HomeMy WebLinkAboutTrans 2015-06-01 COMPLETE AGENDA PACKETCity of Tukwila Transportation Committee ❖ Joe Duffie, Chair ❖ Allan Ekberg ❖ Kathy Hougardy AGENDA Distribution: P. Brodin J. Duffie R. Turpin A. Ekberg M. Hart K. Hougardy Clerk File Copy K. Kruller 2 Extra D. Robertson Mayor Haggerton Place pkt pdf on Z: \TC -UC D. Cline Agendas L. Humphrey e -mail cover to: A. Le, B. Giberson C. O'Flaherty, J. Duffie, F. Iriarte D. Almberg, B. Saxton, R. Tischmak S. Norris, M. Hart, G. Labanara L. Humphrey MONDAY, JUNE 1, 2015 — 5:15 PM FOSTER CONFERENCE ROOM — 6300 BUILDING (formerly known as Conference Room #1) Next Scheduled Meeting: Monday, June 15, 2015 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Commute Trip Reduction a) Forward to 6/15/15 Pg. 1 Grant Acceptance (3) Regular Consent Agenda b) 2015 Overlay and Repair Program b) Forward to 6/15/15 Pg. 9 Construction Management Supplement No. 1 with KPG Regular Consent Agenda c) Interurban Ave S (S 143rd St to Fort Dent Way) c) Forward to 6/15/15 Pg. 23 Construction Management Supplement No. 1 with Anchor QEA Regular Consent Agenda d) Resolution for Six -Year Transportation Improvement Program d) Forward to 6/8/15 C.O.W. Pg. 27 (2016 -2021) and 6/15/15 Regular e) TUC Transit Center: Andover Park W Street and Water Projects e) Forward to 6/15/15 Pg. 71 Construction Management Supplement No. 2 with AECOM Regular Consent Agenda 3. SCATBd f) . SCATBd 4/21/15 Meeting Summary f) Information Only Pg. 75 SCATBd 5/19/15 Meeting Agenda 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: • 42nd Ave S /Allentown Roadside Barriers • ADA Transition Plan Consultant Selection and Contract Next Scheduled Meeting: Monday, June 15, 2015 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. T"ransport i. n l mitte " 2015 Work Plan Description Qtr Depot Action or Briefing Status BNSF Inte'rmoda'I Facility Access . .......w._......._. _ _.m _ _ Design! contract (to a... COW 1FU o.. a0 r ), Complete �th Phase II__..___.__.. �... �... �.. _____...- _._�._.�..�_.__._..___ ___._...�. Avenue South I .._....�...�. �...__�._ -._.. __._�.�..._. Design Contract Supplement - design undergroundung P Seattle City Light underground agreement �_ .._...._. _..__� P .......mm Follow-up on potential for coordination with SeaTa'c __.._.__... . ... ............................. - . . ......... PWW _._. B _ �_..._.. ,_..�...�.,.�_. ADA Improvements ._. ....�_..._ ............._.,. .......- ._......... _. ._..�......__.......,..._ Design n contract and b'fld award 2 P A Annual Overlay and Repair P,roagrarn .�._.._._..�.._._._.____..._ Bud Award PWW A �; Avenue S (S 1 7ta' - S 144" St)' � _ Funding, and Design contract 2 PWW A 53d Ave S Water Nliafln Replacement, Sewer Rehab (from A Utilities) Cascade View Safe Route's to Schoo; l Closeout B PWW A Andover parr 'West/ TUC Transit Center Closeout 3 PWW A Thorndyke Safe Routes to School Closeouit B PWW A Boeing access Road over BNRR Drudge Rehab Bad Award 3 P'WW A Residential Street Improvements Design contract 2 PWW A. Safety-based priority list 4 PWW B Annual Bridge Inspections and Repairs Program update 4 P'WW B TUC Ped /Bike Fridge Right- of -way and easement acquisition 1 P'WW A Complete Bid Award' 4 PWW A. Interurban Avenue S (S 143" Fort Dent Wa'y) Status update 4 PWW B S 1440 St phase II (42 `"d Ave S TI B) Bid' award �4 PW A . �....�. -.. Cr+ossw a'Ik petition - Tilt /S I39th Vicinity ........._ _...__... Present engineering analysis B PWW B OTHER TSB: pedestrian bulb replacement (test location) PWW B Allentown Roadside Barriers - outreach and design alternatives PW B Complete I u amish/ S 119"' Peril Bridge present condition and repairs B Complete 1 PWW (briefing) Transit plan update contract 4 P'WW A. Standard Reports/Briefings Frequency Dept. Facility Tours As needed P'WW Committee Work Plan Council, Staff f%, f City Of Tukwila Jim Hagge,rton, Mayot I 11011 go] V M Fly 1 [61 Z FA N Ai U4 TO: Mayor Haggerton Transportation Comm Utee FROM: Jack Pace,,, Director 4 BY: Margaret Lubov, CT oordinator a SUBJECT: 201!2 Congestion Mitigation Air Quality, Growth Transportation Efficiency Center and Transportation Demand Management Expansion Gr�a;nt, 2015i Congestion Mitigation Air Quality Regional Transportation Demand Management Grant and Transportation Management Implementation Agreement 2015-20117 .ISS11E The Coiuncif is being asked to accept three grant awards to fund Transportation Demand Management (TDM) programs in Tukwila and regional growth centers, Grant #1 is $186:,3344 Federal grant funds adminiisitered by Washington State Department of Transportation (WSDO;T) for trip reduction efforts in Tukwila's regional growth center. The project title is 2012 CMAQ GTEC/TDM Expansion, ei Grant #2 is $330,000 Federal grant funding administered by WSDOT for expansion of trip reduction efforts for South King County. The project title is 2015 CMAQ Regional TD,M Services. Grant #3 is the renewal of the current WSDiOT TDNI allocation for the biennium 2015-2017 and will be for $74,,500. ,13ACKGROUND In 2012, WSDOT submitted a CMAQ grant applicat�ion to PiSRC for a GTEC (Growt�h Transportation Efficiency Center) and TDM Expansion project to provide transportat�ion demand management (TDMI)i in regional urban centers and corridors that serve them, and to implement regionwid'e demand management marketing and promotions. This application, Grant #11, was initially on the contingency list and is awarded at this time with funds obligated by WSDOlT, Funding for TDM implementation will be provided to GTECs and their participating or,vanizaliQus, including local 'urisclictions that lm� ' #:Iement cornllateA . it I *W&ffrWW are comprilsed of local jurisdictions, emp:loiyers and c!ommiunity groups that intend to improve transportation efficiency and reduce greenhouse gas emissions. Coalitions in ten regional growth centers (Canyon Park, Downtown BeHevue, Downtown Seattle, Downtown Tacoma, Everett, Lynnwood, Overjake, South Hill, Totem Lake and Tulkwilia), have produced GTEC plans, whiich describe TDM services tailored to meet the needs of the center, Tukwila's GTE�C is the Urban Center. M1 5/15/15 1nfome ma' CMAQ201 2-2015 -. 41M Page 2 The Implementation essentially OT funds for CTR activities as has ,. it years. every two ,w regiion by partners in conjunction D For the M jects, Tukwila's current CTR Coordinator will provide techinicall for FINANCIAL project. Staff will be hired and hioused'at the City of Tukwila, Department of Community Development, There are no matching funds required for the City., Grant funds I, a The Council is beingi, asked to accept three grant awards and forward this, item to the June 15, Regular • I a for approval. ATTACHMENTS Summary 2012 CMA I Partners Summary ryr 2014 CMAQ Partners Letter of Support 2012 Letter of Support 201 PSRC 20114 FH A REGIONAL COMPETITION - FINAL PROJECT SCORES Notice of untended Grant Awards M111! 