Loading...
HomeMy WebLinkAboutReg 2015-05-18 Item 5D - Contract Supplement #12 - Tukwila Urban Center Pedestrian-Bicycle Bridge Design and Right-of-Way Acquisition with KPFF Consulting Engineers for $164,371.10COUNCIL AGENDA SYNOPSIS Meehn ,g Date Prepared by Mayor's revi �aw' Coundt review 05/18/15 BG 1-JA ITEM INFORMATION ITEMNO. 5.D. 33 ISTAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 05/18/15 AGENDA ITEM TITLE Tukwila Urban Center Pedestrian/ Bicycle Bridge Right-of-Way Supplemental Agreement No. 12 with KPFF Consulting Engineers CATEGORY ❑ Discussion MtS Date Z Motion MtS Date 09118119 ❑ Resolution Mt ,g Date ❑ Ordinance Mtg Date ❑ Bid Award Mt& Date F-1 Public Hearing Mt g Date ❑ Other Mig Date SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ❑ PW1' SPONSOR'S Contract No. 07-123 with KPFF Consulting Engineers provided design services for the TUC SUMMARY Pedestrian/ Bicycle Bridge. Due to relocation of the bridge and additional right-of-way issues, KPFF will need to continue to provide preliminary engineering services. The right- of-way budget of $1,100,000.00 will cover KPFF's Supplemental Agreement No. 12. Council is being asked to approve KPFF's Supplement No. 12 for $164,371.10, bringing the entire contract to $1,998,227.42. REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 05/4/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE RIQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $164,371.10 $1,100,000.00 $0.00 Fund Source: 104 ARTERIAL STREET FUND (PAGE 12, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION OS/18/15 MTG. DATE ATTACHMENTS 05/18/15 Informational Memorandum dated 05/01/15 KPFF Supplemental Agreement No. 12 to Contract No. 07-123 Page 12, 2015 CIP Minutes from the Transportation Committee meeting of 05/04/15 33 34 City of Tukwila TD: MoyorHog0erhnn Transportation Committee FROM: �~/, Bob Gibemspn' Public Works Director V^ ~ BY: Cyndy Knighton, Senior Program Manager DATE: May t2O15 SUBJECT: Tukwila Urban Center Pedestrian/Bicycle Bridge Project No. Q051D4O3. Contract No. O7'123 Supplemental Agreement No. 12 ISSUE Approve Supplemental Agreement No. 12 with KPFF in the amount of $164'371.10 to provide additional engineering design and right of way acquisition services for the Tukwila Urban Center (TUC) Pedestrian/Bicycle Bridge project. BACKGROUND Since 2006' KPFF has been under contract to she and then design the TUC Pedestrian/Bicycle Bridge over the Green River. The design work is predominately funded by federal grants and in 2013 Tukwila was awarded funds through the State of Washington's Regional Mobility Grant Program for right of way (ROW) acquisition and construction. In |a10 2013, Supplemental Agreement No. 10 was approved which included funds for final doaign, additional studies required by permitting agencies, and ROW acquisition services. Ad this time the design is nearly 90% complete however continuing complications with ROW acquisition have resulted in delay in the design and permitting. The bridge landing locations were shifted slightly to the north to avoid significant R0VV impacts to the Riverview Plaza Office Park. That shift requires additional studies ofcultural resources aa well oadeep boring to study soil conditions on the property commonly called the Nelsen Parcel at 16113 West Valley Highway. DISCUSSION Supplemental Agreement No. 10 included scope and fee for certain tasks which are no longer needed with the new location of the bridge. Some tasks which were originally included have been modified to address the design changes and some new tasks are being added. Supplemental Agreement No. 12 clearly documents which tasks are new, modified or deleted. The scope of work indicates the changes in the task titles. Fee sheets show negative hours for tasks being deleted and new hours for new tasks or additional hours for existing tasks. There are two separate rates, or mu|tip|iem, used in the fee sheets which n#|ooi the changes in salaries since Supplemental Agreement No. 10 was approved. Only now hours are using the higher multiplier. All work currently under contract which ia not being changed by this supplement will remain ed the lower rate. FINANCIAL IMPACT The additional costs associated with the redesign of the bhdge, as well as the RDVV acquisitions work is $164,371.10. This includes removal of work no longer required from Supplemental Agreement No. 10 in the amount of -$42,795.69. As the additional work is primarily in response to HOVV concerns, the ROW budget will be used for this work. Right of Way Budget $1.100p00.00 Nelsen Property Initial Offer -248.000.80 Supplement No. 12 -164.371.10 Remaining Budget $ 687.528.90 RECOMMENDATION Approve Supplemental Agreement No. 12 and consider this item on the Consent Agenda atthe May 18, 2015 Regular meeting. Attachments: Supplemental Agreement No. 12 with Exhibits CIP Pg. 12 w:\pwenV\pmjoom\a'mvumpmjeots\tuop*o bicycle bridge (9ns1o4na)\infonnaUonmemo supplement agreement #10 additional uesigna mw-5'1-1s uu.uoox 36 Adw VWWashington State F Department of Transportation Supplemental Agreement Organization and Address KPFF Consulting Engineers Number 12 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 Original Agreement Number 07 -123 (k) Phone: (206) 622 -5822 Project Number Execution Date Completion Date 05 -RW03 Project Title New Maximum Amount Payable Tukwila Urban Center, Ped/Bicycle Bridge PSE $ 1,998,227.42 Description of Work Modified hydraulic, surveying, permitting, geotechnical engineering and right of way acquisition services. See scope of work (Exhibit A -1) for complete description. The Local Agency of the City of Tukwila desires to supplement the agreement entered into with KPFF Consulting Engineers and executed on and identified as Agreement No. 07 -123 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: See attached. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: 111 Section V, PAYMENT, shall be amended as follows: The total contract value increases by $164,371.10 to a new maximum payable amount of $1,998,227.42. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: DOT Form 140 -063 EF Revised 9/2005 David K. McMullen, PE Consultant Signature By: City of Tukwila Approving Authority Signature Date 37 w Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 1 Exhibit A -1 Scope of Work Tukwila Urban Center, Pedestrian/ Bicycle Bridge Supplement No. 12 - Modified Hydraulic, Surveying, Permitting, Geotechnical Engineering and Right of Way Acquisition Services PROJECT DESCRIPTION KPFF is currently under contract with the City of Tukwila (City) for the Plans, Specifications and Cost Estimate (PS &E) Phase of the Tukwila Urban Center Pedestrian and Bicycle Bridge project. Issues with acquiring the necessary Right -of- Way required that the previous trail /bridge alignment be relocated further north along the Green River Trail. Because of this trail realignment, portions of the scoped services found in Supplement # 10 are no longer applicable. Additionally, relocation of the trail requires additional design effort related to the final bridge alignment, including: • Evaluation of alternative alignments north of Riverview Properties and supplementation of the original TS &L report. • Critical flaws evaluation of the preferred alternative alignment selected in the TS &L supplement • Additional effort included in updating the design of the new alignment to 60 %, 100 %, and final design of trail, bridge, and landings for multi -use trail crossing the Green River, connecting West Valley Highway to Baker Blvd at Christensen Rd. • Additional Geotechnical Engineering. • Additional Surveying • Modified Right -of -Way Acquisition The table below gives a summary of the tasks from Supplement 10 that are being deleted and /or modified as well as new tasks that are being added as a part of this supplement (Supplement 12) Summary of Supplement 10 and 12 Task Changes 1.40, 1.50, 2.12, 3.10, 3.11, 3.20, 3.21, Supplement 10 Tasks Deleted 3.22, 3.23, 3.24, 3.30, 3.31, 3.32, 3.33, 3.34, 3.35, 3.40, 3.50, 5.10, 5.21, 8.33, 8.34, 8.61, 8.81, 8.82 Supplement 10 Tasks Modified 5.20, 5.30, 8.21, 8.32, 8.81 2.13, 3.60, 3.61, 3.62, 3.63, 3.70, 3.71, 3.72, 3.73, 3.74, 3.80, 3.81, 3.82, 3.83, 3.90, 4.30, 4.40, 4.50, 4.60, 4.70, 5.40, Supplement 12 New Tasks 5.50, 7.0, 7.10, 7.20, 8.100, 9.0, 9.10, 9.11, 9.12, 9.13, 9.14, 10.0, 10.10, 10.11, 10.12, 10.13, 10.14, 10.20, 10.21, 10.22, 10.30, 10.31, 10.32, 10.33, 10.34, 10.35 W Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 2 PROJECT OBJECTIVES The overall objectives of this supplement include: • Supplement to TS &L Report evaluating alternative alignments north of the Riverview Plaza properties • Obtain technical data necessary for completion of the PS &E Phase based on the new alignment • Update design according to the new alignment PROJECT TEAM This supplement includes effort by the following project design team members: Prime Consultant Structural Engineering Civil Engineering Surveying Landscape Architecture and Planning Geotechnical Engineering Environmental and Permitting Services River Hydraulics Right of Way Acquisition ON KPFF Consulting Engineers KPFF Consulting Engineers KPFF Consulting Engineers KPG Inc. KPG, Inc. Landau Associates Landau Associates Watershed Science & Engineering Universal Field Services Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 3 SCOPE OF WORK The following is a scope of work for modifications/ additions to design efforts including geotechnical engineering, surveying, permitting, planning, structural engineering, civil engineering, and right of way acquisition services in support of this project's PSE Phase. In addition to the basic services scoped in this document, the Consultant has included additional services that can be performed at the City's request. TASK NO. 1.0 - PROJECT MANAGEMENT AND ADMINISTRATION Task No. 1.40 - Design Team Meetings and Coordination (Supp. 12 TASK ADDED) The consultant team will need two (2) additional internal meetings to coordinate modified project tasks and incorporate scope changes into the project design. Additionally, KPFF will perform general coordination and be the main point of contact for the multidiscipline team. KPFF will collect and disseminate information for the team. Task No. 1.50 - Project Team Meetings with City (Supp. 12 TASK ADDED) An additional two (2) meetings with the City will be