HomeMy WebLinkAboutReg 2015-05-18 Item 5D - Contract Supplement #12 - Tukwila Urban Center Pedestrian-Bicycle Bridge Design and Right-of-Way Acquisition with KPFF Consulting Engineers for $164,371.10COUNCIL AGENDA SYNOPSIS
Meehn
,g Date Prepared by Mayor's revi
�aw' Coundt review
05/18/15 BG 1-JA
ITEM INFORMATION
ITEMNO.
5.D.
33
ISTAFF SPONSOR: BOB GIBERSON I
ORIGINAL AGENDA DATE: 05/18/15
AGENDA ITEM TITLE Tukwila Urban Center Pedestrian/ Bicycle Bridge
Right-of-Way Supplemental Agreement No. 12 with KPFF Consulting Engineers
CATEGORY ❑ Discussion
MtS Date
Z Motion
MtS Date 09118119
❑ Resolution
Mt ,g Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mt& Date
F-1 Public Hearing
Mt g Date
❑ Other
Mig Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ❑ PW1'
SPONSOR'S Contract No. 07-123 with KPFF Consulting Engineers provided design services for the TUC
SUMMARY Pedestrian/ Bicycle Bridge. Due to relocation of the bridge and additional right-of-way
issues, KPFF will need to continue to provide preliminary engineering services. The right-
of-way budget of $1,100,000.00 will cover KPFF's Supplemental Agreement No. 12. Council
is being asked to approve KPFF's Supplement No. 12 for $164,371.10, bringing the entire
contract to $1,998,227.42.
REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 05/4/15 COMMITTEE CHAIR: JOE DUFFIE
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE RIQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$164,371.10 $1,100,000.00 $0.00
Fund Source: 104 ARTERIAL STREET FUND (PAGE 12, 2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
OS/18/15
MTG. DATE
ATTACHMENTS
05/18/15
Informational Memorandum dated 05/01/15
KPFF Supplemental Agreement No. 12 to Contract No. 07-123
Page 12, 2015 CIP
Minutes from the Transportation Committee meeting of 05/04/15
33
34
City of Tukwila
TD: MoyorHog0erhnn
Transportation Committee
FROM: �~/, Bob Gibemspn' Public Works Director V^ ~
BY: Cyndy Knighton, Senior Program Manager
DATE: May t2O15
SUBJECT: Tukwila Urban Center Pedestrian/Bicycle Bridge
Project No. Q051D4O3. Contract No. O7'123
Supplemental Agreement No. 12
ISSUE
Approve Supplemental Agreement No. 12 with KPFF in the amount of $164'371.10 to provide additional
engineering design and right of way acquisition services for the Tukwila Urban Center (TUC) Pedestrian/Bicycle
Bridge project.
BACKGROUND
Since 2006' KPFF has been under contract to she and then design the TUC Pedestrian/Bicycle Bridge over the
Green River. The design work is predominately funded by federal grants and in 2013 Tukwila was awarded funds
through the State of Washington's Regional Mobility Grant Program for right of way (ROW) acquisition and
construction. In |a10 2013, Supplemental Agreement No. 10 was approved which included funds for final doaign,
additional studies required by permitting agencies, and ROW acquisition services. Ad this time the design is nearly
90% complete however continuing complications with ROW acquisition have resulted in delay in the design and
permitting. The bridge landing locations were shifted slightly to the north to avoid significant R0VV impacts to the
Riverview Plaza Office Park. That shift requires additional studies ofcultural resources aa well oadeep boring to
study soil conditions on the property commonly called the Nelsen Parcel at 16113 West Valley Highway.
DISCUSSION
Supplemental Agreement No. 10 included scope and fee for certain tasks which are no longer needed with the new
location of the bridge. Some tasks which were originally included have been modified to address the design
changes and some new tasks are being added. Supplemental Agreement No. 12 clearly documents which tasks
are new, modified or deleted. The scope of work indicates the changes in the task titles. Fee sheets show negative
hours for tasks being deleted and new hours for new tasks or additional hours for existing tasks. There are two
separate rates, or mu|tip|iem, used in the fee sheets which n#|ooi the changes in salaries since Supplemental
Agreement No. 10 was approved. Only now hours are using the higher multiplier. All work currently under contract
which ia not being changed by this supplement will remain ed the lower rate.
FINANCIAL IMPACT
The additional costs associated with the redesign of the bhdge, as well as the RDVV acquisitions work is
$164,371.10. This includes removal of work no longer required from Supplemental Agreement No. 10 in the amount
of -$42,795.69. As the additional work is primarily in response to HOVV concerns, the ROW budget will be used for
this work.
Right of Way Budget $1.100p00.00
Nelsen Property Initial Offer -248.000.80
Supplement No. 12 -164.371.10
Remaining Budget $ 687.528.90
RECOMMENDATION
Approve Supplemental Agreement No. 12 and consider this item on the Consent Agenda atthe May 18, 2015
Regular meeting.
Attachments: Supplemental Agreement No. 12 with Exhibits
CIP Pg. 12
w:\pwenV\pmjoom\a'mvumpmjeots\tuop*o bicycle bridge (9ns1o4na)\infonnaUonmemo supplement agreement #10 additional uesigna
mw-5'1-1s uu.uoox
36
Adw
VWWashington State
F Department of Transportation
Supplemental Agreement
Organization and Address
KPFF Consulting Engineers
Number 12
1601 Fifth Avenue, Suite 1600
Seattle, WA 98101
Original Agreement Number
07 -123 (k)
Phone: (206) 622 -5822
Project Number
Execution Date
Completion Date
05 -RW03
Project Title
New Maximum Amount Payable
Tukwila Urban Center, Ped/Bicycle Bridge PSE
$ 1,998,227.42
Description of Work
Modified hydraulic, surveying, permitting, geotechnical engineering and right of way acquisition services.
See scope of work (Exhibit A -1) for complete description.
The Local Agency of the City of Tukwila
desires to supplement the agreement entered into with KPFF Consulting Engineers
and executed on and identified as Agreement No. 07 -123
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
See attached.
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read:
111
Section V, PAYMENT, shall be amended as follows:
The total contract value increases by $164,371.10 to a new maximum payable amount of $1,998,227.42.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By:
DOT Form 140 -063 EF
Revised 9/2005
David K. McMullen, PE
Consultant Signature
By:
City of Tukwila
Approving Authority Signature
Date
37
w
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 1
Exhibit A -1
Scope of Work
Tukwila Urban Center, Pedestrian/ Bicycle Bridge
Supplement No. 12 - Modified Hydraulic, Surveying, Permitting,
Geotechnical Engineering and Right of Way Acquisition Services
PROJECT DESCRIPTION
KPFF is currently under contract with the City of Tukwila (City) for the Plans,
Specifications and Cost Estimate (PS &E) Phase of the Tukwila Urban Center
Pedestrian and Bicycle Bridge project. Issues with acquiring the necessary Right -of-
Way required that the previous trail /bridge alignment be relocated further north
along the Green River Trail. Because of this trail realignment, portions of the scoped
services found in Supplement # 10 are no longer applicable. Additionally, relocation of
the trail requires additional design effort related to the final bridge alignment,
including:
• Evaluation of alternative alignments north of Riverview Properties and
supplementation of the original TS &L report.
• Critical flaws evaluation of the preferred alternative alignment selected in
the TS &L supplement
• Additional effort included in updating the design of the new alignment to
60 %, 100 %, and final design of trail, bridge, and landings for multi -use trail
crossing the Green River, connecting West Valley Highway to Baker Blvd at
Christensen Rd.
• Additional Geotechnical Engineering.
• Additional Surveying
• Modified Right -of -Way Acquisition
The table below gives a summary of the tasks from Supplement 10 that are being
deleted and /or modified as well as new tasks that are being added as a part of this
supplement (Supplement 12)
Summary of Supplement 10 and 12 Task Changes
1.40, 1.50, 2.12, 3.10, 3.11,
3.20,
3.21,
Supplement 10 Tasks Deleted
3.22, 3.23, 3.24, 3.30, 3.31,
3.32,
3.33,
3.34, 3.35, 3.40, 3.50, 5.10,
5.21,
8.33,
8.34, 8.61, 8.81, 8.82
Supplement 10 Tasks Modified
5.20, 5.30, 8.21, 8.32, 8.81
2.13, 3.60, 3.61, 3.62, 3.63,
3.70,
3.71,
3.72, 3.73, 3.74, 3.80, 3.81,
3.82,
3.83,
3.90, 4.30, 4.40, 4.50, 4.60,
4.70,
5.40,
Supplement 12 New Tasks
5.50, 7.0, 7.10, 7.20, 8.100,
9.0,
9.10,
9.11, 9.12, 9.13, 9.14, 10.0,
10.10,
10.11, 10.12, 10.13, 10.14, 10.20,
10.21,
10.22, 10.30, 10.31, 10.32, 10.33,
10.34,
10.35
W
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 2
PROJECT OBJECTIVES
The overall objectives of this supplement include:
• Supplement to TS &L Report evaluating alternative alignments north of the
Riverview Plaza properties
• Obtain technical data necessary for completion of the PS &E Phase based on
the new alignment
• Update design according to the new alignment
PROJECT TEAM
This supplement includes effort by the following project design team members:
Prime Consultant
Structural Engineering
Civil Engineering
Surveying
Landscape Architecture and Planning
Geotechnical Engineering
Environmental and Permitting Services
River Hydraulics
Right of Way Acquisition
ON
KPFF Consulting Engineers
KPFF Consulting Engineers
KPFF Consulting Engineers
KPG Inc.
KPG, Inc.
Landau Associates
Landau Associates
Watershed Science & Engineering
Universal Field Services
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 3
SCOPE OF WORK
The following is a scope of work for modifications/ additions to design efforts including
geotechnical engineering, surveying, permitting, planning, structural engineering,
civil engineering, and right of way acquisition services in support of this project's PSE
Phase. In addition to the basic services scoped in this document, the Consultant has
included additional services that can be performed at the City's request.
TASK NO. 1.0 - PROJECT MANAGEMENT AND ADMINISTRATION
Task No. 1.40 - Design Team Meetings and Coordination (Supp. 12 TASK
ADDED)
The consultant team will need two (2) additional internal meetings to
coordinate modified project tasks and incorporate scope changes into the
project design.
Additionally, KPFF will perform general coordination and be the main point of
contact for the multidiscipline team. KPFF will collect and disseminate
information for the team.
Task No. 1.50 - Project Team Meetings with City (Supp. 12 TASK ADDED)
An additional two (2) meetings with the City will be required to coordinate
tasks associated with this scope of work.
Deliverables:
• Monthly progress reports and invoices
• As- needed Project Schedule Updates
• Team meetings
o Participation in internal consultant team meetings
o Participation in project meetings with the City
41
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 4
TASK No. 2.0 - TOPOGRAPHIC AND BOUNDARY SURVEY
The following is a scope of work for additional survey items needed as design
proceeds on this project.
KPG has included time and expense for project meetings, management of
surveying and drafting efforts, professional review and quality control in our
proposal.
Task No. 2.10 - Additional Survey and Mapping
Subtask No. 2.12 - Extend Survey of Green River Trail (Supp. 10 TASK
DELETED)
The survey of the Green River Trail shall be extended northerly
approximately 100 -feet to the limit of proposed improvements
Subtask No. 2.13 - Survey North GRT, Additional Christensen Rd and New
Bridge Abutment locations (Supp. 12 TASK ADDED)
Additional survey for the north Green River Trail segment, additional
Christensen Road from the existing Green River Trail head to Baker
Boulevard.
W
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 5
TASK No. 3.0 - ALTERNATIVE ALIGNMENT PRELIMINARY DESIGN, AND TS &L
SUPPLEMENT of NEW ALTERNATIVE ALIGNMENTS
Task No. 3.10 - Survey at Riverview Plaza Parking Lot (Supp. 10 TASK
DELETED)
KPG shall provide the field survey and mapping to augment the Riverview Plaza
parking lot, including studies and alignments of alternative routes.
Subtask No. 3.11 - Utility Locating (Supp. 10 TASK DELETED)
A separate cost for private utility locating services has been included, which
assumes 24 hours of underground utility sensing and locating.
Task No. 3.20 - Walkway Section/ Parking Lot Trail Alignment Studies
(Supp. 10 TASK DELETED)
KPG and KPFF Civil shall provide alternative layouts and improvements to the
Riverview Plaza property, including parking lot reconfiguration. This work will
include additional design studies for proposed improvements, meetings with
property owners of Riverview Plaza, and coordination with the property owner's
consultants
Subtask No. 3.21 - Trail Realignment Alternatives for Riverview Plaza
(Supp. 10 TASK DELETED)
Subtask No. 3.22 - Riverview Frontage /Property Studies (Supp. 10 TASK
DELETED)
Subtask No. 3.23 - Meetings for Riverview Plaza Property Owner
Coordination (Supp. 10 TASK DELETED)
Subtask No. 3.24 - Alternative Alignment Schematic Cost Estimate
Comparison (Supp. 10 TASK DELETED)
Deliverables:
• Trail Alignment Alternatives and Selected Alternative Plan (including
conceptual parking lot reconfigurations.)