5/15/15 1nfomenioCMAQ20112-2015 2014 Regional TDM CMAQ Grant Partners and Regional Growth Centers Partner Additional Partners Budget* Regional G rowth Centers and connecting corridors City of DuPont City of Lakewood Lakewood City of Tacoma Puyallup Downtown Pierce County Joint Base Ft. Lewis-McChordi $330,000 Puyallup South HH1 Pierce Transit Tacoma Downtown Tacoma-Pierce County Chamber Tacoma Mall of Commerce Pierce County Pierce Transit Federal Way City of Tacoma Tacoma - Pierce County Chamber 330,000 Tacoma Downtown of Commerce Tacoma Mall Downtown on the Co City of Kent Burien, City of Renton Kent D owntown CityofTukwila. City of SeaTac $0�,000 33 Tukwila King County Metro Renton SeaTac Bellevue Downtown Associatiorl/ City of Bellevue TransManage $330,000 Bellevue Downtown -_King County Metro Seattle Downtown King County Metro Seattle First Hill/Capitol Hill Commute Seattle $330,000 Seattle South Lake Union City of Seattle I Seattle University Community Seattle Uptown King County Metro $330',000 Seattle Northgate Seattle University Community City of Redmond Kin q County Metro $330,000 Redmond Downtown Kinig Coup!y Metro $330,000 Redmond Overlake Community Transit City of Everett $330,000 Lynnwood Bothell Canyon Park Everett Transit City of Everett $330,000 Everett Community Transit King County Metro Washington State Ridesharing $1010,000 all, entire urban growth area O!qanization and region RideshareOnline King; County Metro Washington State Ridesharing $,200,000 all, entire urban growth area Organization and region $3,600,000 *Budget includes, request for $3 million CMAQ funds and $600,000 in state CTR funds, committed as match. WSDOT will obligate all CMAQ funds and contract with partners for implementation. CMAQ funds distribution: $270' ,000 each for ten implementation groups and $300,000 for regional implementation,. , WSDOT will retain $0 to administer the project. Regional TDM CMAQ Proposal, SDOT April 24,2014 Stan Suchan, suchans@wsdiotma.gov, 206-464-1192, 2016-321-3249 page I April 11, 2012 C I " Ity of Tukwila Jim Haggerton, Alaym Mr. Stan Suchan Public Transportation Division Washington State Department of Transportation 401 Second Avenue Seattle, WA 98104-3850 Dear Mr, Suchan. The City of Tukwila is pleased to support the Washington State Department of Transportation's Regional GTEC and TDM Expansion Project. The City of Tukwila recognizes the opportunity this project offers to help meet our transportation goals by reducing vehicle trips and greenhouse gas emissions. The Regional U17EC and TDM Expansion Project provides an opportunity to leverage ongoing planning efforts and investments in our community including implementation of the City of Tukwila Urban Center Plan and Bicycling and Walking Plan in the coming years. We look forward to collaborating with the Washington State Department of Transportation to implement this project for our citizens, visitors, employees and businesses of our area. Thank you for helping to create this opportunity for the City of Tukwila to reach its transportation goals in King County. Sincerely, r 'Is V, l(ck Pace Director,, Department of Community Development UMUMM U'A" lly of Tukwila Jim Haggerton, Mayor Tepartment of'Community Development Jack Pace, Director Mr. Stan Suchan Public Transportation Division Washington State Department of Transportation Transportation Building PO Box 47300 This letter is to express the City of Tukwila's support for the Washington State Department of Transportation's proposal to support transportation demand management (TDM) implementation focused on regional growth centers and the corridors that serve them through a Regional TDM application for CMt Q funds, i The project provides an opportunity to leverage ongoing planning efforts and investments in our community including implementing The City of Tukwila's Southcenter Plan and Bicycling and Walking Plan (Walk and Roll), and the ability to focus on transportation needs in the North Tukwila Manufacturing Industrial Center (MIC). We look forward to collaborating with the Washington State Department of Transportation and our partners, the City of Kent, the City of Se,aTac, the City of Renton and King County Metro to implement this project for our employees and businesses, citizens and visitors of our area. Thank you for helping to create this opportunity for the City of Tukwila to reach its transportation goals in King County, Sincerely, Nora Gierloff • I . I - I Margaret Lubov, CTR Coordinator, City of Tukwila ML Page 1 "0312014 C\Users+Nom-G\AppDala"-,edWicrosoftNWinckyws\Temporary Inter net Files\Conw�,n(.Outlook POO5,2G2\Let�erbead.doc: 63 outhcenter Boulevard, Barite #100 * Tukwila, Washington 981880, Phone 206431-3670 * Fax: 206-431-3665 FIMAL PRVIJECT SCORES—,by fuindling source, by score, Amount available = $66.3 million ' Request reduced to ROW phase; funding for PE received as part of 20�14 FTA confingency process =-r-ie Lu,bov . .. . ...... ..... . From: Johnston, Kathy <JohnistK@wsdot.wa.gov> Sent: 'ruesd ay, May 12, 201 S 3:20 PM To: Maggie Lubov S�ubject: Confirmation to Proceed with CMAQ Implementation SEEMS= f all • of Owl a 1 T� P94TO 4,11111 IVICAL '101 L41111111111111Lf <V.-Vt UIC bLd N% 1ITutle. ine Washin to rt t, ► V Kathy Johnistoin 11) "w" 9 2015 Overlay Program Overlay Program - Contract or Construction Manage en� Services m SEA Assoc Paving project constuction ex ' nco. Current Knowledge of 81a�,and Tukwila Standards and Procedures Environmental Experience Experience ith similar federal aid pcniccto? Past Postive Experience on City Pa Projects Small Scale Projects 2 2 2 2 1 Utilities Coordination 2 CVn1ruotiOnlospecdon TOTALS For each category, highest score is 5 (witfl the Iowest er worst score onsuitant with the highest score is ranked the best. Staff: Dave Sorensen Selection Date: 5/1/15 Selected Consultant: KPG, Inc. Selection Justification: This firm has demonstrated relevant pavement project design experience including exceptional familiarity with VVSDOT/ FHWA standards, and a solid DBE approach and commitment. And has performed well on previous city overlay projects in providing design and CM services. Based on overall score KPG prevailed. 2015 Overlay Program Vicinity Map AT&JffN47,-6W1�-J -611,11fril 2016 to 2020 PROJECT: Annual Overlay and Repair Program Project No. 91310401 DESCRIPTION: Select, design and construct asphalt and concrete plavement ovedays, of arterial and! residential streets, JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT. IMPACT: Reduces annual maintenance. COMMENT. Ongoing project, Only one year actuals shown in first column. FINANCIAL Through Estimated In $000's) 2013 2�014 2015 2016 20,17 2018 2019 2020 BEYOND TOTAL EXPENSES II i Design 48 100 1!25 125 150 150 175 17'5 175 1,223 Land (R� 0 Const Mgmt, 175 175 175 1 200, 200 22'5 225 230 1,6,05 Construction 1,1125 1,2501 1,260 1,300 11320 1,325 II 1,330 1,340 10,250 TOTAL EXPENSES 1 481 1,400 1,660, 1,660 1I 1,650 1,670 1,725 1,7301 1,745 13,078 FUND, SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual a Mitigabon Expected 0 City 17per, Revenue 48 1, 1,400 1,550 1,560 1,650 1,670 I 1,725 1,730 1,745 13,078 TOTAL SOURCES 48 11,400 1,550 1,560 1,650 1,670 I 1,725 1,730 1,745 13',078 2015 - 2020 Capital Improvement Program 18 12 SUPPUMENTAt, AGREENIENTNO. 11 AcREEMENT No. 14-157 Ptzonc,'r No. 91510401 City of Tukwila Public Work's Department 6300 Southcenter BOUIevard 4 100 Tukwila, WA 98 188 KPG, Inc. 753 - 9th Avenue N. Seattle, WA 98109 PROJECT: 2015 Overlay Pro rare --- Construction Services This SUPPLEMENTAL AGREEMENT No. I is to supplenient the agreement entered into with KPG, I ac, and the City orrukwi ]a, which was executed on the 9th day of October, 201. . All provisions in the basic agreenient remain in effect, except as expressly modiFied as follows: Article 2, Scope of Services, shall be supplemented with the Following: 1 The Consultant qgrees to provide consiruclion senlices, in accordance with the scope of work, inclulded a5 Exhibit A, Article 4, Payment, shall be inodified is fbllows: 11a)inient Jbi, or provicled kv Consultant shall be inazle as provided on L.xhibit B, attached hereto, provide4l that the tartan" amount (lfpqynient to the ("'Onsullantfbr this work not e.weed $1,72,658,89 without express written mocl4icafion ref the Agreement signed by the (7ity, The new total contractshall not exce&l $30,9,380,71 without exp, ress written moc4licalion (rflhe Agreemem s gned kv the Ci y. IN WITNESS WHEREOF, the parties, hereto have set their hands and seals, this day of 2015, APPROVED: APPROVED: CITYOFTUKWILA KPG, INC;. .Ii in I laggerton Nelsen Davis, P.E. Mayor Principal Attested: Christy O'Haherty, City Clerk 13 May 15, 2015 Liu �1� This work will!, provide construction management services for the construction contract to complete the City of Tukwila — 2015 Overlay program. These services will include design support, project manager rent, documentation control, inspection, materials testing, public involvement, and contract administration dluring the construction of the project, as