HomeMy WebLinkAboutCOW 2015-06-22 Item 3A - Bid Award - Miles Resources for 2015 Overlay and Repair Program for $1,344,811COUNCIL AGENDA SYNOPSIS
---------------------------- - - - - -- Initial,
Meeting Date Prepared b Ma or's review Council review
06/22/15 BG
ITEM INFORMATION
ITEMNO.
Spec 2.C.
CAS NUMBER: 77FAFF
SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 06/22115
AGENDA ITEM TITLE 2015 Annual Overlay & Repair Program
Bid Award to Miles Resources, LLC
CATEGORY ❑ Discussion
Mtg Date
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date 06122115
❑ Public Hearing
Mtg Date
❑ Other
Mtg Date
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&'R ❑ Police ❑ PIV
SPONSOR'S The 2015 Annual Overlay & Repair Program was advertised for bids on May 20 and 27,
SUMMARY 2015. Four bids were opened June 3, 2015 with the low bid of $1,344,811.00 from Miles
Resources, LLC. Seven locations are scheduled for asphalt overlay throughout the City,
including a portion of the Fort Dent parking lot. Council is being asked to award the bid to
Miles Resources, LLC in the amount of $1,344,811.00.
REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ® Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 06/15/15 COMMITTEE CHAIR: JOE DUFFIE
RECOMMENDATIONS:
SPONSOR /ADMIN. Public Works
COMMITTEE Unanimous Approval; Forward to C.O.W & Special Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURI: REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,344,811.00 $1,430,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS &301 PARKS (PAGES 10, 18 &33,2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/22/15
MTG. DATE
ATTACHMENTS
06/22/15
Informational Memorandum dated 06/12/15
Vicinity Map
Page 10, 18, & 33, 2015 CIP
Consultant Recommendation Letter
Bid Tabulation
Minutes from the Transportation Committee meeting of 06/15/15
TO:
FROM
BY:
DATE:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
Bob Giberson, Public Works Director
David Sorensen, Project Manager
June 12, 2015
SUBJECT: 2015 Overlay and Repair Program
Project No. 91510401
Bid Award
ISSUE
Award the bid for construction for the 2015 Overlay and Repair Program.
BACKGROUND
The Annual Overlay and Repair Program was created to preserve and maintain the street
structure in a safe and useable condition. The 2015 Project construction will include pavement
repairs and an asphalt overlay for seven locations citywide, including a portion of the Fort Dent
parking lot. Work will also include new pavement markings and ADA curb ramps.
ANALYSIS
A call for bids was advertised for the 2015 Overlay and Repair Program on May 20 and 27,
2015 and four bids were opened on June 3, 2015. The lowest apparent bidder was Miles
Resources, LLC, with a bid of $1,087,164.50 for the base bid (Schedule A & B) and a total of
$1,344,811.00 (with Schedule C). The total of Schedule A & B determines the bid award and
Schedule C is an additive and is not included in the bid decision. The engineer's estimate was
$1,472,432.00 for all schedules. No errors were found in the bid tabulations, but the bid from
Icon Construction was rejected due to missing bid documents. Project design consultant KPG
Inc. concurred with the award to apparent low bidder Miles Resources, LLC.
BUDGET AND BID SUMMARY (All amounts include sales tax)
RECOMMENDATION
Council is being asked to award the construction contract for the 2015 Overlay and Repair
Program to Miles Resources, LLC in the amount of $1,344,811.00 and consider this item at the
June 22, 2014 Committee of the Whole Meeting and then on the Consent Agenda at the Special
Meeting that same night.
Attachments: Vicinity Map
2015 CIP Pages 10, 18 & 33
Consultant Recommendation
Bid Tabulation
W:IPW EngTROJECTSIA- RW & RS ProjectstAnnual Overlay & Repair ProgramsQ015 Overlay & Repair PrograrnTesigMAd and AwarNwardlWorking Docs\Docs to TC Bid AwarckWorking Docs
3
Bid Results
Estimate
2015 Budget
Bid Schedule A
$1,015,369.50
$1,134,277.00
$1,250,000.00
Bid Sch. B Fort Dent
71,795.00
86,350.00
100,000.00
Bid Sch. "C" SC Pkwy.
257,646.50
251,805.00
Subtotal of Bid
$1,344,811.00
Contingency (5 %)
67,240.55
Funds from Bridge Program
80,000.00
Total
$1,412,051,55
$1,472,432.00
$1,430 000.00
RECOMMENDATION
Council is being asked to award the construction contract for the 2015 Overlay and Repair
Program to Miles Resources, LLC in the amount of $1,344,811.00 and consider this item at the
June 22, 2014 Committee of the Whole Meeting and then on the Consent Agenda at the Special
Meeting that same night.
Attachments: Vicinity Map
2015 CIP Pages 10, 18 & 33
Consultant Recommendation
Bid Tabulation
W:IPW EngTROJECTSIA- RW & RS ProjectstAnnual Overlay & Repair ProgramsQ015 Overlay & Repair PrograrnTesigMAd and AwarNwardlWorking Docs\Docs to TC Bid AwarckWorking Docs
3
-
r
f
, r ,
S. BOEING ACCESS RD.
• , in
■
r " •4 • S. 124TH ST.
