Loading...
HomeMy WebLinkAboutPermit 0267 - Brown Transport BUILDING PERMIT CIT`C_)F TUKWILA BUILDING PL .MIT 14475 - 59th Ave. So. / Tukwila, Washington 98067 Applicant to complete numbered spaces only. BUILDIIV,G PERMIT NO. N" 2(5i JOB ADDR E53 1170 Andover Park West DATE 7/24/73 LEGAL 1DESCR. LOT O. BLK 1 TRACT (OSEE ATTACHED SHEET) OWNER MAIL ADDRESS ZIP PHONE 2 J. W. Phillips 1170 Andover Park West Seattle, 96188 CONTRACTOR MAIL ADDRESS PHONE 246-2788 LICENSE NO. 3 Brown Transport Corp. P.O. Box 88823 Seattle, Wa. 98188 N/A ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. 4 ENGINEI.R MAIL ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH 6 USE OF BUILDING Warehousing Carpet Transported to Northwest for delivery 8 Class of work: ❑ NEW iila\OOITION • ALTERATION ❑ REPAIR • MOVE • REMOVE 9 Describe work: 12' X 15" Office in new warehouse 10 Change of use from Change of use to 11 Valuation of work: $ 650.00 1 PLAN CHECK FEE 3.50 PERMIT FEE 7.00 SPECIAL CONDITIONS: Type or Const. III — N Occupancy Group F Division 2 Brown Transport 180 sq. ft. 2 Occ. Size of (Total) Sq,Ft 51326 s ones One Occ. Load 257 Fire Zone III Use �7 Zone C —M Fire Sprinklers Required dyes ■ No APPLICATION ACCEPTED BY: k �� PLANS CHECKED BY 0 AP3OVED FOR ISSUA i CE No. of Dwelling Units OFFSTREET PARKING Covered S PACES: Uncovered O T I C E SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS' COM- MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING SIGN URE OF OWNER (IF WNE BUILDER) FINAL SIGNATURE OR AUTHORIZED AGENT (DATE) WHEN PR LY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION cK. ( / M.O. CASH PERMIT VALIDATION CK. M.O. CASH OCCUPANCY PERMIT REQUIRED BUILDING PERMIT �r CITY OF TUKWILA BUILDING PERMIT 14475 - 59th Ave. So, / Tukwila, Washington 98067 Applicant to complete numbered spaces on /y. J0E ADDR 11.i(> E5S /- /01)'Vt7?, ' 10f Tr DATE 7 /9/7-79 • • LEGAL 1 DESCR, LOT NO. SLR TRACT (❑ /[ 2 ATT CHID [HILT) OWNER • . MAIL AGGRESS ZIP PHONE oKW) c 2 , jC ), Phi/ WPC 7C PrabD�ec a-0C-aSfI (°_E-TOTER. CONTRACTOR MAIL PHONE LICENSE NO, ADD � z dx i3 �z3 s C�tJ RAtu�f `��� -T.ZE c�►� -( ∎ cl ylo 27 C3 / / . � ARCHITECT 4 OR [SIGNER MAIL ADDRESS PHONE • LICENSE N0. ENGINEER p i MAIL ADDRESS PHONE LICENSE NO. 5 ICJ r LENDER MAIL ADDRESS !RANCH 6 /YI - uEr- or !u DINO 7 wrf t ivu1e� iN�7. d4RP6-T T ,5 ;130erE) •7D ' - T roe DE o&2 8 Class of work: LNEW • ADDITION 0 ALTERATION • REPAIR • MOVE • REMOVE • 9 Desc ' work: I X 1 o FRl L.e" -6u 117-- to J 1 N Er-10 1,U IA f2 E tni 53' -- L t 1 L r 1-0 re? 0, Ld , 1--f N ( PL! r`' (20 , 10 Change of use from , Change of use to 11 Valuation of work: $ ►" C►n C, �. cn `�' PLAN CHECK FEE `,i —Tc�v PERMIT FEE / 111 f SPECIAL CONDITIONS: Typo of --�-�j 1t Const. �i r fv Occupancy Group �% Division V 13iLnu4f.) f"/t.(1,41jQJ►F{r�-1 "' 1 %7� —• -z, qrj'„ t Size of Bldq..L= c-" (Total) Sq. Ft. � / --� No. of k� Stories a!� Max. "� Occ. Load --+ / Fire _ ((%'1 ' Zone 1 Use /�It, Zane •' " \ Fire Sprink�ler Required LJYe• ❑No APPLICATION ACCEPTED BY: PLANS CHECKED BY: , APPROVED FOR ISSUANCE BY No. of Dwelling Units OFFSTREET PARKING Covorod SPACES: Uncovered -- NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING, THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM- MENCED. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION Spacial Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING BIG IsTURC OF OWNER-11F OWNER BUILDER) kitO�1 li. % 1VZ"?r �ID FINAL ,. SIGNATU RE OR AUTHORIZED AGENT WHEN PROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION- CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH plan green river electric