Loading...
HomeMy WebLinkAboutPermit B93-0139 - SEAFIRST BANK - DRIVE THRUsty:" , . eit\t-PIR5T f3A‘klif City o 7hkwili (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 Permit No: B93 -0139 Type: B- REROOF Category: NRES Address: 225 TUKWILA PY Location: Parcel #: 359700 -0257 Contractor License No.: REROOF PERMIT Status: ISSUED Issued:: 04 /23/1993 Expires: 10 /20/1993 Type of Occupancy: 0003 TENANT SEAFIRST BANK DRIVE THRU 225 TUKWILA PY, TUKWILA, WA 98188 OWNER SEATTLE 1ST BANK PROPERTIES PO BOX 34033, SEATTLE „WA ..9.81.2.4.•1033 CONTRACTOR FIELDS ROOF SERVI:CE 25924 78TH AVENUE'SOUTH, KENT, WF1`4.9802;, CONTACT ARTHUR HOFF Phone: 206 852 -4974 25924 78TH •AVENUE;'SOUTH; KENT, WA 98032 ******• k************ �**• k *tk.tk*k *** * *k*fit * * ** *•k * *�* ** C'k * *6* * * * *** *lk *.fir* * * ** *fir *fir ***** ar 1. rte, Permit DescripttOri: RECOVER./, ISTIN,G BUR WITH TORCH'DOWN SYSTEM. Phone: 206 852 -4974 Valuatio 5,504.00 ********** *),4:* * ** * * * * ***** * *A1,*4i 4********** k * * * * * *** *4 * * ** * *,fir0, * ** * ** Total Permit Fee: 85.50 Permit , epter Authorized S'ign'ature ate; 1 hereby- cer•t,:ify that 1'" have"r..ead,.and examined °this permit' and` know the same to; b;e trues.., and c'orrect'. -"A'l l prov;i s i {ons of 'law and or;d i nan,ces governing;.ttlis work will be�' compl`�i'e;d with ir�.y , whether specified hereor~ not. The granting , of this permit' clues not presume to. give author;ty .to visolate or canceil;f the,, provisions of any other`; state or local, laws regulating construch.oristhe performance of work. f,.1'� ani °authorized to; sign';':for and obtain th`j�s'; bu`i ld.,i'n, "permit. `' ' rDate ,.. :. This permit ,shall ` "gip' tcome null and voikdz i�f� ;he work is ppt commenced within 180 days from the dat;e� of i ssuance, for; i f,; the work �s suspended or abandoned for a period tofw 18.0 days��i'om the-'''•last tnsp:e'etion. CITY OF TUKWI . Department of Co ,munity Development — Permit Cent& 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Building Permit Application Tracking PLAN CHECK NUMBER eft3- -0 131 PROJECT NAME S2oE akr\K SITE ADDRESS cJ mil) SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPARTMENT. DATE IN. BUILDING - I_ct3 initial review 3 FIRE .: AP:P.ROVED. IZZ/5) _ IROUTED REQUIREMENT CONSULTANT: Date Sent - MMEN Date Approved - FIRE PROTECTION: Sprinklers • Detectors • N/A INIT: FIRE DEPT. LETTER DATED: INSPECTOR: 3 PLANNING ZONING: BAR/LAND USE CONDITIONS? INIT: REFERENCE FILE NOS.: MINIMUM SETBACKS: N- s- E- 0 PUBLIC WORKS UTILITY PERMITS REQUIRED? ( ) Yes () N INIT: PUBLIC WORKS LETTER DATED: 3 OTHER BUILDING - final review X BUILDING OFFICIAL 'FIAT> INIT: 9/711c773 INIT: INIT: TYPE OF CONSTRUCTION: CERT. OF OCCUPANCY? QYes QNo UBC EDITION (year): REVIEW COMPLETED AMOUNT OWING: th CONTACTED T e r U r O4 3`6 U21(11- DATE NOTIFIED 1 -, C� 3 BY: (init.) s__6E) BY: (init.) 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) 01/08/93 ►> ;v 1 1,41Ks0,1' q{3/ _ 34 72 Gti 06 /•'5r CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 DESCRIPTION (206) 431 -3670 1',$%:.; •56 BUILDING PERMIT APPLICATION BUILDING PERMITFEE AMOUNT RCPT::;# `DATE 5t PLAN NUMBER CHECK SCi -S- 0 13 6j APPLICATION MUST BE FILLED OUT : COMPLETELY PLAN CHECK FEE <' BUILDING SURCHARGE OTHER: TOTAL:, SITE ADDRESS ,;2.5 71,tkw,1...4 PROJECT NAME/TENANT SUITE # P4K'Ku?4Y VALUE OF CONSTRUCTION - $ (5l/11a7- TYPE F OF LTNew Building WORK: O Rack Storage Li Addition Reroof ASSESSOR ACCOUNT # THgt4. oY 5-1 L -Tenant Improvement (commercial) U Demolition (building) 0 Remodel (residential) 0 Other DESCRIBE WORK TO BE DONE: �FL4 ► ✓G /L e xis j/,o 6N/t. (.U/7 /i (1 /4.6i•r boa,A) 5 yS FM BUILDING USE (office, warehouse, etc.) B,4.)K 2IVE - r1-1/cu FAc. it_ . NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? No 0 Yes If Yes, new building requirements may need to be met. Please explain: SQUARE FOOTAGE - Building: Tenant Space: Area of Construction: v300 WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? g No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER -4A �-� A/44,4, ' PT HONE 30, ,. /�, ADDRESS f o,. g6-K 3 5‘a 3 3 .e0,--.7&1( /Y /. .V ZIP CONTRACTOR Fl 06 ,6 5" 4dOF .S'Eg✓icy /41‘'.- PHONE is-;2. `/17 jl ADDRESS 2S )f if t!' Ave 5', /C e,v 7 vu /q. ZIP g , WA. ST. CONTRACTOR'S LICENSE # F 1 _ F L - biz. .. S ,pb J 4 EXP. DATE l PHONE / r ARCHITECT /11 ,<)--- ADDRESS ZIP ERIEBY;:CERTI.FY >TH11 BE TRUE :AND CORREC VE RE Mai BUILDING OWNER SIGNATURE OR AUTHORIZED AGENT PRINT NAME 4 ..J ADDRESS, /mil ��f� ,ASE s PP , &i7 1414 CONTACT PERSON DATE H'a, Iq3 PHONE 7sd - y! 7)./ CITY /IP • ffaj' y PHONE APPLICATsON SUBMITTAL in order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT tf the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. DATE APPLICATION ACCEPTED IGD DATE APPLICATION EXPIRES 11) It)] 1q3 09/16/91 COMMERCIAL , , ................................................................................................................................... iNEvficOMNIEFICIAL .,„ .„ ..„ . .„ . . .• D,.•.Completed. budding application permit appon(one . • .•.: • • . • :•• •••• • each . . . . :•Astisser.ACcount Wumber SL113MITTAL CHECKLIST :.:. the • ••• • . " • ."' 8pecificaons • • ....... . D..ptroctutai.calculationis stamped. bya Washfrtgtorf „ . . . . •• Solis report stamped by a Washington State liconse4artgirteer:i.: ............. •.• • :.• • . : • : TopographIcial,oupieY pi Energy calculations stamped by a Washington State licensed engineer or architect ; , :::::„;,•,, fl Legal .• •,•.• • , :•... • . dascipbon .......„; Working :drawings ,. stamped by a Washington State licensed • .„...... ........... ...„ ••••••••••.• Elevations .::• ••••••••:::::••• . . . . .. .Lflndaoapo . : .•Ccirppleted.utility:parrnit.appliCation(one:10.entire: proj • • •' •• • • •••••••••• Six (6) sets of civil drawings :: • • ,.....;•,•.:••• ,1„,„ •••• ...