' GATEWAY DR.
sr �
R FORT DENT PARK
PL
1
SOUTHCENTER BLVD
'•"
■
•
or
• P"LA PARKWAY
Mor
ANDOVER PARK W.
j Z •
j • R
•
•
2015 Overlay Program
Vicinity Map
5
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Bridge Inspections and Repairs Project No, Varies
DESCRIPTION: Ongoing program of bi- annual inspections, repairs, painting and rehabilitation of the 22 City bridges.
Federally required program identifies safety or repair needs in the early stages to minimize hazards and
JUSTIFICATION: costs. The number of bridge inspections necessary each year can vary between 3 and 8 bridges.
Inspection frequencies vary from bridge to bridge and WSDOT provides some inspection services.
STATUS: Construction projects will be determined from inspection reports and noted deficiencies /problems.
MAINT. IMPACT: Reduces maintenance costs.
COMMENT: Ongoing project, only one year actuals are shown in the first column. 42nd Ave S Truss Bridge had repairs
completed in 2014 along with matching funds for the 1- 5 /Klickitat Dr - Unstable Slope /Elevated Walkway.
FINANCIAL Through Estimated
(in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
65
40
40
40
40
45
45
45
45
405
Land(R/W)
0
Const. Mgmt.
30
30
30
30
40
40
40
40
280
Construction
27
200
200
200
200
250
250
250
250
1,827
TOTAL EXPENSES
92
270
270
270
270
335
335
335
335
2,512
FUND SOURCES
Awarded Grant
236
236
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
92
34
270
270
270
335
335
335
335
2,276
TOTAL SOURCES
92
270
270
270
270
335
335
335
335
2,512
6 2015 - 2020 Capital Improvement Program 10
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Overlay and Repair Program Project No. 91310401
DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets.
JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects.
STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay.
MAINT. IMPACT: Reduces annual maintenance.
COMMENT: Ongoing project. Only one year actuals shown in first column.
FINANCIAL Through Estimated
fin tnnn,gi 2n13 2n14 2n15 2n16 2n17 2n1R 2n19 2n2n RFYONn Tf7TA1
EXPENSES
Design
48
100
125
125
150
150
175
175
175
1,223
Land (RNV)
0
Const. Mgmt.
175
175
175
200
200
225
225
230
1,605
Construction
1,125
1,250
1,260
1,300
1,320
1,325
1,330
1,340
10,250
TOTAL EXPENSES
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
TOTAL SOURCES
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
2015 - 2020 Capital Improvement Program 18 7
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Fort Dent Park
Project Nos. 90330107
DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements.
JUSTIFICATION: The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer
field, trail, pond and all major infrastructure.
Funding listed in 2015 through 2020 is for a phased approach to the remaining parking lot repairs in
STATUS: conjunction with the Annual Overlay & Repair Program. A portion of the parking lot overlay was completed
with parking tax dollars in 2011 and another portion in 2014. For 2015, $500k is designated for a potential
BNSF Railroad sewer relocation. Replacement of the small play structure is listed for $250k in Beyond.
MAINT. IMPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water.
COMMENT: King County transferred Fort Dent Park to the City of Tukwila in 2003. Concessionaire agreement with
Starfire Sports Complex. A new playground was installed in 2008 and restrooms were remodeled in 2010.
FINANCIAL Through Estimated
(in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
275
20
10
10
10
10
10
10
355
Land (R/W)
0
Const. Mgmt.
30
15
15
15
15
15
15
120
Construction
1,292
200
600
100
100
100
100
100
250
2,842
TOTAL EXPENSES
1,567
250
625
125
125
125
125
125
250
3,317
FUND SOURCES
Awarded Grant
694
694
Parking Taxes
50
50
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
823
250
625
125
125
125
125
125
250
2,573
TOTAL SOURCES
1,567
250
625
125
125
125
125
125
250
3,317
2015 - 2020 Capital Improvement Program 33
ENGINEERS j
ARCHITECTS (g C"I"
�r+�
LANDSCAPE ARCHITECTS 4
SURVEYORS SFATTLF - TACOMA
June 5, 2015
Mr. David Sorensen, PE
Public Works
City of Tukwila
6300 Southcenter Blvd
Tukwila, WA 98188
RE: 2015 Overlay Program
Dear Dave,
As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the City
of Tukwila 2015 Overlay Program. The lowest bidder in the amount of $1,087,164.50 is Miles
Resources, LLC.
As part of our review, we checked the status of Miles Resources, LLC on the Washington State
Labor and Industries web page to confirm they are currently insured, bonded, and licensed. We
also checked their state and federal debarment status, both of which indicated no issues. Finally,
we ran a rudimentary analysis of their bid against all other bids and industry pricing, which
indicated no substantial imbalances or significant front loading.
It is KPG's recommendation that the 2015 Overlay Program be awarded to Miles Resources,
LLC.
We have enclosed the original bid package along with the contractor verification and bid
tabulation for your review.
Sincerely,
/NathnZnrZoe, P.E.
