Loading...
HomeMy WebLinkAboutTrans 2015-06-01 Item 2D - Resolution - 2016-2021 Transportation Improvement ProgramWA Word Processhig solufions\"TIP 20116.2021 5-15-15 CKbjs Page 1 of 2 28 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTOel, at a Regular Meeting thereof this - day of 2015. Christy Oi'Flaherty, MMC, City'Clerk Kate Krulier, Council President Filed with the City C�erk: Passed by the City Council: Vesolution Number- EM Exhibit,- City of Tu�Wla Six-Year Transportation Improvement Program from 201�6 to 2021 WAWard Processjingi ResolutlonsVTIP 2016-2021 5-15-15 CK:bjs p4*1 DRAFT 2016 - 2021 TIP SUMMARY 2016 -2021 2015 CIP Project Costs in Thousands of Dollars TIP PROJECT TITLE Page No. 2016 2017 2018 2019 2020 2021 TOTAL May 28, 2015 FUNDING SOURCES Federal State/TIB Developer Unsecured City 1 42 -42nd Ave S (S 160 St - S 131 PI) 2 53rd Ave S (S 137th St - S 144th St) 3 ADA Improvements 4 APE /Industry Dr Intersection 5 APE /Minkler Blvd Intersection 6 Annual Bridge Inspections and Repairs 7 Annual Overlay and Repair Program 8 Beacon Ave Bridge Preventative Maintenance 9 Boeing Access Rd Bridge Rehabilitation 10 Cascade View Safe Routes to School Phase 2 11 Frank Zepp Bridge Preventative Maintenance 12 Grady Way Bridge Preventative Maintenance 13 Multipurpose Trails 14 S 133 St /SR599 Intersection 15 Strander Blvd /SW 27th St St Phase III 16 TUC /TOD Pedestrian Improvements 17 TUC - Pedestrian /Bicycle Bridge 18 Walk & Roll Program 19 W Valley Hwy/ S 156 St Intersection 2 6 20 25 24 10 18 11 3 35 27 28 29 12 22 26 5,300 3,173 63 0 0 270 1,560 1,741 5,411 0 2,535 207 60 0 20 70 6,185 0 0 0 920 63 0 0 270 1,650 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 0 0 335 1,670 0 0 0 0 0 60 0 5,000 0 0 0 0 0 0 63 0 0 335 1,725 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 0 0 335 1,730 0 0 0 0 0 60 0 0 0 0 0 0 0 0 63 575 622 335 1,745 0 0 839 0 0 280 630 52,329 1,100 0 175 1,032 5,300 4,093 378 575 622 1,880 10,080 1,741 1,741 5,411 4,193 839 2,535 2,535 207 207 580 630 57,349 1,170 6,185 175 1,032 580 6,000 2,939 5,300 1,154 378 575 622 1,880 10,080 0 1,218 750 89 0 0 0 170 28,024 650 185 175 592 460 29,325 20 500 440 TOTAL * PROJECTS REVISED FROM 2015 -2020 TIP 26,595 2,963 7,128 2,183 New: 42 -42nd Ave S (S 160 St - S 131 PI) Beacon Ave Bridge Preventative Maintenance Frank Zepp Bridge Preventative Maintenance Grady Way Bridge Preventative Maintenance 2,188 59,725 100,782 8,676 6,580 Deleted: BNSF Intermodal Facility Access E Marginal Way (BAR - S 112 St) Macadam Rd & S 144 St Intersection S 144th St Bridge - Sidewalks S 144th St Phase H (42 Ave S - TIB) West Valley Hwy (1 -405 - Strander Blvd) 20 34,414 51,092 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments 06/08/15 06/15/15 04 C G O P S TW Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 5,300,000 5,300,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 9,660,000 9,660,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,300,000 0 0 0 4,360,000 Totals 5,300,000 0 0 0 4,360,000 Report Date: May 27, 2015 w Page 1 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/08/15 06/15/15 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 3,000 3,000 P CN 2016 0 TIB 1,589,000 1,350,000 2,939,000 S CN 2016 0 0 1,150,000 1,150,000 Totals 0 1,589,000 2,503,000 4,092,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 3,000 0 0 0 0 CN 3,170,000 920,000 0 0 0 Totals 3,173,000 920,000 0 0 0 Report Date: May 27, 2015 w N Page 2 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 W Report Date: May 27, 2015 W Page 3 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/08/15 06/15/15 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: May 27, 2015 w Page 4 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07746 Andover Park E /Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/08/15 06/15/15 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 20,000 20,000 P CN 2021 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 W Report Date: May 27, 2015 0' Page 5 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 1,880,000 1,880,000 Totals 0 0 1,880,000 1,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 335,000 335,000 670,000 Totals 270,000 270,000 335,000 335,000 670,000 W Report Date: May 27, 2015 0) Page 6 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/08/15 06/15/15 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 10,080,000 10,080,000 Totals 0 0 10,080,000 10,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Totals 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 W Report Date: May 27, 2015 Page 7 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 TUK -57 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. 06/08/15 06/15/15 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 1,740,900 0 0 1,740,900 Totals 1,740,900 0 0 1,740,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,900 0 0 0 0 Totals 1,740,900 0 0 0 0 W Report Date: May 27, 2015 Page 8 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides 06/08/15 06/15/15 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 4,193,000 0 1,218,000 5,411,000 Totals 4,193,000 0 1,218,000 5,411,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,411,000 0 0 0 0 Totals 5,411,000 0 0 0 0 W Report Date: May 27, 2015 Page 9 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/08/15 06/15/15 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 839,000 Totals 0 0 0 0 839,000 Report Date: May 27, 2015 A D Page 10 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 TUK -55 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. 