Loading...
HomeMy WebLinkAboutPermit D10-301 - NORTH HILL APARTMENTS - BUILDING CNORTH HILL APTS BLDG C 5840 SOUTHCENTER BL D10 -301 City oliTukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 1157200351 Address: 5840 SOUTHCENTER BL TUKW Suite No: Project Name: NORTH HILL APTS - BLDG C DEVELOPMENT PERMIT Permit Number: D10 -301 Issue Date: 11/15/2010 Permit Expires On: 05/14/2011 Owner: Name: NORTH HILL APTS INC Address: 85 S WASHINGTON #308 , SEATTLE WA 98104 Contact Person: Name: GARY ANDERSON Address: 5010 S TACOMA WY , TACOMA WA 98409 Contractor: Name: G P ANDERSON CONSTRUCTION INC Address: 121 BELLA BELLA DR , FOX ISLAND WA 98333 Contractor License No: GPANDCI033RP Phone: 253 - 377 -4491 Phone: Expiration Date: 12/16/2011 DESCRIPTION OF WORK: REPLACE STAIRS, STRINGERS AND HANDRAIL ON ONE STAIRWAY IN BUILDING C Value of Construction: Type of Fire Protection: Type of Construction: $3,000.00 V -B Fees Collected: $243.92 International Building Code Edition: 2009 Occupancy per IBC: 0021 * *continued on next page ** doc: IBC -10/06 D10 -301 Printed: 11 -15 -2010 City okukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: D10-301 Issue Date: 11/15/2010 Permit Expires On: 05/14/2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: N rAW-) Date: I hereby certify that I have read and ex ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied grith, hether specified herein or not. The granting of this permit does not pres e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perfo a e of work. I am authorized to sign and obtain this development permit. Signature: Date: 1 F/ 5 �� Print Name: (— C�el�$ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IBC -10/06 D10-301 Printed: 11 -15 -2010 9 �J�`N��A wq� City of Tukwila C J 0 190a Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 1157200351 Address: 5840 SOUTHCENTER BL TUKW Suite No: Tenant: NORTH HILL APTS - BLDG C PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: D10 -301 ISSUED 11/04/2010 11/15/2010 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: All wood to remain in placed concrete shall be treated wood. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** doc: Cond -10/06 D10 -301 Printed: 11 -15 -2010 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Date: MI5-VC) Print Name: �^ Aa/g1,50 ordinances governing or local laws regulating doc: Cond -10/06 D10 -301 Printed: 11 -15 -2010 CITY OF TUKLII1A Community Develo7ITnent Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Building Pet) No. 1)([)— 30 1 Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: �aq C i can) Blvd Tenant Name: Nor Ht I/ 4D--i O/ y met.L /`c, 1Cj7Cwt t 4 Mailing Address: II City Property Owners Name: King Co Assessor's Tax No.: If 57)-0- 0 3s- 1 apz_ Suite Number: Floor: New Tenant: ❑ Yes ❑..No State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: /11 41(41.- Sc, ""\ Day Telephone: s Mailing Address: 0 v T cpw 0.4•, • 4 ▪ co..�• k / City E -Mail Address: Fax Number: .2- C-. 