Loading...
HomeMy WebLinkAboutPermit 0301 - Moore Clear Company4'. .4 BUILDING PERMIT CIT OF TUKWILA BUILDING PLKMIT 14475 - 59th Ave. So. / Tukwila, Washington 9B067 Applicant to complete numbered spaces only. BUILDING ' PERMIT NO. N° 301 JOE ADDRESS 15424 — 53rd Ave.•So. DATE 9/26/73 LEGAL 1 OESCR. LOT HO. ELK 14 TRACT Brookvale Garden Tracts ( SEE ATTACHED SHEET) OWNER Lessee MAIL ADDRESS ZIP PHONE 2155 -1931 2 Moore Clear Co. 8301 N. E. Halsey St. Portland, Oregon 97220 CONTRACTOR MAIL ADDRESS PH ONE2 5105 LICENSE NO, Moore Clear Co. 15424 — 53rd Ave. So. Seattle, 98158 ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. a . ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH 6 USE OF BUILDING 7 8 Class of work: • NEW ❑ ADDITION • ALTERATION ❑ REPAIR EX MOVE • REMOVE 9 Describe work: Temporary Shed (storage) 10 Change of use from Change of use to 11 Valuation of work: $ PLAN CHECK FEE PERMIT FEE 5.00 SPECIAL CONDITIONS: TYPO of Const. V —N Occupancy Group J Division 2 Permit valid for one year from date of issuance. Size of Bldg. (Total) Sq. Ft. 96 No. of Stories One Max. Occ. Load 0 FIrD ZOno 11 Use /� Zone C-2 Fire Sprinklurs ry� Required �YBS F^JNO APPLICATION ACCEPTED BY • PLANS CHECKED BY. APP OVED FOR ISSU NCE No. of DweIIing Units OFFSTREET PARKING j Covered J Uncovered �— NOTICE PARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING, THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM• MENCED. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORI TO VIOL• OR CANCEL THE PROVISIO ANY OTHER A E OR LO' A LAW REGULATING CONSTRU TI N OR ,THE ' R-ORMANC •F CONSTRUCTION. 9 f Spacial Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING SIGNATURE Or OWNER IIF OVINE BUILDER) FINAL SIGNATURE OR AUTHORIZED AGENT (DATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION cK. M.O. OCCUPANCY PERMIT REQUIRED 14475 • :;{i: i Ave. So. / T ukv ;iu, Wcshi1(;tDJt V8NUJ Applicant to complete numbered spaces only. JOD ADDR EL S / DATE .. F.GAL 1 DESCR. LOT NO. -'BLK� TRACT ( ❑SEE ATTACHED SHEET) O'NNER MAIL ADDRESS ZIP PHONE In4Rr -- CZ EpI 2el44 •- .57 o.r CO. RAC OR MAIL ADDRESS PHONE LICENSE NO. I(/l ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. i . ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH 6 USC OF BUILDING / 8 Class of work: ,ZJVEW • ADDITION • ALTERATION ❑ REPAIR MOVE ❑ REMOVE 9 Describe work: _ 1/ aLd2- , 10 Change of use from Change of use to 11 Valuation of work: $ SPECIAL CONDITIONS: I PLAN CHECK FEE 5 do PERMIT FEE Typo of IQ Const. Occupancy Group J Division 2.. C(CXV4-4-- L(^2 .It a „1 f A�( c � uo(J� rv7 (Total) Sq. gFt. I V I Stories ()14- 1” l= Occ. Load Q Fire = Zone Use (� Zone v -Z.- Fire Sprinklers LYJ Required Dios NO APPLICATION ACCEPTED BY: PLANS CHECKED BY: APPROVED FOR ISSUANCE BY: No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- (NG, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK NOT. SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM. MENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING 5/GRAIL/RC OP OWNER (IP OWNER BUILDER) • FINAL SIGNATURE ON AUTHORIZED AGENT (DATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION • cK. M.O. CASH PERMIT VALIDATION cK. M.O. CASH OCCUPANCY PERMIT REQUIRED MOORE CLEAR CO.. • 8301 N.E. HALSEY ST. PORTLAND, OREGON 97220 TELEPHONE 255 -1931 REPLY TO: 15424. 53RD AVENUE 50, SEATTLE, WA. 98188 244.5105 V s5` %z' .4.A2z:r 7 -1 FLYWO 00 promo"... / 14%4 7 1 MOORE CLEAR CO.. 8301 N.E. HALSEY ST. PORTLAND, OREGON 97220 TELEPHONE 255 -1931 REPLY TO: 15424 - 53R0 AVENUE 60. SEATTLE, WA. 98188 244.5105 MOORE CLEAR CO.. 8301 N.E, HALSEY ST. PORTLAND, OREGON 97220 TELEPHONE 255 -1931 REPLY TO: 15424 • 53R0 AVENUE 50. SEATTLE, WA. 98188 244.5105 %5. • 5't. --.._ ._ So c.9 rrC 6 / /1/4 /5 t /. Alo 3.3 ' A/E 50. I ,m