Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL08-0794 - COLOCATION ACQUISITION COMPANY
COLOCATION ACQUISITION COMPANY 12201 TUKWILA INTERNATIONAL BL ELO8-794 Parcel No.: 0923049120 Address: Suite No: CitAf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us ELECTRICAL PERMIT 12201 TUKWILA INTERNATIONAL BL TUKW Permit Number: Issue Date: Permit Expires On: EL08 -794 07/21/2008 01/17/2009 Tenant: Name: COLOCATION ACQUISITION COMPANY Address: 12201 TUKWILA INTERNATIONAL BL , TUKWILA WA Owner: Name: INTERNATIONAL GATEWAY WEST Address: 12201 TUKWILA INTERNATIONAL BLVD , SEATTLE WA Contact Person: Name: PAT BURKE Address: 900 N 34 ST SUITE 108 , SEATTLE WA Contractor: Name: TITAN ELECTRIC INC Address: 900 N 34 ST, SUITE 108 , SEATTLE WA Contractor License No: TITANEI963OB Phone: Phone: 206 - 633 -2811 Phone: 206 - 633 -2811 Expiration Date: 09/02/2008 DESCRIPTION OF WORK: ADD 300 KVA UPS AND PNIS Value of Electrical: 100,000.00 Fees Collected: Type of Fire Protection: National Electrical Code Edition: Electrical Service provided by: SEATTLE CITY LIGHT Permit Center Authorized Signature:, I hereby certify that I have read and governing this work will be complie The granting of this construction or Signature: $1,877.50 2005 Date: 0241t51 ed this permit and know the same to be true and correct. All provisions of law and ordinances , whether specified herein or not. oes not presume to give authority to violate or cancel the provisions of any other state or local laws regulating ce of work. I am authorized to sign and obtain this electrical permit. Date: / I /0 Print Name: j This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doe: EL -4/07 EL08 -794 Printed: 07 -21 -2008 Parcel No.: 0923049120 Address: Suite No: Tenant: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS 12201 TUIKWILA INTERNATIONAL BL TUKW COLOCATION ACQUISITION COMPANY Permit Number: Status: Applied Date: Issue Date: EL08 -794 ISSUED 06/19/2008 07/21/2008 1: ** *ELECTRICAL * ** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change m the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: Date: 7/' f / doc: Cond -Elec EL08 -794 Printed: 07 -21 -2008 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us Electrical Permit No. Project No. PLO 19— 7R / (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: /..? D/ Aveie , l4. 4.1ir/1G0.44M4(8/ 4 Tenant Name: (n ,d (" Ac 9il'f, r!M 1. 7x1 11 G Property Owners Name: (a(OCdiiern /�qs isii5A (,�y„/ L G Mailing Address: 1 2,1 O / / K G wi/u !d hJ`✓nuseaw,4,1 /.3L ['o f„,,/A City qoa King Co Assessor's Tax No.: 0`7) Suite Number: Floor: /Sr New Tenant: ❑ Yes [i�..No `9 State Zip CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: Pal gd Day Telephone: (i) 3 Z e/t Mailing Address: ,`/. 1/14 Jf ;4. la E -Mail Address: /db 074T�rdd-yjG . ,'.e0 are */6 City / state Zip Fax Number: ( 74) i3'/-Z /2 S ELECTRICAL CONTRACTOR INFORMATION Company Name: 777' K L .c..76fC /4/c_ Mailing Address: dD p /1/A3''1 51ij 3 L% /L7t3 Contact Person: /2 t 6 E -Mail Address: Pub f !G►r.GIA2-1"`L . yty Contractor Registration Number: 6e4, Lek City State Zip r ,, Day Telephone: 61 /o 31- Of 1/ Fax Number: 2'&) 372 if" 2 17 8 Expiration Date: /'1— z Valuation of Project (contractor's bid price): $ Q Scope of Work (please provide detailed information): D4 r>� . v,'1 u Ps No Will service be altered? Type of Use: Type of work: ❑ New ❑ Low Voltage Property Served by: ❑ Puget Sound Energy Seattle City Light Yes Adding more than 50 amps? Yes ❑ No Addition Generator El Service Change El Fire Alarm 111Applicattons \Forms- Apphcaaons On Lrte \4 -2007 - Electncal Permit Appl¢ation.doc hh ❑ Remodel ❑ Tenant Improvement El Telecommunication ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $140.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings $75.00 ea ❑ Low voltage systems (alarm. furnace thermostat) 555.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration 575.00 (no added /altered circuits) ❑ Service change with added/altered circuits $75.00 number of added circuits $10.00 ea ❑ Circuits added/altered without service change 550.00 (up to 5 circuits) ❑ Circuits added /altered without service change $50.00 (6 or more circuits) $7.00 ea ❑ Meter /mast repair $65.00 ❑ Low voltage systems 555.00 (alarm, furnace thermostat) MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) 558.00 ❑ Temporary service (generator) 575.00 ❑ Manufactured/mobile home service $80.00 (excluding garage or outbuilding) ❑ Carnivals $75.00 Number of concessions $10.00 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY TIIE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: Po- iBivt Mailing Address: fen) N 34tfi Day Telephone: vtllc City Date: 0<i) (226)G33 -LB'i State Zip Date Application Accepted: 67.461_01r. Date Application Expires: I) l�_ dre' Staff Initials: U ' H ?Apphcauons \Forms - Applicanons On Line \4.2007 - Elecmcal Permit Apphcation.doc bh Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http.: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 0923049120 Permit Number: EL08 -794 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 06/19/2008 Applicant: COLOCATION ACQUISITION COMPANY Issue Date: Receipt No.: R08 -02180 Payment Amount: $1,877.50 Initials: WER Payment Date: 06/19/2008 10:04 AM User ID: 1655 Balance: $0.00 Payee: TITAN ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 006402 1,877.50 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 1,502.00 ELECTRICAL PLAN - NONRES 000.345.832.00.0 375.50 Total: $1,877.50 3828 06/19 0711 TOTAL 187750 doc: Receiot -06 Printed: 06 -19 -2008 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION IL 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 "7 91 Project: _ �Vt -!ate 1 if/p) ,I 64/I.S.�'O /Al Type of Inspection: - X t' dress: .� % ,te Called: Special Instructions: Date Wanted: --V-- �_./ ini. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENT : 114)1. 11/4/ a771 a/0 ='17-ijth4 /1/ l7 Date: 7/ ,1i4 ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: iwas. -. .unl ,1214151'=•:+ i INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. -3' CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36X0 Project: COOL( /� "TOW //a/1S/!'c Type of Inspection: ^� / /6/ c/ �' Add es ) . 