required to coordinate tasks associated with this scope of work. Deliverables: • Monthly progress reports and invoices • As- needed Project Schedule Updates • Team meetings o Participation in internal consultant team meetings o Participation in project meetings with the City 41 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 4 TASK No. 2.0 - TOPOGRAPHIC AND BOUNDARY SURVEY The following is a scope of work for additional survey items needed as design proceeds on this project. KPG has included time and expense for project meetings, management of surveying and drafting efforts, professional review and quality control in our proposal. Task No. 2.10 - Additional Survey and Mapping Subtask No. 2.12 - Extend Survey of Green River Trail (Supp. 10 TASK DELETED) The survey of the Green River Trail shall be extended northerly approximately 100 -feet to the limit of proposed improvements Subtask No. 2.13 - Survey North GRT, Additional Christensen Rd and New Bridge Abutment locations (Supp. 12 TASK ADDED) Additional survey for the north Green River Trail segment, additional Christensen Road from the existing Green River Trail head to Baker Boulevard. W Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 5 TASK No. 3.0 - ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN, AND TS &L SUPPLEMENT of NEW ALTERNATIVE ALIGNMENTS Task No. 3.10 - Survey at Riverview Plaza Parking Lot (Supp. 10 TASK DELETED) KPG shall provide the field survey and mapping to augment the Riverview Plaza parking lot, including studies and alignments of alternative routes. Subtask No. 3.11 - Utility Locating (Supp. 10 TASK DELETED) A separate cost for private utility locating services has been included, which assumes 24 hours of underground utility sensing and locating. Task No. 3.20 - Walkway Section/ Parking Lot Trail Alignment Studies (Supp. 10 TASK DELETED) KPG and KPFF Civil shall provide alternative layouts and improvements to the Riverview Plaza property, including parking lot reconfiguration. This work will include additional design studies for proposed improvements, meetings with property owners of Riverview Plaza, and coordination with the property owner's consultants Subtask No. 3.21 - Trail Realignment Alternatives for Riverview Plaza (Supp. 10 TASK DELETED) Subtask No. 3.22 - Riverview Frontage /Property Studies (Supp. 10 TASK DELETED) Subtask No. 3.23 - Meetings for Riverview Plaza Property Owner Coordination (Supp. 10 TASK DELETED) Subtask No. 3.24 - Alternative Alignment Schematic Cost Estimate Comparison (Supp. 10 TASK DELETED) Deliverables: • Trail Alignment Alternatives and Selected Alternative Plan (including conceptual parking lot reconfigurations.) KPFF civil shall provide cost estimates for two (2) alternative alignments, compare the estimated costs to the current alignment, and identify changes to project cost as a result of alignment revisions. Task No. 3.30 - 30% Plans (Supp. 10 TASK DELETED) KPFF civil will meet with Riverview Plaza property owner representatives to discuss project progress selected alternative alignment to 30% design. Anticipated work includes preparation of new plan sheets for horizontal alignment, vertical alignment, site preparation, utility relocation, storm drainage, pavement markings and signing, and paving plans. 43 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 6 Subtask No. 3.31 - Site Preparation Plans (Supp. 10 TASK DELETED) Subtask No. 3.32 - Utilities Plans (Supp. 10 TASK DELETED) Subtask No. 3.33 - Storm Drainage and Grading (Supp. 10 TASK DELETED) Subtask No. 3.34 - Paving Plans (Supp. 10 TASK DELETED) Subtask No. 3.35 - Pavement Marking Plans (Supp. 10 TASK DELETED) Task No. 3.40 Update Storm Drainage Report (Supp 10. TASK DELETED) Storm Drainage report will need to be revised to assess impacts due to revised alignment. This may trigger stormwater detention requirements, and will also change basin delineation. Task No. 3.50 - Update Cost Estimate (Supp 10. TASK DELETED) Cost estimate will be revised to integrate quantities for preferred alignment. Task No. 3.60 - New Trail Alignment (Supp. 12 NEW TASK) KPG will update the Urban Design, Landscape and Illumination plans to a 60% design level based upon the new preferred alignment which will be selected in the TS &L Report Supplement 01. Subtask No. 3.61 - Update New Trail Alignment Urban Design to 60% (Supp. 12 NEW TASK) Subtask No. 3.62 - Update New Trail Alignment Landscape Design to 60% (Supp. 12 NEW TASK) Subtask No. 3.63 - Update New Trail Alignment Illumination Design to 60% (Supp. 12 NEW TASK) Task No. 3.70 - TS &L Alignment Studies (Supp 12. NEW TASK) KPFF shall evaluate up to 6 alternative alignments connecting Baker Blvd at Christensen Rd to West Valley Highway with a multi -use trail and bridge crossing. Work will include alignment layout, evaluation of project costs and other impacts with existing conditions and future improvements and development, right -of -way needs, and supplemental report to existing TS &L Report. .. Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 7 Subtask No. 3.71 - Alternative Alignment Layouts (Supp. 12 NEW TASK) Subtask No. 3.72 - Evaluation of Alternative Alignment Layouts (Supp. 12 NEW TASK) Subtask No. 3.73 - TS &L Report Supplement 01 (Supp. 12 NEW TASK) Subtask No. 3.74 - Design Team and City Review Meetings (Supp. 12 NEW TASK) Task No 3.50 - Fatal Flaw Assessment of Subsequent Preferred Alignment (Supp. 12 NEW TASK) KPFF shall evaluate the preferred alignment identified from the additional alignments evaluated in the TS &L Supplement. This evaluation includes meetings with King County Flood District representatives to evaluate impacts to levee, evaluation of structures within the levee and river, evaluation of river modeling done by King County Flood District for establishment of the 100 year flood elevation, assessment of horizontal alignment, and development of vertical alignment alternatives for clearances of the structure over the Green River. Work also includes meeting with City staff to review proposed alternative and resultant realignment of preferred multi -use trail along the north side of Riverview Plaza and revised landing alignment east of Green River to West Valley Highway. Subtask No. 3.81 - River and Levee Constraints (Supp. 12 NEW TASK) Subtask No. 3.82 - Horizontal and Vertical Alignment Alternatives (Supp. 12 NEW TASK) Subtask No. 3.82 - Design Team and City Review Meetings (Supp. 12 NEW TASK Task 3.90 - Presentation Graphics (Supp. 12 NEW TASK) KPFF will prepare graphics for City suitable for presentation to the general public and the elected officials. 45 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 8 TASK No. 4.0 - CIVIL ENGINEERING Task No. 4.30 - Trail Alignment and Modeling (Supp 12. NEW TASK) KPFF civil team shall meet and coordinate design elements for revised trail alignment and layout. This work includes coordination meetings, evaluation of City standards for future frontage improvements, coordination of design elements and scope of improvements, evaluation of grades for landings, and other coordination necessary to develop the preliminary concept to a schematic design level. Task No. 4.40 - Storm Drainage Approach (Supp. 12 NEW TASK) KPFF shall design new storm drainage improvements for trail. Work includes new storm drainage report evaluating runoff and detention criteria. KPFF will present findings to City and work with the City to provide required improvements which may include mitigated collection and detention within an adjacent basin, dispersed runoff across adjacent city owned park, raingardens along West Valley Highway, and other measures currently unidentified. KPFF civil shall review all other discipline reports and information, including new survey topographic map and terrain model, supplemental geotechnical report, and proposed layout from Planners and Landscape Architect. Review will include providing comments and requests for additional information or revisions, and review of resubmittal. Task No. 4.50 - Quantities and Cost Estimate (Supp. 12 NEW TASK) KPFF shall quantify construction elements and earthwork, and prepare a preliminary cost estimate for new proposed improvements. Task No. 4.60 - Wall /Railing Assessment (Supp. 12 NEW TASK) KPFF shall work with team to design new trail alignment north of Riverview Plaza's north entrance, and along the north side of their parcel. Work shall include design of new horizontal and vertical alignment, modeling of pavement section, evaluation of trail and shoulder widths, evaluation of wall heights and types of retaining walls and railings Task No. 4.70 - 30% Plan Sheet and Layout (Supp. 12 NEW TASK) KPFF civil shall provide permit support for revised environmental permitting information. This information is typically total earthwork summaries, stormwater impacts, project and construction description, evaluation of tree impacts, and support graphics for same. M Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 9 TASK NO. S. 0 - ENVIRONMENTAL AND PERMITTING SERVICES Landau Associates will provide supplemental environmental and permitting services for this project. The scope of services is based on discussions with and information provided by a City of Tukwila (City) Shoreline Planner regarding impacts to trees adjacent to the Green River, 30 percent plan review documentation referencing an illumination study associated with proposed bridge lighting, and coordination with WSDOT Local Programs. Task No. 5.10 - USCG Navigation Survey and Bridge Permit Application (Supp. 10 TASK DELETED) The purpose of this task is to conduct the required Navigation Survey and prepare the General Bridge permit application materials to USCG standards. To conduct the Navigation Survey, Landau Associates will contact local waterway users /managers to determine the type and characteristic of watercraft common to the stretch of the Green River affected by the proposed project. Contact with local waterway user groups /managers will include: City officials City Chamber of Commerce WDFW USACE Port of Seattle and select number of tenants. Landau Associates will document findings into a memorandum format that will include a summary of methods and results. Landau will also prepare the application cover letter formatted to the USCG Bridge Permit Application Guide. Landau will prepare draft documentation for review and comment by KPFF and the City, and then final documentation. Assumptions: No team meetings or onsite meetings with waterway user groups are included in this scope of services. Contact with no more than three Port tenants will be required as part of the Navigation Survey. Waterway user group survey will be limited to email /phone correspondence. Vessel traffic from the Port does not pass downstream of the Duwamish River Turning Basin (i.e., approximate River Mile 6). Deliverables: An electronic (MS Word) copy of the draft Navigation Survey memorandum and application cover letter. An electronic (Adobe PDF) and one paper copy of the final Navigation Survey and application cover letter. 