06/08/15 06/15/15 14 0.040 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 2,534,812 0 0 2,534,812 Totals 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 Report Date: May 27, 2015 A Page 11 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -56 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. 06/08/15 06/15/15 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 206,500 0 0 206,500 Totals 206,500 0 0 206,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 206,500 0 0 0 0 Totals 206,500 0 0 0 0 Report Date: May 27, 2015 A N Page 12 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/08/15 06/15/15 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 360,000 360,000 Totals 0 0 360,000 360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 120,000 Totals 60,000 60,000 60,000 60,000 120,000 Report Date: May 27, 2015 A W Page 13 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07748 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. 06/08/15 06/15/15 04 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 27, 2015 A A Page 14 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave 06/08/15 06/15/15 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 STP 3,850,000 0 620,000 4,470,000 P RW 2021 STP 1,150,000 0 179,000 1,329,000 P CN 2021 FMSIB 5,000,000 0 1,000,000 6,000,000 P CN 2021 TIGER III 20,000,000 0 25,000,000 45,000,000 Totals 30,000,000 0 26,799,000 56,799,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 5,000,000 0 0 RW 0 0 0 0 1,329,000 CN 0 0 0 0 51,000,000 Totals 20,000 0 5,000,000 0 52,329,000 Report Date: May 27, 2015 A (T Page 15 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/08/15 06/15/15 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 70,000 70,000 P RW 2021 STP(E) 80,000 0 0 80,000 S RW 2021 0 0 20,000 20,000 P CN 2021 STP(E) 420,000 0 580,000 1,000,000 Totals 500,000 0 670,000 1,170,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 70,000 0 0 0 300,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 70,000 0 0 0 1,100,000 Report Date: May 27, 2015 A 0) Page 16 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd Of extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian /bicycle bridge over the Green River 06/08/15 06/15/15 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 OTHER 6,000,000 185,000 6,185,000 Totals 0 6,000,000 185,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,223,000 0 0 0 0 Totals 7,223,000 0 0 0 0 Report Date: May 27, 2015 A Page 17 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. 06/08/15 06/15/15 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: May 27, 2015 A CO Page 18 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct safety and capacity improvements at intersection. 06/08/15 06/15/15 03 O P S T W CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 39,615,212 8,339,000 56,416,000 104,370,212 Report Date: May 27, 2015 A Page 19 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk and illumination. Street portion will coordinate with Water and Surface Water capital improvement program projects. 06/09/14 06/16/14 1833 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 251,000 251,000 P CN 2016 0 TIB 1,000,000 200,000 1,200,000 Totals 0 1,000,000 451,000 1,451,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 251,000 0 0 0 0 CN 0 600,000 600,000 0 0 Totals 251,000 600,000 600,000 0 0 01 Report Date: June 17, 2014 Page 1 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 01 Report Date: June 17, 2014 Page 2 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/09/14 06/16/14 1833 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2020 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 01 Report Date: June 17, 2014 N Page 3 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03764 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets 06/09/14 06/16/14 1833 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 20,000 20,000 P CN 2020 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 01 Report Date: June 17, 2014 w Page 4 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 1,815,000 1,815,000 Totals 0 0 1,815,000 1,815,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 335,000 670,000 Totals 270,000 270,000 270,000 335,000 670,000 01 Report Date: June 17, 2014 Page 5 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/09/14 06/16/14 1833 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 9,880,000 9,880,000 Totals 0 0 9,880,000 9,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 Totals 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 01 Report Date: June 17, 2014 01 Page 6 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/09/14 06/16/14 1833 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 FMSIB 950,000 0 300,000 1,250,000 P CN 2020 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,250,000 CN 0 0 0 0 12,500,000 Totals 0 0 0 0 13,750,000 01 Report Date: June 17, 2014 Page 7 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. 