identify need for new/expanded efforts.
Increase rapid re-housing opportunities to enable households to
Iocate housing and exit homelessness quickly. Utilize data and best
practices to refine existing models and define the model for young
adults.
Continue One Home campaign a coordinated countywide, landlord
outreach strategy to recruit new rental partners.
2016
2016
�
+
Ongoing
�
*** Reallocate existing resources
**
Available via reallocation of
existing resources or by
obtaining new funding
Little or no ongoing funding
+ � ** needed besides support from
partners
Provide/secure training and technical assist nce to build the capacity
of providers to implement tailored services and Housing First
practices that are flexible and responsive to the needs and priorities
of the families and individuals. Develop mobile services models not
attached to specific housing units/projects to ensure housing stability
(e.g. aftercare models, peer support, etc.)
Expand capacity building efforts to ensure culturally appropriate and
responsive services.
Create a Move-Up strategy that assists people who have achieved
stability in PSH -who no longer need or desire to live there- to move
into affordable housing to free up units for other highly vulnerable
individuals that need it.
Retain existing Permanent Supportive Housing and prioritize
admission to chronically homeless persons ahead of other
populations. Identify appropriate and sufficient services resources to
ensure housing stability iri PSH (e.g. Medicaid).
Expand access to Iow income multi-family housing by decreasing
tenant screening barriers and implementing homeless preferences in
low income multi-family housing.
Explore alternative housing models that are less expensive
permanent housing options, such as shared housing, host homes,
boarding houses, and SROs.
2016
2015
2015
Ongoing $$
2015
Leverage existing funding for
** training; reallocate existing
resources for services
**
Sources of revenue not
identified
**
Partially available, cannot be
achieved without newfunding;
leverage unit/vouchers through
turnover
Partially available, cannot be
** achieved without new funding
(Medicaid, etc.)
Changes in policy could be
** accomplished with little new
cost incurred
2016 $$ **
Partially available, cannot be
achieved without new funding
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 39 of 124
Strategy 2.4: Create employment and education opportunities to support stability
Basis: Need, Data and Effectiveness
Creating employment and education opportunities is an obvious approach to stabilizing people in
housing and ensures that they do not return to our homeless system. Unemployment,
underemployment, and low wages relative to rent burden put millions of families at risk of
homelessness nationally and are frequent causes of homelessness. For many individuals
experiencing homelessness, finding living wage employment is an essential part of moving on
from homelessness —and usually is one of the biggest challenges.
Many individuals experiencing homelessness face obstacles to finding and maintaining
employment. As a result, connecting people with job training and placement programs is critical
to ensuring they have the tools they need for long -term stability and success. Further, added
coordination and access to work supports like childcare subsidies and transportation assistance
can help increase the likelihood that individuals will be able to retain employment.
Through employment programs, people who are or have been homeless can access job- training
programs that increase their individual skill set and enhance their ability to find gainful
employment. For example eighty -seven percent of the homeless individuals served by King
County Community Employment Services found employment, with 70% earning enough to be self- sufficient.
Attachment A to the February 11, 2015 PIC Agenda Item 7
of those who
were homeless
became
employed
increase n median
annual income of
the homeless
participants
Back to Top of GOAL 2: MAKE HOMELESSNESS BRIEF and ONE -TIME
2.4.A Expand the Employment Navigator role to scale and increase capacity
to build stronger employer relationships.
2015
$$
**
Partially available, cannot be
achieved without new
revenue /leveraging resources
2.4.B
Integrate financial empowerment strategies into housing services to
improve financial stability (e.g. money- management advice and
coaching).
2016
Available
2.4.0
2.4.D
Develop internship /employment programs that are specifically
designed to connect YYA to identified living -wage employment.
2016
$$
**
Sources of revenue not identified'
leverage mainstream services
Convene employment and educational organizations with the intent
to (i) create a more coordinated system across the region for all
populations and (ii) structure programs to meet the needs of
individuals experiencing homelessness.
2015
++
**
Can be accomplished with little
new cost incurred
2.4.E
Collaborate with homeless liaisons in Public Schools to provide
resource's needed for homeless youth to access schools and other
educational facilities in an immediate and uncomplicated manner.
2015
Can be accomplished with little
new cost incurred
2.4.F
Improve data collection on the employment needs and outcomes of
people experiencing homelessness.