detailed below. KPG ("Consultant") will provide to the City of Pacific ("City") construction management services for the project. A detailed scope for the Contract folllows: The following scope of services and associated costs are based upon the assumptions outlined below. General Assumptions: The proposed: project team will include one full-time documentation control specialist, a, part- time resident engineer during construction activities, one full-time inspector for each location during construction activities w h e r e unlit price work is being performed, sub - consultants to provide services for materials testing, and other supporting tasks as deemed necessary. It is anticipated that full- time site observation will be required for the entire of the project. • The level of service is based on a, construction project duration of approximately 601 calendar days. KPG estimates a total project duration of 98 calendar days (14 weeks) including preconstruction service, construction services, and project closeout. No suspensions or stop work periods are anticipated during this duration. It is anticipated that the KPG Willi develop the Record of Materials (ROM). This scope of services provides the management of the ROM and scheduling of required materials testing respectively. 0 It is anticipated that the City will review and execute the insurance, bonds, and the Construction Contract, 1, KPG will do all public outreach, and ensure affected business and residents are notified of impending contractor activities, one week prior to work by door to door and or A-board signs that include date, hours of work, and a KPG staff phone number to call for questions. • The design engineers, from KPG will be available during construction to answer questions during construction and review RAM's, shop drawings, and answer RFI's that require a level of engineering expertise outside of the capabilities of the Consultant, City of Tukwila — 2015 Overlay Program Page 1 of 7 L'P'G Construction Management Services Project Number 14117 Scope, of Work 5110115 14 I MOREOVER IN iiiiiii! 111111111111111111 111 1111 • of Pacific engineering standards,, 1111. SCOPE OF WORK The objective and purpose of this Construction Management Services Agreement is for the Consultant to successfully deliver the construction of the Project to the City by ensuring that the improvements are constructed in accordance with the approved Plans and Specifications, as may be amended or revised, that all of the required Project documentation ns , accounted for, Provide overall project management, coordination with the City, monthly progress reports, and iinvoiciing. This effort will include the following elements, * Organize and layout work for project staff. Prepare project instructions on contract administration procedures to be used during construction, * Review monthly expenditures and CM team scope activities. Prepare and submit project progress letters to the City along with invoices describing CIA services provided each month. Prepare and submit reporting required by funding source(s), if any. 0 Monthly invoices and progress reports 21 Preconstruction Conference. The Consultant will prepare an agenda for, distribute notices of, and conduct a preconstruction conference in the City's offices, The Consultant's project manager, resident engineer, inspector, and document control specialist will attend the preconstruction conference. The Consultant will prepare a written record of the meeting and distribute copies of the minutes to all attendees and affected agencies, staff, etc. At the Pre-construction conference, the Consultant shall facilitate discussions with the Contractor concerniing the plains, specifications, schedules, issues with utilities, unusual conditions, Federal!, State, and local requirements and any other items that will result in better project understanding among the parties, involved. Deliverobles 0 Preconstruction, conference agenda with meeting minutes TASIK 3 — CONSTRUCTION SERVICES - FIELD 31 On-site Observation: The Consultant shall provide the services of one full time inspector p e r I o c a t i o n during construction activities and other tasks necessary to monitor the progress of the work. An additional part time junior inspector, to be approved by the City, may be incorporated as dictated by the Contractor's approach to the Work. Construction staff shall ) oversee the following items of work, on the City of Tukwila — .x'0.15 Overlay Program Poge 2 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 IN [XNEWUMM project site, and will observe the technical progress of the construction, including providing day-to-day contact with the Contractor and the City: * Preparation to include mobilization, clearing and grubbing, removal of structures * Grading, installation of drainage and storm sewer * Erosion Control and Planting * HMA grinding and paving * Driveways, curb, gutter and sidewalk * And all incidental items necessary to complete the Wolrk as described in the Plans and/or Specifications. Fiield inspection staff will perform the following duties as a matter of their daily activities: L Observe technical conduct of the construction, Including providing day-to-day contact with construction contractor, City, utilities, and other stakeholders, and monitor for adherence to, the Contract Documents. The Consultant's personnel will! act in aiccordaince with Sections 1-015.1 and 1-05.2 of the Standard Specifications. H. Observe material, workmianshiip�, and construction areas for compliance with the, Contract Documents and applicable cocles, and notify construction contractor of nioinicomplliance. Advise the City of ainy noni-confo!rming work observed during site visits. HL Document all material delivered to the job site in accordance with the contract documents, iv. Prepare daily inspection, repoirts, recording the construction, contractor's operations as actually observed by the Consultant; includes quantities of work placed that day, contractor's equipment and crews, and other pertinent information, V, Interpret Contract Documents in coordination with the City and KPG, Vi. Resolve questions which imay arise as to the quality and acceptability of material furnished, work performed, and rate of progress of work perfo,rmed by the construction contractor. Establish communications with adjacent property owners, Respond to questions from property owners and the general pubiliIc, vilii!. Coordinate with permit holders on the Project to monitor compliance with approved permits, if applicable. ix. Prepare field records and documents to help assure the Project is administered in i accord:anice with the funding requirements, X. Collect and calculate delivery t�ickets and salesman's daily reports of aggregate. Ali tickets will be iniit!ialed with correct bid itern and stationing identified (Construction Manual 10-2). I XH. Take periodic digital photographs during the course of construction, andl record locations. Cityof TukwHa-2,015 Overlay Program Page 3 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 IM 4=1, Iff-415 xiii. Coordinate with the City's maintenance personnel. xiv. Punch list, Upon substantial completion of work, coordinate with the Client and affected agencies, to prepare a 'punch list' of items to be completed or corrected. Coordinate final inspection with those agencies, Assumptions: • Consultant will provide observation, services for the days/hours that the contractor's personnel are on-site. • The Consultant's monitoring of the construction contractor's activities is to ascertain whether or not they are performing the work in accordance with the Contract Documents; in case of noncompliance, Consultant will reject non-conforming work, and pursue the other remedies in the interests, of the City, as detailed in the Contract Documents. The Consultant cannot guarantee the construction contractors" performance, and it is understood that Consultant shall assume no responsibility for- proper construction means, methods,, techniques; project site safety, safety precautions or programs; or for the failure of any other entity to perform, its work in accordance with laws,, contracts, regulations, or City's expectations. 