Loading...
HomeMy WebLinkAboutRes 1860 - 2016-2021 Transportation Improvement ProgramCity of Tukwila Washington Resolution No. 1860 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2016- 2021), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2016- 2021); and WHEREAS, on June 8, 2015, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2016 -2021 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Processing \Resolutions \TIP 2016 -2021 5 -15 -15 CK:bjs Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this / 5day oflLtAJQ. , 2015. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APP VED S TO FORM BY: ( Rachel B. urpin, City Attorney Ka e Kruller ouncil President Filed with the City Clerk: Passed by the City Council: Resolution Number: 0-1 Exhibit: City of Tukwila Six-Year Transportation Improvement Program from 2016 to 2021 WkWord Processing\Resolutions\TIP 2016-2021 5-15-15 CK:bjs Page 2 of 2 Agency: Tukwila County: King MPO /RTPO: PSRC State t of Transportation Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments 06/08/15 06/15/15 04 C G O P S TW Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 5,300,000 5,300,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 9,660,000 9,660,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,300,000 0 0 0 4,360,000 Totals 5,300,000 0 0 0 4,360,000 Report Date: June 02, 2015 Page 1 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 Local Funds WA- 06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/08/15 06/15/15 2016 04 C G O P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 3,000 3,000 P CN 2016 0 TIB 1,589,000 1,350,000 2,939,000 S CN 2016 0 0 1,151,000 1,151,000 Totals 0 1,589,000 2,504,000 4,093,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 3,000 0 0 0 0 CN 3,170,000 920,000 0 0 0 Totals 3,173,000 920,000 0 0 0 Report Date: June 10, 2015 Page 2 fel Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA- 05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/08/15 06 /15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 378,000 378,000 Totals 0 0 378,000 378,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: June 02, 2015 Page 3 tington State trtmertw of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/08/15 06 /15/15 05 C G O P S TW 0.190 CE No 0 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals 0 0 0 0 575,000 Report Date: June 02, 2015 Page 4 Washington state Department o Transportatlon Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA- 07746 Andover Park E /Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/08/15 06 /15/15 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 20,000 20,000 P CN 2021 0 0 602,000 602,000 Totals 0 0 622,000 622,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: June 02, 2015 Page 5 Washington State vw Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/08/15 06/15/15 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 1,880,000 1,880,000 Totals 0 0 1,880,000 1,880,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 335,000 335,000 670,000 Totals 270,000 270,000 335,000 335,000 670,000 Report Date: June 02, 2015 Page 6 .w � mo Washington State VI/ Department at Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment A A o F o z o Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA- 03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/08/15 06 /15/15 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2016 0 0 10,080,000 10,080,000 Totals 0 0 10,080,000 10,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Totals 1,560,000 1,650,000 1,670,000 1,725,000 3,475,000 Report Date: June 02, 2015 Page 7 a Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN Rauoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID S m 0 v a ;uawpuawy ed (1;uawanoadwI c 0 W N q)Buai mai adAy le;uewuoainu3 paJinbaa M J 19 Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. TUK-57 06/08/15 06/15/15 14 0.010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 1,740,900 0 0 1,740,900 Totals 1,740,900 0 0 1,740,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,900 0 0 0 0 Totals 1,740,900 0 0 0 0 Report Date: June 02, 2015 Page 8 Agency: Tukwila County: King MPO /RTPO: PSRC State of Transportation Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside aagwnN /Guoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 8. STIP ID G. Structure ID 0 m yuawpuawy 0 m 0 0 0 z 0 adAl;uawanwdwi m 0 s adkj ieluawuognu3 paJinbaa M2! 00 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. WA05409 06/08/15 06/15/15 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 FMSIB 950,000 0 300,000 1,250,000 P CN 2021 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 12, 500, 000 CN 0 0 0 0 1,250,000 Totals 0 0 0 0 13,750,000 Report Date: June 02, 2015 Page 9 tngtun State rtmtt of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It will be 110' wide curb to curb and have sidewalks on both sides 06/08/15 06/15/15 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 4,193,000 0 1,218,000 5,411,000 Totals 4,193,000 0 1,218,000 5,411,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,411,000 0 0 0 0 Totals 5,411,000 0 0 0 0 Report Date: June 02, 2015 Page 10 Washington State Vr Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside -n c tx m o Pi, m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/08/15 06/15/15 28 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 839,000 Totals 0 0 0 0 839,000 Report Date: June 02, 2015 Page 11 Agency: Tukwila County: King MPO /RTPO: PSRC State of Transportation Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside r, m 0 m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID L ro Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 TUK -55 Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. 