Loading...
HomeMy WebLinkAboutTrans 2015-06-15 Agenda Front SheetCity of Tukwila Transportation Committee • Joe Duffie, Chair • Allan Ekberg • Kathy Hougardy Distribution: J. Duffie A. Ekberg K. Hougardy K. Kruller D. Robertson Mayor Haggerton D. Cline L. Humphrey B. Giberson F. I riarte R. Tischmak G. Labanara P. Brodin R. Turpin M. Hart Clerk File Copy 2 Extra Place pkt pdf on Z: \TC -UC Agendas e -mail cover to: A. Le, C. O'Flaherty, J. Duffie, D. Alm berg, B. Saxton, S. Norris, M. Hart, L. Humphrey AGENDA MONDAY, JUNE 15, 2015 — 5:15 PM FOSTER CONFERENCE Room — 6300 BUILDING (formerly known as Conference Room #1) ll, PRESENTATION(S) 2. BUSINESS AGENDA a) 42nd Ave S /Allentown Roadside Barriers Project Status Update b) 2015 Overlay and Repair Program Award Construction Bid c) Americans with Disabilities Act (ADA) Transition Plan Consultant Selection and Agreement d) Transit Network Plan Update Consultant Selection and Agreement 3. SCATBd f) • SCATBd 5/19/15 Meeting Summary • SCATBd 6/16/15 Meeting Agenda 4. MISCELLANEOUS 5. ANNOUNCEMENTS /Pt, fifif,r/ riff a) For Information only. b) Forward to 6/22/15 C.O.W. & Special Consent Agenda c) Forward to 6/22/15 C.O.W. & Special Consent Agenda d) Forward to 6/22/15 C.O.W. & Special Consent Agenda f) Information Only Future Agendas: • • kat 15' Pg. 1 Pg. 7 Pg. 17 Pg. 33 Pg. 49 Next Scheduled Meeting: Monday, July 6, 2015 The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206 - 433 -0179 for assistance. Transportation Committee - 2015 Work Plan Description Qtr Dept Action or Briefing Status BNSF Intermodal Facility Access Design contract (to COW only) 1 PW A Complete 42 Avenue South Phase 111 Design Contract Supplement — design undergrounding 2 PW A Seattle City Light underground agreement 4 PW A Follow -up on potential for coordination with SeaTac 2 PW B ADA Improvements Design contract and bid award 2 PW A Annual Overlay and Repair Program Bid Award 2 PW A 53rd Avenue S (S 137th — S 144th St) Funding and Design contract 2 PW A 53rd Ave S Water Main Replacement, Sewer Rehab (from Utilities) A Cascade View Safe Routes to School Closeout 3 PW A Andover Park West/ TUC Transit Center Closeout 3 PW A Thorndyke Safe Routes to School Closeout 3 PW A Boeing Access Road over BNRR Bridge Rehab Bid Award 3 PW A Residential Street Improvements Design contract 2 PW A Safety -based priority list 4 PW B Annual Bridge Inspections and Repairs Program update 4 PW B TUC Ped /Bike Bridge Right -of -way and easement acquisition 1 PW A Complete Bid Award 4 PW A Interurban Avenue S (S 143`d — Fort Dent Way) Status update 4 PW B S 144th St Phase I I, (42nd Ave S — TIB) Bid award 4 PW A Crosswalk Petition — TIB /S 139th Vicinity Present engineering analysis 3 PW B OTHER TIB pedestrian bulb replacement (test locations) 2 PW B Allentown Roadside Barriers — outreach and design alternatives 2 PW B Complete Duwamish/ S 119th Ped Bridge — present condition and repairs 1 PW B Complete (briefing) Transit plan update contract 4 PW A TIP Resolution 2 PW A Complete Standard Reports /Briefings Frequency Dept. Facility Tours As needed PW SCATBD Semimonthly PW City of Tukwila Updated 6/8/15