Loading...
HomeMy WebLinkAboutUtilities 2015-08-25 Item 2B - Update - 1227 Andover Park East Emergency Sewer Repair (Central Business District Sanitary Sewer Rehabilitation)City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY: Mike Cusick, PE, Senior Program Manager DATE: August 21, 2015 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Emergency Sewer Repair at 1227 Andover Park East ISSUE Update Utilities Committee on an emergency sewer repair at 1227 Andover Park East. BACKGROUND City staff was in the process of cleaning the sanitary sewer in Andover Park East in preparation for the 2015/2016 CBD Sanitary Sewer Rehabilitation Project. The jet head used for cleaning became obstructed and medium to large gravel debris was present within the sewer system, indicating a possible break in the sewer main. The City contracted with Bravo Environmental to video the sewer line. During the videoing their camera became lodged in a hole in the bottom of the pipe and could not be removed. It was determined that it was necessary to excavate the sewer main in order to remove the camera and determine the extent of the damage to the sewer main as an emergency situation. DISCUSSION R.L. Alia (Alia) was hired to perform the necessary emergency excavation on a time and materials basis. Bravo Environmental's camera was extracted and the repair of the pipe is the next step. The extent of the pipe repair will be determined after the damaged section is exposed for visual inspection. FISCAL IMPACT The repair work being completed by Alia is being performed under force account to track all actual costs. This work will be paid for using 2015/2016 CBD Sanitary Sewer Rehabilitation Project funds. RECOMMENDATION Information only at this time. An emergency declaration Resolution will be brought back to a future Utilities Committee meeting. Attachment: Photo W: \PW Eng \PROJECTS\A- SW Projects \CBD Sewer Rehabilitation (91140203) \Info Memo SS Repair at 1227 APE - RRT- gl- sb.docx 5 1227 andover east sewer south downstream north 12 asbestos cement