Exhibit,- City of Tu�Wla Six-Year Transportation Improvement Program from 201�6 to 2021
WAWard Processjingi ResolutlonsVTIP 2016-2021 5-15-15
CK:bjs
p4*1
DRAFT 2016 - 2021 TIP SUMMARY
2016 -2021 2015 CIP Project Costs in Thousands of Dollars
TIP PROJECT TITLE
Page No. 2016 2017 2018 2019 2020 2021 TOTAL
May 28, 2015
FUNDING SOURCES
Federal State/TIB Developer Unsecured City
1 42 -42nd Ave S (S 160 St - S 131 PI)
2 53rd Ave S (S 137th St - S 144th St)
3 ADA Improvements
4 APE /Industry Dr Intersection
5 APE /Minkler Blvd Intersection
6 Annual Bridge Inspections and Repairs
7 Annual Overlay and Repair Program
8 Beacon Ave Bridge Preventative Maintenance
9 Boeing Access Rd Bridge Rehabilitation
10 Cascade View Safe Routes to School Phase 2
11 Frank Zepp Bridge Preventative Maintenance
12 Grady Way Bridge Preventative Maintenance
13 Multipurpose Trails
14 S 133 St /SR599 Intersection
15 Strander Blvd /SW 27th St St Phase III
16 TUC /TOD Pedestrian Improvements
17 TUC - Pedestrian /Bicycle Bridge
18 Walk & Roll Program
19 W Valley Hwy/ S 156 St Intersection
2
6
20
25
24
10
18
11
3
35
27
28
29
12
22
26
5,300
3,173
63
0
0
270
1,560
1,741
5,411
0
2,535
207
60
0
20
70
6,185
0
0
0
920
63
0
0
270
1,650
0
0
0
0
0
60
0
0
0
0
0
0
0
0
63
0
0
335
1,670
0
0
0
0
0
60
0
5,000
0
0
0
0
0
0
63
0
0
335
1,725
0
0
0
0
0
60
0
0
0
0
0
0
0
0
63
0
0
335
1,730
0
0
0
0
0
60
0
0
0
0
0
0
0
0
63
575
622
335
1,745
0
0
839
0
0
280
630
52,329
1,100
0
175
1,032
5,300
4,093
378
575
622
1,880
10,080
1,741 1,741
5,411 4,193
839
2,535 2,535
207 207
580
630
57,349
1,170
6,185
175
1,032
580
6,000
2,939
5,300
1,154
378
575
622
1,880
10,080
0
1,218
750 89
0
0
0
170
28,024
650
185
175
592
460
29,325
20 500
440
TOTAL
* PROJECTS REVISED FROM 2015 -2020 TIP
26,595 2,963
7,128 2,183
New:
42 -42nd Ave S (S 160 St - S 131 PI)
Beacon Ave Bridge Preventative Maintenance
Frank Zepp Bridge Preventative Maintenance
Grady Way Bridge Preventative Maintenance
2,188 59,725 100,782 8,676 6,580
Deleted:
BNSF Intermodal Facility Access
E Marginal Way (BAR - S 112 St)
Macadam Rd & S 144 St Intersection
S 144th St Bridge - Sidewalks
S 144th St Phase H (42 Ave S - TIB)
West Valley Hwy (1 -405 - Strander Blvd)
20 34,414 51,092
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, drainage, sidewalks, bike facilities, and
driveway adjustments
06/08/15
06/15/15
04
C G O P S
TW
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
0
5,300,000
5,300,000
P
CN
2021
0
0
4,360,000
4,360,000
Totals
0
0
9,660,000
9,660,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
5,300,000
0
0
0
4,360,000
Totals
5,300,000
0
0
0
4,360,000
Report Date: May 27, 2015
w
Page 1
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/08/15
06/15/15
04
C G O P S
TW
0.420
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2016
0
0
3,000
3,000
P
CN
2016
0
TIB
1,589,000
1,350,000
2,939,000
S
CN
2016
0
0
1,150,000
1,150,000
Totals
0
1,589,000
2,503,000
4,092,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
3,000
0
0
0
0
CN
3,170,000
920,000
0
0
0
Totals
3,173,000
920,000
0
0
0
Report Date: May 27, 2015
w
N
Page 2
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/08/15
06/15/15
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
378,000
378,000
Totals
0
0
378,000
378,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
63,000
63,000
63,000
63,000
126,000
Totals
63,000
63,000
63,000
63,000
126,000
W
Report Date: May 27, 2015
W
Page 3
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/08/15
06/15/15
05
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2021
0
0
575,000
575,000
Totals
0
0
575,000
575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
0
0
575,000
Totals
0
0
0
0
575,000
Report Date: May 27, 2015
w
Page 4
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07746
