Loading...
HomeMy WebLinkAboutPermit D11-099 - 16700 VACANT BUILDING - REROOFVACANT BUILDING 16700 SOUThCENTER PY Dl 1 -099 City olDI'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #l00 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us DEVELOPMENT PERMIT Parcel No.: 2623049128 Address: 16700 SOUTHCENTER PY TUKW Suite No: Project Name: VACANT BUILDING Permit Number: D11 -099 Issue Date: 05/03/2011 Permit Expires On: 10/30/2011 Owner: Name: PARKWAY SQUARE Address: C/0 ROSEN PROPERTIES , PO BOX 5003 98009 Contact Person: Name: RICH BRATLAND Address: PMB #316 , 16821 SMOKEY POINT BL 98223 Contractor: Name: NW ROOFING SOLUTIONS LLC Address: 16821 SMOKEY PT BL, PMB 316 , ARLINGTON, WA 98223 Contractor License No: NWROORS971M4 Phone: 425 - 218 -2815 Phone: (425)231 -8273 Expiration Date: 07/24/2011 DESCRIPTION OF WORK: REROOF (OVERLAY) - ONE ROOF EXISTING. MECHANICAL FASTEN DES -DECK COVERBOARD OVER EXISTING ROOF. INSTALL SINGLE PLY PVC ROOFING MEMBRANE COMPLETE PER MANUFACTURERS REQUIREMENTS. SEE ATTACHED SCOPE OF WORK. Value of Construction: $68,985.00 Type of Fire Protection: Type of Construction: Electrical Service Provided by: Fees Collected: $1,907.12 International Building Code Edition: 2009 Occupancy per IBC: 0019 * *continued on next page ** doc: IBC -7/10 D11-099 Printed: 05 -03 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: N N Water Main Extension: Water Meter: N Permit Center Authorized Signature: Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. Start Time: End Time: Fill 0 c.y. End Time: Private: Public: Profit: N Non - Profit: N Private: Public: A.A_UfL Date: l I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: "4- zt_ 774 ► ' c/ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: /J/ PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila doc: IBC -7/10 D11 -099 Printed: 05 -03 -2011 shall not be valid. The issuance of a permit 'sed on construction documents and other dat 11 not prevent the Building Official from requiring the correc f errors in the construction documents and der data. doc: IBC -7/10 D11 -099 Printed: 05 -03 -2011 `CITY OF TUAILA ,Commun/ty Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://Www.ci.tukwila.wa.us Building Permit No. - oqf Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. or of we use onl Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION / (7oc S..,1c3,1 v,*4he-€.4-Te- Pa -way 81,,(I King Co Assessor's Tax No.: 2 6Z3 o 4-i- - 1' / Z8- 07 Site Address: 7t'` k w\ W A 5 8 1 /ea. Suite Number: Floor: Tenant Name: , VA C- P% N t New Tenant: ❑ Yes ❑ .. No Property Owners Name: Evere -11 Pk S- L pp,,, Ce. ■t e..." d e q Park j (Am Sg v, ou-� Mailing Address: PO :E,)( 6 0 0 3 �-e. /4 v tee. wa 9800? City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: / i `k erat cz Day Telephone: �a Z / 8 2 $) S' Mailing Address: PM 8 C"1/4, /43Z4 s'•.0*€ �,� f . /vd/ �}�1 t..-fa.�a t I,J \ 4$'ZZ3 City State Zip E -Mail Address: ii*V.") r a o T' "5 S o 14'ft .15 Q . a i o o, C e ,.•,, Fax Number: ti-2 S 2 5 Z 7$ S S GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: N kf / ' u -C, Y..5 S4 1t,,-4 7 s,as 1 LI..0 nn -/ Mailing Address: PM 5 4 ? l b $ Z 1 S.....rce,' (�,, El Vcl, Ar- I,,, -0, (.,/R S$'2 2 2 I City State Zip Contact Person: �1 e h gee, 4 )c....14 Day Telephone: 42 218 Lst 1 E -Mail Address: w 11 r e o'1l+1j S o L41 0.17 ?c% ilk A o o,< o .1 Fax Number: ' i 2 S 2 S2 78 cr Contractor Registration Number: N ■Al R 0 0 n 4 °I-7 / edi 4 Expiration Date: 7- Z 4- 11 All plans must be stamped by Architect of Record e o� C ans )74a n fi Company Name: w e •i''/Wl► b11' v2 A s5' o C i s 4i' Mailing