Loading...
HomeMy WebLinkAboutCOW 2015-06-08 COMPLETE AGENDA PACKET"��'� Tukwila City Council Agenda or ❖ COMMITTEE •OF THE WHOLE ❖ Jim Haggerton, Mayor Counci /members: + Joe Duffle + Dennis Robertson ...— David Cline, CityAdministrator + Allan Ekberg + Verna Seal Kate Kruller, Counci/ President + Kathy Hougardy + De'Sean Quinn Monday, June 8, 2015, 7:00 PM Tukwila City Hall Council Chambers 1. CALL TO ORDER / PLEDGE OF ALLEGIANCE 2. SPECIAL PRESENTATIONS a. An update on Tukwila tourism and Seattle Southside. Katherine Kertzman, Tourism Program Manager. b. An update on the implementation of the Shoreline Master Program (SMP). Carol Lumb, Senior Planner. 3. CITIZEN COMMENT At this time, you are invited to comment on items not included on this agenda is (p /ease limit your comments to five minutes per citizen). To comment on an item listed on this agenda, please save your comments until the issue presented for discussion. 4. PUBLIC HEARING A resolution adopting the 2016 -2021 Transportation Improvement Program. Pg.1 5. SPECIAL ISSUES a. A resolution adopting the 2016 -2021 Transportation Improvement Program. b. A fireworks permit for an event at Foster High School on June 12, 2015. c. A fireworks permit for the July 4 event at Starfire Sports Complex. d. Grants (3) for the Commute Trip Reduction (CTR) Program. e. Update and discussion regarding the Park Watch Program. Pg.1 Pg.53 Pg.65 Pg.77 Pg.95 6. REPORTS a. Mayor b. City Council c. Staff d. City Attorney e. Intergovernmental 7. MISCELLANEOUS 8. EXECUTIVE SESSION 9. ADJOURN TO SPECIAL MEETING • SPECIAL MEETING ❖ + Ord #2477 + Res #1860 1. CALL TO ORDER / ROLL CALL 2. CONSENT AGENDA a. Approval of a fireworks permit for an event at Foster High School on June 12, 2015. b. Approval of a fireworks permit for the July 4 event at Starfire Sports Complex. Pg.53 Pg.65 3. ADJOURNMENT Tukwila City Hall is wheelchair accessible. Reasonable accommodations are available at public hearings with advance notice to the City Clerk's Office (206- 433 -1800 or TukwilaCityClerk @TukwilaWA.gov). This notice is available at www.tukwilawa.gov, and in alternate formats with advance notice for those with disabilities. Tukwila Council meetings are audio /video taped. HOW TO TESTIFY If you would like to address the Council, please go to the podium and state your name and address clearly for the record. Please observe the basic rules of courtesy when speaking and limit your comments to five minutes. The Council appreciates hearing from citizens but may not be able to take immediate action on comments received until they are referred to a Committee or discussed under New Business. COUNCIL MEETINGS No Council meetings are scheduled on the 5th Monday of the month unless prior public notification is given. Regular Meetings - The Mayor, elected by the people to a four -year term, presides at all Regular Council Meetings held on the 1st and 3rd Mondays of each month at 7:00 p.m. Official Council action in the form of formal motions, adopting of resolutions and passing of ordinances can only be taken at Regular Council meetings. Committee of the Whole Meetings - Council members are elected for a four -year term. The Council President is elected by the Council members to preside at all Committee of the Whole meetings for a one -year term. Committee of the Whole meetings are held the 2nd and 4th Mondays at 7:00 p.m. Issues discussed are forwarded to the Regular Council meeting for official action. GENERAL INFORMATION At each Council meeting citizens are given the opportunity to address the Council on items that are not included on the agenda during CITIZENS COMMENTS. Please limit your comments to 5 minutes. Special Meetings may be called at any time with proper public notice. Procedures followed are the same as those used in Regular Council meetings. Executive Sessions may be called to inform the Council of pending legal action, financial, or personnel matters. PUBLIC HEARINGS Public Hearings are required by law before the Council can take action on matters affecting the public interest such as land -use laws, annexations, rezone requests, public safety issues, etc. Section 2.04.150 of the Tukwila Municipal Code states the following guidelines for Public Hearings: 1. The proponent shall speak first and is allowed 15 minutes for a presentation. 2. The opponent is then allowed 15 minutes to make a presentation. 3. Each side is then allowed 5 minutes for rebuttal. 4. Citizens who wish to address the Council may speak for 5 minutes each. No one may speak a second time until everyone wishing to speak has spoken. 5. After each speaker has spoken, the Council may question the speaker. Each speaker can respond to the question, but may not engage in further debate at this time. 6. After the Public Hearing is closed and during the Council meeting, the Council may choose to discuss the issue among themselves, or defer the discussion to a future Council meeting, without further public testimony. Council action may only be taken during Regular or Special Meetings. COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Cou cil eview 06/08/15 BG .s24O../ C ❑ Ordinance Mtg Date 06/15/15 BG ❑ Other Mfg Date Mtg Date 06/15/15 SPONSOR ❑ Council n Mayor ❑ Adm Svcs C DCD ❑ Finance ❑ Fire ❑ Legal E P&R ❑ Police 0 PW SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 8, 2015 for the 2016 - 2021 Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. REVIEWED BY • COW Mtg. ❑ Cmte ❑ CA &P Cmte Arts Comm ❑ F &S Cmte ® Transportation Cmte ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: JOE DUFFIE ITEM INFORMATION ITEM No. 4 & 5.A. CAS NUMBER: STAFF SPONSOR BOB GIBERSON ORIGINAL AGENDA DATE: 6/08/15 AGENDA ITEM TI I'LE Resolution adopting the Six -Year Transportation Improvement Program 2016 - 2021 CATEGORY ® Discussion Mtg Date 06/08/15 ❑ Motion Mtg Date ►1 Resolution ❑ Ordinance Mtg Date ❑ Bid Award Mtg Date ® Public Hearing Mtg Date 06/08/15 ❑ Other Mfg Date Mtg Date 06/15/15 SPONSOR ❑ Council n Mayor ❑ Adm Svcs C DCD ❑ Finance ❑ Fire ❑ Legal E P&R ❑ Police 0 PW SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 8, 2015 for the 2016 - 2021 Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. REVIEWED BY • COW Mtg. ❑ Cmte ❑ CA &P Cmte Arts Comm ❑ F &S Cmte ® Transportation Cmte ❑ Parks Comm. ❑ Planning Comm. COMMITTEE CHAIR: JOE DUFFIE ❑ Utilities DATE: 6/01/15 RECOMMENDATIONS: SPONSOR /ADMIN. CoMMIrrEE Public Works Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 6/08/15 6/15/15 MTG. DATE ATTACHMENTS 6/08/15 Informational Memorandum dated 05/29/15 (revised after 6/1 TC) Draft Resolution Draft 2016 — 2021 TIP Spreadsheet Current Adopted 2015 — 2020 TIP Minutes from the Transportation Committee meeting of 06/01/15 6/15/15 1 2 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Cyndy Knighton, Senior Program Manager DATE: May 29, 2015 (revised after 6/1 TC; changes shown in strike -thru underlined) SUBJECT: Resolution for Six -Year Transportation Improvement Program (2016 -2021) ISSUE Resolution to adopt the 2016 -2021 Six -Year Transportation Improvement Program. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related projects. The TIP generally lists only those transportation- related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water, and capital facilities projects. The TIP is required to be adopted by June 30 on an annual basis, while the CIP is prepared during Summer /Fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors which normally occur during the time between adoptions of each document. ANALYSIS The attached spreadsheet is the "Draft" 2016 - 2021 TIP and was created by modifying the 2015 - 2020 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the CIP. Added: 40 -42nd Avenue S (CIP Pg. 2), Beacon Avenue S Bridge Maintenance (CIP Pg. 10), Frank Zepp Bridge Maintenance (CIP Pg. 10), Grady Way Bridge Maintenance (CIP Pg. 10), included for future and awarded grants. Deleted: E Marginal Way (BAR — S 112th St) — Study completed, Macadam Road /S 144th Street Intersection (CIP Beyond) — Study completed, S 144th Street Phase II (CIP pg. 15) — Project scheduled for completion in 2015. More detailed descriptions of the changes are included in the overview page of the 2016 TIP. RECOMMENDATION Council is being asked to approve the Resolution for the 2016 -2021 Six -Year Transportation Improvement Program and consider this item at the June 8, 2015 Committee of the Whole with a Public Hearing and subsequent June 15, 2015 Regular Meeting. Attachments: Draft Resolution Draft 2016 -2021 TIP Summary 2016 — 2021 "Draft" Transportation Improvement Program Current Adopted 2015 — 2020 TIP W:\2015 Info Memos \TIP 2016 Revised gl.docx 3 4 AFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2016- 2021), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2016- 2021); and WHEREAS, on June 8, 2015, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2016 -2021 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Processing \Resolutions \TIP 2016 -2021 5 -15 -15 CK:bjs Page 1 of 2 5 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2015. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City :;Clerk Kate Kruller, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2016 to 2021 W: \Word Processing \Resolutions \TIP 2016 -2021 5 -15 -15 CK:bjs 6 Page 2 of 2 DRAFT 2016 - 2021 TIP SUMMARY 2016 -2021 2015 CIP Project Costs in Thousands of Dollars TIP PROJECT TITLE 1 42 -42nd Ave S (S 160 St - S 131 PI) 2 53rd Ave S (S 137th St - S 144th St) 3 ADA Improvements 4 APE/Industry Dr Intersection 5 APE /Minkler Blvd Intersection 6 Annual Bridge Inspections and Repairs 7 Annual Overlay and Repair Program 8 Beacon Ave Bridge Preventative Maintenance 9 BNSF Regional Center Access 10 Boeing Access Rd Bridge Rehabilitation 11 Cascade View Safe Routes to School Phase 2 12 Frank Zepp Bridge Preventative Maintenance 13 Grady Way Bridge Preventative Maintenance 14 Multipurpose Trails 15 S 133 St/SR599 Intersection 16 S 144th St Bridge Sidewalks 17 Strander Blvd /SW 27th St St Phase III 18 TUC/TOD Pedestrian Improvements 19 TUC - Pedestrian /Bicycle Bridge 20 Walk & Roll Program 21 West Valley Highway 22 W Valley Hwy/ S 156 St Intersection June 2, 2015 FUNDING SOURCES Page No. 2016 2017 2018 2019 2020 2021 TOTAL Federal State/TIB Developer Unsecured City 2 6 20 25 24 10 18 13 11 3 35 27 28 29 12 22 26 5,300 3,173 63 0 0 270 1,560 1,741 0 5,411 0 2,535 207 60 0 0 20 70 6,185 0 0 0 0 920 63 0 0 270 1,650 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 0 63 0 0 335 1,670 0 0 0 0 0 0 60 0 0 5,000 0 0 0 0 0 0 0 63 0 0 335 1,725 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 0 63 0 0 335 1,730 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 0 63 575 622 335 1,745 0 0 0 839 0 0 280 630 1,219 52,329 1,100 0 175 630 1,032 5,300 4,093 378 575 622 1,880 10,080 1,741 1,741 0 5,411 4,193 839 2,535 2,535 207 207 580 630 1,219 57,349 1,170 6,185 175 630 1,032 5,300 2,939 1,154 378 575 622 1,880 10,080 0 0 1,218 750 89 0 0 580 0 460 170 1,219 29,325 28,024 20 500 650 6,000 185 175 630 440 592 TOTAL PROJECTS REVISED FROM 2015 -2020 TIP New: 42 -42nd Ave S (S 160 St - S 131 PI) Beacon Ave Bridge Preventative Maintenance Frank Zepp Bridge Preventative Maintenance Grady Way Bridge Preventative Maintenance 26,595 2,963 7,128 2,183 2,188 61,574 102,631 8,676 6,580 20 34,414 52,941 Deleted: E Marginal Way (BAR - S 112 St) Study on the project to design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control has determined no additional capacity is necessary and only typical frontage requirements required with redevelopment will be needed. Macadam Rd & S 144 St Intersection Project to design and construct a northbound left turn lane from Macadam to S 144th Street has been studied and determined to no longer be necessary. S 144th St Phase II (42 Ave S - TIB) Project to design and construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage,new signal at 42nd Ave S and new pedestrian rapid flash beacon in conjuction with Tukwila Village will be completed. 03 61"milliit Washington State yip Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN AW0Pd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID X. 2 3. a. o 2. -o a; :i. a 'cm uollnlosaa adl(1 luawanoJdwl sa1300 !Hl!Nl 0 ad61 1eluawuonnu3 paJlnbaa M2I 17 40-42 Ave S (S 160 St - S 131 PL) - - S 160th Street to Southcenter Blvd ks, bike facitt‘S, and WA-07745 06/08/15 06/15/15 fp! NEENE 04 CGOPS T W Yes Funding lattem Status Phase Phase Start Year (YYYy) ii Federal FunOode Fedef01Funds State Fund Code Eni State Funds Local Funds Total Funds CN 2016 • I At, VA, 0 0 5,300,000 5,300,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 9,660,000 9,660,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,300,000 0 0 0 4,360,000 Totals 5,300,000 0 0 0 4,360,000 Report Date: June 02, 2015 Page 1 Washington State VW Department of Wansportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside c ct r, 0 JegwnN Riuoud A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 a 0 0 0 a 3 0 0 •oN uogniosed ad61 luawanoidwi c 0 0 0 0 r 0 0 adAi IeluawuoJ!Au3 pannbaa M21 17 53rd Avenue S S 137th St to S 144th St Design and construct urban residential stres.,e;;Iovem7entaltinclude ourb, IIgutter, sidewalk , illumination and undergroundin44freet portion will OgOlIdinate with Water, Surface Water and Sewer capital improvement program lorolootP.. WA-06601 06/08/15 06/15/15 -'1;1-741 04 • CGOPS T W 0 420 CE No Funding Status Phase Phase Start Year (YYYY) 1 Federal Fund Oode Federal FPnds Stat8-Ftitidende State Funds Leal Funds Total Funds PE 2016 0 0 3,000 3,000 P CN 2016 TIB Es 1,589,000 1,350,000 2,939,000 CN 2016 0 0 1,150.000 1,150,000 Totals 0 1,589,000 2,503,000 4,092,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 3,000 0 0 0 0 CN 3,170,000 920,000 0 0 0 Totals 3,173,000 920,000 0 0 0 Report Date: June 02, 2015 CC) Page 2 O =� Washington State VI/ Department o1 Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN R;uoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID a -o a. 3 0 3 0 •oN uo!an!osaa adRj auawano.idwl sapo3 '4!I!i!1 m 0 S adA1 IeWuewuoJ!Au3 pai!nba2! M2I 00 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgraded with a City developed plan ture in conjunctii WA -05405 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYVY) Federal Fund Code tgattreita ands ate Fund,Code tate`Funds Lvsal Funds Total Funds S ALL 2016 0 0 378,000 378,000 Totals' 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: June 02, 2015 Page 3 ���� Washington State V/ Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN A;uoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID ;uawpuawy ON uoi;niosall ad61;uawanoJdwI dAl teluawuonnu3 pa.nnbaa Ma 16 Andover Park E /Industry Dove Signal Andover Park E Industry Drive to Design and construct a traffic signal and infersection improver WA -03766 06/08/15 06/15/15 05 CGOPS TW 0.190 CE No Funding Status Phase Phase Start Year(YYYY) Federal Fund Code P CN 2021 itate Fund:Code Funds Local Funds Total Funds 0 0 575,000 575,000 Totals; 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: June 02, 2015 Page 4 Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside .agwnN Aluo!Jd A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID -o a 3 0. 