Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL08-1390 - KING COUNTY DATA CENTER
KING COUNTY DATA CENTER 3355 S 120 PL ELO8-1390 Parcel No.: Addr :ss: Suite No: City+f Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 1023049069 3355 S 120 PL TUKW ELECTRICAL PERMIT Permit Number: Issue Date: Permit Expires On: EL08 -1390 11/03/2008 05/02/2009 Tenant: Name: Address: Owni in Name: Address: Conti ict Person: Name: Address: KING COUNTY DATA CENTER 3355 S 120 PL , TUKWILA WA SABEY CORPORATION 12201 TUKWILA INTL BLVD 4THFL , SEATTLE WA LAURA RANNOW 5614 7TH AVE S , SEATTLE WA Conti actor: Name: VECA ELECTRIC CO INC Address: 5614 7 AV S , SEATTLE WA Contractor License No: VECAECI542MU Phone: Phone: 206 - 436 -5245 Phone: 206 860 -0231 Expiration Date: 10/31/2009 DESC RIPTION OF WORK: FURN;SH AND INSTALL COMPUTER POWER DISTRIBUTION INSIDE NEW DATA CENTER. PROVIDE LIGHTING AND CARD ACCESS CONTROLS Value of Electrical: Type A Fire Protection: 717,000.00 Electrical Service provided by: Fees Collected: National Electrical Code Edition: SEATTLE CITY LIGHT Permit Center Authorized Signature: 4 r� $9,089.38 2005 Date: 11-3-00 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of constr uctio o permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating erformance of work. . authorized to sign and obtain this electrical permit. Signs- ure. Print !lame: L Date: ((^ (f) C This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abE ndoned for a period of 180 days from the last inspection. doc: El.-4/07 EL08 -1390 Printed: 11 -03 -2008 ParcE d No.: 1023049069 Address: Suite No: Tena • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 3355 S 120 PL TUKW KING COUNTY DATA CENTER PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: EL08 -1390 ISSUED 10/28/2008 11/03/2008 1: ** *ELECTRICAL * ** 2: A ;opy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at ea.:h work site. 3: AI proved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: Al. electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-96B WAC. 5: Wien any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: Tile issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presses to grant this authority are therefore not valid. 7: AT y change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hen by certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws :•egulating construction or the performance of work. Date: doc: Cond -Elec EL0 8-1390 Printed: 11-03-2008 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us SITE LOCATION Electrical Permit No. E 3qo Project No. (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Site Address: 3355 South 120th Place, Tukwila, WA Tenant Name: King County Data Center King Co Assessor's Tax No.: 10).1014— qO 4,9 Suite Number: New Tenant: Property Owners Name:_ Sabey Corp. Mailing Address: 12201 TUKWILA INTL BLVD 4TH FL Tuwila Floor: Ix_ Yes ❑ ..No WA 98168 City State Zip CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: Laura Rannow Mailing Address: 5614 7th Ave S Seattle, WA 98108 E -Mail Address: laura.rannow @veca.com Day Telephone: 206-436-5245 ELECTRICAL CONTRACTOR INFORMATION City State Fax Number: 425 - 696 -0128 Zip Company Name: VECA Electric Co, INC Mailing Address: 5614 7th Ave S Seattle, WA 98108 Contact Person: Laura Rannow E -Mail Address: laura.rannow @veca.com Contractor Registration Number: VECAECI542MU City State Day Telephone: 206-436-5245 Fax Number: 425- 696 -0128 Expiration Date: 10/31/09 Zip Valuation of Project (contractor's bid price): $ 717.000 Scope of Work (please provide detailed information): Furnish & install computer power distribution inside new data center. Provide lighting & card access controls. Will service be altered? ❑ Yes Type of Use: Data Center Type of work: No Adding more than 50 amps? I] Yes ❑ No ❑ New ❑ Addition ❑ Service Change ❑ Low Voltage ❑ Generator ❑ Fire Alarm Property Served by: ❑ Puget Sound Energy XI Seattle City Light H: Applications\Forms- Applications On Line4-2017 - Electrical Permit Application doc bh ❑ Remodel ❑ Telecommunication Tenant Improvement ❑ Temporary Service Page 1 of 2 1 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $140.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings $75.00 ea ❑ Low voltage systems (alarm, fumace thermostat) $55.00 ca RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $75.00 (no added/altered circuits) ❑ Service change with added/altered circuits $75.00 number of added circuits $10.00 ea ❑ Circuits added/altered without service change $50.00 (up to 5 circuits) ❑ Circuits added/altered without service change $50.00 (6 or more circuits) $7.00 ea ❑ Meter /mast repair $65.00 ❑ Low voltage systems $55.00 (alarm, furnace thermostat) { PERMIT APPLICATION NOTES - MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $58.00 ❑ Temporary service (generator) $75.00 ❑ Manufactured/mobile home service $80.00 (excluding garage or outbuilding) ❑ Carnivals $75.00 Number of concessions $10.00 ea Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signatur Print Nam adUAPA.-- CVVV1(k-01-—) Mailing Address: S(o 1' q s ;lute— S [Date Application Accepted: 1 Day Telephone: Se_a.N -14._ LA—) IN 98 0 S City State Zip Staff Initials: Date: L o � c1067- Y36-SJy -- Date Application Expires: 4-4\4 �U q Ii.Wpplications\Fonns- Applications On Line\4 -2007 - Electrical Permit Application doc bh Page 2 of 2 et ;Pa 1908 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us ParcE 1 No.: 1023049069 Addr ass: 3355 S 120 PL TUKW Suite No: Appli cant: KING COUNTY DATA CENTER RECEIPT Permit Number: Status: Applied Date: Issue Date: EL08 -1390 PENDING 10/28/2008 Receipt No.: R08 -03629 Initia s: WER User D: 1655 Payment Amount: $9,089.38 Payment Date: 10/28/2008 09:00 AM Balance: $0.00 Payer VECA ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 045461 9,089.38 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 ELECTRICAL PLAN - NONRES 000.345.832.00.0 7,271.50 1,817.88 Total: $9,089.38 doc: Ri,ceiot -06 Printed: 10 -28 -2008 l2. INSPECTION RECORD �® 013-k i vi Retain a copy with perm' INSPECTION NO. PERMIT NO;1' CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 /ii, t �� y A/9 Type of Inspection: /�h� Address: Ji Date Called: Special ln-structions: / f'p? Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: L «-- tivsaf)77-641 Inspe 4G� Date /, El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPE ION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with perm' PERMIT N (206)431 -3670 Project: /4)6 c( /,�vi `/ 4/ Type of Inspection: /�� / (- Aress: _� .. -g �j Date Called: Special Instructions: Date Wanted: n _s 3lU% a.m. Requester: Phone No: tCOMMENTS: proved per applicable codes. DCorrections required prior to approval. f A14 L - (Zni4k El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: ti INSPECTION RECORD Retain a copy with permiitti3:—./3-‘r INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION R 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 �� Ft' IA CCx/!/ ' Y -774 Type of Inspection: -�"' /14/ COMMENTS: iti.34". Aids • S / Sr Date Called: 'or, C� C G //cam- -&v Special Instructions: - FoWA /A14- Date Wanted: �., cm Requester: G 6- Phokt ' 6etc 3� ?`'3/ 7 ',I- ........ PIOV proved per applicable codes. Corrections required prior to approval. COMMENTS: iti.34". 'or, C� C G //cam- -&v - FoWA /A14- 1__::)a 7 ',I- ........ PIOV 0/4- Lt-1/ /cd -- f / e/641 f/i/t/AL Insp it 674-$4677" Dat/ r7 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD � Retain a copy with permi -/39 0 INS CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION rz- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pr j ct: IAIG ca14/7 ' M 74 Type of Inspection: 700 2- Address: .7/ S 725' S /2-v / Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: roved per applicable codes. Corrections required prior to approval. C MMENTS: pA li r` E Y f T( ,A1/7C#/r$ (y'_, - f‘a-0/t. iws (4)/ly c44-6.8 Inspec /LC Date. / El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permi CITY OF TUKWILA BUILDING DIVISION �- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: . PR& X$5 AX of Inspection: 700 Z ) 4.3 Address: �. sir `/` ^` Date Called: 77-0 r 2/1 f‘e50, irk 520-4 ::7'V `> /! u • fI / / Special Instructions: Date Wanted: 1 a.m. p.m. Requester: Phone No: proved per applicable codes. LJ Corrections required prior to approval. 