Address: /3/0% /`/t 2 S-1-h al; Po e•ex g 1 b, K i'r, lan tl 1 wa g 0 $ 3 City State Zip Contact Person: ,i 1\ C i i_ ksi,l`. Day Telephone: 2 0 6 a./ 7 2 Sal E -Mail Address: Fax Number: 31.0 7 $ 6 /694, ENGIIl tER OF RECORD - All plans must be stamped by Engineer of Record Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: 5Aitr_ AS )D P. cgA!Su L'iAcv-T /eoVE H:\ Applications \Forms- Application.On Line\2010 Application. \7 -2010 - Permit Application.doc Revised: 7 -2010 lid .1 •� . Page 1 of 6 BUILDING PERMIF'INFORMATI 206 -431 -3670 • Valuation of Project (contractor's bid price): $ �► z, 9 8S . 0 0 Existing Building Valuation: $ �/ '1, 000 Scope of Work (please provide detailed information): /2 e - /' o n "(C(8 v<2./- 1 .%.t ) — O11v.2 r—o - �/�x; 5}, ,,�5 fVl ecf!rwniCa/ tq 5Te.vti ,Dev1S _Dec* CV- Loa— c vet- 9 x i5*r . r b' C, 1nstc..11 Str,lle ply Pvc .554\r.J me,...ivrGne, corn1 7L P-a/- rnaAut-Fac+ i TQr Ir►erA; re rr.4..„.4S . See Qkkac,k ed s'copQ e—F vv„,-k, Will there be new rack storage? ❑ ....Yes � ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below .. #12T1 DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ Applications\Porms:Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of . Occupancy per IBC 1'`.Floor -' 2nd Floor 3ftioleor_ lap Floors thru Basement. Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck .. #12T1 DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ Applications\Porms:Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 PERMIT APPLICATION NOTES — pplicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: /l ®.-. Print Name: Ri.c /at-J. Res + Mailing Address: rP/t'1 i #/(:), / 6 ,R / Date: Y//, ,-7/1 Day Telephone: 425 Zi$ S A r l le%S4ay., City State Zip Date Application Accepted: Date Application Expires: 0„ (5-----t/ Staff Initials: H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 6 of 6 • �J��I�4 wqs City of Tukwila y�y Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us RECEIPT ParcelNo.: 2623049128 Permit Number: D11 -099 Address: 16700 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 04/15/2011 Applicant: VACANT BUILDING Issue Date: Receipt No.: R11 -00733 Initials: User ID: WER 1655 Payment Amount: $1,907.12 Payment Date: 04/15/2011 11:42 AM Balance: $0.00 Payee: RICH BRATLAND TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 015637 ACCOUNT ITEM LIST: Description 1,907.12 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $1,907.12 1,153.10 749.52 4.50 doc: Receiot -06 Printed: 04 -15 -2011 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 %Li, (206) 431 -3670 .Permit Inspection Request Line (206) 431 -2451 OH ta tiA (� h Type of i ecti;ni i � 4 � . Address:' Date Called: Special Instructions: / r ate Wantecjz-t _ �_ T -7 , ,/-� am p.m. Requester: Phone No: f Approved per applicable codes. ['Corrections required prior to approval. COMMENTS: • ix r �7r G-0 Qi 1 1 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit au -- Dem PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Projictf ` 4 ••} Tv-.of I ec 'on: 60 • k n ICJ Address: ((Q"?END SL .1.okrKA. Date Called: Special Instructions: Date Wanted �! ��' „Raj. p.m. Requester: Phone No• n i ` 822.3 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: )0\ iDat,g n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. y INSPECTION RECORD Retain a copy with permit •01 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 12. 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: kiACAkr"r Sur ■1 Type of Inspection: 4 11 8- RE ROO Address: 1 0700 G INertioe o-r1= T2 Date Called: a CI Special Instructions: Date Wanted: Co iiiiii Requester: Phone No: 1- 1 2 - 5 - 2 . 