• ..• NOTE See'utilitypiinnif •ippliCatiorT' andcheottist . . ........ .„:..,.. submittal requirements., .:” • . • • • • ." • . .. .. • • . .... . RACK STORAGE „.„„. Completed bitikling.:permikfipplica, Assossor Account Number : [11 : • •.• " • •.• . • . . . Two (2) sets of plank which Building floor plan showing • ..; • Entirsi•SPriCa..■iittpfe fitOks•will be • • • Dlmensions af afl a1s1e •••• Li Tenant space lloOrp1nri showing !Op), *pl#:,00!#yout;::04t..:01d.••••••:;.. NOTE::4nclude dimehaions'af rackelhaight,*dtfiand :and tack ..slap! on pI.an ::•• • • •-;•• • •••••••.• ••• Structural caldulotions•stamPed by a Washington Stata Unsed ••••• ..: engineer (nicht storage and . . RESIDENTIAL . . . ... ,..„ . . COMMERCIAL „... TENAHT IMPROVEMENTh • Completed bE.I!!diptfiiii000..*14*.t46.6•:;O:ni!•fiii:•.0cti)i*p.,Ii*:,or •:•••• • Assessor Acc :•••:::'•:•71#0 • ttPO;P.. • p . .,•„ . : .. . . . : . ...„...... of adjacent (common •WallYtentint::%,, .. • • Tenant space pian wtth usa ot each room Iabolled • ” • Now walis, existing wail, and waIi to be domoiishec • .:.•:•, • .......„........••••••...................••• ••••••••••••••.....,•••::•:::•. ;hod of "..,.."':::•:•:,:','ettantfinet.it fat and,.011ing •,„ tioito • • ineybare.ettire4.1f.attioltirelWorlt1ije be.clOne'.(?;,:eff. •••-•""••• akifaiiiaaParafa:UillfY.Pik.' • aP/0010# ............................................................................. ..... . . .... . . ............... HERCOF [1 Completed bulIcng perrnit appUaton (one for each Assessor Accouflt Number Warrative descnblng existing roof TE..:Acertifleatlen Iattotis off tflp rad pr:if removed, and NEW SINGLE.FAMILY.:::DWELLINGS/ADDITIONS.;::.,:.::::i*:::.... ::.::,1..':'.1: .. ....:6':,.,'...:::::::::::::::::".1'.::•:1::;,;.::::':::',.:;'.:::•.'':'::•:,•''''..:...i:::::::::::',.:.::' . '::.:::.....:..:....,:::::::::::.:...Y..::::.::.7::1.:.:::::::::.C.::...:...':'.:'...:::::.:::.„::..:.,-..::.: . Conic:dated building :permit application (one for:eactt:sstructure),;',',':•:',":i1:::: - ,....*:.,::::,.,........,". • .,•,..::•:•,...,•; .....: ••:•-,, .••• ,•:••:•:•;.•,.. :•,.•••,....,...I.,...;:..: .....••,..,.,•:::,•••:...:........,•:..............::.•,:•••••....,:••••:•:•:••••••• A04eitOr 1%.cX?i,rit.NtiMber.:•:::::::::',:.•::::i::::::::::::',.::;;;;::::::::::::::•••,:.:;'•;',.:::1;;'..•:;:;i;:;;;;,';•::::::,•,:::::.g.::::::::::::::::;:::;4::::::„;•:;•::.:1;::::,i .1...egnldescription..,...,.:::::::•:.„;:.,..;::;.,:•,„.„„:,;:;:::•:;::;;::,„...„::::,..,:„.2.„...,,;:.....;:,,:,,::::,;;;;,...:„:.,.,.:.:::::.;,...,:„..., ...• : ••••• "•,• . ,•• . :::::,.• ....., . „•....• .......,„::,......„.„.„..., . „..;:„.,..::::.,;,„;:,.:,:;•..„...;.,,;:•;• :„,....,...:•:::.;;•,,,.....,.::::::„„:::,„:„....;.:„...... TWoapte.. (2) Of.Worlting :draWings;,:wnlen:include :: •••••••• -...............„,....„:......„.„„:„.„...,. . :::::::;,;:::,;,, .•:•:::::',.!.' Ste. pleuv:::••■•••••••••■•1 lon.piari,41*.itif..det hydrant ::,...:,....; Foundation plan forilucfsosi re buflOtra;.StrOwIr.4.;', • „:":. • ■.Floor. plan ':::::. •::::::: ::::: :::::;:y :.::::::::::::::••wiOrtr. sod length of accass.). • • Roof plan' .,.•:•„.• ',....:' •::' ' :' .• • •:-..'::::': ..•••••::::::.: :: '••••,:•-•'•.::: -,::::••:. ; . :: • •• : • Building 'elevations (all views) ::•••:. : ::...:, :.:•: .: ..••.,: : • ::•:: ....:::•... Building cross-sectiOn„...:• ....i.:•:: .,•.:•;•:.•..:..• •;: • : '1.•:;.::•....:,. :::„.:',.:...,...:. .:,.....•.StructUrni framing plans.:::. :1:::••.::::::•:::...:.•:.;.;: , ,:::::::',.::;;,.... . : . .:::::;:::',;::::',..,•,:::.,:::;',::::::::::::::..: „ ..:. ••••:•...:.;,...,-.:,..;,.......::::..,...„.„ ; „,... ...„:, ...,...,„,...-.„,,,•••:•;,,•,,,.•,,,:,...,,,...„,„....,......„..„:„:„.: .:...,... EWashington State Energy Code data :::::;::•••:::.::::.,..'....:.:::::::.•„,::;,:.:::;;:::::::::,;.:::::,;;:;:::::::::::;:....,..:::;..,. .,, ,::;.::,,..::::::.:.,::. .....:....,..:,:.„;,;.........:,:.,:.-;... ..••.•:.:::::.:..:::::,• ......•:..;;•„:,,:::,....•;:::::::::•,........;:.•,....;,..•;.•,:.:,:;„:::::::::„:;:;•:::::::::;.;•:, :::„:, i:.[-----1 Completed 'Utility :Permit applicatiOn:'...• ''.:.,:::,:::'::::::::1,-;::'::::::,..:::',.;.,,•:•:!;::::::::,;:::;;::.::::::::.,::,..ii•-.::::,',:ii:;',':.:',':':::',:. ,.. . . ...,.. :....:,. ...,.:;.,.:...,.• ,•:,, , : ,-.: .., : .. .., , • .„ • • , „ ......•.:.,.: ::,...,:•,',::::::::.•.::,••.:•,,,,„:':::::::;,:.,...-,,-...,..:;.,,,.'„;.,.,..,..::• Six • (6) sets of site plans showing utilitip6..:••:::::::,:•.:,:..5-::.•••::•::•:•,'.."•..;:::::::•:::1:::...:•:•••:•::i::•.::::•.:::•'••••'.•: •..... :,... ,:::. .. . . •.' • '.... ' '. ••••. • • • ••••: :.. : ... ••••: '• .]•••• :•:•••:.•:•••:•••::•".•••.•:•••,•' •:•.:...::!:.1..... ....NOTE:. Building she plan and utility silo, plan maybe Combined ..:- See::.::...,..:::::: utility permit application and checklist for ;pacific. submittatraquiramen* Ackitional topographkal and soils . information may be required if. uniqua site conditions: . . - . • . • • ' • . . • . • • . • ............,„:. Cemplate•:1biillOrig permit :siipilleattOti.:(eee•icit"eack: Assessor Account Number • . . . . . . . . • ... • „ ":"..: ......„.... .........•••••••••• ••••••••• ••• • . • •••••••••-• ••••• • ••••• •-• ••.".••••.••••••” •• ••••.•• ••• •• ....... ....... • • • .. .1 • . 1 TO01:00klit) • • BUR4'°11fi li1:11'n7'ele va. • Building •Structural fraMing plans „ . NOTE: If any Udfify.. work M to be goner provide thility:parrnif application and plans must .. . . . . . ............. . . ::„ • Conitilood building P PIP !!:OPPIic#00n roe el*h•8010turff).::: • : E Assessor Account Narrative describing eXIsting:reof;:.,inaterlal being recnOied,',1110,: •• material being Instalied ••'• : : : • . : •:, : . NOTE: A certification letter Is reqUked prier to final Inspktion and sign off of the permit. • , • * k******1 4*********************** * * * * ** *k * * * * * * *i4 * ** * * * * ***'* ** ** CITY OF- 'TUKWIL;A .WA TRANSMIT * * *. * * * ** r.