5,r ` : in ox- i !i e ev,. ) 4.3 2/4 _ M84— /3'-6 .,r'5 4-4, 6_2— ty6 fc,—"I vi —i /cip7 4/41/4t 77-0 r 2/1 f‘e50, irk 520-4 1 v ' ,, 0 1 Inspector( 611 � 0` , Date: �� 4L r7 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit INSPE ION NO. PERMIT 0. CITY OF TUKWILA BUILDING DIVISION iQ 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: 01/6 cdr/,2/7Y M "r71 Type of Inspection: 7M3 Address: --<— ...5 /207Y "/ Date Called: Special Instructions: Date Wanted: �/ a.m. p.m. Requester: Phone No: proved per applicable codes. ❑ Corrections required prior to approval. OMMENTS: - .�7I� � ///7-;// A Inspec %t L el/7 An/16* /� Dater /,/ /' n $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: ,__..• • _ _ - .......S.. - A ...sue INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PERMIT le- (206)431 -3670 Project: / /M.6 <.,uii Y Type of Inspection: 7!,07 Address: Date Called: Special Instructions: Date Wanted: / / a.m. p.m. Requester: Phone No: proved per applicable codes. Corrections required prior to approval. MMENTS: /J �� -- #TU CiRr2,4 / <_,ys 9 rill <2 ) Cz & 2 I n s peCfdr: Date's /0 Ej $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: 1-46-- 13;0 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION R"' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pro' C4,/A/7)1 V ' ' Type of Inspection: 7( 03 SAS J — .J .� , V 1 ?e�� Date Called: Special Instructions: Date Wanted: 2/ a.•: Requester: Phone No: A, • roved per applicable codes. El Corrections required prior to approval. COMMENTS: f) /,/ O,11- --11 -H Inspe Date: „.9-- // o El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: INSPECTION RECORD Retain a copy with permit INS ECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION r?- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pro ect: 6 Type of Inspection: ��� dress� /20 I)/ Date Called: Special Instructions: Date Wanted: 4 / (�Q/ a.m. p.m. Requester: Phone No: ig, Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: pn. 0/4— wAu.S — cs/H - .s/G ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISI 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit /21_ PERMIT NO. ON csri (206)431- 70 Pro ect: i 1. Ca/ Air Y An 77q Type of Inspection: 7,0-P 1 K....) jIK5,..,,,. /2-0 7 0 Date Called: Special Instructions: Date Wanted: /� !/ a.m. p.m. Requester: Phone No: pproved per applicable codes. COMMENTS: /OA- DCorrections required prior to approval. t- Cf)77;Y ;4 a Inspecto / /` tie r Date273 /! $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee eee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: - -- - �gS lv.aer�aY. _ f . i�di.e`..s.r•�- . .• .sr -. t ..• ... •..eMC INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 12- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Projec456- : �/ C 1 p�y `r M Type of Inspection: ifzio Date Called Special Instructions: Date Wanted:, Z/ a.m. p.m. Requester: Phone No: pproved per applicable codes. Corrections required prior to approval. OMMENTS: /0/9 6/4 --140, 6.v' —gs1 7x_A n� A41141.?" i #(Lo S ffr- ,s4faiO4 i 704 of 3 vf'S Inspector :8/E. eip/ 446®'off ate: ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: AL- INSPICTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 12- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pr9ject: M/ cr>« '7 Type of Inspection: 3 Ass `� ri Date Called: Special Instructions: Date Wanted: / v /e2,3 p.m. Requester: Phone No: 1;2.- proved per applicable codes. n Corrections required prior to approval. COMMENTS: o/ - ` / ;/ ,47- 7TM ref- Inspec /GL /flL<6'/ij'q Date: O �/ 3 El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: • Em4i2i tor �"` .o��nsl1,r :'•e..sd.t••}�s;�. v.= • Interior 2006 Washington State Nonresidential Energy Code Compliance Form Lighting Summary '_006 Washington State Nonresidential Energy Code Compliance Forms LTG;INT Revised July 2007 Project Info Project Address King County Data center Date 10/28/2008 3355 South 120th Place For Building Department Use dti Itali OP ®i ... Tukwila, WA 98168 Applicant Name: VECA Electric Applicant Address: 5614 7th Ave S Seattle, WA 98108rI� Applicant Phone: 206- 436 - 5245 Project Description ❑ New Building J Addition ❑ Alteration ' ? ^[]Plans Inc ^'1ir.. Refer to WSEC Section 1513 for controls and commissioning requlrtt7agnts. [Compliance Option 0 Prescriptive ® Lighting Power Allowance 0 Systems naly s , (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces clearly on plans.), '. Alteration Exceptions [check appropriate box - sec. 1132.3) ❑ No changes are being made to the lighting ❑ Less than 60% of the fixtures new, installed wattage not increased, & space use not changed. Maximum Allowed Lighting Wattage _ovation floor /room no.) Occupancy Description Allowed Watts per ft2„,, Area in ft 2 Allowed x Area Ind Floor Data Center 1.00 7459.0 7459.0 nd Floor A3 Strip Fixture 39 61.0 2379.0 " From Table 15 -1 (over) - document all exceptions on form LTG -LPA Total Allowed Watts 7459.0 Proposed Lighting Wattage _ovation floor /room no.) Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed .nd Floor T -8 43 91.0 3913.0 nd Floor A3 Strip Fixture 39 61.0 2379.0 --RCVIEWCD FOR 1 CODE COMPLIANCE NFPA 70 NEC OCT 31 2008 City Tukwila Total Proposed Watts may Total Proposed Watts 6292.0 Notes: 1. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T -8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. 2. For proposed Watts /Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and other criteria as specified in Section 1530. For hard -wired ballasts only, the default table in the NREC Technical Reference Manual may also be used. For track lighting, list the greater of actual luminaire wattage or length of track multiplied by 50, or as applicable, the wattage of current limiting devices or of the transformer. 3. List all fixtures. For exempt lighting, note section and exception number, and leave Watts /Fixture blank. ELOS- 1390 RECEIVED OCT 282008 PERMIT CENTER 2006 Washington State Nonresidential Energy Code Compliance Form r3teri,or ;Lighting Summary (back) . '006 Washington State Nonresidential Energy Code Compliance Forms LTG -INT Revised July 2007 Prescriptive Spaces Occupancy: O Warehouses, storage areas or aircraft storage hangers O Other Q ualification Checklist Note: If occupancy type is "Other" and fixture answer is checked, the number of fixtures it the space is not limited by Code. Clearly indicate these spaces on plans. If not qualif ed, do LPA Calculations. Lighting Fixtures: (Section 1521) ❑ Check if 95% or more of fixtures comply with 1,2 or 3 and rest are ballasted. 1. Fluorescent fixtures which are non - lensed with a) 1 or 2 two lamps, b) reflector ) p ) or louvers, c) 5 -60 watt T -1, T -2, T-4, T -5, T -8 lamps, and d) hard -wired elec- tronic dimming ballasts. Screw -in compact fluorescent fixtures do not qualify. 2. Metal Halide with a) reflector b) ceramic MH lamps <= 150w c) electronic ballasts 3. LED lights. TABLE 15 -1 Unit Liahtina Power Allowance (LPA Use' LPAz (W /sf) Use' LPA` (W /sf) Automotive facility 0.9 Office buildings, office /administrative areas in facilities of other use types (including but not limited to schools hospitals, institutions, museums, banks, churches) 1.0 Convention center 1.2 1.2 Penitentiary and other Group 1 -3 Occupancies Police and fire stations" 1.0 1.0 Courthouse Cafeterias, fast food establishments', restaurants /bars5 1.3 Post office 1.1 Dormitory 1.0 Retail10, retail banking, mall concourses, wholesale stores •allet rack shelvin.) 