30) 02 Si 2S 3 377 L/9 q/ bt)A gpit I State Zip GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Mailing Address: V P ctexsw. (0A 0- / 5b (0 5)-A-1-1 Ta �ovtiy LA-7 Contact Person: 6cs• T I eta. Ot• City State Zip Day Telephone: .15-3 3 E -Mail Address: Fax Fax Number: A S 3 301 4,V/C" Contractor Registration Number: PDc r 0 X73 12 19 Expiration Date: 12 -- 1 ARCHITECT OF RECORD - All plans must be stamped by Architect of Record Company Name: Mailing Address: City Contact Person: Day Telephone: Fax Number: E -Mail Address: State Zip ENGINEER OF RECORD - All plans must be stamped by Engineer of Record Company Name: Mailing Address: city Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh a l�3 °Q°L Page 1 of 6 BUILDING PERMIT INFORMATION — 206 -431 -3670 w ;v��D 3 , Cc) of Project (contractor's bid price): $ 3 D Existing Building V luation: $ Scope of Work (pl ase provide detailed information): rC �%iG c 5 s t n�' c/� / �jA d I i. ra Will there be new rack storage? ❑ ....Yes ❑ ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq R): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms- Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor rd Floor 3td Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck ■ PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq R): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms- Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 PERMIT APPLICATION NOTES — Wicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR RUTH RIZED AGENT: Signature: Date: /0 ^1 740 Print Name: 1- C C. AY/(Af Mailing Address: So/ D Sac -I'd, rco^t -- Date Application Accepted: as3 Day Telephone: 5771/11.-6 City ZJ� vo9 State Zip Date Application Expires: j ._ r,_ i 1 Staff Initials: H:\ Applications \Forms - Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh viyz Page 6 of 6 PLUMBING AND GAS PIPING PER INFORMATION — 206 - 431 -3670 • PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Plumbing work (co t; i actor's bid price): $ Valuation of Gas Piping work (co i actor's bid price): $ Scope of Work (please provide deta :-d information): Building Use (per Int'1 Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlet 'teing ' rr tailed and the quantity below: Fixture Type: Qty Fixture Type: • • , Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet ,. I Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) ,' od -waste grinder, co Tercial Floor Drain Shower, single head trap Lavatory ' Was 1, ountain Receptor, indirect waste Sinks Urinals Water CI et Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater ._r d/or vent Industrial w.' e treatment interceptor, in., } ding trap and vent, excep •r kitchen type grease interc 'tors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repai r alteration of wat- << i iping and/or water tre ent equipment Repair or alteration ii' drainage or vent pipin Medical gas piping system serving 1 -5 inlets/outlets for a specific gas Each additional medical gas inlets/outlets greater than 5 : ackflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device x other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter • Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuu breakers not included ' lawn sprinkler back w protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets H:Wpplications\Forms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 5 of 6 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 1157200351 Address: 5840 SOUTHCENTER BL TUKW Suite No: Applicant: NORTH HILL APTS - BLDG C RECEIPT Permit Number: D10 -301 Status: PENDING Applied Date: 11/04/2010 Issue Date: Receipt No.: R10 -02237 Payment Amount: $243.92 Initials: WER Payment Date: 11/04/2010 02:02 PM User ID: 1655 Balance: $0.00 Payee: LEE ANDERSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 00521D ACCOUNT ITEM LIST: Description 243.92 Account Code Current Pmts BUILDING - RES PLAN CHECK - RES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $243.92 145.10 94.32 4.50 doc: Receipt-06 Printed: 11 -04 -2010 ,r'f1541, -77 7... .a,.r -a,r ,vr_.i -,;.; �r -• :•c ,'t`., }- 4 k'�- x�ss �7G�,s.