3 7J 0 0 0 adAy;uawanoidwi c 0. CD adkL Iquawuonnu3 16 Andover Park ElMinkler Blvd Intersection Andover Park E Mink ler Blvd to , Construct left turn lanes on Andover Park East and reconstraOt Affic sigrial WA-07746 06/08/15 06/15/15 03 CGOPS T W No Funding Status Phase Phase Start Year (YYYY) Federal Fund-Code erat Funds State Fund-65de Star' Ftindi Cobol Funds Total Funds P PE 2021 0 0 20,000 20,000 P CN 2021 0 111,„ 0 602,000 602,000 0 „EL 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: June 02, 2015 Page 5 WWashington State Department of Transportation Agency: Tukwila County: King MP0 1RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN Alpoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID m ;uawpuewy ON uognlosaa adAj luawanoadwi c c) o N adAl MuawuoJinu3 pannbaa MN 14 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspect repairs and maintenance WA -03731 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code ,Ponds tate FundCode ate f ands Local Funds Total Funds S ALL 2016 0 0 1,880,000 1,880,000 Totals 0 0 1,880,000 1,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 335,000 335,000 670,000 Totals 270,000 270,000 335,000 335,000 670,000 Report Date: June 02, 2015 Page 6 W� Washington State /1/7 Department of Tlransportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside aagwnry �Guoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3, 0 c 3uawpuawy ad4j luawanoadwI C 0 0 N ad61 ieluewuoiinug pai!nbaa M2I 16 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets'80 needed in ittrival progl WA -03733 06/08/15 06/15/15 06 CGOPS TW No Funding Status Phase Phase Start Year (YYYY)' Federal Fund Code fate Fund Dude aGe Hinds Local Funds Total Funds S ALL 2016 0 0 10,080,000 10,080,000 Totals 0 10,080,000 10,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,560,000 1,650,000 1,670, 000 1,725,000 3,475,000 Totals 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Report Date: June 02, 2015 Page 7 Washington State W, Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside iagwnN Il ;uoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID '00 a 3 a 3 3 A 0 c 3 0 adiCj auawanoadwi c 0 0 N 0 m 0 3 S rn 3 0 3 3 3 paiinbaa M21 19 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck andpalritstrUCti TUK -57 06/08/15 06/15/15 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY}:- Federal Fund Code eral ,Funds State Fund Code State Fends Local Funds Total Funds S CN 2016 STP(B :1,740,900 0 0 1,740,900 Total& ;740,900 0 0 1,740,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,900 0 0 0 0 Totals 1,740,900 0 0 0 0 Report Date: June 02, 2015 Page 8 Albs IF7Washington State /7; Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JaqwnN Rluoud A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3. 3 0. 3 •oN uogniosaa 3 -o 0 3 0 c 0 0. adAj Ieluawuonnu3 pa.nnbaa M21 00 BNSF Regional Center Access New Facility to Construct a new access to the BNSF RegroeOEOlitii6-66Orihter, relocatingThe 900+ daily truck trips from residential streOftjh Allentown. WA05409 06/08/15 06/15/15 08 EIS No Ega '1-SA SCaa 44 Funding Status Phase Phase Start Year (WY* Federal Fund de edataI Funds Sfate Fundttide State Funds L�cal Funds Total Funds P PE 2021 FMS10:4 950 000 0 300,000 1,250,000 P CN 2021 FMS1E1F 14,812 500 %Fa 0 1,687,500 12,500,000 10a-506 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 12,500,000 CN 0 0 0 0 1,250,000 Totals 0 0 0 0 13,750,000 Report Date: June 02, 2015 Page 9 Washington State I// Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN AWood A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID , (o 0. m o. 3 0 3 0 •oN uoi1niosaa adIj luewano.idwi 1 m_ r 0 5 adA1 ie ;uawu paiinbaa M21 14 / 1380(003) Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing bridge with a 340'.16n �cohei fear91 will be 110' wide curb to curb and have sidewalks on both side. eel bridge s1 TUK -52 06/08/15 06/15/15 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYV) Federal Fund Funds fate Fund;Code fate Funds Local Funds Total Funds S CN 2016 STP( 0 1,218,000 5,411,000 Totals: 0 1,218,000 5,411,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,411,000 0 0 0 0 Totals 5,411,000 0 0 0 0 Report Date: June 02, 2015 Page 10 03 =j'Aillit Washington State Department of Transportation Agency; Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN Aluoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 0 0. luawpuawy 0 0 c_ 0 0 adal luawaAoJdwI c n 0 m 0 gl6ual lelol dAj Muawuonnu3 pannbaN M?J 19 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path; ks- rtd a traffic circle intersection of 33rd Ave S and S 140th Street WA -03795 06/08/15 06/15/15 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY� Federal Fund: Code ands e FundCode fate Funds Local Funds Total Funds P ALL 2021 0 750,000 89,000 839,000 Totals; 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 839,000 Totals 0 0 0 0 839,000 Report Date: June 02, 2015 89,000 839,000 Page 11 ��''�� Washington State V// Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside c 0 no 3 ro aegwnN Rauoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 3, a 0 a D 3 0 3 0 'oN uoianiosaa ad6y 4uawanoJdwI c 0 0 0 0 co ad61 ieyuawuoJ!Au3 paJ!nbaa Mif 16 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry D;. Paint the structural steel, overlay deck and protection. L and instaE eisrn TUK -55 06/08/15 06/15/15 14 0.040 CE No Funding Status Phase Phase Start Year (YYYY) j FederalFundCode ands ate Funcf,COde tafe Fjinds Local Funds Total Funds S CN 2016 STP(BR0<<` 2,534,812 0 0 2,534,812 Totals 4,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 Report Date: June 02, 2015 Page 12 N O i VWashington State Department of Tnsportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside 7 no g JagwnN 6Iuoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID D o. wawpuawy 'oN uognIosad adi j 4u9w0noJdwI c 0 n N m 0 i0 adAl IeJuawuoJinu3 pannbaa Mb 14 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW Renton Retrofit existing bridge with seismic protection TUK -56 06/08/15 06/15/15 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY)- FederalFund;Gode at Fends :ate Fund code Local Funds Total Funds S CN 2016 STP(BR}' 206,500 0 0 206,500 Iota IB 0 0 206,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 206,500 0 0 0 0 Totals 206,500 0 0 0 0 Report Date: June 02, 2015 Page 13 ���� Washington State WI Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN Rluoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID luawpuawy •oN uoilniosaa 2 0 3 2 c 0 0 m N m r co r ad61 Ieluawuonnu3 pannbaa Mb 00 Multipurpose Trails to Wde array of necessary trail improvements 6 ure WA -03783 06/08/15 06/15/15 28 CE No Funding Status S Phase Phase Start Year (YYYyj„ Federal Fund God oral Fund'. State Fund Code Fends Local Funds Total Funds CN 2016 0 0 360,000 360,000 Totals! 0 0 360,000 360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 120,000 Totals 60,000 60,000 60,000 60,000 120,000 Report Date: June 02, 2015 Page 14 s =r. Washington State 1 /I Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Jagwnry 63!Joud A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID luawpuawy 'ory uo!ln!osaa adki luawanoJdw! sapo3 Amin gl6ua� !eloi adAj !eluawuoJinu3 pannbaa M21 16 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI WA-07748 06/08/15 06/15/15 04 CGOPS T W No Funding Status Phase • Phase Start Year (YrfiTh Federal Fund Code FedaiirFtmds State =Fund Odd e to State Funds Local Funds Total Funds P PE 2021 KeTj 0 iftV 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 15 �^� Washington State ►7/ Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside c no g N 2 3 o A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID a -oo a D 3 a 3 A ads i auawanoJdwl c n a N adRy Ieluawuonnu3 pannbaa M21 17 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over I T.6 ;S and 53rd Ave WA03782 06/08/15 06/15/15 28 0.250 No Funding Status Phase Phase Start Year(YYYY)=: Federal Fund Code al Funds ;State FunVtOde Funds Lpcal Funds Total Funds P ALL 2021 STP(BR }'; 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219, 000 Totals 0 0 0 0 1,219,000 Report Date: June 02, 2015 Page 16 Washington State Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside 3 0 A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x N 0 a -o a 3 a 3 'ON uo!1n!osaa ad,(j auawanoadw! sapoo /t!I!lfl 0 0 0 5 3 0 v m 0 c a 16 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a nevitroadwa extending Strandi Boulevard /SW 27th St from West Valley Highway to OaksdafeAve WA -05410 06/08/15 06/15/15 01 EIS No Funding Status Phase Phase Start Year (YYYY)> Federal Fund-:Gbde ands :ate Fund Code tate Fands Local Funds Total Funds P PE 2018 STP 3,850,000 0 620.000 4,470,000 P RW 2021 0,000 0 179,000 1,329,000 P CN 2021 5eboo 0 1,000,000 6,000,000 P CN 2021 TIGER III 20,000,000 0 25,000,000 45, 000.000 Totals 30,000,000 0 26,799,000 56,799,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 5,000,000 0 0 RW 0 0 0 0 1,329,000 CN 0 0 0 0 51,000,000 Totals 20,000 0 5,000,000 0 52,329,000 Report Date: June 02, 2015 Page 17 •Ti Depairt Agency: Tukwila County: King MPO /RTPO: PSRC State of Transportation Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Jagwnry 6luoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID a 3 a 3 T O 0 c O adAl luawanoJdwI c 0 o. N 17 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection betweetrthe'Tjskwita,Urban Center (Ftucjyai Tukwila Station, with service by Amtrak Sounder Commuter-Rail/Transit Oriented Development (TOD) area WA -03772 06/08/15 06/15/15 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYI k Federal Fundtode Federattfunds to Fund,Code State Funds octal Funds Total Funds S PE 2016 0 0 70,000 70,000 P RW 2021 0,000 0 0 80,000 S RW 2021 0 20,000 20,000 P CN 2021 STP(E) 420,000 0 580,000 1,000,000 Totals 500,000 0 670,000 1,170,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 70,000 0 0 0 300,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 70,000 0 0 0 1,100,000 Report Date: June 02, 2015 Page 18 zI��� Washington State t// Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN 6lu0ud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID D 3 a. 0 ON uoyn!osaa adAl luawano.idw! sapoo AT!!!lfl 416ua1 Ielol adAJ !eluawu pannba2! M2I 00 / 1320(002) Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian /bicycle bridge3?ver the Green R TUK -50 06/08/15 06/15/15 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal FundCode Funds ate Fund Code tetelFUnd I Funds Total Funds S CN 2016 0 6,000,000 185,000 6,185,000 Totals: 6,000,000 185,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,223,000 0 0 0 0 Totals 7,223,000 0 0 0 0 Report Date: June 02, 2015 Page 19 ��t Washington State V/ Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside iagwnN 6iuopd A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID '00 0. 0 0 c 0 z O 3 v 0 0 3 0 3 sa1300 Rl!1!ifi adAi !eiuewuoi!Au3 pannbaa M21 00 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritizzd(isf=oPpt design standards. „recomm WA -03761 06/08/15 06/15/15 28 No Funding Status Phase Phase Start Year (YYYY} 3 Federal Fund Code er ?ands ate Fund Code tate&Funds Local Funds Total Funds P PE 2021 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: June 02, 2015 Page 20 Mb. Depari tSor t nsportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside c o. g Jagwnry Aluoud A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID luawpuawv 0 0: g • ad61 ;uawanoJdwl sepoo 64!198 yl6uai ielol adlly leauawuoJinu3 pannbaa M2! 14 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct widening to 7 lanes ii-1011d. - WA03779 06/08/15 06/15/15 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code edera Funds State Fund.COde State Funds LOCal Funds Total Funds P PE 2021 P CN 2021 0 0 60,000 60,000 0 0 570,000 570,000 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60.000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 21 AIM ��'.'� Washington State �// Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN AWoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID o. -°o a 3 a 3 0 'oN uolanlosaa adAl auaw0no.1dwI gl6ual le�ol 3 0 m z a c 14 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct safety and capacity improve eft on- WA -03765 06/08/15 06/15/15 03 OPSTW CE No Funding Status Phase Phase Start Year (YY Federal Fund.+Oode P PE 2021 era[ Fund`s to Fund'Code Finds Local Funds Total Funds 0 0 50,000 50,000 P CN 2020 CM 40.000 0 542,000 982,000 Totals 0.000' 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50.000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 52,352,912 8,339,000 59,277,300 119,969,212 Report Date: June 02, 2015 Page 22 A. Washington State 'V� Department of Transportation Six Year Transportation Improvement Program From 2015 to 2020 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside N Outside Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Adopted State Fund Code A 3 v a Total Funds S PE 2015 m ' 5. 3 0 F It; A. PIN /Project No. B. STIP ID P > 2016 c .a 1,000,000 200,000 1,200,000 z 0 CN C. Project Title 451,000 1,451,000 3 600,000 3 - m 0 3 Totals D. Road Name or Number 600,000 o, 'o' o'. 0 r 0 d 0 E. Begin & End Termini 3 ' -1 o 'c_, F. Project Description G. Structure ID .o'. o 0 y m o 17 WA -06601 06/09/14 06/16/14 1833 04 C G O P S 0.420 CE No TW 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk and illumination. Street portion will coordinate with Water and Surface Water capital improvement program projects. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 251,000 251,000 P CN 2016 0 TIB 1,000,000 200,000 1,200,000 Totals 0 CN 1,000,000 451,000 1,451,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 251,000 0 0 0 0 CN 0 600,000 600,000 0 0 Totals 251,000 600,000 600,000 0 0 Report Date: June 17, 2014 Page 1 .Ii V71Washington State Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted 3 CD a 3 a xl c o' ' o 3 v m 3 a 1 0 c = n 0 m .