HomeMy WebLinkAboutPermit D10-077 - LARSON RESIDENCE - GARAGE AND REMODELLARSON RESIDENCE
14244 55 AV S
D1O-077
Parcel No.:
Address:
Suite No:
City* Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Inspection Request Line: 206- 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
3365900119
14244 55 AV S TUKW
DEVELOPMENT PERMIT
Permit Number:
Issue Date:
Permit Expires On:
D10-077
03/17/2010
09/13/2010
Tenant:
Name:
Address:
Owner:
Name:
Address:
Phone:
LARSON RESIDENCE
14244 55 AV S , TUKVVILA WA
LARSON DAVID V
14244 55TH S , TUKWILA WA 98168
Contact Person:
Name:
Address:
Phone:
DAVE LARSON
14244 55 AV S , TUKINILA WA 98168
206 - 799 -7892
Contractor:
Name: OWNER AFFIDAVIT - DAVE LARSON
Address: 14244 55 AV S , TUKWILA WA 98168
Phone:
Contractor License No:
Expiration Date:
DESCRIPTION OF WORK:
REISSUE OF EXPIRED PERMIT D04 -098.
GARAGE ADDITION AND HOUSE REMODEL . NEW ROOF SQUARE FOOTAGE = 300 SF. ROOF DRAINS TO BE TIED INTO
EXISTING SYSTEM. EXPANDING BEDROOM INTO CARPORT. ADDING GARAGE ADDITION; ADDING 7'X22' TO FAMILY
ROOM ABOVE GARAGE. OVERFRAMING FLAT ROOF TO CREATE PITCHED ROOF. RELOCATING DOORS IN ACCESSORY
STRUCTURE.
Value of Construction: $32,054.80
Type of Fire Protection: NONE
Type of Construction: V -B
Fees Collected:
International Building Code Edition:
Occupancy per IBC:
$356.42
2006
22
* *continued on next page **
doc: IBC -10/06
D10 -077 Printed: 03 -17 -2010
City mftukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Inspection Request Line: 206- 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
Permit Number: D10-077
Issue Date: 03/17/2010
Permit Expires On: 09/13/2010
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
Fire Loop Hydrant: N Number: 0 Size (Inches): 0
Flood Control Zone:
Hauling: N Start Time: End Time:
Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation:
Moving Oversize Load: Start Time: End Time:
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Storm Drainage:
Street Use: Profit: N Non - Profit: N
Water Main Extension: Private: Public:
Water Meter: N
Permit Center Authorized Signature:
Date: -V- 0 l
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the ormance of work. I am authorized to sign and obtain this development permit.
Signature:
Print Name:
/4lk5Ofr?
Date:
3-/7--/0
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: IBC -10/06
D10 -077 Printed: 03 -17 -2010
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
Parcel No.: 3365900119
Address: 14244 55 AV S TUKW
Suite No:
Tenant: LARSON RESIDENCE
PERMIT CONDITIONS
Permit Number: D10 -077
Status: ISSUED
Applied Date: 03/16/2010
Issue Date: 03/17/2010
1: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
2: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
3: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
4: All electrical work shall be inspected and approved under a separate permit issued by the City of Thkwila Building
Department (206- 431- 3670).
5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
* *continued on next page **
doc: Cond -10/06
D10 -077 Printed: 03 -17 -2010
4 S
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating
construction or the performance of work.
Signature:
Print Name:
Date: 3- /7 -/0
doc: Cond -10/06
D10 -077 Printed: 03 -17 -2010
Site Address:
CITY OF TUKWILP
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http.//www.ci.tukw ila. wa. us
.(F,or ofce use only),:
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
I`/2y`i/ 5
-- 5.IL. s,
Tenant Name: De., .,.^ V r Le/ J.- $ o h
Property Owners Name:
Mailing Address:
King Co Assessor's Tax No.:
Suite Number: Floor:
New Tenant: ❑ Yes El ..No
33bsgo- 011q
Set
City
CONTACT PERSON'— wbo do:we'contact when your per'mrt is,iiady 'to be issued
State
Zip
Name: rG( d2e1 Day Telephone: ma7
Mailing Address:
City State Zip
E -Mail Address: c4 fired 1/ iav s."2 ' . J-.f elw Fax Number:
GENERAL CONTRACTOR INFORMATION P
(Contractor Information for Mechanical (pg.4)11or Plumbing and Gas Piping (pg3
Company Name:
/vA
Mailing Address:
Zip
Contact Person:
E -Mail Address:
Contractor Registration Number:
City
Day Telephone:
Fax Number:
Expiration Date:
State
- ARCHITECT OF< RECORD -"All .plans,must be•wet stamped by.Archltect of =Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fa cNumber:
State
Zip
• .ENGINEER OFR1CORD = It plaits must be wet'stamped by Eng veer o 2Recor
Company Name:
Mailing Address:
A/ A--
Contact Person:
E -Mail Address:
H:Wpplications\Forms- Applications On Line \2009 Applications \1-2009 - Permit Application.doc
Revised: 1 -2009
bh
City
Day Telephone:
Fax Number:
Page 1 of 6
State
Zip
BUILDING PERMIT 'NO _ ION —206.431-:;3670 '
Valuation of Project (contractor's bid price): $ gpDa e%U
Existing Building Valuation: $
Scope of Work (please provide detailed information):
Will there be new rack storage? ❑ Yes
No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas; in.Square Footage Below:
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
Floor area of accessory dwelling:
FIRE PROTECTION /HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm tk, None
❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8-1/1" x 11 " paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H',Wpplications\Porms- Applications On Line12009 Applications11•2009 • Permit Application.doc
Revised: 1 -2009
bh
Page 2 of 6
Existing '
Interior Remodel
Addition:to •
Existing,;
St ibture .
