SHORELINE MASTER PROGRAM.
PROGRESS REPORT
rY
Tukwila Shoreline Master Program
(SMP)
• City's original SMP - adopted in 1974
(after 1971 State approval of the Shoreline
Management Act)
• Complete revision of SMP approved by
City Council on August 15, 2011 and by
the Washington State Department of
Ecology October 28, 2011
Tukwila SMP Update
Key Issues
• Shoreline Environment designations,
buffer widths and minimum levee profile
• Public access requirements
• Vegetation protection and landscaping
• Shoreline stabilization standards
• Shoreline restoration /adjacent properties
• Nonconforming Uses and Structures
Shoreline Permit Triggers
(WAC 173- 270030 (6))
• Proposal meets definition of
"development" under SMA: construction,
exterior alteration of structures; dredging,
drilling; dumping; filling; removal of any
sand, gravel or minerals; bulkheading; any
project of a permanent or temporary
nature which interferes with the normal
public use of the surface of the waters
overlying lands subject to the SMA.
Levee Reconstruction
Shoreline Management Act
Key Exemptions
• Projects that cost less than $6,416;
• Normal maintenance or repair of existing
structures or developments;
• Watershed restoration projects;
• Emergency construction necessary t
protect property from damage by the
elements;
• Construction of single family home.
J
Permit Activity Since
October 28, 2011
• Shoreline Substantial Development
Permits: 8
• Shoreline Variances: 1
• Shoreline Exemptions: 15
• Shoreline Relief: 1
• TOTAL 25
Approved Shoreline Permits
• Fill in shoreline; (1)
• Installation of fiber optic cable (3)
• Short plats (2)
• Road improvements (1)
• Levee reconstruction (1)
• Variance for different levee profile (1)
• Relief from SMP requirements for
property adjacent to restoration site (1)
Pending /Anticipated Shoreline
Permits
• Addition to commercial recreational
facility
• Hotel
• Pedestrian Bridge in Urban Center
• Riverbank repair
Restoration Volunteer
Approved Shoreline Exemptions
• Routine maintenance of: levee (vegetation
removal at direction of COE); storm water
pipes; road re- paving; gas lines; Hesco
unit removal; noise panel installation (10)
• Building demolition; (1)
• Projects costing less than $6,416 (2)
• Site investigation prior to actual
development; (1)
• Shoreline restoration project (1)
Shoreline Exemptions
• One shoreline exemption request denied
(over $6,416 cost threshold)
North Wind's Weir Off Channel
Habitat
City Light Restoration Site
Possible Revisions to SMP
• Building height outside buffer
• No CUP for dredging associated with a
consent decree
• Drive aisles in buffer -treat as streets?
• Add policy that requires the use of the
City's minimum levee profile.
• Allow alternative levee profiles that
achieve the same habitat benefits as City's
Possible Revisions to SMP
• Housekeeping items: add "Purpose"
section to TMC 18.44; revise location of
Transition Zone based on Duwamish
Blueprint work; add requirement for
periodic maintenance and monitoring
reports for shoreline landscaping projects.