�.:c•• INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Dt0 -3 Proje : . ,( ,..I ti__; r Type of Inspection: , Add ss: Date Call r Special-instructions: �O! _ °r O S is mod( 3 (-A C e Date Wanted: .4 m. - "% -(Cm. Requester: Phone No: 2—.S-3 3 7-7 - -4 4 en, Approved per applicable codes. Corrections required prior to approval. COMMENTS: r)--ei iLk:r (--.01ApaP r _ n Inspecr'or: Date,:/k ❑ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. I9orlh H;11 Aps.r#mests REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. FILE Permit No. Plan review approval is subject to 8110f8 Approval of construction tents does not the violation of any adopted cob or o ddin�aInce. Receipt of a p p r o v e d F +1 1 1 ' 1 11 , - is admo ed. BY Date: (/ —/S.--/ 0 if lii�/ [ 11>r To.%IO *i1iIw rttvitwED FOR CODE COMP BUILDING DIVISION u2010 �I�p � p� N NOV oa 2010 bto �o ' PERMITCENTEk Bid E 304 204 104 303 203 103 302 202 102 301 201 101 Studios %f-1 5 Se.0 BId D 303 302 301 203 202 201 103 102 101 1x1 Std 555 6-D A/01-r(-i ( Apr4s . BId C 304 303 302 301 204 203 202 201 104 103 102 101 1x1 303 302 301 203 202 201 103 102 101 Studios 5g3a REVIEWED FOR CODE COMPLIANCE Nov 10 1010 Cityof Tukwila BUILDING D"' 'Ql^hP WA 304 303 302 301^ x 204 203 202 201 104 103 102 101 1x1 RECEIVED NOV 0 4 2010 PERMIT CENTER a CONSULTING ENGINEERS PACIFIC NORTHWEST ENGINEERING INC. PACIF C N0FTn- INNEET E N G I N E E R I N G November 2, 2010 #10 -590 GP Anderson Construction Attn: Lee Anderson 5010 South Tacoma Way Tacoma, WA 98409 FILE COPY /o,.. _-- e.t Mo.% Re: North Hill Apartment Stair Repair Plan Number: North Hill Apartments Site: 5700 Southcenter Blvd. Tukwila, WA Mr. Anderson, REVIEWED FOR CODE COMPLIANCE APDofVED NUV 1 u 2010 City of Tukwila BUILDIN( fiVISInni Pacific Northwest Engineering Inc. (PNE) as requested has reviewed the existing architectural drawings for the North Hill Apartment Complex (pages A -1 through A -9, dated 1 -5 -88, revised 3- 21 -88) for repairs proposed to the stair areas as a result of rot damage. As a result of our review, we have determined that P.T. #2 DF or HF is adequate for replacement of 4x4 and 6x6 posts, 4x10 and 6x10 beams, and the 3x12 stair stringers. The existing sizes are to remain, but may be replaced with the same dimensional size using P.T. HF or DF #2 lumber. These members are best shown on sheet A -9 of 9, section A of the existing architectural drawings. Calculations are included for reference. All hardware used to attach new P.T. members shall be Simpson Z -Max, Hot Dipped Galvanized, or Stainless Steel. If there are any more questions or concerns, please contact our office. Sincerely, Luke W. Moerke, P.E. Pacific Northwest Engineering, Inc. DtO3Ol NOV 0 12010 Pacific Northwest Engineering Inc. 1944 Pacific Ave; Ste 305 Tacoma, WA 98402 Phone (253) 682 -2850 Fax (253) 682 -2851 RECEIVED NOV 04 2010 PERMIT CENTER Page 1 of 8 P. \!