47 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 10 Task No. 5.20 - Tree Assessment (Supp. 10 and Supp. 12 TASK MODIFIED) Landau Associates will conduct a tree assessment on the 16113 West Valley Highway property within 50 feet of the proposed bridge alignment and bridge landing. For the assessment, Landau Associates will identify the species, approximate height and crown spread, and general age class and health of trees identified on project survey. Landau will also conduct an assessment of the approximate extent of shade provided by identified trees. The shade assessment will be based on analysis of the height and crown spread of trees and altitude of the sun at 8:00 a.m., 10:00 a.m., and noon, on the Winter Solstice (i.e., altitudes with potential to provide the maximum extent of shade over the Green River). Landau will amend the project survey to identify tree species and required tree protection zone. Methods . and results of the tree assessment will be summarized in shoreline permitting documentation included in Landau Associates' existing contract. Assumptions: • Determination of age class will be made following shoreline permitting requirements (i.e. young, mature, over mature). • Tree assessment field effort will require a single site visit by two Landau Associates staff members and will take no more than 8 hours to complete. • The City will arrange for any necessary right of entry to complete the tree assessment. • The need for quantitative shade assessment will be determined based on evaluation of trees to be impacted by the project. A qualitative assessment of shade provided by impacted trees will be evaluated based on size /shape of tree and distance to the River. Quantitative assessment will be needed for native species determined to likely provide significant shade to the River. • Shade analysis will be completed using hand calculations, and will be completed for individual trees or groups of trees as applicable. Deliverables: • Draft and final tree assessment documentation to be incorporated into shoreline permitting documentation included under existing contract. .; Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 11 Task No. 5.21 - Biological Assessment (Supp 10. TASK DELETED) KPFF civil engineers shall establish revised bridge alignments to accommodate WDFW request to save two large Douglas -Fir trees located along the east bank of the Green River. Two alignments will be created, one to clear only the tree located furthest to the south, and another to clear both large trees. Task No. 5.30 - Lighting Study Support (Supp. 10 and Supp. 12 TASK MODIFIED) Landau Associates will provide support to KPFF in developing the lighting study associated with proposed bridge illumination. Landau Associates is including a level of effort to include no more than 12 hours of Associate, 8 hours of Senior CAD support, and 5 hours of Staff /Senior Technician. The purpose of the study will be to determine the impacts of bridge lighting on the Green River below in support of the permitting process. Deliverables: • To be determined Task 5.40. - De Minimis Section 4(i) Evaluation (Supp 12. TASK ADDED) Landau Associates will prepare necessary documentation to support Section 4(f) evaluation associated with potential trail improvements to the Green River Trail in the vicinity of City -owned open space immediately north of Riverview Plaza. The documentation will consist of the WSDOT Section 4(f) De Minimis Impact Determination form. Landau Associates will prepare the WSDOT Section 4(f) De Minimis Impact Determination form for review and comment by KPFF and the City, and then a final document. Assumptions • Programmatic Section 4(f) evaluation does not apply to the proposed project due to presence of critical habitat. • The City will complete necessary public outreach associated with the evaluation process. • The City Parks Department will provide written support for the proposed project and unavoidable impacts to Section (40 resources. Deliverables • An electronic (Adobe PDF) copy of the draft and final technical memorandum. Task 5.50. - Historic Property Inventory (Supp. 12 TASK ADDED) Landau Associates will retain the services of Equinox Research and Consulting International, Inc. (ERCI) to support inventory of the residence on the Nelsen ,, Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 12 property for required compliance with Section 106 NHPA. ERCI will prepare an Historic Property Inventory Form to support Section 106 NHPA compliance. Landau Associates will prepare copies of necessary forms to assist with agency consultation. Assumptions: • WSDOT has indicated requirement to inventory the residence on the Nelsen property. Deliverables: • Historic Property Inventory Form TASK No. 7.0 - GEOTECHmcAL ENGINEERING SERVICES (Supp. 12 NEW TASK) Task No. 7.10 - Field Explorations and Laboratory Testing (Supp. 12 NEW TASK) Landau Associates will advance a boring on the property at 16113 West Valley Highway (King County Parcel number 000580033) to characterize subsurface conditions near the proposed east bridge abutment. This boring will be advanced to a depth of about 120 ft below the existing ground surface (BGS). One additional boring will be advanced at least 160 ft BGS from the existing trail and will be located near the proposed east bridge abutment. The borings will be completed using a track - mounted drill rig using mud -rotary drilling techniques. The drilling will be accomplished by Holocene Drilling of Puyallup, Washington under subcontract to Landau Associates. A geologist or geotechnical engineer from Landau Associates will supervise the explorations, obtain soil samples from the borings, and prepare field logs of conditions encountered in the explorations. Soil samples will be obtained from the borings on about a 5 -ft depth interval using the Standard Penetration Test (SPT) procedure, and delivered to our laboratory for further classification. Soil samples obtained from the explorations will be held in our laboratory for 30 days after submittal of the final report. After that date, the soil samples will be disposed of, unless arrangements are made to retain them. Drill cuttings will be placed in steel drums and transported to WM Dickson's facility in Tacoma, Washington for disposal. Prior to drilling, a representative of Landau Associates will mark the boring locations in the field and arrange for an underground utility locate (1- 800... call before you dig). Landau Associates will also arrange for a private utility locate at each of the boring locations. Landau Associates will conduct geotechnical and analytical laboratory testing on representative soil samples obtained from the exploratory borings to aid in their classification and determination of engineering properties. Laboratory testing completed in our laboratory is expected to consist of 4 natural moisture 50 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 13 content determinations, 3 fines content determinations, 5 index tests (either mechanical sieve analysis or Atterberg limit determinations), and 3 combined analyses (mechanical sieve and hydrometer). Task No. 7.20 - Geotechnical Evaluation, Reporting, and Meetings (Supp. 12 NEW TASK) Based on the results of our previous explorations for the TSL design phase, the field investigation, and laboratory testing program completed for this project, Landau Associates will complete geotechnical engineering analyses to confirm and or modify our previous recommendations to support 30% design of the bridge, including: • Recommendations for earthwork and site preparation including: clearing, stripping, and grubbing; the suitability of onsite soils for reuse in structural fill; import structural fill requirements, subgrade preparation; and placement and compaction of structural fill. • Pavement subgrade preparation. • Porous asphalt and porous concrete pavement sections (asphalt or Portland cement concrete and base course thickness) required for structural support of the proposed traffic. • Conventional asphalt and Portland cement concrete pavement design. • Seismic design criteria, including an evaluation of liquefaction and lateral spreading potential. • An evaluation of the stability of the riverbanks and recommended stabilization measures. • Recommendations for approach embankment structural earth wall including: embedment depth, foundation subgrade preparation, design parameters, nominal bearing pressure, anticipated foundation settlement, and wall backfill and drainage considerations. • Estimated settlement of the approach embankments. • Recommended foundation type (driven piles /drilled shafts); recommended tip elevations; expected range of nominal axial capacity; uplift capacity; downdrag loads; estimated settlements of bridge foundations; additional lateral loads caused by lateral spreading; soil parameters for input into L -Pile (or equivalent) lateral pile capacity software. • Construction considerations for the recommended foundation type. • Discussion of the impacts of constructing the bridge abutment and approach embankment on the existing dike located at the west side of the bridge and any recommended mitigation measures. The results of the field explorations and geotechnical engineering analyses will be summarized in a geotechnical report. The report will include a site plan 51 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 14 showing the exploration locations, summary logs of conditions observed in the borings, results of the geotechnical and analytical laboratory testing, and a discussion of subsurface soil and groundwater conditions at the exploration locations. Assumptions: • City will obtain the right of entry to perform all geotechnical