7w/ k# 2V, >> i Date Called: Va Special Instructions: Date Wanted: _ �i�' a.m. P.m. Requester: Phone No: ['Approved per applicable codes. Corrections required prior to approval. COMMENTS: M ()/Z— fv/ 44 /2 -1A) T adira , tilc 7)41.1 f3 F Ins !k 4riM/,p Date: /Z,-5l ' ?S ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: • PERMIT COORD COPY • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL08 -794 DATE: 06 -19 -08 PROJECT NAME: COLOCATION ACQUISITION COMPANY SITE ADDRESS: 12201 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: ,o� Bulfding r1-11\/CJ 2 ision Fire Prevention Planning Division Public Works ❑ Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 06 -24 -08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ LETTER OF COMPLETENESS MAILED: Ping ❑ PW ❑ Staff Initials: TUES/THURS RO ING: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 07 -22 -08 Not Approved (attach comments) 1-1 DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip,doc 2 -28-02 Untitled Page • s Page 1 of 2 Electrical Contractor A business licensed by Lai to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. TITAN ELECTRIC INC Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company TITAN ELECTRIC INC 2066332811 900 N 34TH STE 108 SEATTLE WA 98103 KING CORPORATION UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Separation Date Previous License Next License Associated License Specialty 1 Specialty 2 602250925 ACTIVE TITANEI9630B ELECTRICAL CONTRACTOR 9/2/2004 9/2/2008 TITANE *986Q5 FUNG *LH967M9 GENERAL UNUSED MASTER ELECTRICIAN INFORMATION License FUNG *LH967M9 Name FUNG, LAWRENCE H Status ACTIVE Business Owner Information Name Role Effective Date Expiration Date FUNG, LAWRENCE H AGENT 09/02/2004 BURKE, PATRICK D PRESIDENT 09/02/2004 FUNG, LAWRENCE H SECRETARY 09/02/2004 CROOK, TRAVIS J VICE PRESIDENT 09/02/2004 Bond Information I https: / /fortress.wa. gov /lni/bbip/Detail. aspx ?License= TITANEI9630B 1 1 I 07/21/2008 EXISTING SERVICE ENTRANCE; SWITCHBOARD LOCATED IN PARKING LEVEL P2 ID ) co TEMPORARY SYSTEM n J 300kW J. J r UPS-C 300 WA MBP UPS-C 300 WA T4 300 kVA K -13 Y 480 :120 /208/ MrY1 - #3/O 22kAIC 1LDUC 0 ) 1000A J-BOX W/TEtMINALS FOR FUTURE UPS CONNECTIONS 22kAIC C0- LOCATE 1 PULLBOX "PB1" 24'x24'x12" PULLBOX "PB2" 24 "x24 "x12" (4) 4 "C., (4) #600kCMIL + (1) #4 /OG 4 "C., (4) #500kCMIL + (1) #3G 1HP1 30, 4W 277/480V 400A D-1 0 FULLY RATED 1000kW 1600A/30 CD 4 -POLE 1600A ATS GENERATOR REMOTE ANNUNCIATOR PANEL (4) 4 "C., (4) #600kCMIL + (1) #4 /0G MAIN SWITCHBOARD "MSB' 277/480V, 30, 4W, 65kAIC a1 La roc` I ) TVSS 0 0 1 1HM2 30, 4W 277/480V 400A 1HM1 30, 4W 277/480V 400A 1 1H 1A 30, 4W 277/480/ 600A 1HL1 30, 4W 277/480V 125A T1 112.5kVA xQ \- J1 -'tiAJ #1/0 GEC 2 "C., (3) #1, (1) #4 /ON + (2) #6G 2 "C., (3) #2/0 + (1) #6G (2) 4 "C., (3) #500kCMIL + (1) #1/0G T2 300kVA, K -13 460:120/208V (2) 2 "C., (3) #2/0, (2) #2 /ON + (2) #2G 1 LINE DISTRIBUTION PANEL "11.D2" 400A, 120/208V, 30, 4W, 10kAIC 1-1/4"C., (4)/4 + (1) #100 1 C (1#4/ON + (2)6G 2.C., 4 /ON #+ �1 2�6G #3/0 GECX UPS- -B 300kVA WITH INTERNAL BYPASS (3) 4 "C., (3) #4O0kCMIL, (2) #400kCMIL N + (2) #2/00 EL 11 0 co ITVISSI o 1LL1 30, 4W 120/208V 125A 1LP1 30, 4W 120/208/ 125A uJ-BOX W/TER11INALS FOR FUTURE UPS CONNECTIONS 0 J 22kAIC 600A 1LM1 30, 4W 120/208V 225A G 30, 4W 120/208V 60A LOCATED AT GENERATOR (2) 2-1/2"C., (3) #4/0, (2) #4 /ON + (2) #2G 2210.1c - --_- -. P 600A C00D FUTURE J CO- LOCATE 2 MBB MBB T 600A T 600A L J RIB /Th • Y1#3/0 GEC 600A/3P BIB f"-\ 600A /3P BYPASS PANEL "MBP -A ", 42kAIC (2) 4 "C., (3) #500kCMIL + (1) #1 /OG UPS -A 300kVA WITH INTERNAL BYPASS 0l ID MBP -B T3 300kVA, K -13 480:120/208V #3/0 GEC' 1 UNE DISTRIBUTION PANEL "1 LOU-A" 1000A, 120/208V, 30, 4W, 22kAIC E-1 2UA31 C1 30, 4W 120/208/ 400A 2UA32 CiA 30, 4W 120/208V 225A �1 NI 0-1 N 000 1 LDU -B - 1000A, 30, 4W, 22kAIC ID i 2IJA33 30, 4W 120/208V 225A 2UA34 30, 4W 120/208V 400A 2UA35 30, 4W 120/208/ 400A 2UA36 30, 4W 120/208V 400A 2UB31 30, 4W 120/208/ 400A 2UB32 30, 4W 120/208/ 400A C0- LOCATE 3 ONELINE DIAGRAM NOT TO SCALE 2UB33 30, 4W 120/208V 400A 2UB34 30, 4W 120/208V 400A SEPARATE PERMIT REQUIRED FOR: 4Mechani CI Electrical Niyiumbing LirGas Piping City of Tukwila BUILDING DIVISION 2UB35 30, 4W 120/208V 400A 2UB36 30, 4W 120/208V 400A REVISIONS No of work shall ll ber ade to the scope Tukwila Build ng Division. of NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 5 2 "C., 3) #1, (1) #4 ON + (2) #6G SW 30, 4W 120/208V 125A SWA 30, 4W 120/208V C0- LOCATE 4 FllLE COPY Permit No. 2UA41 30, 4W 120/208V 225A 2UB41 30, 4W 120/208V 225A Pear review approval Is subject to errors and omissions. Approval of constniellon doc uneis doss not authOrize the violation of any adopted code or ordinance. Fleceipt of approved ; ,' and ocedidone le acknowledged: BY Date:, -7/ ?. /6 g City of ?UM W& BUILDING ENVISION COPPER FEEDER SCHEDULE CODE AMPS CONDUIT SIZE CONDUCTOR SIZE GROUND CONDUCTOR 20C 20 3/4 (3) #12 #12 20D 20 3/4 (4) #12 #12 30B 30 3/4 (2) #10 #10 30C 30 3/4 (3) #10 #10 30D 30 3/4 (4) #10 #10 40B 40 3/4 (2) #8 #10 40C 40 3/4 (3) #8 #10 40D 40 3/4 (4) #8 #10 50B 50 3/4 (2) #8 #10 50C 50 3/4 (3) #8 #10 50D 50 3/4 (4) #8 #10 60B 60 3/4 (2) #6 #10 60C 60 3/4 (3) #6 #10 60D 60 1 (4) #6 #10 70B 70 1 (2) #4 #8 70C 70 1 (3) #4 #8 70D 70 1 -1/4 (4) #4 #8 60C 80 1 (3) #4 #8 80D 80 1 -1/4 (4) #4 #8 90C 90 1 -1/4 (3) #2 #8 90D 90 1 -1/4 (4) #2 #8 100c 100 1 -1/4 (3) #2 #8 100D 100 1 -1/4 (4) #2 #8 100E 100 2 (5) #1/0 #8 125C 125 1 -1/4 (3) #1 #6 125D 125 1 -1/2 (4) #1 #6 125E 125 2 (5) #2/0 #6 150C 150 1 -1/2 (3) #1/0 #6 150D 150 2 (4) #1 /0 #6 150E 150 2 -1/2 (5) #310 #6 175C 175 1 -1/2 (3) #2/0 #6 175D 175 2 (4) #210 #6 175E 175 2 -1/2 (5) #410 #6 200C 200 2 (3) #310 #6 200D 200 2 (4) no #6 200E 200 3 (5) 250 kCMIL 126 225C 225 2 (3) #4/0 #4 225D 225 2 -1/2 (4) #410 #4 225E 225 2 -1/2 (5) 250 kCMIL #4 250C 250 2 (3) 250 kCMIL #4 250D 250 2 -1/2 (4) 250 kCMIL #4 250E 250 3 -1/2 (5) 400 kCMIL #4 300C 300 2 -1/2 (3) 350 kCMIL #4 300D 300 3 (4) 350 kCMIL #4 300E 300 3-1/2 (5) 500 kCMIL #4 350D 350 3-1/2 (4) 400kCMIL #3 400C 400 3 (3) 500 kCMIL #2 4000 400 3-1/2 (4) 500 kCMIL #2 400E 400 (2) 3 (5) 250 kCMIL #2 500C 500 (2) 2 (3) 250 kCMIL #2 500D 500 (2) 2 -1/2 (4) 250 kCMIL #2 500E 500 (2) 3-1/2 (5) 400 kCMIL #2 600C 600 (2) 2 -1/2 (3) 350 kCMIL #1 600D 600 (2) 3 (4) 350 kCMIL #1 600E 600 (2) 3-1/2 (5) 500 kCMIL #1 700C 700 (2) 3 (3) 400 kCMIL #1/0 700D 700 (2) 3 (4) 400 kCMIL #1/0 700E 700 (3) 3 (5) 350 kCMIL #1/0 800C 800 (2) 3 (3) 500 kCMIL #110 800D 800 (2) 3-1/2 (4) 500 kCMIL #1/0 800E 800 (3) 3 -1/2 (5) 400 kCMIL #110 10000 1000 (3) 3 (3) 400 kCMIL #2/0 1000D 1000 (3) 3 (4) 400 kCMIL #2/0 1000E 1000 (3) 4 (5) 600 kCMIL #2/0 1200G 1200 (3) 3-1/2 (3) 600 kCMIL #3/0 1200D 1200 (3) 3-1/2 (4) 600 kCMIL #3/0 16000 1600 (4) 3-1/2 (3) 600 kCMIL #4/0 1600D 1600 (4) 3-1/2 (4) 600 kCMIL #4/0 2000C 2000 (5) 3-1/2 (3) 600 kCMIL 250 kCMIL 2000D 2000 (5) 3 -1/2 (4) 600 kCMIL 250 kCMIL 2500D 2500 (6) 4 (4) 600 kCMIL 350 kCMIL 3000D 3000 (8) 4 (4) 500 kCMIL 400 kCMIL 4000D 4000 (10) 4 (4) 600 kCMIL 500 kCMIL NOTES: 1 ALL CONDUCTORS ARE COPPER WITH THWN/THHN INSULATION 2 CONDUIT FILL BASED ON RIGID PVC SCHEDULE 40 RACEWAY (MINIMUM SIZE 3/4 ") 3 ALL GROUNDING CONDUCTOR SIZES BASED ON TABLE 250-95 FOR EQUIPMENT GROUNDING CONDUCTORS 4 CONDUCTOR AMPACITIES BASED ON TABLE 310 -16, 75 DEGREE COLUMN, EXCEPT WHERE NOTED. 