Loading...
HomeMy WebLinkAboutPermit EL08-0183 - RAINIER INDUSTRIESRAINIER INDUSTRIES 18375 OLYMPIC AV S ELO8-1 83 Cityllf Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 7888900130 Address: 18375 OLYMPIC AV S TUKW Suite No: ELECTRICAL PERMIT Permit Number: EL08 -183 Issue Date: 04/11/2008 Permit Expires On: 10/08/2008 Tenant: Name: RAINIER INDUSTRIES Address: 18375 OLYMPIC AVE S , TUKWILA WA Owner: Name: AMMEX CORPORATION Phone: Address: PO BOX 88047 , TUKWILA WA Contact Person: Name: RICK BAILEY Phone: 206 - 633 -2811 Address: 900 N 34TH ST , SEATTLE WA Contractor: Name: TITAN ELECTRIC INC Phone: 206 - 633 -2811 Address: 900 N 34 ST, SUITE 108 , SEATTLE WA Contractor License No: TITANEI963OB Expiration Date: 09/02/2008 DESCRIPTION OF WORK: REMODEL BUILDING TO UPDATE FIXTURES TO ENERGY EFFICIENT. REPLACE DISTRIBUTION AND MOST PANELS WIITH NEW. INSTALL BUSDUCT FOR NEW EQUIPMENT , REMODEL SOME OF THE EXISTING OFFICE SPACES Value of Electrical: 759,000.00 Fees Collected: $9,535.63 Type of Fire Protection: National Electrical Code Edition: 2005 Electrical Service provided by: PUGET SOUND ENERGY Permit Center Authorized Signature: LuL4jL Date: 1_ � 1 —de I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this construction or Signature: Print Name: oes not presume to give authority to violate or cancel the provisions of any other state or local laws regulating ance of work. I am authorized to sign and obtain this electrical permit. Date: £//i, S This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -4/07 EL08 -183 Printed: 04 -11 -2008 Parcel No.: 7888900130 Address: Suite No: Tenant: • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 18375 OLYMPIC AV S TUKW RAINIER INDUSTRIES PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: EL08 -183 ISSUED 02/22/2008 04/11/2008 1: ** *ELECTRICAL * ** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construc r the performance of work. Signature: Print Name: -=sif -51nsL 1 te_ Date: 11/ ( /0 5 doc: Cond -Elec EL08 -183 Printed: 04 -11 -2008 • CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http:ll www. ci. tkwila. wa. us Electrical Permit No. C1-O 0- 18 3 Project No. (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: L 8 ? 9O —01:20 Suite Number: New Tenant: Site Address: 18375 01r1.Neic S. Tenant Name: 7,41..vne.• SvA]Skrie -S Property Owners Name: Scot* C0 -mebt (P-carter Mailing Address: 18'374 nl•noic_ . S . Floor: © Yes ❑ .. No • City State R& 188 Zip CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: "Rick %■ Ve-1 Mailing Address: `k,o 1.134/4 Sirref E -Mail Address: Rtc..k6 �-. elee�ric. • ,�x� Day Telephone: City zv/v- 633 -2&11 State Fax Number: 7n6 - 371 - a118 V/0 3 Zip ELECTRICAL CONTRACTOR INFORMATION Company Name: Ti*avn Ete< v' . Mailing Address: gob 14 3'I74 5W-rc + Contact Person: E -Mail Address: t ck iz.►�k b friYw e 1ec d ,L . frk:an El9<o30 B Contractor Registration Number: 55cc{}{c City Day Telephone: Fax Number: Expiration Date: 98/03 State Zip ZCC,- X033-2811 zs41.33 704,,--371-/-21Z2 9 -2 -08 Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): iZa."cc�a\ ioil���� .4o opdoie �� 14-ores -6 eAergy e ieJ- IIQ.elace 1)154- r1124}iuy'1 ino5+- Ake/5 w14I1 ,uC..t,!, bu,5,1Jc4- x,4-4.A fewtodcl 5Q i4 . ex1-54k•„7 0 irrce yaces Will service be altered? ® Yes Type of Use: filed e.A.cive;ecr . Type of work: ❑ New ❑ Addition ❑ Low Voltage ❑ Generator Property Served by: NA Puget Sound Energy ❑ Seattle City Light ❑ No Adding more than 50 amps? ® Yes ❑ No ❑ Service Change ❑ Fire Alarm H:'AppltcahonsTorms- Applications On Line \4-2007 - Electrical Permit Application doc bh a Remodel ® Tenant Improvement ❑ Telecommunication ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ Ncw single family dwellings $140.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings $75.00 ea ❑ Low voltage systems (alarm, furnace thermostat) $55.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $75.00 (no added/altered circuits) ❑ Service change with added/altered circuits $75.00 number of added circuits $10.00 ea ❑ Circuits added/altered without service change $50.00 (up to 5 circuits) ❑ Circuits added/altered without service change $50.00 (6 or more circuits) $7.00 ea ❑ Meter /mast repair $65.00 ❑ Low voltage systems $55.00 (alarm, furnace thermostat) MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $58.00 ❑ Temporary service (generator) $75.00 ❑ Manufactured/mobile home service $80.00 (excluding garage or outbuilding) ❑ Carnivals $75.00 Number of concessions $10.00 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. 1 HEREBY CERTIFY TIIAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: \c k l�a►�y Mailing Address: q00 ,j 39 TM Scree} Date: 2 Day Telephone: Za0— (..33.2811 yes d 41e City W4 State 4818$ Zip Date Application Accepted: e Date Application Expires: i ) 6 Staff Initials: (kip „p H:\Applications \Forms- Applicahons On Line \4-2007 - Electrical Permit Application.doc bh Page 2 of 2 Parcel No.: Address: Suite No: Applicant: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 7888900130 18375 OLYMPIC AV S TUB:VN RAINIER INDUSTRIES RECEIPT Permit Number: Status: Applied Date: Issue Date: EL08 -183 ISSUED 02/22/2008 04/11/2008 Receipt No.: R08 -01467 Initials: BLH User ID: ADMIN Payee: Payment Amount: $348.00 Payment Date: 05/02/2008 12:59 PM Balance: $0.00 TITAN ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 6037 ACCOUNT ITEM LIST: Description 348.00 Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 348.00 Total: $348.00 1928 05/02 9710 TOTAL 348.00 doc: Receiot -06 Printed: 05-02 -2008 • City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 7888900130 Address: 18375 OLYMPIC AV S TUKW Suite No: Applicant: RAINIER INDUSTRIES RECEIPT Permit Number: EL08 -183 Status: PENDING Applied Date: 02/22/2008 Issue Date: Receipt No.: R08 -00517 Initials: WER User ID: 1655 Payment Amount: $9,535.63 Payment Date: 02/22/2008 04:03 PM Balance: $0.00 Payee: TITAN ELECTRIC TRANSACTION LIST: Type Method Description Amount Payment Check 5828 9,535.63 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 ELECTRICAL PLAN - NONRES 000.345.832.00.0 7,628.50 1,907.13 Total: $9,535.63 9065 02/25 0710 TOTAL 9535.63 doc: Receiot -06 Printed: 02 -22 -2008 /0 INSPECTION NO. INSPECTION RECORD Retain a copy with permit 161t' PERMIT NO- CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431- Project: 4/9//f//k/ / P�57 /f.S�C Type of Inspectio r m. a one did / S Date Called: Special Instructions: . ; p f 1 - Date Wanted: a.m. p.m. ilequeste"d .Se L Z..— Phone No: :z- - 3 r3 ‘5"613 COMMENTS: roved per applicable codes. ❑ Corrections required prior to approval. .77-0 "4045- Inspec ar, ,,cy Date }t / 7/0 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: IDate: INSPECTION RECORD Retain a copy with permit kce4-/Fg PERNJfT NO. CITY OF TUKWILA BUILDING DIVISION 1Y� 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 %/44, /937fc Type of Inspection: 412/i.0 /- ,Of - 7f'9 - Address Date Called: .,,, M — //iii,,z_ :3l OA -- IV// fr/t% F Special Instructions: Date Wanted: /�/ a�m. Requester: " Phone No: pproved per applicable codes. tj Corrections required prior to approval. EOMMENTS: /79 . ()/' -- i7 g- .cf V /GC /- ,Of - 7f'9 - // s- J J _ C of /4L 'o / �fff c '1 ii/ - ( )[ Gd C//) ;J 6 ( ) , T / / ' .,,, M — //iii,,z_ :3l OA -- IV// fr/t% F f V9L 0X ^-- / IAlLV/V&- PICTett, 1 Ti A/ /94/4 flip ,2& (),- E 0 tifirm F-4/17- / i f 44//c.rY6A' Inspecto . i t gie-T4Wgii Date: (/ // /7 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: b INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Pr ect: /nN/ /A)4.si S Type of Inspection' 2 s ,409 )9£i7VC Ail c't NfC73 AVA G7#' Ad refs : / L.S 4 C /Z. YR,/ c b ,5 Date Called: Special Instructions: - Date Wanted: a Requester: ---66MY f i hillf G/ ;CA FY- 77ST7'V6 /A'h Phone No: fit `f— 'Approved per applicable codes. Jorrections required prior to approval. COMMENTS: p,q AV) A Aif' / 12/416S -i.00c, Aii; 2 s ,409 )9£i7VC Ail c't NfC73 AVA G7#' f y ,,/Z /Un ,f 6/'7&( G /6//73 ' iv /iSr 1hU7 _Cl %C el 40 ;OOJ 0 Ali /t TO i . ‘,/()T TA /9 Ala L1li Rice- -16 /2 t/ 4A' AI 7'4(/gh 7 /R1C 1_4461417-04 ---66MY f i hillf G/ ;CA FY- 77ST7'V6 /A'h Gf) t 1 %gip ■olo o, t V fit 141' I.a *s6c /11 4,(fl ur/E.\ F/- /j) 77& O/ kW /01CAI T .47 f/z/MtiC Date: ` // e/ Ei $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION RECORD �/ Retain a copy with permit r""" INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: /4 -- S i// C .- tnAie /t �/ Type of Inspection: '''�/)' Ade_ ss:_ /C0 dricia--5 Date Called: Date Wanted: 46/2_ ��„ Special Instructions: Requester: Phone No: proved per applicable codes. Corrections required prior to approval. COMMENTS: /pg. /4 -- S i// C .- tnAie /t �/ I�i1�,�Ji f withiiL romv, o1 - CE IL IAt., ,,' - / ] FLooA dricia--5 InsPe /L/ LIV/ L,ej,4ll;w Date:, -4 $58.00 REINSPECTION FEE QUIRED. Prior to inspection, fee must be paid at 6300 Southcenter B1 .. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit fL48- �g3 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: f t „ \AI I ` r `1)i Type of Inspection: —71— 1r4 6- p,qre;5 Address Dvitik. 4,t . Date Called: - 012517-f CoI D oli r-1WAI5rov-46 Special Instructions: Date Wanted: c/3° a.m. p.m. Requester: Phone No: DApproved per applicable codes. Corrections required prior to approval. COMMENTS: ! 1r4 6- p,qre;5 ALE, Sao A pt ' CA -t4 5 DVT"- Fo L 600 cu - 012517-f CoI D oli r-1WAI5rov-46 S 6 c-0/.1p7 AK. _ -1-12-44Foet,K R Mka Inspector: tC?'Ak(t\ ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: 0� I1.. O Receipt No.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION P- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pr sect: • ;frli /t /Nl cYt( Type of Inspection: i(16 3 Addre s: / $3I1®I v/m // # Date Called: Special Instructions: Date Wanted: r../...) a.m. Requester: Phone No: proved per applicable codes. Corrections required prior to approval. ' OMMENTS: cO/- F avA 4F //C AAl f - RT7,1 Inspec& 1 $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Date: — //- 7/0 Receipt No.: Date: 1/ INSPECTION RECORD Retain a copy with permit INSPECTION NO. PER T NO. CITY OF TUKWILA BUILDING DIVISION 1t- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 P5oject: _/ I ,�W '•`r/ _ Type of Inspection: ,�P0 Address: ,. Date Called: Special Instructi • ns: Date Wanted: SA Requester: Phone No: proved per applicable codes. El Corrections required prior to approval. COMMENTS:: Y DV /T/ 710i115Fi/v4144 /,9,r /F,(s fr_:? --rizbi~vy-4 /2//4/ , /I 7. AAiW L5 Inspector i 67wrivii Dater * r/ $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 4?- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: AliNg ------Y Type of Inspection: 0 it - .cE%Zi/1 u F ,ri kb l ss: s Date Called: 9/A' rn, is Special Instructions: Date Wantec1 449 a.m. �_ Requester: Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: pfi 0 it - .cE%Zi/1 u F ,ri 4» artliy 1A)p I r ,U1' 9/A' rn, is %- F %A (f Il Inspec I it teial ill /1611 Date ,'/ // /Q8 $58.00 REINSPECTION FEE REQUIRED. Prior o inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Project: #11/ 4 / /vvsrloif Type of Inspection: 760 3- ,i A�e ss: `'`4 7 a}�04c /910. Date Called: Special Instructions: Date Wanted: / /I/ S- r C u.7rfrryii. Requester: Phone No: proved per applicable codes. El Corrections required prior to approval. (COMMENTS: 141/45- -- ,4) t) eft/ g 5 Inspec, 1!� &r,zMij(/1 Date: 1/1/./ar $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: i INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION .1Q 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 INSPECTION RECORD Retain a copy with permit 146q-,A3/3 PERMIT NO. Pr ject: MP Vg71 Plik--M 14 Type of Inspection: -20-&7 Address: At ate Called: Special Instructions: Date Wanted: !_ .) �7. gym. Requester: Phone No: pproved per applicable codes. O Corrections required prior to approval. COMMENTS:' 6L,),(:)- / aft.- TmA4fanim / (4 4)&5 ci f IQ= ham. if2tLyi Rohl S M7G/T --- 2/"'' Azb, gr -extpi Inspector ` Date: „s.'