HomeMy WebLinkAboutPlanning 2015-08-27 COMPLETE AGENDA PACKETCity of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
HAIR, MIKE HANSEN; VICE - CHAIR, SHARON MANN; COMMISSIONERS, LOUISE
STRANDER, THOMAS MCLEOD, BROOKE ALFORD, MIGUEL MAESTAS, AND NHAN
VGUYEN
BOARD OF ARCHITECTURAL REVIEW
PUBLIC HEARING AGENDA
AUGUST 27, 2015 - 6:30 PM
TUKWILA CITY HALL COUNCIL CHAMBERS
L
Call to order
II.
Attendance
III.
Adoption of 07/23/15 Minutes
BOARD OF ARCHITECTURAL REVIEW
IV. CASE NUMBER: L15 -0027 Design Review
APPLICANT: Dale Sweeney, Architect
REQUEST: Construct a five- story, 92 -unit Holiday Inn Express hotel
LOCATION: 90 Andover Park E., Tukwila, WA 98188
V. DIRECTOR'S REPORT
VI. ADJOURN
6300, `outhcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665
Date:
Time:
Location:
Present:
Absent;
City of Tukwila
Planning Commission
BOARD OF ARCHITECTURAL REVIEW (BAR)
AND
PLANNING COMMISSION (PC)
PUBLIC HEARING MINUTES
July 23, 2015
6:30 PM
Council Chambers
Chair, Mike Hansen; Vice Chair, Sharon Mann; Commissioners, Louise Strander, Brooke
Alford, and Nhan Nguyen
Commissioners, Thomas McLeod and Miguel Maestas
Staff: Jack Pace, Director; Minnie Dhaliwal, Planning Supervisor; La
Planner, Valerie Lonneman, Assistant Planner, and Wynetta Bi
Commission Secretary
Jack Pace, Director, Department of Community Development, on behalf of Ma
the Governor's Smart Communities Award to the Planning Commissioners that
Southcenter Plan.
Chair Hansen called the public hearing to order at 6:40
Motion: Commissioner Mann made a
Strander seconded the motic
Commissioner Alford made
Mann seconded the. motion
Chair Hansen opened the public hearing; an
Ii1 -' 1
CASE
LOCA
L1
Benjamin, Assistant
s, Planning
presented
the
adopt the 06/18/15 minutes. Commissioner
ere in favor.
minutes. Commissioner
e wishing to provide testimony.
W (BAR) PUBLIC HEARING
rsop, Magellan Architects
t a new 12,386 sq. ft. addition for a bowling alley and 1,646 sq. ft. second
ition off the northeast corner of the existing 32,166 sq. ft. amusement
7300 Fun Center Way, Tukwila, WA 98188
Valerie Lonneman, Assistant Planner, Department of Community Development, gave the presentation for
staff. She asked the Commissioners the appearance of fairness questions; there was no disclosure and no one
objected to any of the Commissioners hearing the case. Staff provided background on the project and gave an
overview of the review process. Design Review applies because the structure is over 10,000 sq. ft. The site is
within the Shoreline Jurisdiction Urban Conservancy Environment. Therefore, a Shoreline Substantial
Development review was conducted and the permit was approved. SEPA was also reviewed and a DNS was
issued. Staff recommended approval with no conditions.
Josh Peterson, Architect for the applicant, Magellan, noted that the landscaping on the north end of the site
was addressed. He explained that the alterations for the addition on the second floor of the existing building
2
Public Hearing Minutes
July 23, 2015
are interior only. He also passed around color samples and offered to answer questions.
Ms. Lonneman stated she received an email from Commissioner Alford and she wanted to address the issues
in the email. She raised the topic of Commissioner Alford's recommendation pertaining to the landscaping
for the Commission to discuss.
She also provided explanation in reference to Commissioner Alford's question regarding the proposed
emergency vehicle access and turn around. She said she discussed the concerns with the Fire Marshall
and he said it is necessary for the site to maintain a 26 ft. access area to reach the proposed second floor
addition.
Mr. Peterson commented there would be a paved area for the access area
Commissioner Strander asked for clarification on the need for conditions for the issues raised as a result
of Commissioner Alford's landscaping recommendation. Staff said if the Commission is in consensus
with Commissioner Alford's recommendation they will need to approve with conditions. However, the
emergency vehicle access will be approved by the Fire Department; as part of the building permit process.
Commissioner Alford provided clarification on the
Mr. Peterson and Scott Huish, for the applicant,
Chair Hansen asked the applicant and Commissioner
required landscaping condition. The applicant had no
would handle suggested landscaping at the time of the I:
make it a condition of their approval or request the Ian
approval process.
There were no further comments.
The public hearing was
The Commission
Motion:
questions raised by Commissioner Mann.
if they could suggest some language for the
ion and suggested that it be noted that they
permit. Staff said that the Commission could
plan be handled during the building permit
issioner Alford moved that staff review and approve the landscaping plan during the building permit
and that the project be approved otherwise as presented. Commissioner Stander seconded the
All were in favor'
G COMMISSION PUBLIC HEARINGS
Chair Hansen opened the public hearing and swore in those wishing to provide testimony.
CASE NUMBER: L15 -0007 Marijuana Zoning Code Amendment
APPLICANT: City of Tukwila
REQUEST: Proposed amendments to the Zoning Code regulations regarding marijuana uses
and definitions to meet new Washington State regulations contained in SB 5052.
Definitions will be revised to reflect the language in the new state law and
medical marijuana uses will be accommodated within the same location criteria
as recreational marijuana uses.
LOCATION: Citywide
Minnie Dhaliwal, Planning Supervisor, Department of Community Development gave the presentation
for staff She provided background on the project. She said the City has had a moratorium prohibiting
medical marijuana, collective gardens, and dispensaries since 2011 due to inconsistent regulations. This
year the Washington State legislature adopted two bills that provide more clarity and allow the local
Page 2 of 4
Public Hearing Minutes
July 23, 2015
jurisdictions control over marijuana uses. At the direction of Community Affairs and Parks (CAP) staff
drafted an ordinance that repeals the existing moratorium on medical marijuana uses and updates the
definitions to be consistent with the State law. It accommodates commercial medical marijuana uses
within the same zoning designations (HI and TVS) as recreational marijuana uses. Also, it prohibits
cooperatives, collective gardens and dispensaries. The ordinance also corrects the omission of marijuana
uses from the Tukwila South Overlay (where the underlying zoning is HI or TVS). Additionally, it
establishes more severe penalties for illegal grow operations. Community Affairs and Parks has reviewed
the proposed draft ordinance and forwarded it to the Planning Commission for their recommendation,
which is the purpose of tonight's public hearing. The Planning Commission is being asked to determine
whether the proposed zoning is appropriate.
Staff entered into the record an email from Chuck Parrish. Mr. Parrish inquired which zones should allow
marijuana uses. (See the attached email for details).
Staff noted that the State criteria has some location restrictions for instance, marijuana uses are not
allowed within a certain distance of parks, schools, and family dayeares. Staff showed a map with the
buffer areas from these uses with underlying zoning.
Commissioner Mann asked for some clarification on cooperatives and collective gardens. She said she
understands the concerns of medical marijuana use. She said the collective gardens in the neighborhoods
have nothing to do with medical marijuana.
There was no public testimony.
The public hearing was closed.
The Planning Commission deliberated.
The Planning Commissioners asked several clam
1) What qualifies a patient to grow a lin
domicile and how is it tracked? Staff. A
medical need. Also there is a volunteer j
that are writing a lot of prescriptions.
2) Should marijuana uses be allowed in t
policies mandate that MIC areas be pre
inber of medical marijuana plants in their own
d users need to demonstrate to the State there is a
and the State Law attempts to track down doctors
This may be inconsistent. Staff. King County
industrial uses. The PC can determine if they
3) Why are cooperatives being banned? Staff. Cities are able to regulate this with the new bill.
4) Do the rules apply the same for recreational and medical retail stores? Staff. The ordinance
applies the same rules for both.
5) Does the State allow the City to receive a portion of the sales tax? Staff. Not in the past but with
the new house bill a small percentage is allowed if the total amount of tax exceeds a certain
amount.
6) If growers are growing` more than the allowable 15 plant who is going to enforce? Staff. The
police will do the first investigation and determine if it is a criminal or civil violation. If it is a
criminal violation they continue with the process, if it is considered civil Code Enforcement will
take the lead.
7) If several individuals live at a residence what is the limit on number of plants -is it 15 per person?
Staff. That would be considered collective grow or cooperative, which the ordinance prohibits.
State Law limits 15 plants per household on one tax parcel.
8) Is personal recreational marijuana grow allowed in a residence? Staff. No
Motion:
Commissioner Mann moved to forward the draft ordinance as proposed to the City Council for their review.
Commissioner Stander seconded the motion. All were in favor.
Page 3 of 4
3
Public Hearing Minutes
July 23, 2015
Commissioner Mann said she wanted to personally thank the staff, City Council and Police Department
for all their work on the marijuana issue.
Chair Hansen opened the public hearing and swore in those wishing to provide testimony.
CASE NUMBER: L15 -0017 General Comprehensive Plan Updates
APPLICANT: City of Tukwila
REQUEST: Updates to the Tukwila Comprehensive Plan Introduction, Vision, Glossary and
Land Use Map Legend sections to reflect current conditions and revisions.
LOCATION: Citywide
Laura Benjamin, Assistant Planner, Department of Community De
to these updates are technical items that reflect new policy language
Plan and the Strategic Plan is headed.
There was no public testimony.
The public hearing was closed.
Staff addressed clarifying questions raised by the
Following are the Planning Commissioners rec
housing. It was the consensus of the
read: Housing that cost less than 3
She also inquired on
to the City Council
most of the changes
s the Comprehensive
in regards to affordable
cc for affordable housing to
on a County -wide medium
program" has been dropped and she asked staff
revising the land use map legend in the mixed office section to add
the second sentence to read, `except those uses and densities area
a'. The Commission concurred.
pprove the glossary as revised, and for staff to look into either including
ties in school program' was deleted from the glossary and forwarding it
val. Commissioner Alford seconded the motion. All were in favor.
Commissioner Alford made a motion to approve the land use map legend as revised and forward to the
City Council for their review. Commissioner Mann seconded the motion. All were in favor.
Director's Report
• Staff provided information on upcoming meetings
Adjourned: 8:15 PM
Submitted by: Wynetta Bivens
Planning Commission Secretary
4 Page 4 of 4
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
Staff Report
Board of Architectural Review for Tukwila Holiday Inn Express
Prepared August 19, 2015
HEARING DATE: August 27, 2015
FILE NUMBERS: L15 -0027 Design Review
L15 -0028 Shoreline Substantial Development
APPLICANT: Dale Sweeney, Architect
REQUEST: Board of Architectural Review approval for a Holiday Inn Express, proposed for
the vacant site at 90 Andover Park East. The hotel will be five stories, with 92
hotel rooms.
LOCATION: 90 Andover Park East
COMPREHENSIVE PLAN
AND ZONING
DESIGNATION: Tukwila Urban Center — Transit Oriented Development
SEPA DETERMINATION: Exempt
NOTIFICATION: A Notice of Application was distributed to agencies that may have an interest in
the project on June 23, 2015. The Notice of Application was also posted on the
project site and mailed to surrounding residences /property owners. There were
no comments received in response to the Notice of Application.
STAFF:
Valerie Lonneman
ATTACHMENTS: A. Plan Set (Site Plan A010, Site Details A011, Front Elevation A200, Right
Elevation A201, Left Elevation A202, Rear Elevation A203, Iso footcandle
E1.01, Grading and Utility Plan 2/6, Landscape Plan L -1, Irrigation Plan L -2,
Landscape Details & Specifications L -3, Irrigation Notes and Details L -4)
B. Color Renderings (5 perspectives)
C. Materials Board (presented at hearing)
D. Development Agreement
E. Holiday Inn Express Exterior Lighting Guide
F. Green Fagade Trellis Info Sheet
G. TMC 18.28.130 Neighborhood Corridor summary sheet
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax: 206 - 431 -3665 5
Findings
Vicinity /Site Description
Project Description
This project seeks to transform a vacant lot into a 62,337 sq. ft. five- story, 92 -unit Holiday Inn Express hotel
located at 90 Andover Park E (the SE corner of Tukwila Parkway and Andover Park East). The project includes
frontage improvements along Andover Park E and Christensen Road, 98 parking spaces including a shared
parking lot along Christensen Road for hotel guests and access to the Green River Trail, landscaping, and
improvements to the vehicular and pedestrian circulation. The site will be accessed by one driveway on Andover
Park East and two on Christensen Road (see Attachment A).
Figure 1. Project location
Figure 2. Aerial view of project site
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
A
Page 12
Existing Development
The lot is currently vacant and has no existing development. Previous use of this site was as a gas station. All
structures associated with the previous use were demolished and excavated in 2006, at which time soil
remediation for the site was completed. The parcel contains 1.16 acres and is zoned Tukwila Urban Center -
Transit Oriented Development (TUC -TOD). Andover Park E and Christensen Road, which run parallel on the
western and eastern sides of the lot, are both classified as Neighborhood Corridors.
Figure 3. Existing Conditions — project site looking NE from Andover Park E.
Figure 4. Existing conditions — looking south from Tukwila Pkwy (Green River Trail, Christensen Road, and project site)
Surrounding Land Use
Adjacent development and land uses include a one -story building that is currently vacant to the south, a one -story
building to the west (across Andover Park East), which houses Lowe's hardware store, a public parking lot for
access to the Green River Trail to the east, and Tukwila Parkway and I -405 to the north. Farther to the east across
Christensen Road are two three -story buildings including the Best Western, located across the river, and the
Riverton Office Plaza southeast of the site along the Green River Trail.
Topography & Vegetation
The parcel is generally flat, with a steep embankment along the Green River to the east of the parcel (beyond
Christensen Road and the Green River Trail) and a hill to the north of the parcel, sloping up to Tukwila Parkway.
L15 -0027 – Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page 13
VA
Development Agreement
In March 2015, the Tukwila City Council approved a Development Agreement between the City of Tukwila and
Tukwila TSD, LLC (the developer) for the proposed hotel at 90 Andover Park East (see Attachment D). The
agreement allowed the developer to create shared parking stalls to accommodate required parking for the
proposed hotel in the right -of -way of Christensen Road. The shared space includes a drive aisle, 14 new parking
spaces, and a reconfiguration of the existing spaces for a total of 45 parking spaces, with 41 to be shared and 4
stalls to be reserved for non -hotel users.
In exchange for the shared parking the developer agreed to do the following items:
• Landscape the old cul -de -sac area and maintain any areas landscaped as part of this development.
• Maintain the parking area (striping, paving, and signs).
• Provide public and emergency access through the subject property.
• Construct a pedestrian connection from Andover Park E to Christensen Road and the Green River Trail.
• Pay $93,849 to the city for future riverbank restoration work.
The terms of this agreement have been fulfilled or shall be conditioned as part of the building permit.
Design Review
This project is subject to Board of Architectural Review approval under Tukwila Municipal Code (TMC)
18.28.030.D. As a large scale project, the project is subject to the applicable district -based standards, corridor -
based standards, and supplemental standards in TMC Chapter 18.28 and the guidelines set forth in the
Southcenter Design Manual. This discussion below is grouped into four sub - sections: District Based Standards;
Corridor Based Standards; Supplemental Standards; and Southcenter Design Manual. The standards can be found
online at htlp: // www. tukwilawa. gov / dcd /urbanplan/TMC18.28_New_ Southcenter_Zoning_pdf and the Design
Manual can be found at http: / /www.tukwilawa.gov/ dcd /urbanplan/ Southcenter %20Subarea %20Pian_Final.pdf.
I. District -Based Standards
Structure Height (TMC 18.28.070): The proposed building reaches a maximum height of 68 feet, which is in
conformance with the building height restriction of 70 feet with a height bonus granted in exchange for public
frontage improvements along Andover Park E and Christensen Road.
Maximum Block Face Length (TMC 18.28.080): The proposed building is in compliance as it does not exceed
the 700 foot maximum block face length.
Side and Rear Setbacks and Landscaping Requirements (TMC 18.28.100 - .110): The building meets the
minimum 5 foot setback and landscaping requirement for the side and rear yards.
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Rl
Page 14
II. Corridor -Based Standards
Andover Park East and Christensen Road are both considered Neighborhood Corridors. See Attachment G for
Neighborhood Corridor standards summary sheet.
Public Frontage Standards (TMC 18.28.150): The proposed project meets the requirements for public frontage
standards along Andover Park East, including streetscape width and landscaping. Ornamental pedestrian- and
vehicular -scale street lights shall be installed along the frontage per the Department of Public Works standard.
Applicant shall submit a street lighting plan to satisfy this requirement with the building permit materials.
Due to the arrangement for provision of shared parking on Christensen Road, the applicant has requested several
modifications to the Neighborhood Corridor frontage standards for the eastern frontage as is permitted by TMC
18.28.130 C. The modification request requires a Type 2 decision, which may be consolidated as part of the BAR
decision per TMC 18.104.030. The applicant must demonstrate that the modified corridor design: 1. Satisfies the
urban design goals as stated in the Corridor Type's purpose, requirements, and description; 2. Is designed to
transition safely to the existing conditions at either end; and 3. Enhances the streetscape of the site and adjacent
development.
The proposed frontage modification widens the landscaping island in between the on -site hotel parking lot and
the adjacent off -site shared parking lot on Christensen Road. A nine - foot -wide landscaping strip with a nine -foot-
wide sidewalk is proposed in lieu of the 15 -foot sidewalk frontage improvement standard required for the
Neighborhood Corridor (see Attachment G). Approximately four feet of this landscaping strip is within the right -
of -way, with five feet of perimeter landscaping on the subject lot. The modification is a preferred approach to the
requirement at the site as it is within the shoreline zone and at the terminus of Christensen Road.
Building Orientation /Placement & Landscaping (TMC 18.28.160 - .190): The proposed project meets building
orientation standards. The building will be oriented to Andover Park E and Christensen Rd, and parking will be
provided on the side and rear of the building. Along Andover Park E, no parking is proposed between the
building and the street. Along Christensen Road, one double - loaded aisle of parking is proposed between the
building and the street.
Architectural Design Standards (TMC 18.28.200):
Neighborhood Corridor
Design Response
Architectural Design Standards
Acceptable
Partial
Unresponsive
Not applicable
Facade articulation Increment
Commercial /mixed use maximum — 50 feet
X
Major vertical modulation maximum — 120
X
feet
Ground level Transparency
Commercial -use minimum — 50% X
Comments:
• Frontage improvements are only required along Andover Park E and Christensen Road; the
property does not abut Tukwila Parkway along the northern parcel line (there is city owned
land in- between the subject parcel and the road). Additionally, no access is provided from
Tukwila Parkway and the site topography slopes up to further separate the road from the
development site. Therefore, the City has determined that frontage standards shall not be
required for the northern frontage.
Table 1. Architectural Design Standards for the Neighborhood Corridor
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page 15
n
M. Supplemental Standards
Special Corner Feature (TMC 18.28.220): The building is located on the corner of Tukwila Parkway and
Andover Park E. The northwest corner of the hotel features a 1 -story area with an indoor pool, adjacent to an
outdoor patio area with stamped concrete, benches, and landscaping. These features differentiate the northwest
corner from the other corners of the building, opening the area up and creating an inviting, human -scale public
space.
Landscaping Types and General Landscaping Requirements (TMC 18.28.230 - .240): The landscaping plan
includes all required information for proposed vegetation. Spacing, dimensional, and screening/cover
specifications are all satisfied.
Irrigation plans have been submitted and approved by the urban ecologist. The setbacks are planted with
sufficient shrubs and groundcovers to fulfill the landscaping requirements. Perimeter and interior landscaping
square footage requirements have been satisfied. The landscaping islands and trees provided within the landscape
islands are consistent with the code requirements. The City's Urban Environmentalist has reviewed and approved
proposed plant material to ensure appropriate species selection and spacing. A maintenance agreement for all
landscaping installed as part of the development (outside of the subject parcel) shall be instated as required by the
development agreement.
Open Space Regulations (TMC 18.28.250): The building footprint of approximately 17,000 square feet requires
850 square feet of open space. The open space provided on site includes the public plaza on the northwest corner
of the lot and the pedestrian connection from Andover Park E to the Green River Trail, exceeding the open space
requirement. 14 individual seats or 42 linear feet of seating has been provided in the form of seven six -foot
benches.
General Parking Requirements and Guidelines (TMC 18.28.260 - .270): The proposed project provides 98
parking stalls, which is sufficient to fulfill the parking requirements for the hotel (a minimum of one stall per
room). Per the Development Agreement, all parking stalls within the right -of -way of Christensen Road shall be
for the j oint use of the hotel guests and Green River Trail users and at least four spaces shall be designated
exclusively for public access to the Green River Trail with appropriate signs. The parking lot meets requirements
for compact car stalls, stall dimensions, setbacks, curb cuts, access, and provision of pedestrian walkways.
Parking lot landscaping, layout, and bicycle parking are provided per code requirements.
The sidewalk detail on the building permit must be revised to conform to TMC 18.28.260.C. Lc, which requires
the curb cut design for driveways to match the height of the sidewalk to ensure that the sidewalk stays at a
consistent grade for pedestrians (see Figure 5).
L15 -0027 — Tukwila Holiday Inn Express Page 16
Board of Architectural Design Review Staff Report
10
Driveway Witli Platttittl:; Strip
i'.britinng ssI ills nWhm 1'11c, skh' wa/A t o e cmai'n h /
and h a conaiirwiarren.s Win s`i'onr,
Figure 5. TMC 18.28260.C. requires driveways in the TUC to be level with the height of the sidewalk.
Site Requirements (TMC 18.28.280): A walkway connecting Andover Park E to the Green River Trail has been
provided along the northern lot line. A small pedestrian path through the landscaped area that separates Christensen
Road from the hotel parking lot has been provided to facilitate pedestrian circulation and reduce plant damage
from pedestrian traffic. The three pedestrian crosswalks within the parking lot shall be finished with the same
stamped concrete as that used in the plaza in order to enhance pedestrian safety, comfort, and the attractiveness
of the site.
IV. Southcenter Design Manual
The Southcenter Design Manual guidelines support and complement the community vision described in the
Southcenter Subarea Plan, supplement and expand upon the design requirements in Chapter 18.28, and provide a
flexible tool for quality and innovation. The Design Manual is organized into two main sections: Site Design
Elements and Building Design.
Site Design Elements covers a number of design topic areas, including Site Design, Service Areas and
Mechanical Equipment, Lighting, Walls and Fences, and Open Spaces. The section on Building Design covers
Architectural Concept, Entrances and Doors, Building Fagade — Base and Top, Corner Treatments, Building
Massing, Building Details and Elements, Building Materials and Colors, Windows, Weather Protection, Blank
Walls, and Parking Structures.
For each topic area, there are one or more Design Criteria, which can be general in nature. The Design Criteria
explain the requirements for development proposals. They are the decision criteria by which the Director or
Board of Architectural Review will decide whether to approve, condition or deny a project. The examples and
explanations which augment each Design Criteria, provide guidance to the project applicant, to City Staff in
reviewing a proj ect proposal, and to the decision maker in determining whether the pro) ect meets the Design
Criteria.