5 CODE LETTER "C" INDICATES 3 PHASE, 3W OR 1 PHASE, 3W 6 CODE LETTER "D" INDICATED 3 PHASE, 4W (NO DERATING FOR CURRENT- CARRYING NEUTRAL) 7 CODE LETTER "E" INDICATES 3 PHASE, 4W, 200% N (CONDUCTORS DERATED FOR CURRENT- CARRYING NEUTRAL) REVIEWED-TOR CODE COMPUA E %RA70 JUL p8Mt Public Works, Building Division PERMIT NUMBER RECEIVED JUN 19 2008 PERMIT CENTER ELO879 FILE COPY a-IA.1NT ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 COLOCATION ACQUISITION COMPANY LLC Sheet Title: ONELINE DIAGRAM Designed By: MSC Drawn By: CJP Project No: Date: 06/18/08 Sheet Number: EO Titan Electric PANEL SCHEDULE PANEL: EXISTING SERVICE ENTRANCE Project: Date : Location : Fed From : SCL Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.D. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 2000 2000 480 277 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 MAIN SWTICHBOARD MSB A 1600 3 32.7 6.0 36.1 38.2 1061.9 1174.9 3 B 43.0 43.0 3 B 0.0 0.0 5 C 41.8 41.8 5 C 0.0 7 UPS -C A 400 3 39.0 39.0 7 PANEL 2AU11 176.0 176.0 9 3 B 0 0 1.2 1.2 9 0.0 0.0 11 C 0.0 0.0 11 0.0 13 C A 600 3 0.0 0.0 0.0 15 NO LOAD B 125 3 4.1 0.0 17 C B 12.6 0.0 0.0 19 17 A 400 c 21,3 0.0 303.6 0.0 X 2000 21 B B 400 3 0.0 0.0 29.7 0.0 0 0 23 C C B 0 0.0 0.0 0.0 0.0 0.0 29.7 X 25 23 A 175 C 0 0 X X X _ X 0.2 34.8 0.0 X X X LX 29.7 27 B B PANEL 2AU35 0 B 400 3 0.0 0.0 0.0 29 19.7 C X X X X 0 27 31 B 0.0 0.0 31 1LD2-A A 600 17.7 17.7 29 0 11.4 C 0.0 33 0 B 0 0 16.6 16.6 31 0.0 0.0 0.0 35 0 C 0 0 0.0 0.0 0.0 33 0.0 0.0 37 0 A 125 3 0.0 39 0.0 0.0 35 0.0 39 0 B 0 0 0.0 41 vrnrP 0.0 0.0 0.0 41 arnre C 0 0 p.p 2 NO LOAD 1 p.p 1 p.p p.p 2 A A B 0 0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 176.0 0 0.0 Phase A 58.6 Phase B 58.7 Phase C 58.7 Conn. Kva 176.0 Conn. Amps 489 Demand Kva 176.0 Demand Amps 489 0 4 0.0 0.0 0.0 LOAD SUMMARY ( Total, Al Sections ) Rec Kva 32.7 Heat Kva 6.0 Motor Kva 36.1 Ltg Kva 38.2 Other Kva 1237.9 0 0.0 Phase A Phase B 0.0 Phase C 0.0 Conn. Kva 1350.9 Conn. Amps 1625 Demand Kva 1376.2 Demand Amps 1655 0 4 0 B C 0.0 0.0 6 0 0.0 0.0 0.0 6 0 C 0 0 0.0 0 NO LOAD 0.0 0.0 0.0 8 0.0 A 4 0.0 0 B 0 0.0 0.0 0.0 10 0 B 0 0 0,0 0 C 0 0.0 0.0 12 0 C 0.0 0.0 8 14 PANEL 2UC11 FUTURE LOAD A 0.0 0.0 14 0 A 0 0 0.0 10 0 0.0 0.0 16 B B 0 0 0.0 0.0 12 0.0 0.0 0.0 18 0 C 0 0 58.7 0.0 0.0 14 0.0 0.0 20 0 A 0.0 0.0 22 0.0 0.0 0.0 0.0 22 0 B 0 0 0.0 24 0 0.0 0.0 0.0 24 0 C 0 0 0.0 26 0 0.0 0.0 0.0 26 0 A 0 0 0.0 28 0.0 0.0 0.0 28 22 B o B 0 0 0 0.0 0.0 0.0 30 0 C 0 0 C 32 0.0 0.0 0.0 32 0.0 A 26 0.0 0 A 0 0 0.0 0.0 34 0 B 0 0 0.0 36 B 0.0 0.0 0.0 36 0 C 0.0 0.0 30 38 0 C 0.0 0.0 38 0 A 0 0 0.0 32 0 0.0 0.0 0.0 40 0 B 0 0 0.0 0.0 34 0.0 0.0 0.0 42 0 C 0 0 0.0 0.0 0.0 36 0.0 0.0 REMARKS : first 10 kva rec Ca 1007 + balance ® 50% = 21.4 largest motor a 1257 + balance 0 100% = 63.2 lighting @ 125% = 47.8 heating © 100% = 6.0 other ® 100% = 1237.9 0 0% 0 0.0 0.0 Titan Electric PANEL SCHEDULE PANED MSB PANEL: 1LDUA Project: Date : Location : Fed From : UPS -A Section: 1 Ckt No, Load Kva CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Mips Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0J Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 1000 1000 208 110 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 2AU31 A 400 3 160.7 3 B 43.0 43.0 3 B 0.0 0.0 5 C 41.8 41.8 5 C 0.0 7 PANEL 1HM2 A 400 3 39.0 39.0 7 PANEL 2AU11 NO LOAD B 225 3 B 0 0 1.2 1.2 9 0.0 I 11 C 0.0 0.0 11 0.0 13 C A 600 3 0.0 0.0 13 PANEL SW NO LOAD B 125 3 4.1 4.1 15 C B 12.6 0.0 4.1 4.1 17 A 400 c 21,3 0.0 303.6 4.1 4.1 19 PANEL 2AU33 B B 400 3 0.0 0.0 29.7 29.7 0 0 21 C C B 0 0.0 0.0 0.0 0.0 29.7 29.7 X 1000 23 A 175 C 0 0 X X X _ X 0.2 34.8 72.7 29.7 29.7 27 B 25 PANEL 2AU35 0 B 400 3 0.0 0.0 0.0 29 19.7 19.7 X X X X 0 27 31 B 0.0 0.0 31 1LD2-A A 600 17.7 17.7 29 0 11.4 C 0 0 0 B 0 0 16.6 16.6 31 0.0 0.0 A 35 0 C 0 0 0.0 0.0 0.0 33 0.0 0 B 0 0 125 3 0.0 39 0.0 0.0 35 26.6 0 C 0 0 0 0.0 41 vrnrP 0.0 0.0 37 41 0 A 0 0 p.p 2 NO LOAD 1 p.p 0.0 0.0 39 A 0 B 0 0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 176.0 0 0.0 Phase A 58.6 Phase B 58.7 Phase C 58.7 Conn. Kva 176.0 Conn. Amps 489 Demand Kva 176.0 Demand Amps 489 0 4 0.0 0.0 0.0 0.0 41 crnrP B C 0.0 0.0 6 0 0.0 0.0 8.p p.p 2 C 0 A 0.0 0 NO LOAD 0.0 0.0 0.0 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 299.7 0 0.0 Phase A 104.8 Phase B 99.4 Phase C 95.5 Conn. Kva 299.7 Conn. Amps 832 Demand Kva 299.7 Demand Amps 832 0 4 0.0 0 B 0 0.0 0.0 0.0 10 0 0.0 0.0 6 0,0 0 C 0 0 0.0 12 0 C 0.0 0.0 8 14 PANEL 2UC11 FUTURE LOAD A 0.0 0.0 14 0 A 0 0.0 0.0 10 0 B 0 0 B B 0 0 0.0 0.0 12 0.0 0 C 18 0 C 0 0 58.7 0.0 0.0 14 0.0 0 A 0 0 0.0 0.0 22 0.0 0.0 16 0.0 22 B 0 0 0 0.0 24 0 0.0 0.0 18 24 0 C 0 0 0.0 26 0 0.0 0.0 0.0 20 0 0 A 0 0.0 28 0.0 0.0 0.0 0.0 22 B o B 0 0 0 0.0 0.0 0.0 0.0 0.0 24 0 0 C 32 0.0 0.0 0.0 32 0.0 0.0 26 0.0 0 A 0 0 0.0 0.0 34 0 0.0 0.0 28 0.0 36 B 0.0 0.0 0.0 36 0 C 0.0 0.0 30 38 0 C 0 0 38 0 A 0 0.0 0.0 32 0 0.0 A 0.0 40 0 B 0 0 0.0 0.0 34 0.0 0 B 0 0 C 0 0 0.0 0.0 0.0 36 0.0 0 C first 10 kva rec 0 100% + balance 0 50% - 21.4 largest motor @ 125% + balance ® 100% = 52.1 lighting ® 125% = 47.8 heating ® 100% = 6.0 other 0 100% - 1061.9 0 0% 0 0.0 0.0 0.0 0.0 38 0 A 0 0 0.0 0.0 40 0 B 0 0 0.0 0.0 42 0 C 0 0 0.0 0.0 REMARKS t first 10 kva rec ® 1007 + balance a 50% = 0.0 largest motor @ 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating a 100% - 0.0 other © 100% = 299.7 0 0% 0 0.0 0.0 Titan Electric PANEL SCHEDULE PANED MSB Project: Date : Location : Fed From : SCL Section: 1 Ckt No CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 1600 1600 480 277 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 1HP1 A 400 3 12.6 148.1 160.7 3 B 0.0 0.0 5 C 0.0 0.0 7 PANEL 1HM2 A 400 3 2.2 279.6 281.8 9 B 0 0 0.0 0.0 11 C 0.0 0.0 13 1 LDU -B A 600 3 145.8 145.8 15 B 0 0 0.0 0.0 17 C 12.6 0.0 0.0 19 PANEL 1HM1 A 400 3 21,3 0.0 303.6 325.1 0 0 21 B B 0 0 0.0 0.0 0.0 0.0 X 1600 23 C C 0 0 0.0 0.0 0.0 0.0 0.0 A 25 25 PANEL 1LD2 A 175 3 31.7 6.0 X X X _ X 0.2 34.8 72.7 X X X _ X 27 27 B B 0 0 0.0 29 0.0 0.0 0.0 29 C C 0 0 0.0 31 0.0 0.0 0.0 31 1LD2-A A 600 3 1.0 33 0 11.4 149.9 