HomeMy WebLinkAbout03-110 - Wade Perrow Construction - Foster Golf Clubhouse Construction• Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 • /(6 - / 1 1) (S) 2000 Edition - Electronic Format AIA Document G701- 2000 • CHANGE ORDER NUMBER: 18 DATE: S July 12, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable topreviously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) - ... . " -- - was $ 2.798.500.00 The net change by previously authorized Change Orders $ 588.936.00 The (Contract Sum) prior to this Change Order was $ 3.387.436.00 The (Contract Sum) will be (increased) ted; (mac -hanged) by this Change Order in the amount of $ 5,752.40 The new (Contract Sum) including this Change Order will be $ 3.393.188.40 The Contract Time will be (increased` (accrcaacd) (unchanged) by zero (0 ) days. The date of Substantial Completion for phase two as of the date of this Change Order therefore is -A June 10, 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost ox time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions, AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date O 2000 The American Institute ot Architects. Reproduction ot the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to -legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col8.aia -- 7/12/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER n ARCHITECT n CONTRACTOR FIELD OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 oe/ ORIGINALS • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila CONTRA T!R(Typedname) ,9fjNER(Typed name) �w01�1 David A. Clark BY July 12. 2004 DATE (Sign BY (Signature) 44/4/4,-.4,47 I'E-Ai M water' BY 7/Fs/el DATE Owner's Representative (Typed Name) Dept. Dir. Initials _7l1A'o`t DATE DATE O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col8.aia -- 7/12/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Change Order No. 18 Foster Golf Links Clubhouse Date 7/12/2004 1 Per COP's 62-72. $ 7,052.00 2 Backcharges from RBI: Drilling light fixtures $ (200.00) 3 Backcharges from RBI: Relocate receptacle @ coke machine $ (388.00) 4 Backcharges from RBI: Replace vision panels in doors $ (143.60) 5 Duplicate line item on CO 15 (line 7). $ (568.00) Total of all items above $ 5,752.40 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 588,936.00 Contract prior to this change order was $ 3,387,436.00 This Change Order $ 5,752.40 New Contract Sum incl. this CO $ 3,393,188.40 David A. Clark Architects, PLLC CO 18 Summary -building 7/12/2004, 1:41 PM 2000 Edition - Electronic Format Certificate ofSubstantial Completion PROJECT: (Name and address) New Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO OWNER: (Name and address) City of Tukwila 6200 Southcenter Blvd. Tukwila. WA 98168 AIA Document G704 - 2000 PROJECT NUMBER: 1701 CONTRACT FOR: Building CONTRACT DATE: June 6. 2003 TO CONTRACTOR: (Name and address) Wade Perrow Construction. LLC 10421 Burnham Drive NW P.O. Box 1728 Gig Harbor. WA 98335 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Entire Project. including phase one and phase two. This project was staged and contract time was provided for two construction phases The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty period for scope of work included in phase two shall commence as of the Date of Issuance below, except as indicated below for items on the attached list. For scope of work included in phase one, the warranty period shall commence on April 16, 2004. except as indicated below. David A. Clark Architects, PLLC ARCHITECT BY David A. Clark June 10, 2004 DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless o ;:i e-agreed4e r-wfiting;4The date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: The Contractor will complete or correct the Work on the list of items attached hereto within thirty ( 30 ) days from the above date of Substantial Completion. Wade Perrow Construction, LLC CONTRACTOR 64111 V" V BY DAmi O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: certificate of sub completion phase 2 061004.aia -- 6/9/2004. AIA License Number 1011213, which expires on 8/5/2004. DATE OWNER n ARCHITECT CONTRACTOR FIELD OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G704-2000 CERTIFICATE OF SUBSTASITIAI. COMPLETION The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 1st 4-ORIGNALS � • • The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 11:59 PM (time) on June 10. 2004 (date). City of Tukwila b'\/ W\( OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Owner accepts the responsibility for security. maintenance. utilities _& insurance. however this does not relieve the contractor from any conditionas required by the contract documents up to and including final payment & release of retainage. (Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.)applicable warranties required by the Contract Documents, except as stated below: © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. User Document: certificate of sub completion phase 2 061004.aia -- 6/9/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 • • Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: � AG 01/43-/10 6 ) 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 17 DATE: S May 19, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) As indicated on the following summary sheet. The original (Contract Sum) _ .. . • • - - was $ 2.798.500.00 The net change by previously authorized Change Orders $ 588.936.00 The (Contract Sum) prior to this Change Order was $ 3.387.436.00 The (Contract Sum) will be (-increased) (Eleefeased-). (unchanged) by this Change Order in the amount of $ 0.00 The new (Contract Sum) including this Change Order will be $ 3.387.436.00 The Contract Time will be (increased) (deerease4) (unthangcd) by Twenty (20 ) days. The date of Substantial Completion for phase two as of the date of this Change Order therefore is June 10. 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col7.aia -- 5/19/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER n ARCHITECT n CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ORIGINALS ENT'D JUL 0 6 2004 Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects, PLLC Wade Perrow Construction David A. Clark BY May 19. 2004 DATE Mike Sweeney City of Tukwila OWN ER (Typed name) QQAA (Signature) PA,/ It U-kJ.�'J&1 6TE1/EA✓ M M BY BY•6104 DATE Owners Representative (Typed Name) Dept. Dir. Initials DATE DATE O 2000 The American Institute ot Architects. Reproduction ot the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col7.aia -- 5/19/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 • Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila, WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: • P6 to -no ' 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 16 DATE: S May 5, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 586,403.00 The (Contract Sum) prior to this Change Order was $ 3.384.903.00 The (Contract Sum) will be (increased) (decreased) by this Change Order in the amount of $ 2.533.00 •he new (Contract Sum) including this Change Order will be $ 3.387.436.00 The Contract Time will • - ' (unchanged) by zero (0 ) days. The date of Substantial Completion for phase two as of the date of this Change Order therefore is May 21, 2004. NOTE: This Change Order does not include changes in the Contrgct Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document Amt. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive. Of minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all 0 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted belbw. expiration as noted below. expiration as noted ilkelow. expiration as noted below. expiration as noted below. expiration as noted below. expiration as oted below. User Document: fgl col6.aia -- 5/6/2004. AIA License Number 1011213, which expires on 8/5/2004. 1 OWNER I/ ARCHITECT n CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ENT'D MAY 2 7 2004 • • • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects PLLC Wade Perrow Construction City of Tukwila O N E R (Typed name) , >M V1/� • David A. Clark BY May 5. 