/ r $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: The doc Cori in c to b whit NEG L08 Switchboard General Information Pow -R -Line C - Specifications Quantity: 1 Alignment: Front Access/ Front and Rear Align Service: 480Y/277V 3 -Phase 4 -Wire Minimum Interrupt Rating: 25 kA Bus Specifications Bus Amps: 1600 Bus Bracing Rating: 65kA Neutral Amps: 1600 Bus Material: Aluminum Heat Test Aluminum Ground Bus Bolted To Frame, (1) 350 kcmil Ground Lug Incoming Information Incoming Entry: Bottom Incoming Location: Right Incoming Qty & Size: Terminals, Mechanical, Bottom, See Utility Specifications Structure Specifications Service Entrance Enclosure Type: Type 1 Seismic Zone 4 Qualified Allow a minimum of an additional 6 in. on each end of the switchboard for bolt down brackets (Seismic Anchoring). Refer to seismic installation data sheet 1A32007 and drawing 1A32010 for details. Utility Specifications 1600 Amps Util. Mtr. Compt. - PUGET SOUND ENERGY Utility Service Requirements Page References: Lug Drillings Per Page: 347 CT Compartment Per Page 322/330 UGPS Per Page 345/346 Meter Socket(s) LUGS (5) 300 -800 kcmil (,J ��, . CODE COMPLIANCE NFPA 70. + NEC APR 10 200 City Of Tukwila Enclosure properties Struct # Description /Modifications 1 50x chassis mounted feeders (Feeder Structure) Auxiliary Bus 2 Incoming Utility Structures (Incoming Utility Section) Vertical isolating barrier - full height Horizontal isolating barrier Auxiliary Bus HLE REER !Eip FEB D 2 2 ZOOU PERMIT CENTbl Information on this Lament is created by Eaton ooration. It Is disclosed 'nfidence and It Is only e used for the purpose In ;h it IS supplied. PREPARED BY DATE i L081 02/05/08 Eaton Corporation Sumter, SC -- - APPROVED BY DATE . -- _— JOB NAME Rainier Industries ' DESIGNATION MDP VERSION 6.3 TYPE Switchboards DRAWING TYPE Customer Appr. ALT NUMBER 101070807 -0000 REVISION 1 DWG SIZE A G . : ITEM SHEET 1 OF 3 Front View Power Flow 1 monk Dam 2 3PROV MATH - 1 5 8 r_aba.l 2 Floor Plan Top /Bottom Cable Exit 12.00 2.50 24.00 3.00 30.00 3.00 3.00 39.00 A Total of 2 Structures, Total Width of 81 Inches Allow a Minimum of an Additional 6 inches on each end for Seismic Anchoring Brackets. Width- Inches Width -MM Depth - Inches Depth -MM Height- Inches Height -MM Weight - Lbs(Est.) Weight- Kg(Est.) 36.00 914 30.00 761 90.00 2285 1000 453 45.00 1142 30.00 761 90.00 2285 1000 453 The Information on thls document is created by Eaton Corporation. It Is disclosed In confidence and It is only to be used for the purpose In which It is supplied. PREPARED BY L081 APPROVED BY DATE 02/05/08 DATE Eaton Corporation JOB NAME Rainier Industries DESIGNATION MDP Sumter, SC VERSION TYPE 6.3 Switchboards DRAWING TYPE Customer Appr. NEG -ALT NUMBER L081010713807 -0000 REVISION DWG SIZE A G.O. ITEM SHEET 2 OF 3 Switchboard Units Information Str# Unit Description /Modifications 1 1 Blank Cover -15 X 2 Blank Cover -7 X 3 Feeder Brkr. -3P [LD 600A Frame] Provision 4 Feeder Brkr. -600A 3P [LD 600A Frame], Trip Terminals, Mechanical, (2) 400 -500 kcmil 5 Feeder Brkr. -400A 3P [KD 400A Frame], Trip Terminals, Mechanical, (1) 2/0 -500 kcmil 6 Feeder Brkr. -400A 3P [KD 400A Frame], Trip Terminals, Mechanical, (1) 2/0 -500 kcmil 7 Feeder Brkr. -400A 3P [KD 400A Frame], Trip Terminals, Mechanical, (1) 2/0 -500 kcmil 8 Feeder Brkr. -400A 3P [KD 400A Frame], Trip Terminals, Mechanical, (1) 2/0 -500 kcmil Nameplate 600 A. Thermal Mag 400 A. Thermal Mag 400 A. Thermal Mag 400 A. Thermal Mag 400 A. Thermal Mag PRLC32_Utility -1600A Utility Metering - PUGET SOUND ENERGY The information on this document is created by Eaton Corporation. It is disclosed in confidence and It is only to be used for the purpose in which it is supplied. PREPARED BY L081 APPROVED BY DATE 02/05/08 I Eaton Corporation 1 DATE JOB NAME DESIGNATION Rainier Industries MDP VERSION 6.3 TYPE Switchboards NEG -ALT NUMBER L0810107D807 -0000 REVISION 1 DWG SIZE A G.O. Sumter, SC DRAWING TYPE Customer Appr. ITEM SHEET 3 OF 3 WESCO BILL OF MATERIAL Neg# L0810107D807 Alt# 0000 02/05/08 Job Name: Rainier Industries 12 :57 :52 Customer Bill of Material 1 PRLC Switchboard Pow -R -Line C Switchboard, Front Access/ Front and Rear Align, Type 1 480Y/277V 3 -Phase 4 -Wire, 1600 Aluminum, Minimum Interrupt Rating: 25kA, Bus Bracing Rating: 65kA 1 Pow -R -Line C 1 Seismic Zone 4 Qualified 1 Vertical Isol. Barrier (Service Entrance) 1 Horizontal Isol. Barrier (Service Entrance) 1 Service Entrance Label 1 1600 Amp AL Main Structure 1 1600A Utility Metering - PUGET SOUND ENERGY 1 1600 Amp AL Distribution Structure 5 Thermal Mag Trip - Standard 4 400A 3P [KD 400A Frame], Trip 400 A., Thermal Mag, (1) 2/0 -500 kcmil, Mechanical 1 600A 3P [LD 600A Frame], Trip 600 A., Thermal Mag, (2) 400 -500 kcmil, Mechanical 1 3P [LD 600A Frame] Provision, Designations: MDP All orders must be released for manufacture within 90 days of date of order entry. If approval drawings are required, drawings must be returned approved for release within 60 days of mailing. If drawings are not returned accordingly, and /or if shipment is delayed for any reason, the price of the order will increase by 1.0% per month or fraction there of for the time the shipment is delayed. Cutler Hammer Selling Policy 25 -000 applies. 11 -03 -2008 RICK BAILEY 900 N 34TH ST SEATTLE WA 98103 CityofTu.1a Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Permit No. EL08 -183 18375 OLYMPIC AV S TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code, every permit issued by the Building Division under the provisions of the code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or fmal inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code does allow the Building Official to approve one extension of time for an additional period not exceeding 180 days. Extension requests must be in writinff and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 12/16/2008 , your permit will become null and void and any further work on the project will require a new permit application and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: er Marshall t Technician Permit File No. EL08 -183 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 04- 25 -'08 08:32 FROM- publicworks /dcd 2064313665 T -385 P002/002 F -921 REIMBURSEMENT AUTHORIZATION AND APPROVAL TO CONDUCT INSPECTION ACTIVITIES DURING OFF HOURS Date: ' 1z�o k Requested by: _�2a�■ Firm/Company: Permit # E Lc J ._______j1___3:rjMN_Legjttcnjdntl �$ Project Address/Location: 1; 37$ o .' - S. -7(J\ OifJ0 Scope of Work: s��lACt exi s�in /lain �4 •�vP ,rifh New �6w4 C � Date of Off-Hours Construction Activity: 5\10k0 Time of Ofd Hours Construction Activity From: 6, :w eilpm To: 5 esrk ' h% c 204o- 383 - Mo'I y Phone No./Pager of Contact Person: De nn; 5 rc c 206- 371- GiL% a nd9 Special Conditions for Consideration: Rcj,csE- ,4d'/�od, ;ng�c_�rc� sr_IiWen • Contractor will be charged a minimum of four (4) hours inspection time for any off -hours inspection work to includt weekend and holidays at 5 O.00 per hour. The undersigned, as an authorized representative of the above firm and hereby agrees to reimburse the City for its overtime inspections on the above referenced project. A separate invoice will be issued for all inspection time in excess of four (4) hours. Signature: 4(4 Reviewed by: i/ O aa' Approved !1 Disapproved REMARKS: File RECENED CITY OF TUKWIL MAY i0 2 2008 PERMIT CEN1'h;• 4 March 26, 2008 • Cizy of Tukwila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Rick Bailey 900 North 3461 Street Seattle, WA 98103 RE: CORRECTION LETTER #1 Electrical Permit Application Number EL08 -183 Rainier Industries Dear Mr. Bailey, This letter is to inform you of corrections that must be addressed before your electrical permit can be approved. All correction requests from the Building Department must be addressed and reflected on your drawings. Building Department: Bill Buterbaugh, at 206 973 -4758, if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that three (3) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenzer service. If you have any questions, please contact me at (206) 433 -7165. Sincerely, Brenda o t Permit Coordinator encl xc: File No. EL08 -183 P:\Pernut Center \Correction Letters \2008\EL08 -183 Correction Ltr #1.DOC jem 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 1 • • Building Division Review Memo Date: March 25, 2008 Project Name: Rainier Industries Permit #: EL08 -183 Plan Reviewer: Bill Buterbaugh 1. Provide AIC ratings for all panels 2. Provide transformer secondary fault current calculations 3. Provide Panel schedule and load calculations for 'MDP' PERMIT COORD COPY • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL08 -183 PROJECT NAME: RAINIER INDUSTRIES SITE ADDRESS: 18375 OLYMPIC AVE S Original Plan Submittal Response to Incomplete Letter # DATE: 03 -28 -08 X Response to Correction Letter # 1 Revision # After Permit Issued DEPARTMENTS: /firB g'DIVISIOn Public Works Fire Prevention Structural Planning Division n Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Fy Incomplete n DUE DATE: 04 -01-08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 04 -29 -08 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 • • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL08 -183 PROJECT NAME: RAINIER INDUSTRIES SITE ADDRESS: 18375 OLYMPIC AVE S X Original Plan Submittal Response to Correction Letter # DATE: 02 -22 -08 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Bu I Ing`LAvlslon Public Works Fire Prevention Structural n Planning Division n Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete U Incomplete DUE DATE: 02-26-08 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 03-25-08 Not Approved (attach comments) [-V. DATE: Permit Center Use Only p1 CORRECTION LETTER MAILED: 'O& 2,,,'/ 4 Departments issued corrections: Bldg rid Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 City of Tukwila Department of Community Development 6300 Southeenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: help : / /www.cttukwila.wa.us. Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the maid fax, etc. Date: Plan Check/Permit Number: EL08 -.I 83 ❑ Response to Incomplete Letter # /ZI Response to Correction Letter # 1 ❑ Revision # _ after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: RAINIER INDUSTRIES Project Address: 18375 Olympic Avenue S Contact Person: Rick Bailey Phone Number: Summary of Revision: S4 l "�M ON J " PIO S?o 4 E'S rizat1 �tJr�er1 dL� Le► S VII o g. CRA1.4 6S /N GLuNE. PRov i o E A.cc . 12.;Ari h! (S Frog ALL t�''A-1-14 -4- S 2• ?lam) t (1E-1S Y44J S F: - S Oco.j o A V f F 4u r c_ )S 3, FiLog 1 t Lo AA S o wt t,4•/Lr Full- MP. OFIMWRA MAR 2 8 20081 •'FRtorr CENTER UNC44i4144Lb pp� . O. Z, eo. 3 004 -1s-r SheetNamber(s): f`�VtSfoMS ?� SN,&b�p"S � � � "Cloud" or highlight all areas of revision including date f revision Received at the City of Tukwila Permit Center by: • Entered in Pernxits Plus on 3. ) o 1 app1ications\fonns- aPPlications on linclrevision subm ftaI Created: 8 -13 -2004 Revised: 6 Look Up a Contractor, Electric n or Plumber License Detail Washington State Department of Labor and Industries Electrical Contractor A business licensed by L &I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. License Information License TITANE1963OB Licensee Name TITAN ELECTRIC INC Licensee Type ELECTRICAL CONTRACTOR UBI 602250925 Ind. Ins. Account Id 4568600 Business Type CORPORATION Address 1 900 N 34TH STE 108 Address 2 City SEATTLE County KING State WA Zip 98103 Phone 2066332811 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 9/2/2004 Expiration Date 9/2/2008 Suspend Date Separation Date Parent Company Previous License TITANE *986Q5 Next License Associated License FUNG *LH967M9 Master Electrician Information License FUNG *LH967M9 Name FUNG, LAWRENCE H Status ACTIVE Business Owner Information Name Role Effective Date Expiration Date FUNG, LAWRENCE H AGENT 09/02/2004 BURKE, PATRICK D PRESIDENT 09/02/2004 FUNG, LAWRENCE H SECRETARY 09/02/2004 CROOK, TRAVIS J VICE PRESIDENT 09/02/2004 • Page 1 of 2 https: / /fortress.wa.gov /lni/bbip /printer. aspx ?License= TITANEI963OB 04/11/2008 Interior Lighting Summary LTG -INT 2007 Washington State Nonresidential Energy Code Compliance forms Revised - July 2007 Project Info Project Address RAINIER INDUSTRIES Date 2/22/2008 BLDG K SOUTHCENTER S IND. PARK For Building Department Use 18375 OLYMPIC AVE S., TUKWILA, WA. 98188 Applicant Name: CASE ENGINEERING Applicant Address: 10614 BEARDSLEE BLVD, STE C, BOTHELL, WA 98011 Applicant Phone: 425- 402 -9400 1 Project Description NEW CONSTRUCTION (EMT CONDUIT) Compliance Option LIGHTING POWER ALLOWANCE Maximum Allowed Lighting Wattage (Interior) Location Occupancy Description Allowed W /SF Area in ft2 Allowed x Area ABBREVIATIONS MANUFACTURERING 1.30 102417 133142 (EMT CONDUIT) OFFICE 1.00 25682 25682 2 4 #3/0 CU (EMT CONDUIT) 400N > 0.0 ** From Table 15 -1 (over) - document all exceptions on form LTG -LPA Total Allowed Watts Proposed Lighting Wattage (Interior) 158824 2 -1/2 Location Fixture Description / of Fixtures W /Fixt W Proposed F1 -CHAIN MTD LINEAR FLR HIGH BAY 335 335 112225 1 #6 CU F2 -2x4 RECESSED FLUORESCENT TROFFER 292 94 27448 3 F3 -NOT USED 1#4 CU 300G > 3- PHASE, 4 -WIRE, TRANSFORMER SECONDARY F4 -2x2 RECESSED FLUORESCENT TROFFER 9 78 702 4 #3/0 CU F5- SURFACE MTD 2x4 FLUORESCENT 11 62 682 3 F6- SURFACE MTD 2x2 FLUORESCENT 13 78 1014 F7 -NOT USED F8 -WALL MOUNTED, 2', FLUORESCENT VANITY LT 11 29 319 Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Watts 142390 FEEDER SCHEDULE RECEPTACLE OUTLETS CONDUIT CONDUCTORS TAG 1 AMPS QTY 1 SIZE PHASE /NEUTRAL 1GROUND 3- PHASE, 4 -WIRE 100 1 1-1/4 4 #3 CU (EMT CONDUIT) 100N > I E____3 UNDERCOUNTER FLUORESCENT 200 1 2 4 #3/0 CU (EMT CONDUIT) 200N > ABBREVIATIONS 225 1 2 -1/2 4 #4/0 CU (EMT CONDUIT) ® ADDITIONAL SYMBOLS 400 2 2 4 #3/0 CU (EMT CONDUIT) 400N > JUNCTION BOX & CONDUIT FOR FURNITURE SYSTEM TELEPHONE /DATA CONNECTION ❑ CONNECTION POINT TO BUSSWAY 600 2 2 -1/2 4 #350 kCMIL CU (EMT CONDUIT) 600N > 3- PHASE, 3 -WIRE, NO NEUTRAL 200 1 2 3 #3/0 CU 1 #6 CU 200G > 300 1 3 3 #350 kCMIL CU 1#4 CU 300G > 3- PHASE, 4 -WIRE, TRANSFORMER SECONDARY <400NG2> 400 .2 2 4 #3/0 CU 1 #2 CU <600NG2> 600 2 3 4 #350 kCMIL CU 1 #1/0 CU ROOF LIGHTING FIXTURE SCHEDULE TYPE DESCRIPTION INTERIOR LAMP WATTS /FIXT F1 CHAIN MOUNTED FLUORESCENT HIGH BAY, NOMINALLY 1.5' x 4' WITH WIDE (6) F32T8/835 188 DISTRIBUTION WITH WHITE REFLECTANCE WHITE FINISH. LITHONIA IB632LWD SERIES. LAMPING IN PROOF /WORK AREAS 41K. F1X SIMILAR TO "F1" EXCEPT WITH EMERGENCY BATTERY PACK F2 2'x4' RECESSED DIRECT /INDIRECT TROFFER WITH WHITE STEEL HOUSING. PERFORATED METAL CENTER BASKET WITH ACRYLIC OVERLAY LENS FOR LAMP ENCLOSURE. LITHONIA 2AVG332SMDR SERIES F2X SIMILAR TO "F2" EXCEPT WITH EMERGENCY BATTERY PACK F3 NOT USED F4 2'x2' RECESSED DIRECT /INDIRECT TROFFER WITH WHITE STEEL HOUSING. PERFORATED METAL CENTER BASKET WITH ACRYLIC OVERLAY LENS FOR LAMP ENCLOSURE. LITHONIA 2AVG2CF4OMDR SERIES F4X SIMILAR TO "F4" EXCEPT WITH EMERGENCY BATTERY PACK F5 2'x4' SURFACE MOUNTED DIRECT /INDIRECT TROFFER WITH WHITE STEEL HOUSING PERFORATED METAL CENTER BASKET WITH WHITE ACRYLIC OVERLAY LENS FOR LAMP ENCLOSURE. LITHONIA 2AVX232SMDR SERIES F6 2'x2' SURFACE MOUNTED DIRECT /INDIRECT TROFFER WITH WHITE STEEL HOUSING. PERFORATED METAL CENTER BASKET WITH WHTIE ACRYLIC OVERLAY LENS FOR LAMP ENCLOSURE LITHONIA 2AVX2CF4OMDR SERIES F7 NOT USED F8 WALL MOUNTED VANITY LIGHT WITH WHITE WRAPAROUND DIFFUSER LITHONIA SERIES X1 EXIT SIGN, WHITE HOUSING WITH GREEN STENCIL FACE LETTERING MOUNT AT 8' -0" AFF UON. LITHONIA LQM SERIES EM EMERGENCY BATTERY PACK WITH TWO ROTATABLE HEADS (6) F32T8/835 188 (3) F32T8/832 94 (3) F32T8/832 94 (2) FT40/832 78 (2) FT40/832 78 (2) F32T8/832 62 (2) FT40/832 78 (1) F24T5/HO/835 29 LED (2) 5.4W WEDGE 5 20 LOAD SUMMARY (PER NEC 220 CATEGORIES) PANEL MDP DESCRIPTION CONNECTED LOAD -kVA PC1 PC3 H2 PC4 DP1 TOTAL CONN. LOAD -kVA DEMAND FACTOR DEMAND LOAD kVA AMPS LIGHTING RECEPTACLES - GENERAL USE ** MOTORS LARGEST MOTOR LOAD HEATING EQUIPMENT TOTAL 66.9 13.4 136.0 7.2 90.3 234.5 154.4 33.0 63.8 56.9 56.2 