L15 -0027 — Tukwila Holiday Inn Express Page 17
Board of Architectural Design Review Staff Report
11
A. Site Design/Elements
1. Site Design
The intent of the site design /elements criteria is to encourage site design which is easily understood, appropriate
to the area, takes advantage of unique opportunities, and is a positive element in the architectural character of
the District within which it is located. The design criteria address various elements including: facilitation of
traffic circulation by connecting through - streets; provision of safe, convenient, and connected pedestrian access;
encouragement of harmonious visual character (where desirable); arrangement of buildings to enhance street
frontages and the pedestrian environment; incorporation of open space and landscaping as a unifying feature;
incorporation of screening, environmental mitigation, utilities and drainage as positive design elements;
incorporation of opportunities for joint development of sites; and the use of site design to take advantage of
and /or enhance views of and access to natural amenities such as the Green River.
The project meets the design criteria. Due to the fact that the site must comply with both the Tukwila Urban
Center and the Shoreline Jurisdiction criteria, the applicant had to strike a balance between the two codes, with
priority given to the meet the requirements of the Shoreline Jurisdiction, which is state mandated. Therefore, the
main entrance of the building is oriented toward the Green River per TMC 18.44.110. Le. However, the TUC
public frontage improvements, public patio, and secondary exterior public entrance on Andover Park East are
instrumental in ensuring that one does not feel like the building has turned its "back" to the street. Additionally, a
pedestrian connection from Andover Park E to the Green River Trail is proposed along the northern side of the
lot, further enhancing pedestrian access in the area. The building is designed to provide views of the river from a
balcony and from rooms that face the Green River.
2. Service Areas and Mechanical Equipment
The intent of the service areas and mechanical equipment design criteria is to minimize the potential negative
impacts of service elements through thoughtful siting and screening while meeting functional needs. Design
criteria include: service element location and design; minimizing public visibility of loading docks and service
bays, location and /or design of utility meters; electrical conduit and other service utility apparatus; rooftop
equipment screening; and concealment and design incorporation of downspouts.
The project meets the design criteria. The refuse and disposal area is accessible and properly screened by
appropriate enclosures (with a limestone -like stone veneer to match building exterior) and landscaping. Waste
Management has confirmed that the proposed site design provides sufficient access to this area. Appropriate
vegetative screening has been indicated on the landscaping plan to obscure mechanical equipment. There is no
rooftop mechanical equipment proposed.
3. Lighting
Site lighting should be designed to promote safety as well as enhance the nighttime appearance of buildings and
landscaping.
The project meets the design criteria. The style of the exterior lighting fixtures fits the more contemporary
building design, and the fixtures are appropriately spaced. Four different types of building- mounted fixtures are
proposed. Gray, upward facing lights will be used to cast the signature Holiday Inn Express blue light beams onto
the columns over the main entrance and the secondary entrance on Andover Park E, enhancing architectural
features at night. Square gray, downward projecting sconces will be used on the front columns of the porte
cochere to enhance visibility of the main entrance. Circular gray sconces will be wall- mounted along the upper
fagade around the building and will cast an "X" shaped beams on the walls. Curved gray, downward- tilting LID
sconces will be mounted along the first floor exterior to help illuminate pedestrian areas (see Figures 6 & 7 and
Attachment E).
L15 -0027 — Tukwila Holiday Inn Express Page 18
Board of Architectural Design Review Staff Report
12
Additionally, bollard lights will provide pedestrian- oriented lighting along the pedestrian connection to the Green
River Trail on the north side of the building.
Figure 6. Proposed building- mounted lights. Fixtures left to right: upward casting blue light, downward casting blue light,
"X" light, and curved first -floor sconce.
Figure 7. Rendering of Holiday Inn Express signature blue lighting elements.
4. Walls and Fences
Walls and fences shall be designed to be compatible with the building, improve the appearance of the site, and
improve safety.
The proposed building meets the design criteria. The main entrance features pilasters that help announce the
pedestrian "gateway" to the hotel. The walls of the refuse and disposal enclosure will be finished with limestone -
like stone veneer to match the building and the gate of the enclosure will be western red cedar or equivalent.
5. Open Space
Provide safe, attractive, and usable open spaces that promote pedestrian activity and enhance the setting and
character of the development.
The proposed design features a patio area adjacent to the one -story pool area, which will increase the amount of
sunlight received by the patio, which is located on the northwestern corner of the building. Landscaping and
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page 19
13
stamped concrete will improve the aesthetics of the area. The patio is adjacent to the proposed pedestrian
connector that runs the length of the northern lot line, connecting Andover Park E. to the Green River Trail. The
patio will serve as an inviting public space along Andover Park E, enhancing the character and functional use of
the north and western sides of the building. The applicant shall submit stamped concrete detail/photo for planning
approval with building permit materials.
B. Building Design
1. Architectural Concept
The architectural design criteria encourages building design with easily understood organization, an
appropriate relationship to the site, and with a positive impact on the architectural character of the District
within which it is located. Architectural design should unify the massing and components of a structure or
structures on a site into a cohesive and consistent thematic or stylistic architectural character or style that is
responsive to the functional requirements of the development.
The fagades include notable elements of modulation, a distinct base and top, variation in the roofline, and
elements of detail such as square embellishments copper accents, and columns, which satisfy the design criteria
(see Attachment B).
2. Entrances and Doors
The primary entrance should be located and designed to represent the overall style and architectural character
of the building and ensure a welcoming public face to the building.
The project meets the design criteria. The primary entrance on the eastern side of the building has high visibility
(with a covered port cochere) and is consistent with the building's architectural details (Figure 8). A secondary
pedestrian- oriented public entrance is located on the west side of the building to provide access from Andover
Park East (Figure 9). The northern fagade features an additional keyed entrance for hotel guests that is visually
consistent with the other entrances but more discrete.
L15 -0027 — Tukwila Holiday Inn Express Page 110
Board of Architectural Design Review Staff Report
14
Figure 8. East elevation rendering of proposed hotel.
Figure 9. West elevation rendering of proposed hotel.
3. Building Facade — Base & Top
Create a building base where the horizontal articulation of the lowerpart of a building fa(ade's design
establishes a human scale for pedestrian users and passers -by, and aesthetically "ties " a building to the ground.
Create a "top " on buildings through a substantial horizontal articulation of the fa(ade at the uppermost floor of
the building to provide an attractive fa(ade skyline and complete the upper fa(ade composition. Rooflines should
reflect the architectural style of the building and be a distinctive design element. Roof surfaces should be
punctuated with varying roof forms to break up large massing of roof surfaces and /or to provide opportunities to
daylight interior spaces. Roof overhangs for both flat and sloping roofs are encouraged to add depth, shadow
and visual interest.
Building design meets design criteria. The first floor facade is finished with a limestone -like stone veneer to
provide horizontal articulation and a durable and distinct base. Copper- colored metal awnings along the first floor
further establish a pedestrian scale experience. The top floor and eves are finished with a lighter beige E.F.I.S.,
which distinguishes the top of the building and contrasts with the dark brown and black of the roof. The roof has
a pitch of 7:12 with many distinct ridgelines and includes exaggerated overhangs that add architectural interest.
4. Corner Treatments
The design criteria serve to emphasize building corners at important intersections with a distinctive building
element.
The Northwest corner of the hotel features a 1 -story area housing an indoor pool, which lies adjacent to an
outdoor patio. These stepped back nature of the building at this corner differentiates it from the other corners of
the building, opening the area up and creating an inviting, human -scale public space.
5. Building Massing
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page Ill
15
The use of horizontal and vertical modulation is required to maintain the desired human scale and character for
the Southcenter area. The requirements encourage the design of building facades which incorporate interesting
architectural details that add variety to the facade, animate the streetpresence, and are attractive at a
pedestrian scale.
The project meets the design criteria. The project utilizes decorative awnings, roofline differentiation, variation
in materials, vertical and horizontal modulation, and architectural details including copper- painted awnings and
columns to reduce the perceived scale and add visual interest.
6. Building Details and Elements
Detail elements are required to encourage the incorporation of design details and small -scale elements into
building facades that are attractive at a pedestrian scale.
The project meets the design criteria. The project employs protruding window frames, custom - designed copper
colored awnings, decorative building- mounted light fixtures, an interesting assortment of building materials, and
stylized concrete design elements to provide texture and sculptural relief.
7. Building Materials and Colors
The use of natural materials that reflect our Northwest setting such as stone, local woods like cedar and fir, and
functional materials like concrete, brick, and metal are encouraged. Wall cladding materials appropriate to the
architectural style and building type shall be used. Authentic materials and methods of construction should be
used to the degree possible. More than two colors and materials should be incorporated into each building's
design. Monochromatic schemes are discouraged. Color choices should include warm rich colors that reflect
and complement the woodlands, water and open sky of the region; weathered wood and oxidized metal colors
relate to industrial and agricultural influences.
The project meets the design criteria. Fagade materials and colors will be neutral and subdued, with muted green
accent -walls on the eastern, southern, and northern facades. A variety of building materials are incorporated in
the design, including E.F.I.S, copper colored painted metal, glass, cedar, and limestone -like stone veneer panels.
Fascia/beams will be painted dark brown to give the appearance of wooden roof beams and trim (Attachment C
to be provided at hearing).
8. Windows
Ornamental framing and hardware should be used to provide a utilitarian opportunity for craftsmanship and
decoration. Window frames and sills should be designed to be prominent and substantial in order to enhance
openings and add additional relief.
The project meets the design criteria for windows by utilizing prominent window frames and sills that add
textural relief and detailing to the fagade. The project includes copper- painted flat metal awnings above the first -
floor windows and sloped copper- painted metal awnings above other windows and balconies, which provide
additional articulation and interest to the windows.
9. Weather Protection
Design buildings with non - residential ground floor uses to provide pedestrian weather protection along adjacent
street front sidewalks and open spaces using awnings, canopies, or building overhangs such as porticos, covered
porches and arcades. Where building orientation to streets /open spaces is required for the applicable Corridor
Type, weather protection at least 6 feet in width along at least 75 percent of the fa(ade must be provided.
The project meets the design criteria. Six -foot deep horizontal awnings overhanging 75% of the first -floor
windows /doors along Andover Park E and Christensen Road and a porte cochere provides cover for the passenger
L15 -0027 — Tukwila Holiday Inn Express Page 112
Board of Architectural Design Review Staff Report
16
loading zone at the main building entrance on the eastern fagade. Several benches on the southern fagade are
proposed under awnings, providing a weather- protected outdoor seating area near the main entrance.
10. Blank Walls
Blank walls are not permitted facing streets, sidewalks, open spaces, or pedestrian pathways and instead shall be
designed to provide visual interest and human scale.
The proposed project includes a pattern of windows and trellises (see Attachment F) to cover blank walls and is
consistent with the blank wall requirements.
11. Parking Structures
Design criteria do not apply as the project does not include a parking structure but rather a parking lot.
V. Public Comments
A Notice of Application was distributed to agencies that may have an interest in the project on June 23, 2015.
The Notice of Application was also posted on the project site and mailed to surrounding residences /property
owners. There were no comments received in response to the Notice of Application.
Conclusions
1. District -Based Standards
Structure height, length, and setback requirements are in compliance with the Tukwila Urban Center- Transit
Oriented Development standards.
2. Corridor -Based Standards
Public frontage, building orientation and landscaping, fagade articulation, blank wall, and transparency
requirements have been fulfilled in accordance with the Neighborhood Corridor standards. The Department
Director determined that the 50% ground -level transparency requirement is not applicable to the northern
fagade (Adjacent to Tukwila Parkway, a Commercial Corridor) as the subject property does not directly abut
the street.
The proposed frontage modification widens the landscaping island between the on -site hotel parking lot and
the adjacent off -site shared parking lot on Christensen Road. A nine - foot -wide landscaping strip with a nine-
foot -wide sidewalk is proposed in lieu of the 15 -foot sidewalk frontage improvement standard required for
the Neighborhood Corridor (see Attachment G). Approximately four feet of this landscaping strip is within
the right -of -way, with five feet of perimeter landscaping on the subject lot. The modification is a preferred
approach to the requirement at the site as it is within the shoreline zone and at the terminus of Christensen
Road.
3. Supplemental Standards
Landscaping is in compliance with all TUC -TOD requirements. The City's Urban Environmentalist has
reviewed and approved proposed plant materials to ensure appropriate species selection and spacing. A
maintenance agreement for all landscaping installed as part of the development (within and outside of the
subject parcel) shall be provided by the applicant as required by the development agreement.
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page 113
17
The site design provides sufficient open space, parking, and pedestrian access to meet code requirements.
Additional features, such as a cut - through path in the middle of the landscape island along the eastern
property line, serve to increase the utility and durability of the site.
The sidewalk detail on the building permit must be revised to conform to TMC 18.28.260.C. 1.e. to provide a
consistent sidewalk grade.
VI. Southcenter Design Manual
1. Site Design Elements
The project meets the design criteria. The proposed development meets the minimum setback requirement
and creates a pedestrian -scale environment on Andover Park East. Pedestrian amenities such as benches and
shade trees are provided. A pedestrian connection from Andover Park E to the Green River Trail is proposed
along the northern side of the lot.
Landscape islands and stamped concrete pedestrian crossings will promote efficient vehicular circulation and
access to parking spaces while providing safe and convenient pedestrian access throughout the site. The
proposed site design adds one additional access point off of Christensen Road, which will allow hotel guests
and the general public to access parking on Christensen Road from Andover Park E and provide emergency
vehicle access between the two roads. This design will also improve vehicular access to the Green River
Trail parking lot, which is currently only available by driving north on Christensen Road, with the nearest
cross street at Baker Boulevard.
Interior parking lot landscaping and perimeter landscaping follow a coherent design concept, which will
soften the built environment and create an inviting, pedestrian - friendly atmosphere. Proposed lighting
matches the contemporary building design and will improve visibility of the building at night by illuminating
areas of the fagade, without causing off -site light pollution along the shoreline.
The proposed public patio will enhance the pedestrian environment on the corner of Andover Park E and
Tukwila Parkway through improved landscaping and amenities such as benches, shade trees, and stamped
concrete. Applicant shall submit stamped concrete detail/photo for planning approval with building permit
materials
2. Building Design
The proposed building achieves a more contemporary architectural design than neighboring buildings,
improving the architectural character of the TUC -TOD District. The renderings demonstrate a cohesive style
and high quality design with ample modulation, articulation, and attention to detail. The color palate features
saturated warm neutral hues, with muted green accent walls and metal copper- colored awnings. Materials are
varied, adding visual interest. The dynamic roofline pitch is pleasing to the eye and in conjunction with the
dark brown fascia and beams, the black roof with dramatic overhangs will create a strong but harmonious
"top" to the building. The wall washer lights will provide subtle illumination of the building fagade,
highlighting architectural features such as the columns at night.
The scale of the proposed five -story building is larger than neighboring development, particularly when
compared the office building located directly to the south, however there are two three -story buildings
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
IN
Page 114
located across the river and southeast of the site along the Green River Trail that are more compatible with
the proposed development in scale and design.
Recommendations
Staff recommends the approval of the Design Review application with the following conditions:
1. Prior to building permit approval, civil plans shall be revised to demonstrate conformance with TMC
18.28.260.C. Lc, which requires the curb cut design for driveways to match the height of the sidewalk to
ensure that the sidewalk stays at a consistent grade for pedestrians.
2. Applicant shall submit stamped concrete detail/photo for planning approval with building permit
materials.
Staff also recommends approval of modification of the corridor standards along Christensen Road to require nine
feet of sidewalk and nine feet of landscaping (with approximately four feet in the right of way and five feet of
perimeter landscaping on the site) in lieu of the 15 -foot Neighborhood Corridor frontage requirement.
Informational Items
1. Any signage for the property shall be reviewed through submittal of a separate sign permit application.
2. Prior to building permit approval, a maintenance agreement shall be submitted to the city for review and
approval for the parking lot and landscaped areas, easement for public /fire access, and easement for
public trail access, per the terms of the Development Agreement dated May 15, 2015 (City Ordinance
No. 2473).
L15 -0027 — Tukwila Holiday Inn Express
Board of Architectural Design Review Staff Report
Page 115
W
20
VINICITY NAP
ANDOVER PARK EAST
"UBLIC AREA
SEE LANDSCAPING PLAN
II\
■
■
■
■
■
I_
■
■
9' -3 I /4"
MONUMENT
SIGN
,
PROPOSED HOTEL
(5) STORY
92 UNITS
62,337 SQFT
HC
PARC NG
SIGNS
i 771
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
,
,
,
,
,
,
,
,
,
,
,
■
Lr-
II
t
C PARKING 51
WHEELSTOP
-TYP
5 STANDARD STALLS AT 9' -0 WIDE
4 STANDARD STALLS AT 9' -0 WIDE2 HANDICAP STALLS
4- 4
0
12 COMPACT STALLS AT 8' -0" WIDE
ASPHALT ROADWAY
C
C
C
C
C
SITE PLAN
SCALE: I " = 20' -0"
LANDSCAPE
ONSITE PARKING SCHEDULE
25 STANDARD PARKING STALLS
24 COMPACT PARKING STALLS
4 HANDICAP PARKING STALLS
53 TOTAL ONSITE PARKING STALLS
\/-200' SHORELINE
\
DUMPSTER
CONC.
SLAB
45
OFFSITE PARKING SCHEDULE
43 STANDARD PARKING STALLS
2 HANDICAP PARKING STALLS
45 TOTAL OFFSITE PARKING STALLS
JURISDICTION LINE
TRAIL SIGNS
SEE DETAIL 7/A
LINE OF 011WM 125' BUFFER
•II
1111011
NDARD STALLS AT 9'-0' WID
I
I
I
I
I
ANAKD STA
2
AO11
24'- 1 I 1 /2"
•
U
Q
ASPHALT ROADWAY
I
I
I
9' -0"
I ce)
u�
0
U
z
PORTS COCHERE
II
PASSENGER LOADING ZONE
STAMPED
CONC. - SEE
LANDSCAPE
_PLAN
G STANDAR
P DESTRIAN
A CESS
a_
U
N
U
z
9'
0"
4
sZ
O
U
STANDARD OFFSITE PARKING STALLS
S
RESERVED FOR TRAIL
I
' COMPACT
' STALL
I
J
STAMPED CONC. AT CROSSWALKS - TYP.
5
AO 1 1
I
/
/
/
)MPACT STALLS AT 4' -0"
LANDSCAPE
5' -0"
z
UI
U
Q
1 9' -0"
14 STANDARD OFFSITE PARKING STALLS
ITYP STANDARD
STALL SIZE
5' -4"
ii
1
C
/
N
a
0Q
U
Q
c
0
C
0
V- ,
200' SHORELINE JURISDICTION LINE
0
CH RISTENSEN
z
Q
U _,
N
W
U
- U
Q
LINE OF OHWM BUFFER
I
I
RE-STRIPED
OFFSITE
PARKING AREA
I
I
i
I
I
I
LINE OF OHWM BUFFER
LINE OF ORDINARY HIGH WATER
0
WWW
W
W' Q
N-
N
N /
N
z
0
WO
z z
w
W
wi Q
W
<0
OW
h
z
0
C
w
tL'
a �
w
H
O
z
w
Q
O
0
z
7/23/2015 Per City Revision
(NOT FOR CONSTRUC
Z
nJ
w
F-
(,-
N w
0'
F)
AOIO j,
o
N
V 1N 3 IN H OVl1V
N
N
I ' -6"
RESERVED
FOR
TRAIL USE
2-1/2"— GALVANIZED STEEL PIPE
CONC. SIDEWALK PER CIVIL DWGS.
PARK SIGN DETAIL
SCALE: 3/4" = 1 ' -0"
PARKING SIGNS AS PER ADAAG 4.6
SEE 4/A01 I
ASPHALT PAVING TO TOP OF WALK
WHEEL STOP
MAXIUM SLOPE OF PAVEMENT 1:48
2" PAINTED STRIPES - TYPICAL
INTERNATIONAL SYMBOL FOR
ACCESSABLITY - TYPICAL
SEE 1 /A0 1 1
BLUE BACKGROUND WITH
WHITE BORDER, $ SYMBOL
5/8" HIGH WHITE LETTERING
ON BLUE BACKGROUND, TYP.
VAN ACCESSIBLE SIGNAGE
2-1/2"— GALVANIZED STEEL PIPE
CONC. SIDEWALK PER CIVIL DWGS.
hANDICAP / VAN ACCESSIBLE SIGN DETAIL
SCALE: 3/4" = 1 ' -0"
d
PAINT SOLID (2 COATS) WHITE
ON BLUE BACKGROUND
NE
NOTES:
1. (REFER TO SITE PLAN
2. GRID TO BE USED FOR LAYOUT
PURPOSES ONLY
hANDICAP SYMBOL
SCALE: 3/4" = 1 ' -0"
NOTES:
1- VERIFY DRAINAGE REQUIREMENTS
WITH HEALTH INSPECTOR
2. PROVIDE CEILING MOUNTED LIGHT
AND DUPLEX OUTLET IN STORAGE
0'-0" X 12' -0
CLEAR AREA MIN.
6
HOSE BIB -
d°
■
3"
8' -9"
8' -0" MIN
HANDICAP STALLS
SCALE: 1/4" = 1 ' -0"
SNORING WALL PER
CIVIL DRAWINGS
CONCRETE SLAB WITH
REINFORCING 6" MINIMUM
TURN SLAB EDGE DOWN
PAINT ALL INTERIOR
SIDES OF WALLS
6" DIAMETER STEEL PIPE
BOLLARDS FILLED W/
CONCRETE. TYP.
TRASh ENCLOSURE SECTION
SCALE: 1/4" = 1 ' -0"
DIAGONAL BRACING
LOCKABLE HASP
3
AREA OF TRASH
RECPT.
D
D
D
EXTERIOR FINISh
EIFS TO MATCH
BUILDING COLORS
PAINT INTERIOR
SIDE OF WALL
REINFORCED
MASONRY PIERS
6" DIAMETER STEEL
PIPE BOLLARDS FILLED
W/ CONCRETE. TYP.
SHORING WALL PER
® CIVIL DRAWINGS
STEEL GATE POST
— EACH SIDE
811
HATCHED AREA INDICATES
CONCRETE SLAB WITH
REINFORCING $ 6" MINIMUM
TURN SLAB EDGE DOWN
TRASh ENCLOSURE PLAN
SCALE: 1/4" = 1 ' -0"
D
/
\\
//
/\
C
\\
//
/7
\\
\\
//
POST - PAINTED.
WESTERN RED
CEDAR OR EQUAL
DROP ROD, 1" DIAMETER X
2' -0" LONG WITH 90 DEGREE z0
BEND AT EA. GATE.
TRASh ENCLOSURE ELEVATION
SCALE: 1/4" = 1 ' -0"
I—
U
H-
z
0
U
0
w
I-
0
z
z
W
0
w w z z_
~ ~ W
v
w
�<
—••• QO
N �
z
0
w
w
I-
0
z
w
0
z
uJ J
J
� Q
H
z 0
< W
0
I—
w
(SHEET NO.
w
A011
PDT generated
_kPDF Creator
a
K.COM
N
W
B UILDING SIGNAGE NOTES
I . ALL SIGNAGE INDICATED FOR ILLUSTRATIVE
PURPOSES ONLY. LOCATION, SIZE, ETC. TO BE PER
FRANCHISE REQUIREMENTS.
2. MINIMUM EXTERIOR GRADE 3/4" PLYWOOD
BLOCKING REQUIRED AT SIGN LOCATIONS. AREA
SHOULD COVER ENTIRE LENGTH AND HEIGHT OF
FASCIA OR SPACE AVAILABLE FOR SIGN.
3. ELECTRICAL AND FINAL CONNECTION BY
CONTRACTOR. ELECTRICAL REQUIREMENTS MAY BE
OBTAINED FROM SIGN COMPANY.