•
_
'New _ °'
:,vTypeof '
• Construction .per, '
. Type of
Occupancy per
1at Floor
151.
V
Floor
PI Floor
Floors., Yhrii
''Basement
Accessory Structure*
cAlt bhe'd Garage
.' mJ (o
p
Detached Garage,
Attached Carport,
Detached Ca"rpo"rt
Covered Deck.
Uncovered Deck
V
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
Floor area of accessory dwelling:
FIRE PROTECTION /HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm tk, None
❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8-1/1" x 11 " paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H',Wpplications\Porms- Applications On Line12009 Applications11•2009 • Permit Application.doc
Revised: 1 -2009
bh
Page 2 of 6
PERMIT APPLICATION NOTES Applical le to'all °permits n this applica ions:;
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNE AUTHORIZED AGENT:
Signature:
Print Name:
D4VS i V �1--ef
Mailing Address: /177}7i471-5 5 _ So
Date: d
Day Telephone: 2-06 - 9y 7e 92_
City
State Zip
Date Application Accepted:
— lb-i0
Date Application Expires:
9-16)-t0
Staff Initials:
H:\Applications\Forms- Applications On Line\2009 Applications \1 -2009 - Permit Application.doc
Revised: 1 -2009
bh
Page 6 of 6
.: I -3 /
PLUMBING AND GAS PIPING-1 RMIT INFORMATION 206 431; -3 / 0 ;
PLUMBING AND GAS PIPING CONTRACTOR INFORMATION
Company Name:
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
Valuation of Project (contractor's bid price): $
Scope of Work (please provide detailed information):
Building Use (per Int'l Building Code):
Occupancy (per Int'l Building Code):
Utility Purveyor: Water:
Sewer:
Indicate type of plumbing fixtures and /or gas piping outlets being installed and the quantity below:
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty
Bathtub or combination
bath/shower
Bidet
Clothes washer, domestic
Dental unit, cuspidor
Dishwasher, domestic,
with independent drain
Drinking fountain or
water cooler (per head)
Food -waste grinder,
commercial
Floor Drain
Shower, single head trap
Lavatory
Wash fountain
Receptor, indirect waste
Sinks
Urinals
Water Closet
Building sewer and each
trailer park sewer
Rain water system — per
drain (inside building)
Water heater and/or vent
Industrial waste treatment
interceptor, including trap
and vent, except for kitchen
type grease interceptors
Each grease trap
(connected to not more
than 4 fixtures - <750
gallon capacity)
Grease interceptor for
commercial kitchen ( >750
gallon capacity)
Repair or alteration of
water piping and /or water
treatment equipment
Repair or alteration of
drainage or vent piping
Medical gas piping
system serving 1 -5
inlets /outlets for a
specific gas
Each additional medical
gas inlets /outlets greater
than 5
Backflow protective
device other than
atmospheric -type vacuum
breakers 2 inch (51 mm)
diameter or smaller
Backflow protective device
other than atmospheric -type
vacuum breakers over 2
inch (51 mm) diameter
Each lawn sprinkler
system on any one meter
including backflow
protection devices
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections (1 -5)
Atmospheric -type
vacuum breakers not
included in lawn
sprinkler backflow
protections over 5
Gas piping outlets
H:1ApplicationslForms- Applications On- Line12009 Applications11 -2009 Permit Application. doc
Revised. 1 -2009
bh
Page 5 of 6
•
City of Tukwila
0
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.TukwilaWA.gov
Parcel No.: 3365900119
Address: 14244 55 AV S TUKW
Suite No:
Applicant: LARSON RESIDENCE
RECEIPT
Permit Number:
Status:
Applied Date:
Issue Date:
D10 -077
ISSUED
03/16/2010
03/17/2010
Receipt No.:
Initials:
User ID:
Payee:
R13 -01321
WER
1655
Payment Amount: $63.00
Payment Date: 04/15/2013 09:46 AM
Balance: $0.00
DAVID LARSON
TRANSACTION LIST:
Type Method
Descriptio Amount
Payment Credit Crd MC
Authorization No. H20935
ACCOUNT ITEM LIST:
Description
63.00
Account Code
Current Pmts
PLAN CHECK - RES
000.345.830
Total: $63.00
63.00
doc: Receiot -06 Printed: 04 -15 -2013
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100 .