1 1 : 3 - - 2 - f = 3 Pc Approved per applicable codes. Corrections required prior to approval. 3 COM €NTS: is2h(-3c ('38'6. fPe,/ Date: 4111/1/ 7EINSPECTION FEE R UIRED. Prior t next inspection. fee must be aid at 6300 Southcenter Blvd.. Suite 17 . Call to schedule reinspection. Sika SarnafH Wald Class Roofing and Wmerproofing 15 Year System Warranty Warranty Serial 140.: 0000003890 - 214211.1 SIKAPLAN ROOFING WARRANTY FOR COMMERCIAL BUILDING Building Owner Everett Plaza Shopping Center dba Parkway Square Building Name: Parkway Square Shopping Center Building Address: 16700 Southcenter Parkway Boulevard Tukwila, WA 98188 Applicator, Madsen Roofing Company, 8625 Martin Way East, Olympia, WA 98516 Telephone: (360) 456-2821 Date of Substantial Completion: 9/16/2011 Date of Inspection: 9/13/2011 By: Steven Shaver Building/Area Name: Parkway Square Shopping Center Used As: RETAIL - GENERAL MERCHANDISE Area Warranted: 42,900 sq. ft. Sika Samafil warrants to the owner of the building described above ('Owner'), that subject to the terms, conditions. and limitations stated herein, Sika Samafil will repair leaks originating from the Sikaplan Roofing Membrane, Samatherm Insulation or Sika Samafil Roofing Accessories installed according to Sika Samafils Technical Instructions by a Sika Samafll Authorized Roofing Applicator for a period of 15 (fifteen) years commencing with the date of substantial completion of the installation of the Roofing Membrane. TERMS, CONDITIONS, LIMITATIONS 1. Owner shall notify Slice Samafll on the first business day Immediately following the discovery of each leak to the Roofing System and confirm In writing within one week. 2.11 on Sika Samafil's Inspection, Sika Samafil determines that the leak is caused by a defect In the Sikaplan Roofing SMembrane, Sarnatherm Authorized Insulation ppicaor's workmanship applied by that Sikaplan Sikaplan Membrraanpe, except 88 provided In or from thefol owingtparagraphathree (3) Owner's remedies and Sika Samafll's liability shall be limited to Sika Samafll's repair of the Roofing Membrane, Samatherm Insulation or Accessory. SIke Small's cumulative liability throughout the duration of this warranty shall not exceed the original Installed cost of the Sikaplan Roofing System. 3. This warranty does not apply and may be null and void if any of the following occur. (a) The Roofing Membrane, Samatherm Insulation or Accessory is damaged by a natural disaster inciuding, but not limited to. earthquake, lightning. hail, windstorm in excess of gale force, hurricane, or tornado, or. (b) but not limited Membrane, , andaism, falling Insulation objects, civil Accessory cell or act damaged f war, or: act of negligence, accident, or misuse inducting, (c) A deficient pia existing conditlon or equipment is causing water entry, or. d Metal work or otha accessories or equipment is used in the Roofing and causes leaks, or: e There are any atteratlons or repairs made on or through the completed roof, or objects such as but not limited to fixtures, equipment, or structures are placed on or attached to the completed roof without first obtaining written authorization from Sika Samafil, or. (f) Failure by the Owner or his lessee to use reasonable care In maintaining the roof as described in the Owner's Guide provided with this warranty, Including that of sealants and caulking, or: (g) Loss of Integrity of the building envelope and, or structure including. but not limited to partial or complete loss of roof decking. wall siding, windows, doors or other envelope components or from roof damage by wind blown objects, or. (h) Condensatlon