HomeMy WebLinkAboutReg 2015-05-18 Item 5C - Contract Supplement #3 - 42nd Avenue South / Gilliam Creek Culvert Design with CH2M Hill for $437,583.57COUNCIL AGENDA SYNOPSIS nifials Meetin ,g Date Prepared by MTVor's review Council review 05/18/15 BQA I I ITEM INFORMATION ITEM NO. 5-C. 11 ISTAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 05/18/15 AGENDA ITEM TITLE 42nd Ave S Phase III Project (S 160" St - Southcenter Blvd) Design Supplemental Agreement No. 3 with CH2MHill CATEGORY ❑ Discussion Mtg Date ❑ Motion ,g Date 09118115 Mt ❑ Resolution Mt ,g Date ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date SPONSOR ❑ Council ❑ Mayor [:] HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police Z PW1' SPONSOR'S Contract No. 12-010 with CH2MHill provided design services for the 42nd Ave S Phase III SUMMARY Project and the Gilliam Creek Surface Water Culvert. Due to undergrounding and right-of- way additions, CH2MHill will need to continue to provide preliminary engineering services. The 2015 additional budget for design and right-of-way to $1,174,000.00 will cover CH2MHill's Supplemental Agreement No. 3. Council is being asked to approve CH2MHill's Supplement No. 3 for $437,583.00, bringing the entire contract to $1,164,577.57. REVIEWED BY ❑ cow mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 05/4/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $437,583.00 $567,000.00 $0.00 Fund Source: 104 ARTERIAL STREET FUND (PAGE 2, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 05/18/15 MTG. DATE ATTACHMENTS 05/18/15 Informational Memorandum dated 05/01/15 CH2MHill Supplemental Agreement No. 3 to Contract No. 12-010 Page 2, 2015 CIP Minutes from the Transportation Committee meeting of 05/04/15 11 12 City of Tukwila TD: K8ayorHag8ert»n Transportation Committee FROM: BpbGiberaon, Public Works Director V,`— BY: Cyndy Knighton, Senior Program Manager DATE: May 1.2O15 SUBJECT: Project No. 99410303, Contract No 12-010 Supplemental Agreement No. 3 ISSUE Authorize the Mayor to sign Supplemental Agreement No. 3 with CH2MHiII for $437,583.57 for the combined 42 nd Ave S and Gilliam Creek Culvert design contract. BACKGROUND |n February 2O12.CH2K8HiU began design work ona project combining the »o" Ave S(Southoen0er Blvd toS16«mSt) roadway project and the Gilliam Creek culvert replacement project. At this time, the project is designed through the SO% level and nearly at the SO% level. Council had previously directed staff to not underground the aerial utilities due to the high cost' but a change in Seattle City Light (SCL) policies has presented the City with the opportunity for cost sharing. The design was slowed down in 2014 pending decision on the undergrounding issue. Now that staff has been directed to proceed with the undergrounding, a supplemental scope and fee is necessary for CH2MHiII to complete the work. DISCUSSION UndergroundinQ the aerial utilities naquin*a new civil and electrical design to be ommp|eted, as well as the redesign of some elements which must be modified from the existing 60% design |owa| plans. The City is responsible for all of the civil design costs and SCL is responsible for all electrical design costa. Construction costs will be shared with SCL. at 6O/4O split with 40% being Tukwi|a'e share. Additionally, it was found that 4 parcels will require permanent easements for utilities and 15 parcels will require construction easements tu connect the homes with the relocated power lines. Design will take most of 2015 to oonnp|ato however the design team is working toward a possible ad date in October. Construction will occur in2O1G. Financial Impact The 2015 C|P sheet includes an additional $2Q0.O00 for design and $100,000 for right of way. This supplement includes approximately $33'UOOfor HOVV related work, but this does not include negotiations or acquisition costs. A Project Funding Estimate will be part of this supplement's work which will aid staff in determining the final RDVV costs. The undergnounding and redesign work is approximately $105,000 over the available budget. The forthcoming budget amendment will include this amount. Design Element Amount (rounded) Undergrounding (Civil Design) $304.462 Redesign to accommodate undergrounding 99.697 Right ofWay _-33,424 Total Supplement No. 3 RECOMMENDATION Approve Supplement No. 3Lo Contract No. 12-01U with