HomeMy WebLinkAboutRes 1860 - 2016-2021 Transportation Improvement ProgramCity of Tukwila
Washington
Resolution No. 1860
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2016-
2021), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2016- 2021); and
WHEREAS, on June 8, 2015, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six -year Transportation Improvement Program
for the calendar years 2016 -2021 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
W: \Word Processing \Resolutions \TIP 2016 -2021 5 -15 -15
CK:bjs
Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this / 5day oflLtAJQ. , 2015.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APP
VED S TO FORM BY:
(
Rachel B. urpin, City Attorney
Ka
e Kruller
ouncil President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
0-1
Exhibit: City of Tukwila Six-Year Transportation Improvement Program from 2016 to 2021
WkWord Processing\Resolutions\TIP 2016-2021 5-15-15
CK:bjs
Page 2 of 2
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
t of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to Southcenter Blvd
Design and construct street improvements, drainage, sidewalks, bike facilities, and
driveway adjustments
06/08/15
06/15/15
04
C G O P S
TW
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
0
5,300,000
5,300,000
P
CN
2021
0
0
4,360,000
4,360,000
Totals
0
0
9,660,000
9,660,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
5,300,000
0
0
0
4,360,000
Totals
5,300,000
0
0
0
4,360,000
Report Date: June 02, 2015
Page 1
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
Local Funds
WA- 06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/08/15
06/15/15
2016
04
C G O P S
TW
0.420
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2016
0
0
3,000
3,000
P
CN
2016
0
TIB
1,589,000
1,350,000
2,939,000
S
CN
2016
0
0
1,151,000
1,151,000
Totals
0
1,589,000
2,504,000
4,093,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
3,000
0
0
0
0
CN
3,170,000
920,000
0
0
0
Totals
3,173,000
920,000
0
0
0
Report Date: June 10, 2015
Page 2
fel
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA- 05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/08/15
06 /15/15
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
378,000
378,000
Totals
0
0
378,000
378,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
63,000
63,000
63,000
63,000
126,000
Totals
63,000
63,000
63,000
63,000
126,000
Report Date: June 02, 2015
Page 3
tington State
trtmertw of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
4th
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/08/15
06 /15/15
05
C G O P S
TW
0.190
CE
No
0
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2021
0
0
575,000
575,000
Totals
0
0
575,000
575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
0
0
575,000
Totals
0
0
0
0
575,000
Report Date: June 02, 2015
Page 4
Washington state
Department o Transportatlon
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA- 07746
Andover Park E /Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/08/15
06 /15/15
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
20,000
20,000
P
CN
2021
0
0
602,000
602,000
Totals
0
0
622,000
622,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
20,000
CN
0
0
0
0
602,000
Totals
0
0
0
0
622,000
Report Date: June 02, 2015
Page 5
Washington State
vw Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/08/15
06/15/15
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
1,880,000
1,880,000
Totals
0
0
1,880,000
1,880,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
270,000
335,000
335,000
670,000
Totals
270,000
270,000
335,000
335,000
670,000
Report Date: June 02, 2015
Page 6
.w
� mo Washington State
VI/ Department at Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
A
A
o
F
o
z
o
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA- 03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/08/15
06 /15/15
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2016
0
0
10,080,000
10,080,000
Totals
0
0
10,080,000
10,080,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,560,000
1,650,000
1,670,000
1,725,000
3,475,000
Totals
1,560,000
1,650,000
1,670,000
1,725,000
3,475,000
Report Date: June 02, 2015
Page 7
a
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
JagwnN Rauoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
S
m
0
v
a
;uawpuawy
ed (1;uawanoadwI
c
0
W
N
q)Buai mai
adAy le;uewuoainu3
paJinbaa M J
19
Beacon Ave S Bridge Preventative Maintenance Project
Beacon Avenue South over South Ryan Way
S Victor St to S 170th St
Remove and replace failed bridge deck and paint structural steel.
TUK-57
06/08/15
06/15/15
14
0.010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
1,740,900
0
0
1,740,900
Totals
1,740,900
0
0
1,740,900
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,740,900
0
0
0
0
Totals
1,740,900
0
0
0
0
Report Date: June 02, 2015
Page 8
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
aagwnN /Guoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
8. STIP ID
G. Structure ID
0
m
yuawpuawy
0
m
0
0
0
z
0
adAl;uawanwdwi
m
0
s
adkj ieluawuognu3
paJinbaa M2!