KPFF civil shall provide cost estimates for two (2) alternative alignments,
compare the estimated costs to the current alignment, and identify changes
to project cost as a result of alignment revisions.
Task No. 3.30 - 30% Plans (Supp. 10 TASK DELETED)
KPFF civil will meet with Riverview Plaza property owner representatives to
discuss project progress selected alternative alignment to 30% design.
Anticipated work includes preparation of new plan sheets for horizontal
alignment, vertical alignment, site preparation, utility relocation, storm
drainage, pavement markings and signing, and paving plans.
43
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 6
Subtask No. 3.31 - Site Preparation Plans (Supp. 10 TASK DELETED)
Subtask No. 3.32 - Utilities Plans (Supp. 10 TASK DELETED)
Subtask No. 3.33 - Storm Drainage and Grading (Supp. 10 TASK
DELETED)
Subtask No. 3.34 - Paving Plans (Supp. 10 TASK DELETED)
Subtask No. 3.35 - Pavement Marking Plans (Supp. 10 TASK DELETED)
Task No. 3.40 Update Storm Drainage Report (Supp 10. TASK DELETED)
Storm Drainage report will need to be revised to assess impacts due to revised
alignment. This may trigger stormwater detention requirements, and will also
change basin delineation.
Task No. 3.50 - Update Cost Estimate (Supp 10. TASK DELETED)
Cost estimate will be revised to integrate quantities for preferred alignment.
Task No. 3.60 - New Trail Alignment (Supp. 12 NEW TASK)
KPG will update the Urban Design, Landscape and Illumination plans to a 60%
design level based upon the new preferred alignment which will be selected in
the TS &L Report Supplement 01.
Subtask No. 3.61 - Update New Trail Alignment Urban Design to 60%
(Supp. 12 NEW TASK)
Subtask No. 3.62 - Update New Trail Alignment Landscape Design to 60%
(Supp. 12 NEW TASK)
Subtask No. 3.63 - Update New Trail Alignment Illumination Design to 60%
(Supp. 12 NEW TASK)
Task No. 3.70 - TS &L Alignment Studies (Supp 12. NEW TASK)
KPFF shall evaluate up to 6 alternative alignments connecting Baker Blvd at
Christensen Rd to West Valley Highway with a multi -use trail and bridge
crossing. Work will include alignment layout, evaluation of project costs and
other impacts with existing conditions and future improvements and
development, right -of -way needs, and supplemental report to existing TS &L
Report.
..
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 7
Subtask No. 3.71 - Alternative Alignment Layouts (Supp. 12 NEW TASK)
Subtask No. 3.72 - Evaluation of Alternative Alignment Layouts (Supp. 12
NEW TASK)
Subtask No. 3.73 - TS &L Report Supplement 01 (Supp. 12 NEW TASK)
Subtask No. 3.74 - Design Team and City Review Meetings (Supp. 12 NEW
TASK)
Task No 3.50 - Fatal Flaw Assessment of Subsequent Preferred Alignment
(Supp. 12 NEW TASK)
KPFF shall evaluate the preferred alignment identified from the additional
alignments evaluated in the TS &L Supplement. This evaluation includes
meetings with King County Flood District representatives to evaluate impacts
to levee, evaluation of structures within the levee and river, evaluation of river
modeling done by King County Flood District for establishment of the 100 year
flood elevation, assessment of horizontal alignment, and development of
vertical alignment alternatives for clearances of the structure over the Green
River. Work also includes meeting with City staff to review proposed
alternative and resultant realignment of preferred multi -use trail along the
north side of Riverview Plaza and revised landing alignment east of Green River
to West Valley Highway.
Subtask No. 3.81 - River and Levee Constraints (Supp. 12 NEW TASK)
Subtask No. 3.82 - Horizontal and Vertical Alignment Alternatives (Supp.
12 NEW TASK)
Subtask No. 3.82 - Design Team and City Review Meetings (Supp. 12 NEW
TASK
Task 3.90 - Presentation Graphics (Supp. 12 NEW TASK)
KPFF will prepare graphics for City suitable for presentation to the general
public and the elected officials.
45
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 8
TASK No. 4.0 - CIVIL ENGINEERING
Task No. 4.30 - Trail Alignment and Modeling (Supp 12. NEW TASK)
KPFF civil team shall meet and coordinate design elements for revised trail
alignment and layout. This work includes coordination meetings, evaluation of
City standards for future frontage improvements, coordination of design
elements and scope of improvements, evaluation of grades for landings, and
other coordination necessary to develop the preliminary concept to a schematic
design level.
Task No. 4.40 - Storm Drainage Approach (Supp. 12 NEW TASK)
KPFF shall design new storm drainage improvements for trail. Work includes
new storm drainage report evaluating runoff and detention criteria. KPFF will
present findings to City and work with the City to provide required
improvements which may include mitigated collection and detention within an
adjacent basin, dispersed runoff across adjacent city owned park, raingardens
along West Valley Highway, and other measures currently unidentified.
KPFF civil shall review all other discipline reports and information, including
new survey topographic map and terrain model, supplemental geotechnical
report, and proposed layout from Planners and Landscape Architect. Review
will include providing comments and requests for additional information or
revisions, and review of resubmittal.
Task No. 4.50 - Quantities and Cost Estimate (Supp. 12 NEW TASK)
KPFF shall quantify construction elements and earthwork, and prepare a
preliminary cost estimate for new proposed improvements.
Task No. 4.60 - Wall /Railing Assessment (Supp. 12 NEW TASK)
KPFF shall work with team to design new trail alignment north of Riverview
Plaza's north entrance, and along the north side of their parcel. Work shall
include design of new horizontal and vertical alignment, modeling of pavement
section, evaluation of trail and shoulder widths, evaluation of wall heights and
types of retaining walls and railings
Task No. 4.70 - 30% Plan Sheet and Layout (Supp. 12 NEW TASK)
KPFF civil shall provide permit support for revised environmental permitting
information. This information is typically total earthwork summaries,
stormwater impacts, project and construction description, evaluation of tree
impacts, and support graphics for same.
M
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 9
TASK NO. S. 0 - ENVIRONMENTAL AND PERMITTING SERVICES
Landau Associates will provide supplemental environmental and permitting
services for this project. The scope of services is based on discussions with and
information provided by a City of Tukwila (City) Shoreline Planner regarding
impacts to trees adjacent to the Green River, 30 percent plan review
documentation referencing an illumination study associated with proposed bridge
lighting, and coordination with WSDOT Local Programs.
Task No. 5.10 - USCG Navigation Survey and Bridge Permit Application
(Supp. 10 TASK DELETED)
The purpose of this task is to conduct the required Navigation Survey and
prepare the General Bridge permit application materials to USCG standards.
To conduct the Navigation Survey, Landau Associates will contact local
waterway users /managers to determine the type and characteristic of
watercraft common to the stretch of the Green River affected by the proposed
project. Contact with local waterway user groups /managers will include:
City officials
City Chamber of Commerce
WDFW
USACE
Port of Seattle and select number of tenants.
Landau Associates will document findings into a memorandum format that will
include a summary of methods and results. Landau will also prepare the
application cover letter formatted to the USCG Bridge Permit Application
Guide.
Landau will prepare draft documentation for review and comment by KPFF and
the City, and then final documentation.
Assumptions:
No team meetings or onsite meetings with waterway user groups are included
in this scope of services.
Contact with no more than three Port tenants will be required as part of the
Navigation Survey.
Waterway user group survey will be limited to email /phone correspondence.
Vessel traffic from the Port does not pass downstream of the Duwamish River
Turning Basin (i.e., approximate River Mile 6).
Deliverables:
An electronic (MS Word) copy of the draft Navigation Survey memorandum and
application cover letter.
An electronic (Adobe PDF) and one paper copy of the final Navigation Survey
and application cover letter.
47
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 10
Task No. 5.20 - Tree Assessment (Supp. 10 and Supp. 12 TASK
MODIFIED)
Landau Associates will conduct a tree assessment on the 16113 West Valley
Highway property within 50 feet of the proposed bridge alignment and bridge
landing. For the assessment, Landau Associates will identify the species,
approximate height and crown spread, and general age class and health of
trees identified on project survey. Landau will also conduct an assessment of
the approximate extent of shade provided by identified trees. The shade
assessment will be based on analysis of the height and crown spread of trees
and altitude of the sun at 8:00 a.m., 10:00 a.m., and noon, on the Winter
Solstice (i.e., altitudes with potential to provide the maximum extent of shade
over the Green River).
Landau will amend the project survey to identify tree species and required tree
protection zone. Methods . and results of the tree assessment will be
summarized in shoreline permitting documentation included in Landau
Associates' existing contract.
Assumptions:
• Determination of age class will be made following shoreline
permitting requirements (i.e. young, mature, over mature).
• Tree assessment field effort will require a single site visit by two
Landau Associates staff members and will take no more than 8
hours to complete.
• The City will arrange for any necessary right of entry to complete
the tree assessment.
• The need for quantitative shade assessment will be determined
based on evaluation of trees to be impacted by the project. A
qualitative assessment of shade provided by impacted trees will
be evaluated based on size /shape of tree and distance to the
River. Quantitative assessment will be needed for native species
determined to likely provide significant shade to the River.
• Shade analysis will be completed using hand calculations, and
will be completed for individual trees or groups of trees as
applicable.
Deliverables:
• Draft and final tree assessment documentation to be incorporated
into shoreline permitting documentation included under existing
contract.
.;
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 11
Task No. 5.21 - Biological Assessment (Supp 10. TASK DELETED)
KPFF civil engineers shall establish revised bridge alignments to
accommodate WDFW request to save two large Douglas -Fir trees located
along the east bank of the Green River. Two alignments will be created, one
to clear only the tree located furthest to the south, and another to clear
both large trees.
Task No. 5.30 - Lighting Study Support (Supp. 10 and Supp. 12 TASK
MODIFIED)
Landau Associates will provide support to KPFF in developing the lighting
study associated with proposed bridge illumination. Landau Associates is
including a level of effort to include no more than 12 hours of Associate, 8
hours of Senior CAD support, and 5 hours of Staff /Senior Technician. The
purpose of the study will be to determine the impacts of bridge lighting on the
Green River below in support of the permitting process.
Deliverables:
• To be determined
Task 5.40. - De Minimis Section 4(i) Evaluation (Supp 12. TASK ADDED)
Landau Associates will prepare necessary documentation to support Section
4(f) evaluation associated with potential trail improvements to the Green River
Trail in the vicinity of City -owned open space immediately north of Riverview
Plaza. The documentation will consist of the WSDOT Section 4(f) De Minimis
Impact Determination form.
Landau Associates will prepare the WSDOT Section 4(f) De Minimis Impact
Determination form for review and comment by KPFF and the City, and then a
final document.
Assumptions
• Programmatic Section 4(f) evaluation does not apply to the
proposed project due to presence of critical habitat.
• The City will complete necessary public outreach associated with
the evaluation process.
• The City Parks Department will provide written support for the
proposed project and unavoidable impacts to Section (40
resources.
Deliverables
• An electronic (Adobe PDF) copy of the draft and final technical
memorandum.
Task 5.50. - Historic Property Inventory (Supp. 12 TASK ADDED)
Landau Associates will retain the services of Equinox Research and Consulting
International, Inc. (ERCI) to support inventory of the residence on the Nelsen
,,
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 12
property for required compliance with Section 106 NHPA. ERCI will prepare an
Historic Property Inventory Form to support Section 106 NHPA compliance.
Landau Associates will prepare copies of necessary forms to assist with agency
consultation.
Assumptions:
• WSDOT has indicated requirement to inventory the residence on
the Nelsen property.
Deliverables:
• Historic Property Inventory Form
TASK No. 7.0 - GEOTECHmcAL ENGINEERING SERVICES (Supp. 12 NEW TASK)
Task No. 7.10 - Field Explorations and Laboratory Testing (Supp. 12 NEW
TASK)
Landau Associates will advance a boring on the property at 16113 West Valley
Highway (King County Parcel number 000580033) to characterize subsurface
conditions near the proposed east bridge abutment. This boring will be
advanced to a depth of about 120 ft below the existing ground surface (BGS).
One additional boring will be advanced at least 160 ft BGS from the existing
trail and will be located near the proposed east bridge abutment. The borings
will be completed using a track - mounted drill rig using mud -rotary drilling
techniques.
The drilling will be accomplished by Holocene Drilling of Puyallup, Washington
under subcontract to Landau Associates. A geologist or geotechnical engineer
from Landau Associates will supervise the explorations, obtain soil samples
from the borings, and prepare field logs of conditions encountered in the
explorations. Soil samples will be obtained from the borings on about a 5 -ft
depth interval using the Standard Penetration Test (SPT) procedure, and
delivered to our laboratory for further classification. Soil samples obtained
from the explorations will be held in our laboratory for 30 days after submittal
of the final report. After that date, the soil samples will be disposed of, unless
arrangements are made to retain them.