2015
**
Can be accomplished with little
new cost incurred
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction Page 40 of 124
01
Cn - g g
C 3 A Co ��- ass es
Solving homelessness will take more than a Committee, it will take the entire Community to End
Homelessness and provide a home for all.
Attachment A to the February 11, 2015 PIC Agenda Item 7
The 2005 -2015 Ten -Year Plan brought together key leaders from multiple sectors to build political and
public will to end homelessness in King County. This strong level of public and private engagement led
to successes such as the Campaign to End Chronic Homelessness, through which partners developed
nearly 2,400 new units of housing for chronically homeless individuals, by funding in a coordinated
way to maximize our results. We have also successfully aligned funding to support strategies for
addressing youth and family homelessness.
The governance and decision - making of the Committee to End Homelessness has become overly
complicated and diffuse. For example, the Governing Board has authority to set strategic direction,
yet does not as a body have the authority to increase revenue, change policy, or make funding
decisions. The Interagency Council has the authority to recommend policy and investment priorities.
The Funders Group are not aligning funding as seamlessly as envisioned, as they must balance the
recommendations of the Interagency Council with their trustees or elected officials. The Consumer
Advisory Council plays an important role in providing input, and is represented on the Governing
Board and Interagency Council, and is a strength of the current governance structure.
All partners must be aligned if we are to meet the goals of this plan, and a new level of engagement
and accountability among all sectors is needed. Formal agreements must be established among
funders and providers to clarify roles and accountability for community - level, not funding stream or
program - level, results. Elected officials must be presented with clear policy recommendations and
investment opportunities that lead to regional, community -level results. Business and faith leaders
should be presented with concrete opportunities to provide resources, financial and in -kind, to
support the plan's goals. Awareness and engagement of residents of King County, including those
housed and those experiencing homelessness, is a huge potential resource that efforts such as Facing
Homelessness are only beginning to explore.
Staffing for CEH is necessary to provide support the success of the plan. Clear roles for CEH staff and
partners must be developed and formalized.
February 11, 2015
Goals 1 and 2 are achieved
Z) Accountability across sectors
Work with all CEH partners (funders and
providers) to:
3.1 Establish effective decision - making body
and formal agreements to guide
collective action among all partners
3.2 Formalize roles for business leaders and
faith community leaders
3.3 Strengthen engagement of King County
residents, including those housed and
those experiencing homelessness
3.4 Solidify and sustain infrastructure to
operate system, including advocacy,
data analysis, capacity building, planning
and coordination
Item 7: CEH Draft Strategic Plan Introduction Page 41 of 124
Attachment A to the February 11, 2015 PIC Agenda Item 7
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 42 of 124
Establish a single, consolidated, inclusive leadership committee, with strong
working Executive Committee, to replace existing diffuse decision-making
structure (consolidation of existing Governing Board, Interagency Council, and
Funders Group).
Establish &4OUs among local govemment� philanthropy and funderstoalign
3.1.B �
funding and commit to community-tevet outcomes.
2015
Create a business leaders task force, such as the Home for Good model in Los
3.2.A Angeles, to support the State and Federal advocacy activities and to support
imptantation of the ptan with resources.
2015
+ + +
***
Expand existing successful initiatives that engage faith institutions and
32B individual congregantspa�icu|ar|yaroundadvocacyrecruitmentof
� � ' advocacy,
� | tandtords, and provision of day centers, meats and shelter space.
»»e»rm»re
faith coalitions
2015
$ $
+ + +
*�*�*�
3.3.A
Launch a community-wide public awareness and engagement campaign to
support goals of plan, focusing on humanizing people experiencing
homelessness and finding ways for al residents to engage in the solution.
2015
S S
+ +
**
--��-~,-
m
3.4.A
Release an annual consolidated funding round for homeless services and
housing, aligned towards outcomes of this plan, including local, state, and
Federal funding.
[at a minimum]
King County, City
of Seattle, and
United Way
2016
+ + +
* **
.
