HomeMy WebLinkAboutPermit 0301 - Moore Clear Company4'. .4
BUILDING PERMIT
CIT OF TUKWILA BUILDING PLKMIT
14475 - 59th Ave. So. / Tukwila, Washington 9B067
Applicant to complete numbered spaces only.
BUILDING '
PERMIT NO.
N° 301
JOE ADDRESS
15424 — 53rd Ave.•So.
DATE
9/26/73
LEGAL
1 OESCR.
LOT HO.
ELK
14
TRACT
Brookvale Garden Tracts ( SEE ATTACHED SHEET)
OWNER Lessee MAIL ADDRESS ZIP PHONE 2155 -1931
2 Moore Clear Co. 8301 N. E. Halsey St. Portland, Oregon 97220
CONTRACTOR MAIL ADDRESS PH ONE2 5105 LICENSE NO,
Moore Clear Co. 15424 — 53rd Ave. So. Seattle, 98158
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO.
a .
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
LENDER MAIL ADDRESS BRANCH
6
USE OF BUILDING
7
8 Class of work: • NEW ❑ ADDITION • ALTERATION ❑ REPAIR EX MOVE • REMOVE
9 Describe work: Temporary Shed (storage)
10 Change of use from
Change of use to
11 Valuation of work: $
PLAN CHECK FEE
PERMIT FEE 5.00
SPECIAL CONDITIONS:
TYPO of
Const. V —N
Occupancy
Group J
Division 2
Permit valid for one year from date of
issuance.
Size of Bldg.
(Total) Sq. Ft. 96
No. of
Stories One
Max.
Occ. Load 0
FIrD
ZOno 11
Use /�
Zone C-2
Fire Sprinklurs ry�
Required �YBS F^JNO
APPLICATION ACCEPTED BY
•
PLANS CHECKED BY.
APP OVED FOR ISSU NCE
No. of
DweIIing Units
OFFSTREET PARKING j
Covered J Uncovered
�— NOTICE
PARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB-
ING, HEATING, VENTILATING OR AIR CONDITIONING,
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM•
MENCED.
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORI TO VIOL• OR CANCEL THE
PROVISIO ANY OTHER A E OR LO' A LAW REGULATING
CONSTRU TI N OR ,THE ' R-ORMANC •F CONSTRUCTION.
9 f
Spacial Approvals
Required
Not Required
Approved
ZONING
HEALTH DEPT.
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
FOUNDATION
FRAMING
SIGNATURE Or OWNER IIF OVINE BUILDER)
FINAL
SIGNATURE OR AUTHORIZED AGENT (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION cK. M.O.
OCCUPANCY PERMIT REQUIRED
14475 • :;{i: i Ave. So. / T ukv ;iu, Wcshi1(;tDJt V8NUJ
Applicant to complete numbered spaces only.
JOD ADDR EL S
/
DATE
.. F.GAL
1 DESCR.
LOT NO. -'BLK�
TRACT
( ❑SEE ATTACHED SHEET)
O'NNER MAIL ADDRESS ZIP PHONE
In4Rr -- CZ EpI 2el44 •- .57 o.r
CO. RAC OR MAIL ADDRESS PHONE LICENSE NO.
I(/l
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO.
i .
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
LENDER MAIL ADDRESS BRANCH
6
USC OF BUILDING
/
8 Class of work: ,ZJVEW • ADDITION • ALTERATION ❑ REPAIR MOVE ❑ REMOVE
9 Describe work: _ 1/ aLd2- ,
10 Change of use from
Change of use to
11 Valuation of work: $
SPECIAL CONDITIONS:
I PLAN CHECK FEE
5 do
PERMIT FEE
Typo of IQ
Const.
Occupancy
Group J
Division 2..
C(CXV4-4-- L(^2 .It a „1 f
A�( c � uo(J�
rv7
(Total) Sq. gFt. I V I
Stories ()14-
1” l=
Occ. Load Q
Fire =
Zone
Use (�
Zone v -Z.-
Fire Sprinklers LYJ
Required Dios NO
APPLICATION ACCEPTED BY:
PLANS CHECKED BY:
APPROVED FOR ISSUANCE BY:
No. of
Dwelling Units
OFFSTREET PARKING
Covered
SPACES:
Uncovered
NOTICE
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB-
(NG, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK NOT. SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM.
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
Special Approvals
Required
Not Required
Approved
ZONING
HEALTH DEPT.
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
FOUNDATION
FRAMING
5/GRAIL/RC OP OWNER (IP OWNER BUILDER)
•
FINAL
SIGNATURE ON AUTHORIZED AGENT (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION • cK. M.O. CASH PERMIT VALIDATION cK. M.O. CASH
OCCUPANCY PERMIT REQUIRED
MOORE CLEAR CO..
•
8301 N.E. HALSEY ST. PORTLAND, OREGON 97220
TELEPHONE 255 -1931
REPLY TO: 15424. 53RD AVENUE 50,
SEATTLE, WA. 98188 244.5105
V
s5`
%z'
.4.A2z:r 7 -1
FLYWO 00 promo"... /
14%4 7
1
MOORE CLEAR CO..
8301 N.E. HALSEY ST. PORTLAND, OREGON 97220
TELEPHONE 255 -1931
REPLY TO: 15424 - 53R0 AVENUE 60.
SEATTLE, WA. 98188 244.5105
MOORE CLEAR CO..
8301 N.E, HALSEY ST. PORTLAND, OREGON 97220
TELEPHONE 255 -1931
REPLY TO: 15424 • 53R0 AVENUE 50.
SEATTLE, WA. 98188 244.5105
%5. • 5't. --.._
._ So
c.9 rrC 6 / /1/4 /5 t /.
Alo
3.3 ' A/E
50.
I ,m