HomeMy WebLinkAbout96-009 - Entranco Engineers - Interurban Avenue Bridge Widening Consultant• • April 9, 2003 Entranco 10900 NE 8th Street, Suite 300 Bellevue, Washington 98004 City of Tukwila Interurban Avenue Bridge Widening — Green River City Project No. 89 -RW 13 Supplement No. 3 to Contract 96-009 (c ) Entranco Project No. 96007-20 The City of Tukwila desires to Supplement the Consultant Agreement entered into with Entranco, Inc. on March 20, 1996. The provisions in the February 8, 1996 agreement remain in effect except as expressly modified by Supplement No. 3, and as permitted under Section XIV, Extra Work. The changes to the Agreement are described as follows: 1 Section II, Scope of Work. The attached Exhibit "B-3" which describes the services to be performed under this Supplement No. 3, is hereby made part of this Agreement. 11 Section IV, Time for Beginning and Completion. The completion date as indicated on the cover of the original agreement is amended to a new date of May 31, 2003. 111 Section V, Payment. The attached Exhibit "C-3", which establishes the payment for work to be performed under this Supplement No. 3, is hereby made a part of this Agreement. The maximum amount payable for Supplement No. 3 inclusive of all fees and other costs, is $7,863.00. The total amount of this Agreement as supplemented, inclusive of all fees and other costs, is $170,272.00 as set forth in the attached Exhibit "D-3" and by this reference made part of this Agreement. I 1 4/zL/03, ORIGINALS • • If you concur with this Addendum and agree to the changes stated above, please sign in the appropriate spaces below and return to this office for final action. CITY OF TUKWILA 6t3 Title J2 , "UO3 Date ENTRANCO, INC. By: Dennis ns, P.E. Vice Presi nt f(1'63 Date • • EXHIBIT B-3 SCOPE OF WORK SUPPLEMENT NO. 3 RE -ADVERTISEMENT - EXTRA WORK Interurban Avenue Bridge Widening — Green River CITY PROJECT NO. 89-RS13 Entranco Project No. 1-10-96007-21 INTRODUCTION The project was originally bid early in 2002. Due to bid prices exceeding the available funding, the City rejected all bids, and revisions and updates were made to the project in order to re -bid. Entranco prepared a scope and budget for the revisions and updates (Supplement No. 2) and performed the work necessary for the project re -bid. Reviewing our assumptions and estimate for that work, we find that extra effort was expended in the areas outlined below, and qualify for compensation by the City. EXTRA WORK The following items reflect extra work, and are a part of this Supplement No. 3: 302 Update Plans and Specifications to 2002 Standards Budgeted time substantially overran in 2 areas — CADD and Engineer Review. CADD involvement was higher than anticipated due to revisions to the work (water line revisions, habitat enhancement refinement, etc.). Updating to new standards required a more extensive and comprehensive review than expected. 306 Constructability Review The City requested that Entranco review the submitted bids and identify areas in which money could be saved, or portions of work could be eliminated from, or postponed on the project. This process involved both a field and office review, which exceeded the originally anticipated scope of work. 307 Document Production Entranco produced the PS&E package in house in order to reduce the overall document costs. While money was saved, the production costs exceeded the originally budgeted amount. 309 (NEW) DNR Permit Application - This item was not addressed in the Rebid Scope of Services. While substantial work was expended to accomplish this work, Entranco believes that 8 hours is justified for finalization of the permit application. EXHIBIT C-3 J -J cC co -) O O co co V V 0 m 0 m a 2 • 0 .c 0 0 m CA .0 0 0 0) m N C CU > > a a c 0o a CO m • .• 0 0 c °) c N Project Name: Phase Name: O E 0 d O d Phase No.: fr 0 0 (95) TechSup $16.50 co 0 0 N co 8 $132.008 Direct Salary $2,637.50 Per Diem Plan Copying ($1.00/sheet) Overhead @ 165.0% $4,351.88 Lodging Plotting Subtotal $6,989.38 Travel Copying ($0.10/page) Meals Computer (CADD) ($9.00/hou Fee @ 12 % ' $838.73 Reproduction - Specifications Mileage ($0.345/mile) $34.90 Outside Reimbursables & Subconsultants Reproduction - Plans Total: Word Proc. ($5.00/hour) Internal Rate Pay Items $34.90 Postage/Delivery GPS Receiver ($200/day) GRAND TOTAL = • $7,863.00 Mileage/pers. vehicle - Other Supplies Total = $34.90 Other Total = (94) Proj Asst $24.00 (55) Const. Inspector $30.50 .