CH2K8HiUin the amount of$437'S83.57 and consider this item on the Consent Agenda a1 the May 18.2O15 Regular meeting. Attachments: Supplemental Agreement No. 3 with Exhibits C|P Pg. u w:\pw rw & rs projects\42nd ave s phase iii (99410303 94-rsO3)\design\information memo supplemental agreement #3 additional design for ugo-1'/5'sb.docx 14 City of Tukwila Agreement Number: 12-010 (c) 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment #3 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12-010 between the City of Tukwila and CH2M Hill Engineers, Inc. is amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform the services, identified on Exhibit A-1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 4: Payment shall be modified as follows: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B-1, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $437,583.57 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $1,164,577.57 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of CITY OF TUKWILA Jim Haggerton, Mayor ATTEST/AUTHENTICATED City Clerk CA: 2012 .20 CH2M HILL ENGINEERS, INC. Printed Name/TitLel4ungA-e, Vice President F-ATJD 21-TOW3 t ITTAW, Ito] Ile] a LTA City Attorney Page I of I 15 16 Exhibit A -1 40th — 42nd Ave S. Phase III City of Tukwila Amendment 3 Scope of Work The scope of work is amended as follows: General Assumptions The original AGREEMENT had a contract duration of 18 months commencing in February, 2012. The schedule assumed a continuous uninterrupted effort ending in August, 2013. The project schedule has incurred periods of delay with little or no activity (approximately 10 months total) while design decisions including Utility Undergrounding were evaluated by the City. Two time extension Amendments have been executed for a total of 24 months without any scope or budget adjustments. Amendment 1 extended the duration to December 31, 2014, and Amendment 2 extended the duration to December 31, 2015. This Amendment 3 defines scope and budget adjustments for additional services within the extended duration. TASK 1 1. Project Management Due to the incorporation of utility undergrounding, and the extension of the project schedule, additional project management is required for providing overall project administration, team management, schedule management, scope and budget management, and the preparation of progress reports and invoicing. The original scope of work assumed a project duration of 18 months. With credit for 10 months of inactivity, the additional duration for purposes of project management is assumed to be 14 months. Deliverables: • Monthly progress reports and invoices (14) • Bi- Monthly meeting materials (7), notes and action items • Schedule Updates I TASK 2 2. Gilliam Creek Culvert 2.5.2 Culvert 60 %, 90 %, and Final Design Additional work will be required to prepare a unique performance specification (special provision) to describe the work required to support in -place the existing Seattle City Light (SCL) underground electrical ductbank during the culvert construction. The excavation and installation of the proposed culvert will require the concrete encased ductbank to be supported over a long free span during construction. Additional work will be required to coordinate with other Utilities (Puget Sound Energy (PSE) and Valley View Sewer) related to the temporary support and /or by -pass during the culvert installation. The CONSULTANT will incorporate plans, details and specifications from PSE, and Valley View Sewer into the contract package. Deliverables: • Design coordination with SCL, PSE and Valley View Sewer to incorporate into contract • Special Provision for Contractor Designed Support System for SCL Ductbank TASK 3 3. Geotechnical Engineering 3.2 Geotechnical Analysis and Report Due to the incorporation of utility undergrounding, and the addition of a Stormwater Detention Pond, additional geotechnical field exploration will be required. Assumptions: • Up to 5 additional borings totaling 125 feet to provide subsurface information for the design of large SCL Electrical Vaults (4) and the Stormwater Detention Pond (1). Deliverables: • Boring Logs and Laboratory analysis • Incorporate additional subsurface information into Geotechnical Design Report im TASK 4 4. Survey and Mapping 4.3 Supplemental Surveys Due to the incorporation of utility