06/09/14 06/16/14 1833 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 STP(BR) 179,500 0 45,000 224,500 S CN 2015 STP(BR) 8,625,600 0 2,220,100 10,845,700 Totals 8,805,100 0 2,265,100 11,070,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 224,500 0 0 0 0 CN 8,603,000 2,242,700 0 0 0 Totals 8,827,500 2,242,700 0 0 0 01 Report Date: June 17, 2014 Page 8 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/09/14 06/16/14 1833 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 839,000 0 0 Totals 0 0 839,000 0 0 01 Report Date: June 17, 2014 Page 9 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/09/14 06/16/14 1833 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 170,000 170,000 P RW 2020 0 0 700,000 700,000 P CN 2020 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,000,000 3,300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 0 0 0 0 3,300,000 01 Report Date: June 17, 2014 Page 10 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Z 3 cr A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 }uewpuewy m 0 0 0 Z 0 adi j ;uewanoadw! sepoo MI!Bf1 1 0 3 ed j !e }uawuoa!nu3 pea!nbe Mb 17 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane WA -03763 06/09/14 06/16/14 1833 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 90,000 90,000 P RW 2020 0 0 90,000 90,000 P CN 2020 0 0 430,000 430,000 Totals 0 0 610,000 610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 0 0 0 0 610,000 0) Report Date: June 17, 2014 0 Page 11 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles 06/09/14 06/16/14 1833 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 50,000 50,000 P CN 2020 0 0 280,000 280,000 Totals 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 ALL 0 0 0 0 280,000 Totals 50,000 0 0 0 280,000 0) Report Date: June 17, 2014 Page 12 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03769 S 133rd St /SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. 06/09/14 06/16/14 1833 06 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 60,000 60,000 P CN 2020 STP 460,000 0 110,000 570,000 Totals 460,000 0 170,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 0) Report Date: June 17, 2014 N Page 13 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/09/14 06/16/14 1833 28 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2020 STP(BR) 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: June 17, 2014 w Page 14 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03762 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes 06/09/14 06/16/15 1833 03 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 TIB 1,000,000 480,000 1,480,000 Totals 0 1,000,000 480,000 1,480,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,480,000 0 0 0 0 Totals 1,480,000 0 0 0 0 0) Report Date: June 17, 2014 Page 15 nig Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 S rander Blvd /SW 27th St Phase 111 Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/09/14 06/16/14 1833 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 FMSIB 5,000,000 0 0 5,000,000 P ALL 2020 TIGER IV 27,000,000 0 1,150,000 28,150,000 Totals 32,000,000 0 1,150,000 33,150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,150,000 Totals 0 0 0 0 33,150,000 0) Report Date: June 17, 2014 0' Page 16 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station/TOD area. Connection may include an underpass under the UPRR line. 06/09/14 06/19/14 1833 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 280,000 280,000 P RW 2020 0 0 100,000 100,000 P CN 2020 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 580,000 1,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 0 0 0 0 1,080,000 0) Report Date: June 17, 2014 Page 17 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Development of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit - oriented development. The project, a pedestrian /bicycle bridge across the Green River, will form the backbone of a pedestrian corridor connecting the compact land uses and high ridership bus stop in the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its surrounding transit - oriented development. This will improve public access to the station from all parts of the center, and provide a direct, safe and enjoyable walking experience. The high level of urban level amenity will attract the types and densities of uses envisioned in a regional center. 06/09/14 06/16/14 1833 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 OTHER 6,000,000 1,485,000 7,485,000 Totals 0 6,000,000 1,485,000 7,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,485,000 0 0 0 0 Totals 7,485,000 0 0 0 0 0) Report Date: June 17, 2014 Page 18 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewalk /bike lanes on Macadam, S 144th St to S 150th St. 06/09/14 06/16/15 1833 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 140,000 140,000 Totals 0 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 140,000 0 0 0 0 Totals 140,000 0 0 0 0 0) Report Date: June 17, 2014 Page 19 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03779 West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/09/14 06/19/10 1833 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 60,000 60,000 P CN 2020 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 0) Report Date: June 17, 2014 Page 20 riSt Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 06/09/14 06/16/15 1833 03 O P S T W CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 56,242,800 8,750,000 26,473,400 91,466,200 Report Date: June 17, 2014 Page 21