00
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
WA05409
06/08/15
06/15/15
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
FMSIB
950,000
0
300,000
1,250,000
P
CN
2021
FMSIB
10,812,500
0
1,687,500
12,500,000
Totals
11,762,500
0
1,987,500
13,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
12, 500, 000
CN
0
0
0
0
1,250,000
Totals
0
0
0
0
13,750,000
Report Date: June 02, 2015
Page 9
tngtun State
rtmtt of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(003) TUK -52
Boeing Access Road Bridge Rehabilitation
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing bridge with a 340' long concrete or steel bridge structure. It
will be 110' wide curb to curb and have sidewalks on both sides
06/08/15
06/15/15
14
0.200
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
4,193,000
0
1,218,000
5,411,000
Totals
4,193,000
0
1,218,000
5,411,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
5,411,000
0
0
0
0
Totals
5,411,000
0
0
0
0
Report Date: June 02, 2015
Page 10
Washington State
Vr Department of Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
-n
c
tx
m o
Pi, m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -03795
Cascade View Safe Routes to School Phase 2
S 140th St/33rd Ave S
to
Construct an off - street paved shard use path, sidewalks, and a traffic circle at the
intersection of 33rd Ave S and S 140th Street.
06/08/15
06/15/15
28
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2021
0
WSDOT
750,000
89,000
839,000
Totals
0
750,000
89,000
839,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
839,000
Totals
0
0
0
0
839,000
Report Date: June 02, 2015
Page 11
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
r,
m 0
m m
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
L
ro
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
TUK -55
Frank Zepp Bridge Preventative Maintenance Project
S 180th Street over the Green River
SR 181 - West Valley Highway to Sperry Drive S
Paint the structural steel, overlay deck and replace the deck joint, and install seismic
protection.
06/08/15
06/15/15
14
0.040
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
2,534,812
0
0
2,534,812
Totals
2,534,812
0
0
2,534,812
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,534,812
0
0
0
0
Totals
2,534,812
0
0
0
0
Report Date: June 02, 2015
Page 12
� Washington State
Tar Department of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
JegwnN / !Joud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
x
0
v
0.
)uawpuawy
m
0
0
0
z
0
adity )uewanoadwJ
c
0
0 N g
m
r
tsa
adAi ieluawu
palinbaa Mb
14
Grady Way Bridge Preventative Maintenance Project
Grady Way Bridge over BN and UP Railroads
Interurban Avenue S to Longacres Drive SW, Renton
Retrofit existing bridge with seismic protection.
TUK-56
06/08/15
06/15/15
14
0.230
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
STP(BR)
206,500
0
0
206,500
Totals
206,500
0
0
206,500
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
206,500
0
0
0
0
Totals
206,500
0
0
0
0
Report Date: June 02, 2015
Page 13
Agency: Tukwila
County: King
MPO /RTPO: PSRC
State
of Transportation
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03783
Multipurpose Trails
to
Wide array of necessary trail improvements to existing trail system infrastructure
06/08/15
06 /15/15
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
0
360,000
360,000
Totals
0
0
360,000
360,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
60,000
60,000
60,000
60,000
120,000
Totals
60,000
60,000
60,000
60,000
120,000
Report Date: June 02, 2015
Page 14
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -07748
S 133 St/SR599 Southbound Intersection
S 133rd Street
SR 599 Southbound Ramps to S 134th PI
Construct intersection improvements including signalization or roundabout, lighting,
crosswalks, and drainage.
06/08/15
06/15/15
04
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
60,000
60,000
P
CN
2021
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: June 02, 2015
Page 15
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
-n
c
°.
m 5.
m e.
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06/08/15
06/15/15
28
0.250
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2021
STP(BR)
975,200
0
243,800
1,219,000
Totals
975,200
0
243,800
1,219,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
1,219,000
Totals
0
0
0
0
1,219,000
Report Date: June 02, 2015
Page 16
ingicte, State
rttrtetrt of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
JagwnN Rluoud
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0
o a
luawpuawy
ON uolynlosaa
adk(1 luawanoJdwl
c
0.