49.5 67.3 72.9 82.5 141.0 18.0 164.2 5.3 96.8 193.4 325.7 82.5 238.5 576.4 *50% DEMAND ON GENERAL USE RECEPTACLES OVER 10 kVA * *DOES NOT INCLUDE RECEPTACLES FOR SPECIFIC EQUIPMENT 1513.3 1.25 1.00 1.25 1.00 0.60 121.0 101.7 325.7 103.1 238.5 345.8 146 123 392 124 287 417 1235.9 1489 ® 480Y/277V 3PH, 4W C/T 1600 AMP 480Y/277V 30,4W A 400/3 400/3 n 400/3 r1 400/3 600/3 -S PANEL PC1 PANEL PC3 PANEL H2 PANEL PC4 PANEL DP1 SPACE MDP ONELINE DIAGRAM NOT TO SCALE SYMBOL LEGEND RECEPTACLE OUTLETS LIGHTING OUTLETS ie SINGLE h® DUPLEX .4 DOUBLE DUPLEX i® SINGLE SPECIAL PURPOSE OR DUPLEX OUTLET ON DEDICATED CIRCUIT 0 DOUBLE DUPLEX OUTLET ON DEDICATED CIRCUIT IA SWITCHED RECEPTACLE o SURFACE MOUNTED DOWNLIGHT Q RECESSED DOWNLIGHT ❑ a PENDANT FIXTURE OR CHANDELIER Q ' WALL MOUNTED FIXTURE OO RECESSED EMERGENCY EGRESS FIXTURE OR NIGHT LIGHT (NL) SURFACE FLUORESCENT 01 FLUSH FLOOR OUTLET BOX / RECESSED FLUORESCENT iv TELEVISION 1 TELEPHONE . TELEPHONE /DATA p JUNCTION BOX WITH BLANK COVER I:@T TIMER-CONTROLLED RECEPTACLE FOR COFFEE MAKER SWITCH OUTLETS • • PENDANT FLUORESCENT 01 FLUORESCENT OPEN STRIP I E____3 UNDERCOUNTER FLUORESCENT ' RECESSED FLUORESCENT CONNECTED TO EMERGENCY CIRCUIT [.l EXIT LIGHT (CEILING OR UNIVERSAL MOUNT) " EXIT LIGHT (WALL MOUNT) DUAL HEAD EMERGENCY EGRESS FIXTURE D Q TRACK LIGHT S SINGLE -POLE S2 DOUBLE -POLE S3 THREE -WAY S4 FOUR -WAY Sp DIMMER Sos OCCUPANCY SENSOR Sp PILOT- LIGHTED SK KEY- OPERATED SLV LOW VOLTAGE SM MASTER D PUSHBUTTON os CEILING MOUNTED OCCUPANCY SENSOR ABBREVIATIONS CKT CIRCUIT C.O. CONDUIT ONLY AL ALUMINUM CU COPPER REC RECEPTACLES LTS LIGHTS GFCI GROUND FAULT CIRCUIT INTERRUPTER (R) REMOVE EXISTING XFMR TRANSFORMER GND GROUND LCP LIGHTING CONTROL PANEL NL NIGHT LIGHT PP POWER POLE WP WEATHER PROOF EXTG EXISTING P.O.S. POINT OF SERVICE CLG CEILING TTB TELEPHONE TERMINAL BOARD (E) EXTG. TO REMAIN (RE) RELOCATED EXISTING U.O.N. UNLESS OTHERWISE NOTED DF DRINKING FOUNTAIN PANELBOARDS, SWITCHES & EQUIPMENT i CIRCUIT BREAKER PANEL / / /// SWITCHBOARD OR MOTOR CONTROL CENTER 6 TERMINAL CABINET ❑J DISCONNECT SWITCH El FUSED DISCONNECT SWITCH ®.I COMB. STARTER & DISCONNECT SWITCH 0 FAN CONNECTION ® EQUIPMENT CONNECTION ® MOTOR CONNECTION 0- - - MULTI - OUTLET PLUG -IN ASSEMBLY (SEE NOTES) ®FSD FIRE SMOKE DAMPER CONNECTION ADDITIONAL SYMBOLS CIRCUITING I® FURNITURE SYSTEM POWER CONNECTION. CONNECT CONDUCTORS TO FURNITURE SYSTEM FLEX CONDUIT PROVIDED BY OTHERS. VERIFY REQUIREMENTS. CONCEALED IN CLG. OR WALL WIRING - - - WIRING CONCEALED IN FLOOR NO. OF CONDUCTORS 111 BRANCH CIRCUIT HOME RUN --III GROUNDING ELECTRODE -LV- LOW VOLTAGE -•-I1 CIRCUIT WITH ISOLATED GROUND [40 JUNCTION BOX & CONDUIT FOR FURNITURE SYSTEM TELEPHONE /DATA CONNECTION ❑ CONNECTION POINT TO BUSSWAY EPARATE PERMIT REQUIRED FOR: Mechanical ❑ Electrical Nir Plumbing gGas Piping City of Tukwila .oli...DING DIVISION 1 ST FLOOR PC1 300G T2 225 kVA XFMR • #-< 225N PC1A PC1B c=,<600NG2> PC2A PC2B 400N 400N BD #4 PC3A <400NG2><=, 225N T3 150 kVA XFMR • PC3 200G ■ 4 #3/0 CU IN EXTG (2) 4 "C (PARALLEL RUNS) H2 H1 LCP DP1C (E) 2ND FLOOR C/T INCOMING MDP 1600A 480Y/277V 30, 4W ,-< 100N >-1 DP1 200G T1 150 kVA XFMR • DP1A DP1B c==.<400NG2> 4 #3/0 CU IN EXTG 2 1/ " C LCP PC4 REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC APR 10 2008 ity -Of Tukwila B ILDIN DIVI ; ION FILES Y Permit No.. elb Plar review apprnvai !i °sciSbject to errors and omissions. Approval of construction documents does not authorize the violation of an opted code or ordinance. Receipt of approved Fl x - 'op and conditions is acknowledged: Date: , 1 t o City of Tukwila BUILDING D VISION REVISIONS °Icy c ?anpes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 100N >1 T4 225 kVA XFMR • PC4A PC4B c=400NG2> ■ PC4C 1 ST FLOOR #1/0 CU• APPROVED PI 5,r1 7,7ICATIOI'r f,•„ -.'r r'j aN ::.:D. MODIFIED OR ALTERED. WITHOUT AUTHORIZATION FROM THE r?LIILDING ALL WORK SHALL BE CONE IN ACCORDANCE WITH THE APPROVED PAINS AND I :21,D,IECT TO FIE .0 IN5PF' 1IOT,`, #2 CU -0 TO EXISTING 500 kVA PAD - MOUNTED TRANSFORMER #2 CU -o EXISTING (5) SETS #500 kCMIL AL (VERIFY) RISER DIAGRAM NOT TO SCALE 4 #600 kCMIL CU IN EXISTING 4" CONDUIT #1/0 CU-o -< 300G CORE'TION L.•T 6R #_- ,._. Public Works, Building Division PERMIT NUMBER 08 AID TI TAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206- 633 -2811 Fax: 206- 374 -2128 Email: Info@titanelectric.net CAS I? Pr ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425 - 402 -9400 Fax: 425 - 402 -9402 City Review / \ Comments 03/28/08 Rev. #: Revision: Date: Project Title: Tenant Improvements for: RAINI bR INDUSTRI hS BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: RISER DIAGRAM, /gi LEGEND & SCHEDULES RECEIVED hm 8 ZOUO PERMIT CENTER Egos- t83 FILE COPY Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: R0.1 Titan Electric. PANEL SCHEDULE PANEL: DP -1 ProjecRainer Industries Date : Locatioll*Wila Fed From : MDP Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL 400 400 208 120 3 35,000 600 600 480 277 3 25,000 Amp P Rec Heat Motor Ltg Other Total DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 1 Spare A 20 1 2.9 0.00000 0.01057 0.01057 1.6 3 0.0 3 Spare B 20 1 2.9 1.4 5 0.0 5 Spare C 20 1 1.2 1.6 7 0.0 7 Spare A 20 1 2.9 0.8 9 0.0 9 Spare B 20 1 2.9 0.8 11 0.0 11 Spare C 20 1 1.2 1.5 1.5 13 0.0 13 Spare A 20 1 10 350 kCMIL CU 2 2.9 4.5 1.0 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 0.0 A.I.C. 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed Rec - Corridor 15 Spare B 20 1 0.063 0.051 2.9 4.5 0.4 17 0.0 17 Spare C 20 1 70 3/0 CU 1 1.4 1.5 1.5 19 0.0 19 Spare A 20 1 FEEDER TO BD #2 2.5 4.5 0.6 X 0.0 21 Trip /Fu 21 Spare B 20 1 110 3/0 CU 2 2.5 0.00435 0.00286 0.00520 0.6 X 0.0 X 600 23 Spare C 20 1 0.079 0.052 1.4 0.2 1.1 0.0 25 Rec - Offices 25 Spare C 20 1 16.5 2.4 1.2 x ^ _ x _ _ x 0.0 _ X _ _ _ x Rec - Plotter 27 Spare C 20 1 16.5 2.9 1.5 1.5 29 0.0 29 Spare C 20 1 16.5 1.5 1.5 1.5 31 0.0 31 Spare C 20 1 0.063 0.051 1.7 1.5 1.5 33 0.0 33 Spare C 20 1 80 4/0 CU 1 2.0 1.5 1.5 35 0.0 35 Spare C 20 1 FEEDER TO PANEL H2 40 3/0 CU 2 1.5 1.5 37 0.0 37 Transformer DP -1A Feed A 200 3 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 1.8 39 0.0 39 Transformer DP -1A Feed B 200 3 11,501 14,000 1.2 1.2 41 0.0 41 Transformer DP -1A Feed C 200 A 0.00038 0.00040 0.00055 9.6 2 0.0 2 Spare A 20 1 2.4 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 76.4 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.8 Other Kva 26.4 0 0.0 Phase A 37.6 Phase B 33.6 Phase C 32.4 Conn. Kva 103.6 Conn. Amps 288 Demand Kva 70.6 Demand Mips 196 0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 56.2 Heat Kva 0.0 Motor Kva 72.9 Ltg Kva 63.8 Other Kva 5.3 0 0.0 Phase A 24.3 Phase B 24.3 Phase C 24.3 Conn. Kva 198.2 Conn. Amps 238 Demand Kva 201.4 Demand Amps 242 0 4 Spare B 20 1 0.8 1.2 6 0.0 6 Spare C 20 1 1'0 " 350 kCMIL CU 2 2.5 0.00019 0.00020 0.00028 0.0 8 0.0 8 Spare A 20 1 FEEDER TO PANEL PC4C 3.3 0.250 0.059 0.8 10 0.0 10 Spare B 20 1 10,000 1.8 25 350 kCMIL CU 2 0.8 12 0.0 12 Spare C 20 1 23,504 2.7 FEEDER TO XFMR T1 0.4 14 0.0 14 Spare A 20 1 0.00178 0.01226 0.01239 2.8 0.8 16 0.0 16 Spare B 20 1 2.8 51,597 0.4 18 0.0 18 Spare C 20 1 2.3 1.5 1.5 20 0.0 20 Spare A 20 1 27.5 2.4 1.0 22 0.0 22 Spare B 20 1 27.5 0.0 0.4 24 0.0 24 Spare C 20 1 27.5 0.0 0.4 26 0.0 26 Elevator Feed A 100 3 0.0 13.8 1.2 28 13.8 28 Elevator Feed B 100 3 0.0 13.8 1.2 30 13.8 30 Elevator Feed C 100 3 0.0 13.8 0.0 32 13.8 32 Panel H1 Feed A 100 3 0.0 1.1 1.1 34 0.0 34 Panel H1 Feed B 100 3 0.0 1.1 1.1 36 0.0 36 Panel H1 Feed C 100 3 0.0 1.1 1.1 38 0.0 38 Existing Roof Unit A 60 3 0.0 10.5 1.1 40 10.5 40 Existing Roof Unit B 60 3 0.0 10.5 1.1 42 10.5 42 Existing Roof Unit C 60 3 0.0 10.5 0.4 REMARKS • Includes Load from DP -1B 10.5 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 33.1 largest motor 0 125% + balance 0 100% = 83.3 lighting 0 125% = 79.8 heating 0 100% = 0.0 other 0 100% = 5.3 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: DP-1A ProjecRainer Industries Date : LocotoFiikwila Fed From : 225KVA Transformer Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 400 400 208 120 3 35,000 Amp P Rec Heat Motor Ltg Other Total 1 Rec - Offices A 20 1 1.6 10.5 2.9 0.00000 0.01057 0.01057 1.6 3 Rec - Offices B 20 1 1.4 10.5 2.9 1.4 5 Rec - Offices C 20 1 1.6 10.5 1.2 1.6 7 Rec - Offices A 20 1 0.8 10.5 2.9 0.8 9 Rec - Offices B 20 1 0.8 10.5 2.9 0.8 11 Rec - Plotter C 20 1 0.8 10.5 1.2 1.5 1.5 13 Rec - Offices A 20 1 1.0 1.0 10 350 kCMIL CU 2 2.9 4.5 1.0 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Rec - Corridor B 20 1 0.4 0.6 0.063 0.051 2.9 4.5 0.4 17 Rec - Copier C 20 1 0.8 0.8 70 3/0 CU 1 1.4 1.5 1.5 19 Rec - Open Office A 20 1 0.6 0.8 FEEDER TO BD #2 2.5 4.5 0.6 X Trip /Fu 21 Rec - Open Office B 20 1 0.6 0.8 110 3/0 CU 2 2.5 0.00435 0.00286 0.00520 0.6 X 400 23 Rec - Open Office C 20 1 0.2 10 3/0 CU 1 0.079 0.052 1.4 0.2 1.1 25 Rec - Offices A 20 1 1.2 16.5 2.4 1.2 x ^ _ x _ _ x X _ _ _ _ _ _ X 27 Rec - Plotter B 20 1 0.8 0.00703 0.01054 0.01267 16.5 2.9 1.5 1.5 29 Rec - Plotter C 20 1 0.8 0.8 16.5 1.5 1.5 1.5 31 Rec - Plotter A 20 1 0.8 0.8 0.063 0.051 1.7 1.5 1.5 33 Rec - Plotter B 20 1 1 0.6 80 4/0 CU 1 2.0 1.5 1.5 35 Rec - Plotter C 20 1 1 0.8 FEEDER TO PANEL H2 40 3/0 CU 2 1.5 1.5 37 Rec - Lunchroom, Samples A 20 1 1.8 0.8 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 1.8 39 Rec - Dishwasher B 20 1 1 0.8 11,501 14,000 1.2 1.2 41 Rec - Mechanical C 20 1 0.4 0.8 0.00038 0.00040 0.00055 9.6 2 Rec - Offices A 20 1 1.2 1.8 2.4 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 76.4 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.8 Other Kva 26.4 0 0.0 Phase A 37.6 Phase B 33.6 Phase C 32.4 Conn. Kva 103.6 Conn. Amps 288 Demand Kva 70.6 Demand Mips 196 0 4 Rec - Offices B 20 1 1.2 1.0 0.8 1.2 6 Spare C 20 1 0.8 6.5 1'0 " 350 kCMIL CU 2 2.5 0.00019 0.00020 0.00028 0.0 8 Rec - Open Office A 20 1 0.8 0.6 FEEDER TO PANEL PC4C 3.3 0.250 0.059 0.8 10 Rec - Open Office B 20 1 0.8 0.8 10,000 1.8 25 350 kCMIL CU 2 0.8 12 Rec - Open Office C 20 1 0.4 0.6 23,504 2.7 FEEDER TO XFMR T1 0.4 14 Rec - Open Office A 20 1 0.8 0.8 0.00178 0.01226 0.01239 2.8 0.8 16 Rec - IT Office B 20 1 0.4 0.8 2.8 51,597 0.4 18 Rec - Copier C 20 1 0.8 0.8 2.3 1.5 1.5 20 Rec - Corridor A 20 1 1.0 0.6 27.5 2.4 1.0 22 Rec - Open Office B 20 1 0.4 0.8 27.5 0.0 0.4 24 Rec - Files C 20 1 0.4 0.8 27.5 0.0 0.4 26 Copier A 30 2 0.8 0.8 0.0 1.2 1.2 28 Copier B 30 2 0.8 0.8 0.0 1.2 1.2 30 Spare C 20 1 0.8 0.8 0.0 0.0 32 Rec - Lunchroom refrigerator A 20 1 0.8 0.8 0.0 1.1 1.1 34 Rec - Lunchroom Vending B 20 1 0.8 0.8 0.0 1.1 1.1 36 Rec - Lunchroom Vending C 20 1 0.8 0.8 0.0 1.1 1.1 38 Rec - Lunchroom Vending A 20 1 0.0 0.8 0.0 1.1 1.1 40 Rec - Lunchroom refrigerator B 20 1 0.0 0.8 0.0 1.1 1.1 42 Rec - Lunchroom C 20 1 0.4 0.8 0.0 0.4 REMARKS • Includes Load from DP -1B first 10 kva rec 0 100% + balance 0 50% = 43.2 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 1.0 heating 0 100% = 0.0 other 0 100% = 26.4 0 0% 0 0.0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: DP-18 ProjecRainer Industries Date : LocatoTukwila Fed From : 150KVA Transformer Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 400 400 208 120 3 ..,,. 35,000 Amp P Rec Heat Motor Ltg Other Total 1 Existing rec. A 20 1 0.8 10.5 2.9 0.00000 0.01057 0.01057 0.8 3 Existing rec. B 20 1 0.8 10.5 2.9 0.8 5 Existing rec. C 20 1 0.8 10.5 1.2 0.8 7 Existing rec. A 20 1 0.8 10.5 2.9 0.8 9 Existing rec. B 20 1 0.8 10.5 2.9 0.8 11 Existing rec. C 20 1 0.8 10.5 1.2 0.8 13 Existing rec. A 20 1 0.8 1.0 10 350 kCMIL CU 2 2.9 4.5 0.8 A.I.C. 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Existing rec. B 20 1 0.8 0.6 0.063 0.051 2.9 4.5 0.8 17 Existing rec. C 20 1 0.8 0.8 70 3/0 CU 1 1.4 4.5 0.8 19 Existing rec. A 20 1 0.8 0.8 FEEDER TO BD #2 2.5 4.5 0.8 X Trip /Fu 21 Existing rec. B 20 1 0.8 0.8 110 3/0 CU 2 2.5 0.00435 0.00286 0.00520 0.8 0.8 400 23 Existing rec. C 20 1 0.8 10 3/0 CU 1 0.079 0.052 1.4 0.8 1.1 25 Existing rec. A 20 1 0.8 16.5 2.4 0.8 x _ _ _ _ X X _ _ _ _ _ _ X 27 Existing rec. B 20 1 0.8 0.00703 0.01054 0.01267 16.5 2.9 AFC 0 XFMR SECONDARY 0.8 29 Existing rec. C 20 1 0.8 0.8 16.5 1.5 0.8 31 Existing rec. A 20 1 0.8 0.8 0.063 0.051 1.7 0.8 33 33 B 20 1 1 0.6 80 4/0 CU 1 2.0 0.00504 0.00408 0.00648 0.0 35 35 C 20 1 1 0.8 FEEDER TO PANEL H2 40 3/0 CU 2 0.079 0.052 0.0 37 37 A 20 1 1 0.8 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 0.0 39 39 B 20 1 1 0.8 11,501 14,000 0.0 41 41 C 20 1 1 0.8 0.00038 0.00040 0.00055 ftg 2 Rec - Elevator Machine Room A 20 1 0.8 1.8 2.4 0.