3.4.B
Unify —--'`"---'----------`'---''`-,,''—'------
^unhiedfundingagenqy �
King County City
ofSeatdc�orCEH
itself f
2016
$
+ +
v+�*
3.4.0
|ncreasemnd consolidate infrastructure for staffing of key functions,
including HMIS, data analysis, funding applications, advocacy, capacity
bui|ding�and planning and coordination
coordination;
Create matrixed management system for staffing of key functions, including
HMIS, data analysis, funding applications, advocacy, capacity building, and
planning and coordination.
One
partners
2015
$ $
++
**
34D
' '
Increase fundin&for or|exero&eexistin&odxococy�oHDn& functions (this
must occur outside of local government) �
philanthropic,
business, faith
'
nonprofit partners
2015
$ $
+ +
+�+�
3.4.E
Consotidate coordinate entry oversight.
One of the funding
partners
2015
$
+ +
** � �
February 11, 2015
Item 7: CEH Draft Strategic Plan Introduction
Page 42 of 124
rp-a n.
MC
COUNCIL AGENDA SYNOPSIS
Meelin a
,g Date Prepared by M W Council review
_Sorj review
03/02/15 Co
ITEM INFORMATION
TA.
We
STAFFSPONSOR: COUNCIL PRESIDENT KRULLER I
ORIGINAL A(,FNixA DATE: 3/2/ 15
A(,ENDA IrI,MTrrl,r A motion to appoint an Acting Council President for the 3/9/15 Committee of the
Whole Meeting
CATEGORY ®Discwsxion
Alig Date 312115
E Motion
Mi
,g Date 312115
❑ Resolution
Ai g Date
❑ Ordinance
Ali g Date
❑ BzdAxard
Mt g Date
1:1 Public, Hearing
MtS Date
F-1 Other
Mt g Date
SPONSOR E Council ❑ Mayor [:] FIR ❑ DCD ❑ Finance ❑ F'zre ❑ IT ❑ P&R [:] Police ❑ PWI
SPONSOR'S Council President Kruller will not be in attendance at the March 9, 2015 Committee of the
SUMMARY Whole Meeting. It is necessary for the Council to select an Acting Council President for
that meeting.
REV I 1,"WIU) BY ❑ cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte F-1 Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR /ADMIN. Council President
Commi'l,r] I,],,,
COST IMPACT I FUND SOURCE
ExPi,',NDITURF REQuiRrli) AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments:
MTG.
RECORD OF COUNCIL ACTION
MTG.
ATTACHMENTS
3/2/15
No Attachments
We
•1
COUNCIL AGENDA SYNOPSIS
nilials
Meeting Dale Prepared by Ma ors review Council review
03/02/15 co
ITEM INFORMATION
ITEM NO.
7.B.
61
STAIN SPONSOR: COUNCIL PRESIDENT KRULLER
� ORIGINAL A(3FINDA DA'I'S: 3/2/15
A(,, L,"NDA I'n ;m Tj,n,E- Discussion and potential decision regarding the addition of language in
Councilmember emails noting, in part, that "email communication is subject to public
disclosure."
CATEGORY Z Discwsion
At g Date 312115
Z Motion
A 1g Date 312119
❑ Resolution
Mt g Dale
❑ Ordinance
M/g Date
❑ BidAxard
M1 g Date
❑ Public Hearing
Mig Date
F-1 Other
Mig Date
SPONSOR Z Council []Mayor [:] HR ❑ DCD E] Finance ❑ Fire ❑ IT [:] P&R ❑ Police [:] PV
SPONSOR'S Many agencies incorporate language at the end of emails emphasizing that email
SUMMARY communication is subject to public disclosure. At the request of the Council President, the
City Attorney has reviewed and approved the following language that can be added to
Councilmember emails.
"Please be aware that email communication with City of Tukwila Councilmembers is a
public record and is subject to disclosure upon request. Public documents and records are
available to the public as provided under the Washington State Public Records Act
(Chapter 42.56 RCW)."
Rj;X I I 3Wl -I) BY ❑ cow mtg. [:] CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
F-1 Utilities Cmte F-1 Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: COMMITTEE CHAIR:
RECOMMENDATIONS:
SPONSOR/At)MIN• Council President
COMIMFI-11
COST IMPACT I FUND SOURCE
ExPj M)ITURI 3 RV(2U I RI AMOUNT BUDGETED APPROPRIATION REQUIRED
Fund Source:
Comments.-
MTG.
RECORD OF COUNCIL ACTION
MTG.
