Loading...
HomeMy WebLinkAboutPermit D10-353 - WESTFIELD SOUTHCENTER MALL - SEISMIC UPGRADESWESTFIELD MALL STRUCTURAL UPGRADES 2800 SOTJTHCENTER MALL D10 -353 City otkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us DEVELOPMENT PERMIT Parcel No.: 9202470010 Address: 2800 SOUTHCENTER MALL TNKW Suite No: Project Name: WESTFIELD MALL - SEISMIC UPGRADE Permit Number: D 10 -353 Issue Date: 03/21/2011 Permit Expires On: 09/17/2011 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: MARK HILLIARD Address: 2601 4 AV #350 , SEATTLE WA 98121 Contractor: Name: B N BUILDERS INC Address: 2601 4 AV STE 350 , SEATTLE WA 98121 Contractor License No: BNBUII *990K3 Phone: 206 718 -1896 Phone: 206 382 -3443 Expiration Date: 09/12/2011 DESCRIPTION OF WORK: SEISMIC UPGRADE TO EXISTING BRACE FRAME Value of Construction: $10,000.00 Fees Collected: $464.52 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: IIB Occupancy per IBC: 0019 Electrical Service Provided by: * *continued on next page ** doc: IBC -7/10 D10 -353 Printed: 03 -21 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: N N • • Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. End Time: Fill 0 c.y. Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: N Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to construction or the performance of wor • . am aut to this permit. Signature: c ve authority to violate or cancel the provisions of any other state or local laws regulating • • ed to sign and obtain this development permit and agree to the conditions attached Print Name: MAYiAG. A LI Date: 3 +2.I,I This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDTPIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: The special inspections for steel elements of buildings and structures shall be required. All welding shall be done by a Washington Association of Building Official Certified welder. 6: Installation of high- strength bolts shall be periodically inspected in accordance with AISC specifications. 7: When special inspection is required, either the owner or the registered design professional in responsible charge, doc: IBC -7/10 D10 -353 Printed: 03 -21 -2011 shall employ a special inspection agency a tify the Building Official of the appointment r to the first building inspection. The special inspector sfurnish inspection reports to the Building Of OW in a timely manner. 8: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 9: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 10: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D10-353 Printed: 03 -21 -2011 CITY OF TUKW►LA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hup://www c i. tulavi (a. wa. us SITE LOCATION Building Permit No. Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No, big Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** King Co Assessor's Tax No.: 619,0 2_14,1 -b®t 0 Site Address: 2800 . Soonte.. iSrtY .. MALL Suite Number: Floor: Tenant Name: W esTF1 ' New Tenant: ❑ Yes No Property Owners Name: W is'STV11:14,0 LLC Mailing Address: '2 O SourHtt-t.yrwk. M Ak .. , TII1Ci MLA City wA State 48188 Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: MAP*. 4-rit,r uA000 Day Telephone: 2.0 10 r%ito Mailing Address: 2( OI 4T" A lE. 03i0 Soma A)& 18114 City State Zip E -Mail Address: Wvvirkln P brn bat 1dGY s.Go nn Fax Number: to tp S%t .5 � 410 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: emea sow) tR t we., c Mailing Address: 21001 s�T l4 Ad E 4 -3 5O S ewr W q 812.1 Contact Person: 4P 2•V. 441 tj_ - b. % E -Mail Address: Pvk rld) bn bur Ickrs. G4W► Contractor Registration Number: TdI4154i $ ittlque3 City State Zip Day Telephone: 2.0 (0 1 r g 1$110 Fax Number: 2b(. '382.31 a}b Expiration Date: 1A .1,$. ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: 14/P Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD - All pia . must be wet stamped by Enginee of Record Company Name: k e 1R3 Mailing Address: SOD FiFmk & 1 ''$OO ■ Sti1rTI,. 9 it109 City State Zip Day Telephone: ZCg0 340 22.55 E -Mail Address: Fax Number: 24,40 340 22Lptp Contact Person: ACCole. P H H:\Applications\Forms- Applications On Line\2009 Applications \I-2009 - Permit Application doc Revised: 1-2009 bh Page 1 of 6 BUILDING PERMIT INFORM ZION - 206 - 431 -3670 Valuation of Project (contractor's bid price): $ 101 000 Existing Building Valuation: $ Scope of Work (please provide detailed information): SriSMr G. l3pC,edko e. *b far riAlC4 saw, e triwkivie Will there be new rack storage? ❑ Yes 'NI.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: • Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ▪ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. • H:WpplicationsTorms- Applications ▪ On Line\2009 Applications \I-2009 - Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per ,.. IBC I :t Floor 2 "d Floor 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: • Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ▪ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. • H:WpplicationsTorms- Applications ▪ On Line\2009 Applications \I-2009 - Permit Application.doc Revised: 1 -2009 bh Page 2 of 6 PERMIT APPLICATION NOTES _ Applicable to'alliiehnit;iiiribis.lii.PACAliii0 Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. } Date: 112.2.q. 9 BUILDING OWNS R AUTHQRIZED AGENT: p Signature: �A•� Print Name: PAP e. A %Vildk A flJ Day Telephone: 2046 .111%. 9 Saito Mailing Address: ZCIC 4 ME 3S0 AYT Ty IN 141/4 418 $24 State Zip Date Application Accepted: i ' ^ Date Application Expires: at (�1 ( 1 ( Staff Initials: Ali HA Applications On Line\2009 Applications \I -2009 - Permit Application. doc Revised: 1 -2009 bh Page 6 of 6 PLUMBING AND GAS PIPIT ..- ERIVIIT INFORMATION'.= ~206 =431= PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Building Use (per Int'I Building ode): Occupancy (per Int'l Building Co. `, : Utility Purveyor: Water: ewer: Indicate type of plumbing fixtures and /or s piping outlets being in , :lled and the quantity below: Fixture Type: Qty Fixture T , e: Qty ; ` ixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountai r water cooler (per h- d) Food -waste grinder, commercial Floor Drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater an .: sr vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair a. alteration of water ping and /or water trea ent equipment Repair or alteration of •_rainage or vent piping Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 ::ckflow protective . evice other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Bac -_7 ow protective device other : : n atmospheric -type vacuum i\,'reakers over 2 inch (51 ' , ) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping o', . ets H: Applications Yorms- Applications On- Line\2009 Applications11-2009 Permit Application.doc Revised: 1 -2009 bh Page 5 of 6 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 9202470010 Permit Number: D10 -353 Address: 2800 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 12/29/2010 Applicant: WESTFIELD MALL - SEISMIC UPGRADE Issue Date: Receipt No.: R11 -00548 Initials: User ID: WER 1655 Payment Amount: $283.30 Payment Date: 03/21/2011 01:04 PM Balance: $0.00 Payee: B N BUILDERS TRANSACTION LIST: Type Method Descriptio Amount Payment Check 56936 283.30 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 640.237.114 Total: $283.30 278.80 4.50 doc: Receipt -06 Printed: 03 -21 -2011 1111 1110 wq� City of Tukwila �.4 y Department of Community Development �. Gl 6300 Southcenter Boulevard, Suite #100 ``'' Tukwila, Washington 98188 ?I Phone:206- 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www. ci. tukwi la. wa. us RECEIPT Parcel No.: 9202470010 Permit Number: D10-353 Address: 2800 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 12/29/2010 Applicant: WESTFIELD MALL - SEISMIC UPGRADE Issue Date: Receipt No.: R10 -02583 Payment Amount: $181.22 Initials: JEM Payment Date: 12/29/2010 03:57 PM User ID: 1165 Balance: $283.30 Payee: MARK & TRACEY HILLIARD TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11682 181.22 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 181.22 Total: $181.22 doc: Receiot -06 Printed: 12 -29 -2010 , 1 '1! !I ;.iii I .1 • ID to -3 53 INSPECTION RECORD Retain a copy with permit INSPECTION NO.... PERMIT NO. CITY OF'TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection_ Request Line (206) 431 -2451 Pro'ec • g 4444 Type o Inspection ■ Address: VOI .: s. ivy- i t Date Galled: Le-1--4 e Special Instructions: • z) ,5 S 0 76 03 5 r4 ,cc; . ✓? GrA • . Date Wanted:. 1 1 —'4 — I 1 �,gdN p.m. Requester: M ill K Phone No: -7(8-'(o y 5i • • • Approved per applicable codes. Corrections required prior to approval. COMMENTS: . �Pa AA fti-s _r' 7 N A ( Le-1--4 e (•. `.t anvo.ws - 1,4 prt,,.4 1 4 pect 'Dail: INSPECTIQN.FEE REQUIRED. Pri,• r to next inspection. fee must be paiat 6300 Sbuthcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 re PERMIT NO. 1- (206)431 -3670 Project: Type of Inspection: / .,_..0 /t/S }��l%7 %'J 45 )� // i/E'J/e‘s /et-i-'7 - L i A '/j // , r - d , P .---;A.6-1/ At70-40 Y "A/ L-67T�%� Address: C9■3o0 07 ft// Date Called: Special Instructions: Date Wanted: e-3 -// rfi` P. Requester: Phone No: — .)46-2.,6 -!!°96. 0 Approved per applicable codes. ElCorrections required prior to approval. COMMENTS: 7---0 \ ...cif .5',/ ,r' 1A- /!!1401S 4-7-Aa(// rf (. / .,_..0 /t/S }��l%7 %'J 45 )� // i/E'J/e‘s /et-i-'7 - L i A '/j // , r - d , P .---;A.6-1/ At70-40 Y "A/ L-67T�%� Inspe • r: m/ ..„ .00 REINSPECTION FE REQUIRED. Prior to inspection, fee must be id at 6300 Southcenter tvd., Suite 100. Call to schedule reinspection. Date: R-ceipt No.: (Date: _ MAYES TESTING ENGINEERS, INC. October 12, 2011 City of Tukwila Building Department 6200 South Center Blvd Tukwila, WA 98188 -8188 Attention: Building Official Re: Westfield Southcenter Seismic Upgrade Final Letter 2800 Southcenter Mall Permit No. D10 -353 Tukwila, WA Project No. L11321 Gentlemen, SeaWCe afire 20225 CedarValy Road Suite 110 Lynwood, WA 98036 0h425.742.9360 fax 425.745.1737 Tacama OBce 10029 S. Taooma Way Suite E -2 Tacoma, WA98499 ph 253.584.3720 fax 253.584.3707 AwtlandO/Boe 7911 NE 33rd Drive Suite 190 Pbriland, OR 97211 ph 503.281.7515 fa;<503281.7579 This is to inform you that registered special inspections have been completed for this project as per our reports, copies of which have been sent to you. Special inspection was provided for: • Structural Steel Welding • Proprietary Anchors To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform to, the city approved drawings, or engineer approved changes. We trust this provides you with the information that you require. Should you have any questions please call us at 425/742 -9360. Sincerely, Mayes Testing Engineers, Inc. Timothy G. Beckerle, P.E. Branch Manager u • iI r .1t. • ` "4n: ? { 4l4Y4q —tiPas x MAYES TESTING ENGINEERS, INC. Project No. Project Address Permit No. Bldg Dept. L11321 Westfield Southcenter Seismic Upgrade 2800 Southcenter Mall, Tukwila, WA D10 -353 City of Tukwila Engineer ABKJ Contractor BN Builders, Inc. Record No. 005 Date 8/2/2011 Weather Inspection Structural steel Sample(s) -- fr Seattle Office 20225 Cedar Valley Road Site 110 Lyrrtwood, WA 98036 ph 425.742.9360 to 425.745.1737 Tacoma office 10029 S. Tacoma Way Stile E -2 Tacoma, WA 98499 ph 253.584.3720 fax 253.584.3707 Fbrtland Office 7911 NE 33rd Dime Site 190 Portland, OR 97211 503281.7515 fax 503281.7579 Performed ultrasonic testing on welds for the top flange doubler plate on grid Q/18, and bottom flange doubler plate at grid Q/19. Welds were acceptable to AWS D1.1 Table 6.2. Performed visual inspection on welding stiffeners at the column base at grid Q/19, as shown on detail 3/S.2. Welds were in compliance with AWS D1.1. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Mike Virgilio Reviewed By: Kevin Graham Senior Project Manager Page 1 of 1 MAYES TESTING ENGINEERS, INC 20225 Cedar Valley Road, Suite 110 Ph 425.742.9360 Lynnwood, WA 98036 Fax 425.745.1737 10029 S. Tacoma Way, Suite E -2 Tacoma, WA 98499 7911 NE 33rd Drive, Suite 190 Portland, OR 97211 Specification: AWS D1.1 Ph 253.584.3720 Fax 253.584.3707 Ph 503.281.7515 Fax 503.281.7579 UT Equipment: Model: USN 58L Serial No.: 01WR68 Page 1 of 1 Ultrasonic Examination Report Project No.: L11321 Date: 8/2/2011 Project: Westfield Southcenter Seismic Upgrade Weld Process: ❑ SMAW ® FCAW ❑ GMAW El SAW Transducer: Method: Freq.: 2.25 MHz ❑ Long ® Shear ® IIW El DSC Calibration Block: Size: 3/4 x 3/4 ❑ Other ❑ Other 4. f. l.ocationWed 1 �, � � � r y j�.' 4 1, 6 Pi 1 roar�ul xc � 7 �� F i tv , rr�� t,1 { kr IndicationNumber 4TrarischiCer AtigIDETA :,:'•Aiiii iiiia iiiiii -:‘ ''-'3:-:; '..4_4;iciiiiti trasLiEt a v { }S w '4 s s �' (� w ound P atFi°l ' , !�P D� P i3 s ontin]`' y {V9 r _ V#6 4 Y. L � i aft Rt�s��.. � • L . a ength s u.� IJ J { {sFih t y E r'Cf�t�,M Ley t,l� �,,, r Depth - 'f ��}Fttl Distance T ;X� itwT - h "via P fi it UY N% 5.*t"� s m, V C1 Ixhf a" $tpi F.v nk+tta' z 4. fti , S� . `0 E,, ' qqt��y�.�. }, "xr {' '4c -} J• P {S�t,��yij° i 1 � k y'h ema t.,- 4' j a �C-cF- ' s b , ' ra...» Q/18 TF 70 60 X Northeast TF 70 60 X Northwest TF 70 60 X Southeast TF 70 60 X Southwest Q/19 BF 70 60 X Inspector: Mike Virgilio Level: II MTE 1521 -2C. Rev 0, 712/07 MAYES TESTING ENGINEERS, INC. Project No. L11321 Project Westfield Southcenter Seismic Upgrade Address 2800 Southcenter Mall, Tukwila, WA Permit No. D10 -353 Bldg Dept. Tukwila Contractor BN Builders, Inc. Record No. 001 Date 7/25/2011 Weather -- Inspection Project management Sample(s) -- RECEIVED CITY OP TUKWILA JUL 2 8 2011 PERMIT CENTEP Seattle Office 20225 Cedar valeyRoad Stile 110 Lyrnwood, WA 98036 ph 425.7429360 fax 425.745.1737 Tacoma office 10029 S. Tacoma Way Suae E-2 Tacoma, WA 98499 01 253.584.3720 fa( 253.584.3707 Portland Office 7911 NE 33rd Drive Stine 190 Portland, OR 97211 ph 503281.7515 fax 503281.7579 Made a visit to the jobsite to review the project scope of work with the welding contractor and evaluate the weld conditions. Reviewed the contractors weld procedures and found them in compliance with AWS D1.1. Discussed the ultrasonic test procedures and conditions for the proposed weld joints. Looked at the fit -up of some column splice welds and column to continuity plates. Found these joints in compliance with AWS D1.1 and the structural drawings. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Mike Virgilio Reviewed By: Tw ."'") Timothy G. Beckerle, P.E. Branch Manager Page 1 of 1 ABKJI ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers STRUCTURAL ENGINEERING CALCULATIONS 800 Fifth Avenue, Suite 2500 Seattle, Washington 98 I04 Tel: 206.340.2255 Fax: 206.340.2266 I www.abkj.com 25 January 2011 ABKJ Project Number (10141.00) Volume (1 of 1) Westfield Shoppingtown Southcenter Phase VI Seismic Upgrade Permit Comment Responses - Structural Analysis Tukwila, WA REVIEWED FOR CODE COMPLIANCE FEB 2 2 2011 Submitted to: Westfield Corporation 633 Southcenter Seattle, WA 98188 -2888 Tel: (206)- 246 -0423 Fax: (206)- 244 -8607 City of Tukwila BUILDING DIv1,4m FEB - 7 2011 ABKJ� ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers STRUCTURAL ENGINEERING CALCULATIONS 800 Fifth Avenue, Suite 2500 Seattle, Washington 98104 Tel: 206.340.2255 I Fax: 206.340.2266 www.abkj.com 25 January 2011 ABKJ Project Number (10141.00) Index to Structural Calculations: Partial Lateral Seismic Design STADDPro Evaluation Frame Models Upgrade Member Design and R1SA 2D Model Pages: L1 -- L4A E1 -- E26 U1 -- U9 ABKJII ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 Tel: 206.340.2255 Fax: 206.340.2266 www.abkj.com PROJECT W s T P///%�.1� .StE/ SNJ / G (/PG 12111)E- JOB # 07 / D O DATE SUBJECT .4;o--.57 4 tv BY [/, 5, 7D11"/ sr0N / SHEET# .'�Q4S, Ai A "A /u U AkW Si s - m,y52- (gam�i - 3,5 -o eL3/.44-0ey - 3 = - M °MEN T Gieit-, -n c� C4 3,0 V CSC' iQ 3s . - /, z S I f y P El 4-0-1;N A"vee/-1 I A 1 I I I i -+- ! 1-�4a)k. ; 2,v .J e6 0 &--L/< I I : /6i / -, s awsT - , 3 I ty� Iy L !vv! Ion „2r- /I' 7 I I /zG,S� !� SPJf)7,-7 r11 (71729 ►- , 719, f3 k ; • /o, 9 I /2 /°.Si= I . io gcs ` i i ri I 1 I I i i � i I. l tf00 tiLm� I A-) .A J!, , 44!T- i Gr,PllDk.b4 /�' 6 s'NIA )LA-Az 5 i I I • MSRMaps Microsoft Research Maps Search MSR Maps Street 1633 Southcenter City Iseattle _ - State 49.11- Page 1 of 1 L.14 /..4k . „ 4. 40) Home 1 Advanced Find 1 Famous Places 1 Web Services 1 About 1 Bing Maps f" TheNafione/Nfap Q/633 Southcenter Mall, Tukwila, WA 98188 -2816 Tukwila, Washington, United States 6/13/2002 Download 1 E -mail 1 Info 1 Print 1 Order Photo 1 Bing Maps • • OUT ► (wa so 0 Longitude Latitude 17.15-)27; 47.45867 GO O IN Size Urban Areas Aerial Photo Image courtesy of the U.S. Geological Survey USGS Online Stream Gauging Stations: ®USGS Green R at Tukwila, WA Source = 300951 Running Time 15.63 ms ei 2010 Microsoft Corporation. Server= TK2TERRAWEB21 'Terms of !Privacy Use Statement m Yds 50 100, 150, 50r 100' 150' Mkrosoft Sponsored Research By Bing http:// msrmaps. com /image.aspx ?T= 4 &S= 10 &Z =10 &X= 2778 &Y =26281 &W =1 &qs= 633 +... 