sampling • No permit fees will be charged for the borings • All field work will be performed during daylight hours between Monday and Friday and any traffic control will consist of traffic cones Deliverables: • Draft geotechnical report (2 hard copies and Adobe PDF) • Final geotechnical report (4 hard copies and Adobe PDF) TASK NO. 8.0 - RIGHT OF WAY SERVICES It is assumed federal funds are participating in the project, however there are no federal funds participating in the Right of Way phase. Universal Field Services, Inc. (UFS) will complete all Right of Way services in accordance with the City of Tukwila (City) Washington State Department of Transportation's (WSDOT) approved Right of Way Acquisition Procedures, the federal Uniform Relocation Assistance and Real Property Acquisitions Policies Act (URA), WSDOT Local Agency Guidelines - Section 25 (Right of Way Procedures), and the Washington Administrative Code (WAC 468 -100) state Uniform Relocation Assistance and Real Property Acquisition. The project area consists of primarily business use properties. Up to four (4) separate tax parcels will require various real property rights as shown in Table A below. One (1) residential occupant may be displaced by this project. Additional parcels or real property rights other than those shown in Table A will require an amendment to this scope of work and related fee estimate. Right of Way plans are not available for review and use at this time. This scope of work is based on the following: • Discussions with the City's design team KPFF. • Recent tour of the project limits. • Review of limited public on -line information (mapping / ownership information). • Preliminary Schematic Drawing and Exhibits - Right of Way plans not available. 52 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #I2 Page 15 Task No. 8.20 - Title /Ownership Review (Supp 10. TASK MODIFIED) Subtask No. 8.21 - UFS Title /Ownership Review (Supp. 10 TASK MODIFIED) Obtain title reports from the City or KPFF and perform reviews of existing right of way and ownership information. (If requested, UFS will order title reports or any updates). Review special exceptions described in each title report to determine the City's acceptance of title at closing. Provide the City with a parcel summary memo listing ownerships, title exceptions, etc. Deliverable: • Prepare parcel summary memo listing ownerships, title exceptions, etc. Task No. 8.30 - Data Collection and Limit Identification Subtask No. 8.32 - Right of Way Limits and Easements (Supp. 10 and Supp. 12 TASK MODIFIED) KPFF civil engineers will identify limits of right of way takes, as well as temporary and permanent easements for the project. Limits will be provided to the survey team, and the right of way acquisition team, for legal description and exhibits for use by the right of way acquisition team. Subtask No. 8.33 - Temporary Right of Entry/Access Permit (Supp. 10 TASK DELETED) As part of the feasibility planning and preliminary design phase for the project, the City and the consulting team may require temporary access to gather pertinent information for investigational geotechnical, environmental studies, hydrology, and land survey purposes, etc. It is intended Right of Entry (ROE) Permits will be inclusive of all purposes as stated in this task. It is assumed property owners will not be compensated for the temporary grant of access and all properties will be left in the same condition as was prior to entry. See Table A below for parcels requiring ROE Permits. The City or KPFF will provide exhibits as attachments to each permit depicting the extents of the ROE area. Deliverable: Obtain one (1) Right of Entry Permit due to common ownership. Subtask No. 8.34 - Legal Description and Exhibits for Acquisition (Supp 10. TASK DELETED) Eight (8) Legal descriptions and exhibits shall be prepared for right -of -way acquisition. 53 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 16 Prepare legal descriptions and graphic exhibits for temporary easements as well as for permanent easements for each of the four Riverview Plaza parcels (8 legal descriptions). Provide staking or painting of easements for viewing purposes. Deliverahles Updated Survey Project Base Map (two hardcopies, one electronic copy) Copies of title reports Acquisition legal descriptions with graphic exhibits Task No. 8.60 - Relocation Plan (Supp. 10 TASK DELETED) A relocation plan will be developed based on WSDOT's Right of Way Manual and LAG Manual Section 25. According to the City, the owner of the residential site has purchased another residence and has vacated the premises, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. This scope of work assumes the property owner is displaced by the project. It is assumed there will be one (1) residential owner- occupant of a single family home displaced as a result of this project (see Table A). UFS will develop a relocation plan resulting from personal assessment interviews with the occupant(s). If additional displacements are subsequently discovered, the Relocation Plan will be amended by UFS. Additional relocations will require an amendment to this scope of work and related fee estimate. Deliverable: • Relocation Plan Subtask No. 8.61 - FHWA Funds Authorization for ROW (Supp. 10 TASK DELETED) Shortly after the Right of Way Plans (prepared by KPFF), the PFE, and Relocation Plan have been submitted to WSDOT and assuming NEPA clearance has been obtained, the City would typically receive a letter from FHWA through WSDOT Highways and Local Programs authorizing the use of federal funds to acquire Right of Way. This letter of authorization is required in order for the City to receive federal funding participation and reimbursement for costs incurred with Appraisal, Appraisal Review, Acquisition Negotiations, and Relocation Assistance services. Deliverable: For informational purposes only Task No. 8.80 - Acquisition Negotiation, Relocation and Closeout 54 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 17 Subtask No. 8.81 - Acquisition Negotiation (Supp. 10 and Supp. 12 TASK MODIFIED) Acquire real property rights from up to four (4) separate tax parcels (including City of Tukwila) as shown in Table A below. Appraisals, Appraisal Reviews, and AOS worksheets completed in the Appraisal and Appraisal Review task will be submitted to the City for written approval establishing the amount of Just Compensation to the property owner. Upon written approval from the City, UFS will prepare the offer package(s) and promptly present offers to purchase all the required real property interests and negotiate in good faith to reach a settlement with each property owner(s). Offers will be presented in person when at all possible. Negotiations will be conducted in accordance with statutory and regulatory requirements and will include: Coordinate administrative settlement approvals with the City; Negotiate as necessary with lien holders, assisting escrow in the closing process; Prepare and maintain parcel files to include fair offer letters, acquisition documents, a standard diary form indicating all contacts with owner(s), and other items necessary for negotiations. Negotiations shall not be deemed to have failed until at least three significant meaningful contacts have been made and documented with each owner and /or their representative through direct personal contacts. Out - of -area owner(s) will be contacted by telephone and by certified mail. If negotiations reach an impasse, UFS will provide the City with written notification. The filing and cost of condemnation proceedings shall be the responsibility of the City. Deliverables: • Acquisition Negotiation services with owners of up to four (4) separate tax parcels. • Completed parcel files including necessary records of all Right of Way Acquisition services. Subtask No. 8.82 - Relocation (Supp. 10 TASK DELETED) According to the City, the owner (Nelson) of the residential site recently purchased another residence and has vacated the premises, possibly because of the pending project. Relocation eligibility and entitlements are subject to discussions with the City and the owner. This scope of work assumes the property owner is displaced by the project. It is assumed there will be one (1) residential owner- occupant of a single family home displaced as a result of this project. Universal will provide Relocation Assistance and Advisory Services under the guidelines of the federal URA, WSDOT LAG Manual - Section 25 and the City's approved Policies and Procedures, as directed. Relocation services are generally outlined as follows: 55 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 18 • Inform displaced occupants, in writing, of their potential displacement, eligibility, entitlements, and provide an explanation of their relocation benefits. • Assist in search of replacement site(s). • Assist displaced occupant(s) in filing relocation claims for payment. • Maintain a current relocation diary for each displaced occupant. • Maintain necessary records to support state audit of the relocation services portion of the project. Deliverahles- Relocation Advisory and Assistance Services for one (1) residential owner- occupant. Completed relocation assistance files. Task No. 8.100 - Green River Trail Easement Negotiation (Supp. 12 TASK ADDED) The City of Tukwila is the Grantee on two existing easements for public access, trail, road and flood control under recording numbers 8009190876 and 9108301275. These easements are located, in part, along the northerly boundary of tax parcel numbers 2523049077 and 2523049039. Both parcels are owned by BRCP Riverview Plaza, LLC. During survey work for this project it was discovered that a portion of the Green River Trail as currently constructed is located outside of the legally described limits of the easements. At the City's request, UFS will negotiate with the Grantor of the easements in an attempt to modify the legal descriptions. UFS will contact the parcel owner or their representative and conduct up to two (2) on site meetings. If it is determined the owners are not receptive to modifying the easements, the negotiations will be deemed to have failed. It is assumed the City will not use eminent domain for the modification of these easements. Deliverables: • Revised easements under recording numbers 8009190876 and 9108301275 Additional Work If other tasks are required to be performed or there are changes in pertinent information or if negotiations exceed the industry standard for a good faith effort to negotiate (three "in- person" landowner contacts), UFS reserves the right to request additional compensation as an equitable adjustment. UFS shall not be responsible for delays caused beyond its control. 