Loading...
HomeMy WebLinkAboutReg 2015-06-15 COMPLETE AGENDA PACKET Tukwila City Council Agenda ❖ REGULAR MEETING •:� Jim Haggerton, Mayor Counci/members: Joe Duffie Dennis Robertson David Cline, City Administrator Allan Ekberg Verna Seal Kate Kruller, Council President Kathy Hougardy De'Sean Quinn Monday, June 15, 2015; 7:00 PM • Ord #2477 • Res #1860 1. CALL TO ORDER / PLEDGE OF ALLEGIANCE / ROLL CALL 2. SPECIAL PRESENTATION Introduction of Police Records Specialist Christina Titialii. Mike Villa, Police Chief. 3. CITIZEN At this time, you are invited to comment on items not included on this agenda COMMENT (please limit your comments to five minutes per citizen). To comment on an item listed on this agenda, please save your comments until the issue is presented for discussion. 4. CONSENT a. Approval of Minutes: 6/1/15 (RegularMtg.) AGENDA b. Approval of Vouchers. c. Authorize the Mayor to sign Supplement No. 1 to contract #14-157 with Pg.1 KPG, Inc., for construction management services for the 2015 Annual Repair and Overlay Project in the amount of $172,658.89. [Reviewed and forwarded to Consent by the Transportation Committee on 611115] d. Authorize the Mayor to sign Supplement No. 1 to contract #14-066 with Pg.23 Anchor QEA for continued construction management services for the Interurban Avenue South (So. 143rd to Fort Dent Way) Street Improvement Project in the amount of $463,928.00. [Reviewed and forwarded to Consent by the Transportation Committee on 611115] e. Authorize the Mayor to sign Supplement No. 2 to contract #13-199 with Pg.31 AECOM Technical Services for construction management services for the Tukwila Urban Center (TUC) Transit Center, Andover Park West Street and Water Projects, in the amount of $33,962.66. [Reviewed and forwarded to Consent by the Transportation Committee on 611115] f. Authorize the Mayor to sign a contract with Green River Construction Pg.41 for the 2015 Annual Small Drainage Program in the amount of $182,142.50. [Reviewed and forwarded to Consent by the Utilities Committee on 619115] g. Authorize the Mayor to sign a contract with PACE Engineers, Inc., for Pg.53 design services for the Andover Park East Water and Sewer Replacement Project and the Macadam Road South Water Upgrade Project in the amount of$359,858.00. [Reviewed and forwarded to Consent by the Utilities Committee on 619115] (continued...) REGULAR MEETING Monday, June 15, 2015 Page 2 5. UNFINISHED a. A resolution adopting a six-year Transportation Improvement Program Pg.81 BUSINESS (2016-2021), and directing the same to be filed with the State Secretary of Transportation and the Transportation Improvement Board. b. Commute Trip Reduction (CTR) grants; Pg.107 (1) Authorize the Mayor to sign the 2012 Congestion Mitigation and Air Quality Growth Transportation Efficiency Center/Transportation Demand Management grant agreement from the Washington State Department of Transportation in the amount of $186,334.64. (2) Authorize the Mayor to sign the 2015 Congestion Mitigation and Air Quality Regional Transportation Demand Management grant agreement administered by the Washington State Department of Transportation in the amount of $270,000.00. (3) Authorize the Mayor to sign an agreement with the Washington State Department of Transportation for funding coming to the City in the amount of $74,500.00 for the Commute Trip Reduction Program. Please refer to 618115 C.O.IN packet, Q c. An update on the Regional Fire Authority process. Pg.109 6. NEW BUSINESS 7. REPORTS a. Mayor b. City Council c. Staff - City Administrator Report Pg.123 Cl. City Attorney e. Intergovernmental 8. MISCELLANEOUS 9. EXECUTIVE SESSION 10. ADJOURNMENT Tukwila City Hall is wheelchair accessible. Reasonable accommodations are available at public hearings with advance notice to the City Clerk's Office(206-433-1800 or TukwilaCityClerk @TukwilaWA.gov).This notice is available at www.tukwilawa.gov,and in alternate formats with advance notice for those with disabilities. Tukwila Council meetings are audio/video taped. HOW TO TESTIFY If you would like to address the Council, please go to the podium and state your name and address clearly for the record. Please observe the basic rules of courtesy when speaking and limit your comments to five minutes. The Council appreciates hearing from citizens but may not be able to take immediate action on comments received until they are referred to a Committee or discussed under New Business. COUNCIL MEETINGS No Council meetings are scheduled on the 5th Monday of the month unless prior public notification is given. Regular Meetings - The Mayor, elected by the people to a four-year term, presides at all Regular Council Meetings held on the 1st and 3rd Mondays of each month at 7:00 p.m. Official Council action in the form of formal motions, adopting of resolutions and passing of ordinances can only be taken at Regular Council meetings. Committee of the Whole Meetings - Council members are elected for a four-year term. The Council President is elected by the Council members to preside at all Committee of the Whole meetings for a one-year term. Committee of the Whole meetings are held the 2nd and 4th Mondays at 7:00 p.m. Issues discussed are forwarded to the Regular Council meeting for official action. GENERAL INFORMATION At each Council meeting citizens are given the opportunity to address the Council on items that are not included on the agenda during CITIZENS COMMENTS. Please limit your comments to 5 minutes. Special Meetings may be called at any time with proper public notice. Procedures followed are the same as those used in Regular Council meetings. Executive Sessions may be called to inform the Council of pending legal action, financial, or personnel matters. PUBLIC HEARINGS Public Hearings are required by law before the Council can take action on matters affecting the public interest such as land-use laws, annexations, rezone requests, public safety issues, etc. Section 2.04.150 of the Tukwila Municipal Code states the following guidelines for Public Hearings: 1. The proponent shall speak first and is allowed 15 minutes for a presentation. 2. The opponent is then allowed 15 minutes to make a presentation. 3. Each side is then allowed 5 minutes for rebuttal. 4. Citizens who wish to address the Council may speak for 5 minutes each. No one may speak a second time until everyone wishing to speak has spoken. 5. After each speaker has spoken, the Council may question the speaker. Each speaker can respond to the question, but may not engage in further debate at this time. 6. After the Public Hearing is closed and during the Council meeting, the Council may choose to discuss the issue among themselves, or defer the discussion to a future Council meeting, without further public testimony. Council action may only be taken during Regular or Special Meetings. COUNCIL AGENDA SYNOPSIS ' ----------------------------- ---Initials--------------------------------- ITEM NO. Meetin Date Prepared b Mayor's review Council review 06/15/15 BG 4.C. ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 06/15/15 AGENDA ITEM TITLE 2015 Annual Overlay&Repair Program Construction Management Supplement No. 1 with KPG, Inc. CATEGORY ❑ Discussion ®Motion ❑ Resolution ❑ Ordinance ❑Bid Award ❑Public Hearing ❑ Other Mtg Date Mtg Date 06115115 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑ HR ❑ DCD ❑Finance ❑Fire ❑IT ❑P&R ❑ Police ®PW SPONSOR'S KPG, Inc. is currently the design consultant for the 2015 Annual Overlay& Repair Program SUMMARY with Contract No. 14-157. Three engineering firms were evaluated for construction management services and KPG was chosen as the most qualified. The construction bid opening was 6/3/15 and will be forthcoming. Council is being asked to approve Supplemental Agreement No. 1 to Contract No. 14-157 with KPG for construction management services in the amount of$172,658.89. REVIEWED BY ❑COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ®Transportation Cmte ❑Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑Planning Comm. DATE: 06/01/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $172,658.89 $175,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS(PG 18, 2014 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memorandum dated 05/29/15 Consultant Selection Scoring Matrix Vicinity Map Page 18, 2015 CIP Contract, Scope of Work, and Fee Estimate Minutes from the Transportation Committee meeting of 06/01/15 1 2 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director AA BY: David Sorensen, Project Manager DATE: May 29, 2015 SUBJECT: 2015 Overlay and Repair Program Project No. 91510401, Contract No. 14-157 Supplement No. 1 for Construction Management Services ISSUE Execute Supplement No. 1 with KPG, Inc. to provide construction management services for the 2015 Overlay and Repair Program. BACKGROUND Three (3) engineering firms were evaluated to provide construction management services for the City's 2015 Overlay and Repair Program (see attached scoring and selection matrix). Each consulting firm provides services with expertise in multiple engineering disciplines. All of the firms are qualified, however KPG, Inc. possesses a knowledge and understanding of the City's program that provides efficiency and benefits which cannot be matched at this time by any other firm. KPG, Inc. has prepared preliminary plans for several of the project segments as part of the 2014 Overlay and Repair Program and has also performed very well on previous City projects, including the preliminary design of the 2015 Overlay and Repair Program. The selection of a consultant to provide these services will continue to be evaluated annually as a consultant's staffing and expertise changes over time. DISCUSSION KPG, Inc. has provided a Supplement, scope of work, and fee estimate for construction management services for the 2015 Overlay and Repair Program for$172,658.89. Construction bid opening is scheduled for June 3, 2015. FISCAL IMPACT Sup No. 1 CM Budget Construction Management Sup No. 1 $ 172,658.89 $ 175,900.00 RECOMMENDATION Council is being asked to approve Supplement No. 1 to Contract 14-157 for construction management services with KPG, Inc. for the 2015 Overlay and Repair Program in the amount of $172,658.89 and consider this item on the Consent Agenda at the June 15, 2015 Regular Meeting. Attachments: Consultant Selection Scoring Matrix Vicinity Map Page 18,2015 CIP Contract,Scope of Work and Fee Estimate W:\PW Eng\PROJECTS\,-RW&RS Projects\Annual Overlay&Repair Programs\2015 Overlay&Repair Program\Construction ManagementTocs to TC 3 4 2015 Overlay Program — Contract for Construction Management Services DEA Associate U C d a CH2M Hill, Inc. Paving project design/ constuction experience. 2 5 3 Current Knowledge of FHWA, State, and Tukwila Standards and Procedures 2 4 3 Environmental Experience 2 2 2 Experience with similar federal aid projects? 2 3 3 Past Postive Experience on City Paving Projects 1 5 0 Small Scale Projects 3 4 2 Utilities Coordination 2 4 3 Contruction Inspection 1 5 4 TOTALS 15 32 20 For each category, highest score is 5 (with the lowest or worst score 1) Consultant with the highest score is ranked the best. Staff: Dave Sorensen Selection Date: 5/1/15 Selected Consultant: KPG, Inc. Selection Justification: This firm has demonstrated relevant pavement project design experience including exceptional familiarity with WSDOT/ FHWA standards, and a solid DBE approach and commitment. And has performed well on previous city overlay projects in providing design and CM services. Based on overall score KPG prevailed. 01 6 M ••; ♦� e 0001.K S. BOEING ACCESS RD. . t n ■ ie •• •° ■ S. 1247H ST. � R . GATEWAY DR. . , ,• Now ■ FORT DENT PARK IL SOUIHCENTER BLVD O ■ • '� • R r • TUKWILA PARKWAY .M■ ANDOVER PARK W. i . J ■ t R ■ 2015 Overlay Program Vicinity Map 7 8 CITY OF TUKWILA CAPITAL. PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Overlay and Repair Program Project No. 91310401 DESCRIPTION: Select,design and construct asphalt and concrete pavement overlays of arterial and residential streets, JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water,sewer,and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT.IMPACT: Reduces annual maintenance. COMMENT: Ongoing project.Only one year actuals shown in first column. FINANCIAL Through Estimated in$000's 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 48 100 125 125 150 150 175 175 175 1,223 Land(RNV) 0 Const. Mgmt. 175 175 175 200 200 225 225 230 1,605 Construction 1,125 1,250 1,260 1,300 1,320 1,325 1,330 1,340 10,250 TOTAL EXPENSES 1 481 1,400 1 1,550 1 1,560 1 1,650 1 1,670 1 1,725 1,7301 1,745 1 13,078 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 TOTAL SOURCES 1 481 1,400 1 1,550 1 1,560 1 1,650 1 1,670 1 1,725 1 1,730 1 1,745 1 13,078 Project Locatlon Z y .» 2015-2020 Capital Improvement Program 18 9 10 SUPPLEMENTAL AGREEMENT No.1 AGREEMENT No.14-157 PROTECT No. 91510401 City of Tukwila KPG,Inc. Public Works Department 753 -9th Avenue N. 6300 SouthcenterBoulevard #100 Seattle,WA 98109 Tukwila,WA 98188 PROTECT: 2015 Overlay Program—Construction Services This SUPPLEMENTAL AGREEMENT NO. 1 is to supplement the agreement entered into with KPG, Inc.and the City of Tukwila,which was executed on the 9th day of October,2014. All provisions in the basic agreement remain in effect,except as expressly modified as follows: Article 2,Scope of Services,shall be supplemented with the following: The Consultant agrees to provide construction services in accordance with the scope of work included as Exhibit A. Article 4,Payment,shall be modified as follows: Payment for work provided by Consultant shall be made as provided on Exhibit B, attached hereto, provided that the total amount of payment to the Consultant for this work not exceed$172,658.89 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $309,386.71 without express written modification of the Agreement signed by the City. IN WITNESS WHEREOF, the parties hereto have set their hands and seals this day of ,2015. APPROVED: APPROVED: CITY OF TUKWILA KPG,INC. Jim Haggerton Nelson Davis,P.E. Mayor Principal Attested: Christy O'Flaherty,City Clerk 11 EXHIBITA-1 Construction Management Services Scope of Work May 15, 2015 City of Tukwila —2015 Overlay Program This work will provide construction management services for the construction contract to complete the City of Tukwila — 2015 Overlay Program. These services will include design support, project management, documentation control, inspection, materials testing, public involvement, and contract administration during the construction of the project, as detailed below. KPG ("Consultant") will provide to the City of Pacific("City")construction management services for the project. A detailed scope for the Contract follows: I. INTRODUCTION The following scope of services and associated costs are based upon the assumptions outlined below. General Assumptions: • The proposed project team will include one full-time documentation control specialist, a part- time resident engineer during construction activities, one full-time inspector for each location during construction activities w h e r e unit price work is being performed, sub-consultants to provide services for materials testing, and other supporting tasks as deemed necessary. It is anticipated that full- time site observation will be required for the entire of the project. • The level of service is based on a construction project duration of approximately 60 calendar days. • KPG estimates a total project duration of 98 calendar days (14 weeks) including preconstruction service, construction services, and project closeout. No suspensions or stop work periods are anticipated during this duration. • It is anticipated that the KPG will develop the Record of Materials (ROM). This scope of services provides the management of the ROM and scheduling of required materials testing respectively. • It is anticipated that the City will review and execute the insurance, bonds, and the Construction Contract. 