1/20/2011 Project Name = Westfield South Center Mall Date = Thu Jan 20 10:37:36 PST 2011 Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 47.45867 Longitude = - 122.26102 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0 ,Fv = 1.0 Data are based on a 0.05000000074505806 deg grid spacing Period Sa (sec) (g) 0.2 1.427 (Ss, Site Class B) 1.0 0.489 (S1, Site Class B) Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 47.45867 Longitude = - 122.26102 Spectral Response Accelerations SMs and SM1 SMs =Fax Ss and SM1 =FvxS1 Site Class D- Fa= 1.0 ,Fv = 1.511 Period Sa (sec) (g) 0.2 1.427 (SMs, Site Class D) 1.0 0.738 (SM1, Site Class D) Conterminous 48 States 2003 NEHRP Seismic Design Provisions Latitude = 47.45867 Longitude = - 122.26102 Design Spectral Response Accelerations SDs and SD1 SDs = 2/3 x SMs and SD1 = 2 /3xSM1 Site Class D - Fa = 1.0 ,Fv = 1.511 Period Sa (sec) (g) 0.2 0.952 (SDs, Site Class D) 1.0 0440- (wi1 C( 0) Lire /14-k ABKJi ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 PROJECT W5 r Prn* `a SS € /SM / G SUBJECT 4n/ TeI:206.340.2255 1 //P 6RA- Pe JOB# 07/14 oo Fax: 206.340.2266 I www.abkj.com DATE BY D..6, .?OHNSrb/J7 SHEET# L 2 /6iA - ASS) -4r) -4-0 iNei 770 Fi 1e-3 ST ik2E 67? A/V - 9, PAI/Q5 6F1 , /e 4/nnS, E x(sr AFV iy El 46 Ap To FOP jyiE , Sii✓cc o of= 2:7/APIAT4 1.5 r x i 114,1 _ 6:0 P x,5 19 I I i ' IP ' , , I I i - Ids "'T v i �f*" / 0.S w Tll W/ b x ?16 W /G° 3L J B I T - 0,26 _5*- ;�-!TJ 1�'�? Lstil, is o! M ODEZ ; ((/ - E1 /4 i --r 1 I: I I !� � I / ! I el; 7' 1 • I , /,o i,/ 4 /adi i h - //rnhE .. j lit% / � w/ o k;Zt 4 tAv(/ 6 1 o 3/ Qi IT r I A voi tI/ / 2 (7 9 o . !\ / y! 1 i i i ! ! , ! i 1 1 ! L' 'r ' 11 i 14 I 1 1 ' ! • "'EI it rirt /-fori Is tA- /°f4' v I ii4 0. PE CI ! ! - V. lie- I 13 I (9-(212-1-7-15.!>( I I !C` S I 13(4)__-_-___o, SN I I I T 0. y J Z i 0 .,10/5 1 7(oi %sJ1�2 LP/ > 1�rib I 11 1 J: i • r 7 o,i fa I ,rc'g 2 42. Pk , I ABKJI ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 Tel: 206.340.2255 PROJECT W sr Pl ,4JE 6 — S/V{1 C v( 4, i OB t! Fax: 206.340.2266 DATE SUBJECT IJe -7 e BY 12S, .TayNJT"a ?"4/ • SHEET# www.abkj.com Or, 11' `3/41.4 1 / Y 1 * I T I P ° '— -.__i " ' (- H o 118 70 Y 9 1 - —i ; , .1 _1' j 11 1 I I I 1 1 1! I I I ! 1 1 i I I I -1//1 L. i v 00-7). 0.4 7)&= 1 711P/ CA-L.: ( Mac . ._, 1 !r re _3' I /ISM -, ! 1 I l ! 0 e?? La 472 � I i I ; . I , 1 1 ---i 1 1 i l I I I I 1 Id 1 l4 .1 ,I 1 fits.d <I 1 1 (ASb ([/4ftd) I 1, ! i I 1 !OGL 1 1 ! j ' . GL W `. 6 L 1_,. P 1l? Me_T✓ = - L�IQ��_ rt. I Ae-� 1 Ki- � ro a i4, -,/ Im, :15 n ./3,-S/ 4 v ' ‘4 = 41 ... ,. ,./4 .. -J 0144...c L o12:;, 44 T .:: .- I 1 ! Y a J .•� �I '�� �,, 1 ; . 41 11111.19 �1 ` -- �. Gc 7%,..33 --11A-1 1 ■■ 1--_1-5 ■ ■ ■■ 11 ■ ■NI . s O, 015 h r- p . • 1 (It'll-51)0.0 t 3 015 sit .0 k' . ,x ABKJI ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 PROJECT W'F1) SUBJECT rr I ulScw Tel: 206.340.2255 I Fax: 206.340.2266 www.abkj.com JOB # BY DATE SHEET# 3 II' _id .. 1 • II _u• itatr _ i (�e kd (� ��-5 PAM t Sti- Ab DEI. 1 M ti-F-40 , _ I � MAI r t-r s6ra.n- t.1- ( ow r tb' I c. s 1 Tv 11- gyp' MI - G1 i1- ■■■■ r► 1 ■EPU OI -• f. r .' P t 1)1/1-‘D EL- ti) \ piiUNum i,._ - raw— Ifl 1 k` ring g , { �/■ -r E ;It :, .. IIMI i► IIJI= Imp I it 'Ill 1. 6sow YYl . Ef arimemm t c �, ill �i il ■ WE ■■ MEM IIJPiII i� OMR IM. 5. 1) =-1 I. (PC i. ABKJIII ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 Tel: 206.340.2255 I Fax: 206.340.2266 www.abkj.com PROJECT WS' io/4AJE 6 - W..1/4/G //f' / .47 JOB # 0 7 / q / o 0 DATE (o PcG //0 BY I>_ S, ,71,1/1-4.17- /✓ SHEET# L 11' /. SUBJECT 17es -/ G 11 ?J 1 (4;'—'4A-,--r,--___17 ____ '' cs� N f I i i ___ I i I , I 3 # r ' I t i ! I ' 1AijO 0 w 1 =1 i i; I t i '�1�// V _t_tf . ��--3�� Imo/, 7z�!-� i i ; , z_15 !� ! ' , I i 1 I , I I 0,23 i (0,19) 1 (36000) , =; I / 11 ►� 8, ! l i i I ■ Vv , z ;9i 4 ft 0 75 1 ' .-,-, LT7-4- ,5:i2-/...i-6---irrv-J-ti97.1- i 1 i 1 V_--?-- = r21ir-/-4) -(-31 4-= z� # ■ 1 ■ ' i ■■ , vivo ■ ■N■■■■ e 0/4 e-M/74 c IIMEIM sailigia- all -4-fbe ■■■I■■■■■■■■ ■W■■■■■■■■■■■■ ■ ■■■ ■■■■■■■ ■■■■■■■■■■■ ■■ ABKJII ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98104 PROJECT SUBJECT 1nrst ?4.1 Ae- b SEl (r.-% v wr .A Pam i t ›au- E Tel: 206.340.2255 Fax: 206.340.2266 www.abkj.com JOB # BY - - iLe v 1 sB. r 1 H-a-tl of 1'04r1- I �� - - -S- t.or9 1Z.'i' J 4F , 8 th- - o. � s p DATE °L , I SHEET# LOA- /4k, 1«01;', 3. 1 A c.E 1 -ate✓ 1'042 -. �5�� ... 12. 4. 2 , � Y _r .3AS.IIi . 14A-1? (- 113 I N I I.1 -kti onS A4P. .. (I o 14._14 S )b + 0.7? QA (I.0 0. ID�is J �..1%4*.5.E+,1*5 -1 (.461-)1› +0.7E. SE5- or O,jA- i 4 u0 SCI INS Aer*--aurveL( ' •►6N Software licensed to ABKJ Job No 07141.00 Sheet No 1 Part Rev Job Tine WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Dat€06- Dec -10 Chd DSJ File JumperFrame.std IDaterrime 06- Dec -2010 09:53 3.200 kip .3.700 kip .288.000 Ibflft - 288.000 IblIft -3.700 kip - 2288.000 Ibfth X:1.097 In 36 W8X24 W8X24 36 oad 3 : DO:placrnicn: Displacement - In Whole Structure Loads 0.890082kip:lft Displacements 12in:1ft 3 DL +SEISMIC Print Time/Date: 06/12/2010 10:14 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 1 Software licensed to ABKJ Job No 07141.00 Sheet No 1 . -2/ &2. Rev Pan Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation BY DSJ Date06- Dec -10 Chd DSJ File JumperFrame.std IDate/T'"1e 06- Dec -2010 09:53 Job Information I Structure Type 1 PLANE FRAME Number of Nodes Engineer Checked Approved Name: DSJ DSJ DHB Date: 06- Dec -10 3 DL +SEISMIC I Structure Type 1 PLANE FRAME Number of Nodes 6 Highest Node 6 Number of Elements 5 Highest Beam 5 I Number of Basic Load Cases 2 Number of Combination Load Cases 1 Included in this rintout are data for. I All 1 The Whole Structure Type UC Name Primary 1 DEAD Primary 2 SEISMIC Combination 3 DL +SEISMIC Nodes Node X (ft) Y (ft) Z (ft) 1 0.000 0.000 0.000 2 24.000 0.000 0.000 3 0.000 17.000 0.000 4 24.000 17.000 0.000 5 -4.000 17.000 0.000 6 28.000 17.000 0.000 Beams Beam Node A Node B Length (ft) Property 0 (degrees) 1 5 3 4.000 2 0 2 3 4 24.000 2 0 3 4 6 4.000 2 0 4 1 3 17.000 1 0 5 2 4 17.000 1 0 Print Time/Date: 06/12/2010 10:02 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 3 • /4 Software licensed to ABKJ Job No 07141.00 Sheet No E3/eu, 2 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ DatE06- Dec -10 Chd DSJ File JumperFrame.std I Date/rime 06-Dec -2010 09:53 Section Properties Prop Section Area In la J Material STEEL 29E 3 (in2) (in4) (in4) (in4) STAINLESSSTEEL 1 W8X24 7.080 18.300 82.800 0.314 STEEL 2 W16X36 10.600 24.500 448.000 • 0.502 STEEL Materials Mat Name E (kip/in2) v Density (kip/in3) a (1PF) 1 STEEL 29E 3 0.300 0.000 6.5E -6 2 STAINLESSSTEEL 28E 3 0.300 0.000 9.9E -6 3 ALUMINUM 10E 3 0.330 0.000 12.8E -6 4 CONCRETE 3.15E 3 0.170 0.000 5.5E -6 Supports Node X (kip/in) Y (kip/in) Z (kipfin) rX (kipitldeg) rY (kip-ft/deg) rZ (kip deg) 1 Fixed Fixed Fixed Fixed Fixed Fixed 2 Fixed Fixed Fixed Fixed Fixed Fixed Releases There is no data of this type. Basic Load Cases Number Combination UC Name Name 1 DEAD 3 2 SEISMIC DEAD Combination Load Cases Comb. Combination UC Name Primary Primary UC Name Factor 3 DL +SEISMIC 1 DEAD 1.00 - - 2 SEISMIC 1.00 Node Loads : 1 DEAD Node FX (kip) FY (kip) FZ (kip) MX (kip'in) MY (kip'in) MZ (kip -in) 5 - -3.700 - - - - 6 - -3.700 - - - - Print Time/Date: 06/12201010:02 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 3 • Software licensed to ABKJ Job No 07141.00 Sheet No 3 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Datt06- Dec -10 Chd DSJ File JumperFrame.std IDate/Time 06- Dec - 201009:53 Beam Loads : 1 DEAD Beam Type Direction Fa Da (ft) Fb Db Ecc. (ft) 1 UNI . Ibf/ft GY - 288.000 - - - - 2 UNI Ibf/ft GY - 288.000 - - - - 3 UNI Ibf/ft GY - 288.000 - • - - - Selfweiqht : 1 DEAD Direction Factor Y -1.000 Node Loads : 2 SEISMIC Node FX (kip) FY (kip) FZ (kip) MX (kip -in) MY (kip'in) MZ (kip-in) 5 3.200 - - - - - 6 • 3.200 - - - - Print Time/Date: 06/12/2010 10:02 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 3 aol Software licensed to ABKJ Job No 07141.00 Sheet No 1 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Date06- Dec -10 Chd DSJ File JumperFrame.std IDatemme 06-Dec-2010 09:53 e Displacement Summary Beam Displacement Detail Summary Ulsplacemenrs Node UC X (in) Y (in) Z (in) Resultant (in) rX (rad) rY (rad) rZ (rad) Max X 6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 0.000 0.000 -0.002 Min X 3 1:DEAD -0.000 -0.009 0.000 0.009 0.000 0.000 0.000 Max Y 5 2:SEISMIC 1.097 0.060 0.000 1.098 0.000 0.000 -0.001 Min Y .6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 0.000 0.000 -0.002 Max Z 1 1:DEAD 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Min Z 1 1:DEAD 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Max rX 1 1 :DEAD 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Min rX 1 1:DEAD 0.000 0.000 0.000 0.000 . 0.000 0.000 0.000 Max rY 1 1:DEAD 0.000 0.000 0.000 0.000 0.000. 0.000 0.000 Min rY 1 1:DEAD 0.000 0.000 0.000 0.000 • 0.000 0.000 0.000 Max rZ 5 1:DEAD -0.000 -0.033 0.000 0.033 0.000 0.000 0.001 Min rZ 6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 0.000 0.000 -0.002 Max Rst 6 •3:DL +SEISMIC 1.097 -0.093 0.000 1.101. 0.000 0.000 -0.002 Beam Displacement Detail Summary Ulsplacemenrs snown ,n Beam I,COG,,,uu.o,c mu UC r.`.c,,.... �.... d (ft) .......... • X (in) Y (in) Z (in) Resultant (in) Max X 3 3:DL +SEISMIC 4.000 1.097 -0.093 0.000 . 1.101 Min X 5 1:DEAD 11.900 -0.005 -0.006 0.000 0.008 Max Y • 1 2:SEISMIC 0.000 1.097 0.060 0.000 1.099 Min Y 3 3:DL +SEISMIC 4.000 1.097 -0.093 0.000 1.101 Max Z 1 1:DEAD 0.000 -0.000 -0.033 0.000 0.033 Min Z 1 1:DEAD 0.000 -0.000 -0.033 0.000 0.033 Max Rst 3 3:DL +SEISMIC 4.000 1.097 -0.093 0.000 1.101 Beam End Displacement Summary vispiacements snown 111110116 Beam u,u,uata Node "HS E., cov,,..� ... UC .... ........• X (in) Y (in) Z (in) Resultant (in) Max X 3 6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 Min X 1 5 1:DEAD -0.000 -0.033 0.000 0.033 Max Y 1 5 2:SEISMIC 1.097 0.060 0.000 1.099 Min Y 3 6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 Max Z 1 5 1:DEAD -0.000 -0.033 0.000 0.033 Min Z 1 5 1:DEAD -0.000 -0.033 0.000 0.033 Max Rst 3 6 3:DL +SEISMIC 1.097 -0.093 0.000 1.101 Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 1 of 8 E6 ,/e l6 Software licensed to ABKJ Job No ' 07141.00 Sheet No 2 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Dat'06- Dec -10 Chd DSJ File JumperFrame.std IBete/Tune 06-Dec -2010 09:53 Beam End Force Summary The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest tension value nor an Deem. Axial Shear Torsion Bending Section Beam Node UC Fx (kip) Fy (kip) Fz (kip) Mx (kip in) My (kip -in) Mz (kip-in) Max Fx 5 2 3:DL +SEISMIC 11.460 3.146 0.000 0.000 . 0.000 337.040 Min Fx 3 4 2:SEISMIC -3.200 -0.004 0.000 0.000 0.000 -0.186 Max Fy 3 4 1:DEAD 0.000 4.996 0.000 0.000 0.000 208.704 Min Fy 2 4 3:DL +SEISMIC -0.066 -6.056 0.000 0.000 0.000 513.292 Max Fz 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Min Fz 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Max Mx 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Min Mx 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Max My 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Min My 1 5 1:DEAD 0.000 -3.700 0.000 0.000 0.000 -0.000 Max Mz 2 4 3:DL +SEISMIC -0.066 -6.056 0.000 0.000 . 0.000 513.292 Min Mz 4 3 3:DL +SEISMIC 6.716 3.254 0.000 0.000 0.000 - 319.546 Beam Force Detail Summary, Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam end A. Axial Shear Torsion Bending Section Beam UC d (ft) Fx (kip) Fy (kip) Fz (kip) Mx (kip -in) My (kip'in) Mz (kip -in) Max Fx 5 3:DL +SEISMIC 0.000 11.460 3.146 0.000 0.000 0.000 337.040 Min Fx 3 2:SEISMIC 0.000 -3.200 -0.004 0.000 0.000 0.000 -0.186 Max Fy 3 1:DEAD 0.000 0.000 4.996 0.000 0.000 0.000 208.704 Min Fy 2 3:DL +SEISMIC 24.000 -0.066 -6.056 0.000 0.000 0.000 513.292 Max Fz 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000 0.000 -0.000 Min Fz 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000 0.000 -0.000 Max. Mx 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000 0.000 -0.000 Min Mx 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000. 0.000 -0.000 Max My 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000 0.000 -0.000 Min My 1 1:DEAD 0.000 0.000 -3.700 0.000 0.000 0.000 -0.000 Max Mz 2 3:DL +SEISMIC 24.000 -0.066 -6.056 0.000 0.000 0.000 513.292 Min Mz 4 3:DL +SEISMIC 17.000 6.716 3.254 0.000 0.000 0.000 -319.546 Beam Maximum Forces by Section Property Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 8 Axial Shear Torsion Bending Section Max Fx (kip) Max Fy (kip) Max Fz (kip) Max Mx (kip-in) Max My (kip -in) Max Mz (kip"in) W8X24 Max +ve 11.460 3.254 0.000 0.000 0.000 344.240 Max -ve -2.168 -0.054 0.000 0.000 0.000 - 319.546 W16X36 Max +ve 3.200 4.996 0.000 0.000 0.000 513.292 Max -ve -3.200 -6.056 0.000 0.000 0.000 - 312.282 Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 8 Software licensed to ABKJ Job No 07141.00 Sheet No E :/0, 4 3 Rev Part Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ DatE06- Dec -10 Chd DSJ File JumperFrame.std IDate/i°"e 06-Dec -2010 09:53 Beam Combined Axial and Bending Stresses Summary Max Tens Beam L/C Length (ft) . Stress (psi) d r (ft) Corner Stress (psi) d (ft) Corner 1 1:DEAD 4.000 3.69E 3 4.000 • 3 -3.69E 3 4.000 1 0.054 2:SEISMIC 4.000 305.181 4.000 1 Min FX 1 3:DL +SEISMIC -3.266 3:DL +SEISMIC 4.000 3.99E 3 4.000 3 -3.39E 3 4.000 1 2 . 1:DEAD 24.000 3.56E 3 0.000 3 -3.57E 3 0.000 1 -3.211 2:SEISMIC 24.000 5.53E 3 • 0.000 1 -5.53E 3 0.000 3 -0.054 3:DL +SEISMIC 24.000 9.08E 3 24.000 3 -9.09E 3 24.000 1 3 1:DEAD 4.000 3.69E 3 0.000 3 -3.69E 3 0.000 1 -0.054 2:SEISMIC 4.000 0.000 0.000 3.632 - 305.172 0.000 1 -0.054 3:DL +SEISMIC 4.000 3.39E 3 0.000 3 -3.99E 3 0.000 1 . 4 1:DEAD 17.000 1.61E 3 17.000 1 Min MY 1' 1:DEAD -0.054 2:SEISMIC 17.000 16E 3 0.000 3 -16.6E 3 0.000 1 -3.266 3:DL +SEISMIC 17.000 17.5E 3 0.000 3 -15.5E 3 0.000 1 5 1:DEAD 17.000 1.61E 3 17.000 3 2:SEISMIC 17.000 16.6E 3 0.000 3 -16E 3 0.000 1 3:DL +SEISMIC 17.000 17.8E 3 0.000 3 -14.5E 3 0.000 1 Reaction Summary Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 8 Horizontal Vertical Horizontal Moment Node UC FX (kip) FY (kip) FZ (kip) MX (kip-in) MY (kip-in) MZ (kip -in) Max FX 2 1:DEAD 0.054 9.293 0.000 0.000 0.000 -3.632 Min FX 1 3:DL +SEISMIC -3.266 7.125 0.000 0.000 0.000 344.240 Max FY 2 3:DL +SEISMIC -3.134 11.460 0.000 0.000 0.000 337.040 Min FY 1 2:SEISMIC -3.211 -2.168 0.000 0.000 0.000 340.608 Max FZ 1 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Min FZ 1 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Max MX 1 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Min MX 1 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Max MY 1 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Min MY 1' 1:DEAD -0.054 9.293 0.000 0.000 0.000 3.632 Max MZ 1 3:DL +SEISMIC -3.266 7.125 0.000 0.000 0.000 344.240 Min MZ 2 1:DEAD 0.054 9.293 0.000 0.000 0.000 -3.632 Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 8 H. ± Software licensed to ABKJ Job No 07141.00 Sheet No 4 EVE?, c Rev Part Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Date06- Dec -10 Chd DSJ File JumperFrame.std lDatemme .06-Dec-201009:53 Steel Design (Track 2) Beam 1 Check 1 * * * * * * * * * * * ** MEMBER 1 * * DESIGN CODE * I AISC -1989 * * * * * * * * * * * * * * ** I AISC SECTIONS I ST W16X36 PARAMETER IN KIP INCH l< - -- LENGTH (FT)= 4.00 - - - >1 17.4 (KIP -FEET) KL /R -Y= 31.57 I KL /R -Z= 7.38 + UNL = 48.00 I L1 CB = 1.00 + L1 CMY = 0.85 I L1 CMZ = 0.85 + L1 L1 FYLD = 36.00 ILO NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -I DFF = 0.00 -1.0 PROPERTIES IN INCH UNIT AX = 10.60 - -Z AY = 4.20 AZ = 4.02 SY = 7.02 SZ = 56.49 RY = 1.52 RZ = 6.50 L1 STRESSES L1 IN KIP INCH LI L1 LI dff= 0.00 VALUE LOCATION LOADING ABSOLUTE MZ ENVELOPE (WITH LOAD NO.) MAX FORCE/ MOMENT SUMMARY (KIP -FEET) FA = 18.87 fa = 0.30 FCZ = 23.76 FTZ = 23.76 FCY = 27.00 FTY = 27.00 fbz = 3.69 fby = 0.00 Fey = 149.81 Fez = 2739.31 FV = 14.40 fv = 1.19 AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z 0.0 0.0 0.0 •0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 .0 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * DESIGN SUMMARY (KIP -FEET) * * * RESULT/ FX PASS 3.20 C CRITICAL COND/ RATIO/ MY MZ AISC- H1 -3 1.713E -01 0.00 17.38 LOADING/ LOCATION 3 4.00 * * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 4 of 8 Software licensed to ABKJ Job No 07141.00 Sheet No E9 /E2 f. Rev Part Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Da1'06- Dec -10 Chd DSJ Fig JumperFrame.std �Dale/Time 06-Dec -2010 09:53 Steel Design (Track 2) Beam 2 Check 1 * **** * * * * * * ** MEMBER. 