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 -431 -3665
Web site: http: / /www.ci.tukwila.wa.us
Parcel No.: 3365900119
Address: 14244 55 AV S TUKW
Suite No:
Applicant: LARSON RESIDENCE
RECEIPT
Permit Number: D10 -077
Status: PENDING
Applied Date: 03/16/2010
Issue Date:
Receipt No.: R10 -00461
Payment Amount: $356.42
Initials: WER Payment Date: 03/16/2010 08:58 AM
User ID: 1655 Balance: $0.00
Payee: DAVE LARSON
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd VISA -
Authorization No. 05568B
ACCOUNT ITEM LIST:
Description
356.42
Account Code Current Pmts
BUILDING - RES
STATE BUILDING SURCHARGE
000.322.100 351.92
640.237.114 4.50
Total: $356.42
AY ENT
RE(TEVE
rinn. Rncaint -OA
PrintPri• 03 -1R- 9(11(1
INSPECTION NO.
P/0-077
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 431 -2451
(206) 431 -3670
Project "44
LA ii":516
Type of Inspection: l /�
Address: 14244 4V
1�''1"t �
�
Date Call ediq /z /z is
G.tJ
Special Instructions:
Date Wanted:
%r
a.m.
p.m.
itequestei r _ ti
Phone _,,m. 7g/2-
Approved per applicable codes. El Corrections required prior to approval.
COMMENTS: _726 etervxmeize
Inspector:
Date:009e
n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
•
h•
INSPECTION RECORD
Retain a copy with permit
, INSPECTION N0. '
P(O-a77
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
'Permit IhtOection Request Line (206) 431 -2451
Prof _. �__ . __ ...,- - • - - -
Typ of Ij;' ectio
Address: , j1� v44 dq 55- o 3
Date Called:
Sp'eCial Instructions:• ±
.
Date WantQd:. iVe0 /3 a.m.
t' %/ p.m.
Requester:
Phonei:.�!' 7471 79m.
Approved per applicable codes.
1;4 6440%,..f, „-.4477.4get
Corrections required prior to approval.
(Inspector:
Date/6/3
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedules reinspection.
Jzv
PE
INSPECTION RECORD
Retain a copy with permit
• INSPECTION NO. PERMIT NO.
. CITY OF TUKWILA BUILDING DIVISION
6300 Southcehter Blvd., #100, Tukwila. WA 98188
:. Permit Inspection Request Line (206) 431 -2451
pio.o77
(206) 431 -3670
Projec5040
Type of I�
NCI
Address: `42.4.4 135 d, rs
Date Called:
Special Instructions:
•
Date Wanted:
/� /1�
!/
ap m.
m.
Requester:
Phone
'qq - 76?
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
r
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
. paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
DO- 677
PERMIT NO.
• . CITY OF: TUKWILA BUILDING DIVISION
(206) 431 -3670
t' '.. 6300 Southcenter Blvd.:, #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 431 -2451
Project`
, • k
Type sti Inspe do
A: dress:
. .O-14
Date Called:
Special Instructions:
• •
• •
Date Wante¢;.., 7 i2f...._ 's a.m.
p.m.
Requester:
Phone No:
O .: [1 Approved• per` applicable codes.
• a •
▪ •::. COMMENTS:
ECorrections required prior to approval.
M
D Z
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
• .paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
1•
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
INSPECTION RECORD
Retain a copy with permit
a0-077
PERMIT NO.
Project:
Type of Ins
do
Addre;si7 ty's. 5. A 5
Date Ca'' led:
SpecOiaal Instructions: •
Date Wanted: .
Requester:
Phone No:
•
proved per applicable codes. a Corrections required prior to approval.
COMMENTS:
Y„4
4.
8L4
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
r
it
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
. .. D/01:077
Project:
. -►y
Type of Inspec on:
1
/'o/7V'
Addre �/ /}7/
jelk
Date Called: ('//3)
Special Instructions:
•
s.
Date Wanted:
X /--;/i
a.m.
