HomeMy WebLinkAboutTrans 2015-06-15 Agenda Front SheetCity of Tukwila
Transportation Committee
• Joe Duffie, Chair
• Allan Ekberg
• Kathy Hougardy
Distribution:
J. Duffie
A. Ekberg
K. Hougardy
K. Kruller
D. Robertson
Mayor Haggerton
D. Cline
L. Humphrey
B. Giberson
F. I riarte
R. Tischmak
G. Labanara
P. Brodin
R. Turpin
M. Hart
Clerk File Copy
2 Extra
Place pkt pdf on Z: \TC -UC
Agendas
e -mail cover to: A. Le,
C. O'Flaherty, J. Duffie,
D. Alm berg, B. Saxton,
S. Norris, M. Hart,
L. Humphrey
AGENDA
MONDAY, JUNE 15, 2015 — 5:15 PM
FOSTER CONFERENCE Room — 6300 BUILDING
(formerly known as Conference Room #1)
ll,
PRESENTATION(S)
2. BUSINESS AGENDA
a) 42nd Ave S /Allentown Roadside Barriers
Project Status Update
b) 2015 Overlay and Repair Program
Award Construction Bid
c) Americans with Disabilities Act (ADA) Transition Plan
Consultant Selection and Agreement
d) Transit Network Plan Update
Consultant Selection and Agreement
3. SCATBd
f) • SCATBd 5/19/15 Meeting Summary
• SCATBd 6/16/15 Meeting Agenda
4. MISCELLANEOUS
5. ANNOUNCEMENTS
/Pt, fifif,r/ riff
a) For Information only.
b) Forward to 6/22/15 C.O.W.
& Special Consent Agenda
c) Forward to 6/22/15 C.O.W.
& Special Consent Agenda
d) Forward to 6/22/15 C.O.W.
& Special Consent Agenda
f) Information Only
Future Agendas:
•
•
kat 15'
Pg. 1
Pg. 7
Pg. 17
Pg. 33
Pg. 49
Next Scheduled Meeting: Monday, July 6, 2015
The City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206 - 433 -0179 for assistance.
Transportation Committee - 2015 Work Plan
Description
Qtr
Dept
Action or
Briefing
Status
BNSF Intermodal Facility Access
Design contract (to COW only)
1
PW
A
Complete
42 Avenue South Phase 111
Design Contract Supplement — design undergrounding
2
PW
A
Seattle City Light underground agreement
4
PW
A
Follow -up on potential for coordination with SeaTac
2
PW
B
ADA Improvements
Design contract and bid award
2
PW
A
Annual Overlay and Repair Program
Bid Award
2
PW
A
53rd Avenue S (S 137th — S 144th St)
Funding and Design contract
2
PW
A
53rd Ave S Water Main Replacement, Sewer Rehab (from
Utilities)
A
Cascade View Safe Routes to School
Closeout
3
PW
A
Andover Park West/ TUC Transit Center
Closeout
3
PW
A
Thorndyke Safe Routes to School
Closeout
3
PW
A
Boeing Access Road over BNRR Bridge Rehab
Bid Award
3
PW
A
Residential Street Improvements
Design contract
2
PW
A
Safety -based priority list
4
PW
B
Annual Bridge Inspections and Repairs
Program update
4
PW
B
TUC Ped /Bike Bridge
Right -of -way and easement acquisition
1
PW
A
Complete
Bid Award
4
PW
A
Interurban Avenue S (S 143`d — Fort Dent Way)
Status update
4
PW
B
S 144th St Phase I I, (42nd Ave S — TIB)
Bid award
4
PW
A
Crosswalk Petition — TIB /S 139th Vicinity
Present engineering analysis
3
PW
B
OTHER
TIB pedestrian bulb replacement (test locations)
2
PW
B
Allentown Roadside Barriers — outreach and design alternatives
2
PW
B
Complete
Duwamish/ S 119th Ped Bridge — present condition and repairs
1
PW
B
Complete
(briefing)
Transit plan update contract
4
PW
A
TIP Resolution
2
PW
A
Complete
Standard Reports /Briefings
Frequency
Dept.
Facility Tours
As needed
PW
SCATBD
Semimonthly
PW
City of Tukwila
Updated 6/8/15