Loading...
HomeMy WebLinkAboutPermit D06-046 - Stepping Stone Ventures #46 - Mobile HomeSTEPPING STONE VENTURES UNIT 46 14005 42 AV EXPIRED D06 -046 Parcel No.: 1523049008 Address: 14005 42 AV 5 TUKW Suite No: City ei Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: ci.tukwila.wa.us Tenant: Name: STEPPING STONE VENTURES Address: 14005 42 AV S, UNIT 46, TUKWILA WA Owner: Name: ANDERSON CARL AUGUST Address: 10212 NE 43RD, KIRKLAND WA 98033 Phone: Contact Person: Name: ERIN O'LEARY Address: 20303 10 AV W, LYNNWOOD WA 98036 Phone: 206 484 -3840 Architect of Record: Name: - Address: , Phone: Engineer of Record: Name: - Address: , Phone: DESCRIPTION OF WORK: INSTALL AND SET UP OF MOBILE HOME DEVELOPMENT PERMIT Contractor: Name: ESE CONSTRUCTION INC Address: 7189 F & S GRADE RD, SEDRO WOOLEY, WA 98284 Phone: Contractor License No: ESECOI *000RA Expiration Date:12 /01/2007 Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: D06 -046 Issue Date: 03/16/2006 Permit Expires On: 09/12/2006 Value of Construction: $1,150.00 Fees Collected: $96.01 Type of Fire Protection: NONE International Building Code Edition: 2003 Type of Construction: Occupancy per IBC: 0022 doc: IBC-PERMIT * *continued on next page ** 006 -046 Printed: 03 -16 -2006 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Sanitary Side Sewer: N Sewer Main Extension: N Private: Public: Storm Drainage: N Street Use: N Profit: N Non - Profit: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: City the Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206- 431 -3665 Web site: ci.tukwila.wa.us Water Main Extension: N Private: Public: Water Meter: N Permit Center Authorized Signature: II\I Print Name: r. Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number: D06 -046 Issue Date: 03/16/2006 Permit Expires On: 09/12/2006 Date: 6 j n710 I hereby certify that I have read and l�x�miriedthis permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constru or the pert rmance of work. I am authorized to sign and obtain this development permit. Signature: t Date:C B71 L /0 �rt h al-ex -ex the o This permit shall become null and void If Work Is not commenced within 180 days from the date of Issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doe: IBC-PERMIT 006-046 Printed: 03 -16 -2006 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 1523049008 Address: 14005 42 AV 5 TUKW Suite No: Tenant: STEPPING STONE VENTURES 1: ** *BUILDING DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS Permit Number: D06 -046 Status: ISSUED Applied Date: 02/10/2006 Issue Date: 03/16/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the Inspectors prior to start of any construction These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or Intemational Residential Code, International Mechanical Code, Washington State Energy Code. 5: All wood to remain in placed concrete shall be treated wood. 6: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Department of Public Health - Seattle and King County (206/296- 4932). 8: All electrical work shall be Inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248- 6630). 9: VALIDITY OF PERMIT: The Issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors In the construction documents and other data. 10: ** *PLANNING DEPARTMENT CONDITIONS * ** 11: Manufactured home must be set back 5 feet from S. 141st Street property line. doc: Conditions * *continued on next page ** D06 -046 Printed: 03 -16 -2006 City of Tukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: �� Date: � /4 /6 t, Print Name: Cr: h L -@'i ✓ doc: Conditions D06 -046 Printed: 03 -16 -2006 fa * t •■•••••• na an rnian s t aps worm 1/44e in ra0 2 Permit Center ace 6300 Southcenter 81vd, Suite 100 Tukwila, WA 98188 I rrE,A 0, E-Mail Addrms: iSats I g Venal *nice elentsipnit spprocado•V-201111) .V.4e.#•-•!••••ne, • •••••••■••..• 'Ito,: -, .. . - L-MithanietilPetidit No r'• - -;:*itliO:Wiiikiteiiiiii - iSlii; . .....-... .. . . . . . Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** King Co Assessor's Tax No.: lc 2 4a4 Site Address: I 1 100.5 * L ia " 'WC.. 5 Suite Number: Floor Tenant Name: New Tenant 0-... Yes 0 ..No Mailing Address: Property Owners Name: CS 0 " v..S4 Ve.-ti +WO& Lt_c_, Li L.....%, A ilikleltyP • ay wA tic30,3c, /NO Company Name: Mailing Address: at, Same rIP Contact Person: Day Telephone: E-Mail Address: Fax Number Company Name: Mailing Address: Car • Sus Contact Person: Day Telephone: E-Mail Address: Fax Number. Name: ..4 la CY Lear, y Day Telephony acgt il 0 38 0 Mailing Address: ;an ,AC12% i 10 Ave-. (i.-) i-th marry° VA t ine Fax Ntimber: Lia c 1 a03 1 GENERA5 , tteNtRAPD_RPar 1 10.41 1 0. 10 lgeithanical gialneketintealat09411:gaitkeiT-1---.: ,.. :-. I- I _ ... Company Name: E S r.. rah.c4yvr±6V1 1 Lik. Mailing Address: — i r i Pil F S G r A /a — F.4 6 ( atg ( e l et 2( 8 1 1 car Contact Person: ea n oo: Irl, .1 Day Telephone: ?)(r) s T15 Cp "5 E-Mail Address: Fax CIINCO Ft 54, ril 3 II 5 C011traCtOr RegignitiOR Numbai FSP.. CO t + CO g • A- Expiration Date: /- 06 "An original or notarized copy of =lent Washington State Contractor License must be presented et the lime of pent* issuance" [BUILDING PERMIT INFORMATION = 206.431- -3670 Valuation of Project (contractor's bid pricer S 1) 50 Existing Building Valuation: $ r 0 Scope of Work (please provide detailed information) ' tVS4x 1 p Will there be new rack storage? ❑..Yes If "yes", see Handout No. Provide All Banding Areas in Square Footage Below for requirements. p Illoint 1 to 44f mum PLANNING DIVISION: Single - family building footprint (manna laudation oral Moves. plus ay dodo over It ruches sod avaaaags peaty than 1* Wets) *For an Accessory dwelling, provide the following: Lot Area (sq It): Floor area of principal dwelling: Floor area for accessary dwelling: *provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact Handicap: Will there be a change