4. RACEWAYS / WIREWAYS ARE NOT ALLOWED
5. PERMANENT ACCESS DOORS TO INTERIOR OF ALL
PARAPETS WHERE SIGNS ARE LOCATED TO BE
PROVIDED BY CONTRACTOR AND COORDINATED WITh
ARCHITECT. CONTRACTOR TO FURNISH AND CONNECT
PRIMARY ELECTRICAL SERVICE INSIDE PARAPET WALL.
6. GUESTROOMS OR PUBLIC SPACES WITh SIGNAGE
ON EXTERIOR WALLS MUST HAVE ELECTRICAL
PENETRATIONS, ACCESS DOORS AND /OR REMOTE
TRANSFORMERS COORDINATED AND /OR INSTALLED,
WITh ARCHITECT APPROVAL, PRIOR TO CLOSING UP
THE WALL. PENETRATION LAYOUT MAY BE OBTAINED
FROM SIGN COMPANY.
TYP PLAN NOTES
I . DIMENSIONS ARE TO THE FACE OF STUD (F.O.S.),
FACE OF CONCRETE (F.O.C.), FACE OF POST (F.O.P.) OR
CENTERLINE OF PARTY WALLS U.N.O. VERIFY ALL
DIMENSIONS.
2. EXTERIOR WALLS TO BE 2x6 STUDS, TYP. (U.N.O.).
INTERIOR WALLS TO BE 2x4 STUDS, TYP. (U.N.O.). ALL
CONSTRUCTION TO BE ONE HOUR FIRE RATED TYP
(U.N.O.).
3. FOR FLOOR/CEILING AND ROOF /CEILING TYPES AND
ASSEMBLIES, SEE BUILDING SECTIONS IN SECTION A.
4. FOR PLATE HEIGHTS SEE BUILDING SECTIONS IN
SECTION A6 AND CORE SECTIONS IN SECTION A9.
ELEVATION NOTES
GENERAL:
I . PROVIDE BLOCK'G AND POWER FOR EXTERIOR
SIGNAGE
E.I.F.S. NOTES:
I . EXTERIOR INSUL. $ FINISH SYSTEM (EIFS) SYSTEM TO
BE INSTALLED PER MANUFACTURERS SPECIFICATIONS
AND DETAILS.
2. MANUFATURERS INSTALLATION MANUAL,
SPECIFICATIONS, CONSTRUCTION DOCUMENTS AND
PROJECT MANUAL TO BE ON SITE THROUGHOUT
CONSTRUCTION PROCESS.
4. EIFS WARRANTY:
A. MANUF. ShALL PROVIDE A WRITTEN, I0 YR. LIMITED
MATERIALS WARRANTY AGAINST DEFECTIVE MATERIALS.
B. THE APPLICATOR ShALL WARRANT WORKMANSHIP
SEPARATELY AND PROVIDE A 5 YR WARRANTY AGAINST
DEFECTIVE INSTALLATION WORKMANSHIP.
2x2 MEDALLION
T.O. PL LVL 5 AL
478' -6"
METAL ROOF
GUARDRAIL—
IF111 111
[ IIIII111111IIIIII111111IIIIIIIIIVIIIVIII
I II II II1[111111111111
E.I.F.S PER MANUF.
SPECS AND
DETAILS.
EXPANSION JOINTS
2x2 MEDALLION
2" TRIM
WALL WASHER LIGhTS
Level 5 S
9' -6"
T.O PL LV`L, 4
468' -3"
VINYL WINDOW w/
PTAC UNIT
EXPANSION JOINTS
VERTICAL REVEALS
EXPANSION JOINTS
Level 4 S
9' -3"
T.O PL LV`L, 3 �
458' -0"
WALL WASHER LIGhTS
Level 3 AL
49' -0"
T.OPLL 2
447' -9"
COPPER COLOR CAP
EXPANSION JOINTS
EXTERIOR LIGHT
Level 2 AIL
8' -9"
T.OPLL
437-7"
STONE VEENER PER MANUF.
SPECS AND DETAILS.
Dr
ic
De
DtD
.I •I •I •1
.I •I •I •1
■ •I •I •1
EIIINIE1
HIE
MIKE
IEEE
®I■IM
moms
NE1._.
■ ■1 MI
■ ■1 MI
MIAMI
■ ■IIiI•Iu
® ®II! ®®
■■ MU
■I ■IMI®
Nommis
MINIM
.I ■I ■I ■I.
.I ■I ■I ■I.
■ ■1 ■1 ■■
■ ■1 ■1 ■■
®1 ■1 ■1 •1
®I ■I ■I ■1
■■■E
NEEEN
AGO
FRONT ELEVATION
PINEAPPLEGROVE ROMAN LEAF
36SM -066 I
SCALE: I /8" = I ' -0"
Level I
425' -6"
z
O
1-
U
1-
z
0
U
0
w
1-
O
Luct
z
1-
z
0
w0
z
w=
w
w�
owo
w
U
W
Z
U
J
z
O
w
w
1-
O
z
w
O
z
Z
Z
W
H
Z
0
SHEET NO.
LLJ
A200
to
ifo
PDT generated
kPDF Creator
a
K corn
N
3)
B UILDING SIGNAGE NOTES
I . ALL SIGNAGE INDICATED FOR ILLUSTRATIVE
PURPOSES ONLY. LOCATION, SIZE, ETC. TO BE PER
FRANCHISE REQUIREMENTS.
2. MINIMUM EXTERIOR GRADE 3/4" PLYWOOD
BLOCKING REQUIRED AT SIGN LOCATIONS. AREA
SHOULD COVER ENTIRE LENGTH AND HEIGHT OF
FASCIA OR SPACE AVAILABLE FOR SIGN.
3. ELECTRICAL AND FINAL CONNECTION BY
CONTRACTOR. ELECTRICAL REQUIREMENTS MAY BE
OBTAINED FROM SIGN COMPANY.
4. RACEWAYS / WIREWAYS ARE NOT ALLOWED
5. PERMANENT ACCESS DOORS TO INTERIOR OF ALL
PARAPETS WHERE SIGNS ARE LOCATED TO BE
PROVIDED BY CONTRACTOR AND COORDINATED WITh
ARCHITECT. CONTRACTOR TO FURNISH AND CONNECT
PRIMARY ELECTRICAL SERVICE INSIDE PARAPET WALL.
6. GUESTROOMS OR PUBLIC SPACES WITh SIGNAGE
ON EXTERIOR WALLS MUST HAVE ELECTRICAL
PENETRATIONS, ACCESS DOORS AND /OR REMOTE
TRANSFORMERS COORDINATED AND /OR INSTALLED,
WITh ARCHITECT APPROVAL, PRIOR TO CLOSING UP
THE WALL. PENETRATION LAYOUT MAY BE OBTAINED
FROM SIGN COMPANY.
TYP PLAN NOTES
I . DIMENSIONS ARE TO THE FACE OF STUD (F.O.S.),
FACE OF CONCRETE (F.O.C.), FACE OF POST (F.O.P.) OR
CENTERLINE OF PARTY WALLS U.N.O. VERIFY ALL
DIMENSIONS.
2. EXTERIOR WALLS TO BE 2x6 STUDS, TYP. (U.N.O.).
INTERIOR WALLS TO BE 2x4 STUDS, TYP. (U.N.O.). ALL
CONSTRUCTION TO BE ONE HOUR FIRE RATED TYP
(U.N.O.).
3. FOR FLOOR/CEILING AND ROOF /CEILING TYPES AND
ASSEMBLIES, SEE BUILDING SECTIONS IN SECTION A.
4. FOR PLATE HEIGHTS SEE BUILDING SECTIONS IN
SECTION A6 AND CORE SECTIONS IN SECTION A9.
ELEVATION NOTES
GENERAL:
I. PROVIDE BLOCK'G AND POWER FOR EXTERIOR
SIGNAGE
E.I.F.S. NOTES:
I . EXTERIOR INSUL. $ FINISH SYSTEM (EIFS) SYSTEM TO
BE INSTALLED PER MANUFACTURERS SPECIFICATIONS
AND DETAILS.
2. MANUFATURERS INSTALLATION MANUAL,
SPECIFICATIONS, CONSTRUCTION DOCUMENTS AND
PROJECT MANUAL TO BE ON SITE THROUGHOUT
CONSTRUCTION PROCESS.
4. EIFS WARRANTY:
A. MANUF. ShALL PROVIDE A WRITTEN, I0 YR. LIMITED
MATERIALS WARRANTY AGAINST DEFECTIVE MATERIALS.
B. THE APPLICATOR ShALL WARRANT WORKMANSHIP
SEPARATELY AND PROVIDE A 5 YR WARRANTY AGAINST
DEFECTIVE INSTALLATION WORKMANSHIP.
T.O. PL LVL 5
478' -6"
E.I.F.S PER MANUF.
SPECS AND
DETAILS.
Levels
469' -6"
EXPANSION JOINTS
Level
459'-3"
VINYL WINDOW w/
PTAC UNIT
Level 1
STONE VEENER 0
EXPANSION JOINTS
Level
438' -9"
STONE VEENER PER MANUF.
SPECS AND DETAILS.
Level I
425' -6"
RIGHT ELEVATION
WALL SCONCE LIGHTS
4x8 TRELLIS
SCALE: I /8" = I ' -0"
z
0
U
0
w
I-
0
z
z
0
wO
zz
w=
wu-
z
0
w
w
I-
0
z
w
0
z
Z
Z
H
Z
0
I
w
(SHEET NO.
w
L420I
I
PDT generated
_kPDF Creator
a
K.COM
N
01
2.2 ,'
�4 5
6 .2
7.
I 7.
PROVIDE BLOCKING TO SUPPORT SIGNAGE
AND ELECTRICAL - EACH INDEPENDENT
I LETTTER REQUIRES A SOURCE OF POWER
B UILDING SIGNAGE NOTES
I . ALL SIGNAGE INDICATED FOR ILLUSTRATIVE
PURPOSES ONLY. LOCATION, SIZE, ETC. TO BE PER
FRANCHISE REQUIREMENTS.
2. MINIMUM EXTERIOR GRADE 3/4" PLYWOOD
BLOCKING REQUIRED AT SIGN LOCATIONS. AREA
SHOULD COVER ENTIRE LENGTH AND HEIGHT OF
FASCIA OR SPACE AVAILABLE FOR SIGN.
3. ELECTRICAL AND FINAL CONNECTION BY
CONTRACTOR. ELECTRICAL REQUIREMENTS MAY BE
OBTAINED FROM SIGN COMPANY.
4. RACEWAYS / WIREWAYS ARE NOT ALLOWED
5. PERMANENT ACCESS DOORS TO INTERIOR OF ALL
PARAPETS WHERE SIGNS ARE LOCATED TO BE
PROVIDED BY CONTRACTOR AND COORDINATED WITh
ARCHITECT. CONTRACTOR TO FURNISH AND CONNECT
PRIMARY ELECTRICAL SERVICE INSIDE PARAPET WALL.
6. GUESTROOMS OR PUBLIC SPACES WITh SIGNAGE
ON EXTERIOR WALLS MUST HAVE ELECTRICAL
PENETRATIONS, ACCESS DOORS AND /OR REMOTE
TRANSFORMERS COORDINATED AND /OR INSTALLED,
WITh ARCHITECT APPROVAL, PRIOR TO CLOSING UP
THE WALL. PENETRATION LAYOUT MAY BE OBTAINED
FROM SIGN COMPANY.
TYP PLAN NOTES
I . DIMENSIONS ARE TO THE FACE OF STUD (F.O.S.),
FACE OF CONCRETE (F.O.C.), FACE OF POST (F.O.P.) OR
CENTERLINE OF PARTY WALLS U.N.O. VERIFY ALL
DIMENSIONS.
2. EXTERIOR WALLS TO BE 2x6 STUDS, TYP. (U.N.O.).
INTERIOR WALLS TO BE 2x4 STUDS, TYP. (U.N.O.). ALL
CONSTRUCTION TO BE ONE HOUR FIRE RATED TYP
(U.N.O.).
3. FOR FLOOR/CEILING AND ROOF /CEILING TYPES AND
ASSEMBLIES, SEE BUILDING SECTIONS IN SECTION A.
4. FOR PLATE HEIGHTS SEE BUILDING SECTIONS IN
SECTION A6 AND CORE SECTIONS IN SECTION A9.
ELEVATION NOTES
GENERAL:
I. PROVIDE BLOCK'G AND POWER FOR EXTERIOR
SIGNAGE
E.I.F.S. NOTES:
I . EXTERIOR INSUL. $ FINISH SYSTEM (EIFS) SYSTEM TO
BE INSTALLED PER MANUFACTURERS SPECIFICATIONS
AND DETAILS.
2. MANUFATURERS INSTALLATION MANUAL,
SPECIFICATIONS, CONSTRUCTION DOCUMENTS AND
PROJECT MANUAL TO BE ON SITE THROUGHOUT
CONSTRUCTION PROCESS.
4. EIFS WARRANTY:
A. MANUF. ShALL PROVIDE A WRITTEN, I0 YR. LIMITED
MATERIALS WARRANTY AGAINST DEFECTIVE MATERIALS.
B. THE APPLICATOR ShALL WARRANT WORKMANSHIP
SEPARATELY AND PROVIDE A 5 YR WARRANTY AGAINST
DEFECTIVE INSTALLATION WORKMANSHIP.
Level 6 Roof Plan AIL
496' -9"
Roof Mid -point
489' -9"
T.O. PL LVL
478' -6"
EXPANSION JOINTS
E.I.F.S PER MANUF.
SPECS AND
DETAILS.
Level
9' -6"
T.OPLL'4
468' -3"
WALL WASHER LIGhTS
EXPANSION JOINTS
VINYL WINDOW w/
PTAC UNIT
Level
9' -3"
T.OPLL'3
458' -0"
WALL WASHER LIGhTS
Level3
49'-0"
T.O PL L . 2
447' -9"
Level2
8' -9"
T.OPLL
437-7"
STONE VEENER PER MANUF.
SPECS AND DETAILS.
WALL SCONCE LIGhTS
WALL SCONCE LIGhTS
LEFT ELEVATION
SCALE: 1/8" = I ' -0"
Level
425' -6"
z
0
I-
U
H-
z
0
U
0
w
I-
0
z
0
W
CC V
W
ww
< J
z
0
wO
zz
w=
wu-
z
0
w
w
0
z
w
0
z
Z
Z
H
z_
0
I
w
w
(SHEET NO.
A202
PDT generated
_kPDF Creator
.0
N
a)
GABLE VENT
2x2 MEDALLION
METAL AWNING
I� H
Holiday Inn
Express
E.I.F.S PER MANUF.
SPECS AND
DETAILS.
m
0
N
B UILDING SIGNAGE NOTES
MEI
STONE VEENER
I. ALL SIGNAGE INDICATED FOR ILLUSTRATIVE
PURPOSES ONLY. LOCATION, SIZE, ETC. TO BE PER
FRANCHISE REQUIREMENTS.
2. MINIMUM EXTERIOR GRADE 3/4" PLYWOOD
BLOCKING REQUIRED AT SIGN LOCATIONS. AREA
SHOULD COVER ENTIRE LENGTH AND HEIGHT OF
FASCIA OR SPACE AVAILABLE FOR SIGN.
3. ELECTRICAL AND FINAL CONNECTION BY
CONTRACTOR. ELECTRICAL REQUIREMENTS MAY BE
OBTAINED FROM SIGN COMPANY.
4. RACEWAYS / WIREWAYS ARE NOT ALLOWED
5. PERMANENT ACCESS DOORS TO INTERIOR OF ALL
PARAPETS WHERE SIGNS ARE LOCATED TO BE
PROVIDED BY CONTRACTOR AND COORDINATED WITh
ARCHITECT. CONTRACTOR TO FURNISH AND CONNECT
PRIMARY ELECTRICAL SERVICE INSIDE PARAPET WALL.
6. GUESTROOMS OR PUBLIC SPACES WITh SIGNAGE
ON EXTERIOR WALLS MUST HAVE ELECTRICAL
PENETRATIONS, ACCESS DOORS AND /OR REMOTE
TRANSFORMERS COORDINATED AND /OR INSTALLED,
WITh ARCHITECT APPROVAL, PRIOR TO CLOSING UP
THE WALL. PENETRATION LAYOUT MAY BE OBTAINED
FROM SIGN COMPANY.
21
31
21
WALL WASHER LIGhTS
--
--
r�
m•
--
ri
--
--
r'
TYP PLAN NOTES
I. DIMENSIONS ARE TO THE FACE OF STUD (F.O.S.),
FACE OF CONCRETE (F.O.C.), FACE OF POST (F.O.P.) OR
CENTERLINE OF PARTY WALLS U.N.O. VERIFY ALL
DIMENSIONS.
2. EXTERIOR WALLS TO BE 2x6 STUDS, TYP. (U.N.O.).
INTERIOR WALLS TO BE 2x4 STUDS, TYP. (U.N.O.). ALL
CONSTRUCTION TO BE ONE HOUR FIRE RATED TYP
(U.N.O.).
3. FOR FLOOR/CEILING AND ROOF /CEILING TYPES AND
ASSEMBLIES, SEE BUILDING SECTIONS IN SECTION A.
4. FOR PLATE HEIGHTS SEE BUILDING SECTIONS IN
SECTION A6 AND CORE SECTIONS IN SECTION A9.
ELEVATION NOTES
GENERAL:
I . PROVIDE BLOCK'G AND POWER FOR EXTERIOR
SIGNAGE
E.I.F.S. NOTES:
I . EXTERIOR INSUL. $ FINISH SYSTEM (EIFS) SYSTEM TO
BE INSTALLED PER MANUFACTURERS SPECIFICATIONS
AND DETAILS.
2. MANUFATURERS INSTALLATION MANUAL,
SPECIFICATIONS, CONSTRUCTION DOCUMENTS AND
PROJECT MANUAL TO BE ON SITE THROUGHOUT
CONSTRUCTION PROCESS.
4. EIFS WARRANTY:
A. MANUF. ShALL PROVIDE A WRITTEN, 10 YR. LIMITED
MATERIALS WARRANTY AGAINST DEFECTIVE MATERIALS.
B. THE APPLICATOR ShALL WARRANT WORKMANSHIP
SEPARATELY AND PROVIDE A 5 YR WARRANTY AGAINST
DEFECTIVE INSTALLATION WORKMANSHIP.
KOOf PLAN S
506' -3"
Level G Roof Plan S
496' -9"
Roof Mid-
489' -9"
T.O. FLLVL5 S
478' -6"
E.I.F.S PER MANUF.
SPECS AND
DETAILS.
- -
r1
m•
- -
ri
- -
- -
20
Z
x0
30
■
III
30
30
All
Level 5 S
9' -6"
T.OPLL 4
468' -3"
EXPANSION JOINTS
Level 4
9'3"
T.OPLL 3
WALL WASHER LIGhTS 45581_011
VINYL WINDOW
VERTICAL REVEAL
Level 3 S
49' -0"
T.O PL L . 2
447' -9"
EXPANSION JOINTS
Level 2 S
8' -9"
T.OPLL I
437-7"
STONE VEENER PER MANUF.
SPECS AND DETAILS.
REAR ELEVATION
WALL SCONCE LIGhTS
SCALE: 1/8" = I ' -0"
Level I Aro
425' -6"
Botiool S
420' -6"
z
0
I—
U
H-
z
0
U
0
w
I-
0
z
z
0
w0
z
w=
u_
—� o0
z
0
w
w
I-
0
z
w
0
z
Z
Z
H
z
0
I—
w
w
(SHEET NO.
A203
PDT generated
_kPDF Creator
CO M
CC
ISOEOOTCA \DLE PLOT
OF 0\1 100W PSM
HALF SCALE
Tukwila Parkway
ISOEOOTCA \DL
I PLOT
OF TWO 400W PSV
HALF SCALE
BB AA
AA1 -•-• VFT SERIES "RUUD" TWO LIGHT 25' POLE
AA- r VFT SERIES "RUUD" ONE LIGHT 25' POLE
BB- ■ VFT SERIES "RUUD" ONE LIGHT WALL MOUNT
CTJ SITE PLAN
NORTH
-2
K 8LED(1pdf
or invaiiri reference
K 8 LED (11,pdf
or invalid f Fence
1431
z
7
Q(f)
ow
JD-
0 X
=w
DRAWING TITLE
BENCHMARK
TOP OF CONC
MON. IN CASE
ELEV. = 25.93'
DATUM — NAVD 88
Tukwila Park way
rn
rn
EXISTING 60"
CONCRETE WATER
RIGHT -OF -WAY
EXISTING;`
STREET'
NE
PROPOSED
MOTEL BUILDING
FFE =28.0
EXISTING STOP
10" STORM
2
CB
EXI$TIN;G SANITARY
EWER IMANHOL
0
20
40
SCALE IN FEET
CONSTRUCTION NOTES
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =24.25
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =28.4, IE =23.80
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =23.26
INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =22.97
0
0
0
0
0
0
,o
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
INSTALL 90 LF OF 10" 3034 PVC STORM DRAIN AT SLOPE =0.50%
INSTALL STORM TREATMENT MANHOLE ASSEMBLY, SEE DETAIL 1
RIM =27.7, IE IN= 22.87, IE OUT =20.57
INSTALL STORM MANHOLE OVER EXISTING STORM PIPE PER STANDARD DRAWING DS -10A
RIM =28.0, IE =20.0
INSTALL FDC ASSEMBLY
INSTALL FIRE HYDRANT ASSEMBLY PER STANDARD DRAWING WS -13
HOT TAP EXISTING 10" DIP WATER MAIN WITH 6" FIRE AND 4" DOMESTIC SERVICE
INSTALL 4" WATER METER ASSEMBLY PER STANDARD DRAWING WS -04
INSTALL 4" REDUCED PRESSURE CHECK VALVE ASSEMBLY IN HOT BOX
PER STANDARD DRAWING WS-21A
CONSTRUCT NEW 8" SANITARY SEWER MAIN EXTENSION (SEE DETAIL SHEET 4 FOR DETAILS)
INSTALL NEW 8" SANITARY SEWER LATERAL AND CLEANOUT ASSEMBLY
PER STANDARD DRAWING SS -03
INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =29.6, IE =26.9
INSTALL SOLID GRATE ON EXISTING CATCH BASIN
REMOVE EXISTING CURB AND GUTTER
EXISTING CATCH BASIN AND OUTLET TO REMAIN
INSTALL SOLID LID ON EXISTING CATCH BASIN
INSTALL 107 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL 61 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL 20 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
CONNECT 6" ROOF DRAIN TO 10" AT IE =20.45
CONNECT 6" ROOF DRAIN TO MANHOLE AT IE =21.25
INSTALL 90 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL ROOF DRAIN DOWNSPOUT, TYPICAL
CONSTRUCT 25' COMMERCIAL DRIVEWAY PER STANDARD DRAWING RS -09
CONSTRUCT SO THERE WILL BE NO ELEVATION CHANGE AS SIDEWALK CROSSES DRIVEWAY
28 INSTALL CATCH BASIN WITH SOLID LID PER STANDARD DRAWING DS -01
RIM =29.6, IE =26.9
INSTALL 23 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL TRASH ENCLOSURE FLOOR DRAIN AND CONNECT TO SANITARY SEWER
EXISTING
CURB
EXISTING
PAVEMENT —\
PEDESTRIAN AND
VEHICULAR —SCALE
DECORATIVE STREET
LIGHTING
STREET
TREE
J
U-
0
CONCRETE
SIDEWALK
m
15'
SIDEWALK
STREET TREES IN A CONTNUOUS LANDSCAPED STRIP A MINIMUM
OF 5 FEET WIDE LOCATED AT BACK OF CURB FACE
NEIGHBORHOOD CORRIDOR SECTION
TRT ENGINEERING LLC
l 2636 S.E. MARKET STREET
PORTLAND, OREGON 97214
PHONE (503) 235 -7592
FAX (503) 235 -7593
TUKWILA SITE 7/19/15
HOLIDAY INN EXPRESS 8c SUITES
91 ANDOVER PARK EAST
TUKWILA, WA 98188
GRADING AND UTILITY PLAN
DRAWING NO.