accumulates In the roof assembly due to Incorrect design or due to a reduction in the vapor barrier effectiveness, or. (1) A significant change in the use of the building by the Owner or his lessee expected by Sika Salt to effect the Roofing Membrane as originally installed, or The Roofing Membrane is damaged by contaminates and/or spills, or. Deficient desiggn applied to the Roofing Membrane such as membrane contact with inco mpatible materials and/or substrates. or. (1 The Owner fal s to comply with every tern and condition stated herein. 4. During the period of this warranty, Sika Samafil, Its agents and employees, shall have tree access to the roof during regular business hours. 5. Should the Roofing Membrane be concealed, the cost of exposure of the Roofing Membrane for purposes of Sika Samafirs Investigation and/or repair, such as removal and replacement of any paving or overburden, shall be the Owner's responsibility. 6. Sika Samafil shall have no obligation under this warranty until all invoices for materials, installation, and services have been pad for In full. 7. Sikpa Samafil's failure at any time to enforce any of the terms or conditions stated herein shall not be construed to be a waiver of such 8. This iwarranty is extended solely and exclusively to the owner of the Building at the time the Sikaplan Roofing System Is insstalllled. It does Samafil land the costs to process the transfer and to inspect transferable to repair the Sikaplptan Roofing approved if necessary, are writing d for by the original owner. 9. The Owner and Sika Samafil hereby agree that any and all claims (contractual, statutory, common law or otherwise), disputes, or suits that in any way, directly or indirectly, arise out of or relate to this Warranty, or the alleged breach thereof. or to any contracts between the owner and Slka Samafil, or the alleged breach thereof, or to the design manufacture, sale, distribution, Installation, and /or inspection of the Sikaplan Roofing System, shall first ybe submitted yto non - binding mediation before a neutral mediator jointly selected by the parties or, in the absence of agreement, as designated by the mediation, Arbittration Rules. Any such mediation and/or arbitration shall take place in Boston.lMaaMassachusetts. This Warranty. and any claims, disputes or suits between the parties hereto shall be governed by, and construed and enforced In accordance with, the laws of the Commonwealth of Massachusetts. 10. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, =LIMING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THERE ARE NO WARRANTIES THAT EXiEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. THE REMEDIES STATED HEREIN ARE EXCLUSIVE REMEDIES AND SIKA SARNAFIL SHALL NOT BE RESPONSIBLE OR LIABLE FOR ANY INDIRECT, CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING THE PRESENCE OF MOLDS, FUNGJ, BACTERIA, SPORES. MYCOTOXINS OR THE LINE OR FURTHER LOSS OF ANY KIND WHATSOEVER, INCLUDING BUT NOT LIMITED TO, DAMAGE TO THE BUILDING ON WHICH THE COMPONENTS OF THE ROOF ARE SITUATED, DAMAGE TO THE CONTENTS THEREOF, LOSS OF USE OF THE BUILDING OR ANY COMPONENT PART THEREOF, OR DAMAGE TO ANY OTHER PROPERTY OR PERSONS. NO REPRESENTATIVE OF SIKA SARNAFIL HAS AUTHORITY TO MAKE ANY REPRESENTATIONS OR PROMISES EXCEPT AS STATED HEREIN. Issued By: Brian Whelan This Warranty Is Effective From: 9/16/2011 Authorized Signature: bAl j,,,(L-„ Through: 9/15/2026 Title: Senior Vice President Date: 9/26/2011 ® Sika Samar, A Division of Sika Corporation, 100 Dan Road, Canton, MA 02021 s s}Arn ar f®® Tel.: 800- 451 -2502, Fax 781 - 828-5365, www.sikacorp.com (� �f Page 1 of 1 NoHMOs, Rooting Solu loni LLC PMB #316 16821 Smokey Point Blvd Arlington, WA 98223 Phone 425 218 2815 Fax 425 252 7855 e -mail: nwroofingsolutions@yahoo.com April 15, 2011 SUBMI'11ED TO: City of Tukwila Department of Community Developme 6300 Southcenter Blvd, Ste #100 Tukwila, WA 98118 RE: Roof specification. Proposed scope of work: ATTACHMENT TO PERMIT APPLICATION REVIEWED FOR BODE COMPLIANCoB LOCATION: t APPROVED APR 29 2011 Parkway Square 16700 Southcenter Parkway Tukwila, WA City " ;'ht BUILDING DIVISION • Prepare existing roof, walls, curbs, etc., to accept new roofing system. Legally dispose of debris. • Install '/" Densdeck coverboard mechanically fastened over the existing roofing. Include Densdeck Prime on walls. • Install Sarnafil Sikaplan 45 mil PVC membrane. Attach per manufacturer requirements to achieve 60 MPH wind uplift rating. • Apply Sarnafil G410 48 mil flashing membrane, fully adhered at walls, curbs, etc. Re -flash plumbing stacks, conduits, heat stacks, etc., per manufacturer requirements. • Replace existing coping metal at parapet walls with new 24 ga Kynar standing seam coping, standard color. Provide bevel board under the coping to slope toward roof side. At gutter edge provide new drip -edge fabricated from Sarnafil clad metal. Replace the existing gutter with new gutter of like kind and dimensions (10 foot sections). Replace the existing downspouts. ttih1 o 99 RECEIVED APR 152011 PERMIT CENTER Product Data Sheet Edition: 11/2010 Version no.: 0010 Composition: Sikaplan® 45 is a white, 45 mil. nominal thickness PVC membrane. Sika- plan 45 is manufactured with a polyester scrim for reinforcement. Codes and Approvals: Installation: Availability: Maintenance: Sikaplan 45 meets the cool roofing requirements of Califomia's Title 24, USGBC's LEED program and Green Globes. The membrane meets initial Energy Starw Reflectivity Requirements with an initial solar reflectance of 0.81 an initial solar emmitance of 0.85 and a SRI of 101. Three year, aged membrane reflectivity testing results are pending. Sika Samafil's Mechanically Attached Systems using Sikaplan PVC membranes are classified by Underwriters Laboratories, Inc., Underwrit- ers Laboratories of Canada, FM Global, Miami -Dade and Florida Building Code. Sika Samafil membranes also meet the material requirements of International building code. Sikaplan 45 comes in 10 feet x 150 feet rolls weighing approx. 430 Ibs and 5 feet x 150 feet rolls weighing approx. 215 Ibs. Sikaplan 45 membrane is wrapped in a clear protective film and strapped 8 rolls to a wooden pallet. Sikaplan 45 is installed by a Sika Samafil Authorized Applicator. Sikaplan 45 shall be installed to an acceptable substrate with fasteners and plates in the seam overlap in the "Sikaplan Mechanically- Attached System ". All seams will be hot -air welded for watertight protection. Sikaplan 45 can be used on flashings on Sikaplan roof assemblies. Sikaplan 45 is available directly from a Sika Samafil Authorized Applica- tor or by contacting your Sika Samafil regional office. For office locations please contact Sika Sarnafil. Upon successful completion of the installed roof by the Sika Sarnafil Autho- rized Applicator, Sika Samafil will provide a warranty to the building owner via the applicator. Sikaplan 45 requires no maintenance. As a prudent preventative measure, Sika Sarnafil recommends that the building owner or owner's representative inspect the installed roof system for damage, plugged drains, weathered sealants, etc. at least twice a year and after each storm. RECEIVED APR 15 2011 PERMIT CENTER a r - filo Technical: Sika Samafil's Technical Representatives are available to advise applica- tors as to the correct installation methods of Sikaplan 45. Technical Data (as manufactured): parameters Reinforcing Material Overall Thickness Thickness Over Scrim Breaking Strength, min., Ibf /in. (KN /m) Elongation at Break, min. Machine Direction Cross Direction Seam Strength, min., (% of breaking strength) Retention of Properties After Heat Aging Tensile Strength, min., (% of original) Elongation, min., (% of original) Tearing Strength, min., lbf (N) Low Temperature Bend, -40 °F (-40 °C) Accelerated Weathering Test (Florescent Light, UV exposure) Cracking (7x magnification) Discoloration (by observation) Crazing (7x magnification) Linear Dimensional Change Weight Change After Immersion in Water Static Puncture Resistance, 33 Ibf (15 kg) Dynamic Puncture Resistance, 14.7 ft -Ibf (20 J) Initial Solar Reflectance Emissivity Solar Reflective Index (SRI) Recycled Content ENERGY STAR ASTM Test Method D751 D751 D751 D751 ASTM D-4434 Spec. fteauirement 0.045 (1.14) 200 (35.0) 15% 15% D751 75 03045 D751 D751 D1004 D2136 G154 D1204 D570 D5602 D5635 E903 E408, C1371, Other E1980 90 90 45.0 (200) Pass 5,000 Hours None Negligible None 0.5% max. ± 3.0% max. Pass Pass Typical Physical properties Polyester 0.045 (nominal) 0.020 (avg.) 230 (40.0) 20% 20% 85 95 90 45 (200.0) Pass 10,000 Hours None Negligible None 0.31% 2.9% Pass Pass 0.81 0.85 101 9% Pre - Consumer / 1% Post Consumer As an ENERGY STAR® Partner, Sika Samafil Inc. has determined that this product meets the ENERGY STAR® guidelines for energy efficiency on both low -slope and steep -slope construction. Corporate Office Sika Sarnafil A Division of Sika Corporation 100 Dan Road Canton, MA 02021 Tel.: (781) 828 -5400 1- 800 -451 -2504 Fax: (781) 828 -5365 Web: www.sikacorp.com Email: webmaster.sarnafil @us.sika.com C COOL ROO/ wtw:cuue*IL RECEIVED APR 15 2011 PERMIT CENTER Canada Office Sika Sarnafil A Business Unit of Sika Canada 6820 Davand Drive Mississauga, ON L5T 1J5 Tel.: (905) 670 -2222 1- 800 - 268 -0479 Fax: (905) 670 -5278 Web: www.sika.ca Disclaimer: The information, and, in particular, the recommendation relating to the application and end -use of Sika Samafil products, are given in good faith based on Sika Samafil's current knowledge and experience of the products when property stored, handled and applied under normal conditions in accordance with Sika Samafil recommendations. In practice, the differences in materials, substrates and actual site conditions are such that no war- ranty in respect of merchantability of fitness for a particular purpose, nor any liability arising out of any legal relationship whatsoever, may be inferred from this information. The user of the product must determine the product's suitability for the intended application and purpose. Sika Samafil reserves the right to change the properties of its products. The proprietary rights of third parties must be observed. All orders are accepted subject to our current terms of sale and delivery. Users must always refer to the most recent issue of the local Product Data Sheet for the product concemed, copies of which will be supplied on request. Natimest Roofing Sakai= MC PMB #316 16821 Smokey PointBlvd Arlington, WA 98223 Phone 425 218 2815 Fax 425 252 7855 e-mail: nwroofingsolutions(yahoo.com FYi-KWAY sQuARE cF PLAPJ SEPARATE PERMIT REQUIRED FOR: iMechanical Electrical Plumbing TO Gas Piping City of Tukwila BUILDING DIVISION LiCo TEN/9LE 1" = Co (eurr()() REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. Pe rm 16700 Southcenter Parkway, Tukwila, WA - Google Maps Google maps Page 1 of 1 To see all the details that are visible on the screen, use the "Print" link next to the map. 