56 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 19 Assumptions: The City / KPFF will provide the following: • Exhibit maps to accompany Right of Entry Agreements • Preliminary Commitments (Title Reports) for all parcels shown in Table A. If requested, UFS will order title reports or any updates. The title company will bill the City directly for each report. • Approve designation of the escrow company used for this project. The escrow company will bill the City directly for all escrow services provided. • Right of Way Plans and Drawings, Maps, Exhibits, Right of Way Staking, etc., as necessary. • The necessary Environmental Site Assessments prior to commencing the PFE as discussed in the Project Funding Estimate task. • Legal descriptions in electronic format for all real property rights to be acquired and easement areas • Form approval, in electronic format, of all legal conveyance documents prior to use (i.e. offer letters, purchase and sale agreements, escrow instructions, easements, deeds, leases and permits). • Review and approval of all determinations of value, established by the project appraisers. Provide written authorization prior to offers being made to property owners. • Review and approval of all relocation entitlements prior to presentation to the displaced person. • Payment of any and all compensation payments to property owners, recording fees, relocation payments, legal services and any incidental costs which may arise necessary to complete each transaction. • Send "Introduction Letters" to property owners as necessary. • Property staking for easement modification, if necessary. 57 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 20 TABLE A - PARCEL ACQUISITION & EASMENT MODIFICATION No. Tax Parcel No Taxpayer / Owner Current Use Easement Modification Total Fee Simple Partial Fee Simple Pei ui Trail Easement Temp. Const. Easement AR / AOS (See Note 3) 1 000580 -0033 Nelsen Single Family Residence X (See Note 1) AR 2 252304 -9081 City of Tukwila River Trail To Be Determined AOS 3 022310 -0040 Park East Real Estate LLC Office Bldg / Bank X X AOS AOS 4 022310 -0099 Andover Plaza LLC Retail X X 5 252304 -9077 BCRP Riverview Plaza LLC Office Bldg X 6 252304 -9039 Notes: 1. AR (Appraisal and Appraisal Review) / AOS (Administrative Offer Summery - in lieu of Appraisal) Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 21 TASK NO. 9.0 - ADDITIONAL STRUCTURAL DESIGN (Supp. 12 NEW TASK) Task No. - 9.10 Additional Structural Design (Supp. 12 NEW TASKS) KPFF will revise the current 30% design plans to the new alignment (Alternative Alignment A) as well as provide additional structural design and drawings associated with the new layout. Subtask No. 9.11 - Update 30% Bridge Drawings to New Alignment (Supp. 12 NEW TASK) KPFF will update the current bridge drawings to reflect the new bridge alignment and additional approach span and associated foundation. Subtask No. 9.12 - Approach Span Design and Drafting (Supp. 12 NEW TASK KPFF will design and produce drawings associated with the approximately 45 -foot long approach span at the western landing Subtask No. 9.13 - Abutment Design and Drafting (Supp. 12 NEW TASK) KPFF will design and produce drawings associated with the abutment that supports the approach span at the west landing. Subtask No. 9.14 - Revise Drilled Shaft Design (Supp. 12 NEW TASK) KPFF will revise and update the drilled shaft foundation design and drawings based on the new locations, additional loads imposed by the approach span and the new geotechnical information based on the additional geotechnical borings. TASK NO. 10.0 - BRIDGE AESTHETICS COLLABORATION(SUPP. 12 NEW TASK) LMN will revise the overall bridge structural aesthetic to the current bridge alignment, to be documented in graphics used for design workshops and presentation renderings. This will require remodeling the proposed bridge to adjust bridge features to the revised alignment. Task No. 10.10 - Bridge Structure (Supp. 12 NEW TASK) Subtask No. 10.11 - Arch Geometry (Supp. 12 NEW TASK) Subtask No. 10.12 - Suspension Cable Connections (Supp. 12 NEW TASK) Subtask No. 10.13 - Bridge Deck Connections (Supp. 12 NEW TASK) Subtask No. 10.14 - Tied Arch Connections (Supp. 12 NEW TASK) W Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12 Page 22 Task No. 10.20 - East Approach (Supp. 12 NEW TASK) Subtask No. 10.21 - Deck Treatments (Supp. 12 NEW TASK) Subtask No. 10.22 - Handrail System (Supp. 12 NEW TASK) Task No. 10.30- Design Development and Coordination (Supp. 12 NEW TASK) Subtask No. 10.31 - Tied Arch Sketches (Supp. 12 NEW TASK) Subtask No. 10.32 - West Approach Sketches (Supp. 12 NEW TASK) Subtask No. 10.33 - East Approach Sketches (Supp. 12 NEW TASK) Subtask No. 10.34 - Study Model Development (Supp. 12 NEW TASK) Subtask No. 10.35 - Renderings (Supp. 12 NEW TASK) •1 EXHIBIT E-1 KPFF Consulting Engineers CONSULTANT FEE DETERMINATION SUMMARY OF COST Classification Overhead (OH) Cost OH Rate x DSC of Total Hours X 42.00 X 0.00 X 216.00 X 14.00 X 703.00 X 356.00 X 8.00 X 4.00 X Rate = Cost $2,706.06 $0.00 $11,793.60 $630.00 $24,886.20 $13,965.88 $230.80 $80.00 DSC Subtotal $54,292.54 $54,292.54 Fixed Fee (FF) FF Rate 30.00% $54,292.54 $16,287.76 Reimbursables Adjustments Supplement 0 e 5.69, Subtotal -$42,795.69 Subconsultant Costs (See Exhibit G) $64,583.73 IGRAND TOTAL: Date: 4/23/2015 61 Hour Surn(Tiary KPFF Gansulilrlg Roo,— ENGINEERING COST ESTIMATE: Tukwila Urban Center - Ped—trian/Bi,yoo Bridge, Supplement No. 12 APIR 23, 2,016 KPFF Ga—ftiog Eq—s KPFF TukWI6, Wb'�� CentEir - Pedestrian/B(�YqI6 Bir'd , , , k'.1 -' , ; I , Supplement " , , , , ! 0 1 1, upp ement o. 12 Pr(ndpaI Charge Tadhnical Sp—.JI,d P,.I.t Manager Sensor E,ginam � Do `g" Eng CADD Tedh—u Project -rdmetd, Ad dratio Su Supip 10 Fee Removed. MULTIPLIER E2.7516 Supp 12 Foe Added MULTIPLIER It.. SCOPE OF WORK WP 10 $62.50 $60,10 $50,77 $4327 $32A9 $35,19 $24.81 $20000 5 P; $64.43 $64,04 $54 60 $45,00 $36,40 $39.23 $28,55 $20,00 2,62E2 1.0 PROJECT MANAGEMENT 8 a 12 ARMIN I Miffin $0 0 0 0 00 $3,07433 1,40 " M TASK I'D K F) M.NT, 8 12 $0,00 $3,074.33 S- m U— R— 0 0 0 0 0 0 0 Supt, 121.. et., Add,,ISordtd 16 0 24 0 a 0 5 D $0,00 $6,148.67 Rarr�Gaaabkre WARIM $000 $000 2.0 TOPOGRAPHIC AND BOUNDARY SURVEY (KPG) ,j ,,,J"", 2.10 Additionati—y-doeppirig 212 Exterid-vey.1 G— Rive T,M Su W 10 TASK DELETED $000 $0,00 2,13 1 Sur NvI, GRT, Akffl CNIat, Rd, Now Bricir ANd Ldeak— - Supp 12 TASK ADDED $0400 $0.00 &u ,, 10 Lukwv R-1 Sub al. 0 0 0 0 0 0 0 0 S,,,, I2 t ee, Added 0 0 0 0 0 0 0 0 W.00 sam Peinrtrusades $000 $0,00 3.0 ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT. ALIGNMENTS (KPFF & KPG) SJO I,DaNTI;11 awleal"ITI , IITIKE)ELETE. p, Ner Ideal. Sea, E. 320 n2�y S.S.VPedifing Let Trail hArdeend Studle, - SUM 10. TASK DELETED ---$0.00- -S0-00 wa RAgnmadf Aflearniat— For. FMI- Ree. - SMp 10 TASK DELETED -2 1279,40 $0.00 322 PN.W— flomedelprapan, Ilucks, SUM 10 T DELETED -2 .$279,40 $000 323 W IT pla. prodarly — —dirdb.. . sew" TASK DELETED -6 -$838.19 $0,00 324 --- n�=Ncdd,!"reedadde-ri.. -Sepo 10 TASK DELETED -8 -16 42o565.59 $0,00 3410 Plane 10 DELETED 2n_Bg;_ -2 4343,95 1 $0.00 ,_ 31 SaWp,�:,d M2 0 TASK DELETED �4 a 1 .$2,057.43 $000 332 FEE 'MASK 8 4 -$1,866A1 $om -7i3— eM.":ZT,!�T M.,K DELETED 8 8 -8 -$2,844,71 $0,00 su P!�Dq Plane - sued 10 TASK 4 -8 1 -8 $2,057,43 $0,00 135 Paw.ti' %rtel Ma.iki PWs-SUpp 10TASK DELETED -4 "8 8 -$2.057,43 $0.00 3,40 -Updto $term Driamigto AeMrf ^ Sup, 19 TASK DELETED 2 4 -32 8 -4 -$5,76042 $0,00 350.: Update Cost Eadirmade - SuM, 12JASK DELETED -8 -16 $2.565.59 $om 350 i UMW 311 t��iw;;VTASK ad 60% - SME 12 NEW TAW $0,00 $0.00 362 M-S,#,pl2 NE TASK $000 $0.00 763 7 T�; M !M � to W% - SUM 12 NEW TASK $0,00 $0,00 3.70 TEAL Sopplemorri, 01 - Spa 12 NEW TASK W, M/N I ............ ', M, 3.71 Ahnafi.ArV—tL,,-ft-SuM12NF.W TALK 2 J 1 16 23 24 1 so 00 $7,24353 372. FwJuWIo,.fAke—AAq--SdM12NFW TASK 2 16 76 $0 ,00 $9,69819 3.73 TS&L.R.Mrt$uM1-90l -SM,12NEWTASK 2 16 88 24 4 $0,00 $13,496S1 3,74 Doeba Team sou City R.4 — M.* -6u 12 NEW TASK 4 8 8 $0.00 $2,56769 3M lRalsl Bear Asieersaaam of!Z7Z�iid!�— -11upp 11 NEW TASK $000 $000 381 1 Beer ard L— T� 16 15 $000 $3,68876 392 H.,U-W and V.k.1 TASK 2 32 55 16 ¢0,00 $11,688,53 383 TASK 2 a 20 4 $000 $3,75699 350 NEW TASK 2 15 8 $0,00 $2,50550 Su , 10 L.I. Rore,ed, ,U.w -4 0 -SB 40 -60 44 -4 0 S,4X, 12 1— AddA S,m"A 14 0 1 114 0 1 300 76 1 0 4 -$23,516.44 $54,645.71 CIVIL (KPFF) 16 40 40 10.00 $0.00 $0,00 $10,133.98 4.0 am NEW TASK TASK 16 40 16 0 E02 $7,661.36 4M CkAntiflell add C*M E$tIrrj1i�,2,E TA SK 8 40 S000 $4,86582 4,110 NEW all I RaMN A.-- Ui T., L 16 24 8 p0,00 $5,34967 4,70 L"1,Supp12NEWTASK 4 14 14 32 32 8 $0,00 $11,216.71 S,,,, 1a Labor 4 ' 0 0 0 0 L ,5-, 12 lwa&. 4 0 70 14 176 96 8 0 $om $39,227.55 !!L�—dui ENVIRONMENTAL AND PERMITTING SERVICES Landau mm $0,00 $000 $mo I $000 5A0 $110 USCG Nevi gation Sd od Mid, permit App, + S.M, 10 TASK DELVE. —ND— raw A.--, , jil TASK MODIFIED $0.00 $000 5.20 Tree .--I _::, TASK MODIFIED $0.00 $0.00 5 wl Bi .0-IA—sma" FC 24 -16 $4,902,03 E0, 3 $E ��SU=KDEUETED Ugluing Study Su K Mort seap I $0.00 $000 520 -: $0,00 $400 ��M4Ma��0111111D 12 NEW TASK $0,00 $00 - 00 5 W Melork M_t_ _ Supp 12 NEW TASK $0400 $000 44,902.0 $0.00 Sd, 1z L—, Addkd S,,b-g 0 1 0 0 0 He 2014 11 04 G—trnwd F64 Eafimata (AOd&P—oved) v1 Ad P,,q. 1 .1 14 62 H— Summary KP<F Gansultlrig EN-5 ENGINEERING COST ESTIMATE: T.k.fl. L,l Canter- Pild.iitriawSmycl. Biridg., Sul 1 12 ARM 23, 2018 KPFF C—L�g E —e KPFF §Up"p- lierrient o� p61nFip. 'che'ge T.l S 4 i el P,.J,.t Manager S.