2/6
PROJECT NO.
1
REV
DATE
DESCRIPTION
DWN BY
DES BY
CHK BY
APP BY
DATE OF ISSUE
MAY 2015
DWN BY TRT CHK BY
DES BY TRT APP BY
CONSTRUCTION NOTES
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =24.25
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =28.4, IE =23.80
O INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =23.26
INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =26.7, IE =22.97
0
0
0
0
0
0
,o
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
INSTALL 90 LF OF 10" 3034 PVC STORM DRAIN AT SLOPE =0.50%
INSTALL STORM TREATMENT MANHOLE ASSEMBLY, SEE DETAIL 1
RIM =27.7, IE IN= 22.87, IE OUT =20.57
INSTALL STORM MANHOLE OVER EXISTING STORM PIPE PER STANDARD DRAWING DS -10A
RIM =28.0, IE =20.0
INSTALL FDC ASSEMBLY
INSTALL FIRE HYDRANT ASSEMBLY PER STANDARD DRAWING WS -13
HOT TAP EXISTING 10" DIP WATER MAIN WITH 6" FIRE AND 4" DOMESTIC SERVICE
INSTALL 4" WATER METER ASSEMBLY PER STANDARD DRAWING WS -04
INSTALL 4" REDUCED PRESSURE CHECK VALVE ASSEMBLY IN HOT BOX
PER STANDARD DRAWING WS-21A
CONSTRUCT NEW 8" SANITARY SEWER MAIN EXTENSION (SEE DETAIL SHEET 4 FOR DETAILS)
INSTALL NEW 8" SANITARY SEWER LATERAL AND CLEANOUT ASSEMBLY
PER STANDARD DRAWING SS -03
INSTALL CATCH BASIN PER STANDARD DRAWING DS -01
RIM =29.6, IE =26.9
INSTALL SOLID GRATE ON EXISTING CATCH BASIN
REMOVE EXISTING CURB AND GUTTER
EXISTING CATCH BASIN AND OUTLET TO REMAIN
INSTALL SOLID LID ON EXISTING CATCH BASIN
INSTALL 107 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL 61 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL 20 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
CONNECT 6" ROOF DRAIN TO 10" AT IE =20.45
CONNECT 6" ROOF DRAIN TO MANHOLE AT IE =21.25
INSTALL 90 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL ROOF DRAIN DOWNSPOUT, TYPICAL
CONSTRUCT 25' COMMERCIAL DRIVEWAY PER STANDARD DRAWING RS -09
CONSTRUCT SO THERE WILL BE NO ELEVATION CHANGE AS SIDEWALK CROSSES DRIVEWAY
28 INSTALL CATCH BASIN WITH SOLID LID PER STANDARD DRAWING DS -01
RIM =29.6, IE =26.9
INSTALL 23 LF OF 10" 3034 PVC STORM AT SLOPE =0.50%
INSTALL TRASH ENCLOSURE FLOOR DRAIN AND CONNECT TO SANITARY SEWER
EXISTING
CURB
EXISTING
PAVEMENT —\
PEDESTRIAN AND
VEHICULAR —SCALE
DECORATIVE STREET
LIGHTING
STREET
TREE
J
U-
0
CONCRETE
SIDEWALK
m
15'
SIDEWALK
STREET TREES IN A CONTNUOUS LANDSCAPED STRIP A MINIMUM
OF 5 FEET WIDE LOCATED AT BACK OF CURB FACE
NEIGHBORHOOD CORRIDOR SECTION
TRT ENGINEERING LLC
l 2636 S.E. MARKET STREET
PORTLAND, OREGON 97214
PHONE (503) 235 -7592
FAX (503) 235 -7593
TUKWILA SITE 7/19/15
HOLIDAY INN EXPRESS 8c SUITES
91 ANDOVER PARK EAST
TUKWILA, WA 98188
GRADING AND UTILITY PLAN
DRAWING NO.
2/6
PROJECT NO.
JAPANESE SPURGE
(16)
PING SNOWBERRY
(1 0)
'GRO -UOW' 'SUMAC
(5)
EVERGREEN CLEMATIS
(5)
COAST LEUGOTHOE
(5)
'GRIMSONSPIRE' OAK
SWEETBOX
RED FLOWERING CURRANT,
PAG I F I G WAX MYRTLE.
(10)
SNOWBERRY
(15)
RING CURRANT
ECON-- GRAPE
(22).
RED FLO
Tukwila Parkway
'GRD 1' SU (SNAC
COMPACT OREGON GRAPE
(2)
SLENDER HINOKI ;CYPR
COMPACT ORES
WESTERN RED CEDAR
(2)
RE)D FLOWER
N OOTKA R
SNOWBER �
SNOWBERRY
(I S)
(2)
EVERGREEN GLEMATI (I)
ANEMONE (I)
'BLUE WAVE' HYDRANG E4
SEAT WALL, TYP
PEDESTRIAN PLAZA WITH
SPECIALITY PAVING, TRELLIS
15ENGHES (5)
EVERGREEN CLEMATIS
I)
ANEMONE CLEMATIS
(I)
JAPANESE HORNBEAM (2)
'CRIMSON SPIRE' OA(K
'MAGIC CARPET SPIREA
(6)
'GREEN VASE' ZELGOVA
JAP
NOO+KA R.SE
(2°i)
'GRO -LrW' SU
(35)
KELSEY .OGW
(20)
(5)
TREE GRATE, TYP.
'SOFT TOUGH' HOLLY
X20)
'STELLA DE ORO' DAYL I LY
(5)
'OTTO LUYKEN' LAUREL
(-1)
'MAC I G CARPET' SPIREA
(8)
'MORNING LIGHT' MISGANT (4)
'HAMELN' FOUNTAIN GRASS
(21)
'MAC I G CARPET' SFI R Ea
'AUTUMN BRILLIANCE' SERV I GEB
L
0
REEVE'S DWARF SKIMMIA 4) (4 EETBOX
'BLUE WAVE' HYDRANGEA
(5) SWEETBOX
REEVE'S DWARF SKIMMIA
(10)
'SKY PENGIL' HOLLY
BENCH, TYP
'MORNING LIGHT' MISGANTHUS
SWEETBOX
(5)
(2) ANEMONE CLEMATIS
'SOFT TOUGH' HOLLY (5)
WARD ARBORVITAE
(4)
'OTTO LUYKEN' LAUREL
(23) 'SKY PENGIL' HOLLY
'MORNING LIGHT' MISGANTHUS (2)
(-1) BENCHES (2)
'SKY PENGIL' HOLLY
(5) 'FIRE POWER' NANDI (2
'MORNING LIGHT' MISGANTHUS
'STELLA DE ORO' DAYLILY'MAGIG CARPET' SPIREA
(4)
(5)
'AUTUMN, BRILLIANCE' SERVICEBERRY
(I)
WARD ARBORVITAE
'SOFT TOUGH' HOLLY
(16)
LILY TURF
(I I)
REEVE'S DWARF SKIMMIA
2
SWEETBOX
'SKY PENGIL' HOLD Y
v'OTTO LUYKEN' LAURE L
ki 1
tit 3
1GIL' HOLL ra ®
mla
i
Egg
RPET' SPIREA ■ : a
■l■i
SERV GEBERR �� .1
"1"triA71117:1 /V 4110
L vi.
a'oi
ti "'I 1
r. -wile
fir.
ID
Jr4 Tom:
k ~
(15)
TUMN BRILLIANCE' SERVIGEBERRY
'SOFT TOUGH' HOLLY
KELSEY Dom` OOD
�N (I o)
GH, TYP
KATSU
KELSEY
(12)
KATSURA
I
SNOWBERRY
(4)
'AUTUMN BRILLIANCE' SE
(3)
RED: FLOWERING CURRANT
(I)
SNOWBERRY
(4) `.
PEDESTRIAN _ -
SNOWEERRY
BUFFER ZONE 11
11
EBERRY
'SKY PENGIL' HOLLY
WARD ARBORVITAE
(10)
1.21:12171142WAMI .o
'GRO -LOW' SUMAC
(S)
■I�
I,..0
1.1.11.1
alb id
ram i •i
Era mak,
Imiall
mol ma,
■_i III Am
TERN RED CEDAR
SEY DOGWOOD-
(3)
'GRO -LOW' I SUMAC
'AUTUMN BRILLIA
(I)
SERV I LEER
'MAGIC CARPET' SPIREA
RRY
(2)
DW �JRF 4MEOO
(5-1) II
'OTTO LUYKEN' LAUREL
(5) 1
'SOFT TOUGH' HOLLY
'EDD I E'S WHITE WONDER' DOGWOOD
(Ir
POINT REYES GEANOTHUS
(25)
.II..... j■..ii ■i ii i1I■.■itjN ....... 0
,,
r #-r'
4 0
h O
.„,,,„
Ik:.ii
JA frA
I LL I A ,F' ERV I GE 3E
Y;
RY
'MAGIC CARPET' SPIREA
(8)
'AUTUMN BRILLIANCE,' SERVIGEBERR
—'STELLA DE ORO' DAYL I LY
(8)
'EDDIE'S WHIT ONDER' DOGWOOD
(C C ..: C I o LC NREGO� -RAP
SN WHERRY
(2) KATSURA
STREET SIN TO
REMAIN -SEE SURVEY
COMPACT OREGON CRAPE
(5)
ii,
KELSEY DOGWOC,'D,
(16)
WARD ARBORVI
WESTERN RED GE
'OTTO LUYKEN'
GOMI RAPE
1 (10)
A
(6)
AR
(6)
REL
5)
WARD ARBORVITAE
'OTTO LUYKEN' LAUREL
(7) (4)
WARD ARBORVITAE
(7) WARD ARBORVITAE
(16)
'OTTO LUYKEN' LAUREL
WESTER
(I)
AR
'GRO -Lc
(3)
RED FL
(2)I r=
G
FRONT SECTION
TRELLIS DETAIL
II
SIDE SECTION
200' SHORELINE JURISDICTION LINE
SHEET NOTES
I. REFER TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. NO PLANT SUBSTITUTIONS SHALL BE PERMITTED WITHOUT PRIOR APPROVAL OF LANDSCAPE
ARCH TEGT /OWNER.
3. ALL WORK SHALL 5E PERFORMED TO THE SATISFACTION OF THE LANDSCAPE ARCHITECT /OWNER.
4. PLANT LIST QUANTITIES ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR 15 RESPONSIBLE FOR
VERIFYING ALL QUANTITIES IN LIST WITH ACTUAL PLAN GALL -OUTS, AND INSTALLING PLANTINGS PER
THE LANDSCAPE PLAN. GROUNDGOVER QUANTITIES SHALL BE ADJUSTED AS REQUIRED FOR FIELD
CONDITIONS AT THE SPECIFIED SPACING.
5. ALL PLANTS MUST BE APPROVED BY LANDSCAPE ARCHITECT OR OWNER'S REPRESENTATIVE PRIOR
TO INSTALLATION.
LEGEND
SYMBOL DESCRIPTION
TREE GRATE, TYP.
TRELLIS, TYP
SITE FURNISHINGS
SYMBOL DESCRIPTION
PEDESTRIAN BENCH, TYP.
4' X 5' GREENSCREEN ATTACHED TO BUILDING
SYMBOL DESCRIPTION
24" WIDE CONCRETE BAND - CONCRETE WITH LAMP
BLACK OR EXPOSED AGGREGATE
STAMPED CONCRETE OR PAVERS
PLANT SCHEDULE
TREES
BOTANICAL NAME
COMMON NAME
GONT
GAL
SIZE
13
AMELANCHIER GANADENSIS 'AUTUMN BRILLIANCE'
NATIVE
'AUTUMN BRILLIANCE' SERVIGEBERRY
B 4 B
2 "GAL
6' - 5' HT.
2
GARPINUS JAPONICA
JAPANESE HORNBEAM
B 4 B
2 "GAL
12' -I6' HT,
4
CERC I12 I PHYLLUM JAPONI CUM
KATSURA
54 B OR GONT.
2 "CAL
12' -16' HT,
5
GHAMAEGYPARIS OBTUSA 'GRAGILIS'
SLENDER HINOKI CYPRESS
5415 OR CONT.
0
c
6' - 8' HT.
2
GORNUS NUTTALLII 'EDDIE'S WHITE WONDER'
ADAPATI VE
'EDDIE'S WHITE WONDER' DOGWOOD
B 4 B
2 "GAL
10' -12' HT.
3
OUERCUS ROBUR X ALBA 'CRIMSON SPIRE'
'CRIMSON SPIRE' OAK
B 4 B
2 "GAL
10' -12' HT.
I I
THUJA PL I CATA
WESTERN RED CEDAR
B 4 B
6' -8' HEIGHT
I
TSUGA HETEROPHYLLA
NATIVE
WESTERN HEMLOCK
B 4 B
6' -8' HEIGHT
3
ZELKOVA SERRATA 'GREEN VASE'
'GREEN VASE' ZELKOVA
B 8 B
2 "GAL
12' -I6' HT,
SHRUBS
BOTANICAL NAME
COMMON NAME
SIZE
SPACING
5
CLEMATIS ARMANDII 'APPLE BLOSSOM'
ATTACH TO TRELLIS TO ENCOURAGE GROWTH
EVERGREEN CLEMATIS
5 GAL
ESPALIER
5
CLEMATIS MONTANA RUBENS
ATTACH TO TRELLIS TO ENCOORAGE GROWTH
ANEMONE CLEMATIS
5 GAL
ESPALIER
'1I
GORNUS SERI CEA 'KELSEY I'
KELSEY DOGWOOD
I GAL
@ 5' O.G.
1-1
HEMEROCALLIS X 'STELLA DE ORO'
'STELLA DE ORO' DAYLILY
1 GAL
@ 1.5' O.G.
cl
HYDRANGEA MAGROPHYLLA 'BLUE WAVE'
'BLUE WAVE' HYDRANGEA
5 GAL
@ 5' O.G.
26
ILEX GRENATA 'SKY PENGIL'
'SKY PENGIL' HOLLY
5 GAL
@ 25' O.G.
8ci
ILEX GRENATA 'SOFT TOUGH'
'SOFT TOUGH' HOLLY
1 GAL
@ 3' O.G.
5
LEUCOTHOE AXILLARIS
COAST LEUCOTHOE
5 GAL
@ 4' O.G.
II
LIRIOPE MUSGARI 'VARIEGATA'
LILY TURF
I GAL
@ 2' O.G.
5a
MAHONIA AOUIFOLIUM 'COMPACTA'
COMPACT OREGON GRAPE
2 GAL
@ 4' O.G.
1 c
MISGANTHUS SINENSIS 'MORNING LIGHT'
'MORNING LIGHT' MISGANTHUS
5 GAL
@ 4' O.G.
10
MYRICA GAL IFORNIGA
NATIVE PLANT
PAC, IFIG WAX MYRTLE
5 GAL
® 6' O.G.
16
NAND INA DOMESTIGA 'FIRE POWER'
'FIRE POWER' NANDINA
2 GAL
@ 25' O.G.
7
PARTHENOC I SSUS TRI CUSP IDATA 'VEITCHII'
STAKE TO ENCOURAGE CLIMBING
BOSTON IVY
5 GAL
@ 4' O.G.
21
PENNISETUM ALOPECURO I DES ' HAMELN'
' HAMELN' FOUNTAIN GRASS
1 GAL
@ 2' O.G.
63
PRUNUS LAUROGERASUS 'OTTO LUYKEN'
15 " -21 " HT. & SPREAD
'OTTO LUYKEN' LAUREL
B 4 B
@ 4' O.G.
64
RHUS AROMATIGA 'GRO -LOW'
ADAPTIVE PLANT
'GRO -LOW' SUMAC
2 GAL
@ 4' O.G.
18
RIBES SANGUINEUM 'KING EDWARD VII'
NATIVE PLANT
RED FLOWERING CURRANT
5 GAL
® 6' O.G.
44
ROSA NUTKANA
NATIVE PLANT
NOOTKA ROSE
2 GAL
® 5' O.G.
16
SARGOGOGGA HUM ILIS
SWEETBOX
5 GAL
@ 4' O.G.
2
SARGOGOGGA RUSCIFOLIA
SWEETBOX
5 GAL
@ 4' O.G.
2c1
SKIMMIA REEVESIANA
REEVE'S DWARF SKIMMIA
2 GAL
@ 5' O.G.
5a
SP I RASA -JAPONICA 'MAO IC CARPET'
'MAGI G CARPET' SP I REA
2 GAL
® 5' O.G.
10
SYMPHOR I CARPOS ALBUS
CREEPING SNOWBERRY
2 GAL
@ 4' O.G.
56
SYMPHOR I CARPOS OGGI DENTAL IS
NATIVE
SNOWBERRY
2 GAL
@ 4' O.G.
56
THUJA OGGI DENTAL S 'WOODWARDII'
18 " -21 " HT. & SPREAD
WARD ARBORVITAE
B 4 B
@ 4' O.G.
MASSES
BOTANICAL NAME
COMMON NAME
GONT
SPACING
106
GEANOTHUS GLORIOSUS
POINT REYES GEANOTHUS
1 GAL. GONT.
@ 25' O.G.
604
MAHONIA NERVOSA
DULL OREGON GRAPE
4" POT
@ 12" O.G.
40
PACHYSANDRA TERMINAL 5 'GREEN CARPET'
JAPANESE SPURGE
I GAL. CONT.
® 25' O.G.
86
SHIBATAEA KUMASACA
DWARF BAMBOO
1 GAL. GONT.
@ 20" O.G.
INTERIOR PARKING LANDSCAPE CALCULATIONS
PARKING AREA
SOUTH (33 STALLS X 15 SO. FT.)
EAST ON SITE (18 STALLS X 15 SO. FT.)
EAST OFF SITE (14 STALLS X 15 SO. FT.)
TOTALS
REQUIRED PROVIDED
495 SQ. FT.
210 SO. FT.
210 SO. FT.
1035 SO. FT.
PER TMG 18.44.080.3.b, 10 SQ FT PER 300 SF OF PAVING. 11,401ci S.F. PROPOSED
(I1,4q SF / 300 S.F.) X 10 S.F. = 383 SF REQUIRED, 883 S.F. PROPOSED.
811 SO. FT.
6-12 SO. FT.
538 SO. FT.
2021 50. FT.
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
EY B. GLANDER
CENSE NO. 405
RES ON 02 -06 -2017
0
NORTH
20 40
SCALE: 1" = 20'
60 feet
a)
co
revision
0
c
14 -0702
job no.
TLG
drawn
JBG
checked
08/12/15
date
HOLIDAY INN EXPRESS
1
Landscape Architecture Site Planning
1821 4th Avenue E. Olympia, WA 98506
ph. (360) 357 -6972
fx. (360) 786 -8073 www.glanderassociates.com
N
sheet
L -1
of 4
W
O
0
FINISHED GRADE.
CLEAR TO FENCE OR
HARDSCAPE WHERE
APPLICABLE.
2" MINIMUM BELOW GRADE
TURF POP UP HEAD.
I
1/2" MARLEX STREET ELLS.
LATERAL LINE AND PVC TEE.
TURF SPRAY MARLEX ASSEMBLY
SCHEDULE 80 PVC
NIPPLE, SET AT
45 DEGREE ANGLE.
3" = I' -0"
328403.13 -01
TECHLINE CV MAXIMUM LENGTH OF SINGLE LATERAL (FEET)
DRIPPER SPACING
12"
18"
24"
DRIPPER FLOW
RATE (GPH)
0.26
0.4
0.6
0.9
0.26
0.4
0.6
0.9
0.6
0.9
0.6
INLET PRESSURE
(PSI)
15
127
109
86
65
177
151
120
91
152
116
25
427
325
256
194
604
459
361
274
458
348
35
539
409
322
244
763
579
456
346
580
440
45
618
469
369
280
877
664
523
397
666
506
TECHLINE FLOW PER 100 FEET
DRIPPER
SPACING
0.26 GPH DRIPPER
0.4 GPH DRIPPER
0.6 GPH DRIPPER
0.9 GPH DRIPPER
GPH
GPM
GPH
GPM
GPH
GPM
GPH
GPM
12"
26.40
0.44
40.00
0.67
61.00
1.02
92.00
1.53
18"
17.58
0.29
26.67
0.44
41.00
0.68
61.00
1.02
24"
N/A
N/A
N/A
N/A
31.00
0.51
46.00
0.77
TECHLINE CV GENERAL GUIDELINES FOR WATERING TIME
SYMBOL
TURF
SHRUB & GROUND COVER
CLAY
LOAM
SANDY
CLAY
LOAM
SANDY
DIPPER FLOW (GPH)
0.26
0.4
0.6
0.26
0.4
0.6
DRIPPER INTERVAL
18"
12"
12"
18"
18"
12"
LATERAL (ROW) SPACING
18 " -22"
18 " -22"
12 " -16"
18 " -24"
18 " -24"
16 " -20"
APPLICATION RATE (IN /HR)
.19 -0.15
.43 -.35
.96 -.72
.19 -.21
.29 -.21
.72 -.58
TIME TO APPLY 1/4"
79 -100
35 -43
16 -21
79 -107
52 -71
21 -26
NETAFIM MAX LENGTH - FLOW - WATERING CHARTS
N.T.S.
SOIL
SURFACE
DRIPLINE BARBED ELL.
12" BELOW GRADE
ANTELCO RATCHET CLAMP NO.
44345 AT ALL BARBED
CONNECTIONS. STAPLE OR STAKE AT ALL TEES,
ELLS, AND AT 5' O.G. AT CLAY, 4' O.G.
AT LOAM, OR 3' O.G. AT SAND.
DRIPLINE AS SPECIFIED.
i
•
4
•
SUPPLY LATERAL
LINE FROM VALVE,
SIZE AS PER PLANS.
328413.56 -30
BLANK DRIPLINE TUBING RISE
TYPICAL "XPANDO" ADAPTER
DRILLED HOLE IN PVC MANIFOLD,
WITH RATCHET CLAMP, AS PER
DETAIL.
SCH 40 PVC SUPPLY AND EXAUST
HEADER, MINIMUM I -1/2" DIAMETER,
UNLESS NOTED AS LARGER ON PLAN.
DRILL HOLES FOR EXPANDO INSERT
ADAPTER AS PER DETAIL.
TYPICAL DRIPLINE TO MANIFOLD CONNECTION WITH "XPANDO" ADAPTER
IRRIGATION SCHEDULE
SYMBOL
MANUFACTURER /MODEL /DESCRIPTION
£3'664n-4({306a°
60 Q T 150 H 210 TT TQ F
TORO O- T- 51OZ -6P -PR 8 SERIES
TURF SPRAY, 6" POP -UP, WITH BUILT IN -RISER
PRESSURE REGULATOR. ALSO INCLUDES THE
ZERO FLUSH WIPER SEAL. I/2"
FEMALE- THREADED I NLET. PRECISION SERI ES
SPRAY NOZZLES.