Andover Park E /Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/08/15
06/15/15
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
20,000
20,000
P
CN
2021
0
0
602,000
602,000
Totals
0
0
622,000
622,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
20,000
CN
0
0
0
0
602,000
Totals
0
0
0
0
622,000
W
Report Date: May 27, 2015
0'
Page 5
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/08/15
06/15/15
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
1,880,000
1,880,000
Totals
0
0
1,880,000
1,880,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
270,000
335,000
335,000
670,000
Totals
270,000
270,000
335,000
335,000
670,000
W
Report Date: May 27, 2015
0)
Page 6
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/08/15
06/15/15
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
10,080,000
10,080,000
Totals
0
0
10,080,000
10,080,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,560,000
1,650,000
1,670,000
1,725,000
3,475,000
Totals
1,560,000
1,650,000
1,670,000
1,725,000
3,475,000
W
Report Date: May 27, 2015
Page 7
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
TUK -57
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
06/08/15
06/15/15
14
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
1,740,900
0
0
1,740,900
Totals
1,740,900
0
0
1,740,900
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,740,900
0
0
0
0
Totals
1,740,900
0
0
0
0
W
Report Date: May 27, 2015
Page 8
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(003) TUK -52
Boeing Access Road Bridge Rehabilitation
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It
will be 110' wide curb to curb and have sidewalks on both sides
06/08/15
06/15/15
14
0.200
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
4,193,000
0
1,218,000
5,411,000
Totals
4,193,000
0
1,218,000
5,411,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
5,411,000
0
0
0
0
Totals
5,411,000
0
0
0
0
W
Report Date: May 27, 2015
Page 9
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -03795
Cascade View Safe Routes to School Phase 2
S 140th St/33rd Ave S
to
Construct an off - street paved shard use path, sidewalks, and a traffic circle at the
intersection of 33rd Ave S and S 140th Street.
06/08/15
06/15/15
28
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2021
0
WSDOT
750,000
89,000
839,000
Totals
0
750,000
89,000
839,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
839,000
Totals
0
0
0
0
839,000
Report Date: May 27, 2015
A
D
Page 10
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
TUK -55
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
06/08/15
06/15/15
14
0.040
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
2,534,812
0
0
2,534,812
Totals
2,534,812
0
0
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
Report Date: May 27, 2015
A
Page 11
nig
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
TUK -56
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
06/08/15
06/15/15
14
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
206,500
0
0
206,500
Totals
206,500
0
0
206,500
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
206,500
0
0
0
0
Totals
206,500
0
0
0
0
Report Date: May 27, 2015
A
N
Page 12
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
06/08/15
06/15/15
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
0
360,000
360,000
Totals
0
0
360,000
360,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
60,000
60,000
60,000
60,000
120,000
Totals
60,000
60,000
60,000
60,000
120,000
Report Date: May 27, 2015
A
W
Page 13
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07748
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 Southbound Ramps to S 134th PI
Construct intersection improvements including signalization or roundabout, lighting,
crosswalks, and drainage.