°1 m CO 5, m 3 v 1:3 CD xi A .6° 'c_, a 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: June 17, 2014 Page 2 7 Washington Stat$ Department of 7 ansportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Funding Priority Number Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds 3 v Total Funds P CN 2020 m ' 0 m A. PIN /Project No. 8. STIP ID 575,000 Totals D Si A c 1 0 575,000 ' z C. Project Title 0 3 °— 3 - •°• n �. D. Road Name or Number E. Begin & End Termini o a 3 a 3 F. m E= m m F. Project Description G. Structure ID g. m v° o. .'. o 1 A st 0 o a . -t m c. c 16 WA -03766 06/09/14 06/16/14 1833 05 C G O P S 0.190 CE No TW Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2020 4th 0 5th & 6th 0 575,000 575,000 Totals 0 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: June 17, 2014 Page 3 i Washington staTrg Department of ansportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation. Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID Hearing Adopted D m 'a 3 .e', o E c ' c 3 a < 3 ID a 1 A c = Q 0 2 m m . PE 2020 m ' ' d ' m o c, 2, 16 0 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets WA -03764 06/09/14 06/16/14 2020 1833 03 0 0.190 CE Totals No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 20,000 20,000 P CN 2020 0 0 602,000 602,000 Totals 0 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: June 17, 2014 Page 4 i Z"jr. WashingtOn State VA/ Department of Transportation W Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted D m o 3 P. c S 6' ' o 3 c m 3 m c = o o N --4 8 r m '< 'o 3 = 0 CD z A a c, a 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/09/14 06/16/14 1833 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 1,815,000 1,815,000 Totals 0 0 1,815,000 1,815,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 335,000 670,000 Totals 270,000 270,000 270,000 335,000 670,000 Report Date: June 17, 2014 Page 5 Washington state Tar Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Funding Status Phase Phase Start Year (YYYY) Adopted Federal Funds z 3 3 Local Funds Total Funds m '< o' ALL Fun, rity N A. PIN /Project No. B. STIP ID C. Project Title 5th & 6th D m CD o m 3 Totals w 7 3 72 9,880,000 9,880,000 D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m o, 3 o z P. m o y r s d m . c, o. 16 WA -03733 06/09/14 06/16/14 1833 06 C G O P S No TW Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2015 4th 0 5th & 6th 0 9,880,000 9,880,000 Totals 0 1,560,000 0 9,880,000 9,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 Totals 1,550,000 1,560,000 1,650,000 1,670,000 3,450,000 Report Date: June 17, 2014 Page 6 i Washington State %,gr Department of Transportation rn Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID Hearing Adopted D m 'a 3 u a o ' z N a m 3 -I m c = 0 n o 2 8 r- = .- m 3 d 1 m z m a c a. 00 950,000 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. WA -05409 06/09/14 - 06/16/14 P 1833 08 FMSIB 10,812,500 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 FMSIB 950,000 5th & 6th 0 300,000 1,250,000 P CN 2020 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,250,000 CN 0 0 0 0 12,500,000 Totals 0 0 0 0 13,750,000 Report Date: June 17, 2014 Page 7 V7Washington State 1 Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside m 0 0 m 3 m y Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID Hearing Adopted Amendment zi Li c c o v 'o m 3 —1 o _ .� o 0 °i m r = PE m '< 'o 3 d -i A m c, a 14 / 1380(003) Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. TUK -52 06/09/14 06/16/14 CN 1833 14 8,625,600 CN 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 STP(BR) 179,500 0 45,000 224,500 S CN 2015 STP(BR) 8,625,600 CN 0 2,220,100 10,845,700 Totals 8,805,100 0 2,265,100 11,070,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 224,500 0 0 0 0 CN 8,603,000 2,242,700 0 0 0 Totals 8,827,500 2,242,700 0 0 0 Report Date: June 17, 2014 Page 8 .� Washington State W V� Department of Transportation 03 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID = m Adopted Amendment Resolution No. - v m m F. i 0 c 0 0 o m m r- s ALL 2018 m 5 - o' - �_ m CD , A .0 c. c 19 750,000 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. WA -03795 06/09/14 06/16/14 0 1833 28 839,000 839,000 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750,000 89,000 839,000 Totals 0 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 839,000 0 0 Totals 0 0 839,000 0 0 Report Date: June 17, 2014 Page 9 ri Washington State / Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment XI M c c c o Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/09/14 06/16/14 170,000 1833 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 170,000 170,000 P RW 2020 0 0 700,000 700,000 P CN 2020 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,000,000 3,300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 0 0 0 0 3,300,000 Report Date: June 17, 2014 Page 10 ,- Washington State Department of Transportation 0 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. 3 v m a —1 °m c c 0 m m V 3 co s m 'e - o m E 1 m 3 c, a 17 WA -03763 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane 06/09/14 06/16/14 1833 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 0 0 90,000 90,000 P RW 2020 0 0 90,000 90,000 P CN 2020 0 0 430,000 430,000 Totals 0 0 610,000 610,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 0 0 0 0 610,000 Report Date: June 17, 2014 Page 11 was hn,gtan State 7/ Department oI TYansportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside m c n2 m m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type c n °a m 0 d r- ; Et m 0 3 �_ d 0 m xi z a E. 0. 00 Local Funds WA -03783 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles 06/09/14 06/16/14 2015 1833 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 50,000 50,000 P CN 2020 0 0 280,000 280,000 Totals 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 ALL 0 0 0 0 280,000 Totals 50,000 0 0 0 280,000 Report Date: June 17, 2014 Page 12 ■ 77Washington State 4; Department of Transportation N Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 8. STIP ID G. Structure ID Hearing Adopted Amendment Resolution No. 3 v 3 1 0 E — n 0 0 V d 5 PE 2020 m 00 m m .i 0 . c, a 16 0 S 133rd St/SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. WA -03769 06/09/14 06/16/14 2020 1833 06 C G O P S TW 0 0.190 CE Totals No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 60,000 60,000 P CN 2020 STP 460,000 0 110,000 570,000 Totals 460,000 0 0 170,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 17, 2014 Page 13 iWaahijngton State t Department of Tlransportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside -n n �, d 1 m Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 1 P B. STIP ID G. Structure ID Hearing Adopted Amendment 0 o Z c 3 c A 3 - o ° 2 8 1— A co ALL 171 '< 'o 0 T `� m a c o 17 5th 8 6th S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S WA -03782 06/09/14 06/16/14 975,200 1833 28 243,800 1,219,000 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code . State Funds Local Funds Total Funds P ALL 2020 STP(BR) 975,200 5th 8 6th 0 243,800 1,219,000 Totals 975,200 0 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: June 17, 2014 Page 14 i �^�' Washington State `{F Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 m Adopted Amendment to u, o o 3 c 0 < 2 CD a -i 0 c _ `� o m -t a „ r Federal Funds State Fund Code m '< m ^_ ^_ 0 A m e. o. 17 Local Funds S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes WA -03762 06/09/14 06/16/15 2015 1833 03 C G O P S TW TIB 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 TIB 1,000,000 480,000 1,480,000 Totals 0 1,000,000 480,000 1,480,000 , Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,480,000 0 0 0 0 Totals 1,480,000 0 0 0 0 Report Date: June 17, 2014 Page 15 Vlasfdngton State Department of Ttansp ation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside - o � . ir 0 N d Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description _G. Structure ID Hearing Adopted Amendment XI CD u, s o o Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/09/14 06/16/14 1833 01 0 EIS No 0 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 33,150,000 S ALL 2020 FMSIB 5,000,000 0 0 5,000,000 P ALL 2020 TIGER IV 27,000,000 0 1,150,000 28,150,000 Totals 32,000,000 0 1,150,000 33,150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,150,000 Totals 0 0 0 0 33,150,000 Report Date: June 17, 2014 Page 16 ANL 7; Washington State Department of Transportation rn Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID m 2 Adopted Amendment XI c c o ' o Improvement Type Utility Codes z a m r- 5. PE 2020 m 3 o' 3 3 d 1 01 7) A E • a 17 0 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station/TOD area. Connection may include an underpass under the UPRR line. WA -03772 06/09/14 06/19/14 2020 1833 28 0 0.750 CE P Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 280,000 280,000 P RW 2020 0 0 100,000 100,000 P CN 2020 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 580,000 1,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 0 0 0 0 1,080,000 Report Date: June 17, 2014 Page 17 Washington state V/0 Department of TPanspottatiion Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted l Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Development of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit - oriented development. The project, a pedestrian /bicycle bridge across the Green River, will form the backbone of a pedestrian corridor connecting the compact land uses and high ridership bus stop in the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its surrounding transit - oriented development. This will improve public access to the station from all parts of the center, and provide a direct, safe and enjoyable walking experience. The high level of urban level amenity will attract the types and densities of uses envisioned in a regional center. 06/09/14 06/16/14 1,485,000 1833 28 0 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2015 0 OTHER 6,000,000 1,485,000 7,485,000 Totals 0 6,000,000 1,485,000 7,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,485,000 0 0 0 0 Totals 7,485,000 0 0 0 0 Report Date: June 17, 2014 Page 18 Wash ngton State 7% Department of Transportation 03 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside n _ m 0 w m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted, Amendment XI m m o c o ' o Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewaik/bike lanes on Macadam, S 144th St to S 150th St. 06/09/14 06/16/15 140,000 1833 28 0 140,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 140,000 140,000 Totals 0 140,000 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 140,000 0 0 0 0 Totals 140,000 0 0 0 0 Report Date: June 17, 2014 Page 19 i iWashington State t Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m 2( co Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03779 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd . Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/09/14 06/19/10 60,000 1833 03 CN 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 60,000 60,000 P CN 2020 0 0 570,000 570,000 Totals 0 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 17, 2014 Page 20 i �� Washington State I/; Department of Transportation 01 0 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 4th WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1 -405 06/09/14 06/16/15 50,000 1833 03 0 P S T W 2020 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & 6th 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 0 592,000 1,032,000 Expenditure Schedule Federal Funds State Funds Local Funds Phase Grand Totals for Tukwila 1st 2nd 26,473,400 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Report Date: June 17, 2014 Page 21 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 56,242,800 8,750,000 26,473,400 91,466,200 Report Date: June 17, 2014 Page 21 Transportation Committee Minutes June 1, 2015 - Page 2 C. Supplemental Agreement: Interurban Avenue South (South 143rd Street to Fort Dent Way) Staff is seeking Council approval of Supplemental Agreement No 1 with Anchor QEA in the amount of $463,928.00 for continued construction management services for the Interurban Avenue South (South 143 Street to Fort Dent Way) Project. Construction on this project has been underway since July 2014 and significant delays have occurred due to geotechnical information regarding two major project features: the retaining wall near Fort Dent Way and the stormwater detention vault near South 149th Street. The original completion date of October 14, 2015 will likely need to be extended to near the year's end. This supplement would cover the cost of construction management services by Anchor through the end of 2015 and brings the project total to $10,499,201.39. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. D. Resolution: Six -Year Transportation Improvement Program (2016 -2021) Staff is seeking Council approval of a resolution that would adopt the annual update of the Six -Year Transportation Improvement Program (TIP) for 2016 -2021. The TIP, updated annually as required by the RCW, is a compilation of transportation projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Projects must be included in the TIP to be eligible for certain grant funding. Committee members and staff reviewed the list of projects. Several projects were deleted from the 2016 TIP due to their completion or because they are no longer deemed necessary-The Committee requested that staff include a table of projects that includes a brief description and reason for omission, if applicable, in the information that is provided to the Committee of the Whole. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE, INCLUDING PUBLIC HEARING. E. Supplemental Agreement: Tukwila Urban Center Transit Center Staff is seeking Council approval of Supplemental Agreement No. 2 to Contract No. 13 -199 in the amount of $33,962.66 with AECOM Technical Services for the TUC Transit Center, Andover Park West Street, and Water Improvement Projects. The TUC Transit Center project was completed on April 3, 2015 and included a substantial number of unexpected utility conflicts, design changes, and delays. This supplement will allow AECOM to finalize the project close -out. There is sufficient balance in the project's budget contingency balance to cover this cost. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. III. SCATBd Councilmember Hougardy highlighted the "Stuck in Traffic" report from the May 19, 2015 SCATBd agenda. IV. MISCELLANEOUS Meeting adjourned at 6:10 p.m. Next..meeting: Monday, June 15, 2015 Committee Chair Approval Min es by GL 51 52 vo*44, 'tow COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by 06/08/15 DT Mayor's review Atedi Council review ITEM INFORMATION ITEM No. 5.B. & Spec 2.A. 53 STAFF SPONSOR: DON TOMASO, FIRE MARSHAL ORIGINAL AGENDA DATE: 06/08/15 AGENDA ITEM TITLE Foster High School Graduation Ceremony Fireworks Display on June 12, 2015. CATEGORY Z Discussion Mtg Date 06/08/15 Motion Date 06/08/15 Resolution Mtg Date Ordinance Mtg Date E .Bid Award Mtg Date E Public Hearing Mtg Date Other Mtg Date ■ Mtg SPONSOR E Council LIJ Mayor E HR E DCD L Finance Fire E IT E P&R L Police E PW SPONSOR'S Approval of the Fireworks permit for the upcoming Foster High School Graduation SUMMARY Ceremony. REVIEWED BY COW Mtg. Z CA&P Cmte Z F&S Cmte Transportation Cmte Utilities Cmte E Arts Comm. E Parks Comm. 1 Planning Comm. DATE: 06/02/14 COMMITTEE CHAIR: HOUGARDY RECOMMENDATIONS: SroNsoR/ADmIN, COMMITTEE Fire Marshal Office, Fire Department Unanimous Approval; Forward 6/8 C.O.W & Special Mtg. to follow COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED SO SO $0 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/08/15 MTG. DATE ATTACHMENTS 06/08/15 Informational Memorandum dated 05/28/15 with permit conditions Map of School district sites Minutes from the Finance and Safety Committee meeting of 6/2/15 *Documentation changed after FS to include public notice to those within 500 feet. Notice is attached.* 53 54 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Finance and Safety Committee FROM: Chris Flores, Interim Fire Chief BY: B/C Don Tomaso, Fire Marshal DATE: May 28, 2015 SUBJECT: Fireworks Permit for Foster High School Graduation ISSUE Require City Council approval for the fireworks permit for the public fireworks display at the Foster High School graduation ceremony in to honor Cynthia Chesak on June 12, 2015. BACKGROUND The Tukwila School District and Community would like to honor Ms. Chesak for her 34 years of teaching at Foster High School and her contributions to the Tukwila Community with a fireworks send off. DISCUSSION The sponsors have retained the same fireworks company as the Parks and Recreation Department for the 4th of July display, Western Display Fireworks, Ltd., a company with 61 years of experience in public displays. The discharge location for this show will be on the baseball field behind Showalter Middle School, with the fallout area being the grass outfield area. Additionally, the largest aerial shell will be 1.75 "; this allows for a smaller safety perimeter and will be what is known as a "multi shot cake" and "multi shot box ". FINANCIAL IMPACT None RECOMMENDATION In order to accommodate the event date of June 12, 2015, the Council is being asked to consider this item at the June 8 Committee of the Whole meeting with approval to occur at a Special Meeting to follow that same night. ATTACHMENTS Fireworks permit conditions 55 56 City of Tukwila Fire Marshal's Office Jim Haggerton, Mayor Chris Flores, Interim Fire Chief FIREWORKS PERMIT CONDITIONS To: Western Display Fireworks, Ltd. From: B /C. Tomaso, Fire Marshal Re: Foster High School Graduation Fireworks Display Date: May 28, 2015 1. Provide the attached notice to all residents within 500 feet of the site. 2. Establish Safety perimeter a minimum of 30 minutes prior to display start. 3. Have Pyrotechnicians in visible uniform clothing. 4. No Pyrotechnics shall be delivered to site prior to the day of the display. 5. All personnel inside the safety perimeter shall use Personnel Protective equipment as outlined in NFPA 1123. 6. Only Pyrotechnicians, Safety Monitors and Fire Watch personnel will be within the safety perimeter. 7. Portable fire extinguishers shall be in place prior to unloading of pyrotechnics from transport vehicle. (2A 20 BC Minimum Size) 8. Tukwila Fire Department shall inspect mortar racks prior to loading of any pyrotechnic shells. 9. Tukwila Fire Department shall inspect all static displays upon completion of set up. Fire Marshal's Office: 6300 Southcenter Blvd. Suite 209 • Tukwila, Washington 98188 • Phone: 206 -575 -4407 • Fax: 206 -575 -4439 57 City of Tukwila Page 2 10. One Tukwila Fire Department apparatus shall be on location prior to the start of the display. 11.Any breech of the safety perimeter shall suspend the display until the perimeter is cleared and re— established. 12. Upon completion of the display, the fallout area shall be checked for unexploded shells. Cleaning of debris, if not practical on the night of the event shall be at first Tight the next day. 13. No combustible materials shall be stored inside the safety perimeter. Fire Marshal's Office: 6300 Southcenter Blvd. Suite 209 • Tukwila, Washington 98188 • Phone: 206 -575 -4407 • Fax: 206 -575 -4439 58 2015 Foster High School Graduation Fireworks Discharge Site Plan 59 60 City of Tukwila Jim Haggerton, Mayor Fire Department Chris Flores, Interim Fire Chief Public Notice There will be a Public Fire Works Display For the Foster High School Graduation Ceremony This is an approved and permitted event pursuant to Tukwila Municipal Code 8.12.020 (1) and Revised Code of Washington 70.77 Location Werner L. Neudorf Stadium 4242 S. 144th Street June 12, 2015 This will occur between the hours of 8:30 PM to 9:30 PM The display will last no longer than 20 minutes and will consist of the discharge of aerial firework devices. Tukwila Police and 911 dispatchers have been notified. Tukwila Fire Marshal's Office • 6300 Southcenter Blvd., Suite #209 • Tukwila, Washington 98188 • Phone: 206 - 575 -4407 • Fax: 206 -575 -4439 • Email: FireMarshal@tukwilawa.gov 61 62 Finance & Safety Committee Minutes June 2, 2015 — Page 2 B. Fireworks Permits: Foster High School Graduation and Family 4th at the Fort Staff is seeking Council approval of a Fireworks Permit Application submitted by Western Display Fireworks Ltd. for a fireworks display at Foster High's graduation ceremony on June 12, 2015. The fireworks display is to honor Ms. Cynthia Chesak on the occasion of her retirement after 34 years. The discharge location will be on the baseball field behind Showalter Middle School, with the fallout area being the grass outfield area. The largest aerial shell will be 2 inches. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE AND SPECIAL MEETING. Staff is seeking Council approval of a Fireworks Permit Application submitted by Western Display Fireworks Ltd. for the fireworks display at the City's annual 4th of July Celebration at Starfire Sports Complex. The application has been approved by the Fire Marshal and found to be in compliance with standards and regulations, and this vendor and launch location have been working well. The show is estimated to be 20 -30 minutes starting at around 10:00 p.m. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE AND SPECIAL MEETING. III. MISCELLANEOUS Meeting adjourned at 6:14 p.m. Next meeting: Tuesday, June 16, 2015 — 5:30 p.m. — Hazelnut Conference Room Committee Chair Approval Minutes by LH 63 64 COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by 06/08/15 DT Mayor's review AagC. Council review •ITEM INFORMATION ITEM No. 5.C. & Spec 2.B. 65 STAFF SPONSOR: DON TOMASO, FIRE MARSHAL ORIGINAL AGENDA DATE: 06/08/15 AGENDA ITEM TITLE Family at the Fort Fireworks Display Permit CATEGORY E Discussion Mtg Date 6/8/15 E Motion Mtg Date 06/8/15 — Resolution Mtg Date Ordinance Mtg Date E Bid Award Mtg Date Public Hearing Mtg Date E Other Mtg Date SPONSOR Lil Council E Mayor 111HR 0 DCD E Finance I Fire E IT 111 P&R E Police PIP' SPONSOR'S Approval of the Fireworks permit for the upcoming Family at the Fort event sponsored by SUMMARY Tukwila Parks and Recreation Department on July 4, 2015 REVIEWED BY E COW Mtg. CA&P Cmte E Utilities Cmte Arts Comm. DATE: 06/02/14 i1 F&S Cmte Comm. CHAIR: HOUGARDY Transportation Cmte E Parks COMMITTEE • Planning Comm. RECOMMENDATIONS: SPONSOR/ADMIN. CommurEE Fire Marshal Office, Fire Department Unanimous Approval; Forward 6/8 C.O.W & Special Mtg. to follow COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0 $0 $0 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION MTG. DATE ATTACHMENTS 06/08/15 Informational Memorandum dated 05/18/15 with permit conditions Map's of Starfire Facility Western Display Application and paper work Minutes from the Finance and Safety Committee meeting of 6/2/15 65 66 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Finance and Safety Committee FROM: Chris Flores, Interim Fire Chief BY: B/C Don Tomaso, Fire Marshal DATE: May 18, 2015 SUBJECT: Fireworks Permit for 4th of July at Starfire ISSUE Require City Council approval for the annual fireworks permit for the Tukwila Parks and Recreation Family 4th at Starfire Sports Complex. BACKGROUND The City of Tukwila has been sponsoring a family oriented 4th of July celebration for the last 14 years. This is one of the most successful City sponsored events in terms of public attendance and participation. This event will draw in excess of 5,000 people to the park to view and participate in the festivities scheduled by Parks and Recreation. DISCUSSION Parks and Recreation has retained the same fireworks company, Western Display Fireworks, Ltd., a company with 61 years of experience in public displays. We will use the same location as last year to avoid having to protect the sports turf fields in the northeast corner of the facility. This fireworks discharge location will be in the southwest corner of the facility on the natural grass fields. Additionally, the largest aerial shell will be 3 "; this allows for a smaller safety perimeter. Western Display has also proposed several ground displays that the crowd will be able to see when looking south. FINANCIAL IMPACT This event is funded through the Parks and Recreation Department. RECOMMENDATION Staff recommends that Council approve the permit as presented at the June 8 Committee of the Whole meeting with approval to occur at a Special Meeting to follow that same night. ATTACHMENTS Fireworks application and Western Display Fireworks, Ltd paper work Fireworks permit conditions 67 68 City of Tukwila Fire Marshal's Office Date: May 18, 2015 To: Interim Chief Flores From: B/C Tomaso, Fire Marshal Re: Public Fireworks Display Permit Jim Haggerton, Mayor Chris Flores, Interim Fire Chief I have reviewed the permit application information provided by Western Display Fireworks, Ltd. They have applied for the permit for a public fireworks display at the Starfire Sports Complex, 14800 Starfire Way. Western Display is a licensed Pyrotechnic Company with the State of Washington. The display will be held in conjunction with the City's planned event on the 4th of July, "Family Fun at the Fort", being organized by the Parks and Recreation Department. This will be a 20 to 30 minute show starting at approximately 2200 hours. The fireworks will be transported to the site in the AM of July 4th and will be under the required supervision until they are discharged. The mortar tubes and support equipment will be brought to the location on July 4th. The application was reviewed to WAC 212 -17 and accepted industry standards, and we find everything is within these guidelines. The display will be held again in the Southwest corner of the facility. We will however, have a small portion of the 6720 Fort Dent Way Office building within the South edge of the fallout zone. Crowd control can be a potential issue, as the crowd that assembles to watch the fireworks show has increased each and every year. Last year the traffic leaving the site was managed with the available Tukwila Police on site and available patrol units. To mitigate these issues, I believe the following measures should be done: • Stage two fire apparatus at the site: one apparatus on each side of the river in order to cover the 6720 Fort Dent Office building. Apparatus shall be out of service during the display and for 30 minutes following the display. Fire Marshal's Office: 6300 Southcenter Blvd. Suite 209 • Tukwila, Washington 98188 • Phone: 206 -575 -4407 • Fax: 206 -575 -4439 69 City of Tukwila Page 2 • Have Tukwila Police provide crowd control during the public display. A minimum of 4 officers will be required. Provide traffic control to the Fort Dent Way and Interurban Ave intersection to expedite traffic flow. (2 additional Tukwila Police shall be available to respond to the site if requested.) • Comply with Fire Works Permit Conditions attached. Fire Marshal's Office: 6300 Southcenter Blvd Suite 209 • Tukwila, Washington 98188 • Phone: 206 -575 -4407 • Fax: 206 -575 -4439 70 City of Tukwila Fire Marshal's Office Jim Haggerton, Mayor Chris Flores, Interim Fire Chief FIREWORKS PERMIT CONDITIONS To: Western Display Fireworks, Ltd. From: B /C. Tomaso, Fire Marshal Re: July 4th Fireworks display, 14800 Starfire Way, Tukwila, WA 98168 Date: May 18, 2015 1. Notify Washington State Patrol at 425- 649 -4658. 2. Notify FAA specialist at 425 - 227 -2536 or 425 - 227 -2500. 3. Establish Safety perimeter a minimum of 30 minutes prior to display start. 4. Have Pyrotechnicians in visible uniform clothing. 5. No Pyrotechnics shall be delivered to site prior to the day of the display. 6. All personnel inside the safety perimeter shall use Personnel Protective equipment as outlined in NFPA 1123. 7. Only Pyrotechnicians, Safety Monitors and Fire Watch personnel will be within the safety perimeter. 8. Portable fire extinguishers shall be in place prior to unloading of pyrotechnics from transport vehicle. (2A 20 BC Minimum Size) 9. 4 - Tukwila Police officers shall be on site a minimum of 30 minutes prior to the start of the display for crowd control, and shall remain for a minimum of 30 minutes past the end of the display or the crowd disperses. (2 additional Tukwila Police officers shall be available to respond to the site if requested.) Fire Marshal's Office: 6300 Southcenter Blvd. Suite 209 • Tukwila, Washington 98188 • Phone: 206 -575 -4407 • Fax: 206 -575 -4439 71 City of Tukwila Page 2 10. Tukwila Fire Department shall inspect mortar racks prior to loading of any pyrotechnic shells. 11. Tukwila Fire Department shall inspect all static displays upon completion of set up. 12. Two Tukwila Fire Department apparatus shall be on location prior to the start of the display. (One will be an overtime staffed engine) 13.Two additional overtime firefighters will be the designated fire watch personnel assigned to the Starfire turf practice fields South of Starfire's main building. 