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 56.2 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.8 Other Kva 5.3 0 0.0 Phase A 21.9 Phase B 20.0 Phase C 20.4 Conn. Kva 62.3 Conn. Amps 173 Demand Kva 39.4 Demand Amps 109 0 4 Elevator Cab Lts B 20 1 1 1.0 0.8 0.8 6 Rec - Elevator Pit C 20 1 0.8 6.5 1'0 " 350 kCMIL CU 2 2.5 0.00019 0.00020 0.00028 0.8 8 Existing rec. A 20 1 0.8 0.6 FEEDER TO PANEL PC4C 3.3 0.250 0.059 0.8 10 Existing rec. B 20 1 0.8 0.8 10,000 1.8 25 350 kCMIL CU 2 0.8 12 Existing rec. C 20 1 0.8 0.6 23,504 2.7 FEEDER TO XFMR T1 0.8 14 Existing rec. A 20 1 0.8 0.8 0.00178 0.01226 0.01239 2.8 0.8 16 Existing rec. B 20 1 0.8 0.8 2.8 51,597 0.8 18 Existing rec. C 20 1 0.8 0.8 2.3 0.00736 0.01285 0.01481 0.8 20 20 A 20 1 1 0.6 27.5 2.4 0.0 22 22 B 20 1 1 0.8 27.5 0.0 0.0 24 Existing rec. C 20 1 0.8 0.8 27.5 0.0 0.8 26 Existing rec. A 20 1 0.8 0.8 0.0 0.8 28 Existing rec. B 20 1 0.8 0.8 0.0 0.8 30 Existing rec. C 20 1 0.8 0.8 0.0 0.8 32 Existing rec. A 20 1 0.8 0.8 0.0 0.8 34 Existing rec. B 20 1 0.8 0.8 0.0 0.8 36 BAS Controls C 20 1 0.8 0.8 0.0 0.8 38 Sub Feed for Floor 2 Exisitng Panel A 200 3 0.0 0.8 0.0 0.0 40 Sub Feed for Floor 2 Exisitng Panel B 200 3 0.0 0.8 0.0 0.0 42 Sub Feed for Floor 2 Exisitng Panel C 200 3 0.0 0.8 0.0 0.0 REMARKS : ' REMARKS : first 10 kva rec 0 100% + balance 0 50% = 33.1 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 1.0 heating 0 100% = 0.0 other 0 100% = 5.3 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: DP -1 C ( Existing) ProjecRainer Industries Date : LocatioFukwila fend from DP -1B on first floor Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 200 200 208 120 3 Amp P Rec Heat Motor Ltg Other Total 1 Rec - Offices A 20 1 0.6 10.5 2.9 0.00000 0.01057 0.01057 0.6 3 Rec - Open Office B 20 1 0.8 10.5 2.9 0.8 5 Rec - Open Office C 20 1 0.8 10.5 1.2 0.8 7 Rec - Sign Display A 20 1 1.4 10.5 2.9 1.4 9 Rec - Sign Display B 20 1 1.4 10.5 2.9 1.4 11 Rec - Server Room C 20 1 0.4 10.5 1.2 0.4 10,000 13 Rec - Shared Office A 20 1 1.0 10 350 kCMIL CU 2 2.9 4.5 2.9 1.0 A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 Rec - Open Office B 20 1 0.6 0.063 0.051 2.9 4.5 2.9 0.6 17 Rec - Open Office C 20 1 0.8 70 3/0 CU 1 1.4 4.5 1.4 0.8 19 Rec - Open Office A 20 1 0.8 FEEDER TO BD #2 2.5 4.5 2.5 0.8 X Trip /Fu 21 Existing rec. B 20 1 0.8 110 3/0 CU 2 2.5 0.00435 0.00286 0.00520 2.5 0.8 400 23 23 Rec - Refrigerator C 20 1 10 3/0 CU 1 0.079 0.052 1.4 1.1 1.1 25 25 Rec - Coffee A 20 1 16.5 2.4 1.5 1.5 X _ _ _ _ _ _ X 27 27 Rec - Microwave B 20 1 0.00703 0.01054 0.01267 16.5 2.9 AFC 0 XFMR SECONDARY 1.2 1.2 29 Rec - Open Office C 20 1 0.8 16.5 1.5 1.5 0.8 31 Rec - Open Office A 20 1 0.8 0.063 0.051 1.7 1.7 0.8 33 Rec - Open Office B 20 1 0.6 80 4/0 CU 1 2.0 0.00504 0.00408 0.00648 2.0 0.6 35 Existing rec. C 20 1 0.8 FEEDER TO PANEL H2 40 3/0 CU 2 0.079 0.052 0.0 0.8 37 Existing rec. A 20 1 0.8 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 0.0 0.8 39 Existing rec. B 20 1 0.8 11,501 14,000 0.0 0.8 41 Existing rec. C 20 1 0.8 0.00038 0.00040 0.00055 0.0 8.6 2 Rec - Offices A 20 1 1.8 2.4 2.4 1.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 31.4 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 5.3 0 0.0 Phase A 13.1 Phase B 12.0 Phase C 11.6 Conn. Kva 36.7 Conn. Amps 102 Demand Kva 26.0 Demand Amps 72 0 4 Rec - Conf, Offices B 20 1 1.0 2.7 2.7 1.0 6 Rec - Copier C 20 1 6.5 1'0 " 350 kCMIL CU 2 2.5 0.00019 0.00020 0.00028 1.5 1.5 8 Rec - Training A 20 1 0.6 FEEDER TO PANEL PC4C 3.3 0.250 0.059 3.3 0.6 10 Rec - Offices B 20 1 0.8 10,000 1.8 25 350 kCMIL CU 2 1.8 0.8 12 Rec - Restrooms C 20 1 0.6 23,504 2.7 FEEDER TO XFMR T1 2.7 0.6 14 Rec - Open Office A 20 1 0.8 0.00178 0.01226 0.01239 2.8 2.8 0.8 16 Rec - Open Office B 20 1 0.8 2.8 51,597 2.8 0.8 18 Rec - Open Office C 20 1 0.8 2.3 0.00736 0.01285 0.01481 2.3 0.8 20 Rec - Open Office A 20 1 0.6 27.5 2.4 2.4 0.6 22 Existing rec. B 20 1 0.8 27.5 0.0 0.0 0.8 24 Existing rec. C 20 1 0.8 27.5 0.0 0.0 0.8 26 Existing rec. A 20 1 0.8 0.0 0.0 0.8 28 Existing rec. B 20 1 0.8 0.0 0.0 0.8 30 Existing rec. C 20 1 0.8 0.0 0.0 0.8 32 Existing rec. A 20 1 0.8 0.0 0.0 0.8 34 Existing rec. B 20 1 0.8 0.0 0.0 0.8 36 Existing rec. C 20 1 0.8 0.0 0.0 0.8 38 Existing rec. A 200 3 0.8 0.0 0.0 0.8 40 Existing rec. B 200 3 0.8 0.0 0.0 0.8 42 Existing rec. C 200 3 0.8 0.0 0.0 0.8 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 20.7 largest motor O 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 5.3 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: H1 Project: Rainer Industries Date : Location : Tukwila Fed From : DP -1 32,34,36 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire 1 100 100 480 277 3 14,000 Amp P Rec Heat Motor Ltg Other Total 1 Metal Shop Lights A 20 1 10.5 2.9 0.00000 0.01057 0.01057 2.9 3 Metal Shop Lights B 20 1 10.5 2.9 2.9 5 Metal Shop Lights EM C 20 1 0.01185 0.00780 0.01419 10.5 1.2 1.2 7 Wood Shop Lights A 20 1 0.038 0.040 10.5 2.9 2.9 9 Wood Shop Lights B 20 1 10.5 2.9 2.9 11 Wood Shop Lights EM C 20 1 225 kVA XFMR CO 5.5% Z 10.5 1.2 1.2 13 Assembly Lights A 20 1 FEEDER TO PANEL PC1A/PC1B 10 350 kCMIL CU 2 2.9 4.5 2.9 A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Assembly Lights B 20 1 FEEDER TO PANEL PC2A /PC2B 80 4/0 CU 1 0.063 0.051 2.9 4.5 2.9 17 Assembly Lights EM C 20 1 22,000 FEEDER TO BD #1 70 3/0 CU 1 1.4 4.5 1.4 19 Assembly Lights A 20 1 5,663 10,000 FEEDER TO BD #2 2.5 4.5 2.5 X Trip /Fu 21 Assembly Lights B 20 1 10,000 FEEDER TO PANEL PC3 110 3/0 CU 2 2.5 0.00435 0.00286 0.00520 2.5 X 400 23 Assembly Lights EM C 20 1 FEEDER TO XFMR T3 10 3/0 CU 1 0.079 0.052 1.4 1.4 25 Production Lights A 20 1 16.5 2.4 2.4 x _ _ _ _ _ _ X 27 Production Lights B 20 1 0.00703 0.01054 0.01267 16.5 2.9 AFC 0 XFMR SECONDARY 2.9 29 Production Lights EM C 20 1 10 3/0 CU 2 0.079 0.052 16.5 1.5 1.5 31 Production Lights A 20 1 FEEDER TO BD #3 2.5 0.063 0.051 1.7 1.7 33 Production Lights B 20 1 10,000 2.5 80 4/0 CU 1 2.0 0.00504 0.00408 0.00648 2.0 35 Spare C 20 1 5,406 2.5 FEEDER TO PANEL H2 40 3/0 CU 2 0.079 0.052 0.0 37 Spare A 20 1 0.00208 0.01216 0.01234 22,455 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 0.0 39 Spare B 20 1 0.00675 0.02312 0.02408 11,501 14,000 0.0 41 Spare C i8 1 10 s P, ° C . 1 0.038 0.040 0.00038 0.00040 0.00055 0.0 2 1st Floor Office Lights A 20 1 TRANSFORMER T2 6.5 2.4 2.4 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 63.8 Other Kva 0.0 0 0.0 Phase A 26.2 Phase B 23.4 Phase C 14.2 Conn. Kva 63.8 Conn. Amps 77 Demand Kva 79.8 Demand Amps 96 0 4 1st Floor Office Lights B 20 1 225 kVA XFMR @ 5.5% Z 6.5 2.7 2.7 6 1st Floor Office Lights C 20 1 6.5 1'0 " 350 kCMIL CU 2 2.5 0.00019 0.00020 0.00028 2.5 8 1st Floor Breakroom Lights A 20 1 7,795 6.5 FEEDER TO PANEL PC4C 3.3 0.250 0.059 3.3 10 1st Floor Restroom Lights B 20 1 0.03107 0.02005 0.03698 6.5 10,000 1.8 25 350 kCMIL CU 2 1.8 12 2nd Floor Office Lights C 20 1 6.5 23,504 2.7 FEEDER TO XFMR T1 2.7 14 2nd Floor Office Lights A 20 1 10.5 0.00178 0.01226 0.01239 2.8 2.8 16 2nd Floor Office Lights B 20 1 IMPEDENCE @ 120 VOLTS 10.5 2.8 51,597 2.8 18 2nd Floor Office lights C 20 1 10.5 2.3 0.00736 0.01285 0.01481 2.3 20 2nd Floor Office Lights A 20 1 27.5 2.4 2.4 22 Outside Pole Lights B 20 1 0.00158 0.00104 0.00189 27.5 0.0 0.0 24 Spare C 20 1 0.250 0.059 0.00500 0.00118 0.00514 27.5 0.0 0.0 26 Spare A 20 1 1. CALCULATIONS ARE BASED ON OHMIC METHOD, 277 VOLTS LINE TO GROUND FAULT. 0.0 0.0 28 Spare B 20 1 0.0 0.0 30 Space C 20 1 0.0 0.0 32 Space A 20 1 0.0 0.0 34 Space B 20 1 0.0 0.0 36 Space c 20 1 0.0 0.0 38 Space A 20 1 0.0 0.0 40 Space B 20 1 0.0 0.0 42 Space C 20 1 0.0 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 0.0 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 79.8 heating 0 100% = 0.0 other 0 100% = 0.0 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: H2 Project: Rainer Industries Date : Location : Tukwila Fed From : MDP Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 400 400 480 277 3 25,000 Amp P Rec Heat Motor Ltg Other Total 1 Existing 1st Floor Heat A 60 3 10.5 0.0 0.00000 0.01057 0.01057 10.5 3 Existing 1st Floor Heat B 60 3 10.5 0.0 10.5 5 Existing 1st Floor Heat C 60 3 0.01185 0.00780 0.01419 10.5 0.0 10.5 7 Existing 1st Floor Heat A 60 3 0.038 0.040 10.5 0.0 10.5 9 Existing 1st Floor Heat B 60 3 10.5 0.0 10.5 11 Existing 1st Floor Heat C 60 3 225 kVA XFMR CO 5.5% Z 10.5 0.0 10.5 13 Existing H.W.T A 30 2 FEEDER TO PANEL PC1A/PC1B 10 350 kCMIL CU 2 0.0 4.5 4.5 A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Existing H.W.T B 30 2 FEEDER TO PANEL PC2A /PC2B 80 4/0 CU 1 0.063 0.051 0.0 4.5 4.5 17 Existing H.W.T C 30 2 22,000 FEEDER TO BD #1 70 3/0 CU 1 0.0 4.5 4.5 19 Existing H.W.T A 30 2 5,663 10,000 FEEDER TO BD #2 0.0 4.5 4.5 Trip /Fu 21 Spare B 20 1 10,000 FEEDER TO PANEL PC3 110 3/0 CU 2 0.0 0.00435 0.00286 0.00520 0.0 X 400 23 Spare C 20 1 FEEDER TO XFMR T3 10 3/0 CU 1 0.079 0.052 0.0 0.0 25 Existing A.0 Unit A 100 3 16.5 0.0 16.5 X _ _ _ _ x 27 Existing A.0 Unit B 100 3 0.00703 0.01054 0.01267 16.5 0.0 AFC 0 XFMR SECONDARY 16.5 29 Existing A.0 Unit C 100 3 10 3/0 CU 2 0.079 0.052 16.5 0.0 16.5 31 Existing Heat A 20 3 FEEDER TO BD #3 2.5 0.063 0.051 0.0 2.5 33 Existing Heat B 20 3 10,000 2.5 80 4/0 CU 1 0.0 0.00504 0.00408 0.00648 2.5 35 Existing Heat C 20 3 5,406 2.5 FEEDER TO PANEL H2 40 3/0 CU 2 0.079 0.052 2.5 37 Spare A 20 1 0.00208 0.01216 0.01234 22,455 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 0.0 39 Spare B 20 1 0.00675 0.02312 0.02408 11,501 14,000 0.0 41 Spare C i8 1 10 s P, ° C . 1 0.038 0.040 0.00038 0.00040 0.00055 0.0 2 Existing 2nd Floor Heat A 40 3 TRANSFORMER T2 6.5 0.0 6.5 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kva 141.0 Motor Kva 132.0 Ltg Kva 0.0 Other Kva 18.0 0 0.0 Phase A 100.0 Phase B 95.5 Phase C 95.5 Conn. Kva 291.0 Conn. Amps 350 Demand Kva 311.6 Demand Amps 375 0 4 Existing 2nd Floor Heat B 40 3 225 kVA XFMR @ 5.5% Z 6.5 0.00454 0.00953 0.01056 6.5 6 Existing 2nd Floor Heat C 40 3 6.5 1'0 " 350 kCMIL CU 2 0.038 0.040 0.00019 0.00020 0.00028 6.5 8 Existing 2nd Floor Heat A 40 3 7,795 6.5 FEEDER TO PANEL PC4C 100 3 CU 1 0.250 0.059 6.5 10 Existing 2nd Floor Heat B 40 3 0.03107 0.02005 0.03698 6.5 10,000 FEEDER TO PANEL DP1 25 350 kCMIL CU 2 6.5 12 Existing 2nd Floor Heat C 40 3 6.5 23,504 25,000 FEEDER TO XFMR T1 6.5 14 Existing 2nd Floor Heat A 60 3 10.5 0.00178 0.01226 0.01239 0.0 10.5 16 Existing 2nd Floor Heat B 60 3 IMPEDENCE @ 120 VOLTS 10.5 0.0 51,597 10.5 18 Existing 2nd Floor Heat C 60 3 10.5 0.0 0.00736 0.01285 0.01481 10.5 20 Existing A.0 Unit A 175 3 27.5 0.0 27.5 22 Existing A.0 Unit B 175 3 0.00158 0.00104 0.00189 27.5 0.0 27.5 24 Existing A.0 Unit C 175 3 0.250 0.059 0.00500 0.00118 0.00514 27.5 0.0 27.5 26 Spare A 20 1 1. CALCULATIONS ARE BASED ON OHMIC METHOD, 277 VOLTS LINE TO GROUND FAULT. 0.0 0.0 28 Spare B 20 1 0.0 0.0 30 Spare C 20 1 0.0 0.0 32 Spare A 20 1 0.0 0.0 34 Spare B 20 1 0.0 0.0 36 Spare C 20 1 0.0 0.0 38 Spare A 20 1 0.0 0.0 40 Spare B 20 1 0.0 0.0 42 Spare C 20 1 0.0 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 0.0 largest motor 0 125% + balance 0 100% = 152.6 lighting 0 125% = 0.0 heating 0 100% = 141.0 other 0 100% = 18.0 0 0% 0 0.0 0.0 VzOStV7 SHORT CIRCUIT CALCULATIONS CIRCUIT DEFINITION CONDUCTOR CIRCUIT IMPEDENCE AVAILABLE PANEL DESCRIPTION # IN OHMS /MFT OHMS FAULT AIC LENGTH SIZE PARALLEL R X R X Z CURRENT RATING (A) AVAILABLE FAULT CURRENT @ PSE 500 kVA XFMR 0.00000 0.01057 0.01057 26,200 FEEDER TO PANEL MDP 70 600 kCMIL AL 5 0.036 0.039 0.00050 0.00055 0.00074 0.06050 0.01112 0.01113 24,888 65,000 FEEDER TO PANEL PC1 300 3/0 CU 2 0.079 0.052 0.01185 0.00780 0.01419 0.01235 0.01892 0.02259 12,259 14,000 FEEDER TO XFMR T2 10 350 kCMIL CU 1 0.038 0.040 0.00038 0.00040 0.00055 0.01273 0.01932 0.02314 11,972 TRANSFORMER T2 IMPEDENCE @ 120 VOLTS 0.00239 0.00363 0.00434 27,635 225 kVA XFMR CO 5.5% Z 0.00454 0.00953 0.01056 AFC © XFMR SECONDARY 0.00693 0.01316 0.01487 8,068 FEEDER TO PANEL PC1A/PC1B 10 350 kCMIL CU 2 0.038 0.040 0.00019 0.00020 0.00028 0.00712 0.01336 0.01514 7,927 22,000 FEEDER TO PANEL PC2A /PC2B 80 4/0 CU 1 0.063 0.051 0.00504 0.00408 0.00648 0.01216 0.01744 0.02126 5,644 22,000 FEEDER TO BD #1 70 3/0 CU 1 0.079 0.052 0.00553 0.00364 0.00662 0.01265 0.01700 0.02119 5,663 10,000 FEEDER TO BD #2 50 3/0 CU 1 0.079 0.052 0.00395 0.00260 0.00473 0.01660 0.01960 0.02568 4,672 10,000 FEEDER TO PANEL PC3 110 3/0 CU 2 0.079 0.052 0.00435 0.00286 0.00520 0.00485 0.01398 0.01480 18,722 25,000 FEEDER TO XFMR T3 10 3/0 CU 1 0.079 0.052 0.00079 0.00052 0.00095 0.00564 0.01450 0.01556 17,806 TRANSFORMER T3 IMPEDENCE © 120 VOLTS 0.00106 0.00272 0.00292 41,102 150 kVA XFMR © 4.4% Z 0.00703 0.01054 0.01267 AFC 0 XFMR SECONDARY 0.00809 0.01326 0.01554 7,724 FEEDER TO PANEL PC3A 10 3/0 CU 2 0.079 0.052 0.00040 0.00026 0.00047 0.00848 0.01352 0.01596 7,517 18,000 FEEDER TO BD #3 40 4/0 CU 1 0.063 0.051 0.00252 0.00204 0.00324 0.01100 0.01556 0.01906 6,296 10,000 FEEDER TO BD #4 80 4/0 CU 1 0.063 0.051 0.00504 0.00408 0.00648 0.01352 0.01760 0.02220 5,406 10,000 FEEDER TO PANEL H2 40 3/0 CU 2 0.079 0.052 0.00158 0.00104 0.00189 0.00208 0.01216 0.01234 22,455 25,000 FEEDER TO PANEL PC4 250 600 kCMIL CU 1 0.025 0.048 0.00625 0.01200 0.01353 0.00675 0.02312 0.02408 11,501 14,000 R FEEDER TO XFMR T4 10 s P, ° C . 1 0.038 0.040 0.00038 0.00040 0.00055 vo,�e �.� 0.00713 0.02352 0.02458 11,271 TRANSFORMER T2 ��� • IMPEDENCE @ 120 VOLTS ° ap 0.00134 0.00441 0.00461 26,017 225 kVA XFMR @ 5.5% Z .Vet _ 0.00454 0.00953 0.01056 AFC @ XFMR SECONDARY �'` 0.00588 0.01395 0.01514 7,928 FEEDER TO PANEL PC4A /PC4B 1'0 " 350 kCMIL CU 2 0.038 0.040 0.00019 0.00020 0.00028 0.00607 0.01415 0.01539 7,795 22,000 FEEDER TO PANEL PC4C 100 3 CU 1 0.250 0.059 0.02500 0.00590 0.02569 0.03107 0.02005 0.03698 3,245 10,000 FEEDER TO PANEL DP1 25 350 kCMIL CU 2 0.039 0.050 0.00049 0.00063 0.00079 0.00099 0.01174 0.01179 23,504 25,000 FEEDER TO XFMR T1 10 3/0 CU 1 0.079 0.052 0.00079 0.00052 0.00095 0.00178 0.01226 0.01239 22,353 TRANSFORMER T1 IMPEDENCE @ 120 VOLTS 0.00033 0.00230 0.00233 51,597 150 kVA XFMR @ 4.4% Z 0.00703 0.01054 0.01267 AFC @ XFMR SECONDARY 0.00736 0.01285 0.01481 8,105 FEEDER TO PANEL DP1A /DP1B 10 3/0 CU 2 0.079 0.052 0.00040 0.00026 0.00047 0.00776 0.01311 0.01523 7,879 35,000 FEEDER TO PANEL DP1C 20 3/0 CU 1 0.079 0.052 0.00158 0.00104 0.00189 0.00934 0.01415 0.01695 7,080 35,000 FEEDER TO PANEL H1 20 3 CU 1 0.250 0.059 0.00500 0.00118 0.00514 0.00599 0.01292 0.01424 8,424 10,000 NOTES TO CALCULATIONS: 1. CALCULATIONS ARE BASED ON OHMIC METHOD, 277 VOLTS LINE TO GROUND FAULT. 2. CONDUCTOR IMPEDANCE IS BASED ON NATIONAL ELECTRICAL CODE TABLE 9. TI TAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info @titanelectric.net CASH ( II ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 City Review / \ Comments 03/28/08 Rev. #: Revision: Date: Project Title: Tenant Improvements for: RAINI bR INDUSTRI FS BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: PANEL SCHEDULES MEWED HAR Z 8 ZUUti PERMIT CENTEh Designed By: MSC Drawn By: CJP Project No: 8009 Date: 02/22/08 Sheet Number: N;0.2 Titan Electric. PANEL SCHEDULE PANEL: PC -1 ProjeciRainer Industries Date : LocaticT4Wila Fed From : MDP Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 400 400 480 277 3 14,000 Amp P Rec Heat Motor Ltg Other Total 1 11G Welder 002 A 40 3 0.6 0.2 1.0 1.0 8.3 8.3 3 11G Welder 002 B 40 3 1 0.6 1.2 1.0 8.3 8.3 5 TIG Welder 002 C 40 3 20 1 1 1.2 8.3 8.3 7 11G Welder 004 A 40 3 A 20 1 1 8.3 8.3 9 110 Welder 004 B 40 3 Drill Press B 20 1 8.3 8.3 11 11G Welder 004 C 40 3 11 Rigid Chop Saw C 20 8.3 8.3 13 11G Welder 005 A 40 3 1.2 13 Cord Drop A 8.3 8.3 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 0.4 15 11G Welder 005 B 40 3 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 22,000 15 Cord Drop 8.3 8.3 17 11G Welder 005 C 40 3 0.0 0.2 17 8.3 8.3 19 Milling Machine A 15 3 0.0 0.2 1.0 1.0 A Trip /Fu 21 Milling Machine B 15 3 0.0 0.2 Trip /Fu 1.0 1.0 X 400 23 Milling Machine C 15 3 0.0 X 600 1.0 1.0 C 50 25 A 20 1 0.0 4.2 4.2 25 0.0 X _ _ X 50 27 B 20 1 1 4.2 4.2 X _ X X 27 0.0 29 C 20 1 Spare B 20 4.2 4.2 0.0 31 A 20 1 29 Spare C 20 4.2 0.0 33 B 20 1 1 31 Panel PC -2 Feed A 225 0.0 35 C 20 1 50 2 33 Panel PC -2 Feed B 0.0 37 Dust Collector A 50 3 C 50 13.3 35 Panel PC -2 Feed 13.3 39 Dust Collector B 50 3 Drill Press A 13.3 1 37 13.3 41 ,Dust Collector C 50 3 39 Plasma Cutter 13.3 50 2 13.3 2 11G Welder 003 A 50 3 4.2 41 Plasma Cutter C 13.2 13.