undergrounding, and the addition of the Stormwater Detention Pond, additional field survey is required to supplement the basemap and DTM. The additional coverage required includes the following: • North Side of 160th west of 42nd to the next utility pole where the Undergrounding will terminate. • Additional Survey to incorporate trenches on up to 10 private properties to provide power and communications services and locate the existing service connection points. • Topo of property at 15421 42nd Ave S. for the design of the Stormwater Detention Pond Assumptions: • The City will support the CONSULTANT to secure rights of entry for private properties, within the defined project limits, to be surveyed prior to the commencement of field survey work. Deliverables: • Supplemental design surveys • Updated basemapping TASK 5 5. 30% Design 5.2. Stormwater Design 5.2.2. Stormwater Management Concept The CONSULTANT will evaluate the option of providing an off -site stormwater pond and develop a conceptual design to support decision making on its viability. • Preliminary Pond sizing and site assessment and optimization of available space. Work shall include sizing the pond, site layout, preliminary grading, and inlet and outlet configuration. Assumptions: • After evaluating three options for stormwater vaults it was decided to evaluate the viability of an off -site stormwater pond on City -owned property. Deliverables: • Develop a Schematic Pond Concept 19 TASK 6 6. Environmental Documentation 6.1 Environmental Support The CONSULTANT will provide the following support: • JARPA - Consultation and coordination with Tribe to justify methodology for Gilliam Creek Culvert sizing. • Review and respond to SEPA comments • Cultural Resources Memo - research and memo preparation • Tree Permit - develop plans showing trees to be removed and replacement requirements. TASK 7 7. Right of Way 7.1 Acquisitions from private property Due to the addition of the off -site Stormwater Detention Pond and incorporation of utility undergrounding, acquisition of right of way is necessary. This includes a Project Funding Estimate (PFE) to define the total right -of -way costs, parcel calculations, legal descriptions, parcel maps, and right of way plans. Appraisals and Acquisitions are not in this scope of work and will be added by amendment after the PFE is complete and the costs for right -of -way are better defined. Due to the incorporation of utility undergrounding, it is anticipated that additional property will be necessary for placement of equipment and facilities to make the undergrounding of the aerial overhead utilities possible. This work is dependent on the needs of SCL and the private telecommunications companies. Temporary rights will also be needed to construct services for power and communications to each property. Assumptions: • 4 parcels will require permanent rights for Utilities • 15 parcels will require temporary rights (construction easement) • City owns the residential parcel for the Stormwater Detention Pond and the boundary for the pond site will be defined by the preparation of a parcel exhibit and description. • Appraisals and Acquisitions are not in this scope of work Deliverables: • Project Funding Estimate (PFE) • Parcel calculations, legal descriptions and exhibits • Right -of -Way plan 20 TASK 8 8. Agency, Stakeholder, and Community Coordination 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) Due to the incorporation of utility undergrounding additional coordination will be necessary. 8.1.3. Property Owners (replace existing task with the following) Fifteen (15) properties are anticipated to be affected by the utility undergrounding and would be impacted by trenching across their property to points of service. The CONSULTANT will prepare for and attend up to 40 Property Owner Meetings to coordinate new underground power and communications service connections to each property south of SR 518. The CONSULTANT will assist the CITY in obtaining Rights of Entry for the purpose of installing the trench and conduit to each property requiring conversion from overhead to underground power and communications. Assumptions: • Up to three (3) meetings with each private property owner will be necessary to determine trenching routes, connection points, and obtain rights -of- entries • Up to 40 meetings total will