3.2 Suibistantiail', Completion: Upon substantial completion of work, coordinate with the City and other affected agencies, to perform a project inspection and develop a comprehensive list of deficiencies or 'punchlis,t' of items to be completed. A punchlist and Certificate of Substantial Completion will be prepared by the Consultant and issued by the City. i 3.3 Materials Testing: Coordinate the work of the materials testing technicians and testing laboratories in the observation and testing of materials used in the construction; document and evaluate results of testing; and address deficiencies. Frequency of testing shall be determined by the resident engineer. • Daily Construction Reports with project photos ® submitted on a weekly basis • Punch List, Certificate of Substantial Completion • Review test reports for compliance TASK 4.1 — CONSTRUCTION SERVICES — OFFICE City of Tukwilo — 2015 Overlay Program Page 4 of 7 Construction Management Services Scope of Work KPG Project Number 14117 5/10/15 HFA 411VINUM-EM X Document Control. Original documentation will be housed at the Consultant's office, and filled in accordance with standard filing protocol. A copy of working fi:les will be maintained in the field office. Document Control: consists of. ■ Final Estimate (Approving Authority File) Comparison of Preliminary and Final Quantities (Approving Authority File) Final Records (Approving Authority (File), ■ Record of Material Samples and Tests ■ Affidavit of Wages Paid ■ Release for the Protection of Property Owneirs and General Contractor B, Project Coordination,- Liaison with City, construction contractor, engineer, utilities and property owners on a regular basis to discuss project issues and status. C. Plan Interpretations: Provide technical, interpretations of the drawings, specifications, and contract documents, and' evaluate requested deviations from the approved design or specifications. Coordinate with City for resolution Of issues involiving scope, schedule, and/or budget changes. D. Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, and distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. E. linitial: Schieduile Review. Perform detailed schedule review of contractor provided CPM for coiniformance with the contract documents. F. Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum items. Review the Contract Price allocations andl verify that such allocations are made, in accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for payment each month will be calculated with detailed data. & Monthly Pay Requests: Prepare monthly requests for payment, review with the City, contractor and! approve as permitted. Utilize City provided format for pay estimates, or Colinsuiltanit format. H. Monthly Schedule Review. At the monthly cutoff, review contractor's updated scheduile and compare with field-observed progress, as described in Section 1-08 of the Special Provisions. In addition, perform schedule analysis on contractor provided CPM updates and review schedule for delays, and! impacts. Coordinate with Contractor in the development of recovery schedules, as needed, to address delays caused by either events or issues within the Contractor's control or other events or issues beyond the Contractor's control. L Certified Payroll: Process and track all certified payroll per State Prevailing Wage Requirements. This includes verifying the initial payroll for compliance and 10% of all payrolls submitted thereafter. Tracking payroll each week. J. Weekly Statement of Working Days: Prepare and issue weekly statement of working day report each week. K. Subcontractor Documentation: Process / Approve all required! subcontractor documentation. Request to Sublets willll be verified and logged. This includes checking System Award Management System (SAMS), verifying business licensing, reviewing insurance, City of Tukwila — 2015 Overlay Program Page 5 of 7 KPG Construction Management. ervices Project Number 14117 Scope of Work 5110115 18 documentation, verifying city business, licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid. All suibcon,tractor documentation will be logged into KPG's subcontractor hogs. L. Record Drawings: Review record drawings, prepared by the Contractor, and prepare a conformed set of project record drawings based on Contractor provided information and from inspection notes. Record drawings to be verified on a monthly basis, as part of the progress payment to the Contractor. Upon project complletion, contractor provided markups will be verified, for cornpleteness, and supplemented with inspection, information. The Consultant will provide the marked up plan sheets with both the contractors and, inspectors as -built information. Revisions to the CAD drawings are not included M. Physical Completion Letter: Following completion of all punchilist work, prepare physical completion letter to the contractor, and recommends that City and/or Utilities accept the project, N,. Project Closeout: Transfer all project documents to the City for permanent storage. • Schedule review comments • As-built schedule Mleeting agendas and notes Monthly Pay Estimates Subcontractor Packets, Cost Projection Physical Completion Letter Final Project Documents TASK 4.2 — SUBM::ffTAL/RFI PROCESSING A. Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test reports, and other submittals from the Contractor for compliance with the contract documents. Key submittals to be transmitted to the City for their review and approval. Submittals shall be logged and tracked. B. Request for Information (IRF11): Review and respond to RFI's. RFI's shall be logged and tracked. C. Record of Materials (ROM): Utilize ROM prepared by KPG and updlate based on Special Provisions and Plans for use an the project, based on the contract specifications. The ROM will be maintained by the Resident Engineer. The ROM will track all of the materials, delivered to the site including manufacturer /supplier, approved RAM's, QPL items, material compliance documentation, and all other required cloculmentation. Defiverables Submittal log RFII Log Completed Record! of Material for Mliateriall Certification TASK 4.3—CH!ANGE MANAGEMENT A, Case, Log: Develop and maintain a case log which, includes change orders, RFP's, Field Work Directives City of Tukw ila — 2015 Over)oy Program Page 6 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 IF] B. Change Orders: Develop change orders and provide technical assistance to negotiate change orders, and assist in resolution of disputes which may OCCUr during the course of the project, Each change, order will be executed in accordance with WSDOT Standard Specifications and contain the following: • Change order • Independent Cost Estimate • Time impact Analysis, • Contractor's Pricing • Herbal Approval Memo • Back up documentation C. Field Work Directives: Prepare field work directives as necessary to keep, the contractor on schedule. D. Minor Change Orders, Develop minor change orders per WSDOT Standard Specifications, Each minor change order will be executed and contain the foHowing: • lindepenclent Cost Estimate • Verbal Approval Memo •, Bank up documentation E. Force Account. Track contractor force account labor, equipment and materialls. All force account calculations will be verified by the engineer and double checked by the documentation specialist. Defiverobles • Change Cirder(s) • Case Management Log • RFII Log • Minor Change Order(s) • Force Account Records City of Tukwila — 2015 Overlay Progrom Page 7 of 7 Construction Management Services Scope of Work KPG Project Number 14117 5110115 KII HOUR AND FEE ESTIfyIATE Project: City of Tukwila 2015 Overlay Program Construction Services EXHIBIT 8 naf ement, Coordination. Administration k3y level of effort by Cee ifieatiun Preconstruetlon Bud 2 - Preconstruction Services (Estimated duration 3 weeks) Weekly level of effort by Classification 16 0 16 4 - Closeout/Record bw Services Estimated duration 4 weeks Weekly revel of effort by Classification Closeout / Rees rd Dwg Bud Sub trael T3 Fi 20 226 36 360 ;251.00 72. 