***** yr******** r1..**'! Y******4 r4: k * * * *** *4 * * ** * * *. * ** * * * *4 * ** *4 TRANSMIT``Number■::9300.049.6 Amaurite .. 85..50 04/2)./93 .09:47 Permit i No: D93 -013'9 ;Type :.8 EROQF `REROOF PERMIT /21/3 ac P : 700-'0257 rite Addr.e4si :225 :TUKWIL.A. PY, Pay;mevit Meth.oda `CHECK NatatianI 'FIELDS ROOF',;3ERV ` Inita .8143 * 4*** v4******** k4******:**** 4** k * * ** * **'*7(* * * * *,r4 ** ** * * *4* *fi4, * * * * * *4 Account: Cade `pescr'ipt`.iun Paid 0•00/322.10o.. BUILDING;. N0NItES ' :81.00 000/306.904 STATE .nU):LDING SURCHARGE. "4.50 Fatal This Payment) 85..50 Total 'F'.ees: 85.50 All: Payments. 85,.50 Ralartcea; .00 M CENE3i'A 81.00: GENERA 4.50 TOTAL 85.50 CHECK 85.50 CHANCE,' 0.00. 9957A000 15:08 CITY OF TUKWILA REROOF CONDITIONS Permit No: B93-0139 Project Name: SEAFIRST BANK DRIVE THRU Address: 225 TUKWILA PY * * *** ** * * *4 *It * *:* ** * * loOZA*C Icit*n. 0 clle * A * 'k******* *4:44-)Qtzic.* 401( * * -le* * * * • * * * * * 1( le * * * THE FOLLOWING CONDITIONS 1WILL APPLY, TO R1-ROOF PERMITS ERMIT5: , I . All rceloofing,„.yroJectS will )';bp accomplished 41W,gc'opti*ce wi th 2. Appeniil x Chapter 2. azv.6-,f7 Building , C6'.04 (UBCY InOcOons: ' „ 34 ' ' ■0.? ■■6..' '11; .0, Pe • -, ,, ,,.,,,, L , • . pp,,,New,,,rof coverings shall:not. ap0 1 i ed wi thout first ' feolkhilngl a pre rOof.Ing nspe,41 on from the BO Id tri,g,,,,,,; Noi 4 DlAwitmand ',weTtton aRDfovaTtOilii'vtlIg Bui 1 dinq, Fifep„eCtei The pre-roofing ) ntto, i4,411 pay,,,,Aart i Cularl, att'entlonto evidence 91-AopitiutatiAn of ::Water( Where extentiWROn0ng . ofwater, T-s 'ntan 'anill,y0e-o"-F:4.1e roof s0-tretur 4*r camel wiCe41A tedt ydr0 2o \,1:1F3c- shall 1. be made and,,,,,,1 J,41 c615,11*Fttme Thtiiefs,f1 such. A ',,,,.'.;:iJopalifson of roof draAnt or. vf,A scuppers, reS1.00,n4pef tt*,,,r0,9/4til,14ctural changes, shall 1).e7i .4pspmk1 i shed . Ap Inspece419,..i'c9yer4ng,,the tbo4,lis ted t o 1)4;4, p rOp, a r e d by a .' qua 1 i Al os-spOtoto& Inspector, e'Jas. owdil :Aet arptpeda by the Building 4Qfditairi„ may ba accepted In 1 i si2eu cNk ',i10 ,;'prelnspectiOn by the Bui 1(0ngs*--.J.,*pf,oior.'%,lx A / B. AWArial Anspect,ion and approval 's4.41/1,,,,,bV,1,6btaiped from ) the BVTding 'Division ;.when .thire-roof4ngt6 coApOte. As a contfftlon litof the 01141 inspection foi4 roofs Ofat require a f irevAp,orlaiit roof cottemtng;vunde'r the prqVitloplOf , Tab 1 e: 32-A,N1'988 UBC, the roof installer shall :pro014Ahe I rispoctoOW a writtOneStOt*iiiiit indi cat ind:0,fre fol lowing k 141„ 0 4 ';04. .d.'fr,, ,,,,, • (or s om e ttitritiksym i 1 a r) : ,,,,)' j,q.. 4.Y4-----, ,;A % ;- I HAVE INSTALLED A ROOF MEMIW ' Eli R $',6)1,P,,i.,- Dlisl INSULATION IF APPLICABLE, CONSISTING OF (MAN PAZ ' ..tWISPEC FICATION # .' , DATA SHEET ENCLOSED, WHICH MEETS OR EXCEEDS THE REQUIREMENTS, FOR CLASS A OR CLASS B ROOFS. THIS ROOF WAS INSTALLED AT (ADDRESS) , UNDER CITY OF TUKWILA PERMIT NO. tri2013c1. (The statement shall include the name of the :roofing - company that instal 100 the roof ,,:.stgnature 'oflntta 1 ler and date.) . . _ .. Above All A Fields Roof FRS FIELDS ROOF SERVICE, INC. I.HAVE INSTALLED A ROOF MEMBRANE ASSEMBLY, CONSISTING OF FIELD'S CORPORATION SPECIFICATION # 2- BP -R", (DATA SHEET ENCLOSED) WHICH. MEETS OR EXCEEDS THE REQUIREMENTS FOR CLASS B ROOFS. THIS ROOF WAS INSTALLED AT 225 TUKWILA PARKWAY, UNDER CITY OF TUKWILA PERMIT NO. B93-0139. ashington 98032; • (206) 652-4974 (206) 952 -3744 • z O er 25 Years Experience; Contractor, Reg. No. FLEE. -DR- 52621:1; SPECIFICATION Benefits 2 -BP -R • Cold asphalt flex • Polyester strength • Aluminum reflectivity 12+ YEAR TYPE ROOF' Specification Summary This Fields high performance roof maintenance specification is designed to extend the life of suitable existing roof systems. This system includes one FIELDS GLASS base sheet and one FIELDS POLYESTER ply sheet adhered with FIELDS F100 FIBERED ROOF COATING, hereinafter referred to as FIELDS F100 COLD ASPHALT. The FIELDS POLYESTER ply sheet is flood coated with FIELDS F100 COLD ASPHALT, which is allowed to set up, and then surfaced with FIELDS F600 FIBERED ALUMINUM COATING. Optional surface applications may be selected to meet regional roofing practices. Materials Per 100 Square Feet Quantity FIELDS F400 ROOF PRIMER (optional) 1/2 -1 gal. FIELDS GLASS F51 BASE II 108 sq. ft. FIELDS POLYESTER E3N OR T254 PLY 108 sq. ft. FIELDS F100 COLD ASPHALT (3 1/2 gallons /sheet) 7 gals. FIELDS F100 COLD ASPHALT (Flood Coat) 3 1/2 gals. FIELDS F600 FIBERED ALUMINUM COATING 1 gal. Optional Surface Applications Per 100 Square Feet Quantity GRANULES (Applied Over Flood Coat) 60 lbs. FIELDS F500 ALUMINUM COATING (Applied Over Flood Coat) 1 gal. („ FIELDS F960 REFLECTIVE EMULSION (Applied Over Flood Coat) 1 gal. FIELDS F975 ALUMINUM EMULSION COATING (Applied Over Flood Coat) 1 gal. Application Preparation: The existing roof system must be free of moisture, clean, and dry. Use FIELDS F100 COLD AS- PHALT, FIELDS F200 PLASTIC ROOF CEMENT, or FIELDS F300 ALL WEATHER MASTIC and FIELDS WO- VEN FIBERGLAS or FIELDS POLYESTER to seal around all vents, pipes, drains, exposed edges, open 1lashings, splits, and blisters. FIELDS RUFTAC II may be used in lieu of the above procedure. Contact the Fields Director of Customer Service should you require specific information about split and blister repair procedures. Apply FIELDS F400 1 ROOF PRIMER over the existing roof surface at the rate of EXISTING FIELDS class — • 1/2 -1 gallon per 100 square feet (optional). Cold asphalt prod - base sheet FIELDS ucts apply best when warmed to temperatures between 70 °F POLYESTER pp Y p F1oo ply sheet and 100 °F. FI00 1 3' Installation: Install the FIELDS GLASS base sheet and the r Floc Lus FIELDS FIELDS POLYESTER ply sheet in shingle fashion so the flow r i, i�o of water is over or parallel to the laps. Start at the low point A1U41t1U4 of the deck, Install the FIELDS GLASS base sheet using an FIELDS CORPORATION • 2240 TAYLOR WAY • TACOMA, WA 98421 • (206) 627.4098. 