ATTACHMENTS
3/2/15
No Attachments
61
62
City of Tukwila jim Haggerton, Mayor
6200 Southcenter Boulevard
WA • ..
The City of opportunity, the community of choice
TO: Mayor Haggerton
Councilmembers
FROM: David Cline, City Administrator
DATE: February 25, 2015
SUBJECT: Report for March 2, 2015 Regular Council Meeting
The City Administrator Report is meant to provide the Council, staff and community an update on the
activities of the City and on issues that concern Tukwila. Please let me know if you have any questions
or need additional information about any of the following items.
Intergovernmental Update
• AWC City Action Days: Mayor Haggerton, Council President Kruller, Councilmembers Duffie,
Hougardy and Robertson, City Administrator David Cline, Communications and Government
Relations Manager Rachel Bianchi and Council Analyst Laurel Humphrey attended AWC's City
Action Days Conference in Olympia.
• Case Study on Seizure of Motels: City Administrator David Cline met with students from the
Evans School of Public Affairs who are compiling a case study on the seizure of criminal
property and use of eminent domain for their Municipal Management class.
• Congressman Smith Business Meeting: On February 20, Congressman Smith held a business
outreach meeting at the UPS Store at soo Andover Park West and discussed regulations
affecting small business. Economic Development staff attended.
• Lodging Tax Advisory Committee (LTAC): The City's LTAC committee met on February 20.
Council President Kruller chaired the meeting. The Committee recommended approval of
funding for street -pole banners near the Starfire Sports Complex to recognize the Sounders.
• Tour of Renton Technical College: Staff facilitated a tour for Tukwila School District
Administrators at Renton Technical College in order to learn about the wide range of programs
available to students.
• SeaTac Council Work session: Councilmember Hougardy and Brandon Miles, Economic
Development Liaison attended a SeaTac City Council to discuss the mission and goals of the
Soundside Alliance for Economic Development. Councilmember Hougardy provided a briefing
on the history of Soundside as well as their current work plan.
II. Community Events
63
City Administrator Report
February 25, 2015
Page 2
• Tukwila Sounder Station Ribbon Cutting: Mayor Haggerton, Councilmembers Kruller and
Hougardy, City Administrator David Cline and several staff members attended the Tukwila
Sounder Station Ribbon Cutting Ceremony on February 18.
III. Staff Updates
• Foster Golf Links Parking Issue: There is a growing number of automobiles parking in the
Foster Golf Links parking lot, most likely due to King County Metro's decision to not lease
additional parking spaces at the nearby park & ride. These non - recreational users are having
an impact on the golf course. In an attempt to resolve this issue Foster Golf Links will be
placing advanced warning "6 HR Parking, Recreation Use Only" and "Authorized Parking Only
Vehicles Impounded" signs on the north end of the parking lot by March 1. Violation
enforcement will begin on April 1, 2015. The City will continue to work with King County
Metro to find a long -term solution for park and ride users. This issue is on the Transportation
Committee's work plan.
• TCC Tree Thinning: On Wednesday, February 11 the parks crew removed 8 trees from the
Tukwila Community Center parking lot. The trees were not growing well and were hindering
healthy growth of nearby trees. Staff is coordinating with the Seattle Woodworking Club to
donate the tree trunk wood rounds to the Seattle Wish Program through Children's Hospital.
Eight replacement trees will be planted on site in the near future.
Public Safety
• Canine Teams Present to Local Girl Scouts: On January 22 the Tukwila Police Canine Teams
gave a presentation to 30 -4o Tukwila Girl Scouts at Tukwila Elementary School. The
presentation provided background about the work and lives of Canines Doc and Ace. A few of
the girls indicated they would like to become Police Canine handlers themselves. The Girl
Scouts are raising money from their cookie sales to purchase a bullet proof vest for Canine
Doc, as well as other dog supplies and equipment.
• ALICE Training: School Resource Officer Lisa Harrison and Commander Rick Mitchell o
attended ALICE (Alert, Lockdown, Inform, Counter, Evacuate) training in Redmond, WA.
ALICE is a training course to train school district personnel and teachers on how to respond to
an active shooter or intruder in the schools. Both Commander Mitchell and Officer Harrison
are now certified instructors.