1. KPG will do all public outreach, and ensure affected business and residents are notified of impending contractor activities one week prior to work by door to door and or A-board signs that include date, hours of work, and a KPG staff phone number to call for questions. • The design engineers from KPG will be available during construction to answer questions during construction and review RAM's, shop drawings, and answer RFI's that require a level of engineering expertise outside of the capabilities of the Consultant. City of Tukwila—2015 Overlay Program Page 1 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5/10/15 12 EXHIBIT A-1 • Services will be performed in accordance with the Contract plans & special provisions, and City of Pacific engineering standards. II. SCOPE OF WORK The objective and purpose of this Construction Management Services Agreement is for the Consultant to successfully deliver the construction of the Project to the City by ensuring that the improvements are constructed in accordance with the approved Plans and Specifications, as may be amended or revised, that all of the required Project documentation is accounted for. TASK 1—MANAGEMENT/COORDINATION/ADMINISTRATION Provide overall project management, coordination with the City, monthly progress reports, and invoicing. This effort will include the following elements. • Organize and layout work for project staff. Prepare project instructions on contract administration procedures to be used during construction. • Review monthly expenditures and CM team scope activities. Prepare and submit project progress letters to the City along with invoices describing CM services provided each month. Prepare and submit reporting required by funding source(s),if any. Deliverables • Monthly invoices and progress reports TASK 2—PRECONSTRUCTION SERVICES 2.1 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices of, and conduct a preconstruction conference in the City's offices. The Consultant's project manager, resident engineer, inspector, and document control specialist will attend the preconstruction conference. The Consultant will prepare a written record of the meeting and distribute copies of the minutes to all attendees and affected agencies,staff, etc. At the Pre-construction conference, the Consultant shall facilitate discussions with the Contractor concerning the plans, specifications, schedules, issues with utilities, unusual conditions, Federal, State, and local requirements and any other items that will result in better project understanding among the parties involved. Deliverables • Preconstruction conference agenda with meeting minutes TASK 3—CONSTRUCTION SERVICES-FIELD 3.1 On-site Observation: The Consultant shall provide the services of one full time inspector per location during construction activities and other tasks necessary to monitor the progress of the work. An additional part time junior inspector, to be approved by the City, may be incorporated as dictated by the Contractor's approach to the Work. Construction staff shall oversee the following items of work, on the City of Tukwila—2015 Overlay Program Page 2 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 13 EXHIBITA-1 project site, and will observe the technical progress of the construction, including providing day-to-day contact with the Contractor and the City: • Preparation to include mobilization,clearing and grubbing, removal of structures • Grading, installation of drainage and storm sewer • Erosion Control and Planting • HMA grinding and paving • Driveways,curb,gutter and sidewalk • And all incidental items necessary to complete the Work as described in the Plans and/or Specifications. Field inspection staff will perform the following duties as a matter of their daily activities: i. Observe technical conduct of the construction, including providing day-to-day contact with construction contractor, City, utilities, and other stakeholders, and monitor for adherence to the Contract Documents. The Consultant's personnel will act in accordance with Sections 1-05.1 and 1-05.2 of the Standard Specifications. ii. Observe material, workmanship, and construction areas for compliance with the Contract Documents and applicable codes, and notify construction contractor of noncompliance. Advise the City of any non-conforming work observed during site visits. iii. Document all material delivered to the job site in accordance with the contract documents. iv. Prepare daily inspection reports, recording the construction contractor's operations as actually observed by the Consultant; includes quantities of work placed that day, contractor's equipment and crews, and other pertinent information. V. Interpret Contract Documents in coordination with the City and KPG. vi. Resolve questions which may arise as to the quality and acceptability of material furnished,work performed, and rate of progress of work performed by the construction contractor. vii. Establish communications with adjacent property owners. Respond to questions from property owners and the general public. Viii. Coordinate with permit holders on the Project to monitor compliance with approved permits, if applicable. ix. Prepare field records and documents to help assure the Project is administered in accordance with the funding requirements. X. Collect and calculate delivery tickets and salesman's daily reports of aggregate. All tickets will be initialed with correct bid item and stationing identified (Construction Manual 10-2). xi. Attend and actively participate in regular on-site weekly construction meetings. xii. Take periodic digital photographs during the course of construction, and record locations. City of Tukwila—2015 Overlay Program Page 3 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5/10/15 14 EXHIBITA-1 xiii. Coordinate with the City's maintenance personnel. xiv. Punch list. Upon substantial completion of work, coordinate with the Client and affected agencies, to prepare a 'punch list' of items to be completed or corrected. Coordinate final inspection with those agencies. Assumptions: • Consultant will provide observation services for the days/hours that the contractor's personnel are on-site. • The Consultant's monitoring of the construction contractor's activities is to ascertain whether or not they are performing the work in accordance with the Contract Documents; in case of noncompliance, Consultant will reject non-conforming work, and pursue the other remedies in the interests of the City, as detailed in the Contract Documents. The Consultant cannot guarantee the construction contractors' performance, and it is understood that Consultant shall assume no responsibility for: proper construction means, methods,techniques; project site safety, safety precautions or programs; or for the failure of any other entity to perform its work in accordance with laws, contracts, regulations, or City's expectations. 3.2 Substantial Completion: Upon substantial completion of work, coordinate with the City and other affected agencies, to perform a project inspection and develop a comprehensive list of deficiencies or 'punchlist' of items to be completed. A punchlist and Certificate of Substantial Completion will be prepared by the Consultant and issued by the City. 3.3 Materials Testing: Coordinate the work of the materials testing technicians and testing laboratories in the observation and testing of materials used in the construction; document and evaluate results of testing; and address deficiencies. Frequency of testing shall be determined by the resident engineer. Deliverables • Daily Construction Reports with project photos—submitted on a weekly basis • Punch List,Certificate of Substantial Completion • Review test reports for compliance TASK 4.1—CONSTRUCTION SERVICES—OFFICE City of Tukwila—2015 Overlay Program Page 4 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 15 EXHIBIT A-1 A. Document Control. Original documentation will be housed at the Consultant's office, and filed in accordance with standard filing protocol. A copy of working files will be maintained in the field office. Document Control consists of: ■ Final Estimate (Approving Authority File) ■ Comparison of Preliminary and Final Quantities(Approving Authority File) ■ Final Records(Approving Authority File) ■ Record of Material Samples and Tests ■ Affidavit of Wages Paid ■ Release for the Protection of Property Owners and General Contractor B. Project Coordination: Liaison with City, construction contractor, engineer, utilities and property owners on a regular basis to discuss project issues and status. C. Plan Interpretations: Provide technical interpretations of the drawings, specifications, and contract documents, and evaluate requested deviations from the approved design or specifications. Coordinate with City for resolution of issues involving scope, schedule, and/or budgetchanges. D. Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, and distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. E. Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for conformance with the contract documents. F. Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum items. Review the Contract Price allocations and verify that such allocations are made in accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for payment each month will be calculated with detailed data. G. Monthly Pay Requests: Prepare monthly requests for payment, review with the City, contractor and approve as permitted. Utilize City provided format for pay estimates, or Consultant format. H. Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and compare with field-observed progress, as described in Section 1-08 of the Special Provisions. In addition, perform schedule analysis on contractor provided CPM updates and review schedule for delays and impacts. Coordinate with Contractor in the development of recovery schedules, as needed, to address delays caused by either events or issues within the Contractor's control or other events or issues beyond the Contractor's control. I. Certified Payroll: Process and track all certified payroll per State Prevailing Wage Requirements. This includes verifying the initial payroll for compliance and 10% of all payrolls submitted thereafter.Tracking payroll each week. J. Weekly Statement of Working Days: Prepare and issue weekly statement of working day report each week. K. Subcontractor Documentation: Process/Approve all required subcontractor documentation. Request to Sublets will be verified and logged. This includes checking System Award Management System (SAMS), verifying business licensing, reviewing insurance City of Tukwila—2015 Overlay Program Page 5 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 16 EXHIBIT A-1 documentation,verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid.All subcontractor documentation will be logged into KPG's subcontractor logs. L. Record Drawings: Review record drawings prepared by the Contractor, and prepare a conformed set of project record drawings based on Contractor provided information and from inspection notes. Record drawings to be verified on a monthly basis, as part of the progress payment to the Contractor. Upon project completion, contractor provided markups will be verified for completeness and supplemented with inspection information. The Consultant will provide the marked up plan sheets with both the contractors and inspectors as-built information. Revisions to the CAD drawings are not included M. Physical Completion Letter: Following completion of all punchlist work, prepare physical completion letter to the contractor, and recommend that City and/or Utilities accept the project. N. Project Closeout: Transfer all project documents to the City for permanent storage. • Schedule review comments • As-built schedule • Meeting agendas and notes • Monthly Pay Estimates • Subcontractor Packets • Cost Projection • Physical Completion Letter • Final Project Documents TASK 4.2—SUBMITTAL/RFI PROCESSING A. Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test reports, and other submittals from the Contractor for compliance with the contract documents. Key submittals to be transmitted to the City for their review and approval. Submittals shall be logged and tracked. B. Request for Information(RFI): Review and respond to RFI's.RFI's shall be logged and tracked. C. Record of Materials (ROM): Utilize ROM prepared by KPG and update based on Special Provisions and Plans for use on the project, based on the contract specifications.The ROM will be maintained by the Resident Engineer.The ROM will track all of the materials delivered to the site including manufacturer/supplier, approved RAM's, QPL items, material compliance documentation, and all other required documentation. Deliverables • Submittal log • RFI Log • Completed Record of Material for Material Certification TASK 4.3—CHANGE MANAGEMENT A. Case Log: Develop and maintain a case log which includes change orders, RFP's, Field Work Directives City of Tukwila—2015 Overlay Program Page 6 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 17 EXHIBITA-1 B. Change Orders: Develop change orders and provide technical assistance to negotiate change orders, and assist in resolution of disputes which may occur during the course of the project. Each change order will be executed in accordance with WSDOT Standard Specifications and contain the following: • Change order • Independent Cost Estimate • Time Impact Analysis • Contractor's Pricing • Verbal Approval Memo • Back up documentation C. Field Work Directives: Prepare field work directives as necessary to keep the contractor on schedule. D. Minor Change Orders: Develop minor change orders per WSDOT Standard Specifications. Each minor change order will be executed and contain the following: • Independent Cost Estimate • Verbal Approval Memo • Back up documentation E. Force Account: Track contractor force account labor, equipment and materials. All force account calculations will be verified by the engineer and double checked by the documentation specialist. Deliverables • Change Order(s) • Case Management Log • RFI Log • Minor Change Order(s) • Force Account Records City of Tukwila—2015 Overlay Program Page 7 of 7 KPG Construction Management Services Project Number 14117 Scope of Work 5110115 18 HOUR AND FEE ESTIMATE Project: City of Tukwila 2015 Overlay Program Construction Services EXHIBIT B KPG • Architecture • Landscape Architecture • Civil Engineering • 1 - Management, Coordination, Administration (Estimated duration 16 weeks) Weekly level of effort by Classification 0 0 1 0 0 0 0 0 0 0 0 2 Preconstruction Budget Estimate 0 0 16 0 0 0 0 0 0 0 0 32 4,344.50 2 - Preconstruction Services (Estimated duration 3 weeks) Weekly level of effort by Classification 0 0 16 0 0 0 0 16 0 0 10 2 Preconstruction Budget Estimate 0 0 48 0 0 0 0 48 0 0 30 6 $ 15,123.33 3 - Construction Services (Estimated duration 9 weeks) Weekly level of effort by Classification 0 0 16 0 0 25 4 30 10 0 16 6 Construction Period Budget Estimate 0 0 144 0 0 225 36 270 90 0 144 54 $ 109,882.36 4 - Closeout/Record Dwg Services (Estimated duration 4 weeks) Weekly level of effort by Classification 0 0 4 0 5 0 0 8 0 0 16 2 Closeout / Record Dwg Budget Estimate 0 0 16 0 20 0 0 32 0 0 64 8 13,058.71 Subt 224 0 i 20 350 :'" 00 0 236- . , . 42,, Reimbursables & Subconsultants Material Testing Allowance $ Construction Vehicle (3 months @ $750) $ Miscellaneous - Mileage, Repro, Field Supplies $ 25,000.00 2,250.00 3,000.00 reject Budget ` " 5/26/2015 20 City Of Tukwila • Transportation Committee TRANSPORTATION COMMITTEE Meeting Minutes June 1, 2015— 5:15 p.m. — Foster Conference Room, 6300 Building PRESENT Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy Staff: David Cline, Robin Tischmak, Michael Ronda, David Sorensen, Maggie Lubov, Peter Lau, Cyndy Knighton, Gail Labanara, Laurel Humphrey CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:15 p.m. I. PRESENTATIONS 11. BUSINESS AGENDA A. Grant Acceptance: Commute Trip Reduction (CTR) Staff is seeking Council approval to accept three grant awards relating to Transportation Demand Management (TDM) programs. A revised informational memo was distributed to the Committee to correct the funding level of grant no. 2. 1. $186,334.64 in Federal funds administered by Washington State Department of Transportation (WSDOT) for trip reduction efforts in Tukwila's regional growth center. 2. $270,000.00 in Federal funds administered by WSDOT for expansion of trip reduction efforts in South King County. 3. $74,500 funding renewal for the current TDM allocation for the 2015-2017 biennium. The first two grants are part of WSDOT's effort to reduce greenhouse gas emissions by awarding Federal Congestion Mitigation and Air Quality Improvement (CMAQ) grants for projects in urban growth centers and corridors. The projects propose to enhance and expand trip reduction strategies such as online tools, trainings and incentives. Funding from the grants will completely cover costs for one position along with marketing and material expenses. The third grant is a renewal of WSDOT funds for the existing CTR program in the City, in place since 1991. No matching funds are required for any of the grants. The Committee asked clarifying questions and felt that a program overview would be helpful to the full Council prior to considering the grant awards. NO DECISION. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE. B. Supplemental Agreement: 2015 Overlay and Repair Program Staff is seeking Council approval of Supplemental Agreement No. 1 in the amount of $172,658.89 with KPG, Inc. for construction management services for the 2015 Overlay and Repair Program. The base contract No. 14-157 was for design services for this project. KPG was selected from a pool of three firms for their expertise and experience in Tukwila. The bid for construction is scheduled to be opened on June 3, 2015 and the results will be presented at the next Transportation Committee meeting. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. 21 22 COUNCIL AGENDA SYNOPSIS ----------------------------------Initials--------------------------------- ITEM.NO. Mee tin Date Pre aced by Ma is review Council reviem, 06/15/15 BG 4. D. ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 06/15/15 AGENDA ITEM TI'i'LI? Interurban Ave S Construction Management Supplemental Agreement with Anchor QEA CATEGORY ❑ Discussion N Motion ❑ Resolution ❑ Ordinance ❑Bid Award ❑ Public Hearing ❑ Other Mt g Date Mtg Date 06115115 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑ HR ❑ DCD ❑Finance ❑Fire ❑ IT ❑P&'R ❑ Police ❑PW' SPONSOR'S Contract No. 14-066 with Anchor QEA provides construction management for the SUMMARY Interurban Ave S Project. Due to construction difficulties with the retaining wall and stormwater vault, the project has been delayed and Anchor will need to continue to provide construction management services through December 2015. Contingency of$1,139,675.00 will cover Anchor's Supplemental Agreement No. 1. Council is being asked to approve Anchor's Supplement No. 1 to Contract No. 14-066 in the amount of$463,928.00. REVIEWED BY F] COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑Transportation Cmte ®Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑Planning Comm. DATE: 06/01/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $463,928.00 $10,499,201.39 $0.00 Fund Source: 104 ARTERIAL STREET FUND(PAGE 14, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memorandum dated 05/29/15 Anchor QEA Supplement Agreement No. 1 to Contract No. 14-066 Minutes from the Transportation Committee meeting of 06/01/15 23 24 City of Tukwila Jim Haggerton, Mayor ••= INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee ��..