in use? ❑—Yes ❑..No If "yes", explain: FIRE PKOTECrIOrURAZARDOUS MATERIALS: 0.. Sprinklers 0-Automatic Fie Alarm None ❑ . Other (specify) Will there be storage or use of 8anmtable, combustlble or bar materials in the buik ing? ❑..Yes 0-No 1f yest attach list of materials and storage locations' on a separate 81/2111 paper brdknting quantities and Material Safety Data Sheets. Existing Interior Remodel Addition to F.iding Structure New 'lope of Construction per IBC Type of Occupancy per IBC l Floor D Floor 3i Floor Floors .Batemrnt - . Accessory Structures Attached Garage Detached Garage Attached Carport . Detached t arport Covered Deck .. Uncovered Deck [BUILDING PERMIT INFORMATION = 206.431- -3670 Valuation of Project (contractor's bid pricer S 1) 50 Existing Building Valuation: $ r 0 Scope of Work (please provide detailed information) ' tVS4x 1 p Will there be new rack storage? ❑..Yes If "yes", see Handout No. Provide All Banding Areas in Square Footage Below for requirements. p Illoint 1 to 44f mum PLANNING DIVISION: Single - family building footprint (manna laudation oral Moves. plus ay dodo over It ruches sod avaaaags peaty than 1* Wets) *For an Accessory dwelling, provide the following: Lot Area (sq It): Floor area of principal dwelling: Floor area for accessary dwelling: *provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact Handicap: Will there be a change in use? ❑—Yes ❑..No If "yes", explain: FIRE PKOTECrIOrURAZARDOUS MATERIALS: 0.. Sprinklers 0-Automatic Fie Alarm None ❑ . Other (specify) Will there be storage or use of 8anmtable, combustlble or bar materials in the buik ing? ❑..Yes 0-No 1f yest attach list of materials and storage locations' on a separate 81/2111 paper brdknting quantities and Material Safety Data Sheets. PUBLIC WORKS PERMIT E1FORMATION -204- 433-0179 Scope of Work (please provide detailed informations Please refer to Public Works Bulletin /1 for fen and estimate *beet Water District U_Tukwila ... Water District 1125 ❑_Water Availability P U -` ViIVucc ❑..Renton 0 -Sewer Use Calificate -Sewer AvailalalityPdovided ❑..Approved a system, pr�We 2 espies der cu rrent septic ❑-Seattle ❑- Sep<ic System- For matte design approve/ by fang Comity Health Department. b _Civil" Plans (Maximum Papa Sae -22" x 34") ❑ _Technical information Report (Sturm Drainage) ❑_Road 0_ insurance ❑_ Easanmt(s) -Right-of-way Use- Naopmtt for less than 72 holds ❑ -Right-of-way Use -No Disturbance ❑ _CmuandiaJExeavatiodrd l - Right-of-way Non Right- of -way ❑ -Total Cut cubic yards ❑ _Tau! Fd1 cubic yards ❑_Sanitary Side Sewer 0-Cap or Remove Utilities ❑-- Frmmge kuprovat ats ❑_Tarts Control ❑"."Backllow Prevention - Fie Protection ❑._Permanent Water Mary Size_ ❑_Temporary Water Meter Sore_ ❑ _Water Only Meta Size._ _Sewer Main Extension —Public _Water ManFvtnemr Public FIN& CE 1NFORMAT[ON Fire Line rue at Meaty tine _ ❑_Water ❑_Sewer Domestic Water - CA before you Dig: 1. 800 - 5555 ❑ - Abandon Septic Tank ❑ _ Ctub Cut ❑ Pavase nt Cm ❑ _ Looted Fie Line Wes WOO WOO Private Private ❑ _ Theta= ❑ .. Work in Flood Zone ❑ - Scam Dntinago Number of Public Fire Hydrants) ❑ _Sewage Treatment Mon hly Savior: BOGna m: Name ❑ _Renton ❑ - Qwtediaiat Report 0-Traffic Impact Analysis ❑ - Maintenance Agmement(s) 0-Hold Harmless ❑ - Right-of-way Use - Profit k r less than Tl hours ❑ .. Right-of-way Use - Potential Disturbance ❑ - Crease interceptor ❑ - Chaooetimtion ❑ _ Timch Motivation ❑ - Utility Undaganmding 0-Deduct Water Meter 31ia� Day Tekphm Mailing Address Car same Zip Warta MeowRctind/Bdllmc Name Telephonm Mailing Address Sale Do Unit Type: Qty Unit Type Qty Unit Type Qty Boiler/Compressor: Qty Furnace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0-3 HP /10%000 BTU . Fumace>100K BTU Evaporator Cooler Difiiixr 3-15 HP/500,000 BTU Floor Furnace Ventilation Fan Connecad to Shale Duct T crmestat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Rata VentilationSystan Wood/Gas Stave 30-50 HP /1,750,000 BTU Appliance Vat Hood and Duct Water Heater 301- HP /1,730,000 BTU Repair or Addition to Heat/Refrig/Cooling System hteinaalar -Domestic Emergency Geometer Air Handling Unit <10,000 CFM Inanaaor— Cotmnllud Other Mechanical Equipman MECHANICAL CONTRACTOR INFORMATION Company Name: Mailing Address: c+r shy rip Contact Person: Day Telephone: E-Mail Address: Fax N[mtber. Contractor Registration Number. Expiration Date: "An original or notarized copy of currant Washington State Contractor License must be presented at the time of permit issuance" Valuation of Project (contractor's bid price): S Scope of Work (please provide detailed intonation): Ilse: Residential: New --CI Replacement.....% Commercial: New... .0 Replacement__❑ Fuel Type: Electric X. Gas._ 'Outer: Indicate type of mechanical work being installed and the quantity below: Value of Construction — o all cases, endue of construction amount should be entered by the applicant This figure will be reviewed and is subject to possible revision by the Permit Center to comply with ameot See schedules. Expiration of Plan Review — Applications for which no permit Is issued within ISO days following thedate of application shall expire by limitation. The Building Official may extend the time for actin by the applicant tin a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform BuildngCode (anent edition). No application dial be wattled more than once. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNORA Signature: C T " .O Print Name: 9 k / to (Y c yt DayyTelephone: (o TD r� 803C-to 0 c.h.J Mailing Address: B I �ttn ! -P (,e k.) k yon I'1 btMe'e� IN A °r 8c 3C-to 1 Date Application Accepted: Val Pis* c dimenall WOWS OW 02' tt , Ue Date Application Expires: Page4 178 l0• Cie Date: c9- — Q -O 4P 1 Staff Initials: I 1 RECEIPT NO: R06 -00351 Initials: JEM Payment Date: 03/16/2006 User ID: 1165 Total Payment:659.56 Payee: STEPPING STONE VENTURES, LLC SET ID: 0315 SET NAME: STEPPING STONES SET TRANSACTIONS: Set Member Amount D06 -042 59.96 D06 -043 59.96 006 -044 59.96 D06 -045 59.96 D06 -046 59.96 D06 -047 59.96 D06 -048 59.96 D06 -049 59.96 D06 -050 59.96 D06 -051 59.96 D06 -052 59.96 TOTAL: 659.56 TRANSACTION LIST: Type Method Description ACCOUNT ITEM LIST: Description BUILDING - RES STATE BUILDING SURCHARGE City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 SET RECEIPT Amount Payment Check 6064 659.56 TOTAL: 659.56 Account Code Current Pmts 000/322.100 610.06 000/386.904 49.50 TOTAL: 659.56 Steven M. Mullet, Mavor Steve Lancaster, Director 3621 03/16 9716 TOTAL 659.56 Cit n� Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431 -3670 Fax: 206 -431 -3665 SET RECEIPT Copy Reprinted on 02 -10 -2006 at 14:28:20 02/10/2006 RECEIPT NO: R06 -00200 Initials: JEM User ID: 1165 Payee: STEPPING STONE VENTURES, LLC SET TRANSACTIONS: Set Member Amount D06 -042 D06 -043 D06 -044 D06 -045 D06 -046 D06-047 D06 -048 D06 -049 D06 -050 006 -051 006 -052 TOTAL: ACCOUNT ITEM LIST: Description PLAN CHECK - RES 36.05 36.05 36.05 36.05 36.05 36.05 36.05 36.05 36.05 36.05 36.05 396.55 000/345.830 TOTAL: Steven Mu(iet. Mavor Steve Lancaster, Director Payment Date: 02/10/2006 Total Payment: 396.55 SET ID: 021006 SET NAME: STEPPING STONE VENTURES TRANSACTION LIST: Type Method Description Amount Payment Check 6035 396.55 TOTAL: 396.55 Account Code Current Pmts 396.55 396.55 2348 02/10 9716 TOTAL 396.55 ESE Construction Inc. 7189 F &S Grade Rd. Sedro Wooley, We. 98284 360. 7083899 3603664346 fax WAINS 01937 11105 ESECOI'"OOORA 12106 s+ Ron Saint President Any size manufactured home 12'14'116' wide to 70' long State approved tie downs even/ 11' on center Typical blocking and tie down Installation to Washington state code 8x8x1 6 hollow concrete blocks set on 2 ea. 4x4x8 solid concrete blocks (pad) Or state approved metal stands on pads with wood shimes and wedges. Foundation pier blocking 8' center to 12' center CITY OF TUKWILA FEB 2 3 2006 PERMIT CENTEh Manufactured Home Main Beam Perimeter block at every door and window larger than 48" MATERIALS C AL C UL A TI O NS.� ... - I Q, Q w LIU wri 2i 1� 5 ProGuard RECEIVED CITY OF TUKWILA FEB 2 3 2006 PERMIT CENme rough-sawn t ible to s ted center num al and centerren t �O y esign fo 7 i • i' Jn Y 1a o :o instal( vie.: .\ t9 4 Lifetime Wa3ty 4.0 V vrnY I ,q wh:iC 4 . White btr- %'r"80JJ 1A:0_r September 21, 2005 Mr. Scott Moreno Minute Man Products, Inc. 30S West King Street East Flat Rock NC 28726 Dear Scam Sincerely Minute Man I. t 'Mine 682 0268 ze Pacific Consulting Engineers 09/22/06 08168am P. 002 7104O40K1GJ r.r„ 2150 Bell An., Sane 143 • Ssmmenw, CA 93831 • (616) 561.6028 • Fr: (916)364.6029 RE: State of Washington Engineer's seal ar David A. Dahrnen P.E. 'Z Fr ie \ Copp eto e atioo Pat? � seaos Please be advised my Washington Engineer's license has been renewed to 7117107. I have Stamped and signed by seal on this lever. I have re- sealed the Engineered Tie Down plan and details with the updated WA seal and have mailed the plans to you for your use. INCOMPLETE RECEIVED cnyorrum LTR# I MAR 10 2006 TDTPL 1 1 pEilarceur Ir CORRECTION LTR# p6o4& Minute Man 828 882 0268 2r 09/22/05 08e68em P. 003 • - e MINUTE MAN ANCHOkkS, INC. 305 WEST XING STREET LAST FLATROCE, NC 28126 PH: (SOO) 438 -7277 ENGINEERED Tffi DOWN SYSTEM DESIGN & GENERAL NOTES DESIGN LOADS: ' WIND 15 PSF • SOIL BEARING 1000 PSF • TIE DOWN STRAP - 31504 WORKING LOAD ' SEISMIC ZONE 4 ST APS TO BE MIN. 1 114" WIDE x 0.035 THICKNESS ZINC PLATED AND STM D.395391 • EARTH AUGERS 2962# MIN. (TESTED TO 47504 MIN.) • CROSS DRIVES 1727 it (CALCULATED) • CONCRETE SLAB ANCHORS 13904 (CALCULATED) GENERAL rants: 1. THE CHARTS SHOWN HEREIN ARE FOR THE REQUIRED NUMBER OF TIE DOWNS ON THE SIDES OF THE MANUFACTURED HOME 2. TIE DOWNS ARE REQUIRED AT EACH CHASSIS BEAM. EACH END OF EACH TRANSPORTABLE SECTION OF THr MANUFACTURED HOME AND CAN BE ANY OF THE TYPES SHOWN HEREIN. 3. COMBINATIONS OF THE DIFFERENT TYPES OF TIE DOWNS CAN SE USED. 4. IN THE EVENT AN EARTH AUGER CANNOT SE INSTALLED DUE TONY OBSTRUCTION, USE OF CROSS DRIVE ANCHORS IS PERMITTED, PROVIDED (2) CROSS DRIVES ARE INSTALLED FOR EACH EARTH AUGER THAT CANNOT BE INSTALLED. 5. FOR ALL TIE DOWN INSTAUATIONS, THE MFG'D HOME CHASSIS MEMBERS ARE SHOWN AS "r BEAMS. FOR ILLUSTRATION PI82POSES ONLY. CHASSIS BEAMS CAN ALSO BE "C" SHAPED OR 'RFC" SHAPED. S. END TE DOWNS CAN BE LOCATED WITHIN 24' OF EITHER SIDE CF CHASSIS BEAM AXIS AS SHOWN. - r - re1Am. T. THE SIZES, TYPES, LENGTHS, ECT. OF MATERIAL SHOWN HEREIN ARE MINIMUM. LARGER, LONGER, HEAVIER MATERIALS SUPPLIED BY MINUTE -MAN PRODUCTS. MAY BE USED AT THE SAME SPACING & LOCATION SHOWN. S. ALL PARTS ARE STAMPED MMA- WITH THE APPROPRIATE PART NUMBER. 9. THIS TIE DOWN SYSTEM CAN BE USED WTTH 10' WIDE MANUFACTURED HOME SECTIONS WITH 100" CHASSIS CENTERS PROVIDED THE HEIGHT FROM GRADE TO THE BOTTOM OF THE CHASSIS BEAM DOES NOT EXCEED 19". 10. TIE DOWN STRAPS IN THE LONGITUDINAL OR TRANSVERSE DIRECTION CAN BE BOLTED TO THE HITCH ATTACHMENS PLATE THAT IS WELDED TO THE CHASSIS BEAM. • i Lit • 7117.' • • M1MSI Mud TI rl r STZSL ATAM MN mat TI I • Nor— Minutes Man . sIQWN. Ur • - '.V'9ZC• - S :C kASSR C .m '.E OOWN CONNZCTIONS\ v %ANC T:E NC4836, EZDH & MMA34 EARTH AUGER TIE DOWN SOL rz !lawn C tLV Ir NOLC AT MD `KICHT Or StnA fSTALL T/Y ASO7 ear. 1414A 4 MARE TIC I12 £. Ma 828 692 0268 09/22/05 08:S8am P. 004 M M MS{ r*AMC mC STMLIZCR RATC RILL 9/1r HOLE a MD IRIOMT Or EAM. *STALL 1/r A.TO7 VOLT. rm. STRM SCrI • DpM aura ' STRL VIRAR rDR 1E NICNOR rout is DOWN ANCHOR " C I BEAM CHASSIS 'pre' SEAM CHASSIS INSTALLATION INSTRUCTIONS 1. THE DRIVE MACHINE 18 STARTED AND THE ANCHOR 18 TURNED INTO THE GROUND TO A POINT WHERE THE TOP (STABILIZER HEAD PLATE) IS FLUSH OR SLIGHTLY BELOW GROUND LEVEL THIS INSURES THAT THE E,ZANCHOR STABILIZER WILL BE AT ITS REQUIRED INSTALLATION POSmON. 