Loading...
HomeMy WebLinkAboutTrans 2015-04-06 2015 Work Plan: Transportation CommitteeTransportation Committee - 2015 Work Plan Description Qtr Dept Action or Briefing Status BNSF Intermodal Facility Access Design contract (to COW only) 1 PW A 42 Avenue South Phase III Design Contract Supplement — design undergrounding 2 PW A Seattle City Light underground agreement 4 PW A Follow -up on potential for coordination with SeaTac 2 PW B ADA Improvements Design contract and bid award 2 PW A Annual Overlay and Repair Program Bid Award 2 PW A 53rd Avenue S (S 137th — S 144`" St) Funding and Design contract 2 PW A 53rd Ave S Water Main Replacement, Sewer Rehab (from Utilities) A Cascade View Safe Routes to School Closeout 3 PW A Andover Park West/ TUC Transit Center Closeout 3 PW A Thorndyke Safe Routes to School Closeout 3 PW A Boeing Access Road over BNRR Bridge Rehab Bid Award 3 PW A Residential Street Improvements Design contract 2 PW A Safety -based priority list 4 PW B Annual Bridge Inspections and Repairs Program update 4 PW B TUC Ped /Bike Bridge Right -of -way and easement acquisition 1 PW A Complete Bid Award 4 PW A Interurban Avenue S (S 143rd — Fort Dent Way) Status update 4 PW B S 144th St Phase II (42nd Ave S — TIB) Bid award 4 PW A Crosswalk Petition — TIB/S 139th Vicinity Present engineering analysis 3 PW B OTHER TIB pedestrian bulb replacement (test locations) 2 PW B Allentown Roadside Barriers — outreach and design alternatives PW B Duwamish/ S 119th Ped Bridge — present condition and repairs 1 PW B Transit plan update contract 4 PW A Standard Reports /Briefings Frequency Dept. Facility Tours As needed PW SCATBD Semimonthly PW Committee Work Plan Council, Staff 1 City of Tukwila Updated 3/12/15