Drill cuttings will be placed in steel drums and transported to WM Dickson's
facility in Tacoma, Washington for disposal. Prior to drilling, a representative
of Landau Associates will mark the boring locations in the field and arrange for
an underground utility locate (1- 800... call before you dig). Landau Associates
will also arrange for a private utility locate at each of the boring locations.
Landau Associates will conduct geotechnical and analytical laboratory testing
on representative soil samples obtained from the exploratory borings to aid in
their classification and determination of engineering properties. Laboratory
testing completed in our laboratory is expected to consist of 4 natural moisture
50
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 13
content determinations, 3 fines content determinations, 5 index tests (either
mechanical sieve analysis or Atterberg limit determinations), and 3 combined
analyses (mechanical sieve and hydrometer).
Task No. 7.20 - Geotechnical Evaluation, Reporting, and Meetings (Supp.
12 NEW TASK)
Based on the results of our previous explorations for the TSL design phase, the
field investigation, and laboratory testing program completed for this project,
Landau Associates will complete geotechnical engineering analyses to confirm
and or modify our previous recommendations to support 30% design of the
bridge, including:
• Recommendations for earthwork and site preparation including:
clearing, stripping, and grubbing; the suitability of onsite soils for reuse
in structural fill; import structural fill requirements, subgrade
preparation; and placement and compaction of structural fill.
• Pavement subgrade preparation.
• Porous asphalt and porous concrete pavement sections (asphalt or
Portland cement concrete and base course thickness) required for
structural support of the proposed traffic.
• Conventional asphalt and Portland cement concrete pavement design.
• Seismic design criteria, including an evaluation of liquefaction and
lateral spreading potential.
• An evaluation of the stability of the riverbanks and recommended
stabilization measures.
• Recommendations for approach embankment structural earth wall
including: embedment depth, foundation subgrade preparation, design
parameters, nominal bearing pressure, anticipated foundation
settlement, and wall backfill and drainage considerations.
• Estimated settlement of the approach embankments.
• Recommended foundation type (driven piles /drilled shafts);
recommended tip elevations; expected range of nominal axial capacity;
uplift capacity; downdrag loads; estimated settlements of bridge
foundations; additional lateral loads caused by lateral spreading; soil
parameters for input into L -Pile (or equivalent) lateral pile capacity
software.
• Construction considerations for the recommended foundation type.
• Discussion of the impacts of constructing the bridge abutment and
approach embankment on the existing dike located at the west side of
the bridge and any recommended mitigation measures.
The results of the field explorations and geotechnical engineering analyses will
be summarized in a geotechnical report. The report will include a site plan
51
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 14
showing the exploration locations, summary logs of conditions observed in the
borings, results of the geotechnical and analytical laboratory testing, and a
discussion of subsurface soil and groundwater conditions at the exploration
locations.
Assumptions:
• City will obtain the right of entry to perform all geotechnical
sampling
• No permit fees will be charged for the borings
• All field work will be performed during daylight hours between
Monday and Friday and any traffic control will consist of
traffic cones
Deliverables:
• Draft geotechnical report (2 hard copies and Adobe PDF)
• Final geotechnical report (4 hard copies and Adobe PDF)
TASK NO. 8.0 - RIGHT OF WAY SERVICES
It is assumed federal funds are participating in the project, however there are no
federal funds participating in the Right of Way phase. Universal Field Services,
Inc. (UFS) will complete all Right of Way services in accordance with the City of
Tukwila (City) Washington State Department of Transportation's (WSDOT)
approved Right of Way Acquisition Procedures, the federal Uniform Relocation
Assistance and Real Property Acquisitions Policies Act (URA), WSDOT Local
Agency Guidelines - Section 25 (Right of Way Procedures), and the Washington
Administrative Code (WAC 468 -100) state Uniform Relocation Assistance and Real
Property Acquisition.
The project area consists of primarily business use properties. Up to four (4)
separate tax parcels will require various real property rights as shown in Table A
below. One (1) residential occupant may be displaced by this project. Additional
parcels or real property rights other than those shown in Table A will require an
amendment to this scope of work and related fee estimate. Right of Way plans are
not available for review and use at this time.
This scope of work is based on the following:
• Discussions with the City's design team KPFF.
• Recent tour of the project limits.
• Review of limited public on -line information (mapping / ownership
information).
• Preliminary Schematic Drawing and Exhibits - Right of Way plans not
available.
52
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #I2
Page 15
Task No. 8.20 - Title /Ownership Review (Supp 10. TASK MODIFIED)
Subtask No. 8.21 - UFS Title /Ownership Review (Supp. 10 TASK
MODIFIED)
Obtain title reports from the City or KPFF and perform reviews of existing
right of way and ownership information. (If requested, UFS will order title
reports or any updates). Review special exceptions described in each title
report to determine the City's acceptance of title at closing. Provide the City
with a parcel summary memo listing ownerships, title exceptions, etc.
Deliverable:
• Prepare parcel summary memo listing ownerships, title
exceptions, etc.
Task No. 8.30 - Data Collection and Limit Identification
Subtask No. 8.32 - Right of Way Limits and Easements (Supp. 10 and
Supp. 12 TASK MODIFIED)
KPFF civil engineers will identify limits of right of way takes, as well as
temporary and permanent easements for the project. Limits will be
provided to the survey team, and the right of way acquisition team, for legal
description and exhibits for use by the right of way acquisition team.
Subtask No. 8.33 - Temporary Right of Entry/Access Permit (Supp. 10
TASK DELETED)
As part of the feasibility planning and preliminary design phase for the
project, the City and the consulting team may require temporary access to
gather pertinent information for investigational geotechnical, environmental
studies, hydrology, and land survey purposes, etc. It is intended Right of
Entry (ROE) Permits will be inclusive of all purposes as stated in this task.
It is assumed property owners will not be compensated for the temporary
grant of access and all properties will be left in the same condition as was
prior to entry. See Table A below for parcels requiring ROE Permits. The
City or KPFF will provide exhibits as attachments to each permit depicting
the extents of the ROE area.
Deliverable:
Obtain one (1) Right of Entry Permit due to common ownership.
Subtask No. 8.34 - Legal Description and Exhibits for Acquisition (Supp 10.
TASK DELETED)
Eight (8) Legal descriptions and exhibits shall be prepared for right -of -way
acquisition.
53
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 16
Prepare legal descriptions and graphic exhibits for temporary
easements as well as for permanent easements for each of the
four Riverview Plaza parcels (8 legal descriptions).
Provide staking or painting of easements for viewing purposes.
Deliverahles
Updated Survey Project Base Map (two hardcopies, one electronic
copy)
Copies of title reports
Acquisition legal descriptions with graphic exhibits
Task No. 8.60 - Relocation Plan (Supp. 10 TASK DELETED)
A relocation plan will be developed based on WSDOT's Right of Way Manual
and LAG Manual Section 25. According to the City, the owner of the
residential site has purchased another residence and has vacated the
premises, possibly because of the pending project. Relocation eligibility and
entitlements are subject to discussions with the City and the owner.
This scope of work assumes the property owner is displaced by the project. It
is assumed there will be one (1) residential owner- occupant of a single family
home displaced as a result of this project (see Table A). UFS will develop a
relocation plan resulting from personal assessment interviews with the
occupant(s). If additional displacements are subsequently discovered, the
Relocation Plan will be amended by UFS. Additional relocations will require an
amendment to this scope of work and related fee estimate.
Deliverable:
• Relocation Plan
Subtask No. 8.61 - FHWA Funds Authorization for ROW (Supp. 10 TASK
DELETED)
Shortly after the Right of Way Plans (prepared by KPFF), the PFE, and
Relocation Plan have been submitted to WSDOT and assuming NEPA
clearance has been obtained, the City would typically receive a letter from
FHWA through WSDOT Highways and Local Programs authorizing the use
of federal funds to acquire Right of Way. This letter of authorization is
required in order for the City to receive federal funding participation and
reimbursement for costs incurred with Appraisal, Appraisal Review,
Acquisition Negotiations, and Relocation Assistance services.
Deliverable:
For informational purposes only
Task No. 8.80 - Acquisition Negotiation, Relocation and Closeout
54
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 17
Subtask No. 8.81 - Acquisition Negotiation (Supp. 10 and Supp. 12 TASK
MODIFIED)
Acquire real property rights from up to four (4) separate tax parcels
(including City of Tukwila) as shown in Table A below. Appraisals,
Appraisal Reviews, and AOS worksheets completed in the Appraisal and
Appraisal Review task will be submitted to the City for written approval
establishing the amount of Just Compensation to the property owner.
Upon written approval from the City, UFS will prepare the offer package(s)
and promptly present offers to purchase all the required real property
interests and negotiate in good faith to reach a settlement with each
property owner(s). Offers will be presented in person when at all possible.
Negotiations will be conducted in accordance with statutory and regulatory
requirements and will include: Coordinate administrative settlement
approvals with the City; Negotiate as necessary with lien holders, assisting
escrow in the closing process; Prepare and maintain parcel files to include
fair offer letters, acquisition documents, a standard diary form indicating all
contacts with owner(s), and other items necessary for negotiations.
Negotiations shall not be deemed to have failed until at least three
significant meaningful contacts have been made and documented with each
owner and /or their representative through direct personal contacts. Out -
of -area owner(s) will be contacted by telephone and by certified mail. If
negotiations reach an impasse, UFS will provide the City with written
notification. The filing and cost of condemnation proceedings shall be the
responsibility of the City.
Deliverables:
• Acquisition Negotiation services with owners of up to four (4)
separate tax parcels.
• Completed parcel files including necessary records of all Right of
Way Acquisition services.
Subtask No. 8.82 - Relocation (Supp. 10 TASK DELETED)
According to the City, the owner (Nelson) of the residential site recently
purchased another residence and has vacated the premises, possibly
because of the pending project. Relocation eligibility and entitlements are
subject to discussions with the City and the owner. This scope of work
assumes the property owner is displaced by the project. It is assumed
there will be one (1) residential owner- occupant of a single family home
displaced as a result of this project. Universal will provide Relocation
Assistance and Advisory Services under the guidelines of the federal URA,
WSDOT LAG Manual - Section 25 and the City's approved Policies and
Procedures, as directed. Relocation services are generally outlined as
follows:
55
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 18
• Inform displaced occupants, in writing, of their potential displacement,
eligibility, entitlements, and provide an explanation of their relocation
benefits.
• Assist in search of replacement site(s).
• Assist displaced occupant(s) in filing relocation claims for payment.
• Maintain a current relocation diary for each displaced occupant.
• Maintain necessary records to support state audit of the relocation
services portion of the project.
Deliverahles-
Relocation Advisory and Assistance Services for one (1) residential
owner- occupant.
Completed relocation assistance files.
Task No. 8.100 - Green River Trail Easement Negotiation (Supp. 12 TASK
ADDED)
The City of Tukwila is the Grantee on two existing easements for public access,
trail, road and flood control under recording numbers 8009190876 and
9108301275. These easements are located, in part, along the northerly
boundary of tax parcel numbers 2523049077 and 2523049039. Both parcels
are owned by BRCP Riverview Plaza, LLC. During survey work for this project
it was discovered that a portion of the Green River Trail as currently
constructed is located outside of the legally described limits of the easements.
At the City's request, UFS will negotiate with the Grantor of the easements in
an attempt to modify the legal descriptions.
UFS will contact the parcel owner or their representative and conduct up to
two (2) on site meetings. If it is determined the owners are not receptive to
modifying the easements, the negotiations will be deemed to have failed. It is
assumed the City will not use eminent domain for the modification of these
easements.
Deliverables:
• Revised easements under recording numbers 8009190876 and
9108301275
Additional Work
If other tasks are required to be performed or there are changes in pertinent
information or if negotiations exceed the industry standard for a good faith
effort to negotiate (three "in- person" landowner contacts), UFS reserves the
right to request additional compensation as an equitable adjustment. UFS
shall not be responsible for delays caused beyond its control.
56
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 19
Assumptions:
The City / KPFF will provide the following:
• Exhibit maps to accompany Right of Entry Agreements
• Preliminary Commitments (Title Reports) for all parcels shown in
Table A. If requested, UFS will order title reports or any updates.
The title company will bill the City directly for each report.
• Approve designation of the escrow company used for this project.
The escrow company will bill the City directly for all escrow
services provided.
• Right of Way Plans and Drawings, Maps, Exhibits, Right of Way
Staking, etc., as necessary.
• The necessary Environmental Site Assessments prior to
commencing the PFE as discussed in the Project Funding
Estimate task.
• Legal descriptions in electronic format for all real property rights
to be acquired and easement areas
• Form approval, in electronic format, of all legal conveyance
documents prior to use (i.e. offer letters, purchase and sale
agreements, escrow instructions, easements, deeds, leases and
permits).
• Review and approval of all determinations of value, established by
the project appraisers. Provide written authorization prior to
offers being made to property owners.
• Review and approval of all relocation entitlements prior to
presentation to the displaced person.
• Payment of any and all compensation payments to property
owners, recording fees, relocation payments, legal services and
any incidental costs which may arise necessary to complete each
transaction.
• Send "Introduction Letters" to property owners as necessary.
• Property staking for easement modification, if necessary.