2 * DESIGN CODE * AISC -1989 * * 1 AISC SECTIONS 1 ST W16X36 1 * 1< - -- LENGTH (FT)= 24.00 - - ->1 * * *• * * * * * * * * ** PARAMETER IN KIP INCH 42.8 (KIP -FEET) 1 1 PROPERTIES IN INCH UNIT AX = 10.60 - -Z AY = 4.20 AZ = 4.02 SY = 7.02 SZ = 56.49 RY = 1.52 RZ = 6.50 L3 STRESSES IN KIP INCH KL /R -Y= 189.44 1 L3 KL /R -Z= 44.30 +L2 UNL = 288.00 • I L2 L3 CB = 1.00 + L2 CMY = 0.85 1 L3 L3 L2 CMZ = 0.85 + L2 FYLD = 36.00 1 L3 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -1 DFF = 0.00 4.6 dff= 0.00 VALUE LOCATION LOADING • AXIAL 0.0 0.0 0 ABSOLUTE MZ ENVELOPE (WITH LOAD NO.) MAX FORCE/ MOMENT SUMMARY (KIP -FEET) FA = 4.16 fa = 0.01 FCZ = 7.89 FTZ = 21.60 FCY = 27.00 FTY = 27.00 fbz = 9.09 fby = 0.00 Fey = 4.16 Fez = 76.09 FV = 14.40 fv = 1.44 SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z 0.0 0.0 0.0 0.0 0 0 0.0 0.0 0 0.0 0.0 0 ******************************************* * * * * * * * * * * * * *** * * * * * * * * * * * * * * ** * * * * * RESULT/ FX FAIL 0.07 T DESIGN SUMMARY (KIP -FEET) CRITICAL COND/ RATIO/ MY MZ AISC- H2 -1 1.151E +00 0.00 42.77 LOADING/ LOCATION 3 24.00 * * * * * ****************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** rim " = 421 k -' M - "(19 '12'1 ) - 9,1 kJ; 56, 5 e 5 V, o V A? sins; • wig urn Go Mr leeSf Ora fVArJG . Print Time/Date: 08/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 5 of 8 Ero /12 6 • Software licensed to ABKJ Job No 07141.00 Sheet No 6 Part Rev Job Tale WST Phase 6 Seismic Upgrade Ref By DSJ • Dat`06- Dec -10 Chd DSJ client Westfield Corporation File JumperFrame.std Date/rime 06-Dec -2010 09:53 Steel Design (Track 2) Beam 3 Check 1 * * * * * * * * * * * ** * I = = = == MEMBER 3 * 1 AISC SECTIONS * 1 ST W16X36 DESIGN CODE * I AISC -1989 * ______________ * * 1< - -- LENGTH (FT)= * * * * * * * * * * * ** 4.00 - - - >I PROPERTIES IN INCH UNIT AX = 10.60 - -Z AY = 4.20 AZ = 4.02 __= SY = 7.02 SZ = 56.49 RY = 1.52 RZ = 6.50 17.4 (KIP -FEET) PARAMETER IL1 STRESSES IN KIP INCH 1 L1 IN KIP INCH + L1 KL /R -Y= 31.57 1 L1 L1 FA = 21.60 KL /R -Z= 7.38. + fa = 0.30 UNL = 48.00 1 L1 FCZ = 23.76 CB = 1.00 + L1 FTZ = 23.76 CMY = 0.85 1 L1 FCY = 27.00 CMZ = 0.85 + L1 L1 FTY = 27.00 FYLD = 36.00 1 LO fbz = 3.69 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -1 fby = 0.00 DFF = 0.00 -1.0 Fey = 149.81 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 2739.31 (WITH LOAD NO.) FV = 14.40 fv = 1.19 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * ** * * * * * * * * * * * *** * * * * * * ** * * * * ******************************************* * * * * * * * * * * * * * * * ** * * * * * * * * ** * * ** DESIGN SUMMARY (KIP -FEET) * RESULT/ CRITICAL COND/ RATIO/ LOADING/ FX MY MZ LOCATION PASS • AISC- H2 -1 1.693E -01 3 3.20 T 0.00 17.38 0.00 * * * Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 6 of 8 A Software licensed to ABKJ Job No 07141.00 Sheet No 7 Part Rev ' Job Title WST Phase 6 Seismic Upgrade Ref By DSJ Dat€06- Dec -10 Chd DSJ client Westfield Corporation Fite JumperFrame.std Date/rime 06-Dec -2010 09:53 Steel Design (Track 2) Beam 4 Check 1 * * * * * * * * * * * *+ * I MEMBER 4 * 1 AISC SECTIONS * 1 ST W8X24 DESIGN CODE * 1 AISC -1989 * * * I< - -- LENGTH (FT)= 17.00 - - - >1 * * * * * * * * * * * ** PROPERTIES IN INCH UNIT AX = 7.08 - -Z AY = 1.79 AZ = 3.48 SY = 5.64 SZ = 20.88 RY = 1.61 RZ = 3.42 28.7 (KIP -FEET) PARAMETER 1L3 STRESSES IN KIP INCH I L3 IN KIP INCH + L3 L3 .KL /R -Y= 126.89 1 L3 FA = 9.27 KL /R -Z= 59.65 + L3 fa = 1.01 UNL = 204.00 1 L3 L3 FCZ = 19.27 CB = 1.00 + L2 FTZ = 21.60 CMY = 0.85 1 L3 FCY = 27.00 CMZ = 0.85 + FTY = 27.00 FYLD = 36.00 1 L2 fbz = 16.48 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -1 fby = 0.00 DFF = 0.00 -0.3 Fey = 9.27 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 41.97 (WITH LOAD NO.) FV = 14.40 fv = 1.82 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * * * * * * * + * * * * * * * * * * * * * ** * * DESIGN SUMMARY (KIP -FEET) * * * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ * FX MY MZ LOCATION PASS AISC- H1 -3 9.639E -01 3 7.12 C 0.00 28.69 0.00 * * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 PrintRun7of8 Software licensed to ABKJ Job No 07141.00 Sheet No 8 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref client Westfield Corporation By DSJ DatE06- Dec -10 Chd DSJ File JumperFrame.std I Daterrime 06- Dec - 2010 09:53 Steel Design (Track 2) Beam 5 Check 1 ** * * * * * * * * * ** * 1 =--.= MEMBER 5 * I AISC SECTIONS * I ST W8X24 DESIGN CODE * I AISC -1989 * _ * I<--- LENGTH (FT)= 17.00 - - ->I * * * * * * * * * * * ** PROPERTIES IN INCH UNIT AX = 7.08 - -Z AY = 1.79 AZ = 3.48 SY = 5.64 SZ = 20.88 RY = 1.61 RZ = 3.42 28.4 (KIP -FEET) PARAMETER IL2 STRESSES IN KIP INCH I L2 IN KIP INCH + L2 L2 KL /R -Y= 126.89 I L2 FA = 9.27 KL /R -Z= 59.65 + L2 fa = 1.62 UNL = 204.00 I L2 L2 FCZ = 19.27 CB = 1.00 + L3 FTZ = 21.60 CMY = 0.85 I L2 FCY = 27.00 CMZ = 0.85 + FTY = 27.00 FYLD = 36.00 I L3 fbz = 16.14 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -I fby = 0.00 DFF = 0.00 -0.2 Fey = 9.27 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 41.97 (WITH LOAD NO.) FV = 14.40 fv = 1.76 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * DESIGN SUMMARY (KIP -FEET) * * * * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ * FX MY MZ LOCATION = = PASS AISC- H1 -1 9.149E -01 3 11.46 C 0.00 28.09 0.00 * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/12/2010 10:03 STAAD.Pro for Windows 20.07.02.15 Print Run 8 of 8 El 3/ U - �. ►/"�' Software licensed to ABKJ Job No 07141.00 Sheet No � 1 ■ Rev Part Job Title WST Phase 6 Seismic Upgrade Ref By DSJ Dat% Dec 10 chd DSJ File HighBay Braced Frame.st[Date / rime 06-Dec-2010 10:07 client Westfield Corporation 3.200s•I ! i- II -5.200 kip - 432.000 Ibfi• ,..11l .X31 -5.200 pod I kip 0.216 In W12X79 0.149 In W12X79 I�^r.• ..,I 3. s.; :.Et� 4 Di Displacement - In II I • W12X79 iI Sin W12X79 I I 10X22 Whole Structure Loads 1.4333kip:lft • Displacements 9in:lft 3 DL +SEISMIC • Print Time/Date: 06/12/2010 10:10 STAAD.Pro for Windows 20.07.02.15 Software licensed to ABKJ Job No 07141.00 Sheet No 1 Rev Part Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation Job Information Structure Type 1 PLANE FRAME I Number of Nodes Engineer Checked Approved Name: DSJ DSJ DHB Date: 6 Dec 10 3 DL +SEISMIC Structure Type 1 PLANE FRAME I Number of Nodes 6 Highest Node 6 I Number of Elements 8 Highest Beam 8 Number of Basic Load Cases 2 Number of Combination Load Cases Included in this rintout are data for. All The Whole Structure • Type IJC Name Primary 1 DL Primary 2 SEISMIC Combination 3 DL +SEISMIC Nodes Node X (ft) Y (ft) 2 (ft) 1 0.000 0.000 0.000 2 24.000 0.000 0.000 3 0.000 21,000 Q.000 4 24.000 21.000 0.000 5 0.000 13.500 0.000 6 24.000 13.500 0.000 Beams Beam Node A Node B Length (ft) Property ft (degrees) 1 1 5 13.500 2 0 2 5 3 7.500 2 0 3 2 6 13.500 2 0 4 6 4 7.500 2 0 5 3 .4 24.000 3 0 6 5 6 24.000 1 0 7 5 4 25.145 4 0 8 3 6 25.145 4 0 By DSJ Dal% Dec 10 Chd DSJ File HighBay Braced Frame.stIDate/rime 06- Dec -2010 10:07 PrintTime/Date: 06112/2010 10:10 STAAD.Pro for Windows. 20.07.07.15 Print Run 1 of 3 1 AtaW . Software licensed to ABKJ Job No 07141.00 Sheet No 2 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref By DSJ Dat% Dec 10 Chd DSJ Client Westfield Corporation File HighBay Braced Frame.st Date/rime 06-Dec -2010 10:07 Section Properties Prop Section Area (in2) In (in4) in (in4) J (in4) Material 1 W10X22 6.490 11.400 118.000 0.224 STEEL 2 W12X79 23.200 216.000 662.000 3.601 STEEL 3 W16X31 9.120 12.400 375.000 0.421 STEEL 4 Cir 0.75 0.442 0.016 0.016 0.031 STEEL Materials Mat Name E v Density a rZ (kip- ft/deg) 1 -(kip/in2) Fixed (kip /1n3) (1/°F) 1 STEEL 29E 3 0.300 0.000 6.5E -6 2 STAINLESSSTEEL 28E 3 0.300 0.000 9.9E -6 3 ALUMINUM 10E 3 0.330 0.000 12.8E -6 4 CONCRETE 3.15E 3 0.170 0.000 5.5E -6 Supports Node X ( kip/in) Y (kip/in) Z (kip/in) rX (kip-ft/deg) rY (kip-ft/deg) rZ (kip- ft/deg) 1 Fixed Fixed Fixed Fixed Fixed Fixed 2 Fixed Fixed Fixed Fixed Fixed Fixed Releases There is no data of this type. Basic Load Cases Number Combination LJC Name Name 1 DL 3 2 SEISMIC DL Combination Load Cases Comb. Combination LJC Name Primary Primary LJC Name Factor 3 DL +SEISMIC 1 DL 1.00 2 SEISMIC 1.00 Print Time/Date: 06/1212010 10:10 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 3 Software licensed to ABKJ Job No 07141.00 Sheet No 3 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation Node Loads : 1 DL Node FX (kip) FY (kip) FZ (kip) MX (kipin) MY (kip -in) MZ -(kip -in) 3 - -5.200 - - - - 4 - -5.200 - - - - Beam Loads : 1 DL By DSJ Dat% Dec 10 Chd DSJ File HighBay Braced Frame.slIDate / rime 06-Dec-2010 10:07 Beam Type Direction Fa Da Fb Db Ecc. 3.200 - - - (ft) - 4 (ft) 5 UNI Ibf/ft GY - 432.000 - - - - Selfweiqht : 1 DL Direction Factor Y -1.000 Node Loads : 2 SEISMIC Node • FX (kip) FY (kip) FZ (kip) MX (kip -in) MY (kip -in) MZ (kip -in) 3 3.200 - - - - - 4 3.200 - - - - - Print Time/Date: 06/12/2010 10:10 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 3 Software licensed to ABKJ Job No 07141.00 Sheet No 1 Rev Part Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation Node Displacement Summary BY DSJ Datt6 Dec 10 Chd DSJ File HighBay Braced Frame.stlDate / rime 06-Dec-2010 10:07 Beam Displacement Detail Summary • Node UC X (in) Y (in) Z *(in) Resultant (in) rX (rad) rY (rad) rZ (rad) Max X 3 3:DL +SEISMIC 0.219 -0.003 0.000 0.219 0.000 0.000 -0.001 Min X 5 1:DL -0.002 -0.003 0.000 0.004 0.000 0.000 0.000 Max Y 3 2:SEISMIC 0.218 0.001 0.000 0.218 0.000 0.000 -0.001 Min Y 4 3:DL +SEISMIC 0.216 -0.005 0.000 0.216 0.000 0.000 -0.000 Max Z 1 1:DL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Min Z 1 1:DL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Max rX 1 1:DL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Min rX 1 1:DL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Max rY 1 1:DL 0.000 . 0.000 0.000 0.000 0.000 0.000 0.000 Min rY 1 1:DL . 0.000 0.000 , 0.000 0.000 0.000 0.000 0.000 Max rZ . 4 1:DL -0.002 -0.004 0.000 0.005 0.000 0.000 0.000 Min rZ 6 3:DL +SEISMIC . 0.149 -0.004 0.000 0.149 0.000 0.000 -0.001 Max Rst 3 3:DL +SEISMIC 0.219 -0.003 0.000 0.219 0.000 0.000 -0.001 Beam Displacement Detail Summary • Beam End Displacement Summary Beam UC d (ft) X (in) Y (in) Z (in) Resultant (in) Max X 7. 3:DL +SEISMIC 12.572 1.848 -5.341 0.000 5.651 Min X 8 1:DL 12.572 -1.661 -5.325 0.000 5.578 Max Y 8 2:SEISMIC 17.601 0.177 0.029 0.000 0.180 Min Y 7 3:DL +SEISMIC 12.572 1.848 . -5.341 0.000 5.651 Max Z 1 1:DL 0.000 0.000 0.000 0.000 0.000 Min Z 1 1:DL 0.000 0.000 0.000 0.000 0.000 Max Rst 7 3:DL +SEISMIC 12.572 1.848 -5.341 0.000 5.651 Beam End Displacement Summary Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20- 07.02.15 Print Run 1 of 10 Beam Node UC X (in) . Y (in) Z (in) Resultant (in) Max X 2 3 3:DL +SEISMIC 0.219 -0.003 0.000 0.219 Min X 1 5 1:DL -0.002 -0.003 0.000 0.004 Max Y 2 3 2:SEISMIC 0.218 0.001 0.000 0.218 Min Y 4 4 3:DL +SEISMIC 0.216 -0.005 0.000 0.216 Max Z 1 1 1:DL 0.000 0.000 0.000 0.000 Min Z 1 1 1:DL 0.000 0.000 0.000 0.000 Max Rst 2 3 3:DL +SEISMIC 0.219 -0.003 0.000 0.219 Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20- 07.02.15 Print Run 1 of 10 f: .41 Software licensed to ABKJ Job No 07141.00 Sheet No 0_4. 2 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation Beam End Force Summary By DSJ Date Dec 10 Chd DSJ File HighBay Braced Frame.sIIDate/rime 06-Dec-2010 10:07 The signs of the forces at end B of each beam have been reversed. For example: this means that the Min Fx entry gives the largest tension value v YVy Axial Shear Torsion Bending Beam Node UC Fx (kip) Fy (kip) Fz (kip) Mx (kip"in) My (kip"in) Mz (kip -in) Max Fx 3 2 3:DL +SEISMIC 15.701 3.111 0.000 0.000 0.000 374.935 Min Fx 6 5 3:DL +SEISMIC -3.003 -0.212 0.000 0.000 0.000 - 54.770 Max Fy 5 3 1:DL 2.931 5.556 0.000 0.000 0.000 233.948 Min Fy 5 4 3:DL +SEISMIC 2.930 -6.368 0.000 0.000 0.000 350.859 Max Fz 1 1 1:DL 12.712 0.089 0.000 0.000 0.000 1.110 Min Fz 1 1 1:DL 12.712 0.089 0.000 0.000 0.000 1.110 Max Mx 1 1 1:DL 12.712 ' 0.089 0.000 0.000 0.000 1.110 Min Mx 1 1 1:DL 12.712 0.089 0.000 0.000 0.000 1.110 Max My 1 1 ' 1:DL 12.712 0.089 0.000 0.000 0.000 1.110 Min My 1 1 1:DL 12.712 0.089 0.000 0.000 0.000 1.110 Max Mz 1 1 3:DL +SEISMIC 9.724 3.289 0.000 0.000 0.000 377.149 Min Mz 4 4 3:DL +SEISMIC 12.439 3.402 0.000 0.000 0.000 - 351.767 Beam Force Detail Summary Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from beam end Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 10 Axial Shear Torsion Bending Beam UC d (ft) Fx (kip) Fy (kip) Fz (kip) Mx (kip -in) My (kip -in) Mz (kip -in) Max Fx 3 3:DL +SEISMIC 0.000 15.701 3.111 0.000 0.000 0.000 374.935 Min Fx 6 3:DL +SEISMIC 0.000 -3.003 . -0.212 0.000 0.000 0.000 - 54.770 Max Fy 5 1:DL 0.000 2.931 5.556 0.000 0.000 0.000 233.948 Min Fy 5 3:DL +SEISMIC 24.000 2.930 -6.368 0.000 0.000 0.000 350.859 Max Fz 1 1:DL 0.000 12.712 0.089 0.000 0.000 0.000 1.110 Min Fz 1 1:DL 0.000 12.712 0.089 0.000 0.000 0.000 1.110 Max Mx 1 1:DL 0.000 12.712 0.089 0.000 0.000 0.000 1.110 Min Mx 1 1:DL 0.000 12.712 0.089 0.000 0.000 0.000 1.110- Max. My 1 1:DL 0.000 12.712 0.089 0.000 0.000 0.000 1.110 Min My 1 1:DL 0.000 12.712 0.089 0.000. 0.000 0.000 1.110 Max Mz 1 3:DL +SEISMIC 0.000 9.724 3.289 0.000 0.000 0.000 377.149 Min Mz 4 3:DL +SEISMIC 7.500 12.439 3.402 0.000 0.000 0.000 - 351.767 Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 2 of 10 Software licensed to ABKJ Job No Sheet No 7Rev 07141.00 3 Part E26 Job Title WST Phase 6 Seismic Upgrade Ref BY DSJ Date6 Dec 10 Chd DSJ Client Westfield Corporation File HighBay Braced Frame.st Date/rime 06- Dec - 2010 10:07 Beam Maximum Forces by Section Property Beam Combined Axial and Bending Stresses Summary Axial Shear Torsion Bending Section Stress (psi) Max Fx (kip) Max Fy (kip) Max Fz (kip) Max Mx (kip -in) Max My (kip -in) Max Mz (kip in) W10X22 Max +ve 626.222 0.264 0.000 0.000 0.000 82.600 Max -ve -3.003 -0.741 0.000 0.000 0.000 - 68.685 W12X79 Max +ve 15.701 3.402 0.000 0.000 0.000 377.149 0.000 Max -ve -2.989 -2.922 0.000 0.000 0.000 - 351.767 W16X31 Max +ve 2.931 5.556 0.000 0.000 0.000 350.859 1 Max -ve -0.001 -6.368 0.000 0.000 0.000 - 174.434 Cir 0.75 Max +ve 2.849 0.018 0.000 0.000 0.000 0.914 626.222 Max -ve -2.864 -0.018 0.000 0.000 0.000 -0.454 Beam Combined Axial and Bending Stresses Summary Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 10 Max Comp Max Tens Beam L/C Length (ft) Stress (psi) d (ft) Corner Stress (psi) d (ft) Corner 1 1:DL 13.500 626.222 13.500 1 2:SEISMIC 13.500 3.39E 3 0.000 3 -3.64E 3 0.000 1 3:DL +SEISMIC 13.500 3.95E 3 0.000 3 -3.11E 3 0.000 1 2 1:DL 7.500 2.66E 3 7.500 3 -1.73E 3 7.500 1 2:SEISMIC 7.500 1.02E 3 7.500 1 -1.16E 3 7.500 3 3:DL +SEISMIC 7.500 1.5E 3 7.500 3 - 709.823 7.500 1 3 1:DL 13.500 626.222 13.500 3 2:SEISMIC 13.500 3.65E 3 0.000 3 -3.39E 3 0.000 1 3:DL +SEISMIC 13.500 4.18E 3 0.000 3 -2.83E 3 0.000 1 4 1:DL 7.500 2.66E 3 7.500 1 -1.73E 3 7.500 3 2:SEISMIC 7.500 1.16E 3 7.500 1 -1.02E 3 7.500 3 3:DL +SEISMIC 7.500 3.83E 3 7.500 1 -2.75E 3 7.500 3 5 1:DL 24.000 5.27E 3 0.000 3 -4.63E 3 0.000 1 2:SEISMIC 24.000 2.48E 3 0.000 1 -2.48E 3 0.000 3 3:DL +SEISMIC 24.000 7.75E 3 24.000 3 -7.11E 3 24.000 1 6 1:DL 24.000 137.091 0.000 3 -1.06E 3 0.000 1 2:SEISMIC 24.000 2.96E 3 24.000 3 -2.96E 3 24.000 1 3:DL +SEISMIC 24.000 3.1E 3 24.000 3 -4.02E 3 24.000 1 7 1:DL 25.145 21.9E 3 0.000 -21.9E 3 0.000 2:SEISMIC 25.145 -6.61E 3 0.000 3:DL +SEISMIC 25.145 15.4E 3 25.145 -28.4E 3 25.145 8 1:DL 25.145 21.9E 3 25.145 -21.9E 3 25.145 2:SEISMIC 25.145 6.61E 3 25.145 3:DL +SEISMIC 25.145 28.5E 3 25.145 -15.6E 3 25.145 Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 3 of 10 Software licensed to ABKJ Job No 07141.00 Sheet No 4 Part Rev Job Tate WST Phase 6 Seismic Upgrade Ref By DSJ oatt6 Dec 10 Chd DSJ Client Westfield Corporation Reaction Summary File HighBay Braced Frame.stIDate/nme 06 -Dec- 2010 10:07 Print Time/Date: 08/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 4 0110 Horizontal Vertical Horizontal Moment Node UC FX (kip) FY (kip) FZ (kip) MX (kip -in) MY (kip in) MZ (kip -in) Max FX 2 1:DL 0.089 12.712 0.000 0.000 0.000 -1.110 Min FX 1 3:DL +SEISMIC -3.292 9.724 0.000 0.000 0.000 377.149 Max FY 2 3:DL +SEISMIC -3.108 15.701 0.000 0.000 0.000 374.935 Min FY 1 2:SEISMIC -3.203 -2.989 0.000 0.000 0.000 376.039 Max FZ 1 1:DL -0.089 12.712 0.000 0.000 0.00. 0 1.110 Min FZ 1 1:DL -0.089 12.712 0.000 0.000 0.000 1.110 Max MX 1 1:DL -0.089 12.712 0.000 0.000 0.000 1.110 Min MX 1 1:DL -0.089 12.712 0.000 0.000 0.000 1.110 Max MY 1 1:DL -0.089 12.712 0.000 0.000 0.000 1.110 Min MY 1 1:DL -0.089 12.712 0.000 0.000 0.000 1.110 Max MZ 1 3:DL +SEISMIC -3.292 9.724 0.000 0.000 0.000 377.149 Min MZ 2 1:DL 0.089 12.712 0.000 0.000 0.000 -1.110 Print Time/Date: 08/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 4 0110 Software licensed to ABKJ Job No 07141.00 Sheet No Part Rev Joe Title WST Phase 6 Seismic Upgrade Ref By DSJ Date6 Dec 10 Chd DSJ Client Westfield Corporation File HighBay Braced Frame.stIDate/rene 06-Dec-2010 10:07 Steel Design (Track 2) Beam 1 Check 1 * * * * * * * * * * *** * I = = = = =1 =__ MEMBER 1 * I AISC SECTIONS * I ST W12X79 DESIGN CODE * I AISC -1989 * ______ __ _ = ___ * * I <--- LENGTH (FT)= 13.50 - - - >I * * * * * * * * * * * ** PROPERTIES IN INCH UNIT AX = 23.20 - -Z AY = 5.30 AZ = 11.86 SY = 35.76 SZ = 106.95 RY = 3.05 RZ = 5.34 31.4 (KIP -FEET) PARAMETER IL3 STRESSES IN KIP INCH I L2 IN KIP INCH + L2 KL /R -Y= 53.09 I L2 FA = 18.07 KL /R -Z= 30.33 +• L2 fa 0.42 UNL = 162.00 I FCZ = 21.60 CB = 1.00 + L3 FTZ = 21.60 CMY = 0.85 I L2 L3 FCY = 27.00 CMZ = 0.85 + L2 L3 FTY = 27.00 FYLD = 36.00 I L3 fbz = 3.53 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -I fby = 0.00 DFF = 0.00 0.2 Fey = 52.98 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 162.36 (WITH LOAD NO.) MAX FORCE/ MOMENT SUMMARY (KIP -FEET) FV = 14.40 fv =. 