Requester:
Phone No:
ElApproved per applicable codes. EJ Corrections required prior to approval.
COM
,� /
tom" £GPI 146 4 c/;410:
1
/'o/7V'
6-44204-- 0 e / j' it;.,--- - �4
1 �7- ' .il a't f
K'fovx . ri4' / id•5 - •'
❑ $60.00 ' EINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
'Date:
10 -01 -2013
City of Tukwila
Jim Haggerion, Mayor
Department of Community Development Jock Pace, Director
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
LARSON RESIDENCE
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date
of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has
begun for a period of 180 days. Your permit will expire on 11/05/2013.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection.
Each inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to
expire. Address your extension request to the Building Official and state your reason(s) for the need to extend
your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 11/05/2013, your permit will become null
and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
1,a1?
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #1100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206 - 431 -3665
January 29, 2013
Dave Larson
14244 55 Ave S
Tukwila, WA 98168
City of f Tukwila �
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
RE: Request for Extension #3
Development Permit No D10 -077
Larson Residence —14244 55 Av S
Dear Mr. Larson,
This letter is in response to your written request for an extension to Permit Number D10 -077. The
Building Official has reviewed your letter and considered your request to extend the above referenced
permit. The City of Tukwila Building Division will be extending your permit an additional 180 days
from the date of expiration, through August 3, 2013, as requested.
The Building Official has noted that this is tentatively the last extension request to be approved. If you
have any questions regarding this matter, please contact him directly.
If you should have any questions, please contact our office at (206) 431 -3670.
File: Permit No. D10 -077
W:\Permit Center\Extension Letters\Permits\2010\D10 -348 Permit Extension #3.docx
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665
• S
Bob Benedicto
B.O.
City of Tukwila
Dear Bob,
I am requesting an extension to permit # D10 -077. We have made substantial progress since the
last inspection. Currently I am installing hardy panel lap siding and in the process of revising our plans to
reduce the scope of work on the original submittal. I will be ready for an inspection within the near
future and do not anticipate the need for any further extensions.
Tl�ks,
Dave Larson
li-
M. 40 .14t144,01 vIo -077
/ V46,01 - 44sl2 gNGtuDE
i // /TE rW 77' .l� <Nr4 6j67+ m,
I
70:04 /S TAII4T /LILq THE L•45T
A TV.NgION RCaPU r7E, OE
ApPROaeo
0 //a2A0/5,
NP 02 lod 13
-N-A- 0/lbs11';
01 -02 -2013
•
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
LARSON RESIDENCE
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date
of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has
begun for a period of 180 days. Your permit will expire on 02/05/2013.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection.
Each inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to
expire. Address your extension request to the Building Official and state your reason(s) for the need to extend
your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 02/05/2013, your permit will become null
and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206-431 -3665
07 -02 -2012
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
LARSON RESIDENCE
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a fmal inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National
Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and
become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date
of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has
begun for a period of 180 days. Your permit will expire on 08/20/2012.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or fmal inspection.
Each inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to
expire. Address your extension request to the Building Official and state your reason(s) for the need to extend
your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 08/20/2012, your permit will become null
and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206-431 -3665
•
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
LARSON RESIDENCE
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 02/27/2012.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 02/27/2012f your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
•
City of Tukwila
Department of Community Development
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
14244 55 AV S TUKW
Dear Permit Holder:
Jim Haggerton, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 03/11/2011.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and /or receive an extension prior to 03/11/2011, your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
nb:JO, rj—i-__
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665
08 -01 -2011
•
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
RE: Permit No. D10 -077
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 09/07/2011.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 09/07/2011, your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
.)*tir.-1.—__
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
•
Jennifer Marshall - Re: Request for permit extension
Page 1 of 1
From: Bob Benedicto
To: Dave Larson
Date: 02/15/2011 4:04 PM
Subject: Re: Request for permit extension
CC: Bill Rambo; Jennifer Marshall
Mr. Larson,
Your request for an extension of 180 days is hereby approved. I cannot, in all good conscience, be a party to
your knee not healing due to the stress of having your permit expire. I'm sure we will revisit this matter in
September.
»> Dave Larson 02/15/2011 2:01 PM »>
Dear Bob,
I am requesting one more extension for permit # D10 -077 as my knee has not recovered as fast as I had hoped
and heavy construction is still a few months away. My permit is do to expire on 3 -11 -11 and would ask that it be
extended 6 months beyond that date. Hopefully, the extra time granted to allow my knee to heal may prevent
the need for a total knee replacement and having to miss several weeks of work. Thank you for your
consideration of this matter.