2004 DATE Mike Sweeney i'4 / 44 c & A./,t% Steven M. Mullet BY BY s////o4 5/19/04 DATE DATE Owner's Representative (Typed Name) Dept. Dir. Initials DATE tf) 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to Legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as oted below. User Document: fgl col6.aia -- 5/5/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 iChange Order Summary Foster Golf Links Clubhouse Change Order No. Date 1 Install the Concessionaire's Smoker stack per COPR 60 2 Deduct restaurant related changes from the scope of work as indicated in CCD 23 for the costs indicated in COP 55 3 Provide additional FRP panels per CCD 20 4 Install a gas line stub into east patio per CCD 18 16 5/5/2004 $ 1,452.00 $ (3,891.00) $ 4,228.00 $ 744.00 Total of all items above $ 2,533.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 586,403.00 Contract prior to this change order was $ 3,384,903.00 This Change Order $ 2,533.00 New Contract Sum incl. this CO $ 3,387,436.00 David A. Clark Architects, PLLC CO 16 Summary -building 5/6/2004, 8:53 AM • Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 15 DATE: S May 5, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The Original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 569,949.00 The (Contract Sum) prior to this Change Order was $ 3.368,449.00 The (Contract Sum) will be (increased) (-deer-eased-) kung by this Change Order in the amount of $ 16.454.00 .he new (Contract Sum) including this Change Order will be $ 3.384.903.00 The Contract Time will be(inn..,,. seel` (dcc_cascd) (unchanged) by zero (0 ) days. The date of Substantial Completion for Phase two as of the date of this Change Order therefore is A May 21. 2004 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. Tess any applicable retainage, on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work, and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted Below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as oted below. User Document: fgl col5.aia -- 5/512004. AIA License Number 1011213, which expires on 8/5/2004. 1 OWNER ARCHITECT n CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ENID MAY 27 2004 • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila • David A. Clark BY May 5. 2004 DATE Mike Sweeney DA ed 'WA4.4en,/& OW ER(Typedname) Yn,--- (Signature) Steven M. Mullet BY BY 5// /chit 5/19/04 DATE DATE Owner's Representative (Typed Name) dit/bO'tt ISignaturel 7A Dept. Dir. Initials O 2000 The American Institute ot Architects'. Reproduction ot the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below.,expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted ,below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted onbelow. expiration as noted below. expiration as noted below. expiration as noted below. expiration as oted below. User Document: fgl co16.aia — 51512004. AIR License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse Change Order No. 15 Date 5/5/2004 1 Provide Landscaping for the outer fire loop lane as directed in CCD 21 per cop 53 2 Provide Art lighting fixtures per CCD 21 per costs indicated in COP 54 3 Modify doors & install Owner supplied hardware per CCD 24 for the costs indicated in COP 56 $ 2,513.00 $ 6,285.00 $ 1,350.00 4 Excavate and fill soft spots in west parking lot per CCD for the costs $ 2,213.00 indicated in COP 57 5 Uncover and remove Underground Storage Tank discovered in the $ 334.00 west parking lot per CCD 26 for the costs in COP 26 6 Widen catwalk and install electrical per the inspectors as indicated in CCD 27 $ 589.00 for the costs indicated in COP 59 7 Provide electrical connection to HWT in cart barn per COP 61 $ 568.00 • 8 Provide gas supply to DR fireplace per COPR 32 $ 2,602.00 • Total of all items above $ 16,454.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 569,949.00 Contract prior to this change order was $ 3,368,449.00 This Change Order $ 16,454.00 New Contract Sum incl. this CO $ 3,384,903.00 David A. Clark Architects, PLLC CO 15 Summary -building 5/5/2004, 6:20 PM • Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 14 DATE: S April 14, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) The net change by previously authorized Change Orders $ The (Contract Sum) prior to this Change Order was $ 3.360.568.00 will be (increased) t(dccrcased) aged) by 7,881.00 including this Change Order will be $ 3.368.449.00 The Contract Time will be ) by two (2 ) days. The date of Substantial Completion as of the date of this Change Order therefore is April 16: 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment, less any applicable retainage. on any form of change order, construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date was $ 2,798.500.00 562, 068.00 The (Contract Sum) this Change Order in the amount of $ The new (Contract Sum) racer ap © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col4.aia -- 4/13/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER 1-0/ ARCHITECT CONTRACTOR FIELD OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT 0401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 1 ENT'DMAY 2 7 2004 • • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects, PLLC Wade Perrow Construction City of Tukwila David A. Clark BY April 14, 2004 DATE Mike Sweeney (Signature) (Signature) BY DATE Owner's Representative (Typed Name) (Signature) Dept. Dir. Initials S' -l1 -o-4 DATE Steven M. Mullet BY 5/19/04 DATE © 2000 ThetArnerican Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions withoutwritten permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col4.aia -- 4/12/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse 1 Misc. electrical work per COPR 13R. 2 Lighting revisions per CCD 15. 3 Add a water supply line per CCD 16. Change Order No. Date 14 4/14/2004 $ 4,398.00 $ 2,690.00 $ 793.00 Total of all items above $ 7,881.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 562,068.00 Contract prior to this change order was $ 3,360,568.00 This Change Order $ 7,881.00 New Contract Sum incl. this CO $ 3,368,449.00 David A. Clark Architects, PLLC CO 14 Summary -building 4/12/2004, 4:30 PM • • 2000 Edition - Electronic Format Certificate of Substantial Completion PROJECT: (Name and address) New Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO OWNER: (Name and address) City of Tukwila 6200 Southcenter Blvd. Tukwila. WA 98168 AIA Document G704 - 2000 PROJECT NUMBER: 1701 OWNER I �/ CONTRACT FOR: Building ARCHITECT [n CONTRACT DATE: CONTRACTOR June 6, 2005 TO CONTRACTOR: (Name and address) Wade Perrow Construction. LLC 10421 Burnham Drive NW P.O. Box 1728 Gig Harbor, WA 98335 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Phase one. including the east and central parking lot and the fire loop lane. Phase one does not include the west parking lot. This project was staged and contract time was provided for two construction phases The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: For phase one only David A. Clark April 16, 2004 Architects, PLLC ARCHITECT BY David A. Clark DATE OF ISSUANCE A list of items to be completed or corrected is attaehed-heretependinci. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. ;mese e se -agreed 4e 4n -wig, 4The date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: The Contractor will complete or correct the Work on the list of items (punch list) provided within ten working days attached -herete within thirty ( 30 ) days from the above date of Substantial Completion. Wade Perrow Construction, LLC CONTRACTOR . w1mi BY ZP„/ ,F�,/.� DATE 4/22-704 © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: certificate of sub completion 041604.aia -- 4/21/2004. AIA License Number 1011213, which expires on 8/5/2004. FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G704-2000 CERTIFICATE OF SUBSTANTIAL COMPLETION The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ORIINALS ENTh MAY 0 5 2004 • • The Owner accepts the Work or designated portion as substantially complete and will assume full possession at 11:59 PM (time) pn April 16. 