KPG, Inc.
cc: Nelson Davis, PE
Enclosures: Miles Resources, LLC bid package including Contractor Verification
Bid Tabulation
7539 TH Avenue North • Seattle, WA 981og • Phone (2o6) 286 -1640 • Fax (2o6) 286 -1639
2502 Jefferson Avenue • Tacoma, WA 98402 • Phone (2S3) 627 -072o • Fax (253) 627-4144
www.kpg.com
.A
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2015 Overlay Program
Project No. 91510401
Bid Tabulation
KPG
51A1) 1. -1A1, ."MA
Bid Document
June 3 2015
I
ENGINEER'S ESTIMATE
Mlles Resources
Lakeside Industries
TUCCI 8 Sons, Inc
Icon Materials - rejected per SP 1
02.13 (missing unit price)
No. Spec Item
Quantity Unit Unit Cost Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
R< ADWAYtS` NERU3,. A} .- :
Tata1SCheduttA
s.
_ gr,...
-.
r
1
1 -04
Minor Change
t
FA
$ 6,000.00
$ 6,000.00
600000
$ 5000 00
6000.00
S 6,00000
6,000.00
$ 6,000.00
6000.00
5 6,000.00
2
1 -07
Resolution of Utility Conflicts
1
FA
0 4,000.00
$ 4,000.00
4000.00
$ 4,000 00
4000.00
$ 4.000 00
4,000.00
$ 4,000.00
4000.00
$ 4 000.00
3
1 -07
SPCC Plan
1
LS
$ 450.00
$ 450.00
50000
$ 500.00
1000.00
$ 1000.00
250.00
$ 250.00
1600.00
$ 1 600.00
4
169
Mobilization
1
LS
$ 85,200.00
$ 85,200.00
8800000
$ 88,000 00
135000.00
$ 135,000.00
56,000.00
$ 56,000.00
100000.00
$ 100000 00
5
1 -10
Project Temporary Traffic Control
1
LS
0115000.00
$ 115000.00
130000.00
$ 130.000.00
12500000
9 12500000
100000.00
$ 100,000.00
180815.00
$ 180815.00
6
2 -02
Asphalt Pavement Removal Ind. Haul
230
SY
$ 25.00
$ 5,750.00
10.00
$ 2,300.00
15.00
5 3,450.00
39.00
$ 8970.00
30.60
$ 7 038.00
7
2 -02
Cement Conc. Sidewalk Removal Inc! . Haul
190
SY
$ 30 00
$ 5,700.00
45.00
$ 8550.00
43.00
$ 8,170.00
46.00
$ 8740.00
109.50
$ 20,805.00
8
2 -02
Cement Conc. Curb Removal Incl. Haul
890
LF
$ 1000
$ 8,900.00
8.90
$ 7,921.00
20.00
$ 17,800.00
500
$ 7,120.00
1165
$ 10 368.50
9
2 -02
Removal of Structure and Obstruction
1
LS
$ 1,500.00
$ 1,500.00
100.00
$ 100.00
2000.00
0 2000.00
3,500.00
$ 3500.00
550.00
$ 550.00
10
2 -03
Unsuitable Foundation Excavation Incl. Haul
130
CY
$ 50.00
$ 6,500.00
20.00
$ 260000
2500
0 3,250.00
40.00
$ 5,200.00
26.00
$ 3380.00
11
2 -03
Gravel Borrow Inc! Haul
250
TON
9 25.00
$ 6,250.00
20.00
$ 5000 00
1000
S 2,500.00
18.00
$ 4,500.00
17.50
$ 4375.00
12
4 -04
Crushed Surfacing Top Course
210
TON
$ 30.00
$ 6,300.00
20.00
$ 4280 00
2000
S 4,200.00
50.00
$ 10,500.00
46.50
$ 9765.00
13
5 -04
Pavement Repair Excavation Incl. Haul
620
CY
$ 60.00
$ 37200.00
87.00
$ 53,940.00
6000
$ 37,200.00
121.00
$ 75,020.00
88.00
$ 54,560.00
14
5 -04
HMA Cl . 1/2 "P12 64 -22
3901
TON
$ 82.00
5 319882.00
77.00
$ 300,377.00
7000
$ 273,070.00
82.50
$ 321,832 50
78.00
$ 304,278.00
15
5 -04
HMA for Pavement Repair CI. 12' PG64 -22
1320
TON
$ 9000
$ 118,800.00
90.00
$ 118,80000
8000
$ 105,600.00
102.00
$ 134,640.00
103.00
$ 135960.00
16
5 -04
Thickened Edge
140
LF
$ 200
$ 280.00
1.00
$ 140.00
2.00
S 280.00
5.00
$ 70000
6.50
9 910.00
17
5 -04
Planing Bituminous Pavement
17890
5Y
$ 500
$ 89450.00
3.75
$ 67,087.50
3.50
$ 62,615.00
3.20
$ 5724800
4.40
$ 78,716.00
i6
7 -12
Adjust Water Valve
47
EA
$ 400.00
$ 18,800.00
42500
$ 19975.00
30000
$ 14,100.00
600.00
$ 29200 00