• Emphasis Patrols: The Community Police Team continues to conduct emphasis patrols at the
Sound Transit Station, focusing attention on the Central Business District and increasing
emphasis on the residential areas.
Project Updates
• Group Health: Group Health is moving approximately 1,00o employees from its administration
and operations campus at 12400 East Marginal Way in Tukwila to Renton next to the Tukwila
Sounder Station in order to have better transportation access and a more efficient, new
building. Group Health's other two administrative buildings will remain occupied with
.,
City Administrator Report
February 25, 2015
Page 3
approximately s,000 employees. The Tukwila Reporter recently posted a good article with
more information.
• Spruce Motel: On February 12 the City completed its purchase of the Spruce Motel on Tukwila
International Boulevard. The property is now completely vacant and fenced. PBS Engineering
is developing specifications for demolition. Demolition of the Spruce and other motels is
scheduled to occur in 2015.
• Briscoe /Desimone Levee Repair: The City of Kent has begun construction of the sheet pile
flood wall. Work will begin near West Valley Highway and will require some lane closures. The
work is scheduled to be completed by July 2015.
IV. Responses to Council /Citizen Inquiries
Date of
Inquiry
Inquiry
Response
2/17/15
Christi Wells, Wells Trucking:
DCD staff have talked with Ms. Wells via telephone and
City
request for assistance in allowing
followed up with an e -mail detailing the options
Council
the Tukwila School District to
available to her: request a zoning code interpretation to
meeting
purchase the truck terminal site
determine if the proposed school district use is similar in
for use for school bus storage,
nature to the legal nonconforming use of the truck
repair and dispatch. Zoning on
terminal on the LDR portion of the site; or request a
the property is split between C /LI
rezone of the site. Each option has different associated
and LDR and the current use is
costs and timelines.
considered legal nonconforming.
2/17/15
Council President Kruller raised
The potential legislation in Olympia only gives cities the
City
concern about legislation in
authority to reduce the distance to 500 feet, it does not
Council
Olympia that would reduce the
automatically reduce the distance. The s,000 foot rule
meeting
distance between where legal
would remain in effect unless a City Council took action
marijuana facilities could be sited
to reduce the distance via ordinance. Some cities have
in relation to schools, etc. She
requested this flexibility because they would like to site
also asked that the City
legal marijuana facilities closer than the s,000 feet
investigate Issaquah's public
currently allowed. Staff reviewed Issaquah's public
consumption ordinance.
consumption ordinance and determined that it adopts a
number of state statutes by reference. The ordinance
does not address odor.
65
M.
Upcoming Meetings & Events
March 2015
2nd (Monday)
3rd (Tuesday)
4th (Wednesday)
5th (Thursday)
6th (Friday)
7th (Saturday)
Dr. Seuss
➢ Arts
➢ Equity &
Birthday Party
Commission,
Diversity
3:00 to 6:00 PM
5:00 PM
Commission,
(Foster Library)
(Community
5:15 PM
Center)
(Hazelnut
➢ Civil Service
Conference
Commission,
Room)
5:00 PM
➢ Finance &
(Hazelnut
Safety Cmte,
Conference Room)
(Haut
(Ha zelInn
Conference
➢ Transportation
Room)
Cmte,
5:15 PM
(Foster
Conference Room)
SUNDAY, MARCH $
Advi e ''
(at 2:00 AM)
D City l
Bear
CANCELLED
Daylight Saving Time
al Mtg
Special Mtg.
Begins
(Work Session to
a=
plan for future
Town Hall Mtgs.),
6:00 PM
(Hazelnut;
Conference Room)
➢ City Council
Regular Mtg.,
7:00 PM
(Council
Chambers)
9th (Monday)
10th (Tuesday)
11th (Wednesday)
12th (Thursday)
13th (Friday)
14th (Saturday)
➢ Community
➢ Utilities Cmte,
➢ COPCAB,
Restore the
Council Chart
Affairs & Parks
5:30 PM
6:30 PM
Duwamish
10:00 AM to
Corte,
(Foster
(Duwamish
Shoreline
12:00 NOON*
5:30 PM
Conference
Conference
Challenge
Talk with a Tukwila City
(Hazelnut
Room)
Room)
1:00 — 4:00 PM
Councilmember about
Conference Room)
Meet at the Green
anything on your mind
River Trail @
regarding Tukwila.