512612015 0 0 64 238 rial Testing if^ nce $ 25,0 Construction Vehicle (3 months $750) $ 2,250.00 Miscellaneous - Mileage. Repro, Field Supplies $ 3,0 00,00 MIA, City of Tukwflai Jim Haggetton, Mayot TO Mayor .prerton Transportation Committee FROM: Bob Giberson, Public Works Directorl�� IIII 11111 1111111 111 Fill 1 11111111 a 0 n I SUBJECT: Interurban Aveniue South (S 1431d St to Fort Dent Way) I Project No., 9031:0402�, Contract No., 14-066 CM Consultant Supplement #1 withi Anchor QEA BAC KGRO.1 Construction has been underway on Interurban Ave S from S 1431d St to Fort Dent Way since Jully 2014. Difficulties encountered in construction of two of the major project features (the retaining wall near Fort Dent Way and the large fill TOM -1 MITA 'I qF;Wn'9 services through the end of 201'5, The negotiations for this su!pplemeniit anticipate a shift in consultant personnel to bette position the team for an extended construction contract. We will work diligently with our contractor to complete the projel witiii, 4is taw fillitefra-tie, FINANCIAL IMPACT Tw w 0,499 1.39 MA—KA—Liz L_ —Q.2A Q �109 1411111111 1 1 111 � 1 1 t" IRT Meeting. Attachment Anchor OEA Contract Supplement #1 will I Exhibit, A 23 WRIN DiJPROJECTSW RIN & IS PrqectOnllerurban Ave S (90310402�4Ccmsu6fanl SelectanVulo Memo CM Anchw up =W #1 05�•22-15 gl-MER do": Contracts Awarded Budge Construction Contract $7,597,833.39 $8,737,508.39 Remaining 15% Construction Contingency 675I,747.00 Anchor QEA Construction Management 1,078,720,00 1,666,693.00 Anchor QEA CM Supplement #1 463,928.0I0 KPG On-Call Construction Support Sup No. 2 357,,973,010 Tukwila Staff, Field Office Expenses, WSD 225,000.00 Potential Utility Conflicts 100,0100.00 Storm Quality Retrofit Budget (CIP page 83) 95,000.00 Tw w 0,499 1.39 MA—KA—Liz L_ —Q.2A Q �109 1411111111 1 1 111 � 1 1 t" IRT Meeting. Attachment Anchor OEA Contract Supplement #1 will I Exhibit, A 23 WRIN DiJPROJECTSW RIN & IS PrqectOnllerurban Ave S (90310402�4Ccmsu6fanl SelectanVulo Memo CM Anchw up =W #1 05�•22-15 gl-MER do": Adw Washinigton, State VJ,ff Department of Transportation Irganization and Address Supplemental Agreement A n ch o r Q EIA, 1, LC , Number One 720 Olive �Vay, SUite 190O original Agreement Number STPUL- 1 O45 (007) Seat 80 Seattle, TA 911 Phone: (206) 287-9130 Project Number 90310402 Execution Date ornpletion Date June 6, 2014 Decernber 31, 2015 Project Title Interurban Avenue South New Maximum Amount Payable Im2rovernents $ $1,542,648.00 Description of Work Provide Construction Managenient Services for roadway irnprovernents from S. 143rd Street to Fort Dent Way, including walls, storrn drainage, illumination, landscaping, paving, and pedestrian facilities. The Local Agency of City of "Fukwila desires to supplement the agreement entered into with Anchor QEA LLC and executed on June 6, 2014 — and identified as Agreement No. 14-0,66 All provisions, in the basic agreement remain in effect except as expressly modified by this supplement The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to ready ElEansion of level of services and time allocation for staff as identified in the original agreement SCOL)e of work. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31, 2015 Mll Section V, PAYMENT, shall be amended as folllows: 'Increase maxii-nurn arnount payable from $1,078,720.00 to $1,542,648.00. as set forth in the attached Exhibit A, and by this reference made a part of this suipplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: (157 M Approving Authority Signature DOT Form 140-063 EF Date 24 Rpvised 912005 *Rate capped at $87.00for this contract Total DSC Overhead (OH Cost including Salary Additives): OH Rate x DISC of 160,94 % x $158,,365.00 Fixed Fee (FF): FF Rate x DISC of Sub-Total Labor: Reimbursables: Mileage Copier/Copies Misc. Supplies and Equipment Lab Fees Subtotal (Supplement 1)1: Grand Total (Original + Supplement 1): Prepared by., Ed Berschinsk� 25�.010 % x $1.5 ,365.E007 NIM Cost $30,,624.00 $44,49&00 $23,946.010 $3,880.00 $6,304.00 $46,365-010 $2,750,00 $254,873,00 0 $1,542,648,00 4/21/2015, P141 Suppl,ement 1 Exhibit A Consultant Fee Determination — Summary Sheet (Cost Plus Fixed Fee) Projec�t� interurban Avenue South, — S. 14V Street to Fort Dent Way Direct Salary Cost (DSQ: Classification Man Hours Rate Principal -- Construction Manager 352 X $87,00* Resident Engineer 927 X $48.00 Senior Staff— Lead Inspector 61.4 X $39,00 Office Engineer 144 X $27.00 . . ......... Environmental Monitor (Permitting) 197 X $32.00 pecia Ity 1,686 X $27w50 Project Coordinator/Administration 110 X $25.00 *Rate capped at $87.00for this contract Total DSC Overhead (OH Cost including Salary Additives): OH Rate x DISC of 160,94 % x $158,,365.00 Fixed Fee (FF): FF Rate x DISC of Sub-Total Labor: Reimbursables: Mileage Copier/Copies Misc. Supplies and Equipment Lab Fees Subtotal (Supplement 1)1: Grand Total (Original + Supplement 1): Prepared by., Ed Berschinsk� 25�.010 % x $1.5 ,365.E007 NIM Cost $30,,624.00 $44,49&00 $23,946.010 $3,880.00 $6,304.00 $46,365-010 $2,750,00 $254,873,00 0 $1,542,648,00 4/21/2015, P141 PM WA Word Processhig solufions\"TIP 20116.2021 5-15-15 CKbjs Page 1 of 2 28 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTOel, at a Regular Meeting thereof this - day of 2015. Christy Oi'Flaherty, MMC, City'Clerk Kate Krulier, Council President Filed with the City C�erk: Passed by the City Council: Vesolution Number- EM Exhibit,- City of Tu�Wla Six-Year Transportation Improvement Program from 201�6 to 2021 WAWard Processjingi ResolutlonsVTIP 2016-2021 5-15-15 CK:bjs p4*1 DRAFT 2016 - 2021 TIP SUMMARY 2016 -2021 2015 CIP Project Costs in Thousands of Dollars TIP PROJECT TITLE Page No. 2016 2017 2018 2019 2020 2021 TOTAL May 28, 2015 FUNDING SOURCES Federal State/TIB Developer Unsecured City 1 42 -42nd Ave S (S 160 St - S 131 PI) 2 53rd Ave S (S 137th St - S 144th St) 3 ADA Improvements 4 APE /Industry Dr Intersection 5 APE /Minkler Blvd Intersection 6 Annual Bridge Inspections and Repairs 7 Annual Overlay and Repair Program 8 Beacon Ave Bridge Preventative Maintenance 9 Boeing Access Rd Bridge Rehabilitation 10 Cascade View Safe Routes to School Phase 2 11 Frank Zepp Bridge Preventative Maintenance 12 Grady Way Bridge Preventative Maintenance 13 Multipurpose Trails 14 S 133 St /SR599 Intersection 15 Strander Blvd /SW 27th St St Phase III 16 TUC /TOD Pedestrian Improvements 17 TUC - Pedestrian /Bicycle Bridge 18 Walk & Roll Program 19 W Valley Hwy/ S 156 St Intersection 2 6 20 25 24 10 18 11 3 35 27 28 29 12 22 26 5,300 3,173 63 0 0 270 1,560 1,741 5,411 0 2,535 207 60 0 20 70 6,185 0 0 0 920 63 0 0 270 1,650 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 0 0 335 1,670 0 0 0 0 0 60 0 5,000 0 0 0 0 0 0 63 0 0 335 1,725 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 0 0 335 1,730 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 575 622 335 1,745 0 0 839 0 0 280 630 52,329 1,100 0 175 1,032 5,300 4,093 378 575 622 1,880 10,080 1,741 1,741 5,411 4,193 839 2,535 2,535 207 207 580 630 57,349 1,170 6,185 175 1,032 580 6,000 2,939 5,300 1,154 378 575 622 1,880 10,080 0 1,218 750 89 0 0 0 170 28,024 650 185 175 592 460 29,325 20 500 440 TOTAL * PROJECTS REVISED FROM 2015 -2020 TIP 26,595 2,963 7,128 2,183 New: 42 -42nd Ave S (S 160 St - S 131 PI) Beacon Ave Bridge Preventative Maintenance Frank Zepp Bridge Preventative Maintenance Grady Way Bridge Preventative Maintenance 2,188 59,725 100,782 8,676 6,580 Deleted: BNSF Intermodal Facility Access E Marginal Way (BAR - S 112 St) Macadam Rd & S 144 St Intersection S 144th St Bridge - Sidewalks S 144th St Phase H (42 Ave S - TIB) West Valley Hwy (1 -405 - Strander Blvd) 20 34,414 