1.5 Exercise center 1.0 School buildings (Group E Occupancy only), school classrooms, day care centers 1.2 Gymnasias, assembly spaces" 1.0 Theater, motion picture 1.2 Health care clinic 1.0 Theater, performing arts 1.6 Hospital, nursing homes, and other Group 1 -1 and 1 -2 Occupancies 1.2 Transportation 1.0 Hotel /motel 1.0 Warehouses ", storage areas 0.5 Hotel banquet/conference /exhibition ha11'•4 2.0 Workshops 1.4 Laboratory spaces (all spaces not classified "laboratory" shall meet office and other appropriate categories) 1.8 Parking garages 0.2 Laundries 1.2 Libraries5 1.3 Plans Submitted for Common Areas Only' Manufacturing facility 1.3 1.1 Main floor building lobbies' (except mall concourses) Common areas, corridors, toilet facilities and washrooms, elevator lobbies 1.2 0.8 Museum =ootnotes for Table 15 -1 In cases in which a general use and a specific use are listed, the specific use shall apply. In cases in which a use is not mentioned specifically, the Unit Power Allowance shall be determined by the building official. This determination shall be based upon the most comparable use specified in the table. See Section 1512 for exempt areas. :) The watts per square foot may be increased, by two percent per foot of ceiling height above twenty feet, unless specifically directed otherwise by subsequent footnotes. :!) Watts per square foot of room may be increased by two percent per foot of ceiling height above twelve feet. 4) For all other spaces, such as seating and common areas, use the Unit Light Power Allowance for assembly. Watts per square foot of room may be increased by two percent per foot of ceiling height above nine feet. li) Reserved. ') For conference rooms and offices less than 150ft2 with full height partitions, a Unit Lighting Power Allowance of 1.10 w/ft2 may be used. 11) Reserved. 9) For indoor sport tournament courts with adjacent spectator seating over 5,000, the Unit Lighting Power Allowance for the court area is 2.60 W /ft2. 0) Display window illumination installed within 2 feet of the window, provided that the display window is separated from the retail space by walls or at least three - quarter- height partitions (transparent or opaque). and lighting for free - standing display where the lighting moves with the display are exempt. An additional 1.5 w /ft2 of merchandise display luminaires are exempt provided that they comply with all three of the following: a) located on ceiling- mounted track or directly on or recessed into the ceiling itself (not on the wall). b) adjustable in both the horizontal and vertical axes (vertical axis only is acceptable for fluorescent and other fixtures with t8CE019 Er of track attachment). c) fitted with LED, tungsten halogen, fluorescent, or high intensity discharge lamps. This additional lighting power is allowed only if the lighting is actually installed. • 1) Provided that a floor plan, indicating rack location and height, is submitted, the square footage for a warehouse may be define) CENTEf computing the interior Unit Lighting Power Allowance, as the floor area not covered by racks plus the vertical face area (access side oral �) of the racks. The height allowance defined in footnote 2 applies only to the floor area not covered by racks. OCf 28 E1.08- X340 �ED PERMIT CENTER VECA Electric SWBD HDP52A ROOM: JSDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: UNIT SUBSTATION TA -52 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 0.0 0.0 372.0 0.0 UPS 52-Al PRIMARY 1200 3 372 447 UPS 52-Al STATIC BYPASS 1200 3 - - AMP: MBP -52 -A1 MAINT BYPASS 1200 3 - - VOLTS: 0.0 0.0 248.0 0.0 UPS 52 -A2 PRIMARY 1200 3 248 298 UPS 52 -A2 STATIC BYPASS 1200 3 - - PHASE: MBP -52 -A2 MAINT BYPASS 1200 3 - - WIRE: 0.0 0.0 124.0 0.0 UPS 52 -A3 PRIMARY 1200 3 124 149 BUS: UPS 52 -A3 STATIC BYPASS 1200 3 - - A.I.C.: MBP -52 -A3 MAINT BYPASS 1200 3 - - M.L.O.: 276.0 UPS 52 -A4 PRIMARY (FUTURE) 800 3 276 332 MAIN CB: UPS 52 -A4 STATIC BYPASS (FUTURE) 800 3 - - FUSE: MBP -52 -A4 MAINT BYPASS (FUTURE) 800 3 - - FLUSH: 0.0 0.0 826.2 0.0 DP -52 -A MECH 1600 3 826 994 SURF: 0.0 8.0 0.0 0.0 52 -H4A LIGHTING VIA 30 KVA 50 3 8 10 16.5 0.0 4.5 0.0 52 -L4A RECPT VIA 30 KVA 50 3 21 25 TVSS 100 3 - - IG GND: 74.0 89.0 293.0 COMMON AREA LOADS (FUTURE) 1200 3 456 548 200% N: - - FD THRU: - - DBL LUG: t� TOP: FCC - BTM: Pei os - _ PANEL - - LOAD _ _ . c:.t - - RCPT r - - LTG - - EQP HEAT VIEtI�� 'S�{�CE - _CO r - - TOTAL - - FEEDE KT 31 � - - LOAD VL - - RCPT - - LTG l ■ l EQP • V ,, - - - - HEAT ,� :1I11U.UJkLL L - - TOTAL - - FEEDER - - kVA TOTAL 2,331 2,804 AMPS 91 97 2,144 - MFG: SQ D CB: NOTE: SWITCHBOARD HAS DUAL INPUT BREAKERS WITH AUTOMATIC TRANSFER FROM NORMAL Feeder T.C.L. is printed here horizontally TO GENERATOR POWER. to allow a block 'paste -link" to the "Load Distribution" columns of a sub- RECEI feed panel or switchboard. I 1 1 Project: SDC -52 5/13/08 OCT 28 E1.08- X340 �ED PERMIT CENTER 4000 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 91 97 2,144 2,331 T.C.L. (kVA) 91 97 2,144 2,331 DEMAND 2,315 2,785 10/28/08 VECA Electric SWBD MBP -52 -A1 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52A RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -AB1 (PROVIDENCE) 400 3 124 149 124.0 STS -AC1 (PROVIDENCE) 400 3 124 149 AMP: 124.0 STS -CD1 (KCDC) 400 3 124 149 VOLTS: STS -BA1 400 3 - - 1STS -CA1 400 3 - - PHASE: STS-DA1 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 372 372 T.C.L. (kVA) 372 372 DEMAND 372 447 10/28/08 VECA Electric SWBD MBP -52 -A2 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52A RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -AB2 (KCDC) 400 3 124 149 STS -AC2 (FUTURE) 400 3 - - AMP: 124.0 STS -AD2 (KCDC) 400 3 124 149 VOLTS: STS -BA2 400 3 - STS -CA2 400 3 - - PHASE: STS -DA2 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 248 298 AMPS 248 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste- link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 248 248 T.C.L. (kVA) 248 248 DEMAND 248 298 10/28/08 VECA Electric SWBD MBP -52 -A3 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52A RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS STS -AB3 (FUTURE) 400 3 - - 124.0 STS -CB2 (KCDC) 400 3 124 149 AMP: STS -CD2 (FUTURE KCDC) 400 3 VOLTS: STS -BA3 400 3 - - STS -CA3 400 3 - - PHASE: STS-DA3 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 124 149 AMPS - 124 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution'. columns of a sub - feed panel or switchboard. I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 124 124 T.C.L. (kVA) 124 124 DEMAND 124 149 10/28/08 VECA Electric SWBD DP -52 -A ROOM: 3RD FLOOR NW Phase A LOAD DISTRIBUTION FROM: HDP -52A RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 64.0 AHU -52 -A1 125 3 64 77 64.0 AHU -52 -A2 125 3 64 77 AMP: 8.0 RF -52A 20 3 8 10 VOLTS: 218.0 CH -52A1 350 3 218 262 218.0 CH -52A1 350 3 218 262 PHASE: 218.0 CH -52A2 (FUTURE) 350 3 218 262 WIRE: CH -52A2 (FUTURE) 350 3 - - BUS: 24.0 CHP -52 -A 70 3 24 29 A.I.C.: 12.2 AHU -52 -A3 40 3 12 15 M.L.O.: 3 - - MAIN CB: 3 - - FUSE: 3 - - FLUSH: 3 - - SURF: 3 - - 3 - - 3 - - IG GND: 3 - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA _ TOTAL 826 994 AMPS 826 - MFG: SQ D CB: NOTE: Feeds T.C.L. is printed here horizontally to allow a block "paste-link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I Project: SDC -52 5/13/08 1600 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 826 826 T.C.L. (kVA) 826 826 DEMAND 826 994 10/28/08 VECA Electric SWBD HDP52B ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: UNIT SUBSTATION TB -52 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 369.0 UPS 52 -B1 PRIMARY 1200 3 369 444 UPS 52 -B1 STATIC BYPASS 1200 3 - - AMP: MBP -52 -B1 MAINT BYPASS 1200 3 - - VOLTS: 369.0 UPS 52 -B2 PRIMARY 1200 3 369 444 UPS 52 -B2 STATIC BYPASS 1200 3 - - PHASE: MBP -52 -B2 MAINT BYPASS 1200 3 - - WIRE: 369.0 UPS 52 -B3 PRIMARY 1200 3 369 444 BUS: UPS 52 -B3 STATIC BYPASS 1200 3 - - A.I.C.: MBP -52 -B3 MAINT BYPASS 1200 3 - - M.L.O.: 276.0 UPS 52 -B4 PRIMARY (FUTURE) 800 3 276 332 MAIN CB: UPS 52 -B4 STATIC BYPASS (FUTURE) 800 3 - - FUSE: MBP -52 -B4 MAINT BYPASS (FUTURE) 800 3 - - FLUSH: 0.0 0.0 826.2 0.0 DP -52 -B MECH 1600 3 826 994 SURF: 52 -H4B LIGHTING VIA 30 KVA (FUTURE) 50 3 - - 52 -L4B RECPT VIA 30 KVA (FUTURE) 50 3 - - TVSS 100 3 - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 2,209 2,657 AMPS 2,209 - MFG: SQ D CB: NOTE: SWITCHBOARD HAS DUAL INPUT BREAKERS WITH AUTOMATIC TRANSFER FROM NORMAL Feeder T.C.L. is printed here horizontally TO GENERATOR POWER. to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 4000 277 480 3 3 CU 65K YES YES YES . T.C.L. (kVA) 2,209 2,209 4 T.C.L. (kVA) 2,209 2,209 DEMAND 2,209 2,657 10/28/08 VECA Electric SWBD MBP -52 -B1 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52B RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -BA1 (PROVIDENCE) 400 3 124 149 STS -BC1 (FUTURE) 400 3 - - AMP: 124.0 STS -CA1 (PROVIDENCE) 