'tt.ictvlicken eV' t.to Heights t. AU, i*telK.:t.,.0 14 2.4-;1.4..e.' • (1 1 • ss, ""?`""'":4:^!.'",•>-1'.,-, • 6ch St , 7:1? • St • -4:;4r. • . kvuot MILE COM? ll IiI© 0°'1 Plan review approvat b to rl- ad wafts. Approval of construction docuntsats doss not authorize the violation of any 0- • -4: cede or oninance. Receipt of approved Fold and Whi!!`r adatoviedged: Off `Nadia INC DIVISION http://www.google.com/local M ap-- y REVIE ED FOR CODE C iiiiPUANCE A PPROVED APR 27 (,ii RECEIVE APR 15 2011 PERMIT CENTER 4/15/2011 09 -01 -2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RICH BRATLAND PMB #316 16821 SMOKEY POINT BL 98223 RE: Permit No. D11 -099 16700 SOUTHCENTER PY TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 10/31/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 10/31/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D11 -099 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 P COPY • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -099 DATE: 04 -15 -11 PROJECT NAME: VACANT BUILDING SITE ADDRESS: 16700 SOUTHCENTER PY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENT : Z t( 41V\ N uilding Division ire PreJen ion Public Works ❑ Structural ❑ Planning Division Permit Coordinator a 11 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 04 -19-11 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Notation: n Approved with Conditions DUE DATE: 05 -17 -11 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Printer Friendly Page • Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company NW ROOFING SOLUTIONS LLC 4252318273 16821 Smokey Pt Blvd Pmb 316 Arlington WA 98223 Snohomish Limited Liability Company UBI No. Status License No. 602290276 Active NWROORS971 M4 License Type Construction Contractor Effective Date 7/24/2003 Expiration Date 7/24/2011 Suspend Date Specialty 1 General Specialty 2 Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status MOTTMBP027PA MOTTMAN BUSINESS PARK LLC Construction Contractor General Unused 10/1/1998 10/1/2011 Active DLBEAC *066CA D L B EARTHWORK CO Construction Contractor General Unused 2/1 /1994 1/8/2012 Active MADSERI147JD MADSEN ROOFING INC Construction Contractor Roofing Unused 4/4/1986 5/1/2012 Active BERSCPC148CD BERSCHAUER PHILLIPS CONST CO Construction Contractor General Unused 2/4/1986 8/9/2012 Active PBJCOI *160KU P B J CONTRACTING INC Construction Contractor General Unused 5/31/1984 8/9/2011 Active HAGENBP993B4 HAGEN BROTHERS PAINTING Construction Contractor Painting /Wallcovering Unused 1/24/2001 9/30/2001 Archived BODENEI061 P5 BODENHAMER ENTERPRISES INC Construction Contractor General Unused 10/25/1994 8/10/1999 Archived BODENI *061P5 BODENHAMER INC Construction Contractor General Unused 10/25/199410/19 /2002 Archived BPGROI *066DW B P GROUP INC Construction Contractor General Unused 3/16/1994 3/1/1995 Archived BODENI *088N0 BODENHAMER INC Construction Contractor General Unused 8/20/1992 8/10/1995 Archived BERSCPS130JP BERSCHAUER PHILLIPS STRCTS INC Construction Contractor General Unused 4/17/1987 8/9/1993 Archived BODENSI160NP BODENHAMER/STEWART INC Construction Contractor General Unused 8/17/1984 3/10/1993 Archived BODENI *177R1 BODENHAMER INC Construction Contractor General Unused 12/21/1983 3/10/1985 Archived MADSELR181NL MADSEN-LAMM ROOFING CO INC Construction Contractor Roofing Unused 10/3/1983 4/1/1986 Archived GEORGMR186NL GEORGE MADSEN ROOFING INC Construction Contractor Roofing Unused 8/13/1982 7/14/1984 Archived https://fortress.wa.gov/lni/bbip/Print.aspx 05/03/2011