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 66.9 Heat Kva 7.2 Motor Kva 136.0 Ltg Kva 0.0 Other Kva 234.5 0 0.0 Phase A 52.4 Phase B 52.4 Phase C 52.4 Conn. Kva 444.6 Conn. Amps 535 Demand Kva 320.6 Demand Mips 386 0 4 110 Welder 003 B 50 3 6.g 2 Chop Saw A 13.2 13.2 6 110 Welder 003 C 50 3 0.0 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 66.9 Heat Kva 7.2 Motor Kva 96.1 Ltg Kva 0.0 Other Kva 117.3 0 0.0 Phase A 50.8 Phase B 55.1 Phase C 57.5 Conn. Kva 287.5 Conn. Amps 798 Demand Kva 209.9 Demand Amps 583 0 4 13.2 13.2 8 TIG Welder Future A 50 3 1.2 20 0.0 1.2 6 0.0 10 11G Welder Future B 50 3 Rec. C 20 0.0 0.2 0.0 12 TIG Welder Future C 50 3 0.2 Metal Office Heat A 20 0.0 0.0 14 11G Welder Future A 50 3 1 0.2 Metal Office Heat B 20 0.0 16 TIG Welder Future B 50 3 20 1 0.2 Metal Office E.F C 0.0 18 TIG Welder Future C 50 3 A 25 3 14 Spare 0.0 20 A 20 1 Iron Worker 006 B 25 3 16 0.0 22 B 20 1 18 Iron Worker 006 C 25 3 0.0 24 C 20 1 2.6 20 Finn Power Swager A 20 0.0 26 A 20 1 1.9 1.9 22 Finn Power Swager B 0.0 28 B 20 1 20 1.9 1.9 24 Finn Power Swager 0.0 30 C 20 1 C 20 1.9 1.9 26 0.0 32 A 20 1 Battery Charger A 25 1.8 1.8 0.0 34 B 20 1 28 Battery Charger 2.3 25 0.0 0.0 36 C 20 1 2 30 Battery Charger 2.3 25 0.0 38 Transformer PC1A A 300 3 20 1 32 Dock Levelers A 0.0 40 Transformer PC1A B 300 3 B 35 2 34 Dock Levelers 0.0 42 Transformer PC1A C 300 3 MIG Welder 008 C 35 2 36 0.0 REMARKS : Includes Toad from Panel PC -1A first 10 kva rec 0 100% + balance 0 50% = 38.5 largest motor 0 125% + balance 0 100% = 146.0 lighting 0 125% = 0.0 heating 0 100% = 7.2 other 0 55% = 129.0 0 0% 0 0.0 0.0 38 Titan Electric. PANEL SCHEDULE PANEL: PC -1A ProjeciRainer Industries Date : Locati iliovila Fed From : 225KVA Transformer Via PC -1 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps 600 Max Amps 600 L - L Volts 208 L - N Volts 120 Phase 3 Wire 1 Amp P Rec Heat Motor Ltg Other Total 1 Rec. A 20 1 0.6 0.2 1.0 1.0 0.0 0.6 3 Rec. B 20 1 0.6 1.2 1.0 1.0 0.0 0.6 5 Morse Chop Saw C 20 1 1 1.2 1.2 1.0 0.0 1.2 7 Drill Press A 20 1 1 0.2 1.2 0.0 0.0 1.2 9 Drill Press B 20 1 1 0.4 1.2 1.2 0.0 1.2 11 Rigid Chop Saw C 20 1 1 1.2 1.2 1.9 0.0 1.2 13 Cord Drop A 20 1 0.2 0.4 0.0 0.2 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 22,000 15 Cord Drop B 20 1 0.2 0.8 0.0 0.2 17 Cord Drop C 20 1 0.2 0.8 0.0 0.2 19 Spare A 20 1 0.2 1.2 0.0 0.2 Trip /Fu 21 Spare B 20 1 20 1 1.2 0.0 X 600 23 MIG Welder C 50 2 C 20 1 0.0 4.2 4.2 25 MIG Welder A 50 2 Spare A 20 1 4.2 4.2 X _ X X 27 MIG Welder B 50 2 27 Spare B 20 4.2 4.2 29 MIG Welder C 50 2 29 Spare C 20 4.2 4.2 31 Spare A 20 1 31 Panel PC -2 Feed A 225 3 0.0 33 MIG Welder 001 B 50 2 33 Panel PC -2 Feed B 225 4.2 4.2 35 MIG Welder 001 C 50 2 35 Panel PC -2 Feed C 225 • 4.2 4.2 37 Drill Press A 20 1 37 Bus Duct 1 & 2 Feed 1.2 200 0.0 1.2 39 Plasma Cutter B 50 2 39 Bus Duct 1 & 2 Feed B 200 4.2 4.2 41 Plasma Cutter C 50 2 41 Bus Duct 1 & 2 Feed C 200 4.2 6.g 2 Chop Saw A 20 1 2 Metal Office rec. 1.2 20 0.0 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 66.9 Heat Kva 7.2 Motor Kva 96.1 Ltg Kva 0.0 Other Kva 117.3 0 0.0 Phase A 50.8 Phase B 55.1 Phase C 57.5 Conn. Kva 287.5 Conn. Amps 798 Demand Kva 209.9 Demand Amps 583 0 4 Chop Saw B 20 1 4 Metal Office rec. 1.2 20 0.0 1.2 6 Rec. C 20 1 0.2 Rec. C 20 0.0 0.2 8 Cord Drop A 20 1 0.2 Metal Office Heat A 20 0.0 0.2 10 Cord Drop/ Drill Press B 20 1 0.2 Metal Office Heat B 20 0.0 0.2 12 Cord Drop C 20 1 0.2 Metal Office E.F C 20 0.0 0.2 14 Iron Worker 006 A 25 3 14 Spare A 20 2.6 2.6 16 Iron Worker 006 B 25 3 16 Spare B 20 2.6 2.6 18 Iron Worker 006 C 25 3 18 Spare C 20 2.6 2.6 20 Finn Power Swager A 20 3 20 Assembly rec. A 20 1.9 1.9 22 Finn Power Swager B 20 3 22 Assembly rec. B 20 1.9 1.9 24 Finn Power Swager C 20 3 24 Assembly rec. C 20 1.9 1.9 26 Spare A 20 1 26 Battery Charger A 25 1.8 1.8 28 Bender 009 B 30 2 28 Battery Charger 2.3 25 0.0 2.3 30 Bender 009 C 30 2 30 Battery Charger 2.3 25 0.0 2.3 32 Spare A 20 1 32 Dock Levelers A 20 1 0.0 34 MIG Welder 008 B 35 2 34 Dock Levelers B 20 4.2 4.2 36 MIG Welder 008 C 35 2 36 Dock Levelers C 20 4.2 4.2 38 Air Compressor A 50 3 38 Dock Levelers 4.8 20 1 4.8 40 Air Compressor B 50 3 40 Dock Levelers 4.8 20 1 4.8 42 Air Compressor C 50 3 42 Dock Levelers 4.8 20 1 4.8 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 38.5 largest motor 0 125% + balance 0 100% = 99.7 lighting 0 125% = 0.0 heating 0 100% = 7.2 other 0 55% = 64.5 0 0% 0 0.0 0.0 0.5 Titan Electric. PANEL SCHEDULE PANEL: PC-1B Projec1ainer Industries Date : Locatia4Wila Fed From : 225KVA Transformer Via PC -1 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 600 600 208 120 3 22,000 Amp P Rec Heat Motor Ltg Other Total 1 Cord Drop A 20 1 0.2 1.0 1.0 0.0 0.2 3 Drill Press B 20 1 1.2 1.0 1.0 0.0 1.2 5 Band Saw C 20 1 1.2 1.0 1.0 0.0 1.2 7 Cord Drop A 20 1 0.2 0.0 0.0 0.2 9 Column 4 plex's B 20 1 0.4 1.2 0.0 0.4 11 Band Saw C 20 1 1.2 1.9 0.0 1.2 13 Spare A 20 1 0.4 0.0 0.0 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 Spare B 20 1 0.8 0.0 0.0 17 Spare C 20 1 0.8 0.0 0.0 19 Spare A 20 1 1.2 0.0 0.0 X Trip /Fu 21 Spare B 20 1 1.2 0.0 X 400 0.0 Space C 23 Spare C 20 1 0.0 0.8 25 0.0 A 25 Spare A 20 1 1 1.2 _ X _ _ _ X _ 27 Space 0.0 X _ _ X _ X _ x _ X 27 Spare B 20 1 0.0 1.2 Space C 0.0 29 Spare C 20 1 0.0 31 Space A 0.0 31 Panel PC -2 Feed A 225 3 0.0 33 Space B 0.0 33 Panel PC -2 Feed B 225 3 0.0 35 Space C 0.0 0.0 35 Panel PC -2 Feed C 225 • 3 1.2 37 Transformer PC 3A A 0.0 0.0 37 Bus Duct 1 & 2 Feed A 200 3 0.0 39 Transformer PC 3A B 0.0 0.0 39 Bus Duct 1 & 2 Feed B 200 3 0.0 41 Transformer PC 3A C 0.0 0.0 41 Bus Duct 1 & 2 Feed C 200 $ 0.0 2 Heat Transfer A e.e 0.0 2 Metal Office rec. A 20 1 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 90.3 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 30.1 Phase B 30.1 Phase C 30.1 Conn. Kva 258.1 Conn. Amps 310 Demand Kva 256.4 Demand Amps 308 0 4 Heat Transfer 0.0 1.2 LOAD SUMMARY ( Total, M Sections ) Rec Kva 46.0 Heat Kva 4.8 Motor Kva 57.6 Ltg Kva 0.0 Other Kva 34.5 0 0.0 Phase A 30.7 Phase B 30.9 Phase C 29.0 Conn. Kva 142.9 Conn. Amps 397 Demand Kva 111.7 Demand Amps 310 0 4 Metal Office rec. B 20 1 1.2 6 Heat Transfer C 0.0 1.2 6 Rec. C 20 1 0.3 8 Space A 0.0 0.3 8 Metal Office Heat A 20 2 0.0 1.2 0.4 B 0.0 1.2 10 Metal Office Heat B 20 2 0.8 1.2 Space C 0.0 1.2 12 Metal Office E.F C 20 1 1.9 14 0.8 A 0.0 0.8 14 Spare A 20 1 0.0 16 1.1 B 0.0 0.0 16 Spare B 20 1 0.0 18 1.5 C 0.0 0.0 18 Spare C 20 1 0.0 20 1.2 A 0.0 0.0 20 Assembly rec. A 20 1 0.6 22 0.0 B 0.0 0.6 22 Assembly rec. B 20 1 0.6 24 0.0 C 0.0 0.6 24 Assembly rec. C 20 1 0.6 26 0.0 A 0.0 0.6 26 Battery Charger A 25 3 0.0 28 0.0 B 2.0 2.0 28 Battery Charger B 25 3 0.0 30 Space C 2.0 2.0 30 Battery Charger C 25 3 0.8 32 Space A 2.0 2.0 32 Dock Levelers A 20 1 1.0 34 Space B 0.5 0.5 34 Dock Levelers B 20 1 0.8 36 Space C 0.5 0.5 36 Dock Levelers C 20 1 0.8 38 Space A 0.5 0.5 38 Dock Levelers A 20 1 0.0 40 0.0 B 0.5 0.5 40 Dock Levelers B 20 1 0.0 42 0.0 C 0.5 0.5 42 Dock Levelers C 20 1 0.0 REMARKS : Includes load from Panel PC -3A 0.0 10 kva rec 0 100% + balance 0 50% = 11.7 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 90.3 other 0 100% = 154.4 0 0% 0 0.0 0.5 0.5 REMARKS : Includes load from Panel PC -2A and Busway 11 & 12 first 10 kva rec 0 100% + balance 0 50% = 28.0 largest motor 0 125% + balance 0 100% = 58.2 lighting 0 125% = 0.0 heating 0 100% = 4.8 other 0 60% = 20.7 0 0% 0 0.0 0.0 0.0 Titan Electric PANEL SCHEDULE PANEL: PC-2A Project: Date : Location : Fed From : Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire 1 225 225 208 120 3 0, 22,000 Amp P Rec Heat Motor Ltg Other Total 1 Chop Saw CHPS 06 A 20 1 0.4 1.0 1.0 2.0 1.4 3 Disc Sander DSCS -01 B 20 1 7.8 1.0 1.0 2.0 1.0 5 Chop Saw CHPS 04 C 20 1 7.8 1.0 1.0 2.0 1.0 7 Wall rec. A 20 1 0.8 0.0 0.0 0.8 9 Chop Saw B 20 1 0.0 1.2 0.0 1.2 11 LDS -01 C 20 1 0.0 1.9 0.0 1.9 13 Wall rec. A 20 1 0.4 0.0 0.4 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 Wall rec. B 20 1 0.8 0.0 0.8 17 Wall rec. C 20 1 0.8 0.0 0.8 19 Wood Office rec A 20 1 1.2 0.0 1.2 X Trip /Fu 21 Wood Office rec B 20 1 1.2 0.0 X 400 1.2 Space C 23 Wood Office E.F C 20 1 0.0 0.8 25 0.8 A 25 Wood Office Heater A 20 2 1 1.2 _ X _ _ _ X _ 27 Space 1.2 X _ _ x X _ X _ x _ X 27 Wood Office Heater B 20 2 0.0 1.2 Space C 1.2 29 Spare C 20 1 0.0 31 Space A 0.0 31 Spare A 20 1 0.0 33 Space B 0.0 33 Spare B 20 1 0.0 35 Space C 0.0 35 Column rec. C 20 1 1.2 37 Transformer PC 3A A 200 1.2 37 CNC Ox future A 100 3 0.0 39 Transformer PC 3A B 0.0 0.0 39 CNC Ox future B 100 3 0.0 41 Transformer PC 3A C 0.0 0.0 41 CNC Ox future C 100 3 0.0 2 Heat Transfer A 0.0 0.0 2 CNC -01/ 02 rec. A 20 1 0.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 90.3 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 30.1 Phase B 30.1 Phase C 30.1 Conn. Kva 258.1 Conn. Amps 310 Demand Kva 256.4 Demand Amps 308 0 4 Heat Transfer B 0.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 18.1 Heat Kva 2.4 Motor Kva 11.1 Ltg Kva 0.0 Other Kva 25.5 0 0.0 Phase A 15.6 Phase B 16.8 Phase C 18.7 Conn. Kva 57.1 Conn. Amps 158 Demand Kva 44.3 Demand Amps 123 0 4 Wall rec. B 20 1 1.2 6 Heat Transfer C 100 1.2 6 Wall rec. C 20 1 1.2 8 Space A 1.2 8 BNDS -01 A 20 1 0.0 10 0.4 B 0.4 10 Wall rec. B 20 1 0.8 12 Space C 0.8 12 EDGS -01 C 20 1 1.9 14 Space A 1.9 14 CHPS -02 A 20 2 0.0 16 1.1 B 1.1 16 CHPS -02 B 20 2 0.0 18 1.5 C 1.5 18 CHPS -07 C 20 1 0.0 20 1.2 A 1.2 20 BNDS -02 A 20 1 0.8 22 0.0 B 0.8 22 Wall rec. B 20 1 0.6 24 0.0 C 0.6 24 Wall rec. C 20 1 0.6 26 0.0 A 0.6 26 Spare A 20 1 0.0 28 0.0 B 0.0 28 Spare B 20 1 0.0 30 Space C 0.0 30 Wall rec. Assembly C 20 1 0.8 32 Space A 0.8 32 Colunm rec. Assembly A 20 1 1.0 34 Space B 1.0 34 CNC computer B 20 1 0.8 36 Space C 0.8 36 CNC computer C 20 1 0.8 38 Space A 0.0 0.8 38 CNC 01 A 100 3 0.0 40 Space B 6.5 6.5 40 CNC 01 B 100 3 0.0 42 Space C 6.5 6.5 42 CNC 01 C 100 3 0.0 REMARKS : Includes load from Panel PC -3A first 10 kva rec 0 100% + balance 0 50% = 11.7 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 90.3 other 0 100% = 154.4 0 0% 0 0.0 6.5 6.5 REMARKS : Includes load from Panel PC -2A first 10 kva rec 0 100% + balance 0 50% = 14.1 largest motor 0 125% + balance 0 100% = 12.5 lighting 0 125% = 0.0 heating 0 100% = 2.4 other 0 60% = 15.3 0 0% 0 0.0 0.0 0.0 Titan Electric PANEL SCHEDULE PANEL: PC -2B Project: Date : Location : Fed From : Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 225 225 208 120 3 22,000 Amp P Rec Heat Motor Ltg Other Total 1 Battery Charger A 30 3 0.0 1.0 2.0 2.0 3 Battery Charger B 30 3 7.8 1.0 0.0 2.0 2.0 5 Battery Charger C 30 3 7.8 1.0 0.0 2.0 2.0 7 Spare A 20 1 1 0.0 0.0 0.0 9 Spare 8 20 1 0.0 0.0 0.0 0.0 11 Spare C 20 1 0.0 0.0 0.0 Spare A 20 1 0.0 0.0 0.0 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 Spare B 20 1 0.0 0.0 0.0 17 Spare C 20 1 0.0 0.0 0.0 19 Spare A 20 1 0.0 0.0 0.0 X Trip /Fu 21 Spare B 20 1 0.0 0.0 X 400 0.0 Space C 23 Spare C 20 1 0.0 0.0 25 0.0 A 25 Spare A 20 1 1 0.0 _ X _ _ _ X _ 27 Space 0.0 _ X _ _ X X _ _ X _ x _ X 27 Spare 8 20 1 0.0 0.0 Space C 0.0 29 Spare C 20 1 0.0 31 Space A 0.0 31 Spare A 20 1 0.0 33 Space B 0.0 33 Spare B 20 1 0.0 35 Space C 0.0 35 Spare C 20 1 0.0 37 Transformer PC 3A A 200 0.0 37 Spare A 20 1 0.0 39 Transformer PC 3A B 0.0 0.0 39 Spare B 20 1 0.0 41 Transformer PC 3A C 0.0 0.0 41 _§138F6 C i8 j 0.0 2 Heat Transfer A 0.0 0.0 2 Spare A 20 1 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 90.3 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 30.1 Phase B 30.1 Phase C 30.1 Conn. Kva 258.1 Conn. Amps 310 Demand Kva 256.4 Demand Amps 308 0 4 Heat Transfer B 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 6.0 0 0.0 Phase A 2.0 Phase B 2.0 Phase C 2.0 Conn. Kva 6.0 Conn. Amps 17 Demand Kva 6.0 Demand Amps 17 0 4 Spare B 20 1 0.0 6 Heat Transfer C 100 0.0 6 Spare C 20 1 0.0 8 Space A 0.0 8 Spare A 20 1 0.0 10 Space B 0.0 10 Spare B 20 1 0.0 12 Space C 0.0 12 Spare C 20 1 0.0 14 Space A 0.0 14 Spare A 20 1 0.0 16 0.0 B 0.0 16 Spare B 20 1 0.0 18 0.0 C 0.0 18 Spare C 20 1 0.0 20 0.0 A 0.0 20 Spare A 20 1 0.0 22 0.0 B 0.0 22 Spare B 20 1 0.0 24 0.0 C 0.0 24 Spare C 20 1 0.0 26 0.0 A 0.0 26 Spare A 20 1 0.0 28 0.0 B 0.0 28 Spare B 20 1 0.0 30 Space C 0.0 30 Spare C 20 1 0.0 32 Space A 0.0 32 Spare A 20 1 0.0 34 Space B 0.0 34 Spare B 20 1 0.0 36 Space C 0.0 36 Spare C 20 1 0.0 38 Space A 0.0 0.0 38 Spare A 20 1 0.0 40 Space B 0.0 0.0 40 Spare B 20 1 0.0 42 Space C 0.0 0.0 42 Spare C 20 1 0.0 REMARKS : Includes load from Panel PC -3A first 10 kva rec 0 100% + balance 0 50% = 11.7 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 90.3 other 0 100% = 154.4 0 0% 0 0.0 0.0 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 0.0 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 6.0 0 0% 0 0.0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: PC -3 ProjeclRainer Industries Date : Locaticilikwila Fed From : MDP Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps 400 Max Amps 400 L - L Volts 480 L - N Volts 277 Phase 3 Wire 1 Amp P Rec Heat Motor Ltg Other Total 1 Heat Calendar A 40 3 20 7.8 1.0 7.8 3 Heat Colander B 40 3 20 7.8 1.0 7.8 5 Heat Wender