Dave
Q\q) � b�f ll I11
o11o11ll
file: / /C:\ temp\ XPGrpWise \4D5AA3FBtuk- mail6300 -po 10016B6D36192471 \GW } 00001.... 02/16/2011
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
September 9, 2010
Dave Larson
14244 55 Ave S
Tukwila, WA 98168
RE: Request for Extension
Development Permit No D10 -077
Larson Residence — 14244 55 Av S
Dear Mr. Larson,
This letter is in response to your written request for an extension to Permit Number D10 -077.
The Building Official has reviewed your letter and considered your request to extend the above
referenced permit. The City of Tukwila Building Division will be extending your permit an
additional 180 days from the date of expiration, through March 11, 2011, as requested.
If you should have any questions, please contact our office at (206) 431 -3670.
Sincerely,
shall
it Te'c 1nician
File: Permit No. D10 -077
W:\Pennit Center\Extension Letters \Pennits\2010\DI0 -077 Permit Extension.doc
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 -431 -3665
• S
Bob Benedicto
Building Official
City of Tukwila
September 7, 2010
Dear Bob,
I am requesting a 180 day extension to Permit No. D10 -077. This permit is due to expire on
9/13/2010. As we discussed over the phone complications to relatively minor knee surgery have left me
incapacitated for the last month and will make it difficult to proceed for a few months coming.
Thanks,
Dave Larson
RECEIVED
CITY OF TUKWILA
SEP. 0 8 2010
PERMIT CENTER
6,cp o\ll3`In
�i'
•
ity of f Tukwlla
Jim Haggerton, Mayor
DAVE LARSON
14244 55 AV S
TUKWILA WA 98168
epartment of Community Development Jack Pace, Director
RE: Permit No. D10 -077
14244 55 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 09/13/2010.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and /or receive an extension prior to 09/13/2010, your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
R■C■IL-
Bill Rambo
Permit Technician
File: Permit File No. D10 -077
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665
E PL RV EW /RCOPY NG SLIP
ACTIVITY NUMBER: D10 -077 DATE: 04 -08 -13
PROJECT NAME: LARSON RESIDENCE
SITE ADDRESS: 14244 55 AV S
Original Plan Submittal _
Response to Correction Letter # X Revision # 1 After Permit Issued
Response to Incomplete Letter #
EPARTMENTS:
Building Divi on
Vt�r�t
Public Works
NM OA" . t)
Fire Prevention
Structural
n
Planning / D'ivi'sion
Permit Coordinator •
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
n
DUE DATE: 04 -09 -13
Not Applicable
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
TUES/THURS ROUTING:
Please Route Structural Review Required
No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 05 -07 -13
Approved Approved with Conditions n Not Approved (attach comments)
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
PE;•a k PY •
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D10 -077
PROJECT NAME: LARSON RESIDENCE
SITE ADDRESS: 14244 55 AV S
X Original Plan Submittal Response to Incomplete Letter #
DATE: 03 -16 -10
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
u (ding ivision pi
Public Works
Fire Prevention
Structural
Planning Division
n Permit Coordinator II
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
DUE DATE: 03-18-10
Not Applicable
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route
Structural Review Required
No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved n Approved with Conditions
Notation:
REVIEWER'S INITIALS: DATE:
DUE DATE: 04 -15 -10
Not Approved (attach comments)
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
PROJECT NAME: Larson PERMIT NO: O- u 7 7
SITE ADDRESS: 14 2-1-1)-1 ORIGINAL ISSUE DATE: -t7 —( 0
REVISION LOG
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
ISSUED DATE
STAFF
INITIALS
1
-
(3
Summary of Revision:
(
14- -(s -13
_
Summar of Revision: he C'2,
scale +
We) r <<
›j% r,,,
✓
e� y9or
-f--
c& . 4-: LA q,,. -� op C
f�
�--s al d
`` 4
4,,, '
Received by: a rw
_ 4 4r,s40'-
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Web site: http: //www.ci.tukwila.wa.us
REVISION
SUBMITTAL
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date:
— `3
Plan Check/Permit Number:
❑ Response to Incomplete Letter #
❑ Response to Correction Letter #
IEL Revision # / after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
Project Name:
Project Address:
Contact Person:
v 4-4
,D1d -077
Phone Number: 2.4o6 --7G% 9- 7
Sum ry of Revision:
ly 5 /7",>^s L,
6-6y9 1 D '.r /c' r '< ,
RECEIVED
CITY OF TUKWILA
APR 0 8 2013
Sheet Number(s): If 7 UJ
"Cloud" or highlight-fill areas of revision da revisi
Received at the City of Tukwila Permit Center by:
`_Entered in Permits Plus on
H:\ Applications \Forms- Applications On Line12010 Applications \7 -2010 - Revision Submittal.doc
Created: 8-13 -2004
Revised: 7 -2010
CITY OF TUKWILA
Department of Community Development
630o Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431-367o FAX (2o6) 431 -3665
E -mail: tukplan@ ci.tukwila.wa.us
Permit Center /Building Division
206 431 -3670
Public Works Department
206 433 -0179
Planning Division
206 431 -3670
AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION
PERMIT NO: 1) 10- D -7 7
STATE OF WASHINGTON)
) ss.