- 0 u) LC; CO CO Eft - .- o ,- 10 tri CO CO Vi (85,87) Survey Crew $46.00 (80) Sury Office $27.00 7 $189.00 7 $189.00 (75) Sury Mgr $48.00 1 $48.00 1 $48.00 (51) CADD $23.50 CCOO O O to 30 $705.00 (95) Word Proc. $25.00 (35) Tech. Edit. $29.00 (1) AUTO CAD $22.00 (20) Staff Engr/Sci $24.00 (17) Des. Engr/Sci $33.00 28 $924.00 CV 00 CO 0 M O O O) CO (10) Proj. Engr/Sci $34.00 7 $238.00 7 $238.00 (3) Proj. Mgr. $49.00 TOTALS (2) HOURS/ Principal DOLLARS $61.50 8 $237.00 tM() O cv z-, O 0 M 03 r to co V3 co 0 M V> Off) LC) CMO N 03 Y U) a F- Incorporate Addendum Changes Update Plans and Specifications to 2002 Standards Specifications Labor Rates Make Electrical Updates to Plans and Coordinate with WSDOT Engineer's Estimate 1 Constructability Review Document Production i Bid Review DNR Permit Application TOTALS Y W m 0 o O M M M M CI M M M rn M Z 0 0 Cn N Printed: 4/9/03 T\forms\pcforms\estimateworkbookNW\cpff.xlw EXHIBIT D-3 City of Tukwila Interurban Avenue Bridge Widening — Green River City Project No. 89-RW13 Original Contract Amount Contract 96-009 — Summary Supplement No. 1 Supplement Supplement No. 2 No. 3 Total Contract Amount Direct Salary Cost Overhead Direct Non -Salary Costs Fixed Fee Subconsultant Costs Total $ 24,075.00 $ 39,724.00 $ 8,015.00 $ 7,656.00 $ 20,783.00 $ 100,253.00 $13,598.00 $ 5,272.00 $22,437.00 $ 8,699.00 $ 197.00 $ 4,953.00 $ 4,324.00 $ 1,676.00 $ 1,000.00 $ - $41,556.00 $ 20,600.00 $ 2,638.00 $ 45,583.00 $ 4,352.00 $ 75,212.00 $ 35.00 $ 13,200.00 $ 838.00 $ 14,494.00 $ - $ 21,783.00 $ 7,863.00 $170,272.00 October 1, 2002 Entranco 10900 NE 8th Street, Suite 300 Bellevue, Washington 98004 City of. Tukwila Interurban Avenue Bridge Widening — Green River City Project No. 89 -RW 13 {Supplement No. 2 to Contract 96-009 (0 Entranco Project No. 96007-20 The City of Tukwila desires to Supplement the Consultant Agreement entered into with Entranco, Inc. on March 20, 1996. The provisions in the February 8, 1996 agreement remain in effect except as expressly modified by Supplement No. 2, and as permitted under Section XIV, Extra Work.. The changes to the Agreement are described as follows: Section II, Scope of Work. The attached Exhibit "B-2" which describess the services to be performed under this Supplement No. 2, is hereby made part of this Agreement II Section IV, Time for Beginning and Completion. The completion date as indicatedon the cover of the original agreement is amended to a new date of December 31, 2002. III Section V, Payment. The attached Exhibit "C-2", which establishes the payment for work to be performed under this Supplement No. 2, is hereby made a part of this Agreement. The maximum amount payable for Supplement No. 2 inclusive of all fees and other costs, is $20,600.00. The total amount of this Agreement as supplemented, inclusive of all fees and other costs, is $162,409 as set forth in the attached Exhibit "D-2" and by this reference made part of this Agreement. If you concur with this Addendum and agree to the changes stated above, please sign in the appropriate spaces below and return to this office for final action. Page 1 of 3 CITY OF TUKWILA ciyarriInqweio t-11 • Title Date • ENTRANCO, INC. By: Page 2 of 3 _ ir: //\ a e LeMaster, -.E. Senior Vice Preside Date ENTRANCO • • September 30, 2002 EXHIBIT B-2 SCOPE OF WORK SUPPLEMENT NO. 2 RE -ADVERTISEMENT Interurban Avenue Bridge Widening- Green River CITY PROJECT NO. 89-RS13 Entranco Project No. 1-96007-20 I. Introduction The project is being updated for re -bidding as directed by the City of Tukwila. Phase 2 — Final Design of the original contract is hereby supplemented with the following added work. Extra Work — Phase 2 — Final Design III. DETAILED SCOPE OF WORK 6. Additional Services — Additional scope items that are needed for this supplement include: a. Addendum