06/08/15
06/15/15
04
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
60,000
60,000
P
CN
2021
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: May 27, 2015
A
A
Page 14
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -05410
Strander Blvd /SW 27th St Phase III
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct arterial improvements for a new roadway extending Strander
Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave
06/08/15
06/15/15
01
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
STP
3,850,000
0
620,000
4,470,000
P
RW
2021
STP
1,150,000
0
179,000
1,329,000
P
CN
2021
FMSIB
5,000,000
0
1,000,000
6,000,000
P
CN
2021
TIGER III
20,000,000
0
25,000,000
45,000,000
Totals
30,000,000
0
26,799,000
56,799,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
20,000
0
5,000,000
0
0
RW
0
0
0
0
1,329,000
CN
0
0
0
0
51,000,000
Totals
20,000
0
5,000,000
0
52,329,000
Report Date: May 27, 2015
A
(T
Page 15
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/08/15
06/15/15
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2016
0
0
70,000
70,000
P
RW
2021
STP(E)
80,000
0
0
80,000
S
RW
2021
0
0
20,000
20,000
P
CN
2021
STP(E)
420,000
0
580,000
1,000,000
Totals
500,000
0
670,000
1,170,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
70,000
0
0
0
300,000
RW
0
0
0
0
100,000
CN
0
0
0
0
700,000
Totals
70,000
0
0
0
1,100,000
Report Date: May 27, 2015
A
0)
Page 16
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd Of extended)
and Longacres Way (if extended)
Baker Boulevard to West Valley Highway
Construct a new pedestrian /bicycle bridge over the Green River
06/08/15
06/15/15
28
0.640
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
OTHER
6,000,000
185,000
6,185,000
Totals
0
6,000,000
185,000
6,185,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
7,223,000
0
0
0
0
Totals
7,223,000
0
0
0
0
Report Date: May 27, 2015
A
Page 17
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan)
Various City Streets
to
Evaluate deficiencies and create a prioritized list of projects and recommended
design standards.
06/08/15
06/15/15
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
175,000
175,000
Totals
0
0
175,000
175,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
175,000
Totals
0
0
0
0
175,000
Report Date: May 27, 2015
A
CO
Page 18
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03765
West Valley Highway /S 156th St
SR181/West Valley Highway
Southcenter Blvd to S 158th St
Construct safety and capacity improvements at intersection.
06/08/15
06/15/15
03
O P S T W
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
50,000
50,000
P
CN
2020
CMAQ
440,000
0
542,000
982,000
Totals
440,000
0
592,000
1,032,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
50,000
CN
0
0
0
0
982,000
Totals
0
0
0
0
1,032,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
39,615,212
8,339,000
56,416,000
104,370,212
Report Date: May 27, 2015
A
Page 19
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk and illumination. Street portion will coordinate with Water and Surface
Water capital improvement program projects.
06/09/14
06/16/14
1833
04
C G O P S
TW
0.420
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
0
0
251,000
251,000
P
CN
2016
0
TIB
1,000,000
200,000
1,200,000
Totals
0
1,000,000
451,000
1,451,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
251,000
0
0
0
0
CN
0
600,000
600,000
0
0
Totals
251,000
600,000
600,000
0
0
01
Report Date: June 17, 2014
Page 1
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/09/14
06/16/14
1833
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
378,000
378,000
Totals
0
0
378,000
378,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
63,000
63,000
63,000
63,000
126,000
Totals
63,000
63,000
63,000
63,000
126,000
01
Report Date: June 17, 2014
Page 2
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/09/14
06/16/14
1833
05
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2020
0
0
575,000
575,000
Totals
0
0
575,000
575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
0
0
575,000
Totals
0
0
0
0
575,000
01
Report Date: June 17, 2014
N
Page 3
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03764
Andover Park E /Minkler Blvd. Intersection
Andover Park E
Minkler Blvd to
Design and construct intersection and traffic signal improvements and widening for
left turn pockets
06/09/14
06/16/14
1833
03
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
20,000
20,000
P
CN
2020
0
0
602,000
602,000
Totals
0
0
622,000
622,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
20,000
CN
0
0
0
0
602,000
Totals
0
0
0
0
622,000
01
Report Date: June 17, 2014
w
Page 4
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/09/14
06/16/14
1833
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
1,815,000
1,815,000
Totals
0
0
1,815,000
1,815,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
270,000
270,000
335,000
670,000
Totals
270,000
270,000
270,000
335,000
670,000
01
Report Date: June 17, 2014
Page 5
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/09/14
06/16/14
1833
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
9,880,000
9,880,000
Totals
0
0
9,880,000
9,880,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,550,000
1,560,000
1,650,000
1,670,000
3,450,000
Totals
1,550,000
1,560,000
1,650,000
1,670,000
3,450,000
01
Report Date: June 17, 2014
01
Page 6
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/09/14
06/16/14
1833
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
FMSIB
950,000
0
300,000
1,250,000
P
CN
2020
FMSIB
10,812,500
0
1,687,500
12,500,000
Totals
11,762,500
0
1,987,500
13,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
1,250,000
CN
0
0
0
0
12,500,000
Totals
0
0
0
0
13,750,000
01
Report Date: June 17, 2014
Page 7
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(003) TUK -52
Boeing Access Road Bridge Rehabilitation
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing Boeing Access Road bridge structure over the Burlington
Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge
sub - structure, seismic retrofit, and construction of a new bridge deck including
pedestrian /bicycle amenities.