COUNTY OF KING )
�ct v , * <i/ 1/ i 1,(p" , states as follows:
[please print name]
1. -I have made application for a permit from the City of Tukwila, Washington.
2. I understand that state law requires that all building construction contractors be registered with the
State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the
Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have
read or am familiar with RCW 18.27.090.
3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the
City of Tukwila must verify either that the contractor is registered by the State of Washington, or that
one of the exemptions stated under RCW 18.27.090 applies.
4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I
hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090,
I consider the work authorized under this permit to be exempt under number 13, and will therefore
not be performed by a registered contractor.
5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to
persons making electrical installations on their own property or to regularly employed employees
working on the premises of their employer. The proposed electrical work is not for the construction
of a new building for rent, sale or lease.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision
to engage an unregistered contractor to perform const • 'on work.
L IA/
Owner
Owner's Agent
Signed and sworn to before me this
6 day of
e7
O ARY PUBLIC in and for the State of Washington
Residing at A140j._ , County
'744(44'11.- , 1O.
Name as commissioned:
My commission expires: 05-019"/ v
18,27,090 Exemptions. The registration provisions of this chapter do not apply to.
1. An authorized representative of the United States
government, the state of Washington, or any incorporated
city, town, county, township, irrigation district, reclamation
district, or other municipal or political corporation or
subdivision of this state;
2. Officers of a court when they are acting within the scope
of their office;
3. Public utilities operating under the regulations of the
utilities and transportation commission in construction,
maintenance, or development work incidental to their own
business;
4. Any construction, repair, or operation incidental to the
discovering or producing of petroleum or gas, or the
drilling, testing, abandoning, or other operation of any
petroleum or gas well or any surface or underground mine
or mineral deposit when performed by an owner or lessee;
5. The sale of any finished products, materials, or articles of
merchandise that are not fabricated into and do not become
a part of a structure under the common law of fixtures;
6. Any construction, alteration, improvement, or repair of
personal property performed by the registered or legal
owner, or by a mobile /manufactured home retail dealer or
manufacturer licensed under chapter 46.70 RCW who shall
warranty service and repairs under chapter 46.7o RCW;
7. Any construction, alteration, improvement, or repair
carried on within the limits and boundaries of any site or
reservation under the legal jurisdiction of the federal
government;
8. Any person who only furnished materials, supplies, or
equipment without fabricating them into, or consuming
them in the performance of, the work of the contractor;
9. Any work or operation on one undertaking or project by
one or more contracts, the aggregate contract price of
which for labor and materials and all other items is less
than five hundred dollars, such work or operations being
considered as of a casual, minor, or inconsequential nature.
The exemption prescribed in this subsection does not apply
in any instance wherein the work or construction is only a
part of a larger or major operation, whether undertaken by
the same or a different contractor, or in which a division of
the operation is made into contracts of amounts less than
five hundred dollars for the purpose of evasion of this
chapter or otherwise. The exemption prescribed in this
subsection does not apply to a person who advertises or
puts out any sign or card or other device which might
indicate to the public that he or she is a contractor, or that
he or she is qualified to engage in the business of
contractor;
10. Any construction or operation incidental to the
construction and repair of irrigation and drainage ditches
of regularly constituted irrigation districts or reclamation
districts; or to farming, dairying, agriculture, viticulture,
horticulture, or stock or poultry raising; or to clearing or
other work upon land in rural districts for fire prevention
purposes; except when any of the above work is performed
by a registered contractor;
ii. An owner* who contracts for a project with a registered
contractor, except that this exemption shall not deprive the
owner of the protections of this chapter against registered
and unregistered contractors. The exemption prescribed in
this subsection does not apply to a person who performs
the activities of a contractor for the purpose of leasing or
selling improved property he or she has owned for less than
twelve months;
12.* Any person working on his or her own property,
whether occupied by him or her or not, and any person
working on his or her personal residence, whether owned
by him or her or not but this exemption shall not apply to
any person who performs the activities of a contractor on
his or her own property for the purpose of selling,
demolishing, or leasing the property;
13. An owner* who performs maintenance, repair, and
alteration work in or upon his or her own properties, or
who uses his or her own employees to do such work;
14. A licensed architect or civil or professional engineer
acting solely in his or her professional capacity, an
electrician certified under the laws of the state of
Washington, or a plumber certified under the laws of the
state of Washington or licensed by a political subdivision of
the state of Washington while operating within the
boundaries of such political subdivision. The exemption
provided in this subsection is applicable only when the
person certified is operating within the scope of his or her
certification;
15. Any person who engages in the activities herein
regulated as an employee of a registered contractor with
wages as his or her sole compensation or as an employee
with wages as his or her sole compensation;
16. Contractors on highway projects who have been
prequalified as required by RCW 47.28.070, with the
department of transportation to perform highway
construction, reconstruction, or maintenance work;
17. A mobile /manufactured home dealer or manufacturer
who subcontracts the installation, set -up, or repair work to
actively registered contractors. This exemption only applies
to the installation, set -up, or repair of the
mobile /manufactured homes that were manufactured or
sold by the mobile /manufactured home dealer or
manufacturer;
18. An entity who holds a valid electrical contractor's
license under chapter 19.28 RCW that employs a certified
journeyman electrician, a certified residential specialty
electrician, or an electrical trainee meeting the
requirements of chapter 19.28 RCW to perform plumbing
work that is incidentally, directly, and immediately
appropriate to the like -in -kind replacement of a household
appliance or other small household utilization equipment
that requires limited electric power and limited waste
and /or water connections. An electrical trainee must be
supervised by a certified electrician while performing
plumbing work.