57
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 20
TABLE A - PARCEL ACQUISITION & EASMENT MODIFICATION
No.
Tax Parcel No
Taxpayer / Owner
Current Use
Easement
Modification
Total Fee
Simple
Partial Fee
Simple
Pei ui Trail
Easement
Temp. Const.
Easement
AR / AOS
(See Note 3)
1
000580 -0033
Nelsen
Single Family
Residence
X
(See Note 1)
AR
2
252304 -9081
City of Tukwila
River Trail
To Be Determined
AOS
3
022310 -0040
Park East Real Estate LLC
Office Bldg /
Bank
X
X
AOS
AOS
4
022310 -0099
Andover Plaza LLC
Retail
X
X
5
252304 -9077
BCRP Riverview Plaza LLC
Office Bldg
X
6
252304 -9039
Notes:
1. AR (Appraisal and Appraisal Review) / AOS (Administrative Offer Summery - in lieu of Appraisal)
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 21
TASK NO. 9.0 - ADDITIONAL STRUCTURAL DESIGN (Supp. 12 NEW TASK)
Task No. - 9.10 Additional Structural Design (Supp. 12 NEW TASKS)
KPFF will revise the current 30% design plans to the new alignment
(Alternative Alignment A) as well as provide additional structural design and
drawings associated with the new layout.
Subtask No. 9.11 - Update 30% Bridge Drawings to New Alignment (Supp.
12 NEW TASK)
KPFF will update the current bridge drawings to reflect the new bridge
alignment and additional approach span and associated foundation.
Subtask No. 9.12 - Approach Span Design and Drafting (Supp. 12 NEW
TASK
KPFF will design and produce drawings associated with the approximately
45 -foot long approach span at the western landing
Subtask No. 9.13 - Abutment Design and Drafting (Supp. 12 NEW TASK)
KPFF will design and produce drawings associated with the abutment that
supports the approach span at the west landing.
Subtask No. 9.14 - Revise Drilled Shaft Design (Supp. 12 NEW TASK)
KPFF will revise and update the drilled shaft foundation design and
drawings based on the new locations, additional loads imposed by the
approach span and the new geotechnical information based on the
additional geotechnical borings.
TASK NO. 10.0 - BRIDGE AESTHETICS COLLABORATION(SUPP. 12 NEW TASK)
LMN will revise the overall bridge structural aesthetic to the current bridge
alignment, to be documented in graphics used for design workshops and
presentation renderings.
This will require remodeling the proposed bridge to adjust bridge features to the
revised alignment.
Task No. 10.10 - Bridge Structure (Supp. 12 NEW TASK)
Subtask No. 10.11 - Arch Geometry (Supp. 12 NEW TASK)
Subtask No. 10.12 - Suspension Cable Connections (Supp. 12 NEW TASK)
Subtask No. 10.13 - Bridge Deck Connections (Supp. 12 NEW TASK)
Subtask No. 10.14 - Tied Arch Connections (Supp. 12 NEW TASK)
W
Exhibit A - Scope of Work
Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #12
Page 22
Task No. 10.20 - East Approach (Supp. 12 NEW TASK)
Subtask No. 10.21 - Deck Treatments (Supp. 12 NEW TASK)
Subtask No. 10.22 - Handrail System (Supp. 12 NEW TASK)
Task No. 10.30- Design Development and Coordination (Supp. 12 NEW
TASK)
Subtask No. 10.31 - Tied Arch Sketches (Supp. 12 NEW TASK)
Subtask No. 10.32 - West Approach Sketches (Supp. 12 NEW TASK)
Subtask No. 10.33 - East Approach Sketches (Supp. 12 NEW TASK)
Subtask No. 10.34 - Study Model Development (Supp. 12 NEW TASK)
Subtask No. 10.35 - Renderings (Supp. 12 NEW TASK)
•1
EXHIBIT E-1
KPFF Consulting Engineers
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Classification
Overhead (OH) Cost
OH Rate x DSC of
Total Hours X
42.00 X
0.00 X
216.00 X
14.00 X
703.00 X
356.00 X
8.00 X
4.00 X
Rate = Cost
$2,706.06
$0.00
$11,793.60
$630.00
$24,886.20
$13,965.88
$230.80
$80.00
DSC Subtotal $54,292.54
$54,292.54
Fixed Fee (FF)
FF Rate 30.00% $54,292.54 $16,287.76
Reimbursables
Adjustments
Supplement 0 e 5.69,
Subtotal -$42,795.69
Subconsultant Costs (See Exhibit G) $64,583.73
IGRAND TOTAL:
Date: 4/23/2015
61
Hour Surn(Tiary KPFF Gansulilrlg Roo,—
ENGINEERING COST ESTIMATE: Tukwila Urban Center - Ped—trian/Bi,yoo Bridge, Supplement No. 12
APIR 23, 2,016
KPFF Ga—ftiog Eq—s
KPFF
TukWI6, Wb'�� CentEir - Pedestrian/B(�YqI6 Bir'd
, , , k'.1 -' , ; I ,
Supplement " , , , , ! 0 1 1,
upp ement o. 12
Pr(ndpaI
Charge
Tadhnical
Sp—.JI,d
P,.I.t
Manager
Sensor
E,ginam
� Do `g"
Eng
CADD
Tedh—u
Project
-rdmetd,
Ad dratio
Su
Supip 10 Fee
Removed.
MULTIPLIER
E2.7516
Supp 12 Foe
Added
MULTIPLIER
It.. SCOPE OF WORK
WP 10
$62.50
$60,10
$50,77
$4327
$32A9
$35,19
$24.81
$20000
5 P;
$64.43
$64,04
$54 60
$45,00
$36,40
$39.23
$28,55
$20,00
2,62E2
1.0
PROJECT MANAGEMENT
8
a
12
ARMIN
I Miffin
$0 0
0 0
00
$3,07433
1,40
" M
TASK I'D K F)
M.NT,
8
12
$0,00
$3,074.33
S- m U— R—
0
0
0
0
0
0
0
Supt, 121.. et., Add,,ISordtd
16
0
24
0
a
0
5
D
$0,00
$6,148.67
Rarr�Gaaabkre
WARIM
$000
$000
2.0
TOPOGRAPHIC AND BOUNDARY SURVEY (KPG)
,j ,,,J"",
2.10
Additionati—y-doeppirig
212
Exterid-vey.1 G— Rive T,M Su W 10 TASK DELETED
$000
$0,00
2,13
1 Sur NvI, GRT, Akffl CNIat, Rd, Now Bricir ANd Ldeak— - Supp 12 TASK ADDED
$0400
$0.00
&u ,, 10 Lukwv R-1 Sub al.
0
0
0
0
0
0
0
0
S,,,, I2 t ee, Added
0
0
0
0
0
0
0
0
W.00
sam
Peinrtrusades
$000
$0,00
3.0
ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT. ALIGNMENTS (KPFF & KPG)
SJO
I,DaNTI;11 awleal"ITI , IITIKE)ELETE.
p,
Ner Ideal. Sea, E.
320
n2�y S.S.VPedifing Let Trail hArdeend Studle, - SUM 10. TASK DELETED
---$0.00-
-S0-00
wa RAgnmadf Aflearniat— For. FMI- Ree. - SMp 10 TASK DELETED
-2
1279,40
$0.00
322
PN.W— flomedelprapan, Ilucks, SUM 10 T DELETED
-2
.$279,40
$000
323
W IT pla. prodarly — —dirdb.. . sew" TASK DELETED
-6
-$838.19
$0,00
324
---
n�=Ncdd,!"reedadde-ri.. -Sepo 10 TASK DELETED
-8
-16
42o565.59
$0,00
3410
Plane 10 DELETED
2n_Bg;_
-2
4343,95
1 $0.00
,_
31
SaWp,�:,d M2
0 TASK DELETED
�4
a
1
.$2,057.43
$000
332
FEE
'MASK
8
4
-$1,866A1
$om
-7i3—
eM.":ZT,!�T M.,K DELETED
8
8
-8
-$2,844,71
$0,00
su
P!�Dq Plane - sued 10 TASK
4
-8
1 -8
$2,057,43
$0,00
135
Paw.ti' %rtel Ma.iki PWs-SUpp 10TASK DELETED
-4
"8
8
-$2.057,43
$0.00
3,40
-Updto $term Driamigto AeMrf ^ Sup, 19 TASK DELETED
2
4
-32
8
-4
-$5,76042
$0,00
350.:
Update Cost Eadirmade - SuM, 12JASK DELETED
-8
-16
$2.565.59
$om
350
i
UMW
311
t��iw;;VTASK
ad 60% - SME 12 NEW TAW
$0,00
$0.00
362
M-S,#,pl2 NE TASK
$000
$0.00
763
7
T�;
M !M � to W% - SUM 12 NEW TASK
$0,00
$0,00
3.70
TEAL Sopplemorri, 01 - Spa 12 NEW TASK
W,
M/N I
............
', M,
3.71
Ahnafi.ArV—tL,,-ft-SuM12NF.W TALK
2
J
1 16
23
24
1
so 00
$7,24353
372.
FwJuWIo,.fAke—AAq--SdM12NFW TASK
2
16
76
$0 ,00
$9,69819
3.73
TS&L.R.Mrt$uM1-90l -SM,12NEWTASK
2
16
88
24
4
$0,00
$13,496S1
3,74
Doeba Team sou City R.4 — M.* -6u 12 NEW TASK
4
8
8
$0.00
$2,56769
3M lRalsl
Bear Asieersaaam of!Z7Z�iid!�— -11upp 11 NEW TASK
$000
$000
381 1
Beer ard L— T�
16
15
$000
$3,68876
392
H.,U-W and V.k.1 TASK
2
32
55
16
¢0,00
$11,688,53
383
TASK
2
a
20
4
$000
$3,75699
350
NEW TASK
2
15
8
$0,00
$2,50550
Su , 10 L.I. Rore,ed, ,U.w
-4
0
-SB
40
-60
44
-4
0
S,4X, 12 1— AddA S,m"A
14
0
1 114
0
1 300
76
1 0
4
-$23,516.44
$54,645.71
CIVIL (KPFF)
16
40
40
10.00
$0.00
$0,00
$10,133.98
4.0
am
NEW TASK
TASK
16
40
16
0
E02
$7,661.36
4M
CkAntiflell add C*M E$tIrrj1i�,2,E TA SK
8
40
S000
$4,86582
4,110
NEW
all I RaMN A.-- Ui T.,
L
16
24
8
p0,00
$5,34967
4,70
L"1,Supp12NEWTASK
4
14
14
32
32
8
$0,00
$11,216.71
S,,,, 1a Labor 4
'
0
0
0
0
L
,5-, 12 lwa&.
4
0
70
14
176
96
8
0
$om
$39,227.55
!!L�—dui
ENVIRONMENTAL AND PERMITTING SERVICES Landau
mm
$0,00
$000
$mo
I
$000
5A0
$110
USCG Nevi gation Sd od Mid, permit App, + S.M, 10 TASK DELVE.
—ND—
raw A.--, , jil TASK MODIFIED
$0.00
$000
5.20
Tree .--I _::, TASK MODIFIED
$0.00
$0.00
5 wl
Bi .0-IA—sma" FC
24
-16
$4,902,03
E0,
3
$E
��SU=KDEUETED
Ugluing Study Su K
Mort seap I
$0.00
$000
520 -:
$0,00
$400
��M4Ma��0111111D
12 NEW TASK
$0,00
$00
- 00
5 W
Melork M_t_ _ Supp 12 NEW TASK
$0400
$000
44,902.0
$0.00
Sd, 1z L—, Addkd S,,b-g
0 1
0
0
0
He 2014 11 04 G—trnwd F64 Eafimata (AOd&P—oved) v1 Ad P,,q. 1 .1 14
62
H— Summary KP<F Gansultlrig EN-5
ENGINEERING COST ESTIMATE: T.k.fl. L,l Canter- Pild.iitriawSmycl. Biridg., Sul 1 12
ARM 23, 2018
KPFF C—L�g E —e
KPFF
§Up"p-
lierrient o�
p61nFip.
'che'ge
T.l
S 4
i el
P,.J,.t
Manager
S.-,
Dg—.,
i
Et,gltt—
CARD
T.h--
P'.1.1
C—dlinat.,
Aftnstwj.
in
S.pO I OF..
fl--w
MULTIPLIER
Supp 12 Fep
Added:
MULTIPLIER
It., SCOPE OF WORK
Swe 10 Rates
S62.50
$60,10
$50.77
$43027
$32689
$35,19
$24AI
$20,00
2,7516
F; P
$64,43
$64,04
$54660
$4500
$35,40
$39,23
$28685
$20.00
2,6262
7.0
GEOTECHNICAL - Supp. 12 NEW TASK (Landau)
$0400
$0400
7.10
FWd 1 12 NEW TASK
720'
Gwtahi 12 NEW TASK
$0,00
$0 .00
S� , iO Latur
0
0
0
0
0
0
&" 1214—
0
0
0
0
0
0
0
0
0
$000
WOO
$0,00
$0600
8.0
RIGHT-OF-WAY SERVICES 1
t124
*�
TIIWO—..p g;;;W
821
LFSTMw1a—,1*R-ww S-10TASKMODIFIED
$0600
$0604D
832
11 1, E= ED
11
-40
-80
1�
-$14,377,22
$000
W.