➢ Tukwila
BECU Campus
*Notes special meeting
P g
➢ City Council
International
(12770 Gateway
location this month:
Committee of
Boulevard
Drive)
Tukwila Police
the Whole Mtg.,
Action Cmte,
Visit:
Community Resource
7:00 PM
7:00 PM
forterra.org /events
Center at Westfield Mall
(Council
(Note new
for information &
(in foyer of the south
Chambers)
meeting
registration.
entrance, garage side)
location:
Valley View
"Strike Out Hunger"
Sewer District,
event at ACME Bowl
3460 S. 148't'
to benefit Tukwila
St)
Food Pantry.
10 AM to 12 NOON
(100 Andover Park W.)
For information e-mail
StrikeOutHunger@
TukwilaRotary.org
-TAX PREPARATTON
A SSISTANCE
d�lered bj Unrted Way ofKm County fr6rny�ziowv
untd April i $6t for hqusehaids,',
zning tinder $60
(i00', Also oiie on one,#
na>xcraloti0seh>ag healthcare eoroLhnettt
and otker publt;eneftts: '.
CONfiACT 1 HE
T TKWILA Ct)MM[iNITX
CENTER "'1012 DAXS AND HOI7I25'AVAILAB
E: 206 76$ -2822
➢ Arts Commission: 1st Tues., 5:00 PM, Tukwila Community Center. Contact Stephanie Gardner at 206 - 767 -2342.
➢ Civil Service Commission: 1st Mon., 5:00 PM, Hazelnut Conf Room. Contact Kim Gilman at 206 - 431 -2187.
➢ COPCAB (Community Oriented Policing Citizens Adv. Board): 2nd Thurs., 6:30 PM, Duwamish Conference Room.
Contact Chris Partman at 206 -431 -2197.
➢ Equity & Diversity Commission: 1st Thurs., 5:15 PM, Hazelnut Conf Room. Contact Joyce Trantina at 206 - 433 -1868.
➢ Finance & Safety Committee: 1st & 3rd Tues., 5:30 PM, Hazelnut Conf. Room. (a) Ordinance providingfor the issuance of
$6,250,000 Limited Tax General Obligation Bonds for arterial streets. (b) Authorization to spend Lodging Tax Funds for street pole
banners. (c) Ordinance amending Ordinance Nos. 2464 and 2465 to conform debt service payment dates. (d) Ordinance updating
TMC Chapter 3.32 regarding unbudgeted equipment or fixed assets. (e) Interlocal Agreement extending animal control services.
➢ Library Advisory Board: 1st Tues., 7:00 PM, Community Center. Contact Stephanie Gardner at 206- 767 -2342.
➢ Transportation Committee: I st & 3rd Mon., 5:15 PM, Foster Conf. Room. (a) Non - recreational parking at Foster Golf Links.
➢Tukwila Int'l. Blvd. Action Cmte: 2nd Tues., 7:00 PM, Valley View Sewer District. Contact Chief Villa at 206- 433 -1815.
67
March
�
•:
Tentative Agenda Schedule
K
See agenda packet
cover sheet for this
week's agenda
(March 2, 2015
Regular Meeting).
0
Special Presentation:
2014 Police
Department Annual
Report.
Appointments/
Proclamations:
- Commission and
Board Appointments
- Proclamations:
Earth Day
Arbor Day
National
Volunteer Day
z
Special Presentation
Debt presentation.
Special Issues
A Development
Agreement relating to
shared use of parking
in the right -of -way.
A consultant contract
for the BNSF
Intermodal Facility
Access Project.
13
w
Consent Agenda
A consultant contract
for the BNSF Intermodal
Facility Access Project.
Unfinished Business
A Development
Agreement relating to
shared use of parking in
the right -of -way.
W
Special Presentation:
Watershed -based
restoration and salmon
recovery in Tukwila
(WRIA9)
23
Special Issues
Discussion and
consensus on Sound
Cities Association
Public Issues
Committee (SCA PIC)
items.
Committee of the
Whole to be followed
by a Special Meeting.
Special Presentation:
State of the Municipal
Court.
Special Issues
Discussion and
consensus on Sound
Cities Association
Public Issues
Committee (SCA PIC)
items.