CB 0Y GA
HUNTER MP3000 PROS- 12- PRS4O -CV
SHRUB ROTATOR, 12" (30.48 CM) POP -UP WITH
CHECK VALVE, PRESSURE REGULATED TO 40
PSI (2. 76 BAR), MP ROTARY NOZZLE. 15= BLUE
ADJ ARC. '10 -210, Y= YELLOW ADJ ARC 210 -270,
A =GRAY 360 ARC ON PRS4O BODY.
SYMBOL
MANUFACTURER /MODEL / DESCRIPTION
MODEL
NETAF I M LVCZ580I00 75 -HF
PRE - ASSEMBLED CONTROL ZONE KIT, WITH I "
SERIES 80 CONTROL VALVE, 5/4" D I SC FILTER,
AND HIGH FLOW PRESSURE REGULATOR 4.5GFM
TO I 7.66PM.
TYPE
NETAFIM LVGZ -150
PRE - ASSEMBLED CONTROL ZONE KITS WITH
I -I/2" SERIES 80 CONTROL VALVE, I -1/2" DISC
FILTER AND I -I/2" HIGH FLOW PRESSURE
REGULATOR. FLOW RANGE: II GFM - 55 GPM.
COMMERCIAL APPLICATION.
PSI @ POG
AREA TO RECEIVE DRIPLINE
NETAFIM TLDL -6 -12 (20)
TECHLINE PRESSURE COMPENSATING
LANDSCAPE DRIPLINE. 0.66FH EMITTERS AT
12.0" O.G. DRIPLINE LATERALS SPACED AT
20.0" APART, WITH EMITTERS OFFSET FOR
TRIANGULAR PATTERN. SURFACE AND SUB
SURFACE INSTALLATIONS. UV RESISTANT.
PRECIP
I
NETAFIM LVCZ580I 00 7S -HF
I "
AREA FOR DRIPLINE
36.68
46.55
13.34
0.61 in /h
2
NETAFIM LVCZ580100 75-HF
1 "
AREA FOR DRIPLINE
35.44
46.4'7
SYMBOL
MANUFACTURER /MODEL /DESCRIPTION
0
TORO P22O -26 -0 GLOBE
ELECTRIC, I ", I -I/2" 2" AND 5" PLASTIC IN -LINE
REMOTE CONTROL VALVE. EQUIPPED TO
WITHSTAND PRESSURE UP TO 220 PSI. FILTER
SCREEN ON 2" AND 5" MODELS. STANDARD
SOLENOID. GLOBE BODY STYLE.
0
HUNTER HQ -33DRC
QUICK COUPLER VALVE, YELLOW RUBBER
COVER, RED BRASS AND STAINLESS STEEL, WITH
3/4" NPT INLET, 2 -PIECE BODY.
MS
BUCKNER-SUPER I OR 3100 -FRS I "
NORMALLY OPEN I" BRASS MASTER VALVE
THAT FROV I DES D I RTY WATER PROTECTION.
PRESSURE REGULATION FEATURE.
0
WILKINS #2OO 3/4"
ANGLE VALVE FOR MANUAL DRAIN ASSEMBLY
WITH KEY EXTENSION
4
FEECO 850 I "
DOUBLE CHECK BACKFLOW DEVICE
BF
AREA FOR DRIPLINE
WATER METER I "
ASSUME STATIC WATER PRESSURE AT METER
BETWEEN 65 PSI AND 150 PSI
M
3.80
0.61 in /h
IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21
PVC CLASS 200 IRRIGATION PIPE. ONLY
LATERAL TRANSITION PIPE SIZES I" AND ABOVE
ARE ND I GATED ON THE PLAN, WITH ALL OTHERS
BEING 3/4" IN SIZE.
TORO 1=220-26 -0 GLOBE
1 "
IRRIGATION MAINLINE: PVC SCHEDULE 40
PVC SCHEDULE 40 IRRIGATION PIPE.
45.61
58.(16
PIPE SLEEVE: PVC SCHEDULE 40
BURY ALL SLEEVES 24" BELOW GRADE,
PROVIDE SLEEVES UNDER ALL PAVED
SURFACES.
0.2(1 in /h
6
#
#.-
Valve Callout
Valve Number
Valve Flow
Valve Size
DRIPLINE BARBED INSERT TEE
OR ELL.
RATCHET CLAMP AT ALL
BARBED CONNECTIONS,
ANTELCO PART NO. 44345.
BANK DRIPLINE TUBING RISER,
LENGTH AS REQUIRED.
RATCHET CLAMP AT ALL
BARBED CONNECTIONS,
ANTELCO PART NO. 44345.
INSERT ADAPTER, ANTELCO
XPANDO 13MM X 14MM, PART
NO. 4550[5.
13MM ANTELCO "CAPO" RUBBER
GROMMET, NO. 45735.
DRILL 5/ 8" HOLE IN PVC
MANIFOLD PIPE AT DRIP LINE
SPACING. YOU MUST USE A
"FORSTNER" DRILL BIT FOR
DRILLING INTO PVC. REMOVE
ANY EXCESS BURRS OR
ROUGH EDGES.
NOTE:
I. USE RATCHET
CLAMP AT ALL
BARBED
CONNECTIONS.
2. THOROUGHLY FLUSH
SYSTEM TO REMOVE
ANY DRILL BURRS
OR DEBRIS.
TYPICAL "XPANDO" ADAPTER INSTALLATION AT MANIFOLD
DRIPLINE TO MANIFOLD "XPANDO" ADAPTER CONNECTION
N.T.S.
328413.56 -83
VALVE
SCHEDUL
E
NUMBER
MODEL
SIZE
TYPE
PSI
PSI @ POG
GPM
PRECIP
I
NETAFIM LVCZ580I 00 7S -HF
I "
AREA FOR DRIPLINE
36.68
46.55
13.34
0.61 in /h
2
NETAFIM LVCZ580100 75-HF
1 "
AREA FOR DRIPLINE
35.44
46.4'7
12.54
0.61 in /h
3
NETAFIM LVGZ -150
1 -1/2"
AREA FOR DRIPLINE
42.36
5 7.20
18.'75
0.61 in /h
4
NETAFIM LVCZ5801 OO '75 -LF
1 "
AREA FOR DRIPLINE
32.55
38.0'7
3.80
0.61 in /h
5
TORO 1=220-26 -0 GLOBE
1 "
SHRUB ROTARY
45.61
58.(16
15.5(1
0.2(1 in /h
6
TORO 1=220-26 -0 GLOBE
1 "
SHRUB ROTARY
46.38
55.86
(1.04
0.25 in /h
7
TORO 1=220-26 -0 GLOBE
I"
BUBBLER
44.1(1
4(1.61
5.00
15.32 in /h
8
NETAFIM LVGZ -150
1 -1/2"
AREA FOR DRIPLINE
40.66
50.22
11.8'7
0.61 in /h
112"
Tukwila Parkway
SHEET NOTES
I. SEE DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. PLAN IS DIAGRAMMATIC,. ALL PIPING, LATERALS, AND WIRE TO BE LOCATED IN BED OR LAWN AREAS
WHERE APPROPRIATE.
3. PIPE SIZES ARE TO REMAIN CONSTANT BETWEEN PIPE SIZE GALL -OUTS.
4. LOCATE ALL MAINLINES WITHIN THE PROJECT LIMITS.
5. ALL WORK SHALL BE PERFORMED TO THE SATISFACTION OF THE LANDSCAPE ARCHITECT /OWNER.
6. INSTALL DRIP IRRIGATION PER MANUFACTURER'S RECOMMENDATIONS. FOR CLARITY, THE IRRIGATION PLAN
SHOWS ONLY RECOMMENDED PVC SUPPLY AND EXHAUST HEADERS AND A HATCH SHOWING THE AREA OF
DRIPLINE. CONTRACTOR SHALL INSTALL HEADERS AND DRIPLINE AS DESCRIBED IN THE PLANS, EQUIPMENT
LIST, SPECIFICATIONS AND DETAILS.
3/4
3�4�
3�4�
3�4�
3 "'sl.
11/4'
p
inner i s
FEi di`
g imi� ®■i■■k �=:
ii
0
D
O
O
J
J
DO
OOTBA
WIDTH
1111 -
I���III„ 111=
PLANTING PIT
SHALL BE A MIN OF
3X THE
ROOTBALL WIDTH.
1" CHAINLOCK TREE TIES
(2) -BVC WOOD TREE
STAKES (8' HT.)
2" MULCH IN BASIN
3" WATER RETENTION BASIN (IN
SHRUB AND GROUNDCOVER
AREAS ONLY)
FERTILIZER TABLETS
REMOVE BURLAP FROM
TOP 2/3 OF ROOT BALL.
BACKFILL SOIL MIX
NOTES:
1. REMOVE TREATED OR SYNTHETIC
BURLAP COMPLETELY.
2. INSTALL 24" DEPTH ROOT BARRIER
AT THE EDGE OF ANY PAVING
WITHIN 8 Fl. OF TREE TRUNK.
3. ENSURE THE TRUNK FLARE IS
VISIBLE ABOVE GRADE AFTER
PLANTING.
TREE PLANTING & STAKING DETAIL
N.T.S.
c)
t
=W=1
=III=
329343 -03
5' SQUARE CAST IRON TREE
GRATE TO MATCH SIDEWALK
GRADE.
I
SHA
R
NOTES:
LANTING PI
L BE A MIN
TWICE THE
OTBALL WID
OF
H.
1. REMOVE TREATED OR SYNTHETIC BURLAP COMPLETELY.
2" DEPTH MULCH IN BASIN
CONCRETE SIDEWALK
TREE GRATE FRAME SET IN
CONCRETE
BACKFILL SOIL MIX
FERTILIZER TABLETS
REMOVE BURLAP FROM
TOP 2/3 OF ROOT BALL.
24" ROOT BARRIER
COMPACTED NATIVE SOIL
2. TREE GRATE SHALL BE MODEL SLC SERIES, FAIRWEATHER SITE FURNISHINGS,
PORT ORCHARD, WA AS AVAILABLE THROUGH SITE LINES, EVERETT, WA PH.
(800) 541 -0869, FX. (425) 347 -3056 OR APPROVED EQUAL.
TREE GRATE & PLANTING DETAIL
N.T.S. 329343 -07
LANDSCAPE SPECIFICATIONS
SHRUB FLARE SHALL
BE CLEARLY VISIBLE
AFTER PLANTING
PLANTING PIT
SHALL BE A
MIN. OF TWICE
THE ROOTBALL
DEPTH
D
6" i 6"
MIN. MIN.
PLANTING PIT SHALL
BE A MINIMUM OF
TWICE THE ROOT -
BALL WIDTH
MULCH
WATERING BASIN BERM
FERTILIZER TABLETS,
2 " -6" DEPTH
REMOVE BURLAP FROM A
MIN. OF 2/3 FROM ROOTBALL
AFTER PLACING SHRUB IN
PLANTING HOLE (REMOVE
COMPLETELY IF FIBERGLASS
OR TREATED).
BACKFILL SOIL MIX
SHRUB PLANTING DETAIL (B &B OR CONT.)
NTS
329333 -01
FINISH GRADE (INCLUDING
BED MULCH)
2" @ SHRUB BEDS,
FLUSH @ LAWN AREA
ASPHALT PAVING
WIDTH VARIES
REFER TO PLAN
IIIIIIIIIIIIIIIlIIIE
AUSTIN
1 I I 1 111111111111 I I I I I'
Ming'
CONCRETE CURB OR
ADJACENT PAVEMENT
4
3" MIN.; REFER TO
PLAN FOR SPECIFIC
BERM & CROWN HIS.
SUB -BASE MATERIAL
NATIVE SOIL
TOPSOIL FILL - REFER TO
SPECIFICATIONS FOR SOIL TYPE
NOTE: GENERAL CONTRACTOR SHALL REMOVE EXCESS ASPHALT
PAVEMENT AND SUB- BASE MATERIAL DOWN TO NATIVE SOIL.
PARKING ISLAND PLANTER DETAIL
NTS
WEAVE VINE BRANCHES INTO SCREEN, STARTING AT
BOTTOM. TIE LARGER BRANCHES LOOSELY TO
SCREEN, IF NECESSARY W/ BIO- DEGRADEABLE TIES.
= 111 =111: ����*��. *, ' 4�' i I11 =111 =1
111E111 =kt1 144 4I% =111 =111:
111 =11111���`I�```I$''``iiii I���I���I���I���I�IIIEIIIEI
111 = 111= Ir•������*$ *$����!F;! �,������������������ *$* =111 =1111
111 =111 �i.���.����•��y ; ,,. ���4���� _.���.���11E111E1
111= 111= 111Em-.. 10-.. m111m111o111= 111 =111:
ELEVATION
VINE PLANTING DETAIL
3" THICK GREENSCREEN PANEL ATTACHED
ATTACHED TO WALL BEYOND
PANEL SEAM
MOUNTING CLIP
3293 -02
GENERAL NOTES:
1. PLANT VINES PER LANDSCAPE PLANS. TYPICAL SPACING VARIES
FROM 1' TO 4' O.C. DEPENDING UPON VINE SPECIES AND
CONTAINER SIZE, SEE LANDSCAPE PLANS FOR ADDITIONAL
INFORMATION.
2. ENSURE IRRIGATION IS ADEQUATELY WATERING PLANTS ALONG
WALLS. SUPPLEMENT BY HAND WATERING IF NECESSARY.
3. INSTALL PER LANDSCAPE PLANS. GREENSCREEN DOES NOT
SUPPLY PLANT MATERIAL.
3" THICK GREENSCREEN
PANEL ATTACHED TO WALL
BEYOND
12" MAX.
REMOVE STAKE OR ANY TEMPORARY
TRELLIS DEVICE.
3" MULCH LAYER
_
ININ .� - -.41 -u: I
1=11' 11 'j 11 =18181811
:1111. 11 �j�!i =11 1M�1
1 =11� ��15i� ,,,���:111_Md1�811
:111_k�II� , >> r {L;!1.3111 1 LM
I_Ih_ ■. _..i_II1E��16..
1111= 111 = 111 = 111 =■1= 11810181E
SECTION
BACKFILL MIX -SEE SHRUB
PLANTING DETAIL
FINISHED GRADE
REMOVE CONTAINER AND
LOOSEN ROOTS
PLANTER BED SEE SPECIFICATIONS
FOR PREPARATION
3/4" = 1' -0"
S -G R -01
CONTINUOUS OUTER ROW OF PLANTS
SPACED "X" ON CENTER AND SET BACK
FROM THE PLANTING BED EDGE 2/3 "X"
ti
/ \ / \ / \
\ /+\ /+\ /� \X /+ \X /_
TRIANGULAR SPACING WITHIN
PLANTING BED
7
AREA FOR SPACING ADJUSTMENT
EDGE OF PLANTING BED
SPECIFIED PLANT SPACING = "X"
INDIVIDUAL PLANTS REPRESENTED AS: +
PLANT SPACING DETAIL
NTS
2/3 "X"
MAINTENANCE PRACTICES
3293 -01
I. KEEP ALL WALKS AND PAVED AREAS CLEAN. KEEP SITE FREE FROM
DEBRIS RESULTING FROM LANDSCAPE WORK AND MAINTENANCE.
2. REPAIR ALL DAMAGED PLANTED AREAS AND REPLACE PLANTS
IMMEDIATELY UPON DISCOVERY OF DAMAGE OR LOSS. STRAIGHTEN
AND TIGHTEN TREE STAKES AND GUYS AS NEEDED. REMOVE ALL TREE
STAKES AND GUYS AFTER ONE PLANTING SEASON.
3. MAINTAIN ADEQUATE MOISTURE IN SOIL TO ENSURE VIGOROUS GROWTH.
MODIFY IRRIGATION SCHEDULE FOR THE SEASON TO ELIMINATE
OVERWATER I NG. LANDSCAPE AREAS SHALL RECEIVE NO MORE THAN AN
I" OF IRRIGATION PER WEEK. MAINTAIN ALL HEADS AND DRIFLINE IN
PROPER WORKING ORDER. REPAIR DAMAGED HEADS, DRIP L 1 NE OR
OTHER EQU 1 PMENT AS NEEDED TO PREVENT WATER WASTE. DRIP LINE
THAT BECOMES EXPOSED SHALL BE REBURIED. REPLACE BATTERIES (IF
REQUIRED) IN ANY WIRELESS RAIN OR ET SENSOR.
4. I N FALL ENSURE ALL LEAVES ARE COLLECTED AND REMOVED OFF SITE,
CLEAN OUT CATCH BASIN GRATES AS NEEDED.
5. TEST BACK FLOW DEVICE YEARLY OR AS REQUIRED BY THE CITY.
IRRIGATION SYSTEM SHALL BE WINTERIZED PRIOR TO FREEZING
TEMPERATURES. DURING SPRING START UPS ADJUST AND TEST ALL
HEADS, VALVES AND OTHER EQUIPMENT FOR PROPER WORKING ORDER,
REPLACE OR REPAIR AS NEEDED.
6. KEEP LANDSCAPE AREAS FREE FROM WEEDS SY CULTIVATING, HOEING,
OR HAND PULL 1 NG. USE OF CHEMICAL WEED KILLERS SHALL BE KEPT TO
A MINIMUM; SPECIFIC REQUIREMENTS IN SHORELINE BUFFER AREAS EXIST
CONSULT CITY REQUIREMENTS PRIOR TO USE OF ANY CHEMICALS WITH IN
THE SHOREL 1 NE BUFFER .REMOVE ANY INVASIVE SPECIES IN ALL
LANDSCAPE AREAS.
WATER, FERTILIZE, AND MOW LAWN AREAS IN ACCORDANCE WITH
NORMAL NURSERY PRACTICE.
I. REFER TO DETAILS FOR ADDITIONAL INFORMATION.
2. REMOVE FROM SITE ALL EXISTING WEEDS AND VEGETATION NOT SHOWN TO REMAIN ON
FLANS.
3. DISTRIBUTE IMPORTED SANDY LOAM TOPSOIL (APPROVED BY THE LANDSCAPE ARCHITECT)
IN AREAS SHOWN AND AT DEPTHS INDIGATED FOR CROWNING AND BERM ING OF LANDSCAPE
AREAS, AND BACKFILL OF RETAINING WALLS (IF REQUIRED). DOTTED LINES INDICATE I'
CONTOUR INTERVALS. ALL LANDSCAPE AREAS SHALL RECE I VE TOPSOIL, WHETHER
INDIGATED ON PLANS OR NOT, 50 THAT FINISH GRADES OF ALL SHRUB BEDS SHALL BE 2"
BELOW TOPS OF ADJACENT CURBS AND PAVEMENT, AND LAWN AREAS SHALL BE 1/2" BELOW
TOPS OF ADJACENT CURBS AND PAVEMENT. STRUCTURAL F ILL AREAS: ANY LANDSCAPE
AREAS OCCURRING WITHIN STRUCTURAL FILL ZONES SHALL HAVE SAID STRUCTURAL FILL
MATERIALS EXCAVATED TO A DEPTH OF 12" BELOW FINISH GRADES IN SHRUB AREAS AND 6"
BELOW GRADE IN LAWN AREAS, AND REPLACED WITH SPECIFIED TOPSOIL. DISPOSE OF
EXCAVATED MATERIAL OFF SITE.
4. FINE GRADE ALL LANDSCAPE BEDS PRIOR TO PLANTING OPERATIONS.
5. NO PLANT SUBSTITUTIONS SHALL. BE PERMITTED WITHOUT PRIOR APPROVAL. OF LANDSCAPE
ARCHITECT/OWNER.
6. ALL PLANTS SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN STANDARD FOR
NURSERY STOCK.
ALL PLANT MATERIALS AND PLANT LOCATIONS SHALL BE APPROVED BY THE LANDSCAPE
ARCHITECT PRIOR TO INSTALLATION. ALL PLANTS SHALL BE THOROUGHLY WATERED
IMMEDIATELY AFTER PLANTING WITH ALASKA FISH FERTILIZER SOLUTION.
S. ROOT BARRIER SHALL. BE INCORPORATED ADJACENT AND PARALLEL TO PAVING, CURB AND
SIDEWALK, A MINIMUM OF 15 LINEAR FEET (7.5 ON EITHER SIDE OF TRUNK), 24" DEEP, WHERE
ANY TREE IS WITHIN 6' OF PAVING, CURB OR SIDEWALK. ROOT BARRIER SHALL BE DEEPROOT
U5-24 AS AVAILABLE FROM EWING IRRIGATION PRODUCTS, 2°101 S TACOMA WAY, TACOMA,
WA c4840ci, (253) 476 -c4530 OR APPROVED EQUAL.
cl SOIL AMENDMENT FOR SOIL PREPARATION AND PLANTING BACKFILL SHALL BE A SCREENED
5/8" MINUS NITRIFIED WOOD RESIDUAL COMPOST EQUAL TO:
A. "COMPOST PLUS" BRAND COMPOST AS AVAILABLE FROM SOUTH SOUND SOILS, TENINO
WA (360) 273 -8862.
B. "GROGO" BRAND COMPOST AS AVAILABLE FROM SAWDUST SUPPLY CO., SEATTLE, WA
(206) 622 -4321, OR GREAT WESTERN SUPPLY, OLYMPIA, WA. (360) 754 -3722.
G. PREP /LRI COMPOST AS AVAILABLE FROM RANDELS SAND AND GRAVEL, INC., PUYALLUP,
WA (253) 537 -6828.
10. SOIL PREPARATION - (ALL LANDSCAPE AREAS). SPREAD G G.Y. OF SPECIFIED SOIL
AMENDMENT PER 1000 S.F. (APPROX. 3" DEPTH) OF AREA. ROTO -TILL ALL OF THE ABOVE TO
A 12" DEPTH AND GRADE SMOOTH, COMPACTING AS REQUIRED AND REMOVING ALL ROCKS,
CLODS AND DEBRIS.
II. DO NOT PLACE MULCH TOFDRESS AGAINST TRUNKS OF TREES OR SHRUBS. MAINTAIN A 4"
MULCH FREE RING AROUND ALL PLANT CROWNS.
12. BACKFILL MIX FOR ALL PLANTS SHALL 5E A BLEND OF 1/5 EXISTING SITE SOIL, 1/5 COARSE
SAND, AND 1/3 SOIL AMENDMENT SPECIFIED IN NO. °I.
13. APPLY OSMOCOTE 18 -6 -12, cl MONTH SLOW RELEASE FERTILIZER OVER THE SURFACE OF ALL
PLANT PITS AT THE FOLLOWING RATES:
TREES OVER 10' HEIGHT
ALL SHRUBS EXCEPT I GALLONS:
GROUND COVERS:
2 CUPS
1/2 CUP
1/4 CUP
TREES UNDER 10' HEIGHT: I CUP
I GALLON PLANTS: 1/4 CUP
14. FERTILIZER TABLETS FOR ALL PLANTS SHALL BE AGRIFORM (20 -10 -5) 21 GRAM OR 10 GRAM
TABLETS DISTRIBUTED AS FOLLOWS: ALL TREES: 4 -21 GRAM TABLETS, ALL SHRUBS (EXCEPT
I GALLONS): 5 -21 GRAM TABLETS, ALL I GALLONS: I -21 GRAM TABLET, ALL 2 -I/4" AND 4"
POT GROUND COVERS: I -IO GRAM TABLET EACH. SET TABLETS DIRECTLY NEXT TO
ROOTBALL.
15. ALL SHRUB AND GROUND COVER BEDS SHALL RECEIVE A 2" DEPTH (6 G.Y. PER 1000 S.F.)
OF "MEDIUM GRIND" HEM /FIR BARK MULCH AS TOP DRESSING.