2. FOR THE E-Z ANCHOR/STABILIZER TO ACHIEVE FULL POTENTIAL, INSTALL THE ANCHOR VERTICALLY WITH NO DEVIATION GREATER THAN 10 DEGREES. NOTE: A SLIGHTLY GREATER ANGLE MAY BE USED TO START THE ANCHOR TO AVOID CONTACT WITH THE HOME & STRAIGHTENED AS THE ANCHOR'S GROUND SET. THE SPLIT BOLT 18 INSERTED, STRAP FASTENED, AND TIGHTENING ADJUSTMENT MADE. NOT WITH MACHINE INSTALLATION, A MINUTE -MAN ADAPTER DESIGNED TO FIT BOTH THE ANCHOR HEAD AND DRIVE MACHINE SHAFT IS AVAILABLE. INSTALLERS 00 NOT NEED ADDITIONAL OR SPECIAL EQUIPMENT FOR E,Z ANCHOR INSTALLATION. NOTE: AN ADDITIONAL STABILIZER PLATE I8 NOT REQUIRED WTH EZDH & GW2 EARTH AUGER 11E DOWN. CONCRETE TIE DOWN MOSS DRIVE TIE DOWN RECCNASSIS PEW MO TIC CONN COMCCOONS rum Swim, SCE t RrC rout CND TIC DOWN CONNECTIONS GROUND L"+C t 71OC THE Down EARN AUGER TIE DOWN IMT VOLT ! SIOC TIC DONN `\ - ZRn4 MOOR STAVUSLN MATC 0, IL 0 -- al ATr nr-eo Q .. CROSS DRIVE W/ STA5ILI7rR FIRST CHECK FOR UNDERGROUND UTILITY LOCATION; EZDH EARTH AUGERS 1. SEE DETAIL THIS BOOKLET FOR INSTALLATION INSTRUCTIONS. EARTH AUGERS 1. INSTALL AUGERS INTO SOIL WITH CONSTANT DOWNWARD PRESSURE TO MINIMIZE SOIL DISTURBANCE LEAVING APPROX. 17' OF SHAFT EXPOSED. 2. INSTALL STABILIZER PLATE - DRIVE FLUSH WITH GROUND SURFACE, 3. COMPLETE TURNING AUGER INTO GROUND UNTIL AUGER HEAD 1S FLUSH WITH GROUND SURFACE AND TOP OF STABILIZER PLATE. CROSS DRIVE ANCHORS 1. CROSS DRIVES ARE USED WHERE HARD ROCKY SOL OCCURS. IF THE GROUND SURFACE IS OTHER THAN ROCK OR MINIMUM 2" ASPHALT, INSTALL MMASD2 STAWILZER PLATE, OR PLACE 17k12k12" DEEP CONCRETE CONCRETE SLAB ANCHORS 1. CONCRETE SLAB TO BE MINIMUM 312' THICK AND IN GOOD CONDITION. 2. MINIMUM SLAB AREA REQUIRED FOR EACH ANCHOR IS 28 SC. FEEL 3. DRILL PROPER SIZE HOLE IN SLAB MINIMUM 17' FROM ANY EDGE ALL APPLICATIONS 1, ATTACH STRAPS TO CHASSIS BEAM IN MANNER SHOWN. 2. INSERT STRAP THROUGH SPLJT NUT. CUT OFF EXCESS STRAP AND TIGHTEN UNTIL SNUG Minute Man 828 892 0258 O � CHNff SINGLE WIDE INSTALLATION INSTRUCTIONS TIE DOWN LOCATIONS 10 10 5 01011E DOanS SEE CM■RT DOUBLE WIDE EARTH AUGERS I CROSS DRIVE ANCHORS CONCRETE SLAB ANCHORS 3554'77 a re ° F 32 47 57 67 73' , 34' 47 60' 59' 88' r mI A t� J 1' ° ' 1 EIf � . � .W. � 11h! nE ccw 2 3 4 Ra 3 4 5 6 7 � 4 6 5 7 8 NO TE IF OBSTRUCTIONS PRECLUDE THE PLACEMENT OF THE SIDE TIE DOWNS AT THE 7 LOCATION SHOWN SIDE TIE DOWNS AT 7-0" FROM EACH END HAVE A TOLERANCE OF It 18" MIN. SOLT ON TOP PIER .NE7oh END TIE DOWN NOTE; TIE DOWN STRAPS'AT'THE CHASSIS BEAM ENO5'(END TIE DOWNS) CAN BE ATTACHED TO A CHASSIS SUPPORT PIER WITH A PIER BOLT ON TOP. (SEE SKETCH ABOVE) 09/22/05 08158am P. 005 tiro le Wins E awir TRIPLE WIDE Minute Man TLW 01-03 MMA - a02 STABILIZER PLATE STABILIZATION PLATE WELDED TO ROD WOE & STRAP HEAD AZTEx ANCHOR CROSS DRNE ANCHOR 829 692 02S8 NC4636 7/6 DIA 36 AUGER ANCHOR MMA SPUT BOLT & NUT MMA 210ADH MMA- 210POH STARILIZER CAP COMPACDNO USX 1 MMA - 18 CONCRETE CH R « Q US[ OuTS/D[ NOL[S FOR + 4 11AACCS TOP FIAT£ W170U PLATE LONGITUDINAL FRA ME TIE AN0 CLAMP MMA -37 (FOR WINO ZONE 1) CROSS DRIVE ANCHOR W/ 23/32 "043' RODS MMA -91 5/5 01A MMA - 3/4 01.4 MMA -94 3/4 OA 32 AUGER ANCHOR 32 "AUGER ANCHOR 36 AUGER ANCHOR t MMA 6 3/4 OH 4430 NU 3/4 09/22/05 06i68am P. 008 MM 32 STEEL STRAP W /BUCHEL O9 MMA-.34 BOTTOM PLATE ICCATION Cr MODE r oM MMA -7I STEEL STRAP H /CORNER TIE 0 0 O 1 i 1p1A 7t CORNSP TIE aVNECTED a r r CUP NEAREST 10 MMA -6Z0 3/ DIA 4430 0H 3/4 CIA 00'AuGER ANCHOR 30' AUGER ANCHOR TOP PLATE OMSAS IEAM USE NSW NOtES FOR r - r FLANOC$ • lT +d!' GRADE MCIINE FOlOS STRENG7N NOR NE ROD 07 -31 -2007 ERIN O'LEARY 20303 10 AV W LYNNWOOD WA 98036 RE: Permit No. D06 -046 14005 42 AV S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writine and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09 /07/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 0 4 4 na rr Marshall, Permit Technician xc: Pent File No. D06-046 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 March 23, 2007 Erin O'Leary Stepping Stone Ventures, LLC 20303 10 Av W Lynnwood, WA 98036 RE: Request for Extension #2 Development Permit No. D06 -042 through 052 & D06 -105 Stepping Stone Ventures —14005 42 Av S Dear Erin: This letter is in response to your written request for an extension to Permit Nos. D06 -042 through 052 and D06 -105. The City of Tukwila Building Division will be extending the expiration dates of your permits for an additional 180 days. Consequently, permits D06 -042 through D06 -052 will be extended through September 07, 2007 and permit D06 -105 will be extended through September 25, 2007. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, jem rshall it'Tealtnician City of Tukwila 2-Atu4As File: Permit No. D06 -042 through 052 & D06 -105 P:Vermife?,Extension Letters\Penmtst2006D06- 042 -052 & 105 Permit Extension #2.doc Page 1 of 1 Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206-431-3665 March 9, 2007 Jennifer Marshall City of Tukwila 6300 Southcenter Boulevard Suite #100 Tukwila Washington 98188 RE: Request for Extension on Permits Dear Jennifer Marshall: I am writing you to request an extension on the following (11) permits: D06 -042 043 044 045 046 048 049 050 051 052 105 The request is asked due to the time it has taken to finalize the necessary electrical upgrades with Seattle City Light. Please accept our request for the extension on these permits Sincerely, Erin 'Leary Stepping Stone Ventures, LLC dba Southgate Mobile Home Park 18� i� 03-/ &07 Ijlliok fa -it-o 4 Mfr s& Gir oI X114- (14 RECEIVED CITY 7:-r /v p MAR 0 9 2007 :•i. :;i! CENTER 02 -02 -2007 ERIN O'LEARY 20303 10 AV W LYNNWOOD WA 98036 RE: Permit No. D06 -046 14005 42 AV S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206-431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide saristactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 03/11/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. XC: Permit Pile No. D06-046 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 September 15, 2006 Erin O'Leary Stepping Stone Ventures, LLC 20303 10 Av W Lynnwood, WA 98036 Dear Erin: Sincerely arshall emit 1`ethnician City of Tukwila Department of Community Development Steve Lancaster, Director RE: Request for Extension Development Permit No. D06 -042 through 052 & D06 -105 Stepping Stone Ventures —14005 42 Av S This letter is in response to your written request for an extension to Permit Nos. D06 -042 through 052 and D06 -105. The City of Tukwila Building Division will be extending the expiration dates of your permits for an additional 180 days. Consequently, permits D06 -042 through D06 -052 will be extended through March 11, 2007 and permit D06 -105 will be extended through March 29, 2007. If you should have any questions, please contact our office at (206) 431 -3670. Mutv File: Permit No.1306 -042 through 052 & 1306 -105 P'Jennifer1Extension Utters\Pennile\D06-042.052 & 105 Pent Extension.doe Page 1 011 jem Steven M. Mullet, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 - 431 -3665 61 kl To EATUD t€0 V495 oct-x-01, September 8, 2006 Jennifer Marshall City of Tukwila 6300 Southcenter Boulevard Suite #100 Tukwila Washington 98188 RE: Request for Extension on Permits Dear Jennifer Marshall: I am writing you to request an extension on the following (13) permits: Ex.? waft D06-015 OZ- 25 -07 \ ThWor ExTEND ArTsis 1114E. 042 0q - It 06. 043 044 t 045 046 047 0°1-12. - t>4 (CIS I 1'0' 048 - tt 049 050 051 052 11 105 oct- 30 -06, j11,.2-1-17-7) The request is asked due to an extended period of time it took to complete financing that was required to move forward with the above referenced permit numbers. Please accept our request for our first extension on these permits. We are looking forward to beginning our work within the next week. Sincerely, Erin O'Leary Stepping Stone LLC dba Southgate Mo. ome Park RECEIVED CRY OF TUKWILA SEP 0 8 am PERMIT CENTER 07 -28 -2006 ERIN O'LEARY 20303 10 AV W LYNNWOOD WA 98036 RE: Permit No. D06 -046 14005 42 AV S TUKW Dear Permit Holder: City of Tukwila Lla Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/12/2006, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: rshall, it Technician Permit File No. D06-046 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 -431 -3665 March 2, 2006 Erin O'Leary 20303 10 Av W Lynnwood, WA 98036 RE: Letter of Incomplete Application # 1 to Correction Letter #1 Development Permit Application D06 -042 through 052 Stepping Stone Ventures — 14005 42 Av S (Units 35, 36, 38, 39, 40, 41, 42, 43, 44, 46, 58) Dear Ms. O'Leary: This letter is to inform you that your resubmittal received at the City of Tukwila Permit Center on February 23, 2006 is determined to be incomplete. Before your application can continue the plan review process the attached items from the following department(s) need to be addressed: Buildinv Department: Allen Johannessen, at 206 433 - 7163, if you have any questions concerning comment below. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 433 - 7165. Sincerely, Enclosures File: Permit D06 -042 through 052 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 1L e()!l4r rshall cian P:VenniferUncomplete LetterA2006\D06 -042 through 052 Inc Ltr #1 to Corr #t.DOC 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 Determination of Completeness Memo Tukwila Building Division Alien Johannessen, Plan Examiner Date: February 28, 2006 Project Name: Stepping Stone Ventures Permit #: D06-042, 043, 044, 045, 046, 047, 048, 049, 050, 051 and 052 Plan Review: Allen Johannessen, Plans Examiner A Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (Drawing and structural calculations sheets shall be original signed wet stamp not copied.) "' Please address all comments per previous letter dated February 21.2006. 1 Provide details for each individual mobile home installation that shall show the following items as recommended by the manufacture. (Not the contractor) a) Show the recommended spacing and constriction method for the support blocking. (By the manufacture) b) Show the recommended method of tie downs with details and hardware specifications. (By the manufacture) c) Show skirting details as recommended by the manufacture. Sheets that were submitted are not clear and legible. Provide sheets that are legible. 2 Provide setback dimensions on the site plan that meet setback requirements. Setbacks for that location are 6 feet. Show the appropriate setbacks on the plans. Should there be questions conceming the above requirements, contact the Building Division at 206-431- 3670. No further comments at this time. February 22, 2006 Erin O'Leary 20303 10 Av W Lynnwood, WA 98036 Dear Ms. O'Leary: City of Tukwila Department of Community Development Steve Lancaster, Director RE: CORRECTION LETTER #1 Development Permit Application Number 006 -042 through 052 Stepping Stone Ventures —14005 42 Av S (Units 35, 36, 38, 39, 40, 41, 42, 43, 44, 46, 58) Steven M. Mullet, Mayor This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire, Planning, and Public Works Departments have no comments. Building Department: Allen Johannessen, at 206 433 -7163, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) complete sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 433 -7165. Sincerely pit Je i arshall j it echnician encl xc: File No. D06 -042 through 052 P:Vennirer\Cotrtction Letten\2006\306042 thou 052 Correction Ltr NI DOC jem 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206-431-3665 Building Division Review Memo Tukwila Building Division Allen Johannessen, Plan Examiner Date: February 21, 2006 Project Name: Stepping Stone Ventures Permit #: D06- 042, 043, 044, 045, 046, 047, 048, 049, 050, 051 and 052 Plan Review: Allen Johannessen, Plans Examiner A Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (Drawing and structural calculations sheets shall be original signed wet stamp, not copied.) 