06/09/14
06/16/14
1833
14
0.200
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
STP(BR)
179,500
0
45,000
224,500
S
CN
2015
STP(BR)
8,625,600
0
2,220,100
10,845,700
Totals
8,805,100
0
2,265,100
11,070,200
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
224,500
0
0
0
0
CN
8,603,000
2,242,700
0
0
0
Totals
8,827,500
2,242,700
0
0
0
01
Report Date: June 17, 2014
Page 8
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -03795
Cascade View Safe Routes to School Phase 2
S 140th St/33rd Ave S
to
Construct an off - street paved shard use path, sidewalks, and a traffic circle at the
intersection of 33rd Ave S and S 140th Street.
06/09/14
06/16/14
1833
28
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2018
0
WSDOT
750,000
89,000
839,000
Totals
0
750,000
89,000
839,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
839,000
0
0
Totals
0
0
839,000
0
0
01
Report Date: June 17, 2014
Page 9
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03770
East Marginal Way
E Marginal Way
Boeing Access Road to S 112th St
Design and construct widening to 3 lanes including curb & gutter, sidewalks,
drainage, landscaping, and utility undergrounding.
06/09/14
06/16/14
1833
03
P S T W
0.280
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
170,000
170,000
P
RW
2020
0
0
700,000
700,000
P
CN
2020
STP
1,300,000
0
1,130,000
2,430,000
Totals
1,300,000
0
2,000,000
3,300,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
170,000
RW
0
0
0
0
700,000
CN
0
0
0
0
2,430,000
Totals
0
0
0
0
3,300,000
01
Report Date: June 17, 2014
Page 10
nig
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Z
3
cr
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0
}uewpuewy
m
0
0
0
Z
0
adi j ;uewanoadw!
sepoo MI!Bf1
1
0
3
ed j !e }uawuoa!nu3
pea!nbe Mb
17
Macadam Road /S 144th St Intersection
Macadam Road
S 144th Street to
Widen Macadam Road to add a northbound left turn lane
WA -03763
06/09/14
06/16/14
1833
03
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
90,000
90,000
P
RW
2020
0
0
90,000
90,000
P
CN
2020
0
0
430,000
430,000
Totals
0
0
610,000
610,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
90,000
RW
0
0
0
0
90,000
CN
0
0
0
0
430,000
Totals
0
0
0
0
610,000
0)
Report Date: June 17, 2014
0
Page 11
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03783
Multipurpose Trails
to
Design and construct safe connections to public trails to promoste pedestrian and
bicycle modes of transportation in lieu of motorized vehicles
06/09/14
06/16/14
1833
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2015
0
0
50,000
50,000
P
CN
2020
0
0
280,000
280,000
Totals
0
0
330,000
330,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
50,000
0
0
0
0
ALL
0
0
0
0
280,000
Totals
50,000
0
0
0
280,000
0)
Report Date: June 17, 2014
Page 12
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03769
S 133rd St /SR 599 SB Ramps Intersection
S 133rd Street
SR 599 SB Ramps to
Design and construct intersection improvements including a new traffic signal.