be necessary. Deliverables: • Preparation and attendance at 40 property owner meetings 8.1.4. Utilities The CONSULTANT will coordinate with utility companies including: Seattle City Light (SCL), Comcast, Century Link and Zayo to facilitate the undergrounding of all power and communication lines along 42nd Ave S. Assumptions: • Up to twelve meetings with utility companies to coordinate the design of their facilities with the other proposed project improvements. Deliverables: • Meeting minutes and Action items 21 Task 9 9. Contract Drawings 9.3. Roadway and Stormwater Drainage 9.3.1. Roadway Sections The CONSULTANT will revise and update the roadway sections to incorporate City directed changes to the location and configuration of the proposed west sidewalk along the roadway. Deliverables: • Revisions incorporated into 90% and 100% Typical Roadway Sections 9.3.2. Paving, Grading and Drainage Plans and Profiles The CONSULTANT will revise the location and configuration of the west sidewalk (from 7' sidewalk with 4' amenity zone to 8' sidewalk with 3' amenity zone) along with removal of the Timber utility poles and addition of new Luminaires will necessitate significant revisions to the paving plans. Driveway types will change hydrants will be relocated (all behind sidewalk), and mailboxes may need to be placed in clusters with localized widening to the amenity zone. This will require coordination with Property Owners and Post Office which is covered under 8.1. Deliverables: • Revisions incorporated into 90% and 100% Paving, Grading and Drainage Plans and Profiles and Detail Sheets 9.3.3. Stormwater Management Facilities • Design of Stormwater Pond including inlet and outlet structures and associated grading, retaining wall, erosion and sedimentation control, planting and fencing plan • Two additional Plan sheets showing grading plan and sections for the pond. • Revise Demolition and Erosion Control Plan to cover additional area at Pond Site. • Add additional Retaining wall plan, profile and details • Additional planting on Landscaping plans at the pond site. Deliverables: • 60%,90%, and 100% Stormwater Management Plans and Details (4) 9.5. Utility 9.5.2. Utility Undergrounding Plans — Power and Communication Seattle City Light, Century Link and Comcast have overhead utilities. The CITY has decided to move these facilities underground into a Joint Power/ Communications Ductbank. Seattle City Light (SCL) will provide the type, size and approximate location of vaults and conduits for the underground system, as well as SCL Construction Guidelines and general design assumptions. The CONSULTANT will coordinate utility work to confirm compatibility with existing and proposed utilities, storm drain, signal, illumination, landscaping, irrigation, and urban design. The CONSULTANT will confirm clearance requirements with SCL. Only SCL 22 approved materials, specifications and construction guidelines will be used in designing SCL facilities. These items will be included in the contract documents. Coordination meetings will be needed with Century Link and Comcast to determine the vaults, conduit runs and other facilities. Each private telecommunications company will be required to provide a plan layout showing the vault and conduit system that they need to underground their facilities. The CONSULTANT will confirm that space is available and coordinate with each, to shift vaults to fit with other existing and proposed features. These vaults will be shown on the Utility Undergrounding plans, with references to the Utility Company Plans for details of the Vaults and conduits. Where conflicts are identified between the utility undergrounding design and the current design of stormwater, illumination, and traffic signal equipment locations, the CONSULTANT will make adjustments to the utility company locations to avoid conflicts. Where significant modifications are identified the CONSULTANT will alert the CITY prior to making revisions. Final Utility Undergrounding drawings will include plans, sections and details. Plans will indicate poles and other SCL facilities to be removed, new vaults, and ductbank runs. Utility undergrounding sections will show bedding, backfill and conduit spacing requirements for the joint utility trench. Profiles will be developed for the Ductbank that show depth of cover and crossing