2004 (date). City of Tukwila eve 11V }'1. — OWNER BY DATE The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: Security: The security system procured by the owner and leaseholder is in full operation for the Phase I areas for golf operations. and due to the contractors construction in - progress is partially and intermittently operable in phase II construction areas. The owner. solely as a matter of convenience. and only to the extent permitted by the owner. allows the contractor limited but uncertain benefit of the owners security system designed for the entire facility. However. owner retains the right to bypass. make inoperable. and deactivate any and all alarm devices in the phase II construction areas under control of the contractor. and provides no guarantee of security system performance. Through substantial completion of Phase II construction security provisions for all areas affected by phase II construction remain the sole responsibility of the contractor. The owners alarm system now functioning in part in a compromised (construction) mode. shall not be relied upon by the contractor to guarantee security coverage in any form whatsoever. or to assure security interests or measures in the interests of the contractor are provided. In the event of a loss the contractor shall have no right to claim or to challenge the owners security system. which if and when provided to the phase II construction area at the sole discretion of the owner. is provided only as a matter of convenience without cost to the contractor. and to serve the owner's overall interests in the security of the entire facility, which will in time. become the owners premises completely. construction period that require punchlist work. Maintenance: Maintenance or all interior and exterior areas under control of the contractor shall remain contractors responsibility. Maintenance of phase I areas reverts to the owner upon issuance of this document. Contractor shall maintain the site and shall move. clean. washdown or street -sweep outside areas of the site when those areas are not yet substantially complete. or if substantially complete have been effected from work performed in the Phase I1 construction effort. Insurance: Contractor's Insurances currently in force at the limits shall remain as contractually required. Utilities. General: Except as noted below. Contractor shall incur all utility related costs for the facility thru April 30. 2004. at which time utility costs shall revert to the owner and contractor shall be relieved of owners "common" utility expenses normally incurred by an owner assuming building operations. Contractor shall maintain at least one portable toilet for use by its workers and shall continue waste disposal services for construction worker wastes. through substantial completion for phase II construction. Power: After the current billing cycle ends. the Owner shall accept the electrical billing for the phase one portions of the building. Contractor shall read sub meter and provide full copies of the electrical billing from the utility to the Owner's representative. Owner shall then submit payment for that portion direct to the utility. O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: certificate of sub completion 041604.aia -- 4/21/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 0 (AJ NAPA -- Water: Gentracto - shall eontinue—te- pay for all water use in the building mil --tie 171- St/0mA • Gas: After the current billing cycle ends, Owner shall accept responsibility for gas meter dedicated to phase one. Coordinate with Owner's representative the transfer of billing address with the Utility. Damage: Damage to the work by owners actions will be documented by the owner when known. and will be attributed to the owner only after a punchlist issued and approved by the architect is provided the contractor documenting those areas within the phase 1 (Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.)applicable warranties required by the Contract Documents, except as stated below: © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. User Document: certificate of sub completion 041604.aia -- 4/21/2004. AIA License Number 1011213, which expires on 8/5/2004. 3 Change Order PROJECT: (N ne and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. TukwNila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 63 -Ho (in) 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 13 DATE: S April 1, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT I5 CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum), was $ 2,798,500.00 The net change by previously authorized Change Orders $ 461, 327.00 The (Contract Sum) prior to this Change Order was $ 3,259.827.00 will be (increased) {decreased {-unchanged} by 100, 741.00 including this Change Order will be $ 3,360,568.00 The Contract Time will be ' (unchanged) by Fourteen (14 ) days. The date of Substantial Completion as of the date of this Change Order therefore is April 14. 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment, less any applicable retainage. on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work, and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date The (Contract Sum) this Change Order in the amount of $ The new (Contract Sum) _.. . "..- . r. . © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution/ WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col3.aia -- 3/31/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER ARCHITECT n CONTRACTOR FIELD OTHER [1,-7 AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA@ AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington,',D .C. 20006-5292 Not valid until signed by the: Architect, Contractor and Owner. David A. Clark Architects, PLLC Wade Perrow Construction • City of Tukwila OWN ER(Typedname) Signature) David A. Clark BY April 1, 2004 DATE Mike Sweeney (Si: •-• BY p 4 (�I/�c-lL DATE 41i Owner's Representative (Typed Name) fci Dept. Dir. Initials tf-r-out DATE (Sgnature) i�horc(a &vy BY µ/7/D4 DATE © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col3.aia -- 3/31/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse 1 Additional sewer work per COP 28. 2 Add. fill to fire 'loop per COP .18. Change Order No. 13 Date 4/1/2004 $ 84,011.00 $ ::16,730.00 Total of all items above $ 100,741.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 461,327.00 Contract prior to this change order was $ 3,259,827.00 This Change Order $ 100,741.00 New Contract Sum incl. this CO $ 3,360,568.00 David A. Clark Architects, PLLC CO 13 Summary -building 3/31/2004, 4:54 PM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila, WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor, WA 98335 THE CONTRACT I5 CHANGED AS FOLLOWS: 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 12 DATE: £ March 31, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) (Guaranteed Maximum Price} was $ 2,798,500.00 The net change by previously authorized Change Orders $ 429,158.00 The (Contract Sum) _ .. prior tothis Change Order was $ 3,227,658.00 The (Contract Sum) Maximum Pr cc) will be (increased) (dccr ased} (unchanged} by this Change Order in the amount of $ 32,169.00 The new (Contract Sum) including this Change Order will be $ 3.259.827.00 The Contract Time will be (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 31, 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions, AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment, Tess any applicable retainage. on any form of change order. construction change directive, or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work, and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as ,noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col2.aia -- 3/31/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER ARCHITECT CONTRACTOR FIELD OTHER H, AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT 0401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila CONTR T • R(Typedname) (Signature) : gnature David A. Clark BY March 31. 2004 DATE Mike Sweeney O'h�1 02 I4 -i -h-t BY 41 1104 OWNER (Typed name) (Signature) 43e -A -Al ?)hcrct . BY j4/1/b4 DATE DATE Owner's Representative (Typed Name) Dept. Dir. Initials �-r- al/ DATE © 2000 The American Institute ot Architects. Reproduction ot the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below: expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col2.aia -- 3/31/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 • Change Order Summary Change Order No. 12 Foster Golf Links Clubhouse Date 3/31/2004 1 Add water feature to front landscape circle per CCD #12. $ 32,169.00 Total of all items above $ 32,169.