-, Dg—., i Et,gltt— CARD T.h-- P'.1.1 C—dlinat., Aftnstwj. in S.pO I OF.. fl--w MULTIPLIER Supp 12 Fep Added: MULTIPLIER It., SCOPE OF WORK Swe 10 Rates S62.50 $60,10 $50.77 $43027 $32689 $35,19 $24AI $20,00 2,7516 F; P $64,43 $64,04 $54660 $4500 $35,40 $39,23 $28685 $20.00 2,6262 7.0 GEOTECHNICAL - Supp. 12 NEW TASK (Landau) $0400 $0400 7.10 FWd 1 12 NEW TASK 720' Gwtahi 12 NEW TASK $0,00 $0 .00 S� , iO Latur 0 0 0 0 0 0 &" 1214— 0 0 0 0 0 0 0 0 0 $000 WOO $0,00 $0600 8.0 RIGHT-OF-WAY SERVICES 1 t124 *� TIIWO—..p g;;;W 821 LFSTMw1a—,1*R-ww S-10TASKMODIFIED $0600 $0604D 832 11 1, E= ED 11 -40 -80 1� -$14,377,22 $000 W. -W 7L _nI1 TZ FIED a $0400 $2,674,54 833 T RV9*fEnl - SWp 10 TASK DELETED $TOO $0.00 i -TASK DELETED $000 $O'Q 6A01. R.WIAIn I + i 12TASK DELETED $0.00 $0,00 8.81 FHWA 10TAWDELETED $3,00 $000 SAO ! ffiii Oft 8.81 $D6DO $0,00 21 cl Tr P—I(2523O4-M1)tkw12TA$Kl _0 $0,00 $000 3A- i ki Pi— LUG Ol BWdxq Parcel Sul " TASK DELETED $000 $0600 38 - i Rl Pike. U-c Oft. Di P- 4(252304,90311 2M 10 TASK DELETED $0.00 $0600 4A -DROP i PUr ITS Offim BAc*V P—I (252304-W77) - Supp 10 TASK DOLE TED $0400 $D'OO 4B - BACP F#-vi -Paves l Off" Bel i L252104-9077X SWp 10 TASK DELETED $0,00 $0,00 5- i Riwaiew Plaza LLGQltke i P—A (ZiOA,90M, $011p 10 TASK DELETED $0,00 $0600 6 8wllk Put UMbm Stem WY i (2522(34-t ) � 10 TASI(DEL E I ED $0.00 $0600 7 Pk i li 0115mBikVi (002310. � -Supr12 TASK WIDIFIED $0600 $0600 8 Ai i LIC fl.W P-0 (0=100W) - Supp 12 TAW MODIFIED $0600 882 -Rl INs. I Fi i - Supp 10 TASK DELETED $0.00 $000 BAW G— Rtvw Trail i Nogottiod—nd Modiftaffm -Supp, 12 NEW TASK 1 $0,00 $000 S!!E �� Re,—�, W.W L 0 0 0 -aO -16 0 0 S�LO Sul 0 a a 0 12 4 0 0 414,377.22 $2,674.84 ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPIFF) $O'SO $0,00 9.0 910 A*J" Ste—I Di SW " NEW 9.19 307: ` �l � 2 25 1 60 $0,00 $8,844.15 9t2 Desch Span Dr - . 12 *�� 2 70 45 $0j00 $11,482,30 913 lkmrN 2NEWTASK S 2 70 45 $0 00 $11,482,30 14 '.4 Spp 2WW TASK O'gi 2 1 50 30 $0,00 $8,077.56 Supp 10 Let- R—el S.It xA 0 0 0 0 0 a 0 a S M, 12 14- eletel 8 1 0 0 0 1 215 180 0 0 $am $39,886.31 1 �S', BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN)— MORNSOM OliIiiiiiiiiii $0.00 $0 ,00 100 i T." -T.—i 1- NEW TASK $0.00 SOVOO 1012 C--t— , S— Ski SL" 12 NEW TASK $0,00 $0,00 10,13 C-0— - i Di 12 NEW TASK $000 $000 10,14 V--6— Tied A16 12 NEW TASK $000 $0..00 1020.'. i - 12 Nil TASK '77q��Tgg77 T-7 777W 6 1021 DkT,..—e 12 NEW TASK $0,00 $0,00 W.V. :H—W Systan --Supp 12 NEW TASK i $0 ,00 1020' 0"gn Dl wid i - Supp 72 NEW TASK M11M / /,' p $100 $0,00 10,31 TW&aSkha--SPgp12NEW TASK 1032 W- Ape—t$�Wi--S� 12l TASK $0�00 $0,00 1033 W TASK $0,00 $0400 7_ 34 VM=MSypl - Surq, 12 NEW TASK : $0,00 $0400 1035 R—WI�p - &PP 12 NEW TAW $100 $0,00 Otm, a 0 0 0 0 0 0 0 SO.DO Sign, 12 Labs A<Idal �S—EN�.! 0 0 0 0 0 0 0 0 $0.00 H—.,. .4 1 0 1 216 I= -40 1 14 ME -140 1 703 356 8 0--1 1 $0000 -$42,795.69 $0,00 $142,583.07 Supp 10 Labor Removed Sum Supp 12 Labor Added Sun Reimbursables Firm Total DESIGN TEAM TOTAL I Reimbursables Sum $0.00 $0.00 JKPFF SUBTOTAL: -$42,795.69 $142,583.07 Total Addtl Fee (Supp 12 - Suppl 0) $99,787.38 _ File 2014,11 04 Ccirnbnac[ Fee EOMate (Add&H—o-1) vl is Page 2 cf 14 63 EXHIBIT G-1 KPG, CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12 Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate Reimbursables Adjustments Supplement 10 Subtotal Total Hours X 74.00 X 0.00 X 164.00 X 216.00 X 20.00 X 0.00 X Rate = Cost $0.00 $6,581.32 $6,750.00 $953.20 $0.00 DSC Subtotal $19,087.12 163.17% $19,087.12 $31,145.31. 30.00% $19,087.12 $5,726.14 Fee Removed -$18,478.20 -$18,478.20 ISubconsultant Total: $37,480.371 Date: 4/23/2015 M, Hour Surnmary KPFF Consulting Engineers ENGINEERING COST ESTIMATE: Tukwila Urban Center - Pedeatrian,Bicycle Bridge, Supplement No. 12 F0. 2014.11.04 ^.rrt -nod F- FSt—lo (Add&Removed) v I Page 3 0l 14 65 H., Summary KPFF Co-Ot,ag E,9-a ENGINEERING COST ESTIMATE: Tukwila Urban r-tar - Pedestriata/Bicycle Brid9g, Supplement No. 12 APO 23, 2015 KEG KEG TUkWIa bi�ba'li` Ce'n'ter "Pdd6st'ri'an/B!6i le'B,r'dg�e", , I ' I "I I " " , ; , I, SU'�pldriien't 1� o , 1 11 2 so,,10, UD/L/E �.I "' I I S E D.Ig ­ JD/L/E/S CAD T�h Survq C- Off- Ad�,k, Soft t0 Foe P Removed Supp 12 Fee Added MULTIPLIER MULTIPLIER S-pp 10 "t." $64,90 Item SCOPE OF WORK Supp 12 P.I.e $64,90 $56956 $40,13 $31,25 $47.66 $23908 2.9317 $56.56 $4013 $31925 547.66 $23,08 7.0 GEOTECHNICAL - Supp. 12 NEW TASK (Landau) $0,00 $0,00 7,10 ROWS o llooand Labo-y'rlating, IlOpp 12 NEW TASK ZZl rvotschnical Evalustlon Re kV and Mash "9% - Supp 12 NEW TASK $0.00 $000 kL;,o 10I al- R-- Subtotal: 0 0 0 0 0 0 121 d- Allxt 0 0 0 0 0 W.DO $0.00 RaurvlulsaEUes $0.00 $0.00 8-0 RIGHT-OF-WAY SERVICES (DES) SM TMWO-hip R.law $0�00 $0.00 821 :UFS Tidla-H, RZ TASK MODIFIED 11U)(l ula col"on am Until 'Zn10 $000 aw- Righ, d-Wy LkTft eW EaaaPiada 10 11�11!FF�11) 8 V $0,00 $0,00 SM FI*YfA- P-0 - S- 10 TASK DELETED $0,00 $000 I. A,,$9,6- TASK DELETED -2 -20 -10 - $3,600.83 $0,00 '1180 12 TASK DELETED $0.00 $000 861 FHWA ROW -Segi 10 TASK DELETED 1;0.00 $000 &W ANulsitlan N"odation, PWocatl6n aW cloliaoul 77 277 9, )X11, , $0.00 5000 -7�7 P-1 &4,?- Npdlbe I Frof-I!, SIP* F.,* Reeidaroe FW- (1WM-D=) 11' TASK MW ED "....2 -d &�KMODJFI,j ED $000 $000 3A -BRCP RN-kw P 04 9WS, - &W 10 TASK DFA E 11D $0.00 $000 3(3-BRCPRKexrrewPk..LLCOfr-Bu"PNCIAr1523049M9) Sup, to TASK DELETED $0.00 $000 4A, BACP Rh-,kw Plao. LUC Mi. N" P-al E2523049077) - Stipp 10 TASK DELETED $000 $0,00 4B - BROP Rk.,i- Pat. LLD DO- Ele"y P-d - Su to TASK DELE ITT) $0.00 $0,00 5 � BACP Thom. w Pa. UG Offloa B�UZ���!7 11 TASK D11-11-111 $0.00 VP0 0 TASK DCLF I ED $000 $0.00 7 - Pak H" E,bib LL C C Ik,* [**B.* Piaod ( 10- 0040) - Supp Q TASK MODIFIED $000 $000 8-AKJo-PIwaLLCRoWPwcoI(O lG0099) Supp'12TASKMODRIED $000 $000 &W fN.4-f N.%�!TASK DELETED $000 $0900 SUN (;,_ Rh- T.11 E-1 Ma,,i kalke - Supp. 12 NEW TASK $000 $000 .P, 101.. alw' F7mnovod 'Ubluw 0 -2 -20 -10 0 0 Supp 12 L� Added �bKol 0 0 0 0 0 0 4316M.83 $0�00 NalrzibusaNyw NINE= 111limmilism $ .00 $0.00 9.0 ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KIRFF) 9,10 A""SkoiaxatDavign S,"12NEWTASK p 'p" 9.11 IP TASK $0,00 $0,0 9,12 path. aralIX - Mn�WIW $0,00 som- 913 Al- wid fh 12 NEW TASK $0,00 $000 9,14 P-i. Dr W Rial, Dkjn -Supp 12 NEW TASK $0,00 $0,00 Supp lO L- "-a- "jow, 0 0 0 0 0 0 12 AWd 0 0 0 0 0 0 $0.00 $0.00 Roimtursatvas MEN $0.00 $0.00 10.0 BRIDGE AESTHETICS COLLABORATION -Su . 12 NEW TASK (ILMN) A 10.10 TASK oll Arcti i2, NEW TASK $0900 $0 DO 1012 Cor-0-SoaP Daum- Sopp 12 NEW TASK $0,00 $0.00 10,13 Co,-tk- &k* Supo 12 NEW TASK $0.00 $000 10A4 � TASK $0,00 $000 1019 osch Rampa-Sd •14 NEW 7 = ,,,l I'll I'll, , "I'll" I I'll, 1 Supp 12 NEW TASK $0,00 1022 H,-,kA Sy- - Sopp 12 NEW TASK $0.00 -Do $0.00 10.90 SUM 12 NEW TASK 2 NEW TASK SoOe $0.00 1132 Wmi Apprp SkWJ- Supp 12 NEW TASK $000 $000 1033 Supp 12 NEW TASK $000 $000 10�34 V=�� - Su;ip 12 NEW TASK $0.00 $000 10,35 R-kako - SUPP 12 NEW TASK $0.00 $000 Sum ifl L-, 0 0 0 a 0 0 &W 12 L- A,*WA 111-1 0 0 0 0 0 0 $0.00 $0.00 RimtursabWS Stipp 10 Labor Remove Su !n sm -73 � -20 !!! "0-$18,478.20 $0.00 $0.00 $55,958.57 Supp 12 Labor Added �1:4 �2 i2l '4 216 20 Reimbursables I Firm Total DESIGN TEAM TOTAL Total Addtl Reimbursables Sum $om $0.00 F-KPG SUBTOTAL* -$18,478.20 $55,958.57 Fee (Supp 12 - Supp10) $37,480.37 P 1. 2014 11 04 C mbmd 11.101 Page 4 of 14 66 EXHIBIT G-1 Universal Field Services CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 12 Classification Quality Assurance Project Manager Acquisition Specialist Relocation Specialist Sr. Administrative Specialist Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate Reimbursables Mileage Misc Expendables Cost Adjustments Supplement 10 Supplement 10 41.00 Subtotal Total Hours X Rate = Cost 7.00 X $52.00 = $364.00 41.00 X $42.00 = $1,722.00 46.00 X $38.00 = $1,748.00 80.00 X $38.00 = $3,040.00 14.00 X— $30.00 = $420.00 DSC Subtotal $7,294.00 48.09% $7,294.00 $3,507.68 30.00% $7,294.00 $2,188.20 120 miles @ $0.575 $69.00 Photographs, equip rental, etc $150.00 Reimbursable Removed -$12,584.50 Fee Removed -$25,226.93 -$37,592.43 ISubconsultant Total: -$24,602.551 Date: 4/23/2015 M. R.", Summary KPFF C.,­Ihnq Engineers ENGINEERING COST ESTIMATE: Tukwila U,ba. Came, - Pedestrian /Bicycle Bridge, Supplement N.. 12 April 23,2015 UN-e.I Reid S-m. UPS T6k labrb' " ' ' ' "t plediiWita`h/p; `)3"d c en, er - rlFei, Supple'mi 'e'n't No. 12 Quality Assurance P,q.t M­g� Aq­twn Spjal, 't S, Adriinistral- Sp.i.jmt SUPP I 0 Fee R.T.,ed Supp 12 Fee Added MULTIPLIER MULTIPLIER ft- SCOPE OF WORK Supp Rat. $50,24 $42.00 $38,00 $3800 $29,00 2,0210 Supp 12 Ra10e $5200 $42.00 $38.00 $38,00 $30,00 1,7809 1.0 PROJECT MANAGEMENT IAO MI- - D. K KPG & KPFF) NEW TAI $0, $0,00 ISO 1: V11 T:" T. KPIRS $0,00 $000 0 0 12 L_ �l 0 $0.00 $0.00 NWrnNUSatdae $0,00 $0.00 2.0 TOPOGRAPHIC AND BOUNDARY SURVEY (KPG) 2.10 i A"ti-I .,,y and -pping 2112 E-ld . d C..., P$- Tnil - SuF 10 TASK DELETED $0,00 $0,00 213 �ITASKADDEU 1$0.00 U $0,00 &.pp 1. t.atwr Pw" 0 0 0 0 0 S� 12 Lak. Adkd S4.tal 0 0 0 $0.00 $0,00 RWmtwrlm $0.0 $0.00 340 3.10 ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT. ALIGNMENTS (KPFF & KPG) Sunn,I, at Rlh­Nw PWn Pwklm Lot- Supp 10 TASK DELETED LEM' j $0,00 $aoo 3,11 1 Uffitvtw NotUaed &m 10TMKOELETED 320 W.W-, S-V- P Wq - T,.# AII,. -SBMMa, S." DCL.CTIM3 "TA $0,00 $0.00 3,21 ��62K VAR AW-t LEE OF 3n Rh,a,l.wfi,#,r/ �IyLl:ll!i ;-. IVW9��,D , $0,00 $0,0 323 .{orRK.V-P" W--d-k.-10TASKDELETEE) $0.00 $0.00 324 SupplO!7TA$KDE ED $0m $0.00 3.30 30% flans -8 10 TASK DELETED $000 $000 331 iSinP trwWm - 10 T- OF LETED $0.00 $000 3,32 Ulatim - 10 TASK DELETED $000 $000 3,33 Stor.Dninra G­" -$,"IDTASKDELETED $0.00 $000 334 . P.Wiw PI.-.: Sl 0 TAM DELETED $0.00 $000 935 P_ Makkv PL­ - '.T TL $0.00 $0,00 7)"L Uld, 0TAE.ELET $000 $000 350 D 1. Cost Estlrnb =SU W, TASK DELETED $0,00 $000 3M N.W T,,O All g- - Spp 12 NEW TASK F 361 T,al I- F, 60%. S," 12 NEW TASK $0,00 382 -Sp 12 NEW TASK $0.00 $0,00 ,L--m.W% 383 T. mz.,&12 NEW TASK $0.00 $0,00 3.70 ES& L f 01 � Supp I8 NEW TASK ........... ms 171 Aft-t�. 12 NEW TASK $0m $000 172 !t�� EvWnfi. 12 NEW TASK $000 $mo 1,73 TS&L Papon Sar.TA-t 01; Sum 12 NEW TASK $0.00 $000 3.74 Dmig, Teara and City HM rV - SopP 12 NEW TASK $000 $000 IM F.W Fun A­viml of N­ P,.f-.d Align-M, 5,pp 12 NEW TASK $0,00 $mo 3,81 <Wier and L- Contrakla - Spp I , NEW TASK $0 00 $om 3,82 NEW TASK 1­krwanftl " Va," Alqn­�� $0,00 $0.00 3.03 F12 D.ipT-aACftyR.4.w W TAtIK $0,00 $OrOO S.W W-Jan Gr,pN,, : SU pp 12 NEW TASK $0,00 $0r00 Supp 10 La- &ibU 0 0 0 a 0 S," 12 Leh, AddW SuNUat. a 0 0 0 0 $0.00 R�amtwrsaMxs JOIN= $0.00 $0.00 4.0 CIVIL (KPFF) $om $000 4.30 TnI All gann and 1010"Ing -Sup 12 NEW TASK 4M_ 81- Own" Approach -Sum 12 NEW TASK $0m $000 150, Oad COp Extant., SU pa 12 NEW TASK $0.00 $000 4M Wall I Elating As-uanat - Supp 12 NEW TASK $OrOO $0,00 4.70 30% Pla-Inal 150up and Layout -Su 12 NEW TASK $000 $OrOO S P, 10 La ,, R­ ­d S.Nal a 1 0 0 1 0 0 s­ 12 1*. Added S.1- 0 0 0 $0'00 0J 02. $0.00 $0.00 5.0 ENVIRONMENTAL AND PERMITTING SERVIEES Landau ) SAO W_S N,,19"- USCG 0­" W Bricige Pwnft U IO App� TASK DELETED $0,00 $0,00 5 20 T-A-1,S.Pp19TASKM RED $0. 