400 3 124 149 VOLTS: STS -AB1 400 3 - - STS -CB1 400 3 PHASE: STS-DB1 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL _ - - FEEDER - - kVA TOTAL 248 298 AMPS 248 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste- link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 248 248 T.C.L. (kVA) 248 248 DEMAND 248 298 10/28/08 VECA Electric SWBD MBP -52 -B2 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52B RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -BA2 (KCDC) 400 3 124 149 96.0 STS -BC2 (KCDC) 400 3 96 115 AMP: 124.0 STS -DA2 (KCDC) 400 3 124 149 VOLTS: STS -AB2 400 3 - - STS-CB2 400 3 - - PHASE: STS -DB2 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDE - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL 1 - - FEEDER - - kVA TOTAL 344 414 AMPS - - 344 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 344 344 4 T.C.L. (kVA) 344 344 DEMAND 344 414 10/28/08 VECA Electric DIST 52 -BC2 ROOM: SDC -52 -03 KCDC SPACE Phase A LOAD DISTRIBUTION FROM: MBP -52A2 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 56.0 52 -BC2 -1 400 3 56 155 20.0 52- BC2 -2a 200 3 20 56 AMP: 14.0 52- BC2 -2b 200 3 14 39 VOLTS: 5.0 52- BC2 -2c 200 3 5 14 PROVISION ONLY 400 3 - - PHASE: PROVISION ONLY 400 3 '' - WIRE: - - BUS: '' - A.I.C.: '. - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP A - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - LTG - - EQP v - - HEAT - - TOTAL - FEEDER - kVA TOTAL 95 264 AMPS 95 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 120 208 3 3 CU 65K NO YES YES T.C.L. (kVA) 95 95 T.C.L. (kVA) 95 95 DEMAND 95 264 10/28/08 VECA Electric SWBD MBP -52 -B3 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52B RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS STS -BA3 (FUTURE) 400 3 - - STS-BC3 (FUTURE) 400 3 - - AMP: 124.0 STS -DC3 (FUTURE KCDC) 400 3 124 149 VOLTS: STS -AB3 400 3 - - STS-CB3 400 3 - - PHASE: STS -DB3 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDE - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER _ - - kVA TOTAL 124 149 AMPS - - 124 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 124 124 2 T.C.L. (kVA) 124 124 DEMAND 124 149 10/28/08 VECA Electric SWBD DP -52 -B ROOM: 3RD FLOOR NW Phase A LOAD DISTRIBUTION FROM: HDP -52A RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 128.0 AHU -52 -B1 225 3 128 154 - - AMP: 8.0 RF -52B 20 3 8 10 VOLTS: 218.0 CH -52B1 350 3 218 262 218.0 CH -52B1 350 3 218 262 PHASE: 218.0 CH -52B2 (FUTURE) 350 3 218 262 WIRE: CH -52B2 (FUTURE) 350 3 - - BUS: 24.0 CHP -52 -B 70 3 24 29 A.I.C.: 12.2 AHU -52 -B3 40 3 12 15 M.L.O.: 3 - - MAIN CB: 3 - - FUSE: 3 - - FLUSH: 3 - - SURF: 3 - - 3 - - 3 1 - - IG GND: 3 - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 826 994 AMPS - 826 - MFG: SQ D CB: NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1600 277 480 3 3 CU 65K YES YES YES . T.C.L. (kVA) 826 826 4 T.C.L. (kVA) WO 826 826 DEMAND 826 994 10/28/08 VECA Electric SWBD HDP52C ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: UNIT SUBSTATION TB -52 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 369.0 UPS 52 -C1 PRIMARY 1200 3 369 444 UPS 52 -C1 STATIC CYPASS 1200 3 - - AMP: MCP -52 -C1 MAINT CYPASS 1200 3 - - VOLTS: 369.0 UPS 52 -C2 PRIMARY 1200 3 369 444 UPS 52 -C2 STATIC CYPASS 1200 3 - - PHASE: MCP -52 -C2 MAINT CYPASS 1200 3 - - WIRE: 369.0 UPS 52 -C3 PRIMARY 1200 3 369 444 BUS: UPS 52 -C3 STATIC CYPASS 1200 3 - - A.I.C.: MCP -52 -C3 MAINT CYPASS 1200 3 - - M.L.O.: 276.0 UPS 52 -C4 PRIMARY (FUTURE) 800 3 276 332 MAIN CB: UPS 52 -C4 STATIC CYPASS (FUTURE) 800 3 - - FUSE: MCP -52 -C4 MAINT CYPASS (FUTURE) 800 3 - - FLUSH: 826.2 DP -52 -C MECH 1600 3 826 994 SURF: 52 -H4C LIGHTING VIA 30 KVA (FUTURE) 50 3 - - 52 -L4C RECPT VIA 30 KVA (FUTURE) 50 1 3 - - TVSS 100 3 - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL) LOAD - - - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 2,209 2,657 AMPS 2,209 - MFG: SQ D CB: NOTE: SWITCHBOARD HAS DUAL INPUT BREAKERS WITH AUTOMATIC TRANSFER FROM NORMAL Feeder T.C.L. is printed here horizontally TO GENERATOR POWER. to allow a block "paste- link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 4000 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 2,209 2,209 2 T.C.L. (kVA) 2,209 2,209 DEMAND 2,209 2,657 10/28/08 VECA Electric SWBD MBP -52 -C1 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52C RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -CA1 (PROVIDENCE) 400 3 124 149 124.0 STS -CB1 (FUTURE) 400 3 124 149 AMP: 124.0 STS -CD1 (PROVIDENCE) 400 3 124 149 VOLTS: STS -AB1 400 3 - - STS-CB1 400 3 - - PHASE: STS -DB1 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDE - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER 1 - - kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub- feed panel or switchboard. Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 372 372 Z T.C.L. (kVA) 372 372 DEMAND 372 447 10/28/08 VECA Electric SWBD MBP -52 -C2 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52C RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -CA2 (FUTURE) 400 3 124 149 96.0 STS -CB2 (KCDC) 400 3 96 115 AMP: 124.0 STS -CD2 (KCDC) 400 3 124 149 VOLTS: STS -AC2 400 3 - - STS -BC2 400 3 - - PHASE: STS-DC2 400 3 - - WIRE: .. - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 344 414 AMPS - 344 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 344 344 4 T.C.L. (kVA) 344 344 DEMAND 344 414 10/28/08 VECA Electric DIST 52 -CB2 ROOM: SDC -52 -03 KCDC SPACE Phase A LOAD DISTRIBUTION FROM: MBP -52C2 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 20.0 52-BC2-la 200 3 20 56 14.0 52 -BC2 -1 b 200 3 14 39 AMP: 5.0 52 -BC2 -1 c 200 3 5 14 VOLTS: 56.0 52 -BC2 -2 400 3 56 155 10.9 0.0 30.2 0.0 PANEL 52 -CB2L 150 3 41 114 PHASE: PROVISION ONLY 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDE - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 136 378 AMPS 11 - 125 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block 'paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. Project: SDC -52 5/13/08 1200 120 208 3 3 CU 65K NO YES YES T.C.L. (kVA) 11 125 136 T.C.L. (kVA) 11 125 136 DEMAND 136 377 10/28/08 VECA Electric PANEL: 52 -CB2L (KCDC) ROOM: FUTURE FEED -THRU: Phase A LOADS FROM: 52 -TLB A B C RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS KVA AMPS 1.1 1 COMMAND CENTER A 20 1 1.1 9.2 1.1 3 COMMAND CENTER B 20 1 1.1 9.2 AMP: 150 1.1 5 COMMAND CENTER C 20 1 1.1 9.2 VOLTS: 120 1.1 7 COMMAND CENTER A 20 1 1.1 9.2 208 1.1 9 BUILD ROOM B 20 1 1.1 9.2 PH: 3 1.1 11 BUILD ROOM C 20 1 1.1 9.2 WIRE: 4 1.0 13 BUILD ROOM 208 v OUTLET A 30 2 1.0 8.3 BUS: AL 1.0 15 B 1.0 8.3 A.I.C.: 18K 0.7 17 SERVER RM CONVEN OUTLETS C 20 1 0.7 5.8 MLO: YES 0.7 19 SERVER RM CONVEN OUTLETS A 20 1 0.7 5.8 MCB: 1.1 21 BUILD ROOM B 20 1 1.1 9.2 3R: 0.7 23 PRINTER 128 HLC 5 -15R C 20 1 0.7 5.8 FLUSH: 2.4 25 PRINTER 128 HLC 14 -30R A 30 3 2.4 20.0 SURF: YES 2.4 27 B 2.4 20.0 2.4 29 C " " 2.4 20.0 4.0 31 PRINTER 128 HLC 14 -50R A 50 3 4.0 33.3 IG GRND. 4.0 33 B 4.0 33.3 200% N: 4.0 35 " C " " 4.0 33.3 FD THRU NO 37 A 20 1 0.0 0.0 DBL LUG 39 B 20 1 0.0 0.0 TOP: YES 41 C 20 1 0.0 0.0 BTM: 0.3 2 PRINTER EPS 4110 5 -115R A 20 1 0.3 2.5 PANEL T.C.L. 1.0 4 PRINTER EPS 4110 6 -15R B 20 2 1.0 8.3 LOAD (kVA) 1.0 6 C " " 1.0 8.3 RCPT 10.9 2.0 8 PRINTERS 5 -30R A 30 1 2.0 16.7 LTG 0.0 2.0 10 PRINTERS B 30 1 2.0 16.7 EQP 30.2 2.0 12 PRINTERS C 30 1 2.0 16.7 HEAT 0.0 0.6 14 PRINT ROOM OUTLETS A 20 1 0.6 5.0 1 0.6 16 PRINT ROOM OUTLETS B 20 1 0.6 5.0 TOTAL 41.1 0.6 18 PRINT ROOM OUTLETS C 20 1 0.6 5.0 c 20 _ A 20 1 0.0 0.0 FEEDER T.C.L. r 22 B 20 1 0.0 0.0 LOAD (kVA) 24 C 20 1 0.0 0.0 RCPT 10.9 26 A 0.0 0.0 LTG 0.0 28 B 0.0 0.0 EQP 30.2 30 C 0.0 0.0 HEAT 0.0 32 A 0.0 0.0 34 B 0.0 0.0 TOTAL 41.1 36 C 0.0 0.0 LG MTR 38 A 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 40.7 42 C 0.0 0.0 AMPS 112.8 - A 0.0 0.0 - B 0.0 0.0 - C 0.0 0.0 10.9 0.0 30.2 0.0 KVA/AMPS: 13.2 110.0 14.3 119.2 13.6 113.3 Mfg/Type: 3.5 0.0 9.7 0.0 A CB Type: 3.9 0.0 10.4 0.0 B Remarks: OUTLET LOADS 3.5 0.0 10.1 0.0 C VECA Electric SWBD MBP -52 -C3 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52C RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -CA3 (FUTURE) 400 3 124 149 124.0 STS -CB3 (FUTURE) 400 3 124 149 AMP: 124.0 STS -CD3 (FUTURE) 400 3 124 149 VOLTS: STS -AB3 