14.Any breech of the safety perimeter shall suspend the display until the perimeter is cleared and re— established. 15. Upon completion of the display, the fallout area shall be checked for unexploded shells. Cleaning of debris, if not practical on the night of the event shall be at first light the next day. 16. No combustible materials shall be stored inside the safety perimeter. Fire Marshal's Office: 6300 Sauthceuter Blvd. Suite 209 • Tukwila, Washington 98188 • Phone: 206.575 -4407 • Fax: 206 -575 -4439 72 73 74 Finance & Safety Committee Minutes June 2, 2015 — Page 2 B. Fireworks Permits: Foster High School Graduation and Family 4th at the Fort Staff is seeking Council approval of a Fireworks Permit Application submitted by Western Display Fireworks Ltd. for a fireworks display at Foster High's graduation ceremony on June 12, 2015. The fireworks display is to honor Ms. Cynthia Chesak on the occasion of her retirement after 34 years. The discharge location will be on the baseball field behind Showalter Middle School, with the fallout area being the grass outfield area. The largest aerial shell will be 2 inches. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE AND SPECIAL MEETING. Staff is seeking Council approval of a Fireworks Permit Application submitted by Western Display Fireworks Ltd. for the fireworks display at the City's annual 4th of July Celebration at Starfire Sports Complex. The application has been approved by the Fire Marshal and found to be in compliance with standards and regulations, and this vendor and launch location have been working well. The show is estimated to be 20 -30 minutes starting at around 10:00 p.m. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE AND SPECIAL MEETING. III. MISCELLANEOUS Meeting adjourned at 6:14 p.m. Next meeting: Tuesday, June 16, 2015 — 5:30 p.m. — Hazelnut Conference Room Committee Chair Approval Minutes by LH 75 76 COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared 15 Mayo ' • review Council review 06/08/15 ML At 1,N. 06/15/15 ML Ordinance Mtg Date E Bid Award Mtg Date 11Public Hearin,g Mtg Date El Other Mtg Date CATEGORY Fri Discussion 0 Mtg Date Mtg SPONSOR E Council Mayor E HR A DCD E Finance L Fire IT E Re.,R E Police DPW SPONSOR'S Tukwila has received notification of intended award of the following grants: SUMMARY 2012 CMAQ GTEC/TDM Expansion - $186,364.64 Federal grant funds administered by WSDOT; 2015 CMAQ Regional TDM Services- $270,000.00 Federal grant funds administered by WSDOT; and Transportation Management Implementation Agreement 2015-2017 - renewal grant for CTR implementation from WSDOT. ITEM INFORMATION ITEM No. 5.D. 77 STAFF SPONSOR: MARGARET LUBOV ORIGINAI, AGENDA DATE: 06/08/15 AGENDA ITEM TITI,I_7, Acceptance of Transportation related grants. 6/8/15 Motion Date 6/15/15 0 Resolution Mtg Date Ordinance Mtg Date E Bid Award Mtg Date 11Public Hearin,g Mtg Date El Other Mtg Date CATEGORY Fri Discussion 0 Mtg Date Mtg SPONSOR E Council Mayor E HR A DCD E Finance L Fire IT E Re.,R E Police DPW SPONSOR'S Tukwila has received notification of intended award of the following grants: SUMMARY 2012 CMAQ GTEC/TDM Expansion - $186,364.64 Federal grant funds administered by WSDOT; 2015 CMAQ Regional TDM Services- $270,000.00 Federal grant funds administered by WSDOT; and Transportation Management Implementation Agreement 2015-2017 - renewal grant for CTR implementation from WSDOT. REVIEWED BY — COW Mtg. CA&P Cmte 111 F&S Cmte E Utilities Cmte Arts Comm. E Parks Comm. DATE: 06/01/15 COMMITTEE CHAIR: DuFFIE I Transportation Cmte E Planning Comm. RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Department of Community Development Transportation Com.; Forward to C.O.W. COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0 $0 $0 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 6/8/15 MTG. DATE ATTACHMENTS 6/8/15 Informational Memorandum dated 6/3/15 New memo after TC to provide greater dal Notice of Intended Grant Awards - Email 5/12/15 Minutes from the Transporation Committee of 6/1/15 6/15/15 77 78 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Jack Pace, Director BY: Margaret Lubov, CTR Coordinator DATE: June 3, 2015 SUBJECT: 2012 Congestion Mitigation Air Quality, Growth Transportation Efficiency Center and Transportation Demand Management Expansion Grant, 2015 Congestion Mitigation Air Quality Regional Transportation Demand Management Grant and Transportation Management Implementation Agreement 2015 -2017 ISSUE The Council is being asked to accept three grant awards to fund Transportation Demand Management (TDM) programs in Tukwila and regional growth centers. • Grant #1 is $186,334.64 Federal grant funds administered by Washington State Department of Transportation (WSDOT) for trip reduction efforts in Tukwila's regional growth center. The project title is 2012 CMAQ GTEC/TDM Expansion (Congestion Mitigation Air Quality/ Growth Transportation Efficiency Center). These funds are new. • Grant #2 is $270,000 Federal grant funding administered by WSDOT for expansion of trip reduction efforts for South King County. The project title is 2015 CMAQ Regional TDM Services (Congestion Mitigation Air Quality). These funds are new. • Grant #3 is the renewal of the current WSDOT TDM (Transportation Demand Management) allocation for the biennium 2015 -2017 and will be for $74,500. BACKGROUND Commute trip reduction (CTR) is a WSDOT grant funded program required by state law. The City ordinance #2201 is in compliance with state requirements. The first ordinance was adopted in 1991 and was updated to reflect current changes in law in 2010. Staff provides technical assistance to administer, implement, analyze and review employer programs to meet state trip reduction goals. Staff half time position is fully funded by WSDOT with no general funds used. The City of Tukwila has an opportunity to accept additional grant funds to fulfill our mission for cleaner air and to reduce congestion. In 2012, WSDOT submitted a CMAQ grant application to PSRC for a GTEC (Growth Transportation Efficiency Center) and TDM Expansion project to provide transportation demand management (TDM) in regional urban centers and corridors that serve them, and to implement regionwide demand management marketing and promotions. This application, Grant #1, was initially on the contingency list and is awarded at this time with funds obligated by WSDOT. Funding for TDM implementation will be provided to GTECs and their participating organizations, including local jurisdictions that implement commute trip reduction (CTR). GTECs are comprised of local jurisdictions, employers and community groups that intend to improve transportation efficiency and reduce greenhouse gas emissions. Coalitions in ten regional growth centers (Canyon Park, Downtown Bellevue, Downtown Seattle, Downtown Tacoma, Everett, Lynnwood, Overlake, South Hill, Totem Lake and Tukwila) have produced GTEC plans, MI 5/15/15 InfomemoCMAQ2012 -2015 REVISED 6/1/15 79 INFORMATIONAL MEMO Page 2 which describe TDM services tailored to meet the needs of the center. Tukwila's GTEC is the Urban Center. In 2014, WSDOT submitted a CMAQ grant application to PSRC for Regional TDM projects which received high scores for emphasis on trip reduction efforts for the region. This grant ( #2) will build on our efforts in South King County to reduce trips in regional growth centers, implementing acitivities as outlined above. The two grants will allow a coalition to grow as well as provide a focused opportunity to test demand management strategies in our urban center. The Implementation Agreement (Grant #3) is essentially a renewal of WSDOT funds for CTR activities as has been in place since 1991 when the CTR law was passed. We renew funding every two years. DISCUSSION WSDOT is awarding federal grant funding (CMAQ) for enhancement for urban growth centers and corridors as defined by the Puget Sound Regional Council. The projects propose to further develop the use of the tool, Rideshareonline.com and will offer trip reduction services and incentives along with other activities designed to reduce trips to urban centers. Deliverables include intensive training, increased use of transportation alternatives such as bicycle and pedestrian use, as well as transit and rideshare activities. A pilot project with King County Housing Authority and Hopelink is intended to provide education and incentives to clients. A reduction in greenhouse gas emissions is anticipated. Grant Project #1 will commence July 1, 2015 through December 31, 2017 and Grant Project #2 will commence July 1, 2015 and end December 31, 2018. Allocation Grant for 2015 -2017 will commence July 1, 2015 and end June 30, 2017. The City Attorney's office reviewed the WSDOT boilerplate contracts in December 2014 and in April 2014. The three contracts will be sent to the city separately in June. The funding from both CMAQ grants will completely cover costs for at least one position along with marketing and material expenses to implement projects such as one with Hopelink. All three agreements will be in the same form as the boilerplate has been approved throughout the region by the partners in conjunction with WSDOT. For the projects, Tukwila's current CTR Coordinator will provide technical management for the project. Staff will be hired and housed at the City of Tukwila, Department of Community Development. There are no matching funds required for the City. FINANCIAL IMPACT Grant funds RECOMMENDATION The Council is being asked to accept three grant awards on the consent agenda at the June 15, 2015 Regular Meeting. ATTACHMENTS Summary 2012 CMAQ Partners Summary 2014 CMAQ Partners Letter of Support 2012 Letter of Support 2014 PSRC 2014 FHWA REGIONAL COMPETITION - FINAL PROJECT SCORES Notice of intended Grant Awards MI 5/15/15 InfomemoCMAQ2012 -2015 REVISED 6/1/15 80 2012 GTEC and TDM Expansion CMAQ Partners and Regional Growth Centers WSDOT 2012 CMAQ Proposal: GTEC and TDM Expansion Partner CMAQ* Match* Regional Growth Centers and connecting corridors Pierce County $186,363.64 $70,000 Puyallup South Hill City of Tacoma $186,363.64 $70,000 Tacoma Downtown City of Tukwila $186,363.64 $70,000 Tukwila City of Bellevue $186,363.64 $70,000 Bellevue Downtown City of Seattle $186,363.64 $70,000 Seattle Downtown City of Redmond $186,363.64 $200,000 Redmond Downtown $186,363.64 $200,000 Redmond Overlake Community Transit $186,363.64 $70,000 Lynnwood Community Transit $186,363.64 $70,000 Bothell Canyon Park Everett Transit $186,363.64 $70,000 Everett City of Kirkland $186,363.64 $70,000 Totem Lake King County Metro $100,000 $70,000 Regionwide marketing, entire urban growth area and region RideshareOnline $200,000 $70,000 Regionwide marketing, entire urban growth area and region $2,350,000 $1,170,000 *Budget includes request for $2,350,000 million of CMAQ funds and match, which is comprised of $770,000 in state CTR funds and $400,000 in local Redmond funds. WSDOT will obligate all CMAQ funds and contract with partners for implementation. WSDOT will retain $0 to administer the project. , Stan Suchan, WSDOT suchans@wsdot.wa.gov or 206 - 464 -1192 2014 -05 -16 81 82 2014 Regional TDM CMAQ Grant Partners and Regional Growth Centers Partner Additional Partners Budget* Regional Growth Centers and connecting corridors . Pierce County City of DuPont City of Lakewood City of Tacoma Joint Base Ft. Lewis - McChord Pierce Transit Tacoma - Pierce County Chamber of Commerce $330,000 Lakewood Puyallup Downtown Puyallup South Hill Tacoma Downtown Tacoma Mall City of Tacoma Pierce County Pierce Transit Tacoma - Pierce County Chamber of Commerce Downtown on the Go $330,000 Federal Way Tacoma Downtown Tacoma Mall City of Tukwila City of Kent City of Renton City of SeaTac King County Metro $330,000 Burien Kent Downtown Tukwila Renton SeaTac City of Bellevue Bellevue Downtown Association/ TransManage King County Metro $330,000 Bellevue Downtown City of Seattle King County Metro Commute Seattle $330,000 Seattle Downtown Seattle First HiIVCapitol Hill Seattle South Lake Union Seattle University Community Seattle Uptown King County Metro $330,000 Seattle Northgate Seattle University Community City of Redmond King County Metro $330,000 Redmond Downtown King County Metro $330,000 Redmond Overlake Community Transit City of Everett $330,000 Lynnwood Bothell Canyon Park Everett Transit City of Everett Community Transit $330,000 Everett King County Metro Washington State Ridesharing Organization $100,000 all, entire urban growth area and region RideshareOnline King County Metro Washington State Ridesharing Organization $200,000 all, entire urban growth area and region $3,600,000 *Budget includes request for $3 million CMAQ funds and $600,000 in state CTR funds committed as match. WSDOT will obligate all CMAQ funds and contract with partners for implementation. CMAQ funds distribution: $270,000 each for ten implementation groups and $300,000 for regional implementation. WSDOT will retain $0 to administer the project. Regional TDM CMAQ Proposal, WSDOT Stan Suchan, suchans@wsdot.wa.gov, 206 - 464 -1192, 206 - 321 -3249 April 24, 2014 page 1 83 84 April 11, 2012 City of Tukwila Department of Community Development Mr. Stan Suchan Public Transportation Division Washington State Department of Transportation 401 Second Avenue Seattle, WA 98104 -3850 Dear Mr. Suchan: Jim Haggerton, Mayo) Jack Pace, Directo, The City of Tukwila is pleased to support the Washington State Department of Transportation's Regional GTEC and TDM Expansion Project. The City of Tukwila recognizes the opportunity this project offers to help meet our transportation goals by reducing vehicle trips and greenhouse gas emissions. The Regional GTEC and TDM Expansion Project provides an opportunity to leverage ongoing planning efforts and investments in our community including implementation of the City of Tukwila Urban Center Plan and Bicycling and Walking Plan in the coming years. We look forward to collaborating with the Washington State Department of Transportation to implement this project for our citizens, visitors, employees and businesses of our area. Thank you for helping to create this opportunity for the City of Tukwila to reach its transportation goals in King County. Sincerely, ack Pace Director, Department of Community Development 6300 Southcenter Boulevard, Suite #100•Tukwila, Washington 98188 •Phone 206 - 431 -3670 85 86 April 3, 2014 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Mr. Stan