162.3 33 0 B 0 0 0.0 35 0 0.0 0.0 0.0 35 0 C 0 0 0.0 37 0 0.0 0.0 0.0 37 PANEL 1HL1 A 125 3 0.0 39 0 26.6 0.0 26.6 39 0 B 0 0 0.0 41 vrnrP 0.0 0.0 0.0 41 cpnra C p.p p.p 2 NO LOAD 1 p.p 8.p p.p 2 A A 3 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 176.0 0 0.0 Phase A 58.6 Phase B 58.7 Phase C 58.7 Conn. Kva 176.0 Conn. Amps 489 Demand Kva 176.0 Demand Amps 489 0 4 0.0 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 32.7 Heat Kva 6.0 Motor Kva 36.1 Ltg Kva 38.2 Other Kva 1061.9 0 0.0 Phase A 1174.9 Phase B 0.0 Phase C 0.0 Conn. Kva 1174.9 Conn. Amps 1413 Demand Kva 1189.1 Demand Amps 1430 0 4 0 B 0.0 0.0 6 0 0.0 0.0 0.0 6 0 C 0 0 0.0 8 NO LOAD 0.0 0.0 0.0 8 A A 3 0.0 0.0 10 0 0.0 0.0 0.0 10 0 B 0 0 0,0 12 0 0.0 0.0 0.0 12 0 C 0.0 0.0 14 PANEL 2UC11 FUTURE LOAD 0.0 0.0 0.0 14 0 A 0 0 58.6 16 0.0 0.0 0.0 16 B B 0 0 58.7 18 0 0.0 0.0 0.0 18 0 C 0 0 58.7 20 0 0.0 0.0 0.0 20 0 A 0.0 0.0 22 0 0.0 0.0 0.0 22 0 B 0 0 0.0 24 0 0.0 0.0 0.0 24 0 C 0.0 0.0 26 0 0.0 0.0 0.0 26 0 A 0 0 0.0 28 0.0 0.0 0.0 28 B B 0.0 0.0 30 0 0.0 0.0 0.0 30 0 C 0 0 0.0 32 0.0 0.0 0.0 32 A A 0.0 0.0 34 0 0.0 0.0 0.0 34 0 B 0 0 0.0 36 0 0.0 0.0 0.0 36 0 C 0.0 0.0 38 0 0.0 0,0 0.0 38 0 A 0 0 0.0 40 0 0.0 0.0 0.0 40 0 B 0 0 0.0 42 0 0.0 0.0 0.0 42 0 C 0 0 0.0 REMARKS : first 0.0 0.0 0.0 REMARKS I first 10 kva rec 0 100% + balance 0 50% - 21.4 largest motor @ 125% + balance ® 100% = 52.1 lighting ® 125% = 47.8 heating ® 100% = 6.0 other 0 100% - 1061.9 0 0% 0 0.0 0.0 Titan Electric PANEL SCHEDULE PANED 1LDUB Project: Date : Location : Fed From : UPS-I3 Section: 1 Ckt No CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 1000 1000 208 110 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 2BU31 A 400 3 43.0 43.0 3 B 41.8 41.8 5 c 39.0 39.0 7 PANEL 2BU33 A 400 3 37.9 37.9 9 B 0 0 36.3 36.3 11 c 36.5 36.5 13 PANEL 2BU35 A 400 3 12.6 12.6 15 B 0 0 12.6 12.6 17 C 12.6 12.6 19 A 0.0 0.0 0 0 21 B B 0 0 0.0 0.0 0.0 X 1000 23 0 C 0 0 0.0 0.0 0.0 0.0 A 25 A 0.0 0.0 X X X _ X 0.0 0.0 X X X _ X 0 27 B 0 0 0.0 0.0 29 0.0 0.0 29 C 0 0 0.0 0.0 31 0.0 0.0 31 A 0.0 0.0 33 0 0.0 0.0 33 0 B 0 0 0.0 0.0 35 0 0.0 0.0 35 0 C 0 0 0.0 0.0 37 0 0.0 0.0 37 0 A 0 0 0.0 0.0 39 0 0.0 0.0 39 0 B 0 0 0.0 0.0 41 vrnrP 0.0 0.0 41 ¢pare C p.p p.p 2 NO LOAD 1 p.p 1 p.n 2 PANEL 2UB11 NO LOAD A 225 3 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 176.0 0 0.0 Phase A 58.6 Phase B 58.7 Phase C 58.7 Conn. Kva 176.0 Conn. Amps 489 Demand Kva 176.0 Demand Amps 489 0 4 0.0 0.0 LDAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 291.6 0 0.0 Phase A 100.6 Phase B 96.8 Phase C 94.2 Conn. Kva 291.6 Conn. Amps 809 Demand Kva 291.6 Demand Amps 809 0 4 0 B 0.0 0.0 6 0 0.0 0.0 6 0 C 0 0 0.0 0.0 8 NO LOAD 0.0 0.0 8 PANEL 2041 NO LOAD A 225 3 0.0 0.0 10 0 0.0 0.0 10 0 B 0 0 0.0 0,0 12 0 0.0 0.0 12 0 C 0.0 0.0 14 PANEL 2UC11 FUTURE LOAD 0.0 0.0 14 0 A 0 0 58.6 58.6 16 0.0 0.0 16 B 0 0 58.7 58.7 18 0 0.0 0.0 18 0 C 0 0 58.7 58.7 20 0 0.0 0.0 20 0 A 0.0 0.0 22 0 0.0 0.0 22 0 B 0 0 0.0 0.0 24 0 0.0 0.0 24 0 C 0.0 0.0 26 0 0.0 0.0 26 0 A 0 0 0.0 0.0 28 0.0 0.0 28 B 0.0 0.0 30 0 0.0 0.0 30 0 C 0 0 0.0 0.0 32 0.0 0.0 32 A 0.0 0.0 34 0 0.0 0.0 34 0 B 0 0 0.0 0.0 36 0 0.0 0.0 36 0 C 0.0 0.0 38 0 0.0 0.0 38 0 A 0 0 0.0 0.0 40 0 0.0 0.0 40 0 B 0 0 0.0 0.0 42 0 0.0 0.0 42 0 C 0 0 0.0 0.0 REMARKS : first 0.0 0.0 REMARKS 1 first 10 kva rec @ 1007 + balance © 50% = 0.0 largest motor a 1257 + balance © 100% = 0,0 lighting © 125% = 0.0 heating © 100% = 0.0 other © 100% = 291.6 0 0% 0 0.0 0.0 Titan Electric PANEL SCHEDULE; PANEL: 1LDUC Project: Date : Location : Fed From : UPS- -B Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 1000 1000 208 110 .3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 NO LOAD A 400 3 0.0 3 B 0.0 5 C 0.0 7 NO LOAD A 400 3 0.0 9 B 0 0 0.0 11 C 0.0 13 NO LOAD A 400 3 0.0 15 B 0 0 0.0 17 C 0.0 19 A 0.0 0.0 0 0 21 B 0 0 0.0 0.0 X 1000 23 C 0 0 0.0 0.0 25 A 0.0 0.0 X X X _ X 27 B 0 0 0.0 0.0 29 C 0 0 0.0 0.0 31 A 0.0 0.0 33 0 6 0 0 0.0 0.0 35 0 C 0 0 0.0 0.0 37 0 A 0 0 0.0 0.0 39 0 B 0 0 0.0 0.0 41 vrnrP C p.p p.p 2 NO LOAD A 225 3 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 176.0 0 0.0 Phase A 58.6 Phase B 58.7 Phase C 58.7 Conn. Kva 176.0 Conn. Amps 489 Demand Kva 176.0 Demand Amps 489 0 4 0 B 0.0 0.0 6 0 C 0 0 0.0 0.0 8 NO LOAD A 225 3 0.0 0.0 10 0 B 0 0 0.0 0,0 12 0 C 0.0 0.0 14 PANEL 2UC11 FUTURE LOAD A 600 3 58.6 58.6 16 B 0 0 58.7 58.7 18 0 C 0 0 58.7 58.7 20 0 A 0.0 0.0 22 0 B 0 0 0.0 0.0 24 0 C 0.0 0.0 26 0 A 0 0 0.0 0.0 28 B 0.0 0.0 30 0 C 0 0 0.0 0.0 32 A 0.0 0.0 34 0 B 0 0 0.0 0.0 36 0 C 0.0 0.0 38 0 A 0 0 0.0 0.0 40 0 B 0 0 0.0 0.0 42 0 C 0 0 0.0 0.0 REMARKS : first 10 kva rec a 100% + balance @ 50% = 0.0 largest motor ® 1257 + balance @ 100% 0.0 lighting 01 125% = 0.0 heating ® 100% = 0.0 other Ca 100% - 176.0 0 0% 0 0.0 0.0 REVIEVVED RE CODE CD�P� C NFPA JUL 0 8 2203 LDING DIVISION_ ;y -Of Tukwila ELo8 MI RECEIVED JUN 19 2 PERMIT CENTER 1 i; TI ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206 -374 -2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 COLOCATION ACQUISITION COMPANY LLC Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: Date: 06/18/08 Sheet Number: N;1 Titan Electric PANEL SCHEDULE PANED A -31 Project: getty data center Dote : Location : Fed From : 1 -LOU-A Section: 1 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Band Gnd. Iso. Gnd. Feed Thru Sub Feed Tap Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 ROW A/ RACK #8 A 30 2 1.0 1.0 1.0 3 B 0 B 0 0 1.0 1.0 1.0 1.0 5 ROW A/ RACK #8 C 30 2 1.0 1.0 7 1.0 1.0 7 Row H/ Rack #8 A 0 0 1.0 1.0 9 Row D/ Rack #4 1.0 1.0 9 ROW A/ RACK #8 B 20 2 1.0 11 C 1.0 1.0 11 0 C 0 0 13 Row 0/ Rack #4 A 20 2 1.0 1.0 13 ROW A/ RACK #5 A 30 2 0 9 0 0 1.0 1.0 15 Row B/ Rack #5 B 0 0 C 20 2 1.0 1.0 17 ROW A/ RACK #5 C 30 2 1.0 1.0 19 21 0 A 0 0 2 1.0 1.0 0 ROW A/ RACK #5 B 20 2 0 0 1.0 1.0 X 400 23 X C 23 20 C 0 0 1.0 1.0 1.2 25 ROW A/ RACK #3 A 30 2 Row H/ Rack #5 A 50 3 1.0 1.0 X X el • 0 • 27 1.1 B x x X _ _ 0 27 1.0 B 0 1.0 1.0 29 ROW A/ RACK #3 C 30 2 29 1.0 C 0 1.0 1.0 31 31 A 1.1 1.1 31 Row H/ Rack #2 A 50 1.0 1.0 33 ROW A/ RACK #1 B 30 2 33 B 0 1.0 1.0 35 35 C 1.1 1.1 35 B C 0 1.0 1.0 37 ROW A/ RACK #1 A 30 2 37 Row H/ Rack #1 A 50 1.0 1.0 39 39 B 1.1 1.1 39 0 B 0 1.0 1.0 41 Space C 0 0 41 GI C 0.0 0.0 2 ROW B/ RACK #12 A 20 2 2 Row I/ Rack #8 A 30 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 4 B 1.0 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 54.0 0 0.0 Phase A 19.7 Phase B 17.7 Phase C 16.6 Conn. Kva 54.0 Conn. Amps 150 Demand Kva 54.0 Demand Amps 150 0 4 B 0.0 1.2 1.2 6 ROW 8/ RACK #12 C 20 