51,092 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments 06/08/15 06/15/15 04 C G O P S TW Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 5,300,000 5,300,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 9,660,000 9,660,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,300,000 0 0 0 4,360,000 Totals 5,300,000 0 0 0 4,360,000 Report Date: May 27, 2015 w Page 1 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/08/15 06/15/15 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 3,000 3,000 P CN 2016 0 TIB 1,589,000 1,350,000 2,939,000 S CN 2016 0 0 1,150,000 1,150,000 Totals 0 1,589,000 2,503,000 4,092,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 3,000 0 0 0 0 CN 3,170,000 920,000 0 0 0 Totals 3,173,000 920,000 0 0 0 Report Date: May 27, 2015 w N Page 2 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 W Report Date: May 27, 2015 W Page 3 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/08/15 06/15/15 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: May 27, 2015 w Page 4 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07746 Andover Park E /Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/08/15 06/15/15 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 20,000 20,000 P CN 2021 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 W Report Date: May 27, 2015 0' Page 5 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 1,880,000 1,880,000 Totals 0 0 1,880,000 1,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 335,000 335,000 670,000 Totals 270,000 270,000 335,000 335,000 670,000 W Report Date: May 27, 2015 0) Page 6 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/08/15 06/15/15 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 10,080,000 10,080,000 Totals 0 0 10,080,000 10,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Totals 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 W Report Date: May 27, 2015 Page 7 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 TUK -57 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. 06/08/15 06/15/15 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 1,740,900 0 0 1,740,900 Totals 1,740,900 0 0 1,740,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,900 0 0 0 0 Totals 1,740,900 0 0 0 0 W Report Date: May 27, 2015 Page 8 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides 06/08/15 06/15/15 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 4,193,000 0 1,218,000 5,411,000 Totals 4,193,000 0 1,218,000 5,411,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,411,000 0 0 0 0 Totals 5,411,000 0 0 0 0 W Report Date: May 27, 2015 Page 9 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/08/15 06/15/15 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 839,000 Totals 0 0 0 0 839,000 Report Date: May 27, 2015 A D Page 10 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 TUK -55 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. 06/08/15 06/15/15 14 0.040 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 2,534,812 0 0 2,534,812 Totals 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 Report Date: May 27, 2015 A Page 11 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -56 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. 06/08/15 06/15/15 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 206,500 0 0 206,500 Totals 206,500 0 0 206,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 206,500 0 0 0 0 Totals 206,500 0 0 0 0 Report Date: May 27, 2015 A N Page 12 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/08/15 06/15/15 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 360,000 360,000 Totals 0 0 360,000 360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 120,000 Totals 60,000 60,000 60,000 60,000 120,000 Report Date: May 27, 2015 A W Page 13 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07748 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. 06/08/15 06/15/15 04 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 27, 2015 A A Page 14 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave 06/08/15 06/15/15 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 STP 3,850,000 0 620,000 4,470,000 P RW 2021 STP 1,150,000 0 179,000 1,329,000 P CN 2021 FMSIB 5,000,000 0 1,000,000 6,000,000 P CN 2021 TIGER III 20,000,000 0 25,000,000 45,000,000 Totals 30,000,000 0 26,799,000 56,799,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 5,000,000 0 0 RW 0 0 0 0 1,329,000 CN 0 0 0 0 51,000,000 Totals 20,000 0 5,000,000 0 52,329,000 Report Date: May 27, 2015 A (T Page 15 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/08/15 06/15/15 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 70,000 70,000 P RW 2021 STP(E) 80,000 0 0 80,000 S RW 2021 0 0 20,000 20,000 P CN 2021 STP(E) 420,000 0 580,000 1,000,000 Totals 500,000 0 670,000 1,170,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 70,000 0 0 0 300,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 70,000 0 0 0 1,100,000 Report Date: May 27, 2015 A 0) Page 16 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd Of extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian /bicycle bridge over the Green River 06/08/15 06/15/15 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 OTHER 6,000,000 185,000 6,185,000 Totals 0 6,000,000 185,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,223,000 0 0 0 0 Totals 7,223,000 0 0 0 0 Report Date: May 27, 2015 A Page 17 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. 06/08/15 06/15/15 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: May 27, 2015 A CO Page 18 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct safety and capacity improvements at intersection. 06/08/15 06/15/15 03 O P S T W CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 39,615,212 8,339,000 56,416,000 104,370,212 Report Date: May 27, 2015 A Page 19 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk and illumination. Street portion will coordinate with Water and Surface Water capital improvement program projects. 06/09/14 06/16/14 1833 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 251,000 251,000 P CN 2016 0 TIB 1,000,000 200,000 1,200,000 Totals 0 1,000,000 451,000 1,451,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 251,000 0 0 0 0 CN 0 600,000 600,000 0 0 Totals 251,000 600,000 600,000 0 0 01 Report Date: June 17, 2014 Page 1 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 01 Report Date: June 17, 2014 Page 2 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/09/14 06/16/14 1833 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2020 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 01 Report Date: June 17, 2014 N Page 3 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03764 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets 06/09/14 06/16/14 1833 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 20,000 20,000 P CN 2020 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 01 Report Date: June 17, 2014 w Page 4 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 1,815,000 1,815,000 Totals 0 0 1,815,000 1,815,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 335,000 670,000 Totals 270,000 270,000 270,000 335,000 670,000 01 Report Date: June 17, 2014 Page 5 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/09/14 06/16/14 1833 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 9,880,000 9,880,000 Totals 0 0 9,880,000 9,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 Totals 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 01 Report Date: June 17, 2014 01 Page 6 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/09/14 06/16/14 1833 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 FMSIB 950,000 0 300,000 1,250,000 P CN 2020 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,250,000 CN 0 0 0 0 12,500,000 Totals 0 0 0 0 13,750,000 01 Report Date: June 17, 2014 Page 7 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. 