0.62 AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * DESIGN SUMMARY (KIP -FEET) * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ FX MY MZ LOCATION CC PASS AISC- H1 -3 1.865E -01 9.72 C 0.00 31.43 * 3 0.00 * * * * ****************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time /Date: 08 /12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 5 of 10 Software licensed to ABKJ Job No 07141.00 Sheet No 6 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref By DSJ Dat% Dec 10 Chd DSJ Client Westfield Corporation File HighBay Braced Frame.st Date/rime 06-Dec-2010 10:07 Steel Design (Track 2) Beam 2 Check 1 * * * * * * * * * * * ** * 1 MEMBER 2 * I AISC SECTIONS * I ST W12X79 DESIGN CODE * I AISC -1989 * _____ _____________ • I < - -- LENGTH (FT)= 7.50 - - - >I * * * ** * * * * * * ** PARAMETER IN KIP INCH 19.6 (KIP -FEET) 1 PROPERTIES IN INCH UNIT AX = 23.20 - -Z AY = 5.30 AZ = 11.86 SY = 35.76 SZ = 106.95 RY = 3.05 RZ = 5.34 L1 STRESSES L1 IN KIP INCH KL /R -Y= 29.50 I L1 FA = 19.98 KL /R -Z= 16.85 + L1 fa = 0.46 UNL = 90.00 1 LI FCZ = 23.76 CB = 1.00 + FTZ = 23.76 CMY = 0.85 I FCY = 27.00 CMZ = 0.85 +L3 L2 L1 FTY = 27.00 FYLD = 36.00 I L3 L2 L2 fbz = 2.20 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -I fby = 0.00 DFF = 0.00 6.0 Fey = 171.65 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 526.06 (WITH LOAD NO.) FV = 14.40 fv = 0.55 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 , 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * ** * * ** * * DESIGN SUMMARY (KIP -FEET) * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ FX MY MZ LOCATION * PASS AISC- H1 -3 1.157E -01 1 10.78 C 0.00 19.57 7.50 * * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/1212010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 6 of 10 Software licensed to ABKJ Job No 07141.00 Sheet No 7 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ Dat% Dec 10 Chd DSJ Fite HighBay Braced Frame.sllDaternme 06- Dec -2010 10:07 Steel Design (Track 2) Beam 3 Check 1 ** * * ** ** * * * ** * I = == I MEMBER 3 * 1 AISC SECTIONS * 1 ST W12X79 DESIGN CODE * I AISC -1989 * __________ * * I< - -- LENGTH (FT)= 13.50 - - - >I * * * * * * ** * * *** PROPERTIES IN INCH UNIT AX = 23.20 - -Z AY = 5.30 AZ = 11.86 SY = 35.76 SZ = 106.95 RY = 3.05 RZ = 5.34 31.3 (KIP -FEET) PARAMETER 1L2 STRESSES IN KIP INCH 1 L3 IN KIP INCH + L3 KL /R -Y= 53.09 1 L3 FA = 18.07 KL /R -Z= 30.33 + L3 fa = 0.68 UNL = 162.00 1 FCZ = 21.60 CB = 1.00 + L3 L2 FTZ "= 21.60 CMY = 0.85 1 L3 L2 FCY = 27.00 CMZ = 0.85 + L2 FTY = 27.00 FYLD = 36.00 1 L2 fbz = 3.51 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -1 fby = 0.00 DFF = 0.00 -0.6 Fey = 52.98 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 162.36 (WITH LOAD NO.) FV = 14.40 fv = 0.59 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******.************************************** * ***** ***- * **** **** * ** ****** * ** * DESIGN SUMMARY (KIP -FEET) * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ FX MY • MZ LOCATION PASS AISC- H1 -3 1.998E -01 3 15.70 C 0.00 31.24 0.00 * * * * * ******************************************* * * * *** * * * * * * * * * * ** ** * * ** * * * * * ** Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 7 of 10 Software licensed to ABKJ Job No 07141.00 Sheet No 8 Part Rev Job Title WST Phase 6 Seismic Upgrade Ref Client Westfield Corporation By DSJ pat Dec 10 Chd DSJ File HighBay Braced Frame.sl1Date/rlme 06- Dec - 201010:07' Steel Desiqn (Track 2) Beam 4-Check 1 * 1 = =1 MEMBER 4 * I AISC SECTIONS I'ST W12X79 DESIGN CODE * I AISC -1989 * = * I< - -- LENGTH (FT)= 7.50 - - - >I * * * * * * * * * * * ** PROPERTIES IN INCH UNIT AX = 23.20 - -Z AY = 5.30 AZ = 11.86 SY = 35.76 SZ = 106.95 RY = 3.05 RZ = 5.34 29.3 (KIP -FEET) PARAMETER I L3 STRESSES IN KIP INCH I L3 IN KIP INCH + L3 L3 KL /R -Y= 29.50 I L3 FA = 19.98 KL /R -Z= 16.85 + fa = 0.54 UNL = 90.00 I L3 FCZ = 23.76 CB = 1.00 + L3 FTZ = 23.76 CMY = 0.85 I L3 FCY = 27.00 CMZ = 0.85 + L3 FTY = 27.00 FYLD = 36.00 IL2 L2 fbz = 3.29 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -I fby = 0.00 DFF = 0.00 4.9 Fey = 171.65 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 526.06 (WITH LOAD NO.) FV = 14.40 fv = 0.64 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT-Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * DESIGN SUMMARY (KIP -FEET) * * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ * FX MY MZ LOCATION = PASS AISC- H1 -3 1.653E -01 3 12.44 C 0.00 -29.31 7.50 * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 8of10 Software licensed to ABKJ Job No 07141.00 Sheet No X25 6-2 4, Part Ng Rev Job Title WST Phase 6 Seismic Upgrade Ref By DSJ DatE6 Dec 10 Chd DSJ client Westfield Corporation File HighBay Braced Frame.st Steel Design (Track 2) Beam 5 Check 1 * * * * * * * * * * * ** * 1 == _ 1 MEMBER 5 * 1 AISC SECTIONS 1 * 1 ST W16X31 DESIGN CODE * I AISC -1989 * * I< - -- LENGTH (FT)= 24.00 - - - >1 * * * * * **** ** ** Y PROPERTIES IN INCH UNIT 1 AX = 9.12 1 - -Z AY = 0.00 AZ = 0.00 I = == SY = 4.49 SZ = 47.23 RY = 1.17 RZ = 6.41 0.0 (KIP -FEET) PARAMETER 1 STRESSES IN KIP INCH 1 IN KIP INCH KL /R -Y= 246.99 1 FA = 0.00 KL /R -Z= 44.91 + fa = 0.00 UNL = 288.00 1 FCZ = 0.00 CB = 1.00 + FTZ = 0.00 CMY = 0.00 1 FCY = 0.00 CMZ • 0.00 + FTY = 0.00 FYLD = 36.00 1 fbz = 0.00 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- - + - - -1 fby = 0.00 DFF = 0.00 * * * * ** Fey = 171.65 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 526.06 (WITH LOAD NO.) FV = 0.00 fv = 0.64 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z 'MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 ******************************************* * * * * * * * * * ****** * ** * * * * * * ** * * * ** * * * * * * OK RESULT/ FX DESIGN SUMMARY (KIP -FEET) * * * CRITICAL COND/ RATIO/ LOADING/ MY * * * * * * *** ** ** ** MZ LOCATION 1.235E+00 0.00 1 7.50 * ******************** ** * * * *t********. * * * * * * * * * * * * * ** SRAce- y Roop DIA 4'MRA4ri Datelrbne 06 -Dec- 2010 10:07 Print Time/Date: 06/12/2010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 9 of 10 Software licensed to ABKJ Job No 07141.00 Sheet No Z6 10 Rev Part Job Title WST Phase 6 Seismic Upgrade Ref By DSJ °atf6 Dec 10 Chd DSJ Client Westfield Corporation File HighBay Braced Frame.st Date/rime 06-Dec-2010 10:07 Steel Design (Track 2) Beam 6 Check 1 * * * * * * * * ** * ** * I 1 MEMBER 6 * 1 AISC SECTIONS 1 * 1 ST W10X22 DESIGN CODE * 1 AISC -1989 * * * I< - -- LENGTH (FT)= * * * * * * * * * * * ** 24.00 - - ->1 PROPERTIES IN INCH UNIT AX = 6.49 - -Z AY = 2.21 AZ = -2.76 SY = 3.97 SZ = 23.21 RY = 1.33 RZ = 4.26 6.9 (KIP -FEET) PARAMETER 1 L3 STRESSES IN KIP INCH 1 IN KIP INCH +L2 L3 KL /R -Y= 217.30 I L2 FA = 3.16 KL /R -Z= 67.54 + L2 L3 fa = 0.46 UNL = 288.00 1 FCZ = 8.48 CB = 1.00 + L3 L2 FTZ = 21.60 CMY = 0.85 1 L3 L2 FCY = 27.00 CMZ = 0.85 + FTY = 27.00 FYLD = 36.00 1 L1 fbz = 3.56 NSF = 1.00 +---+---+--- +--- +--- +--- +--- +--- +-- -+ - - -1 fby = 0.00 DFF = 0.00 0.1 Fey = 3.16 dff= 0.00 ABSOLUTE MZ ENVELOPE Fez = 32.73 (WITH LOAD NO.) FV = 14.40 fv = 0.34 MAX FORCE/ MOMENT SUMMARY (KIP -FEET) AXIAL SHEAR -Y SHEAR -Z MOMENT -Y MOMENT -Z VALUE 0.0 0.0 0.0 0.0 0.0 LOCATION 0.0 0.0 0.0 0.0 0.0 LOADING 0 0 0 0 0 * * DESIGN SUMMARY (KIP -FEET) * * * * * RESULT/ CRITICAL COND/ RATIO/ LOADING/ FX MY MZ LOCATION PASS AISC- H2 -1 4.197E -01 3 3.00 T 0.00 6.88 24.00 * ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Print Time/Date: 06/122010 10:12 STAAD.Pro for Windows 20.07.02.15 Print Run 10 of 10 Title : Westfield ST Phase VI Seismic Upgra Job if 07141.00 Dsgnr: D.S. Johnston, P.E. Date: 12:42PM, 6 DEC 10 Description : Member Strengthening Scope : Structural Engineering Rev: 580006 User: KW- 0600114, Ver 5.8.0, 1- Dec-2003 (c)1983-2003 ENERCALC Engineering Software Built -Up Section Properties Description ...K �. ter., ,R Strengthen Existing W16X36 Beam • Page 1 framing.ecwCalculations General Information ,..J,.., a. H.,..., ,� u. �,. v.:.: �. :._.� . ..,,.� _ . ..,:u, :, ...: x .: Type... #1 Rectangular #2 Rectangular #3. Rectangular Height Height Height 0.5000 in 1.0000 in 1.0000 in Width Width Width 8.0000 in 2.5000 in 2.5000 in X cg 0.0000 in - 1.4500 in 1.4500 in Y cg - 8.1800 in 7.0000 in 7.0000 in Steel Shapes #1: Name W16x36 Location of Centroid from Datum Angle 0 deg Depth Width Xcg 0.000 in Ycg 0.000 in Area Summary 15.8600 in Ixx 448.0000 in4 6.9850 in lyy 24.5000 in4 10.6000 in2 Xbar 3.493 in Ybar 7.930 in Total Area X cg Dist. Y cg Dist. 19.6000 in2 0.0000 in 0.1163 in Ixx 960.884 in4 r xx 7.0018 in Iyy 58.950 in4 r yy 1.7343 in Edge Distances from CG... +X 4.0000 in S left 14.7375 in3 -X - 4.0000 in S right 14.7375 in3 +Y 7.8137 in S top 122.9747 in3 -Y - 8.5463 in S bottom 112.4324 in3 Je'cr WI 6 x G o ,c0R STA/11, 17) oOE. Yv / 8 x 6 o PR a,te r/es; 5 0, / ,,1 d 8 hi 13,3 in3 g7in Center of Gravity U2 U2� 5 niM of Gravity Y X Center Gravity Center of WA& v. / () 2 ii Title : Westfield ST Phase VI Seismic Upgra Job # 07141.00 Dsgnr: D.S. Johnston, P.E. Date: 12:42PM, 6 DEC 10 Description : Member Strengthening Scope : Structural Engineering Rev: 580006 User KW- 0600114, Ver 5.8.0, 1- Dec -2003 (c)1983 -2003 ENERCALC Engineering Software Built -Up Section Properties �...rl_ T.+ .., arrrr.... v. r. axa..r ++n�•.�.....m:,...<..:... .r... -. • •":`.. Description Strengthern Existing W8x24 Column Page 1 framing.ecw:Celculations x. aJ. Sx r.... :.r......v..,i�•..a..:+vs�..c., General Information Type... #1 Rectangular #2 Rectangular Height Height 1.0000 in Width 1.0000 in Width 5.0000 in 5.0000 in X cg 0.0000 in 0.0000 in Ycg 4.4000 in - 4.4000 in Steel Shapes #1: Name W8x24 Location of Centroid from Datum Angle 0 deg Depth Width Xcg 0.000 in Ycg 0.000 in Area Total Area X cg Dist. Y cg Dist. 17.0800 in2 0.0000 in 0.0000 in 7.9300 in 6.4950 in 7.0800 in2 Ixx I yy Xbar Ybar 82.7000 in4 18.3000 in4 3.248 in 3.965 in Ixx 277.133 in4 r xx Iyy 39.133 in4 r yy Edge Distances from CG... +X 3.2475 in S left -x - 3.2475 in S right +Y 4.9000 in S top -Y - 4.9000 in S bottom 4.0281 in 1.5137 in 12.0503 in3 12.0503 in3 56.5578 in3 56.5578 in3 J &t.c r yv/ O k T 5' p R SJA427 Ph ooe-f: kVi0 )c l $ PAPoPer, r xy = 53,.7 - Sy = /3,3 T,3 r).. ac 3z ry a0/ L "/u z� Title : Westfield ST Phase VI Seismic Upgra Job # 07141.00 Dsgnr: D.S. Johnston, P.E. Date: 12:42PM, 6 DEC 10 Description : Member Strengthening Scope : Structural Engineering Rev: 580006 User: KW- 0600114, Ver 5.8.0. 1-Dec-2003 (c)1983 -2003 ENERCALC Engineering Software Built -Up Section Properties Page 1 framing.ecw:Calculations Description Strengthern Existing W8x24 Column Type... #1 Rectangular #2 Rectangular Steel Shapes Height Height #1: Name W8x24 Location of Centroid from Datum 1.0000 in Width 1.0000 in Angle Width 5.0000 in 5.0000 in 0 deg Depth Width Xcg 0.000 in Ycg 0.000 in Area Summary Total Area X cg Dist. Y cg Dist. X cg 0.0000 in 0.0000 in 7.9300 in 6.4950 in 7.0800 in2 Ixx lyy Xbar Ybar Y cg 4.4000 in - 4.4000 in 82.7000 in4 18.3000 in4 3.248 in 3.965 in 17.0800 in2 0.0000 in 0.0000 in 11oc 277.133 in4 r xx 4.0281 in Iyy 39.133 in4 r yy 1.5137 in Edge Distances from CG... +X 3.2475 in S left 12.0503 in3 -X - 3.2475 in S right 12.0503 in3 +Y 4.9000 in S top 56.5578 in3 -Y - 4.9000 in S bottom 56.5578 in3 (4 5 /u1 68k 5 113 ; 82.5 -62.6 92.7 92 Y -10.3 4.5 Loads: LC 1, dead + seismic (strength for d Results for LC 1, dead + seismic (strength 1 Member Bending Moments (k -ft) Reaction units are k and k -ft eflection) or deflection) I. 7 ,T- , ,I!\ -\; _j. I $7,.7 -4.18 k �14 ' -81. 6 1 92.3 92.3 '12 -10.2 18.2 AKB Engineers Joseph Glaser 10- 141 -00 Westfiled Phase 6 Seismic Upgrade - deflection calcul... January 26, 2011 11:34 AM Strengthened jumper frame 1- 26 -1... Company Designer Job Number January 26, 2011 Joseph Glaser 11:34 AM 10- 141- 00Westfiled Phase 6 Seismic Upgrade - deflection calculations Checked By: Materials (General) Material Label Young's Modulus (ksi) Shear Modulus Poisson's Thermal Coef. (ksi) Ratio (per 10 115 F STL 29000 11154 .3 I .65 ) Weight Density Yield Stress k/ft ^3) (ksi) .49 36 Joint Coordinates Joint Label X Coordinate (10 Y Coordinate (ft) Joint Temperature F N1 0 DL 0 STL 0 BEAM N2 .24 1.2 0 50.1 0 • 984 N3 0 ..:M3 : -'.:. ' 17 :' 0 ° N4 .. - 24. ..... = 17;.•:•-• . : , ... 0 :. . N5 -4 :' 17 M4 0 N6 :...,.'.28•.• 17'- -.•;.: ,.. 0. 1.2 Boundary Conditions Joint Label X Translation (k/in ) Y Translation (kfin Rotation (k -ft/rad N1 Reaction Reaction Reaction N2 • Reaction' - .Reaction Reaction Member Data Shape / Member Label I Joint J Joint Rotate Section Set rees Material Phys End Releases Set Memb I -End J -End TOM AVM AVM End Offsets Inactive I -End J -End Code Length in in (ft) M2 N5 DL N6 STL BEAM STL Y 1.2 'snovi!; 50.1 ;Snow Load 984 32 ..:M3 : -'.:. ' N1 .. :' - +13 ° : `: - COLUMN .':STL .. 'Y.. .: . - .. :. , .... :' ::•,17 • M4 N2 N4 STL COLUMN STL Y 1.2 1 3 Load Combination #6 - (1.1... y 1 1 17 Sections Section Database Material Label Area in A2 SA SA I (90,270) 0.180) (90.270 inA4 I (0,180) T/C in ^41 Onl BEAM W18X60 DL Dead Load STL -1 17.6 1.2 1.2 'snovi!; 50.1 ;Snow Load 984 COLUMN". :.`..� W10X45 :.': ::� - STL : `: ;13.3 = 12 ..., 12 •, . _ • 53.4 :. ,.248 :' '.;:,: SEC3 STL 1 1.2 1.2 1 3 Load Combination #6 - (1.1... y 1 1 DL Basic Load Case Data BLC No. Basic Load Case Category Code Descri ption Category Descriation Gravity X Y Load Type Totals Joint Point Direct Dist. 1 dead DL Dead Load 1.13 -1 2 1 2" 'snovi!; :'SL: ;Snow Load 1 :-- =`,. 3 seismic EL Earthquake Load : 2 •• • (Load ,Combination' #5 = .(1:1:;.1- Yd;,.; .1 .. - 2 DL :11:13'.;= Load Combinations cription Env WS PD SRSS CD BLC Factor BLC Factor BLC Factor BLC Factor 1 dead + seismic (strength for... 1 DL 1.13 EL 1 : 2 •• • (Load ,Combination' #5 = .(1:1:;.1- Yd;,.; .1 .. - 1 DL :11:13'.;= :L.::EL Y ': ..7 :. :; • .. • 3 Load Combination #6 - (1.1... y 1 DL 1.1 EL .525 SL .75 4.' Load Combination #8 := .(.46.':. y : :' • 1 1 DL .467:. `. • 1EL•.: :7 • • . • 5 1 RISA -2D Version 5.5 [M: \TRANSFER \JosephG \projects \Westfield Mall - Permit Revisions \Strengthened jAaneellframe 1 Company : / January 26, 2011 Designer : Joseph Glaser 11:34 AM Job Number : 10- 141- 00VVestfiled Phase 6 Seismic Upgrade - deflection calculations Checked By: Joint Loads /Enforced Displacements, Category : DL. BLC 1 : dead Joint Label [L)oad,[M]ass,or, Direction Magnitude [Misplacement (k, k -ft in, rad, k *s ^2/ft N5 L Y -3.7 N6 L -3.7 Joint Loads /Enforced Displacements. Category : EL. BLC 3 : seismic Joint Label [L]oad,[M]ass,or, Direction Magnitude [Misplacement (k, k -ft, in, rad, k`s ^2/ft N5 L X 10.268 N6 10.268 Member Direct Distributed Loads. Category : DL. BLC 1 : dead Member Label • Direction Start Magnitude (k/ft, F) -.288 1 -.288 M2 Y End Magnitude (k/ft, F) Start Location (ft or % End Location (ft or % 0 0 Member Direct Distributed Loads. Category : SL. BLC 2 : snow Member Label Direction Start Magnitude End Magnitude Start Location (k/ft, F) (k/ft, F) (ft or %) End Location (ft or% ) M2 Y -.6 -.6 0 0 Reactions. By Combination LC Joint Label X Force (k) Y Force (k) Moment (k -ft) 1 N1 - 10.303 4.502 92.695 0 N2 = 10:233' - . 18 :178 . . 92.311 1 Totals:. - 20.536 22.68 1.075 1 COG (ft): X: 12 _ Y: 16.348 Joint Displacements. By Combination LC Joint Label X Translation Y Translation ( ) in in Rotation (radians; 1 N1 0 1.208 0 .126 0 ..1. N2 • . 0 • . " = . 1.075 0 . 1 N3 H1 -1 1.255 1 -.002 - 1.742e -3 1 •N4. .241 . . 1:255 H1 -1 .. = :009 . .:..• '- 1.81,5e -3 1 N5 1.256 .072 - 1.553e -3 1 . '.: N6 .. 1.256 '- • - .1'06, - - 2.005e -3 MemberAISC ASD 9th Code Checks. By Combination LC Member Label Code Chk Loc Shear Chk Loc ASD Eqn. (ft ) (ft) Message 1 M2 1.208 27.667 .126 27.667 H1-3 1 ' • • " . M3 1.075 0 . • ;, :243 0 H1 -1 1 M4 1.152 0 .241 0 H1 -1 RISA -2D Version 5.5 [M: \TRANSFER \JosephG \projects \Westfield Mall - Permit Revisions \Strengthened IBagiB@frame 1 Company Designer Job Number January 26, 2011 .roseph Glaser 11:38 AM 10- 141 -0Westfiled Phase 6 Seismic Upgrade - ASD Load combinations Checked By: Materials (General) Material Label Young's Modulus Shear Modulus (ksi) " (ksi) STL 29000 Poisson's Thermal Coef. Ratio (per 10 "5 F Weight Density (k/ft "3) Yield Stress (ksi) 11154 .3 .65 .49 36 Joint Coordinates Joint Label X Coordinate Y Coordinate (ft ) Joint Temperature F Boundary Conditions Joint Label X Translation (k/in Y Translation (k/in Rotation (k- ft/rad N1 Reaction Reaction Reaction N2 Reaction Reaction Reaction Member Data Shape / Member Label 1 Joint J Joint Rotate Section Material Phys End Releases Set Memb I -End J -End TOM AVM AVM End Offsets Inactive 1 -End J -End Code Length in in (ft) M2 N1 N6 0' 0 0 • . N2 : 1 ' . 