`I IFAITC 1P(` flO C' A /AIFPC\Nnr+h 1-lill Annrfmcnfe \Alnrfh 41111 Pnrorlmcnf I offor .le, Project: North Hill Apartment Repairs Location: Roof Beam 1 Multi- Loaded Multi -Span Beam [2009 International Building Code(2005 NDS)] 3.5 IN x 7.25 IN x 20.0 FT (6 + 8 + 6) #2 - Douglas- Fir -Larch - Dry Use Section Adequate By: 129.8% Controlling Factor: Moment DEFLECTIONS Laft Center B1S11t Live Load -0.02 IN L/4796 0.05 IN L/2113 -0.02 IN L/4796 Dead Load 0.00 in 0.02 in 0.00 in Total Load -0.02 IN L/3771 0.07 IN U1392 -0.02 IN L/3771 Live Load Deflection Criteria: U240 Total Load Deflection Criteria: U180 REACTIONS 9 a IZ Live Load 173 lb 1096 Ib 1096 Ib 173 Ib Dead Load 49 Ib 686 Ib 686 lb 49 Ib Total Load 223 Ib 1781 lb 1781 Ib 223 Ib Uplift (1.5 F.S) -78 Ib 0 Ib 0 Ib -78 Ib Bearing Length 0.10 in 0.81 in 0.81 in 0.10 in BEAM DATA Left Span Length 6 ft Unbraced Length -Top 0 ft Unbraced Length -Bottom 6 ft Live Load Duration Factor 1.00 Notch Depth 0.00 Center Rjgbt 8 ft 6 ft 0 ft 0 ft 8 ft 6 ft MATERIAL PROPERTIES #2 - Douglas- Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Min. Mod. of Elasticity: Comp. to Grain: Base Values Adjusted Fb = 900 psi Fb' = 1158 psi Cd =1.00 CI =0.99 CF =1.30 Fv = 180 psi Fv' = 180 psi Cd =1.00 E = 1600 ksi E' = 1600 ksi E_min = 580 ksi E_min' = 580 ksi Fc -1= 625 psi Fc -1' = 625 psi Controlling Moment: -1287 ft -lb Over left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Controlling Shear: 1076 Ib At a distance d from left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2 Comparisons with required sections: Section Modulus: Area (Shear): Moment of Inertia (deflection): Moment: Shear: Read provided 13.34 in3 30.66 in3 8.96 in2 25.38 in2 14.38 in4 111.15 in4 -1287 ft -lb 2958 ft-lb 1076 Ib 3045 Ib Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page of UNIFORM LOADS Left Center S1gtil Uniform Live Load 63 plf 188 plf 63 plf Uniform Dead Load 38 plf 113 plf 38 plf Beam Self Weight 6 plf 6 plf 6 plf Total Uniform Load 107 plf 307 plf 107 plf )VOTES Paf3P 2 of R • Project: North Hill Apartment Repairs Location: Roof Beam 1 - Support Column [2009 International Building Code(2005 NDS)] 3.5 IN x 3.5 IN x 8.0 FT #2 - Hem -Fir - Dry Use Section Adequate By: 66.4% VERTICAL REACTIONS Live Load: Vert-LL -Rxn = Dead Load: Vert-DL -Rxn = Total Load: Vert-TL -Rxn = 1096 Ib 704 Ib 1800 Ib COLUMN DATA Total Column Length: 8 ft Unbraced Length (X -Axis) Ly: 8 ft Unbraced Length (Y -Axis) Ly: 8 ft Column End Condtion -K (e): 1 Axial Load Duration Factor 1.00 COLUMN PROPERTIES #2 - Hem -Fir Compressive Stress: Bending Stress (X -X Axis): Bending Stress (Y -Y Axis): Modulus of Elasticity: Min. Mod. of Elasticity: Column Section (X -X Axis): Column Section (Y -Y Axis): Area: Section Modulus (X -X Axis): Section Modulus (Y -Y Axis): Slendemess Ratio: Base Values Adiusted Fc = 1300 psi Fc' = 437 psi Cd =1.00 CF1 15 Cp =0.37 Ci =0.80 1020 psi Fbx = 850 psi Fbx' = Cd =1.00 CF =1 50 Ci =0.80 Fby = 850 psi Fby' = Cd =1.00 CF =1 50 Ci =0 80 E = 1300 ksi E' _ E_min = 470 ksi E min' = dx = dy = A= Sx = Sy = Lex /dx = Ley /dy = Column Calculations (Controlling Case Only): Controlling Load Case: Axial Total Load Only (L + D) Actual Compressive Stress: Allowable Compressive Stress: Eccentricity Moment (X -X Axis): Eccentricity Moment (Y -Y Axis): Moment Due to Lateral Loads (X -X Axis): Moment Due to Lateral Loads (Y -Y Axis): Bending Stress Lateral Loads Only (X -X Axis): Allowable Bending Stress (X -X Axis): Bending Stress Lateral Loads Only (Y -Y Axis): Allowable Bending Stress (Y -Y Axis): Combined Stress Factor: Fc = Fc' = Mx-ex = My-ey = Mx = My = Fbx = Fbx' = Fby = Fby' = CSF = 1020 psi 1235 ksi 447 ksi 3.5 in 3.5 in 12.25 in2 7.15 in3 7.15 in3 27.43 27.43 147 psi 437 psi 0 ft-lb 0 ft-lb 0 ft -Ib 0 ft -lb 0 psi 1020 psi 0 psi 1020 psi 0.34 Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 �Y41 i -.1••••-e...