Loading...
HomeMy WebLinkAboutPermit D10-077 - LARSON RESIDENCE - GARAGE AND REMODELLARSON RESIDENCE 14244 55 AV S D1O-077 Parcel No.: Address: Suite No: City* Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.ci.tukwila.wa.us 3365900119 14244 55 AV S TUKW DEVELOPMENT PERMIT Permit Number: Issue Date: Permit Expires On: D10-077 03/17/2010 09/13/2010 Tenant: Name: Address: Owner: Name: Address: Phone: LARSON RESIDENCE 14244 55 AV S , TUKVVILA WA LARSON DAVID V 14244 55TH S , TUKWILA WA 98168 Contact Person: Name: Address: Phone: DAVE LARSON 14244 55 AV S , TUKINILA WA 98168 206 - 799 -7892 Contractor: Name: OWNER AFFIDAVIT - DAVE LARSON Address: 14244 55 AV S , TUKWILA WA 98168 Phone: Contractor License No: Expiration Date: DESCRIPTION OF WORK: REISSUE OF EXPIRED PERMIT D04 -098. GARAGE ADDITION AND HOUSE REMODEL . NEW ROOF SQUARE FOOTAGE = 300 SF. ROOF DRAINS TO BE TIED INTO EXISTING SYSTEM. EXPANDING BEDROOM INTO CARPORT. ADDING GARAGE ADDITION; ADDING 7'X22' TO FAMILY ROOM ABOVE GARAGE. OVERFRAMING FLAT ROOF TO CREATE PITCHED ROOF. RELOCATING DOORS IN ACCESSORY STRUCTURE. Value of Construction: $32,054.80 Type of Fire Protection: NONE Type of Construction: V -B Fees Collected: International Building Code Edition: Occupancy per IBC: $356.42 2006 22 * *continued on next page ** doc: IBC -10/06 D10 -077 Printed: 03 -17 -2010 City mftukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.ci.tukwila.wa.us Permit Number: D10-077 Issue Date: 03/17/2010 Permit Expires On: 09/13/2010 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: -V- 0 l I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the ormance of work. I am authorized to sign and obtain this development permit. Signature: Print Name: /4lk5Ofr? Date: 3-/7--/0 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IBC -10/06 D10 -077 Printed: 03 -17 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 3365900119 Address: 14244 55 AV S TUKW Suite No: Tenant: LARSON RESIDENCE PERMIT CONDITIONS Permit Number: D10 -077 Status: ISSUED Applied Date: 03/16/2010 Issue Date: 03/17/2010 1: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 2: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 3: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 4: All electrical work shall be inspected and approved under a separate permit issued by the City of Thkwila Building Department (206- 431- 3670). 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** doc: Cond -10/06 D10 -077 Printed: 03 -17 -2010 4 S City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: Date: 3- /7 -/0 doc: Cond -10/06 D10 -077 Printed: 03 -17 -2010 Site Address: CITY OF TUKWILP Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http.//www.ci.tukw ila. wa. us .(F,or ofce use only),: Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** I`/2y`i/ 5 -- 5.IL. s, Tenant Name: De., .,.^ V r Le/ J.- $ o h Property Owners Name: Mailing Address: King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: ❑ Yes El ..No 33bsgo- 011q Set City CONTACT PERSON'— wbo do:we'contact when your per'mrt is,iiady 'to be issued State Zip Name: rG( d2e1 Day Telephone: ma7 Mailing Address: City State Zip E -Mail Address: c4 fired 1/ iav s."2 ' . J-.f elw Fax Number: GENERAL CONTRACTOR INFORMATION P (Contractor Information for Mechanical (pg.4)11or Plumbing and Gas Piping (pg3 Company Name: /vA Mailing Address: Zip Contact Person: E -Mail Address: Contractor Registration Number: City Day Telephone: Fax Number: Expiration Date: State - ARCHITECT OF< RECORD -"All .plans,must be•wet stamped by.Archltect of =Record Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fa cNumber: State Zip • .ENGINEER OFR1CORD = It plaits must be wet'stamped by Eng veer o 2Recor