24 0 -- -. 0 ;::13.3• N3 Ma-`: , 0 17 0 COLUMN 'N4: ' Y •24 •17 1 N5 -4 17 0 : .-, N6'• -' 28 ,. , .17 . 0 -: Boundary Conditions Joint Label X Translation (k/in Y Translation (k/in Rotation (k- ft/rad N1 Reaction Reaction Reaction N2 Reaction Reaction Reaction Member Data Shape / Member Label 1 Joint J Joint Rotate Section Material Phys End Releases Set Memb I -End J -End TOM AVM AVM End Offsets Inactive 1 -End J -End Code Length in in (ft) M2 N5 N6 17.6 BEAM STL Y 984 1 :.,COLUMN :•.'1.- : ' •W1 0X45 , ° -STL ;::13.3• 32 Ma-`: , N1 N3 °. ..; COLUMN STL Y 1 1.2 1.2 1 1 17 M4 N2 N4 1 COLUMN STL Y `'EL, :7 .= 17 Sections Section Database Material Area SA SA 1 (90,270) 0,270 in "4 I (0,180) T/C in "4) Onl BEAM W18X60 STL 17.6 1.2 1.2 50.1 984 1 :.,COLUMN :•.'1.- : ' •W1 0X45 , ° -STL ;::13.3• 1:2• :....;1:2 .` . 53:4.., _ 248. • SEC3 seismic STL 1 1.2 1.2 1 1 Basic Load Case Data BLC No. Basic Load Case Category Category )escription Gravity X Y Load Type Totals Joint Point Direct Dist. 1 dead DL Dead Load 1 -1 2 . EL 1 2 . _ , snow" : . . " 'SL. , .,. • .. Snow Load '. 3 seismic EL Earthquake Load 2' Load Combinations BLC Factor BLC Factor BLC Factor BLC Factor 1 Idead + seismic (strength for... 1 DL 1.13 . EL 1 1' 2 .:ILoad Combination #5 - (1 :1.. ::.y.'I:. s::.' ` 1 1 1.' ..DL'. '1.13 :.. `'EL, :7 .= .. 3 Load Combination #6 - (1.1... y 1 DL 1.1 EL .525 SL .75 4 (Load Combination #8 - (.46.1 y' V :" ; - 1 1 DL .467- . '.'''EL . • • .:7. ' 5 1 RISA -2D Version 5.5 [M: \TRANSFER \JosephG \projects \Westfield Mall - Permit Revisions \Strengthened jlaagl 8frame 1 Company Designer Job Number .Joseph Glaser 10- 141- 0Westfiled Phase 6 Seismic Upgrade - ASD Load combinations January 26, 2011 11:38 AM Checked By: Joint Loads /Enforced Displacements. Category : DL. BLC 1 : dead Joint Label [L]oad,[M]ass,or, [Misplacement Direction Magnitude (k, k -ft, in, rad, k•s "2/ft) N5 L Y -3.7 N6 L Y • -3.7 Joint Loads /Enforced Displacements. Category : EL. BLC 3 : seismic Joint Label [ L]oad,[M]ass,or, Direction [Misplacement Magnitude (k, k -ft, in, rad, k's "2/ft N5 L X 10.268 N6 • L ..X • 10.268 Member Direct Distributed Loads. Category : DL.. BLC 1 : dead Member Label Direction Start Magnitude End Magnitude Start Location (k/ft, F) (k/ft, F) (ft or % Y 1 -.288 End Location (ft or% M2 -.288 0 0 Member Direct Distributed Loads. Category : SL. BLC 2 : snow Member Label Direction Start Magnitude End Magnitude (k/ft, F) (k/ft, F) M2 1 Y 1 -.6 Start Location (ft or %) -.6 1 0 Envelope Reactions Joint Label End Location (ftor %) 0 X Force (k) Y Force Lc (k) Lc Moment (k -ft ) Lc N1 max -4.793 3 14.649 3 64.944 2 . min 2:7.223 • ' 2. ' . -:1. • • •:4.' .•.4.5.29 3 N2 max -5.988 3 21.829 3 64.673 4 :min : "':--7:173 •• . -4 . •' `9:473.»4:5i.838 0.000 4 3 Reaction Totals : max - 10.781 3 36.478 3 'min.: = 14.375 .. 2 ....9 :373 ' - ' 4 Envelope Joint Displacements Joint Label X Translate Y Translate in Lc in Lc Rotate radians Lc Envelope Member MSC ASD 9th Code Checks Member Label Code Chk Loc Shear Chk Loc (ft ) Lc (ft) Lc ASD Eqn. Message M2 N1 .912 27.667 max 0.000 2 0.000 4 0 3 • • •:758 :_ ..` 0 •:.:2`.: :min. 2.,0.000 '. 3 • •••0:000:•',.3 :.2 H1 -2 ...::. • N2 .786 max 0.000 4 0.000 4 0 3 . ':min ::':.0.000 3 . , 0.000 := • ‘.3'.. : :, ..0 ... • 4 Ni max .879 4 0 4 - 1.209e -3 2 .. :miri' =' • :659. 3 .. :'-:008-:.:,' :'3•.': =11548e =3 3 N4 max .879 2 -.005 4 - 3.195e -4 3 •..• .- ;mine ..::659:. . 3 : `:011:.... 3'.: - :281e 3 2 N5 max .879 4 .056 3 - 1.019e -3 2 :A :min, :.r:66 .•. :.3.. . :045.•ti:;2i';'- .1:339e -3 3 N6 max .879 2 -.037 3 - 5.286e -4 3 .. • .•-.= -min :: ::659 :3.. .: =.079' •-.:••f :2 -1 471e -3 2 Envelope Member MSC ASD 9th Code Checks Member Label Code Chk Loc Shear Chk Loc (ft ) Lc (ft) Lc ASD Eqn. Message M2 .912 27.667 2 .146 27.667 3 H1-3 M3 • •:758 :_ ..` 0 •:.:2`.: ..170= .'°'';: 0' ". :.2 H1 -2 ...::. • M4 .786 0 2 .169 . 0 4 H1-2 RISA -2D Version 5.5 [M :\ TRANSFER \JosephG \projects \Westfield Mall - Permit Revisions \Strengthened jldagE4frame 1 r,1 ,11.1 u 1; FEB 0 7 2011 . . FIEJD INC. •�, 4 ABKJI ANDERSEN • BJORNSTAD• KANE •JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle, Washington 98104 DATE: January 25, 2011 TO: Mr. Patrick Burns Operations and Risk Manager Westfield Shoppingtown Southcente 633 Southcenter .. F$tI COPY REV R MEMORANDUM I�206.340.2266 I www.abkj.com APPRf9VED FEB 2 2 2011 City of Tukwila BUILDING DIVISION Seattle, WA 98188 • . 1 I : i ', ' .1 FEB - 7 2011 .' FROM: Joseph Glaser, P.E. RE: Building Permit Plan Review — First Submittal Westfield Mall Seismic Upgrade (D10 -353) Dear Mr. Burns: We have reviewed the plan review comments dated January 14, 2011 which you have forwarded to us. Attached please find our response to each of these comments. We have followed the format of beginning with a portion of each review comment (in bold and following the original numbering scheme), followed by our response. In addition, we have provided a narrative for the project, in order to better explain the current permit submittal package and to aid in its review. Please incorporate this package along with the attached revised structural drawings and supplemental structural calculations into the permit response package you prepare for the Building Official for the City of Tukwila, Department of Community Development. HISTORY The original portion of the South Center Mall, which is where the current seismic upgrade is to occur, was constructed in 1966 and according to the General Notes for the Permitted drawing set, it was designed under the Seismic guidelines of the 1961 UBC and amendments. In 1987, a voluntary seismic upgrade was undertaken at the owner's volition (see attached plan, Figure 1). This was "voluntary" as no upgrade was necessitated due conditions described in the provisions of IBC Section 3401: "alteration, repair, addition or change of occupancy to an existing structure ". A series of seismic strengthening measures were prescribed at that time. All phases were completed except for "Phase 6 ", which comprise the measures currently under consideration. What we propose in this current permit submittal, therefore, is a voluntary upgrade. As such, it shall adhere to IBC Section 3404.5. DESCRIPTION OF THE REGIONS TO BE STRENGTHENED AND THE EXISTING LATERAL FORCE RESISTING SYSTEMS IN THESE REGIONS There are two regions / locations where elements of the existing lateral force resisting system (LFRS) are to be strengthened. The region described in detail A on sheet S -2 (Region "A ") is bounded by gridlines "13 ", on the West, "20" to the East, "F" to the North and "N" to the south. Please refer to page L1 of the calculations and on the attached Figure 2 from the As -Built Plan set. To explain the justification of isolating this region in terms of our seismic modeling of it, on the East at gridline "20" the region is bounded by a seismic joint (see referenced detail 14/S -21 on Figure 4) , on the North ( "F ") and West ( "13 ") by the edge of the building, and on the South ( "0 ") by an adjacent region with a similar LFRS layout (this continuity is based on the assumption of a flexible roof diaphragm so that the seismic Toads are distributed according to the tributary area associated with each line of resistance of the LFRS elements). The region described in detail B on sheet S -2 (Region "B ") is contiguous with Region "A" directly to the south and is the bounded by gridlines "13" on the West, "20" to the East, "0" to the North and "U" to the south. Please refer to Figure from the As -Built Plan set. The region is bounded on the East at gridline "20" by a seismic joint, on the North ( "0 ") by region "A ", on the South ( "U ") by the edge of the building and on the West ( "13 ") by a contiguous region. (Note from the "NEW SEISMIC UPGRADE FRAMING" plan (Figure 1) other portions of the building have had seismic upgrades. We feel that this further justifies our "regional" approach to this upgrade). Based on several factors, primarily the details describing the two types of frame elements in these regions (the typical "Jumper Beam Frame" of detail 1/S -2 - figure 5 - and the "High Bay Bracing" of detail 10/5 -18 - figure 6)'coupled with the limited capacity of the roof diaphragm, it was concluded that the two types of frames provided lateral resistance and formed the LFRS in the East -West direction. DESIGN APPROACH In our analysis to provide the strengthening measures described in the 1987 document (as it pertains to "Phase 6 "), we determined that if we follow the flexible diaphragm analogy and distributed the seismic forces (based on current IBC requirements) equally to each existing element of the LFRS, each existing frame element will be slightly overstressed (see sheet L3 and E9 of the original calculations). We feel it is justifiable to make the flexible diaphragm analogy and equal distribution to each frame element because each frame has similar stiffness. The goal of the strengthening of a given frame is that by stiffening the selected element, it will attract more seismic load and lower the load to the adjacent LFRS elements (note that there will be no increase in the load to the adjacent existing frames, satisfying paragraph (1) of IBC Section 3404.5). This redistribution of forces is described in the calculations on sheet L3 of the existing calculations. This increased load to the strengthened frame forms the basis of the current design. Within the original and revised calculations, the organization is as follows: • Sheet L1 —The seismic loads are determined • Sheet L2 — assume equal distribution to each of 19 frames per flexible diaphragm analogy. Rho (redundancy coefficient) is determined, and loads are distributed to the existing frames. The high frames are determined to be adequate in deflection. The jumper frames indicate excessive deflection. This however is using E (full strength loads), which to check for existing conditions is conservative. Using 70% of E, deflection is 2.82" < 3.01" allowed. • Sheet L3 — Redistribute loads to system, such that 10% of the 15% overloading to the existing frames is distributed to the frame to be strengthened in order to determine its Toad. The results of the RISA analysis (see sheets U5 — U7) are presented and shown to be within the deflection limits. • Sheet L4 — The adequacy of the Existing Decking is demonstrated. • Sheet L5 —The revised load combinations per IBC 1605.3.1 and ASCE 7 -05 (ASD) are provided. The RISA analysis of these combinations (sheets U8 -U9) are shown to be adequate. • A quantitative description of the strengthening of the existing members as a transformed section ("Built-Up Section Properties "), is provided on sheets U1 through U4. The properties of the built up sections become the Beam and Column used in the "JumperFrame_Strengthened" model used in the STAAD analysis on sheets U5 — U21. Note that in response to several permit comments, the STAAD analysis has been revised and simulated in RISA 2 -D. Please see relevant portions of the Permit. Response letter below. PERMIT COMMENT RESPONSES 1. Structural special inspections by ...: This has been addressed in the revised drawings. Please see sheet S -1. 2. Structural tests by qualified ...: This has been addressed in the revised drawings. Please see sheet S -1. 3. The general structural notes, Sheet S-1, should be revised ... : This has been addressed in the revised drawings. Please see sheet S -1. 4. The extent of each type of special inspection ... : This has been addressed in the revised drawings. Please see sheet S -1. 5. The earthquake load design data in the general structural notes ...: This has been addressed in the revised drawings. Please see sheet S -1. 6. A note should be added to the general structural notes, Sheet S -1...: This has been addressed in the revised drawings. Please see sheet S -1. 7. A note should be added to the general structural notes, Sheet S -1, ...: There are no slip - critical connections in this project. All connections are friction type. See paragraph 3 of STRUCTURAL STEEL section of General notes. 8. A note should be added to the general structural notes, Sheet S -1 ...: This has been addressed in the revised drawings. Please see sheet S -1. 9. A note should be added to the general structural notes, Sheet S -1 ...: This has been addressed in the revised drawings. Please see sheet S -1. 10. The complete-joint-penetration groove welds of the beam flanges, ...: Detail 4/S -2 (formerly 4/S -1) and the General Notes have been updated and have been revised accordingly. 11. Steel ordinary moment frames are proposed, but these are not permitted ... due to being assigned to Seismic Design Category D ...: Per ASCE 7 -05 section 12.2.5.6, ordinary steel moment frames in Seismic Design Category D are allowed in one story structures up to a height of 65' and the dead load does not exceed 20 psf. As all of these conditions are met, the steel ordinary moment frame should be allowed. 12. The size of the structure where the steel ordinary moment frames are proposed ...: Please see Narrative section above and the associated figures (plans and details from As -Built Structural Drawing set) which address this comment. 13. The note: "moment frame selected for upgrading" ... : Please see Narrative section above and the associated figures (plans and details from As -Built Structural Drawing set) which addresses this comment. 14. The note: "moment frame selected for upgrading" ... : Please see Narrative section above and the associated figures (plans and details from As -Built Structural Drawing set) which addresses this comment. 15. Assuming the existing lateral- force - resisting vertical elements are concentrically braced frames, replacing ... leads to the creation of a horizontal combination seismic force - resisting system ...: As is discussed in the Narrative section, the existing lateral force resisting system (LFRS) is a combination of "Jumper Frames" and "High Brace Frames ". Also, the frame elements chosen for upgrading are "Jumper Frames ", which we have categorized as ordinary moment frames. (See Figures 2, 3, 5, and 6). The "High Brace Frames" are difficult to classify, but are not true concentrically braced frames. Our interpretation of the cited sections (especially section 12.2.3.2 of ASCE 7 -05) is that they are intended to base a design on the less rigid and /or less ductile elements of a system where combined structural elements of the LFRS were used. We feel that this would be more appropriate for new construction where the types of systems are more easily categorized and designed to a specific standard (R, Cd, and Overstrength). Because of our approach of strengthening of a selected frame in an existing system, which because of its strengthening attracts additional Toad and which is designed to resist that load in terms of shear, moment, and deflection (see deflection related responses below), we feel that using the deflection amplification factor (Cd = 3.0) associated with the "Ordinary Moment Frame" categorization of the strengthened element is appropriate. 16. Based on our understanding of the occupancy of the structure ...: The original design uses an importance factor of le = 1.25. See calculations sheet L1. 17. A seismic base shear, V, for allowable stress design ... the determination of allowable story drift is based on strength design ...: This has been corrected in the revised calculations. See sheets L3 and U7. 18. The determination of allowable story drift, in the calculations assumes a classification ... : This has been corrected in the revised calculations. See sheet L3. 19. The structure is required to be designed for the additional load combination indicated below....: This has been corrected in the revised calculations. See sheet L4A. 20. The building is required to be designed for load combinations that include vertical seismic Toad effects....: This has been corrected in the revised calculations. See sheet L4A. 21. The STAAD.Pro analyses assumes fixed -end conditions at the bottom of each column ...: The bases of the columns are encased in the concrete footing. Please see attached figures 7. Please feel free to contact our office should you have any questions, Thank you, Joseph Glaser, P.E. Senior Project Engineer a1. - d µ; ry�i:` -! '�r,�7„�'L tkrr..n`s�.a+•':�,'•` -,�'. �..rG,�j��� >��,.� .c?.,y�� „r,' _ " 1'iar"q` t, ar. S� y� s �}'i��•- ��.l�y :}� z' >�t r- , "}-�7" - Z.' 1 ''r'= f �—' a.;,. Zc�t >�;' - -: aLg�r:y`tyr :'' .� �•�a�e.'�q't�'� -i�"" '1 3�`..1r�e�Y.k ^'e^;<'�x?�•jy i ry�LE4 -.. t�f'E�'�y;,�`• s.,�:?�'.;".r�Yr+�.�'(k*.F°q,A .'�%. z. 'x?S. '$ ..ta:t?" Y;n•;t,'i,, a. Fe yu"'l,ltc��;� :J �'�: t`- Rxp. .r- ,.