-W 7L _nI1
TZ FIED
a
$0400
$2,674,54
833
T RV9*fEnl - SWp 10 TASK DELETED
$TOO
$0.00
i -TASK DELETED
$000
$O'Q
6A01.
R.WIAIn I + i 12TASK DELETED
$0.00
$0,00
8.81
FHWA 10TAWDELETED
$3,00
$000
SAO
! ffiii
Oft
8.81
$D6DO
$0,00
21 cl Tr P—I(2523O4-M1)tkw12TA$Kl _0
$0,00
$000
3A- i ki Pi— LUG Ol BWdxq Parcel Sul " TASK DELETED
$000
$0600
38 - i Rl Pike. U-c Oft. Di P- 4(252304,90311 2M 10 TASK DELETED
$0.00
$0600
4A -DROP i PUr ITS Offim BAc*V P—I (252304-W77) - Supp 10 TASK DOLE TED
$0400
$D'OO
4B - BACP F#-vi -Paves l Off" Bel i L252104-9077X SWp 10 TASK DELETED
$0,00
$0,00
5- i Riwaiew Plaza LLGQltke i P—A (ZiOA,90M, $011p 10 TASK DELETED
$0,00
$0600
6 8wllk Put UMbm Stem WY i (2522(34-t ) � 10 TASI(DEL E I ED
$0.00
$0600
7 Pk i li 0115mBikVi (002310. � -Supr12 TASK WIDIFIED
$0600
$0600
8 Ai i LIC fl.W P-0 (0=100W) - Supp 12 TAW MODIFIED
$0600
882
-Rl INs. I Fi i - Supp 10 TASK DELETED
$0.00
$000
BAW
G— Rtvw Trail i Nogottiod—nd Modiftaffm -Supp, 12 NEW TASK
1 $0,00
$000
S!!E �� Re,—�, W.W
L
0
0
0
-aO
-16
0
0
S�LO
Sul
0
a
a
0
12
4
0
0
414,377.22
$2,674.84
ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPIFF)
$O'SO
$0,00
9.0
910
A*J" Ste—I Di SW " NEW
9.19
307: ` �l �
2
25 1
60
$0,00
$8,844.15
9t2
Desch Span Dr - . 12 *��
2
70
45
$0j00
$11,482,30
913
lkmrN 2NEWTASK
S
2
70
45
$0 00
$11,482,30
14
'.4 Spp 2WW TASK
O'gi
2
1 50
30
$0,00
$8,077.56
Supp 10 Let- R—el S.It xA
0
0
0
0
0
a
0
a
S M, 12 14- eletel
8 1
0
0
0
1 215
180
0
0
$am
$39,886.31
1
�S',
BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN)—
MORNSOM
OliIiiiiiiiiii
$0.00
$0 ,00
100
i T."
-T.—i 1-
NEW TASK
$0.00
SOVOO
1012
C--t— , S— Ski SL" 12 NEW TASK
$0,00
$0,00
10,13
C-0— - i Di 12 NEW TASK
$000
$000
10,14
V--6— Tied A16 12 NEW TASK
$000
$0..00
1020.'.
i - 12 Nil TASK
'77q��Tgg77
T-7 777W
6
1021
DkT,..—e 12 NEW TASK
$0,00
$0,00
W.V.
:H—W Systan --Supp 12 NEW TASK
i
$0 ,00
1020'
0"gn Dl wid i - Supp 72 NEW TASK
M11M
/ /,' p
$100
$0,00
10,31
TW&aSkha--SPgp12NEW TASK
1032
W- Ape—t$�Wi--S� 12l TASK
$0�00
$0,00
1033
W TASK
$0,00
$0400
7_
34
VM=MSypl
- Surq, 12 NEW TASK
:
$0,00
$0400
1035
R—WI�p - &PP 12 NEW TAW
$100
$0,00
Otm,
a
0
0
0
0
0
0
0
SO.DO
Sign, 12 Labs A<Idal �S—EN�.!
0
0
0
0
0
0
0
0
$0.00
H—.,.
.4 1
0 1
216
I=
-40
1 14
ME
-140
1 703
356
8
0--1
1
$0000
-$42,795.69
$0,00
$142,583.07
Supp 10 Labor Removed Sum
Supp 12 Labor Added Sun
Reimbursables
Firm Total
DESIGN TEAM TOTAL
I
Reimbursables
Sum
$0.00
$0.00
JKPFF SUBTOTAL: -$42,795.69
$142,583.07
Total Addtl Fee (Supp 12 - Suppl 0) $99,787.38
_
File 2014,11 04 Ccirnbnac[ Fee EOMate (Add&H—o-1) vl is Page 2 cf 14
63
EXHIBIT G-1
KPG,
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12
Classification
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate
Reimbursables
Adjustments
Supplement 10
Subtotal
Total Hours X
74.00 X
0.00 X
164.00 X
216.00 X
20.00 X
0.00 X
Rate = Cost
$0.00
$6,581.32
$6,750.00
$953.20
$0.00
DSC Subtotal $19,087.12
163.17% $19,087.12 $31,145.31.
30.00% $19,087.12 $5,726.14
Fee Removed -$18,478.20
-$18,478.20
ISubconsultant Total: $37,480.371
Date: 4/23/2015
M,
Hour Surnmary
KPFF Consulting Engineers
ENGINEERING COST ESTIMATE: Tukwila Urban Center - Pedeatrian,Bicycle Bridge, Supplement No. 12
F0. 2014.11.04 ^.rrt -nod F- FSt—lo (Add&Removed) v I Page 3 0l 14
65
H., Summary KPFF Co-Ot,ag E,9-a
ENGINEERING COST ESTIMATE: Tukwila Urban r-tar - Pedestriata/Bicycle Brid9g, Supplement No. 12
APO 23, 2015
KEG
KEG
TUkWIa bi�ba'li` Ce'n'ter "Pdd6st'ri'an/B!6i le'B,r'dg�e",
, I ' I "I I " " , ; , I,
SU'�pldriien't 1� o , 1 11 2
so,,10,
UD/L/E
�.I
"' I I S
E
D.Ig
JD/L/E/S
CAD
T�h
Survq
C-
Off- Ad�,k,
Soft t0 Foe
P
Removed
Supp 12 Fee
Added
MULTIPLIER
MULTIPLIER
S-pp 10 "t." $64,90
Item SCOPE OF WORK Supp 12 P.I.e $64,90
$56956
$40,13
$31,25
$47.66
$23908
2.9317
$56.56
$4013
$31925
547.66
$23,08
7.0
GEOTECHNICAL - Supp. 12 NEW TASK (Landau)
$0,00
$0,00
7,10
ROWS o llooand Labo-y'rlating, IlOpp 12 NEW TASK
ZZl
rvotschnical Evalustlon Re kV and Mash "9% - Supp 12 NEW TASK
$0.00
$000
kL;,o 10I al- R-- Subtotal:
0
0
0
0
0
0
121 d- Allxt
0
0
0
0
0
W.DO
$0.00
RaurvlulsaEUes
$0.00
$0.00
8-0
RIGHT-OF-WAY SERVICES (DES)
SM
TMWO-hip R.law
$0�00
$0.00
821
:UFS Tidla-H, RZ TASK MODIFIED
11U)(l
ula col"on am Until 'Zn10
$000
aw-
Righ, d-Wy LkTft eW EaaaPiada 10 11�11!FF�11)
8 V
$0,00
$0,00
SM
FI*YfA- P-0 - S- 10 TASK DELETED
$0,00
$000
I. A,,$9,6- TASK DELETED
-2
-20
-10
- $3,600.83
$0,00
'1180
12 TASK DELETED
$0.00
$000
861
FHWA ROW -Segi 10 TASK DELETED
1;0.00
$000
&W
ANulsitlan N"odation, PWocatl6n aW cloliaoul
77 277
9, )X11, ,
$0.00
5000
-7�7
P-1 &4,?- Npdlbe
I Frof-I!, SIP* F.,* Reeidaroe FW- (1WM-D=) 11' TASK MW ED
"....2 -d &�KMODJFI,j ED
$000
$000
3A -BRCP RN-kw P 04 9WS, - &W 10 TASK DFA E 11D
$0.00
$000
3(3-BRCPRKexrrewPk..LLCOfr-Bu"PNCIAr1523049M9) Sup, to TASK DELETED
$0.00
$000
4A, BACP Rh-,kw Plao. LUC Mi. N" P-al E2523049077) - Stipp 10 TASK DELETED
$000
$0,00
4B - BROP Rk.,i- Pat. LLD DO- Ele"y P-d - Su to TASK DELE ITT)
$0.00
$0,00
5 � BACP Thom. w Pa. UG Offloa B�UZ���!7 11 TASK D11-11-111
$0.00
VP0
0 TASK DCLF I ED
$000
$0.00
7 - Pak H" E,bib LL C C Ik,* [**B.* Piaod ( 10- 0040) - Supp Q TASK MODIFIED
$000
$000
8-AKJo-PIwaLLCRoWPwcoI(O lG0099) Supp'12TASKMODRIED
$000
$000
&W
fN.4-f N.%�!TASK DELETED
$000
$0900
SUN
(;,_ Rh- T.11 E-1 Ma,,i kalke - Supp. 12 NEW TASK
$000
$000
.P, 101.. alw' F7mnovod 'Ubluw
0
-2
-20
-10
0
0
Supp 12 L� Added �bKol
0
0
0
0
0
0
4316M.83
$0�00
NalrzibusaNyw
NINE=
111limmilism
$ .00
$0.00
9.0
ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KIRFF)
9,10
A""SkoiaxatDavign S,"12NEWTASK
p
'p"
9.11
IP TASK
$0,00
$0,0
9,12
path. aralIX - Mn�WIW
$0,00
som-
913
Al- wid fh 12 NEW TASK
$0,00
$000
9,14
P-i. Dr W Rial, Dkjn -Supp 12 NEW TASK
$0,00
$0,00
Supp lO L- "-a- "jow,
0
0
0
0
0
0
12 AWd
0
0
0
0
0
0
$0.00
$0.00
Roimtursatvas
MEN
$0.00
$0.00
10.0
BRIDGE AESTHETICS COLLABORATION -Su . 12 NEW TASK (ILMN)
A
10.10
TASK
oll
Arcti i2, NEW TASK
$0900
$0 DO
1012
Cor-0-SoaP Daum- Sopp 12 NEW TASK
$0,00
$0.00
10,13
Co,-tk- &k* Supo 12 NEW TASK
$0.00
$000
10A4
� TASK
$0,00
$000
1019
osch Rampa-Sd •14 NEW 7
= ,,,l
I'll I'll, ,
"I'll" I I'll, 1
Supp 12 NEW TASK
$0,00
1022
H,-,kA Sy- - Sopp 12 NEW TASK
$0.00
-Do
$0.00
10.90
SUM 12 NEW TASK
2 NEW TASK
SoOe
$0.00
1132
Wmi Apprp SkWJ- Supp 12 NEW TASK
$000
$000
1033
Supp 12 NEW TASK
$000
$000
10�34
V=�� - Su;ip 12 NEW TASK
$0.00
$000
10,35
R-kako - SUPP 12 NEW TASK
$0.00
$000
Sum ifl L-,
0
0
0
a
0
0
&W 12 L- A,*WA 111-1
0
0
0
0
0
0
$0.00
$0.00
RimtursabWS
Stipp 10 Labor Remove Su !n
sm
-73
�
-20
!!! "0-$18,478.20
$0.00
$0.00
$55,958.57
Supp 12 Labor Added
�1:4
�2
i2l
'4
216
20
Reimbursables I
Firm Total
DESIGN TEAM TOTAL Total Addtl
Reimbursables Sum $om
$0.00
F-KPG SUBTOTAL* -$18,478.20
$55,958.57
Fee (Supp 12 - Supp10) $37,480.37
P 1. 2014 11 04 C mbmd 11.101 Page 4 of 14
66
EXHIBIT G-1
Universal Field Services
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center - Pedestrian /Bicycle Bridge, Supplement No. 12
Classification
Quality Assurance
Project Manager
Acquisition Specialist
Relocation Specialist
Sr. Administrative Specialist
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate
Reimbursables
Mileage
Misc Expendables
Cost
Adjustments
Supplement
10
Supplement
10
41.00
Subtotal
Total Hours
X
Rate =
Cost
7.00
X
$52.00 =
$364.00
41.00
X
$42.00 =
$1,722.00
46.00
X
$38.00 =
$1,748.00
80.00
X
$38.00 =
$3,040.00
14.00
X—
$30.00 =
$420.00
DSC Subtotal
$7,294.00
48.09%
$7,294.00
$3,507.68
30.00%
$7,294.00
$2,188.20
120 miles @ $0.575 $69.00
Photographs, equip rental, etc $150.00
Reimbursable Removed -$12,584.50
Fee Removed -$25,226.93
-$37,592.43
ISubconsultant Total: -$24,602.551
Date: 4/23/2015
M.