2 6 Row I/ Rack #7 C 30 1.2 1.2 8 8 A 1.0 1.0 8 0.0 A SPACE 1.2 1.2 10 ROW B/ RACK #11 B C 60 3 10 Row I/ Rack #6 2 30 4.1 4.1 4.1 4.1 12 14 Row C/ Rack #13 A 0 0 SPACE C 0 4.1 4.1 16 ROW B/ RACK #10 8 20 2 Row I/ Rack #5 A 30 2 1.2 1.2 18 Row C/ Rack #13 C 1.0 16 0 B 0 0 1.2 1.2 20 ROW B/ RACK #10 A 20 2 Row I/ Rack #4 C 30 2 1.2 1.2 22 Row C/ Rack #12 B 1.0 20 A 0 0 1.2 1.2 24 ROW B/ RACK #9 C 20 2 Row I/ Rack #3 B 30 2 1.2 1.2 26 Row C/ Rack #12 A 1.0 24 C 0 0 1.0 1.0 28 ROW B/ RACK #9 B 20 2 Row I/ Rock #2 A 30 2 1.0 1.0 30 Row C/ Rack #11 C 1.0 28 0.0 B 0 0 1.0 1.0 32 ROW B/ RACK #8 A 20 2 Row I/ Rack#1 C 30 2 1.0 1.0 34 Row C/ Rack #11 B 1.0 32 SPACE A 0 1.0 1.0 36 ROW B/ RACK #8 C 20 2 C B 1.2 1.2 38 Row C/ Rack #10 A 0.0 36 + balance 0 50% = 0.0 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 C 1.2 1.2 40 Spare 8 0 0 A 0.0 0.0 42 Spare C 0 0 B 0.0 0.0 REMARKS ' first 10 kva rec © 1007 + balance ® 50% = 0.0 largest motor ® 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% - 0.0 other © 100% -- 124.6 0 0% 0 0.0 0.0 42 TITAN ELECTRIC PANEL SCHEDULE PANEL: A -35 Project: Date : Location : Fed From : 1 -LDU -A Section: 1 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row H/ Rack #9 A 50 3 1.0 1.1 1.1 3 B 0 B 0 0 1.0 1.0 1.1 1.1 5 Row 1.3.7 Rack #7 C 0 0 1.0 1.0 7 1.1 1.1 7 Row H/ Rack #8 A 50 3 1.0 1.0 9 Row D/ Rack #4 1.1 1.1 9 0 B 0 0 1.0 11 C 1.1 1.1 11 0 C 0 0 13 Row 0/ Rack #4 A 20 2 1.1 1.1 13 Row H/ Rack #7 A 50 3 0 9 0 0 1.1 1.1 15 Row B/ Rack #5 B 0 0 C 20 2 1.1 1.1 17 Row C/ Rack #7 C 0 0 1.1 1.1 19 Row H/ Rack #6 A 50 3 2 1.1 1.1 0 0 21 B B 0 0 1.2 1.1 1.1 X 400 23 20 C 0 0 1.0 1.2 1.2 1.1 1.1 Row C/ Rock #6 A 25 Row H/ Rack #5 A 50 3 1.0 1.2 1.2 X X ~_ Ti _ _ X 0 1.1 1.1 x x X _ _ 20 27 1.0 B 0 0 1.2 1.2 29 Row C/ Rack #6 1.1 1.1 29 1.0 C 0 0 1.2 1.2 31 Row B/ Rack #3 1.1 1.1 31 Row H/ Rack #2 A 50 3 1.2 1.2 33 Row C/ Rack #5 1.1 1.1 33 B 0 0 1.2 1.2 35 Row B/ Rack #3 1.1 1.1 35 B C 0 0 1.2 1.2 37 0 1.1 1.1 37 Row H/ Rack #1 A 50 3 1.2 1.2 39 Row B/ Rack #2 1.1 1.1 39 0 B 0 0 1.2 1.2 41 Gpa,,e 1.1 1.1 41 GI C 1.2 0.0 2 Row B/ Rack #2 A 0.0 2 Row I/ Rack #8 A 30 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 23.1 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 1.0 1.0 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 54.0 0 0.0 Phase A 19.7 Phase B 17.7 Phase C 16.6 Conn. Kva 54.0 Conn. Amps 150 Demand Kva 54.0 Demand Amps 150 0 4 B 0.0 10 1.2 1.2 6 Row B/ Rack #1 1.0 1.0 6 Row I/ Rack #7 C 30 2 4.1 4.1 8 1.0 1.0 8 0.0 A SPACE A 0 4.1 4.1 10 Row CZ Rack #3 1.0 1.0 10 Row I/ Rack #6 2 30 2 4.1 4.1 12 Row C/ Rack #13 1.0 1.0 12 SPACE C 0 1.2 1.2 14 Row C/ Rack #2 1.0 1.0 14 Row I/ Rack #5 A 30 2 1.2 1.2 16 Row C/ Rack #13 1.0 1.0 16 0 B 0 0 1.2 1.2 18 Row C/ Rack #2 1.0 1.0 18 Row I/ Rack #4 C 30 2 1.2 1.2 20 Row C/ Rack #12 1.0 1.0 20 A 0 0 1.2 1.2 22 Row C/ Rack #1 1.0 1.0 22 Row I/ Rack #3 B 30 2 1.2 1.2 24 Row C/ Rack #12 1.0 1.0 24 C 0 0 1.2 1.2 26 Row C/ Rack #1 1.0 1.0 26 Row I/ Rock #2 A 30 2 1.2 1.2 28 Row C/ Rack #11 1.0 1.0 28 0.0 B 0 0 1.2 1.2 30 Row D/ Rack #7 1.0 1.0 30 Row I/ Rack#1 C 30 2 1.2 1.2 32 Row C/ Rack #11 1.0 1.0 32 SPACE A 0 1.2 1.2 34 Row D/ Rack #7 1.0 1.0 34 C B 1.2 1.2 36 Row C/ Rack #10 C 0.0 36 + balance 0 50% = 0.0 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 C 4.1 4.1 38 Row 0/ Rack #6 A 0.0 38 A 4.1 4.1 40 0 B 0.0 40 B 4.1 4.1 42 SPACE C 0.0 42 C 0.0 0.0 REMARKS I first 10 kva rec 0 1007 + balance ® 50% = 0.0 largest motor © 125% + balance ® 100% - 0.0 lighting © 125% = 0.0 heating @ 100% = 0.0 other 0 100% = 74.1 0 0% 0 0.0 0.0 REMARKS i first 10 kva rec ® 1007 + balance @ 50% = 0.0 largest motor 0 1257 + balance @ 100% = 0.0 lighting ® 125% = 0.0 heating © 100% = 0.0 other ® 100% = 54.0 0 0% 0 0.0 0,0 Titan Electric PANEL SCHEDULE PANED A -32 Project: Date : 11/6/2006 Location : Fed From : 1- LOU- -A Section: 2 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 225 225 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row B/ Rack #7 A 20 2 1.0 1.2 1.2 3 B 0 B 0 0 1.0 1.0 1.2 1.2 5 Row 1.3.7 Rack #7 C 20 2 1.0 1.0 7 1.2 1.2 7 A 1.0 1.0 9 Row D/ Rack #4 1.2 1.2 9 Row B/ Rack #6 B 60 3 1.0 11 C 4.1 4.1 11 0 C 0 0 13 Row 0/ Rack #4 A 20 2 4.1 4.1 13 0 A 0 0 0 9 0 0 4.1 4.1 15 Row B/ Rack #5 B 20 2 C 20 2 1.2 1.2 17 Row C/ Rack #7 C 20 2 1.2 1.2 19 Row B/ Rack #5 A 20 2 2 1.2 1.2 0 0 21 Row C/ Rack #7 B 20 2 1.2 1.2 X 225 23 Row B/ Rack #4 C 20 2 1.0 1.2 1.2 27 25 Row C/ Rock #6 A 20 2 1.0 1.0 1.2 1.2 X X ~_ Ti _ _ X 0 27 Row B/ Rack#4 B 20 2 1.0 1.0 31 1.2 1.2 29 Row C/ Rack #6 C 20 2 1.0 33 Row D/ Rack #1 B 60 1.2 1.2 31 Row B/ Rack #3 A 20 2 35 C 0 0 1.2 1.2 33 Row C/ Rack #5 B 60 3 A 0 0 1.2 1.2 35 Row B/ Rack #3 C 20 2 B 1.2 1.2 37 0 A 0 0 __ _ _ j 1.2 1.2 39 Row B/ Rack #2 B 20 2 1.2 1.2 41 Gpa,,e C B 0 0 1.2 0.0 2 Row B/ Rack #2 A 20 2 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 23.1 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 0 B 0.0 0.0 10 1.2 1.2 6 Row B/ Rack #1 C 60 3 0.0 0.0 12 SPACE 4.1 4.1 8 A 0.0 0.0 14 SPACE A 0 4.1 4.1 10 Row CZ Rack #3 B 20 2 16 SPACE B 0 0 4.1 4.1 12 Row C/ Rack #13 C 20 2 SPACE C 0 0 1.2 1.2 14 Row C/ Rack #2 A 20 2 A 0 0 1.2 1.2 16 Row C/ Rack #13 B 20 2 0 1.2 1.2 18 Row C/ Rack #2 C 20 2 1.2 1.2 20 Row C/ Rack #12 A 20 2 0.0 1.2 1.2 22 Row C/ Rack #1 B 20 2 0.0 0.0 1.2 1.2 24 Row C/ Rack #12 C 20 2 0.0 0.0 32 1.2 1.2 26 Row C/ Rack #1 A 20 2 0.0 0.0 34 SPACE 1.2 1.2 28 Row C/ Rack #11 B 20 2 0.0 36 SPACE C 0 1.2 1.2 30 Row D/ Rack #7 C 20 2 38 SPACE A 0 0 1.2 1.2 32 Row C/ Rack #11 A 20 2 SPACE 8 0 0 1.2 1.2 34 Row D/ Rack #7 B 20 2 C 1.2 1.2 36 Row C/ Rack #10 C 60 3 + balance 0 50% = 0.0 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 0.0 4.1 4.1 38 Row 0/ Rack #6 A 0 0 4.1 4.1 40 0 B 0 0 4.1 4.1 42 SPACE C 0 0 0.0 0.0 REMARKS I first 10 kva rec 0 1007 + balance ® 50% = 0.0 largest motor © 125% + balance ® 100% - 0.0 lighting © 125% = 0.0 heating @ 100% = 0.0 other 0 100% = 74.1 0 0% 0 0.0 0.0 Titan Electric PANEL SCHEDULE PANED A -33 Project: Date : Location : Fed From : 1 -LDU -A Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 110 3 4 0 Amp P Rec Heat Motor Lt• Other Total 1 Row C/ Rack #9 A 20 2 1.0 1.2 1.2 3 B 0 B 1.0 1.0 1.2 1.2 5 Row C/ Rack #9 C 20 2 1.0 1.0 7 1.2 1.2 7 A 1.0 1.0 9 Row D/ Rack #4 1.2 1.2 9 Row C/ Rack #8 6 20 2 1.0 11 C 1.2 1.2 11 C 1.0 1.0 13 Row 0/ Rack #4 A 20 2 1.2 1.2 13 Row C/ Rack #8 A 20 2 0 9 0 0 1.2 1.2 15 1.0 B 17 Row 0/ Rack #3 C 20 2 1.2 1.2 17 Row C/ Rack #7 C 20 2 1.2 1.2 19 X 400 A Row D/ Rack #3 B 20 2 1.2 1.2 0 o 21 Row C/ Rack #7 B 20 2 1.2 1.2 X 400 23 Row