C 40 3 20 7.8 1.0 7.8 7 Space A Space A 20 1 0.0 9 Space B Space B 20 1 0.0 11 Space C Space C 20 1 0.0 13 Space A Space A 20 1 0.0 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Rush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 25,000 15 Space B Space B 20 1 0.0 17 Space C Space C 20 1 0.0 19 Space A Space A 20 1 0.0 Trip /Fu 21 Space B 21 Space B 20 1 0.0 X 400 23 Space C 600 23 Space C 20 1 0.0 25 Space A 25 Space A 20 1 0.0 _ X _ _ _ X _ 27 Space B 0.0 _ X _ x _ X 27 Space B 20 0.0 29 Space C 0.0 29 Space C 20 0.0 31 Space A 0.0 31 Space A 20 0.0 33 Space B 0.0 33 Space B 20 0.0 35 Space C 0.0 35 Space C 20 0.0 37 Transformer PC 3A A 200 3 0.0 37 Bus Duct #3 Feed A 225 0.0 39 Transformer PC 3A B 200 3 0.0 39 Bus Duct #3 Feed B 225 0.0 41 Transformer PC 3A C 200 3 0.0 41 ' C 225 0.0 2 Heat Transfer A 100 3 8.A 22.3 Column rec. A 20 22.3 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 90.3 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 30.1 Phase B 30.1 Phase C 30.1 Conn. Kva 258.1 Conn. Amps 310 Demand Kva 256.4 Demand Amps 308 0 4 Heat Transfer B 100 3 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 61.7 Phase B 61.3 Phase C 44.9 Conn. Kva 167.8 Conn. Amps 466 Demand Kva 104.3 Demand Amps 290 0 22.3 Column rec. B 20 22.3 6 Heat Transfer C 100 3 0.4 22.3 Column rec. C 20 22.3 8 Space A 0.4 8 Column rec. A 20 0.0 10 Space B 0.4 10 Column rec. B 20 0.0 12 Space C 0.4 12 Column rec. C 20 0.0 14 Space A 0.4 14 Column rec. A 20 0.0 16 Space B 0.4 16 Column rec. B 20 0.0 18 Space C 0.4 18 Space C 20 0.0 20 Space A 0.0 20 Space A 20 0.0 22 Space B 0.0 22 Space B 20 0.0 24 Space C 0.0 24 Space C 20 0.0 26 Space A 0.0 26 Space A 20 0.0 28 Space B 0.0 28 Space 8 20 0.0 30 Space C 0.0 30 Space C 20 0.0 32 Space A 0.0 32 Space A 20 0.0 34 Space B 0.0 34 Space B 20 0.0 36 Space C 0.0 36 Space C 20 0.0 38 Space A 0.0 38 Bus Duct #4 Feed A 225 0.0 40 Space B 0.0 40 Bus Duct #4 Feed B 225 0.0 42 Space C 0.0 42 Bus Duct #4 Feed C 225 0.0 REMARKS : Includes load from Panel PC -3A first 10 kva rec 0 100% + balance 0 50% = 11.7 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 90.3 other 0 100% = 154.4 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: PC -3A 120/208v ProjeciRainer Industries Date : Locat oSi�kwila Fed From : 150KVA Transformer via PC -3 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1° 600 600 208 120 3 18,000 Amp P Rec Heat Motor Ltg Other Total 1 Wall rec. A 20 1 1.0 1.0 3 Wall rec. B 20 1 1.0 1.0 5 Wall rec. C 20 1 1.0 1.0 7 Space A 20 1 0.0 9 Space B 20 1 0.0 11 Space C 20 1 0.0 13 Space A 20 1 0.0 A.I.C. 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Space B 20 1 0.0 17 Space C 20 1 0.0 19 Space A 20 1 0.0 Trip /Fu 21 Space B 20 1 0.0 X 600 23 Space C 20 1 0.0 25 Space A 20 1 0.0 _ X _ x _ X 27 Space B 20 1 0.0 29 Space C 20 1 0.0 31 Space A 20 1 0.0 33 Space B 20 1 0.0 35 Space C 20 1 0.0 37 Bus Duct #3 Feed A 225 3 0.0 39 Bus Duct #3 Feed B 225 3 0.0 41 Bus Duct #3 Feed C 225 3 8.A 2 Column rec. A 20 1 0.4 0.4 LOAD SUMMARY ( Total, All Sections ) Rec Kva 13.4 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 154.4 0 0.0 Phase A 61.7 Phase B 61.3 Phase C 44.9 Conn. Kva 167.8 Conn. Amps 466 Demand Kva 104.3 Demand Amps 290 0 4 Column rec. B 20 1 0.4 0.4 6 Column rec. C 20 1 0.4 0.4 8 Column rec. A 20 1 0.4 0.4 10 Column rec. B 20 1 0.4 0.4 12 Column rec. C 20 1 0.4 0.4 14 Column rec. A 20 1 0.4 0.4 16 Column rec. B 20 1 0.4 0.4 18 Space C 20 1 0.0 20 Space A 20 1 0.0 22 Space B 20 1 0.0 24 Space C 20 1 0.0 26 Space A 20 1 0.0 28 Space 8 20 1 0.0 30 Space C 20 1 0.0 32 Space A 20 1 0.0 34 Space B 20 1 0.0 36 Space C 20 1 0.0 38 Bus Duct #4 Feed A 225 3 0.0 40 Bus Duct #4 Feed B 225 3 0.0 42 Bus Duct #4 Feed C 225 3 0.0 REMARKS : Includes load for Busway 13 & #4 first 10 kva rec 0 100% + balance 0 50% = 11.7 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 60% = 92.6 0 0% 0 0.0 0.0 REVIEWED FOR CODE COMPLIANCE NFPA 70 NEC APR 10 200 City Of Tukwila ILDIN ION MAR 2 8 2008 PERMIT CENTEFi TI TAJN- ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CA S N: or ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 City Review / Comments 03/28/08 Rev. #: Revision: Date: Project Title: Tenant Improvements for: RAI \IER INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: PANEL SCHEDULES Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: F;0.3 Titan Electric. PANEL SCHEDULE PANEL: PC -4 Projec4Rainer Industries Date : Locato Fukwila Fed From : MDP Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 400 400 480 277 3 14,000 Amp P Rec Heat Motor Ltg Other Total 1 CEI # 1 A 20 3 0.6 2.2 2.2 2.2 3 CEI # 1 B 20 3 0.0 2.2 2.2 2.2 5 CEI # 1 C 20 3 0.6 0.0 2.2 2.2 2.2 7 Compressor #1 A 50 3 0.8 10.6 1.2 10.6 9 Compressor #1 B 50 3 0.6 10.6 1.2 10.6 11 Compressor #1 C 50 3 0.0 10.6 0.0 10.6 13 Compressor #2 A 30 3 0.8 7.2 1.2 7.2 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 Compressor in B 30 3 1.2 0.0 7.2 1.2 7.2 17 Compressor #2 C 30 3 1.2 7.2 0.8 7.2 19 Spare A 20 1 0.0 0.4 1.2 0.0 21 Trip /Fu 21 Spare B 20 1 0.0 0.4 1.2 600 0.0 X 400 23 Spare C 20 1 0.8 0.0 25 0.0 A 20 25 Spare A 20 1 0.0 1.2 x _ _ X 27 6.1 0.0 x _ _ _ _ _ X 1 27 Spare B 20 1 1.2 29 Marine Cord Drop C 6.1 0.0 29 Spare C 20 1 1.2 31 Marine Cord Drop A 6.1 0.0 31 Existing Roof Unit A 60 3 1.2 33 Inventory Wall rec. B 6.1 0.0 33 Existing Roof Unit B 60 3 1.2 35 Shipping wall rec. C 6.1 0.0 35 Existing Roof Unit C 60 3 1.2 37 Inventory Desk rec. A 6.1 0.0 37 Transformer PC -4A A 300 3 1.2 39 Shrink wrapper B 11.1 0.0 39 Transformer PC -4A B 300 3 0.3 41 Shrink wrapper C 11.1 0.0 41 Transformer PC -4A C 300 3 9.3 2 Marine Wall rec A 11.1 0.0 2 CEI #2 A 20 3 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 42.1 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 4.6 0 0.0 Phase A 13.6 Phase B 12.7 Phase C 9.5 Conn. Kva 46.7 Conn. Amps 130 Demand Kva 30.7 Demand Mips 85 0 2.2 Marine Cord Drop 2.2 2.2 LOAD SUMMARY ( Total, M Sections ) Rec Kva 56.9 Heat Kva 0.0 Motor Kva 67.3 Ltg Kva 33.0 Other Kva 164.2 0 0.0 Phase A 30.9 Phase B 33.8 Phase C 34.9 Conn. Kva 321.4 Conn. Mips 387 Demand Kva 314.2 Demand Amps 378 0 4 CEI #2 B 20 3 1.2 6 2.2 C 2.2 2.2 6 CEI #2 C 20 3 1.2 8 2.2 A 2.2 2.2 8 Spare A 20 1 0.8 10 Marine Cord Drop B 20 0.0 10 Spare B 20 1 1.2 12 Marine Cord Drop C 20 0.0 12 Spare C 20 1 1.2 14 Marine Office rec. A 20 0.0 14 Manufacturing EM Lights A 20 1 1.2 16 Marine Office rec. 2.9 20 2.9 16 Warehouse lighting B 20 1 1.2 18 Marine Office rec. 2.9 20 2.9 18 Warehouse lighting C 20 1 1.2 20 Marine Wall rec 2.9 20 2.9 20 Manufacturing EM Lights A 20 1 1.2 22 Marine Wall rec 1.4 20 1.4 22 Warehouse lighting B 20 1 0.8 24 Marine Wall rec 2.9 20 2.9 24 Warehouse lighting C 20 1 1.2 26 Marine Wall rec 2.9 20 2.9 26 Warehouse lighting A 20 1 1.2 28 Marine Wall rec/ Cad Desk 1.4 6.1 1.4 28 Warehouse lighting B 20 1 1.2 30 Marine Wall rec 2.4 6.1 2.4 30 Warehouse lighting C 20 1 0.8 32 Spare 2.9 6.1 2.9 32 Manufacturing EM Lights A 20 1 0.0 34 Spare 1.5 6.1 1.5 34 Inventory Lights B 20 1 0.0 36 Spare 1.7 6.1 1.7 36 Inventory Lights C 20 1 0.0 38 Sub Panel PC -4C 2.0 6.1 2.0 38 Inventory/ Shipping EM Lights A 20 1 0.0 40 Sub Panel PC -4C 1.5 13.3 1.5 40 Shipping Lights B 20 1 0.0 42 Sub Panel PC -4C 1.7 13.3 1.7 42 Shipping Lights C 20 1 0.0 REMARKS : Includes load from Panel PC4C first 2.0 13.3 2.0 REMARKS : Includes load from Panel PC4A first 10 kva rec 0 100% + balance 0 50% = 33.5 largest motor 0 125% + balance 0 100% = 75.3 lighting 0 125% = 41.3 heating 0 100% = 0.0 other 0 100% = 164.2 0 O% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: PC -4A 120/208v ProjecCainer Industries Date : LocatioTii4kwila Fed From : 225KVA Transformer Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 600 600 208 120 3 22,000 Amp P Rec Heat Motor Ltg Other Total 1 CEI #1 A 20 3 0.6 2.2 1.2 2.2 3 CEI #1 B 20 3 0.0 2.2 1.2 2.2 5 CEI #1 C 20 3 0.6 0.0 2.2 1.2 2.2 7 Rec. for CEI #1 A 20 1 0.8 0.0 1.2 0.8 9 Spare B 20 1 0.6 0.0 1.2 0.0 11 Spare C 20 1 0.0 3.8 0.0 0.0 13 Wall rec. A 20 1 0.8 1.1 1.2 0.8 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 208v rec. B 20 2 1.2 0.0 1.2 1.2 17 208v rec. C 20 2 1.2 0.8 1.2 19 Grommet #4 A 20 2 0.0 0.4 1.2 0.4 21 Trip /Fu 21 Grommet #4 B 20 2 0.0 0.4 1.2 600 0.4 X 600 23 Overhead rec. C 20 1 0.8 0.0 25 0.8 A 20 25 KBAR 51 A 60 3 0.0 1.2 x _ _ X 27 6.1 6.1 X _ _ _ X _ _ x 1 27 KBAR 51 B 60 3 1.2 29 Marine Cord Drop C 6.1 6.1 29 KBAR 51 C 60 3 1.2 31 Marine Cord Drop A 6.1 6.1 31 KBAR 54 A 60 3 1.2 33 Inventory Wall rec. B 6.1 6.1 33 KBAR 54 B 60 3 1.2 35 Shipping wall rec. C 6.1 6.1 35 KBAR 54 C 60 3 1.2 37 Inventory Desk rec. A 6.1 6.1 37 Forstrom A 100 3 1.2 39 Shrink wrapper B 11.1 11.1 39 Forstrom B 100 3 0.3 41 Shrink wrapper C 11.1 11.1 41 Forstrom C 100 g 9.3 2 Marine Wall rec A 11.1 hint 2 CEI #2 A 20 3 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 42.1 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 4.6 0 0.0 Phase A 13.6 Phase B 12.7 Phase C 9.5 Conn. Kva 46.7 Conn. Amps 130 Demand Kva 30.7 Demand Mips 85 0 2.2 Marine Cord Drop B 2.2 LOAD SUMMARY ( Total, M Sections ) Rec Kva 56.9 Heat Kva 0.0 Motor Kva 13.9 Ltg Kva 0.0 Other Kva 151.0 0 0.0 Phase A 72.0 Phase B 70.6 Phase C 68.3 Conn. Kva 221.8 Conn. Amps 616 Demand Kva 200.0 Demand Amps 555 0 4 CEI #2 B 20 3 1.2 6 2.2 C 20 .2.2 6 CEI #2 C 20 3 1.2 8 2.2 A 20 2.2 8 Rec. for CEI #2 A 20 1 0.8 10 Marine Cord Drop B 20 0.8 10 Column rec. B 20 1 1.2 12 Marine Cord Drop C 20 1.2 12 Column rec. C 20 1 1.2 14 Marine Office rec. A 20 1.2 14 Column rec. A 20 1 1.2 16 Marine Office rec. B 20 1.2 16 Column rec. B 20 1 1.2 18 Marine Office rec. C 20 1.2 18 Column rec. C 20 1 1.2 20 Marine Wall rec A 20 1.2 20 Wall rec. for FIAB A 20 1 1.2 22 Marine Wall rec B 20 1.2 22 Wall rec. for FIAB B 20 1 0.8 24 Marine Wall rec C 20 0.8 24 Overhead rec. C 20 1 1.2 26 Marine Wall rec A 20 1.2 26 KBAR 52 A 60 3 1.2 28 Marine Wall rec/ Cad Desk B 6.1 6.1 28 KBAR 52 B 60 3 1.2 30 Marine Wall rec C 6.1 6.1 30 KBAR 52 C 60 3 0.8 32 Spare A 6.1 6.1 32 KBAR 53 A 60 3 0.0 34 Spare B 6.1 6.1 34 KBAR 53 B 60 3 0.0 36 Spare C 6.1 6.1 36 KBAR 53 C 60 3 0.0 38 Sub Panel PC -4C A 6.1 6.1 38 FIAB A 125 3 0.0 40 Sub Panel PC -4C B 13.3 13.3 40 FIAB B 125 3 0.0 42 Sub Panel PC -4C C 13.3 13.3 42 FIAB C 125 3 0.0 REMARKS : Includes load from Panel PC4C first 10 kva rec 0 100% + balance 0 50% = 26.1 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 4.6 0 0% 0 0.0 13.3 13.3 REMARKS : Includes load from Panel PC4B first 10 kva rec 0 100% + balance 0 50% = 33.5 largest motor 0 125% + balance 0 100% = 15.6 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 151.0 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: PC -4B 120/208v Projec€ainer Industries Date : LocatwTukwila Fed From : 225KVA Transformer Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps 600 Max Amps 600 L - L Volts 208 L - N Volts 120 Phase 3 Wire 1 Amp P Rec Heat Motor Ltg Other Total 1 Marine Wall rec A 20 1 1.2 0.6 1.9 1.2 3 Marine Cord Drop B 20 1 1.2 0.0 1.9 1.2 5 Marine Cord Drop C 20 1 1.2 0.6 0.0 3.8 1.2 7 Marine Cord Drop A 20 1 1.2 0.6 0.0 1.2 9 Marine Cord Drop B 20 1 1.2 0.6 0.0 1.2 11 Spare C 20 1 2 0.0 3.8 0.0 13 Marine Cord Drop A 20 1 1.2 0.0 1.1 1.2 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 22,000 15 Marine Cord Drop B 20 1 1.2 0.0 0.0 1.2 17 Column rec. C 20 1 0.8 0.0 0.8 19 Marine Cord Drop A 20 1 1.2 0.0 0.0 1.2 X Trip /Fu 21 Marine Cord Drop B 20 1 1.2 1 0.0 1.2 600 23 Spare C 20 1 C 20 1 0.0 0.0 25 Marine Cord Drop A 20 1 1.2 A 20 1 0.0 1.2 x _ _ X 27 Marine Cord Drop B 20 1 1.2 Bus Drop B 20 1 1.2 29 Marine Cord Drop C 20 1 1.2 29 C c 1.2 31 Marine Cord Drop A 20 1 1.2 31 A A 1.2 33 Inventory Wall rec. B 20 1 1.2 33 B B 1.2 35 Shipping wall rec. C 20 1 1.2 35 C C 1.2 37 Inventory Desk rec. A 20 1 1.2 Cord Drop Duplex rec. A 20 1 1.2 39 Shrink wrapper B 20 2 0.3 Cord Drop Duplex rec. B 20 1 0.3 41 Shrink wrapper C 20 2 9.1 Cord Drop Duplex rec. C 20 1 9.3 2 Marine Wall rec A 20 1 1.2 Shipping Office rec. A 20 1 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 42.1 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 4.6 0 0.0 Phase A 13.6 Phase B 12.7 Phase C 9.5 Conn. Kva 46.7 Conn. Amps 130 Demand Kva 30.7 Demand Mips 85 0 4 Marine Cord Drop B 20 1 1.2 Shipping Office rec. B 20 1 1.2 6 Marine Cord Drop C 20 1 1.2 Shipping Office rec. C 20 1 1.2 8 Marine Wall rec A 20 1 1.2 Shipping Office rec. A 20 1 1.2 10 Marine Cord Drop B 20 1 1.2 Spare B 20 1 1.2 12 Marine Cord Drop C 20 1 1.2 Spare C 20 1 1.2 14 Marine Office rec. A 20 1 0.8 Spare A 20 1 0.8 16 Marine Office rec. B 20 1 0.8 Spare B 20 1 0.8 18 Marine Office rec. C 20 1 0.8 Spare C 20 1 0.8 20 Marine Wall rec A 20 1 0.8 Spare A 20 1 0.8 22 Marine Wall rec B 20 1 0.8 Spare B 20 1 0.8 24 Marine Wall rec C 20 1 0.8 Spare C 20 1 0.8 26 Marine Wall rec A 20 1 1.2 Cord Drop A 20 1 1.2 28 Marine Wall rec/ Cad Desk B 20 1 1.2 Cord Drop Quad rec B 20 1 1.2 30 Marine Wall rec C 20 1 0.8 30 C c 0.8 32 Spare A 20 1 32 32 A 20 1 0.0 34 Spare B 20 1 34 34 B 20 1 0.0 36 Spare C 20 1 36 BNDS -03 C 20 1 0.0 38 Sub Panel PC -4C A 100 3 38 38 A A 3 0.0 40 Sub Panel PC -4C B 100 3 40 40 B B 3 0.0 42 Sub Panel PC -4C C 100 3 42 42 C C 3 0.0 REMARKS : Includes load from Panel PC4C first 10 kva rec 0 100% + balance 0 50% = 26.1 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 4.6 0 0% 0 0.0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: PC -4C (Existing) Project Diner Industries Existing Panel that feeds Dock Levelers Date : Locatiol•iikWiIa Fed From : 225KVA Transformer Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 100 100 208 120 3 10,000 Amp P Rec Heat Motor Ltg Other Total 1 Existing rec. A 20 1 0.6 1.9 0.0 0.6 3 Chop saw B 20 1 0.0 1.9 0.8 0.8 5 Dock leveler rec. C 20 1 0.6 0.0 3.8 0.0 0.6 7 Dock leveler rec. A 20 1 0.6 0.0 0.0 0.6 9 Dock leveler rec. B 20 1 0.6 0.0 0.0 0.6 11 Battery Charger C 30 2 0.0 3.8 1.9 1.9 13 Battery Charger A 30 2 0.0 1.1 1.9 1.9 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Spare B 20 1 0.0 0.0 0.0 0.0 17 Spare C 20 1 0.0 