305.00
$ 14,335.00
19
7 -12
Adjust Water Meter Box
1
EA
$ 500.00
$ 500.00
300.00
$ 300.00
300.00
S 300.00
500.00
$ 50000
320.00
$ 320.00
20
861
ErosionNJater Pollution Control
1
FA
$ 3500.00
$ 3500.00
3500.00
$ 3500.00
350000
$ 3,500.00
3500.00
$ 3500.00
3500.00
$ 3,500.00
21
901
Inlet Protection
41
EA
9 7500
$ 3075.00
70.00
$ 2,870.00
75.00
0 3075.00
90.00
$ 3690.00
46.50
$ 1906.50
22
8 -04
Cement Conc. Traffic Curb and Gutter
910
LF
$ 30.00
$ 27,300.00
2000
0 18200.00
20.00
$ 18200.00
36 00
$ 32760.00
20.50
$ 18 655.00
23
8 -04
Extruded Curb
690
LF
$ 10.00
0 6,900.00
7.00
$ 4,830.00
6.90
$ 4,761.00
7.00
$ 4,830.00
7.50
$ 5175.00
23A
8 -04
Remove and Replace Precast Dual Faced Sloped Mountable Curb
280
LF
$ 10.00
$ 2.800.00
20.00
$ 5,600.00
19.00
$ 5,320.00
33 00
$ 9,240.00
24.00
$ 672000
24
8 -06
Cement Conc. Driveway Entrance
110
SY
$ 80.00
0 8,800.00
50.00
$ 5500.00
93.00
$ 10,230.00
70.00
$ 7700.00
51.50
$ 566500
25
8-13
Add t Monument Case and Cover
8
EA
9 500 00_0
A000 00
350 00
$ 2 800 00
300 00
$ 2 400 00
600 00
$ 4 800 00
305 00
$ 2 440 00
g ntA. sts tt �rui A .,.
t.
#
_
;* _
_ .
26
8-20
Traffic Signal Modifications (Gateway Drive and Interurban Ave 5) Complete
1
LS
$ 38500.00
$ 38 500.00
21000.00
$ 21,000 00
20500.00
$ 20,500.00
25000.00
$� 25,000.00
29000.00
$ 29000.00
27
8 -20
Traffic Signal Modifications (Tukwila Parkway and Andover Park W), Complete
1
LS
9 57000.00
0 57,000.00
30000.00
$ 30000.00
28500.00
$ 28500.00
34,000.00
$ 34,000.00
40200 00
$ 40,200.00
28
8 -20
TraKo Si. nal Modification (Tukwila Park we and Andover Park E) Com• ete
1
LS
$ 37,500.00
9 37,500.00
28000.00
$ 28000.00
27500.00
$ 27,500.00
31,000 00
$ 31000.00
3640000
$ 36400.00
$ 11,97000
29
514
Cement Conc. Sidewalk
190
SY
$ 5500
$ 10,450.00
60.00
$ 11,400.00
60.00
$ 11,400.00
60.00
$ 11,400 00
63.00
30
8-14
Cement Conc. Curb Ramp Type Parallel A
9
EA
$ 1,500.00
$ 13,500.00
950.00
$ 8550.00
1880.00
9 16,920.00
2600.00
$ 23,40000
1000.00
$ 800000
31
814
Cement Conc. Curb Ramp Type Parallel 8
1
EA
$ 1,500.00
$ 1,500.00
950.00
$ 95000
188000
$ 1,880.00
2600.00
$ 2,600.00
1000.00
$ 1000.00
32
8 -14
Cement Conc. Curb Ramp Type Single Direction A Modified
2
EA
$ 1,50000
$ 3000.00
1300.00
$ 2,600 00
2318 00
$ 4,636.00
2600.00
$ 5,200.00
1400.00
$ 2,800.00
33
8 -14
Cement Conc. Curb Ramp Type Combination
1
EA
$ 1,500.00
9 1,500 00
1100.00
$ 1,100.00
2115.00
$ 2115.00
2600.00
$ 260000
1200.00
$ 1,200.00
34
8 -15
Cement Conc. Curb Ramp Type Perpendicular A
3
EA
$ 1,500.00
$ 4,500.00
80600
$ 2,40000
1365.00
$ 4,095.00
2600.00
$ 780000
850.00
$ 2550.00
i(?�2
k ) klk'E 3t 4 Et)t1 ll% , '_.. .
k ,
.,. ,,
a ;.,
_ -
_._-
35
765
Adjust Catch Basin
41
EA
$ 450.00
$ 18,450.00
10600
$ 4,10000
40000 $ 16400.00
700.00
$ 28,700.00
410.00
$ 10810.00
36
7 -05
Rectangular Vaned Grate
4
EA
$ 600.00
$ 2400.00
25600
$ 1,00000
150.00 9 600.00
500.00
9 2000.00
375.00
$ 1,500.00
37
7
Storm Manhole Frame and Cover
1
EA
$ 700.00
$ 700.00
70600
$ 700.00
350.00 9 350.00
500.00
$ 500.00
375.00
$ 375.00
38
7 -05
Storm Drain Marker
41
EA
$ 50 00
9 2050.00
15.00
$ 615.00
15.00 $ 615.00
15.00
0 615.00
16.00
$ 656.00
S WIMAIIketAl4IXWZI ER( , L A ' -
..