Company Name: Mailing Address: A/ A-- Contact Person: E -Mail Address: H:Wpplications\Forms- Applications On Line \2009 Applications \1-2009 - Permit Application.doc Revised: 1 -2009 bh City Day Telephone: Fax Number: Page 1 of 6 State Zip BUILDING PERMIT 'NO _ ION —206.431-:;3670 ' Valuation of Project (contractor's bid price): $ gpDa e%U Existing Building Valuation: $ Scope of Work (please provide detailed information): Will there be new rack storage? ❑ Yes No If yes, a separate permit and plan submittal will be required. Provide All Building Areas; in.Square Footage Below: PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: Floor area of accessory dwelling: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm tk, None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/1" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H',Wpplications\Porms- Applications On Line12009 Applications11•2009 • Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 Existing ' Interior Remodel Addition:to • Existing,; St ibture . • _ 'New _ °' :,vTypeof ' • Construction .per, ' . Type of Occupancy per 1at Floor 151. V Floor PI Floor Floors., Yhrii ''Basement Accessory Structure* cAlt bhe'd Garage .' mJ (o p Detached Garage, Attached Carport, Detached Ca"rpo"rt Covered Deck. Uncovered Deck V PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: Floor area of accessory dwelling: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm tk, None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/1" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H',Wpplications\Porms- Applications On Line12009 Applications11•2009 • Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 PERMIT APPLICATION NOTES Applical le to'all °permits n this applica ions:; Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE AUTHORIZED AGENT: Signature: Print Name: D4VS i V �1--ef Mailing Address: /177}7i471-5 5 _ So Date: d Day Telephone: 2-06 - 9y 7e 92_ City State Zip Date Application Accepted: — lb-i0 Date Application Expires: 9-16)-t0 Staff Initials: H:\Applications\Forms- Applications On Line\2009 Applications \1 -2009 - Permit Application.doc Revised: 1 -2009 bh Page 6 of 6 .: I -3 / PLUMBING AND GAS PIPING-1 RMIT INFORMATION 206 431; -3 / 0 ; PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and /or gas piping outlets being installed and the quantity below: Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor Drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and /or water treatment equipment Repair or alteration of drainage or vent piping Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets H:1ApplicationslForms- Applications On- Line12009 Applications11 -2009 Permit Application. doc Revised. 1 -2009 bh Page 5 of 6 • City of Tukwila 0 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 3365900119 Address: 14244 55 AV S TUKW Suite No: Applicant: LARSON RESIDENCE RECEIPT Permit Number: Status: Applied Date: Issue Date: D10 -077 ISSUED 03/16/2010 03/17/2010 Receipt No.: Initials: User ID: Payee: R13 -01321 WER 1655 Payment Amount: $63.00 Payment Date: 04/15/2013 09:46 AM Balance: $0.00 DAVID LARSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd MC Authorization No. H20935 ACCOUNT ITEM LIST: Description 63.00 Account Code Current Pmts PLAN CHECK - RES 000.345.830 Total: $63.00 63.00 doc: Receiot -06 Printed: 04 -15 -2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 . Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 3365900119 Address: 14244 55 AV S TUKW Suite No: Applicant: LARSON RESIDENCE RECEIPT Permit Number: D10 -077 Status: PENDING Applied Date: 03/16/2010 Issue Date: Receipt No.: R10 -00461 Payment Amount: $356.42 Initials: WER Payment Date: 03/16/2010 08:58 AM User ID: 1655 Balance: $0.00 Payee: DAVE LARSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA - Authorization No. 05568B ACCOUNT ITEM LIST: Description 356.42 Account Code Current Pmts BUILDING - RES STATE BUILDING SURCHARGE 000.322.100 351.92 640.237.114 4.50 Total: $356.42 AY ENT RE(TEVE rinn. Rncaint -OA PrintPri• 03 -1R- 9(11(1 INSPECTION NO. P/0-077 INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 (206) 431 -3670 Project "44 LA ii":516 Type of Inspection: l /� Address: 14244 4V 1�''1"t � � Date Call ediq /z /z is G.tJ Special Instructions: Date Wanted: %r a.m. p.m. itequestei r _ ti Phone _,,m. 7g/2- Approved per applicable codes. El Corrections required prior to approval. COMMENTS: _726 etervxmeize Inspector: Date:009e n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • h• INSPECTION RECORD Retain a copy with permit , INSPECTION N0. ' P(O-a77 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 'Permit IhtOection Request Line (206) 431 -2451 Prof _. �__ . __ ...,- - • - - - Typ of Ij;' ectio Address: , j1� v44 dq 55- o 3 Date Called: Sp'eCial Instructions:• ± . Date WantQd:. iVe0 /3 a.m. t' %/ p.m. Requester: Phonei:.�!' 7471 79m. Approved per applicable codes. 1;4 6440%,..f, „-.4477.4get Corrections required prior to approval. (Inspector: Date/6/3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedules reinspection. Jzv PE INSPECTION RECORD Retain a copy with permit • INSPECTION NO. PERMIT NO. . CITY OF TUKWILA BUILDING DIVISION 6300 Southcehter Blvd., #100, Tukwila. WA 98188 :. Permit Inspection Request Line (206) 431 -2451 pio.o77 (206) 431 -3670 Projec5040 Type of I� NCI Address: `42.4.4 135 d, rs Date Called: Special Instructions: • Date Wanted: /� /1� !/ ap m. m. Requester: Phone 'qq - 76? Approved per applicable codes. Corrections required prior to approval. COMMENTS: r REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be . paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit DO- 677 PERMIT NO. • . CITY OF: TUKWILA BUILDING DIVISION (206) 431 -3670 t' '.. 6300 Southcenter Blvd.:, #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 Project` , • k Type sti Inspe do A: dress: . .O-14 Date Called: Special Instructions: • • • • Date Wante¢;.., 7 i2f...._ 's a.m. p.m. Requester: Phone No: O .: [1 Approved• per` applicable codes. • a • ▪ •::. COMMENTS: ECorrections required prior to approval. M D Z REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be • .paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. 1• INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 INSPECTION RECORD Retain a copy with permit a0-077 PERMIT NO. Project: Type of Ins do Addre;si7 ty's. 5. A 5 Date Ca'' led: SpecOiaal Instructions: • Date Wanted: . Requester: Phone No: • proved per applicable codes. a Corrections required prior to approval. COMMENTS: Y„4 4. 8L4 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. r it INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 . .. D/01:077 Project: . -►y Type of Inspec on: 1 /'o/7V' Addre �/ /}7/ jelk Date Called: ('//3) Special Instructions: • s. Date Wanted: X /--;/i a.m. Requester: Phone No: ElApproved per applicable codes. EJ Corrections required prior to approval. COM ,� / tom" £GPI 146 4 c/;410: 1 /'o/7V' 6-44204-- 0 e / j' it;.,--- - �4 1 �7- ' .il a't f K'fovx . ri4' / id•5 - •' ❑ $60.00 ' EINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: 10 -01 -2013 City of Tukwila Jim Haggerion, Mayor Department of Community Development Jock Pace, Director DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 LARSON RESIDENCE 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 11/05/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 11/05/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 1,a1? Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #1100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206 - 431 -3665 January 29, 2013 Dave Larson 14244 55 Ave S Tukwila, WA 98168 City of f Tukwila � Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Request for Extension #3 Development Permit No D10 -077 Larson Residence —14244 55 Av S Dear Mr. Larson, This letter is in response to your written request for an extension to Permit Number D10 -077. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending your permit an additional 180 days from the date of expiration, through August 3, 2013, as requested. The Building Official has noted that this is tentatively the last extension request to be approved. If you have any questions regarding this matter, please contact him directly. If you should have any questions, please contact our office at (206) 431 -3670. File: Permit No. D10 -077 W:\Permit Center\Extension Letters\Permits\2010\D10 -348 Permit Extension #3.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 • S Bob Benedicto B.O. City of Tukwila Dear Bob, I am requesting an extension to permit # D10 -077. We have made substantial progress since the last inspection. Currently I am installing hardy panel lap siding and in the process of revising our plans to reduce the scope of work on the original submittal. I will be ready for an inspection within the near future and do not anticipate the need for any further extensions. Tl�ks, Dave Larson li- M. 40 .14t144,01 vIo -077 / V46,01 - 44sl2 gNGtuDE i // /TE rW 77' .l� <Nr4 6j67+ m, I 70:04 /S TAII4T /LILq THE L•45T A TV.NgION RCaPU r7E, OE ApPROaeo 0 //a2A0/5, NP 02 lod 13 -N-A- 0/lbs11'; 01 -02 -2013 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 LARSON RESIDENCE 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 02/05/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 02/05/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206-431 -3665 07 -02 -2012 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 LARSON RESIDENCE 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 08/20/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or fmal inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 08/20/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206-431 -3665 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 LARSON RESIDENCE 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 02/27/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 02/27/2012f your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • City of Tukwila Department of Community Development DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 14244 55 AV S TUKW Dear Permit Holder: Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 03/11/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 03/11/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, nb:JO, rj—i-__ Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 08 -01 -2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director DAVE LARSON 14244 55 AV S TUKWILA WA 98168 RE: Permit No. D10 -077 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 09/07/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 09/07/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, .)*tir.-1.