1 Provide details for each individual mobile home installation that shall show the following items as recommended by the manufacture. a) Show the recommended spacing and construction method for the support blocking. b) Show the recommended method of tie downs with details and hardware specifications. c) Show skirting details as recommended by the manufacture. 2 Provide setback dimensions on the site plan that meet setback requirements. Should there be questions conceming the above requirements, contact the Building Division at 206-431- 3670. No further comments at this time. ACTIVITY NUMBER: D06 -046 DATE: 03 -10 -06 PROJECT NAME: STEPPING STONE VENTURES SITE ADDRESS: 14005 42 AV S, UNIT 46 X Response to Incomplete Letter # 1 Revision # After Permit Issued Original Plan Submittal X Response to Correction Letter # 1 DEP j Butlding Division Public Works ❑ DETERMINATIQN OF COMPLETENESS: (Tues., Thurs.) Complete Comments: TUES/THURS ROUy1NG: Please Route �rf Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28-02 IWPERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Incomplete Approved with Conditions Planning Division Permit Coordinator DUE DATE: 03-14 -06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 04-11 -06 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: D06 -046 DATE: 02 -23 -06 PROJECT NAME: STEPPING STONE VENTURES SITE ADDRESS: 14005 42 AV 5, UNIT 46 Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued DEPART ENTS: �Z uil�ing 'vision Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Incomplete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: 5 i (n' Departments determined incomplete: Bldg REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -2802 PERMIT COORD COPY.. PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Approved with Conditions❑ Planning Division ❑ Permit Coordinator ❑ LETTER OF COMPLETENESS MAILED: Fire ❑ Ping ❑ PW ❑ Staff Initials: DUE DATE: 02-28-06 Not Applicable ❑ TUES/THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required DATE: DUE DATE: 03-28-06 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: D06 -046 DATE: 02 -10 -06 PROJECT NAME: STEPPING STONE VENTURES SITE ADDRESS: 14005 42 AV S, UNIT 46 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: � 6 4 t,4-tt ,t Buildingt ivision LAN P li Wor s Structural ❑ f 114. No 2l c � DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU ING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Documents/routing slip.doc 2-28-02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Incomplete ❑ DUE DATE: 03-14 -06 Approved with Conditions Not Approved (attach comments)d 611 I+ - 2- (4-o& Fire Prevention LN DUE DATE: 02-14-06 Not Applicable ❑ DATE: G 2741* Planning Division Permit Coordinator Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: City of Tukwila Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the maid fax, eta n ,� / _ Date: 3-10-o (p Plan Check/Permit Number: D06 -04.9 ® Response to Incomplete Letter # 1 to Correction Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: STEPPING STONE VENTURES Project Address: 14005 42 Av S, Unit 41, Contact Person: Erin O'Leary Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431 -3665 Web site: http: //www.ci.tukwila.wa.us Summary of Revision: . a a hu-F 1 kats , &4J -•rh Q 4244;4-16' irt4 Phone Number: yam- reel g.c. Steven M. Mullet, Mayor Steve Lancaster, Director GL. eel 011Tormule MAR 1 0 2008 PERMff CENTER • .1 . , • • a s .. 41 • • 'Per- O ..S /°i fo(e (OaS ct —1-1.‘ 64 sa*ioin td,2as a Cetc. p , , Yto Meal --fa p'.subrd.k am1- 1-1oi d ra.wt Sheet Number(s): "Cloud" or highlight all areas of revision Including date of ision Received at the City of Tukwila Permit Center by: 1 J V [ Entered in Permits Plus on - O(0 \applications arms- applications on Tine\ evisian submittal Created: 8.13 -2061 Revised: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206-431-3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # _ after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Stepping Stone Ventures Project Address: 14005 42 Av S, Unit 46 Contact Person: Erin O'Leary Plan Check/Permit Number: D06 -046 Phone NumberaO6 y8 y, l Steven M. Mullet, Mayor Steve Lancaster, Director PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit 6 hmit Center by: _Ma k Entered in Permits Plus on h -Z3-oQ \applications\ forms - applications on line\revision submittal Created: 8 -13 -2004 Revised: Otiirner :.- - -_, . -- .: . . ./lgettjlCor �Cf ... n:; `` Name: SFc+�0p; n 4 � � r T tvA)e . 1{ a rt �G S �Fsl�� • Addre r o o . * )� is 03 Address: �I�.1.3A one: �Cxp 4 R ^ � Ave. .'111 }O � r A1r.c uu Phone: an (0 `T8"7 ' �1"Tn CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Permit Center/Building Division: 206 -431 -3670 Public Works Department: 206 - 433-0179 Planning Division: 206 -431 -3670 RECEIVED CITY OF TUKWILA FEB 1 2006 PERMIT CENTEN Ii PartA It be compieted:by Site ddress (attach map and legalqcscription showingdrant location and size of main): *Lib y� FtVt eS lukz ,tk /.4 (o This certificate is for the purposes of ❑ Residential Building Permit ❑ Preliminary Plat ❑ Short division ❑ CommerciaUlndustrial Building Permit ❑ Rezone '❑!Other I. Jet 7` � Estimated number of service connections and water meter size(s): Vehicular distance from nearest hydrant to the closest point of structure is ft. Area is served by (Water Utility District): • 2. improvements required. I hereby certify that the above information is true and correct. KU/ co L,,ottai.Cck9c' r /2C Agency hone 2ec - 2c ? 