, . ,.
_ _ .-
x
mat4 -
..
m _. ,
.
_ -
,-
$ 4,100.00'
39
7 -05
Adjust Manhole
10
EA
$ 500.00
$ 5000.00
550.00
$ 550000
40000 $ 4,000.00
700.00
$ 7000.00
410.00
40
7 -05
Sewer Manhole Frame and Cover
1
EA
$ 700.00
$ 700.00
700.00
$ 700.00
350.00 $ 350.00
500.00
$ 500.00
375.00
$ 37500
TR7k Fii?Gt}`IYfRQ .iTEi/tCESSGHEDll1E,A1,, n
v,, -
.: _,_e
V.._,
0_ i.
,.,
A.., -, -' , _
ataiSSamattia
_,
- 1 ..
41
8 -09
Raised Pavement Marker Type 1
45
HUND
$ 160 00
$ 7200.00
165.00
$ 7425.00
163.00 $ 7,335.00
163.00
$ 7,3300
5
173.50
$ 780750
42
8 -09
Raised Pavement Marker Type 2
14
HUND
$ 400.00
$ 5600.00
350.00
$ 4,900.00
340.00 $ 4,760.00
340.00
$ 4,760.00
362.50
$ 507500
43
8 -22
Plastic Traffic Arrow
14
EA
$ 100.00
$ 1,400.00
60.00
$ 840.00
57.00 $ 798.00
57.00
9 79800
6100
$ 854.00
44
8 -22
Plastic Stop Line
170
LF
$ 10.00
$ 1700 00
700
$ 81190 .00
6.65 $ 1,130.50
7.00
$ 1,190.00
765
$ 1,198 50
45
8 -22
Plastic Crosswalk Line
1700
SF
$ 5.00
9 8500.00
3.50
$ 5,950 00
3.47 $ 5,899.00
3.50
$ 595000
3.70
$ 6290.00
46
8 -22
Plastic Line, 4 Inch
1740
LF
$ 2.00
$ 3480.00
1.00
$ 1740.00
0.95 $ 1653.00
1.00
$ 174000
1.00
$ 1,74000
47
8 -22
Plastic Rumble Strip
390
LF
$ 3.00
$ 1,170.00
4.50
$ 1755 00
4.44 $ 173160
4.50
$ 1755.00
4.70
$ 1,833 00
48
8-23
Temporary P tLne
7220
LF
$ 100
$ 722000
020
$ 144400
017 $ 122740
020
$ 144400
020
$ 144400
RGADSt1?E EVE.tiY?4tE S .��nEDUL A) �.0
5�
x
1 of3
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2015 Overlay Program
Project No. 91510401
Bid Tabulation
K■G
013113/-- 1AC0A13
Bid Document
June 3 2015
pp
1 ENGINEER'S ESTIMATE
®®
Miles Resources
Laken do Industries TUCCI 8 Sons, Inc
Icon Materials - rejected per SP 1
02.13 (missing unit price)
No. Spec Item Quantity Unit Unit Cost Total Cost
Unit Price
Total Cost
Unit Price
Total Cost Unit Price
Total Cost
Unit Price
Total Cost
49
8 -02
Property Restoration
1
FA
$ 3900.00
$ 3000.00
3000.00
$ 3000.00
3000.00
$ 3000.00 3000.00
$ 300000
3000.00
$ 3,000.00
50
8 -02
Edge Restoration
2460
LF
$ 2.00
$ 492000
200
$ 4,92000
300
$ 7,380.00 6.00
$ 14,760.00
missing
F,I �FAIC #73%„4kT4 1111 ITEMS #SGld4.11N A? .,_ _ __ , .
4 , ...
x
n �. .'- -,
-
K
51 1 8 -19 ( Adjust Gas Valve
1 I EA L$ 500 00 �, $ 500 00
500 00
$ 500 00
550 00
$ 550 00 600 CO
$ 600 00
missing
TOTAL CONSTRUCTION COST (SCHEDULE A) $ 1,134,277.00
$ 1,015,369.50
$ 1,028,346.50
$ 1,125,087.50
$ 1,174,240.00
RQ ,- 1,A fWC iUtE B) - , , , _ > , `, 7,..