16. ALL WORK SHALL BE PERFORMED TO THE SATISFACTION OF THE LANDSCAPE
ARCH TEGT /OWNER.
17. ALL PLANTS SHALL BE GUARANTEED FOR ONE FULL YEAR FROM DATE OF PROJECT
ACCEPTANCE. ALL REPLACED PLANTS SHALL BE RE- GUARANTEED. ALL REPLACEMENTS
SHALL BE MADE WITHIN 21 DAYS OF RECEIVING WRITTEN NOTICE FROM THE OWNER.
CONTRACTOR SHALL NOT BE RESPONSIBLE FOR PLANTS DYING DUE TO OWNER NEGLECT OR
VANDALISM, AFTER THE MAINTENANCE PERIOD.
IS. PLANT LIST QUANTITIES ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE
FOR VERIFYING ALL QUANTITIES IN LIST WITH ACTUAL FLAN CALL -OUTS, AND INSTALLING
PLANTINGS PER THE LANDSCAPE FLAN. GROUNDCOVER AND /OR MASS SHRUB QUANTITIES
SHALL BE ADJUSTED AS REQUIRED FOR FIELD GOND I TI ONS AT THE SPECIFIED SPACING.
11. FINAL INSPECTION SHALL OGGUR AT THE CONCLUSION OF A 60 -DAY MAINTENANCE PERIOD.
MAINTENANCE PERIOD SHALL COMMENCE UPON COMPLETION OF ALL LANDSCAPE
INSTALLATION ACTIVITIES AND SHALL INCLUDE THE FOLLOWING:
A. REMOVE ALL WEEDS OVER I" IN HEIGHT.
B. REPLACE DEAD OR UNHEALTHY PLANTS.
G. ENSURE PROPER FUNCTION OF IRRIGATION SYSTEM.
D. ENSURE ADEQUATE MOISTURE 15 DEL 1 VERED TO ALL LANDSCAPE BEDS INCLUDING
NON - IRRIGATED AREAS.
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
EY B. GLANDER
ICENSE NO. 405
RES ON 02 -06 -2017
a)
4-
ca
0
revision
0
c
14 -0702
job no.
TLG
drawn
checked
08/12/15
date
HOLIDAY INN EXPRESS
I.
0‘
Landscape Architecture Site Plan
1821 4th Avenue E. Olympia, WA 98506
ph. (360) 357 -6972
fr. (360) 786 -8073 www.glanderassoc
LS & SI
sheet
L -3
of 4
MAXIMUM SINGLE LATERAL LENGTH, FLOW PER 100 FEET, AND
GENERAL GUIDELINES FOR WATERING TIME, SEE CHARTS ON
DETAIL:
PVC MAINLINE.
TYPICAL VALVE, FILTER,
PRESSURE REGULATOR.
TYPICAL OFFSET
2" FROM
HARDSCAPE, 4"
FROM PLANTED
AREA.
•
• ■■
TYP I GAL
LATERAL PIPE
FROM VALVE
ASSEMBLY, SIZE
AS PER PLANS.
■
■
TYP I GAL OFFSET
2" FROM
HARDSCAPE, 4"
FROM PLANTED
AREA.
TYPICAL I -1/2" MINIMUM ���-
SUPPLY MANIFOLD. DRILL Z
HOLES WITH "XPANDO" INSERT
ADAPTERS FOR DRIPLINE AS
PER DETAIL:
SUPPLY MANIFOLD.
MAXIMUM LENGTH 0
LATERAL, SEE CHART.
11
u
4
- RILINE SPACING AC,-
NOTED. EMITTERS
OFFSET FOR
EXHAUST MANIFOLD.
END FEED EXAMPLE
TUBING LATERALS WITH
EMITTER SPACING AS
NOTED. STAPLE (TLS6)
AT ALL TEES, ELLS, AND
AT 5' O.G. AT CLAY, 4'
O.G. AT LOAM, OR 3' O.G.
AT SAND.
MANUAL LINE FLUSHING
VALVE PLUMBED TO
EXHAUST HEADER, AS
FAR FROM THE
SUPPLY HEADER AS
POSSIBLE. AT
CENTER FEED, FLUSH C
VALVE AT EACH
EXHAUST END.
{
SUPPLY
L. MANIFOLD.
u
MAXIMUM LENGTH OF SINGLE
LATERAL, SEE CHART.
EXHAUST MANIFOLD.
CENTER FEED EXAMPLE
NETAFIM TECHLINE CV W/ XPANDO MANIFOLD
N.T.S.
328413.56 -20
n
FINISH GRADE AT LIP OF BOX IN TURF AND PAVED
AREAS (1" BELOW LIP IN ALL OTHER AREAS)
VALVE BOX: REFER TO IRRIGATION SHEET
NOTES OR SPECIFICATIONS
VALVE BOX COVER
0 • --■
A
BRASS UNION
BRASS NIPPLES
o°
0 0 00
o •0 ° o O O o
PVC MAINLINE
0
0
0
° °
6" MIN. CLEAFNC,
cO
0 Op o
°° o °° 0 O
BACKFLOW PREVENTOR
0 0
0 0
PEA GRAVEL (INSTALL MIN. 2 CU.
FT. BELOW BACKFLOW
PREVENTOR)
DOUBLE CHECK VALVE
NTS
SET BOX AT FINISH GRADE
(INCLUDING BARK MULCH) AT SHRUBS.
SET BOX AT FINISH GRADE
IN TURF AREAS.
A.E.P. RECTANGULAR BOX #1015
WITH 6" EXTENSIONS AS REQUIRED.
WATER PROOF WIRE CONNECTORS
ON 30" LOOPED WIRES.
ui ui
0 0
0 + 0 + FINISHED GRADE.
0
J
w
m
z
w
0
J
w
m
z
PVC CONDUIT FOR
CONTROLLER WIRES.
328404:1-OI
6X2X16 CONC. BLOCK CAPS,
ONE EACH SIDE (2 TOTAL)
SXT SCHEDULE 80 NIPPLES
VALVE INLET SIZE.
MASTER CONTROL VALVE
PVC MAIN LINE.
1/2" WIRE CLOTH GOPHER
SCREEN, WRAP UP SIDES.
1 1/2" = 1' -0"
NOTE: ALL WIRES TO BE INSTALLED AS PER LOCAL
CODES. NO "IN- LINE" WIRE SPLICES ALLOWED. TAPE
AND BUNDLE WIRES EVERY 20 FEET. PROVIDE
EXPANSION COILS AT EACH VALVE - WRAPPING WIRE
AROUND 1/2" PIPE 15 TIMES. ALL THREADED
CONNECTIONS SHALL BE MADE WITH TEFLON TAPE.
SHED. 80 PVC UNION
LATERAL PIPE TO
SPRINKLERS
LOW VOLTAGE WIRES
1 CU. FT. DRAIN GRAVEL
BELOW VALVE
0
ELECTRONIC CONTROL VALVE
325406.23-11
VALVE BOX COVER
FINISH GRADE AT LIP OF BOX
IN TURF AND PAVED AREAS;
1" BELOW LIP IN ALL OTHER
AREAS
VALVE BOX; REFER TO
IRRIGATION SHEET NOTES
AND /OR SPECS
ELECTRIC CONTROL VALVE
SCH. 80 PVC NIPPLE
SCH. 40 PVC & FITTING
2 X 4 CEDAR BLOCK
TAPE AND BUNDLE WIRES
SCH. 80 PVC NIPPLE; LENGTH
AS REQUIRED
SCH. 40 PVC FITTING
PRESSURE MAINLINE
NTS
328406.13 -05
2" PVC SLEEVE
MAIN LINE
REDUCING TEE
RAINBIRD #63100
VALVE MARKER
1111-1111
111M111 1111
-1
FINISH GRADE
CHAMPION #200 -075 (OR EQ.)
BRASS ANGLE VALVE WITH
UNION. INSTALL AT ALL
MAINLINE LOW POINTS TO
FACILITATE COMPLETE
MAINLINE DRAINAGE.
3/4" CLOSE NIPPLE
3/4" X 3" PROTECTIVE
PVC NIPPLE
GRAVEL SUMP
(2 CU. FT.)
C2D
MANUAL DRAIN VALVE
NTS
12" MAX
6" MIN.
10" DIAMETER VALVE BOX.
HEAD BRAND "QVC" ON LID
WITH 2" HIGH CHARACTERS.
FINISHED GRADE.
4
TWO STAINLESS
STEEL CLAMPS.
QUICK COUPLING VALVE AS
SPECIFIED.
328406 -OI
LAWN AREAS.
z
GALV. NIPPLE, LENGTH AS REQ.
6" DEEP LAYER OF 3/4"
CRUSHED ROCK.
3" PVC SCHEDULE 80
NIPPLE.
1/2" X 36" GALV
STEEL PIPE.
THREE PVC SCH 80
ELLS.
12" PVC SCHEDULE 80
NIPPLE.
QUICK COUPLING VALVE IN BOX
SHRUB AREAS.
11/2" = I' -0"
20 "X14" JUMBO
PLASTIC VALVE
BOX.
PVC TRUE UNION
BALL VALVE.
328406.43 -02
CONTROLLER WIRE WITH 30 INCH LINEAR
LENGTH OF COIL, WITH PLASTIC I.D. TAG
AND WATERPROOF CONNECTORS.
RCV AS SPECIFIED.
FILTER AS SPECIFIED.
PRESSURE REGULATOR AS
SPECIFIED.
PVC UNION W/ SHORT
NI PPLES.
2" ABOVE GRADE
AT SHRUBS.
SET BOX FLUSH
AT TURF.
ijSxT TEE W/ 2"
NIPPLE AT MAINLINE.
Y2" WIRE CLOTH GOPHER
SCREEN, WRAP UP SIDES.
SCH. 80 RISER.
OUTLET PIPE SAME SIZE
AS VALVE, 24" MIN.
LENGTH TO FIRST
FIT4IGDOWN AS REQ. TO
LATERAL PIPE DEPTH.
TWO 6X2X16 CONCRETE BLOCK
GAPS, ONE ON EACH SIDE OF THE
BOX.
1" DRIP VALVE /FILTER /REGULATOR
a
11/2" = I' -0"
328413.76 -23
IRRIGATION SPECIFICATIONS
I. This plan is diagrammatic; all piping, valves, etc. shall be installed in shrub be where possible and
shall follow the plan as close as is practical.
2. Locate all mainlines within the project limits.
S. Pipe sizes are constant between pipe size call -outs.
4. Refer to details for additional information.
5. All piping and wiring under paved areas shall be housed in class 200 PVG sleeves installed at a 24"
depth. Size sleeves as needed to accommodate pipe and wires, unless otherwise specified on
drawing.
6. Contractor shall make field adjustments as needed to obtain full coverage. Landscape Architect
reserves the right to make nozzle changes as needed at no additional cost. Adjust head positions
and add or delete heads as needed depending on actual field conditions.
1. All manual, gate and electrical valves and other underground equipment shall be housed in Nelson,
Ametek or equal rectangular valve boxes.
S. No in -line wire splices allowed. Supply valve boxes at all electrical junctions. Tape and bundle wires
every 25 linear feet.
ci. Contractor is responsible for complete system drainage. Install manual drains at all mainline low
point(s) and where indicated on plan. Contractor shall provide adjustable check valves on any
irrigation he that experiences low he drainage.
10. All threaded pipe connections shall be made using Teflon tape wrapped at least three times around
pipe threads.
II. All gate and electric valves shall be installed with unions on the downstream end of the valve (refer
to details).
12. All pipe shall have a firm uniform bearing for the entire length of each line, free of rocks or debris.
All trenches containing pipe and /or wires shall be backfilled with clean topsoil, free of all lumber,
rubbish and rocks over I" in size, or clean sand if clean topsoil is not available.
15. Contractor shall provide owner with one set of as -built record drawings showing exact actual locations
of all sprinkler equipment. Contractor shall orient owner with complete system and controller
operations, and winterization procedures.
14. Contractor shall supply and install all equipment shown on the plans and indicated in the specifications
to achieve proper operation of said equipment. All equipment installations, electrical and plumbing
connections shall be in conformance with all applicable codes and ordinances, these specifications, and
the manufacturers recommendations whether indicated on the drawings or not.
15. Contractor shall include in his bid one Fall winterization and one Spring activation of irrigation system.
These activities shall be included as part of Owner orientation procedures. Any damage to the
irrigation system or the landscape as a result of failure to comply with these requirements shall be the
sole responsibility of the Contractor.
16. Contractor shall guarantee in writing on his company letterhead all materials and workmanship for a
period of one full year following acceptance of system installation.
17. Backflow preventor shall be inspected and tested by a certified backflow device inspector. Provide
Owner with one copy of approval certificate.
10" DIAMETER ROUND VALVE
BOX, SEE SPECIFICATIONS.
FINISH GRADE.
H H H H II
18" BELOW GRADE
SET BOX 2" ABOVE GRADE AT SHRUBS.
SET BOX FLUSH TO GRADE AT LAWN.
III III III
•
ISOLATION VALVE AS
SPECIFIED.
BRASS ISOLATION VALVE
11/2" = I' -0"
SET CONTROLLER 60" ABOVE
FINISHED GRADE UNLESS
OTHERWISE NOTED.
CONTROLLER AS SPECIFIED. -
SECURELY BOLT CONTROLLER
TO WALL. INSTALL BACKUP
BATTERIES AS REQUIRED.
GROUND AS PER MFG.
SPECIFICATIONS.
1/2" DIAMETER RIGID
STEEL CONDUIT FOR
110 VAC ELECTRICAL
SOURCE. INSTALL AS
PER LOCAL ELECTRICAL
CODES.
FINISHED GRADE.
LONG SWEEP ELL.
WALL MOUNT CONTROLLER
FOUR COMMON
BRICK SUPPORTS.
10" DIA. PVC PIPE
EXTENSION, LENGTH
AS REQUIRED.
6
PVC MAIN LINE.
SLIP /THREAD COUPLING.
6" SCHEDULE 80 THREADED
NIPPLE.
1 1/2" DIAMETER RIGID
STEEL CONDUIT FOR
RCV WIRES.
USE PVC SCH. 40
BELOW GRADE.
328406.33 -OI
BALL VALVE
D.C.V.A.
(SEE DRAWING FOR LOCATION AND SIZE)
MASTER VALVE
QUICK COUPLER
MAINLINE
MANUAL DRAIN VALVE
WATER METER/ POINT OF CONNECTION (P.O.C.) BY OTHERS
POINT OF CONNECTION DIAGRAM
NTS
N.T.S.
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
B. GLANDER
I _ NSE NO. 405
EXPIRES ON 02 -06 -2017
WATER SOURCE: DRIP VALVE TYPIGAL TEGHLINE DRIPPER
OR LATERAL FROM VALVE.
I
I
LINE TUBING.
I TYPIGAL PVC OR POLY
SUPPLY OR EXHAUST HEADER
TYPIGAL SUPPLY HEADER.
0 MANUAL LINE FLUSHING VALVE
PLUMBED TO PVC OR POLY
HEADER
I I
revision
1 \ice!!!
Ali
II'
' i___
- +-
SUPPLY
HEADER
lit
EXHAUST
HEADE-
---
III
i
- +
- -
O
C
I'
JEM
drawn
TLG
checked
! I� 1I
1
\�
', \, .
�
1111W
0\
Landscape Architecture Site Plan
1821 4th Avenue E. Olympia, WA 98506
ph. (360) 357 -6972
fx. (360) 786 -8073 www.glanderassoc
-.
0 0
TOTAL THE COMBINED CHECK LONGEST
LENGTH OF THESE LATERAL AGAINST
LATERALS AND COMPARE CHART FOR MAX.
TO THE CHART FOR MAX. LENGTH OF SINGLE
LENGTH OF SINGLE LATERAL
•
e _
.
ISLAND
LAYOUT
IRREGULAR
ODD CURVES
ilthiA6IFIING OUT JOINING LATERALS
LATERALS
. 0
jl
i
llllii
(ilu�i — i
yjlulli f li!IIII p TYPICAL START CONNECTION
ON EXHAUST HEADER.
TOTAL LENGTH OF TEGHLINE TUBING
I
e -1111
i
i
IN THIS
MAX.
TYPICAL
SUPPLY
si
AREA GAN NOT EXCEED THE
LENGTH OF RUN.
START CONNECTION ON
HEADER.
IRREGULAR
AREAS: TRIANGULAR
PARKING ISLAND TYPICAL LAYOUT
MANUAL LINE FLUSHING VALVE.
TOP OF SLOPE. TEGHLINE CV LATERAL TUBING.
PVC SUPPLY LATERALS PARALLEL TO THE
HEADER. OW CONTOURS OF THE SLOPE.
PVC. EXHAUST HEADER.
iorwitiffor.--•.-...
TOE OF
54 MAXIMUM ELEVATION
CHANGE WITHOUT
VALVE. IF GREATER,
INSTALL INLINE CHECK
VALVES EVERY
ELEVATION CHANGE.
II
�! SLOPE.
CHECK TOP 2/5 OF
. SLOPE:
CONVENTIONAL
54" IN SPACING.
BOTTOM I/3 OF SLOPE:
lipCONVENTI ONAL SPACING
PLUS 25 %.
REMOTE CONTROL
VALVE ASSEMBLY.
SLOPE FEED LAYOUT
NETAFIM TECHLINE CV W/ XPANDO MANIFOLD
N.T.S.
328413.56 -20
n
FINISH GRADE AT LIP OF BOX IN TURF AND PAVED
AREAS (1" BELOW LIP IN ALL OTHER AREAS)
VALVE BOX: REFER TO IRRIGATION SHEET
NOTES OR SPECIFICATIONS
VALVE BOX COVER
0 • --■
A
BRASS UNION
BRASS NIPPLES
o°
0 0 00
o •0 ° o O O o
PVC MAINLINE
0
0
0
° °
6" MIN. CLEAFNC,
cO
0 Op o
°° o °° 0 O
BACKFLOW PREVENTOR
0 0
0 0
PEA GRAVEL (INSTALL MIN. 2 CU.
FT. BELOW BACKFLOW
PREVENTOR)
DOUBLE CHECK VALVE
NTS
SET BOX AT FINISH GRADE
(INCLUDING BARK MULCH) AT SHRUBS.
SET BOX AT FINISH GRADE
IN TURF AREAS.
A.E.P. RECTANGULAR BOX #1015
WITH 6" EXTENSIONS AS REQUIRED.
WATER PROOF WIRE CONNECTORS
ON 30" LOOPED WIRES.
ui ui
0 0
0 + 0 + FINISHED GRADE.
0
J
w
m
z
w
0
J
w
m
z
PVC CONDUIT FOR
CONTROLLER WIRES.
328404:1-OI
6X2X16 CONC. BLOCK CAPS,
ONE EACH SIDE (2 TOTAL)
SXT SCHEDULE 80 NIPPLES
VALVE INLET SIZE.
MASTER CONTROL VALVE
PVC MAIN LINE.
1/2" WIRE CLOTH GOPHER
SCREEN, WRAP UP SIDES.
1 1/2" = 1' -0"
NOTE: ALL WIRES TO BE INSTALLED AS PER LOCAL
CODES. NO "IN- LINE" WIRE SPLICES ALLOWED. TAPE
AND BUNDLE WIRES EVERY 20 FEET. PROVIDE
EXPANSION COILS AT EACH VALVE - WRAPPING WIRE
AROUND 1/2" PIPE 15 TIMES. ALL THREADED
CONNECTIONS SHALL BE MADE WITH TEFLON TAPE.
SHED. 80 PVC UNION
LATERAL PIPE TO
SPRINKLERS
LOW VOLTAGE WIRES
1 CU. FT. DRAIN GRAVEL
BELOW VALVE
0
ELECTRONIC CONTROL VALVE
325406.23-11
VALVE BOX COVER
FINISH GRADE AT LIP OF BOX
IN TURF AND PAVED AREAS;
1" BELOW LIP IN ALL OTHER
AREAS
VALVE BOX; REFER TO
IRRIGATION SHEET NOTES
AND /OR SPECS
ELECTRIC CONTROL VALVE
SCH. 80 PVC NIPPLE
SCH. 40 PVC & FITTING
2 X 4 CEDAR BLOCK
TAPE AND BUNDLE WIRES
SCH. 80 PVC NIPPLE; LENGTH
AS REQUIRED
SCH. 40 PVC FITTING
PRESSURE MAINLINE
NTS
328406.13 -05
2" PVC SLEEVE
MAIN LINE
REDUCING TEE
RAINBIRD #63100
VALVE MARKER
1111-1111
111M111 1111
-1
FINISH GRADE
CHAMPION #200 -075 (OR EQ.)
BRASS ANGLE VALVE WITH
UNION. INSTALL AT ALL
MAINLINE LOW POINTS TO
FACILITATE COMPLETE
MAINLINE DRAINAGE.
3/4" CLOSE NIPPLE
3/4" X 3" PROTECTIVE
PVC NIPPLE
GRAVEL SUMP
(2 CU. FT.)
C2D
MANUAL DRAIN VALVE
NTS
12" MAX
6" MIN.
10" DIAMETER VALVE BOX.
HEAD BRAND "QVC" ON LID
WITH 2" HIGH CHARACTERS.
FINISHED GRADE.
4
TWO STAINLESS
STEEL CLAMPS.
QUICK COUPLING VALVE AS
SPECIFIED.
328406 -OI
LAWN AREAS.
z
GALV. NIPPLE, LENGTH AS REQ.
6" DEEP LAYER OF 3/4"
CRUSHED ROCK.
3" PVC SCHEDULE 80
NIPPLE.
1/2" X 36" GALV
STEEL PIPE.
THREE PVC SCH 80
ELLS.
12" PVC SCHEDULE 80
NIPPLE.
QUICK COUPLING VALVE IN BOX
SHRUB AREAS.
11/2" = I' -0"
20 "X14" JUMBO
PLASTIC VALVE
BOX.
PVC TRUE UNION
BALL VALVE.
328406.43 -02
CONTROLLER WIRE WITH 30 INCH LINEAR
LENGTH OF COIL, WITH PLASTIC I.D. TAG
AND WATERPROOF CONNECTORS.
RCV AS SPECIFIED.
FILTER AS SPECIFIED.
PRESSURE REGULATOR AS
SPECIFIED.
PVC UNION W/ SHORT
NI PPLES.
2" ABOVE GRADE
AT SHRUBS.
SET BOX FLUSH
AT TURF.
ijSxT TEE W/ 2"
NIPPLE AT MAINLINE.
Y2" WIRE CLOTH GOPHER
SCREEN, WRAP UP SIDES.
SCH. 80 RISER.
OUTLET PIPE SAME SIZE
AS VALVE, 24" MIN.
LENGTH TO FIRST
FIT4IGDOWN AS REQ. TO
LATERAL PIPE DEPTH.
TWO 6X2X16 CONCRETE BLOCK
GAPS, ONE ON EACH SIDE OF THE
BOX.
1" DRIP VALVE /FILTER /REGULATOR
a
11/2" = I' -0"
328413.76 -23
IRRIGATION SPECIFICATIONS
I. This plan is diagrammatic; all piping, valves, etc. shall be installed in shrub be where possible and
shall follow the plan as close as is practical.
2. Locate all mainlines within the project limits.
S. Pipe sizes are constant between pipe size call -outs.
4. Refer to details for additional information.
5. All piping and wiring under paved areas shall be housed in class 200 PVG sleeves installed at a 24"
depth. Size sleeves as needed to accommodate pipe and wires, unless otherwise specified on
drawing.