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 429,158.00 Contract prior to this change order was $ 3,227,658.00 This Change Order $ 32,169.00 New Contract Sum incl. this CO $ 3,259,827.00 David A. Clark Architects, PLLC CO 12 Summary -building 3/31/2004, 4:51 PMS Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 2000 Edition - Electronic Format AIA Document G701— 2000 CHANGE ORDER NUMBER: 11 DATE: 5 March 26, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT I5 CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 422,689.00 The_(Contract Sum) prior to this Change Order was $ 3.221,189.00 The (Contract Sum) Maximum Price} will be (increased) {dccrca.sed} {-aged} by this Change Order in the amount of $ 6,469.00 The new (Contract Sum) including this Change Order will be $ 3.227,658.00 The Contract Time will be • . - (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 31, 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document Azoi. Change Order Acceptance Pursuant to the Contract and General Conditions, AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. Tess any applicable retainage. on any form of change order. construction change directive. or minor change in the work, constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced, with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl coll.aia -- 3/25/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER ARCHITECT CONTRACTOR FIELD OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects, PLLC David A. Clark BY March 26, 2004 DATE Mike Sweeney Wade Perrow Construction City of Tukwila CONT C OR(Typedname) OWNER (Typed name) 35111111 '24.1‘1.4 gnature) PhY700 / o . army BY S/7104 DATE ,D401 MC) l/.-/1 BY 3(74 if DATE Owner's Representative (Typed Name) Dept. Dir. Initials DATE © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution' WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below.kexpiration as noted below. expiration as noted below. expiration as noted below. expiration as noted ,below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted. below. User Document: fgl coll.aia -- 3/25/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Change Order No. Date Foster Golf Links Clubhouse 11 3/26/2004 1 Relocated electrical meter in accordance with Supplemental Instruction SI #24. $ 1,049.00 2 Irrigate the Westerly Phase II portion per COP 37. $ 5,420.00 Total of all items above Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 422,689.00 Contract prior to this change order was $ 3,221,189.00 This Change Order $ 6,469.00 New Contract Sum incl. this CO $ 3,227.,658.00: David A. Clark Architects, PLLC 6,469.00 CO 11 Summary -building 3/25/2004, 3,:58 PM Change Order PROJECT: (Name and address)' Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila, WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 • 2000 Edition - Electronic Format o3-no,T) AIA Document G701- 2000 CHANGE ORDER NUMBER: 10 DATE: 5 March 2, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT I5 CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798,500.00 The net change by previously authorized Change Orders $ 411.835.00 The (Contract Sum) prior to this Change Order was $ 3.210.335.00 The (Contract Sum) (-6ttan eed-MEHEinitime} will be (increased) (decreased) (un� by this Change Order in the amount of $ 10.854.00 The new (Contract Sum) including this Change Order will be $ 3.221.189.00 The Contract Time will be (increased) sed) (mac -hanged.} by Three (3 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 31. 2004. NOTE: This Cliange Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document AZOL Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. Tess any applicable retainage. on any form of change order. construction change directive. or minor change in the work, constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work, and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up -to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col0.aia -- 3/1/2004. AIA License Number 1011213, which expires on 8/5/2004. W OWNER n ARCHITECT n CONTRACTOR FIELD n OTHER 1c AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ENT'D MAR 2 3 2004 Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC • Wade Perrow Construction City of Tukwila David A. Clark . BY March 2. 2004 DATE Mike Sweeney BY *3/64 DATE Owners Representative (Typed Name) Dept. Dir. Initials / 10 9 DATE BY DATE O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl col0.aia -- 3/1/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Change Order No. 10 Foster Golf Links Clubhouse Date 3/2/2004 1 Add additional sod & landscaping to the water feature per COPR 25. $ 2,454.00 2 Provide shear wall panels on walls H6 to H7 & J2 to J4 per COPR 32. $ 6,710.00 3 Add ;conduit to Post Indicator Valve per CCD #11. $ 427.00 4 Change the CCTV monitor to AG. Neovo Model F-415 & delete the monitors per Option 2 of COPR 40. $ 214.00 5 Add a receptacle adjacent to EF -4 per COPR 45. $ 255.00 6 Misc. electrical changes per Field Work Records: 10-13. $ 794.00 7 Total of all items above $ 10,854.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 411,835.00 Contract prior to this change order was $ 3,210,335.00 This Change Order $ 10,854.00 New Contract Sum incl. this CO $ 3,221,189.00 David A. Clark Architects, PLLC CO 10 Summary -building 3/1/2004, 2:07 PM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 9R DATE: S February 18, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previouslyereruted Construction Change Directives) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 409.118.00 The (Contract Sum) prior to this Change Order was $ 3.207.618.00 The (Contract Sum) (Guaranteed Price) will be (increased) (deer -eased} (ung by this Change Order in the amount of $ 2,717.00 The new (Contract Sum) including this Change Order will be $ _ 3.210,335.00 The Contract Time will be (increased) ((did) (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 28. 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are m dispute as described in Subparagraph 7.3.8 of AIA Document A20L Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive, or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date • O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document fgl co9r.aia — 3/1/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER n ARCHITECT .n CONTRACTOR n FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects, PLLC Wade Perrow Construction ARCHITECT (Typed name) CONTRA TOR (Typed naine) Ara maw - (Signature) David A. Clark BY February 18. 2004 DATE Mike Sweeney 111.1 10444.41. -ii BY DATE Owner's Representative (Typed Name) lia,ka- (Signature) Dept. Dir. Initials DATE City of Tukwila OWN ER (Typed name) w\ (Signature) BY 43joLf DATE © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as )ted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as ,toted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co9.aia -- 2/17/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse Cliaige Order No. 9R Date 2/18/2004 1 Revise the location of the Irrigation Controller as indicated in COPR 27. 2 Change from Manual to automatic flushbolts per COP 35 3 Add electrical vault (handhole) extension rings per CCD 10 $ 1,207.00 $ 395.00 $ 1,115.00 Total of all items above $ 2,717.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 409,118.00 Contract prior to this change order was $ 3,207,618.00 This Change Order $ 2,717.00 New Contract Sum incl. this CO $ 3,210,335.00 David A. Clark Architects, PLLC CO 9R Summary -building 3/1/2004, 9:58 AM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 8R DATE: February 5, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previouslyexecuted Construction Change Directives) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 397.649.00 The (Contract Sum) prior to this Change Order was $ 3.196.149.00 The (Contract Sum) (Cuafifilteed-Maximufft-PFiee} will be (increased) by this Change Order in the amount of $ 11.469 ;.00 The new (Contract Sum) including this Change Order will be $ _ 3,207.618.00 The Contract Time will be (increased) d) (aged) by Four (4 ) days. The date of Substantial Completion as of the date of this Change Order therefore is March 28. 2004. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oL Change Order Acceptance Pursuant to the Contract and General Conditions, AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractors signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive. or minor change in the work, constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document fgl co8r.aia – 3/1/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER I �' ARCHITECT n CONTRACTOR FIELD n 11/ OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction T (7medname) A CONTRACTOR (Typed name) nl David A. Clark (Sig BY 2_,'.p¢ BY DATE Mike Sweeney D44 44x44)..mi '_/1WetF DATE Owner's Representative STyped Name) aiair(Signature) Dept. Dir. Initials 7-3 61 DATE City of Tukwila NER(Typedname) �r (Signature) /4/41 BY ,5c5/c DA E ® 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co8.aia -- 2/5/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Change Order No. 8R Foster Golf Links Clubhouse Date 2/5/2004 1 Alter east parking lot planters per COP 12 $ 2,992.00 2 Alter Windows per COP 15 $ 1,298.00 3 Alter the grades at the putting green per COP 19 $ 3,867.00 4 Provide Misc. restaurant changes per COP 26R $ 919.00 5 Increase the dumpster to handle restaurant waste per COP 29 $ 1,082.00 6 Correction on previous COP error per COP 34 $ (580.00) 7 Investigate existing sewer conditions per COP 38 $ 1,891.00 Total of all items above $ 11,469.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 397,649.00 Contract prior to this change order was $ 3,196,149.00 This Change Order $ 11,469.00 New Contract Sum incl. this CO $ 3,207,618.00 David A. Clark Architects, PLLC CO 8 Summary -building 3/1/2004, 9:57 AM • Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 • 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 7R DATE: S January 21, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT 1S CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previouslyerecuted Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 398.158.00 The (Contract Sum) prior to this Change Order was $ 3.196.658.00 The (Contract Sum) (-Guaiwiteed-Maximum Price) will be {increased)(decreased) by this Change Order in the amount of $ (509.00) The new (Contract Sum) including this Change Order will be $ _ 3.196.149.00 The Contract Time will be (increased) ( eFea;ed (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions, AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractors signature or acceptance of payment, less any applicable retainage, on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date - © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co7r.aia -- 3/1/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER El ARCHITECT n CONTRACTOR FIELD n OTHER F4 AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila David A. Clark BY January 21. 2004 DATE Mike Sweeney BY "010i b ,.1 UA t4/- t-..1 11 DATE Owner's Representative (Typed Name) Dept. Dir. Initials DATE (signature)) -- ) BY *.3/0 DATE ei 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co7.aia -- 1/20/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 ;efit ,By: TUKWILA GOLF/PARKS MAINT CE; 2064398453; Mar -1- 1:39PM; Page 2/3 Change Order Summary Change Order No. 7 Date 1/21/2004 Foster Golf Links Clubhouse I Seal Coat East parking lot per COP 24. A) warranted conditions remain unchanged B) subject to approval of not less than 30% emulsified coal tar material specfl confirmation being provided owner by subcontractor. C) See attached drawing NOTICE: Article 12.3.1 of The General Conditions for Construction, incorporated w/in the contract documents between the parties, provides for the owner's acceptance of non -conforming work. The provisions of Article 12.3.1 are applied to this change order only as follows, relating solely to the work performed pursuant to Change Order Proposal 24, requiring a 30% coal -tar seal -coating application to the East/Phase 1 <s Parking Lot. Upon completion of the seal -coating application at the contractor's sole xpense, the East/Phase I Parking Lot will be accepted as complete by the owner. By so doing, the owner relieves the contractor of any and all claims or actions under warran a conditions which would otherwise be allowed under the contract documents, an approximate 2,985 SF section of the parking lot only, which after seal -coating will be isolated and physically marked by the parties, and which is referenced diagrammatically herein as an attachment identifying general location & dimension. $0.00 2 Delete intercom equipment & installation per COP 31. $ (509.00) Total of all items above -$509.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 398,158.00 Contract prior to this change order was $ 3,196,658.00 This Change Order $ (509.00) New Contract Sum incl. this CO $ 3,196,149.00 David A. Clark Architects, PLLC CO 7R Summary -building 3/1/2004, 9:56 AM Sant By: TUKWILA GOLF/PARKS MAINT illICE; 2064398453; = - HINON Ndiel El' 96' Mar - 1:40PM; Page 3/3 11 2T-5" 8'-i" 0 0 0 0 ti 0 of • 21' 15' 11 0 11 11 11 b t41mm� c iZ m Am _,A yXD F Z D�rn y„ TTI m r z� Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 AG e3sI/o(J) 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 6 DATE: S January 14, 2004 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 281.765.00 The (Contract Sum) prior to this Change Order was $ 3.080.265.00 The (Contract Sum) {Geefafiteed44a*inittnae) will be (increased) (decreased} (•... d) by this Change Order in the amount of $ _ 116.393.00 The new (Contract Sum) including this Change Order will be $ 3.196.658.00 The Contract Time will be (increased) (decreased} (unchanged) by Two (02 ) days. The date of Substantial Completion as of the date of this Change Order therefore is Increased. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage. on any form of change order. construction change directive. or minor change in the work, constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as, noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as' . noted below. expiration as noted below. expiration as noted below. User Document: fgl co6.aia – 1/13/2004. AIA License Number 1011213, which expires on 8/5/2004. OWNER n ARCHITECT n CONTRACTOR n FIELD ri OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. 11111111111 2000 AIA® AIA DOCUMENT G701-2000_ CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 n•stitute o e'ENTD :IAN 27 2004 Not valid until signed by the Architect, Contractor and Owner. David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila N ER (Typed name) j 1(1 (Signature) David A. Clark BY January 14. 2004 DATE Mike Sweeney nat a (Signature) Vythl �bJL7 BY f/2D/o4 DATE Owners Representative (Typed Name) Dept. Dir. Initials DATE sreveb M,111 u (ze'l BY //2(DA DATE D 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co6.aia -- 1/13/2004. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse Change Order No. 6 Date 1/14/2004 1 Remove & replace continuous storm gutter @ new East entry per COP 8. Per COP 8 Per COP 33 2 Provide a reduced scale & altered water feature per COP 16A. 3 Install fill at old entry above waterline per COP 23 4 Provide 2 calendar contract days due to snow and power outage per letter of 1/12/04, adjusted per Architect. $ 9,085.00 $ 1,775.00 $ 94,259.00 $ 11,274.00 Total of all items above $ 116,393.