**-- Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page /of AXIAL LOADING Live Load: Dead Load: Column Self Weight: Total Load: PL = 1096 Ib PD = 686 Ib CSW = 18 Ib PT = 1800 Ib NOTES Pay, 3 of R Project: North Hill Apartment Repairs Location: Stair Stringer Multi- Loaded Multi -Span Beam [2009 International Building Code(2005 NDS)] 2.5 IN x 9.25 IN x 7.0 FT (Actual 8.1 FT) #2 - Douglas- Fir -Larch - Dry Use Section Adequate By: 52.5% Controlling Factor: Moment DEFLECTIONS Center Live Load 0.06 IN L/1469 Dead Load 0.01 in Total Load 0.07 IN L/1167 Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240 REACTION Live Load Dead Load Total Load Bearing Length A 700 Ib 700 Ib 181 Ib 181 Ib 881 Ib 881 Ib 0.56 in 0.56 in BEAM DATA Span Length Unbraced Length -Top Unbraced Length -Bottom Beam End Elevation Difference Live Load Duration Factor Notch Depth Center 7 ft 0 ft 7 ft 4 ft 1.00 0.00 MATERIAL PROPERTIES #2 - Douglas- Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Min. Mod. of Elasticity: Comp. to Grain: Base Values Adjusted Fb = 900 psi Fb' = 792 psi Cd =1.00 CF =1.10 Ci =0.80 Fv' = 144 psi Fv = 180 psi Cd =1.00 Ci =0.80 E = 1600 ksi E' = 1520 ksi E_min = 580 ksi E_min' = 551 ksi Ci =0.95 Fc -1= 625 psi Fc -1' = 625 psi Controlling Moment: 1543 ft-Ib 3.499 Ft from left support of span 2 (Center Span) Created by combining all dead toads and live loads on span(s) 2 Controlling Shear: 628 Ib At a distance d from left support of span 2 (Center Span) Created by combining all dead roads and live loads on span(s) 2 Comparisons with required sections: Section Modulus: Area (Shear): Moment of Inertia (deflection): Moment: Shear: BeAYI 23.37 in3 6.54 in2 35.08 in4 1543 ft-Ib 628 Ib Provided 35.65 in3 23.13 in2 164.89 in4 2353 ft-Ib 2220 Ib �v. 6 r. •.. • • • Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page of LOADING DIAGRAM 7 ft UNIFORM LOADS Center Uniform Live Load Uniform Dead Load Beam Self Weight Total Uniform Load 200 plf 40 plf 5 plf 245 plf NOTES Para 4 of R Project: North Hill Apartment Repairs Location: Floor Beam - 3rd Floor Multi- Loaded Multi -Span Beam [2009 International Building Code(2005 NDS)] 3.5 IN x 9.25 IN x 20.0 FT (6 + 8 + 6) #2 - Douglas- Fir -Larch - Dry Use Section Adequate By: 60.0% Controlling Factor: Moment DEFLECTIONS Left Center Eight Live Load 0.00 IN L /MAX 0.04 IN L/2463 0.00 IN L /MAX Dead Load 0.00 in 0.01 in 0.00 in Total Load 0.00 IN L /MAX 0.05 IN L/2098 0.00 IN L /MAX Live Load Deflection Criteria: L1240 Total Load Deflection Criteria: U180 EACTION$ Live Load Dead Load Total Load Bearing Length A D Sc 12 441 Ib 2499 Ib 2499 lb 441 Ib 49 Ib 362 Ib 362 lb 49 Ib 490 Ib 2861 Ib 2861 lb 490 Ib 0.22 in 1.31 in 1.31 in 0.22 in BEAM DATA Span Length Unbraced Length -Top Unbraced Length -Bottom Live Load Duration Factor Notch Depth Left 6 ft 0 ft 6 ft 1.00 0.00 Center Eight 8 ft 6 ft 0 ft 0 ft 8 ft 6 ft MATERIAL PROPERTIES #2 - Douglas- Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Min. Mod. of Elasticity: Comp. 1 to Grain: Base Values Adjusted Fb = 900 psi Fb' = 864 Cd =1.00 CF =1.20 Ci =0.80 Fv = 180 psi Fv' = Cd =1.00 Ci =0.80 E = 1600 ksi E_min = 580 ksi Ci =0.95 Fc -1 = 625 psi psi 144 psi E' = 1520 ksi E_min' = 551 ksi Fc -1' = 625 psi Controlling Moment: 2246 ft-lb 4.0 Ft from left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2, 3 Controlling Shear: 1456 Ib At a distance d from left support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 1, 2, 3 Comparisons with required sections: Section Modulus: Area (Shear): Moment of Inertia (deflection): Moment: Shear: Read 31.2 in3 15.17 in2 22.49 in4 2246 ft-lb 1456 Ib Provided 49.91 in3 32.38 in2 230.84 in4 3594 ft-lb 3108 Ib ••w..