R.", Summary KPFF C.,Ihnq Engineers
ENGINEERING COST ESTIMATE: Tukwila U,ba. Came, - Pedestrian /Bicycle Bridge, Supplement N.. 12
April 23,2015
UN-e.I Reid S-m.
UPS
T6k labrb' " ' ' ' "t plediiWita`h/p; `)3"d
c en, er - rlFei,
Supple'mi 'e'n't No. 12
Quality
Assurance
P,q.t
Mg�
Aqtwn
Spjal, 't
S,
Adriinistral-
Sp.i.jmt
SUPP I 0 Fee
R.T.,ed
Supp 12 Fee
Added
MULTIPLIER
MULTIPLIER
ft- SCOPE OF WORK
Supp Rat.
$50,24
$42.00
$38,00
$3800
$29,00
2,0210
Supp 12 Ra10e
$5200
$42.00
$38.00
$38,00
$30,00
1,7809
1.0
PROJECT MANAGEMENT
IAO
MI- -
D. K KPG & KPFF)
NEW TAI
$0,
$0,00
ISO 1:
V11
T:" T. KPIRS
$0,00
$000
0
0
12 L_ �l
0
$0.00
$0.00
NWrnNUSatdae
$0,00
$0.00
2.0
TOPOGRAPHIC AND BOUNDARY SURVEY (KPG)
2.10 i
A"ti-I .,,y and -pping
2112
E-ld . d C..., P$- Tnil - SuF 10 TASK DELETED
$0,00
$0,00
213
�ITASKADDEU
1$0.00
U
$0,00
&.pp 1. t.atwr Pw"
0
0
0
0
0
S� 12 Lak. Adkd S4.tal
0
0
0
$0.00
$0,00
RWmtwrlm
$0.0
$0.00
340
3.10
ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT. ALIGNMENTS (KPFF & KPG)
Sunn,I, at RlhNw PWn Pwklm Lot- Supp 10 TASK DELETED
LEM'
j
$0,00
$aoo
3,11
1 Uffitvtw NotUaed &m 10TMKOELETED
320
W.W-, S-V- P Wq - T,.# AII,. -SBMMa, S." DCL.CTIM3
"TA
$0,00
$0.00
3,21
��62K
VAR AW-t LEE
OF
3n
Rh,a,l.wfi,#,r/ �IyLl:ll!i
;-. IVW9��,D ,
$0,00
$0,0
323
.{orRK.V-P" W--d-k.-10TASKDELETEE)
$0.00
$0.00
324
SupplO!7TA$KDE ED
$0m
$0.00
3.30
30% flans -8 10 TASK DELETED
$000
$000
331
iSinP trwWm - 10 T- OF LETED
$0.00
$000
3,32
Ulatim - 10 TASK DELETED
$000
$000
3,33
Stor.Dninra G" -$,"IDTASKDELETED
$0.00
$000
334
. P.Wiw PI.-.: Sl 0 TAM DELETED
$0.00
$000
935
P_ Makkv PL - '.T TL
$0.00
$0,00
7)"L
Uld, 0TAE.ELET
$000
$000
350
D 1. Cost Estlrnb =SU W, TASK DELETED
$0,00
$000
3M
N.W T,,O All g- - Spp 12 NEW TASK
F
361
T,al I- F, 60%. S," 12 NEW TASK
$0,00
382
-Sp 12 NEW TASK
$0.00
$0,00
,L--m.W%
383
T. mz.,&12 NEW TASK
$0.00
$0,00
3.70
ES& L f 01 � Supp I8 NEW TASK
...........
ms
171
Aft-t�. 12 NEW TASK
$0m
$000
172
!t��
EvWnfi. 12 NEW TASK
$000
$mo
1,73
TS&L Papon Sar.TA-t 01; Sum 12 NEW TASK
$0.00
$000
3.74
Dmig, Teara and City HM rV - SopP 12 NEW TASK
$000
$000
IM
F.W Fun Aviml of N P,.f-.d Align-M, 5,pp 12 NEW TASK
$0,00
$mo
3,81
<Wier and L- Contrakla - Spp I , NEW TASK
$0 00
$om
3,82
NEW TASK
1krwanftl " Va," Alqn��
$0,00
$0.00
3.03
F12
D.ipT-aACftyR.4.w W TAtIK
$0,00
$OrOO
S.W
W-Jan Gr,pN,, : SU pp 12 NEW TASK
$0,00
$0r00
Supp 10 La- &ibU
0
0
0
a
0
S," 12 Leh, AddW SuNUat.
a
0
0
0
0
$0.00
R�amtwrsaMxs
JOIN=
$0.00
$0.00
4.0
CIVIL (KPFF)
$om
$000
4.30
TnI All gann and 1010"Ing -Sup 12 NEW TASK
4M_
81- Own" Approach -Sum 12 NEW TASK
$0m
$000
150,
Oad COp Extant., SU pa 12 NEW TASK
$0.00
$000
4M
Wall I Elating As-uanat - Supp 12 NEW TASK
$OrOO
$0,00
4.70
30% Pla-Inal 150up and Layout -Su 12 NEW TASK
$000
$OrOO
S P, 10 La ,, R d S.Nal
a 1
0
0 1
0
0
s 12 1*. Added S.1-
0
0
0
$0'00
0J
02.
$0.00
$0.00
5.0
ENVIRONMENTAL AND PERMITTING SERVIEES Landau )
SAO
W_S
N,,19"-
USCG 0" W Bricige Pwnft U IO
App� TASK DELETED
$0,00
$0,00
5 20
T-A-1,S.Pp19TASKM RED
$0. 00
$000
Ste
T- A--I - Sapp 12 TASK MODIFIED
$0,00
$000
521
N � Supp 10 TASK DELETED
$00
$0.00
_W_
.
!Ml TASKMODWIEO
$000
$000
SM
$000
$000
so.
Ml!�,Stpq*12TASKMODIFIED
M IM-4etv - �pp 12 NEW TASK
$0,00
$0,00
SM
HISW I_fmy-SaPP12 NEW TASK
$OrOO
$0.00
S_ 12 1- "�l S��.v
0
0
$0.00
$0.00
Prnmtxrtsadas
$0,00
$0.00
File: 2014 11 04 CoulbIlled Foie E sfllate (Add&RamoveJ) V1 Ifs Page 5 of 14
68
H- S,--y
KPFF C-,sung Engineers
ENGINEERING COST ESTIMATE: Tukwila Urban Cant,, - PodestflaniBicycle Bridge, Supplement No. 12
Aont a 2015
Universal Red Services
UFS
ge,
Sup'Oe�fi' ent �o� 12
""I"
A_'n...
P10).1
no
Manager
A qu.fte
S�iali,e
spoclefist
S
Ad--nob-
sp-HM
111pp
Fort, .. d
S'po 12 Fee
Added:
MULTIPLIER_
MULTIPLIER
It., SCOPE OF WORK
Supp 10 Rates
$50624
$42400
$38.00
$3800
$2900
2:0210
Supp 12 Rates
$52,00
$42.00
$38.00
$3800
$30,00
1.7809
7,0
IGEOTECHNICAL - SuoD. 12 NEW TASK (Landauj
$0 .00
$000
7.10
F4;1 Ea oration and LaborarortrTasting -Supp 12 NEW TASK
720
G".dkud Ev.1.0., R q " M"ON. - ftpp 12 NEW TASK
$0,00
$0,00
Supp "I L #wr Ilona- 1-dal.
0
0
0
0
p
S- 12 1- Added Sutro.
0
0
0
0
$0.00
$0,00
Rai b-H.
$0.00
$0.00
8.0
RIGHT-OF-WAY SERVICES (UFS)
02D
TM*Onwtdp P-1arw r
1
11 1
8,21
UFS TW.TrataaOtip Ha� - 8,pp To TASK OODIRED
-6
-3
-5636,62
$0,00
JIM
D.. C.1.11- and Unit W..9ficallo.
7
-2
f4grot-Way tintlis ME nens -5� 101 ASK 1,K)OWILU
$o'De
$0600
832.
BW.4.Ww LkNft and Eawrarara - Sopp 12 TASK MODIFIED
$0.00
$0.00
8,33
Ten,,ouvyRI*oIEnkyA-P-0 -SL"101ASKDEW.TFD
-1
-2
-10
-4
.$1,273,72
$000
ON
Logal rt-ipdoes 'and EA&W WA - TASK DELETED
$0,00
$0,00
030
R.W.0- Plan - Supp 12 TASK DELETED
4
-
$om
$29919
861
fHWA Forka AartoLattor, for ROW -1St 10 FASXDEAETED
-6.5
-$499,19
$0,00
SRO
M
M0 T
-061
X I
I - W- I Fid-lu * LTRask$- P-0 OW�M) �ft 12 TAW MODIFIED
3
13
80
6
$0,00
$6,984,69
L- (2523M-9061) S� 42 TASK MODIFIED
2
16
$0,00
$1,23238
����ParA
3A -C !nd (25Z104 WG% - SwP 10 TASK DELETED
L
-1
-3
-25
-4
-$2,510,57
$0,00
38 EEPqCP A- ULC paroO (2,523bl W39) -8.4V 10 TAW DELETED
-1
-3
-25
4
-$2,510,57
$0,00
4A -BEEF RK-4-Pfau LED Off BkkV P.cet gMMF%771: -:Sure 10 TASK DELETED
-1
-3
-25
4
-$2,510,57
$0,00
48- EDGE flivaAaw PU- LLD -S- ID TASK DIUETID
-1
-3
-25
-4
-$2,510,57
$0,00
5 - Eflcp f1waliaw Puna I I c Ot -.Su M 10 TX$K DELETED
-1
-4
-30
-6
-$3,096.66
$0,00
s,id,P,#,,kutws,,SmrmWa uckyPwcei(2.52w49o4s) Supp 10 TASK DELETED
-1
-5
-30
k
-8
-$3,181,54
$0.00
-1-
7. Park Real Eatak, LED Ofte Bkkg�Bauk P-4 (00231eOW) - 94P 12 TASK MODIFIED
4
$0.00
$299,19
8-&xko,xPa2AUOR,*APwWre=Io-o(rog Supl,12TA5K MODIFIED
4
$0.00
$299.19
8,82
RoWotko NismamimithPx*-SupplOTASKDELErED
-3
.10
-65
-6
.$6,496,95
$000
$,too
G- Rive Trail E.- Ngoll.0- and Modilleaden - Supp. 12 NEW TASK
4
14
30
8
$OM
$3,875.24
10 LaMx P.-J SlIL1tIXW.
-t0
33
-182.5
-65
1 -41
1 e"j, �uoee
-
7
41
40
W
14
425,226.93
$12,989.88
Hermt,ursataas
ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF)
NEWAIM
$0.00
$0.00
9,0
9.10 ;
k 11 NEW TASK
911
IN- AJI7-- Soo, 12 NEW TASK
$0.00
$000
9.12
NEW TASK
$0,00
$0600
.13
EW12
TASK
$0,00
$000
9.14
R- Doled Shan roast, Sopp 12 NEW TASK
$0 .00
1 $0.00
S, to Lalrx R- sel,.A
0
0
0
a
0
SO
$0.00
Seep 12 tao� AJkd Sebuia
0
0
0
0
.00
1 HannWraaFMm.
BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN)
MANNIKIN
$0.00
$219.00
10.0
10.10
ASK
-7-11
TASK
$0,00
$000
1012
Q-11iona - SUsn Gbi V NEW TASK
$OrOO
$0609
10.13
C-Ik- - 130ki, Deck -: 126 NEW TASK
$000
$000
10.14
Caerarliko-jkjAn�h�tk� 2NEWTASK
0°/r 0O
$0,00
M20
� S.WJ2
App,-t R.." NEW TASK
.,1 /$r
"'q
10,21
Dw-kTrwansoft - Sure 12 NEW TASK
$0=
$OrOO
10.22
Randall Stswrn -Sapp 12 NEW TASK
$OrOO
$000
10,30
pang. Mvai -Land Cow!Z!�� 12 NEW TASK
$oM
$000
1102i
JadAuhSafa--.pp1
10.32
W- Apraub Skodws - 12 NEW TASK
$0,00
$000
10.11
Fast Aprt-b Swikiwa - 12 NEW TASK
$0 DO
$000
10,1{
Sh.* Jkew4 DIWoo- - Soup 12 WV TASK
$0.00
$0900
10.35
Raodkw-:54 12 NEW TASK
$0,00
$0,00
Supp f 0 Labor P--d sebu,el
0
0
0
0
1
$0.00
$0.00
I? La. -kol S.K-I
0
0
0
$12,!Met,50
Supp 10 Labor Removed Sum
-10
-33
183
tt�"
65
;4'
- $25,226.93
'9
E$128.'9..08'8d
Supp i 2 Labor Added Sum
-
1
7 4-1
R
.