7otar,schedul R
52
1 -04
Minor Change
1
FA
$ 2,000.00
$ 2000.00
2000.00
$ 2000.00
200000
$ 2000.00 2000.00
$ 2000.00
2000.00
$ 2,000.00
53
1 -07
SPCC Plan
1
LS
$ 250.00
$ 250.00
500.00
$ 50000
1000.00
$ 1,000.00 25000
$ 250.00
1600.00
$ 1,600.00
54
1 -09
Mobilization
1
LS
$ 6,400.00
$ 6,400.00
11300.00
$ 11300.00
5000.00
$ 5000 00 500000
$ 5,000.00
5100.00
$ 5,100.00
55
1 -10
Project Temporary Traffic Control
1
LS
$ 1900000
$ 10,000.00
30D0.00
$ 3000.00
5000.00
$ 5,000.00! 600000
$ 8,000.00
4500.00
$ 4,500.00
56
2 -03
Unsuitade Foundation Excavation Incl. Haul
170
CY
$ 50.00
$ 8,500.00
2D.00
$ 3,400.00
2500
$ 4,250.00 40.00
$ 6,800.00
26.00
$ 4,42900
57
2 -03
Gravel Borrow Incl. Haul
320
TON
$ 25.00
0 8,000.00
2D.00
$ 6400.00
10.00
$ 3200.00
18.00
$ 5,760.00
18.00
$ 5,760.00
58
494
Crushed Surfacing Top Course
250
TON
5 30.00
$ 7,500.00
3500
0 6750.00
30.00
$ 7,500.00
33.00
$ 8,250.00
31.50
$ 7975.00
59
5 04
Pavement Repair Excavation Incl. Haul
270
CY
$ 60.00
$ 16,200.00
42.50
$ 19475
38.50
$ 19395.00
60.00
$ 16,200.00
51.10
$ 13,797.00
60
594
HMA for Pavement Repair CI. 12" PG 64 -22
280
TON
$ 90.00
$ 25,200.00
84 00
$ 23,520.00
80.00
$ 22,40000
88.00
$ 24,640.00
88.00
5 24,640 00
61
8 -01
Erosion/Water Pollution Control
1
FA
5 800.00
$ 800.00
800.00
$ 800.00
80900
$ 800.00
80000
$ 800.00
800.00
$ 800.00
8 -01
Inlet Protection
4
EA
$ 75.00
$ 300.00
70.00
$ 280.00
75.00
$ 300.00
9000
$ 360.00
46.00
$ 184.00
�e62
?t 1k
i
i, ,Y'M �!, . �{3,,- +� `g, 8) .. l= �.. - . _
1
's-_.. -'` -� , ,..
_ ._ .. ---,
,.
.-_
.. . k.T-
-. -
_~'',14,14:05,k,
1 -.
. a t
63
8 -22
Plastic Traffic Arrow
2
EA
$ 100 -00
$ 200.00
60.00
$ 12000
57.00
$ 114.00
57.00
$ 114.00
6075
5 121.50
64
8 -22
Paint Line, 4 inch
500
LF
$ 2.00
$ 1,000 00
0.50
$ 250.00
0.50
$ 250.00
0.50
$ 250.00
0.50
$ 250.00
TOTAL. CONSTRUCTION COST (SCHEDULE 13) $ 86,350.00
$ 71,795.00
$ 62,209.00
$ 78,424.00
$ 71,047.50
R`QALPIiA IP8ADtTIYE CHEDULE C) x,: .. .a :..i _ ...
=Tot$ ddINveScherluie ,--A-% _
._ .,.
t.. eag
,-
,ter _
,,, a .
�..__
$ 200900
65
1 -04
Minor Change
1
FA
$ 2000.00
$ 200000
203000
$ 2000.00
2000.00
$ 2,000.00]
2000. D0
$ 200000
2000.0D
66
1 -07
Resolution of Utility Conflicts
1
FA
$ 2000.00
$ 2000.00
2000.00
$ 2000.00
2000.00
$ 2000.00
2000. D0
$ 2000 00
2000.00
$ 2,000.00
67
1 -07
SPCC Plan
1
LS
$ 150.00
$ 150.00
500.00
$ 500.00
1000.00
$ 1,000.00
250.00
$ 25000
1600.00
$ 1900 00
68
1 -09
Mobilization
1
LS
$ 18,620.00
$ 18,620.00
3100000
$ 31900 00
25000.00
$ 25,000.00'
10,000.00
$ 10,000.00
18150.00
$ 18150.00
69
1 -10
Project Temporary Traffic Control
1
LS
$ 35000.00
$ 35,00000
45000.00
$ 45,000.00
3000000
$ 30,000.00
29,000.00
$ 29,000.00
29800.00
$ 29,800.00
70
2 -02
Asphalt Pavement Removal Ind. He
30
SY
$ 25.00
$ 75000
4000
$ 1,200 00
20.00
5 600.00
50.00
$ 1,500 00
48.00
$ 1440.00
71
2 -02
Cement Conc. Sidewalk Removal Ind. Haul
20
SY
$ 3000
$ 60000
75.00
$ 1,500.00
43.00
$ 860.00
50.00
$ 1,000.00
193.00
$ 3,860.00
72
2 -02
Cement Conc. Curb Removal Incl. Haul
90
LF
$ 1000
$ 90000
20.00
$ 1,80000
20.00
$ 0.800.00
20.00
$ 1.800.00
18.00
$ 1,620.00
73
2 -02
Removal of Structure and Obstruction
1
LS
$ 500.00
$ 50000
100.00
$ 100.00
100000
$ 1,000.00
1,500.00
$ 1,500.00
550.00
$ 550.00
74
4 -04
Crushed Surfacing Top Course
30
TON
$ 30.00
$ 90000
20.00
$ 600.00
30.00
$ 90090
50.00
$ 1,500.00
75.00
$ 2,250.00
75
5 -04
HMA Cl. 12" PG 64 -22
800
TON
$ 82.00
$ 65,60000
88.00
$ 76400.00
69.30
$ 5544900
80.00
$ 64,000.00
84.50
$ 67.600.00
76
5 -04
Flaning Bituminous Pavement
6630
SY
$ 5.00
$ 33,150 00
4.75
$ 31,492 50
3.30
$ 21,879 00
3.30
$ 21,879.00
3.60
$ 23.868.00
77
7 -12
Adjust Water Valve
1
EA
$ 400 00
$ 400.00
500.00
$ 50000
300.00
$ 30090
600.00
$ 600.00
305.00
$ 30500
78
8 -01
ErosionNVater Pollution Control
1
FA
$ 1,000.00
$ 1,000.00
1000.00
$ 1.000.00
1000.00
$ 1,000.00
1,000.00
$ 1,000.00
1000 OD
$ 1,000.00
79
8 -01
Inlet Protection
7
EA
$ 75.00
$ 525.00
70.00
$ 490.00
75.00
$ 525.00
90.00
$ 630.00
46 00
$ 322.00
80
8 -04
Cement Conc. Traffic Curb and Gutter
100
LF
$ 30.00
$ 3000.00
2000
5 2,000.00
20.00
$ 2,000.00
43.00
$ 4,300.00
21.00
$ 2100.00
81
8-06
Cement Conc. Driveway Entrance
40
5Y
$ 80.00
$ 3200.00
5000
$ 2.000.00
93.00
$ 3720,00
110.00
$ 4400.00
51.50
$ 206000
TRkPJ°
I C
'p
0.