0.0 0.0 19 Spare A 20 1 0.0 0.0 0.0 0.0 X Trip /Fu 21 Spare B 20 1 0.0 0.0 0.0 0.0 100 23 Spare C 20 1 0.0 1.8 0.0 0.0 0.0 25 DRP -01 A 20 1 0.0 1.8 0.0 0.0 x _ _ _ _ X _ _ _ _ 27 Bus Drop B 20 1 0.0 0.0 29 29 C c 0.0 0.0 31 31 A A 0.0 0.0 33 33 B B 0.0 0.0 35 35 C C 0.0 0.0 37 Cord Drop Duplex rec. A 20 1 0.0 0.0 39 Cord Drop Duplex rec. B 20 1 0.0 0.0 41 Cord Drop Duplex rec. C 20 1 e•i1 f1.8 2 Shipping Office rec. A 20 1 0.6 1.6 0.0 0.6 LOAD SUMMARY ( Total, M Sections ) Rec Kva 5.2 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 4.6 0 0.0 Phase A 4.5 Phase B 2.0 Phase C 3.3 Conn. Kva 9.8 Conn. Amps 27 Demand Kva 9.8 Demand Amps 27 0 4 Shipping Office rec. B 20 1 0.6 1.6 0.0 0.6 6 Shipping Office rec. C 20 1 0.8 0.8 0.0 0.8 8 Shipping Office rec. A 20 1 0.8 1.8 0.0 0.8 10 Spare B 20 1 0.0 1.8 3.9 0.0 12 Spare C 20 1 0.0 1.0 3.9 0.0 14 Spare A 20 1 0.0 0.8 1.0 0.0 16 Spare B 20 1 0.0 0.0 18 Spare C 20 1 0.0 0.0 20 Spare A 20 1 0.0 0.0 22 Spare B 20 1 0.0 0.0 24 Spare C 20 1 0.0 0.0 26 Cord Drop A 20 1 0.0 0.0 28 Cord Drop Quad rec B 20 1 0.0 0.0 30 30 C c 0.0 0.0 32 32 A 20 1 0.0 0.0 0.0 34 34 B 20 1 0.0 0.0 0.0 36 BNDS -03 C 20 1 0.0 0.0 38 38 A A 3 0.0 12.3 0.0 40 40 B B 3 0.0 12.3 0.0 42 42 C C 3 0.0 12.3 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 5.2 largest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 4.6 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: Busway 1 Projec€ainer Industries 80 Feet Long, Needs feed thru Lugs Date : Locati& .Ikwila Fed From : PC -2B 37,39,41 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 200 200 208 120 3 4 »..,,.., 10,000 Amp P Rec Heat Motor Ltg Other Total 1 TBS 01 A 20 2 3 1.9 0.0 1.9 3 TBS 01 B 20 2 3 1.9 0.0 1.9 5 Cord Drop C 20 1 0.6 0.0 3.8 0.0 0.6 7 PLN 02 A 20 2 0.0 0.0 0.0 9 PLN 02 B 20 2 0.0 0.0 0.0 11 PLN 02 C 20 1 1.0 3.8 0.0 0.0 13 Cord Drop Quad rec. A 20 1 0.4 1.1 0.0 0.4 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Bus Drop B 20 1 0.4 0.0 0.0 0.4 17 Bus Drop C 20 1 0.4 0.0 0.4 19 Bus Drop A 20 1 0.4 0.0 0.0 0.4 0.0 Trip /Fu 21 Bus Drop B 20 1 0.8 0.0 0.0 0.0 23 CHPS 01 C 20 1 1.8 0.0 0.0 0.0 25 DRP -01 A 20 1 1.8 1.8 0.0 1.8 _ _ _ _ _ _ _ _ _ 27 Bus Drop B 20 1 0.8 0.0 29 29 c c 0.0 31 31 A A 0.0 33 33 B B 0.0 35 35 C C 0.0 37 Cord Drop Duplex rec. A 20 1 0.8 0.0 39 Cord Drop Duplex rec. B 20 1 0.8 0.0 41 Cord Drop Duplex rec. C 20 1 0.8 8.8 2 JNT 01 A 20 2 2 1.6 0.0 1.6 LOAD SUMMARY ( Total, All Sections ) Rec Kva 19.0 Heat Kva 0.0 Motor Kva 45.7 Ltg Kva 0.0 Other Kva 0.0 0 0.0 Phase A 8.7 Phase B 6.5 Phase C 3.2 Conn. Kva 64.7 Conn. Amps 180 Demand Kva 61.6 Demand Amps 171 0 4 JNT 01 B 20 2 0.8 1.6 0.0 1.6 6 6 C 20 1 1 0.8 0.0 0.0 8 PLN -01 A 20 2 3 1.8 0.0 1.8 10 PLN -01 B 20 2 3 1.8 3.9 1.8 12 Cord Drop Quad rec C 20 1 0.4 1.0 3.9 0.4 14 Cord Drop Quad rec A 20 1 0.4 0.8 1.0 0.4 16 Cord Drop Quad rec B 20 1 0.4 0.4 18 18 c c 0.0 20 0 A 0 1 0.0 0.0 22 0 B 0 1 0.0 0.0 24 0 C 0 1 0.0 0.0 26 Cord Drop A 20 1 0.4 0.4 28 Cord Drop Quad rec B 20 1 0.4 0.4 30 30 c c 0.0 32 32 A 20 1 0.0 0.0 34 34 B 20 1 0.0 0.0 36 BNDS -03 C 20 1 1.8 1.8 38 38 A A 3 12.3 0.0 40 40 B B 3 12.3 0.0 42 42 c C 3 0.0 12.3 0.0 REMARKS : Includes load from Busway #2 first 10 kva rec 0 100% + balance 0 50% = 14.5 largest motor 0 125% + balance 0 100% = 47.1 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 0.0 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: Busway 2 Project tainer Industries 80 Feet Long Date : LocatioFitkwila Fed From : PC -2B 37,39,41 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 200 200 208 120 3 10,000 Amp P Rec Heat Motor Ltg Other Total 1 4 -WPLN A 40 3 3 3.8 0.0 3.8 3 4 -WPLN B 40 3 3 3.8 0.0 3.8 5 4 -WPLN C 40 3 3 0.0 3.8 0.0 3.8 7 PLN 02 A 40 3 3.8 0.0 3.8 9 PLN 02 B 40 3 3.8 0.0 3.8 11 PLN 02 C 40 3 1.0 3.8 0.0 3.8 13 CHPS 02 A 20 1 3 1.1 0.0 1.1 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Bus Drop B 20 1 0.8 0.0 0.0 0.8 17 Bus Drop C 20 1 0.8 0.0 0.8 19 Cord Drop Quad rec. A 20 1 1.2 0.0 0.0 1.2 0.0 Trip /Fu 21 Bus Drop B 20 1 0.8 0.0 0.8 0.0 23 CHPS 01 C 20 1 1.8 0.0 1.8 0.0 25 CHPS 03 A 20 1 1.8 0.0 1.8 _ _ _ _ _ _ 27 Bus Drop B 20 1 0.8 0.8 29 29 c c 0.0 31 31 A A 0.0 33 33 B B 0.0 35 35 C C 0.0 37 Cord Drop Duplex rec. A 20 1 0.8 0.8 39 Cord Drop Duplex rec. B 20 1 0.8 0.8 41 Cord Drop Duplex rec. C 20 1 0.8 fl.fi 2 BNDS 01 A 20 1 2 1.8 0.0 1.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 11.2 Heat Kva 0.0 Motor Kva 35.1 Ltg Kva 0.0 Other Kva 0.0 0 0.0 Phase A 19.2 Phase B 14.3 Phase C 12.8 Conn. Kva 46.3 Conn. Amps 129 Demand Kva 48.6 Demand Amps 135 0 4 Bus drop B 20 1 0.8 0.0 0.8 6 6 c C 20 1 0.8 0.0 0.0 8 TBS 02 A 20 2 3 1.9 3.9 1.9 10 TBS 02 B 20 2 3 1.9 3.9 1.9 12 TBS 03 C 20 1 0.0 1.0 3.9 1.0 14 TBS 03 A 20 1 0.0 0.8 1.0 1.0 16 16 B 20 1 0.0 0.0 18 18 C c 0.0 20 ABD -D1 A 15 3 0.8 0.8 22 ABD -D1 B 15 3 0.8 0.8 24 ABD -D1 C 15 3 0.8 0.8 26 Vacuum Cord Drop A 20 1 1.2 1.2 28 28 B B 0.0 30 30 C c 0.0 32 32 A A 0.0 34 34 B B 0.0 36 36 c c 0.0 38 38 A A 3 12.3 0.0 40 40 B B 3 12.3 0.0 42 42 c C 3 0.0 12.3 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 10.6 largest motor 0 125% + balance 0 100% = 38.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 0.0 0 0% 0 0.0 0.0 Titan Electric. PANEL SCHEDULE PANEL: Busway 3 Projec &ainer Industries 130 Feet Long, Date : LocatucFut(WiIO Fed From : PC -2B 37,39,41 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 1 225 225 208 120 3 10,000 Amp P Rec Heat Motor Ltg Other Total 1 Durst 351 See note below A 125 3 3.4 12.3 12.3 3 Durst 351 See note below B 125 3 3.4 12.3 12.3 5 Durst 351 See note below C 125 3 0.0 0.0 12.3 12.3 7 0 A 2 5.0 0.0 0.0 9 0 B 2 5.0 0.0 0.0 11 0 C 1 1.0 0.0 0.0 0.0 13 3360 -3 A 50 3 0.0 4.5 4.5 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 15 3360 -3 B 50 3 0.0 0.0 4.5 4.5 17 3360 -3 C 50 3 0.0 4.5 4.5 19 A A 0.0 0.0 0.0 Trip /Fu Trip /Fu 21 B B 0.0 0.0 0.0 23 23 c c 0.0 0.0 0.0 25 25 A A 0.0 0.0 0.0 _ _ _ _ 27 27 B B 0.0 0.0 29 c c 0.0 0.0 31 A A 0.0 0.0 33 B B 0.0 0.0 35 c C 0.0 0.0 37 A A 0.0 0.0 39 B B 0.0 0.0 41 C C ?n 1 8.8 8.8 2 QS 3200 A 70 2 5.0 5.8 5.8 LOAD SUMMARY ( Total, All Sections ) Rec Kva 1.6 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 79.1 0 0.0 Phase A 29.1 Phase B 28.3 Phase C 23.3 Conn. Kva 80.7 Conn. Amps 224 Demand Kva 49.1 Demand Amps 136 0 4 QS 3200 B 70 2 5.0 5.8 5.8 6 Cord Drop C 20 1 0.8 0.0 0.0 0.8 8 Durst 800 A 50 3 3.9 5.7 5.7 10 Durst 800 B 50 3 3.9 5.7 5.7 12 Durst 800 C 50 3 3.9 5.7 5.7 14 Wall rec. A 20 1 0.8 0.0 0.8 16 B B 0.0 0.0 18 c c 0.0 0.0 20 A A 0.0 0.0 22 B B 0.0 0.0 24 c c 0.0 0.0 26 A A 0.0 0.0 28 B B 0.0 0.0 30 c c 0.0 0.0 32 A A 0.0 0.0 34 B B 0.0 0.0 36 c c 0.0 0.0 38 A A 3 12.3 12.3 0.0 40 B B 3 12.3 12.3 0.0 42 C C 3 0.0 12.3 12.3 0.0 REMARKS : first 10 kva rec 0 100% + balance 0 50% = 1.6 Durst 351 needs to have neutral disconnected at the sainedtitn4laogest motor o 125% + balance 0 100% = 0.0 the line voltage lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 60% = 47.5 0 0% 0 0.0 Titan Electric. PANEL SCHEDULE PANEL: Busway 4 Projec4 alner Industries 130 Feet Long, Date : LocatioTilkWiIa Fed From : PC -28 37,39,41 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire 225 225 208 120 3 10,000 Amp P Rec Heat Motor Ltg Other Total 1 Seal 62 A 40 2 3.4 3.4 3 Seal 62 B 40 2 3.4 3.4 5 Cord Drop Duplex rec. C 20 1 0.8 0.0 0.8 7 Seal 6000 A 60 2 5.0 5.0 9 Seal 6000 B 60 2 5.0 5.0 11 Cord Drop Duplex rec. C 20 1 1.0 0.0 1.0 13 Overhead rec. A 20 1 0.8 0.0 0.8 A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 15 Cord Drop Duplex rec. B 20 1 1.2 0.0 0.0 1.2 17 Wall rec. C 20 1 0.8 0.0 0.8 19 A 0.0 0.0 Trip /Fu 21 B 0.0 0.0 23 c 0.0 0.0 25 A 0.0 0.0 _ _ _ ^ 27 B 0.0 29 c 0.0 31 A 0.0 33 B 0.0 35 c 0.0 37 A 0.0 39 B 0.0 41 C 20 1 8.8 2 AGL A 60 2 5.0 5.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 5.6 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 75.3 0 0.0 Phase A 30.4 Phase B 30.8 Phase C 19.8 Conn. Kva 80.9 Conn. Amps 225 Demand Kva 50.8 Demand Mips 141 0 4 AGL B 60 2 5.0 5.0 6 Cord Drop Duplex rec. C 20 1 1.0 0.0 1.0 8 Dyesub-1 A 40 3 3.9 3.9 10 Dyesub -1 B 40 3 3.9 3.9 12 Dyesub -1 C 40 3 3.9 3.9 14 A 0.0 16 B 0.0 18 c 0.0 20 A 0.0 22 B 0.0 24 c 0.0 26 A 0.0 28 B 0.0 30 c 0.0 32 A 0.0 34 B 0.0 36 c 0.0 38 Durst 351 See note below A 125 3 12.3 12.3 40 Durst 351 See note below B 125 3 12.3 12.3 42 Durst 351 See note below C 125 3 0.0 12.3 12.3 REMARKS : Durst 351 needs to have neutral disconnected at the sa the line voltage first 10 kva rec 0 100% + balance 0 50% = 5.6 sagest motor 0 125% + balance 0 100% = 0.0 lighting 0 125% = 0.0 heating 0 100% = 0.0 other 0 60% = 45.2 0 0% 00.0 601M • rbs REC 1 VEf MAR 2 8 LOOfi PERMIT CENTER 'TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CAS h; IF ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 A City Review Comments 03/28/08 Rev. #: Revision: Date: Project Title: Tenant Improvements for: RAI \IER ISDUSTRIh',S BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: 8009 Date: 02/22/08 Sheet Number: X0.4 it WELD (E) #8 TABLE PC1A-3 #8 PC1A-33,35,37, 39,41 (1 RIDGID CHOP SAW DRILL PRESS DRILL PRESS (1 MORSE CHOP SAW #3-001 MIG #3-002 TIG (1) DRILL PRESS (1)PLASMA CUTTER PC1-1,3,5 PC1A-17 DROP 44" 78" A.F.F #3-007 MILLING MACHINE DROP 'w 78" A.F.F PC1A-15 PC1-19,21,23 PC1A-13 DROP 78" A.F.F PC1A-13,15,17 PC1A-1 PC1A-1 ACV,DA111 1115-6 PC1B-11 PC113-9 Na., IRON PC1B-7/1,' DROP 41! 78" A.F.F #10 (1) BAND SAW #3-006 IRON W AKER (1) FINN POWER SWAGE 13-009 BENDER CC1 •CC PC1A-14,16,18 PC1A-20,2 ,24 ............... • TIG PC1A-28,30 PC1A-38,40,42 MIG #3-010 AIR COMPRESSER TIG PC1A-12 DROP al 78" A.F.F (2) MIG WELDERS (2) TIG WELDEKS (1) DRILL PRESS 1) BAND SAWS MIA-23,25;270 Pt /48 118 MIG . PC1B-3 Pb1B-9 PC1-8,10,12, 14,16,18 PC1B-1 5 (1) DRILL PRESS PC1B-7,9,11 METAL 61-10F' 135 PC1B-1,3,5 PC1 -1 ala lI PC1B-20 .1T10 WORK TABLE L__1 PC1A-1O ath DROP 'w 78" A.F.F PC1A-8 DROP 8" A.F.F OFFICE: 5 DATA T-STAT ELEC. BASE-BOARD (2) 4-WAY OUTLET (1) DOUPLEX RECEPTICAL (1) VENT FAN (1) TIMER FOR FAN 90-MIN 2-WAY SWITCH FOR LITES PC1A-1 PC1A-8,10,12 \ A PC1B-2 PC1A-6 PC1A-6,8,10 .. . #8 • PC1A-34,36 #3-008 MIG #3-003 TIG #8 PC1-2,4,6 (1) DEWALT CHOP SAW PC1A-4 (1) DEWALT CHOP SAW ME PC1B-cP2 11 LATTICE SANDER 15 ) #4-LDS-01 LATTICE DRILL PC1A- oz 1 PC1A-6 A 4: A PC1B-4 PC2A-19 ce EP DOOR WOOD ORKING BENCH 110F 3 ) P 2A-7,9,11, ) 13,15,17 #4-CHPS-04 CHOPSAW 1—• 1 el ASSEMBLY LATTICE TABLE DODR WOOD WORKING BENCH 2 OF 3 DSCS-01 DI C-SANDE-R ROLLING TABLE 1 OF 2 ROLLING TABLE 2 OF 2 #4-CHPS-0 CHOPSAW1 PC2A-1, DROP In — - ealr" WOOD WORKING BENCH 3 OF 3 TAB SA BUSS DROP BUSS DROP DUST COLLECTION 30 , 480 V, 50 A, 40 HP PC1-37,39,41 \DUST COLLECTION SIBLFEOR LOCATION POSSIBLE OS PRIMARY WP SYSTEM #4-CHPS-01, #4-CHPS-03 CHOP SAWS (1) BUSS DROP #4-PLN-01 PLANER BUSS DROP 1 RAFTE ENCH 17 #9-BNDS (1) BUSS USS DROP 1 PC1B-8,10 PC2A-25,27 PC2A-21 PC2A-25,27 PC1A-1,3,5, 7,9,11 yy METAL PC1B-2 OFFICE 1 j 1 WOOD OFFICE PC2A-21 2A-23 PC1B-20 136, A AA PC2A-21 C1B PC1 T2 PC1A/PC1B PC18-20,22,24 PC2A-22 PC1B-2,4,6 PC2A-22 #4-BNDS-03 BUSS DROP #4-DRP-01 BUSS DROP 2,4 —1 #4-TBS-01 TABLE SAW (1) BUSS DROP • 4-CNC-01 ROUTER 1 PC2A-19,21,23 2A-35 4 WAY PLANER BUSSDROP 35 WOOD 61-10P 1 1347 #4-PLN-02-PLANN BUSSDROP f8 #8 #4-TBS-02, #4-TBS-03 TABLESAW BUSS DROP CIRCUIT NUMBERS SHOWN IN WOOD SHOP AREA REFER TO PANEL PC2A UNLESS NOTED OTHERWISE (TYPICAL). \ 1 CNC 01 1 PC2Ai-38,4,-0,42 L PC2A-2,4,6, 8,10,12 PC2A/PC2B PC2A-30,32, 34,36 POWER/COMMUNICATIONS PLAN - WOOD/METAL SHOPS A) NORTH SCALE: 1/8" = r--0" J 1 1/4"C-3 #3 Cu I I I I I I I I PC2A-3739, L CNC COMPUTER WORKSTATI Ir I 01 ON SS RING AREA URES 17 DROP .... RING LE ANDSAW P 11 11 / 0 il 10 il I PA MO 0 II IAleog r Iiiii: 0 SAW 0:1:11 2,1 A P &rip TS ARBUCKS TABLE P ., 11 eil'USS DROP Iii /I #4-CHPS-J5 CHOP SAW /"AND SAW,, RINQ 7-1-2404 LE BUSS DROP 24 0 \ .9 m r- RI -I 0 ROP ROLLING TABL CN ROU R2 FUT RE a 11 11 11 11 11 #9-ABD-01 (1) BUSS DROP NMI IFCaTat EQUIPMENT WIND MACH! ABRAIDING E ARINE) 20,22 BUSS DROP 2 0 18 I I PC2A-1118,20,22,24 I 1 I g ) z #4-CHPS-07 ROLLING TABLE. #4-CHPS-02 24 ROLLING TABLE ROLLING TABLE #4-EDGS-01 #4-BN BAND DS-01 SAW CO -J 6 10 LIJ LO (3 //////////////// / ELECTRIC FORKLIFT PARKING SPOT / REVIONE'D f0?, CODE COWIll\KE ORN70 I\1EC WR 0 lta 1 COI °lull. /LOG • - - Public Works, Building Division PERMIT NUMBER 0 8 I 3 Appry gE—aleg0 R. Frir.FAV/Fr) FEES 22 ZU08 PEFIMIT CENTER • FILE C 'TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE IF ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvements for: RAINIER INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: WOOD/METAL SHOPS POWER/COW. PLAN Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: E1.1 D13 /#8 PC1- 13,15,17 3 -005 110 (E� PC1 B- 26,28,30 BATTERY CHARGERS PC1B -24 ASY -RA-01 PC1B -42 (E) 1 (IT 'ON T7 PC10 -20 m ao m PC1B -24 PC19 -20 TABLE TABLE TABLE PCt T2 IPCiA/PC1B PC1 B- 20,22,24 PC1B -40 PC1B -38 (E) (E) w r m PC1B -36 (E) PC1B -34 (E) A$5EM5L+65EMBLY AREA AREA 134 134 PC1B -34 (E) PC 1 B- 32,34,36, 38,40,42 PC1B -32 (E) D12 D11 D10 D9 D8 D7 PC2A /PC2B PC2A- 30,32, 34,36 PC2A -32 / / / / / / / / / / / / / //j / ELECTRIC FORKLIFT PARKING SPOT / / / / / / / / / / / / / / / //� PC2A -32 POWER /COMMUNICATIONS PLAN - ASSEMBLY ROOM NORTH SCALE: SCALE: 1/8" = 1' -0" w � '•1(bir u V D FEB ..2 2 2008 PEC~ IMIT CENTER TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE IV ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 Project Title: Tenant Improvements for: RAINIER INDUSTRI HS BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: ASSEMBLY ROOM POWER /COMM. PLAN Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: E1.2 E -1,3;5 I 4!) I 0 L DURST 351, 4VURE 30 , 208 V, DURST 3 11- #5-3360-1 VUTEK 3360 PRINTER 30 , 298 V, 40 A 8,10,112 DRUST 800 30 , 208 V, 48 A • VUTEK 3360 1!