6. Contractor shall make field adjustments as needed to obtain full coverage. Landscape Architect
reserves the right to make nozzle changes as needed at no additional cost. Adjust head positions
and add or delete heads as needed depending on actual field conditions.
1. All manual, gate and electrical valves and other underground equipment shall be housed in Nelson,
Ametek or equal rectangular valve boxes.
S. No in -line wire splices allowed. Supply valve boxes at all electrical junctions. Tape and bundle wires
every 25 linear feet.
ci. Contractor is responsible for complete system drainage. Install manual drains at all mainline low
point(s) and where indicated on plan. Contractor shall provide adjustable check valves on any
irrigation he that experiences low he drainage.
10. All threaded pipe connections shall be made using Teflon tape wrapped at least three times around
pipe threads.
II. All gate and electric valves shall be installed with unions on the downstream end of the valve (refer
to details).
12. All pipe shall have a firm uniform bearing for the entire length of each line, free of rocks or debris.
All trenches containing pipe and /or wires shall be backfilled with clean topsoil, free of all lumber,
rubbish and rocks over I" in size, or clean sand if clean topsoil is not available.
15. Contractor shall provide owner with one set of as -built record drawings showing exact actual locations
of all sprinkler equipment. Contractor shall orient owner with complete system and controller
operations, and winterization procedures.
14. Contractor shall supply and install all equipment shown on the plans and indicated in the specifications
to achieve proper operation of said equipment. All equipment installations, electrical and plumbing
connections shall be in conformance with all applicable codes and ordinances, these specifications, and
the manufacturers recommendations whether indicated on the drawings or not.
15. Contractor shall include in his bid one Fall winterization and one Spring activation of irrigation system.
These activities shall be included as part of Owner orientation procedures. Any damage to the
irrigation system or the landscape as a result of failure to comply with these requirements shall be the
sole responsibility of the Contractor.
16. Contractor shall guarantee in writing on his company letterhead all materials and workmanship for a
period of one full year following acceptance of system installation.
17. Backflow preventor shall be inspected and tested by a certified backflow device inspector. Provide
Owner with one copy of approval certificate.
10" DIAMETER ROUND VALVE
BOX, SEE SPECIFICATIONS.
FINISH GRADE.
H H H H II
18" BELOW GRADE
SET BOX 2" ABOVE GRADE AT SHRUBS.
SET BOX FLUSH TO GRADE AT LAWN.
III III III
•
ISOLATION VALVE AS
SPECIFIED.
BRASS ISOLATION VALVE
11/2" = I' -0"
SET CONTROLLER 60" ABOVE
FINISHED GRADE UNLESS
OTHERWISE NOTED.
CONTROLLER AS SPECIFIED. -
SECURELY BOLT CONTROLLER
TO WALL. INSTALL BACKUP
BATTERIES AS REQUIRED.
GROUND AS PER MFG.
SPECIFICATIONS.
1/2" DIAMETER RIGID
STEEL CONDUIT FOR
110 VAC ELECTRICAL
SOURCE. INSTALL AS
PER LOCAL ELECTRICAL
CODES.
FINISHED GRADE.
LONG SWEEP ELL.
WALL MOUNT CONTROLLER
FOUR COMMON
BRICK SUPPORTS.
10" DIA. PVC PIPE
EXTENSION, LENGTH
AS REQUIRED.
6
PVC MAIN LINE.
SLIP /THREAD COUPLING.
6" SCHEDULE 80 THREADED
NIPPLE.
1 1/2" DIAMETER RIGID
STEEL CONDUIT FOR
RCV WIRES.
USE PVC SCH. 40
BELOW GRADE.
328406.33 -OI
BALL VALVE
D.C.V.A.
(SEE DRAWING FOR LOCATION AND SIZE)
MASTER VALVE
QUICK COUPLER
MAINLINE
MANUAL DRAIN VALVE
WATER METER/ POINT OF CONNECTION (P.O.C.) BY OTHERS
POINT OF CONNECTION DIAGRAM
NTS
N.T.S.
STATE OF
WASHINGTON
LICENSED
LANDSCAPE ARCHITECT
B. GLANDER
I _ NSE NO. 405
EXPIRES ON 02 -06 -2017
a)
ca
revision
O
C
14 -0702
job no.
JEM
drawn
TLG
checked
08/12/15
date
HOLIDAY INN EXPRESS
1111W
0\
Landscape Architecture Site Plan
1821 4th Avenue E. Olympia, WA 98506
ph. (360) 357 -6972
fx. (360) 786 -8073 www.glanderassoc
ES Al
sheet
L -4
of 4
COLOR RENDERING ATTACHMENT B
m
Attachment C. Colors and Materials Board (to be presented at hearing)
.i
ATTACHMENT D
.1,4
THIS DEVELOPMENT AGREEMENT is made and entered into this day of
M (XU 2015, by and between the City of Tukwila, a noncharter, optional code
Washington C� 11unicipal corporation, hereinafter the "City," and Tukwila TSD LLC, an S corporation,
organized under the laws of the State of Washington, hereinafter the "Developer."
C) t�
WHEREAS, the Developer desires to develop a new five-story hotel at 90 Andover Park East
with 92 guest rooms; and
WHEREAS, one parking space per guest room is required for lodging uses in the Tukwila
Urban Center Transit Oriented Development District; and
WHEREAS, the Developer has submitted a site plan showing the required number of parking
0 0
stalls for the hotel cannot be accommodated as surface parking on the project site; and
WHEREAS, the Developer proposes non-exclusive use of parking and drive aisle area in the
right-of-way of Christensen Road to meet the parking requirements for the proposed hotel at 90
Andover Park East; and
WHEREAS, the City of Tukwila is the owner of the Christensen Road right-of-way, which
includes undeveloped area adjacent to the project's eastern property line, paved street, parking, and
cul-de-sac areas; and
WHEREAS, the parking area in the right-of-way of Christensen Road is currently used by
members of the public for access to the Green River Trail, shoreline, and parks areas; and
WHEREAS, hotel parking spaces are expected to be used primarily in the evening and
C, D
nighttime hours; parking spaces for trail, shoreline, and parks access are expected to be used during
rz,
daylight hours; and
WHEREAS, the Developer proposes to add parking spaces within the undeveloped right-of-
way area adjacent to the hotel site and to reconfigure existing spaces to increase the number of
parking spaces that would be shared for hotel use and the public for access to the Green River Trail;
and -)44 0� 1
41
WHEREAS, all parking spaces within the right -of -way area will be shared and at least four
spaces will be designated for non -hotel users to ensure access to the Green River Trail for members
of the public; and
WHEREAS, the Developer proposes to maintain the parking area within the right -of -way as
outlined in Exhibit 2 for the length of this agreement; and
WHEREAS, the vision for parking areas within the Transit Oriented Development (TOD)
Neighborhood in the Southcenter Subarea Plan is that "parking will be accommodated by a
combination of off- and on- street parking spaces /lots" and shared parking facilities. "Such facilities
can be shared between public and private uses" (p. 19); and
WHEREAS, the Developer proposes to construct a pedestrian connection between the
intersection of Andover Park East and Tukwila Parkway to the Green River Trail; and
WHEREAS, implementation strategies for policy 10.2.1 of the Tukwila Comprehensive Plan
include "Seek opportunities for public /private partnerships;" and
WHEREAS, a through -way from Andover Park East to Christensen Road will be constructed as
part of the project to replace the emergency vehicle maneuvering function of the cul -de -sac; and
WHEREAS, uses that provide public access are prioritized in the Urban Conservancy
Environment in the Shoreline Element of the Tukwila Comprehensive Plan and the proposed
development furthers this goal; and
WHEREAS, the Washington State Legislature has authorized the execution of a development
agreement between a local government and a person having ownership or control of real property
within its jurisdiction (RCW 36.70B.170(1)); and
WHEREAS, a development agreement must set forth the development standards and other
provisions that shall apply to, govern and vest the development, use and mitigation of the
development of the real property for the duration specified in the agreement (RCW 36.70B.170(1));
and
WHEREAS, for the purposes of this development agreement, "development standards"
includes, but is not limited to, all of the standards listed in RCW 36.70B.170(3); and
WHEREAS, a development agreement must be consistent with the applicable development
regulations adopted by a local government planning under chapter 36.70A RCW (RCW
36.70B.170(1)); and
2
42
WHEREAS, Tukwila Municipal Code Section 18.86.030 explicitly allows for flexibility in
development standards applicable to a property developed under a development agreement "to
achieve public benefits, respond to changing community needs, or encourage modifications which
provide the functional equivalent or adequately achieve the purposes of otherwise applicable City
standards "; and
WHEREAS, this Development Agreement by and between the City of Tukwila and the
Developer (hereinafter the "Development Agreement "), relates to the development known as the 90
Andover Park East Hotel, which is located at: 90 Andover Park East (hereinafter the "Subject
Property "); and
WHEREAS, a development agreement must be approved by ordinance or resolution after a
public hearing (RCW 36.70B.200); and
WHEREAS, a public hearing for this Development Agreement was held on November 24,
2014, and the City Council approved this Development Agreement by Ordinance No. 2473 on March
16, 2015; and
NOW THEREFORE, in consideration of the mutual promises set forth herein, the parties hereto
agree as follows:
III. AGREEMENT
Section 1. The Project. The Project is the development and use of the Subject Property,
located at 90 Andover Park East in the City of Tukwila and a portion of Christensen Road right -of-
way for a 92 -room 5 -story hotel and 45 shared parking spaces on Christensen Road right -of -way, as
shown on Exhibit 2.
Section 2. The Subject Property. The Subject Property and right -of -way are legally
described in Exhibit 1, attached hereto and incorporated herein by this reference.
Section 3. Definitions. As used in this Development Agreement, the following terms, phrases
and words shall have the meanings and be interpreted as set forth in this Section.
a) "Adopting Ordinance" means the Ordinance which approves this Development Agreement,
as required by RCW 36.7013.200.
b) "Council" means the duly elected legislative body governing the City of Tukwila.
c) "Design Guidelines" means the Tukwila Design Manual, as adopted by the City.
d) "Director" means the City's Community Development Director.
e) "Effective Date" means the effective date of the Adopting Ordinance.
9
43
f) "Existing Land Use Regulations" means the ordinances adopted by the City Council of
Tukwila in effect on the Effective Date, including the adopting ordinances that govern the permitted
uses of land, the density and intensity of use, and the design, improvement, construction standards
and specifications applicable to the development of the Subject Property, including, but not limited to
the Comprehensive Plan, the City's Official Zoning Map and development standards, the Design
Manual, the Public Works Standards, SEPA, Concurrency Ordinance, and all other ordinances,
codes, rules and regulations of the City establishing subdivision standards, park regulations, building
standards. "Existing Land Use Regulations" does not include non -land use regulations, which
includes taxes and impact fees.
g) "Landowner" is the party who has acquired any portion of the Subject Property from the
Developer who, unless otherwise released as provided in this Agreement, shall be subject to the
applicable provisions of this Agreement. The "Developer" is identified in Section 5 of this
Agreement.
h) "Project" means the anticipated development of the Subject Property, as specified in Section
and as provided for in all associated permits /approvals, and all incorporated exhibits.
i) "Vesting date" means the date a valid and fully complete building permit application for the
hotel is submitted to the City of Tukwila.
Section 4. Exhibits. Exhibits to this Agreement are as follows:
A. Exhibit 1 - Legal description of the Subject Property and the right -of -way.
B. Exhibit 2 - Conceptual Site Plan
Section 5. Parties to Development Agreement. The parties to this Agreement are:
A. The "City" is the City of Tukwila, 6200 Southcenter Blvd., Tukwila, WA 98188.
B. The "Developer" or Owner is a private enterprise which owns the Subject Property in fee,
and whose principal office is located at 21109 66th Avenue South, Kent, WA 98032.
C. The "Landowner." From time to time, as provided in this Agreement, the Developer may
sell or otherwise lawfully dispose of a portion of the Subject Property to a Landowner who, unless
otherwise released, shall be subject to the applicable provisions of this Agreement related to such
portion of the Subject Property.
Section 6. Project is a Private Undertaking. It is agreed among the parties that the Project is
a private development and that the City has no interest therein except as explicitly outlined in this
Agreement and as authorized in the exercise of its governmental functions.
N
..
Section 7. Effective Date and Term. This Agreement shall commence upon the effective date
of the Adopting Ordinance approving this Agreement, and shall continue in force for a period of 50
years, with the option to extend the Agreement an additional 30 years, unless extended or terminated
as provided herein. Following the expiration of the term or extension thereof, or if sooner terminated,
this Agreement shall have no force and effect, subject however, to post- termination obligations of the
Developer or Landowner.
Section 8. Terms.
A. Design
• The Project at 90 Andover Park East shall be allowed non - exclusive use rights for the
parking spaces and drive aisle area of Christensen Road (as depicted in Exhibit 2) to
meet minimum parking requirements for the development. This Agreement shall not
preclude the City from entering into additional agreements regarding use of this area by
other private parties. The Project will be subject to the development regulations in effect
at the time of complete permit application submittals.
• The site plan attached as Exhibit 2 is included with this Agreement for reference only,
and has not yet been approved as of the date of execution of this Agreement. The site
plan shall be subject to modifications during review of the required land use permits.
• As a result of the cul -de -sac closure, public access through 90 Andover Park East is
hereby allowed and provided for.
• The Developer shall construct a pedestrian connection between the intersection of
Andover Park East and Tukwila Parkway to the Green River Trail.
• All shared parking stalls will be constructed and maintained to Public Works
Infrastructure Design and Construction Standards.
• The Developer shall be responsible for making a payment of $93,849 to the City of
Tukwila. This payment shall be made prior to the issuance of the building permit for the
hotel.
B. Construction
• The cost of permits and plans required for construction of the parking area shall be borne
by the Developer and submitted as part of the permits for the hotel. The parking in the
right -of -way must receive final approval by all required City departments prior to
issuance of the Certificate of Occupancy for the hotel.
C. Maintenance
• The parking area shall be subject to inspections every five years.
• Developer is solely responsible for the cost and maintenance of the parking spaces. New
striping of the parking spaces shall be completed every three years.
9
45
D. Operations
A total of 92 parking spaces are required for the 92 -room hotel as proposed. The site
plan in Exhibit 2 includes 98 parking spaces. All parking spaces within the right -of -way
of Christensen Road and the hotel parking lot shall be for the joint use of the hotel users
and members of the public and at least four spaces shall be designated for non -hotel users
to ensure access to the Green River Trail for members of the public. If the final design of
the hotel is for less than 92 rooms, then any additional spaces after calculating one space
per room plus two spaces shall be designated for non -hotel users.
Section 9. Vested Rights. During the term of this Agreement, unless sooner terminated in
accordance with the terms hereof, in developing the Subject Property consistent with the Project
described herein, Developer is assured, and the City agrees, that the development rights, obligations,
terms and conditions specified in this Agreement, are fully vested in the Developer and may not be
changed or modified by the City, except as may be expressly permitted by, and in accordance with,
the terms and conditions of this Agreement, including the Exhibits hereto, or as expressly consented
thereto by the Developer.
Section 10. Minor Modifications. Minor modifications from the approved permits or the
exhibits attached hereto may be approved in accordance with the provisions of the City's code, and
shall not require an amendment to this Agreement.
Section 11. Further Discretionary Actions. Developer acknowledges that the Existing Land
Use Regulations contemplate the exercise of further discretionary powers by the City. These powers
include, but are not limited to, review of additional permit applications under Shoreline Substantial
Development Permit and Design Review. Nothing in this Agreement shall be construed to limit the
authority or the obligation of the City to hold legally required public hearings, or to limit the
discretion of the City and any of its officers or officials in complying with or applying Existing Land
Use Regulations.
Section 12. Existing Land Use Fees and Impact Fees.
A. Land use fees adopted by the City by ordinance as of the Effective Date of this Agreement
may be increased by the City from time to time, and are applicable to permits and approvals for the
Subject Property, as long as such fees apply to similar applications and projects in the City.
B. All impact fees shall be paid as set forth in the approved permit or approval, or as addressed
in Chapters 16.26 and 9.48 of the Tukwila Municipal Code.
Section 1. Assignment of Interests, Rights, and Obligations. This Agreement shall be
binding and inure to the benefit of the Parties. No Party may assign its rights under this Agreement
without the written consent of the other Party, which consent shall not unreasonably be withheld.
This Agreement shall be binding upon and shall inure to the benefit of the heirs, successors, and
assigns of the Developer and the City.
M.
Section 2. Incorporation of Recitals. The Recitals contained in this Agreement, and the
Preamble paragraph preceding the Recitals, are hereby incorporated into this Agreement as if fully set
forth herein.
Section 3. Severability. The provisions of this Agreement are separate and severable. The
invalidity of any clause, sentence, paragraph, subdivision, section, or portion or the invalidity of the
application thereof to any person or circumstance, shall not affect the validity of the remainder of this
Agreement, or the validity of its application to other persons or circumstances.
Section 4. Termination. This Agreement shall expire and /or terminate as provided below:
A. This Agreement shall expire and be of no further force and effect if the Developer fails to
submit a complete building permit application for the constriction of the hotel within one year, or if
the Project construction is not completed within three years, of the effective date of this Agreement;
or if at any time after Project construction is completed, Developer fails to maintain the parking areas
according to the terms of this Agreement. Nothing in this Agreement shall extend the expiration date
of any pen-nit or approval issued by the City for any development.
B. This Agreement shall expire and be of no further force and effect if the Developer does not
construct the Project as contemplated by the permits and approvals identified in this Agreement, or
submits applications for development of the Subject Property that are inconsistent with such permits
and approvals.
C. This Agreement shall terminate at such time as a change of use occurs at 90 Andover Park
East, or at such time as 90 Andover Park East is redeveloped.
D. This Agreement shall terminate in the event the Washington State Department of
Transportation (WSDOT) widens Interstate 405 in the vicinity of the Subject Property, or should any
other project or condition arise that requires reconfiguration of Tukwila Parkway and /or the Project
parking area.
E. This Agreement shall terminate upon the abandonment of the Project by the Developer. The
Developer shall be deemed to have abandoned the Project if /when written notice is provided to the
City that the Developer's interest in the Project has been terminated. Said notice shall be given to the
City no more than 30 days after the Developer's interest in the Project is terminated.
F. This Agreement may terminate pursuant to Section IV.,3, Severability, or Section IV.,10,
Default, or as otherwise outlined in this Agreement.
G. If the use will continue upon expiration of the term of this Agreement, the Developer shall
either negotiate a new agreement with the City or provide documentation showing how the number of
parking spaces required by the codes at the time of expiration will be provided.
EYA
Section 5. Effect upon Termination on Developer Obligations. Termination of this
Agreement as to the Developer of the Subject Property or any portion thereof shall not affect any of
the Developer's obligations to comply with the City Comprehensive Plan and the terms and
conditions or any applicable zoning code(s) or subdivision map or other land use entitlements
approved with respect to the Subject Property, any other conditions of any other development
specified in the Agreement to continue after the termination of this Agreement or obligations to pay
assessments, liens, fees or taxes.
Section 6. Effects upon Termination on City. Upon any termination of this Agreement as to
the Developer of the Subject Property, or any portion thereof, the entitlements, conditions of
development, limitations on fees and all other terms and conditions of this Agreement shall no longer
be vested hereby with respect to the property affected by such termination (provided that vesting of
such entitlements, conditions or fees may then be established for such property pursuant to then
existing planning and zoning laws).
Section 7. Specific Performance. The parties specifically agree that damages are not an
adequate remedy for breach of this Agreement, and that the parties are entitled to compel specific
performance of all material terms of this Agreement by any party in default hereof.
Section 8. Governing Law and Venue. This Agreement shall be construed and enforced in
accordance with the laws of the State of Washington. Venue for any action shall lie in King County
Superior Court or the U.S. District Court for Western Washington.
Section 9. Attorneys' Fees. In the event of any litigation or dispute resolution process
between the Parties regarding an alleged breach of this Agreement, neither Party shall be entitled to
any award of attorneys' fees.
Section 10. Notice of Default/Opportunity to Cure/Dispute Resolution.
A. In the event a Party, acting in good faith, believes the other Party has violated the terms of
this Agreement, the aggrieved Party shall give the alleged offending Party written notice of the
alleged violation by sending a detailed written statement of the alleged breach. The alleged offending
Party shall have 30 days from receipt of written notice in which to cure the alleged breach unless the
Parties agree, in writing, to additional time. This notice requirement is intended to facilitate a
resolution by the Parties of any dispute prior to the initiation of litigation. Upon providing notice of
an alleged breach, the Parties agree to meet and agree upon a process for attempting to resolve any
dispute arising out of this Agreement. A lawsuit to enforce the terms of this Agreement shall not be
filed until the latter of (a) the end of the cure period, or (b) the conclusion of any dispute resolution
process.
B. After notice and expiration of the ,30 -day period or other time period as agreed to by the
Parties, if such default has not been cured or is not being diligently cured in the manner set forth in
the notice, the other party or Landowner to this Agreement may, at its option, institute legal
proceedings pursuant to this Agreement. In addition, the City may decide to file an action to enforce
.;
the City's Codes, and to obtain penalties and costs as provided in the Tukwila Municipal Code for
violations of this Development Agreement and the Code.
Section 11. No Third -Party Beneficiaries. This Agreement is for the benefit of the Parties
hereto only and is not intended to benefit any other person or entity, and no person or entity not a
signatory to this Agreement shall have any third -party beneficiary or other rights whatsoever under
this Agreement. No other person or entity not a Party to this Agreement may enforce the terms and
provisions of this Agreement.
Section 12. Integration. This Agreement and its exhibits represent the entire agreement of the
parties with respect to the subject matter hereof. There are not other agreements, oral or written,
except as expressly set forth herein.
Section 13. Authority. The Parties each represent and warrant that they have full power and
actual authority to enter into this Agreement and to carry out all actions required of them by this
Agreement. All persons are executing this Agreement in their representative capacities and represent
and warrant that they have full power and authority to bind their respective organizations.
Section 14. Covenants Running with the Land. The conditions and covenants set forth in
this Agreement and incorporated herein by the Exhibits shall run with the land and the benefits and
burdens shall bind and inure to the benefit of the parties. The Developer, Landowner and every
purchaser, assignee or transferee of an interest in the Subject Property, or any portion thereof, shall be
obligated and bound by the terms and conditions of this Agreement, and shall be the beneficiary
thereof and a party thereto, but only with respect to the Subject Property, or such portion thereof,
sold, assigned or transferred to it. Any such purchaser, assignee or transferee shall observe and fully
perform all of the duties and obligations of a Developer contained in this Agreement, as such duties
and obligations pertain to the portion of the Subject Property sold, assigned or transferred to it.
Section 15. Amendment to Agreement; Effect of Agreement on Future Actions. This
Agreement may be amended by mutual consent of all of the parties, provided that any such
amendment shall follow the process established by law for the adoption of a development agreement
(see RCW 36.7013.200). However, nothing in this Agreement shall prevent the City Council from
making any amendment to its Comprehensive Plan, Zoning Code, Official Zoning Map or
development regulations affecting the Subject Property as the City Council may deem necessary to
the extent required by a serious threat to public health and safety. Nothing in this Development
Agreement shall prevent the City Council from making any amendments of any type to the
Comprehensive Plan, Zoning Code, Official Zoning Map or development regulations relating to the
Subject Property.
Section 16. Releases. Developer, and any subsequent Landowner, may free itself from further
obligations relating to the sold, assigned, or transferred property, provided that the buyer, assignee or
transferee expressly assumes the obligations under this Agreement as provided herein.