• Per Washington State Department of Labor and Industries, lessee has been
interpreted to be equivalent to owner for the purpose of these exemptions.
FL
PLANMNG APPROVED •
No changed can be medal° these
plans without-approval
Plann t_ ision of DCD
Approved By: i let APP • 1-1 --1_ l .
Date. ,
Leyce
D- SCse. p'IL, 0h
/7
Pti o
61,413
iI
- — j •
co le- 1 = .O
c-o - 5 810Gi 2 H; r)iQin5
Stu N/e
FILE COPY
It No..
r3 / o '-/O
Al e c.fr)
REVIEWED FOR
1CODE COMPLIANCE
II APPROVED
1 APR 12 2013
Orly of Tukwila
BUILDING DIVISION
New C— rF. RECEIVED
L �4 1l[�eu CITY OF TUKWILA
REVISION N0.
b1oo77
4 f APR 0 8 2013
PERMIT CENTER
ropo.5ea /?o..,.,o del
'co,- %Just {. Pcq / 1 t,r ,<.3
1141‘7* 11 SS''`' 4,e .0. 17,4„,...,l,
Ocey 1-01-= e PA,dbre. `r'3/- 3'78
Re-L4 cry( 71--e
•
4'.
831N30 IMIj d
eo
RECEIVED
F TO
MA - '" 2004
REVIEW : FOR
DE PL �, : s. E
APP ¢��vE
MAR 17 2010
G' otTu..,,,I
BUILDING fnimifFJ
RECEIVED
MAR 16 2010
PERMIT CENTER
•
:REVIEWED FOR
COD PLI
AI* pmE
7 2010
Ci la
BUILDING ®MIST
D
Y,t-C• us�cl� y�5,���...!
AR 16 2010
PEST CENTER '
0 IX
w
C
c
c
co
- .&- ,. dam ' -E
it 2l
RECEIVED
CITY OF TUKWILA
APR 0 8 2013
PERMIT CENTER
N0-ti, e,Gtf 4!) q%
-i t
' 1 i
J
•
•
•
•
1 -T
ii
•
•
•
REVIEWED FOR -
COOE COMP IANCE
APPROVED
APR 12 2013
City of Tukwila
BUtLDING DIVISION
yet -rd,15
1
{
•
> C i
1A00-C
RECEIVED
CITY PF,TUKWILA
APR 0 8 2013
• I'ERIOIT CENTER
I
r '
•
•
•
•
)i • / 6'1"1/(00:K
•
j
r ,,t/tm,.//s;
ic91,:keirotl,a? Atizit;i6
r
•
REVIEWED FOR
CQbE COW PL$ANCE
APPROVED
APR 12 2013
1.
I City of leukdvilai
BUILDING DIVISION
I
44t
•.
;
L.
4ZRECEiVED
CITY OF TUKWILA
- APO 82013
PERMIIT CENTER
1cL'4.+ b-o 5%
ib 2''. .S s fr- el _:
II ii
2A63 - AoilaG R-30
U 1
per.. aro. :. .
I � �
-'r
I
r
1 RECIVED •
CITY -OF ITUKWILQ-
PERMIT OENTER.
f. Ii
.FILE COPY.
emit Na. 1310• 071
Plan review approval is subject to erro and omissions.