18 inch wide starter strip followed by full width sheets. Lap sides 2 inches and ends 6 inches. Install the FIELDS POLYESTER ply sheet in full -width sheets. Lap sides 3 inches and ends 6 inches. Adjacent end laps shall be offset not Tess than 12 inches apart for the FIELDS GLASS base and FIELDS POLYESTER ply sheets. Install each sheet in a uniform application of FIELDS F100 COLD ASPHALT at a rate of 3 1/2 gallons per 100 square feet. Broom in place with soft bristle broom to eliminate voids. Turn each sheet a minimum of 2 inches above the cant strip at all vertical intersections. Surfacing: Uniformly apply FIELDS F100 COLD ASPHALT at the rate of 3 1/2 gallons per 100 square feet over the FIELDS POLYESTER ply sheet. After the FIELDS F100 COLD ASPHALT has set up for approximately 3 fo 6 months, apply FIELDS F600 FIBERED ALUMINUM COATING at the rate of 1 gallon per 100 square f eet. Op- tional surface applications may be applied as specified above. Precautions: To minimize wrinkling, nonadhesion, and fishmouths, apply in temperatures above 45 °F. Apply FIELDS F100 COLD ASPHALT in strict compliance with application rates. On slopes over 1/2 inch to the foot, apply the sheets parallel to "slope. Backnail head laps. Roof traffic shall be restricted for a minimum of 7 days or until FIELDS F100 COLD ASPHALT sets up. Fleshings:, Install the FIELDS GLASS and FIELDS POLYESTER as flashing ply strips in no less than two lay- ers over flat roof edge metal flanges and penetration jack flanges. Install the same in no Tess than three layers (two glass and one polyester) over raised roof edge metal flanges, parapet wall, and curb bases. All concrete and metal flanges to receive flashing ply strips shall be primed with FiELDS F400 ROOF PRIMER at the rate of 1/2 -1 gallon per 100 square feet (optional). All metal flanges shall be set in a uniform layer of FIELDS F200 PLASTIC ROOF CEMENT, FIELDS F250 FLASHING CEMENT, or FIELDS F300 ALL WEATHER MASTIC and nailed to nailable surfaces. All flashing ply strips shall be consecutively set in uniform layers of FIELDS F100 COLD ASPHALT for horizontal surfaces and FIELDS F200, F250, or F300 for vertical surfaces. Extend all flash- ing ply strips to the outside edge of flat or raised roof edges, curbs, and parapet walls and nail 8 inches on center to nailers. On parapet walls counterflashnd with surface mounted reglets, extend flashing ply strips to counterflashing juncture and nail 8 inches on center. Extend the flashing ply strips inward over the field of the roof progressively overlapping the preceding ply no less than 2 inches and terminating a maximum of 6 inches beyond the edge of flange or toe of the cant strip. The linear footage of the flashing ply strips shall not extend over 12 feet. End laps shall be 6 inches minimum. Offset end laps 12 inches from the preceding flashing ply strip. Technical Notes Smooth surface coated roofs are maintenance type roofs and may require recoating every 4 to 5 years by Fields approved roofing contractor. The design criteria and specification contained herein are presented to hel owners, specifiers, and contractors inform themselves of one of several roofing systems that Fields has avail- able. The responsibility for the selection of a suitable specification, its correct installation, and periodic mainte- nance is the sole responsibility of the aforementioned three parties. Refer to the most current edition of the FIELDS B.U.R. ROOFING SYSTEMS MANUAL for more complete information. The specification and design criteria set forth herein does not create any warranty implied or expressed. Fields guarantees their materials to be free from defects and suitable for their intended use. For further details, call the Fields Director of Customer Service, (206) 627 -4098. Specification Legend First number = Number of layers; B = GLASS base sheet, P = POLYESTER ply sheet; R = Recover Footnotes Footnote 1: This is an estimate of minimum life expectancy, not a warranty. This estimate is contingent upc, \ such elements as climate, roof traffic, and stnactural integrity, as well as strict adherence to such other conditions as application specifications, recoating. in 4 to 5 year intervals by a Fields approved roofing contractor, and an annual roof maintenance program. Footnote 2: For detailed illustrations, refer to the "Flashing Details" of the most current edition of the FIELDS B.U.R. ROOFING SYSTEMS MANUAL. r INSPECTION RECORD Retain a copy with permit f513 0139 ~�-� PERMIT No. CITY OF TUKWILA BUILDING DIVISION `�'�� l_O.rSol'1 6300 Southcenter, Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 ro � Ok trt\- eV rItc ypeo nspect n: r) r) RPYopt Address: �, --r )k 10 R Date Called: �- 3w Special Instructions: `Tr} = dc� Date Wanted: L r 1 1 . a r , ‘! 8- Y e_cK0 C ■,`J�• �vntractvr wtit m u(2, u th4) rQ . Requester: krk t-1c3E ' PhoneNo.: `ham -LiCA YiU I, Approved per applicable codes. COMMENTS: 0 Corrections required prior to approval. nspector: air Awe CJ $30.00 REINSPECTION FEE REQUIRED. Prior to relnspection, fee must be paid at 6300 Southcenter Blvd., Suite. 100. Call to schedule reinspection. • see ' . .. VfINSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 0/-5 PEWMtT Ny. (`206 1- 333670 Pr. _�: .,-- A a_) , ' • Trat4 Type of spection: inr- : , / .: SI instructions: tQ .C7 4 . Date Want _'—�' v�'� J am. p.m. Requester: Phone tJo.: (3 Approved per appli COMMENTS: • �J Corrections-required.p for to approval. 