+.. •d1.•..AV r.• I NOIN6Q¢1iNd Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page /of LOADING DIAGRAM t 1 tt Btt aft 6ft UNIFORM LOADS Left plf 25 plf 7 plf plf Center Right 250 plf 25 plf 7 plf 282 plf Uniform Live Load 250 Uniform Dead Load Beam Self Weight Total Uniform Load 282 250 plf 25 plf 7 plf 282 plf POINT LOADS - CENTER SPAN Load Number One Live Load 881 Ib Dead Load 181 Ib Location 4 ft NOTES Pargp5nfR Project: North Hill Apartment Repairs Location: Floor Beam - 2rd Floor Multi- Loaded Multi -Span Beam [2009 International Building Code(2005 NDS)] 5.5 IN x 9.25 IN x 20.0 FT (6 + 8 + 6) #2 - Douglas- Fir -Larch - Dry Use Section Adequate By: 13.0% Controlling Factor: Moment DEFLECTION$ Left Live Load 0.02 IN L/4611 Dead Load 0.00 in Total Load 0.02 IN L/4614 Live Load Deflection Criteria: U360 Center Bight 0.04 IN L/2280 0.04 IN L/1971 0.00 in 0.00 in 0.05 IN L /2066 0.04 IN L/1864 Total Load Deflection Criteria: U240 REACTIONS Live Load Dead Load Total Load Uplift (1.5 F.S) Bearing Length A 738 Ib 63 Ib 800 Ib -204 Ib 0.23 in 2608 lb 4452 Ib 2013 Ib 371 Ib 578 Ib 190 Ib 2980 Ib 5030 Ib 2203 Ib -81 Ib 0 Ib -119 Ib 0.87 in 1.46 in 0.64 in BEAM DATA Span Length Unbraced Length -Top Unbraced Length -Bottom Live Load Duration Factor Notch Depth Left 6 ft 0 ft 6 ft 1.00 0.00 Center Eight 8 ft 6 ft 0 ft 0 ft 8 ft 6 ft fr1 TERIAL PROPERTIES #2 - Douglas- Fir -Larch Bending Stress: Shear Stress: Modulus of Elasticity: Min. Mod. of Elasticity: Comp. -I- to Grain: Base Values Adjusted Fb = 750 psi Fb' = 598 Cd =1.00 CI =1.00 CF =1.00 Ci =0.80 Fv = 170 psi Fv' = 136 Cd =1.00 Ci =0.80 E = 1300 ksi E_min = 470 ksi Ci =0.95 Fc -1= 625 psi psi psi E' = 1235 ksi E_min' = 447 ksi Fc -1' = 625 psi Controlling Moment: -3459 ft-lb Over right support of span 2 (Center Span) Created by combining all dead loads and live loads on span(s) 2, 3 Controlling Shear: 2483 Ib At a distance d from left support of span 3 (Right Span) Created by combining all dead loads and live loads on span(s) 2, 3 Comparisons with required sections: Section Modulus: Area (Shear): Moment of Inertia (deflection): Moment: Shear: Read 69.41 in3 27.38 in2 66.25 in4 -3459 ft-lb 2483 Ib provided 78.43 in3 50.88 in2 362.75 in4 3909 ft-lb 4613 Ib 0860tw6661861rom Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page of LOADING DIAGRAM i 6n 8k6n II UNIFORM LOADS Lei Center 750 75 11 836 Bight plf plf plf plf Uniform Live Load 250 plf Uniform Dead Load 25 plf Beam Self Weight 11 plf Total Uniform Load 286 plf 250 plf 25 plf 11 plf 286 plf POINT LOADS - CENTER SPAN Load Number Qpg Live Load 881 Ib Dead Load 181 Ib Location 4 ft NOTES PAOP R nf R Project: North Hill Apartment Repairs Location: 2nd Floor Beam - Support Column [2009 International Building Code(2005 NDS)] 5.5 IN x 5.5 IN x 8.75 FT #2 - Hem -Fir - Dry Use Section Adequate By: 18.3% VERTICAL REACTION Live Load: Dead Load: Total Load: Vert-LL -Rxn = 8047 Ib Vert-DL -Rxn = 1675 Ib Vert-TL -Rxn = 9722 Ib COLUMN DATA Total Column Length: 8 75 ft Unbraced