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 281,765.00 Contract prior to this change order was $ 3,080,265.00 This Change Order $ 116,393.00 New Contract Sum incl. this CO $ 3,196,658.00 David A. Clark Architects, PLLC CO 6 Summary -building 1/13/2004, 7:48 PM 111 Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: 463- 116 (e.,) 2000 Edition - Electronic Format AIA Document G701- 2 800 CHANGE ORDER NUMBER: 5R DATE: ;October 9, 2003 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executedConstruction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2,798.500.00 The net change by previously authorized Change Orders $ 272,517.00 The (Contract Sum) prior to this Change Order was $ 3.071.017.00 The (Contract Sum) (Gua tnteed-Ma*imum Price) will be (increased) (decreased} (unchanged} by this Change Order in the amount of $ 9248.00 The new (Contract Sum) including this Change Order will be $ 3,080 265.00 The Contract Time will be (increased) (dee eased} (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2oi. Change Order Acceptance Pursuant to the Contract and General Conditions. AIA A201 article 7.5: "Acceptance of Change Constitutes Release From Claims" General Conditions Section 7.5.1 of the executed contract between the parties reads: Contractor's signature or acceptance of payment. less any applicable retainage, on any form of change order. construction change directive. or minor change in the work. constitutes full and final settlement of all claims of any kind or nature connected with or relative to the changed contract work. and further constitutes full and final settlement of all claims of any kind or nature connected with or relating to all changes or series of changes issues up to that date © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. elcpiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co5r.aia -- 10/28/2003. AIA License Number 1011213, which expires on 8/5/2004. XC.: atrze w. -Jinfart, r OWNER gi ARCHITECT CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 D N O V 2 0 2003 David A. Clark Architects. PLLC ARCHIT CT (T)pe+dnem (Signature) David A. Clark pitNi t iE#.l..1ey BY BY J October 9. 2003 Wade Perrow Construction City of Tukwila DATE Mike Sweeney i4o/43 DATE Owner's Representative {Typed Name) //;d/)-3 (Signature) i Dept. Dir. Initials (lb 1 DATE (Signature) BY DATE O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co5.aia -- 10/8/2003. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse 1 Supply & install 230 LF 4" perf. Pipe per COP 14R Change Order No. Date 5 10/9/2003 9,248.00 Total of all items above $ 9,248.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 272,517.00 Contract prior to this change order was $ 3,071,017.00 This Change Order $ 9,248.00 New Contract Sum incl. this CO $ 3,080,265.00 David A. Clark Architects, PLLC CO 5R Summary -building 10/28/2003, 8:53 AM 1 Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT I5 CHANGED AS FOLLOWS: 2000 Edition - Electronic Format o(4) AIA Document G701- 2000 CHANGE ORDER NUMBER: 4 DATE: SOctober 06, 2003 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Indude where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 269.265.00 The (Contract Sum) prior to this Change Order was $ 3.067.765.00 The (Contract Sum) {-Gu eed-Maximuine} will be (increased) (decreased} {hanged} by this Change Order in the amount of $ 3.252 The new (Contract Sum) including this Change Order will be $ 3.071.017.00 The Contract Time will be (increased) -{decreased} (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co4.aia -- 10/15/2003. AIA License Number 1011213, which expires on 8/5/2004. • w. - &nanct. ancat OWNER' V( ARCHITECT n CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ENID NOV 202003 David A. Clark Architects. PLLC Wade Perrow Construction City of Tukwila CONTRACTOR (2)ped name) David A. Clark BY October 6. 2003 DATE D q,.l NI SIL-r�t.J�7 • 0 NNER(7ypedname) rv>iv>-4-- (Sgnature) BY BY !0/9/0 3 DATE DATE © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date, of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co4.aia -- 10/6/2003. AIA License Number 1011213, which expires on 8/5/2004. 2 Change Order Summary Foster Golf Links Clubhouse 1 See attached COP 11 Change Order No. Date 4 10/6/2003 3,252.00 Total of all items above $ 3,252.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 269,265.00 Contract prior to this change order was $ 3,067,765.00 This Change Order $ 3,252.00 New Contract Sum incl. this CO $ 3,071,017.00 David A. Clark Architects, PLLC CO 4 Summary -building 10/15/2003, 1:55 PM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila, WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT I5 CHANGED AS FOLLOWS: • 03 -iia (zi) 2000 Edition - Electronic -Format AIA Document G701— 2000 CHANGE ORDER NUMBER: 1 DATE: August 29, 2003 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change Orders $ 0.00 The (Contract Sum) prior to this Change Order was $ 2,798.500.00 The (Contract Sum) fenner-anteedim ice} will be (,.n d) by this Change Order in the amount of $ (3,811.00) The new (Contract Sum) including this Change Order will be $ 2.794,689.00 The Contract Time will be (ifter-eased)'�ed) (unchanged) by (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. An additional ten (10) days will be granted to the contractor for the Stage 1 completion time. for a total of 70 days from NTP. This Stage 1 extension will not alter the contractual time frame obligations for Phase one and Phase two completion. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: FGL C01.AIA -- 8/29/2003. AIA License Number 1011213, which expires on 8/1/2004. 1 OWNEI ARCHITECT n CONTRACTOR FIELD El OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. 6 © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington; D.C. 20006-5292 T'D OCT 17 2003- v Not valid until signed by the Architect, Contractor and Owner. • David A. Clark Architects. PLIC • Wade Perrow Construction Cites f Tukwila NE(Ty�dn k (Signature) David A. Clark BY August 29. 2003 DATE BY DATE M (Signature) BY 9/3/21-7 DATE © 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal, prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: FGL COI.AIA -- 8/29/2003. AIA License Number 1011213, which expires on 8/1/2004. Change Order Summary Foster Golf Links Clubhouse 1 Replace ATB w/ crushed rock per COPR #7. 2 Delte "remove CB & cap" from drawing C 103 3 Haul & dispose unsuitable soils per COP #3 Change Order No. Date 1 8/29/2003 $ (13,735.00) $ (125.00) $ 10,049.00 Total of all items above $ (3,811.00) Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ - Contract prior to this change order was $ 2,798,500.00 This Change Order $ (3,811.00) New Contract Sum incl. this CO $ 2,794,689.00 David A. Clark Architects, PLLC CO 1 Summary-building.xls 8/28/2003, 12:08 PM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 RECEIVED SEP 15 Z003 WPC, iNC. CO -WO c4 2000 Edition - Electronic Format AIA Document G701- 2000 - CHANGE ORDER NUM: OWNER DATE: September 12, 20 ARCHITECT ARCHITECT'S PROJECT NUMBER: 1701 CONTRACTOR TO CONTRACTOR: CONTRACT DATE: NTP June 30, 2003 (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was $ 2.798.500.00 The net change by previously authorized Change .Orders $ 271.924.00 The (Contract Sum) prior to this Change Order was $ 3.070.424.00 The (Contract Sum) (--Gua meed i e--Pricc) will be (decreased) (unchanged) by this Change Order in the amount of $ (2.659.00) The new (Contract Sum) including this Change Order will be $ _ 3.067.765.00 The Contract Time will be (increased) (fid) (unchanged) by Zero (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1.. Not valid until signed by,the Architect, Contractor and Owner. O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can ,be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co3.aia -- 9/11/2003. AIA License Number 1011213, which expires on 8/1/2004. FIELD OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of • Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 OCT 172003' David A. Clark Architects. PLLC Wade Perrow Construction ARCH! T (Typed nam e/r/ CONTRACTOR (Typed name) (Signature) (Signa, re) David A. Clark M'�,,�, i -, BY BY September 12. 2003 DATE DATE 111c 10 3 City of Tukwila OWNER (Typed name) .5rEVEA) in M u ll tore) D BY q // 043 DATE O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co3.aia -- 9/11/2003. AIA License Number 1011213, which expires on 8/1/2004. 