(( FROM: Bob Giberson, Public Works Directorl� BY: Michael Ronda,Construction Project Manager DATE: May 29,2015 SUBJECT: Interurban Avenue South (S 143rd St to Fort Dent Way) Project No.90310402,Contract No. 14-066 CM Consultant Supplement#1 with Anchor QEA ISSUE Execute a contract supplement with Anchor QEA (Anchor) in the amount of$463,928.00 to perform continued construction management(CM) services through the end of 2015 for the Interurban Ave S street improvement project. BACKGROUND Construction has been underway on Interurban Ave S from S 143rd St to Fort Dent Way since July 2014. Difficulties encountered in construction of two of the major project features(the retaining wall near Fort Dent Way and the large stormwater detention vault near S 149th St) have delayed construction progress and we now believe the original scheduled physical completion date of October 14,2015 will need to be extended to sometime near the end of the year. DISCUSSION Anchor has provided the attached contract supplement and fee estimate to continue to perform construction management services through the end of 2015.The negotiations for this supplement anticipate a shift in consultant personnel to better position the team for an extended construction contract. We will work diligently with our contractor to complete the project within this new timeframe. FINANCIAL IMPACT Contracts Awarded Budget Construction Contract $7,597,833.39 $8,737,508.39 Remaining 15%Construction Contingency 675,747.00 Anchor QEA Construction Management 1,078,720.00 1,666,693.00 Anchor QEA CM Supplement#1 463,928.00 KPG On-Call Construction Support Sup No. 2 357,973.00 Tukwila Staff, Field Office Expenses, WSDOT 225,000.00 Potential Utility Conflicts 100,000.00 Storm Quality Retrofit Budget(CIP page 83) 95,000.00 Totals $10,499,201.39 $10,499,201.39 RECOMMENDATION Council is being asked to approve the construction management contract supplement with Anchor QEA in the amount of $463,928.00 for the Interurban Ave S Project and consider this item on the Consent Agenda of the June 15, 2015 Regular Meeting. Attachment: Anchor QEA Contract Supplement#1 with Exhibit A W:\PW Eng\PROJECTS\+-RW&RS Projects\Interurban Ave S(90310402)\Consultant Selection\Info Memo CM Anchor Supplement#105-29-15 gl-MER.docx 25 26 � Washington State VI/ Department of Transportation Supplemental Agreement Organization and Address Anchor QEA, LLC Number One 720 Olive Way, Suite 1900 Original Agreement Number STPUL-1045 (007) Seattle, WA 98101 Phone: (206) 287-9130 Project Number 90310402 Execution Date Completion Date June 6, 2014 December 31, 2015 Project Title Interurban Avenue South New Maximum Amount Payable Improvements $ $1,542,648.00 Description of Work provide Construction Management Services for roadway improvements from S. 143rd Street to Fort Dent Way, including walls, storm drainage,illumination, landscaping, paving, and pedestrian facilities. The Local Agency of City of Tukwila desires to supplement the agreement entered into with Anchor QEA LLC and executed on June 6, 2014 and identified as Agreement No. 14-066 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: Expansion of level of services and time allocation for staff as identified in the original agreement scope of work. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31 2015 III Section V, PAYMENT, shall be amended as follows: Increase maximum amount payable from$1,078,720.00 to $1,542,648.00. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: ,�t-�' ,'� �� By: r onsultant Signature Approving Authority Signature 14Y,\ DOT Form 140-063 EF Date Revised 9/2005 27 Supplement 1 Exhibit A Consultant Fee Determination—Summary Sheet (Cost Plus Fixed Fee) Project: Interurban Avenue South—S. 143rd Street to Fort Dent Way Direct Salary Cost(DSC): Classification Man Hours Rate = Cost Principal—Construction Manager 352 X $87.00* $30,624.00 Resident Engineer 927 X $48.00 $44,496.00 Senior Staff— Lead Inspector 614 X $39.00 $23,946.00 Office Engineer 144 X $27.00 $3,880.00 Environmental Monitor(Permitting) 197 X $32.00 $6,304.00 Inspector-Specialty 1,686 X $27.50 $46,365.00 Project Coordinator/Administration 110 X $25.00 $2,750.00 *Rate capped at$87.00 for this contract Total DSC = $158,365.00 Overhead (OH Cost including Salary Additives): OH Rate x DSC of 160.94 %x $158,365.00 $254,873.00 Fixed Fee (FF): FF Rate x DSC of 25.00 %x $158,365.00 $39,591.00 Sub-Total Labor: $452,829.00 Reimbursables: Mileage $4,800.00 Copier/Copies $2,100.00 Misc.Supplies and Equipment $324.00 Lab Fees $3,875.00 Subtotal (Supplement 1): $463,928.00 Grand Total (Original +Supplement 1): $1,542,648.00 Prepared by: Ed Berschinski Date: 4/21/2015 28 Transportation Committee Minutes June 1, 2015-Page 2 C. Supplemental Agreement: Interurban Avenue South (South 143 d Street to Fort Dent Way) Staff is seeking Council approval of Supplemental Agreement No 1 with Anchor QEA in the amount of $463,928.00 for continued construction management services for the Interurban Avenue South (South 143 Street to Fort Dent Way) Project. Construction on this project has been underway since July 2014 and significant delays have occurred due to geotechnical information regarding two major project features: the retaining wall near Fort Dent Way and the stormwater detention vault near South 149th Street. The original completion date of October 14, 2015 will likely need to be extended to near the year's end. This supplement would cover the cost of construction management services by Anchor through the end of 2015 and brings the project total to $10,499,201.39. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. D. Resolution: Six-Year Transportation Improvement Program (2016-2021) Staff is seeking Council approval of a resolution that would adopt the annual update of the Six-Year Transportation Improvement Program (TIP) for 2016-2021. The TIP, updated annually as required by the RCW, is a compilation of transportation projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Projects must be included in the TIP to be eligible for certain grant funding. Committee members and staff reviewed the list of projects. Several projects were deleted from the 2016 TIP due to their completion or because they are no longer deemed necessary-The Committee requested that staff include a table of projects that includes a brief description and reason for omission, if applicable, in the information that is provided to the Committee of the Whole. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE, INCLUDING PUBLIC HEARING. E. Supplemental Agreement: Tukwila Urban Center Transit Center Staff is seeking Council approval of Supplemental Agreement No. 2 to Contract No. 13-199 in the amount of $33,962.66 with AECOM Technical Services for the TUC Transit Center, Andover Park West Street, and Water Improvement Projects. The TUC Transit Center project was completed on April 3, 2015 and included a substantial number of unexpected utility conflicts, design changes, and delays. This supplement will allow AECOM to finalize the project close-out. There is sufficient balance in the project's budget contingency balance to cover this cost. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. III. SCATBd Councilmember Hougardy highlighted the "Stuck in Traffic" report from the May 19, 2015 SCATBd agenda. IV. MISCELLANEOUS Meeting adjourned at 6:10 p.m. Next meeting: Monday, June 15, 2015 Committee Chair Approval Min-s-by GL 29 30 COUNCIL AGENDA SYNOPSIS ----------------------------------Initials--------------------------------- ITEM NO. Meetin Date Prepared by Ma or's review Council review 06/15/15 BG. 4. E. ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 06/15/15 AGENDA ITEM TITLE Tukwila Urban Center-Transit Center and Andover Park West Projects Construction Management Supplemental Agreement with AECOM CATEGORY ❑ Discussion ®Motion ❑ Resolution ❑ Ordinance ❑Bid Award ❑ Public Hearing ❑ Other Mtg Date Mtg Date 06115115 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑HR ❑ DCD ❑Finance ❑Fire ❑IT ❑P&R ❑ Police ® PW SPONSOR'S Contract No. 13-199 with AECOM Technical Services provided construction management SUMMARY for the TUC Transit Center and Andover Park W Street and Water Improvements. Due to various issues,the project has been delayed and AECOM will need to continue to provide CM services through September 2015 in order to close out the project. Contingency of $905,626.00 will cover AECOM's Supplemental Agreement No. 2. Council is being asked to approve AECOM's Supplement No. 2 to Contract No. 13-199 in the amount of$33,962.66. REVIEWED BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ®Transportation Cmte ❑Utilities Cmte ❑Arts Comm. ❑Parks Comm. ❑Planning Comm. DATE: 06/01/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $33,962.66 $905,626.00 $0.00 Fund Source: 104 ARTERIAL STREETS(PAGE 16&17, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memorandum dated 05/29/15 AECOM Supplement Agreement No. 2 to Contract No. 13-199 Minutes from the Transportation Committee meeting of 06/01/15 31 32 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Peter Lau, Senior Program Manager DATE: May 29, 2015 SUBJECT: TUC Transit Center Project; Andover Park West Street and Water Projects Project Numbers 90610402,98810404 and 99840105, Contract No. 13-199 Supplemental Agreement No. 2 with AECOM Technical Services ISSUE Approve Supplemental Agreement No. 2 for the construction management (CM) contract with AECOM Technical Services (AECOM) in the amount of$33,962.66 for the Tukwila Urban Center(TUC) Transit Center, Andover Park West Street, and Water Improvement Projects (Transit Center Project). BACKGROUND A CM contract and Supplemental Agreement No. 1 with AECOM were previously executed to provide CM assistance for full-time field engineering, inspections, documentation compliance support, and on-call specialty support. DISCUSSION With a substantial number of unexpected underground utility conflicts, design changes, and delays from the contractor, sub-contractors and material suppliers, the Transit Center Project was physically completed on April 3, 2015. Contract Supplement No. 2 for$33,962.66 will allow AECOM to finalize the project close-out documentation, process remaining change orders, and provide the record drawings based upon the contractor's red-line mark-up drawings. FINANCIAL IMPACT The 15%construction contingency was$905,626.00 and there is currently a remaining balance of $464,716.59 that will adequately pay for AECOM's Supplement No. 2 in the amount of$33,962.66. This will leave a remaining contingency of$430,753.93. RECOMMENDATION Council is being asked to approve the construction management Supplemental Agreement No. 2 with AECOM Technical Services to Contract No. 13-199 in the amount of$33,962.66 and consider this item on the Consent Agenda at the June 15, 2015 Regular Meeting. Attachments: AECOM Supplemental Agreement No.2 to Contract No.13-199 WAPW Eng\PROJECTS\A-RW&RS Projects\Transit Center(90610402)\Construction-City use only\CM Consultant Selection\Info Memo for AECOM CM Supplement k2,2,5-12.15-sb.doc 33 34 A w7AIP Traces Supplemental Agreement Organization and Address Number No. 2 AECOM Technical Services 710 Fifth Avenue, Suite 1000 Original Agreement Number Seattle, WA 98004 13-199 C Phone: 206.624.9349 Project Number Execution Date Completion Date 90610402 12/5/2013 1 9/30/2015 Project Title New Maximum Amount Payable Tukwila Urban Transit Center $ 933,403.01 Description of Work Construction Management Services The Local Agency of City of Tukwila desires to supplement the agreement entered into with AECOM Technical Services and executed on 12/5/2013 and identified as Agreement No. 13-199 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: finalize close-nut documentation and current change.orders; provide CARD as-hunts based upon contractor red- lines, approved chance orders and field directives I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the numbg q��aI gar days for completion of the work to read: Extend time of contract to / 1 III Section V, PAYMENT, shall be amended as follows: Total Value is X33 69 66 which inchides an increase to fixed fee value of�3 070 46 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. By: Rich 7 By: t CAultant Signature Approving Authority Signature DOT Form 140-063 EF Date Revised 9/2005 35 Exhibit A A, COM City of Tukwila -Tukwila Transit Center Budget Summary-Supplement No.2 AECOM Labor-Home Office Employee Classification Hours Rate* Cost Mike Horton PM/QC 8.00 $ 73.88 $591.03 Lloyd Brown CADD Tech 80.00 $ 34.93 $2,794.40 88.00 $3,385.43 Total DSC $3,385.43 Overhead(OH Cost--Including Salary Additives): OH Rate x DSC of 156.22% x $3,385.43 $5,288.72 Fee Fee Rate x DSC of 29.85% x $3,385.43 $1,010.55 Labor Subtotal-Home Office $9,684.70 AECOM Labor-Field Office Employee Classification Hours Rate* Cost Jim Fillis RE 24.00 $ 84.89 $2,037.36 Janet Lee ARE 84.00 $ 45.40 $3,813.60 Leroy Clark Field Lead 8.00 $ 49.91 $399.28 Jamie Shinsato Documentation 24.00 $ 27.11 $650.64 Jesse Rogers Arch.Finishes $0.00 140.00 $6,900.88 Total DSC $6,900.88 Overhead(OH Cost--Including Salary Additives): OH Rate x DSC of 122.43% x $6,900.88 $8,448.75 Fee: Fee Rate x DSC of 29.85% x $6,900.88 $2,059.91 Labor Subtotal-Field Office $17,409.54 Labor Subtotal *Actual 2015 billing rates $27,094.24 Reimbursable Cost Vehicles-Remaining Rental and Fuel(Jan-Apr) $ 4,000.00 Expenses $ - $4,000.00 Subconsultant Cost Materials Testing -Final Otto Rosenau Invoice(12/23/2014) $2,868.42 Surveying $0.00 $2,868.42 Total $33,962.66 36 List of Remaining items for Tukwila: Janet Jaime Jim Mike Leroy Lloyd Final As-builts(added Scope) 4 4 8 80 Receive and Review Remaining Certified Payrolls 8 Receive remaining Affidavits 8 Missing materials certifications,warranties,and other documentation (have a list—need the paperwork) 4 Remaining Force Account for project(miscellaneous from punchlist and Property Resto ration) PE#16 24 ADA ramp report(all info already collected—just need to place on plans and make report for MEF items) 4 Document Filing—print out all missing hard copies,Transfer remaining electrical to City files 8 24 Change Orders—#16,#17,#18 16 12 Internal Document QC review 4 2 4 1AECOM Invoice contract management 61 41 1 Totalsl 84� 241 241 81 81 8 37 38 Transportation Committee Minutes June 1, 2015-Page 2 C. Supplemental Agreement: Interurban Avenue South (South 143rd Street to Fort Dent Way) Staff is seeking Council approval of Supplemental Agreement No 1 with Anchor QEA in the amount of $463,928.00 for continued construction management services for the Interurban Avenue South (South 143 Street to Fort Dent Way) Project. Construction on this project has been underway since July 2014 and significant delays have occurred due to geotechnical information regarding two major project features: the retaining wall near Fort Dent Way and the stormwater detention vault near South 1491h Street. The original completion date of October 14, 2015 will likely need to be extended to near the year's end. This supplement would cover the cost of construction management services by Anchor through the end of 2015 and brings the project total to $10,499,201.39. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. D. Resolution: Six-Year Transportation Improvement Program (2016-2021) Staff is seeking Council approval of a resolution that would adopt the annual update of the Six-Year Transportation Improvement Program (TIP) for 2016-2021. The TIP, updated annually as required by the RCW, is a compilation of transportation projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Projects must be included in the TIP to be eligible for certain grant funding. Committee members and staff reviewed the list of projects. Several projects were deleted from the 2016 TIP due to their completion or because they are no longer deemed necessary-The Committee requested that staff include a table of projects that includes a brief description and reason for omission, if applicable, in the information that is provided to the Committee of the Whole. UNANIMOUS APPROVAL. FORWARD TO JUNE 8, 2015 COMMITTEE OF THE WHOLE, INCLUDING PUBLIC HEARING. E. Supplemental Agreement: Tukwila Urban Center Transit Center Staff is seeking Council approval of Supplemental Agreement No. 2 to Contract No. 13-199 in the amount of $33,962.66 with AECOM Technical Services for the TUC Transit Center, Andover Park West Street, and Water Improvement Projects. The TUC Transit Center project was completed on April 3, 2015 and included a substantial number of unexpected utility conflicts, design changes, and delays. This supplement will allow AECOM to finalize the project close-out. There is sufficient balance in the project's budget contingency balance to cover this cost. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. III. SCATBd Councilmember Hougardy highlighted the "Stuck in Traffic" report from the May 19, 2015 SCATBd agenda. IV. MISCELLANEOUS Meeting adjourned at 6:10 p.m. Next meeting: Monday, June 15, 2015 Committee Chair Approval Min #es by GL 39 40 COUNCIL AGENDA SYNOPSIS • ----------------------------------Initials--------------------------------- ITEMNO. Meeting Date Prepared by Ma or's review Council review 06/15/15 BG 4. F. ITEM INFORMATION CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 06/15/15 AGENDA I'T`EM TITLE 2015 Annual Small Drainage Program Bid Award to Green River Construction CATEGORY ❑Discussion ❑Motion ❑ Resolution ❑ Ordinance ❑ Bid Award ❑Public Hearing [—] Other Mtg Date Mtg Date 06115115 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council [:]Mayor ❑ HR ❑ DCD ❑Finance ❑Fire ❑IT ❑P&R ❑Police ®PW SPONSOR'S The 2015 Annual Small Drainage Program was advertised for construction on May 19 and SUMMARY 26, 2015. Four bids were opened on June 2, 2015 with the low bid of$182,142.50 from Green River Construction. Green River Construction is a local company that has successfully worked for the City in the past. This project will include three sites for drainage improvements. Council is being asked to award the contract to Green River Construction in the amount of$182,142.50. REVIEWED BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑Transportation Cmte ®Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 06/09/15 COMMITTEE CHAIR: DENNIS ROBERTS RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $182,142.50 $261,242.85 $0.00 Fund Source: 412 SURFACE WATER(PAGE 82, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memorandum dated 06/05/15 Page 82, 2015 CIP Project Location Map Bid Tabulation Minutes from the Utilities Committee meeting of 06/09/15 41 42 City of Tukwila Jim Haggerton, Mayor ••= INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director By: Ryan Larson, Senior Program Manager DATE: June 5, 2015 SUBJECT: 2015 Annual Small Drainage Program Project No. 91341201 BID AWARD ISSUE Award a contract to Green River Construction for construction of the 2015 Annual Small Drainage Program. BACKGROUND The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete, but are smaller than a typical capital improvement project. The projects originate from citizen complaints and maintenance staff and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, expense, permitting requirements, and length of time on the list. The highest priority projects are then designed and constructed. The 2015 Annual Small Drainage Program will provide drainage improvements at three locations. A fourth project was completed under a separate construction contract in order to install a new drainage system on Longacres Way S, prior to the Washington State Department of Transportation overlaying the roadway. ANALYSIS The 2015 Annual Small Drainage Program was advertised for bids on May 19 and May 26, 2015. Four bids were received and opened on June 2, 2015. The bids were checked, tabulated, and one error was found. Green River Construction is the apparent low bidder with a bid of $182,142.50. The engineer's estimate was $183,885.00. Green River Construction has successfully constructed past small drainage projects as well as other work with the City of Tukwila. Projects for the 2015 Annual Small Drainage Program include: Site 1) 34th PI S — Replace and abandon an existing 12" pipe on private property and replace it in a City acquired easement. Site 2) 51St Ave S — Replace two failing 12" storm pipes crossing 51St Ave S along the current alignment. A roadway closure will be required due to pipe depth and limited roadway width. Site 3) Gilliam Creek at Tukwila Pkwy/Andover Park E—Add additional quarry spalls, place a concrete pad beneath the pipe, and grout the voids to correct erosion around the existing 108" Gilliam Creek pipe. WAPW Eng\PROJECTS\A-DR Projects\Annual Small Drainage Programs\2015 SDP(91541201)\Design\Info Memo Bid Award 2015 gl-sb.docx 43 INFORMATIONAL MEMO Page 2 Site 4) Long Acres Way Drainage— This project was completed with a budget of$63,757.15 under a separate construction contract due to timing issues with WSDOT paving. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2015 Budget Bid Amount $182,142.50 $183,885.00 $325,000.00 Contingency (15%) 27,321.38 27,582.75 Longacres Way S 0.00 0.00 (63,757.15) Total $209,463.88 $211,467.75 $261,242.85 RECOMMENDATION The Council is being asked to award the construction contract for the 2015 Annual Small Drainage Program to Green River Construction in the amount of$182,142.50 and consider this item on the June 15, 2015 Regular Consent Agenda. Attachments: CIP Page 82 Project Location Map Bid Tabulation WAPW Eng\PROJECTSW DR ProjectsMnual Small Drainage Programs12015 SDP(91541201)1Designllnfo Memo Bid Award 2015 gl-sb.docx 44 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Small Drainage Program Project No. Varies DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing/ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Projects for this annual program are taken from Small Drainage Project List. MAINT.IMPACT: Reduces maintenance. Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar COMMENT: years. Budget for 2014 includes$270k for Thorndyke Safe Routes to School (S 150th St). Grants from State Municipal Stormwater Capacity Grants. FINANCIAL Through Estimated (in$000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 60 80 80 80 80 80 80 80 620 Land (R/W) 0 Const. Mgmt. 70 80 80 80 80 80 80 80 630 Construction 279 270 325 525 525 525 525 525 525 4,024 TOTAL EXPENSES 409 270 485 685 685 685 685 685 685 5,274 FUND SOURCES Awarded Grant 50 50 100 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 409 220 485 635 685 685 685 685 685 5,174 TOTAL SOURCES 409 270 485 685 685 685 685 685 685 5,274 Pro/ect Location., Entire System f z I � 2015-2020 Capital Improvement Program 82 45 46 h0 *m164m mfg s 871h P, If 2015 Annual Neighborhood eeo Drainage Program s„611r S,5„q M161 ,16th g1 Yn Io N 5' I th 1-h I 122 d S, dp 1 211 1 L% 1261h St 6,21 mwV 1h S1 111h Not to Scale 5,351 S1 h�, Site 1 < S 146th Site 2 < U—, S14 s— S-Id St Site 3 S 156th St 1-1. Px, 1-4 Site 4 I 11s a s tent — < �d,Wa tt Tl—D, 168th -1h sI Riverstl I i't s 2001h S, Z” Date.June 3,2015 By:R.Linsao WAPW Eng\GIS\Projects\RyanL\CIP Storm Drainage\2015 drainage program.mxd 48 CITY OF TU KW I LA DEPARTMENT OF PUBLIC WORKS 2015 Small Drainage Program Project No. 91541201 Bid Tabulation K: ?G Prepared By: Sam Douglas, P Date: b -G 2oiS Item No Section No Item Description Oty Unit Engineer's Estimate Road Construction Northwest Inc. Laser Underground & Earthworks Green River Construction CCT Construction Inc. Unit Price Amount Unit Price Amount Unit Price Amount Unit Price ` Amount Unit Price Amount ROADWAY 1 1 -04 Minor Change 1 FA $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 $ 8,000.00 2 1 -07 Temporary Water Pollution / Erosion Control 1 LS $ 8,000.00 $ 8,000.00 $ 4,200.00 $ 4,200.00 $ 3,000.00 $ 3,000.00 $ 8,000.00 $ 8,000.00 $ 12,800.00 $ 12,800.00 3 1 -09 Mobilization 1 LS 516,500.00 $ 16,500.00 $ 18,000.00 $ 18,000.00 $ 21,000.00 $ 21,000.00 $ 12,000.00 $ 12,000.00 $ 23,000.00 $ 23,000.00 4 1 -09 Resolution of Utility Conflicts 1 FA $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 5 1 -10 Project Temporary Traffic Control 1 LS $ 9,500.00 $ 9,500.00 $ 15,000.00 $ 15,000.00 $ 5,000.00 $ 5,000.00 $ 8,000.00 $ 8,000.00 $ 10,000.00 $ 10,000.00 6 2 -01 Clearing and Grubbing 1 LS $14,000.00 $ 14,000.00 $ 4,500.00 $ 4,500.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 12,000.00 $ 12,000.00 7 2 -02 Pavement Removal 635 SY $ 15.00 $ 9,525.00 $ 9.00 $ 5,715.00 $ 10.00 $ 6,350.00 $ 4.50 $ 2,857.50 $ 9.20 $ 5,842.00 8 2 -03 Unsuitable Foundation Excavation Incl. Haul 10 CY $ 35.00 $ 350.00 $ 75.00 $ 750.00 $ 100 -00 $ 1,000.00 $ 120.00 $ 1,200.00 $ 60.00 $ 600.00 9 2 -03 Gravel Borrow Incl. Haul 35 TN $ 25.00 $ 875.00 $ 55.00 $ 1,925.00 $ 30.00 $ 1,050.00 $ 50.00 $ 1,750.00 $ 40.00 $ 1,400.00 10 4 -04 Crushed Surfacing Top Course 205 TN $ 35.00 $ 7,175.00 $ 45.00 $ 9,225.00 $ 30.00 $ 6,150.00 $ 32.00 $ 6,560.00 $ 60.00 $ 12,300.00 11 5 -04 HMA Cl. 1/2° PG 64 -22 90 TN $ 150.00 $ 13,500.00 $ 170.00 $ 15,300.00 $ 150.00 $ 13,500.00 $ 172.00 $ 15,480.00 $ 210.00 $ 18,900.00 12 5 -04 HMA Berm/Thickened Edge 80 LF $ 7.00 $ 560.00 $ 6.50 $ 520.00 $ 5.00 $ 400.00 $ 10.00 $ 800.00 $ 22.00 $ 1,760.00 TRAFFIC CONTROL DEVICES 13 8 -09 Raised Pavement Marker Type 1 0.2 HUN $ 300.00 $ 60.00 $ 2,000.00 $ 400.00 $ 3,000.00 $ 600.00 $ 1,500.00 $ 300.00 $ 800.00 $ 160.00 14 8 -22 Plastic Line, 4 In. 30 LF I $ 3.00 $ 90.00 $ 25.00 $ 750.00 $ 15.00 $ 450.00 $ 30.00 $ 900.00 $ 20.00 $ 600.00 ROADSIDE DEVELOPMENT 15 8 -01 Topsoil/Fine Compost 22 CY $ 50.00 $ 1,100.00 $ 55.00 $ 1,210.00 $ 55.00 $ 1,210.00 $ 40.00 $ 880.00 $ 70.00 $ 1,540.00 16 8 -01 Hydroseed 305 SY $ 5.00 $ 1,525.00 $ 4.00 $ 1,220.00 $ 3.00 $ 915.00 $ 8.00 $ 2,440.00 $ 1.75 $ 533.75 17 8-01 Erosion Control Fabric 295 SY $ 5.00 $ 1,475.00 $ 8.00 $ 2,360.00 $ 5.00 $ 1,475.00 $ 5.00 $ 1,475.00 $ 4.00 $ 1,180.00 18 8 -02 Property Restoration i FA $10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 19 8 -12 Black Vinyl Coated Chain Link Fence 80 LF $ 45.00 $ 3,600.00 $ 60.00 $ 4,800.00 $ 60.00 $ 4,800.00 $ 30.00 $ 2,400.00 $ 55.00 $ 4,400.00 STORM DRAINAGE 20 2 -09 Shoring or Extra Excavation Class B 1 LS $ 9,000.00 $ 9,000.00 $ 2,500.00 $ 2,500.00 $ 4,000.00 $ 4,000.00 $ 3,500.00 $ 3,500.00 $ 17,000.00 $ 17,000.00 21 2 -12 Construction Geotextile for Separation 60 SY $ 15.00 5 900.00 , $ 9.00 $ 540.00 $ 30.00 $ 1,800.00 $ 10.00 $ 600.00 $ 8.00 $ 480.00 22 7 -02 Concrete Sill 1 LS $ 1,000.00 $ 1,000.00 $ 5,500.00 $ 5,500.00 $ 8,000.00 $ 8,000.00 $ 6,500.00 $ 6,500.00 $ 12,500.00 $ 12,500.00 23 7 -04 Solid Wall PVC Storm Sewer Pipe 12 In. Diam 250 LF $ 65.00 $ 16,250.00 $ 90.00 $ 22,500.00 $ 150.00 $ 37,500.00 , $ 100.00 $ 25,000.00 $ 60.00 $ 15,000.00 24 7 -04 Solid Wall PVC Storm Sewer Pipe 18 In. Diam 70 LF $ 75.00 $ 5,250.00 $ 250.00 $ 17,500.00 $ 200.00 $ 14,000.00 $ 121.00 $ 8,470.00 $ 120.00 $ 8,400.00 25 7 -04 Remove /Abandon Existing Storm Sewer Pipe 130 LF $ 15.00 $ 1,950.00 $ 9.00 $ 1,170.00 $ 20.00 $ 2,600.00 $ 27.00 $ 3,510.00 $ 25.00 $ 3,250.00 26 7 -05 Remove Drainage Structure 1 EA $ 1,000.00 $ 1,000.00 $ 900.00 $ 900.00 $ 2,00000 $ 2,000.00 $ 750.00 $ 750.00 $ 1,000.00 $ 1,000.00 27 7 -05 Connection to Existing Drainage Structure 5 EA $ 1,000.00 $ 5,000.00 $ 700.00 $ 3,500.00 $ 4,000.00 $ 20,000.00 $ 1,100.00 $ 5,500.00 $ 1,200.00 $ 6,000.00 28 7 -05 Connection to Existing Drainage Pipe 3 EA $ 500.00 $ 1,500.00 $ 700.00 $ 2,100.00 $ 3,000.00 $ 9,000.00 $ 1,000.00 $ 3,000.00 $ 1,000.00 $ 3,000.00 29 7 -05 Catch Basin Type 2 48 In. Diam. 1 EA $ 4,500.00 $ 4,500.00 $ 5,500.00 $ 5,500.00 $ 5,000.00 $ 5,000.00 $ 6,500.00 $ 6,500.00 $ 7,000.00 $ 7,000.00 30 7 -05 Remove and Replace Sanitary Sewer Frame and Cover 2 EA $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 500.00 $ 1,000.00 $ 750.00 $ 1,500.00 $ 1,000.00 $ 2,000.00 31 7 -05 Remove and Replace Storm Sewer Frame and Grate 1 EA $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 700.00 $ 700.00 $ 1,000.00 $ 1,000.00 32 7 -06 Pothole Existing Utilities 1 EA $ 1,000.00 $ 1,000.00 $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 2,200.00 $ 2,200.00 $ 500.00 $ 500.00 33 7 -20 Temporary Water Bypass System 1 LS 511,000.00 $ 11,000.00 $ 4,500.00 $ 4,500.00 $ 9,000.00 $ 9,000.00 $ 5,400.00 $ 5,400.00 $ 25,000.00 $ 25,000.00 34 7 -21 Pressure Grout Installation and Mobilization 1 LS 510,000.00 $ 10,000.00 $ 4,500.00 $ 4,500.00 $ 5,000.00 $ 5,000.00 $ 14,300.00 $ 14,300.00 $ 50,000.00 $ 50,000.00 35 7 -21 Grout Material 1 FA $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 36 8 -15 Light Loose Rip -Rap 12 CY $ 200.00 $ 2,400.00 $ 150.00 $ 1,800.00 $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 $ 180.00 $ 2,160.00 37 8 -15 Quarry Spalls 12 CY $ 150.00 $ 1,800.00 $ 150.00 $ 1,800.00 $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 $ 180.00 $ 2,160.00 TOTAL BID: $ 183,885.00 $ 184,485.00 $ 221,700.00 8181,872.50 $ 285,465.75 Bid Proposal $184,485.00 Matches? Yes Bid Proposal Matches? $221,700.00 Yes Corrected Math Error Bid Proposal Matches? $182,142.50 No Bid Proposal $285,465.75 Yes 50 City Of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes June 9, 2015— 5:30 p.m. — Foster Conference Room, 6300 Building PRESENT Councilmembers: Dennis Robertson, Chair; De'Sean Quinn, Verna Seal Staff: Bob Giberson, Gail Labanara, Robin Tischmak, Pat Brodin, Ryan Larson, Mike Cusick, and Laurel Humphrey i CALL TO ORDER: Committee Chair Robertson called the meeting to////,order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Bid Award: 2015 Annual Small Drainage Program Staff is seeking Council approval to award the construction contract for the 2015 Annual Small Drainage Program to Green River Construction in the amount of $182,142.50. This program constructs drainage projects that are too large for City staT smaller than a typical capital improvement project, and prioritized based on a variety of factors. Green River Construction is the low bidder and has successfully constructed past drainage projects. For 2015 the program will provide drainage improvements at sites'on 3 tn Place South, 51st Place South, and Gilliam Creek at Tukwila Parkway/Andover Place East. ','separate project at Longacres Way South was completed under a s karate contract in coordination with WSDOT paving. UNANIMOUS APPROVAL. FORWAI TO JUNE 15, 2015 REGULAR CONSENT AGENDA. B. Andover Park East W afer& Sewer/Replacemeht:,and Macadam Road South Water Upgrade Staff is seeking Council approv"of a design"agreement with PACE Engineers, Inc. in the amount of $359,858 for t4/e°1 ndover Park East Water and Sewer Replacement Projects and Macadam Road-South Water,Upgrade Project. Existing water and sewer mains in Andover Park E��t between utrander Boulevard and Tukwila Parkway need to be replaced in light of anticipad growth in the area. Existing cast iron water mains in Macadam Road South must be replaced for better fire flow and water quality on the north side of Tukwila. PACE was selected from five firms on the MRSC Roster and has completed satisfactory work in the City. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. III. MISCELLANEOUS Committee Chair Robertson requested that the next Committee meeting include a review of the work plan. Meeting adjourned at 5:42 p.m. Next meeting: Tuesday, June 23, 2015—5:30 p.m. — Foster Conference Room Committee Chair Approval Minutes by LH, Reviewed by GL 51 52 COUNCIL AGENDA SYNOPSIS ' ----------------------------------Initialr--------------------------------- ITEMNO. Meeting Date Prepared b Ma or's review Council review BG• 06/15/15 • 4.G . ITEM INFORMATION STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 06/15/15 AGENDA ITEM TITLE Andover Park E Water&Sewer Replacement& Macadam Rd S Water Upgrade Consultant Agreement with PACE Engineers CATEGORY ❑ Discussion M Motion ❑ Resolution ❑ Ordinance ❑BidAzvard ❑ Public Hearing ❑ Other Mtg Date Mtg Date 06/15/15 Mtg Date Mtg Date Mtg Date Mtg Date Mt g Date SPONSOR ❑ Council ❑Mayor ❑ HR ❑ DCD ❑ Finance ❑Fire ❑ IT ❑P&R ❑ Police ® PW SPONSOR'S This contract is for design of the Andover Park East Water&Sewer Replacement Project SUMMARY and the Macadam Road S Water Upgrade. Five engineering firms were evaluated and PACE Engineers was determined to be the most qualified. The project includes upgrading the water and sewer main in Andover Park E and the water main in Macadam Rd S. Council is being asked to approve the design contract with PACE in the amount of$359,858.00. REVIEWED BY El COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑Transportation Cmte ® Utilities Cmte ❑Arts Comm. ❑ Parks Comm. ❑Planning Comm. DATE: 06/09/15 COMMITTEE CHAIR: DENNIS ROBERTSON RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $359,858.00 $381,000.00 $0.00 Fund Source: 401 WATER FUND&402 SEWER FUND(PAGES 63,75,&61, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memorandum dated 06/05/15 Consultant Rating Sheet Consultant Agreement, Scope of Work, and Fee Pages 63, 75, and 61, 2015 CIP Minutes from the Utilities Committee meeting of 06/09/15 53 54 City of Tukwila Jim Haggerton, Mayor •�= INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee ���'�'G FROM: Bob Giberson, Public Works Director BY: Michael Cusick, Senior Program Manager DATE: June 5, 2015 SUBJECT: APE Water & Sewer Replacement and Macadam Rd S Water Upgrade Project Nos. 99940103, 91440204 and 90440105 Consultant Recommendation and Agreement ISSUE Approve PACE Engineers, Inc. (PACE) to provide design services for the Andover Park East Water and Sewer Replacements and Macadam Rd S Water Upgrade Projects. BACKGROUND The existing water and sewer mains in Andover Park East between Strander Blvd and Tukwila Pkwy that were installed in the early 1960's need to be replaced with larger mains to facilitate the anticipated growth proposed in the this area of the Central Business District. The existing 8" and 6" cast iron water mains in Macadam Rd S were installed in 1968 and 1976 and the proposed water main is required for better fire flow and water quality on the north side of Tukwila Hill. ANALYSIS & FISCAL IMPACT City of Tukwila staff reviewed 5 design engineering firms listed on the Municipal Research and Services Center Roster and chose PACE. PACE has completed other design work for the City in the past and their work was satisfactory. Consultant CIP Design Agreement Budget for 2015 Andover Park E Water $129,708.00 $136,000.00 Andover Park E Sewer 88,366.00 90,000.00 Macadam Rd S Water Upgrade 141,784.00 155.000.00 Total $359,858.00 $381,000.00 RECOMMENDATION Council is being asked to approve the design agreement with PACE Engineers, Inc. in the amount of $359,858.00 for the Andover Park E Water and Sewer Replacement Projects and Macadam Rd S Water Upgrade Project and consider this item on the Consent Agenda at the June 15, 2015 Regular Meeting. Attachments: Consultant Rating Sheet Consultant Agreement with Scope of Work 2015 CIP Sheets 63,75 and 61 WAPW Eng\PROJECTS\A-WT Projects\APE Water Main Replacement(99940103)\Info Memo PACE APE Water Sewer and Macadam Water-so gl.docx 55 56 2015 MACADAM RD WATER UPGRADE ication Review Consultant Total (Highest Total Score is best) 65 61 53 38 38 Firm Ranking 1 2 3 4 4 2015 APE WATER / SEWER UPGRADE alification Review G``' �•j`,'/ ?/ �g /54t Consultant Total (Highest Total Score is best) 65 62 49 38 38 Firm Ranking 1 2 3 4 4 W: \PW Eng \PROJECTS\A- WT Projects\APE Water Main Replacement (99940103)\APE WATER AND SEWER Proposal Rating SHEET (3) gl.xis 58 City Of Tukwila Contract Number: 6200 Southcenter Boulevard, Tukwila WA 98188 CONSULTANT AGREEMENT FOR ENGINEERING DESIGN SERVICES FOR THE ANDOVER PARK EAST WATER AND SEWER LINES MACADAM ROAD WATER LINE THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and PACE Engineers, Inc., hereinafter referred to as "the Consultant", in consideration of-the mutual benefits, terms, and conditions hereinafter specified. 1. Proiect Designation. The Consultant is retained by the City to perform the services, identified on Exhibits A and 1A in connection with the projects titled Andover Park East Water and Sewer Replacement and Macadam Road Water Upgrade 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit A and 1A attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending , unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibits B and 1 B attached hereto, provided that the total amount of payment to the Consultant shall not exceed $359,858.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is 59 executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. CA revised 1-2013 Page 2 60 2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. Certificates of coverage and endorsements as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. CA revised: 1-2013 Page 3 61 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence of any disability in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non-Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. CA revised: 1-2013 Page 4 62 17. Notices. Notices tothe City of Tukwila shall besent to the following address: City Clerk City ofTukwila 02OOGouthmanterBoulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: PACE Engineers, Inc 11255 Kirkland Way, Suite 30O Kirkland, \0mQ8D33 18. . This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negoi|stiono, repreeentodonG, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. DATED this day of 20- . CITY OFTUKVV|LA CONSULTANT PP�r& By: Mayor, Jim Haggerton Printed Name: Title: _ Attest/Authenticated: Approved amtuForm: City Clerk, Christy CyFlahenty Office of the City Attorney Cx revised : 1-2018 Page 64 EXHIBIT A CITY OF TUKWILA ANDOVER PARK EAST WATER AND SEWER REPLACEMENT SCOPE OF WORK The Andover Park East Water and Sewer Replacement will replace approximately 2200 feet of existing 12" water main in Andover. Park East from Strander Blvd. to Tukwila Parkway with 16" water main. It will also extend approximately 950 feet of 10" water main in Christensen Road from approximately the SPU pipeline ROW northerly to an existing main to complete a fire loop. Also included along Christensen Road is approximately 750 feet of 8" fire services to reconnect the fire systems of buildings to the west. The project also involves construction of a new sewer main (size to be determined) in Andover Park East from. Strander Blvd. to approximately Baker Blvd. This main'will replace an existing 10" main that flows north. The intent is to redirect flow south to an existing King County main in Strander Blvd. to transfer flows that currently are served by the City's Lift Station No. 2. This will take some of the burden off of that facility, which has minimal capacity for upgrades. This new sewer line will be sized to accommodate all future development within the service area. Although we will be producing a single plan set for the water and sewer improvements, we will track the design costs separately and submit under separate invoices to allow the City to track costs associated with each and pull from appropriate funds. Many work tasks are common to both the water and sewer and will be performed simultaneously as part of the overall project. However, the time associated with each task will be apportioned as well as possible to reflect the level of effort needed for water and sewer design. Task 1 — Project Management& Meetings This task is for general project management and meetings relating to the project. More specifically, meetings are expected to include plan and specification review meetings with the City at major phases of the design. We have assumed 3 plan review meetings during the course of design. General project management, including communication and coordination shall involve internal project administration, review and preparation of invoices & pertinent backup materials, progress reports, responding to general client questions and reviewing and coordinating survey updates as necessary. Task 2—Survey/Mapping The survey work along the corridor has already been completed by the City for preliminary design efforts. However, the survey is over 10 years old. Oe therefore propose to send a crew out to verify and update survey information as necessary and modify mapping accordingly. This should be a minimal effort but we feel it is important to pick up any new features since the initial work was completed. 