- �eS1�'�c:�.n:�,�i mi" ;r?' -' i'a°x•�+,: �.z_'ti't;.''�'�.`f'•'" ��;,'ii�'.,� January 14, 2011 File No. 262011.005/00101 Mr. Bob Benedicto, Building Official City of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — First Submittal Westfield Mall Seismic Upgrade (D10 -353) Dear Mr. Benedicto: We reviewed the proposed project for compliance with the structural provisions of the 2009 International Building Code (IBC) as amended and adopted by the state of Washington and the city of Tukwila. The permit applicant should address the comments below. CIVII!ENGINEERING' w=`' t, STRUCTURAL ENGINEERIN rhR ANNING "SURVEYINGK{ Etf-f xC% jtrr.;7 Responses to the review comments below should be made in an itemized letter form. We recommend the permit applicant have the structural engineer respond and resubmit two sets of the revised structural drawings and one copy of the supplemental structural calculations for additional review. All information should be submitted directly to Reid Middleton, Inc. Geotechnical No comments Architectural No comments Structural 1. Structural special inspections by qualified special inspectors should be provided. See IBC Sections 1704 and 1707. The following is a summary: a. Fabrication and erection of structural steel: Periodic, see also Section 1704.3. b. Welding of structural steel for single -pass fillet welds (maximum 5/16- inch): Periodic, see also Section 1704.3. V,IASH•r400;; 728 134th Street SW Suite 200 Everett, WA 98204 Phone: 425 741 -3800 =ax. 425 741 -3900 ALASKA 4300 8 Street Suite 302 Anchorage, AK 99503 ?hone: 907 567 -7439 Fax. 907 561 -5319 Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005 /00101 Page 2 c. Welding of structural steel other than single -pass fillet welds (maximum 5/16- inch): Continuous, see also Section 1704.3. d. High - strength bolting of structural steel other than slip - critical: Periodic, see also Section 1704.3. e. High - strength bolting of structural steel, slip - critical, where applicable: Continuous, see also IBC Section 1704.3, Section M5.4 of AISC 360 -05 and RCSC Section 9.3. 2. Structural tests by qualified special inspectors should be conducted. See IBC Sections 1704 and 1708. The following is a summary: a. Nondestructive testing of the complete-joint-penetration (and partial-joint- penetration, where applicable) groove - welded joints at the steel ordinary moment frames. See IBC Section 1708.3 and Section 18 and Appendix Section Q5.2 of AISC 341 -05. 3. The general structural notes, Sheet S -1, should be revised by specifying an additional special inspection (i.e., fabrication and erection of structural steel). See IBC Section 1705.2. Refer to Sections 1704 and 1707 and the structural comment above to determine the additional type of special inspection. 4. The extent of each type of special inspection in the general structural notes, Sheet S -1, should be specified for review (e.g., periodic or continuous). See IBC Section 1705.2(5). Refer to Section 1702.1 for the definitions of continuous special inspection and periodic special inspection. Refer to Sections 1704 and 1707 and the structural comment above to determine when continuous or periodic special inspection is required for each type of special inspection. 5. The earthquake load design data in the general structural notes, Sheet S -1, should be revised by also specifying the site class, design spectral response accelerations, SDS and SD /, design base shear, V, seismic response coefficient, CS, and analysis procedure used. See IBC Section 1603.1.5. 6. A note should be added to the general structural notes, Sheet S -1, specifying nondestructive testing of the complete-joint-penetration (and partial-joint- penetration, where applicable) groove- welded joints at the steel ordinary moment frames. See IBC Section 1708.3 and Section 18 and Appendix Section Q5.2 of the AISC 341 -05. Reid iddleton' 1 Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005 /00101 Page 3 7. A note should be added to the general structural notes, Sheet S -1, specifying that, other than erection bolts, the high - strength bolts at the seismic- force- resisting system of the building shall be pretensioned and their faying surfaces shall be prepared as required for slip - critical connections (Class A, /c >_ 0.35). See IBC Section 2205.2.2, Section 7.2 AISC 341 -05 and Section J3.8 of AISC 360 -05. 8. A note should be added to the general structural notes, Sheet S -1, specifying that the welds at the members and connections of the seismic - force - resisting system of the building shall be made with filler metal producing welds with a minimum Charpy V -notch toughness of 20 ft -Ibf at 0 degrees F. See IBC Section 2205.2.2 and Section 7.3a of AISC 341 -05. 9. A note should be added to the general structural notes, Sheet S -1, specifying that demand critical welds shall be made with filler metal producing welds with a minimum Charpy V -notch toughness of 20 ft -lbf at minus 20 degrees -F and 40 ft -Ibf at 70 degrees -F. See IBC Section 2205.2.2 and Section 7.3b of AISC 341 -05. 10. The complete-joint-penetration groove welds of the beam flanges, shear plates and beam webs to the columns of the steel ordinary moment frames are required to be demand - critical welds. Detail 4 /S -1 should be revised by specifying the locations of these welds for review. See IBC Section 2205.2.2 and Sections 5.1(5) and 11.2c of AISC 341 -05. 11. Steel ordinary moment frames are proposed, but these are not permitted in the structure due to being assigned to Seismic Design Category D. The drawings should be revised by providing a seismic force- resisting system that is approved for Seismic Design Category D. See IBC Sections 1613.1 and 3404.1, and Table 12.2 -1, Item C.4, of ASCE 7 -05. 12. The size of the structure where the steel ordinary moment frames are proposed and the characteristics of the existing seismic force - resisting systems are unclear. Documentation confirming the number of stories or framing levels of the structure, the extent of the structure beyond what is shown on Sheet S -1, the locations of seismic joints enabling an apparent assumption of 7 bays, 24 feet 0 inches in width, in the effective structure for the purposes of the analysis, the types and locations of the existing lateral- force- resisting vertical elements, and other pertinent information, should be submitted to enable review. Refer to Section 12.2.5.6 of ASCE 7 -05. Reid iddleton` Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005 /00101 Page 4 13. The note: "moment frame selected for upgrading" at Partial Roof Framing Plans A and B is not clear. A narrative should be submitted explaining the choice of the moment frames in the current drawings and the probability that other moment frames will be proposed for upgrading in the future, should be submitted for review. 14. The note: "moment frame selected for upgrading" at Partial Roof Framing Plans A and B is also unclear with respect to what is currently in place at the locations for upgrading. Based on the details elsewhere on Sheet S -1, it appears that the existing lateral- force - resisting vertical elements consist of steel concentrically- braced frames. 15. Assuming the existing lateral- force - resisting vertical elements are concentrically braced frames, replacing or supplementing them with steel ordinary moment frames leads to the creation of a horizontal combination seismic force- resisting system. For steel ordinary concentrically braced frames, the lower value of the response modification coefficient, R, and the higher value of the deflection amplification factor, Co, is required to be used for the structure. This will require the calculations to be revised and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Section 1613.1 and Section 12.2.3.2 of ASCE 7 -05. 16. Based on our understanding of the occupancy of the structure (Occupancy Category III), the seismic base shear, V, and lateral seismic forces, Fx, are required to be multiplied by an importance factor, 1, of 1.25. This requirement, however, was not considered in the determination of V or Fx in the calculations • (pages L1 -L3), but it was assumed in the determination of the deflections, ax (pages L2 and L3). The calculations should be revised and resubmitted for review. The structural design may need to be revised. Please verify. • See IBC Section 1613.1 and Table 1604.5, and Sections 11.5, 12.8.1, 12.8.1.1, and 12.8.6 of ASCE 7 -05. 17. A seismic base shear, V, for allowable stress design is determined on page L 1 of the calculations, but the determination of the allowable story drift, tlx is based on strength design (page L2). The calculations should be revised and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Sections 1602.1 (notation for "E "), 1605, and 1613.1, Sections 12.4 and 12.8.6 of ASCE 7 -05, and Table 12.12.1 of ASCE 7 -05. Reid iddleton Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005 /00101 Page 5 18. The determination of allowable story drift, dx, in the calculations apparently assumes a classification of Occupancy Category II for the structure, but our understanding is that a classification of Occupancy Category III is required. The calculations for allowable story drift, dx, should be revised for 75 percent of the calculated value and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Section 1613.1 and Table 12.12 -1 of ASCE 7 -05. 19. The structure is required to be designed for the additional load combination indicated below. This load combination does not appear to be considered in the STAAD.Pro analyses, which should be revised and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Sections 1605.1 and 1605.3.1. Note that D = dead load and E = earthquake Toad (strength design). a. 0.6 D + 0.7 E 20. The building is required to be designed for load combinations that include vertical seismic load effects. These load combinations do not appear to be considered in the calculations STAAD.Pro analyses, which should be revised to include load combinations with vertical seismic load effects as indicated below and resubmitted for review. The structural design may need to be revised. Please verify. Note that D = dead load, E = seismic load effect, QE = effect of horizontal seismic forces, p = redundancy factor, and SDS = design spectral response acceleration parameter at short periods. See IBC Section 1613.1 and Section 12.4 of ASCE 7 -05. a. E = P QE + 0.2 SDS D. b. E = p QE - 0.2 SDS D. 21. The STAAD.Pro analyses assume fixed -end conditions at the bottom of each column in the steel moment frames. The calculations do not appear to consider the effect of this assumption on the steel base plates, the anchorage of the frames to the foundation and the foundation. Substantiating data verifying structural adequacy should be submitted for review. The structural design may need to be revised. Please verify. See IBC Section 1604.4. Reid iddleton %yr Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005/00101 Page 6 Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project. If you have questions or need additional clarification, please contact us. Sincerely, 'd Middleton, Inc. Philip Brazil, P.E., S Senior Engineer cc: Mark Hilliard, BN Builders (by e-mail) Joseph Glaser, ABKJ (by e-mail) Brenda Holt, City of Tukwila (by e-mail) knb:\doc\.26\planrevw\tukwila\1 1 \t001 r1.doc \prb Reid iddleton ABKJI ANDERSEN • BJORNSTAD • KANE • JACOBS Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98 I 04 Tel: 206.340.2255 Fax: 206.340.2266 www.abkj.com PROJECT kAnr Pl-tnrse 4' 5 ,14. rurre3B SUBJECT DATE BY SHEET# 7 1 1 - 1 1 . , • , 1-1 1 f --T -'1 1 1 __ _J _ ____J._ .1 . _1. _ • , , : • 1 1 . . . 1 . -. .---i-- i 1 1 , ! 1 1 , .- :.---- --I-- -I --.----!--------- - ---• - i--. -7- • 4 i i - • , •_____I 1 I _t ' _1 t .1_ . . i -i, - ---- -1- 1 1 1 ! : . . 1 • : ! ! , ! . . , 1 • 1 I . • , , ! ! . ! • 1 1 L j _i _,' 1 .• • __i_ . i f -•t ! , I : 1 1 1 I 4 . LI ! • I 1 , • _i_ 1 1 : : ; . i • , 1 , _ . 1 , , --- - I . , .i_ f 1 i , —1 — -4 1 ; . - I I ; : , • i 1 1 i I I . : i 1 1 I I --i-- : -1 I ---- -, ' — 1 -----f • . . , I • 1 1 : I 1 -i I ' --1-- I ! T I : : i I I ! , . I i , 1 I , , - — . 4 - ' 1 • 1 ! I , ■ J : I • • I 1 I ; , . , . i 1 i— i -L.1 . , 1 , , -I ___1 . ! 1 • 1 I _ P_ L4 1 , -4 --t- ' : : ; I • -, —1 I ' • • i I • • ! , 1 • : 1 , 1 • 1 • . , . . 1 I t -1 ! I - - i • I j • I I --4- i 1 , 1 i i I , • i 1 J , ', I i i . . • : . , 1 I- • _I . ---r— --. — • , . I , ; • I I I T 4 - --4 . 1 . I .ii , . 1 1 _L___ --1 __J_ _, • . I -!- . • 1 . 1 i . I _I I . . , ; i 1 1 , I _L I I 1 1 1 i I i 4- • --I- : --t ! I, • 4- --t I I . I. I I I I ■ I 11 t . 1 --4 I I ! I ! I . , I II I I 1 or • A THE 'ANTED • 7' • mEZZ ROC MEE 05HS. GUESS? uhi 1-07 Jt i 1 LEGEND CASUAL REIM CORNER SOPHISTICATE 640 0- - - •- EXSALEUR RENNETN BERM CUTLERY ART GALLERY 1-07 RATH BOOT WORKS GEM 1-05 On/SCREE KITCHEN & COMPANY M0N7H — YEAR LEASE EXPIRATION DATE r =Gt.' rearm% =tar:sorra mmrrrres• mr6 CARLTON CARDS 1-05 NATURUZER PHASE 65. JANUARY 2004 PHASE #6. JANUARY 2007 THE BON MARCHE s • s,M11 7-1C - C7 0. mligrucral DEAL rjERIt0rm4Ns0ER'S PENDING ..-1 I 'was 11050 mmN RENOVATEti CENTER COURT • IWOH ROCF =NEW% REGO= AT COURGES. FRAIE: Eeda MALL OFFICE MALL OFFICE • 0— .-:.- 015 PICTURE PEOPLE ...••••• • ! • EFLAIORLI AT COOL EMI 1-1= IND FAME SUMO. a car causn.4-In cm N•rr•NNI-1) rt.ORSer 41EGy 1 THINGS FRANKLIN LEEDS # SO 1 REMEMBERED COAT 01 TV` AMERICAN EAGLE OuTFiTTERS FOOTACTION MARK'S HALLMARK USA • • • i Ci2 1=1 NEW RErGEATED MAN TRANCE I I= 1 ! 1 1 1-00 . RAVE GIRL ABERCROMBIE & FITCH - -o -.-.-- - -o SOUTHCENTER MALL 1 1 1, 03- 31-D" 1-mati Ito RP • 01/19/0 L SCLPIFP28 ZINIVAND.0 LP 1FP2B SNONtrAst• u 2 • 14L II 11. 1) 1 • •.. . . .1)) '2 tI ) a !1 , B1N.2 ow L.) tai ■; kJ-. • al- • 5,t. 0...i • - . 1... 4 . . ... z A z • lik..!•:1••'•4 • § • .s.r 1 , • • . '477 • /14 • 01'A; #7,■• S•••• -1.••• 7.• • r.• • • ••,?.....:::••1.; ," • • ". •••• • T•••71!•• , `•• ;:•‘2‘.. • 7'• 4.,'ACIPF.e; ,.t•••:;-• • :.•g- .Z •••••,., • • ;••••••!...t.• •, • • ,•:••• • 9.17:"Pit, • • • • •'•• • • • ••••• 714 1.14- .4 -- " • 41141 .. • • • vi . • .4tr4 • wi 4 ' • •,kBP •. • 1.. L • -. - St• , • 1. .4'6 • r 7...4 oka4,1 r T fli14&i' • "11 • ••• '; • ;4, 4 4, 3 SkQIw.�Yr Y• v - Y�.1 '. `'''�l.S,Y''3I✓i4�1• / Y'(.. LVr3.mo i�lf G Wtbry+ rY•hCf14A.A�4({,�l�,V,CnLY"•iiW .. A. ^4, Y12 �' S4 'TWA''• , 1- -�r.i Sr -� R " • ZZ2V1 ZZ271 ^9�1 t• 971 971 21S•. • • 41•df H , 4 ABKJ� AND! F'SE N • LJC4 tiS'p, -j • tiANI • IAC:,:E;' Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle, Washington 98104 St RIr c 1 Tel: 206.340.2255 I Fax: 206.340.2266 0 - la rL4-, Sr M www.abkj.com i . 2* 11 it •• r�. 4 Cr9S° MO. 5- ELEV- SQ•'. 7' 1 --- 7..CK7Pc sur;Ppl=s =f8 i I SEE 1417-. 011.1 IS_ !OAF LS 4 -4.N rAP ve d - 4104 BOLTZ troF tis .� Stk,F17•PCMT 'STD. 4.1 • S.C. 2- 20W coldwECTro1,t ifo • SWF cr�cS. tt7eF21 I 1 -- taaFia-, 10414F 21 • LLatx4it SEAT r iz• TM wax MS 3ECT10ki spaIcc. . fQ' 3 L'c' # 14 u, 4 - ID-744 1—. 14/e, ! ABKJ1 Ar41.:LYSEN • ;_lif.-■-.S-AD• VAIJI • ..Ac CI-c Consulting Civil and Structural Engineers 800 Fifth Avenue. Suite 2500 Seattle,Washington 98104 Pr•toik •t)t.- t • Tel: 206.340.2255 Fax: 206.340.2266 -• - , St *L NE.= 4 FLR—MIAL _ • LIff men ILI th - 1/4 Kr7P) /3\ - - ;DETAIL Scala: .6.2.1=c' 2L IC. 14 E. TyP1c...6L._ Jo! sr cE PaC 'SPEC I. )IaT AL: 5., pc CI Li - Et 72-111.• IXG PLAArSt taf ire SEE zezu re L4i.J www.abki.com ji • . ELEV. VISSIES• Ir/P lieLIDIEC.It / ATZ3:34- MIMS. bessrms% thx. ucarmatesmes) L. c' oETA4 L s•s• 5 c IQ : `• 1-0" ■ , b:;3. Id I SA sett 5f. C ri.co..rs / see oe.-!AI i_ '2', 11:1 S 91-rT. 5L9E ID*Til i L WM= fn. . .../r)1 .S 1 I IST EM- WRESZ E ST1-- =AM %MIR- Si5CTS GI'ME '2' - sec-rs &I WEE= eissse men Fururrimta FtA - TIPICAL .21A0 : r Gt120E2111.14 ic v4-• JULAPETZ 15EAM id LALLere NeE MAU?. 1Y'=11_ ...111111,7 .1: ik.axil; to: feAra - t ECX.TaL - PAK C1=1-_ te.4 1-417 lit "Z. 15E-.4 44 ••■•■•-•.,1911•■■■ TA ie, ABKJI ANC:1 rdSE F: • Ey 11()P.:SlAr • ICA..4 • ACCE Consulting Civil and Structural Engineers 800 Fifth Avenue, Suite 2500 Seattle,Washington 98 I 04 Td: 206.340.2255 tJ[V( 1 12F-42-H117 12-F- „ ••• Fax: 206.340.2266 www.abkj.com I I 7 4, i 1 P 1.1 1,1.4. • ,/,,,er 5tCT Iczfp: 11 NI44 1rt I 127-16-11-16i ABKJI 1.S! r4 • f• • 1/al( • Consulting Civil and Structural Engineers 1 800 Fifth Avenue. Suite 2500 Seattle.Washington 98101 Tel: 206.340.2255 1 :-• ' .1 '• • • • ;. • I Fax: 206.340.2266 www.abkj.com 1 • V • ;1 Reid iddleton February 17, 2011 File No. 262011.005/00102 Mr. Bob Benedicto, Building Official City of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — Final Submittal Westfield Mall Seismic Upgrade (D10 -353) Dear Mr. Benedicto: CIVIL ENGINEERING STRUCTURAL ENGINEERING PLANNING SURVEYING RECEN D 1FE8 la 20111 DEye pPp NT We reviewed the proposed project for compliance with the structural provisions of the 2009 International Building Code (IBC) as amended and adopted by the state of Washington and the city of Tukwila. The permit applicant has responded successfully to our comments. A new sheet not included in the drawings that we reviewed initially was submitted with the revised drawings. The other sets of drawings should be reconciled in preparation for permit issuance. One additional copy of this new sheet is enclosed to facilitate the process. This new sheet is: S1 (original S1 renumbered to S2). The "red- lined" revisions noted below were made to the drawings with the concurrence of the structural engineer. The other sets of drawings should be reconciled in preparation for permit issuance. 