Suchan Public Transportation Division Washington State Department of Transportation Transportation Building PO Box 47300 Olympia, WA 98504 -7300 Dear Mr. Suchan: This letter is to express the City of Tukwila's support for the Washington State Department of Transportation's proposal to support transportation demand management (TDM) implementation focused on regional growth centers and the corridors that serve them through a Regional TDM application for CMAQ funds. The City of Tukwila recognizes the opportunity this project offers to help meet our transportation goals by reducing vehicle trips and greenhouse gas emissions and to work collaboratively with neighboring jurisdictions and agencies to implement TDM strategies to accomplish these goals. The project provides an opportunity to leverage ongoing planning efforts and investments in our community including implementing The City of Tukwila's Southcenter Plan and Bicycling and Walking Plan (Walk and Roll), and the ability to focus on transportation needs in the North Tukwila Manufacturing Industrial Center (MIC). We look forward to collaborating with the Washington State Department of Transportation and our partners, the City of Kent, the City of SeaTac, the City of Renton and King County Metro to implement this project for our employees and businesses, citizens and visitors of our area. Thank you for helping to create this opportunity for the City of Tukwila to reach its transportation goals in King County. Sincerely, Nora Gierloff Deputy Director, Department of Community Development Cc: Jack Pace, Director, Department of Community Development Margaret Lubov, CTR Coordinator, City of Tukwila ML Page 1 C:\ Users \Nora- G\AppData\Loca1\Microsoft \Windows \Temporary Internet Files\ Content. Outlook\PP0052G2\Letterhead.doc 04/03/2014 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax: 206 - 431 -3665 87 88 PSRC 2014 FHWA REGIONAL COMPETITION - FINAL PROJECT SCORES, by funding source, by score Amount available = $66.3 million Category Sponsoring Agency Project Title Funding Source Phase Amount Requested TOTAL SCORE Cumulative Total Corridor Sound Transit" Light Rail Extension: South 200th (SeaTac) to Kent/Des Moines CMAQ PE, ROW $5,000,000 88 $5,000,000 Corridor WSF Mukilteo Multimodal Ferry Terminal STP CN $12,100,000 79 $17,100,000 RGC Seattle Broadway Streetcar Extension CMAQ CN $10,000,000 76 $27,100,000 RGC WSDOT Regional Transportation Demand Management CMAQ Other $3,000,000 76 $30,100,000 RGC Lynnwood Poplar Way Extension Bridge STP ROW $3,050,000 76 ;; $33,150,000 Corridor Bainbridge Island / WSF Sound to Olympics Trail Extension and Bainbridge Ferry Terminal Pedestrian Loading Bridge Replacement STP PE, CN $2,192,000 75 $35,342,000 MIC PSCAA Regional Clean Port Truck Program CMAQ CN $3,460,000 74 $38,802,000 Corridor Renton Rainier Ave S Corridor Improvements - Phase 4 STP PE $2,600,000 74 $41,402,000 Corridor Federal Way Pacific Highway South HOV Lanes Phase V STP CN $7,000,000 71 $48,402,000 Corridor Tacoma Schuster Parkway Promenade STP PE $1,170,172 69 $49,572,172 Corridor King County Transit Speed and Reliability Corridor Improvements STP PE, CN $5,683,000 66 $55,255,172 Corridor Seattle Route 48 South Electrification CMAQ PE, CN $10,000,000 65 $65,255,172 Corridor Snohomish County Adaptive Signal Controll System: SR 527 from 228th St SE to SR 96; and SR 96/128th St SW /Airport Rd from Seattle Hill Rd to SR 526 STP PE, CN $1,730,000 65 $66,985,172 Corridor Seattle Center City Gateway ITS STP PE, CN $6,570,000 ___ _64 $73,555,172 MIC Fife Port of Tacoma Road Interchange with 1 -5 - Ramp Construction STP CN $7,006,500 63 $80,561,672 Corridor Bothell SR 522 Multi -Modal Corridor Stage 3 Improvements (83rd Place NE to Wayne Curve) STP ROW $5,200,000 62 $85,761,672 Corridor Sound Transit Diesel Retrofit of Commuter Rail Locomotives CMAQ Other $12,000,000 61 $97,761,672 Corridor Bellevue NE 15th Street Multi -Modal Corridor STP PE $3,000,000 61 $100,761,672 Corridor Pierce County Canyon Road East Freight Corridor Improvement, Phase 2 - SR 512 to 70th Avenue East/48th Street East STP PE, ROW $13,822,300 61 $114,583,972 RGC Renton Logan Ave N - Phase 1 STP CN $2,600,000 60 $117,183,972 MIC Port of Bremerton Cross SKIA Phase 2 -1 (Construction) STP CN $2,160,770 60 $119,344,742 MIC Port of Tacoma Port of Tacoma Road Reconstruction STP CN $7,240,222 60 $126,584,964 RGC PSCAA Electric & Hybrid Truck Voucher Program CMAQ CN $3,370,000 58 $129,954,964 Corridor Shoreline SR 523 (N /NE 145th Street), Aurora Avenue N to I -5 STP PE $4,300,000 57 $134,254,964 Corridor Community Transit 40 Ft Hybrid Bus Project CMAQ Other $5,200,000 56 $139,454,964 Corridor Bellevue 120th Avenue NE Widening - Stage 3 STP CN $4,500,000 56 $143,954,964 RGC Tacoma Puyallup Avenue Multimodal Corridor Project STP Planning Study $692,000 56 $144,646,964 RGC Tukwila Strander Blvd. /SW 27th St Extension STP PE, ROW $5,000,000 56 $149,646,964 Corridor Puyallup Shaw Road, 12th Ave SE to 23rd Ave SE STP PE, ROW $7,274,221 53 $156,921,185 Corridor WSDOT I -5 /Northbound Marine View Drive to SR 528 - Peak Use Shoulder Lane STP PE $3,287,000 52 $160,208,185 RGC Kitsap County Silverdale Way Road Widening Project STP CN $3,000,000 51 $163,208,185 Corridor Everett 100th St. Corridor (Airport Rd. to Evergreen Way) STP CN $3,792,540 46 $167,000,725 Category Sponsoring Agency Project Title Funding Source Phase Amount Requested Other WSDOT Snohomish County Recovery Project N/A N/A $0 * Request reduced to ROW phase; funding for PE received as part of 2014 FTA contingency process 89 90 Maggie Lubov From: Johnston, Kathy <JohnstK @wsdot.wa.gov> Sent: Tuesday, May 12, 2015 3:20 PM To: Maggie Lubov Subject: Confirmation to Proceed with CMAQ Implementation Dear Ms. Lubov, I am happy to confirm that you may proceed with the CMAQ grant (s). We look forward to your participation in our CMAQ grant (s) to assist in TDM strategies and activities that will benefit your community and the state, as a whole. The Washington State Department of Transportation is committing state Commute Trip Reduction (CTR) funds as match. We will need to finalize the Scopes of Work as they are attached to the contract. I am excited to work with you on implementing these grants. Please let me know if you need any assistance. Kathy Johnston CTR Program Manager WSDOT 1 91 92 TRANSPORTATION COMMITTEE Meeting Minutes June 1, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building City of Tukwila Transportation Committee PRESENT Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy Staff: David Cline, Robin Tischmak, Michael Ronda, David Sorensen, Maggie Lubov, Peter Lau, Cyndy Knighton, Gail Labanara, Laurel Humphrey CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:15 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Grant Acceptance: Commute Trip Reduction (CTR) Staff is seeking Council approval to accept three grant awards relating to Transportation Demand Management (TDM) programs. A revised informational memo was distributed to the Committee to correct the funding level of grant no. 2. 1. $186,334.64 in Federal funds administered by Washington State Department of Transportation (WSDOT) for trip reduction efforts in Tukwila's regional growth center. 2. $270,000.00 in Federal funds administered by WSDOT for expansion of trip reduction efforts in South King County. 3. $74,500 funding renewal for the current TDM allocation for the 2015 -2017 biennium. The first two grants are part of WSDOT's effort to reduce greenhouse gas emissions by awarding Federal Congestion Mitigation and Air Quality Improvement (CMAQ) grants for projects in urban growth centers and corridors. The projects propose to enhance and expand trip reduction strategies such as online tools, trainings and incentives. Funding from the grants will completely cover costs for one position along with marketing and material expenses. The third grant is a renewal of WSDOT funds for the existing CTR program in the City, in place since 1991. No matching funds are required for any of the grants. The Committee asked clarifying questions and felt that a program overview would be helpful to the full Council prior to considering the grant awards. NO DECISION. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE. B. Supplemental Agreement: 2015 Overlay and Repair Program Staff is seeking Council approval of Supplemental Agreement No. 1 in the amount of $172,658.89 with KPG, Inc. for construction management services for the 2015 Overlay and Repair Program. The base contract No. 14 -157 was for design services for this project. KPG was selected from a pool of three firms for their expertise and experience in Tukwila. The bid for construction is scheduled to be opened on June 3, 2015 and the results will be presented at the next Transportation Committee meeting. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. 93 94 Imo,* '4;ste; COUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's review Council review 06/08/15 RE 094 C ITEM INFORMATION ITEM No. 5.E. 95 STAFF SPONSOR: ROBERT EATON ORIGINAL AGENDA DATE: 6/8/15 AGENDA ITEM TULE Park Watch Program Presentation 06/08/15 Motion Date E Resolution Mtg Date fl Ordinance Mtg Date E .Bid Award Mtg Date El Public Hearing Mtg Date E Other Mtg Date CATEGORY W Discussion • Mtg Date Mtg SPONSOR E Counci l E Mayor El HR E DCD El Finance Fire E IT F ri Pe7R Police Pir SPONSOR'S Staff power point presentation of the Park Watch Program. SUMMARY REVIEWED BY 111 COW Mtg. E Utilities Cmte DATE: 05/26/15 Z CA&P Cmte E F&S Cmte E Parks Comm. COMMITTEE CHAIR: SEAL E Transportation Cmte • Arts Comm. MI Planning Comm. RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Parks and Recreation Department presentation Requested at COW COST IMPACT / FUND SOURCE EXPENDITURE. REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $ $ $ Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION MTG. DATE ATTACHMENTS 06/08/15 Informational Memorandum dated 05/2005 (Documents modified after CAP) Park Watch Program - Logic Model Park Watch Program - Charter (DRAFT) Park Watch Program - Ad Hoc Teams List (DRAFT) Park Watch Program - Ad Hoc Teams Kick-off Event Outline Park Watch Program and City's Strategic Plan Goals Minutes from the Community Affairs and Parks Committee of 5/26/15 95 96 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Community Affairs and Parks Committee FROM: Rick Still, Parks and Recreation Director BY: Robert Eaton, Parks and Recreation Superintendent /l1 DATE: May 20, 2015 SUBJECT: Park Watch Program Update ISSUE Status update of the Park Watch Program, informational only. BACKGROUND In 2014 the Parks and Recreation Department was encouraged by Council President De'Sean Quinn on behalf of the council and citizens to develop a program to connect with the neighborhoods and park users in efforts to implement many of the City's Strategic Plan Goals. Parks and Recreation responded with the concept of a pilot Park Watch Program. DISCUSSION Parks and Recreation began the planning of the conceptual Park Watch Program by using a project management tool, Logic Model (attachment A) to identify the purpose, objectives, stakeholders, scope and key components of the project. From there, a Charter (attachment B) was developed to guide the program and hold it accountable to meeting the City's Strategic Goals and identify the means to accomplishing this. Once the charter was developed then Ad Hoc Teams were identified by the Project Management Team (attachment C). Attachment D is the outline for the Ad Hoc Teams Kick -off Event, scheduled for May 27, 2015, where all members of the ad hoc teams will meet together to be briefed on the program. An overview of the purpose and roles of the ad hocs will be provided along with a review of each teams' objectives. The project schedule will be reviewed and significant target dates identified. Then the ad hocs will break into their respective teams and begin fleshing out their workplans, coordinating points with other ad hocs, check points that coincide with the identified program target dates, and frequency of meetings necessary to complete their tasks. The facilitator of each Ad Hoc Team is on the Project Management Team and will provide updates at the weekly Management Team Meetings. Attachment E identifies the multiple City goals, priorities, objectives and values the Park Watch Program will meet as it is implemented. FINANCIAL IMPACT The program budget for 2015 is $2,000 which is being funded by the Parks Commission serving as the Project Sponsor. The majority of the expense will be for the events. RECOMMENDATION Informational only ATTACHMENTS A. Park Watch Program - Logic Model B. Park Watch Program - Charter C. Park Watch Program - Ad Hoc Teams List D. Park Watch Program - Ad Hoc Teams Kick -off Event (Outline) E. Park Watch Program and City's Strategic Plan Goals 97 98 PROJECT NAME: Park Watch Program PROFESSIONAL Attachment A DATE: February 26, 2015 Inputs Desired Outcomes - Short Term - Mid Term - Long Term Who supplies us with the things we need to do this job /project? What specific things do we need to complete this job /project? What are the main steps in this process? What things are produced through this process? Who actually uses the things we produce through this process? How does the organization benefit from this work? Je o-i -oods) N Create Goal Purpose, _ , ,_t ._. N NJ e a-_o -s Short Term: N Stewarbsoip Pla .. ontacts Mission. Jan fc _n/- E iu.e -t N -ark Visitors N Established to et ee stiff ` N Volunteer F-_o.g_ __, N 201 .,o-;; a.. N City's Visit - & Mission N ty s °t ateg a pi o_g- a s a N Positive Rela ti •"ships N Local businesses N E ril pioyees of local e a -b- . -s N Esta s zed positive .e a ship t . u a s Park Users PROS Plan De,e Timm ne resioents/ne a. _,rs businesses N Education of maintenance/LOS to it zen Police Mayoral FOCUs Areas Create eams Established Council l `c eas el eyes on the park Neighbors Council's Pr e i_ -es Plan/Conduct mtgs (regular Communicah on Pian City staff (va ious improved image, awareness of proEva r:s. Casey (Renton) * City's Values and special) (b/w public & staff) e s) Safety P& ;'s Va <es ( (see wilii Neighbors bors ' Norms iteP0 ,.nu I -- P& , staff Mid Term: N LOS (still being developed) (see Meel {, r y staff (D, ;s) police involvement . ass N Bolstered o i tee-s -i t c-gran ased access to and ese n s st Pa , et J nets . Coa (current & tut s a t �y solve t N Neighborhood N Create � _i _t a -s Performance Measures res wo k _ plan (t eas i-e success) a Long Term: ,v _u Neighborhood [, .e se& L of -. -it ~ N Email lists for PrograrnAViodel doorbeiling. faceboo neignoorn000s (.no,t, your neighbo v_I t= t,PA Guide, Phoning, ,_.) N Revised _OS by N Improve re- en, a iva y (v opp o _uf ;. _) leas' II -es N Public review at L°OS Neighbors (after City N Increased safety of parks e OR Program N Rev users (email) ,t,ne'e the _ complamit fief :vaf , : p,thlic input i(`o park, P- Patch, e,_.) N Increased ownership of the park N Long-temi Enjoyment N ° L _ 1.B. 5, PROS 2, _ _ ` CPR Author(s): Robert Eaton, Dave Johnson, Tracy Gallaway, Rick Still 100 DRAFT Attachment B Tukwila Parks & Recreation Park Watch Program Charter Project Background In 2011 the City began a vigorous workplan to begin revitalizing the City in many different ways, (HPO, LEAN, Crime Reduction, Improve Image, etc.). The first step the City took to begin this process was to listen to the residents, businesses and visitors to the City of Tukwila. The Strategic plan was developed from what the City heard from those that work, live and play in the City of Tukwila. A new Community Vision, City Mission, City Values and Five Strategic Goals /Objectives were developed to provide direction for the future of the City of Tukwila. From there, the Parks and Recreation Department continued momentum started by the Strategic Plan, and using a similar pubic engagement process, developed the 2014 Parks, Recreation and Open Space Plan (PROS Plan). There were five goals identified in the plan that further defined the process and programs the Parks and Recreation Department will utilize to implement the City's Strategic Plan as it relates to P &R activities. Shortly after the adoption of the 2014 PROS Plan, planning began on the 2015 -16 Biennial Budget. In conjunction with the 2015 -16 Biennial Budget the City developed "a detailed 2015 Workplan to guide and track the City' s work holding it accountable to the Strategic Plan Goals. The Council Priorities and the Mayoral Focus Areas also were developed to further define the focus of the City's work for 2015. From all these public planning` processes, two areas of focus rose to the top as very high priorities for 2015: 1) Improving Residential Quality of Life and Neighborhood Connectedness and 2) Improving the Positive Image of Tukwila. In 2014 the Parks and Recreation Department was encouraged by Council President De'Sean Quinn on behalf of the council and citizens to develop a program to connect with the neighborhoods and park users in efforts to implement many of the City's Strategic Plan Goals. Parks and Recreation responded with the concept of a pilot Park Watch Program. Parks and Recreation began the planning of the conceptual pilot Park Watch Program by using a project management tool, Logic Mode, to identify the purpose, objectives, stakeholders, scope and key components of the project. From there, this Charter has been developed to guide the program and ensure that it is, and remains, in line with the City's Strategic Plan Goals and identifies the means to accomplishing the Goals. The program will be developed in 2015 with the goal of having multiple "See You in the Park" meet and greet events with the local neighborhoods and park users in several key parks in the City of Tukwila. Tukwila Parks & Recreation — Park Watch Program -1- 5/20/15 101 DRAFT Attachment B Serving as the Project Team, the Parks and Recreation Management Team will work closely with the Executive Steering Group, Project Sponsor, Project Manager, Ad Hoc Teams and Individual Members throughout the development of this program. The Parks and Recreation Department will partner with the other City Departments to utilize this program to its maximum benefit for both the residents and the City. Ad Hoc Teams will be formed with varying areas of focus and will prove to be great opportunities for cross - department work groups and teams to utilize this program to connect with neighborhoods and park users. The goal of this program is to implement the City's Strategic Plan Goals and Mayor's priorities by establishing community connections, improving residential livability, and promoting the positive image of Tukwila. Project Purpose 1. To establish communications between staff and neighbors 2. To establish positive relationships between staff and neighbors 3. To educate neighbors on the park maintenance service levels of Tukwila's Park System 4. To increase "eyes" on the parks and neighborhoods that improve proper use of the parks and that are familiar with how to report improper use of the parks 5. Make the parks safer and more enjoyable place for our neighbors and residents 6. To improve volunteer programs in our parks 7. To improve connectivity between our residents and the City 8. To foster "ownership" of the parks; and issues going on in the neighborhood Project Objectives 1. To provide opportunities for neighbors and park users to meet staff in a social setting 2. To develop interest from the social gatherings into something more formal as desired create andimplement a Park Watch Program build strong positive relationships with neighbors and park users 5.,To, establish clear communication channels between City staff and park users 6. To educate neighbors and park, users on where, when and how to report issues, concerns, suggestions compliments and positive feedback 7. To collect email and phone numbers (full contact info) from interested neighbors 8. To provide our contact information to the neighbors 9. To foster neighborhood community groups and involvement with the (parks /City ?) (staff ?) (operations ?) (etc. ?) 10. To provide neighbors and park users the opportunity to give input on the service levels of the parks are maintained at 11. To improve access to and /or increase the recreational opportunities within the parks Tukwila Parks & Recreation — Park Watch Program - 2 - 102 5/20/15 DRAFT Attachment B Project Scope The Park Watch Program Team will focus on neighborhoods surrounding six parks throughout the City to begin developing relationships with the neighbors and park users by providing an introductory outreach event: April 25, 2015, 9:00am — 12:00pm @ Crystal Springs Park (in celebration of National Parks Appreciation Day) July 8, 2015, 5:30pm — 7:00pm @ Joseph Foster Memorial Park - July 15, 2015, 5:30pm — 7 :00pm @ Riverton Park July 22, 2015, 5:30pm — 7:00pm @ Duwamish Park - July 29, 2015, 5:30pm — 7:00pm @ Tukwila Park August 4, 2015, 5:30pm — 7:00pm @ Crestview Park (in partnership with the National Night Out Against Crime) 1. Form Ad Hoc Teams to develop program specifics and workplan: - Communication Events - Connection - Business Safety 2. Develop a formal Park Watch structure, as desired by residents, based upon the Neighborhood Watch Program. Project Schedule April — Develop Charter May (early) — Develop Ad Hoc Teams May (late) — Project Ad Hoc Kick -off Event June (early) — Ad Hoc Teams Begin Meeting on Workplans June (late) — Outreach to Neighborhood July — Host "See you in the Park" (meet and greet) Events August — Follow -up with Interested Groups /Individuals Fall /Winter 2015 - Transition to Development of Plan with Specific Neighborhood(s) Implementation Steps 1. Create Goal, Purpose and Mission for program using Logic Model 2. Develop Charter (Objectives, Scope, Schedule, Team members) 3. Form Ad Hoc Teams 4. Plan and conduct regular meetings of various ad hoc teams 5. Develop Communication Plan 6. Reach out and coordinate with other City departments 7. Outreach to neighbors 8. Host "See You in the Park" meet and greet events 9. Follow -up with neighbors post "See You in the Park" events Tukwila Parks & Recreation — Park Watch Program - 3 - 5/20/15 103 DRAFT Attachment B 10. Develop Park Watch Plan(s) with specific neighborhoods 11. Maintain communication channels and professional relationship between City staff and park users. 12. Coordinate regular meetings with formed Neighborhood Park Watch teams 1. Connect with Neighbors and Park users through multiple methods of communication (including possibly phone calls, doorbelling, fliers, emails, mailings, advertisement in Rec Brochure, Channel 21, Tukwila Talk, etc.) 2. Host "See You in the Park" meet and greet events in several key parks from April — August for staff to meet and connect with the neighbors and park users. 3. Develop Neighborhood Park Teams linked with specific parks and facilitate regular meetings to foster ownership and strengthen communications between the neighbors and city staff. 4. Train and educate the Neighborhood Park Teams of how to be involved (reporting issues, volunteering, being a presence in the parks, etc.) Team Membership Executive Steering Group: Proposed 1. Councilmember 2. Councilmember,� 3. David Cline, City Admiinistrator. 4. Rick Still, P &R Director, Project. Sponsor: 1. Parks_Commission Project Manager 1. Robert Eaton, P &R Superintendent Project Team Members: 1. Rick Still, P &R Director 2. Dave Johnson, P &R Superintendent 3. Robert Eaton, P &R Superintendent 4. Tracy Gallaway, P &R Superintendent 5. Stephanie Gardner, P &R Analyst Tukwila Parks & Recreation — Park Watch Program 4 104 5/20/15 DRAFT Attachment B Ad Hoc Teams: 1. Communication 2. Events and Health & Wellness 3. Community Connection 4. Business Connection 5. Safety Individual Members: (Still being developed and added to) 1. Kris Kelly, Parks Supervisor - P &R 2. Brett Owner, Maintenance Specialist - P &R 3. Brian Jaeger, Maintenance Specialist - P &R 4. Malcolm Neely, Maintenance Specialist - P &R 5. Randy Engle, Maintenance Specialist -. P &R 6. Teshome Edesa, Maintenance Specialist - P&R 7. Tim Carpentier, Lead Maintenance Specialist- P &R 8. Shannon Fisher, Recreation Coordinator= P &R 9. Stacey Agmata, Administrative Support, Coordinator - P &R 10. Nate Robinson, Teen Rec Specialist - P&R Warren Orr, Golf Coordinator - P &R 12. Chris Partman, Community Policing Coordinator 13. Rick Mitchell, Police Commander - Police 14. Raejean Kreel, CERT Trainer - Fire 15. Joyce Trantina, Project Development Manager - Mayor`s, Office 16. Brandon Miles, Economic Development Liaison - Mayor's Office 17. Rachel Bianchi, Communications Manager - Communications 18. Nora Gierloff, Deputy Director - DCD 19. Rebecca Fox, Senior Planner. -DCD 20. Andrea Cummins, Urban Environmentalist - DCD 21. Trish Kinlow, Court Administrator - Court 22. Dave Sorensen, Project Manager - PW 23. Dave DeGroot, Foreman - PW 24. Stacy Hansen, Human Services Coordinator - Human Services Critical Success Factors 1. Positive interactions and connection between City staff and neighbors and park users 2. Improved communication channels between City staff and neighbors and park users 3. Improved safety of the parks 4. Increased positive presence in the parks 5. Increased neighborhood connectivity 6. Increased engagement by neighbors and park users 7. Neighbor and Park User input and involvement in decision making of park service levels, amenities and programs. Police Tukwila Parks & Recreation - Park Watch Program 5/20/15 - 5 - 105 DRAFT Attachment B Roles and Responsibilities Executive Steering Group: 1. Approve and support project as outlined in charter 2. Respond to and act as decision - making authority for recommendations proposed by the Project Team 3. Provide guidance to Project Team 4. Support implementation of approved recommendations. Sponsor: 1. Approve and support project as outlined in charter,' 2. Provide support and resources to project 3. Provide input on draft recommendations 4. Partner with Project Team to promote project Project Manager: 1. Monitor consistency with the Team Charter 2. Schedule Project Team meetings, create agendas, and distribute meeting outcomes 3. Provide project updates to Executive Steering Group, Sponsor, Project Team and P &R Department 4. Request guidance or clarification from Executive Steering Group when necessary Project Team: 1. Meet regularly to pursue completion of the projec 2. Guide the project according to the Charter 3. Develop and facilitate ad hoc teams 4. Champion the. project 5. - ,.Develop and present recommendations to the Executive Steering Group for consideration Ad Hoc Teams: Meet regularly to pursue completion of the project 2. Develop workplans in line with both the project objectives and respective ad hoc team objectives 3. Coordinate workplans with other ad hoc teams 4. Champion the project 5. Develop and present recommendations to the Project Team for consideration Individual Members: 1. Regularly attend and actively participate in meetings. 2. Be prepared for Team meetings. 3. Consult with your division regarding agenda items prior to each meeting so you are prepared to communicate your division's processes and needs. 4. Identify additional staff that should be invited to specific Team meetings. Tukwila Parks & Recreation — Park Watch Program - 6 - 106 5/20/15 DRAFT Attachment B 5. For every problem you identify, bring two solutions. 6. Share pertinent work products. 7. Share individual experiences and opinions. 8. Advise the project manager promptly of any circumstances, which preclude the member from fulfilling their responsibilities. 9. Accomplish the work tasks. 