06/08/15 06/15/15 14 0.040 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 2,534,812 0 0 2,534,812 Totals 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,534,812 0 0 0 0 Totals 2,534,812 0 0 0 0 Report Date: June 02, 2015 Page 12 � Washington State Tar Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JegwnN / !Joud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID x 0 v 0. )uawpuawy m 0 0 0 z 0 adity )uewanoadwJ c 0 0 N g m r tsa adAi ieluawu palinbaa Mb 14 Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres Drive SW, Renton Retrofit existing bridge with seismic protection. TUK-56 06/08/15 06/15/15 14 0.230 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 STP(BR) 206,500 0 0 206,500 Totals 206,500 0 0 206,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 206,500 0 0 0 0 Totals 206,500 0 0 0 0 Report Date: June 02, 2015 Page 13 Agency: Tukwila County: King MPO /RTPO: PSRC State of Transportation Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -03783 Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure 06/08/15 06 /15/15 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 0 360,000 360,000 Totals 0 0 360,000 360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,000 60,000 60,000 120,000 Totals 60,000 60,000 60,000 60,000 120,000 Report Date: June 02, 2015 Page 14 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -07748 S 133 St/SR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. 06/08/15 06/15/15 04 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 15 Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside -n c °. m 5. m e. Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/08/15 06/15/15 28 0.250 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 STP(BR) 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 1,219,000 Totals 0 0 0 0 1,219,000 Report Date: June 02, 2015 Page 16 ingicte, State rttrtetrt of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside JagwnN Rluoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 o a luawpuawy ON uolynlosaa adk(1 luawanoJdwl c 0. N r 0 to r adAj Ipluewuo)!Au3 16 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave WA -05410 06/08/15 06/15/15 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 STP 3,850,000 0 620,000 4,470,000 P RW 2021 STP 1,150,000 0 179,000 1,329,000 P CN 2021 FMSIB 5,000,000 0 1,000,000 6,000,000 P CN 2021 TIGER III 20,000,000 0 25,000,000 45,000,000 Totals 30,000,000 0 26,799,000 56,799,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 5,000,000 0 0 RW 0 0 0 0 1,329,000 CN 0 0 0 0 51,000,000 Totals 20,000 0 5,000,000 0 52,329,000 Report Date: June 02, 2015 Page 17 shington State Agency: Tukwila County: King MPO /RTPO: PSRC atk Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. 06/08/15 06 /15/15 28 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2016 0 0 70,000 70,000 P RW 2021 STP(E) 80,000 0 0 80,000 S RW 2021 0 0 20,000 20,000 P CN 2021 STP(E) 420,000 0 580,000 1,000,000 Totals 500,000 0 670,000 1,170,000 Expenditure Schedule Phase 1st 2nd 3rd dth 5th & 6th PE 70,000 0 0 0 300,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 70,000 0 0 0 1,100,000 Report Date: June 02, 2015 Page 18 Vaer ington State rtnient of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (d extended) Baker Boulevard to West Valley Highway Construct a new pedestrian/bicycle bridge over the Green River 06/08/15 06/15/15 28 0.640 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2016 0 OTHER 6,000,000 185,000 6,185,000 Totals 0 6,000,000 185,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,223,000 0 0 0 0 Totals 7,223,000 0 0 0 0 Report Date: June 02, 2015 Page 19 T1, Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment 70 �. 3 z p Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA- 03761 Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. 06/08/15 06 /15/15 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 175,000 Totals 0 0 0 0 175,000 Report Date: June 02, 2015 Page 20 rn Tr Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment m o 5. o Z P Improvement Type Utility Codes Total Length Environmental Type RW Required 14 State Fund Code WA03779 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/08/15 06/15/15 Local Funds Total Funds 03 PE 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 60,000 60,000 P CN 2021 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: June 02, 2015 Page 21 inngton State rttstevtt of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2016 to 2021 N Outside z. z 3 A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 0 3 G. luawpuawy ON uopniosab ad Ai luewanoJdwi c K O 0 0 0 0 r- rP cc 3 n H paJinbaa MM 14 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct safety and capacity improvements at intersection. WA -03765 06/08/15 06/15/15 03 OPSTW CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 0 50,000 50,000 P CN 2020 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 592,000 1,032,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 0 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 52,352,912 8,339,000 59,277,300 119,969,212 Report Date: June 02, 2015 Page 22 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 16, 2015 1:46 PM To: 'Andi Markley' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2016 -2021 June 16, 2015 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM Following is a Zink to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation Improvement Program for 2016 -2021. http://records.tukwilawa.gov/VVebLink8/1/doc/258715/Page1.aspx Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 16, 2015 1:49 PM To: 'GregA @tib.wa.gov' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2016 -2021 June 16, 2015 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation Improvement Program for 2016 -2021. http: // records .tukwilawa.gov /WebLink8 /1 /doc /258715/Pagel .aspx Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 16, 2015 1:47 PM To: 'LYNNP @wsdot.wa.gov' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2016 -2021 June 16, 2015 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM Following is a Zink to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation Improvement Program for 2016 -2021. http: // records .tukwilawa.gov /WebLink8 /1 /doc /258715/Pagel .aspx Please contact me with any questions at 206 433 -1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1