—__ Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • Jennifer Marshall - Re: Request for permit extension Page 1 of 1 From: Bob Benedicto To: Dave Larson Date: 02/15/2011 4:04 PM Subject: Re: Request for permit extension CC: Bill Rambo; Jennifer Marshall Mr. Larson, Your request for an extension of 180 days is hereby approved. I cannot, in all good conscience, be a party to your knee not healing due to the stress of having your permit expire. I'm sure we will revisit this matter in September. »> Dave Larson 02/15/2011 2:01 PM »> Dear Bob, I am requesting one more extension for permit # D10 -077 as my knee has not recovered as fast as I had hoped and heavy construction is still a few months away. My permit is do to expire on 3 -11 -11 and would ask that it be extended 6 months beyond that date. Hopefully, the extra time granted to allow my knee to heal may prevent the need for a total knee replacement and having to miss several weeks of work. Thank you for your consideration of this matter. Dave Q\q) � b�f ll I11 o11o11ll file: / /C:\ temp\ XPGrpWise \4D5AA3FBtuk- mail6300 -po 10016B6D36192471 \GW } 00001.... 02/16/2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director September 9, 2010 Dave Larson 14244 55 Ave S Tukwila, WA 98168 RE: Request for Extension Development Permit No D10 -077 Larson Residence — 14244 55 Av S Dear Mr. Larson, This letter is in response to your written request for an extension to Permit Number D10 -077. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending your permit an additional 180 days from the date of expiration, through March 11, 2011, as requested. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, shall it Te'c 1nician File: Permit No. D10 -077 W:\Pennit Center\Extension Letters \Pennits\2010\DI0 -077 Permit Extension.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 -431 -3665 • S Bob Benedicto Building Official City of Tukwila September 7, 2010 Dear Bob, I am requesting a 180 day extension to Permit No. D10 -077. This permit is due to expire on 9/13/2010. As we discussed over the phone complications to relatively minor knee surgery have left me incapacitated for the last month and will make it difficult to proceed for a few months coming. Thanks, Dave Larson RECEIVED CITY OF TUKWILA SEP. 0 8 2010 PERMIT CENTER 6,cp o\ll3`In �i' • ity of f Tukwlla Jim Haggerton, Mayor DAVE LARSON 14244 55 AV S TUKWILA WA 98168 epartment of Community Development Jack Pace, Director RE: Permit No. D10 -077 14244 55 AV S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 09/13/2010. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 09/13/2010, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, R■C■IL- Bill Rambo Permit Technician File: Permit File No. D10 -077 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 E PL RV EW /RCOPY NG SLIP ACTIVITY NUMBER: D10 -077 DATE: 04 -08 -13 PROJECT NAME: LARSON RESIDENCE SITE ADDRESS: 14244 55 AV S Original Plan Submittal _ Response to Correction Letter # X Revision # 1 After Permit Issued Response to Incomplete Letter # EPARTMENTS: Building Divi on Vt�r�t Public Works NM OA" . t) Fire Prevention Structural n Planning / D'ivi'sion Permit Coordinator • DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 04 -09 -13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05 -07 -13 Approved Approved with Conditions n Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 PE;•a k PY • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D10 -077 PROJECT NAME: LARSON RESIDENCE SITE ADDRESS: 14244 55 AV S X Original Plan Submittal Response to Incomplete Letter # DATE: 03 -16 -10 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: u (ding ivision pi Public Works Fire Prevention Structural Planning Division n Permit Coordinator II DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 03-18-10 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DATE: DUE DATE: 04 -15 -10 Not Approved (attach comments) Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 PROJECT NAME: Larson PERMIT NO: O- u 7 7 SITE ADDRESS: 14 2-1-1)-1 ORIGINAL ISSUE DATE: -t7 —( 0 REVISION LOG REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE ISSUED DATE STAFF INITIALS 1 - (3 Summary of Revision: ( 14- -(s -13 _ Summar of Revision: he C'2, scale + We) r << ›j% r,,, ✓ e� y9or -f-- c& . 