utilities. Vault location tables will be developed to describe the type size and location for each vault. Additional Details and tables will be included for the conversion of private property power and communications services. The CONSULTANT will coordinate with the CITY, overhead utility companies, and other stakeholders to resolve design issues, clarify design requirements, and to integrate the undergrounding plans, specifications, and costs into the project documents. The CONSULTANT will update the project drawings and design to incorporate utility undergrounding of overhead utilities. The following discipline plans will be updated: General Sheets, Site Preparation and TESC, Paving, Utility and Drainage, Illumination. For the 100% Submittal - Review comments from the 90% submittal will be incorporated into the Utility Undergrounding Plans. The Ductbank profiles will be refined using the pothole information collected. Vault location tables will be developed to describe the type size and location for each vault. For SCL Vaults, the CONSULTANT will develop Butterfly Vault details to show how the conduits enter each vault. Deliverables: • 60 %, 90 %, and 100% Utility Undergrounding Plans, Profiles and Details (16) 9.6. Structures Original scope under task 5.5 assumed up to 3 retaining walls approximately 100' long with a maximum height of 6'. The project requirements have been refined and require the following additional work items. 9.6.1. Design Calculations The CONSULTANT will prepare plans and specifications for 8 retaining walls. The stormwater pond will also require a retaining wall. These walls total approximately 700' in length with two of the walls approaching 10' high in places. The resulting block walls and soldier pile walls require additional design and details that were not in the original scope of work and budget. Deliverables: • Additional Plan and Profile sheets for Soldier Pile Walls 23 • Additional Details sheets for Soldier pile walls (assume 4 sheets) • Additional work to prepare specifications and cost estimate. 9.7. Channelization, Illumination and Signing Due to the incorporation of utility undergrounding, additional work will be required to layout new luminaires with underground wiring, site a service cabinet (metered) served from the SCL vault. • Deliverables: Revisions incorporated into 90% and 100% Channelization, Illumination, and Signing Plans (6) TASK 10 10. Specifications Due to the incorporation of utility undergrounding, additional work will be required on the specifications as follows: The CONSULTANT will incorporate special provisions provided by the utility companies into the project specifications. Deliverables: • 90 %, and 100% Utility Undergrounding Specifications TASK 11 11. Cost Estimating Due to the incorporation of utility undergrounding additional work will be required for the cost estimate as follows: • 11.2 Engineer's Estimate The CONSULTANT will develop a construction cost estimate for each utility company facility relocation that will include the construction costs for the joint trench and installation costs for the associated conduits, vaults, hand holes, closures and pedestals. Quantities for conduits, vaults, hand holes, closures and pedestals will be provided by each utility company for their facilities. The CONSULTANT will incorporate the construction costs into the total project construction estimate and create three additional bid schedules (B, C, D) for the bid package. Deliverables: • 60%,90%, and 100% Utility Undergrounding Cost estimate including additional bid schedules for SCL, Century Link and Comcast. 24 Exhibit B -1 - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III 4/24/2015 Overall Proiect Budaet Summary By Task Task Description Original Budget Amendment III Budget Total Budget Task 1 - Project Management $73,585 $43,222 $116,807 Task 2 - Gilliam Creek Culvert $79,757 $14,659 $94,416 Task 3 - Geotechnical Engineering $45,331 $29,711 $75,042 Task 4 - Survey and Mapping $71,805 $16,456 $88,261 Task 5 - 30% Roadway Design $130,090 $5,138 $135,228 Task 6 - Environmental Documentation $0 $16,364 $16,364 Task 7 - Right of Way $0 $26,941 $26,941 Task 8 - Agency, Stakeholder and Community Coordination $10,138 $30,160 $40,298 Task 9 - Contract Drawings $254,934 $227,100 $482,034 Task 10 - Specifications $12,191 $8,236 $20,427 Task 11 - Cost Estimating $10,228 $19,596 $29,824 Task 12 - Major Milestone Reviews (30 %, 60 %, 90 %, 100 %) $25,150 $0 $25,150 Task 13 - Services During Bidding and Construction $13,785 $0 $13,785 TOTALS $726,994 $437,584 $1,164,577 25 Exhibit B -1 - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III Amendment #3 4/24/2015 Budget Summary By Task Task Description Labor Hours Total Labor Total Reimbursable Overall Totals Utility Undergrounding Task 1 - Project Management 156 $25,933 $0 $25,933 Task 3 - Geotechnical Engineering 24 $4,626 $17,600 $22,226 Task 4 - Survey and Mapping 82 $9,319 $554 $9,874 Task 6 - Environmental Documentation 0 $0 $0 $0 Task 8 - Agency, Stakeholder & Community Coordination * 147 $30,160 $0 $30,160 Task 9 - Contract Drawings 1,304 $188,436 $0 $188,436 Task 10 - Specifications 40 $8,236 $0 $8,236 Task 11 - Cost Estimating 120 $19,596 $0 $19,596 Task 12 - Major Milestone Reviews (30 %, 60 %, 90 %, 100 %) 0 $0 $0 $0 Task 13 - Services Durin Biddin and Construction 0 $0 $0 $0 /..,,r /, .. /. / /(r' /, r,fr / , /f /„ ,r, ./, 1, r / -,n,./ J -. / /J/ r .f fJ� i ?(„ /r'4 A, <, / ,,,, ✓�/ .J,. / I /,, III I Ii' JG/ / r r r„ r i %' r J / ,� rr /., r yl, r,/ t /�/ / r,r✓ / f :�,f.. J51 /I , ,,. /./ ! /�, ✓, / J :�. { ✓f J;,• /' 0 P t'i / .i /a, //'i,r i /1 /a/ Jr,d L. rl,r /// J " ,, /3, IYrI ,/ J ,f/ f r J %r/ %i/ lr �, /�f. c 2 , Culvert & Stormdrain Task 1 - Project Management 65 $10,806 $0 $10,806 Task 2 - Gilliam Creek Culvert 80 $14,659 $0 $14,659 Task 3 - Geotechnical Engineering 16 $3,084 $4,400 $7,484 Task 4 - Survey and Mapping 54 $6,213 $370 $6,583 Task 5 - 30% Roadway Design 32 $5,138 $0 $5,138 Task 6 - Environmental Documentation 88 $16,364 $0 $16,364 Task 9 - Contract Drawin s 280 38,664 $0 $38,664 /, r✓%,,.,, fr. ��if,/, l/r�liil,f�� / / / „� /i�r�f�� /,/,r, ,/ �� ,,��,��/'��1� / aT / /i�, n� /c/ „rJr�� P�e�,Y /,orb!/ uil „/fFr�rr,�,, //, ,,JL,,,r,/ ��„ v J, ,s� / /�/ Right of Way Task 1 - Project Management 39 $6,483 $0 $6,483 Task 7 - Right of way 160 $16,941 $10,000 $26,941 -- .r(-.. IYii 1 ..r, -.. (0 'i l i. r /' / /'./ ( J „// .Y / „ //i 'L' %. f r✓ i l 1.,, ri ir. f.. �� /1Jr / l �r � r �i ,� � %/ J ./ai''� // /G�. f'/ /J . ,. lr -/� iJ� l� f ,;fff/J � „/, kidl / f / 1 / „�i frf/ /r ':c,.� +// t� /ri� ,9y/ �/ / ., �� /✓f �frl /� fed j / /i �f; 'r!`✓�lh ,1, .. ,(/ rf, l Ae, �. f,.V � /i ✓Y/ ,/, '/� f r :r .r /I % i % f i I /i / /.� 1 Jf / .i / ✓,irFlr, f 1 /I. i /k.. ui1 �rJ ,5{), r N.VFt �f f / ;.J. �� �� AMENDMENT #3 TOTALS 2,687 $404,660 1 $32,924 $437,584 * Includes credit ($2,673) for existing scope replaced in the Amendment 26 Exhibit B -1 - Consultant Fee Summary City of Tukwila 40th`- 42nd Avenue South Phase III Direct Labor Classification Quantity X Hours x Rate _ _ Cost Sr. Project Manager Laboratory Services 160.0 $242.52 Survey - Leica DNA03 Digital Level $38,803.20 Sr. Consultant $22.00 118.0 0.4 $219.02 $82.00 $25,844.36 Sr. Engineer $186.00 638.0 Survey - Truck $192.77 $56.00 $122,98726 Engineer 4410 $0.00 $160.57 $71,132.51 Surveyor Total Expenses 140.0 $135.73 $19,002.20 Jr. Engineer 544.0 $104.35 $56,766.40 Sr. Technician 304.0 $138.61 $42,137.44 Technician 220.0 $76.03 $16,726.60 Office 120.0 $93.83 $11,259.60 2,687.0 $404,659.57 Expenses Category Quantity X Rate = Cost Drilling $20,000.00 Laboratory Services $2,000.00 Survey - Leica DNA03 Digital Level 0.5 $44.00 $22.00 Survey - Leica Smart Pole GPS 0.4 $184.00 $82.00 Survey - Leica Smart Pole TPS 3.2 $186.00 $600.00 Survey - Truck 3.9 $56.00 $220.00 Acquisitions - Sub $0.00 Appraisals - PFE $10,000.00 Total Expenses $32,924.00 27 N CO Exhibit B -1 Consultant Fee Determination City of Tukwila 40th - 42nd Avenue South Phase III - Amendment #3 CI-12M HILL INC Sr. Prelec± Title ®Sr. Consultant Sr Engineer Engineer ® ®® TOTAL TOTAL Employee Name {s) Requested Bill Rate Roger Mason 6242.52 Mark Johnson, Matt Johnson 5219.02 Eric Haupt, Raymond Ken Green, Chung, Ken Karen Dawson Jumpawong Greg Brooks 6192.77 6160.57 5135.73 Minh -Tri Khu $104.35 Whitehouse, Russell Mudget 5138.61 Edgar Soares, Jean Pippin, Tom Joseph Chancellor Donegan 176.03 893.83 HOURS DOLLARS as as •a e • ,. • • ®■11=1111111111111■■11111••111111l_rr_ 0 0 • 0 0 • • 0 120 O a 260 e a ., . $43,222 MEM - AA.01 Task 1 - Project Management 100 0 40 1:1 • erall Project Management 100 IIIIIIIIIIIMINIIINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIINIIMIIIINIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIIIIIIMIIIIIMIIIIIIIIIIIIIIIIIIIIII 0 40 0 0 ` 0 0 0 120 260 $43,222 AA.02 Time extensions and associated Project Management ,14 months) Task 2 - Gilliam Creek Culvert 100 0 20 40 20 40 0 0 0 120 0 0 260 80 $43,222 14,659 2.5 Culvert 60%, 90%, and final Design 0 20 20 40 0 0 0 0 0 80 $14,669 _ AA.03 •rolect specucations wit • • "o an. 01.