1. Sheet S -1. At section on structural steel, add "Prepare faying surfaces as required for slip- critical connections (Class A, µ > 0.35)" as shown. 2. Sheet S -1. At section on structural steel, add "@ 0° F" as shown. 3. Sheet S -1. At section on structural steel, add "and 40 ft-lb @ 70° F" as shown. 4. Sheet S -1. At section on quality assurance plan, change from "designated seismic system" to "voluntary seismic improvement" as shown. 5. Sheet S -2. Revise sheet references as shown. Structural special inspections by qualified special inspectors should be provided. The following is a summary: 1. Fabrication and erection of structural steel: Periodic. 2. Welding of structural steel for single -pass fillet welds (maximum 5/16- inch): Periodic. Mr. Bob Benedicto, Building Official City of Tukwila February 17, 2011 File No. 262011.005/00102 Page 2 3. Welding of structural steel other than single -pass fillet welds (maximum 5/16- inch): Continuous. 4. High- strength bolting of structural steel other than slip- critical: Periodic. 5. High- strength bolting of structural steel, slip - critical, where applicable: Continuous. Structural tests by qualified special inspectors and other methods of verification should be conducted or submitted, where applicable. The following is a summary: 1. Nondestructive testing of the complete-joint-penetration (and partial-joint- penetration, where applicable) groove - welded joints at the steel ordinary moment frames. Enclosed are two sets of the revised structural drawings, structural calculations, and correspondence from the structural engineer for your records. If you have questions or need additional clarification, please contact us. Sincerely, Reid Middleton, Inc. Philip B, zil, P.E., S.E. Senior ngineer Enclosures cc: Mark Hilliard, BN Builders (by e -mail) Joseph Glaser, ABKJ (by e -mail) Brenda Holt, City of Tukwila (by e -mail) knb\26 \p lanrevw \tukwi la\ 11 \t001 r2.doc \prb Reid iddleton Reid iddleton January 14, 2011 File No. 262011.005 /00101 Mr. Bob Benedicto, Building Official City of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 Subject: Building Permit Plan Review — First Submittal Westfield Mall Seismic Upgrade (D10 -353) Dear Mr. Benedicto: CIVIL ENGINEERING STRUCTURAL ENGINEERING PLANNING SURVEYING CiTyRNMEq JAN 18 2011 PERMI7CENIER We reviewed the proposed project for compliance with the structural provisions of the 2009 International Building Code (IBC) as amended and adopted by the state of Washington and the city of Tukwila. The permit applicant should address the comments below. Responses to the review comments below should be made in an itemized letter form. We recommend the permit applicant have the structural engineer respond and resubmit two sets of the revised structural drawings and one copy of the supplemental structural calculations for additional review. All information should be submitted directly to Reid Middleton, Inc. Geotechnical No comments Architectural No comments Structural 1. Structural special inspections by qualified special inspectors should be provided. See IBC Sections 1704 and 1707. The following is a summary: a. Fabrication and erection of structural steel: Periodic, see also Section 1704.3. b. Welding of structural steel for single -pass fillet welds (maximum 5/16- inch): Periodic, see also Section 1704.3. 4 ;or, 44 44 Mr. Bob I3enedicto, Building Official City of 'Tukwila January 14, 2011 Pile No. 262011.005/00101 Page 2 c. Welding of structural steel other than single -pass fillet welds (maximum 5/16- inch): Continuous, sec also Section 1704.3. d. Iligh-strength bolting of structural steel other than slip - critical: Periodic, see also Section 1704.3. e. I Iigh- strength bolting of structural steel, slip - critical. where applicable: Continuous, see also IBC Section 1704.3, Section M5.4 of RISC 360 -05 and RCSC Section 9.3. 2. Structural tests by qualified special inspectors should he conducted. Sec IBC Sections 1704 and 1708. The following is a summary: a. Nondestructive testing of the complete-joint-penetration (and partial- joint- penetration, where applicable) groove- welded joints at the steel ordinary moment frames. See IBC Section 1708.3 and Section 18 and Appendix Section Q5.2 of AISC 341 -05. 3. The general structural notes, Sheet S -1, should he revised by specifying an additional special inspection (i.e., fabrication and erection of structural steel). See IBC Section 1705.2. Refer to Sections 1704 and 1707 and the structural comment above to determine the additional type of special inspection. 4. The extent of each type of special inspection in the general structural notes. Sheet S -1. should be specified for review (e.g., periodic or continuous). See IBC Section 1705.2(5). Refer to Section 1702.1 for the definitions of continuous special inspection and periodic special inspection. Refer to Sections 1704 and 1707 and the structural comment above to determine when continuous or periodic special inspection is required for each type of special inspection. 5. The earthquake load design data in the general structural notes. Sheet S -1. should he revised by also specifying the site class. design spectral response accelerations, .S „s and Sm. design base shear. i'. seismic response coefficient. (',s, and analysis procedure used. See IBC Section 1603.1.5. 6. A note should be added to the general structural notes. Sheet S -1, specifying nondestructive testing of the complete-joint-penetration (and partial- joint- penetration, where applicable) groove- welded joints at the steel ordinary moment frames. See 113C Section 1708.3 and Section 18 and Appendix Section Q5.2 of the AISC 341 -05. Reid iddleton Mr. Bob Benedicto, Building Official City of Tukwila January 14. 2011 File No. 262011.005/00101 Page 3 7. A note should he added to the general structural notes, Sheet S -1, specifying that, other than erection bolts, the high - strength bolts at the seismic- force- resisting system of the building shall he pretensioned and their faying surfaces shall be prepared as required for slip - critical connections (Class A, fi > 0.35). See IBC Section 2205.2.2, Section 7.2 AISC 341 -05 and Section J3.8 of AISC 360 -05. 8. A note should be added to the general structural notes. Sheet S -1, specifying that the welds at the members and connections of the scismic- force - resisting system of the building shall he made with filler metal producing welds with a minimum Charpy V -notch toughness of 20 ft -lbf at 0 degrees F. Sce IBC Section 2205.2.2 and Section 7.3a of RISC 341 -05. 9. A note should be added to the general structural notes. Sheet S -1, specifying that demand critical welds shall be made with filler metal producing welds with a minimum Charpy V -notch toughness of 20 ft -lbf at minus 20 degrees -F and 40 ft-Ibf at 70 degrees -F. Sec IBC Section 2205.2.2 and Section 7.3h of AISC 341 -05. 10. The complete- joint- penetration groove welds of the beam flanges, shear plates and beam webs to the columns of the steel ordinary moment frames are required to be demand - critical welds. Detail 4 /S -1 should be revised by specifying the locations of these welds for review. Sce IBC Section 2205.2.2 and Sections 5.1(5) and 11.2c of AISC 341 -05. 11. Steel ordinary moment frames are proposed, but these are not permitted in the structure due to being assigned to Seismic Design Category D. The drawings should he revised by providing a seismic force - resisting system that is approved for Seismic Design Category 1). See IBC Sections 1613.1 and 3404.1, and Table 12.2 -1, Item C.4. of ASCE 7 -05. 12. The size of the structure where the steel ordinary moment frames are proposed and the characteristics of the existing scismic force- resisting systems are unclear. Documentation confirming the number of stories or framing levels of the structure, the extent of the structure beyond what is shown on Sheet S -1. the locations of seismic joints enabling an apparent assumption of 7 hays. 24 feet 0 inches in width. in the effective structure for the purposes of the analysis. the types and locations of the existing lateral- force - resisting vertical elements, and other pertinent inforniation, should be submitted to enable review. Refer to Section 12.2.5.6 of ASCE 7 -05. Reid iddleton Mr. Bob Benedicto, Building Official City of Tukwila January 14. 2011 File No. 262011.005/00101 Page 4 13. The note: "moment frank selected for upgrading'" at Partial Roof Framing Plans A and B is not clear. A narrative should be submitted explaining the choice of the moment frames in the current drawings and the probability that other moment frames will he proposed for upgrading in the future, should he submitted for review. 14. The note: "moment frame selected for upgrading' at Partial Roof Framing Plans A and B is also unclear with respect to what is currently in place at the locations for upgrading. Based on the details elsewhere on Sheet S -1, it appears that the existing lateral - force- resisting vertical elements consist of steel concentrically - braced frames. 15. Assuming the existing lateral- force - resisting vertical elements are concentrically braced frames. replacing or supplementing them with steel ordinary moment frames leads to the creation of a horizontal combination seismic force- resisting system. For steel ordinary concentrically braced frames, the lower value of the response modification coefficient. R, and the higher value of the deflection amplification factor, ('p. is required to be used for the structure. "l'his will require the calculations to he revised and resubmitted for review. The structural design may need to he revised. Please verify. See IBC Section 1613.1 and Section 12.2.3.2 of ASCE 7 -05. 16. I3ased on our understanding of the occupancy of the structure (Occupancy Category 111). the seismic base shear, 1', and lateral seismic forces, Fr, are required to he multiplied by an importance factor, I, of 1.25. This requirement. however. was not considered in the determination of I•' or Fr in the calculations (pages I,1 -L3). but it was assumed in the determination of the deflections, 6, (pages L2 and L3). The calculations should be revised and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Section 1613.1 and Table 1604.5. and Sections 11.5, 12.8.1. 12.8.1.1, and 12.8.6 of ASCE 7 -05. 17. A seismic base shear. f', for allowable stress design is determined on page 1,1 of the calculations, but the determination of the allowable story drift. Ax is based on strength design (page L2). The calculations should he revised and resubmitted for review. The structural design may need to be revised. Please verify. See IBC Sections 1602.1 (notation for "E'"). 1605. and 1613.1, Sections 12.4 and 12.8.6 of ASCE 7 -05. and Table 12.12.1 of ASCE 7 -05. Reid iddleton Mr. Bob Benedicto, Building Official City of Tukwila January 14, 2011 File No. 262011.005/00101 Page 5 18. The determination of allowable story drift, A, in the calculations apparently assumes a classification of Occupancy Category II for the structure. but our understanding is that a classification of Occupancy Category II1 is required. The calculations for allowable story drift. z9C, should be revised fbr 75 percent of the calculated value and resubmitted for review. The structural design may need to be revised. Please verify. See IB(' Section 1613.1 and Table 12.12 -1 of ASCE 7 -05. 19. The structure is required to be designed fbr the additional load combination indicated below. This load combination does not appear to he considered in the STAAD.Pro analyses, which should he revised and resubmitted for review. The structural design may need to he revised. Please verify. See IBC Sections 1605.1 and 1605.3.1. Note that I) - dead load and E = earthquake load (strength design). a. 0.6 D + 0.7 E 20. The building is required to he designed for load combinations that include vertical seismic Toad effects. These load combinations do not appear to he considered in the calculations STAAD.Pro analyses. which should be revised to include load combinations with vertical seismic load effects as indicated below and resubmitted for review. The structural design may need to be revised. Please verify. Note that I) = dead load. E — seismic load effect, QE: = effect of horizontal seismic forces. p = redundancy factor. and S1)5 design spectral response acceleration parameter at short periods. See 113C Section 1613.1 and Section 12.4 of ASCE 7 -05. a. E b. E = p QE p QE' + 0.2 SES D. - 0.2 SES D. 21. The STAAD.Pro analyses assume fixed -end conditions at the bottom of each column in the steel moment frames. The calculations do not appear to consider the effect of this assumption on the steel base plates, the anchorage of the frames to the foundation and the foundation. Substantiating data verifying structural adequacy should be submitted for review. The structural design may need to he revised. Please verify. See IBC Section 1604.4. Reid iddleton Mr. Bob Bcnedicto. Building Official City of Tukwila January 14, 2011 File No. 262011.005/00101 Page 6 Corrections and comments made during the review process do not relieve the permit applicant or the designers from compliance with code requirements, conditions of approval, and permit requirements; nor are the designers relieved of responsibility for a complete design in accordance with the laws of the state of Washington. This review is for general compliance with the International Building Code as it relates to the project. If you have questions or need additional clarification. please contact us. Sincerely, Read Middleton, Inc. Philip Brazil. P.E.. S,E. Senior Engineer cc: Mark llilliard. BN Builders (by e -mail) Joseph Glaser, A13KJ (by e -mail) Brenda [bolt, City of Tukwila (by e -mail) knb: \doc \26 \planrevw \1 ukwila\ 1 I \t00 I r l .doc \prb Reid iddleton 08 -01 -2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director MARK HILLIARD 2601 4 AV #350 SEATTLE WA 98121 RE: Permit No. D10 -353 2800 SOUTHCENTER MALL TUKW Dear Permit I lolder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per thc International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 09/17/2011. Based on the above, you are hereby advised to: 1) Call thc City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 09/17/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D10 -353 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206- 431 -3665 41 Ci ®f d t#i Jim Haggerton, Mayor Department of Community i►Ievelopment Jack Pace, Director January 3, 2011 Dave Swanson. P.E. Reid Middleton 728 - 134th Street SW. Suite 200 Everett, WA 98204 RE: Structural Review Development Permit D10 -353 Westfield Mall Seismic Upgrade — 2800 Southcenter Mall Dear Mr. Swanson: Please review the enclosed set of plans and documents for structural compliance with the 2009 International Building Code. If you should have any questions, please feel free contact us in the Permit Center at (206) 431 -3670. Sincerely, c RNaja_r_ Bill Rambo Permit Technician encl File: i)10 -353 A'.1Petmit Center \Stiuclutal ReNiew'0 I0 -353 Structural Rcvicw DOC 6300 Southcenter Boulevard, Suite #100 e Tukwila, Washington 98188 0 Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 FERMI? COORD COPY � PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D10 -353 DATE: 12/29/10 PROJECT NAME: WESTFIELD MALL - SEISMIC UPGRADE SITE ADDRESS: 2800 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Building 'vision D I'Ut)IIC Works ANA AIi11- D40-1.0 11 kg 3 t-0 Fire Prevention fanning Division qt ,tti U1 ''� tructura Permit Coordinator DETERMINATION OF COMPLETENESS: :1 Complete Comments: Incomplete DUI 1)A1I : 12/30/10 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: I)ep,trtment% determined in(t :mplete: Bld ❑ I ire ❑ I'Ing ❑ P'VV ❑ SIJii Init JIs: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route ip Structural Review Required RLVILWER'S INITIALS: No further Review Required DA1E: APPROVALS OR CORRECTIONS: Approved Notation: REVIFWrR'S INITIAI S: Approved with Conditions DUE DATE: 01/27/11 Not Approved (attach comments) I)AIF: Permit Center Use Only CORRECTION LETTER MAILED: 1 elmrtment, isuerl r Ilrmc tinrtS: Bldg ❑ Fire ❑ Plntt ❑ P4V' ❑ St,1tl Inrt�JIh: 1 kx uml.nt'.: nubnl ' hp Jul :au' Contractors or Tradespeople Peter Friendly Page 0 General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name B N BUILDERS INC UBI No. 602056687 Phone 