update. Update plans and specifications to reflect information included in addendum 1 which was issued as part of the original bidding process. b. Update to 2002 Specifications. Review the current plans and specifications and update to current 2002 specifications. Work shall include reviewing and incorporating appropriate GSP's and Addendum's. c. Labor rates. Update the state and federal wage rate requirements to current rates. d. Electrical revisions. Revise the electrical plans per the comments received from WSDOT and submit to WSDOT for approval. One set of submittals is estimated along with 4 hours of coordination time. It is anticipated that 2 luminaires will be added to the plan set. e. Engineers estimate. Update the Engineers estimate to reflect the revised plans and current pricing. f. Constructibility review. Review the project documents to determine possible means to reduce overall project costs. Address concerns raised during initial bidding concerning clarity on scope of work (i.e., stream mitigation and paved pedestrian trail in the vicinity of the Family Fun Center) g. Document production. h. Bid review. Review bid documents and prepare a tabulation of bids. This item of work shall also include a letter of finding following the review of all bids. Scope of Services• September 30, 2002 Page 2 • IV. DOCUMENTS TO BE FURNISHED BY THE CONSULTANT. 1. Half -scale contract plans and contract provisions, 75 sets. 2. Engineers estimate, two copies. 3. Permit revision application. V. ITEMS AND SERVICES TO BE PROVIDED BY THE AGENCY A. Timely review of all work at mutually agreed upon times and consolidation of all review comments into one set prior to returning the comments to the CONSULTANT. B. Payment of all reviews and/or permit fees. C. Payment of costs associated with advertisement for bids. EXHIBIT D-2 City of Tukwila Interurban Avenue Bridge Widening — Green River City Project No. 89-RW13 Contract 96-009— Summary Original Contract Amount Supplement Supplement No. 1 No. 2 Total Contract Amount Direct Salary Cost $24,075 $13,598 $5,272 $42,945 Overhead $39,724 $22,437 $8,699 $70,860 Direct Non -Salary Costs $8,015 $197 $4,953 $13,165 Fixed Fee $7,656 $4,324 $1,676 $13,656 Subconsultant Costs $20,783 $1,000 $0 $21,783 Total $100,253 $41,556 $20,600 $162,409 Page 3 of 3 EXHIBIT C-2 C Exhibit C-2 LL NN LL 0 - 0 co (+) co O) a m m a` Interurban Avenue Bridge Widening Project Name: Phase Name: O E 0 0 N O a Phase No.: cc O 0 COco W (95) TechSup $18.00 TOTALS 169 2 30 27 48 21 24 16 1 $5,272.00 $123.00 $1,470.00 $918.00 .81,152.00 $609.00 8600.00 $376.00 $24.00 s., OUTSIDE REIMBURSABLES SUBCONSUTANTS INTERNAL RATE PAY ITEMS Direct Salary $5,272.00 Per Diem Plan Copying (81.00/sheet) Overhead @ 165.0% $8,698.80 Lodging Plotting Subtotal $13,970.80 Travel Copying ($0.10/page) Meals Computer (CADD) ($9.00/hou Fee @ 12 % $1,676.50 Reproduction - Specifications $2,950.00 Mileage ($0.345/mile) $25.00 Outside Reimbursables & Subconsultants - $4,927.70 Reproduction - Plans $1,950.00 Total: Word Proc. ($5.00/hour) Internal Rate Pay Items $25.00 Postage/Delivery GPS Receiver ($200/day) GRAND TOTAL = $20,600.00 Mileage/pers. vehicle $27.70 Other Supplies Total= $25.00 Other Total = $4,927.70 (94) Proj Asst $24.00 8 V N tecD (55) Const. Inspector $30.00 (85,67) Survey Crew $46.00 (80) Sury 011. -Sr. $38.00 (75) Sury Mgr $47.00 U Ca 4 $94.00 $ O $ `ii d o m E 14 "' a 0 i» 20 $500.00 (35) Tech. Edit. $29.00 ° o m 1 $29.00 - o m (1) AUTO CAD (20) Staff Engr/Sci $24.00 20 $480.00 t9 r 2 $48.00 fA 0 0) 0 a0 0 0 2 $48.00 (17) Des. Engr/Sci $33.00 (10) Proj. Engr/Sci $34.00 N 0 f9 N 0 m N 11 $374.00 N 43 CO N f9 v 0 m 03 (3) Proj. Mgr. $49.00 N aD CO O Ov N o 0) N O m (0 0 c i 6 $294.00 4 $196.00 (2) Principal $61.50 N 0 C) N F9 TOTALS HOURS/ DOLLARS o u) NN 40 $1,174.00 N 0 h Is 24 $732.00 CO 0 .p- CO o 0 o O 0 n V 6 $244.00 � co Ilncorporate addendum changes Update plans and specifications to 2002 Standards Specifications m . (Make Electrical Updates to Plans and Coordinate with WSDOT Engineer's Estimate Construcibility review Document Production 3 m m m f 3 0 Rates as of 4/00 Printed: 10/1/02