10. Report to your division the Team's activities. Project Team Member Vacancy Replacement The Project Team will submit names of recommended people to fill the vacancy for the Executive Steering Group to evaluate and make a final decision. Operating Guidelines 1. Come prepared ed 2. Be present and engag 3. Throw titles out of the window — we are equal in this room 4. Everyone is accountable to the work assigned to them 5. No cross talk (respect the speaker & no side conversations) 6. Speak your truth, it is okay to challenge each other 7. Don't speak for anyone else but yourself (unless, with permission) 8. Reserve the right to revisit decisions made & information sheet 9. Assume the best intentions and check for understanding 10. The past is used for lessons learned. Focus, on how we can move forward. (Be solution oriented not problem oriented) 11. There needs to be agreement /group support on what messages go out to the other staff 12. We seek agreement /support from everyone 13. Agreement/support indicator will be thumbs up, down, or sideways 14. Don't make it personal and don't take it personal 15. Keep your calendar up to date Tukwila Parks & Recreation — Park Watch Program - 7 - 5/20/15 107 DRAFT Attachment B Values The Team fully supports the values of the City of Tukwila through our actions and work products for this project. Caring We support the diverse community we serve with compassion, empathy and kindness. [Caring about and making a positive impact in the lives of our fellow human beings is at the heart of everything we do.] Professional We hold ourselves to the highest ethical standards and, act with integrity and transparency. We are respectful and courteous with all. [We take great pride in bringing a high level of skill, expertise, quality and commitment to the services we provide for our community and each other.] Responsive We are timely and effective in the delivery of great customer service. We continually strive to find innovative ways to improve. [We are committed to serving our diverse community in a meaningful and relevant ways that are consistent with, our mission.] Tukwila Parks & Recreation — Park Watch Program 5/20/15 -8- 108 DRAFT Attachment B Team Endorsement "We, the undersigned, approve and endorse this Park Watch Program Project and are committed to actively supporting it. We accept responsibility for fulfilling any aspect of the Team Charter that applies to us, including providing resources, actively participating, and effectively communicating. We know what to do and are prepared to act. Our endorsement is an active and positive statement that we are committed to fulfilling the responsibilities designated in this Team Charter." Dated this day of , 2015. Executive Steering Group: (Proposed) Councilmember Councilmember David Cline, City Administrator Rick Still, Parks & Recreation Director Project Team: Rick Still, P &R Director Dave Johnson, P &R Superintendent Robert Eaton, P &R Superintendent Tracy Gallaway, P &R'Superintendent Stephanie Gardner, P &R Analyst Tukwila Parks & Recreation — Park Watch Program - 9 - 5/20/15 109 110 Attachment C Park Watch - Ad Hoc Teams DRAFT PWP Kick -off Event: Wednesday, May 27, 2015 2:30pm - 4:00pm, TCC Meeting Room A 111 Robert - Facilitator (PM) Tracy - Facilitator Stephanie - Facilitator Robert - Facilitator Dave - Facilitator Robert - Facilitator Dave Rachel Bianchi Shannon Kris Warren Kris Rick Tracy Joyce Stacey Chris Portman Stephanie Kris Nate Brandon Rick Mitchell OR Tracy Brett Brian Zach Anderson Malcolm Tesh Randy Tim Gia3j. <. din i u a .,.,. To develop consistent professional messaging of the program that can be utilized by all Ad Hocs To plan "See you in the park' events To establish connections between staff and neighbors /neighborhoods (` ;. To establish connections between staff and local business around parks and trails ' a To partner with Parks Maintenance on issues in the parks Identify /Coordinate the outreach to neighborhoods around the parks To determine how to promote Health and Wellness to neighbors long -term To develop plan /steps for connecting with neighborhoods To develop plan /steps for connecting with local businesses To partner with the City's Hot Spots team on issues in and around the parks To assist other Ad Hocs with the development of communication materials (to maintain consistency) To implement the neighborhood connection workplan To implement the local businesses connection workplan To develop processes to expedite response and action times To coordinate with the City's Communication Dept for messaging and timing of neighborhood outreach ( doorbelling or mtgs, etc.) To determine what the Park Watch Program can glean from and partner with the existing Block Watch Program To identify potential local business volunteer opportunities To develop CPTED plan for all parks and trails (identify areas (or potential areas) for modified maintenance to enhance safety in the parks) To identify existing local neighborhood groups (like block watch, McMicken Heights, etc.) To further develop and strengthen the identified existing neighborhood groups to involve the local neighborhood parks To further develop and strengthen the identified existing neighborhood groups to involve the local neighborhood parks To be an initial contact to local businesses then connect them with Parks Maintenance Staff „'..,' f.- 4 , -."tea„ .'�'&r r , ; �� >..g �, ✓�,.��¢. �: ,8 . : r ova+ -l., ..; ,.�.�i ..§'.. �.� Strengthen connections between staff and neighbors . � .; ya.�.. Strengthen connections between staff and neighbors , ,, � :�.° Implement CPTED plan ...perform inspections, Develop... 4t z s k -a r.e 9 "e... a, .. q... ,.,F. ... -, Plan Park Events s....... �aS.k, 'a"y Doorbelling Plan Outreach to Bicentennial Park & Tukwila Pond Businesses. � V' Develop Workplan, Scope and Purpose Ouline steps /process of PWP Develop Communication Plan Give Updates from Ad Hocs Develop Communication Materials Develop "Passport" Develop Outreach Plan Focus on Fall 2015 Events Work with existing Hot Spots Team Members Develop "The Common Message" for staff to use @ Events What can PWP glean from block watch program Connect with Bike Groups PWP Kick -off Event: Wednesday, May 27, 2015 2:30pm - 4:00pm, TCC Meeting Room A 111 112 DRAFT Attachment D Park Watch Ad Hoc Kick -off Event 5/27/15 2:30PM, TCC Meeting Room A I. Park Watch Program Overview (5min) II. Overview of each Ad Hoc's Role (as defined in the Charter) (5min) A. Communication #1 1. Develop communication plan (timeline /methods /frequency) 2. Assist other Ad Hocs on development of the material B. Events #2 1. Plan logistics of events (food, activities, layout, amenities, etc.) C. Community Connection #3 1. How do we connect with people? a. to get them to come to the events (materials, work with #1) b. while they are at the events (work with #2) c. to establish long -term connections d. best way for them to communicate with parks (parkswatch email, Kris's number, etc.) D. Business Connection #4 1. How do we connect with people? a. to get them to come to the events (materials, work with #1) b. while they are at the events (work with #2) c. to establish long -term connections d. best way for them to communicate with parks (parkswatch email, Kris's number, etc.) Park Safety #5 1. Educational element of when to call police, when to call parks, etc. CPTED of Park and Trail System Ill. Review each Ad Hoc's Objectives (5min) IV. Identify Key Dates (i.e. doorbelling 3 weeks prior to first Event) (5min) V. Break into Ad Hocs (60min) A. Develop workplan /assignments to team members B. Determine Meeting Schedule /Frequency (keep in time with other Ad Hocs and project schedule) 113 114 Attachment E Park Watch Program & City's Strategic Plan Goals Strategic Plan: Goal 1. A Community of Inviting Neighborhoods and Vibrant Business Districts A. Cultivate community ownership of shared spaces. B. Build a broad and collaborative approach to preventing crime and increasing the sense of safety. Goal 4. A High - Performing & Effective Organization D. Ensure City facilities are safe, efficient, and inviting to the public. Goal 5. A Positive Community Identity & Image A. Improve the City's ability to build trust and work with all members of the Tukwila community. C. Promote a positive identity and image of Tukwila. PROS Plan: Goal 2: A Sense of Community — PROS system builds community cohesion with opportunities for social interaction and gathering of all sizes, with designs that strengthen Tukwila's identity. Goal 4: Safe, Inviting & Affordable — Parks and facilities are safe, well maintained and clean; and programs and services are welcoming and accessible for all people. 4.2 Develop master plans /site designs to guide all park improvements and achieve cohesive design and efficient phasing of projects. 4.3 Involve the community in all aspects of project and program planning and implementation 4.4 Involve partners /volunteers in park construction /maintenance to build ownership & reduce City's costs 4.7 Maintain park and public spaces so that they are safe, clean and welcoming. Priorities 2015: #2 Community Livability #3 Create Community Partners to Implement City -wide Plans and Visions #5 Continue to Create a More Effective Organization #6 Improved Communications and Community identity Mayoral Focus 2015: #1 Improving Residential Quality of Life and a Positive Image of Tukwila. Parks Commission Objectives: #1 To submit recommendation to the City Council on the acquisition, development, expansion and operation of parks and recreation facilities and programs in the City. #2 To advocate for health and active lifestyles and promote the quality of life that is provided through the programs and actions of the City's Parks and Recreation Department. #3 To recommend policy and standards for the construction, development, maintenance and operations of parks, playfields, and recreation grounds belonging to or leased by the City. City Mission: To provide superior services that support a safe, inviting and healthy environment for our residents, businesses and guests. City Values: Caring Professional Responsive 115 116 Community Affairs & Parks Committee Minutes May 26, 2015 - Page 2 The Tukwila Park Commission unanimously recommended the partnership at its May meeting. The Committee unanimously supported the pursuit of the Green City partnership via a budget amendment proposal and draft agreement. UNANIMOUS APPROVAL TO RETURN TO COMMITTEE. C. Park Watch Program Staff provided a status update of the Park Watch Program that has been in development since 2014. This program aims to connect City staff with park users and various neighborhoods in an effort to improve communications, connections and livability. The project charter, scope and schedule were described to Committee members. A kick -off meeting for several ad -hoc committees will take place on May 27, 2015. Several "See you in the Park" events are being planned for this summer. Committee members expressed support for the program. Coucilmember Robertson emphasized the importance of outreach and communication as community members have a lot of valuable information to share regarding their parks. INFORMATION ONLY. D. Bid Award: Duwamish Hill Preserve Phase 2 Staff is seeking Council approval to award a construction bid in the amount of $620,587.22 to Paul Brothers, Inc. for the construction of the Duwamish Hill Preserve Phase 2 Project. Paul Brothers, Inc is the low bid of five received and has successful constructed other municipal projects in the Northwest. UNANIMOUS APPROVAL. FORWARD TO JUNE 1, 2015 REGULAR CONSENT AGENDA. III. MISCELLANEOUS Meeting adjourned at 6:45 p.m Next meeting: Monday, June 8, 2015 Committee Chair Approval Minutes by LH 117 118 Upcoming Meetings & Events June 2015 8th (Monday) 9th (Tuesday) 10th (Wednesday) 11th (Thursday) 12th (Friday) 13th (Saturday) > Community Affairs & Parks Cmte, 5:30 PM (Hazelnut Conference Room) > City Council Committee of the Whole Mtg., 7:00 PM (Council Chambers) C.O.W. to be immediately followed by a Special Mtg. ➢ Utilities Cmte, 5:30 PM (Foster Conference Room) > Tukwila International Boulevard Action Cmte, 7:00 PM (Valley View Sewer Dist., 3460 S 148th) ➢ Regional Fire Authority Annexation Steering Committee 5:30 -7:30 PM (Fire Station 51, 444 Andover Park East) > Equity & Diversity Commission, 5:15 PM RESCHEDULED FROM 6/4/15 (Hazelnut Conference Room) ➢ COPCAB, 6:30 PM (Hazelnut— 6200 Southcenter Blvd) Bulky Waste Curbside Collection Day. Pickup starts at 7:00 am. (for Waste Management residential customers). For more information visit: wmnorthwest.com / tukwila or call 1- 855 - 885 -9452. Council Chat 10:00 AM to 12:00 NOON* Talk with a Tukwila City Councilmember about anything on your mind regarding Tukwila. *Note special meeting location this month: (Neighborhood Resource Center on Tukwila International Boulevard) 15th (Monday) 16th (Tuesday) 17th (Wednesday) 18th (Thursday) 19th (Friday) 20th (Saturday) > Transportation Cmte, 5:15 PM (Foster Conference Room) ➢ City Council Regular Mtg., 7:00 PM (Council Chambers) ➢ Finance & Safety Cmte, 5:30 PM (Hazelnut Conference Room) Teen Summer Kickoff Festival! Noon 4:30 PM (Foster High School football stadium) There will be inflatables, music, basketball tournaments, BBQ, dunk tank and more for the teens in grades 6 -12 to enjoy! This is a free event. > Park Commission, 5:30 PM (Community Center) > Planning Commission, Work Session on Housing and Residential Neighborhoods Elements of the Comp. Plan 6:30 PM (Rainier Conference Room, 6300 Southcenter Blvd) ➢Tukwila Historical Society, 7:00 PM (Tukwila Heritage & Cultural Center, 14475 59`h Ave S.) Duwamish Alive! Volunteer event at the Duwamish Hill Preserve 10:00 AM — 1:00 PM (3800 South 115 Street) > Arts Commission: 1st Tues., 5:00 PM, Tukwila Community Center. Contact Stephanie Gardner at 206 - 767 -2342. > Civil Service Commission: 1st Mon., 5:00 PM, Hazelnut Conf Room. Contact Kim Gilman at 206- 431 -2187. > Community Affairs & Parks Committee: 2nd & 4th Mon., 5:30 PM, Hazelnut Conf. (A) Update on medical cannabis. > COPCAB (Community Oriented Policing Citizens Adv. Board): 2nd Thurs., 6:30 PM, Duwamish Conference Room. Contact Chris Partman at 206 - 431 -2197. > Equity & Diversity Commission: 1st Thurs., 5:15 PM, Hazelnut Conf. Room. Contact Joyce Trantina at 206- 433 -1868. >Finance & Safety Committee: 1st & 3rd Tues., 5:30 PM, Hazelnut Conf. Room. > Library Advisory Board: 1st Tues., 7:00 PM, Community Center. Contact Tracy Gallaway at 206 - 767 -2305. ➢Park Commission: 3rd Wed., 5:30 PM, Community Center. Contact Dave Johnson at 206 - 767 -2308. Planning Commission/Board of Architectural Review: 4th Thurs., 6:30 PM, Council Chambers at City Hall. Contact Wynetta Bivens at 206 -431 -3670 > Transportation Committee: 1st & 3rd Mon., 5:15 PM, Foster Conf. Room >Tukwila Historical Society: 3rd Thurs., 7:00 PM , Tukwila Heritage & Cultural Center, 14475 59'" Avenue S. Contact Louise Jones -Brown 206 - 244 -4478. >Tukwila lnt'l. Blvd. Action Cmte: 2nd Tues., 7:00 PM, Valley View Sewer District. Contact Chief Villa at 206 - 433 -1815. ➢Utilities Committee: 2nd & 4th Tues., 5:30 PM, Foster Conf. Room. (A) 2015 Annual Small Drainage Program Bid Award. (B) APE Water & Sewer Replacement and Macadam Rd S Water Upgrade Projects — Consultant Recommendation and Agreement. 119 Tentative Agenda Schedule MEETING 1 REGULAR MEETING 2 C.O.W. June 1 8 See agenda packet cover sheet for this week's agenda (June 8 2015 Committee of the Whole Meeting). 15 Special Presentation: Introduction of Police Records Specialist, Christina Titiahi. Unfinished Business: - A resolution for the TIP. -An update on the Regional Fire Authority process. - Accept 3 grants for CTR Program. 22 Special Issues: Discussion and consensus on Sound Cities Association Public Issues Committee (SCA PIC) Items. Committee of the Whole meeting to be followed by Special Meeting. 120