HomeMy WebLinkAboutTrans 2015-06-01 Item 2C - Contract Supplement #1 - Interurban Avenue South (South 143rd Street to Fort Dent Way) Construction Management with Anchor QEACity of Tukwflai Jim Haggetton, Mayot TO Mayor .prerton Transportation Committee FROM: Bob Giberson, Public Works Directorl�� IIII 11111 1111111 111 Fill 1 11111111 a 0 n I SUBJECT: Interurban Aveniue South (S 1431d St to Fort Dent Way) I Project No., 9031:0402�, Contract No., 14-066 CM Consultant Supplement #1 withi Anchor QEA BAC KGRO.1 Construction has been underway on Interurban Ave S from S 1431d St to Fort Dent Way since Jully 2014. Difficulties encountered in construction of two of the major project features (the retaining wall near Fort Dent Way and the large fill TOM -1 MITA 'I qF;Wn'9 services through the end of 201'5, The negotiations for this su!pplemeniit anticipate a shift in consultant personnel to bette position the team for an extended construction contract. We will work diligently with our contractor to complete the projel witiii, 4is taw fillitefra-tie, FINANCIAL IMPACT Tw w 0,499 1.39 MA—KA—Liz L_ —Q.2A Q �109 1411111111 1 1 111 � 1 1 t" IRT Meeting. Attachment Anchor OEA Contract Supplement #1 will I Exhibit, A 23 WRIN DiJPROJECTSW RIN & IS PrqectOnllerurban Ave S (90310402�4Ccmsu6fanl SelectanVulo Memo CM Anchw up =W #1 05�•22-15 gl-MER do": Contracts Awarded Budge Construction Contract $7,597,833.39 $8,737,508.39 Remaining 15% Construction Contingency 675I,747.00 Anchor QEA Construction Management 1,078,720,00 1,666,693.00 Anchor QEA CM Supplement #1 463,928.0I0 KPG On-Call Construction Support Sup No. 2 357,,973,010 Tukwila Staff, Field Office Expenses, WSD 225,000.00 Potential Utility Conflicts 100,0100.00 Storm Quality Retrofit Budget (CIP page 83) 95,000.00 Tw w 0,499 1.39 MA—KA—Liz L_ —Q.2A Q �109 1411111111 1 1 111 � 1 1 t" IRT Meeting. Attachment Anchor OEA Contract Supplement #1 will I Exhibit, A 23 WRIN DiJPROJECTSW RIN & IS PrqectOnllerurban Ave S (90310402�4Ccmsu6fanl SelectanVulo Memo CM Anchw up =W #1 05�•22-15 gl-MER do": Adw Washinigton, State VJ,ff Department of Transportation Irganization and Address Supplemental Agreement A n ch o r Q EIA, 1, LC , Number One 720 Olive �Vay, SUite 190O original Agreement Number STPUL- 1 O45 (007) Seat 80 Seattle, TA 911 Phone: (206) 287-9130 Project Number 90310402 Execution Date ornpletion Date June 6, 2014 Decernber 31, 2015 Project Title Interurban Avenue South New Maximum Amount Payable Im2rovernents $ $1,542,648.00 Description of Work Provide Construction Managenient Services for roadway irnprovernents from S. 143rd Street to Fort Dent Way, including walls, storrn drainage, illumination, landscaping, paving, and pedestrian facilities. The Local Agency of City of "Fukwila desires to supplement the agreement entered into with Anchor QEA LLC and executed on June 6, 2014 — and identified as Agreement No. 14-0,66 All provisions, in the basic agreement remain in effect except as expressly modified by this supplement The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to ready ElEansion of level of services and time allocation for staff as identified in the original agreement SCOL)e of work. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31, 2015 Mll Section V, PAYMENT, shall be amended as folllows: 'Increase maxii-nurn arnount payable from $1,078,720.00 to $1,542,648.00. as set forth in the attached Exhibit A, and by this reference made a part of this suipplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: (157 M Approving Authority Signature DOT Form 140-063 EF Date 24 Rpvised 912005 *Rate capped at $87.00for this contract Total DSC Overhead (OH Cost including Salary Additives): OH Rate x DISC of 160,94 % x $158,,365.00 Fixed Fee (FF): FF Rate x DISC of Sub-Total Labor: Reimbursables: Mileage Copier/Copies Misc. Supplies and Equipment Lab Fees Subtotal (Supplement 1)1: Grand Total (Original + Supplement 1): Prepared by., Ed Berschinsk� 25�.010 % x $1.5 ,365.E007 NIM Cost $30,,624.00 $44,49&00 $23,946.010 $3,880.00 $6,304.00 $46,365-010 $2,750,00 $254,873,00 0 $1,542,648,00 4/21/2015, P141 Suppl,ement 1 Exhibit A Consultant Fee Determination — Summary Sheet (Cost Plus Fixed Fee) Projec�t� interurban Avenue South, — S. 14V Street to Fort Dent Way Direct Salary Cost (DSQ: Classification Man Hours Rate Principal -- Construction Manager 352 X $87,00* Resident Engineer 927 X $48.00 Senior Staff— Lead Inspector 61.4 X $39,00 Office Engineer 144 X $27.00 . . ......... Environmental Monitor (Permitting) 197 X $32.00 pecia Ity 1,686 X $27w50 Project Coordinator/Administration 110 X $25.00 *Rate capped at $87.00for this contract Total DSC Overhead (OH Cost including Salary Additives): OH Rate x DISC of 160,94 % x $158,,365.00 Fixed Fee (FF): FF Rate x DISC of Sub-Total Labor: Reimbursables: Mileage Copier/Copies Misc. Supplies and Equipment Lab Fees Subtotal (Supplement 1)1: Grand Total (Original + Supplement 1): Prepared by., Ed Berschinsk� 25�.010 % x $1.5 ,365.E007 NIM Cost $30,,624.00 $44,49&00 $23,946.010 $3,880.00 $6,304.00 $46,365-010 $2,750,00 $254,873,00 0 $1,542,648,00 4/21/2015, P141