Reimbursables
Firm T.-I
DESIGN TEAM TOTAL I Total Addtf
Reimbursables Sum -$12,584.50
$" 9,
SUBTOTAL* -$37,811.43
$1 3,20
Fee (Supp 12 - Supp10) .$24,61
File: 2014 -11.04 C-b-1- Fee Estimate (Add,&R-ed) v1 xls Pegg 6 of 14 69
EXHIBIT G-1
Landau , Associates,,',,,,
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12
Classification
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
FF Rate
Reimbursables
Total Hours X
1.00 X
42.00 X
0.00 X
16.00 X
50.00 X
28.00 X
79.00 X
21.00 X
0.00 X
Rate = Cost
$72.22
$1,925.70
$0.00
$629.92
$1,678.50
$872.76.
$2,083.23
$649.11
$0.00
DSC Subtotal $7,911.44
$7,911.44
$16,576.84
$7,911.44 $2,373.43
Adjustments
Supplement 10
Supplement 10
Subtotal
1 -$104.04
-$20,696.00
-$678.02
ISubconsultant Total: $26,183.691
Date: 4/23/2015
70
H-r Summary KPF F C011SUMlIg Engir-95
ENGINEERING COST ESTIMATE: Tukwila Urban Centw - Podestriawilmycle Bridga, Supplement N,, 12
Fl. 2014 11 0,l C—bllod r.. Es1-1. (Add&R.,—uJ) v1 .1, P,g, 7 cr' 14 71
Hun, Summary KPPF C.-A,rIg Engineers
ENGINEERING COST ESTIMATE: Tukwila Urban Canter- Pedestrian,etcyde Bridge, Supplement No. 12
April 23, 2015 -, ;-, , I I I I 1 1, 1 � I I 1 11
Landau Associates
Landau
Tukiiii Urban, Center' PbdettriAn'/BidY66�13'-d
1 1, 1 11 ", I", 1 11 1 1 1 , I p ge,
Supplement No.'I2
Pn-p.l
A.-I.
S-
So""
Project
Nq.t
S.11.1
CAD
StafVS.11-
Toohnia- I
P""c',.
Pi a
-',"
CAD�GIS
Technician
S�pp 10 Fee
Removed:
Supp 12 F-
Added:
MULTIPLIER
MULTIPLIER
It- SCOPE OF WORK
Sapp 10 Rates
$65,00
$47.00
$40.00
12620
$31,00
$2500
$29.00
$24.00
3,2587
S pp 12 Rates
$72.22
$45.85
$42.20
$39,37
$33,57
$3117
$26,37
$30,91
$27.64
3 3953
7.0
GEOTECHNICAL - Supp. 12 NEW TASK (Landau)
MMEMEMM
20 58
2
$0,00
$7,682,48
7.10
lfleld!��FIZ Labanuery Tood2ii - SM 12 NEW TASK
i,Z B
30 2
10
$000
$4,680.56
Sarin 10 Lak�' brow: S-0
V I . A,,, Ad �,N
&W irdlS�4
0
Vo
0
0 0 a
50 2 68
0
12
0
0
$0.00
$12,363.03
14al
RIGHT-OF-WAY SERVICES (UFS)
TltlMOwrarstilp R.Ww
g
$0.00
$16,21690
0.0
$21
TIES Trt.A>.-" RZ��O TASK MODIFIED
$0,00
$aoo
8.30
Data Collection and Until
$000
$0,00
832
Face' -'
832
ZM NE!E1
01 1 E;-!� N
$0 .00
$0.00
Bon
T-Wary Fly, af Er Ac 10 D T
$000
50 .00
ASMIE EFTLEEPE
L
$0,00
$0,00
cm
ii;4�Fglitha
TASK DELETED':
$0.00
$Oxo
8,61
FHWAF.,&Aat--Jark.ROW-8 10 TASK DELETED
$0,00
F00
8'si
P-4 N
MM
I MIN
WON
H
I
2-0212172-
I - Nal.. I Frot-A Sk4, F-Hy Reeklanoe Panel (0(x1590 M13i Supp 12 TASK MODIFIED
$DA0
$0,00
1 0 T11*11 Fl- T.4 Panwl (M�� T) Supp 12 TAW MODIFIED
$0,00
$0,00
CP PIN-i- Fare LLD Offkcl�2:!� L�wrel 11,12"-1139) - e- 11 T. DELETED
$0,00
$000
3B - BFICP Plne� ".. U. Peo, 10 TASK DELETED
1
$000
$0,00
4A - BRCP FlKvnview PW., LED Offio, Building Pwoal ETED
'5 TASK D"
$0,00
$0.00
48 BRcP" t.! PZ (24523OC9077) - Supp 10 TASK DELETED
$0.00
$ 00
S-BRGP ��Pip-L��; (215M4W18) S-IOTASKOELETED
$0,00
$0.00
6 --"*P1br1,IAi S-Wate, LM W P-I M23a4 Surr 10 TASK DELET
$000
$0.00
7- Park Nal Esaaa LIC Offioel3kilyflank PwA TASKMODIFIED
$0.00
$0,00
8- Ardo,,, PlaaLLC Held P&W -Sap I-A "IFIED
$0.00
$0.00
8W,
Ral-t"' (NeleanlFaihnin, P-0 -suRR 10 TASK DELETED
$0.00
$0,00
8.100
G- III- T.11 &-ad Natifttlaa and Modflefien - flam. 12 NEW TASK
$000
$000
S 10 Labor R-1 SuN"I'A
0
0
1
0
1
0
0
0
0
Sul 12 1.4-
0
0
0
0
-0
0
0
a
$0.00
$0.00
RVWM
§Nn=
S0,D0
$0=
9.0
ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF)
910
AMke1Se-WD-iqo SuW12NEWTASK
9,11
Updad. 30% Pt Deft. to New TASK
$0,00
$0,00
912
���W
50,00
$0,00
9,13
AbuimeM aM Dtd 12 NEW TASK
$0,00
$0.00
9,14
� R DAled Short Daakn : Sopt, 12 HE W TASK
$0,00
$0.00
5 10 Labor A-SUbtoW
a
0
0
0
0
0
0
0
0
Sup, 12 Labor A� S-�
a
0
0
a
0
0
0
0
$0.00
$0.00
Rofn-AAS
$0,00
$0.00
10.0
BRIDGE AESTHETICS COLLABORATION - Supp. 12 NEW TASK (LMN)
Bridge Structure. Supp 12 NEWTASK_
_iollo
10.11
kah(I-Poe y- 6app 12NEW TASK
$0.00
$000
1012
r-tow -sUep CW*. �!ZTI'1'14 1=
$0,00
$OrDQ
'%w10013 Conneorare - Bridge Ddk - 'T
$0,00
$000
10.14
Cain -Abos - Tied Ah • Sapp 12 NEW TASK
$GrOQ
$0.00
1020
ouch R S 2 NEW TASK
-
7 7
7_
021
b- u� 12 NEW TASK
$0.00
40,00
-1022
Hancloil Srt- , Supp 12 NEW TASK
$0,00
1 $0.00
70.00.
Devitt" DavN nl and Coordinati-, Suet, tit NEW TASK
0,31
TIM Arch Skath. -$- 12 NEW TASK
$0.00
$0,00
I0.32
Wear Appawh Sk*cfm - Supp 12 NEW TASK
$0r00
$0D0
10.33
E- Aplxrsoh Sleaah. - Earl, 12 NEW TASK
$0,00
$0r00
1034
S" Mania! -S,"12NEWTASK
$000
$0.00
1036
FwudorVe - Sapp 12 NEW TASK
50 .00
$0,00
I01.aWr fl-d S.I-A
0
0
0
0
0
0
0
1
0
S� 12 Lat- A-J SI,bIOA
0
(1
0
0
0
0
0
0
Rei-.a!A�
$0.00
$0.00
Supp 10 Labor Removed Sum l
0.0
-8.0
-86.0
-12.0
0.0
-7.0
1 -48.0
$20,696.00
I
$26,861311
Supp 12 Labor Added Sum l
1.0
42.0
-90-0
28.0
1 79.0
21.0
1 0.0
Reimbursables
Firm Total
DESIGN TEAM TOTAL I Total
Reimbursables
Sum -$104.04:
$20,1122.02
!GFd;u SUBTOTAL: -$20,800.04:$46,983.73
Addtl Fee (Supp 12 - Supp10) $26,183.69
Rle 20 I,t,l 1 04 C-bi,,,.A F,wnv. (Ad1A,1-,.E o,l Page 8 f 14
72
EXHIBIT G-1
. . . . ......
s
. .. . . ...
A -
w 'aq
. . .... .. .
CONSULTANT FEE DETERMINATION
SUMMARY OF COST
Tukwila Urban Center - Pedestrian/Bicycle Bridge, Supplement No. 12
Classification
Overhead (OH) Cost
OH Rate x DSC of
Fixed Fee (FF)
Reimbursables
Total Hours X
8.00
X
0.00
X
34.00
X
20.00
X
216.00
X
0.00
X
0.00
X
0.00
X
Rate Cost
$653.84
$0.00
$1,684.02
$663.40
$5,088.96
$0.00
$0.00
$0.00
DSC Subtotal $8,090.22
$8,090.22
— $15,409.44.
FF Rate '66 $8,090.22 $2,022.56
Subtotal $0.00
ISubconsultant Total: $25,522.221
Date: 4/23/2015
73
Hour Summary KPFF Cnnsuninq Eng,,-,
ENGINEERING COST ESTIMATE: T.k.jI. Urban Center - Pd.,t,i.n/B,oyc I. Bridge, Supplement N.. 12
April 2S, +2015
LVN kohvl�d,
LMN
TOkVtla'Urb66bb6ter-Ped6�tri4n/Bi&ycl6,Bridge,
p"
Su'plement'No'. i2
Pa ne
P,
-g.
D.g
� Pro
kollit.t
Ad-
Sp"s
QA 'QC
Supp 10 F.
Supp 12 F.
Addld
MULTIPLIER
MULTIPLIER
It- SCOPE OF YORK
supp to
2 Rates
$81.73
$32,69
$49,53
$33,17
$23.56
$18,75
$39.42
$38,42
3,1547
1.0
PROJECT MANAGEMENT
$0,w
$0,00
1.40
Doai Tam MwN a autm TASK (KPG KPFF)
1:5p'.
Pr act Team MAalin swlth E T; ,ZNEW
9��2.tZ
XPFF)
$000
$0.00
S,f4 L- R-- S,bto
0
0
0
0
0
a
a
0
12 L,4,,x AW,,l S,W�
0
0
0
0
a
0
0
0
$O.DO
$0.00
$000
$0.00
2.0
TOPOGRAPHIC AND BOUNDARY SURVEY (KPG)
ij F NV�
2a1)
AddIttonal s-y and mpping
212
3 E,*,,Aw afG-RWrftWt S,10TWOELFTED
$0 .00
$0.00
213
Su Nadi GRI, AdrM D"W MTN-Ekk*Ai' IL.a --Sn" 12TX4KADE)UD
$0,00
$000
Strop tO ti- R-.-I
0
0
0
0
0
0
0
2
0
0
0
som
$0.00
$0E00
$0.00
3.0
ALT. ALIGNMENT PRELIMINARY DESIGN & NEW ALT, ALIGNMENTS (KPFF & KPG)
110
S-,yt RN-W. Fla. P.,kIng Lot -Su IDTASK DELETED
3,11
-74tl
10 TASKI)EIETED
$0.00
$0,00
Wabc Satibiit. Parkl Lot TrW Aflgn-t SWW K DELETED
321
Trill Fl-%7� A#-iw F, R&-49w PIWA - ; I! LET
$0,G0
$0m
322
1 Fa-iw kw t srjdlae - 8 10 T TEO
$000
$000
3Y9
k, R . - - i. Tk D r Fn
$000
324
A�= 10 TASK DELETED
$0.00
$0,00
3.30
_3_
Pl.,r%M12 LASKDELFTED
222�_
$0.00
$0,00
31
Si. p S 0 TASK DELETED
mm
$0,00
3.32
TEO
$0000
$0.00
333
777���L `Seep 16 1 ASK Df. LLTFD
$0.00
$000
134
ELETED
$0,00
3�
77��� 10 TASK DELETEU
$0.00
$0,00
3A0
Update Sloan DraM! R l - S 10 TASK DEL TED
$0,00
$0,00
3.50
p. ct Em SIW ID TASTADELETED
$0,00
$000
1W
N-TWIA11g. . supp I NEW SK
381
�,. 6,99n . W%, �
a &�12 NUWTAIK
IL_
$0.00
_762
T,4 b 60y., &W 12
!:��
$000
$000
3"
�=Z. ,2-NEW-TA-K
$0.00
$0.00
3J0
T� 01 , 5.PP 12 NEW TA$K
3.71
Alig- 1,ne- 12 NEW TASK
$0.00
$0m
72
LW�= & AJ.,,W. AU9-. - Supp 12 NEW TASK
$0,00
$0.00
3,73
TM L Ram t 01, SWF 12 NEW I ASK
$100
$000
3.74 ,
Des Toms u City RIVIM - TV.44+t2 NEWT ASK
$000
$000
&W IF.IW
Fk. M--t of N- W;rF 12 NEW TASK
PIZ
�T
$om
$000
Rw L-�r 1�1
$0,00
$000
382
8uTi{i12NEWTXSK
$0,00
$000
3.83
D.6p Tenn aM Review 2!- I 12 NEW TASK
$0.00
$0,00
190'.