06/09/14 06/16/14 1833 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 STP(BR) 179,500 0 45,000 224,500 S CN 2015 STP(BR) 8,625,600 0 2,220,100 10,845,700 Totals 8,805,100 0 2,265,100 11,070,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 224,500 0 0 0 0 CN 8,603,000 2,242,700 0 0 0 Totals 8,827,500 2,242,700 0 0 0 01 Report Date: June 17, 2014 Page 8 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/09/14 06/16/14 1833 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 839,000 0 0 Totals 0 0 839,000 0 0 01 Report Date: June 17, 2014 Page 9 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/09/14 06/16/14 1833 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 170,000 170,000 P RW 2020 0 0 700,000 700,000 P CN 2020 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,000,000 3,300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 0 0 0 0 3,300,000 01 Report Date: June 17, 2014 Page 10 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Z 3 cr A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 }uewpuewy m 0 0 0 Z 0 adi j ;uewanoadw! sepoo MI!Bf1 1 0 3 ed j !e }uawuoa!nu3 pea!nbe Mb 17 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane WA -03763 06/09/14 06/16/14 1833 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 90,000 90,000 P RW 2020 0 0 90,000 90,000 P CN 2020 0 0 430,000 430,000 Totals 0 0 610,000 610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 0 0 0 0 610,000 0) Report Date: June 17, 2014 0 Page 11 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles 06/09/14 06/16/14 1833 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 50,000 50,000 P CN 2020 0 0 280,000 280,000 Totals 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 ALL 0 0 0 0 280,000 Totals 50,000 0 0 0 280,000 0) Report Date: June 17, 2014 Page 12 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03769 S 133rd St /SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. 06/09/14 06/16/14 1833 06 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 60,000 60,000 P CN 2020 STP 460,000 0 110,000 570,000 Totals 460,000 0 170,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 0) Report Date: June 17, 2014 N Page 13 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/09/14 06/16/14 1833 28 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2020 STP(BR) 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: June 17, 2014 w Page 14 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03762 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes 06/09/14 06/16/15 1833 03 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 TIB 1,000,000 480,000 1,480,000 Totals 0 1,000,000 480,000 1,480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,480,000 0 0 0 0 Totals 1,480,000 0 0 0 0 0) Report Date: June 17, 2014 Page 15 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 S rander Blvd /SW 27th St Phase 111 Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/09/14 06/16/14 1833 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 FMSIB 5,000,000 0 0 5,000,000 P ALL 2020 TIGER IV 27,000,000 0 1,150,000 28,150,000 Totals 32,000,000 0 1,150,000 33,150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,150,000 Totals 0 0 0 0 33,150,000 0) Report Date: June 17, 2014 0' Page 16 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station/TOD area. Connection may include an underpass under the UPRR line. 06/09/14 06/19/14 1833 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 280,000 280,000 P RW 2020 0 0 100,000 100,000 P CN 2020 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 580,000 1,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 0 0 0 0 1,080,000 0) Report Date: June 17, 2014 Page 17 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Development of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit - oriented development. The project, a pedestrian /bicycle bridge across the Green River, will form the backbone of a pedestrian corridor connecting the compact land uses and high ridership bus stop in the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its surrounding transit - oriented development. This will improve public access to the station from all parts of the center, and provide a direct, safe and enjoyable walking experience. The high level of urban level amenity will attract the types and densities of uses envisioned in a regional center. 06/09/14 06/16/14 1833 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 OTHER 6,000,000 1,485,000 7,485,000 Totals 0 6,000,000 1,485,000 7,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,485,000 0 0 0 0 Totals 7,485,000 0 0 0 0 0) Report Date: June 17, 2014 Page 18 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewalk /bike lanes on Macadam, S 144th St to S 150th St. 06/09/14 06/16/15 1833 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 140,000 140,000 Totals 0 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 140,000 0 0 0 0 Totals 140,000 0 0 0 0 0) Report Date: June 17, 2014 Page 19 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03779 West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/09/14 06/19/10 1833 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 60,000 60,000 P CN 2020 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 0) Report Date: June 17, 2014 Page 20 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 06/09/14 06/16/15 1833 03 O P S T W CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 56,242,800 8,750,000 26,473,400 91,466,200 Report Date: June 17, 2014 Page 21 Cit of Tukwlla Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Peter Lau, Senior Program Manager DATE: May 29, 2015 SUBJECT: TUC Transit Center Project; Andover Park West Street and Water Projects Project Numbers 90610402, 98810404 and 99840105, Contract No. 13-199 Supplemental Agreement No. 2 with AECOM Technical Services ISSUE Approve Supplemental Agreement No. 2 for the construction management (CM) contract with AECOM Technical Services (AECOM) in the amount of $33,962.66 for the Tukwila Urban Center (TUC) Transit Center, Andover Park West Street, and Water Improvement Projects (Transit Center Project). ACKGROUND A CM contract and Supplemental Agreement No. 1 with AECOM were previously executed to provide CM assistance for full-time fieid engineering, inspections, documentation compliance support, and on-call specialty support. DISCUSSION With a substantial number of unexpected underground utility conflicts, design changes, and delays from the contractor, sub-contractors and material suppliers, the Transit Center Project was physically completed on April: 3, 2015. Contract Supplement No. 2 for $33,962.66 will allow AECOM to finalize the project close-out documentation, process remaining change orders, and provide the record drawing's based upon the contractor's red-line mark-up drawings. FINANCIAL. IMPACT The 15% construction contingency was $905,626.00 and there is currently a remaining balance of $464,716.59 that will adequately pay for AECOM's Supplement No. 2 in the amount of $33,962.66. This will leave a remaining contingency of $430,753.93. RECOMMENDATION Council is being asked to approve the construction management Supplemental Agreement No. 2 with AECOM Technical Services to Contract No. 13-199 in the amount of $33,962.66 and consider this item on the Consent Agenda at the June 15, 2015 Regular Meeting. Attachments: AECOM Supplemental Agreement No. 2 to Contract No, 13-199 WP/ EneROJECTS'A. RW FIS ProieMs1Transit Center (9061041040onstruction - Ciy use o,0 Consultant SellectiontInts MGM tor AECOM CM Supplement tfa 2, 5.12-15 - 5bl:dos 71 Supplemental Agreement Number No. 2 Original' Agreement Number 13-199 Project Number 906! 