0,473 1C-/")1 //6/ (j C - t&/:?. `� ' 'L b 4 ',fk - ( 1 ''� ,t /1 -'5 Fie 6/3/ -3 6 ..5". spector: $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. LPL c$ee .I� -4~; /'rea "e-La& V 01993 "? V-C1 TRANSMITTAL COVER SHEET CCU ;\d; i `l' l i' !.1TY of ELOPMENT 'F'6( - 011 TO: 24I/ J4/$o) FAX: l'iteopq Lu /J / ,,J /, _Did. FROM: 6_JlJ-i" �� /A (ft'1 "' OF X4: f'-')F'1-7,147c Or F2P. DATE: ( � i �5 TIME RE: J il ai 1I 7 iC /J - OW- . ( ji`. i iF/t4 A4mr-4) r �- 'f PfG/ NUMBER OF PAGES (INCLUDING COVER SHEET) : I' .G`aV I e-o_ fed TELE: _44+...2Q , _cg9 317.10 orOR YOUR FILES PER YOUR REQUEST PLEASE HANDLE FOR YOUR APPROVAL MESSAGE: /0//rOR YOUR INFORMATION PLEASE ADVISE OR COMMENT REQUIRES IMMEDIATE ATTENTION ra). /e-ko —P5Fgp 77) PA 6-e BP tl .rr. -_ ,14 6% oi (c ,,. It Ci -14_4.,-.5 `` }' ot .151/ 4 t,- (SW ,4 R E r " e1 P/ /4- pipe. // u4vt&f. -ice- r.1 19sc I, )4 / 1c4f ) T GLS1 r 4 1 r -r 0,44.3, Ole 11191A, FIELDS CORPORATION. ROOFING MANUFACTURER 2240 Taylor Way • Tacoma, WA. 98421 (206) 627-4098 Fax (206) 383-2181 FIELDS CORPORATION COLD APPLIED SYSTEMS SPECIFICATION INDEX DECK U.L. CLASSIFIED Insulation is opptional at any thickness 1 SPEC. NUMBER 2 NUMBER OF LAYERS 3 SURFACE TYPE U.L. RATING 5 SLOPE GLASS BASE SHEET GLASS PLY SHEET GLASS CAP SHEET POLY- ESTER PLY TOTAL PLYS N.C. C. RECOVER 1 -P -R 1 1 Coating A B 1/2" Applied over an existing U.L. 2-B -R 2-BG -R 2 1 1 2 2 Coating Coating A A B B 1/2" 1/2" Class. A or B 2-BP -R 1 1 2 Coating A B 1/2" Roof system 2-P-R 2-G -R 2 2 2 2 Coating Coating A A B B 1/2" 1/2" 3 -B -R 3 3 Coating A B 1/2" 3 -BG -R 1 2 3 Coating A B 1/2" 3 -BGP -R 1 1 1 3 Coating A B 1/2" 3 -BGC -R 1 1 1 3 Mnr1 /Cap A B 3/4" NAILABLE 3 -B -N 3 3 Coating A B 1/2" 3 -BG -N 1 2 3 Coating A 1/2" 3 -(2 BG -N 2 1 3 Coating A B 1/2" 3 -BP -N 2 1 3 Coating A B 1/2" 3 -BGP -N 1 1 1 3 Coating A 1 /2" 3 -BGC -N 1 1 1 3 Mnr1 /Cap A B 3/4" 4 -B -N 4 4 Coating A B 1/2" 4 -BG -N 1 3 4 Coating A 1/2" 4- (2)BG -N 2 2 4 Coating A B 1/2" 4-BGP-N 1 2 1 4 Coating A 1 /2" r 4- (2)BGP -N 2 1 1 4 Coating A B 1/2" 4- C -N 1 2 1 4 Mnrl /Cap A B 3/4" NON- NAILABLE 3 -B -NN 3 3 Coating A 1 /2" 3 -BG -NN 1 2 3 Coating A 1/2" 3 -BP -NN 2 1 3 Coating A 1/2" 3- BGP -NN 1 1 1 3 Coating A 1/2" 3- BGC -NN 1 1 I 3 Mnrl /Cap A 3/4" 4 -B -NN 4 4 Coating A 1/2" 4 -BG -NN 1 3 4 Coating A 1/2" 4- BGP -NN 1 2 1 4 Coating A 1/2" 4- BGC -NN 1 2 1 4 Mnrl /Cap A 3/4" INSULATED 3 -B -I 3 3 Coating A 1 tdta DV tow CO td to 1/2" 3 -BG -I 1 2 3 Coating A 1/2" 3- 2 BG -I 2 1 3 Coating A 1/2" 3 -BP -I 2 1 3 Coating A 1/2" 3 -BGP -I 1 1 1 3 Coating A 1/2" 3 -BGC -I 1 1 1 3 Mnrl /Cap A 3/4" 4 -B -I 4 4 Coating A 1/2" 4 -BG -I 1 3 4 Coating A 1/2" 4-(2)BG-I 2 2 4 Coating A 1/2" 4 -BGP -I 1 2 1 4 Coating A 1/2" 4- (2)BGP -I 2 1 1 4 Coating A 1/2" 4 -BGC -I 1 2 1 4 Mnr1 /Cap A 3/4" NOTES: (Refer 1 INSULATION: 2 SPEC. #: 3 LAYERS: 4SURFACE: 5 RATINGS: to U,L..file #R11285 for specific details of each listings). -Wood fiber insulation is not U.L. approved over combustible decks. -EPS insulation is not acceptable in Fields Cold Applied Systems. 1st number= number of layers; B= Base Sheet; G= Ply Sheet; P= Polyester; C= Cap Sheet; R= Recover; N= nailable; NN= non•nailable; I= insulation Base sheet= F51 TYPE II "FIELDS GLASS BASE SHEET" Ply sheet= F55 TYPE IV, and F56 TYPE VI "FIELDS GLASS PLY SHEET" Cap sheet= F59 "FIELDS GLASS CAP SHEET" Polyester= F254, F272, F60, F21 and "E3N RUFON" "FIELDS POLYESTER PLY" Refer to Fields U.L. file #R11285 or Fields Cold Applied Specifications. N.C.= Non Combustible; C.= Combustible FIELDS CORPORATION ROOFING MANUFACTURER 2240 Taylor Way • Tacoma, WA. 98248 (206) 627 -4098 Fax (206) 383-2181 FIELDS CORPORATION ADDITION LISTINGS (PILE' #: R11285)` COLD APPLCATION SYSTEMS Unless otherwise indicated the base sheet may be mechanically secured, spot or fully adhered along with the ply, cap and /or polyester sheets with "FIELDS F100 FIBERED ROOF COATING" OR "FIELDS F350 COLD PLY ADHESIVE" at the rate of 2.5 or more gals. /sq. When a type G3 "FIELDS GLASS CAP SHEET" is applied with the mineral side down as an alternate to anyispecified base sheet directly over a combustible deck, omit the use of "Fields F5 KRAFT SHEATHING PAPER ". CLASS "A" (1) Deck: N.C. Incline: 1/2 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G1 or G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ",1 -2 gal /sq. B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. FIELDS CORPORATION ROOFING' MANUFACTURER 2240 Taylor Way • Tacoma, WA. 98421 (206) 627-4098 Fax (206) 383 -2181 COLD APPLICATION SYSTEMS -PAGE 2 D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. E. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal. /sq. F. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION" 2.5 or more gal /sq. (Optional) Surfacing: G. Coating: H. Coating: "FIELDS F830 SUNSCREEN" gal /sq. "FIELDS F830 SUNSCREEN" gal /sq. or "FIELDS F835 or "FIELDS F835 SNOWHITE", 1 -2 SNOWHITE", 2 -3 "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 ASPHALT EMULSION ", 3 or more gal /sq. and chopped roving glass 1 lb. or more /sq. (Optional) Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. (2) Deck: N.C. Incline: 3/4 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G1 or G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION ", 1 gal. /sq. COLD APPLICATION SYSTEMS -PAGE 3 B. Coating: "FIELDS F960 REFLECTIVE EMULSION ", 2.5 or more gal /sq. (3) Deck: N.C. Incline 3/4" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. Cap: "FIELDS GLASS'CAP" type G3. (4) Deck: N.C. Incline 1/2" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composition, or PAROC roof insulation. (i3ase Sheet: (Optional) Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. Polyester: One or more layers "FIELDS POLYESTER T254, T272, F21, F60" or RUFON E3N (Minimum weight 2.3 oz /sq yd)(Not U.L. Classified) applied in "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", or more gal /sq. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. FIELDS CORPORATION ROOFING MANUFACTURER COLD APPLICATION SYSTEMS -PAGE 4 C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. CLASS "B" (1) Deck: C -15/32 Incline: 1/2 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, or PAROC roof insulation. Bottom layer: "FIELDS F5 KRAFT SHEATHING PAPER" mechanically secured.(May be omitted when roof insulation is used). Base Sheet: Any "FIELDS GLASS" type G2 product. Ply Sheet: Two or more layers "FIELDS GLASS" type G2 products or one "FIELDS GLASS" type G2 followed by one or more layers of "FIELDS GLASS" type G1 product. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. B. Coating: Surfacing: C. Coating: Surfacing: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. No. 11 roofing granules, 50 lb.or more /sq. "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM ( •'\ EMULSION COATING ", 1 -2 gal /sq. COLD APPLICATION SYSTEMS -PAGE 5 D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq E. Coating: "FIELDS F900 ASPHALT EMULSION ", "FIELDS F950 FIBERED ASPHALT EMULSION" or "FIELDS F960 REFLECTIVE EMULSION ", 2.5 or more gal /sq. F. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM• EMULSION COATING ", 1 -2 gal /sq. G. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION" 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. H. Coating: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 2 -3 gal /sq. I. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 ASPHALT EMULSION ", 3 or more gal /sq. and chopped roving glass 1 1b. or more /sq. (Optional) Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. (1) Deck: C -15/32 incline: 1/2 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, or PAROC roof insulation. Bottom layer: "FIELDS F5 KRAFT SHEATHING PAPER" mechanically secured.(May be omitted when roof insulation is used). Base Sheet: Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G2 product or one "FIELDS GLASS" type G2 followed by one or more "Fields GLASS" type G1 product. FIELDS CORPORATION ROOFING MANUFACTURER COLD APPLICATION SYSTEMS -PAGE 6 Polyester: One or more layers "FIELDS POLYESTER T254, T272, F21, F60" or RUFON E3N (Minimum weight 2.3 oz /sq yd)(Not U.L. Classified) applied in "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", or more gal /sq. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal. /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. (3) Deck: C -15/32 Incline 3/4" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. Cap: "FIELDS GLASS CAP" type G3. (1) Deck: N.C. COMBINATION HOT OR COLD SYSTEMS CLASS "A" Incline: 1/2 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, EPS /wood fiber, EPS /perlite, EPS /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G1 or G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. COATING AND SURFACING OPTIONS: A. Flood -Coat: Hot roofing asphalt. Surfacing Options: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ",1 -2 gal /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. E. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. FIELDS CORPORATION ROOFING .MANUFACTURE R 2240 Taylor Way • Tacoma, WA. 98421 (206) 627.4098 Fax (206) 383 -2181 COMBINATION HOT OR COLD SYSTEMS -PAGE 2 F. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal. /sq. G. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION" 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. H. Coating: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 2 -3 gal /sq. I. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 ASPHALT EMULSION ", 3 or more gal /sq. and chopped roving glass 1 lb. or more /sq. (Optional) Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, ( $ F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. (2) Deck: N.C. Incline: 3/4 Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, EPS /wood fiber, EPS /perlite, EPS /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G1 or G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. COATING AND SURFACING OPTIONS: A. Coating: FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION ", 1 -2 gal. /sq. B. Coating: "FIELDS F960 REFLECTIVE EMULSION ", 2.5 or more gal /sq. COMBINATION HOT OR COLD SYSTEMS -PAGE 3 (3) Deck: N.C. Incline 1/2" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, wood fiber, glass fiber, polyisocyanurate, polyisocyanurate /composite, EPS /wood fiber, EPS /perlite, EPS /composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G1 or G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type Gi or G2 product. Polyester: One or more layers "FIELDS F60 POLYSHIELD" (Minimum weight 3 oz /sq yd)(Not U.L. Classified) applied in hot roofing asphalt 25 lbs /sq. Flood -coat: Hot roofing asphalt. Surfacing OPTIONS: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. CLASS "B" (1) Deck: C- 15/32 Incline 1/2" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, EPS /composite, EPS /perlite, or PAROC roof insulation. Base Sheet: Any "FIELDS GLASS" G2 product. Ply Sheet: Two or more layers "FIELDS GLASS" type Gi or G2 product. COATING AND SURFACING OPTIONS: A. Flood -Coat: Hot roofing asphalt. Surfacing Options: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. FIELDS CORPORATION ROOFING MANUFACTURER COMBINATION HOT OR COLD SYSTEMS -PAGE 4 B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal. /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. E. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. F. Coating: "FIELDS F900 ASPHALT EMULSION ", "FIELDS F950 FIBERED ASPHALT EMULSION" or "FIELDS F960 REFLECTIVE EMULSION ", 2.5 or more gal /sq. G. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 gal /sq. H. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION" 2.5 or more gal /sq. (Optional) Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. I. Coating: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 2 -3 gal /sq. J. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 ASPHALT EMULSION ", 3 or more gal /sq. and chopped roving glass 1 ib. or more /sq. ,COMBINATION HOT OR COLD SYSTEMS -PAGE 5 (OPTIONAL) Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. (2) Deck: Insulation: C -15/32 incline 1/2" (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, EPS /composite or EPS /perlite, or PAROC roof insulation. Base Sheet: Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G2 product or one "FIELDS GLASS" type G2 followed by one or more "Fields GLASS" type G1 product. Polyester: One or more layers "FIELDS F60 POLYSHIELD" (Minimum weight 3 oz /sq yd)(Not U.L. Classified) applied in hot roofing asphalt 25 lbs /sq. Flood -coat: Surfacing Options: Hot roofing asphalt. "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ", 1 -2 gal /sq. FIELDS CORPORATION ROOFING MANUFACTURER MAINTENANCE AND REPAIR SYSTEMS Unless otherwise indicated the base sheet may be mechanically secured, spot or fully adhered along with the ply, cap sheet and /or polyester with "FIELDS F100 FIBERED ROOF COATING" OR "FIELDS F350 COLD PLY ADHESIVE" at the rate of 2.5 -3.5 gals. /sq. or hot roofing asphalt. EPS /composite or EPS /perlite as a roofing insulation may be used when hot roofing asphalt is used to adhere the base, ply, cap sheet or polyester. Refer to "MAINTENANCE AND REPAIR SYSTEMS" page 16 for clarification of other Fields listed systems in this category. CLASS "B" (1) Deck: C -15/32 Incline: 1/2 EXISTING ROOF SYSTEM: Class A or B covered with: nsulation: (Optional) Any thickness, one or more layers U.L. Classified T perlite, glass fiber, polyisocyanurate, polyisocyanurate / composite, PAROC roof insulation. Base Sheet: Any "FIELDS GLASS" type G2 product. Ply Sheet: One or more layers "FIELDS GLASS" type G1 or G2 product. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal. /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. B, Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. FIELDS CORPORATION ROOFING MANUFACTURUR 2240 Taylor Way • Tacoma, WA. 98248 (206) 627.4098 Fax (206) 383.2181 MAINTENANCE AND REPAIR SYSTEMS -PAGE 2 D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. E. Coating: "FIELDS F900 ASPHALT EMULSION ", "FIELDS F950 FIBERED ASPHALT EMULSION" or "FIELDS F960 REFLECTIVE EMULSION ", 2.5 or more gal /sq. F. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 'REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 gal /sq. G. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION" 2.5 -3.5 gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. H. Coating: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 2 -3 gal /sq. I. Coating: "FIELDS F900 ASPHALT EMULSION" or "FIELDS F950 ASPHALT EMULSION ", 3 or more gal /sq. and chopped roving glass 1 lb. or more /sq. (Optional) Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING ", "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE", 1 -2 gal /sq. (2) :;. Deck: C-15/32 Incline: 1/2 EXISTING ROOF SYSTEM: Class A or B covered with: Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate / . composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G2 product. Ply Sheet: (Optional) One or more layers "FIELDS GLASS" type G2 or G1 product. MAINTENANCE AND REPAIR SYSTEMS -PAGE 3 Polyester: One or more layers "FIELDS POLYESTER PLY T254, T272, F21, F60" or RUFON E3N (Minimum weight 2.3 oz /sq yd) (Not U.L.Classified) applied in "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", or more gal /sq. COATING AND SURFACING OPTIONS: A. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal. /sq. Surfacing: "FIELDS F500, F525 or F550 ALUMINUM COATING" or "FIELDS F600, F625 or F650 FIBERED ALUMINUM COATING ", 1 -2 gal /sq. B. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: No. 11 roofing granules, 50 lb. or more /sq. C. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F960 REFLECTIVE EMULSION" or "FIELDS F975 ALUMINUM EMULSION COATING ", 1 -2 gal /sq. D. Coating: "FIELDS F100 FIBERED ROOF COATING" or "FIELDS F350 COLD PLY ADHESIVE ", 2.5 or more gal /sq. Surfacing: "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE ",1 -2 gal /sq. (3) Deck: C -15/32 Incline 1/2" Insulation: (Optional) Any thickness, one or more layers U.L. Classified perlite, glass fiber, polyisocyanurate, polyisocyanurate/ composite, or PAROC roof insulation. Base Sheet: (Optional) Any "FIELDS GLASS" type G2 product hot mopped. Ply Sheet: Polyester: (Optional) One or more layers "FIELDS GLASS" type Gi or G2 product hot mopped. One or more layers "FIELDS F60 POLYSHIELD" (Minimum weight 3 oz /sq yd)(Not U.L. Classified) applied in hot roofing asphalt 25 lbs /sq. PIELDS,.CORPORA TION ROOFING MANUFACTURER MAINTENANCE AND REPAIR SYSTEMS -PAGE 4 Flood -coat: Surfacing Options: Hot roofing asphalt. "FIELDS' F500 F525. or.F550 ALUMINUM COATING ", . "FIELDS F600, F625 .or F650 FIBERED ALUMINUM COATING ",': "FIELDS 7900 ASPHALT EMULSION" or "FIELDS F950 FIBERED ASPHALT EMULSION ", "FIELDS F960 REFLECTIVE EMULSION" or "FIELDSF975 ALUMINUM EMULSION'COATING ", "FIELDS F830 SUNSCREEN" or "FIELDS F835 SNOWHITE" , ..1 -2 gal /sq. • MOWN! • c an 03 . Ur 4, • .c. tr„ - ....: . . ..a, •(-4 .. 0 ,0::. • • `5 .":1 2 'F., !c .0..- A ' . Z W II. Al C) CLI 06-.. A F, -rg BS E ' T, te, .5 'A . v 0 0 . 132 clui :: : : ::..t. Q .8 = .g. P . 1-.:,, ;I•j„.. • ''•4 :•., . .5 `^' Vi . i" g .5 5 . w .5 •0 = .t., ,.,-,- 47.., . = . • 0 O. '5 - , •-:c 000 2ges to 0 u id, ..,, i.„..,.i • LI .0 2.,,, ... ..0 , . .... • R t O' 1/41 E "a 14 s Pa 41.9. . "Ej 2 0 ,, ''' =... con 1.. 44). 0 d ? ,E.,,L ,§1 L "*"...? 1 8 0 b.0 40 V) g 4 II @. '0 • >.... .9 . a .,:, , 0.,c 1E .0 4.) tui- ,,.-e• - ,• 2 0. , 1...- "2 5. 