400 3 - - STS -CB3 400 3 - - PHASE: STS -DB3 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - HEAT - - TOTAL - - FEEDER - kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block 'paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I _Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) • 372 372 T.C.L. (kVA) • 372 372 DEMAND 372 447 10/28/08 VECA Electric SWBD HDP52D ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: UNIT SUBSTATION TB -52 RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 369.0 UPS 52 -D1 PRIMARY 1200 3 369 444 UPS 52 -D1 STATIC BYPASS 1200 3 - - AMP: MDP -52 -D1 MAINT BYPASS 1200 3 - - VOLTS: 369.0 UPS 52 -D2 PRIMARY 1200 3 369 444 UPS 52 -D2 STATIC BYPASS 1200 3 - - PHASE: MDP -52 -D2 MAINT BYPASS 1200 3 - - WIRE: 369.0 UPS 52 -D3 PRIMARY 1200 3 369 444 BUS: UPS 52 -D3 STATIC BYPASS 1200 3 - - A.I.C.: MDP -52 -D3 MAINT BYPASS 1200 3 - - M.L.O.: 276.0 UPS 52 -D4 PRIMARY (FUTURE) 800 3 276 332 MAIN CB: UPS 52 -D4 STATIC BYPASS (FUTURE) 800 3 - - FUSE: MDP -52 -D4 MAINT BYPASS (FUTURE) 800 3 - - FLUSH: 826.2 DP -52 -D MECH 1600 3 826 994 SURF: 52 -H4D LIGHTING VIA 30 KVA (FUTURE) 50 3 - - 52 -L4D RECPT VIA 30 KVA (FUTURE) 50 3 - - TVSS 100 3 - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 2,209 2,657 AMPS 2,209 - MFG: SQ D CB: NOTE: SWITCHBOARD HAS DUAL INPUT BREAKERS WITH AUTOMATIC TRANSFER FROM NORMAL Feeder T.C.L. is printed here horizontally TO GENERATOR POWER. to allow a block 'paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I Project: SDC -52 5/13/08 4000 277 480 3 3 CU 65K 2,209 DEMAND 2,209 2,657 VECA Electric SWBD MBP -52 -D1 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52D RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -DA1 (FUTURE) 400 3 124 149 124.0 STS -DB1 (FUTURE) 400 3 124 149 AMP: 124.0 STS -DC1 (PROVIDENCE) 400 3 124 149 VOLTS: STS -AD1 400 3 - - STS -BD1 400 3 - - PHASE: STS CD1 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL _ - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - - FEEDE - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste-link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 372 372 4 T.C.L. (kVA) 372 372 DEMAND 372 447 10/28/08 VECA Electric SWBD MBP -52 -D2 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52D RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -DA2 (KCDC) 400 3 124 149 124.0 STS -DB2 (FUTURE) 400 3 124 149 AMP: 124.0 STS -DC2 (KCDC) 400 3 124 149 VOLTS: STS-AD2 400 3 - - STS -BD2 400 3 - - PHASE: STS -CD2 400 3 - - WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER - - kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste -link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 372 372 T.C.L. (kVA) ON 372 372 DEMAND 372 447 10/28/08 VECA Electric SWBD MBP -52 -D3 ROOM: SDC 52 MAIN ELEC ROOM Phase A LOAD DISTRIBUTION FROM: HDP -52D RCPT LTG EQP HEAT DESCRIPTION AMP P kVA AMPS 124.0 STS -DA3 (FUTURE) 400 3 124 149 124.0 STS -DB3 (FUTURE) 400 3 124 149 AMP: 124.0 STS -DC3 (FUTURE) 400 3 124 149 VOLTS: STS -AD3 400 3 - - STS -BD3 400 _ 3 - - PHASE: STS -CD3 400 3 WIRE: - - BUS: - - A.I.C.: - - M.L.O.: - - MAIN CB: - - FUSE: - - FLUSH: - - SURF: - - IG GND: - - 200% N: - - FD THRU: - - DBL LUG: - - TOP: - - BTM: - - PANEL - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDS - - LOAD - - RCPT - - LTG - - EQP - - HEAT - - TOTAL - - FEEDER _ kVA TOTAL 372 447 AMPS 372 - MFG: SQ D CB: SQ D NOTE: Feeder T.C.L. is printed here horizontally to allow a block "paste- link" to the "Load Distribution" columns of a sub - feed panel or switchboard. I I I Project: SDC -52 5/13/08 1200 277 480 3 3 CU 65K YES YES YES T.C.L. (kVA) 372 372 Z T.C.L. (kVA) 372 372 DEMAND 372 447 10/28/08 VECA Electric PANEL: 52 -H4A ROOM: PROVIDENCE OFFICE FEED -THRU: LOADS FROM: HDP -52A A B C RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS KVA AMPS 2.0 1 PROVIDENCE DATA CENTER LIGHTS A 20 1 2.0 7.2 2.0 3 PROVIDENCE DATA CENTER LIGHTS B 20 1 2.0 7.2 AMP: 100 2.0 5 PROVIDENCE OFFICE LIGHTS C 20 1 2.0 7.2 VOLTS: 277 2.0 7 PROVIDENCE OFFICE LIGHTS A 20 1 2.0 7.2 480 9 B 20 1 0.0 0.0 PH: 3 11 C 20 1 0.0 0.0 WIRE: 4 13 A 20 1 0.0 0.0 BUS: CU 15 B 20 1 0.0 0.0 A.I.C.: 18K 17 C 20 1 0.0 0.0 MLO: 19 A 20 1 0.0 0.0 MCB: YES 21 B 20 1 0.0 0.0 3R: 23 C 20 1 0.0 0.0 FLUSH: 25 A 20 1 0.0 0.0 SURF: YES 27 B 20 1 0.0 0.0 29 C 20 1 0.0 0.0 31 A 20 1 0.0 0.0 IG GRND 33 B 20 1 0.0 0.0 200% N: 35 C 20 1 0.0 0.0 FD THRU: 37 A 20 1 0.0 0.0 DBL LUG. 39 B 20 1 0.0 0.01 TOP: 41 r C 20 1 0.0 0.0 BTM: YES 2 A 20 1 0.0 0.0 PANEL T.C.L. 4 B 20 1 0.0 0.0 LOAD (kVA) 6 C 20 1 0.0 0.0 RCPT 0.0 8 A 20 1 0.0 0.0 LTG 8.0 10 1 B 20 1 0.0 0.0 EQP 0.0 12 C 20 1 0.0 0.0 HEAT 0.0 14 A 30 3 0.0 0.0 1 16 B 0.0 0.0 TOTAL 8.0 18 C " " 0.0 0.0 c 20 A 30 3 0.0 0.0 FEEDER T.C.L. f 22 B 0.0 0.0 LOAD (kVA) 24 C " " 0.0 0.0 RCPT 0.0 26 A 30 3 0.0 . 0.0 LTG 8.0 28 B 0.0 0.0 EQP 0.0 30 C " " 0.0 0.0 HEAT 0.0 32 A 0.0 0.0 34 B 0.0 0.0 TOTAL 8.0 36 C 0.0 0.0 LG MTR 38 A 30 2 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 10.0 42 C 20 1 0.0 0.0 AMPS 12.0 - A 0.0 0.0 - B 0.0 0.0 - C 0.0 0.0 0.0 8.0 0.0 0.0 KVA/AMPS: 4.0 14.4 2.0 7.2 2.0 7.2 Mfg/Type: 0.0 4.0 0.0 0.0 A CB Type: 0.0 2.0 0.0 0.0 B Remarks: - 0.0 2.0 0.0 0.0 C VECA Electric PANEL: 52 -L4A ROOM: PROVIDENCE FEED -THRU: LOADS FROM: 52 -TLA A B C RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS KVA AMPS 1.1 1 DATA CENTER RECEPTACLES A 20 1 1.1 9.2 1.1 3 DATA CENTER RECEPTACLES B 20 1 1.1 9.2 AMP: 100 1.1 5 DATA CENTER RECEPTACLES C 20 1 1.1 9.2 VOLTS: 120 1.1 7 PROVIDENCE BREAK RECEPTACLES A 20 1 1.1 9.2 208 1.1 9 PROVIDENCE BREAK RECEPTACLES B 20 1 1.1 9.2 PH: 3 1.1 11 PROVIDENCE BREAK RECEPTACLES C 20 1 1.1 9.2 WIRE: 4 1.0 13 COPIER A 20 1 1.0 8.3 BUS: AL 1.1 15 CUBES WEST RECEPTACLES B 20 1 1.1 9.2 A.I.C.: 18K 1.1 17 CUBES WEST RECEPTACLES C 20 1 1.1 9.2 MLO: YES 1.1 19 LARGE CONFERENCE RM RECEPTACLE A 20 1 1.1 9.2 MCB: 1.1 21 CUBES EAST RECEPTACLES B 20 1 1.1 9.2 3R: 1.1 23 STORAGE RECEPTACLES C 20 1 1.1 9.2 FLUSH: 1.1 25 BUILD ROOM RECEPTACLES A 20 1 1.1 9.2 SURF: YES 1.1 27 BUILD ROOM RECEPTACLES B 20 1 1.1 9.2 1.1 29 BUILD ROOM RECEPTACLES _ C 20 1 1.1 9.2 1.1 31 BUILD ROOM RECEPTACLES A 20 1 1.1 9.2 IG GRND. 33 B 20 1 0.0 0.0 200% N: 35 C 20 1 0.0 0.0 FD THRU NO 37 A 20 1 0.0 0.0 DBL LUG 39 B 20 1 0.0 0.0 TOP: YES 41 C 20 1 0.0 0.0 BTM: 0.5 2 N.O.C. POWER A 20 1 0.5 4.2 PANEL T.C.L. 0.5 4 N.O.C. POWER B 20 1 0.5 4.2 LOAD (kVA) 0.5 6 N.O.C. POWER C 20 1 0.5 4.2 RCPT 16.5 0.5 8 N.O.C. POWER A 20 1 0.5 4.2 LTG 0.0 0.5 10 N.O.C. POWER B 20 1 0.5 4.2 EQP 4.5 0.5 12 N.O.C. POWER C 20 1 0.5 4.2 HEAT 0.0 0.5 14 N.O.C. POWER A 20 1 0.5 4.2 1 16 B 0.0 0.0 TOTAL 21.0 18 C 0.0 0.0 c 20 A 0.0 0.0 FEEDER T.C.L. r 22 B 0.0 0.0 LOAD (kVA) 24 C 0.0 0.0 RCPT 16.5 26 A 0.0 0.0 LTG 0.0 28 B 0.0 0.0 EQP 4.5 30 C 0.0 0.0 HEAT 0.0 32 A 0.0 0.0 34 B 0.0 0.0 TOTAL 21.0 36 C 0.0 0.0 LG MTR 38 A 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 17.8 42 C 0.0 0.0 AMPS 49.3 - A 0.0 0.0 - B 0.0 0.0 - C 0.0 0.0 16.5 0.0 4.5 0.0 KVA/AMPS: 8.0 66.7 6.5 54.2 6.5 54.2 Mfg/Type: 5.5 0.0 2.5 0.0 A CB Type: 5.5 0.0 1.0 0.0 B Remarks: - 5.5 0.0 1.0 0.0 C VECA Electric PANEL: 52 -H4B (FUTURE) ROOM: FUTURE FEED -THRU: LOADS FROM: HDP -52B A B C RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS KVA AMPS, 1 A 20 1 0.0 0.0 3 B 20 1 0.0 0.0 AMP: 100 5 C 20 1 0.0 0.0 VOLTS: 277 7 A 20 1 0.0 0.0 480 9 B 20 1 0.0 0.0 PH: 3 11 C 20 1 0.0 0.0 WIRE: 4 13 A 20 1 0.0 0.0 BUS: AL 15 B 20 1 0.0 0.0 A.I.C.: 18K 17 C 20 1 0.0 0.0 MLO: YES 19 A 20 1 0.0 0.0 MCB: 21 B 20 1 0.0 0.0 3R: 23 C 20 1 0.0 0.0 FLUSH: 25 A 20 1 0.0 0.0 SURF: YES 27 B 20 1 0.0 0.0 29 C 20 1 0.0 0.0 31 A 20 1 0.0 0.0 IG GRND 33 B 20 1 0.0 0.0 200% N: 35 C 20 1 0.0 0.0 FD THRU NO 37 A 20 1 0.0 0.0 DBL LUG. 39 B 20 1 0.0 0.0 TOP: YES 41 C 20 1 0.0 0.0 BTM: 2 A 20 1 0.0 0.0 PANEL T.C.L. 4 B 20 1 0.0 0.0 LOAD (kVA) 6 C 20 1 0.0 0.0 RCPT 0.0 8 A 20 1 0.0 0.0 LTG 0.0 10 B 20 1 0.0 0.0 EQP 0.0 12 C 20 1 0.0 0.0 HEAT 0.0 14 A 20 3 0.0 0.0 1 16 _ B 0.0 0.0 TOTAL 0.0 18 C " " 0.0 0.0 c 20 A 30 3 0.0 0.0 FEEDER T.C.L. fi 22 B 0.0 0.0 LOAD (kVA) 24 C " " 0.0 0.0 RCPT 0.0 26 A 30 3 0.0 0.0 LTG 0.0 28 B 0.0 0.0 EQP 0.0 30 C 0.0 0.0 HEAT 0.0 32 A 0.0 0.0 34 B 0.0 0.0 TOTAL 0.0 36 C 0.0 0.0 LG MTR 38 A 30 2 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 0.0 42 C 20 1 0.0 