00 $000 Ste T- A--I - Sapp 12 TASK MODIFIED $0,00 $000 521 N � Supp 10 TASK DELETED $00 $0.00 _W_ . !Ml TASKMODWIEO $000 $000 SM $000 $000 so. Ml!�,Stpq*12TASKMODIFIED M IM-4etv - �pp 12 NEW TASK $0,00 $0,00 SM HISW I_fmy-SaPP12 NEW TASK $OrOO $0.00 S_ 12 1- "�l S��.v 0 0 $0.00 $0.00 Prnmtxrtsadas $0,00 $0.00 File: 2014 11 04 CoulbIlled Foie E sfllate (Add&RamoveJ) V1 Ifs Page 5 of 14 68 H- S,--y KPFF C-,sung Engineers ENGINEERING COST ESTIMATE: Tukwila Urban Cant,, - PodestflaniBicycle Bridge, Supplement No. 12 Aont a 2015 Universal Red Services UFS ge, Sup'Oe�fi' ent �o� 12 ""I" A_'n... P10).1 no Manager A qu.fte S�iali,e spoclefist S Ad--nob- sp-HM 111pp Fort, .. d S'po 12 Fee Added: MULTIPLIER_ MULTIPLIER It., SCOPE OF WORK Supp 10 Rates $50624 $42400 $38.00 $3800 $2900 2:0210 Supp 12 Rates $52,00 $42.00 $38.00 $3800 $30,00 1.7809 7,0 IGEOTECHNICAL - SuoD. 12 NEW TASK (Landauj $0 .00 $000 7.10 F4;1 Ea oration and LaborarortrTasting -Supp 12 NEW TASK 720 G".dkud Ev.1.0., R q " M"ON. - ftpp 12 NEW TASK $0,00 $0,00 Supp "I L #wr Ilona- 1-dal. 0 0 0 0 p S- 12 1- Added Sutro. 0 0 0 0 $0.00 $0,00 Rai b-H. $0.00 $0.00 8.0 RIGHT-OF-WAY SERVICES (UFS) 02D TM*Onwtdp P-1arw r 1 11 1 8,21 UFS TW.TrataaOtip Ha� - 8,pp To TASK OODIRED -6 -3 -5636,62 $0,00 JIM D.. C.1.11- and Unit W..9ficallo. 7 -2 f4grot-Way tintlis ME nens -5� 101 ASK 1,K)OWILU $o'De $0600 832. BW.4.Ww LkNft and Eawrarara - Sopp 12 TASK MODIFIED $0.00 $0.00 8,33 Ten,,ouvyRI*oIEnkyA-P-0 -SL"101ASKDEW.TFD -1 -2 -10 -4 .$1,273,72 $000 ON Logal rt-ipdoes 'and EA&W WA - TASK DELETED $0,00 $0,00 030 R.W.0- Plan - Supp 12 TASK DELETED 4 - $om $29919 861 fHWA Forka AartoLattor, for ROW -1St 10 FASXDEAETED -6.5 -$499,19 $0,00 SRO M M0 T -061 X I I - W- I Fid-lu * LTRask$- P-0 OW�M) �ft 12 TAW MODIFIED 3 13 80 6 $0,00 $6,984,69 L- (2523M-9061) S� 42 TASK MODIFIED 2 16 $0,00 $1,23238 ����ParA 3A -C !nd (25Z104 WG% - SwP 10 TASK DELETED L -1 -3 -25 -4 -$2,510,57 $0,00 38 EEPqCP A- ULC paroO (2,523bl W39) -8.4V 10 TAW DELETED -1 -3 -25 4 -$2,510,57 $0,00 4A -BEEF RK-4-Pfau LED Off BkkV P.cet gMMF%771: -:Sure 10 TASK DELETED -1 -3 -25 4 -$2,510,57 $0,00 48- EDGE flivaAaw PU- LLD -S- ID TASK DIUETID -1 -3 -25 -4 -$2,510,57 $0,00 5 - Eflcp f1waliaw Puna I I c Ot -.Su M 10 TX$K DELETED -1 -4 -30 -6 -$3,096.66 $0,00 s,id,P,#,,kutws,,SmrmWa uckyPwcei(2.52w49o4s) Supp 10 TASK DELETED -1 -5 -30 k -8 -$3,181,54 $0.00 -1- 7. Park Real Eatak, LED Ofte Bkkg�Bauk P-4 (00231eOW) - 94P 12 TASK MODIFIED 4 $0.00 $299,19 8-&xko,xPa2AUOR,*APwWre=Io-o(rog Supl,12TA5K MODIFIED 4 $0.00 $299.19 8,82 RoWotko NismamimithPx*-SupplOTASKDELErED -3 .10 -65 -6 .$6,496,95 $000 $,too G- Rive Trail E.- Ngoll.0- and Modilleaden - Supp. 12 NEW TASK 4 14 30 8 $OM $3,875.24 10 LaMx P.-J SlIL1tIXW. -t0 33 -182.5 -65 1 -41 1 e"j, �uoee - 7 41 40 W 14 425,226.93 $12,989.88 Hermt,ursataas ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF) NEWAIM $0.00 $0.00 9,0 9.10 ; k 11 NEW TASK 911 IN- AJI7-- Soo, 12 NEW TASK $0.00 $000 9.12 NEW TASK $0,00 $0600 .13 EW12 TASK $0,00 $000 9.14 R- Doled Shan roast, Sopp 12 NEW TASK $0 .00 1 $0.00 S­, to Lalrx R- sel,.A 0 0 0 a 0 SO $0.00 Seep 12 tao� AJkd Sebuia 0 0 0 0 .00 1 HannWraaFMm. BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN) MANNIKIN $0.00 $219.00 10.0 10.10 ASK -7-11 TASK $0,00 $000 1012 Q-11iona - SUsn Gbi V NEW TASK $OrOO $0609 10.13 C-Ik- - 130ki, Deck -: 126 NEW TASK $000 $000 10.14 Caerarliko-jkjAn�h�tk� 2NEWTASK 0°/r 0O $0,00 M20 � S.WJ2 App,-t R.." NEW TASK .,1 /$r "'q 10,21 Dw-kTrwansoft - Sure 12 NEW TASK $0= $OrOO 10.22 Randall Stswrn -Sapp 12 NEW TASK $OrOO $000 10,30 pang. Mvai -Land Cow!Z!�� 12 NEW TASK $oM $000 1102i JadAuhSafa--.pp1 10.32 W- Apraub Skodws - 12 NEW TASK $0,00 $000 10.11 Fast Aprt-b Swikiwa - 12 NEW TASK $0 DO $000 10,1{ Sh.* Jkew4 DIWoo- - Soup 12 WV TASK $0.00 $0900 10.35 Raodkw-:54 12 NEW TASK $0,00 $0,00 Supp f 0 Labor P--d sebu,el 0 0 0 0 1 $0.00 $0.00 I? La. -kol S.K-I 0 0 0 $12,!Met,50 Supp 10 Labor Removed Sum -10 -33 183 tt�" 65 ;4' - $25,226.93 '9 E$128.'9..08'8d Supp i 2 Labor Added Sum - 1 7 4-1 R . Reimbursables Firm T.-I DESIGN TEAM TOTAL I Total Addtf Reimbursables Sum -$12,584.50 $" 9, SUBTOTAL* -$37,811.43 $1 3,20 Fee (Supp 12 - Supp10) .$24,61 File: 2014 -11.04 C-b-1- Fee Estimate (Add,&R-ed) v1 xls Pegg 6 of 14 69 EXHIBIT G-1 Landau , Associates,,',,,, CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12 Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate Reimbursables Total Hours X 1.00 X 42.00 X 0.00 X 16.00 X 50.00 X 28.00 X 79.00 X 21.00 X 0.00 X Rate = Cost $72.22 $1,925.70 $0.00 $629.92 $1,678.50 $872.76. $2,083.23 $649.11 $0.00 DSC Subtotal $7,911.44 $7,911.44 $16,576.84 $7,911.44 $2,373.43 Adjustments Supplement 10 Supplement 10 Subtotal 1 -$104.04 -$20,696.00 -$678.02 ISubconsultant Total: $26,183.691 Date: 4/23/2015 70 H-r Summary KPF F C011SUMlIg Engir-95 ENGINEERING COST ESTIMATE: Tukwila Urban Centw - Podestriawilmycle Bridga, Supplement N,, 12 Fl. 2014 11 0,l C—bllod r.. Es1-1. (Add&R.,—uJ) v1 .1, P,g, 7 cr' 14 71 Hun, Summary KPPF C.-A,rIg Engineers ENGINEERING COST ESTIMATE: Tukwila Urban Canter- Pedestrian,etcyde Bridge, Supplement No. 12 April 23, 2015 -, ;-, , I I I I 1 1, 1 � I I 1 11 Landau Associates Landau Tukiiii Urban, Center' PbdettriAn'/BidY66�13'-d 1 1, 1 11 ", I", 1 11 1 1 1 , I p ge, Supplement No.'I2 Pn-p.l A.-I. S- So"" Project Nq.t S.11.1 CAD StafVS.11- Toohnia- I P""c',. Pi a -'," CAD�GIS Technician S�pp 10 Fee Removed: Supp 12 F- Added: MULTIPLIER MULTIPLIER It- SCOPE OF WORK Sapp 10 Rates $65,00 $47.00 $40.00 12620 $31,00 $2500 $29.00 $24.00 3,2587 S pp 12 Rates $72.22 $45.85 $42.20 $39,37 $33,57 $3117 $26,37 $30,91 $27.64 3 3953 7.0 GEOTECHNICAL - Supp. 12 NEW TASK (Landau) MMEMEMM 20 58 2 $0,00 $7,682,48 7.10 lfleld!��FIZ Labanuery Tood2ii - SM 12 NEW TASK i,Z B 30 2 10 $000 $4,680.56 Sarin 10 Lak�' brow: S-0 V I . A,,, Ad �,N &W irdlS�4 0 Vo 0 0 0 a 50 2 68 0 12 0 0 $0.00 $12,363.03 14al RIGHT-OF-WAY SERVICES (UFS) TltlMOwrarstilp R.Ww g $0.00 $16,21690 0.0 $21 TIES Trt.A>.-" RZ��O TASK MODIFIED $0,00 $aoo 8.30 Data Collection and Until $000 $0,00 832 Face' -' 832 ZM NE!E1 01 1 E;-!� N $0 .00 $0.00 Bon T-Wary Fly, af Er Ac 10 D T $000 50 .00 ASMIE EFTLEEPE L $0,00 $0,00 cm ii;4�Fglitha TASK DELETED': $0.00 $Oxo 8,61 FHWAF.,&Aat--Jark.ROW-8 10 TASK DELETED $0,00 F00 8'si P-4 N MM I MIN WON H I 2-0212172- I - Nal.. I Frot-A Sk4, F-Hy Reeklanoe Panel (0(x1590 M13i Supp 12 TASK MODIFIED $DA0 $0,00 1 0 T11*11 Fl- T.4 Panwl (M�� T) Supp 12 TAW MODIFIED $0,00 $0,00 CP PIN-i- Fare LLD Offkcl�2:!� L�wrel 11,12"-1139) - e- 11 T. DELETED $0,00 $000 3B - BFICP Plne� ".. U. Peo, 10 TASK DELETED 1 $000 $0,00 4A - BRCP FlKvnview PW., LED Offio, Building Pwoal ETED '5 TASK D" $0,00 $0.00 48 BRcP" t.! PZ (24523OC9077) - Supp 10 TASK DELETED $0.00 $ 00 S-BRGP ��Pip-L��; (215M4W18) S-IOTASKOELETED $0,00 $0.00 6 --"*P1br1,IAi S-Wate, LM W P-I M23a4 Surr 10 TASK DELET $000 $0.00 7- Park Nal Esaaa LIC Offioel3kilyflank PwA TASKMODIFIED $0.00 $0,00 8- Ardo,,, PlaaLLC Held P&W -Sap I-A "IFIED $0.00 $0.00 8W, Ral-t"' (NeleanlFaihnin, P-0 -suRR 10 TASK DELETED $0.00 $0,00 8.100 G- III- T.11 &-ad Natifttlaa and Modflefien - flam. 12 NEW TASK $000 $000 S­ 10 Labor R-1 SuN"I'A 0 0 1 0 1 0 0 0 0 Sul 12 1.4- 0 0 0 0 -0 0 0 a $0.00 $0.00 RVWM §Nn= S0,D0 $0= 9.0 ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF) 910 AMke1Se-WD-iqo SuW12NEWTASK 9,11 Updad. 30% Pt Deft. to New TASK $0,00 $0,00 912 ���W 50,00 $0,00 9,13 AbuimeM aM Dtd 12 NEW TASK $0,00 $0.00 9,14 � R DAled Short Daakn : Sopt, 12 HE W TASK $0,00 $0.00 5­ 10 Labor A-SUbtoW a 0 0 0 0 0 0 0 0 Sup, 12 Labor A� S-� a 0 0 a 0 0 0 0 $0.00 $0.00 Rofn-AAS $0,00 $0.00 10.0 BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN) Bridge Structure. Supp 12 NEWTASK_ _iollo 10.11 kah(I-Poe y- 6app 12NEW TASK $0.00 $000 1012 r-tow -sUep CW*. �!ZTI'1'14 1= $0,00 $OrDQ '%w10013 Conneorare - Bridge Ddk - 'T $0,00 $000 10.14 Cain -Abos - Tied Ah • Sapp 12 NEW TASK $GrOQ $0.00 1020 ouch R S 2 NEW TASK - 7 7 7_ 021 b- u� 12 NEW TASK $0.00 40,00 -1022 Hancloil Srt- , Supp 12 NEW TASK $0,00 1 $0.00 70.00. Devitt" DavN nl and Coordinati-, Suet, tit NEW TASK 0,31 TIM Arch Skath. -$- 12 NEW TASK $0.00 $0,00 I0.32 Wear Appawh Sk*cfm - Supp 12 NEW TASK $0r00 $0D0 10.33 E- Aplxrsoh Sleaah. - Earl, 12 NEW TASK $0,00 $0r00 1034 S" Mania! -S,"12NEWTASK $000 $0.00 1036 FwudorVe - Sapp 12 NEW TASK 50 .00 $0,00 I01.aWr fl-d S.I-A 0 0 0 0 0 0 0 1 0 S� 12 Lat- A-J SI,bIOA 0 (1 0 0 0 0 0 0 Rei-.a!A� $0.00 $0.00 Supp 10 Labor Removed Sum l 0.0 -8.0 -86.0 -12.0 0.0 -7.0 1 -48.0 $20,696.00 I $26,861311 Supp 12 Labor Added Sum l 1.0 42.0 -90-0 28.0 1 79.0 21.0 1 0.0 Reimbursables Firm Total DESIGN TEAM TOTAL I Total Reimbursables Sum -$104.04: $20,1122.02 !GFd;u SUBTOTAL: -$20,800.04:$46,983.73 Addtl Fee (Supp 12 - Supp10) $26,183.69 Rle 20 I,t,l 1 04 C-bi,,,.A F,wnv. (Ad1A,1-,.E o,l Page 8 f 14 72 EXHIBIT G-1 . . . . ...... s . .. . . ... A - w 'aq . . .... .. . CONSULTANT FEE DETERMINATION SUMMARY OF COST Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12 Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) Reimbursables Total Hours X 8.00 X 0.00 X 34.00 X 20.00 X 216.00 X 0.00 X 0.00 X 0.00 X Rate Cost $653.84 $0.00 $1,684.02 $663.40 $5,088.96 $0.00 $0.00 $0.00 DSC Subtotal $8,090.22 $8,090.22 — $15,409.44. FF Rate '66 $8,090.22 $2,022.56 Subtotal $0.00 ISubconsultant Total: $25,522.221 Date: 4/23/2015 73 Hour Summary KPFF Cnnsuninq Eng,,-, ENGINEERING COST ESTIMATE: T.k.jI. Urban Center - Pd.,t,i.n/B,oyc I. Bridge, Supplement N.. 12 April 2S, +2015 LVN kohvl�d, LMN TOkVtla'Urb66bb6ter-Ped6�tri4n/Bi&ycl6,Bridge, p" Su'plement'No'. i2 Pa ne P, -g. D.g � Pro kollit.t Ad- Sp"s QA 'QC Supp 10 F. Supp 12 F. Addld MULTIPLIER MULTIPLIER It- SCOPE OF YORK supp to 2 Rates $81.73 $32,69 $49,53 $33,17 $23.56 $18,75 $39.42 $38,42 3,1547 1.0 PROJECT MANAGEMENT $0,w $0,00 1.40 Doai Tam MwN a autm TASK (KPG KPFF) 1:5p'. Pr act Team MAalin swlth E T; ,ZNEW 9��2.tZ XPFF) $000 $0.00 S,f4 L- R-- S,bto 0 0 0 0 0 a a 0 12 L,4,,x AW,,l S,W� 0 0 0 0 a 0 0 0 $O.DO $0.00 $000 $0.00 2.0 TOPOGRAPHIC AND BOUNDARY SURVEY (KPG) ij F NV� 2a1) AddIttonal s-y and mpping 212 3 E,*,,Aw afG-RWrftWt S,­10TWOELFTED $0 .00 $0.00 213 Su Nadi GRI, AdrM D"W MTN-Ekk*Ai' IL.a --Sn" 12TX4KADE)UD $0,00 $000 Strop tO ti- R-.