• (DRUST 351) 38,40,42 QS3200 VUTEK QS 3200 PRINTER 10 , 208 / 240 V, 70 A TABLE (1b 32" POSTS 0" SET-BEAM DURST 351, FUTURE 30, 2 8V,37 A IIt 1 8,10,12 (AP irryi 1.0 rol P FOR irHT TABLE #8 GRAPI-IICS SI-10P CIRCUIT NUMBERS SHOWN IN GRAPHIC SHOP AREA REFER TO PANEL PC3A UNLESS NOTED OTHERWISE (TYPICAL). TABLE 2 SEAL 62 LAMINATOR 10,208V/240V, 32A 1,3 TABLE 4 (E) #5-DYESUB-1, VUTEK 3360 PRINTER 30 , 208 V, 40 A TABLE 8 AGL LAMINA 10, 203 V, 4 2, TABLE ° TABLE w CO PC3A-2,4,6 (E) 7, #8 SEAL 6000 LAMINATOR 110,240 V,46 A w co es Ai 12 0 1-1*C-3 #3 CU w ›— 0 1,3,5 PC3-1,3,5 #5-KLIEVERIK-1 HEAT CALANDER 30 , 480 V 35 A 12 SIGNTECK HEAT TRANSFER 30 , 480 V, 100 A SIGNTECH HEAT TRANSFER PC3-2,4,6 TABLE ABLE OVERHEAD ROP FOR IGHT TABLE DROP LIGHT PC3A-8,10,12,14,16 10 (E) 8 13 HANGING SIGN LIFT (4) 48"x144" 16 1640016 DROP 18" A.F.F 14 000 14 (5) 48" POSTS (4) 144" SET-BEAM "•• 14 POWER/COMMUNICATIONS PLAN - GRAPHICS SHOP / V SCALE: 1 /8" = NORTH r33 REM/ED FEB 2 2 2008 PERMIT CENTER ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE IF ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 Project Title: Tenant Improvements for: RAINIER DUSTRI BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: GRAPHICS SHOP POWER/COMM. PLAN Designed By: MSC Drawn By: CJP Project No: 8009 Date: 02/22/08 Sheet Number: E1.3 PC3A -16 TRIAD AND CUTTING 6' x 47' #002- 55 -RY -WT 120 V, 15A C #002 -58 -I F 10,220V,3A C A B C C C C C C C C C YURT I -BEAM OOF LIFT ROOF OVERHEAD #002 -51 -IF 30 , 220 V, 60 A C C 07 1,3,5,7 PC4A- 8,10,12, 14,16,18 #002 -47 -FE 30 , 208 V, 18.5 A 30 , 480 V, 8.7 A PC4 -1,3,5 CONTROL AREA 1,3,5 CEI i 1i 2 -47 -FE PC — 1,3,5,7 2,4, CONTROL AREA PC4— OEM 2,4,6 V AIR HOLDING - IIIMM TANK PC4B -1 #002 -48 -FE CEI #2 -30-, 208 V, 18.5-A 30 , 480 V, 8.7 A — FI 25,27,29 16 18 PC4A- 25,27,29 #2 -001 AIR COMPRESSPR CIRCUIT NUMBERS SHOWN elIN THIS AREA REFER TO PANEL PC4B UNLESS OTHERWISE NOTED. 4 30 0 1- 1/4 "C -3 #3 CU FORSTROM 002 -50 -IF r,r- 37,39,41 PC4A- 37,39,41 0 CIRCUIT NUMBERS SHOWN IN FABRIC SHOP AREA REFER TO PANEL PC4A UNLESS OTHERWISE NOTED. RYER 2801 MATCI -IL INE 11 NC4A- 26;28, #002- 0-IF 30 , 40 V, 100 A PC4A- 31,33,35 (10)32 "X50" (11) 32" POSTS EZU P 10) 50" SET -BEAM PC4A -20,22 13(14.-11 1A 17 i \ 20 DESK #002 -54 -IF 30 , 220 V, 60 A #002 -52 -I F 30 , 220 V, 60 A LL J X 0 m w 0 0 1- 1/4 "C -3 #1 CU PC4A- 38,40,42 PC4A- 32,34,36 B B B B B PC4B -32,34 #002-49-IF 30 , 208 V,111 A 32 34 32,34,36 FIAB 01 -49 -IF /41 I\ MOIll CIRCUIT NUMBERS SHOWN IN THIS AREA REFER TO PANEL PC4B UNLESS OTHERWISE NOTED. TABLE 25 TABL E CEILING MOUNT 027 rt t 20 ■� TABLE C C C C C #002 -53 -I F 30 , 220 V, 60 A DESK MATCNLINE w — J Q m 2901-- TABLE ... TABLE TABLE TABLE (31 PC4B- 25,27,/ 29,31 CEILING MOUNT 6 PC4B- 20,22,2 26,28,3 w —J CO H 26 22 i TABLE 1 PC4 T4 PC4A /PC4B IIG 24 1 POWER /COMMUNICATIONS PLAN - FABRIC SHOP AL SCALE: 1 /8" = 1' -0" NORTH 22 REVIENNED fO CODE. /0 - E.O �FpA An 10 �p08 RECEIVED FEB 2 2 2008 PERMIT CENTER TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206 - 374 -2128 Email: Info@titanelectric.net CASE IF ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 Project Title: Tenant Improvements for: RAINIER ISDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: FABRIC SHOP POWER /COMM. PLAN Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: RYER (10)32 "X50" (11) 32" POSTS EZUP RA 10) 50" SET -BEAM , &PC4A -20,22 ' " 2 % PC4- 13,15,17 NEW AIR COMPRESSPR 30 , 460 V, 37 PC4- 7,9,11 DESK PC4A- 38,40,42 ttuuc- 1r r 30 , 208 V, 111 A FIAB 0 -49 -IF DESK / 22 (6) 48" POSTS (4) 135" SET- BEAM_6" (4) 48 "x135" ROLLING TABLE PC4C- 1,3,5,7,9 (E) PC4C (E) 3 G (E) ►I► 5 'k EAD 0 37 v CIRCUIT NUMBERS SHOWN IN INVENTORY /S & R AREA REFER TO PANEL PC4B UNLESS OTHERWISE NOTED. 33 35 PC4B- 33,35,37 PC4B -39, (E) 11) 5 S " NK RAPP +54" PC4B- 23 -FLOOR CALE CALE 3 ROLLING TABLE (E) 7 3 (E) 1► 7 (E) ih 9 TABLE CART PC4C -11,13 9 (E) 1I� COASTER COASTE C 'G D6 D5 D4 D3 D2 D1 1 SHIPPING TABLE 35 I- (9)32"x50" 7 EZUP RACKS FUO -RA-01 4 -UNIT (10) 32 (9) 50" CIRCUIT NUMBERS SHOWN IN THIS AREA REFER TO PANEL PC4C UNLESS OTHERWISE NOTED. POWER /COMMUNICATIONS. PLAN - INVENTORY/S & R ROOMS HoRTI+ SCALE: 1 /8" = 1' -0" FEB 22 Z008 PEWIT 1T C TER TI TAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE IV ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425 - 402 -9400 Fax: 425- 402 -9402 Project Title: Tenant Improvements for: RAIXI FR INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: INVENTORY /S& R POWER /CON M. PLAN Designed By: MSC Drawn By: CJP Project No: 8009 Date: 02/22/08 Sheet Number: E1.5 L WE..D F1Af 5 NL 5 F1 H1 -22 0 ••a 0 0 < F1 3 FO 1 F1 F1 3 (3\ r1 F1 F1 3 WORK TABLE D14 F1 F1 3 NL F1 F1 3 3 F1 3 METAL SI-10P 135 F1X NL 5 F1 WORK TABLE F1 F1X 5 NL F1 F1 3 TIG F1 MIG F1 F1 r: 1 • .. F1;,...... F1 F1 F1 9 H1 -22 0 X 1 F1 F1X T F1 wooD 6I-40P 1 136 1 NL %xw'k 11 7 , j. a• • 1 F1 6 F1 F1X NL • 3 ® OFFICE 11354 1 3 #10= F1 A i.._D..J 11 F1 9 F1X 7 FD 9 F1 25 F1 F1 (:F1 D 9 25 #1 27 Ft F1 X 29 NL 1 :DURST 351 1 l 1 NL F1 25 F1 127 CI F F1 H1- 1.,3;5 VIA LCP F1X Mil NL X1 7 F1 01'29 X1 F1 0) 0 H1-7, VIA L 33 1X 1® F1X F1 17 M NL 17 D13 H1 -22 ❑t H1-22 F1 D °'F1 15 F1 F1 15 13 19 F'1 X FD 19 NL F1 19 F1 21 FO F1 13 15 F1 F1 23 21 F1 15 F 'ABL.E TI..E. TABLE F1X NL 17 F1 23 FD F1X NL 17 F1 15 w rn F1 21 ASSEMBLY AREA 134 F1 19 FD 19 21 F1 F1 F1 F1 15 13 23 21 F1 F1 F1 15 FD F1 13 D D D 15 13 F1X F1 NL 17 21 F1 23 F1X F1 NL 17 19 F1 FD 19 F1 F1 F1 15 F1 15 13 F1 F1 13 15 15 TABLE ABLE F1 13 F1 23 21 F1 19 23 F1X F1 21 19 23 31 F1X NL 29 F1 33 1,76 ) F1 25 F1 F1 D 27 VUTEK 3$60 (CRUST 151 ) FD F1 H1-25,27'29, 31,33 VIA LCP 27 25 FD 27 25 p.5 F1 F1 D 25 27 F1 27 TABLE TABLE F1 31 F1 M TABLE FO 25 25 1=— c; F1X FT." NCIONTECH 20 HEAT TRANSF14 TABLE F1 24 TABLE TABLE F1 33 w 0) F1` 27 F1 31 F1 F1 25 ABLE F1 22 F1 24 F1 D HA NG1N GRAPHICS H1-20,22,24,26 S1-10P F1 33 VIA LCP F1 16 F1 D O 33 31 F1 F1 C 3 33 F1 F1 18 16 H1- 14,16,18 VIA 'LCP F1 F1 O D 31 33 F1X NL 29 F1 F1 33 31 F1 F1 F1 22 FD 24 F1 F1 24 TRIAD AND € 22 F1 DaIGN LIFT J 24 18 16 F1 1 F1X 2( F1 NL 14 1 v F1X 17 NL TTING TABU F1 F1 F1 16 F1 22 F1 24 F1 22 F1 18 18 16 F1 18 LIGHT 1'A H1- 13,15,17, ::19,21 ::VIA LCP F1 16 F1 18 22 24 16 F1X 14 NL F1 18 21 17 NL NL 14 833 F1 I 18 16 F1 riA D12 D11 D10 D9 D8 D7 1 1 0 3 HG MX<r'.L i:i;Z •• a DELIVERY PARKING E &4�a^Ntii. F'FYt 1 1 1 4V-2 REVIEWED FOR CODE COMPLIANCE NEPA 70 - NEC City Of Tukwila FLAG NOTES PROVIDE LOW VOLTAGE SWITCHES TO CONTROL LIGHTS IN THIS AREA. RECENED PERMIT CENTEh ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 FD 22U ING 6' x 47' F1X MNL F1 F1 24 0 1 22 1 F1 I22 1 F1 24 l • 24 F1X IMINL 20 ¶6 j 1 F1 ED 18 1 A � o A FO 22 F' 0 24 0 F1 24 F1 16 c 1 F1 O 24 FO 22 F1 24 F1 0 22 F1 O 18 F1X F1 NL 14 16 Ej CEI 01Y2-47-FE INTROL AREA I6 CEI 00 ?NTR L AREA F1 1 18 F1 :I 16 A1F LDING F1 X1 14 TANEI TABLE TABLE 3 TABLE TABLE F1 I FIX NL 26 32 YL.RT '`oof: LIFT I -BEAM a: ROOF FO 28 F1 O Rf F1 F1 F1 30 30 f 1 FORSTROM0 0 IF f1 30 F1 O F1 26 26 F1 F1 28 30 PC4- VIA L F1X NL 32 6,28,30,32 P F1 30 F1 30 F1 ..TYPE 926 DESK 26 28 F1 30 F1 F1 26 28 F1 D F1 30 F1 28 26 28 F1X Mil NL RF F1 F1" F1 26 FO F1 28 FABRICATION AREA 28 F1X F1 NL 32 30 26 F1 F1 F1 O D 30 FIAB 002-49- IF 28 F1 28 F1 8 F1 26 28 8 TYPE 55 nFSK F1 30 f1 c, 0 C F1 F1 0 28 30 F1 F1 C O 30 -TYPE -526 DESK X1 F1X I. 32 NL 32 F1 8 F1 30 F1X NL 32 F1 28 F1 JI ;.1., 0 0 0 34 INVENTORY 139 F1X NL 32 TABLE 'ABLE TABLE 'TABLE 11 1 1 , PI: L4ft - Ir.F,; X:k >•:2.F. CAR; cA LING 'rfl: w SI- UPPING/ RECEIVINCx 138 - - Si!IPPijd ^a TAM PC4- 34,36,38, 40,42 VIA LCP EXTd: OFFICE.. 0 CHR3 0 11354 1 D6 D5 LIGHTING PLAN - NORTH WAREHOUSE ■ SCALE: 1 /16" = 1' —O" NORTH 3 HC /01/ 05)? REVIEWED FOR CODE I\70 -NEC NPR "10 2008 C;�y flf Tukwi a ILDIN DIVISION: FLAG NOTES PROVIDE LOW VOLTAGE SWITCHES TO CONTROL LIGHTING IN THIS AREA. I'c r. P II FEB 2 2 2uuti PERMIT CE.NITEF TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE Pr ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 Project Title: Tenant Improvements for: RAINlER INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: LIGHTING PLAN WAREHOUSE SOUTH Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: E2.2 OFFICE 1 104 1 STOR. 1014 EXIT VE5T. 101 1 ART PLOTTERS EXTG. OFFICE 132 13 Qv 13 13 102 15 13 DELIVERY PARKING 25 25 25 OFFICE 103 f • ...... ; 29 • COP MDP •4 DP1A-17 Ti 1 19 25 PLOTTERS 106 2.1 I 6 \ DP1A-25,27,29, 31,33,35 EXPANDED ELEC. 105 DP1 DP1A DP1B i DP-37 39,41 23 19,21,23 OPEN OFFICE 'st 5 EXTG. OFFICE 130 lt• 50 EXTG. OPEN OFFICE 131 5 EXTG. W5OFFICE 5 129 101 21 21 21 EXTG. 5 OFFICE I2S DPIA-1,3,5,7,9 9 301 1-1/4"C-3 #3 1 #8 CU GND 37 •[ [ ..... 37 0 BREAK/ LUNCH RM. 10a (—• DP1A-32,34,36, 38,40,42 GFCI GFCI GFCI S4MPLES i 41 42 109 , /7 _ 1. , ..... ..1 L , .. . . .. l , .[.... . ,[ (/ .... ..\ ) , ; ( 37 gc) ,) , . . 1 / •••••••[ ; .;; JAN. 110 ) r. 1 .... OA 1P LuoM'S RR/S1-IUJR 111 EXTG. OFFICE 121 EXTG. OFFICE 125 C7J MEN'S DPIA-20 2,2 RR/SI-4W R 26,28 0 • 34 el 112 GFCI 020 ELEVATOR & SHUNT TRIP BREAKER EXTG. CONF. 124 0 HANORA L. PER ANSI 505.1[0 PN 4.0 0 STOR. IIIA 5 A 20 ......... ..... \ ..... •-• • ....... \ "," ...... •• ................ EXTG. RECEPTION 123 0 8 ..... 30 x 6' 30 x 6' 130" x 6' 30• x 6' [X)" x 6' 30" x 6' 6 9 •st o 0 24 PILES 114 2001 bPiA-8; 14,16,18 WORK ROOM 113 EXTG. IT 115 24 4014 14 24 0 16 EXTG. OFFICE IT OFFICE 116 16 16 es[ 4 ''':61AC,(..ESS RAMP pN EXTG. OFFICE 122 L.. 401 POWER/COMMUNICATIONS PLAN - 1ST FLOOR OFFICE AREA SCALE: 1 /8" = 1 '--0" 22 OPEN OFFICE 111 10,12 22 14 0 0 EXTG. OPEN OFFICE 119 EXTG. OFFICE 121 2 EXTG. OFFICE 120 IIS 18 18 14,1 ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CASE Pr ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 fifficEVIED Fo-fr CODE COMPLIANCE tslfPA 70 - NEC 1.84 091•11 SION City Of l'ulomla NORTH GENERAL NOTES 1. MAINTAIN CIRCUITS TO ALL EXISTING RECEPTACLES TO REMAIN (NOT SHOWN). 2. CIRCUIT NUMBERS SHOWN REFER TO PANEL DP1A UNLESS OTHERWISE NOTED. RECEPIT FEB 2 2 zUlid PERMIT GEN E, Project Title: Tenant Improvements for: RAINIER INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: POWER/COM1VI. PLAN FIRST FLOOR OFFICE AREA Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: E3.1 4 1013 STAIR *1 13 lei 13 SHARED OFFICE 201 • 1 17 OPEN OFFICE 203 31 STAIRWAY VEST. 1 202 1 BOOTH/AWNING/ SIGN DISPLAY 221 CI 1 n „ 1_1 09 t1 4 ....... / \ • 1/4 7S7 SStSittSSIISSSISSISISS:1 DPIC-1,3,5, 7,9,11 9 31 31 29 31 29 33 OPEN OFF ICE 205 29 33 33 29 • 011 DPIC (E) H2 (E) H1 *9 I\LCP DPIC-23,25,27 3 0. Cl SERVER 204 GFCI GFCI 25 27 JAN. 20 MEN'S RR 208 ') GFCI 12 01 ) 1/4) WOM'S RR 12 11 012 OPEN OFFICE 220 3 IN COPY/ WORK. AREA 219 (8) DPIC-2,4,6, 8,10,12 4 4 10 A tb 20 16,18 OPEN OFF ICE 211 OFFICE 210 A5 10 OFFICE 211 cr, 11 CONF. 218 a 4 a a OFF ICE 215 EXTG. OFFICE 216 A5 20 200 TarrA.NT ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CAS F, IF ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425-402-9400 Fax: 425-402-9402 TRAINING 212 EXTG. OF ICE 1 14 POWER/COMMUNICATIONS PLAN - 2ND FLOOR OFFICE AREA 44) NORTI4 SCALE: 1/8" = 1 —0" Vir 2 2 2 2 2 EXTG. OFF ICE 213 2 REVIEWED FOR CODE COMPLIANCE NfPA 70 - NEC APR o City Of Tukwila BUILD NG DIVISION • GENERAL NOTES 1. MAINTAIN CIRCUITS TO ALL EXISTING RECEPTACLES TO REMAIN (NOT SHOWN). 2. CIRCUIT NUMBERS SHOWN REFER TO PANEL DPIC UNLESS OTHERWISE NOTED. RecnN(Fr FEB 2 2 ZUud PEFIPtiliT CENTEFI Project Title: Tenant Improvements for: RAINIER INDUSTRIES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: POWER/COMM. PLAN SECOND FLOOR OFFICE AREA Designed By: MSC Drawn By: CJP Project No: 8009 Date: 02/22/08 Sheet Number: F1,3.2 I 6 8di' F2 F2 POTTERS • illig1111 8d 111111 ed 11111 8d 8d iiuir•iiiniiu _ .. 111 8d EN 111 8F2d 111111 F2 NL 0 :0. . 1 x 6 en" ., ... 30" 6' 0" x 6' 3.. >': ri ING ii. x i 2. IIII,i:i. :{;'b•$ . :: :i x 6' X 12' light table x 6' 0 x 8' STOR. ON EXIT vESTIBULE PLOTTE `NL EXPANDED ELECTRICAL ROOM EXISTING CEILING & LIGHTS TO REMAIN (MAINTAIN EXISTING CIRCUMNG) 8 FILES EXISTING OFFICE 1 Ha EXISTING CEILING & LIGHTS TO REMAIN (MAINTAIN EXIS I G CIRCUITING) F2 \ 4 6 EXISTING OFFIr'E F2 H1-2,4 0 VIA LCP f MEN'S RR/SNWR EXIS ING 11 OPEN OFFICE ,1-0, F811-9 • 1111 1M1 N OFFIC= F5 WOM' S F5 RR /S1-11.1R EXTG. OPEN OFFICE F2' • EXTG. 4 OPEN OFFICE DELIVERY PARKING a.. EX -G. OFF CE EXTG. OFFICE PaglIIIIMINSMOMEM O O O O► � •NL � ®X1 � . 1I,'i 1....:I1II a ® • � • EX OFF 12 1111111!"11 F2 1 F2 F2 HAN.cRA L PER AN 5e5.10 N MAX SLOPE 1 :12 NWii AGGE'-, S RAMP t.N { R0164-6510*._ CODE C� OP NEc 10 1 u 2p08 ILO =1\1'; DNZ ? uu;R: >:., a: IN :�::�E11.,AL.K LIGHTING PLAN - 1ST FLOOR OFFICE AREA SCALE: 1/8" = 1' -0" FLAG NOTES PROVIDE LOW VOLTAGE OVERRIDE SWITCH TO CONTROL ALL LIGHTS IN THIS AREA. LniT199 FEB L bud imri GEN-I Lt TI TAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206- 374 -2128 Email: Info@ titanelectric.net CASE Pr ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425 -402 -9400 Fax: 425- 402 -9402 Project Title: Tenant Improvements for: Rr1INIER ISDUSTffiES BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: LIGHTING PLAN FIRST FLOOR OFFICE AREA Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: X10 ✓" ■. — Olio ■r ■ ■� � 11151 uum uIi ■,� STAIRWAY VEST. SI4ARED OFFICE F2 NL 0 I!t8 18 .1¶8II48II:8 : F2 F2 F2 18 18 18 18 18 18 a1 p O 111 111 0 P11 1!IIU!I - F2 F2 F2 ,' NL NL 16 16a 16 16 16 16 16 ®X1 llP ..■I , JAN.. % MEN'S RR 6;:1 `O �� 16 4N F5 ems . F5 �' F6 ; mi.. IUIkkiL1 1■.! ■�� F5 F5 dINEMINICI 20d 20e 20. 20 INIPA F2 F2 F2 N1111111 • a= 20d 20d 20e 20 20e 11 1111111111111=1111111111 ®1 20 x1 � to. r2 14 b TI TAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net CAS N: Pr ENGINEERING Consulting Electrical Engineers 10614 Beardslee Blvd., Suite C Bothell, Washington 98011 Phone: 425- 402 -9400 Fax: 425- 402 -9402 F2 F2 ■ F2 ■ F2 ■ F2 LIGHTING PLAN - 2ND FLOOR OFFICE AREA SCALE: 1/8" = 1' -0" NORTH REVIEWED FOR CODE A 7 COMPLIANCE NEC 7 PR 1U 23 FLAG NOTES PROVIDE LOW VOLTAGE OVERRIDE SWITCH TO CONTROL ALL LIGHTS IN THIS AREA. rircmfur FEB 2 2 cUU�i PERMIT CENTEl Project Title: Tenant Improvements for: RAINI FR I \DUSTRIF,S BUILDING K Southcenter S. Ind. Park 18375 Olympic Avenue S. Tukwila, WA 98188 Sheet Title: LIGHTING PLAN SECOND FLOOR OFFICE AREA Designed By: Drawn By: Project No: Date: MSC CJP 8009 02/22/08 Sheet Number: H:4.2