65 Andover Water and Sewer Scope of Work Page 2 Task 3 —Geotechnical Investigations As discussed at the preliminary design meeting with the City, we are proposing three new soil borings to 35-foot depth at appropriate locations to discern the soil and groundwater characteristics. This is most critical for the sewer installation, which w! ill be fairly deep at the southern end of the project. We will be utilizing Landau Associates for the geotechnical work. Landau will also review other geotechnical information from the general vicinity as appropriate/applicable for this work. Task 4— Basin Studv In order to appropriately size the proposed sewer line; PACE will prepare a basin study of the contributing area to determine ultimate flows that must be handled by the new main. This study. will take into consideration the area whose flows currently go to Lift Station No. 2. It will also make allowances for flows from the planned hotels and other future growth potential. The basin study will also make recommendations for location placement of the water and sewer lines. Task 5—Coordination w/King County and SPU Since the plan calls for a new sewer connection to the King County gravity facility in Strander Boulevard, coordination will be required with the County to confirm the capacity of that line and whether the County has planned for this flow. Most of that coordination has already occurred through contact between City and County staff. PACE has allowed time herein for follow-up and final coordination of the connection and other issues. The project will also be impacted by the presence of an existing 60" SPU water main located in Andover Park East. This will require contact and coordination with SPU on potential water and sewer service crossings and requirements for working in close proximity to their main. Task 6— Preparation of Design Plans Under this task, the design of the new water and sewer mains and associated appurtenances will be prepared. Preliminary water design drawings prepared by City staff will be assumed and continued towards completion, with appropriate changes made as agreed by all parties. The sewer design will be shown on the same plan set. With the addition of sewer design and appurtenances it is assumed that the total number of plan sheets will be 18. to 20 with sheets designated for standard details, erosion control, traffic control, etc. Three Copies of the full size plans and contract documents will be submitted for City review at the 30%, 60% and 90% stages of development and it is assumed that design review meetings will be held at each stage. Task 7—Specifications and Contract Documents Contract documents similar to those recently prepared by PACE for other City of Tukwila projects will be prepared for this project, with technical specifications added as appropriate. The project bid documents will include two bid schedules, one for water and one for sewer to allow separate tracking of costs. P:\P15\15412 Andover Park E Water and Sewer\Doc\Andover Scope.doa 66 Andover Water and Sewer Scope of Work Page,3 Task 8 - Permits and Approvals We know that the SEPA process has been completed by City staff and that a Shoreline Substantial Development permit was issued. However, the Shoreline Permit has since expired and will have to be renewed. We have included time in this proposal to update the Shoreline Permit. The City has also received approval from the US Army Corps of Engineers for construction of the water main in Christensen Road, which is considered by the Corps to be on a flood control levee. The only other permits that may be required are potentially a grading permit and a right-of-way use permit. It is assumed City staff will obtain those permits as necessary and that PACE efforts in that regard will not be required. Task 9 - Services During Bidding and Award PACE will provide all services as necessary during the bidding phase of the project. These would include distribution of plans and specifications to contractors, answering questions during the bidding period, preparing and distributing addenda as necessary, preparation and attendance at a pre-bid meeting if necessary and attendance at the bid opening. Task 10—QA/QC For quality assurance during design, a senior level principal will thoroughly review all documents before they are submitted to the City. This will typically occur at each of the review stages and at final document preparation. Task 11 - Construction Administration This.scope does not include construction administration services. Should construction assistance be requested of PACE, a scope and fee for those services can be developed and provided to the City prior to the start of construction. A list of typical services that could be provided includes: 1. Attend and direct the pre-construction conference and provide meeting minutes to all attendees. 2. Review material submittals for compliance with contract documents. 3. Provide construction staking for the improvements (line and grade). 4. Review, approve and prepare contract pay estimates. 5. Prepare change orders as necessary, including all documentation and coordination with the contractor. 6. Attend and conduct construction meetings as required and prepare and distribute` meeting notes. . 7. Monitor construction to determine contractor compliance and prepare all letters and documentation regarding same. 8. Provide construction inspection as needed. 9. Address construction questions as they arise. 10. Prepare punch lists and conduct final inspection, and prepare recommendation of project acceptance. 11. Prepare As-Built drawings. P:\P15\15412 Andover Park E Water and Sewer\Doc\Andover Scope.docx 67 68 EXHIBIT 1 A CITY OF TUKWILA MACADAM ROAD SOUTH WATER UPGRADE SCOPE OF WORK The.Macadam Road South Water Upgrade is intended to replace an existing undersized water main and extend it to the south to Southcenter Boulevard to complete a loop, thereby increasing fire flow and reliability to the Tukwila Hill area. The project consists of the installation of approximately 4,300 lineal feet of 10-inch water main in Macadam Road from Southcenter Boulevard to South 144th Street. This scope of work includes design of the improvements through assistance with the bidding phase of the project. The specific tasks of the scope are described as follows: Task 1 — Project Management&Meetings This task is for general project management and meetings relating to the project. More specifically, meetings are expected to include plan and specification review meetings with the City.at major phases of the design. We have assumed 3 plan review meetings during the course of design. General project management, including communication and coordination shall involve internal project administration, review and preparation of invoices & pertinent backup materials, progress reports, responding to general client questions and reviewing and. coordinating survey updates as necessary. Task 2—Survey/Mapping PACE will be using our in-house survey staff to complete all field survey work on this project, resulting in production of base topographic plans for use by our design staff. Items to be performed under this task include the following: 1. Order design locates and marking of all existing underground utilities. 2. Acquire available as-built utility maps. 3. Conduct research in public records for necessary survey information. 4. Control will be tied to monuments required to establish street rights-of-way. 5. Set additional control points/ benchmarks as needed. 6. Show all topographic data within proposed design/construction limits. 7. Show contour lines at 2-foot intervals within rights-of-way and easements. 8. Show survey control points with elevations and point numbers for use in construction staking. 9. Show all identified utilities including individual service lines where possible. 10. Provide base mapping at scale of 1 = 20'. 11. Walk all topo surveys after base maps are complete to verify visible features are noted. Task 3 — Design and Specifications Under this task, the design of the new water main and associated appurtenances will be prepared. Contract documents similar to those recently prepared by PACE for other City projects will be prepared for this project. Water main design will be shown in both plan 69 Macadam Rd. Water Scope of Work Page 2 and profile and is expected to cover approximately 10 sheets with additional sheets designated for standard.details, erosion control, traffic control, etc. Task 4 - Permits and Approvals The only permit anticipated for this project is a City of Tukwila right-of-way use permit. As on past projects, it is anticipated that the City will obtain this permit. Other than minimal time for coordination, this scope does not include any permitting effort by PACE. Task 5 - Services During Bidding and Award PACE will provide all services as necessary during the bidding phase of the project. These would include distribution of plans and specifications to contractors, answering questions during the bidding period, preparing and distributing addenda as necessary, preparation and attendance at a pre-bid meeting if necessary and attendance at the bid opening. Task 6 —QA/QC For quality assurance during design, a senior level principal will thoroughly review all documents before they are submitted to the City. This will typically occur at each of the review stages and at final document preparation. Task 7 - Construction Administration This scope does not include construction administration services. Should construction assistance be requested of PACE, a scope and fee can be developed at that time. Services that could be provided during construction include the following: 1. Attend and direct the pre-construction conference and provide meeting minutes to all attendees. 2. Review material submittals for compliance with contract documents. 3. Provide construction staking for the improvements (line and grade). 4. Review, approve and prepare contract pay estimates. 5. Prepare change orders as necessary, including all documentation and coordination with the contractor. 6. Attend and conduct construction meetings as required and prepare and distribute meeting notes. 7. Monitor construction to determine contractor compliance and prepare all letters and documentation regarding same. 8. Provide construction inspection as needed. 9. Address construction questions as they arise. 10. Prepare punch lists and conduct final inspection, and prepare recommendation of project acceptance. 11. Prepare As-Built drawings. P:\P15\15411 Macadam Water\Doc\Macadam Scope.docx .70 PACE Billed Labor Total Reimbursable Expenses Subconsultants Total Project Budget) PACE Engineers, Inc. Project Name Project #: Staff Type # (See Labor Rates Table) Staff Type Hourly Rate Drawing/Task Title Task 1 - Project Management Task 2 - Survey /Mapping Task 3 - Geotechnical Investigations Task 4 - Basin Study (N /A) Task 5 - Coordination w /KC & SPU Task 6 - Preparation of Design Plans Task 7 - Specifications and Contract Docs Task 8 - Permits and Approvals Task 9 - Services During Bidding Task 10 - QA/QC Task 11 - Construction Admin. (TBD) EXHIBIT B Andover Park E Water Replacement 15412 Billing Group #:I 00 Location:I Project Budget Worksheet - 2015 Standard Rates Task #:I City of Tukwila [00] 1 Prepared By: Date: Labor Hours by Classification DH 11- May -15 Labor Code 1 $200 Principal Engineer 12 $165 Project Manager 60 48 2 1 4 16 19 33 75 $115 Engineer II 4 24 8 24 60 160 12 40 40 2 € 4 4 12 8 36 12 $155 Sr. Structural Engineer $135 Sr. Planner 24 $105 CAD Drafter I I 160 41 $165 Principal Surveyor 46 $135 Project Surveyor 52 $83 Instrument Person 48 $115 Survey Tech II 2 4 8 _ 8 _ 12 2 91 $95 Project Administrator 12 20 8 Hour Total 122.0 32.0 6.0 0.0 36.0 404.0 112.0 30.0 32.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Hours Total Labor Total 144.0] 204.0] 216.0] .01 24.0] 160.01 8.01 8.0] 8.0] 12.01 $28,800: $33,660 1 $24,840 1 $0 1 $3,240 1 $16,800: $1,320 1 $1,080 1 $664 1 $1,380: $3,800 $115,584.00 40.0 824.0 Expenses Reimbursable rate /unit Quantity = Cost Postage /Courier = $100.00 Plotter $500.00 PhotoNideo Mileage/Travel /Per Diem Miscellaneous Technology Fee (2% of Labor) $2,311.68 Total ( $2,912+ Subconsultants Utility Locate Geotechnical Engineer $9,750 Electrical Engineer Geotechnical Engineer I & C Engineer Subconsultant Subtotal $9,750 Markup = 15% Total � $11,213 P:1P15115412 Andover Park E Water and SewertDoclAndover Water Budget Page 1 of 1 $115,584 $2,912 $11,213 $129,708 Rate Table Used: 2015 Standard Rates Printed: 5/1112015, 2:03 PM PACE Engineers, Inc. Project Budget Worksheet - 2015 Standard Rates Project Name Project #: Staff Type # (See Labor Rates Table) Staff Type Hourly Rate Drawing/Task Title Task 1- Project Management Task 2 - Survey /Mapping Task 3 - Geotechnical Investigations Task 4 - Basin Study Task 5 - Coordination w /KC & SPU Task 6 - Preparation of Design Plans Task 7 - Specifications and Contract Docs Task 8 - Permits and Approvals Task 9 - Services During Bidding Task 10 - QA/QC Task 11 - Construction Admin. (TBD) ndover Park E Sewer Replacement 15412 Billing Group #: 10 Location:I City of Tukwila I Prepared By: Task #: [00] 1 Date: abor Hours by Classification DH 11- May -15 Labor Code 1 $200 Principal Engineer 12 $165 Project Manager 48 40 16 19 33 75 $115 Engineer II $155 Sr. Structural Engineer $135 Sr. Planner $105 CAD Drafter I I 2 4 8 = 4 _ 16 8 2 12 4 16 48 48 = _ = 120 4 24 24 2 € 2 4 8 8 20 41 $165 Principal Surveyor 50 52 $95 Party Chief $83 Instrument Person 48 $115 Survey Tech II 2 2 4 4 6 91 $95 Project Hour Administrator Total 12 16 6 102.0 16.0 6.0 36.0 18.0 232.0 68.0 4.0 26.0 20.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 Hours Total Labor Total 104.0] 142.0: 84.0: 0.01 18.0 = 128.0: 4.0 4.0 4.0] 6.0 34.0 528.0 $20,800: $23,430: $9,660: $0 1 $2,430 $13,440 $660 $380 $332 $690 $3,230 $75,052.00 Expenses Reimbursable rate /unit Quantity 1 Cost Postage /Courier _ $100.00 Plotter $500.00 Photo /Video Mileage/Travel /Per Diem Miscellaneous Technology Fee (2% of Labor) $1,501.04 Total I $2,101 P:1P15115412 Andover Park E Water and SewerlDoc\Andover Sewer Budget Subconsultants Utility Locate Geotechnical Engineer Electrical Engineer Geotechnical Engineer I & C Engineer Subconsultant Subtotal Markup Total $9,750 $9,750 5% $11,213 PACE Billed Labor Total Reimbursable Expenses Subconsultants Total Project Budget $75,052 $2,101 $11,213 $88,366 Rate Table Used: 2015 Standard Rates Page 1 of 1 Printed: 5/1112015, 2:02 PM PACE Engineers, Inc. Project Name Project #: Staff Type # (See Labor Rates Table) Staff Type Hourly Rate Drawing/Task Title Task 1 - Project Management Task 2 - Survey/Mapping Task 3 - Design and Specifications Task 4 - Permits and Approvals Task 5 - Services During Bidding Task 6 - QA/QC Task 7 - Construction Administration (TBD) EXHIBIT 1 B Macadam Road South Water Upgrade 15411 Billing Group #:( [001 Project Budget Worksheet - 2015 Standard Rates Location: j City of Tukwila Task #: [00] Prepared By: Date: Labor Hours by Classification DH 8- May -15 Labor Code 1 $200 Principal Engineer 40 .. 4 40 8 48 12 $165 Project Manager 72 8 100 4 16 16 16 19 33 75 41 $115 Engineer II 12 160 4 16 $155 Sr. Structural Engineer $135 Sr. Planner $105 CAD Drafter II 200 $165 Principal Surveyor 24 46 $135 Project Surveyor 78 52 $83 Instrument Person 16 48 $115 Survey Tech II 82 91 $95 Project Administrator 20 24 12 Hour Total 144.0 212.0 524.0 8.0 52.0 64.