Loading...
HomeMy WebLinkAboutTrans 2015-05-04 Agenda Front SheetCity of Tukwila Transportation Committee ❖ Joe Duffie, Chair ❖ Allan Ekberg ❖ Kathy Hougardy AGENDA Distribution: P. Brodin J. Duffie R. Turpin A. Ekberg M. Hart K. Hougardy Clerk File Copy K. Kruller 2 Extra D. Robertson Pg. 1 Mayor Haggerton Place pkt pdf on Z: \TC -UC D. Cline Agendas L. Humphrey e-mail cover to: A. Le, B. Giberson C. O'Flaherty, J. Duffie, F. Iriarte D. Almberg, B. Saxton, R. Tischmak S. Norris, M. Hart, G. Labanara L. Humphrey MONDAY, MAY 41 2015 — 5:15 PM FOSTER CONFERENCE ROOM — 6300 BUILDING (formerly known as Conference Room #1) Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) 40th —42 n" Ave S (S 1601h St — S 131St PI) Phase III a) Forward to 5/18/15 Pg. 1 Supplemental Agreement No. 3 Regular Consent Agenda b) Tukwila Urban Center Pedestrian Bridge b) Forward to 5/18/15 Pg. 17 Supplemental Agreement No. 12 Regular Consent Agenda 3. SCATBd c) . SCATBd 3/17/15 Meeting Summary c) Information Only Pg. 57 SCATBd 4/21/15 Meeting Agenda 3/19/15 Letter to Legislators 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: • 42nd Ave S /Allentown Roadside Barriers • ADA Transition Plan Consultant Selection and Contract Next Scheduled Meeting: Monday, May 18, 2015 SThe City of Tukwila strives to accommodate individuals with disabilities Please contact the Public Works Department at 206 - 433 -0179 for assistance. Transportation Committee - 2015 Work Plan Description Qtr Dept Action or Briefing Status BNSF Intermodal Facility Access Design contract (to COW only) 1 PW A Complete 42 Avenue South Phase III Design Contract Supplement — design undergrounding 2 PW A Seattle City Light underground agreement 4 PW A Follow -up on potential for coordination with SeaTac 2 PW B ADA Improvements Design contract and bid award 2 PW A Annual Overlay and Repair Program Bid Award 2 PW A 53`d Avenue S (S 137th — S 144th St) Funding and Design contract 2 PW A 53rd Ave S Water Main Replacement, Sewer Rehab (from Utilities) A Cascade View Safe Routes to School Closeout 3 PW A Andover Park West/ TUC Transit Center Closeout 3 PW A Thorndyke Safe Routes to School Closeout 3 PW A Boeing Access Road over BNRR Bridge Rehab Bid Award 3 PW A Residential Street Improvements Design contract 2 PW A Safety -based priority list 4 PW B Annual Bridge Inspections and Repairs Program update 4 PW B TUC Ped /Bike Bridge Right -of -way and easement acquisition 1 PW A Complete Bid Award 4 PW A Interurban Avenue S (S 143`d — Fort Dent Way) Status update 4 PW B S 144th St Phase 11 (42nd Ave S — TIB) Bid award 4 PW A Crosswalk Petition — TIB /S 139th Vicinity Present engineering analysis 3 PW B OTHER TIB pedestrian bulb replacement (test locations) 2 PW B Allentown Roadside Barriers — outreach and design alternatives PW B Duwamish/ S 1191h Ped Bridge — present condition and repairs 1 PW B Transit plan update contract 4 PW A Standard Reports /Briefings Frequency Dept. Facility Tours As needed PW SCATBD Semimonthly PW Committee Work Plan Council, Staff City of Tukwila Updated 3/12/15