0.0 AMPS 0.0 - A 0.0 0.0 - B 0.0 0.0 - C 0.0 0.0 0.0 0.0 0.0 0.0 KVA/AMPS: 0.0 0.0 0.0 0.0 0.0 0.0 Mfg/Type: 0.0 0.0 0.0 0.0 A CB Type: 0.0 0.0 0.0 0.0 B Remarks: - 0.0 0.0 0.0 0.0 C 0 VECA Electric PANEL: 52 -L4B (FUTURE) ROOM: FUTURE FEED -THRU: LOADS FROM: 52 -TLB A B C RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS KVA AMPS 1 A 20 1 0.0 0.0 3 B 20 1 0.0 0.0 AMP: 100 5 C 20 1 0.0 0.0 VOLTS: 120 7 A 20 1 0.0 0.0 208 9 B 20 1 0.0 0.0 PH: 3 11 C 20 1 0.0 0.0 WIRE: 4 13 A 20 1 0.0 0.0 BUS: AL 15 B 20 1 0.0 0.0 A.I.C.: 18K 17 C 20 1 0.0 0.0 MLO: YES 19 A 20 1 0.0 0.0 MCB: 21 B 20 1 0.0 0.0 3R: 23 C 20 1 0.0 0.0 FLUSH: 25 A 20 1 0.0 0.0 SURF: YES 27 B 20 1 0.0 0.0 29 C 20 1 0.0 0.0 31 A 20 1 0.0 0.0 IG GRND. 33 B 20 1 0.0 0.0 200% N: 35 C 20 1 0.0 0.0 FD THRU NO 37 A 20 1 0.0 0.0 DBL LUG 39 B 20 1 0.0 0.0 TOP: YES 41 C 20 1 0.0 0.0 BTM: 2 A 20 1 0.0 0.0 PANEL T.C.L. 4 B 20 1 0.0 0.0 LOAD (kVA) 6 C 20 1 0.0 0.0 RCPT 0.0 8 A 20 1 0.0 0.0 LTG 0.0 10 B 20 1 0.0 0.0 EQP 0.0 12 C 20 1 0.0 0.0 HEAT 0.0 14 A 20 3 0.0 0.0, 1 16 B 0.0 0.0 TOTAL 0.0 18 C " " 0.0 0.0 c 20 A 30 3 0.0 0.0 FEEDER T.C.L. fi 22 B 0.0 0.0 LOAD (kVA) 24 C " " 0.0 0.0 RCPT 0.0 26 A 30 3 0.0 0.0 LTG 0.0 28 B 0.0 0.0 EQP 0.0 30 C " " 0.0 0.0 HEAT 0.0 32 A 0.0 0.0 34 B 0.0 0.0 TOTAL 0.0 36 C 0.0 0.0 LG MTR 38 A 30 2 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 0.0 42 C 20 1 0.0 0.0 AMPS 0.0 - A 0.0 0.0 - B 0.0 1 0.0 - C 0.0 0.0 0.0 0.0 0.0 0.0 KVA/AMPS: 0.0 0.0 0.0 0.0 0.0 0.0 Mfg/Type: 0.0 0.0 0.0 0.0 A CB Type: 0.0 0.0 0.0 0.0 B Remarks: - 0.0 0.0 0.0 0.0 C KVA ' Amps CALC TOTAL 03 •-- 0) N 0 0 N N 0 O O 0 O LO 0 O O 0 10 N 0 O O 0 0 O 0 0 O Q H 0. Q CONN TOTAL 618 42 1 O co Q 7 "I 0 co r n.- NI Q O N N M �I Q O N N M 2 0. SI V1 W II 1 1 QI2 21 2 TI LOAD TYPE 1LIGHTING IGEN USE RECPT ( <10KVA) GEN USE RECPT ( >10KVA) MOTORS & COMPR (EQUIP) LARGEST MOTOR SPECIFIC RECEPTACLES HVAC & MECH EQUIP (HEAT) KITCHEN EQUIP MISC LOADS (TOTAL CONNECTED LOAD (TOTAL CALCULATED LOAD (TOTAL CALCULATED AMPS J T co N` a J= a N)- u) y Y y } y y PANEL T.C.L (kVA) 0.0 0.0 1425.5 O O 1425.5 I O O O O 1425.5 O 0 1425.5 1 FEEDER DEMAND 1425.5 I 1714.6 o AMP: IVOLTS: PHASE: IWIRE: IBUS TYPE: A.I.C.: O IMAIN CB: INEMA 3R: IFLUSH: SURFACE: IGND. BAR: ISO GND: w Z gz 8 0 IFEED THRU: IDBL LUG: ITOP FEED: IBTM FEED: LOAD RCPT LTG EQP F ¢ = TOTAL FEEDER LOAD RCPT LTG a w HEAT TOTAL > x AMPERES N a Q O 64,766'40 4 M 0 n n " n N W W . - W .- W t o N 0 6 0 0 0 6 0 6 0 6 0 6 O 0 0 6 0 6666660666666 0 0 O 0 0 0 0 0 O 0 0 0 o 0 0 0 o 0 0 0 o 0 o 0 0 0 o 0 to ei N. Y O 8 OV 0 N- 0: V N 0 0: N N N CO t0 fD f0 W O 0 O o O o O 0 O 0 O 0 O 0 O 0 O O O O O O o C O O C 0 O 0 O O 0 0 O 0 O O 0 C O C O O O O O O O G O o O 66 O O 0 to H N a MCC -B MODIFICATIONS IPROV ONLY IPROV ONLY PROV ONLY PROV ONLY PROV ONLY PROV ONLY PROV ONLY IPROV ONLY IPROV ONLY IPROV ONLY IPROV ONLY (..) 2 a �$ W W N W ° 8 W K 0 0 2 1 0 2 1 0 0 0 0 2 2 2 2 1 1 1 1 0 2 1 0 2 1 0 2 1 0 2 1 0 2 1 PROVIDE STARTERS FOR UNITS #1 THRU #2 ONLY w 0 Q a CO CO .N- .- 1- w N CO V CO N N N N.- .- .- .- N a 0 0. 0 0 0 0 N N N to to co M 0) 8 0 0 0. a y ceCeCCCCCeCCCCCOCOCOCC > Z LL > Z LL > > > > Z Z Z Z LL LL LL LL > Z LL 1 > Z LL > Z LL > Z LL > Z LL 4 SECTION MCC DEVICE CMB STR ,CMB STR CMB STR CMB STR CMB STR CMB STR ICMB STR ICMB STR CMB STR ICMB STR CMB STR 0) O to co 1 0 VECA Electric 113ASEMENT CHILLER ROOM NN CU DESCRIPTION CP -B 4 CW PUMP 75 HP (TI) CP -B-6 CW PUMP 40. HP (TI) CH -B -XX PROCESS CHILLER (TI) CH -B -XX PROCESS CHILLER (TI) CH -B -XX PROCESS CHILLER (TI) CH -B -)0( PROCESS CHILLER (TI) CP -B -XX PROCESS CHILLER PUMP (TI) ICP-B40( PROCESS CHILLER PUMP (TI) CP -B -XX PROCESS CHILLER PUMP (TI) ICP-B-)0( PROCESS CHILLER PUMP (TI) CP -B -XX TENANT COND PUMP 15HP (TI) T MFG: CB:I w 0 0 Z Project: O a Q u_ Z r' N M V W N. W 0) m N N N N N N N N N N N !") M M M v W al W 0 O O Q CO 0 LOAD DISTRIBUTION f"' Q = O O O 0 O 0 O 0 O O a w pO N 0) n O O V V O O N N N N to f0 f0 f0 W tn ua ' 4 < 4 C 4 C N V 0 J 0 O 0 0 0 0 0 0 O O r- at 0 cc o 0 0 66 o O 0 o 0 VECA Electric PANEL: ELP ROOM: ELEV PENTHOUSE FEED -THRU: LOADS FROM: EL A B RCPT LTG EQP HEAT CKT DESCRIPTION PH AMP P KVA AMPS KVA AMPS 0.8 1 LIGHTING A 20 1 0.8 6.7 0.4 3 CAB LIIGHTS #2 B 20 1 0.4 3.3 AMP: 60 0.4 5 CAB LIIGHTS #3 A 30 1 0.4 3.3 VOLTS: 120 0.4 7 CAB LIIGHTS #4 B 20 1 0.4 3.3 208 0.4 9 CAB LIIGHTS #5 A 20 1 0.4 3.3 PH: 1 0.3 11 ELEV EXHAUST FAN B 20 1 0.3 2.5 WIRE: 3 13 A 20 1 0.0 0.0 BUS: AL 20.0 15 B 20 1 ,� 20.01166.) A.I.C.: 10K 17 A 0.0 0.0 MLO: YES 19 B 0.0 0.0 MCB: 21 A 0.0 0.0 3R: 23 B 0.0 0.0 FLUSH: 25 A 0.0 0.0 SURF: YES 27 B 0.0 0.0 29 A 0.0 0.0 31 B 0.0 0.0 IG GRND: 33 A 0.0 0.0 200% N: 35 B 0.0 0.0 FD THRU NO 37 A 0.0 0.0 DBL LUG. 39 B 0.0 0.0 TOP: " BTM: YES 0.2 2 CONTROL POWER #2 A 20 1 0.2 1.7 PANEL T.C.L. 0.2 4 CONTROL POWER #3 B 20 1 0.2 1.7 LOAD (kVA) 0.2 6 CONTROL POWER#4 A 20 1 0.2 1.7 RCPT 0.2 0.2 8 CONTROL POWER #5 B 20 1 0.2 1.7 LTG 2.4 0.2 10 ELEV MACHINE ROOM OUTLETS A 20 1 0.2 1.7 EQP 21.3 0.2 12 SHUNT TRIP POWER B 20 1 0.2 1.7 HEAT 0.0 14 A 0.0 0.0 16 B 0.0 0.0 TOTAL 23.9 18 A 0.0 0.0 20 B 0.0 0.0 FEEDER T.C.L. 22 A 0.0 0.0 LOAD (kVA) 24 B 0.0 0.0 RCPT 0.2 26 A 0.0 0.0 LTG 2.4 28 B 0.0 0.0 EQP 21.3 30 A 0.0 0.0 HEAT 0.0 32 B 0.0 0.0 34 A 0.0 0.0 TOTAL 23.9 36 B 0.0 0.0 38 A 0.0 0.0 FEEDER DEMAND 40 B 0.0 0.0 kVA 24.5 " AMPS 117.8 0.2 2.4 21.3 0.0 KVA/AMPS: 2.2 18.3 21.7 180.8 Mfg/Type: 0.2 1.6 0.4 0.0 A CB Type: 0.0 0.8 20.9 0.0 B Remarks: 24 CKT PANEL; CKTS #3,5,7,9 PROVIDE LOCK -OFF; MACH RM RECEPT TO BE ON GFI. DHS - 4/19/04 10/28/08 0--31-2009 LAURA RANNOW 5(.14 7TH AVE S SEATTLE WA 98108 City of Tukwila Jim Haggerton, Mayor Department of Community Development R E: Permit No. EL08 -1390 3355 S 120 PL TUKW D !ar Permit Holder: Jack Pace, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Pc r the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code, every permit issued by the Biiilding Division under the provisions of the code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if th.: project should be considered abandoned. If such determination is made, the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code does allow the Building Offmcia! to approve one extension of time for an additional period not exceeding 180 days. Extension requests mist be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/22/2009 , your permit will become null and vcid and any further work on the project will require a new permit application and associated fees. TI ank you for your cooperation in this matter. Si.icerely, r Marshall Technician xc: Pcrmit File No. EL(8 -1390 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL08 -1390 DATE: 10 -28 -08 PROJECT NAME: KING COUNTY DATA CENTER SITE ADDRESS: 3355 S 120 PL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPART MENTS: LI / Buiftrrng Division Public Works Li Fire Prevention Structural ❑ Planning Division ❑ Permit Coordinator T4 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete o DUE DATE: 10 -30-08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUESITHURS ROUTING: Please Route Structural Review Required ❑ No further Review Required o REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: El DUE DATE: 11 -27 -08 VII Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28-02 Untitled Page • • Page 1 of 3 Electrical Contractor A business licensed by LEtI to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. Business and Licensing Information Name Phone Address VECA ELECTRIC CO INC 2064365200 5614 7TH AVE S Suite /Apt. PO BOX 80467 City State Zip County Business Type Parent Company SEATTLE WA 98108 KING CORPORATION UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 601190731 ACTIVE VECAECI542MU ELECTRICAL CONTRACTOR 7/31/1946 10/31/2009 CONTIK *965D6 GENERAL UNUSED MASTER ELECTRICIAN INFORMATION License CONTIK`965D6 Name CONTI, KEITH Status ACTIVE Business Owner Information Name Role Effective Date Expiration Date FAIRBANKS, THOMAS Cancel Date 01/01/1980 Bond Amount ALLEN, RON AGENT 01/01/1980 929407110 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 WESTERN SURETY CO 929407110 01/06/2007 Until Cancelled $4,000.00 01/06/2007 TRAVELERS https: // fortress .wa.gov /lni/bbip/Detail. aspx ?License= VECAECI542MU 11/03/2008 MUM MIME SWIM i1®■ iii g O 3 $ os LIGHTING SYMBOLS