Loading...
HomeMy WebLinkAboutTrans 2015-06-01 Agenda Front SheetCity of Tukwila Transportation Committee ❖ Joe Duffie, Chair ❖ Allan Ekberg ❖ Kathy Hougardy AGENDA Distribution: P. Brodin J. Duffie R. Turpin A. Ekberg M. Hart K. Hougardy Clerk File Copy K. Kruller 2 Extra D. Robertson Mayor Haggerton Place pkt pdf on Z: \TC -UC D. Cline Agendas L. Humphrey e -mail cover to: A. Le, B. Giberson C. O'Flaherty, J. Duffie, F. Iriarte D. Almberg, B. Saxton, R. Tischmak S. Norris, M. Hart, G. Labanara L. Humphrey MONDAY, JUNE 1, 2015 — 5:15 PM FOSTER CONFERENCE ROOM — 6300 BUILDING (formerly known as Conference Room #1) Next Scheduled Meeting: Monday, June 15, 2015 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) Commute Trip Reduction a) Forward to 6/15/15 Pg. 1 Grant Acceptance (3) Regular Consent Agenda b) 2015 Overlay and Repair Program b) Forward to 6/15/15 Pg. 9 Construction Management Supplement No. 1 with KPG Regular Consent Agenda c) Interurban Ave S (S 143rd St to Fort Dent Way) c) Forward to 6/15/15 Pg. 23 Construction Management Supplement No. 1 with Anchor QEA Regular Consent Agenda d) Resolution for Six -Year Transportation Improvement Program d) Forward to 6/8/15 C.O.W. Pg. 27 (2016 -2021) and 6/15/15 Regular e) TUC Transit Center: Andover Park W Street and Water Projects e) Forward to 6/15/15 Pg. 71 Construction Management Supplement No. 2 with AECOM Regular Consent Agenda 3. SCATBd f) . SCATBd 4/21/15 Meeting Summary f) Information Only Pg. 75 SCATBd 5/19/15 Meeting Agenda 4. MISCELLANEOUS 5. ANNOUNCEMENTS Future Agendas: • 42nd Ave S /Allentown Roadside Barriers • ADA Transition Plan Consultant Selection and Contract Next Scheduled Meeting: Monday, June 15, 2015 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. T"ransport i. n l mitte " 2015 Work Plan Description Qtr Depot Action or Briefing Status BNSF Inte'rmoda'I Facility Access . .......w._......._. _ _.m _ _ Design! contract (to a... COW 1FU o.. a0 r ), Complete �th Phase II__..___.__.. �... �... �.. _____...- _._�._.�..�_.__._..___ ___._...�. Avenue South I .._....�...�. �...__�._ -._.. __._�.�..._. Design Contract Supplement - design undergroundung P Seattle City Light underground agreement �_ .._...._. _..__� P .......mm Follow-up on potential for coordination with SeaTa'c __.._.__... . ... ............................. - . . ......... PWW _._. B _ �_..._.. ,_..�...�.,.�_. ADA Improvements ._. ....�_..._ ............._.,. .......- ._......... _. ._..�......__.......,..._ Design n contract and b'fld award 2 P A Annual Overlay and Repair P,roagrarn .�._.._._..�.._._._.____..._ Bud Award PWW A �; Avenue S (S 1 7ta' - S 144" St)' � _ Funding, and Design contract 2 PWW A 53d Ave S Water Nliafln Replacement, Sewer Rehab (from A Utilities) Cascade View Safe Route's to Schoo; l Closeout B PWW A Andover parr 'West/ TUC Transit Center Closeout 3 PWW A Thorndyke Safe Routes to School Closeouit B PWW A Boeing access Road over BNRR Drudge Rehab Bad Award 3 P'WW A Residential Street Improvements Design contract 2 PWW A. Safety-based priority list 4 PWW B Annual Bridge Inspections and Repairs Program update 4 P'WW B TUC Ped /Bike Fridge Right- of -way and easement acquisition 1 P'WW A Complete Bid Award' 4 PWW A. Interurban Avenue S (S 143" Fort Dent Wa'y) Status update 4 PWW B S 1440 St phase II (42 `"d Ave S TI B) Bid' award �4 PW A . �....�. -.. Cr+ossw a'Ik petition - Tilt /S I39th Vicinity ........._ _...__... Present engineering analysis B PWW B OTHER TSB: pedestrian bulb replacement (test location) PWW B Allentown Roadside Barriers - outreach and design alternatives PW B Complete I u amish/ S 119"' Peril Bridge present condition and repairs B Complete 1 PWW (briefing) Transit plan update contract 4 P'WW A. Standard Reports/Briefings Frequency Dept. Facility Tours As needed P'WW Committee Work Plan Council, Staff f%, f