2063823443 Status Active Address 2601 4Th Ave Ste 350 License No. BNBUII'990K3 Suite /Apt. License Type Construction Contractor City Seattle Effective Date 5/23/2001 State WA Expiration Date 9/12/2011 Zip 98121 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status WESTESL913K1 WESTERN STATES LOGISTIX LLC Construction Contractor General Unused 5/8/2009 5/8/2011 Active BASTINB0000J BASTIAN NIELSEN BUILDERS INC Construction Contractor General Unused 9/11/2000 9/7/2001 Archived PURODSI984JN PURODI SYSTEMS INC Construction Contractor Plumbing Unused 6/19/2002 7/2/2010 Expired Business Owner Information Name Role Effective Date Expiration Date BASTIAN, BRAD President 05/23/2001 Bond Amount NIELSEN, JEFF Vice President 05/23/2001 6642084 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 5 INS CO OF AMERICA 6642084 06/02/2009 Until Cancelled 512,000.00 06/05/2009 4 HARTFORD FIRE INS 528SBBK5617 01/01/2002 Until Cancelled 06/02/2009 512,000.00 12/04/2001 3 TRAVELERS CAS & SURETY CO 103355900 08/30/2001 Until Cancelled 04/07/2009 $12,000.0009/06 /2001 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 12 ZURICH AMERICAN INS CO g1a380504400 09/07/2010 09/07/2011 $1,000,000.0009 /07/2010 11 WAUSAU UNDERWRITERS INS. CO TBJZ91442966029 09/07/2009 09/07/2010 $1,000,000.0009 /03/2009 10 WAUSAU BUSINESS INS CO TBKZ91442966028 09/07/2008 09/07/2009 $1,000,000.00 09 /05/2008 9 WAUSAU BUSINESS INS CO TBKZ91442966027 09/07/2007 09/07/2008 $1,000,000.00 09 /05/2007 https://fortress.wa.gov/lni/bbip/Print.aspx 03/21/2011 GENERAL STRUCTURAL NOTES THE FOLLOWING NOTES APPLY UNLESS INDICATED OTHERWISE: CODE• INTERNATIONAL BUILDING CODE, 2009 EDITION. DESIGN LIVE LOADS: ROOF RETAIL FLOORS WIND SEISMIC STRUCTURAL STEEL: = 25 PSF = 100 PSF = 85 MPH (3 SECOND GUST), EXPOSURE C, Iw = 1.15 • SEISMIC DESIGN CATEGORY D. I E = 1.25, SDS = 0.952, SDI = 0.492 R = 3,5 (ORDINARY STEEL MOMENT FRAMES) CD= 3.0 SITE CLASS = D V = 0.340W, C = 0.340 (EQUIVALENT LATERAL FORCE PROCEDURE) ALL STEEL ASTM A36, Fy = 36 KSI, SPECIAL INSPECTION REQUIRED, FABRICATION AND ERECTION PER AISC SPECIFICATIONS. SUBMIT SHOP DRAWINGS, WELDING PER AWS D1.1. MINIMUM SIZE WELDS 3/16" CONTINUOUS FILLET, WELDERS CERTIFIED PER WABO FOR ROD AND POSITION. HIGH — STRENGTH BOLTS PER ASTM A325, TYPICAL BOLTED CONNECTIONS — FRICTION TYPE. TENSION HIGH — STRENGTH BOLTS BY DIRECT TENSION INDICATOR METHQP USING LOAD INDLCATOR WASHERS INSTALLED PER MA CTUREI'S INSTR CTIONS� Y� �'` � ��i ''=" �5 4 I �� 5 C p— e -gr".1 A e---e � t a'�►i J� j (e t -� EMPLOY A PROPER FIRE WATCH T OVERSEE AND MONIT01� ALL FIELD—WELDING OPERATIONS. \ es„3s ALL WELDS USED IN MEMBERS AND CONNECTIONS SHOWN IN THESE DRAWINGS SHALL BE MADE WITH A FILLER METAL THAT CAN PRODUCE WELDS THAT HAVE A MINIMUM CHARPY V —NOTCH TOUGHNESS OF 20 FT -LB. L. c3° '. WHERE WELDS SHOWN IN THESE DRAWINGS ARE DESIGNATED AS DEMAND CRITICAL, THEY SHALL BE MADE WITH A FILLER METAL CAPABLE OF PROVIDING A MINIMUM CHARPY ��-� V —NOTCH (CVN) TOUGHNESS OF 20 FT —LB (27J) AT —20'5, rtr)�' 4.- .-t�j MISCELLANEOUS: REFER TO ARCHITECTURAL DRAWINGS FOR OPENINGS, ARCHITECTURAL TREATMENT AND DIMENTIONS NOT SHOWN, VERIFY ALL DIMENTIONS AND CONDITIONS AT THE PROJECT SITE PRIOR TO STARTING WORK AND NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. PROVIDE TEMPORARY ERECTION BRACING AND SHORING AS REQUIRED FOR STABILITY OF THE STRUCTURE DURING ALL PHASES OF CONSTRUCTION, SPECIAL INSTRUCTIONS: PROVIDE SPECIAL INSPECTIONS IN ACCORDANCE WITH IBC SECTION 1704.3 AND PER THE QUALITY ASSURANCE PLAN FOR THE FOLLOWING: STRUCTURAL WELDING HIGH STRENGTH BOLTING QUALITY ASSURANCE PLAN QUALITY ASSURANCE PER SECTION 1705 IBC 2009. SEISMIC UPGRADE /STRENGTHENING OF COMPONENTS OF THE EXISTING SEISMIC FORCE RESISTING SYSTEM (SFRS), THE EXISTING SFRS CONSISTS OF CONCRETE FILLED STEEL DECK DIAPHRAGMS AND STEEL MOMENT FRAMES ON CONCRETE SPREAD FOOTINGS, SPECIAL INSPECTIONS AND TESTING TO BE PROVIDED IN ACCORDANCE WITH IBC CHAPTER 17: STRUCTURAL STEEL STRUCTURAL WELDING TYPE AND FREQUENCY OF TESTING; PERFORM NON— DESTRUCTIVE TESTING (ULTRASONIC AND MAGNETIC PARTICLE TESTING) OF COMPLETE JOINT PENETRATION GROOVE WELDS (CJP) WHICH ARE IDENTIFIED AS "DEMAND CRITICAL" WELDS ON DRAWINGS. TYPE AND FREQUENCY OF SPECIAL INSPECTION: SPECIAL INSPECTIONS TO CONFORM TO SECTION 1704 IBC 2009 AND ATTACHED TABLE 1704.3, REQUIRED FREQUENCY AND DISTRIBUTION OF TEST AND SPECIAL INSPECTION REPORTS; WEEKLY. STRUCTURAL OBSERVATION TO BE PERFORMED; NONE REQUIRED. i oL f I F f4 Mechanical Electrical Plumbing Gas Piping City of Tukwila DiVl 1' IBC 2009 TABLE 1704.3 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION VERIFICATION AND INSPECTION CONTINUOUS DURING TASK LISTED PERIODICALLY DURING TASK LISTED 1. MATERIAL VERIFICATION OF HIGH — STRENGTH BOLTS, NUTS AND WASHERS: A. INDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS, _ X B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED. — X 2, INSPECTION OF HIGH — STRENGTH BOLTING: A. SNUG —TIGHT JOINTS. — X B. PRETENSIONED AND SLIP— CRITICAL JOINTS USING TURN —OF- NUT WITH MATCHMARKING OR CALIBRATED WRENCH METHODS OF INSTALLATION. — X C. PRETENSIONED AND SLIP— CRITICAL JOINTS USING TURN —OF- NUT WITHOUT MATCHMARKING OR CALIBRATED WRENCH METHODS OF INSTALLATION. X — 3. MATERIAL VERIFICATION OF STRUCTURAL STEEL AND COLD— FORMED STEEL DECK: ._ A. FOR STRUCTURAL STEEL, IDENTIFICATION MARKINGS TO CONFORM TO RISC 360. _ X B. FOR OTHER STEEL, IDENTIFICATION MARKINGS TO CONFORM TO ASTM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS, — X C. MANUFACTURER'S CERTIFIED TEST REPORTS, — X 4. MATERIAL VERIFICATION OF WELD FILLER MATERIALS: A. INDENTIFICATION MARKINGS TO CONFORM TO AWS SPECIFICATION IN THE APPROVED CONSTRUCTION DOCUMENTS. _ B. MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED. — X 5. INSPECTION OF WELDING: A, STRUCTURAL STEEL AND COLD— FORMED STEEL DECK: 1) COMPLETE AND PARTIAL PENETRATION GROOVE WELDS, X — 2) MULTIPASS FILLET WELDS. X — 3) SINGLE —PASS FILLET WELDS > 5/16" X — 4) PLUG AND SLOT WELDS. X — 4) SINGLE —PASS FILLET WELDS 5/16" — X 5) FLOOR AND ROOF DECK WELDS, — X B. REINFORCING STEEL: 1) VERIFICATION OF WELDABILITY OF REINFORCING STEEL OTHER THAN ASTM A706. _ _ 2) REINFORCING STEEL — RESISTING FLEXURAL AND AXIAL FORCES IN INTERMEDIATE AND SPECIAL MOMENT FRAMES, AND BOUNDARY ELEMENTS OF SPECIAL STRUCTURAL WALLS OF CONCRETE AND SHEAR REINFORCEMENT. _ _ 3) SHEAR REINFORCEMENT, — — 4) OTHER REINFORCING STEEL. — — 6. INSPECTION OF STEEL FRAME JOINT DETAILS FOR COMPLIANCE: A, DETAILS SUCH AS BRACING AND STIFFENING, — X B. MEMBER LOCATIONS. — X C. APPLICATION OF JOINT DETAILS AT EACH CONNECTION, — X REVISIONS ....r.e...•w.w... No changes shall h^ 1177:10 to th^ ct'oOe of work without prior approv..7.1 of Tukwila Building Division. NOTE: Revisions will require a new e'en fiuhmitt ^I and may include additional plan review flees. A FILE COPY Permit No........� /��. Plan review approval Is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and. i',,,e : is acknowledged: By ' Date. M p'- ; a - t 201 1. BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE �4 PDionVFE) FEB .82 [iiil Cityof u 1Ia BUILDING mf M 1'IErWED Tl+lx plan was rcrkwrd furgeneral iontorrnance with the &llow*, us'aatc dalb!' the )iiitdictiun: SltrtsNural Provisions of the'ifitternstkoe{ Building Code 0 Nun - structural Provisions of ehe-ittt etintionel Building Code 0 . other . T i'R aet.agdioent is ropo+witde for with all eppliaabte ci ooedkioos of approval.. and. pooh requirements subject to the esquirmnent, and i governing authority. This review does not " kc of the relieve the •rltcl+itect end of $pceord of + responsibili jot a easrtplste d+alga it &ocvr w i oils the taws of the govemiitg jurisdiction -and i of W'ildaiko Jorisdiellos Trp II ■ . Gje ax 'REM MIDDLLT Code Revitev Cbt sdeaat w'LLN C � E 2„ O C L.0 - O U r • 3 O `,OPE 0_ ° c 0_ O L E ° L y L U O C O 2 :ate U w c a -o L lu° —N - 0 _ < t _c En 4-, 2 ▪ C O 0 0 v -6_ 00 U D 0 C • N ° • Ea e 0= 'Lv c w 3 0 U ▪ U ; -•C O C • 0 U °0° U' s- 01 L 0 0 • O L • U 4-■ 0 ▪ 0 Y 11 00 <U.0oa C N '‘.7 -1-• O • 0 N 0 ai - x 0 4) ▪ o 0OC • to Cfn C _ U O'y d c U V ° 0 g 8 7 0 U++ U o_ _,_0 v • L 0 0 ▪ C7 no U > N cU r•- a >. 0 O C °'03 N O C O ° O L tU _c • .0 O y_ =o0 ° C C C ° 0 > O (000 0 °' :x+00 vcQ (L, O_ L L (l1 0 C 0 g 0 0 E x a) 0 0 N 013 0 d!) Y/) .N 0 0.0 O 0 N 0 ,O OD0 ° c) ▪ O C N C EC,O ° ° O*� U = 'T EU° 0 L C VO° — 0) 0 (E n L E (T) O U 0 • to to 0 0 0) C °- °N ▪ a0 E'x — �-C a) m , to c C ++ O N 0 ,V U 9.,)• 0 O 70 0) L U rn..oce —• 0 . (1) C • N o10 O rn D. 0 U C N O E N ° O 4) O L ° N O C C O >,U ° E� co 0 0 ' '«- ) 0 a C O C ▪ U w J LL w 0 N z 0 V► c PERMIT COMMENTS 0 (N1 6 t`i Q TUKWILA, WA 98188 0 5 C 8 1 2 ( 9 0 0 w 0 0 z t-- a 0 W Z Z Y cewm=< a00 0 w 0 z J LU N 0 gram CI) 1 =c C • Q ° C ° •.0 U C T C C :a° — L U a� a� U N C - oa O E .E8 �W•,74•U moo° - Y N C N N C(,E•- o2-1,22 0E-= ▪ < C U a OQ UL U� cc 12 N N O� L -0 O a C o ca o C " U E C N • EEO O .D > C v V rQ� 3 N 0)_v E C 3 -0 SD )n o LW E ° E L a �_c o c aY U O a) m X Q ▪ N N N y N T o • O • oo• °�, ▪ aa� o_U aoo° -Ca d _ • o C O Q N .v•a0o o U °o t NCC O T C 0 3I- EQ . O— 0w °tv v 3• N _▪ � O C O 0 • °w _ ) • �• 0O °Y moll =Q <0c0 CC0° 0) • L ° N 3 xu) N U o N' C 9 v w o U ▪ O'y ° C D O O • ° o-5 „ v - o o °rna) C "-- V C N U .0 p) C0 70 U a 0) .0 • -U ▪ >J0-c N C a-, -E C Sw - N > 0 C C • N ° O) ov o o O 0) O 6—_c 518 -n O (3 0 C C C _0 0) > o U o U NU°' — 0 -0 0 N — ° 0 C N O- TU o- (0 7) 4) = 0 �° 22,5°S 0: 0-0 ° • oN N + -C U l- - o(1,00 • C o O '+ O ▪ C E-C4. v v C7,• ✓ 'L at QO .0 N m0U 0) N £ U,, 0) O L C ° _ — o co N C< 0.g. E ECG 0 H • OU - 0 Q C -° '4) v E ; ° E.(13_2 01 ° (0 - N C N C O.V • OU j•a ,co C o 0 U O 7 - U V).ON w w w 0 0 w 0 ai co I.IJ (E) 14B22 (E) 14822 U) C 0 0 (E) 12814 0 0 0 0 0 (E) 12814 (:) 6 CONC OVER LIGI- TWEIGHT EQUIPMENT PAD 1 1/2" STL DECK ( E)IW16x26 0 (E) 1 1/2 "x2 GA STL DECK V) (E) 114B22 0 w ti MOMENT FRAME SELECTED FOR UPGRADING (1) 0 w 0 LJ 0 "-1 (E) 14822 V) 0 w If 0 0 O 0 H H 'l• m w PARTIAL ROOF FRAMING PLAN Fi CO (E) E12614 0 (E) W16831 1/8"=r—o" N (E) AC HOUSE ABOVE (E) 1 1/8" DI ROD BRACING w 0 0 LLI (E) IW16x36 vim) 0 w (E) ROD V) w MOMENT FRAME SELECTED FOR UPGRADING (E) 1 1 4" D BRA ING W16 6 x co ra 1.0 od m id (E) AC ABOVE 0 HOUSE (E)I W1 x36 (E) 1 1/4" D ROD BRACING 0 0 w 0 w, 0 Lil co LI.J (E) I W16831 PARTIAL ROOF FRAMING PLAN 4. 1/8"=1'-0” N r.— 1 1 1 1 1 l (E) SEISMIC JOINT (E) 1 FRAME TO BE RETROFITTED Q fm, r. — i - - — — —I (E) FRAME TO BE RETROFITTED 4_ 41 18 Agglk TYP /MALL LEVEL (E) TOC EL 28' -6" ROOF LEVEL (E) TOS EL 45' -5" (VERIFY) GRID Q FRAME ELEVATION VICINITY PLAN NO SCALE N 1/8"=1'-0" TYP 5/16 2 -12 5/16 P2 -12 3 SIDES STIFF FP_ TO (E) COL 1/4 1/4 SECTION 3A -3A I. 1x5 ES CONT SECTION 3B -3B REVIEWED NCE CODE COMP APDDAVFD F cUI City of Tukwila BUILDING niviRi ni STIFF IE 3/8x3 ES 0 4' -0" OC (E) X BRACE RODS WHERE PRESENT 3A CUT STIFF FE, TO FIT AROUND (E) GUSSET AS REQD STIFF It 1/2x3 ES ELEVATION TYP RETROFITTED COL & BASE 1 1/2 " =1' -0" ROOF LEVEL (E) TOS EL 44'-11" (VERIFY) /MALL LEVEL (E) TOC EL 28' -6" GRID H FRAME ELEVATION TYP EA 5/16 V2 -12 SI DE 1/8"--=v—o" FE 1x2 1/2 CONT CHAMFER FOR (E ED FOR w _lio/—IYA- '371-417- r111 11:1 NM • ■ - 1�,, 1 1 5/16 2 -12 0 w FL 1/2x8 CONT 1 1/2"-- SPACER FE. ES MMNIMMMWMMMOMM SECTION 4A -4A 14 4A 3" 2'- ft W BM (E)T (E ) WEB W BM TYP (E) DBL ANGLE CLIP EA SIDE CJP* 5/16 1/ REID MIDDLET (E) W BM r +Lf I I +71 6 11 WIDEN 1" COL COVER 411111111 PLATE AT JOINT ES 11 1/2' • a.. • • • (E) W BM R 1/2x3 ES W/ 4 -3/4" DIA BOLTS SPACER I. AS REQD ES EA FLG/ I/ 4 0 0 r■ 4B CJP *> \ SECTION 4B -4B 5/1611 TWO PIECE COVER PLATE AT (E) RODS SLOT & CUT COVER PLATE AROUND (E) ROD & GUSSET 1/4 +.+ Aidit PIT- 5/8 H <1Y1 P -65",w dm ES STIFF FE A <CJP* I. 1x2 1 2 ES CONT/ (E) STIFF FE ES <----OVER it 1/2 ES (E) SPLICE F. 44A ID 1/4 1/ -- -- --- ------ MMWMM _,_,_,.._,._v_,,_,_ MVP mloommmwimmimmommmmommumwm • 4. PLAN 4C -4C ODS) >CJP* I\' 5/16N CJP* `/R to 4C L44B 3 "t COVER I. 1/2 ES J (E) X BRACE RODS WHERE PRESENT 1/4 <TYP LIB 1/2x8 CONT 4C N <CJP* (E) CAP F. STIFF IE. 1/2 ES ELEVATION *NOTE: ALL CJP WELDS ARE CONSIDERED "DEMAND CRITICAL" WELDS. CE PERSDETAIL 3/S -1 (E) W COL TYP BM TO COL RETROFITTED CONNECTION 1 1/2"=1' -0" D(0-353 ANDERSEN • BJORNSTAD • KANE • JACOBS 4) A>t 401 tjto 0 • 0 N g S N z O "Vi c PERMIT COMMENTS I (E) ," LIGH CON I PAD EIG EQ OVER "x2 4 , 1 N N w N 9 (F•' W1 F .'4 f, STL ' ECK I op 0 V) O 'V + ` ! (E) ROD V) w MOMENT FRAME SELECTED FOR UPGRADING (E) 1 1 4" D BRA ING W16 6 x co ra 1.0 od m id (E) AC ABOVE 0 HOUSE (E)I W1 x36 (E) 1 1/4" D ROD BRACING 0 0 w 0 w, 0 Lil co LI.J (E) I W16831 PARTIAL ROOF FRAMING PLAN 4. 1/8"=1'-0” N r.— 1 1 1 1 1 l (E) SEISMIC JOINT (E) 1 FRAME TO BE RETROFITTED Q fm, r. — i - - — — —I (E) FRAME TO BE RETROFITTED 4_ 41 18 Agglk TYP /MALL LEVEL (E) TOC EL 28' -6" ROOF LEVEL (E) TOS EL 45' -5" (VERIFY) GRID Q FRAME ELEVATION VICINITY PLAN NO SCALE N 1/8"=1'-0" TYP 5/16 2 -12 5/16 P2 -12 3 SIDES STIFF FP_ TO (E) COL 1/4 1/4 SECTION 3A -3A I. 1x5 ES CONT SECTION 3B -3B REVIEWED NCE CODE COMP APDDAVFD F cUI City of Tukwila BUILDING niviRi ni STIFF IE 3/8x3 ES 0 4' -0" OC (E) X BRACE RODS WHERE PRESENT 3A CUT STIFF FE, TO FIT AROUND (E) GUSSET AS REQD STIFF It 1/2x3 ES ELEVATION TYP RETROFITTED COL & BASE 1 1/2 " =1' -0" ROOF LEVEL (E) TOS EL 44'-11" (VERIFY) /MALL LEVEL (E) TOC EL 28' -6" GRID H FRAME ELEVATION TYP EA 5/16 V2 -12 SI DE 1/8"--=v—o" FE 1x2 1/2 CONT CHAMFER FOR (E ED FOR w _lio/—IYA- '371-417- r111 11:1 NM • ■ - 1�,, 1 1 5/16 2 -12 0 w FL 1/2x8 CONT 1 1/2"-- SPACER FE. ES MMNIMMMWMMMOMM SECTION 4A -4A 14 4A 3" 2'- ft W BM (E)T (E ) WEB W BM TYP (E) DBL ANGLE CLIP EA SIDE CJP* 5/16 1/ REID MIDDLET (E) W BM r +Lf I I +71 6 11 WIDEN 1" COL COVER 411111111 PLATE AT JOINT ES 11 1/2' • a.. • • • (E) W BM R 1/2x3 ES W/ 4 -3/4" DIA BOLTS SPACER I. AS REQD ES EA FLG/ I/ 4 0 0 r■ 4B CJP *> \ SECTION 4B -4B 5/1611 TWO PIECE COVER PLATE AT (E) RODS SLOT & CUT COVER PLATE AROUND (E) ROD & GUSSET 1/4 +.+ Aidit PIT- 5/8 H <1Y1 P -65",w dm ES STIFF FE A <CJP* I. 1x2 1 2 ES CONT/ (E) STIFF FE ES <----OVER it 1/2 ES (E) SPLICE F. 44A ID 1/4 1/ -- -- --- ------ MMWMM _,_,_,.._,._v_,,_,_ MVP mloommmwimmimmommmmommumwm • 4. PLAN 4C -4C ODS) >CJP* I\' 5/16N CJP* `/R to 4C L44B 3 "t COVER I. 1/2 ES J (E) X BRACE RODS WHERE PRESENT 1/4 <TYP LIB 1/2x8 CONT 4C N <CJP* (E) CAP F. STIFF IE. 1/2 ES ELEVATION *NOTE: ALL CJP WELDS ARE CONSIDERED "DEMAND CRITICAL" WELDS. CE PERSDETAIL 3/S -1 (E) W COL TYP BM TO COL RETROFITTED CONNECTION 1 1/2"=1' -0" D(0-353 ANDERSEN • BJORNSTAD • KANE • JACOBS 4) A>t 401 tjto 0 • 0 N g S N z O "Vi c PERMIT COMMENTS I (E) STL 1/' DECK "x2 4 GA 1 N N w N 9 (F•' W1 F .'4 f, w �� (E) ROD V) w MOMENT FRAME SELECTED FOR UPGRADING (E) 1 1 4" D BRA ING W16 6 x co ra 1.0 od m id (E) AC ABOVE 0 HOUSE (E)I W1 x36 (E) 1 1/4" D ROD BRACING 0 0 w 0 w, 0 Lil co LI.J (E) I W16831 PARTIAL ROOF FRAMING PLAN 4. 1/8"=1'-0” N r.— 1 1 1 1 1 l (E) SEISMIC JOINT (E) 1 FRAME TO BE RETROFITTED Q fm, r. — i - - — — —I (E) FRAME TO BE RETROFITTED 4_ 41 18 Agglk TYP /MALL LEVEL (E) TOC EL 28' -6" ROOF LEVEL (E) TOS EL 45' -5" (VERIFY) GRID Q FRAME ELEVATION VICINITY PLAN NO SCALE N 1/8"=1'-0" TYP 5/16 2 -12 5/16 P2 -12 3 SIDES STIFF FP_ TO (E) COL 1/4 1/4 SECTION 3A -3A I. 1x5 ES CONT SECTION 3B -3B REVIEWED NCE CODE COMP APDDAVFD F cUI City of Tukwila BUILDING niviRi ni STIFF IE 3/8x3 ES 0 4' -0" OC (E) X BRACE RODS WHERE PRESENT 3A CUT STIFF FE, TO FIT AROUND (E) GUSSET AS REQD STIFF It 1/2x3 ES ELEVATION TYP RETROFITTED COL & BASE 1 1/2 " =1' -0" ROOF LEVEL (E) TOS EL 44'-11" (VERIFY) /MALL LEVEL (E) TOC EL 28' -6" GRID H FRAME ELEVATION TYP EA 5/16 V2 -12 SI DE 1/8"--=v—o" FE 1x2 1/2 CONT CHAMFER FOR (E ED FOR w _lio/—IYA- '371-417- r111 11:1 NM • ■ - 1�,, 1 1 5/16 2 -12 0 w FL 1/2x8 CONT 1 1/2"-- SPACER FE. ES MMNIMMMWMMMOMM SECTION 4A -4A 14 4A 3" 2'- ft W BM (E)T (E ) WEB W BM TYP (E) DBL ANGLE CLIP EA SIDE CJP* 5/16 1/ REID MIDDLET (E) W BM r +Lf I I +71 6 11 WIDEN 1" COL COVER 411111111 PLATE AT JOINT ES 11 1/2' • a.. • • • (E) W BM R 1/2x3 ES W/ 4 -3/4" DIA BOLTS SPACER I. AS REQD ES EA FLG/ I/ 4 0 0 r■ 4B CJP *> \ SECTION 4B -4B 5/1611 TWO PIECE COVER PLATE AT (E) RODS SLOT & CUT COVER PLATE AROUND (E) ROD & GUSSET 1/4 +.+ Aidit PIT- 5/8 H <1Y1 P -65",w dm ES STIFF FE A <CJP* I. 1x2 1 2 ES CONT/ (E) STIFF FE ES <----OVER it 1/2 ES (E) SPLICE F. 44A ID 1/4 1/ -- -- --- ------ MMWMM _,_,_,.._,._v_,,_,_ MVP mloommmwimmimmommmmommumwm • 4. PLAN 4C -4C ODS) >CJP* I\' 5/16N CJP* `/R to 4C L44B 3 "t COVER I. 1/2 ES J (E) X BRACE RODS WHERE PRESENT 1/4 <TYP LIB 1/2x8 CONT 4C N <CJP* (E) CAP F. STIFF IE. 1/2 ES ELEVATION *NOTE: ALL CJP WELDS ARE CONSIDERED "DEMAND CRITICAL" WELDS. CE PERSDETAIL 3/S -1 (E) W COL TYP BM TO COL RETROFITTED CONNECTION 1 1/2"=1' -0" D(0-353 ANDERSEN • BJORNSTAD • KANE • JACOBS 4) A>t 401 tjto 0 • 0 N g S N z O "Vi c PERMIT COMMENTS I 1 N N < (0 W Z 0 z 0 I- z CI_w CL 0 O _ g 0°00 c0 COCA 00 -J LIJ W� 0 roc0az 0 0 z —o W Z Z Y £ W 1X Z c) c) 6 DEC 2010 0 z W 2 V)