51767 \applications \water availability (7 -2003) Printed: 9 -16-03 CERTIFICATE OF WATER AVAILABILITY Required only if outside City of Tukwila water district PERMIT NO.: w( 0—t r 4U' Date / - / 9L Ipart&S.Tcribit compteted bye water 4C(lity district;< 1. The proposed project is within t k-t-kiC t qc �i (City/County) 3. The improvements required to upgrade the water system to bring it into compliance with the ubTities' comprehensive plan or to meet the minimum flow requirements of the project before connection and to meet the State cross connection control requirements: (use separate sheet it mom room is needed) 300e) 4. Based upon the improvements listed above, water can be p d and will be available at the site with a flow of at 20 psi residual fora duration of 2 hours at a velocity of fps as documented by the attached calculations. 5. Water ava lity: Acceptable service can be provided to this project D Acceptable service cannot be provided to this project unless the improvements in Item 8.2 are met. O System is not capable of providing service to this project. i , By !Wm Date J p e-S' License Information License ESECOI*000RA Licensee Name ESE CONSTRUCTION INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602034081 Ind. Ins. Account Id #2 Business Type CORPORATION Address 1 7189 F &S GRADE RD Address 2 City SEDRO WOOLLEY County SKAGIT State WA Zip 98284 Phone 56,000.00 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 12/1/2000 Expiration Date 12/1/2007 Suspend Date Separation Date Parent Company Previous License ESECO * *011RA Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #2 CBIC SC6302 12/01/2001 Until Cancelled 512,000.00 11/30/2001 #1 CBIC SC6302 12/01/2000 12/01/2001 56,000.00 11/20/2000 Business Owner Information Name Role Effective Date Expiration Date SOINIE, RONALD E 01/01/1980 SOINIE, ROLENE K 01/01/1980 Look Up a Contractor, Electririan or Plumber License Detail Page 1 of 2 *' % Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https: // fortress. wa. gov /Ini/bbip /printer.aspx ?License= ESECOI *000RA 03/15/2006 mw DORY r -- A PONTION OF THE S.E. 1/4, S.W. 1/4; SEC. 1e�tv6, T.W.P. 23 N., R. 4 E., W.M., IN KING COUNTY, WASHINGTON 8. , 40TH ST. EDGE OF PAVEMENT 1 t�Ay�t'0 EDGE O' PAVEMENT H87.51'23'V• .� 1' �� � I}i - • ---a- - - 531 „• I I of fu MDDLLAR FOIE I 1 50 ` 2� �✓ 1 MODULAR HOLE 30' �a I 1 �� (IiSII�fX4LI )ODULAR'PC l2% MODULAR HOME HIMILAR NOME % �ICN4..(r% MODULAR HOME t`1� 134 L717 Ii.47 / 14X52 \ 10 I i� ; � `C, '.- �'��;1)\ f(�, MDDU.AR HDIE � '•�f �Y. f ( o TONING Co. UTILITY ILDC. Cq� P N3•n ul x 4�A1TYr N I `d o:, sQ v I sW15(o Io- 50' _0J �` '3 i a 65' () 14 is5ro C1 t 'g l0 �6 14 � V> t �6• F I f{T MODULAR {DIE J 1y'/ I I J .4' •• EDGE O' PAVEMENT I I EDGE Or PAVEMENT Jc R• 42.7 12: Y175 -ILT5q :s t ✓ '0�`{� \�.J I 447 MIT S I 307 N d 3 d MB •51.8 •V T` 20 - -• ._ tt( tt - . fu ►— S. 1418T. 8T. — -- — _ — — — Cd t� C3 r, - SU a - -�. ��- � --. �— -- • J 113 F ve,o fi iI11T �. iII���L��II�j�I�j�l��- �I���I�����`y II���II��Ij IIIISIII1111111111116I'. Inch 1116 1 2 :yo \ 3 a 4 I as ... ; r • � ` T { . Since 2872,• i 5L tib El z1, 66. III�III�IIIIIIIII�IIIIIIIII�IIIJ�LLII��LIIIIIII�LIIIIIIII�II1JllIII�I�IIIIIIIIIIIIIIIIIT�lllllllll�lllllllll�llllIIIII�IIIIIIIII�fllllll ►������I����I�ILII �- p FOR CODD OO�p�ANCE _ N_ MAR � 5 2006 JO' 144t LAM OF BEARING IOUTH N87 33 071 V,OASSSFgN 0, RECORD DF SURVEY AS RE- CORDED IN VOLUME 97, PAGE 155, RCORDS OF KING COUNTY, VASHING70K INSTRUMENT USED A FIELD TRAVERSE USING A S17KKIA 3100 TOTAL STATIO INSTRUMENT VAS USED TO ESTABLISH THE RELATIONSHIP BETWEEN THE CONTR0.LING MONUMENTATIDN AS SHOWN. LINEAR AND ANGULAR CLOSURE OF TRAVERSE MEETS THE STANDARDS OF VAC 332 - 130 - 090. LEGEND 00040 FOUND MOIAMENT AS NOTED • ® REC8R0.DEA0 ND) VCL.I t6N PD.GZ YONUYENT DESTROYED DURING NEW CONSTRUCTION OF M(IERNATONAL ROVE (PACIFIC HWY. SOUTH) O SET No. 3 REBAR AND I.D. CAP REFERENCES CORRECTION LTR #---L_ 1. TITLE REPORT ORDER No. II45210 PREPARED BY CHICAGO TITLE INSURANCE:&W0jR . 2. THE F0.LOVING RECOtD D'' SURVEYS VOL. 97 PG. ISS t 136. 3. 4. NY CITY OF TUKWILA GAR 12, ANDN FEB 2 3 2006 OAN -RMIT CEN,rEh LEGAL DR6CRIP'TION THAT OF SEA: TLE�ACCORDING'TO THE PLA'TM &.CEEor. •RSECtXtp0.Ep IND Va(�MET�3TO' CITY PAGES) 12, IN KING COUNTY, WASHINGTON LYING EAST O' THE EASTCRLY MARGIN CIF •STATE D D, 1 (PACIFIC HIGHWAY SOUTH) AS ESTABLISHED IY DEED RECORDED UNDER RECOROIMO HM19ER 20148331 EXCEPT THAT PORi1ON TMEREOi' CO7DEINED FOR PUBLIC ROAD AND HIGHWAY PURPOSES IN KING COUNTY SUPERIDR COURT CAUSE RNUNNER 6099401 TOGETHER WITH ST NORTH 322,7 FEET OF THE VEST 520 FEET IY THE EAST 540 FEET DH' THE SOUTHEAST QUARTER OF THE SOUTHWEST Ql1A,TER O• SECTION I5, TOWNSHIP 23 NORTH, RAMF# 4 EAST, VILLAIETTE IERIDIAN, IN KING COWTY, WASHINGTON. EXCEPT THNT PORTIOR THEREOF CONVEYED TO THE STATE O• VASHINGTCN FOR STATE ROAD No.1 (PACIFIC HIGHWAY SOUTH) BY DEED RECORDED IMDER RECORDING R STATE 20481441 AND EXCEPT THAT PORTION THEREOF COtNDEMNED FOR COUNTY RIGHT SOUTH) IN KING 1>< WAY (42ND AVENUE COUNTY SUPERIOR COURT CAUSE NUMBER RIG TOGETHER WITH THAT PORTION O• VACATED 40TH AVENUE SOUTH (CONNECTION STREET) LYING EASTERLY DF STATE ROAD NA I (PACIFIC HIGHWAY SOUTH) AND ADJOINING ALL THE HEREIN ABOVE DESCRIBED PARCEL Or LANDI EXCEPT THESE PORTIONS CONVEYED-TO THE CITY O' TU(VILLA BY DEEDS RECORDED UNDER RECORDING NUMBERS 20020416003155: AND 20020416003156. (LEGAL DESCRIPTION FROM CHICAGO ;TITLE INSURANCE ORDER N. 1145210) REMV ' FOR C/O JERRI' HIYBOTILE RISEN- IWOOIIIE COM ERCOL REAL ESTATE 1715 114TK 444. SE. SUITE 212 BEIILMIE TIASItNG1pN 90001 M. T ' A PORnON Or THE SE. 114, S.W. 1/4, SEC. 15, T.W.P. 23 N, ;Q,•�� C� R 4 E., W.IL, N KNO COUNF(, 1NSIWNGTOIN VAN CLEAVE AND A890CUTES 112 CANDLEWYCK. DRIVE WEST LAKEW000, WASHINGTON 98499 • • +W (2331 FiRR -V171 rJ A PORTION OF THE S.E. 1/4, S.W. 1/4, SEC. 15, T W P! 23 IN., Ft. 4 E., W.M., IN KING COUNTY, WASHINGTON C ®DE COMP IANCE �IR�aoe»o�� MAY 1 Of TAW010 8.14 Sr. - - - - - I:JT, Rig EDGE OF PAVEMENT 1 V'h�'y�b0 EDGE O• PAVEMENT _ _ — •_, NB7.31.23<V- 1 1 P \ NODULAR HOME ti I � � /yx y� NOBIA.AN HHDE ta) ft 04ew approval is a FlAct to ®nore end or APPMoVor construction doc mw is does not , r*btlon of any accepted code or ordinance. '_jaVPf0vedJ3eW Copy and rtondiNenet Ic ar nAm uZz °z • 1 ET 1 4,d1 JET fNt By` ONO. r.