4-: LA q,,. -� op C f� �--s al d `` 4 4,,, ' Received by: a rw _ 4 4r,s40'- REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: //www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: — `3 Plan Check/Permit Number: ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # IEL Revision # / after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Project Address: Contact Person: v 4-4 ,D1d -077 Phone Number: 2.4o6 --7G% 9- 7 Sum ry of Revision: ly 5 /7",>^s L, 6-6y9 1 D '.r /c' r '< , RECEIVED CITY OF TUKWILA APR 0 8 2013 Sheet Number(s): If 7 UJ "Cloud" or highlight-fill areas of revision da revisi Received at the City of Tukwila Permit Center by: `_Entered in Permits Plus on H:\ Applications \Forms- Applications On Line12010 Applications \7 -2010 - Revision Submittal.doc Created: 8-13 -2004 Revised: 7 -2010 CITY OF TUKWILA Department of Community Development 630o Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431-367o FAX (2o6) 431 -3665 E -mail: tukplan@ ci.tukwila.wa.us Permit Center /Building Division 206 431 -3670 Public Works Department 206 433 -0179 Planning Division 206 431 -3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION PERMIT NO: 1) 10- D -7 7 STATE OF WASHINGTON) ) ss. COUNTY OF KING ) �ct v , * <i/ 1/ i 1,(p" , states as follows: [please print name] 1. -I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number 13, and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform const • 'on work. L IA/ Owner Owner's Agent Signed and sworn to before me this 6 day of e7 O ARY PUBLIC in and for the State of Washington Residing at A140j._ , County '744(44'11.- , 1O. Name as commissioned: My commission expires: 05-019"/ v 18,27,090 Exemptions. The registration provisions of this chapter do not apply to. 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.7o RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; ii. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile /manufactured home dealer or manufacturer who subcontracts the installation, set -up, or repair work to actively registered contractors. This exemption only applies to the installation, set -up, or repair of the mobile /manufactured homes that were manufactured or sold by the mobile /manufactured home dealer or manufacturer; 18. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meeting the requirements of chapter 19.28 RCW to perform plumbing work that is incidentally, directly, and immediately appropriate to the like -in -kind replacement of a household appliance or other small household utilization equipment that requires limited electric power and limited waste and /or water connections. An electrical trainee must be supervised by a certified electrician while performing plumbing work. • Per Washington State Department of Labor and Industries, lessee has been interpreted to be equivalent to owner for the purpose of these exemptions. FL PLANMNG APPROVED • No changed can be medal° these plans without-approval Plann t_ ision of DCD Approved By: i let APP • 1-1 --1_ l . Date. , Leyce D- SCse. p'IL, 0h /7 Pti o 61,413 iI - — j • co le- 1 = .O c-o - 5 810Gi 2 H; r)iQin5 Stu N/e FILE COPY It No.. r3 / o '-/O Al e c.fr) REVIEWED FOR 1CODE COMPLIANCE II APPROVED 1 APR 12 2013 Orly of Tukwila BUILDING DIVISION New C— rF. RECEIVED L �4 1l[�eu CITY OF TUKWILA REVISION N0. b1oo77 4 f APR 0 8 2013 PERMIT CENTER ropo.5ea /?o..,.,o del 'co,- %Just {. Pcq / 1 t,r ,<.3 1141‘7* 11 SS''`' 4,e .0. 17,4„,...,l, Ocey 1-01-= e PA,dbre. `r'3/- 3'78 Re-L4 cry( 71--e • 4'. 