Approval of construction documents d �=� not authorize
the violation of any adopted code or o�iinance. Receipt
of approved Field Copy and conditions t. acknowledged
BY
Date: 1111
eedfreftrd4tilcwil
BUILDING DIVIS
REVISIONS
No changes shall be made to the scope
of work without prior approval of -
Tukwila Building Division..
NOTE: Revisions will require a new plan submittal
and may -include additional plan review fees.
Fleov- Moor
N
JV&w 14,4 1/5 S�i� -� uia /!
off w(l/ �'►' /l 3‘''_ �, 4
Reps o vel GUu /f5
SEPARATE PERMIT
REQUIRED FOR:
P tubing
NJGas Piping
City of Tukwila
Buil 5)11.4G DIVISION_
vac.- 4(/Z -� &41
Cf 5�4�ltt
S p.. 00
T.! :4!"...4/
PERMIT CEN
2:004'
IEWEb
COMPLIANCE
plPlOrhipm
MAID I ,
of Tukwila .
OLDIN( nivISI N
me ,
- Wtha/cw
Duo -o7 7
RECEIVED
MAR 16 2010
PERMIT CENTER
r
zg1
-- R«cued
REVIEWEDF
CODECOMPLIANCE
_MAR 1 7 2010
CRY of T la
BUILDING DivIginU
RECEIVED
MAR 16 2010
PERMIT CENTER
p6L, o2. U--(6)
7R-3o
- stj,.0*,, 643
REVIEWED FOR
CODEPLIE
MAR
72010
VERMIT CENTER
of Tukwila -.
BUILDINGniviginki RECEIVED
MAR 16 2010
PERMIT CENTER
hour
21534
lb
RECEIVED
()FM
•
MAR
-- P RMFT CEN
II A
2.004
Cohn $J -ab --
WED FOR !--
Pd9CE
ROVED : - =-
17 2010
I 4"
—I -
as
IviginN- 6" TH-
"' . �
.RECEIVED
MAR 16 2010 � 12‘,
PERMIT CENTER
1►-
Nov H
24$ r,d
•
`ref To r N,�
RECEIVED 1^
-OF -TL U A
IEWED Fes.
APP
MAR 17 2010
A
City ofTukwila
ILDING fiviQinnr
A0c9 P
MAR .16 221
PST CENTER.
b0A-1-69 8'
A
p
.,,AZIG1-1•11M4it I r cry/In:.
RED- FOR:'
iprE
P
g
-CHANICAL
ECTRICAL
UMBING
S PIPING
CITY; OF TUKWILA
UIL ING DIVISION —
G
,...-.....:. .. ...............
....tk
zs '
--0
•
sJ
%SU
P
TH IS
MUST Br.:
DURi
THIS BUILDING
OCCUPIED • U
,INSPECT!
TUKW
DE PA
IL A
APPROV
BUILDING
lENT OF COMMUNITY 1"./EIV.EWP11.4,
ED FO
DE COMPLIAN
APPPMERY
MAR 1 7 2010
City of Tukwila
UILDING DIVIR1
L1.)
Am A
IVED
MAR 2 2 2004 MAR 1 2010
3
PERMoNsPERMIT ENTER
(-4N3
IND CHANGES SHALL SE MADE TO
–27z SCOPE OF WORK WITHOUT PRI,
OF TUKWILA_ Buil n .r Ft ■
-:'.7:17-.7-MW-VitrrialriclfaUIRE A NEW RN SUatiald
sk'n'D Y Wouez, Antat:ykin PaAknIr.t. FES,.
0
54 w/
,.
i i
ECEIVED
City of Tukwila
MAR 16 2010
BUILDING tHvi4Inm pER T1c6ENTER
t t
_ __.1____ i.__._.t
1
I
! r
lllIi
1111i 1
! ! i
1 ; I
I ; i
I i 1
--i- -- - -1— ' .- _-.- r
1 I I
. ! t
•
, !
I, 1 I 1 - I
1.__ '
I 1 i
1
i I A- P_R-dikt-E00.1 It_p .
i 14.: i 1.)
1
i
I 1 i
I
! ! i
1 1
! i i i
' f i
I I
_ !REVIEWED
APPROVE
mM 1 a1 ?o10
ett4.of T
$UILDING MVISI
>1
RECEIVED
MAR 16 2010
PERMIT CENTER
■
V
ECE VED
F TI IKW, A
•
I
D� SEWED FI
COMP
APPRO
MAR 17 MO
of
BUILDING nwiginw
ECEVEP
AR-16 2010
KNITCBITEA .
{
1926 -VY t s
p
! i 1
i I i
i I 1 i
.i
i
i 1
f
, I 1 I 1
Ana
_tt 2004
MIT CENtt - -- � - -- —
i
Cityof Rik*
BUILDING DiviAIr V