N
r
0
to
r
adAj Ipluewuo)!Au3
16
Strander Blvd /SW 27th St Phase III
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct arterial improvements for a new roadway extending Strander
Boulevard /SW 27th St from West Valley Highway to Oaksdale Ave
WA -05410
06/08/15
06/15/15
01
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2018
STP
3,850,000
0
620,000
4,470,000
P
RW
2021
STP
1,150,000
0
179,000
1,329,000
P
CN
2021
FMSIB
5,000,000
0
1,000,000
6,000,000
P
CN
2021
TIGER III
20,000,000
0
25,000,000
45,000,000
Totals
30,000,000
0
26,799,000
56,799,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
20,000
0
5,000,000
0
0
RW
0
0
0
0
1,329,000
CN
0
0
0
0
51,000,000
Totals
20,000
0
5,000,000
0
52,329,000
Report Date: June 02, 2015
Page 17
shington State
Agency: Tukwila
County: King
MPO /RTPO: PSRC
atk
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area.
06/08/15
06 /15/15
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2016
0
0
70,000
70,000
P
RW
2021
STP(E)
80,000
0
0
80,000
S
RW
2021
0
0
20,000
20,000
P
CN
2021
STP(E)
420,000
0
580,000
1,000,000
Totals
500,000
0
670,000
1,170,000
Expenditure Schedule
Phase
1st
2nd
3rd
dth
5th & 6th
PE
70,000
0
0
0
300,000
RW
0
0
0
0
100,000
CN
0
0
0
0
700,000
Totals
70,000
0
0
0
1,100,000
Report Date: June 02, 2015
Page 18
Vaer
ington State
rtnient of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd (if extended)
and Longacres Way (d extended)
Baker Boulevard to West Valley Highway
Construct a new pedestrian/bicycle bridge over the Green River
06/08/15
06/15/15
28
0.640
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2016
0
OTHER
6,000,000
185,000
6,185,000
Totals
0
6,000,000
185,000
6,185,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
7,223,000
0
0
0
0
Totals
7,223,000
0
0
0
0
Report Date: June 02, 2015
Page 19
T1,
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
70
�.
3
z
p
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA- 03761
Walk & Roll Plan (Nonmotorized Transportation Plan)
Various City Streets
to
Evaluate deficiencies and create a prioritized list of projects and recommended
design standards.
06/08/15
06 /15/15
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
175,000
175,000
Totals
0
0
175,000
175,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
175,000
Totals
0
0
0
0
175,000
Report Date: June 02, 2015
Page 20
rn
Tr
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
m
o
5.
o
Z
P
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
State Fund Code
WA03779
West Valley Highway
SR 181/West Valley Highway
1-405 to Strander Blvd
Design and construct widening to 7 lanes including curb & gutter, sidewalks,
illumination, drainage, and traffic control
06/08/15
06/15/15
Local Funds
Total Funds
03
PE
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
60,000
60,000
P
CN
2021
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: June 02, 2015
Page 21
inngton State
rttstevtt of Transportation
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2016 to 2021
N Outside
z.
z
3
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0
0
3
G.
luawpuawy
ON uopniosab
ad Ai luewanoJdwi
c
K
O
0
0
0
0
r-
rP
cc
3
n
H
paJinbaa MM
14
West Valley Highway /S 156th St
SR181/West Valley Highway
Southcenter Blvd to S 158th St
Construct safety and capacity improvements at intersection.
WA -03765
06/08/15
06/15/15
03
OPSTW
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
0
50,000
50,000
P
CN
2020
CMAQ
440,000
0
542,000
982,000
Totals
440,000
0
592,000
1,032,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
50,000
CN
0
0
0
0
982,000
Totals
0
0
0
0
1,032,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
52,352,912
8,339,000
59,277,300
119,969,212
Report Date: June 02, 2015
Page 22
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 16, 2015 1:46 PM
To: 'Andi Markley'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2016 -2021
June 16, 2015
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a Zink to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation
Improvement Program for 2016 -2021.
http://records.tukwilawa.gov/VVebLink8/1/doc/258715/Page1.aspx
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
1
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 16, 2015 1:49 PM
To: 'GregA @tib.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2016 -2021
June 16, 2015
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation
Improvement Program for 2016 -2021.
http: // records .tukwilawa.gov /WebLink8 /1 /doc /258715/Pagel .aspx
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
1
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Tuesday, June 16, 2015 1:47 PM
To: 'LYNNP @wsdot.wa.gov'
Cc: Bob Giberson
Subject: Tukwila Transportation Improvement Program 2016 -2021
June 16, 2015
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2016 -2021 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a Zink to City of Tukwila Resolution #1860 passed June 15, 2015, adopting the Transportation
Improvement Program for 2016 -2021.
http: // records .tukwilawa.gov /WebLink8 /1 /doc /258715/Pagel .aspx
Please contact me with any questions at 206 433 -1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC
City Clerk
Attachment
xc: Bob Giberson, Public Works Director
1