5 0 (1 `n c.4,'0' L- 0 0 0 01.- o • E 2 .0 P., rn •9 9 lib,: .s, .r. - -2 0 ...c. a. E 0 ):!2'. a) • 0 N o.... . u „9, .„.., , ,‘,.....,...., 6 ,,,.:, ..0 . .94 01 "' a* "il u • „.4 4... tu --. .0 v) ig 4) .C° e .... c.....0 u .9.4 ...) >, 0. z 2..... r31,1 20 ; 4,...,3: 4%,',, r3.:::. ,,_i,::.,.■ y „io t.g E3,,6 2 ,v. , , ;1; P .2 > F 4A > i 9. 2 ..6,coovIm' cat.0.- .7 C ' >I --g 't = ? .T. ',"" 4.) tv . . , tr, la 11 '8 :- -a a .a• c : ) .0 6 . (.5 0. ,.,, 0 c,... = .9. o • 6 1 T.,,,,, sc L4. t ri. ;.,,,, .§. i 1 1 1 • ' 6 - c A E i ':«:,;:.-,:: - ,... . . c`, z 0.1 0 0) ••• U ; ..,'.::...: Ci. 0 at ,.... O ,..... 4., el ... ? r.oi) 5 ..o'c .°44 eon't." ;,g'•::c.07';:"-:: 1.1.,‘.,,i.2:,..53 t= 4 14, 0 .= 9 E u , - ,' = A la I.1) trY, . 5 1 r) i • "i . QR le5 8 1. 7g : -g• , ,...., 15 is 's N li o O • 0 ... (...) 1.1.1., ▪ Tti u •I ii `'3 . g r'g 8 g 49.e tg 6‘o °= ;5, • 0> =4) E .E ..0". ° .4.":.'".0.'. L:. 1.4 ..-. 11 0 ' • 'n •-• :6.4 E 8 • .2 i bp ■•••• = I. . RI 6) .0,5 to c;„7:, ..= a.) ' 0 u p, .1 .o. 1.4...i § .49 Eu 74> P‘it5 ZIP g ! ! .- . r:11:': ::.! (I; !:‘,6 'to 0 .7. an en C 'V E IL 0 Lo 0 2 ,... =.• - . , -- .2_ 70..7,1.,:, .9.0 0.- .v.,,tr 4..„!..,....,---13''''.i' 4:2 -El I It..4jC‘4 4:g° • 2(9 1 . . 8 V1 = .a. . •115 E P.4' 43 a 0.2 tai & 0. 40e°2t11073 .8 • ,,,4' = ,(.4 . E. 0. ; ,. ::. ,c),. #.!,.. ..E „. 0, tn . •-• 0 u• .13 Po .", ' = 0 0 > V .c 0 ELcps.-4.)0 0 73 E •E '5 tr) E .,.'"' ..c, v) • .".i ,,i; t-,1 .6, r • z 0 0 8 8 4-, t) 'n • .4 ....... ,.,,, .-z U ' .--. .- $ (i) . „ ,.s ,.., ,, 0 > t.. 1:1 • 0 . . Fz.. 4 ;.3 m ... 4-,•Kre;•,•::: & ...0 E. 04,_, "W,_, 3 .. . L .. , ,.;:g -E. 06.9...• L c c, >,1-; ,„ 4_, .„ .c, 0 :ri. cc -4 .,.. ca.4 . ,E ..'..P• ,•,..., 0 pc • .c v - . L'L.-0._,e414...E, 11", f; r., g 2 c , 8 >, .2 , ,.. = .re) Ts,,.8 1.:8 • ... - ,o).• g ,... • 8'.0 •,h) ,f2.. . v, , V) -E • 2 72 0 ..0 .E -4 L U ..s . (/) L 2 -0 8 'g ' . I ',c,3 ,`„:4) r'4 § >, c .1.4 e Lt. g 4 4,5 L: • :„.. • co ..,2 .6, -0 -,9,.- • 1991 UNIFORM BUILDING CODE Recover Smooth Surface BUR SpectfIcations =$ E- P16 -N, E-P1 7-N, E P18 -M Firestone APP Membrane Asphalt Primer Existing Smooth Surface Built-up Roof Slope Positive drainage up to 3 inches per lineal foot. For slopes above 3 inches per lineal foot, fastening of the APP is required. Material Requirements Per 100 Sq. Ft. Asphalt Primer 1 gal Firestone APP 160, 170, 180 1 Ply Deck: The existing smooth surface built -up roof must conform to Firestone general requirements. (See General Requirements Section 2.) Asphalt Primer: All smooth surface built -up roof surfaces to receive the Firestone APP Membrane shall be pritned with an ASTM D -41 asphalt primer. Firestone APP Membrane: Starting at the low point of the roof, install one layer of Firestone APP Membrane. Torch apply the Firestone APP Membrane by passing the flame of thc torch evenly across the face of the roll. Heat the membrane with the torch until it develops a sheen or glossy appearance. The Firestone APP Membrane must be fully adhered to the existing surface by using pos- itive pressure on the roll. (Sec General Requirements section 9,1.) Flashing: The flashing material shall be Firestone APP 160, 170, or 180. (See General Requirements Section 10.) Warranty: Max. Red Spec No. Shield Term E -PI6 -N 10 E -P17 -N I0 E -P 18 -M 12 Requirement to upgrade to 12 years: • Apply an approved coating to the APP 160 or 170 Note: Recover applications are not eligible for 15 year warranties. CI TY OF 7UKV't'ItA APR 21' 1993. PERMIT Cr NTER Recover Gravel BUR Specifications GI-M1 6-N, GI-M1 7-N, GI-M1 8-M Firestone APP Membrane Firestone MB Base Sheet Firestone ISO 95+ \ Existing Gravel Surface ...Built-up Roof Slope Positive drainage up to 3 inches per lineal foot. For slopes above 3 inches per lineal foot, fastening of the APP is required. Material Requirements Firestone ISO Firestone MB Base Sheet Firestone APP 160,'170, 180 Per 100 Sq. Ft.• 1 Layer 1 Ply 1 Ply Deck: The existing gravel surface built -up roof must conform to Firestone general requirements. (See General Requirements Section 2.) Insulation: The insulation shall be mechanically fastened in accor- dance with the insulation manufacturer's specifications in the thick- ness required. (See General Requirements Section 7.) Base Sheet: Starting at the low point of thc roof, install 1 ply of Firestone MB Base Sheet by rolling out the sheet dry over the roof insulation. The base sheet must be mechanically attached in accor- dance with Firestone specifications, The first sheet of the Firestone MB Base Sheet shall be a half width to assure a stagger with the APP cap.shect. The base sheet and cup sheet shall maintain a minimum stagger of 12 inches for ail laps. (See General Requirements Section 8.) Firestone APP Membrane: Starting at the low point of the roof, install one layer of Firestone APP Membrane. Torch apply the Firestone APi' Membrane by passing the flame of the torch evenly across the face of the roll. Heat the membrane with the torch until it develops a sheen or glossy appearance. The Firestone APP Membrane must be fully adhered to the concrete deck by using positive pressure on the roll. (Sec General Requirements section 9,1.) Flashing: The flashing material shall be Firestone APP 160, 170, or 180. (See General Requirements Section 10.) Warranty: Max. Red Spec No. Shield Terni GI-M16-N 10 GI -M l7 -N 10 GI -M 18 -M 12 Requirement to upgrade to 12 years: • Apply an approved coating to the APP 160 or 170 Note: Recover applications are not eligible for 15 year warranties. NOLIVD1d1D3d 13 -,Fits n u m ROOF SERVICE Inc. KING CO. 852 -4974 SO sNO: CO. 367 -2564 OLYMPIA 754 -4099 PIERCE Co. 952 -3744 BREMERTON 479 -0650 EVERETT 355 -1506 BELLEVUE 644-7128 ART HOFF fig pc_ Contractor Rep. No. FI•EL•DR•8282LI Commercial,. Industrial, Governmental OVER 30 YEARS OF CONTINUOUS SERVICE