Loading...
HomeMy WebLinkAboutTrans 2015-06-01 Item 2E - Contract Supplement #2 - Tukwila Urban Center: Andover Park West Street and Water Construction Management with AECOMCit of Tukwlla Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Peter Lau, Senior Program Manager DATE: May 29, 2015 SUBJECT: TUC Transit Center Project; Andover Park West Street and Water Projects Project Numbers 90610402, 98810404 and 99840105, Contract No. 13-199 Supplemental Agreement No. 2 with AECOM Technical Services ISSUE Approve Supplemental Agreement No. 2 for the construction management (CM) contract with AECOM Technical Services (AECOM) in the amount of $33,962.66 for the Tukwila Urban Center (TUC) Transit Center, Andover Park West Street, and Water Improvement Projects (Transit Center Project). ACKGROUND A CM contract and Supplemental Agreement No. 1 with AECOM were previously executed to provide CM assistance for full-time fieid engineering, inspections, documentation compliance support, and on-call specialty support. DISCUSSION With a substantial number of unexpected underground utility conflicts, design changes, and delays from the contractor, sub-contractors and material suppliers, the Transit Center Project was physically completed on April: 3, 2015. Contract Supplement No. 2 for $33,962.66 will allow AECOM to finalize the project close-out documentation, process remaining change orders, and provide the record drawing's based upon the contractor's red-line mark-up drawings. FINANCIAL. IMPACT The 15% construction contingency was $905,626.00 and there is currently a remaining balance of $464,716.59 that will adequately pay for AECOM's Supplement No. 2 in the amount of $33,962.66. This will leave a remaining contingency of $430,753.93. RECOMMENDATION Council is being asked to approve the construction management Supplemental Agreement No. 2 with AECOM Technical Services to Contract No. 13-199 in the amount of $33,962.66 and consider this item on the Consent Agenda at the June 15, 2015 Regular Meeting. Attachments: AECOM Supplemental Agreement No. 2 to Contract No, 13-199 WP/ EneROJECTS'A. RW FIS ProieMs1Transit Center (9061041040onstruction - Ciy use o,0 Consultant SellectiontInts MGM tor AECOM CM Supplement tfa 2, 5.12-15 - 5bl:dos 71 Supplemental Agreement Number No. 2 Original' Agreement Number 13-199 Project Number 906! 04( Project Title Tukwila Ur 3aii Transit Center Description of Work (..:onstruction. .Management. Services The Local Agency of City of Tukwila Organization. and Address AECOM Technical Services 710 Fifth Avenue, Suite 1000 Seattle, WA 98004. Phone: 206,624,9349 Execution Date 12/5/2013 Completion Date 9/30/2015 New Maximum Amount Payable $ 933,403.01 desires to supplement the agreement entered into with AECOM 1chnica1 Services and executed on 12/5/2013 and identified as AgreemerGt No, 13-199 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: cIns.e-out documentatinn and el orrent change orders,- provide CAI' lines, apprnved change orders and field directives a,,-huilts based iip(In contractor re Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: 111 Section V, PAYMENT, shall be amended as follows: TrylA Vahie is ¶11 967 66, which includes an innrease tn fixed fee vhu of *1070 46 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces beiow and return to this office for final action. By R ich Reis Consul a t Signature DOT Form 140-063 EF Revised 9/2005 By: Approving Authority Signature Date 72 Exhibit A City of Tukwila - Tukwila Transit Center Budget Summary - Supplement No 2 AZCOM AECOM Labor - Home Office Employee Mike Horton Lloyd Brown Classification PM / 00. CADD Tech, Total DSC Overhead (OH Cost Including Salary Additives): OH Rate x DSC of 156.22% Fee Fee Rate x DSC of 2985% Labor Subtotal - Home Office AECOM Labor - Field Office Employee Classification Jim Rills RE Janet Lee ARE Leroy Claris Field Lead Jamie Shinsato Documentation Jesse Rogers Arch, Finis,hes Hours 8,00 $ Rate' Cost 73.88 5591.03 80„00 $ 34„93 52,794,40 88,00 53385.43 53,385 43 Hours Rate 24.00 $ 84.89 84,00 $ 45.40 8.00 $ 49.91 24.00 $ 27.11 140 00 $3,385 43 $3,385 43 $5,288 72 $1,010,55 $9,684.70 Cost 52,037.36 $3,813„60 $399.28 $650,64 50.00 $6,900,88 Total DSC 56,900.88 Overhead (OH Cost Including Salary Additives): OH Rate x DSC of 122.43% 56,900.88 58,448.75 Fee: Fee Rate x. DSC of 29,8559 x 56,900.88 52,059.91 Labor Subtotal - Field Office Labor Subtotal "'Actual 2015 billing rates Reimbursable Vehicles Remaining Rental and Fuel (Jan, - Apr) Expenses Subconsultant aterials, Testing - Final Otto Rosenau invoice (12/23/2014) Surveying 117,409.54 $27,094.24 Cost $ 4,000 00 $4,000,110 Cost $2,868 42 $0,,00 $2,868.42 T ta 3 , 62. 6 73 List of R.emainrnR ^ ^'it'e Nm s fq N" Tu'k Final As bu dts {added Scope) Receive and Review Remaining C. Receive remaining Affidavits sing materials certifications, warranties, and her documentat'uon need the paperwork) ied Payrol .......... Remaining Force Account for project (mitcelkaneaus fr m ptanchlist and Property Restoration) PE447G AC)A ramp report (all info al re; dy collected — just mod to place and make report for MEF' items) Document Filing —print out all missing hard c trical to .,City files. Charige Orders 416, 447.7, t4Il8 Iritc rnal Document QC review AECOM Invoice contract manag, 4 24 4 80 74