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 Hours Total Labor Total 140.0 $28,000 216.0 $35,640 192.0 $22,080 0.0 $0 0.0 $0 200.0 24.0 $21,000 ; $3,960 78.0 $10,530 16.0 $1,328 82.0 $9,430 56.0 1004.0 $5,320 $137,288.00 Expenses Reimbursable Quantity : Cost rate /unit Postage /Courier $100.00 Plotter $500.00 PhotoNideo Mileage/Travel/Per Diem Miscellaneous Technology Fee (2% of Labor) $2,745.76 Total I $3,346 Subconsultants Utility Locate Mechanical Engineer Electrical Engineer Geotechnical Engineer & C Engineer SubconsultantSubtotal Markup Total $1,000 $1,000 15% $1,150 P:1P15115411 Macadam WaterlDoclDesign Budget Page 1 of 1 PACE Billed Labor Total Reimbursable Expenses Subconsultants Total Project Budget $137,288 $3,346 $1,150 $141,784 Rate Table Used: 2015 Standard Rates Printed: 518/2015, 9:37 AM 74 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Andover Park E Water Main Replacement Project No. 99940103 DESCRIPTION: Design and construct 2,000 LF of new 16"ductile iron pipe along Andover Park East from Tukwila Pkwy to Strander Blvd and 1,100 LF of 10"DIP in Christiansen Rd. JUSTIFICATION: Support future growth within this area of the CBD as aging cast iron system has suffered frequent failures. STATUS: Survey and in-house design is complete. Phase I is scheduled for 2016 and includes construction from Strander Blvd to Baker Blvd. Phase II will be from Baker Blvd to Tukwila Parkway. MAINT. IMPACT: A new pipe will significantly reduce impact on crews from the risk of cataclysmic events. COMMENT: A proposed PWTF was rescinded in 2014 by the State Legislature.Another application was submitted for 2015. FINANCIAL Through Estimated (in$000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 63 136 199 Land(R/W) 0 Const. Mgmt. 173 211 384 Construction 1,253 1,532 2,785 TOTAL EXPENSES 63 0 136 1,426 0 0 0 1,743 0 3,368 FUND SOURCES Awarded Grant 0 Proposed PWTF 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 63 0 136 1,426 0 0 0 1,743 0 3,368 TOTAL SOURCES 63 0 136 1,426 0 0 0 1,743 0 3,368 Project Location P/ $ts st ® i 8100 st Q„ Tutwq. � @ I ®® Tre W 0 a � $ 0® hmM.rstw f Q = N �+ urwrw or + C rest. or E S. � w D"M Or S ® 81808 � a m 2015-2020 Capital Improvement Program 63 75 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Andover Park East Sewer Replacement Project No. 91440204 DESCRIPTION: Design and construct 1,600 LF of 15"and 12"sanitary sewer from Strander Blvd.to 1-405 in Andover Park E. JUSTIFICATION: Sewer improvement will provide additional capacity for future development along Andover Park East. STATUS: Applied for a Public Works Trust Fund Loan(PWTF)in 2016 in conjunction with the APW Water Main Project. MAINT. IMPACT: COMMENT: Phase I is scheduled for 2016 and includes construction from Strander Blvd to Baker Blvd. Phase II will be from Baker Blvd to Tukwila Parkway in 2020. FINANCIAL Through Estimated (in$000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 90 90 Land (R/W) 0 Const. Mgmt. 115 141 256 Construction 1,122 1,004 2,126 TOTAL EXPENSES 1 0 0 90 1,237 0 0 0 1,145 0 2,472 FUND SOURCES Awarded Grant 0 Proposed PWTF/Bond 0 Mitigation Actual 0 Mitigation Expected 290 290 Utility Revenue 0 0 90 947 0 0 0 1,145 0 2,182 TOTAL SOURCES 0 0 90 1,237 0 0 0 1,145 0 2,472 Project Location L ,:e,sas i1 •� y e,s s, ®B `D N we A �osr Tm.ntl or s ® s,eos, A e °r ro 76 2015-2020 Capital Improvement Program 75 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Macadam Rd S Water Upgrade Project No. 90440105 DESCRIPTION: Design and construct 4,300 LF of 10"waterline in Macadam Rd S from S 144th St to Southcenter Blvd. JUSTIFICATION: Improve fire flow water quality to the north side of Tukwila Hill. STATUS: Design will begin in January 2015 with construction to begin in late summer 2015 and continue into 2016. MAINT. IMPACT: The new waterline will eliminate crew maintenance time for flushing the dead end line. COMMENT: FINANCIAL Through Estimated (in$000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 155 155 Land (RNV) 0 Const. Mgmt. 50 150 200 Construction 600 800 1,400 TOTAL EXPENSES 1 0 0 805 1 950 1 0 0 0 0 0 1,755 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 0 805 950 0 0 0 0 0 1,755 TOTAL SOURCES 0 0 805 950 0 0 0 0 0 1,755 Project Location $1 128 S'30 St � ®� N b � \ w E S, s< ��,® s S130 a � `42 S 144 St 1 St = Wg F 4 _X Q N 0 5150 St %S 156 slyest � �tq 1 eo st q TUkwea Pkwy 2015-2020 Capital Improvement Program 61 77 78 City Of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes June 9, 2015— 5:30 p.m. — Foster Conference Room, 6300 Building PRESENT Councilmembers: Dennis Robertson, Chair; De'Sean Quinn, Verna Seal Staff: Bob Giberson, Gail Labanara, Robin Tischmak, Pat Brodin, Ryan Larson, Mike Cusick, and Laurel Humphrey i CALL TO ORDER: Committee Chair Robertson called the meeting to////,order at 5:30 p.m. I. PRESENTATIONS °o II. BUSINESS AGENDA A. Bid Award: 2015 Annual Small Drainage Program Staff is seeking Council approval to award the construction contract for the 2015 Annual Small Drainage Program to Green River Construction in the amount of $182,142.50. This program constructs drainage projects that are too large for City st' 'but smaller than a typical capital improvement project, and prioritized based on a variety of factors. Green River Construction is the low bidder and has successfully constructed past drainage projects. For 2015 the program will provide drainage improvements at sites'on 3 tn Place South, 51st Place South, and Gilliam Creek at Tukwila Parkway/Andover Place East. ','separate project at Longacres Way South was completed under a s karate contract in coordination with WSDOT paving. UNANIMOUS APPROVAL. FORWAI TO JUNE 15, 2015 REGULAR CONSENT AGENDA. B. Andover Park East W afer& Sewer /Replacemeht:,and Macadam Road South Water Upgrade Staff is seeking Council approv"of a design"agreement with PACE Engineers, Inc. in the amount of $359,858 for tEYe°1ndover Park East Water and Sewer Replacement Projects and Macadam`//R/ oad-South Water,Upgrade Project. Existing water and sewer mains in Andover Park E t between 8trander Boulevard and Tukwila Parkway need to be replaced in light of anticipad growth in the area. Existing cast iron water mains in Macadam Road South must be replaced for better fire flow and water quality on the north side of Tukwila. PACE was selected from five firms on the MRSC Roster and has completed satisfactory work in the City. UNANIMOUS APPROVAL. FORWARD TO JUNE 15, 2015 REGULAR CONSENT AGENDA. %.. III. MISCELLANEOUS Committee Chair Robertson requested that the next Committee meeting include a review of the work plan. Meeting adjourned at 5:42 p.m. Next meeting: Tuesday, June 23, 2015—5:30 p.m. — Foster Conference Room Committee Chair Approval Minutes by LH, Reviewed by GL 79 80 COUNCIL AGENDA SYNOPSIS -------- ------- ---------Initials--------------------------------- ITEM NO. Meeting Date Prepared by Ma orlf review Cou cil eview 06/08/15 BG C 06/15/15 BG ' V� 5.A. 1117 ,ITEM INFORMATION CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINALAGENDA DATE: 6/08/15 AGENDA ITEM TITLE Resolution adopting the Six-Year Transportation Improvement Program 2016 - 2021 CATEGORY ® Discussion ❑Motion ® Resolution ❑ Ordinance ❑ Bid Award ®Public Hearing ❑ Other Mtg Date 06108115 Mtg Date Mtg Date 06115115 Mtg Date Mtg Date Mtg Date 06108115 Mtg Date SPONSOR ❑ Council ❑Mayor ❑Adm Svcs ❑ DCD ❑Finance ❑Fire ❑Legal ❑ P&R ❑ Police ❑PW SPONSOR'S The Transportation Improvement Program (TIP) is required by the RCW to be updated SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for federal and state grants. A Public Hearing is scheduled on June 8, 2015 for the 2016 - 2021 Transportation Improvement Program. After the Public Hearing, the TIP is adopted by City Resolution and is then incorporated into the Regional and State TIPs. REVIEWED BY ❑ COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ®Transportation Cmte ❑ Utilities Cmte ❑Arts Comm. ❑Parks Comm. ❑ Planning Comm. DATE: 6/01/15 COMMITTEE CHAIR: JOE DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 6/08/15 Forward to the next Regular Meeting 6/15/15 MTG. DATE ATTACHMENTS 6/08/15 Informational Memorandum dated 05/29/15 (revised after 6/1 TC) Draft Resolution Draft 2016— 2021 TIP Spreadsheet Current Adopted 2015— 2020 TIP Minutes from the Transportation Committee meeting of 06/01/15 6/15/15 Updated summary sheet & legend for the TIP codes as requested at 6/8 C.O.W. Resolution in final form 81 82 DRAFT 2016 - 2021 TIP SUMMARY 2016 -2021 2015 CIP Project Costs in Thousands of Dollars TIP PROJECT TITLE June 10, 2015 FUNDING SOURCES Page No. 2016 2017 2018 2019 2020 2021 TOTAL Federal State/TIB Developer Unsecured City 1 42 -42nd Ave S (S 160 St - S 131 PI) 2 53rd Ave S (S 137th St - S 144th St) 3 ADA Improvements 4 APE /Industry Dr Intersection 5 APE /Minkler Blvd Intersection 6 Annual Bridge Inspections and Repairs 7 Annual Overlay and Repair Program 8 Beacon Ave Bridge Preventative Maintenance 9 BNSF Regional Center Access 10 Boeing Access Rd Bridge Rehabilitation 11 Cascade View Safe Routes to School Phase 2 12 Frank Zepp Bridge Preventative Maintenance 13 Grady Way Bridge Preventative Maintenance 14 Multipurpose Trails 15 S 133 St /SR599 Intersection 16 S 144th St Bridge Sidewalks 17 Strander Blvd /SW 27th St St Phase III 18 TUC /TOD Pedestrian Improvements 19 TUC - Pedestrian /Bicycle Bridge 20 Walk & Roll Program 21 West Valley Highway 22 W Valley Hwy/ S 156 St Intersection 2 6 20 25 24 10 18 13 11 3 35 27 28 29 12 22 26 5,300 3,173 63 0 0 270 1,560 1,741 0 5,411 0 2,535 207 60 0 0 20 70 6,185 0 0 0 0 920 63 0 0 270 1,650 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 0 63 0 0 335 1,670 0 0 0 0 0 0 60 0 0 5,000 0 0 0 0 0 0 0 63 0 0 335 1,725 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 0 63 0 0 335 1,730 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 4360 0 63 575 622 335 1,745 0 0 0 839 0 0 280 630 1,219 52,329 1,100 0 175 630 1,032 9,660 4,093 378 575 622 1,880 10,080 1,741 1,741 0 5,411 4,193 839 2,535 2,535 207 207 580 630 1,219 57,349 1,170 6,185 175 630 1,032 580 6,000 2,939 9,660 1,154 378 575 622 1,880 10,080 0 0 1,218 750 89 0 0 0 170 1,219 28,024 650 185 175 630 592 460 29,325 20 500 440 TOTAL PROJECTS REVISED FROM 2015 -2020 TIP New: 42 -42nd Ave S (S 160 St - S 131 PI) Beacon Ave Bridge Preventative Maintenance Frank Zepp Bridge Preventative Maintenance Grady Way Bridge Preventative Maintenance 26,595 2,963 7,128 2,183 2,188 65,934 106,991 8,676 6,580 20 34,414 57,301 Deleted: E Marginal Way (BAR - S 112 St) Study on the project to design and construct curb, gutter, drainage, lighting, turn lanes, and traffic control has determined no additional capacity is necessary and only typical frontage requirements required with redevelopment will be needed. Macadam Rd & S 144 St Intersection Project to design and construct a northbound left turn lane from Macadam to S 144th Street has been studied and determined to no longer be necessary. S 144th St Phase II (42 Ave S - TIB) Project to design and construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage,new signal at 42nd Ave S and new pedestrian rapid flash beacon in conjuction with Tukwila Village will be completed. Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -07745 40 -42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments 06/08/15 06/15/15 04 C G O P S TW Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 5,300,000 5,300,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 9,660,000 9,660,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,300,000 0 0 0 4,360,000 Totals 5,300,000 0 0 0 4,360,000 Report Date: June 02, 2015 Page 1 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/08/15 06/15/15 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 3,000 3,000 P CN 2016 0 TIB 1,589,000 1,350,000 2,939,000 S CN 2016 0 0 1,151,000 1,151,000 Totals 0 1,589,000 2,504,000 4,093,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 3,000 0 0 0 0 CN 3,170,000 920,000 0 0 0 Totals 3,173,000 920,000 0 0 0 Report Date: June 10, 2015 Page 2 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: June 02, 2015 Page 3 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/08/15 06/15/15 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: June 02, 2015 Page 4 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07746 Andover Park E /Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/08/15 06/15/15 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 20,000 20,000 P CN 2021 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: June 02, 2015 Page 5 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 1,880,000 1,880,000 Totals 0 0 1,880,000 1,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 335,000 335,000 670,000 Totals 270,000 270,000 335,000 335,000 670,000 Report Date: June 02, 2015 Page 6 0 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/08/15 06/15/15 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 10,080,000 10,080,000 Totals 0 0 10,080,000 10,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Totals 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Report Date: June 02, 2015 Page 7 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 TUK -57 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. 06/08/15 06/15/15 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 1,740,900 0 0 1,740,900 Totals 1,740,900 0 0 1,740,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,900 0 0 0 0 Totals 1,740,900 0 0 0 0 Report Date: June 02, 2015 Page 8 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/08/15 06/15/15 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 FMSIB 950,000 0 300,000 1,250,000 P CN 2021 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 12,500,000 CN 0 0 0 0 1,250,000 Totals 0 0 0 0 13,750,000 Report Date: June 02, 2015 Page 9 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides 06/08/15 06/15/15 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 4,193,000 0 1,218,000 5,411,000 Totals 4,193,000 0 1,218,000 5,411,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,411,000 0 0 0 0 Totals 5,411,000 0 0 0 0 Report Date: June 02, 2015 Page 10 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/08/15 06/15/15 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 839,000 Totals 0 0 0 0 839,000 Report Date: June 02, 2015 Page 11 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 TUK -55 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. 06/08/15 06/15/15 14 0.040 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 2,534,812 0 0 2,534,812 Totals 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 Report Date: June 02, 2015 Page 12 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -56 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. 06/08/15 06/15/15 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 206,500 0 0 206,500 Totals 206,500 0 0 206,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 206,500 0 0 0 0 Totals 206,500 0 0 0 0 Report Date: June 02, 2015 Page 13 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/08/15 06/15/15 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 360,000 360,000 Totals 0 0 360,000 360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 120,000 Totals 60,000 60,000 60,000 60,000 120,000 Report Date: June 02, 2015 Page 14 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07748 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. 06/08/15 06/15/15 04 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 15 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/08/15 06/15/15 28 0.250 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 STP(BR) 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: June 02, 2015 Page 16 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave 06/08/15 06/15/15 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 STP 3,850,000 0 620,000 4,470,000 P RW 2021 STP 1,150,000 0 179,000 1,329,000 P CN 2021 FMSIB 5,000,000 0 1,000,000 6,000,000 P CN 2021 TIGER III 20,000,000 0 25,000,000 45,000,000 Totals 30,000,000 0 26,799,000 56,799,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 5,000,000 0 0 RW 0 0 0 0 1,329,000 CN 0 0 0 0 51,000,000 Totals 20,000 0 5,000,000 0 52,329,000 Report Date: June 02, 2015 Page 17 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC /TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail /Transit Oriented Development (TOD) area. 06/08/15 06/15/15 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 70,000 70,000 P RW 2021 STP(E) 80,000 0 0 80,000 S RW 2021 0 0 20,000 20,000 P CN 2021 STP(E) 420,000 0 580,000 1,000,000 Totals 500,000 0 670,000 1,170,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 70,000 0 0 0 300,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 70,000 0 0 0 1,100,000 Report Date: June 02, 2015 Page 18 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian /bicycle bridge over the Green River 06/08/15 06/15/15 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 OTHER 6,000,000 185,000 6,185,000 Totals 0 6,000,000 185,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,223,000 0 0 0 0 Totals 7,223,000 0 0 0 0 Report Date: June 02, 2015 Page 19 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. 06/08/15 06/15/15 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: June 02, 2015 Page 20 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA03779 West Valley Highway SR 181 /West Valley Highway 1 -405 to Strander Blvd Design and construct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/08/15 06/15/15 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 21 Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct safety and capacity improvements at intersection. 