831N30 IMIj d eo RECEIVED F TO MA - '" 2004 REVIEW : FOR DE PL �, : s. E APP ¢��vE MAR 17 2010 G' otTu..,,,I BUILDING fnimifFJ RECEIVED MAR 16 2010 PERMIT CENTER • :REVIEWED FOR COD PLI AI* pmE 7 2010 Ci la BUILDING ®MIST D Y,t-C• us�cl� y�5,���...! AR 16 2010 PEST CENTER ' 0 IX w C c c co - .&- ,. dam ' -E it 2l RECEIVED CITY OF TUKWILA APR 0 8 2013 PERMIT CENTER N0-ti, e,Gtf 4!) q% -i t ' 1 i J • • • • 1 -T ii • • • REVIEWED FOR - COOE COMP IANCE APPROVED APR 12 2013 City of Tukwila BUtLDING DIVISION yet -rd,15 1 { • > C i 1A00-C RECEIVED CITY PF,TUKWILA APR 0 8 2013 • I'ERIOIT CENTER I r ' • • • • )i • / 6'1"1/(00:K • j r ,,t/tm,.//s; ic91,:keirotl,a? Atizit;i6 r • REVIEWED FOR CQbE COW PL$ANCE APPROVED APR 12 2013 1. I City of leukdvilai BUILDING DIVISION I 44t •. ; L. 4ZRECEiVED CITY OF TUKWILA - APO 82013 PERMIIT CENTER 1cL'4.+ b-o 5% ib 2''. .S s fr- el _: II ii 2A63 - AoilaG R-30 U 1 per.. aro. :. . I � � -'r I r 1 RECIVED • CITY -OF ITUKWILQ- PERMIT OENTER. f. Ii .FILE COPY. emit Na. 1310• 071 Plan review approval is subject to erro and omissions. Approval of construction documents d �=� not authorize the violation of any adopted code or o�iinance. Receipt of approved Field Copy and conditions t. acknowledged BY Date: 1111 eedfreftrd4tilcwil BUILDING DIVIS REVISIONS No changes shall be made to the scope of work without prior approval of - Tukwila Building Division.. NOTE: Revisions will require a new plan submittal and may -include additional plan review fees. Fleov- Moor N JV&w 14,4 1/5 S�i� -� uia /! off w(l/ �'►' /l 3‘''_ �, 4 Reps o vel GUu /f5 SEPARATE PERMIT REQUIRED FOR: P tubing NJGas Piping City of Tukwila Buil 5)11.4G DIVISION_ vac.- 4(/Z -� &41 Cf 5�4�ltt S p.. 00 T.! :4!"...4/ PERMIT CEN 2:004' IEWEb COMPLIANCE plPlOrhipm MAID I , of Tukwila . OLDIN( nivISI N me , - Wtha/cw Duo -o7 7 RECEIVED MAR 16 2010 PERMIT CENTER r zg1 -- R«cued REVIEWEDF CODECOMPLIANCE _MAR 1 7 2010 CRY of T la BUILDING DivIginU RECEIVED MAR 16 2010 PERMIT CENTER p6L, o2. U--(6) 7R-3o - stj,.0*,, 643 REVIEWED FOR CODEPLIE MAR 72010 VERMIT CENTER of Tukwila -. BUILDINGniviginki RECEIVED MAR 16 2010 PERMIT CENTER hour 21534 lb RECEIVED ()FM • MAR -- P RMFT CEN II A 2.004 Cohn $J -ab -- WED FOR !-- Pd9CE ROVED : - =- 17 2010 I 4" —I - as IviginN- 6" TH- "' . � .RECEIVED MAR 16 2010 � 12‘, PERMIT CENTER 1►- Nov H 24$ r,d • `ref To r N,� RECEIVED 1^ -OF -TL U A IEWED Fes. APP MAR 17 2010 A City ofTukwila ILDING fiviQinnr A0c9 P MAR .16 221 PST CENTER. b0A-1-69 8' A p .,,AZIG1-1•11M4it I r cry/In:. RED- FOR:' iprE P g -CHANICAL ECTRICAL UMBING S PIPING CITY; OF TUKWILA UIL ING DIVISION — G ,...-.....:. .. ............... ....tk zs ' --0 • sJ %SU P TH IS MUST Br.: DURi THIS BUILDING OCCUPIED • U ,INSPECT! TUKW DE PA IL A APPROV BUILDING lENT OF COMMUNITY 1"./EIV.EWP11.4, ED FO DE COMPLIAN APPPMERY MAR 1 7 2010 City of Tukwila UILDING DIVIR1 L1.) Am A IVED MAR 2 2 2004 MAR 1 2010 3 PERMoNsPERMIT ENTER (-4N3 IND CHANGES SHALL SE MADE TO –27z SCOPE OF WORK WITHOUT PRI, OF TUKWILA_ Buil n .r Ft ■ -:'.7:17-.7-MW-VitrrialriclfaUIRE A NEW RN SUatiald sk'n'D Y Wouez, Antat:ykin PaAknIr.t. FES,. 0 54 w/ ,. i i ECEIVED City of Tukwila MAR 16 2010 BUILDING tHvi4Inm pER T1c6ENTER t t _ __.1____ i.__._.t 1 I ! r lllIi 1111i 1 ! ! i 1 ; I I ; i I i 1 --i- -- - -1— ' .- _-.- r 1 I I . ! t • , ! I, 1 I 1 - I 1.__ ' I 1 i 1 i I A- P_R-dikt-E00.1 It_p . i 14.: i 1.) 1 i I 1 i I ! ! i 1 1 ! i i i ' f i I I _ !REVIEWED APPROVE mM 1 a1 ?o10 ett4.of T $UILDING MVISI >1 RECEIVED MAR 16 2010 PERMIT CENTER ■ V ECE VED F TI IKW, A • I D� SEWED FI COMP APPRO MAR 17 MO of BUILDING nwiginw ECEVEP AR-16 2010 KNITCBITEA . { 1926 -VY t s p ! i 1 i I i i I 1 i .i i i 1 f , I 1 I 1 Ana _tt 2004 MIT CENtt - -- � - -- — i Cityof Rik* BUILDING DiviAIr V