Length (X -Axis) Ly: 8.75 It Unbraced Length (Y -Axis) Ly: 8.75 ft Column End Condtion -K (e): 1 Axial Load Duration Factor 1.00 COLUMN PROPERTIES #2 - Hem -Fir Compressive Stress: Bending Stress (X -X Axis): Bending Stress (Y -Y Axis): Modulus of Elasticity: Min. Mod. of Elasticity: Column Section (X -X Axis): Column Section (Y -Y Axis): Area: Section Modulus (X -X Axis): Section Modulus (Y -Y Axis): Slendemess Ratio: Base Values Adjusted Fc = 575 psi Fc' = 393 psi Cd =1 00 Cp =0 85 Ci =0.80 Fbx = 575 psi Fbx' _ Cd =1 00 CF =1 00 Ci =0 80 Fby = 575 psi Fby' = Cd =1 00 CF =1.00 Ci =0.80 E = 1100 ksi E _ E_min = 400 ksi E min' = dx = dy = A= Sx = Sy = Lex /dx = Ley /dy = Column Calculations (Controlling Case Only): Controlling Load Case: Axial Total Load Only (L + D) Actual Compressive Stress: Allowable Compressive Stress: Eccentricity Moment (X -X Axis): Eccentricity Moment (Y -Y Axis): Moment Due to Lateral Loads (X -X Axis): Moment Due to Lateral Loads (Y -Y Axis): Bending Stress Lateral Loads Only (X -X Axis): Allowable Bending Stress (X -X Axis): Bending Stress Lateral Loads Only (Y -Y Axis): Allowable Bending Stress (Y -Y Axis): Combined Stress Factor: Fc = Fc' = Mx-ex = My-ey = Mx = My = Fbx = Fbx' = Fby = Fby' = CSF = 460 psi 460 psi 1045 ksi 380 ksi 5 5 In 55 in 30.25 in2 27.73 in3 27.73 in3 19.09 19.09 321 psi 393 psi 0 ft-lb 0 ft-lb 0 ft-lb 0 ft -lb 0 psi 460 psi 0 psi 460 psi 0.82 NOIA 460i1raO Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page of AXIAL LOADING Live Load: Dead Load: Column Self Weight: Total Load: PL = 8047 Ib PD = 1626 Ib CSW = 49 Ib PT = 9722 Ib NOTES Para 7 of R Project: North Hill Apartment Repairs Location: 3rd Floor Beam - Support Column [2009 International Building Code(2005 NDS)] 3.5 IN x 3.5 IN x 8.75 FT #2 - Hem -Fir (North) - Dry Use Section Adequate By: 16.5% VERTICAL REACTIONa Live Load: Vert-LL -Rxn = 3595 Ib Dead Load: Vert-DL -Rxn = 1069 Ib Total Load: Vert-TL -Rxn = 4664 Ib COLUMN DATA Total Column Length: 8.75 ft Unbraced Length (X -Axis) Ly: 8.75 ft Unbraced Length (Y -Axis) Ly: 8.75 ft Column End Condtion -K (e): 1 Axial Load Duration Factor 1.00 COLUMN PROPERTIES #2 - Hem -Fir (North) Compressive Stress: Bending Stress (X -X Axis): Bending Stress (Y -Y Axis): Modulus of Elasticity: Min. Mod. of Elasticity: j3ase Values Adiusted Fc = 1450 psi Fc' = 456 psi Cd =1.00 Cf =1.15 Cp =0.34 Ci =0.80 Fbx = 1000 psi Fbx' = 1200 psi Cd =1.00 CF =1.50 Ci =0 80 Fby = 1000 psi Fby' = 1200 psi Cd =1.00 CF =1.50 Ci =0.80 E = 1600 ksi E' = 1520 ksi E_min = 580 ksi E min' = 551 ksi Column Section (X -X Axis): dx = 3.5 in Column Section (Y -Y Axis): dy = 3.5 in Area: A = 12.25 in2 Section Modulus (X -X Axis): Sx = 7.15 in3 Section Modulus (Y -Y Axis): Sy = 7.15 in3 Slendemess Ratio: Lex /dx = 30 Ley /dy = 30 Column Calculations (Controlling Case Only): Controlling Load Case: Axial Total Load Only (L + D) Actual Compressive Stress: Fc = 381 psi Allowable Compressive Stress: Fc' = 456 psi Eccentricity Moment (X -X Axis): Eccentricity Moment (Y -Y Axis): Moment Due to Lateral Loads (X -X Axis): Moment Due to Lateral Loads (Y -Y Axis): Bending Stress Lateral Loads Only (X -X Axis): Allowable Bending Stress (X -X Axis): Bending Stress Lateral Loads Only (Y -Y Axis): Allowable Bending Stress (Y -Y Axis): Combined Stress Factor: Mx -ex = 0 ft-lb My-ey = 0 ft -Ib Mx = 0 ft -Ib My = 0 ft-Ib Fbx = 0 psi Fbx' = 1200 psi Fby = 0 psi Fby' = 1200 psi CSF = 