Loading...
HomeMy WebLinkAboutUtilities 2015-05-27 Item 2A - Update - 14139 56th Avenue South Side Sewer RepairCity of Tukwila Jim Haggelon, Mayor TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director A�6 BY: Robin Tischmak, City Engineer DATE: May 22, 2015 SUBJECT: Side Sewer Repair at 14139 56th Ave S Project No. 91540202 ISSUE Provide an update on the side sewer repair at 14139 56th Ave S. BACKGROUND In April of this year a complaint of the smell of sewage was reported near 14139 56th Ave S. On April 14th, City staff videoed the sewer main in the street and found no blockage. On April 20th, dye was released in a drain from inside the house and was later detected at the surface of the street. A break in the side sewer between the house and the public sanitary sewer main in the street is evident. The sanitary sewer main was constructed in 1965. ANALYSIS City policy in similar experiences has made the property owner responsible for maintenance and repair of the side sewer from the building to the sewer main in the street. The property owner was informed that they are responsible for the repair at which time they responded that they were financially unable to pay for the repairs. Human Services was contacted regarding possible financial assistance and referred the owners to the King County Housing Repair Program. While King County can provide loan services through a lien on the property, the City has the ability by Code to perform the repairs and place a lien the property. The property owner's preference was to have the City perform the work and apply a lien, if appropriate, after the work is complete. Construction of the repair was started on April 18th and is now complete. It was discover during the repair that the installation of a city-owned storm line in 1979 was the cause of the break and that the City is responsible for the repair costs. FISCAL IMPACT The City requested quotes from five contractors to complete the repair. Two of the five contractors returned quotes to the City with the lowest from R.L. Alia at $16,411.86. Funding will come from the 2015 Annual Sewer Repair Program Budget. W:\PW Eng\PROJECTS\A- SW Projects\2015 Annual Sewer Repair (91540201)\Sewer Repair 14139 56th Ave S (91540202)\Info Memo Keith Lowe Sewer Line 051115 - sb.doc