04( Project Title Tukwila Ur 3aii Transit Center Description of Work (..:onstruction. .Management. Services The Local Agency of City of Tukwila Organization. and Address AECOM Technical Services 710 Fifth Avenue, Suite 1000 Seattle, WA 98004. Phone: 206,624,9349 Execution Date 12/5/2013 Completion Date 9/30/2015 New Maximum Amount Payable $ 933,403.01 desires to supplement the agreement entered into with AECOM 1chnica1 Services and executed on 12/5/2013 and identified as AgreemerGt No, 13-199 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: cIns.e-out documentatinn and el orrent change orders,- provide CAI' lines, apprnved change orders and field directives a,,-huilts based iip(In contractor re Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: 111 Section V, PAYMENT, shall be amended as follows: TrylA Vahie is ¶11 967 66, which includes an innrease tn fixed fee vhu of *1070 46 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces beiow and return to this office for final action. By R ich Reis Consul a t Signature DOT Form 140-063 EF Revised 9/2005 By: Approving Authority Signature Date 72 Exhibit A City of Tukwila - Tukwila Transit Center Budget Summary - Supplement No 2 AZCOM AECOM Labor - Home Office Employee Mike Horton Lloyd Brown Classification PM / 00. CADD Tech, Total DSC Overhead (OH Cost Including Salary Additives): OH Rate x DSC of 156.22% Fee Fee Rate x DSC of 2985% Labor Subtotal - Home Office AECOM Labor - Field Office Employee Classification Jim Rills RE Janet Lee ARE Leroy Claris Field Lead Jamie Shinsato Documentation Jesse Rogers Arch, Finis,hes Hours 8,00 $ Rate' Cost 73.88 5591.03 80„00 $ 34„93 52,794,40 88,00 53385.43 53,385 43 Hours Rate 24.00 $ 84.89 84,00 $ 45.40 8.00 $ 49.91 24.00 $ 27.11 140 00 $3,385 43 $3,385 43 $5,288 72 $1,010,55 $9,684.70 Cost 52,037.36 $3,813„60 $399.28 $650,64 50.00 $6,900,88 Total DSC 56,900.88 Overhead (OH Cost Including Salary Additives): OH Rate x DSC of 122.43% 56,900.88 58,448.75 Fee: Fee Rate x. DSC of 29,8559 x 56,900.88 52,059.91 Labor Subtotal - Field Office Labor Subtotal "'Actual 2015 billing rates Reimbursable Vehicles Remaining Rental and Fuel (Jan, - Apr) Expenses Subconsultant aterials, Testing - Final Otto Rosenau invoice (12/23/2014) Surveying 117,409.54 $27,094.24 Cost $ 4,000 00 $4,000,110 Cost $2,868 42 $0,,00 $2,868.42 T ta 3 , 62. 6 73 List of R.emainrnR ^ ^'it'e Nm s fq N" Tu'k Final As bu dts {added Scope) Receive and Review Remaining C. Receive remaining Affidavits sing materials certifications, warranties, and her documentat'uon need the paperwork) ied Payrol .......... Remaining Force Account for project (mitcelkaneaus fr m ptanchlist and Property Restoration) PE447G AC)A ramp report (all info al re; dy collected — just mod to place and make report for MEF' items) Document Filing —print out all missing hard c trical to .,City files. Charige Orders 416, 447.7, t4Il8 Iritc rnal Document QC review AECOM Invoice contract manag, 4 24 4 80 74 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) April 21, 2015 MEETING SUMMARY Members Councilmember Bill Peloza (Chair) Mayor Carol Benson Councilmember Marcie Palmer Mayor Dave Kaplan Councilmember Linda Johnson Mayor Dave Hill Deputy Mayor Jeanne Burbidge Councilmember Debi Wagner Councilmember Stacia Jenkins Kelly McGourty Elizabeth Leavitt Chris Arkills Charles Prestrud Lance Newkirk Councilmember Barry Ladenburg Chelsea Levy City of Auburn City of Black Diamond City of Renton City of Des Moines City of Maple Valley City of Algona City of Federal Way City of Burien City of Normandy Park PSRC (Alternate) Port of Seattle King County (Alternate) WSDOT (Alternate) City of Pacific City of SeaTac Sound Transit (Alternate) I. Open Meeting After opening comments and introductions the Board adopted the meeting summary for their March 17, 2015 meeting. II. Reports, Communications and Citizens Requests to Comment Chair Peloza announced the Metro kicked off Phase 1 of Southeast King County Alternative Service Delivery Project outreach program on April 21st, 2015. The purpose in order to hear from existing and future public transportation users about how current transit service is working for them and what services they hope to see in the future. The Board was interesting in getting more detail on the Project at the next SCATBd meeting. Vic Bishop, Eastside Transportation Association, address the Board on PSRC's T2040 Update transit spending on transit and light rail service, discussed accessibility jobs via transit. Kelly McGourty offered to have PSRC staff attend the next SCATBd meeting provide more information on the information provided by Mr. Bishop. III. I -5 — Sound Transit Federal Way Extension — Cathal Ridge, Sound Transit Chelsea Levy said the draft EIS for the Federal Way Link Extension projects was released for public comment on April 10. The Sound Transit Board will take action on the draft EIS in June. Mr. Ridge said the draft EIS evaluated the light rail route and station alternatives and describes the project's potential effects on the environment, nearby properties, transportation, and other impacts. Four build alternatives were evaluated; along with the impacts associated with each alternative, and the various station and alignment options. The comparison between alternatives included project costs, travel times, daily ridership, lands with TOD potential, and business and residential displacements. The four alternatives included the SR 99 alternative, the I -5 alternative, the SR 99 to I -5 alternative, and the I -5 to SR 99 alternative. Within each alternative different alignments were also reviewed based on state 75 location options. Mr. Ridge said the final EIS will be developed in mid -2016; and the Sound Transit Board will select the preferred alternative in late -2016. SCATBd asked for Sound Transit staff to attend the next meeting to brief the Board on ST 2. IV. SeaTac's Sustainable Airport Master Plan — Elizabeth Leavitt, Port of Seattle. Ms. Leavitt said that due in large part to a strong regional economy; Sea -Tac Airport's annual passenger count is expected to substantially increase in the next 20 years. Sea -Tac is preparing for this growth with the development of its Sustainable Airport Master Plan (SAMP). The SAMP is a long- term blueprint for the future development of the airport with a 20 -year timeframe. In 2014, Sea -Tac was the fastest growing large hub airport in the U.S. serving nearly 37.5 million passengers. In 2034, forecasts project Sea -Tac will reach 66 million annual passengers (up from 37.5 million in 2014) and 540,000 annual operations (up from 350,000 in 2014). Ms. Leavitt said the focus areas of the SAMP include airfield enhancements within the current three - runway configuration, terminal development and potential expansion, roadway improvements and cargo facility modernization. Based on forecasts, Sea -Tac Airport requires 35 additional aircraft gates (Sea -Tac currently has 88) and 16 additional international wide -body aircraft gates (Sea -Tac currently has 11). Ms. Leavitt said the next steps in the SAMP development process included open houses in the summer 2015 and will focus on the preferred alternatives. A preferred plan will be chosen I the fall of 2015. Other Attendees: Vic Bishop, ETA Maiya Andrews, Burien Bob Lindskov, Covington Brandon Carver, Des Moines Andy Williamson, Black Diamond Councilmember Tamie Deady, Black Diamond Ed Conyers, WSDOT Jim Seitz, Renton Amy Danberg, PRR Kim Henry, WSDOT Lyset Cadena, SCA Monica Whitman, Kent Bob Giberson, Tukwila Cheryl Saltys, PSRC Charla Neuman, SSCCCLS Jason Brown, KC Councilmember Regan Dunn Tom Gut, SeaTac Pablo Para Paul Takamine, King County DOT Cathal Ridge, Sound Transit 76 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) MEETING Tuesday, May 19, 2015 9:00 — 11:00 a.m. SeaTac City Hall 4800 South 188th Street SeaTac AGENDA 1. Open Meeting • Introductions • Approve summary of February 17, 2015 SCATBd Meeting Summary Action 9:00 a.m. 2. Reports, Communications and Citizen Requests to Comment • Chair or Vice Chair • Participant Updates from RTC and Other Regional Committees • Legislative Updates • Public Comment Reports and Discussion 9:05 a.m. 3 Stuck In Traffic — Gary Simonson, PSRC Report and Discussion 9:30 a.m. 4. Southeast King County Alternative Service Delivery, Carol Cooper, Metro Transit Report and Discussion 10:15 a.m. 77