D/ Rack #2 C 0 0 1.0 1.2 1.2 27 25 Row C/ Rock #6 A 20 2 1.0 1.0 1.2 1.2 X X II El • • 27 B 1.0 1.0 31 1.2 1.2 29 Row C/ Rack #6 C 20 2 1.0 33 Row D/ Rack #1 B 60 1.2 1.2 31 A 1.1 1.1 35 C 0 0 1.2 1.2 33 Row C/ Rack #5 B 60 3 A 0 0 4.1 4.1 35 0 C 0 0 B 4.1 4.1 37 0 A 0 0 __ _ _ j 4.1 4.1 39 Row C/ Rack#4 B 20 2 1.2 1.2 41 , „,,, C B 0 0 1.2 1.2 2 Row C/ Rack #4 A 20 2 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 87.1 0 0.0 Phase A 29.7 Phase 3 28.7 Phase C 28.7 Conn. Kva 87.1 Conn. Amps 242 Demand Kva 87.1 Demand Amps 242 0 4 0 B 0.0 0.0 10 1.2 1.2 6 Row C/ Rack #3 C 20 2 0.0 0.0 12 SPACE 1.2 1.2 8 A 0.0 0.0 14 SPACE A 0 1.2 1.2 10 Row CZ Rack #3 B 20 2 16 SPACE B 0 0 1.2 1.2 12 C 0.0 18 SPACE C 0 0 1.2 L2 14 Row C/ Rack #2 A 20 2 A 0 0 1.2 1.2 16 0.0 B 0 0 0 1.2 1.2 18 Row C/ Rack #2 C 20 2 1.2 1.2 20 SPACE A 0 0.0 1.2 1.2 22 Row C/ Rack #1 B 20 2 0.0 0.0 1.2 1.2 24 0 C 0.0 0.0 32 1.2 1.2 26 Row C/ Rack #1 A 20 2 0.0 0.0 34 SPACE 1.2 1.2 28 B 0.0 0.0 36 SPACE C 0 1.2 1.2 30 Row D/ Rack #7 C 20 2 38 SPACE A 0 0 1.2 1.2 32 _ A 0.0 40 SPACE 8 0 0 1.2 1.2 34 Row D/ Rack #7 B 20 2 C 1.2 1.2 36 0.0 C first 10 kva rec largest motor + balance 0 50% = 0.0 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 0.0 1.2 1.2 38 Row 0/ Rack #6 A 60 3 4.1 4.1 40 0 B 0 0 4.1 4.1 42 0 C 0 0 4.1 4.1 REMARKS 1 first 10 kva rec 0 100% + balance ® 50% = 0.0 largest motor ® 125% + balance ® 100% = 0.0 lighting © 125% - 0.0 heating @ 100% = 0.0 other 0 100% = 87.1 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: A -34 Project: Date : Location : Fed From : 1 -LDU -A Section: 2 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row 0/ Rack #5 A 20 2 1.0 1.0 3 B 0 0 1.0 1.0 5 Row 0/ Rack #5 C 20 2 1.0 1.0 7 A 0 0 1.0 1.0 9 Row D/ Rack #4 8 20 2 1.0 1.0 11 C 1.0 1.0 13 Row 0/ Rack #4 A 20 2 1.0 1.0 15 0 9 0 0 1.0 1.0 17 Row 0/ Rack #3 C 20 2 1.0 1.0 19 A 1.0 1.0 X 400 21 Row D/ Rack #3 B 20 2 1.0 1.0 23 C 1.0 1.0 25 Row D/ Rack #2 A 30 2 1.0 1.0 X X II • III Ei 27 B 30 2 1.0 1.0 29 Row D/ Rack #2 C 30 2 1.0 1.0 31 A 30 2 1.0 1.0 33 Row D/ Rack #1 B 60 3 1.1 1.1 35 C 0 0 1.1 1.1 37 A 0 0 1.1 1.1 39 SPACE B 0.0 41 F _C_ _ __ _ _ _ 0.0 2 SPACE A 0 0 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 19.3 0 0.0 Phase A 7.1 Phase B 6.1 Phase C 6.1 Cann. Kva 19.3 Conn. Amps 54 Demand Kva 19.3 Demand Amps 54 0 4 SPACE B 0 0 0.0 0.0 6 SPACE C 0 0 0.0 0.0 8 SPACE A 0 0 0.0 0.0 10 SPACE B 0 0 0.0 0.0 12 SPACE C 0 0 0.0 0.0 14 SPACE A 0 0 0.0 0.0 16 SPACE B 0 0 0.0 0.0 18 SPACE C 0 0 0.0 0.0 20 SPACE A 0 0 0.0 0.0 22 SPACE B 0 0 0.0 0.0 24 SPACE C 0 0 0.0 0.0 26 SPACE A 0 0 0.0 0.0 28 SPACE B 0 0 0.0 0.0 30 SPACE C 0 0 0.0 0.0 32 SPACE A 0 0 0.0 0.0 34 SPACE B 0 0 0.0 0.0 36 SPACE C 0 0 0.0 0.0 38 SPACE A 0 0 0.0 0.0 40 SPACE 8 0 0 0.0 0.0 42 SPACE C 0 1007 ® 1257 0.0 REMARKS I first 10 kva rec largest motor + balance 0 50% = 0.0 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 0.0 'REVIEWED FOR CODE COMPLIANCE NFPA 70 N JUL 082O1 -y Of Tukwila 8 ILDING PM- FLOE- 79 1 RECEIVED JUN 19 20 PERMIT CENTER ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206 -374 -2128 Email: Tnfo@titanelectric.net a Project Title: GETTY IMAGES CO- LOCATE #3 COLOCATION ACQUISITION COMPANY LLC Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: Date: 06/18/08 Sheet Number: N;2 TITAN ELECTRIC PANEL SCHEDULE PANEL: A -36 Project: Date : Location : Fed From : 1 -LDU -A Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. lso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row E/ Rack #8 A 30 2 1.0 1.0 3 Space B 0 0 1.0 1.0 5 Row E/ Rack #7 C 30 2 1.0 1.0 7 Row H/ Rack #8 A 0 0 1.0 1.0 9 Row E/ Rack #6 B 30 2 1.0 1.0 11 0 C 0 0 1.0 1.0 13 Row E/ Rack #5 A 30 2 1.0 1.0 15 0 B 0 0 1.0 1.0 17 Row E/ Rack #4 C 30 2 1.0 1.0 19 0 A 0 0 1.0 1.0 X 400 21 Row E/ Rack #3 B 30 2 2 1.0 1.0 1.6 23 400 C 20 C 0 0 1.0 1.0 1.0 25 Row E/ Rack #2 A 30 2 A 30 2 1.0 1.0 X el 1 1 . • 27 1.6 B 20 27 Space B 30 0 1.0 1.0 29 Row E/ Rack #1 C 30 2 ROW A/ RACK #3 C 30 2 1.0 1.0 31 Row B/ Rack #3 A 1.6 31 Space A 30 2 1.0 1.0 33 Space B 1.6 33 ROW A/ RACK #1 B 30 2 1.2 0.0 35 Space C 1.6 35 0 C 0 0 1.2 0.0 37 Space A 1.6 37 ROW A/ RACK #1 A 30 2 1.2 0.0 39 Space B 1.6 39 Row E/ Rack #8 B 30 2 1.2 0.0 41 Space C 1.6 41 Space C 0 0 0.0 2 Space A 0.0 2 ROW B/ RACK #12 A 20 2 1.2 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 16.0 0 0.0 Phase A 6.0 Phase B 5.0 Phase C 5.0 Conn. Kva 16.0 Conn. Mips 44 Demand Kva 16.0 Demand Arnps 44 0 4 Space B LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 Space B 0 0 1.2 0.0 6 Space C 1.2 6 ROW B/ RACK #12 C 20 2 4.1 0.0 8 Space A 1.2 8 Space A 0 0 4.1 0.0 10 Space B 1.2 10 ROW B/ RACK #11 B 60 3 4.1 0.0 12 Space C 4.1 12 Space C 0 0 1.2 0.0 14 Space A 4.1 14 Row E/ Rack #4 A 0 0 1.2 0.0 16 Space B 4.1 16 ROW 0/ RACK #10 B 20 2 1.2 0.0 18 Space C 1.2 18 Row E/ Rack #3 C 30 2 1.2 0.0 20 Space A 1.2 20 ROW B/ RACK #10 A 20 2 1.2 0.0 22 Space B 1.2 22 Row E/ Rack #2 B 30 2 1.2 0.0 24 Space C 1.2 24 ROW B/ RACK #9 C 20 2 1.2 0.0 26 Space A 1.2 26 Row E/ Rack #1 A 30 2 1.2 0.0 28 Space B 1.0 28 ROW B/ RACK #9 B 20 2 1.2 0.0 30 Space C 1.0 30 SPACE c 0 0 1.2 0.0 32 Space A 1.0 32 ROW B/ RACK #8 A 20 2 1.2 0.0 34 Space B 1.0 34 SPACE B 0 0 1.2 0.0 36 Space C 1.0 36 ROW B/ RACK #8 C 20 2 4.1 0.0 38 Space A 1.2 38 SPACE A 0 0 4.1 0.0 40 Space B 1.6 40 Spare B 0 0 4.1 0.0 42 Space C 0.0 42 Spare C 0 CO 100% @ 125% 0.0 0.0 REMARKS I first 10 kva rec largest motor + balance © 50% = 0.0 + balance ® 100% = 0.0 lighting @ 125% = 0.0 heating ® 100% = 0.0 other 0 100% = 16.0 0 0% 0 0.0 0.0 first TITAN ELECTRIC PANEL SCHEDULE PANEL; B -31 Project: Date : Location : Fed From : 1 -LDU -B Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 ROW A/ RACK #8 A 30 2 1.0 1.6 3 Space B 0 0 1.0 1.6 5 ROW A/ RACK #8 C 30 2 1.0 1.6 7 Row H/ Rack #8 A 0 0 1.0 1.6 9 ROW A/ RACK #8 B 20 2 1.0 4.9 11 0 C 0 0 1.0 4.9 13 ROW Al RACK #5 A 30 2 1.0 4.9 15 0 B 0 0 1.0 1.6 17 ROW A/ RACK #5 C 30 2 1.0 1.6 19 0 A 0 0 1.0 1.6 0 400 21 ROW A/ RACK #5 B 20 2 1.2 1.0 1.6 X 400 23 20 C 0 0 1.2 1.6 1.0 1.6 Row H/ Rack #5 A 25 ROW A/ RACK #3 A 30 2 1.2 1.6 x X J 1.0 1.6 X X - X _ 20 27 Space B 30 0 1.2 1.6 29 1.0 1.6 29 ROW A/ RACK #3 C 30 2 1.2 1.6 31 Row B/ Rack #3 1.0 1.6 31 Space A 30 2 1.2 4.9 33 1.0 1.6 33 ROW A/ RACK #1 B 30 2 1.2 4.9 35 Row B/ Rack #3 1.0 1.6 35 0 C 0 0 1.2 4.9 37 Row H/ Rack #1 1.0 1.6 37 ROW A/ RACK #1 A 30 2 1.2 1.6 39 Row B/ Rack #2 1.0 1.6 39 Row E/ Rack #8 B 30 2 1.2 1.6 41 �f 1.0 1.6 41 Space C 0 0 0.0 2 Row B/ Rack #2 0.0 0.0 2 ROW B/ RACK #12 A 20 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 