0.84 CNOtiveirit1i a Luke Moerke Pacific Northwest Engineering 1944 Pacific Ave; Ste #305 Tacoma, WA 98402 StruCalc Version 8.0.101.0 11/2/2010 10:59:24 AM page /of AXIAL LOADING Live Load: Dead Load: Column Self Weight: Total Load: PL = 3595 Ib PD = 1048 Ib CSW = 21 Ib PT = 4664 Ib NOTES PargpR elf R 04 -01 -2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director GARY ANDERSON 5010 S TACOMA WY TACOMA WA 98409 RE: Permit No. D10 -301 5840 SOUTHCENTER BL TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 05/14/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 05/14/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, -----WQ --"--a____ Bill Rambo Permit Technician File: Permit File No. D10 -301 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206 - 431 -3665 • PE 1G CO If PLAN REVIEW /ROUTING SLIP L ACTIVITY NUMBER: D10 -301 DATE: 11 -04 -10 PROJECT NAME: NORTH HILL APTS - BLDG C SITE ADDRESS: 5840 SOUTHCENTER BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: kiAL 11L-10 Building Division �% ` \- -l0 in �ublic Works rire re entiu Structural \\--i4 0 Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-09-10 Complete Incomplete ❑ Comments: Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: nNo further Review Required DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 12 -07 -10 Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Printer Friendly Page • • General /Specialty Contractor A business registered as a construction contractor with Lal to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name G P ANDERSON CONSTRUCTION INC UBI No. 601838669 Phone 2535497450 Status Active Address 121 Bella Bella Dr License No. GPANDCI033RP Suite /Apt. License Type Construction Contractor City Fox Island Effective Date 12/17/1997 State WA Expiration Date 12/16/2011 Zip 98333 Suspend Date County Pierce Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status APEXCL'024B0 APEX CONSTRUCTION LLC Construction Contractor General Unused 1/20/1998 1/4/2003 Archived OLYMPVC055MPCONST CONSTRUCTION INC CONSTRUCTION Construction Contractor General Unused 7/17/1995 9/30/1998 Archived OLYMPVC054R9 OLYMPIC VIEW CONSTRUCTION Construction Contractor General Unused 12/29/1994 9/30/1995 Archived ANDERC'086B2 ANDERSON CONSTRUCTION Construction Contractor General Unused 1/22/1992 1/22/1995 Archived Business Owner Information Name Role Effective Date Expiration Date ANDERSON, GARY Cancel Date 01/01/1980 Bond Amount ANDERSON, PEGEEN 3 01/01/1980 6382694 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 3 oERICAN STATES INS 6382694 12/16/2005 Until Cancelled $12,000.0011 /01/2005 2 DEVELOPERS SURETY Et INDEM CO 445696C 12/16/2001 Until Cancelled 02/06/2006 $12,000.0012/22 /2005 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 12 LIBERTY NORTHWEST INS CORP BH053575320 12/16/2010 12/16/2011 $1,000,000.00 10/08/2010 11 0010 CABINS BH053575320 12/16/2008 12/16/2010 $1,000,000.0011 /06/2009 10 0010 CAS INS BH053575320 12/16/2007 12/16/2008 $1,000,000.00 12/12/2007 9 FIRST SPECIALTY INS CORP FGL22900572600 12/16/2005 12/16/2007 $1,000,000.00 12/15/2006 8 FIRST MERCURY INS CO FMIL000270 12/16/2004 12/16/2005 $1,000,000.00 12/23/2004 https://fortress.wa.gov/lni/bbip/Printaspx 11/15/2010 e$f 1.4444 �! am Log fiPitt. ¢ .. } �` wta ?4 h!r � , 1 • �''���j,/ ?Vey, . �► V i Att...) �wlR7+ �T►7 i . r".. ni . • ,. . ,,„w„,, t ki:4.624417.*Iii. 4441Z% °r 1 CITY OF TUKWILA A I, P R 0.y E D