==.,A I __ aY Of 'liuWA III Dingm BASIS OF BEARING ', • I SOUTH LINE OF S,V. 1/4, SEC. 13, T.V.P. 23 N., R. 4 E„ I ' I'fn'Ii NODULAR HpE CORDEDOIN VOLUME 97. PAGE 355, RCORDSROr KING RE- 10p 1 MODULAR IpO �` =' COUNTY, VASHING70R 11 ar' I INSTRUMENT USED "1 A FIELD TRAVERSE USING A SOKKIA 3100 TOTAL STATION MDD�yI ?� I INSTRUMENT VAS USED TO ESTABLISH THE RELATIONSHIP •P"- L. '""� BETWEEN THE CONTROLLING MOIMIENTATION AS SFOWN. ❑ 7�w LINEAR AND ANGULAR CLOSURE Or TRAVERSE MEETS THE 13.67 Ii.GI AN I STDARDS OF VAC 332 - 130 - 090. I dL �Nt� � -i.� MWIILM HOME 136 LEGEND �' \{' -,•� ID /y +�0� B FOUND MONI111ENT AS NOTED ' - -' /y y I r d4 /� �. -1 NOOtLAR 10[ r �. f ® CALCULATED 1 MRENT RECORD OF SURY[Y AS RECORDED M Vp.. 16, PG. 29. IAONUNENT DESTROYED DURING NEW CONSTRUCTION Or INTERNATIONAL BLVD. I (PACIFIC HWY. SOUTH) 0 u TOVIMO Ca ''� / w O SET No. 3 REBAR AND I.0. CAP p Ex. BLDG. SSA �� u.G� rA.G7 I REFERINCEB It.lY.�2 � Ia1ua11oc UTILITY TLDG C� � P,4l 13.67 r;,•_.4�!� n, L TITLE REPORT DRIER No. 1143210 PREPARED BY CHICAGO TITLE `� a SMx 2. TOE OV CF 'mn n.• ne.,�.,.., I r I �i Iq' I,r1 E7/ Z -- - O ❑ iL ° st V I 50 _p ;` ��\ 1:) 14x5 t I / - H1 V L t �.. 1 14� > 1 f MODULAR NOW 59 /� I u� :51) '1 f Jam/ � ' /" •lb g's 10 1 I EDGE DF PAVEMENT l 1 '4• •' ]I.Y.' I I EDGE Or PAVEMENT I b 3Fi /TL) I) 11:5 •UL75 9 2'la -f2.T5 •IL•75 R. i3 •12.75- 11. ,Ic, � 1i Y i ,Iv /X i r r I Gt y Ian r� I (�` s/ 5'� 't, �+ �tyIsj _- - `: too ( u I •51E •V 720, l\ (U SEPARATE- PERMIT REQLrx RED FOR: Mechanical Electrical Lff Plumbing 11K Gas Piping City Of Tukvii'.a BUILDING DIVISION — — S. user. sr. - — _ CU REVESIONS NO Ch e1115es shall be made to utc �=v-o r, :-io ' r q—'. 1''1 x C'ivd' CS G'" DL, "direst I IvZc,"on. t�c'.f........J vilI ?ire a rc pl_1 sL,',,T,. r w Lil and additional plan r iic v; RECEIVED CITY OF TUKWILA FEB 1,0 2006 PERMIT CENTER POU —D4(o !ot {' E13IFt I I I I. fIl I 1 /I' I I I I 1 I 1 1 .I I t A •� 6 pp ,+ d�yyeo� l 4 t s.r r 4 x tt t,Tst(? Y•7f �.+ t t� ¢ f^�,_,t E.� ::� �ah;�:-r +'9..a►:.,:i: 5 ' b, , £ ` _. � .. �' ... WO 1 �O IYYY MID PLAT 17' JAMES CLARK'S GARDEN ADDITION TO THE CITY O' SEATTLE. VW. 13 O• PLATS, P4 12, AND THE PLAT O' BOBBINS VIEW TRACT AD0., VEIL, 17, M 90. 3. ADDITIONAL RIGHT ON VAY AWIRETp ALONG EITERWITIWA.. p.V0. (PACIFIC HWY. SJ AS PER WARRANTY HEEDS AS PER RECORDING No.'S 20020416003153 AND 20020416003136 CONTAIN NREROUS ERRORS AND CAN NOT BE ESTABLISHE0. RIGHT OFM W DRAWINGS REFERED 701N LEGAL HOSCRIPiION M unY rr.er .� .. .__ _. 4. MONNENTS IN INTEI BEEN DESTROYED DO FROM SURVEY BY V. LEGAL DESCRIPTION T114T BLOCK OF SEATTLE or 'TO THE PLATµTHEREOF RECORDED IN VO UE 13T Or PLATS, PAGE(S) 12, IN KING COUNTY. VASHING70k LYING EAST O' THE EASTERLY MARGIN DF STATE ROAD No. 1 (PACIFIC HIGHWAY SOUTH) AS ESTABLISHED BY DEED RECORDED UNDER RECORDING NUMBER 20142331 EXCEPT THAT PORTION THEREOF CONDEMNED FOR PUBLIC ROAD AND HIGHWAY PURPOSES IN KING COUNTY SUPERIOR COURT CAUSE NUMBER 6099481 TOGETHER WITH "EM' 322.7 hET O• THE VEST 520 FEET Or THE EAST 340 FEET OF THE SOUTHEAST WARTER ON TFE S13UTNVEST QUARTER ON SECTION 15, TOWNSHIP 23 NORTH, RANGE 4 EAST, WILLAMETTE MERIDIAN, IN KING COUNTY, WASHINiTOt EXCEPT THAT PORT113N THEREOF CONVEYED TO THE STATE OF WASHINGTON FOR STATE ROAD No.I (PACIFIC HIGHWAY SOUTH) BY DEED RECORDED UNDER RECORDING NUMBER 20481441 AND EXCEPT THAT PORTION THEREOF CONDEMNED FOR COMITY RIGHT or WAY (42ND AVENUE SOUTH) IN KING COUNTY SUPERIOR COURT CAUSE NUMBER 6140981 TOGETHER WITH THAT PORTION OF VACATED 40TH AVENUE SOUTH (CONNECTION STREET) LYING EASTERLY O• STATE ROAD N0. 1 (PACIFIC HIGHWAY SOUTH) AND ADJOINING ALL THE HEREIN ABOVE DfSCRIKD PARCEL W LANDI EXCEPT THOSE PORTIONS CONVEYED•TO THE CITY OF TUKVILLA BY DEEDS RECORDED UNDER RECORDING NUMBERS 20020416003155: AND 20020416003156. (LEGAL DESCRIPTION rRON CHICAGO TITLE INSURANCE ORDER Nm 1145210) rw C/o A°ARY AM ESTATE 212 A PORTION OF THE SL 1/4, S.W. 1/4, SEC. 15, T.WP. 23 K. R 4 E. WAL, N 00 CGOIM, IMSMHCTON VAN CWV6 AND ASSIMATM 112 CANOLEWYCK DRIVE WEST W(EWOOD, WASHINGTON 98499 _ (253) 588 -3821 1AA111'1 K.V.V. Ir IXI ID K,V•�/ ApppyH tT, K,I ME 07/05 MTE 07 05 MTE 07/05 F.I Na L.L /EFB rvG la 05- 1180AB I MAR 15 ?006 . ` The `Confident Choice • 4 • 1tF t An:Industy Leader Varifon& has been a leader in the vinyl skating ieF e� 6l: d.,xo ..,,• � K y_ �f Y :: • . industry.: for• over 20 years We: are one of. the r�-p largest and fastest growing manufacturers of vinyl . wad b it edtc�o10 siding products and accessories in the world. { g pa�nlsareiuripact i As a leading manufacturer of vinyl product,. safe a ,alwa!s look their best. Variform has continuously engineered and `innovated to produce and offer the highest quality checked. for compound product with the latest technology available. y and heat distortion. t. . All Variform products are made in the U.S.A., built to,stand the test of time, and are backed by a Limited Lifetime Warranty. . I i '•.�^: ':ice•- v' ^! :;Y:�:�L {' �•�!: %.• e, {'.:1 ?: .Y,: �: :i.; -'i�:- .,�•q•s � {.�;: .}f. '!�•�; -: ���.; �.r,.. �,_ ..,.. _. ... .. �'�. mar -.. .• -_ - '7••• ?•� • •. , . ,��. .. "f;; :.���t •: .. .. .. .. ' j j I'i . i .j i it i• i i i I i I i i wi I i i L i I i, I I- 1-I -i- 12 I_ -� I 13 I I 14. I ... I I.5 I � I� 6 1 Inch 1/18 , \ViP(�rT+/�� JjlS�lnce}e72,. i, 1 ��al.l • 1.11a 1 1L li n .0 1.1. 1 1� 1 -81jM 11 11111 . yti �l ��I�I�E il lf Z �l 15 1L 1 llh u14 lL 11111l1E 1 ill lllZ ll4 ll1 l"lill 11 �II�IIIII4 IIII�W�L� I I ProGuard' LTR# I � RECEIVED CORRECTION CITY OFTUKWILA ..MAR 10 2006 L T R' ---- PERMIT CENTEM ""' U76 a 22.1 M AT E R A LS C A LC U L AT 10 N S Size of Home ME 1 1 wwwal Vl"NYl- SKI ITING hhhh-