-' ea.y u.mltta s -®' ®' =:L=M:11.111111111MMMUMENCIIIIMINIIMIIIIIIIIIIIIIIIMEMI �' - - - -5MNIIIIIII Task 3 - Geotechnical Engineering 0 0 Geotechnlcal Analysts and Report 0 ;0 40 D ISMIENNEAMMEMINE 0 MIIIMIMIIIMMINMIIIIIIIIMCEIMIIIIIIMEIMIIIM 0 40 57,711 5 Additional borings for SCL Vaults and Stormwater Pond -- AA. 04 Task 4 - Survey and Mapping 0 0 8 8 60 t r 60 0 _ �11 4.3 SupplementaiSurveys 0 : :0 8 8 601 0 0 60 :. ?0 .:136 1515,532 Surveying to Support Utility Undergrounding and Stormwater Pond ----- - - - - ®a AA.05 Design Task 5- 30% Roadway Design 0 0 8 0 8 32 60 0 0 0 60 0 0 ® $15,532 $5,138 53 Stormwater Design 0 - 0 NM= 32 0. 0 0 0 0 32 56,138 ® Stormwater Management Concept 000 ®011111111311111110�' �' ® $5,138 Deve op a c emetic. -on. oncept - _- ® - - - -- ME= $5,138 AA. 06 Task 6 - Environmental Documentation 0 58 00 • • 0 88 '.16,364 DARPA Consultation and coordination with Tribe to justify IMMENEEMEMMISENIMEI methodology for ildam reek Cu vert sizing. Rewew and respond to SEPA comments 12 ., __ ® -- 24 e 53.880 $1,752 ule P Resources emorandum - research and memo preparation Tree Permit - draw.ngs _ ® ®__ ,2 ®M. 160 '16,941 AA.07 Task 7 - Right of Way 0 t • 1 80 0 0 13OW Ac:uist0on for Stormwater Pond & Utili Linde .roundin. 1111=11111101111111111 1111111311111111111111111111MMIE 80 16D IMEMEI AA.08 Task 8 - Agency, Stakeholder & Community Coordination 36 0 112 -1 0 0 0 0 0 147 $30,160 8.1 51st 1'... -, . • g ., y •. .l ti. t 36 0 112 1 0 0 0 0 0 147 IIELESUNII Property Owners: Prep and attend 40 property owner meetings EMMI- `' � ®- ® - - -111111111•1110MMIll ;Utility •caner s reeling T ate na s Up to 12 meetings ® -® - . $12,561 [ _ .i-- T • . 11111.231MEM® 364 0 480 304 80 0 1,584 - $2,673 ' 227100 AA.09 Task 9 - Contract Drawings 9,3 Roadway and StormYVNt69' Drainage 0 0000®' 0 52 124 : 0 :140 84 00 0 :0 ®111111=111 X400 :458,187 $8,029. 9.3.1 Roadway Sections ' oa.way p an revisions to incorporate c anges to sec ion west ----- ®S - ® ® 9.3.2 sidewalk) Paving, Grading and Drainage Plans and Profiles 0 0 2C 12 24 0 40 0 24 0 0 60 60 $8,029 $9,494 'evisions o -eying ' ens •ue to 0 ange in typica section Inc u.ing - - - -- IIIIIMIIIIIIIIIIIIIIMIIIIIIIIIII -_ 9.3.3 development of custom driveway approach details Stormwater Management Facilities 0 0 12 20 24 100 0 100 24 60 0 0 so 280 59,494 $38,664 •-site tormwater'0n. Design .•'o ••'o: two tormwater ---- - - - - Mgmt Plans and Details) Utility Undergrounding Plans - Power and Communication 24 0 20 220 1.00 160 0 100 160 60 160 0 0 280 724 538,664 $112,795 -:ETe 4∎1111102} 151~ 1g0 1iiT.TT8T:7iranstmiriminsor 1iC_---- 24 0 20 220 0 160 80 0 - 160 120 -111111111111111 160 0 80 - 0 -111111111111111, 724 300 $112,795 535,830 9.6 Details (16) Structures ® Additional retaining wall design - for longer and tater walls IIIIIMM0IMINECIIIIII0IECIMM11•1111011111111111=111111110 2 MMIIIIMIIEIILIIIIIIIIIIIIIIIIIIIMIIIIMIMIIIIIIIIMIIIIIIIICSIIIIIIIMIIIIIINIIMIIIMIIIINMMIIIINIIEIMIIIMIMEIGRIII 111111111111MIMEGINIIIIIIIM■1111111:1111111MILIIIIIIIIMIL1110111111111111311111111111=1111111MMELIIM 20 111111111111M011=11=1111•I=00MIIIIIINIIM 20 40 $8,236 anne ization, umma ion, an. Ignmg 0 ® AA. 10 Luminaire layout and design for Undergrounding Task 10 - Specifications 0 Specfioattons to in Utility Undergrounding Task 11 - Cost Estimating 0 0001 0 0 0 Mtn •.19,596 11.2 Englnee s Estimate 0 0 80 0 0 40 0 0 0 120 519,596 Cost estimating related to Utility Undergrounding _111110111101_ -® - ®0•0111111 TOTALS 160 118 638 ! 