4
X ,
x i
w
82
8 -20
Traffic Signal Modifications (Southcenter Blvd and 66th Ave 5), Complete
1�
LS
$ 4200000
42000.00
22000.00
$ 22000.00
22500.00 22500.00
28,000.00
28,000.00
33000.00
$ 33900 00
83
8-20
Traffic Si nal Mad 6ca6on (S uthcenter Blvd end Interurban Ave 5 (SR 18111 Complet
1
1S
$ 1500000
$ 15,000 00
24000 00
$ 24.00900 00
24000 00 $ 2400000
1600000
$ 1600000
18700.00
$ 1070000
SI1?
fAlK,tiii 72 #V GNETiU1 It'', '''',
a _ _ k 041-
-� ~T
X
+. _.._ ,
.,
. .. _ 4
, . :.
84
8-14
Cement Conc Sidewalk
30
SY
$ 55 00
$ 1,650 00
60 00
$ 1,800 00
60 00'I $ 1,800 00
60 00
$ 1,800 00
6300 $ 1,890 00-
85
8 -14
Cement Conc. Curb Ramp Type Parallel A
2
EA
$ 150000
$ 3000.00
95090
$ 1900.00
188D.00 $ 3760.00
2,60000
$ 5,200.00
1000.00 $ 2000.00
ErO'R
_
86
7 -05
Adjust Catch Basin
11
EA
$ 450.00
$ 4950 00
250.00
$ 2,75000
40000
$ 4400.00
700.00)
$ 7,700 -00
410.00
$ 4,51000
87
7 -05
Storm Drain Marker
7
EA
$ 50 00
$ 350.00
15.00
$ 105.00
15.00
$ 105.00
15.00
$ 105.00
16.00
$ 11200
sA#
A tir
-71.011100V TTI' ED ,$t mac} , _ . ..rli
t .x
t _ - -?-
? _, * ,
iA w
1
v _
88
795 Adjust Manhole
i ( EA
$ 500 00 1 $ 500 00
700 00
$ 700 00
40900 1 $ 400 00
700 00
$ 700 00
410 00 I $ 410 00
TifiA A, ,1Dfl CR R 1 {C #fCitDJ F fir S N ET?t11 C
9, _ . >_. °4=.�
m_ _ «4 l _„
r..
.., . .,
_-
. __,.
wU >
89 8-09
Raised Pavement Marker Type i
12
HUND
$ 160.00
$ 1,920 00
155.00
$ 1,980 00
163G00µ
g 195500
163.00
$ 1,956 00
174.00
$ 2,088.00
90 8 -09
Raised Pavement Marker Type 2
2
HUND
$ 400.00
$ 800.00
35000
$ 700.00
340.00
$ 680.00
340.00
$ 68000
362.00
$ 724.00
2 of
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2015 Overlay Program
Project No. 91510401
Bid Tabulation
KPG
61:22 It t_ • TA ONIA
Bid Document
June 3 2015 1
ENGINEER'S ESTIMATE
Miles Resources
Lakesitle Industries
TUCCI & Sons, Inc
Icon Materials - rejected per SP 1
02.13 (mrssinp unit price)
No. Spec Item Quantity Unit Unit Cost Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
91
8 -22
Plastic Traffic Arrow
10
EA
$ 10000
$ 1,000.00
6000
$ 600.00
57.00
$ 57000
57.00
$ 570.00
6160
$ 610.00
92
8 -22
Plastic Stop Line
200
LF
$ 10.00
$ 2,000 00
700
$ 1,40000
665
$ 1,33000
7.00
$ 1,400.00
7.00
$ 1,400 00
93
8 -22
Plastic Crosswalk Line
270
SF
$ 5.00
$ 1,350.00
350
$ 94520
3.47
$ 936.90
3.50
$ 94560
3.50
$ 945.00
94
8 -22
Plastic Line, 81nch
120
LF
$ 4.00
$ 48060
3.50
$ 420.00
3.50
$ 420.00
3.50
$ 420.00
3.70
0 444.00
95
8 -22
Plastic Line, 4 Inch
1270
LF
$ 2.00
$ 2,54000
1.00
$ 1,27000
0.87
$ 1,104.90
090
$ 1,143 00
0.95
$ 1,206 50
96
8 -23
Temporary Paint Line
3970
LF
$ 1.00
$ 3,97000
0.20
$ 79460
0.17
$ 674.90
0.20
$ 794.00
0.20
$ 794.00
84,71 AAA
i ) D V E L O PNt N�T. A 1?:D J T 17£;; H
. 7, Mt .,... ___
-
,7- .:.« . � , .