06/08/15 06/15/15 03 O P S T W CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 52,352,912 8,339,000 59,277,300 119,969,212 Report Date: June 02, 2015 Page 22 106 COUNCIL AGENDA SYNOPSIS ----------------------------------Initials--------------------------------- ITEM NO. Meefin Mao,g Date Prepared�y ayors review Council review • 06/08/15 ML • 06/15/15 ML 5. B . ITEM INFORMATION STAFF SPONSOR: MARGARET LuBov ORIGINAL AGENDA DATE: 06/08/15 AGENDA ITEM TrIT,E Acceptance of Transportation related grants. CATEGORY ® Discussion Z Motion E] Resolution F-1 Ordinance E] BidAward ❑ Public Hearin,g ❑ Other r Mtg Date 618119 Mt 115115 Mtg Date g Date ,g Date 6 Mtg Date Mt Mtg Date Mtg Date SPONSOR ❑ Council ❑Mayor ❑ HR Z DCD ❑ Finance D .Fire ❑ IT ❑ P&R ❑ Police ❑ PIV SPONSOR'S Tukwila has received notification of intended award of the following grants: SUMMARY 2012 CMAQ GTEC/TDM Expansion - $186,364.64 Federal grant funds administered by WSDOT; 2015 CMAQ Regional TDM Services- $270,000.00 Federal grant funds administered by WSDOT; and Transportation Management Implementation Agreement 2015-2017 - renewal grant for CTR implementation from WSDOT. REVIEWED BY r-1 COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte Z Transportation Cmte F-1 Utilities Cmte F-1 Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 06/01/15 COMMITTEE CHAIR: DUFFIE RECOMMENDATIONS: SPONSOR/ADMIN. Department of Community Development COMMITTEE Transportation Com.; Forward to C.O.W. COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0 $0 $0 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 6/8/15 Forward to the next Regular Meeting MTG. DATE ATTACHMENTS 6/8/15 Informational Memorandum dated 6/3115 #New memo after TC to provide greater clal ity Notice of intended Grant Awards - Email 5/12/15 Minutes from the Transporation Committee of 611/15 6/15/15 No attachments 107 108 COUNCIL AGENDA SY opsiS -----------------------------------I---Initials--------------------------------- ITEMNO. Meeting Date Pre pared by 4�42r.r review ey) Council review 06/15/15 MCB d4d—I(L, 5.C. QD ITEM INFORMATION STAFF SPONSOR: MAYOR'S OFFICE ORIGINAL AGENDA DATE: AGENDA ITEM TITLE Regional Fire Authority Annexation CATEGORY Z Discussion [:1 Motion ❑ Resolution ❑ Ordinance ❑ Bid Award ❑ Public Hearing [:] Other Mtg Date 06115115 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR ❑ Council Z Mayor [:] HR ❑ DCD [:]Finance ❑Fire [:] IT ❑ P&R [:] Police [:]PWI SPONSOR'S This is a progress update on the Kent Regional Fire Authority annexation project with SUMMARY specific information on: Fire Prevention/Investigation/Emergency Management Services RFA Communications Plan REVIEWED BY z cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑Transportation Cmte ❑ Utilities Cmte ❑Arts Comm. ❑Parks Comm. ❑ Planning Comm. DATE: 9/10/2014; 04/13/15 COMMITTEE CHAIR: RECOMMENDATIONS: SPONSOR/ADMIN. Not applicable COMMITTEE Not applicable COST IMPACT/ FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 04/13/15 Briefing 06/15/15 MTG. DATE ATTACHMENTS 06/15/15 Informational Memo dated 6/10/15 - with attachments 109 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton City Council FROM: David Cline BY: Moira Carr Bradshaw DATE: June 10, 2015 SUBJECT: Regional Fire Authority Annexation ISSUE This is a regular update on the progress on the issue of annexation of fire and emergency medical services to the Kent Regional Fire Authority. BACKGROUND The community process of review has been underway since September 2014 when the Fire Exploratory Committee, which included Councilmembers Seal and Kruller and City staff, recommended to the City Council that the City investigate the annexation of the Tukwila Fire Department to the Kent Regional Fire Authority (RFA). In April, the Council was briefed on the make-up and work program of the RFA Annexation Steering Committee, which includes Councilmembers Duffie and Seal and representatives of the residential and business community as well as firefighters and staff. The work of the Finance Work Group, which includes Councilmember Robertson, has also been ongoing since the Council's decision to move forward. The Finance Work Group has been developing the details of a preliminary budget of a consolidated RFA in order to then create the required revenue formula. It has also been discussing the inventory of assets including the potential disposition of the four Tukwila fire stations. The RFA Annexation Steering Committee is discussing the current fire service performance levels, both for fire suppression and emergency medical but also the City functions of fire permitting and emergency management that firefighters perform. DISCUSSION Contracting for municipal services currently provided by fire personnel There are specific municipal functions currently provided by fire personnel: international fire code permitting, emergency management and fire investigation. The City will continue to be financially responsible for providing those services. Annexation into the RFA would provide the City options for contracting for some or all of those services. Attached is a summary of those services and some pros and cons of retaining or contracting with the RFA for each function. Any contract for services will come back to 110 INFORMATIONAL MEMO Page 2 the Council as an Interlocal Agreement for a full review and would occur between a positive vote to annex and the effective date of annexation. Communication Plan The Council requested broad public outreach on this important topic and attached is a Communication Plan that includes key messages on this fire services annexation issue as well as tactics and a schedule. FINANCIAL IMPACT Not applicable at this time RECOMMENDATION Information only, no action required. ATTACHMENTS Fire Prevention/Fire Investigation/Emergency Management Paper Communications Plan Page 2 of 2 111 Background Certain functions currently performed within the Fire Department will continue to be a City responsibility and will continue to impact the City's General Fund budget. With annexation to the Kent RFA,the City will have options as to how to provide those services/perform those functions. Fire Prevention Fire Prevention is divisional name for the part of the Fire Department that is responsible for review, issuance and inspections of permits for items that are regulated by the International Fire Code including specific amendments made to it by the City of Tukwila. The City of Tukwila administers the International Fire Code within the Buildings and Construction Chapter of the Tukwila Municipal Code (TMC 16.)The City's responsibility is to review and issue permits that specify the construction and occupancy of buildings with certain conditions. These are elements of public and life safety,such as electrical, plumbing and structural requirements, and relate to sprinklers and alarms, extinguishers etc. Options The City may choose to: 1. Hire City staff that are responsible for these elements or 2. Contract with the RFA to provide permit review and inspection services. Under the second scenario,the City would still retain the responsibility for charging for and issuing the permit but the RFA and its personnel would have a contract to provide review and consultant services. 3. Contract with the RFA for reviews of specific types/degrees of permit. This would allow for smaller simpler permits to be reviewed and inspected by City staff,thereby potentially streamlining services forTukwila customers. This option would allow the City to explore system improvements for improved performance for customers. City provides Contract Discussion Fire Prevention Services Service for service Customer Service X Accountability/control X Cost X RFA costs more for same service Integration with building X inspections Coordination with Fire operations X Safer buildings for firefighters X Expediency X Fire Investigation The Fire Prevention Bureau is also responsible for inspecting and preparing reports on the origin and cause of fires. The City typically prepares between 0—and 14 reports a year. A qualified inspector needs to be able to appear at a fire incident 24/7,while the scene is still secure and fresh in order to perform the investigation. The choice to contract with the RFA for this service is recommended Page 1 of 2 112 because of the advisability of having staff that are available 24/7 to arrive on the scene of a fire as well as the technical training and experience of the RFA staff. Fire Investigations City Provides Contract for Discussion Service Service 24/7 schedule availability X Accountability/control X Technical ability/resources X Fire Fighter coordination X familiarity Emergency Management Planning for and managing natural or manmade disasters is a critical function of the City. The organization and responsibilities are outlined in the Administration and Personnel section of the TMC (TMC 2.57.) The state mandates that the City provide a director of emergency management and emergency manager. The responsibility for this has been indifferent departments over the years and somewhat depends on the background of staff members that the City may have. Currently two staff members who are located in Fire Department are responsible for this function. Options The City may choose to: 1. Hire staff to assume responsibility 2. Contract with the RFA to be responsible for all current functions 3. Develop some split responsibilities for functions currently performed;for example,contract for development of the required Comprehensive Emergency Mgmt. Plan and other documents. Emergency Management City Provides Contract for Discussion Service Service Visibility/Staff Integration X RFA could assign a specific person to be the Emergency Manager and Director of Emergency Management for the City and they could use an office in the City assist with integration. Accountability X Resources X Integration with X emergency providers Efficiency due to depth of X organization Page 2 of 2 113 Regional Fire Authority Exploratory Process Communications Plan Background The Regional Fire Authority Annexation Steering Committee began meeting in March 2015. Per direction from the City Council their goal is to provide a recommendation to the City Council as to whether to put a ballot measure in front of voters regarding transferring fire and emergency medical services to the Kent RFA. A schedule has been developed that shows delivery of a recommendation in November 2015. In evaluating the choice of whether to proceed to a vote on annexation to the Kent Regional Fire Authority(RFA,)the Committee will meet once a month to investigate and discuss potential issues and impacts associated with an annexation of the Tukwila Fire Department to the Kent RFA. The City wishes to ensure that all stakeholders—including residents and businesses—are aware of the process,the potential implications of both annexing to the RFA as well as keeping the status quo, and have an opportunity to weigh in with thoughts and feedback. Key Messages The City is exploring annexing into the Kent Regional Fire Authority(RFA)in order to ensure fire service continues at existing,or improved,levels of service in Tukwila. • The cost associated with fire and emergency services continues to take up a significant portion of the City's general fund and increases each year. • Consolidation of fire departments can result in lowered costs due to economies of scale obtained by reducing duplication of facilities, leadership, equipment and other expenses within close geographical areas. • Neighboring jurisdictions have pursued consolidation strategies with great success, including Federal Way and Des Moines which merged to become the South King County Fire and Rescue; Auburn,Algona and Pacific's consolidation resulted in the Valley Regional Fire Authority; and Covington, Kent and Fire District 37 all combined to become the Kent RFA. The City has created the Regional Fire Authority Annexation Steering Committee in order to further study the potential benefits and costs associated with a potential annexation. It is expected the committee will provide a recommendation to the City Council by November of 2015. • The City is exploring annexing into the Kent RFA, and this committee is the outcome of previous efforts that considered all available service delivery options and potential partnership opportunities for the provision of fire and emergency services in Tukwila. • Among the major issues under review are the cost impacts on taxpayers in the City,the type of representation the community of Tukwila may have in the governance of the RFA,the ownership and future of Tukwila's existing fire service facilities and assets, and the type and quality of service that would be provided by the RFA to the Tukwila community,compared to the current level of service provided by the municipal fire department. • The Committee will provide the City Council with a recommendation as to whether to move forward with the annexation, but ultimately Tukwila voters will make the final decision as to whether to annex to the RFA for fire services. Page 1 of 9 114 Should the City choose to annex,the Kent RFA is a natural choice given its stability as an organization, the highly successful collaborative relationship already enjoyed between the RFA and the Tukwila Fire Department, as well as the service and professionalism the RFA provides to its community. • The Kent RFA has been in operation since 2010 and has cleared many of the early organizational challenges associated with the creation of a new governmental agency. • Both the Tukwila Fire Department and Kent RFA participate in the King County Regional Training Consortium,are both part of Zone 3, King County's organizational association of local response providers, and support each other through mutual aid calls when needed. • The Kent RFA is accredited by the Center for Public Safety Excellence Commission on Fire Accreditation and provides a supplemental service that saves money and resources, called FD Cares,for residents with chronic health issues and who historically rely heavily on 911 calls to the Fire Department. Annexation into the RFA provides fiscal stability for the provision of fire and emergency medical services in the City of Tukwila because of the fire benefit charge(FBC,)a voter-approved tool that is not available to cities,which must be reauthorized by the voters every six years. • Funding for the Kent RFA includes a two part funding system: • A property tax of up to$1.00 may be levied on the assessed value of property and used for all day-to-day operations and capital needs of the fire department • A FBC of up to 60%of the operating budget may be charged to properties based upon improvements, risk and fire suppression needs and used for both operating and capital expenses such as salaries,equipment,fuel and utilities. • Because the FBC is a fee and not a tax,the 1%limit on annual property tax increases does not apply to the FBC. • A FBC is based on a formula that takes into account the type of structure, square footage,and building use. For instance,a warehouse business storing combustible products pays a different FBC than a single family home due to the time,effort, equipment and supplies needed to fight a fire at the different locations. • The City and RFA continue to explore the FBC formula, and no information is available at this time as to how much the FBC would potentially cost a Tukwila property owner. • The FBC must be approved by the voters every 6 years,which ensures that the RFA is responsible with budgets. The City is exploring the RFA option in order to ensure the long term fiscal health of Tukwila • Annexing to the RFA would allow the City additional flexibility to make much-needed investments in other areas of the City due to freed up property tax levy capacity of the City's portion of property tax. • Until the RFA committee process moves forward, it is too early to determine what the City would do with any taxing authority offset by the annexation of fire service to the Kent RFA. • Any decisions made on the additional revenue capacity and potential investments would be done so through a public process that would allow the community to weigh in with feedback. Page 2 of 9 115 The City of Tukwila is committed to an open,transparent process while exploring annexing into the RFA and encourages participation in and feedback for this effort. • A webpage is available on the City's website(tukwilawa.gov/fire committee)which includes background on the committee, an FAQ and monthly committee packets. • The City is using other communications vehicles to push out information on the RFA, including the Hazelnut, City Pages in the Tukwila Reporter, E-Hazelnut, and TukTV on Comcast channel 21. • Due to the potential impact on businesses,the City will also engage in a business-focused outreach effort as well. • A Speakers Bureau is available for any group and will be making presentations to all of the interested City Boards and Commissions Tactics External Communications In order to meet the City's commitment to open and transparent communications on this topic, it is critical that a variety of communication vehicles be deployed with consistent messaging. In addition, because of the potential impacts to businesses,the City will want to consider business-specific outreach that may require additional resources. General external communications around the RFA will include: • Tukwila Reporter—Inclusion in the Tukwila Reporter City Pages every two to three months (last article was the March,2015 edition) updating readers on process, etc. • City Website—Webpage specific to this topic already developed;committee packets to be linked to as soon as they are ready. • Social Media—To be used to promote events and/or opportunities for the public to specifically weigh in (hearings, open houses, etc.). • Flyers—In order to take advantage of the various public events occurring in Tukwila over the spring and summer,the Communications Division will support Moira in the development of a flyer with information on the potential annexation and committee process that can be distributed to a number of audiences. • E-Hazelnut—Key points of progress will be discussed every two to three months in the E- Hazelnut(last inclusion was January, 2015). • Tukwila Talk—Post on committee progress as feasible. • City Administrator Report—The Report will include regular updates on the work of the committee,specifically the Report that occurs just after each committee meeting so that Council knows what occurred,etc. • Council Update—Regular updates to the Council every two months on the progress of the committee (last update April 13, 2015). • Mailing to Businesses—As the city lacks organizations that have a broad outreach to the business community,the City will have to go directly to the businesses in order to get the word out about the potential annexation. This mailing will provide a comprehensive overview of the issue and potential impacts, but will also be an invite to an opportunity to learn more about the RFA. • Community meetings—The City will host two community meetings as the work of the Committee continues to progress. One will be held during the day with a business focus(though all are welcome to both meetings) and one in the evening geared toward residents. An open- house format with no set agenda but the opportunity to talk with staff and get questions answered is highly recommended. Page 3 of 9 116 • TukTV—Two to three key City staff will participate in a taping of Tukwila: Your Community,the City's 30-minute interview style show highlighting key programs and individuals in the City. This will be filmed in May and shown regularly on TukTV and made available online. • Presentation Deck—A generic overview presentation of the issue, process and timeline will be developed that can be given at various community gatherings(see below)and that will also be narrated and put up on TukTV and the City's website. • Roadshow—Using the presentation developed above, City staff will do a roadshow out in the community to raise awareness of the RFA process. Examples of potential groups include: • Planning Commission o Historical Society • Rotaries o Parks Commission Internal Communications The City would like to ensure that all employees understand the potential issues and impacts of annexing the fire department to the RFA. In order to accomplish this goal,the city will use the following communication vehicles: • The Grapevine—Progress on the RFA discussions to be published in June and October editions. • City Administrator Report (CAR)—The Report will include regular updates on the work of the committee, specifically