PnaentMlon GnpN)cs Se 12 NEW TA
$000
$0,00
L-, R- S,dL..
0
0
0
0
0
0
0
0
00
sum +11 Ur ,, Alkd S-W.
0
0
a
0
0
0
0
0
$0
$0.00
ILISM
NA'alm
11111m
FAIJIFM
loll=
$0.00
$0,00
4.0
CIVIL (KPFF)
0010m
$0,00
$000
4.30
Tra"AN9-t.ndM."Irrq-Sl�gqtT-K
4.40 15-
D.1-w App'.. _ p, TASK
$0,00
$0.00
0-11M and Cm E. %,M12 NEW TASK
$0.00
$0 .00
-4M
$0,00
$0,00
V��.t.&WUNEWTASK
$000
$000
114- 1-4
a
0
0
0
0
0
0
0
Sup, 12 1 - A,kkd,9,bt,W
0
0
0
0
0
0
0
0
$0.00
$0.00
RurnkwrxN4ua
Mims=
am
LINE=
$om
$0.00
a'
$0,00
5.0
ENVIRONMENTAL AND PERMITTING SERVICES (Landau)
5.10
USCG *vl tion S-Y • mW Bridg P*,W . - $� 10 TASK DELETED
S20 jTr-
As-, Su 10 TASK MODIFIED
$000
$0,00
5.20
Tm A-t- Supp 12TASK MODIFIED
$0.00
$0.00
521
S" 10 TASK DELETED
$0 .00
$0.00
=!Z��K M. ED
$0,00
$000
SIC
TASKMO04FIED
$000
$000
==4= W-37 12 NEW TASK
$000
$000
SE0
Hl.-f.I-W"-3Uppl2V WTMK
$0000
1 $000
0
0
0
0
0
0
0
0
$0.00
50.00 -
0
0
0
0
0
1
Fla: l.0'14. 11.04 Co L,,,wJ Fe,, ESM-it, (Ad f& Ralno-J) V1 XIS Pap 9 J 14
74
KPFF C—Oug Egu—s
ENGINEERING COST ESTIMATE: Tukwila Urban Center - Podestrianeicycle Bridge, Supplement No. 12
AqptH 23,2i015
LMN Architects
LMN
Tuk,Mlii" UrbanCenti Peddstirlan/Blic le,Brii:166,
yc
Supplement No. 12
Pa't".
P'.jeA
Manager
P'.j�
Desqn.
P'.j
sxt
noru
Adn,n
� sp—
QA Qc
Sups 10 F.
na—wad'.
S,,pp 12 F.
Added
MULTIPLIER
MULTIPLIER
Item
It. SCOPE OF WORK
Supp 70 Rates
UP 12 Ratan
W, 73
$32,69
$49, 53
$33,17
$2756
$18,15
$39- 42
$38,42
3.1547
7.0
GEOTECHNICAL - Supp. 12 NEW TASK (Landau)
$0.00
$0.00
7.10
91 Ta� 1! NEW TASK
72
=L�
Eve, Sure 12 NEW TASK
$0,00
$000
Sup is —1`1--il.b,ml
0
0
0
0
1 a
0
0
0
&,rp 12 LW AdAttiSi,b—
0
0
0
a
a
0
a
0
P'e."U-aH
$0.00
$0,00
8.0
RIGHT-OF-WAY SERVICES LFS)
IN n
p rtU 1 i "' I I
I
II
TiflatOwnnship Rwlow
8,21
UPS TWOO—hin Ra� 8— 10 TASK MODIFIED
$0.00
$0,00
am
. Wakour., U
Dart 41 Id-lift.Hr.
'1191101A
PAN.
7977577-7775
77
Ivg
&M
R4t-.1-Wwtkrh Easaw.i IOTASKMODIFIED
$000
$0.00
832
Ukuka wd Easeq-h, Supp 12' TASK MODIFIED
$0,00
$0,00
833
', iaraua nj S— DIASKI)FUETED
17—
$0,00
$0,00
i,34
Legal TASK DELETED
�0 00
$0,00
0,40
Uocatfoo Ran - Supp 12 TASK DELETED
$0,00
$000
861
FHWAFurwlaNr -bWWn -Sup,10TA5KI)ELFTED
$0,00
$000
—
881
A ouwd- N.'stwie- Rakwatbn aiM M—
P.,AAqAborNgAann
WOMEN
a
wwor'm
MINK1119001111
W/o
la,
l
"li
'ex55Q06WF 77-7777
I � Nol— Flonuat S a 1
$0 00
$000
RW 9�,,i��,DTASK
1R1h1.1.1i-
$000
$0,00
Pak. (2523.4
L C 0 16. au Id N P % Sep 10 TASK Dl
$0bo
$000
UTi P:.,g
�L
'PRb.'Ia`PW. UCO[Ilk.Mu Sum 10 TASK DELETED
$100
1;0.00
4A
1
$000
$0,00
4B, DROP RI,-6— Plaea LA C olk. Bak drig 'Paces f252304 9077) - &w 101' ASK DELETED
$000
$000
6 DFIGP 0-yew P4s>s L-C Offlo, 8±h Partial (252A4 90791, - SupplO TASK DELEHED
$0,00
$0
6 Su B, 107ASK DELETED
$0,00
$0.00
7-P.kR .WE,UWLtOOOk.bk$96 ask P-14 1A"" "U'"'D
$0,00
$000
8,Ak-Pa,.U-C P,WA Parce(taMG0,A- M.P 'ED
) TASK
$0,00
$0,00
8.82
Rk-AIk.(N1*./FrukeefiFaa1AA) ErED
$0,00
$000
ad.
!�T:KVE
Grw Mvw Trail Ea— 14,9.6.; M lfualon-S.pp.1214EWTASK
E. d.
15"" M t 4- ri— SbM'eat
0
0
a
0
0
0
0
0
Sup{, 12 Isay. A&k,!,�6t,aA
0
0
0
0
0
0
0
0
SO=
$0.00
Rm—'&A.
11RIM
N&IM
NEW
$0,00
$0.00
9.0
ADDITIONAL STRUCTURAL DESIGN - Supp. 12 NEW TASK (KPFF)
MOO
I
Add," SV—.W Daagq - $,,912 NEVY TASK
app.
9011
uad 30% eteg, New TASK
$000
$000
812
Ar4.—h Span .4 ��EW
$0
$000
9r13 I
Abaft— D"a. " D,ahri -Supp 12 NEW TASK:
$0,00
$000
9r 14
RaA.Dd1Iad Shalt D-ay1 SawI21,110TASk
$000
$000
0
0
0
0
1 0
0
0
0
S— 12 -W. A,kkd
0
0
0
0
1 a
a
a
0
$0.00
0.00
$0.00
$0.00
10.0
BRIDGE AESTHETICS COLLABORATION -Su . 12 NEW TASK LMN
Mm
` V
10000
10.10
Bfld!!,t— : ASK
Toll
_ !12
��Z I T AW
1
4
12
$0,00
$1,774,74
10012
0-5oa-. Cabl—Sup,12NEW TASK
1
2
1 12
$0,00
$1,462.23
1013
Cnrha 3 Bfk* Lack St" 12 NEW TASK
1
2
12
$0.00
$1,462.23
1014
Coe—fio,-:Tad fivch 1.,qpI9rNEWTA.SK
1
2
12
$0,00
$1,462.23
1020
AW—h RME.. SUEE 12 NEW TASK
10j21
N TASK
1
1 2
12
$000
$1,46223
1022
12 NEW TASK
1
1 2
12
$0,00
$1,462.23
-10.30
D"��=drabo • Supplilkli
10031
lad fia,::h SWO --Seen 12 NEW TASK
1
6
10
24
$0,00
$4,025.55
1032
Weal Anl Skekhas - Saw 12 NEW TASK
2
16
50 .00
$1,501.70
1033
'12 NEW
East Apyeeh8l,—lae ''F-AEW L
6
10
24
s0.00
$4,025.55
Wu
-udy Mow D'
2
1
1 40
$O'Go
$3,285.49
1035
Fi 12 NEW TASK
4 1
1 40
$000
$3'598'00
SuFK�tO L.- Har'o Subldal.
0
0
0
0
0
0
a
0
Si'?U9. A,"A S,�WIA
a
0
34
20
16
0
0
0
woo
$25,522.22
Houbi'rabk-,
Supp 10 Labor Removed Sum
MEN=
0 0
MMEMEEPENE1114
0
0
0
1 0
$0.00
$0.00
$0,00
$25,522.22
Supp 12 Labor Added Sum l
8 1
0
1 34
0
0
1 0 1
Reimbursables
Firm Total
DESIGN TEAM TOTAL I Total Addtl
Reimbursables Sum $0.00
$0.00
LMN SUBTOTAL; 1$0.00
1 $25,522.22
Fee (Supp 12 -'Su p10) x$25,522.22
File 2014 11 04 Combined Feu Estimate (Add&HIM-11,d) 11 As Paq, 10 of 14
75
CITY QFTUKW|LA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Tukwila Urban Center - Pedestrian/Bicycle Bridge Project No. 90510403
DESCRIPTION: Construct m new pedestrian/bicycle bridge over the Green River.
Peum�hambicydeoonnocdonbe�eenTuw�|a�U�onCemerandcommmerraivAm�nxe��on
xUGT|�|�AT|�N�
Supports local and regional goals and policies regarding land use and transportation in Urban Center.
Pedestrian System Report identified the optimal location for bridge crossing to be south of the Ramada Inn at
STATUS: 1oSO1 West Valley Hwy. Type, Size, and Location Report was completed in2O11 Council approved adesign
of a twin-tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway.
MA|NT.|00wACT: To be determined.
Design grants: State Enhancement for $190k & $500k, Transit Oriented Development (TOD) planning grant
COMMENT: of $55k, and Federal CMAQ grant of $751 K. WSDOT Regional Mobility construction grant of $6.870M.
Project is on Park Impact Fee list with funding of $2 million with an 80%/20% split for $1.6M.
FINANCIAL mxrvunx Estimated
[in 5;nnn,-,i 2ni i 2n14 2015 2016 2f)17 2018 2019 2n2O BEYOND TOTAL
EXPENSES
Design
921
200
442
1,563
Const. Mgmt.
150
700
850
Construction
1,000
5,485
6,485
TOTAL EXPENSES
921
200 1
2,692
1 6,185
1 01
01
01
01
01
9,998
FUND SOURCES
Awarded Grant
842
100
554
1,496
Awarded Reg Mobility
870
6,000
6,870
Park Impact Fees
79
44
70
75
268
2015 u000 Capital Improvement Program 12
Z City Of Tukwila
Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes
May 4, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building
PRESENT
Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Cyndy Knighton, Gail Labanara
CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:19 p.m.
I. PRESENTATIONS
11. BUSINESS AGENDA
A. Supplemental Agreement: 40th —42nd Avenue South Phase III
Staff is seeking Council approval of Supplemental Agreement No. 3 to Contract No. 12-010 with
CH2MHill in the amount of $437,583.57 for the combined 42nd Ave S and Gilliam Creek Culvert design
contract. With the Seattle City Light undergrounding from SR 518 to S 160th St, additional civil design
is needed and additional budget was added to the 2015 CIP. Design is currently at 60%. Council
action will still be required for the SCL undergrounding agreement, right-of-way, and the construction
bid award in late 2015 or early 2016. The Gilliam Creek culvert will require an above ground pond on
the north portion of the yard at the Way Back Inn house. Committee also discussed the need for 8
retaining walls, with the majority at the S 1601h St/42 nd Ave S intersection. UNANIMOUS APPROVAL.
FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA.
B. Supplemental Agreement: Tukwila Urban Center Pedestrian/Bicycle Bridge
Staff is seeking Council approval of Supplemental Agreement No. 12 to Contract No. 07-123 with
KPFF Consulting Engineers in the amount of $164,371.10 for additional design and right-of-way
acquisition services for the TUC Pedestrian/Bicycle Bridge Project. With the change in bridge location
to the north of Riverview Plaza, some of KPFF's tasks can be subtracted while new tasks are needed.
The project is currently at 60% design, but there have been challenges with the access to the Nelsen's
brown house. A meeting is scheduled for 5/5/15 with the ROW consultants and our City Attorney to
determine the best course of action for the needed environmental analysis at that property.
UNANIMOUS APPROVAL. FORWARD TO MAY 18, 2015 REGULAR CONSENT AGENDA.
Ill. SCATl3d
Bob attended the April 21, 2015 SCATBd meeting and will show the Sound Transit Light Rail Planning
presentation at the next May 18, 2015 Transportation Committee meeting. Bob also spoke on the Port
of Seattle's and SeaTac's Sustainable Airport Master Plan. With projected growth, SeaTac Airport will
need additional terminals, so they may relocate some of the maintenance facilities that are currently
north of the airport and use that land for the new terminals. Additional internal transportation would also
be needed to accommodate those new terminals.
IV. MISCELLANEOUS
Meeting adjourned at 5:50 p.m.
Next meeting: Monday, May 18, 2015
-Committee Chair Approval
Minutfls by GL
77