2 Change Order Summary Foster Golf -Links Clubhouse Change Order No. 3 Date 9/11/2003 1 See attached COPR 9. $ (2,659.00) Total of all items above $ (2,659.00) Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ 271,924.00 Contract prior to this change order was $ 3,070,424.00 This Change Order $ (2,659.00) New Contract Sum incl. this CO $ 3,067,765.00 David A. Clark Architects, PLLC CO 3 Summary -building 9/11/2003, 3:27 PM Change Order PROJECT: (Name and address) Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 TO CONTRACTOR: (Name and address) Wade Perrow Construction P.O. Box 1728 Gig Harbor. WA 98335 THE CONTRACT IS CHANGED AS FOLLOWS: o -//o \0 2000 Edition - Electronic Format AIA Document G701- 2000 CHANGE ORDER NUMBER: 2 DATE: st291-3003 Mb/0.3 ARCHITECT'S PROJECT NUMBER: 1701 CONTRACT DATE: NTP June 30, 2003 CONTRACT FOR: Building (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives.) As indicated on the following summary sheet. The original (Contract Sum) was 2.798.500.00 The net change by previously authorized Change Orders $ (3,811.00) The (Contract Sum) _ .. • • •. .. . •• ' -' • prior to this Change Order was $ 2,794.689.00 The (Contract Sum) (Cuaranteed-Maidmum- Price} will be (increased)( -decreased} by this Change Order in the amount of $ 275,735.00 The new (Contract Sum) including this Change Order will be $ 3.070.424.00 The Contract Time will be (inereased) d) (unchanged) by (0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is unchanged. NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive for which the cost or time are in dispute as described in Subparagraph 7.3.8 of AIA Document A2o1. Not valid until signed by the Architect, Contractor and Owner. ® 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: fgl co2.aia -- 9/9/2003. AIA License Number 1011213, which expires on 8/1/2004. OWNER ARCHITECT n CONTRACTOR FIELD n OTHER AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. © 2000 AIA® AIA DOCUMENT G701-2000 CHANGE ORDER The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ENTD OCT 17 200Y. � !� David A. Clark Wade Perrow Construction Architects, PLLC • Cit •,f Tukwila n BY September 10, 2003 DATE DATE alit 1103 DATE O 2000 The American Institute of Architects. Reproduction of the material herein or substantial quotation of itsprovisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document:. fgI co2.aia -- 9/9/2003. AIA License Number 1011213, which expires on 8/1/2004. 2 Change Order Summary Foster Golf Links Clubhouse 1 As indicated on attched COP #2. Change Order No. Date 2 9/10/2003 $ 275,735.00 Total of all items above $ 275,735.00 Original Contract Sum $ 2,798,500.00 Net Change by previous Change Orders $ (3,811.00) Contract prior to this change order was $ 2,794,689.00 This Change Order $ 275,735.00 New Contract Sum incl. this CO $ 3,070,424.00 David A. Clark Architects, PLLC CO 1 Summary-building.xls 9/9/2003, 4:19 PM 1997 Edition -Electronic Format AIA Document A101-1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment%�is a STIPULATED SUM AGREEMENT made as of the'I ti day of June in the year of Two Thousand and Three (In words, indicate day, month and year) BETWEEN the Owner: (Name, address and other information) City of Tukwila 6200 Southcenter Blvd. Tukwila. WA 98168 and the Contractor: (Name, address and other information) Wade Perrow Construction. LLC 10421 Burnham Drive NW P.O. Box 1728 Gig Harbor. WA 98335 The Project is: (Name and location) New Foster Golf Links Clubhouse 13500 Interurban Ave. So. Tukwila. WA 98168 The Architect is: (Name, address and other information) David A. Clark Architects. PLLC 11737 SE 256th PI. Kent. WA 98030 The Owner and Contractor agree as follows. ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except to Washington, D.C. 20006-5292 the extent specifically indicated in the Contract Documents to be the responsibility of others. THIS DOCUMENT HAS IMPORTANT LEGAL "' CONSEQUENCES. CONSULTATION WITH AN ATTORNEY I5 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. 111111111111111 ©1997 AIA® AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: al01 foster contract final 06-05-03.aia --6/52003. AIA License Number 1011213, which expires on 8/31/2003. • ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different -date -is -stated -Mew -of evien is e-fe'-the-dete-te-be fixed -in -e the notice to proceed (NTP) issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed) If, prior to the commencement of the Work, the Owner requires time to file mortgages, THIS DOCUMENT HAS IMPORTANT LEGAL mechanic's liens and other security interests, the Owner's time requirement shall be as CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 15 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. follows: 3.2 The Contract Time shall be measured from the date of commencement. 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than •. > (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. Unless stated elsewhere in the Contrail Documents, insert any requirements for earlier Substantial Completion of certain portions of the Work.) 266 calendar days for Phase One and 326 calendar days for both completion of both Phase One & Phase Two. from date of NTP , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to complete on time or for bonus payments for early completion of the Work.) Liquidated damages shall be as indicated in section 00810. article 5.04 of the project manual. ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Two Million Seven Hundred Ninety Eight Thousand Five Hundred Dollars ($ 2,798,500 ), subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires) None. 4.3 Unit prices, if any, are as follows: As indicated on the bid form. ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, © 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: al01 foster contract final 06-05-03.aia -- 6/5/2003. AIA License Number 1011213, which expires on 8/31/2003. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. ©1997 AIA® AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 ( 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, oras -fellows: 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 28thday of a month, the Owner shall make payment to the Contractor not later than the 28th day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than days after the Architect receives the Application for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Five percent ( 5 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Subparagraph 7.3.8 of AIA Document A2o1-1997. .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Five percent (5%); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Paragraph 9.5 of AIA Document A2o1-1997. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. 5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6 "saienhir shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and Architect's estimate of value for any unsettled claims; and (Subparagraph 9.8.5 of AIA Document A2o1-1997 requires release of applicable retainage upon Substantial Completion of Work with consent ofsurety, ifany.) © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: a101 foster contract final 06-05-03.aia -- 6/5/2003. AIA License Number 1011213, which expires on 8/31/2003. ©1997 AIA® AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 7.4 The Contractor's represent is: (Name, address and other information) Byron Schmidt. Project Manager / Steve Howells. Superintendent Wade Perrow Construction, LLC 10421 Burnham Drive NW P.O. Box 1728 Gig Harbor. WA 98335 • 7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. 7.6 Other provisions: 7.6.1 Disclaimer. No liability of Contractor shall attach to Owner by reason of entering into this Agreement, except as expressly provided in this Agreement. 7.6.2 Counterparts. This Agreement is executed in three (3) identical counterparts. by the parties. each of which shall for all purposes be deemed an original. 7.6.3 Attorney's Fees. In the event litigation is commenced to enforce this Agreement. the prevailing party shall be entitled to recover its costs. including reasonable attomey's and expert witness fees. ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS 8.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor, AIA Document Aioi-1997. 8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction, AIA Document A2o1-1997. 8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated April 30. 2003 , and are as follows: Document Title Pages Attached Exhibit A: indexing the contents of the supplementary and general conditions which are incorporated in their entirety by reference 8.