FLUORESCENT FIXTURE, TYPE AS INDICATED ON PLAN FIXTURE CEILING MOUNTED FIXTURE WALL MOUNTED FIXTURE WALL WASHER FIXTURE WITH BATTERY BACKUP BATTERY PACK EMERGENCY LIGHTING UNIT, TYPE EB1 EXIT SIGN INDICATES EXIT SIGN WITH INTEGRAL EMERGENCY LIGHTS. FIXTURE TYPE — SEE FIXTURE SCHEDULE SINGLE POLE SWITCH 3 WAY SWITCH PRE —SET TYPE DIMMER /SWITCH POLE MOUNT FIXTURE AND POLE PHOTOCELL DAYLIGHT SENSOR OCCUPANCY SENSOR LIGHTING OVERRIDE SWITCH POWER SYMBOLS 4D DUPLEX RECEPTACLE 120V 4H — ISOLATED GROUND DOUBLE DUPLEX RECEPTACLE 120V IH F /4 (i) LP 1: DEDICATED RECEPTACLE 120V ATA RECEPTACLE GFI — WP GFI SPECIAL RECEPTACLE, TYPE AS NOTED OUTLET DESCRIPTION PANEL — 208 VOLT SYSTEM PANEL — 480 VOLT SYSTEM EQUIPMENT CONNECTION FLUSH FLOOR BOX WITH DEVICE AS INDICATED POKE THRU FLOOR BOX DISC NON —FUSED / FUSED STARTER COMBINATION STARTER NOTE: PANEL SCHEDULES, FIXTURE SCHEDULES AND LIGHTING ENERGY CODE SUBMITTAL ARE SEPARATE 8.5 "x11" ATTACHMENTS, AND AN INTEGRAL PART OF THIS PERMIT SUBMITTAL. THEY HAVE BEEN REVIEWED AND APPROVED WITH THIS PERMIT SUBMITTAL. O PB \!l 0 a (ABC) U3S 1 112 CIRCUITING SYMBOLS NEW WIRING. HASH MARKS INDICATE NUMBER OF #10 AWG WIRE UNLESS OTHERWISE NOTED, OTHERWISE, NO HASH MARKS INDICATES TWO WIRES PLUS GROUND UNLESS NOTED OTHERWISE. LONG HASH MARKS DENOTES NEUTRAL. INDICATES GROUND WIRE. i INDICATES ISOLATED GROUND WIRE, WHERE SHOWN. NEW WIRING RUN IN OR BELOW SLAB OR BELOW GRADE. RACEWAY STUB —OUT WITH BUSHING HOME RUN TO PANEL OR LOCATION NOTED CIRCUIT CONTINUATION JUNCTION BOX PULL BOX HAND HOLE THERMOSTAT RACEWAY UP RACEWAY DOWN FLAG NOTE REVISION SYMBOL EQUIPMENT IDENTIFIER. TRANSFORMER CARD READER A BB R `'VIATIONS AC INDICATES ABOVE COUNTER MOUNTING AT +4" ABOVE BACKSPLASH OR +6" ABOVE COUNTERS WITHOUT BACKSPLASH AFF ABOVE FINISHED FLOOR AIC, KAIC AMPS INTERRUPTING CAPACITY A, AMP AMPS AWG AMERICAN WIRE GAGE CB CIRCUIT BREAKER CKT CIRCUIT DED DEDICATED (E) EXISTING EWC ELECTRIC WATER COOLER FA FIRE ALARM FBO FURNISHED BY OTHERS FIBO FUNISHED & INSTALLED BY OTHERS FBOIC FURNISHED BY OTHERS, INSTALLED BY CONTRACTOR GROUND FAULT CIRCUIT INTERRUPTER GFI, GFCI G, GND HT J —BOX N GROUND HEIGHT JUNCTION BOX NEUTRAL NIC NL P PNL POS RO RECEPT SWBD TELE TYP UNO UC V 0 W W/O WP NOT IN CONTRACT NIGHT LIGE -IT POLE PANEL POINT OF SALE/ SALES REGISTER OUTLET RACEWAY ONLY RECEPTACLE SWITCHBOARD TELEPHONE TYPICAL UNLESS NOTED OTHERWISE UNDERCABINET VOLT PHASE WIRE OR WATT WITHOUT WEATHERPROOF DRAWI \C I \DI-X SHEET DESCRIPTION E0.00 COVER SHEET E5.4 ONE LINE PHASE 5 E1.10 PARTIAL 1ST FLR POWER E2.25 PARTIAL 2ND FLR LTNG PH 4 E3.25 PARTIAL 3RD FLR PWR PH 5 E7.25 PARTIAL 2ND FLR COMM PH 5 KING COUNTY DATA CENTER 5201 Volt A2 A3 F1 F2 F3 F4 Qty Mfg LITHONIA LITHONIA LIGHT EDGE LITHONIA LITHONIA CORELITE LITHONIA Catal 2AV G 2 32 MDR 277 GEB PWS1836 LP 2AV G 2 17 MDR 277 GEB PWS1836 LP RAP1 4- 54 -41 -MV 2PM3N SERIES 2PM3N SERIES AP- WP -2T8 SERIES AF SERIES UN SERIES UN SERIES 2SPG -Al2 SERIES LX SERIES F5 F58 F7 LITHONIA LITHONIA LITHONIA X DUAL LITE 1 277 Description 11/13/2007 2x4 D/I LAYIN TROFFER 277 2x2 D/I LAYIN TROFFER Lamp (2) 32w T8 (2 ) 17w T8 277 277 277 277 277 277 1 277 277 2X4 DEEP CELL LAY -IN TROFFER 2X2 DEEP CELL LAY -IN TROFFER 54T5HO (3) 32w T8 (3) 17w T8 12' SUSPENDED PERF DIRECT /INDIRECT DOWNLIGHT 2 -LAMP INDUSTRIAL STRIP Watts 61 34 54 91 (6) 32w T8 (2) 18w (2) 32w T8 2 -LAMP 8 FT. INDUSTRIAL STRIP 51 183 (4) 32w T8 36 61 122 2 LAMP LENSED ACRYLIC TROFFER UNIVERSAL LED EXIT 120/277v (2) 32w T8 61 LED FILE COPY Permit NO. Plar review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinanco. Receipt of approved F k1 Copy ditions is acknowledged: SABEY ARCHITECTURE CONSULTANTS B k (fl• ( Date: City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made tothe scscope of work without prior app o Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. REC IVE OCT 282008 PERMIT CENTS EL08-1390 CONSULTANT: Vera Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436 -5200 Fx (206) 763 -0505 www.veca.com REVISIONS CONSTRUCTION DOC STS REVISION KCDC KCDC PROGRESS KCDC PERMIT 7/25/08 9/2/08 10/5/08 10/14/08 10/27/08 ISSUE DATE All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. SAREY DATA CENTER KING COUNTY DATA CENTER 52 -01 BUILD OUT ��I g i osk' DRAWING TITLE: FIL. PLOT: PROJECT NUMBER: 85878 DRAWN BY: CHECKED BY: APPROVED BY: DRAWING NUMBER: COVER SHEET E0.00 SABEY ARCHITECTURE CONSULTANTS 0 0 0 0 0 0 0 0 0 0 © 0 0 0 0 0 0 0 11111017 ,UU.I PHASE 5 PHASE 4 tt PHASE 3 PHASE 1 FUTURE UPS 41, 52A -L1 /41 UPS -52 -A3 UPS -52 -A2 52A -L1-41 PROV PROV <EY PLAN UPS -52 -A1 LECH PNL M -52A GENERATOR INPUT NORMAL INPUT CONSULTANT: Vera Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436 -5200 Fx (206) 763 -0505 www.veca.com NORMAL INPUT SCOPE OF WORK GENERATOR INPUT 1 UPS -52 -B1 UPS -52 -B2 UPS -52 -B3 FUTURE UPS REVISIONS CONSTRUCTION DOC 7/25/08 STS REVISION 9/2/08 KCDC 10/5/08 KCDC PROGRESS 10/14/08 KCDC PERMIT 10/27/08 SCOPE OF WORK BATT CHGR PNL- 52B -L1 -3 BAT- CHGR 52A L1 /3 77-7 - 0 52A -L1 /39 PHlr�iF.i -!1 52A -L1 /41 XfW42. -HI OA-S;h -U XFR- 52B-HI XFR y2B-L» 52A -L1 /41 41) .. 52A -L1 /39 BLOCK HTR PNL- 52A- L1/1,3 pLe = SITCH HV SWITCH ? TNSFORMER HVL - ji TANK PUMP I HVL -A & CTRLS PNL- 52A --L1/7 .....w._ ,..,ate. —,. SUBSTATION HVL -52A SUBSTATION HVL -52B DAY TANK PUMP PNL - 52A -L1/39 & CTRLS PNL - 52B -L1/7• HV SWITCH HV SWITCH HVL-B I HVL -B TRANSFORMER HVL -B SECONDARY MAIN HVL -B ISSUE DATE All drawings and written rnaterial appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. SABEY DATA CENTER CENTRAL PLANT 52 -01 BUILD OUT ll It r j neast DRAWING TITLE: FILE: PLOT: PROJECT NUMBER: 89007 DRAWN BY: CHECKED BY: APPROVED BY: LEVEL 1 PHASE 4 - POWER SCALE: 1 /8 " =1 —0" DRAWING NUMBER: NORTH FIFECEEW OCT 2 8 2000 PERMIT CENTS FIRST FLOOR POWER PHASE 4 - SDC- 52 ARCHITECTURE CONSULTANTS 0 0 0 0 0 0 0 0 0 0 0 0 PHASE 4 PHASE 1 11 <EY PEA 0 0 0 0 0 0 0 0 0 - -0 a 0 0 FUTURE LTS r FUTURE LTS FUTURE CABINET ROW._._. ._. .. FUTURE LTS FUTURE . CABINET ROW FUTURE LTS FUTURE CABINET ROW _ .._. FUTURE CABINET ROW EL SWITCHING ATE STRIP CONSULTANT: Vera Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436 -5200 Fx (206) 763 -0505 www.veca.com REVISIONS CONSTRUCTION DOC 7/25/08 STS REVISION 9/2/08 KCDC 10/5/08 KCDC PROGRESS 10/14/08 KCDC PERMIT 10 /27/08 FUTURE LTS TWO LEVEL SWITCHING TWO LEVEL SWITCHING ALTERNATE STRIP (TYP) A.3 DIVERSIFY LT SOURCE FROM TWO SEPARATE BUSES PNL 52A -H1 '►. -H1 TWO LE ALTERN (TYP) EL SWITCHING rE STRIP I/O SWITCHING (TYP) 33 PANEL 52 -DA2 I/o SWITCHING (TYP) ISSUE DATE All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. TYPE X - ILLUM EXIT LIGHT SENSOR (2) LS -100XA OCCUPANCY SENSOR WT -1100 OCCUPANCY SENSOR DT -200 OCCUPANCY SENSOR WALL MT WI -200 SABEY DATA CENTER KING COUNTY DATA CENTER 52 -01 BUILD OUT EMERGENCY EGRESS NIGHT LIGHT DZ DAYLIGHT ZONE ( SEPARTAT CONTROLS) LIGHTING OVERRIDE SWITCH NL NIGHT LIGHT o� gast tTA DRAWING TITLE: LO8 t3'10 FILE: PLOT: PROJECT NUMBER: DRAWN BY: CHECKED BY: APPROVED BY: 85878 REEL OCT 2 8 2000 PERMIT CENTER 12 20 DRAWING NUMBER: PARTIAL 2ND FLOOR LIGHTING PHASE 5 NORTH E2.25 SABEY ARCHITECTURE CONSULTANTS PHASE 1 1! <EY PEA FUTURE CABINET ROW FUTURE CABINET ROW 10 PROVIDE GROUNDING SOURCE - THRU EXISTING BUILDING STEEL SYSTEM CB2L -17 CB2L -17 FUTURE CABINET ROW / FUTURE CABINET ROW OOA 52 -AB2 -2 10 10 CB2L -19 52 -C82 0 0 r ID 52 -DA2 0 0 r7 52 -ADZ 0 0 10 52 -BA2 -1 10 52 -BA2 -2 5 COORDINATE LOCATION & MOUNTING HEIGHT WITH ARCHITECT (TYP) 5 10 (2) L21 -30 DROPS PER CABINET (TYP) 10 52- AB2- -1 CB2LA CKT 5,7 CKT 9,11 (2) HUB 320R62 208/1/20A 2P3W FUTURE CABINET ROW 10 CB2L -19 400 D4- Z30 -ZS 400 DZ- ZOS -ZS 52- AD2 -1b 52- DA2 -2b 52- AD2 -2a 10 CB2L -17 10 10 1 1 1 M co N OCB2L --19 (28) L6 -30R DROPS PROVIDE (6) FOURPLEX ONE EACH FOR RACKS #9 -14 ALTERNATE BUSES EC L E C T R I C CONSULTANT: Vera Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436 -5200 Fx (206) 763 -0505 www.veca.com REVISIONS CONSTRUCTION DOC 7/25/08 STS REVISION 9/2/08 KCDC 10/5/08 KCDC PROGRESS 10/14/08 KCDC PERMIT 10/27/08 r) PROVIDE (5) FOURPLEX ONE EACH FOR RACKS #1 -5 ALTERNATE BUSES 10_._. 