_ x, _
,_,'
.� - --
97
8-02 lP pert, Restoration
1 1 FA 10 1 000 00 $ 1 000 00
1000 00 $ 1 000 00
1000 00 ($ 1,000 00
1,000 00
$ 1,000 00
1000.00
$ 1,000 00
98
8-19
Adjust Gas Valve
1
EA
$ 500 00
$ 500 00
500 00
$ 500 00
550 00 15 550 00
600 00
$ 600 00
305.00
$ 305 00
99
8 -19
Adjust Franchise Utility Manhole
1
EA
$ 500.00
$ 500 00
1200.00
$ 1 200.00
600.00 I $ 600.00
1,000.00
$ 1,000.00
650.00
$ 650.00
TOTAL ADDITIVE CONSTRUCTION COST (Schedule C) $ 251,805.00
$ 257,646.50
$ 216,811.70 $ 217,372.00
$ 231,313.50
TOTAL BASE BID (Schedule A • B) $ 1,220,627.00 $;11
$ 1,090,555.50. $ 1,203,511.50
$ 1,245,287.50
TOTAL BASE BID PLUS ADDITIVE (Schedule A + Schedule B + Schedule C) $ 1,472,432.00 F $ 1,344,811.00
$ 1,307,367.20
$ 1,420,883.50
$ 1,476,601.00
3013
City Of Tukwila
• Transportation Committee
TRANSPORTATION COMMITTEE
Meeting Minutes
June 15, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building
PRESENT
Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy
Staff: David Cline, Bob Giberson, Frank Iriarte, Robin Tischmak, Sorensen, Laurel
Humphrey
Guests: Brooke Alford, Lisa Krober
CALL TO ORDER: Committee Chair Duffie called the meeting to or 5 :p.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. 42nd Avenue South /Allentown Roadside Barrier Pro
Staff provided an update on 42nd Avenue South /Allen " °' adside Barrier Project, which
was last before the Committee on April 015. This prod Ps initiated to study guardrail
�o er scent d Avenue South and South
and /or barrier warrants along the Du w ad �� A
115th Street, in order to prevent accid ' e al dum
p � ® g o nd provide security for
large fire apparatus. Several areas of th erbang rec ended for guardrails or
barriers. Originally these barriers were to �' steel a but based upon community
feedback on the aesthetics of these option j ev• �� lan I en prepared that proposes
the use of timber guard r I new barn -ns. In ad tion, replacement of existing
concrete or steel barr er guardr /�� be considered. Use of timber guardrails
will increase the to tst of the - ect. The e ated construction cost for the original plan
based upon 30°' ���'sign was � 99,970.00, �� with timber guardrail the estimated
construction cost bd $470 The revs ' plan also includes increased costs due
to waterline and com ti �� � ,
jl` estimated total project cost is $540,500.00.
The fundin vel for 20 D des $60 r construction and $10,000 for construction
���,
mans , �� as id �� and intends to proceed with Phase 1 of this project which
ca om ple ll t i /1 in thi et. Additional funding will need to be identified and
MR
f�i,,
� � - �
ed by Counc� ''- a add -�� � 'phases can be constructed using the timber guardrail.
RMATION ONL'i
B. 2015 v a v and Re air, pram
Staff is sue'''° g Council roval to award a construction contract to Miles Resources, LLC in
the amoun
� 344, �0 for the 2015 Overlay and Repair Program. Miles Resources was
� -
r,
the low bidd /v eived. UNANIMOUS APPROVAL. FORWARD TO JUNE 22, 2015
COMMITTEE % WHOLE AND SPECIAL CONSENT AGENDA.
C. Consultant Aareement: Americans with Disabilities Act (ADA) Transition Plan
Staff is seeking Council approval of an engineering services contract with the Transpo Group
USA, Inc. in the amount of $104,200.00 for the Americans with Disabilities Act Transition Plan.
The Plan is necessary to address known deficiencies that will bring Tukwila into compliance
with ADA standards within a reasonable time frame. The Transpo Group was selected from
three finalists who were interviewed in person. The budget for this project is $105,000.00.
UNANIMOUS APPROVAL. FORWARD TO JUNE 22, 2015 COMMITTEE OF THE WHOLE
AND SPECIAL CONSENT AGENDA.
13