M
.•
Section 17. Notices. Notices, demands, correspondence to the City and Developer shall be
sufficiently given if dispatched by pre -paid first -class mail to the addresses of the parties as
designated under III Agreement, Section 5 Parties to Development Agreement. Notice to the City
shall be to the attention of both the Mayor's Office and the City Attorney. Notices to subsequent
Landowners shall be required to be given by the City only for those Landowners who have given the
City written notice of their address for such notice. The parties hereto may, from time to time, advise
the other of new addresses for such notices, demands or correspondence.
Section 18. Reimbursement for Agreement Expenses of the City. Developer agrees to
reimburse the City for actual expenses incurred over and above fees paid by Developer as an
applicant incurred by City directly relating to this Agreement, including recording fees, publishing
fees and reasonable staff and consultant costs not otherwise included within application fees. This
Agreement shall not take effect until the fees provided for in this section, as well as any processing
fees owed to the City for the Project, are paid to the City. This Agreement shall be terminated if the
Developer does not pay to the City the fees provided for in this section. Upon payment of all
expenses, the Developer may request written acknowledgement of all fees. Such payment of all fees
shall be paid, at the latest, within 30 days from the City's presentation of a written statement of
charges to the Developer
Section 19. Police Power. Nothing in this Agreement shall be construed to diminish, restrict
or limit the police powers of the City granted by the Washington State Constitution or by general law.
Section 20. Third Party Legal Challenge. In the event any legal action or special proceeding
is commenced by any person or entity other than a party or a Landowner to challenge this Agreement
or any provision herein, the City and Developer will collaborate to resolve such legal action. In the
event such legal action cannot be resolved, the City may elect to tender the defense of such lawsuit or
individual claims in the lawsuit to Developer and/or Landowner(s). In such event, Developer and /or
such Landowners shall hold the City harmless from and defend the City from all costs and expenses
incurred in the defense of such lawsuit or individual claims in the lawsuit, including but not limited
to, attorneys' fees and expenses of litigation, and damages awarded to the prevailing party or parties
in such litigation. Neither the City nor the Developer and /or Landowner shall settle any lawsuit
without the consent of the other. The City and Developer /Landowner shall act in good faith and shall
not unreasonably withhold consent to settle.
Section 21. No Presumption Against Drafter. This Agreement has been reviewed and
revised by legal counsel for both Parties and no presumption or rule that ambiguity shall be construed
against the party drafting the document shall apply to the interpretation or enforcement of this
Agreement.
Section 22. Headings. The headings in this Agreement are inserted for reference only and
shall not be construed to expand, limit or otherwise modify the terms and conditions of this
Agreement.
Section 23. Recording. Developer shall record an executed copy of this Agreement with the
King County Auditor, pursuant to RCW 36.70B.190, no later than 14 days after the Effective Date.
H
50
Section 24. Legal Representation. In entering into this Agreement, Developer represents that
it has been advised to seek legal advice and counsel from its attorney concerning the legal
ID tD
consequences of this Agreement; that it has carefully read the foregoing Agreement and knows the
contents thereof, and signs the same of its own free act; and that it fully understands and voluntarily
accepts the terms and conditions of this Agreement.
IN WITNESS WHEREOF, the parties hereto have caused this Development Agreement to be
executed as of the dates set forth below:
ATTEST-
M y F_ P�_-4
City Clerk,
By (Tri r UJ,- '
City Attorney
OWNER/DEVELOPER:
By
Its ManagingA 15 el,
Tukwila TSD LLC
21109 66 th Avenue South
Kent WA 98032
51
STATE OF WASHINGTON)
} ss.
COUNTY OF
STATE OF WASHINGTON )
ss.
COUNTY OF )
On this )s day of a , 2015, before me personally
appeared JIM HAGGERTON, and said person acknowle ed that he signed this instrument, on oath
stated that he was authorized to execute the instrument, and acknowledged as the MAYOR OF THE
CITY OF TUKWILA to be the free and voluntary act of said party for the uses and purposes
mentioned in this instrument.
o;,, �,y1,1 Pant name: �t i �� 4 F LA kQ/
NOTARY PUBLIC in and for the State of Washington
�'� 3 6 ,= s Residing at i t
J 9-
co
4q►���a��a��• Commission expires:
Exhibit 1 - Legal description of the Subject Property and the right -of -way.
Exhibit 2 - Conceptual Site Plan
52
12
''! • /1/
TRACT 4, ANDOVER INDUSTRIAL PARK NO. 1, ACCORDING TO THE PLAT
THEREOF !'! ! IN VOLUME •• OF PLATS, PAGE 36, RECORDS
COUNTY, #'
! ow- mup
EXCEPT THAT PORTION THEREOF CONDEMNED IN KING COUNTY SUPERIOR
COURT CAUSE NO. 592245, ACCORDING TO DECREE FILED JANUARY 14,
53
LEGAL DESCRIPTION
PARKING EASEMENT
NOVEMBER 18, 2014
PROJECT NO. 06007
AN EASEMENT FOR VEHICULAR PARKING PURPOSES OVER, ACROSS AND UPON
THE RIGHT -OF -WAY OF CHRISTENSEN ROAD, BEING LOCATED IN THE SOUTHEAST
QUARTER OF THE SOUTHEAST QUARTER OF SECTION 23, TOWNSHIP 23 NORTH,
RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON. SAID EASEMENT BEING
MORE PARTICULARLY DESCRIBED AS FOLLOWS;
COMMENCING AT THE INTERSECTION OF THE CENTERLINE OF ANDOVER PARK
EAST WITH THE CENTERLINE OF TUKWILA PARKWAY AS MARKED BY A CONCRETE
MONUMENT;
THENCE NORTH 84 044'00" EAST ALONG THE CENTERLINE OF TUKWILA PARKWAY
231.72 FEET;
THENCE SOUTH 05 016'00" EAST 40.00 FEET TO THE POINT OF INTERSECTION OF
THE SOUTH MARGIN OF TUKWILA PARKWAY WITH THE WEST MARGIN OF
CHRISTENSEN ROAD;
THENCE SOUTHERLY ALONG SAID WEST MARGIN ON A CURVE TO THE RIGHT,
HAVING A RADIUS OF 437.50 FEET, A CENTRAL ANGLE OF 00 °13'45 ", THE CENTER
OF WHICH BEARS SOUTH 80 038'25" WEST, AN ARC DISTANCE OF 1.75 FEET TO
THE TRUE POINT OF BEGINNING;
THENCE EASTERLY ON A CURVE TO THE LEFT, HAVING A RADIUS OF 35.00 FEET, A
CENTRAL ANGLE OF 28 038'13" EAST, THE CENTER OF WHICH BEARS
NORTH 23 022'13" EAST, AN ARC DISTANCE OF 17.49 FEET TO A POINT OF
TANGENCY;
THENCE NORTH 84 044'00" EAST 46.59 FEET TO THE BEGINNING OF A
NON - TANGENT CURVE TO THE LEFT;
THENCE SOUTHERLY AND EASTERLY ON A CURVE TO THE LEFT, HAVING A RADIUS
OF 16.94 FEET, A CENTRAL ANGLE OF 73 °30'10 ", THE CENTER OF WHICH BEARS
NORTH 87 022'15" EAST, AN ARC DISTANCE OF 21.74 FEET TO A POINT OF
REVERSE CURVATURE;
THENCE EASTERLY AND SOUTHERLY ON A CURVE TO THE RIGHT, HAVING A
RADIUS OF 2.50 FEET, A CENTRAL ANGLE OF 72 04537 ", THE CENTER OF WHICH
BEARS SOUTH 13 052'05" WEST, AN ARC DISTANCE OF 3.17 FEET TO A POINT OF
COMPOUND CURVATURE;
THENCE SOUTHERLY ON A CURVE TO THE RIGHT, HAVING A RADIUS OF 1547.72
FEET, A CENTRAL ANGLE OF 09 037'47, THE CENTER OF WHICH BEARS
SOUTH 86 037'42" WEST, AN ARC DISTANCE OF 260.13 FEET;
THENCE NORTH 84 006'43" WEST 43.00 FEET TO THE BEGINNING OF A
NON - TANGENT CURVE TO THE LEFT;
PAGE 1
54
E.
'o
W-
903
� /// 0// �,
PAGE 2
55
EXHIBIT 1 -C
VEHICULAR PARKING EASEMENT AREA
W — 267_.49'
N 8- 4 _ N
231.72' S - - -� '
PARKWAY o o°
� TUKW►LA _,m
N B4'44'00" E
159.38'
R= 437.50'
R=50.00' A= 08'36' 24"
0= 84'56'09" L= 65.72'
L= 74.12'
I
30' 40'
,
,
I
,
I
Q /
, � Q
w T.L. NO. 022300 - 0040 -03 /0
�C
0) cn r / Z , 3:
0 co
� N (
o T r Lo
x O O /W;�
? Z Z /��0
0 Z
Z U
(� 211.59'
,
o N 89'47'51" E
o I
o
I SHY E
sy I ,
30 I b 40'
18903
1 = 50 /FS /sT��E l
TIM HANSON AND ASSOCIATES
8255 CULTUS BAY ROAD
NOV. 2014 CLINTON, WA 98236
PROJECT NO. 06007 PAGE 1 OF 2 425.822.7271
56
�
of sy
CURVE
DELTA
EXHIBIT 1 —C — CONT'D.
RADIUS
RADIAL BEARING
C1
VEHICULAR PARKING
EASEMENT AREA
437.50'
S 80'38'25" W
C2
28'38'13"
17.49'
231.72'
N 23'22'13" E
C3
73'30'10"
21.74'
16.94'
o;
C4
72'45'37"
3.17'
2.50'
S 13'52'05" W
rn
0 0;0
1
260.13'
1547.72'
S 86'37'42" W
C6
Fm
28.83'
1504.72'
N 83'43'52" W
C7
93'47'54"
40.93'
25.00'
N 84'49'45" W
C8
8'22'39"
63.97'
Cl C2
S 89'14'49" W
TPOB
I
�
I I
I
I
CURVE
TABLE
j
' I
' I
I
I
I
w
I
II
LINE TABLE
i I
I
I
I I
I
I
I
I
j I I
I
I
L---kL2
, o ;
I
18903 p
1" = 50'
C /STE�
'�yL
LAt A
TIM HANSON AND ASSOCIATES
8255 CULTUS BAY ROAD
NOV. 2014
PROJECT NO. 06007
PAGE
2 OF 2
CLINTON, WA 98236
425.822.7271
CURVE
DELTA
LENGTH
RADIUS
RADIAL BEARING
C1
013'45"
1.75'
437.50'
S 80'38'25" W
C2
28'38'13"
17.49'
35.00'
N 23'22'13" E
C3
73'30'10"
21.74'
16.94'
N 87'22'15" E
C4
72'45'37"
3.17'
2.50'
S 13'52'05" W
CS
9'37'47"
260.13'
1547.72'
S 86'37'42" W
C6
1'05'52"
28.83'
1504.72'
N 83'43'52" W
C7
93'47'54"
40.93'
25.00'
N 84'49'45" W
C8
8'22'39"
63.97'
437.50'
S 89'14'49" W
NUM
BEARING
DISTANCE
L1
N 84'44'00" E
46.59'
L2
N 84'06'43" W
43.00'
L3
N 00'45'11" W
152.13'
M-17
Hux.mm
W.*
HOLIDAY INN EXPRESS
EXTERIOR LIGHTING GUIDE
AMERICAS REGION
Revised 05 -12 -15
CURB ARC' -A
n " —he Rea ;Nord__ your door is an inviting beacon. vvnen you arrive, you know
you are safe and in the right place. Enhanced design elements at the approach
and entry work together to create this kind of "Real World" we come by creating
an energized and branded sense of arriva that is universa y recognizab e.
•. =..:R_
.nn =r:n' <- § C=bal Brand Rel-. 1nC> ides Americas . -.;:. ;Fn CURB APPEt .
Lighting
Experience:
Facade lightscaping is a Sig, ature
Brand element, used to dramatically
reinforce the Holiday Inn Express Brand
with illuminated color. Colored beams
of light are strategically cast on the
building facade to provide guests
with a visually impactful and intuitively
recognizable cue for way finding to the
property. Additionally, colored light
beams cast along the columns at the
entry provide secondary way finding
to the entrance dramatically
,g the arrival experience.
Essential Elements:
• Brand specified facade and
column lighting
Building ^ g~t ^ ng
NOTE'S:
ALL fixtures should have Universal Voltage Ballasts
Stories referenced are indicative -of the number -of stories the ight is
traveling upme building facade -nmme number m stories m the hotel.
• Locations with six -or n-ore stories. -or -ocati-ons that are oredorninanty
glass: need to be assessed individually and will require custom solutions.
Fixture Type 1
To be used to light 0-1 stories
rmxcmH
Fixture Type 2
To be used to light 2+ stories
150w CMH
Semi Gloss Satin
Holiday inn Express Global Brand Relaunch Hallmark Guides Americas Region CURB APPEAL
Requirement:
A minimum of two up to a maximum of four
light fixtures must be installed meffectively
light the site-specific facade details, Lights
must be cast and narrowed to a visually
defined beam uron the taade and between
windows. xnenem|Unhr wash onthe
buildina or liahts shinina onto windows is
not permitted.
The ight fixtures cn be dIusted on two
axes for proper beam aiming, as well as
adjustable apertures for refined beam
control and shaping.
Ail building light fixtures should bemoumed
at a consistent Above Finish Floor (AFF)
height and discreetly located above the
no,tororxo,o,
Quantit\ mounting ocation and amp
wattage must be determined based on
specific property conditions, x site specific
lighting pan must be submitted for approva
to HG Pan Review prior to instaUation.
Secondary entries or exterior wall surfaces
which are prominently visible from various
building approaches may also be good
locations for additional buildina liahtina.
Hotels are permitted, but not required, to
install additional sets of liahts in secondary
and tertiary locations, s with front entry,
application o[ light fixtures sou:d be in
grous of two to four, based on secific
property conditions. For optional
installations, o site specific lighting plan
must be submitted for approval to HG Plan
Review.
13
Guidelines For Building Lighting Spacing
NOTE: Each &@ beam is
eo« than +(91;mm)
Holiday mnExp@a Global Brand I
kGu
Americas Re
»(9,1-0 -
CURB APPEAL
m w«*
e« )
Building Lighting Priority
rst Priority-Fr n Entry - (Mandatory)
NOT:: Each iight bear E is
>e no U der than 3' (915 r )
Holiday _r r Express G_oba_ Brand
kGu
—meccas Re
Second Pr r_ty Fr r Facade s r k_r Entry
Third Priority -Side Elevations
CURB APPEAL
Column Sconce Lights
Shroud Renderings
Dime sic ns: 1 3C.
Holiday _nn Express G oba Brand e ci
ides
ure Type
70w CMH
Semi Gloss Satin
ricas Region CURB APPEAL
Required:
All hotels must install two sconce
fixtures on columns at primary hotel
entry. The sconce lighting fixtures should
be installed on the front facing portion
of the outermost left and right columns.
For hotels with no columns, the column
light fixtures must be installed to t
and right of the entry door.
The column sconce i gi
primarily intended to be a single down
light application, with a decorative
Holiday Inn Express square branded
shroud. If columns are less than 12::
(305mm) in diameter, shroud should
not be used.
X1l column light fix fixtures could be
Finish Floor (AFF) height towards the
t three g tartars of the column or
present. Consideration sho lid be given
t o actual site- s chitectural details
and other existing light fixture placement
in determining actual light mounting
1.6
Column Sconce Lights
Nan View
Preferred Column Layout
IF THERE IS NO PORTE
COCHERE THEN INSTALL COLUMN
U-115 THrs LOCATM
0
NEW CIXIATI MOUNTED
EKTERICR LCHT1NG – SEE /
DUAL UN SHEET EA-3H —r
Nan View
Alter-r ate Column Layout
Holiday inn Express Global Brand Relaunch Hallmark Guides Americas Reqion I CURB APPEAL
Formula Blue "X Lights
Shroud Renderings
Din m:. s:6'(1 etet
ure Type
5w LED
Semi Gloss Satin
Ho aay nn Express coba Brand R aund
ides
ricas Re /on CURB APPEAL
Recommended:
The Formula Blue "X" Tight is an
optional feature to enhance the
sense of arrival.
L6
Exterior Lighting Information
ures
Deco LL Phone: 866 248_6300 Email: sales@decorsusa.com Web: www.decorsusa.com
arranty Info
Limited Twenty-Four
DecorsUSht LC warrants to
sale by bA is free of
frorn t ase date. This.
warranty e.
toil duct is
ann
and there is
cts
r,t'-
i
Fixtn
uses jai _ not for the Ie 'f t mime ease, that this product at the roe of t
a er als and ' rikmans under for ,c_ and propel j fo " nt tf0j r a 1t s
-chased aar1 installed in ±_ e` : S, . This
as or or =removal o tn_s ` goduct or r a__a1 41 This rraar t is
DecorsUSA, LLC or
ed improper , or in a improper environment, t o rloaded, misused rib
E
any
not used under normal opera � rconditions r not in accordance with and s -tructions. h er ,
other or im ranties of any 1.
warranty is r _ _ x > ae €app _ a
for ar laa rpe _-
consequential damag mitt
ure to orri S warranty
mar `, ..the based on contra
th
ac, L
and , tries for a pa friar purpose, but it as ; wr
ne Lollar
any o
od to two ea , net-torsJSA, LC is not liable for
What
` Jr Vie-
o taetor
damage to
The remedies provided he in are the ex o a
aer _se.
al , _ - _ r ,e c a taa all
d equipment
ye, ' 'e V reaa
4_00
Deruo_ s S ,_LC i r' o such de.eo 't o _ aOe e
t' ur i o purch date, proof of o= o.se and a
DecorsUSA, I LC Attention: Quality Assurance,5005 Newport Drive Suite 204,Ro
eplace it at ] , charge t
e-mail ail i su ort decorsus .co ,
out spy` -_a-
sales or pro
Pled o -grader
IoI
day Inn Express Global Brand ReIaunc
Ilra ar Guides Americas Region CURB APPEAL
chaser € d
=eda_ first
c _em to:
rag eadows.1L66668.
8ft
10 ft
12 ft
14 ft
2 or 3" c-W
Custom Sizes
Ave: able in widths and len,
lure-rents up to 4 ft x 14 ft
• galvanized steel wire paneit;
baked on powder coat finish
green
- black
siiver
white
custoii
''''';•( '• '.-v''''"';'.- ,.-' .,*,,.,; :- ---.. . -,,;:. „ .
t; ' --'!"-;:',46‘,. :T: ,', -•. ': ., .,:-., -si,:, -: - .• • - .
,.,:,.-44.`•i-,•-`1:, . - l• • - ' - ,-,
• g.: ,,.. , , , , ,i., _,-..- i. ,..,t..f,!. „f ,;•., ' ''
„; - s,, • ._ ',1,',":-. ::-. 'f.'--•_ . ' T:,..---, P.'. .
•A - -..•-7
•• ' ;''' ..i- • . -----4,
, ,
_ ,, .,...,,, --..,,,
ir-.4.----iii,--.4„,. •
:_• ...- - - ,
''--4:4 ')JIit,,, -.
• .■rr-
_
•.'.. r' ' ' ‘::'''. ' L- . ' - '
.-..c.,.
t
•
Mounting Hardwa
ft..•I range avai•able
•
/114 P f
i A 1
Wall Mounted Green Facade Trellis Pane
The greenscreen® trellis system can transform blank
concrete or masonry walls into soft-textured, vine
covered, seasonally varying surfaces commonly
referred to as 'green facade walls.' The elements are
simple and the possibilities are endless for mounting
modular or shaped panels near entries, around
windows and in interior courtyards as a living plant
matrix that covers all or part of a building facade...
the examples are many!
Our system of engineered mounting accessories is
esigned to hold greenscreen® trellis panels off the
building surface, protecting the building's waterproof
membrane from direct plant attachment and
transferring the weight of the plants to the screen
structure and the wall. Integrate wall mounted
greenscreen5 elements into new construction or
retrofit to existing buildings with adjustable clips that
adapt to uneven surfaces. Panels can be stacked
side to side or top fo bottom to cover larger areas.
•
4
. ,
'TV.v X.14
ospital, Houston, TX
LU
d 1 N 3 IN H OV1IV
elements
6
Z
�5
F
t3
Z
cc
22
EE
Zo
70
ln-
Z
Z
U
U
Z
iv
Z
x
O
a.
,g ol wns
UP TO 4'- 0 MAXIMUM
IN 2" INCREMENTS
Wall Mounted
This example showing multiple rnod(Alar panels in
a waH bung application references typical trims
and clips frorn our Accessory Items list, Combine
custom screen sizes and profiles fore YOUr own
Unique greenscreene.
PANELTRIM,
5104/5105. OPTIONAL.
MOUNTING CLIP 51328 WITH
5136 SPACER
SEE SUPPORT PLACEMENT
GUIDELINES FOR LOCATION
5 1 32G OPTIONAL
5131 FLEX "C"' RING FOR PANEL
ALIGNMENT OPTIONAL
C cc
5105 PANEL TRIM AT BOTTOM
RECOMMENDED
NO PANELTRIM
REQUIRED @ BOTTOM
PANEL EDGE
FINISH GRADE
t,c c o,5 C rcc^' 1743 S. La Cienega Blvd, Los Angeles CA 90035 T - 800.450,3494 www.greenscreen.corn
I
■
111M.,
0
Figure 18 -23: Neighborhood Corridor Standards
ATTACHMENT G
APPLIED TO:
Existing Streets: Andover Park E. (Tukwila
Pkwy to Trek Christensen), Trek Dr, Industry
Or, Minkler (Andover Park E.), to River, Wig
Dr, Bauch Dr, Nelson PI, S. 156th St
New Streets: As indicated on Corridor Type
Map
Note: This is a summary of key corridor standards. See 18.28.120 to .210 for supplemental details.
THOROUGHFARE • • 4I
Existing street No change
New street See new cross - section
Total required 15 ft; 10 ft on Minkler
width minimum
Landscaping Street trees, located at back of curb face. On
Minkler, trees in a continuous landscaped strip
a minimum of 5 ft wide located at back of curb
face. Also, see 18.28.240 General Landscaping.
Tree spacing 20 -30 ft, depending on species.
Lighting Pedestrian and vehicular -scale decorative street
lighting.
BUILDING ORIENTATION/PLACEMENT
.0 •0
Building orientation to Required
streets/ open spaces
Front yard setback 15 ft
minimum
On -site surface parking
locations
Side or rear of building.
Street Front: 1 double - loaded aisle of
parking between building and primary
street (maximum 63 ft in width). Z
Front yard landscaping 15 ft of streetscape
minimum (waived if Public
Frontage Improvements are built to
standard)
Facade articulation increment
Commercial /mixed -use maximum .......- ..-- _,.... -50 ft
1
f— B ,of I,Jr,=vz;lk
�., , 15Xi
,,sdew,Tfk
Public frontage
�I .....• *.4 � rib i' b I G .....,..r�.,.. li4 G� ._!I... de.Gti' 11�.".."T +;i�
New thoroughfare cross - section
Transparency
ISrri% min
Articulation SI,Y rz2�tx
Facade articulation and ground level transparency
_.. ....... ._ -_
Residential maximum 30 ft
' New street south of Tukwila Pond shall only have on- street parking on
Major vertical modulation maximum 120 ft the south side of the street.
._n. �. � e -.mm
Ground level transparency
Commercial -use minimum 50%
71