52 -CB2L 52 -CB2LA CB2LA CB2LA CKT 13 CKT 2,4 CKT 15 -15R \ 5-15R Vfi \RIF`{� \ VERIFY q 3590 1590 ESCON L N CB2L -17 CB2LA CKT 19,21,23 CKT 25,27,29 (2) RUSSEL STOL RS7428 208/3/60A 3P4W 10 LOOA 52- AD2 -25 52- DA2 -1b CB2L -17 WM SURFACE RACEWAY CB2LA CKT 17 VERIFY PWR REQUIREMENTS B -17 PNL 52 -CB2L 5 -15R CKT 23 14 -50R CKT 25,27,29, 14 -30R CKT 31,33,35 TPP, PNL 52 -C82L 14( PNL 52 -CB2L DP52A- RF- 5201 -D 60 HP VFD DP52C- RF- 5201 -D 60 HP VFD 0 C82L -19 PNL 52 -CB2L 14 12.8 HLC PNL 52 -CB2L 5 -15R CKT 2 6 -15R CKT 4,6 TPP WM SURFACE RACEWAY 5 9 11 WM SURFACE RACEWAY 13,15 208/1/30A.. •L6 30R CB2L -19 EPS 4110 TPP -30R 21 DP52A VAV -. : PNL 52 -CB2L 21 Q SECURITY FB0 ROUGH -IN BY ELEC TPP CKT 08 PNL 52 -CB2L CKT 10 CKT 12 5 -30R 1DP52A- RF- 5201 -A 60 HP VFD TPP 5 -15R �1DP52C- RF- 5201 -C -- 60 HP 1 -1/4 "C 3 #3, #60 VFD 416 Mi DP52A- EF -5201 a-A 1011 HP 16 ik6i covs 0 a CM NIA O1 ISSUE DATE All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. SABEY DATA CENTER KING COUNTY DATA CENTER 52 -01 BUILD OUT • (2) 4 "C DRAWING TITLE: LOS -1390 0 R C ?" '°�. OCT 28M(lkk PERMIT CENTEF, FILE: PLOT: PROJECT NUMBER: 85878 DRAWN BY: CHECKED BY: APPROVED BY: DRAWING NUMBER: PARTIAL 2ND FLOOR POWER PHASE 5 12 20 NORTH 1 /8"= E3.25 TO SITE POWER DISTRIBUTI ❑N `p/ u C p TO SITE POWER DISTRIBUTION (2) 6`C, 3 #350KCM, 1 #2/0 GROUND 27KV S V V I TC I G E A R - MSG-2 1 #2/0 NEUTRAL (2) 6 "C, 3 #350KCM, 1 #2/0 GROUND 1 #2/0 NEUTRAL 50/51N 50/51N 50/51 3 -LA -III 111 1200 3 MRCT FEEDER SCHEDULE 3 —PHASE 4 WIRE + GROUND SYMBOL FEEDER SIZE — CONDUIT & WIRE SIZE + GROUND 504 1 "C -4 #6 &1 #1OG 604 1 1/4 "C — 4 #4 & 1 #10G 704 1 1/4 "C — 4 #4 & 1 #8G 1004 1 1 /2 "C — 4# 1 & 1 #8G 1504 2 "C- 4 #1/O& 1 #6G 2504 3 "C — 4 #25OKCMIL & 1 #4G 8004 (2 SETS) 3 "C 3 #500KCMIL & 1 #1/0 NEUT. & 1 #1/0 GROUND 30004 (8 SETS) 4 "C 4 #500KCMIL & 1 #400KCMIL G PER SET 40004 (10 SETS) 3.5 "C 3 -600, 1 -4 /ON, 1 -500G PER SET 1200A I I M1 ° — — 52 -1 NC MICROPROCESSOR BASED RELAY AND METERING- 27KV, 3PH, 4W, 1200A BUS 27KV, 3PH, 4W, 1200A BUS 600:5 MRCT (TYP) 50/51 SPACE FOR FUTURE BREAKER TO SYSTEM 6 1200A n .a .,.1 1200A o . „. rv1 52 -5 ° -1 SPACE FOR FUTURE BREAKER TO SYSTEM 6 iii 0 FLAG NOTES: UPS ROTATION SHALL BE ABC CW STS TO HAVE (3) 225A OUTPUT BREAKERS REMOVE EXISTING PM820 POWER METER & REPLACE WITH CM4000 FACTORY INSTALLED PM850 POWER METER FACTORY INSTALLED PM820 POWER METER PROVIDE STATUS NOTIFICATION OF BREAKER POSITION VIA ACL MONITORING MONITOR AMPERAGE ONLY VIA ACL MONITORING STS TO HAVE (1) 400A OUTPUT BREAKER TO BE INSTALLED APRIL, 2009 10 FOR FUTURE LOADS 11 PROVIDE POWER QUALITY METERING WITH WAVEFORM CAPTURE FEEDER SCHEDULE 3 —PHASE 3 WIRE + GROUND SYMBOL FEEDER SIZE — CONDUIT & WIRE SIZE + GROUND (203) 1/2 "C — 3 #12 & 1 #12G 303 3/4 "C — 3 #10 & 1 #10G 403 3/4 "C — 3 #8 & 1 #1OG 503 3/4 "C — 3 #6 & 1 #1OG 703 1 "C — 3 #4 & 1 #8G 1003 2 "C -3 #1 &1 #8G lo3) 2 "C — 3 #1/0 & 1 #6G 2003 2 "C — 3 #4/O & 1 #6G 2503 2 -1/2 "C — 3 #25OKCMIL & 1 #4G (oo) 3 "C — 3 #500KCMIL & 1 #2G 5003 (2 SETS) 2-1/2"C — 3 #25OKCMIL & 1 #2G 8003 (2 SETS) 3 "C — 3 #SOOKCMIL & 1#1/0 PER SET 12003 (3 SETS) 3 -1/2 "C — 3 #600KCMIL & 1 #3/0 PER SET 16003 (4 SETS) 3 -1/2 "C — 3 #600KCMIL & 1 #4 /OG PER SET 20003 (5 SETS) 3 -1/2 "C — 3 #600KCMIL & 1 #25OKCMIL PER SET 2500 (6 SETS) 3 -1/2 "C 3 #600KCMIL & 1 #350 KCMIL G PER SET 30003 (8 SETS) 3 "C 3 #500KCMIL & 1#400KCMIL G PER SET 40003 (10 SETS) 3 -1/2 "C 3 #600KCMIL & 1 #500KCMIL G PER SET 12004) (3 SETS) 3 "EMT — 4 #600KCMIL & 43/0 PER SET ARCHITECTURE CONSULTANTS 4444444414 0o PHASE 4 KEY P PHASE 1 LAN 6'C - 3 SINGLE CABLE #350KCMIL, 35KV & 1# 2/0 GROUND, 1 42 /0 NEUTRAL 6 "C - 3 - 1/C #350KC L 35KV, & 1# 2/0 GROUND 1 #2/0 NEUTRAL TO SYSTEM 5, SHEET NO. E5.5 L E C T R I C TO SYSTEM 5, SHE T NO. E5.5 (FUTURE) 5215 526 1E 4000A CONSULTANT: Vera Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436-5200 Fx (206) 763 -0505 www.veca.com 600A, 27KV XFR -52A 110KV BIL 3000 KVA HVS -52A M 80•C 26.4/15.3KV-480/277V 600A, 27KV XFR -52B 110KV BIL 3000 KVA HVS -526 AA 80'C 26.4/ 15.3KV- 480/277V REVISIONS 40004 40004 LOADBANK SWBD LB-52B! 3000A 480v 3P3W 1,- )2500AT d)2509AT b)2500AT )2500AT 1)2500AT I] 3P K❑ 3P © 3P E 3P Oly- 3P LOAD BANK LB -52 2000 KW CONSTRUCTION DOC 7/25/08 STS REVISION 9/2/08 KCDC 10/5/08 KCDC PROGRESS 10/14/08 KCDC PERMIT 10/27/08 2500 KW 3125 KVA GENERATOR "GEN 52A” 4000A 25003 4000A 40004 40004 DIST. SWBD "HDP -52A" 4000AT 4000A BUS 480V- 30 -4W -65 KAIC PM . I i AUTOMATIC TRANSFER CONTROL MODULE DIST. SWBD 'HDP -52B" 4000AT 4000A BUS 480V- 30 -4W -65 KAIC yQ. 3( ag__i 3E J. I PM `d , I _- 4000AT )-- -- - - -- — - - -- 1 AUTOMATIC TRANSFER CONTROL MODULE 4000AT 1)300A7 9)1200AT 9)1200AT9)1200AT 1200A9) 1200A7) 1200A) 1200AT ) 1200AT )12 4 1200AT 6 1600AT 6 100AT 6 50AT o)3P ;TP 0)3P a)3P 1200AT D1200AT)1200AT 1200Ax) 200AT) 1ROOAT d d b d b b 1200AT.) 1200AT) 1200A 0) 800AT p) 800AT 4) 800AT o) SCOPE OF WORK 12003 UPS-52—AI UPS - 521 -A2 UPS -52 -A3 UPS -521 -B1 625KVA/ 562KW 625,KVA/ 562KW 16003 TO COMMON AREA PANEL STATIC 15A7 CFF TATIC fC PNL 52B- -H 1 480/277 100A MCB ATIC W9CI STATIC SN11CI 1200AT )1200AT )1200AT PNL 52A -H1 480/277 100A MCB MBP- 52 -i41 MAINT. b BYPASS NC PANEL, ) 1200AT 1200AT 1200A, 480VI IN NO 1 30-3W MBP- 52-1A3 MAIN'. d BYPASS NC PANEL ) 1200AT 1200AT ) 1200A, 480V 30 -3W 400 1400 .1400 1400 400 .) ) ) ) C D E F 1200AT ) XFR- 52B -L1 30KVA 4609 10 208/120V PNL 52B -L1 208/120 100A MCB 12003 12003 MBP- 52 -�31 MAINT. d BYPASS NC PANEL )1200AT 1200AT 1200A, 480V? NO 30 -3W 11 El 1400 1400 1400 1400 k00, B C B MBP-- 52--1B2 MA Nr. b BYPASS NC PANEL )12C0AT 1 O0AT ) 1200A, 480V? 32 -3W © NO /C MBP -52103 MAINT. BYPASS NC PANEL )1200AT 1200AT) 1200A, 489Vq NO 30 -3W LIM ISSUE DATE All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the same may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. XFR- 52A -L1 30KVA 480V TO 208/120V SABEY DATA CENTER KING COUNTY DATA CENTER 52 -01 BUILD OUT PNL 52A -L1 208/120 100A MCB STS 52 -AB1 PROV STS 52 -C STS 52 -BA1 STS 52 -DA2 PROV KC Ph1 KC Ph1 300KVA, 480V TO, 208/120V 300KVA, 480V TO( 200/120V 3004'A , 480V TO( 208/ 20V Igi%gxe.easT I52AB1 -2 1200A 1200A 125KW 125KW PROV PRCN 1250 12SKN PROV PROV PNL 52A -L2 208/120 100A MLO STS 52 -AC1 PNL 52B -L2 208/120 100A MLO DRAWING TITLE: KC PM ARLINE BUSWAY 300KVA 480V TO 208/120V 300KVA 480V TO , 208/121V 1200A STARUNE BUSWAY 125KW 125KW PNL 52 -CB2L 208/120 400A FTL PNL 2 -CB2LA 208/120 400A MLO STARLINE BUSWAY STARLINE BUSWAY M -52A 1600A 480V //i1T 1600A 480V M -52B 1600A 480V 30 -3W dl b b d d b d d d b d d b )350AT )350A7 �/ 350AT )350AT 125AT )125AT )100AT )50AT ,,/BOAT OAT 30AT )SPARE )SPARE )SPARE SPARE SPARE 3P ¶ 3P 1 3P 3P T 3P 3P 3P 3P j 3P 3P 3P 3P 3P 3P �3P or CH -52A1 CH -52A1 CH -52A2 CH--52A2 292MCA 292MCA 292MCA 292MCA FUTURE FUTURE IU -52A1 A01U -52A2 RF -5203A CHP -52A AHU -52A3 RF -52A 75HP 75HP 60HP 25HP 15HP 7.5HP CH -52B1 CH -5281 CH -52B2 CH -5282 AMU -5281 RF -5203B RF -5203C CHP -52B ABU-5282 RF -52B 292MCA 292MCA 292MCA 292MCA 2 -75HP 6OHP 50HP 25HP 15HP 7.5HP FUTURE FUTURE ELOB- iYO FILE: PLOT: PROJECT NUMBER: 85878 DRAWN BY: CHECKED BY: APPROVED BY: DRAWING NUMBER: XFR- 52A -L3 15KVA k�,�,1,1 480V TO �1 zoa /izov PNL 52A -L3 208/120 60A MCB XFR -520 15KVA 480V TO 208/120 OCT 2OZ000 PERMIT CENTER ONE LINE RISER PHASE 5a E5.4a SILBEY ARCHITECTURE CONSULTANTS 0 0 0 0 0 0 0© 0 0 PHASE 4 t i <EY PHASE 1 it PLA\ 0 0 0 0 0 0 0 0 0 FUTURE CABLE TRAY FUTURE CABLE TRAY FUTURE CABLE TRAY ,' f� FUTURE CABLE TRAY VECA E L E C T R I C CONSULTANT: Veca Electric 5614 7th Ave. South Seattle, WA 98108 Ph (206) 436 -5200 Fx (206) 763 -0505 www.veca.com COORDINATE LOCATION OF FIBER DUCT P / /Airif f ////1/%�////I/////////// 1Pr 0 0 .111 060 PAWMI/ / // //// / / / /.x/. '/11// // /// FUTURE CABLE TRAY ,� ( , 10 / O r �� Ftd:I r 11:11P 0111 r CABLE TRAY REVISIONS CONSTRUCTION DOC 7/25/08 STS REVISION 9/2/08 KCDC 10/5/08 KCDC PROGRESS 10/14/08 KCDC PERMIT 10/27/08 ISSUE DATE All drawings and written material appearing herein constitute the original and unpublished work of the Sabey Corporation and the some may not be duplicated, used or disclosed without the written concent of the Sabey Corporation. SABEY DATA CENTER KING COUNTY DATA CENTER 52 -01 BUILD OUT ...issinsimmommonse ci, Tn g e 't DRAWING TITLE: ELOBb139O FILE: PLOT: PROJECT NUMBER: 85878 DRAWN BY: CHECKED BY: APPROVED BY: DRAWING NUMBER: PARTIAL 2ND FLOOR COMMUNICATIONS PHASE 5 E7.25 NORIH