140 544 304 220 120 2 687 '.404 660 Exhibit B-1 - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III April 24, 201 Reimbursables Reimbursable Item Task 3 - Geotechnical Engineering Task 4 - Survey and Mapping Task 7 - Right of Way Totals Drilling $20,000.00 $20,000.00 Laboratory Services $2,000.00 $2,000.00 Survey - Leica DNA03 Digital Level $22.00 $22.00 Survey - Leica Smart Pole GPS $82.00 $82.00 Survey - Leica Smart Pole TPS $600.00 $600.00 Survey - Truck $220.00 $220.00 Travel - Mileage $0.00 Travel - Parking $0.00 Appraisals - PFE $10,000.00 $10,000.00 Totals $22,000.00 $924.00 $10,000.00 $32,924.00 29 CITY CJFTUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: 40-42 Ave South (S 160 St - S 131 PL) Project No. 99410303 DESCRIPTION: Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. STATUS: Phase III (SIC Blvd (11 54th) - S 160 St), Design began in 2012, construction in 2015. Project No. 99410303 Phase eo-RVV 5 (SIC Blvd (154)-144 St) $3,r9O& Phase xe4nG8o(1*41ao) $1.8s0. both completed. Phase N(G13SSt S131 PI) $1min beyond. Project No. S941O3n1 MAINT. IMPACT Reduce pavement, shoulder, and drainage work. Only Phase III is shown in active years. Project includes Surface Water's Gilliam Creek 42nd Ave S Culvert project COMMENT: for $003k(pQ, 87) and io part of the Walk & Roll Plan. Council directed noundergnoundin8 for Phase III on108/12. but Seattle City Light is now negotiating a 60/40 underground split so $2,500,000 has been added to project. Hmxmov\L Through Eoummau o"«non,qi onix 2o1* 2ois 2016 2017 uo/V 201e zuoo BEvomo TOTAL EXPENSES Phase IV Design 309 466 299 1,074 Land (RAN) 100 100 Construction 2,400 3,800 6,200 Undergrounding 2,500 2,500 TOTAL EXPENSES 309 466 399 5,300 0 0 1 0 0 4,360 10,834 FUND SOURCES Awarded Grant 0 Seattle City Light 1,500 1,500 Surface Water 76 48 124 Bond 4,400 4,400 City Oper. Revenue 233 418 399 (600) 0 0 0 0 4,360 4,810 TOTAL SOURCES 309 466 399 5,300 0 0 0 0 4,360 10,834 2015 2020 Capital Improvement Program N City of Tukwila Transportation Committee TRANSPORTATION COMMITTEE Meeting Minutes May 4, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building PRESENT Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Cyndy Knighton, Gail Labanara CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:19 p.m. I. PRESENTATIONS 11. BUSINESS AGENDA A. Supplemental Agreement: 40th — 42nd Avenue South Phase III Staff is seeking Council approval of Supplemental Agreement No. 3 to Contract No. 12-010 with CH2MHill in the amount of $437,583.57 for the combined 42nd Ave S and Gilliam Creek Culvert design contract. With the Seattle City Light undergrounding from SR 518 to S 160th St, additional civil design is needed and additional budget was added to the 2015 CIP. Design is currently at 60%. Council action will still be required for the SCL undergrounding agreement, right-of-way, and the construction bid award in late 2015 or early 2016. The Gilliam Creek culvert will require an above ground pond on the north portion of the yard at the Way Back Inn house. Committee also discussed the need for 8 retaining walls, with the majority at the S 1601h St/42nd Ave S intersection. UNANIMOUS APPROVAL. FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA. B. Supplemental Agreement: Tukwila Urban Center Pedestrian/Bicycle Bridge Staff is seeking Council approval of Supplemental Agreement No. 12 to Contract No. 07-123 with KPFF Consulting Engineers in the amount of $164,371.10 for additional design and right-of-way acquisition services for the TUC Pedestrian/Bicycle Bridge Project. With the change in bridge location to the north of Riverview Plaza, some of KPFF's tasks can be subtracted while new tasks are needed. The project is currently at 60% design, but there have been challenges with the access to the Nelsen's brown house. A meeting is scheduled for 5/5/15 with the ROW consultants and our City Attorney to determine the best course of action for the needed environmental analysis at that property. UNANIMOUS APPROVAL. FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA. Ill. SCATBd Bob attended the April 21, 2015 SCATBd meeting and will show the Sound Transit Light Rail Planning presentation at the next May 18, 2015 Transportation Committee meeting. Bob also spoke on the Port of Seattle's and SeaTac's Sustainable Airport Master Plan. With projected growth, SeaTac Airport will need additional terminals, so they may relocate some of the maintenance facilities that are currently north of the airport and use that land for the new terminals. Additional internal transportation would also be needed to accommodate those new terminals. IV. MISCELLANEOUS Meeting adjourned at 5:50 p.m. Next meeting: Monday, May 18, 2015 Chair Approval ----------- Millt, I by GL 31