06/09/14
06/16/14
1833
06
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
60,000
60,000
P
CN
2020
STP
460,000
0
110,000
570,000
Totals
460,000
0
170,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
0)
Report Date: June 17, 2014
N
Page 13
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06/09/14
06/16/14
1833
28
0.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2020
STP(BR)
975,200
0
243,800
1,219,000
Totals
975,200
0
243,800
1,219,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
1,219,000
Totals
0
0
0
0
1,219,000
Report Date: June 17, 2014
w
Page 14
nig
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03762
S 144th St Phase 2
S 144th Street
42nd Ave S to Tukwila International Blvd
Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and
utility undergrounding. Coordinate with Tukwila Village development. May include
on- street parking and bike lanes
06/09/14
06/16/15
1833
03
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2015
0
TIB
1,000,000
480,000
1,480,000
Totals
0
1,000,000
480,000
1,480,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,480,000
0
0
0
0
Totals
1,480,000
0
0
0
0
0)
Report Date: June 17, 2014
Page 15
nig
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -05410
S rander Blvd /SW 27th St Phase 111
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the
current terminus of SW 27th St at the east City limits to West Valley Highway,
including access into the permanent Sound Transit train station
06/09/14
06/16/14
1833
01
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
FMSIB
5,000,000
0
0
5,000,000
P
ALL
2020
TIGER IV
27,000,000
0
1,150,000
28,150,000
Totals
32,000,000
0
1,150,000
33,150,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
33,150,000
Totals
0
0
0
0
33,150,000
0)
Report Date: June 17, 2014
0'
Page 16
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Design and construct bike and pedestrian connection between the Tukwila Urban
Center and the Commuter Rail Station/TOD area. Connection may include an
underpass under the UPRR line.
06/09/14
06/19/14
1833
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
280,000
280,000
P
RW
2020
0
0
100,000
100,000
P
CN
2020
STP(E)
500,000
0
200,000
700,000
Totals
500,000
0
580,000
1,080,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
280,000
RW
0
0
0
0
100,000
CN
0
0
0
0
700,000
Totals
0
0
0
0
1,080,000
0)
Report Date: June 17, 2014
Page 17
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd (if extended)
and Longacres Way (if extended)
Near Riverside office complex to Best Western hotel 15901 WVHwy
Development of a new pedestrian /bicycle bridge across the Green River, connecting
the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and
surrounding neighborhood of transit - oriented development. The project, a
pedestrian /bicycle bridge across the Green River, will form the backbone of a
pedestrian corridor connecting the compact land uses and high ridership bus stop in
the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its
surrounding transit - oriented development. This will improve public access to the
station from all parts of the center, and provide a direct, safe and enjoyable walking
experience. The high level of urban level amenity will attract the types and densities
of uses envisioned in a regional center.
06/09/14
06/16/14
1833
28
0.640
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2015
0
OTHER
6,000,000
1,485,000
7,485,000
Totals
0
6,000,000
1,485,000
7,485,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
7,485,000
0
0
0
0
Totals
7,485,000
0
0
0
0
0)
Report Date: June 17, 2014
Page 18
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan
Various City Streets
to
Select, design, and construct non - motorized projects including bike lanes, sidewalks
and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S;
sidewalk on S 130th St, TIB to S 130th St; sidewalk /bike lanes on Macadam, S 144th
St to S 150th St.
06/09/14
06/16/15
1833
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
0
0
140,000
140,000
Totals
0
0
140,000
140,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
140,000
0
0
0
0
Totals
140,000
0
0
0
0
0)
Report Date: June 17, 2014
Page 19
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03779
West Valley Highway
SR 181 /West Valley Highway
1 -405 to Strander Blvd
Design and costruct widening to 7 lanes including curb & gutter, sidewalks,
illumination, drainage, and traffic control
06/09/14
06/19/10
1833
03
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
60,000
60,000
P
CN
2020
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
0)
Report Date: June 17, 2014
Page 20
riSt
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03765
West Valley Highway /S 156th St
SR181/West Valley Highway
Southcenter Blvd to S 158th St
Construct additional northbound left turn lanes at S 156th Street for northbound HOV
to northbound 1 -405
06/09/14
06/16/15
1833
03
O P S T W
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
50,000
50,000
P
CN
2020
CMAQ
440,000
0
542,000
982,000
Totals
440,000
0
592,000
1,032,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
50,000
CN
0
0
0
0
982,000
Totals
0
0
0
0
1,032,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
56,242,800
8,750,000
26,473,400
91,466,200
Report Date: June 17, 2014