25.5 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 Space B 0 0 1.2 1.2 6 Row B/ Rack #1 1.2 1.2 6 ROW B/ RACK #12 C 20 2 4.1 4.1 8 1.2 1.2 8 Space A 0 0 4.1 4.1 10 Row I/ Rack #6 1.2 1.2 10 ROW B/ RACK #11 B 60 3 4.1 4.1 12 Row C/ Rack #13 4.1 4.1 12 Space C 0 0 1.2 1.2 14 Row I/ Rack #5 4.1 4.1 14 Row E/ Rack #4 A 0 0 1.2 1.2 16 Row C/ Rack #13 4.1 4.1 16 ROW 0/ RACK #10 B 20 2 1.2 1.2 18 Row 1/ Rack #4 1.2 1.2 18 Row E/ Rack #3 C 30 2 1.2 1.2 20 Row C/ Rack #12 1.2 1.2 20 ROW B/ RACK #10 A 20 2 1.2 1.2 22 Row I/ Rack #3 1.2 1.2 22 Row E/ Rack #2 B 30 2 1.2 1.2 24 Row C/ Rack #12 1.2 1.2 24 ROW B/ RACK #9 C 20 2 1.2 1.2 26 Row I/ Rack #2 1.2 1.2 26 Row E/ Rack #1 A 30 2 1.2 1.2 28 Row C/ Rock #11 1.0 1.0 28 ROW B/ RACK #9 B 20 2 1.2 1.2 30 Row I/ Rack #1 1.0 1.0 30 SPACE c 0 0 1.2 1.2 32 Row C/ Rack #11 1.0 1.0 32 ROW B/ RACK #8 A 20 2 1.2 1.2 34 1.0 1.0 34 SPACE B 0 0 1.2 1.2 36 Row C/ Rack #10 1.0 1.0 36 ROW B/ RACK #8 C 20 2 4.1 4.1 38 1.2 1.2 38 SPACE A 0 0 4.1 4.1 40 1.2 1.6 40 Spare B 0 0 4.1 4.1 42 SPACE 0.0 0.0 42 Spare C 0 0 0.0 0.0 REMARKS I Cpl 100% @ 125% 0.0 0.0 REMARKS I first 10 kva rec largest motor + balance © 50% = 0.0 + balance CO 100% = 0.0 lighting © 125% = 0.0 heating © 100% = 0.0 other © 100% = 124.6 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANED B -34 Project: Date : Location : Fed From : 1 -LDU -B Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L -- L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row D/ Rack #5 A 20 2 1.0 1.0 3 Space B 0 0 1.0 1.0 5 Row 0/ Rack #5 C 20 2 1.0 1.0 7 Row H/ Rack #8 A 0 0 1.0 1.0 9 Row D/ Rack #4 B 20 2 1.0 1.0 11 0 C 0 0 1.0 1.0 13 Row D/ Rack #4 A 20 2 1.0 1.0 15 0 B 0 0 1.0 1.0 17 Row 0/ Rack #3 C 20 2 1.0 1.0 19 Row B/ Rack #5 A 20 2 1.0 1.0 X 400 21 Row D/ Rack #3 B 20 2 1.2 1.0 1.0 0 0 23 20 C 0 0 1.2 1.6 1.0 1.0 Row H/ Rack #5 A 25 Row 0/ Rack #2 A 30 2 1.2 1.6 x X J 1.0 1.0 X X X 20 27 Space B 30 2 1.2 1.6 29 1.0 1.0 29 Row 0/ Rack #2 C 30 2 1.2 1.6 31 Row B/ Rack #3 1.0 1.0 31 Space A 30 2 1.2 4.9 33 1.0 1.0 33 Row 0/ Rack #1 B 60 3 1.2 4.9 35 Row B/ Rack #3 1.1 1.1 35 0 C 0 0 1.2 4.9 37 Row H/ Rack #1 1.1 1.1 37 0 A 0 0 1.2 1.6 39 Row B/ Rack #2 1.1 1.1 39 Row E/ Rack #8 B 30 2 1.2 1.6 41 �f 1.0 1.0 41 Gpa P 0 C 0.0 2 Row B/ Rack #2 1.0 1.0 2 Row E/ Rack #7 A 30 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 25.5 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 1.0 1.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 35.3 0 0.0 Phase A 12.1 Phase B 12.1 Phase C 11.1 Conn. Kva 35.3 Conn. Mips 98 Demand Kva 35.3 Demand Amps 98 0 4 Space B 0 0 1.2 1.2 6 Row B/ Rack #1 1.0 1.0 6 Row E/ Rack #6 C 30 2 4.1 4.1 8 1.0 1.0 8 Space A 0 0 4.1 4.1 10 Row I/ Rack #6 1.0 1.0 10 Row E/ Rack #5 B 30 2 4.1 4.1 12 Row C/ Rack #13 1.0 1.0 12 Space C 0 0 1.2 1.2 14 Row I/ Rack #5 1.0 1.0 14 Row E/ Rack #4 A 30 2 1.2 1.2 16 Row C/ Rack #13 1.0 1.0 16 Space B 0 0 1.2 1.2 18 Row 1/ Rack #4 1.0 1.0 18 Row E/ Rack #3 C 30 2 1.2 1.2 20 Row C/ Rack #12 1.0 1.0 20 Space A 0 0 1.2 1.2 22 Row I/ Rack #3 1.0 1.0 22 Row E/ Rack #2 B 30 2 1.2 1.2 24 Row C/ Rack #12 1.0 1.0 24 Space C 0 0 1.2 1.2 26 Row I/ Rack #2 1.0 1.0 26 Row E/ Rack #1 A 30 2 1.2 1.2 28 Row C/ Rock #11 1.0 1.0 28 Space B 0 0 1.2 1.2 30 Row I/ Rack #1 1.0 1.0 30 SPACE C 0 0 1.2 1.2 32 Row C/ Rack #11 0.0 0.0 32 SPACE A 0 0 1.2 1.2 34 0.0 0.0 34 SPACE B 0 0 1.2 1.2 36 Row C/ Rack #10 0.0 0.0 36 SPACE C 0 0 4.1 4.1 38 0.0 0.0 38 SPACE A 0 0 4.1 4.1 40 0.0 0.0 40 SPACE B 0 0 4.1 4.1 42 SPACE 0.0 0.0 42 SPACE C first 10 kva rec ® 100% 4 balance © 50% = 0.0 largest motor 0 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other © 100% = 103.1 0 0% 0 0.0 0.0 0.0 REMARKS I © 1007 © 1257 10 kva rec ® 100% + balance © 50% = 0.0 largest motor © 125% + balance © 100% = 0.0 lighting © 125% = 0.0 heating ® 100 % - 0.0 other ® 100% = 74.1 0 0% 0 0.0 0.0 REMARKS 1 first 10 kva rec largest motor + balance ® 50% W 0.0 + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other ® 100% = 35.3 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANED B -32 Project: Date : Location : Fed From : 1 -LDU -B Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row B/ Rack #7 A 20 2 1.2 4.9 3 Space B 0 0 1.2 4.9 5 Row B/ Rack #7 C 20 2 1.2 4.9 7 Row H/ Rack #8 A 50 3 1.2 1.6 9 Row B/ Rack #6 B 60 3 4.1 1.6 11 0 C 0 0 4.1 1.6 13 0 A 0 0 4.1 1.6 15 Row B/ Rack #5 8 20 2 1.2 1.6 17 Row C/ Rack #7 C 0 0 1.2 1.6 19 Row B/ Rack #5 A 20 2 1.2 1.6 X 400 21 21 B 0 0 2 1.2 1.6 X 400 23 Row B/ Rack #4 C 20 2 0 0 1.2 1.6 1.2 25 Row H/ Rack #5 A 50 3 A 20 2 1.2 1.6 x X J 27 Row B/ Rack #4 B 20 2 Space B 1.2 1.6 29 C 0 0 Row C/ Rack #6 C 20 2 1.2 1.6 31 Row B/ Rack #3 A 20 2 Space A 1.2 4.9 33 B 0 0 Row C/ Rack #5 0 60 3 1.2 4.9 35 Row B/ Rack #3 C 20 2 0 C 0 0 1.2 4.9 37 Row H/ Rack #1 A 0 0 0 A 0 0 1.2 1.6 39 Row B/ Rack #2 B 20 2 Row C/ Rack #4 B 20 2 1.2 1.6 41 �f C 41 spa,P C 0.0 2 Row B/ Rack #2 A 20 2 Row C/ Rack #4 A 20 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 25.5 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 1.2 B LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Arnps 286 0 4 Space B 1.2 1.2 6 Row B/ Rack #1 C 60 3 Row C/ Rack #3 C 20 2 4.1 4.1 8 A 1.2 8 Space A 4.1 4.1 10 Row I/ Rack #6 B 30 2 Row C/ Rack#3 B 20 2 4.1 4.1 12 Row C/ Rack #13 C 20 2 Space C 1.2 1.2 14 Row I/ Rack #5 A 30 2 Row C/ Rack #2 A 20 2 1.2 1.2 16 Row C/ Rack #13 B 20 2 Space 8 0 0 1.2 1.2 18 Row 1/ Rack #4 C 30 2 Row C/ RackJ2 C 20 2 1.2 1.2 20 Row C/ Rack #12 A 20 2 Space A 1.2 1.2 22 Row I/ Rack #3 B 30 2 Row C/ Rack #1 B 20 2 1.2 1.2 24 Row C/ Rack #12 C 20 2 Space C 1.2 1.2 26 Row I/ Rack #2 A 30 2 Row C/ Rack #1 A 20 2 1.2 1.2 28 Row C/ Rock #11 B 20 2 Space B 1.2 1.2 30 Row I/ Rack #1 C 30 2 Row D/ Rack #7 C A 20 2 1.2 1.2 32 Row C/ Rack #11 A 20 2 Space 34 Row D/ Rack #7 B 1.2 1.2 34 B 0.0 1.2 1.2 36 C 1.2 1.2 36 Row C/ Rack #10 C 60 3 1.2 38 Row D/ Rack #6 A 4.1 4.1 38 A 0 0 4.1 40 0 B 4.1 4.1 40 B 0 0 4.1 42 0 C 4.1 4.1 42 SPACE C 0 0 4.1 REMARKS i first 10 kva rec ® 100% 4 balance © 50% = 0.0 largest motor 0 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other © 100% = 103.1 0 0% 0 0.0 0.0 0.0 REMARKS I first 10 kva rec ® 100% + balance © 50% = 0.0 largest motor © 125% + balance © 100% = 0.0 lighting © 125% = 0.0 heating ® 100 % - 0.0 other ® 100% = 74.1 0 0% 0 0.0 0.0 REMARKS 1 TITAN ELECTRIC PANEL SCHEDULE PANED B -35 Project: Date : Location : Fed From : 1 -LDU -B Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L -- N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row H/ Rack #9 A 50 3 ! 