the Report that occurs just after each committee meeting so that Council knows what occurred, etc. • All User Email—While an all user email was sent out in early 2015,the City needs to do this on a semi-regular basis in order to keep the issue in front of employees. It is recommended others are sent in May,August and October. • RFA Brown bag lunches—give employees an opportunity to have their questions answered by having brown bag lunches at various City locations where employees have a chance to sit down and talk with staff and administration to learn more about an RFA,the Committee's progress and to have their questions answered. This format could include a discussion with City staff who are currently served by an RFA and what it meant for them personally. Tukwila Fire Department Specific Outreach While members of the Tukwila Fire Department will be reached via the general internal communications effort, the City recognizes that additional communications tactics should be deployed within the Department due to the nature of the potential impacts on this group. As such,the following additional activities will occur: • Email to the Department—Email from Chief Flores or Moira Bradshaw introducing the binders, use of Training Tracker and other tactics to further inform the Department about the deliberations. • Steering Committee Binders at all Fire Stations—Regularly updated binders allows firefighters the opportunity to review hard copies of meeting materials and minutes, increasing their access to the work of the committee. • Training Tracker—Meeting minutes shall be uploaded to the Department's Training Tracker to ensure that members of the Department are well-versed in the work of the committee. Page 4 of 9 117 Timeline Date Tactic Task Responsible Notes Ongoing Website Updated with committee packets Moira to forward packet; Scott to post Feb 3 Tukwila Reporter Recruit members for Steering Committee Spring 2015 e- Hazelnut Update community on RFA investigation April 8 Council Briefing Updated Council on Steering Committee formation and scope Moira with support by Vicky May 8 Reporter Article on the work of the committee to date Moira to draft; Communications support June 5 All User Email Update on the work of the committee to date Moira to draft; Communications support David is sender June 15 Council presentation Overview of the work of the committee to date Moira to draft; Communications support June 19 Flyer Develop flyer /leave behind for use at events Rachel to draft; Moira to edit; Stacia to design June 19 TukTV Tape an episode of Tukwila: Your Community focused on the RFA Moira and Rachel to plan Crystal Sweet interviews Chiefs Schneider and Flores or David Cline June 19 Presentation deck Generic presentation that can be given to a wide variety of groups Moira and Rachel to develop June 19 Grapevine Article Article on the work of the committee to date Rachel to draft; Moira to review June 29 Narrate deck Up on TukTV and website; translations if possible Scott and Rachel Work with the court to use translation services Page 5 of 9 Date Tactic Task Responsible Notes June — August Roadshow Schedule and give presentations to a variety of groups Moira and team Planning Commission, Parks Commission, Library Board, Arts Commission, COBCAP, Equity & Diversity, Human Services Advisory Board, Historical Society, Duwamish Southside Rotary, Southcenter Rotary, Sustain Tukwila Pool, TIBAC; Lodging Tax Advisory Committee. June 25 E- Hazelnut Article on the work of the committee to date Moira to draft; Communications support July 15 Tukwila Talk Article on the work of the committee to date Moira to draft; Communications support and post July 15 City Administrator Report Article on the work of the committee to date Moira to draft; Communications support August City Administrator Report Article on the work of the committee to date Moira to draft; Communications support August 4 National Night Out Distribute Flyers • August 14 Reporter Article on the work of the committee to date; announcing upcoming meeting Moira to draft; Communications support Mid August Council presentation Update Moira to draft; communications support September 1 Mailing to businesses Includes comprehensive overview and invite to Sept 17 meeting Moira to draft; Communications to design /support Page 6 of 9 0 Date Tactic Task Responsible Notes September 1 All user email Update on the work of the committee to date and announcing the brown bag lunches Rachel to draft; Moira to review David to send September 1 Insert in utility bills Update on the work of the committee to date and announcement of community meeting Rachel to draft; Moira to review Moira to work with Finance to ensure date, space in the utility bills, etc. Sept 6 Kid Mail Information and notice of community meeting sent out via the school district Rachel to coordinate with District September 9 Community Meeting @ Night, residential focus Moira and Rachel to plan @ TCC September 9 All user email Reminder about the brown bag lunch Rachel to draft; Moira to review David to send September 10 Brown Bag lunch Allow employees to come in, ask questions Moira and Rachel to plan At 51— open to all employees September 15 All user email Reminder about the brown bag lunch Rachel to draft; Moira to review David to send September 15 City Administrator Report Article on the work of the committee to date Moira to draft; Communications support September 16 Brown Bag lunch Allow employees to come in, ask questions Moira and Rachel to plan TCC September 17 Community Meeting Business focused, during the day Moira, Derek and Rachel to plan September 23 All user email Reminder about the brown bag lunch Rachel to draft; Moira to review David to send Page 7 of 9 Date Tactic Task Responsible Notes September 24 Brown Bag lunch Allow employees to come in, ask questions Moira and Rachel to plan At City Hall September 28 E- Hazelnut Article on the work of the committee to date Moira to draft; Communications support Late September /early October Council presentation Overview of the work of the committee to date Moira to draft; Communications support October 2 Grapevine Article Article on the work of the committee to date Rachel to draft; Moira to review October Tukwila Talk Article on the work of the committee to date Moira to draft; Communications support and post October 15 TukTV Tape a second episode of Tukwila: Your Community with updates on the process Moira and Rachel to plan October 15 City Administrator Report Article on the work of the committee to date Moira to draft; Communications support October 15 All User Email Update on the work of the committee to date Moira to draft; Communications support David is sender October CAR Report Article on the work of the committee to date Moira to draft; Communications support Post - Council Action All User Email Discussion of Council's decision and next steps Moira to draft; Communications support David is sender November /December E- Hazelnut Article on the final decision made by the Council Moira to draft; Communications support Page 8 of 9 Date Tactic Task Responsible Notes November 15 City Administrator Report Article on the work of the committee to date Moira to draft; Communications support December 15 Tukwila Talk Discussion of Council's decision and next steps Rachel to draft; Moira to review and post December 15 Grapevine Article Article on the final decision made by the Council Rachel to draft; Moira to review December 15 TukTV Tape a third episode of Tukwila: Your Community on the Council's decision and next steps Moira and Rachel to plan Page 9 of 9 • city of TukW101a Jim Hla Berton, Mayor° • 6200 Southcemter Boulevard Tukwila,WA 98188-2544 The City of opportunity, the community of choice TO: Mayor Haggerton Councilmembers FROM: David Cline, City Administrator DATE: June 10, 2015 SUBJECT: Report for June 15, 2015 Regular Council Meeting The City Administrator Report is meant to provide the Council, staff and community an update on the activities of the City and on issues that concern Tukwila. Please let me know if you have any questions or need additional information about any of the following items. I. Intergovernmental Update • WCMA/AWC Training: On June 3 the King County City Managers/Administrators group partnered with Washington City/County Management Association (WCMA) and Association of Washington Cities (AWC)to offer a training for City leadership. The training covered Governance models and open government in Washington, Financial management, Employment law and labor relations, Land use law and economic development, and Effective Council/Manager Relations. City Administrator David Cline, Economic Development Liaison Brandon Miles and Deputy Finance Director Vicky Carlsen attended the training. • South King County Leadership Meeting: On June 3 Mayor Haggerton and City Administrator David Cline attended a South King County Leadership Group meeting including South King County Mayors and members of the Sound Transit Board that represent South King County. King County Executive Dow Constantine attended the meeting to help facilitate greater communication and an exchange of ideas regarding Sound Transit Leadership. • Boeing Access Road Meeting: On June g Mayor Haggerton and Communications and Government Relations Manager Rachel Bianchi participated in a meeting with businesses and residents regarding the Boeing Access Road multimodal station. Sound Transit recently began their public engagement process around ST3, which will be the package sent to the voters in November of 2016. Currently both the commuter and light rail stations at Boeing Access Road are on the draft list, and in order for them to stay on the final list, it will be imperative that Sound Transit hears from Boeing Access Road supporters. As such and in partnership with Sabey,the City has developed a toolkit for employers, employees and residents to easily engage with the agency. A website has been developed where the toolkit will be able to be easily shared with other interested stakeholders. The Council should feel free to share the website:www.BoeingAccessRoadStation.org • TIGER Grant Applications: On June 4 the City formally submitted its application for the current round of TIGER funding. Like last year,the City requested $20,000,000 in TIGER funds Phone.,206-433-1800 • Emait* Mayor@TukwRaWA.gov « Website:TukwiiaWkgov 123 City Administrator Report June 10, 2015 Page 2 forthe Strander project to allow us to go underthe Union Pacific tracks and connect with Renton's SW 27th Street. Based on the feedback received from US Department of Transportation on last year's application, as well as the improvements we were able to make on the FY 2015 application, we are hopeful that we will receive the grant. Decisions on TIGER will be made in the fall, and we will know toward the end of the year as to whether we receive any funding. II. Community Events • McMicken Canvass: City staff are currently conducting a house-by-house canvass of the McMicken neighborhood. In the past two weeks almost loo homes have been visited. Canvassing will continue through the end of June. Whereas final survey results will be available laterthis summer, preliminary responses indicate that residents enjoy their neighborhood and appreciate the personal outreach. • Teen Summer Kick-off Festival: The Annual Teen Summer Kick-Off Festival will be held at Foster High School Stadium on Wednesday, June 17 from noon—5:00 pm. The event is organized like a block party for teens in grades 6-12. There will be music, a BBQ, 4 on 4 basketball, dodge ball, bouncers, and more. • #Dreams Unlimited Project Performance: The Tukwila Arts Commission and 4Culture have sponsored the #Dreams Unlimited Project,two professional artists have been working with selected Foster High School students throughout the past four weeks. A final performance of their work will culminate in an inspirational performance which will leave attendees feeling unlimited in their potential. The performance will be held on Wednesday, June 17th at the Foster Performing Arts Center, doors open at 5:30,the performance is FREE. III. Staff Updates Project Updates • Tukwila International Boulevard (TIB)Comprehensive Plan Element: The Planning Commission held a public hearing on the new TIB Element, made their revisions and forwarded their recommended version to the City Council. • Southcenter Plan Wins Smart Communities Award: The City of Tukwila was awarded a 2015 Governor's Smart Communities Award. Tukwila received the Smart ChoicesAward— Implementation of a Comprehensive Plan for the Southcenter Sub-area Plan: fostering development of a high-density, regionally-oriented, mixed use center including housing. Commerce Director Brian Bonlender will present the city awards on behalf of Governor Inslee at the Association of Washington Cities annual conference in Wenatchee. • NW Arena Project: A public EIS Scoping meeting regarding the NW Arena project was held on June 2 at the Tukwila Community Center. Approximately 15 members of the public attended and voiced concerns about traffic, impacts on neighboring businesses and possible changes to the Interurban Trail. • 164th Street Community Meeting: On June 3 there was a 164th Street Community Meeting with citizens from Tukwila and SeaTac. Representatives of the Tukwila Police Department, Tukwila Code Enforcement and the SeaTac Police Department attended the event. This was a Phone,206-433-1800 + Email: Mw ayor@TukwilaWA.gov • Website;TukwilaWA. ov 124 City Administrator Report June 10, 2015 Page 3 follow up to a previous meeting with the neighborhood and Chris Partman gave a presentation on Crime Prevention Training and Reporting. • City Ice Cream Social: On June 4 Over zoo City employees attended the Employee Recognition Ice Cream Social held at the Minkler Shops. Ice cream and other treats were provided for public safety and public works employees that work different shifts and were unable to attend. • Interurban Ave S Update: Walsh Construction is preparing to switch traffic to the west side. Most of the curb and gutter and storm drain has been placed on the east side from S 149th St to Fort Dent Way along with the base layers of the new asphalt roadway. All work is now expected to be completed by the end of the year. Rhone,206-433-1800 + Email: Mw ayor@TukwilaWA.gov • Web site;T'ukwilaWkgov 125 126 Upcoming Meetings & Events June 2015 15th (Monday) 16th (Tuesday) 17th(Wednesday) 18th (Thursday) 19th (Friday) 20th Saturda ➢ Transportation ➢ 8:nanee& Teen Summer ➢ Planning Duwamish Alive! Cmte, Safety GuAe, Kickoff Festival! Commission, Volunteer event at 5:15 PM Cancelled Noon-4:30 PM Work Session the Duwamish Hill (Foster (Foster High School on Housing Preserve Conference football stadium) and 10:00 AM—1:00 PM Room) Residential (3800 South 115 There will be Neighborhoods Street) inflatables,music, basketball Elements of tournaments,BBQ, the Comp. ➢ City Council dunk tank and more Plan Regular Mtg., for the teens in 6:30 PM 7:00 PM grades 6-12 to enjoy! (Rainier (Council This is a free event. Conference Chambers) Room,6300 Southcenter ➢ Park Commission, Blvd) 5:30 PM (Community ➢ Tukwila Center) Historical Society, 7:00 PM (Tukwila Heritage& Cultural Center, 14475 59`t'Ave S.) 22nd (Monday) 23rd (Tuesday) 24th(Wednesday) 25th (Thursday) 26th (Friday) 27tb (Saturday) • Community ➢ Utilities Cmte, ➢ Planning Community Kitchen Tukwila Int'l. Affairs& 5:30 PM Commission, Event Blvd.Action Parks Cmte, (Foster Public Hearing 5:30—8:30 PM Cmte's 5:30 PM Conference on Housing (Community Center) Trash Pickup Day (Hazelnut Room) and Join Project Feast Conference Residential and Tukwila Parks 9:00—10:00 AM Room) Neighborhoods and Recreation for Elements of an evening of the Comp. interactive cooking. For location or • City Council Plan Free. Pre- Committee of 6:30 PM registration is information contact the Whole (Council required, Sharon Mann 206-200-3616 Mtg., Chambers) call 206-768-2822. 7:00 PM (Council Chambers) C.O.W.to be immediately followed by a Special Mtg ➢Arts Commission: 1st Tues.,5:00 PM,Tukwila Community Center. Contact Stephanie Gardner at 206-767-2342. ➢Civil Service Commission: 1st Mon.,5:00 PM,Hazelnut Conf.Room. Contact Kim Gilman at 206-431-2187. ➢Community Affairs&Parks Committee: 2nd&4th Mon.,5:30 PM,Hazelnut Conf. ➢COPCAB(Community Oriented Policing Citizens Adv.Board): 2nd Thurs.,6:30 PM,Duwamish Conference Room. Contact Chris Partman at 206-431-2197. ➢Equity&Diversity Commission: 1st Thurs.,5:15 PM,Hazelnut Conf.Room. Contact Joyce Trantina at 206-433-1868. ➢Finance&Safety Committee: 1st&3rd Tues.,5:30 PM,Hazelnut Conf.Room. Meeting cancelled ➢Library Advisory Board: 1st Tues.,7:00 PM,Community Center. Contact Tracy Gallaway at 206-767-2305. ➢Park Commission: 3rd Wed.,5:30 PM,Community Center. Contact Dave Johnson at 206-767-2308. ➢Planning Commission/Board of Architectural Review: 4'"Thurs.,6:30 PM,Council Chambers at City Hall. Contact Wynetta Bivens at 206-431-3670 •Transportation Committee: 1 st&3rd Mon.,5:15 PM,Foster Conf.Room (A)42 d Ave S/Allentown Roadside Barriers Project Status Update. (B)2015 Overlay and Repair Program Award Construction Bid. (C)Americans with Disabilities Act(ADA) Transition Plan Consultation Selection and Agreement. (D)Transit Network Plan Update Consultation Selection and Agreement. •Tukwila Historical Society: 3rd Thurs.,7:00 PM,Tukwila Heritage&Cultural Center,14475 59's Avenue S. Contact Louise Jones-Brown at 206-244-4478. ➢Tukwila Int'l.Blvd.Action Cmte: 2nd Tues.,7:00 PM,Valley View Sewer District. Contact Chief Villa at 206-433-1815. ➢Utilities Committee: 2nd&4th Tues.,5:30 PM,Foster Conf.Room 127 Tentative Agenda Schedule O MEr�tc � rrvG z MEG �4 a R ui"K June 1 8 15 22 See agenda packet Special Issues: cover sheet for this -Facilities Plan week's agenda Phase 4. (June 15 2015 -Discussion and Regular Meeting). consensus on Sound Cities Association Public Issues Committee(SCA PIC)Items. Committee of the Whole meeting to be followed by Special Meeting. July 6 13 20 27 Special Presentations: Appointments/ Special Issues: Briefing on the"Best Proclamations: �-Review and update Start for Kids" A proclamation for of two of Tukwila's Initiative. National Night Out. Comprehensive Plan Elements: Tukwila Appointments/ International Proclamations: Boulevard,and A proclamation for Housing nd Parks and Recreation g Residential Month. Neighborhoods. The Plan Introduction, Vision,Glossary and Land Use Map legend. -Discussion and consensus on Sound Cities Association Public Issues Committee(SCA PIC)Items. 128