-I 0 0 0 0 0 0 0 2 0 0 0 som $0.00 $0E00 $0.00 3.0 ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT, ALIGNMENTS (KPFF & KPG) 110 S-,yt RN-W. Fla. P.,kIng Lot -Su IDTASK DELETED 3,11 -74tl 10 TASKI)EIETED $0.00 $0,00 Wabc Satibiit. Parkl Lot TrW Aflgn-t SWW K DELETED 321 Trill Fl-%7� A#-iw F, R&-49w PIWA - ; I! LET $0,G0 $0m 322 1 Fa-iw kw t srjdlae - 8 10 T TEO $000 $000 3Y9 k, R . - - i. Tk D r Fn $000 324 A�= 10 TASK DELETED $0.00 $0,00 3.30 _3_ Pl.,r%M12 LASKDELFTED 222�_ $0.00 $0,00 31 Si. p S 0 TASK DELETED mm $0,00 3.32 TEO $0000 $0.00 333 777���L `Seep 16 1 ASK Df. LLTFD $0.00 $000 134 ELETED $0,00 3� 77��� 10 TASK DELETEU $0.00 $0,00 3A0 Update Sloan DraM! R l - S 10 TASK DEL TED $0,00 $0,00 3.50 p. ct Em SIW ID TASTADELETED $0,00 $000 1W N-TWIA11g. . supp I NEW SK 381 �,. 6,99n . W%, � a &�12 NUWTAIK IL_ $0.00 _762 T,4 b 60y., &W 12 !:�� $000 $000 3" �=Z. ,2-NEW-TA-K $0.00 $0.00 3J0 T� 01 , 5.PP 12 NEW TA$K 3.71 Alig- 1,ne- 12 NEW TASK $0.00 $0m 72 LW�= & AJ.,,W. AU9-. - Supp 12 NEW TASK $0,00 $0.00 3,73 TM L Ram t 01, SWF 12 NEW I ASK $100 $000 3.74 , Des Toms u City RIVIM - TV.44+t2 NEWT ASK $000 $000 &W IF.IW Fk. M--t of N- W;rF 12 NEW TASK PIZ �T $om $000 Rw L-�r 1�1 $0,00 $000 382 8uTi{i12NEWTXSK $0,00 $000 3.83 D.6p Tenn aM Review 2!- I 12 NEW TASK $0.00 $0,00 190'. PnaentMlon GnpN)cs Se 12 NEW TA $000 $0,00 L-, R- S,dL.. 0 0 0 0 0 0 0 0 00 sum +11 Ur ,, Alkd S-W. 0 0 a 0 0 0 0 0 $0 $0.00 ILISM NA'alm 11111m FAIJIFM loll= $0.00 $0,00 4.0 CIVIL (KPFF) 0010m $0,00 $000 4.30 Tra"AN9-t.ndM."Irrq-Sl�gqtT-K 4.40 15- D.1-w App'.. _ p, TASK $0,00 $0.00 0-11M and Cm E. %,M12 NEW TASK $0.00 $0 .00 -4M $0,00 $0,00 V��.t.&WUNEWTASK $000 $000 114- 1-4 a 0 0 0 0 0 0 0 Sup, 12 1 - A,kkd,9,bt,W 0 0 0 0 0 0 0 0 $0.00 $0.00 RurnkwrxN4ua Mims= am LINE= $om $0.00 a' $0,00 5.0 ENVIRONMENTAL AND PERMITTING SERVICES (Landau) 5.10 USCG *vl tion S-Y • mW Bridg P*,W . - $� 10 TASK DELETED S20 jTr- As-, Su 10 TASK MODIFIED $000 $0,00 5.20 Tm A-t- Supp 12TASK MODIFIED $0.00 $0.00 521 S" 10 TASK DELETED $0 .00 $0.00 =!Z��K M. ED $0,00 $000 SIC TASKMO04FIED $000 $000 ==4= W-37 12 NEW TASK $000 $000 SE0 Hl.-f.I-W"-3Uppl2V WTMK $0000 1 $000 0 0 0 0 0 0 0 0 $0.00 50.00 - 0 0 0 0 0 1 Fla: l.0'14. 11.04 Co L,,,wJ Fe,, ESM-it, (Ad f& Ralno-J) V1 XIS Pap 9 J 14 74 KPFF C—Oug Egu—s ENGINEERING COST ESTIMATE: Tukwila Urban Center - Podestrianeicycle Bridge, Supplement No. 12 AqptH 23,2i015 LMN Architects LMN Tuk,Mlii" UrbanCenti Peddstirlan/Blic le,Brii:166, yc Supplement No. 12 Pa't". P'.jeA Manager P'.j� Desqn. P'.j sxt noru Adn,n � sp— QA Qc Sups 10 F. na—wad'. S,,pp 12 F. Added MULTIPLIER MULTIPLIER Item It. SCOPE OF WORK Supp 70 Rates UP 12 Ratan W, 73 $32,69 $49, 53 $33,17 $2756 $18,15 $39- 42 $38,42 3.1547 7.0 GEOTECHNICAL - Supp. 12 NEW TASK (Landau) $0.00 $0.00 7.10 91 Ta� 1! NEW TASK 72 =L� Eve, Sure 12 NEW TASK $0,00 $000 Sup is —1`1--il.b,ml 0 0 0 0 1 a 0 0 0 &,rp 12 LW AdAttiSi,b— 0 0 0 a a 0 a 0 P'e."U-aH $0.00 $0,00 8.0 RIGHT-OF-WAY SERVICES LFS) IN n p rtU 1 i "' I I I II TiflatOwnnship Rwlow 8,21 UPS TWOO—hin Ra� 8— 10 TASK MODIFIED $0.00 $0,00 am . Wakour., U Dart 41 Id-lift.Hr. '1191101A PAN. 7977577-7775 77 Ivg &M R4t-.1-Wwtkrh Easaw.i IOTASKMODIFIED $000 $0.00 832 Ukuka wd Easeq-h, Supp 12' TASK MODIFIED $0,00 $0,00 833 ', iaraua nj S— DIASKI)FUETED 17— $0,00 $0,00 i,34 Legal TASK DELETED �0 00 $0,00 0,40 Uocatfoo Ran - Supp 12 TASK DELETED $0,00 $000 861 FHWAFurwlaNr -bWWn -Sup,10TA5KI)ELFTED $0,00 $000 — 881 A ouwd- N.'stwie- Rakwatbn aiM M— P.,AAqAborNgAann WOMEN a wwor'm MINK1119001111 W/o la, l "li 'ex55Q06WF 77-7777 I � Nol— Flonuat S a 1 $0 00 $000 RW 9�,,i��,DTASK 1R1h1.1.1i- $000 $0,00 Pak. (2523.4 L C 0 16. au Id N P % Sep 10 TASK Dl $0bo $000 UTi P:.,g �L 'PRb.'Ia`PW. UCO[Ilk.Mu Sum 10 TASK DELETED $100 1;0.00 4A 1 $000 $0,00 4B, DROP RI,-6— Plaea LA C olk. Bak drig 'Paces f252304 9077) - &w 101' ASK DELETED $000 $000 6 DFIGP 0-yew P4s>s L-C Offlo, 8±h Partial (252A4 90791, - SupplO TASK DELEHED $0,00 $0 6 Su B, 107ASK DELETED $0,00 $0.00 7-P.kR .WE,UWLtOOOk.bk$96 ask P-14 1A"" "U'"'D $0,00 $000 8,Ak-Pa,.U-C P,WA Parce(taMG0,A- M.P 'ED ) TASK $0,00 $0,00 8.82 Rk-AIk.(N1*./FrukeefiFaa1AA) ErED $0,00 $000 ad. !�T:KVE Grw Mvw Trail Ea— 14,9.6.; M lfualon-S.pp.1214EWTASK E. d. 15"" M t 4- ri— SbM'eat 0 0 a 0 0 0 0 0 Sup{, 12 Isay. A&k,!,�6t,aA 0 0 0 0 0 0 0 0 SO= $0.00 Rm—'&A. 11RIM N&IM NEW $0,00 $0.00 9.0 ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF) MOO I Add," SV—.W Daagq - $,,912 NEVY TASK app. 9011 uad 30% eteg, New TASK $000 $000 812 Ar4.—h Span .4 ��EW $0 $000 9r13 I Abaft— D"a. " D,ahri -Supp 12 NEW TASK: $0,00 $000 9r 14 RaA.Dd1Iad Shalt D-ay1 SawI21,110TASk $000 $000 0 0 0 0 1 0 0 0 0 S— 12 -W. A,kkd 0 0 0 0 1 a a a 0 $0.00 0.00 $0.00 $0.00 10.0 BRIDGE AESTHETICS COLLABORATION -Su . 12 NEW TASK LMN Mm ` V 10000 10.10 Bfld!!,t— : ASK Toll _ !12 ��Z I T AW 1 4 12 $0,00 $1,774,74 10012 0-5oa-. Cabl—Sup,12NEW TASK 1 2 1 12 $0,00 $1,462.23 1013 Cnrha 3 Bfk* Lack St" 12 NEW TASK 1 2 12 $0.00 $1,462.23 1014 Coe—fio,-:Tad fivch 1.,qpI9rNEWTA.SK 1 2 12 $0,00 $1,462.23 1020 AW—h RME.. SUEE 12 NEW TASK 10j21 N TASK 1 1 2 12 $000 $1,46223 1022 12 NEW TASK 1 1 2 12 $0,00 $1,462.23 -10.30 D"��=drabo • Supplilkli 10031 lad fia,::h SWO --Seen 12 NEW TASK 1 6 10 24 $0,00 $4,025.55 1032 Weal Anl Skekhas - Saw 12 NEW TASK 2 16 50 .00 $1,501.70 1033 '12 NEW East Apyeeh8l,—lae ''F-AEW L 6 10 24 s0.00 $4,025.55 Wu -udy Mow D' 2 1 1 40 $O'Go $3,285.49 1035 Fi 12 NEW TASK 4 1 1 40 $000 $3'598'00 SuFK�tO L.- Har'o Subldal. 0 0 0 0 0 0 a 0 Si­'?U9. A,"A S,�WIA a 0 34 20 16 0 0 0 woo $25,522.22 Houbi'rabk-, Supp 10 Labor Removed Sum MEN= 0 0 MMEMEEPENE1114 0 0 0 1 0 $0.00 $0.00 $0,00 $25,522.22 Supp 12 Labor Added Sum l 8 1 0 1 34 0 0 1 0 1 Reimbursables Firm Total DESIGN TEAM TOTAL I Total Addtl Reimbursables Sum $0.00 $0.00 LMN SUBTOTAL; 1$0.00 1 $25,522.22 Fee (Supp 12 -'Su p10) x$25,522.22 File 2014 11 04 Combined Feu Estimate (Add&HIM-11,d) 11 As Paq, 10 of 14 75 CITY QFTUKW|LA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Tukwila Urban Center - Pedestrian/Bicycle Bridge Project No. 90510403 DESCRIPTION: Construct m new pedestrian/bicycle bridge over the Green River. Peum�hambicydeoonnocdonbe�eenTuw�|a�U�onCemerandcommmerraivAm�nxe��on xUGT|�|�AT|�N� Supports local and regional goals and policies regarding land use and transportation in Urban Center. Pedestrian System Report identified the optimal location for bridge crossing to be south of the Ramada Inn at STATUS: 1oSO1 West Valley Hwy. Type, Size, and Location Report was completed in2O11 Council approved adesign of a twin-tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway. MA|NT.|00wACT: To be determined. Design grants: State Enhancement for $190k & $500k, Transit Oriented Development (TOD) planning grant COMMENT: of $55k, and Federal CMAQ grant of $751 K. WSDOT Regional Mobility construction grant of $6.870M. Project is on Park Impact Fee list with funding of $2 million with an 80%/20% split for $1.6M. FINANCIAL mxrvunx Estimated [in 5;nnn,-,i 2ni i 2n14 2015 2016 2f)17 2018 2019 2n2O BEYOND TOTAL EXPENSES Design 921 200 442 1,563 Const. Mgmt. 150 700 850 Construction 1,000 5,485 6,485 TOTAL EXPENSES 921 200 1 2,692 1 6,185 1 01 01 01 01 01 9,998 FUND SOURCES Awarded Grant 842 100 554 1,496 Awarded Reg Mobility 870 6,000 6,870 Park Impact Fees 79 44 70 75 268 2015 u000 Capital Improvement Program 12 Z City Of Tukwila Transportation Committee TRANSPORTATION COMMITTEE Meeting Minutes May 4, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building PRESENT Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Cyndy Knighton, Gail Labanara CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:19 p.m. I. PRESENTATIONS 11. BUSINESS AGENDA A. Supplemental Agreement: 40th —42nd Avenue South Phase III Staff is seeking Council approval of Supplemental Agreement No. 3 to Contract No. 12-010 with CH2MHill in the amount of $437,583.57 for the combined 42nd Ave S and Gilliam Creek Culvert design contract. With the Seattle City Light undergrounding from SR 518 to S 160th St, additional civil design is needed and additional budget was added to the 2015 CIP. Design is currently at 60%. Council action will still be required for the SCL undergrounding agreement, right-of-way, and the construction bid award in late 2015 or early 2016. The Gilliam Creek culvert will require an above ground pond on the north portion of the yard at the Way Back Inn house. Committee also discussed the need for 8 retaining walls, with the majority at the S 1601h St/42 nd Ave S intersection. UNANIMOUS APPROVAL. FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA. B. Supplemental Agreement: Tukwila Urban Center Pedestrian/Bicycle Bridge Staff is seeking Council approval of Supplemental Agreement No. 12 to Contract No. 07-123 with KPFF Consulting Engineers in the amount of $164,371.10 for additional design and right-of-way acquisition services for the TUC Pedestrian/Bicycle Bridge Project. With the change in bridge location to the north of Riverview Plaza, some of KPFF's tasks can be subtracted while new tasks are needed. The project is currently at 60% design, but there have been challenges with the access to the Nelsen's brown house. A meeting is scheduled for 5/5/15 with the ROW consultants and our City Attorney to determine the best course of action for the needed environmental analysis at that property. UNANIMOUS APPROVAL. FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA. Ill. SCATl3d Bob attended the April 21, 2015 SCATBd meeting and will show the Sound Transit Light Rail Planning presentation at the next May 18, 2015 Transportation Committee meeting. Bob also spoke on the Port of Seattle's and SeaTac's Sustainable Airport Master Plan. With projected growth, SeaTac Airport will need additional terminals, so they may relocate some of the maintenance facilities that are currently north of the airport and use that land for the new terminals. Additional internal transportation would also be needed to accommodate those new terminals. IV. MISCELLANEOUS Meeting adjourned at 5:50 p.m. Next meeting: Monday, May 18, 2015 -Committee Chair Approval Minutfls by GL 77