1.1 2.5 3 Space B 1.1 2.5 5 Row C/ Rock #9 C 0 0 1.1 2.5 7 Row H/ Rack #8 A 50 3 1.1 2.5 9 0 B 0 0 1.1 2.5 11 0 C 0 0 1.1 2.5 13 Row H/ Rack #7 A 50 3 1.1 2.5 15 Space B 0 0 1.1 2.5 17 Row C/ Rack #7 C 0 0 1.1 2.5 19 Row H/ Rack #6 A 50 3 1.1 2.5 0 0 21 21 B 0 0 2 1.1 2.5 X 400 23 C 0 0 0 0 1.1 2.5 1.2 25 Row H/ Rack #5 A 50 3 A 20 2 1.1 2.5 x X _ T 27 1.6 B 0 0 Space B 1.1 2.5 29 C 0 0 Row C/ Rack #6 C 20 2 1.1 1.6 31 Row H/ Rack #2 A 50 3 Space A 1.1 1.6 33 B 0 0 Row C/ Rack #5 0 60 3 1.1 1.6 35 C 0 0 0 C 0 0 1.1 1.6 37 Row H/ Rack #1 A 50 3 0 A 0 0 1.1 1.6 39 0 B 0 0 Row C/ Rack #4 B 20 2 1.1 1.6 41 Gi C 41 spa,P C 0.0 2 Row I/ Rack #8 A 30 2 Row C/ Rack #4 A 20 2 1.0 1.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 38.0 0 0.0 Phase A 12.6 Phase B 12.6 Phase C 12.6 Conn. Kva 38.0 Conn. Amps 105 Demand Kva 38.0 Demand Mips 105 0 4 1.2 B LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Arnps 286 0 4 Space B 1.0 1.0 6 Row I/ Rack #7 C 30 2 Row C/ Rack #3 C 20 2 1.0 1.0 8 A 1.2 8 Space A 1.0 1.0 10 Row I/ Rack #6 B 30 2 Row C/ Rack#3 B 20 2 1.0 1.0 12 C 1.2 12 Space C 1.0 1.0 14 Row I/ Rack #5 A 30 2 Row C/ Rack #2 A 20 2 1.0 1.0 16 0 B 0 0 Space 8 0 0 1.0 1.0 18 Row 1/ Rack #4 C 30 2 Row C/ RackJ2 C 20 2 1.0 1.0 20 A 0 0 Space A 1.0 1.0 22 Row I/ Rack #3 B 30 2 Row C/ Rack #1 B 20 2 1.0 1.0 24 C 0 0 Space C 1.0 1.0 26 Row I/ Rack #2 A 30 2 Row C/ Rack #1 A 20 2 1.0 1.0 28 B 0 0 Space B 1.0 1.0 30 Row I/ Rack #1 C 30 2 Row D/ Rack #7 C A 20 2 1.0 1.0 32 A 1.2 1.2 32 Space 34 Row D/ Rack #7 B 1.0 1.0 34 B 0.0 1.2 1.2 36 C 0.0 36 C 0.0 _ 1.2 1.2 38 Row D/ Rack #6 A 60 0.0 38 A 0.0 4.1 4.1 40 0 B 0 0.0 40 0 0.0 4.1 4.1 42 0 C 0 0.0 42 C 0.0 4.1 4.1 REMARKS i first 10 kva rec ® 100% 4 balance © 50% = 0.0 largest motor 0 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other © 100% = 103.1 0 0% 0 0.0 0.0 0.0 REMARKS 1 first 10 kva rec © 1007 + balance ® 50% = 0.0 largest motor CO 1257 + balance ® 100% = 0.0 lighting ® 125% - 0.0 heating ® 100% = 0.0 other © 100% = 38.0 0 0% 0 0.0 0.0 REMARKS 1 TITAN ELECTRIC PANEL SCHEDULE PANED B -33 Project: Date : Location : Fed From : 1 -LDU -8 Section: 1 Ckt No CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row C/ Rack #9 A 20 2 1.2 1.6 3 Space B 1.2 1.6 5 Row C/ Rock #9 C 20 2 1.2 1.6 7 Space A 1.2 1.6 9 Row C/ Rock #8 B 20 2 1.2 1.6 11 Space C 1.2 1.6 13 Row Cf Rockj8 A 20 2 1.2 1.6 15 Space B 1.2 1.6 17 Row C/ Rack #7 C 20 2 1.2 1.6 19 Space A 1.2 1.6 x 400 21 Row C/ Rack #7 B 20 2 1.2 1.6 23 Space C 0 0 1.2 1.6 25 Row C/ Rack #6 A 20 2 1.2 1.6 X � X X J 27 Space B 1.2 1.6 29 Row C/ Rack #6 C 20 2 1.2 1.6 31 Space A 1.2 1.6 33 Row C/ Rack #5 0 60 3 4.1 4.9 35 0 C 0 0 4.1 4.9 37 0 A 0 0 4.1 4.9 39 Row C/ Rack #4 B 20 2 1.2 41 spa,P C 1.2 1.2 2 Row C/ Rack #4 A 20 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Arnps 286 0 4 Space B 1.2 1.2 6 Row C/ Rack #3 C 20 2 1.2 1.2 8 Space A 1.2 1.2 10 Row C/ Rack#3 B 20 2 1.2 1.2 12 Space C 1.2 1.2 14 Row C/ Rack #2 A 20 2 1.2 1.2 16 Space 8 0 0 1.2 1.2 18 Row C/ RackJ2 C 20 2 1.2 1.2 20 Space A 1.2 1.2 22 Row C/ Rack #1 B 20 2 1.2 1.2 24 Space C 1.2 1.2 26 Row C/ Rack #1 A 20 2 1.2 1.2 28 Space B 1.2 1.2 30 Row D/ Rack #7 C A 20 2 1.2 1.2 1.2 1.2 32 Space 34 Row D/ Rack #7 B 20 2 0.0 1.2 1.2 36 C 0.0 _ 1.2 1.2 38 Row D/ Rack #6 A 60 3 0.0 4.1 4.1 40 0 B 0 0 0.0 4.1 4.1 42 0 C 0 0 0.0 4.1 4.1 REMARKS i first 10 kva rec ® 100% 4 balance © 50% = 0.0 largest motor 0 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other © 100% = 103.1 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: B -36 Project: Date : Location : Fed From : 1 -LDU -B Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Space A 3 Space B 5 Space C 7 Space A 9 Space B 11 Space C 13 Space A 15 Space B 17 Space C 19 Space A x 400 21 Space B 23 Space C 25 Space A X X ■ 11 1 1 27 Space B 29 Space C 31 Space A 33 Space B 35 Space C 37 Space A 39 Space B 41 Space C 0.0 2 Space A 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 0.0 0 0.0 Phase A 0.0 Phase B 0.0 Phase C 0.0 Conn. Kva 0.0 Conn. Amps 0 Demand Kva 0.0 Demand Amps 0 4 Space B 0.0 6 Space C 0.0 8 Space A 0.0 10 Space B 0.0 12 Space c 0.0 14 Space A 0.0 16 Space B 0.0 18 Space C 0.0 20 Space A 0.0 22 Space 8 0.0 24 Space C 0.0 26 Space A 0.0 28 Space B 0.0 30 Space C 0.0 32 Space A 0.0 34 Space B 0.0 36 Space C 0.0 38 Space A 0.0 40 Space B 0.0 42 Space C ® 1007 ® 1257 0.0 REMARKS 1 first 10 kva rec largest motor _0 4 balance ® 50% = 0.0 + balance 0 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other 0 100% = 0.0 0 0% 0 0.0 0,0 _ RE E CODE COMPLIANCE NEC N JUL 0 8 x08 BUILDING COY- ��TukwiljON LO& 79y RECEIVED JUN 19 2008 PERMIT CENTER a ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206-374-2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 COLOCATION ACQUISITION COMPANY LT,C Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: Date: 06/18/08 Sheet Number: 14,3 MN EN 300 KVA ENTTERT EATTER( 300kVA 103 T3 AC 11444 BATTERY 30000 KVA Electrical 107 j BATTERY BATTERY BATTER! UPS A 300 KVA Co -- Locate 4 0.....1..05....1 AC U (D FM200 1HP1A (E) Decd /Elniq3EGC PUMP 5 HPoy 480V, 30 FLU ID COOLER 10.5 FLA 48 , 30 1HP1A 1/2"C., 3#12 & 1 #12 EGC FM200 Tank AC UP AC Office (E) Vestibule GENE TOR DISCONNECT Office L —109 Storage Room 1 300kYA XFIIR 72 1LDUC 1--1 all_ 2 (El) Lobby DSCOEOIECT OLD PANEL 111P2 RELOCATE AHD RE 1RP1 RAMP L_XXX1 ' (E) WN man E) Mechanica Shaft REMOVE EXITING PANEL BACKB❑XJ R PAIR WALL FM200 Tank REMOVE EXISTING PANEL CIA Corridor 100 TTB Coord. Co- Locate 4 105.... 1HP1 1- 1 /4 "C., 3 #2 & 1 #1 EGC CRAC UNIT 78.7 FLA, 110 MOCP 480V, 30 EXISTING l RELOCATED TO EXTEND EXISTING FROM PANE Elec RAC UNIT TO BE ADJACENT R ❑ ❑MJ BRANCH CIRCUIT L 1HP1A TO NEW UNIT L❑CATI ❑N. AC cn — 4200 Tank AC UP UP T M200 Tik 2UB31 AC 2a=1111111.1MIIMEAMEGEIHMELEnr.IIII=..., n. 1HP1 1 -1 /4'C., 3 #2 & 1 #1 EGC CRAC UNIT 78.7 FLA, 110 MOCP 480V, 30 N a Co. Locate 3 E1D4--:1 POWER /COMMUNICATIONS PLAN SCALE: 1/8" = 1' -0" FM200 Tank AC NORTH FM20 Tank FM200 Tank Co locate 1 [ 107.._1 AC AC Co- •Locate 2 EXISTING CRAC UNIT TO BE L103 j 1 RELOCATED TO ADJACENT R❑❑MJ XTEND EXISTING BRANCH CIRCUIT FR OM PANEL 1HP1A TO NEW AC I UNIT LOCATION. m < m N N N N .;_ �!V E M2 ) lank r► (E) Deck Below P 5 HP V, 30 D COOLER 10.5 FLA V, 30 REVIEWED FOR CODE COOP NEC C E NFPA JUL C 8 2UOB 8f Tukwila BUILDING D V1.. I 1 ELOB 'zi RECEIVED JU't 19 2008 PERMIT CENTER ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 COLOCATION ACQUISITION COMPANY LLC Sheet Title: POWER /COMM FLOOR PLAN Designed By: MSC Drawn By: CJP Project No: Date: 06/18/08 Sheet Number: N:4