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 8.1.3, and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages Attached Exhibit B: indexing the contents of the specifications which are incorporated in their entirety by reference 8.1.5 The Drawings are as follows, and are dated unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Number Title Date Attached Exhibit C: indexing the contents of the drawings which are incorporated in their entirety by reference O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, O 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: al01 foster contract final 06-05-03.aia -- 6/5/2003. AIA License Number 1011213, which expires on 8/31/2003. THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY I5 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. ©1997 AIA® AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 8.1.6 The Addenda, if any, are as follows: Number 1 Date Pages May 18. 2003 .6 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 8. 8.1.7 Other documents, if any, forming part of the Contract Documents are as follows: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document Azo1- 1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not pan of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) Invitation to Bid: Instruction to Bidders: Required Bid Forms: all documents contained in the Bidder's Bid Submittal: and all other documents contained within Volumes 1 and 2 of the Project Manual. This Agreement is entered into as of the day and year first written above and is executed in at least three original copies, of which one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner. deveiz, vvl LZ4- OWNER (Signature) Stew 11.'N vti1 44.11e:•{— (printed name and title) Cit Clerk Attest: This day of .2003 NTRACT • ' (signature) THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES. CONSULTATION WITH AN ATTORNEY 15 ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. AIA Document A201-1997, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. ` /OnNi Mc -414.4-1 (Jr) (printed name and tide) am/ At • 1312 1 A tiv Ca A:tit, Calf elki.k. Approv astoF gull City Attorney Ito 4- 9 7 Contractor's License No. WADEPCL*982R7 Address for giving notices (Owner): Tukwila Parks & Recreation. Administration 12424 42nd Avenue South Address for giving notices (Cont): Tukwila, WA 98168 O 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, © 1997 by The American Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will subject the violator to legal prosecution. WARNING: Unlicensed photocopying violates U5 copyright laws and will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the date of expiration as noted below. expiration as noted below. expiration as noted below. expiration as noted below. User Document: al01 foster contract final 06-05-03.aia -- 6/5/2003. AIA License Number 1011213, which expires on 8/31/2003. c 70 ®1997 AIA® AIA DOCUMENT A101-1997 OWNER -CONTRACTOR AGREEMENT The American Institute of Architects 1735 New York Avenue, N.W. Washington, D.C. 20006-5292 • • EXHIBIT A TABLE OF CONTENTS DIVISION 0 Project Title Page 00001 Seal Pages 00007 Table of Contents 00010 List of Drawings 00015 CaII For Bids 00100 Scope of Work 00150 Instructions to Bidders 00200 Responsible Bidder Determination Form 00220 Proposed Equipment and Labor Schedule 00240 Geotechnical Report 00320 Bid Proposal Form 00400 Bid Security 00430 Non -Collusion Affidavit 00460 Proposed Major Subcontractor List 00480 Proposed 3% Subcontractor List 00485 State Prevailing Wage Rates 00495 Agreement 00500 Performance Bond 00600 General Conditions 00700 Special Conditions 00810 DIVISION 1 — GENERAL REQUIREMENTS Work Restrictions 01140 Project Management and Coordination 01310 Construction Progress Documentation 01320 Submittals 01330 Temporary Facilities and Controls 01500 Closeout Procedures 01770 Project Record Documents 01781 Demonstration and Training 01820 END OF TABLE OF CONTENTS New Foster Golf Links Clubhouse Table of Contents -1 • • EXHIBIT B TABLE OF CONTENTS DIVISION 2 Trench Safety 02165 Site Clearing 02230 Earthwork 02300 Rockery 02330 Site Utilities 02500 Asphalt Paving 02741 Extruded Curb 02750 Irrigation 02810 Fencing 02821 Site Accessories 02870 Landscape 02900 Transplanting 02905 DIVISION 3 Concrete 03300 DIVISION 4 Simulated stone 04730 DIVISION 5 Metal Fabrications 05500 DIVISION 6 Rough Carpentry 06100 Metal -Plate -Connected Wood Trusses 06176 Structural Glued -Laminated Timber 06185 Finish Carpentry 06200 Plastic Laminate 06415 DIVISION 7 Insulation 07210 Asphalt Shingles 07311 Fiber -Cement Siding 07460 Sheet Metal Flashing and Trim 07620 Flexible Flashing 07650 Caulking & Sealants 07920 DIVISION 8 Hollow Metal Doors & Frames 08110 Wood Doors 08200 Coiling Doors 08331 PVC Windows 08530 Door Hardware 08711 Glass & Glazing 08810 New Foster Golf Links Clubhouse Table of Contents -1 DIVISION 9 Gypsum Wallboard 09260 Acoustical Ceilings 09510 Resilient Flooring 09651 Mortar Flooring 09671 Carpeting 09680 Wall Coverings 09720 Special Wall Surfaces (FRP) 09770 Painting 09900 DIVISION 10 Slotted Wood Paneling (Slatwall) 10101 Toilet Partitions 10155 Louvers 10200 Fireplaces 10305 Signage 10431 Fire Extinguisher Cabinets 10520 Fixed Awnings 10536 Operable Partition 10650 Toilet Accessories 10800 DIVISION 11 Food Service Equipment Connection Residential Appliances 11400 11451 DIVISION 12 Manufactured Cabinets 12300 DIVISION 13 - Not Used DIVISION 14 - Not Used DIVISION 15 General Provisions 15000 Basic. Materials and Methods 15050 Supports and Anchors 15140 Insulation 15250 Fire Protection System 15300 Domestic Water Systems 15410 Soil and Drainage Systems 15420 Plumbing Fixtures and Trim 15440 Natural Gas System 15488 HVAC Equipment 15820 Air Distribution System 15840 Energy Management 15900 Testing and Balancing 15990 DIVISION 16 Basic Materials and Methods Grounding and Bonding 16050 16060 New Foster Golf Links Clubhouse Table of Contents -2 Seismic Controls 16071 Electrical Testing 16080 Conductors and Cables 16120 Raceways and Boxes 16130 Cable Trays 16139 Wiring Devices 16140 Lighting Control Devices 16145 Transient Voltage Surge Suppression 16289 Enclosed Controllers 16420 Switchboards 16441 Panelboards 16442 Fuses 16491 Interior Lighting 16511 Exterior Lighting 16521 Fire Alarm 16721 Communications Cabling 16750 DIVISION 17 Building Systems Commissioning 17100 END OF TABLE OF CONTENTS New Foster Golf Links Clubhouse Table of Contents -3 EXHIBIT C DRAWING INDEX 51-IEET DESCRIPTION G-100 G-101 G-IO2 G -I03 C-101 C-102 C-103 C-104 C-105 L -10I L-102 L-201 L-202 L-203 COVER SHEET GENERAL INFORMATION SURVEY PARTIAL SURVEY EROSION CONTROL PLAN SITE GRADING PLAN SITE UTILITY PLAN GENERAL NOTES 4 DETAILS SIDE SEWER ALTERNATE LANDSCAPE PLAN: NORTH LANDSCAPE PLAN: SOUTH IRRIGATION PLAN: NORTH IRRIGATION PLAN: SOUTH IRRIGATION DETAILS 5-101 GENERAL STRUCTURAL NOTES 5-102 FOUNDATION PLAN 5-103 ROOF FRAMING PLAN 5-104 STUD WALL PLAN S-105 SHEAR WALL PLAN 4 SCHEDULE 5-106 SOFFIT FRAMING PLAN S-101 SHEAR WALL ELEVATIONS 5-10S ROOF TRUSS DIAGRAMS S-I0S DETAILS S-110 DETAILS 5-111 DETAILS A-100 SITE DEMO PLAN A -I01 PERMIT SITE PLAN A-102 PHASING PLAN A-103 PARTIAL. SITE PLAN - NORTH A-104 PARTIAL SITE PLAN - SOUTH A-105 FLOOR PLAN A-106 FIRE RATING PLAN A-101 FINISH FLOOR PLAN A-1013 FINISH WALL PLAN A-109 REFLECTED CEILING PLAN A-110 INSULATION PLAN A-111 ATTIC VENTILATION PLAN A-112 ROOF PLAN A-II3 PATIO PLAN 4 DETAILS A-201 A-202 A-203 A-204 BUILDING ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS SHEET pESCRIPTION A-301 BUILDING SECTIONS A-302 WALL SECTIONS A-303 WALL SECTIONS A-401 ENLARGED PLANS A-402 ENLARGED PLANS A-501 SITE DETAILS A-502 DETAILS A-503 DETAILS A-504 DETAILS A -60I DOOR SCHEDULE / DETAILS A-602 WINDOW SCHEDULE / DETAILS Q-101 KITCHEN PLAN 4 GENERAL INFORMATION Q -102J SCHEDULES Q-1022 SCHEDULES Q-103 ELECTRICAL Q-104 PLUMING Q-201 ELEVATIONS Q-202 ELEVATIONS Q-501 HOOD DRAWINGS Q-502 1-IOOD DRAWINGS Q-503 HOOD DRAWINGS Q-504 HOOD DRAWINGS P -I01 PLUMBING FIXTURE SCHEDULE 4 LEGEND P-200 PLUMBING FOUNDATION PLAN P-201 PLUMBING FLOOR PLAN P -30I PLUMBING DETAILS P-302 PLUMBING DETAILS P-303 PLUMBING DETAILS M -I01 HVAC SCHEDULES NOTES 4 LEGEND M-201 MVAC FLOOR PLAN M-202 ENLARGED KITCHEN PLAN 4 ROOF PLAN -HVAC M-301 HVAC SECTIONS t DETAILS: M-302 DETAILS, CONTROL DETAILS t SEQUENCE OF OPERATION E-000 SYMBOLS 4 ABBREVIATIONS. E-001 LUMINAIRE SCHEDULE E -0I0 SINGLE LINE WIRING DIAGRAM E-011 PANEL SCHEDULE E-020 SITE PLAN E-021 SITE DETAILS E-131 POUTER PLAN E-I3K POWER PLAN - KITCHEN EQUIPMENT E -14I LIGHTING PLAN £-501 DETAILS