Loading...
HomeMy WebLinkAboutPermit D11-121 - SEGALE - REROOFSEGALE REROOF 18205 ANDOVER PK W Di 1-121 City oPfukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206.431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov Parcel No.: 3523049119 Address: 18205 ANDOVER PK W TUKW Suite No: Project Name: SEGALE DEVELOPMENT PERMIT Permit Number: Issue Date: Permit Expires On: D11 -121 05/16/2011 11/12/2011 Owner: Name: SEGALE PROPERTIES LLC Address: PO BOX 88028 , TUKWILA WA 98138 Contact Person: Name: BARRY BENNETT Address: PO BOX 88028 , TUKWIL WA 98188 Contractor: Name: SEGALE PROPERTIES LLC Address: PO BOX 88028 , TUKWILA WA 98138 Contractor License No: SEGALPL902CQ Phone: 206 396 -2012 Phone: 206 -575 -2000 Expiration Date: 04/01/2012 DESCRIPTION OF WORK: REMOVE EXISTING SINGLE -PLY MEMBRANE AND REPLACE WITH ANOTHER SINGLE -PLY MEMBRANE. EXISTING BUILT -UP ROOF TO REMAIN. Value of Construction: $59,500.00 Fees Collected: $1,754.16 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2009 Type of Construction: IIB Occupancy per IBC: 0008 Electrical Service Provided by: * *continued on next page ** doc: IBC -7/10 D11 -121 Printed: 05 -16 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N • • Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie N Date: 6/( ned this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not pre me to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit Signature: Print Name: Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Prior to final inspection for this building permit, a copy of the roof membrane manufacturer's warranty certificate shall be provided to the building inspector. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila doc: IBC -7/10 D11 -121 Printed: 05 -16 -2011 shall not be valid. The issuance of a permit d on construction documents and other data 1 not prevent the Building Official from requiring the correcti errors in the construction documents and o data. doc: IBC -7/10 D11 -121 Printed: 05 -16 -2011 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: //www. ci. tkwila. wa. us For °ice'use'.or Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** ITE'lgo.0A'1TI Site Address: 18205 Andover Park West Tenant Name: N/A Property Owners Name: Segale Properties LLC King Co Assessor's Tax No.: 352304 -9119 Suite Number: N/A Floor: Roof New Tenant: ❑ Yes ..No Mailing Address: P.O. Box 88028 Tukwila WA 98188 City State Zip contact Name: Barry Bennett Mailing Address: P.O. Box 88028 Tukwila WA 98188 Day Telephone: (206) 396 -2012 E -Mail Address: BBennett@SegaleProperties.com EIRE i fr CON }TRACTOR INFORMATIOT ontractor Information for nical (pgl0for� Company Name: Segale Properties LLC Mailing Address: P.O. Box 88028 aslElpingi,,(Pg City State Fax Number: (206) 575 -1662 Zip Tukwila WA 98188 Contact Person: Barry Bennett E -Mail Address: BBennett@Segaleproperties.com Contractor Registration Number: SEGALPL902CQ City State Day Telephone: (206) 396 -2012 Fax Number: (206) 575 -1662 Expiration Date: 04/01/2012 Zip 4HIiFECT' OF RECD MEM • mustli "e stampe rchitect Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip Elk& RE All)planvmust. e,stampedtby, Company Name: Engineers Northwest Inc., P.S. Mailing Address: 6869 Woodlawn Avenue NE Seattle WA 98115 Contact Person: Dale Kaemingk E -Mail Address: Dalek @enw.com H:\Applications \Forms- Applicnlions On Line \2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh City Day Telephone: Fax Number: State (206) 525 -7560 (206) 522 -6698 Zip Page 1 of 6 ORMATIa .. ra,. W,3>I33yil3i�J3 1 =3 Valuation of Project (contractor's bid price): $ 59,500.00 Existing Building Valuation: $ Scope of Work (please provide detailed information): Remove existing single ply membrane and replace with another single ply membrane. Existing built -up roof to remain. Will there be new rack storage? ❑ Yes ❑.. No If yes, a separate permit and plan submittal will be required. e 3AllfBuII ing -fAreas in Square Footage &Below 3 f w[Yr+� a33i1;', 33 a w3rvi 111 Floor'll 48,344 0 0 0 Floor,; 1�L j SPr tnkl eri 3_235 1�1F1 F,l'oo'is; 14Balerhiii Aitached Garage a'c Garage' VAttachedX S Detached!;Carpo '"'"44.01;11111 overed ;Uncovered;, PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes m No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: m Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x II " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:WpplicationsWorms- Applications On Line\2010 Applications\7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 7APPUICAT�®NNOTES Applicab le ermtts3m th is.a ltcattoi Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Print Name: Barry Bennett Mailing Address: P.O. Box 88028 Tukwila WA 98188 Date: Day Telephone: 206- 396 -2012 City State Zip IDate Application Accepted: (r I rp;1 02-1 li Date Application Expires: 11 I Difi ■ Staff Initials: H:\Applications'Fonns- Applications On Line \2010 Application0-2010 - Permit Application.doc Revised: 7 -2010 bh Page 6 of 6 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 - 431 -3665 Web site: http: //www. ci. tukwi la. wa. us Parcel No.: Address: 18205 ANDOVER PK W TURIN Suite No: Applicant: SEGALE RECEIPT Permit Number: D11 -121 Status: PENDING Applied Date: 05/02/2011 Issue Date: Receipt No.: R11 -00863 Payment Amount: $1,754.16 Initials: JEW' Payment Date: 05/02/2011 12:15 PM User ID: 1165 Balance: $0.00 Payee: SEGALE PROPERTIES TRANSACTION LIST: Type Method Descriptio Amount Payment Check 629798 1,754.16 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $1,754.16 1,060.40 689.26 4.50 doc: Receiot -06 Printed: 05 -02 -2011 1 • • • F • • f 1 • 1. ' s' INSPECTION RECORD Retain a copy with permit 44)1 D1( -121 INSPECTION • PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter. Blvd., #100, Tukwila. WA 98188 a (206) 431 -3 Permit Inspection Request Line (206) 431 -2451 Proje Type of Inspection: Address: i S AAJO° kiff Date Called: W Specia Instructions: : • • Date Wanted: �= .m. Requester: Phone No: ] • F proved per applicable codes. 1 Corrections required prior to approval. , COMMENTS: EINS'ECTION FEE REQUIRED. Prior to ffext inspection. fee must be pai . t 6300 Southcenter Blvd.. Suite 10 . Call to schedule reinspection. REVIEWED FOR 'Firestone ODECOMPLIANCE UMUANG "IILI" "tir"°rilmN APPROVED UltraPly MAY 12 2011 CityofTukwila BUILDINUM TPO Firestone UltraPly TPO is a flexible Thermoplastic Polyolefin roofing membrane that is produced with a polyester weft inserted reinforcement. This heat weldable TPO membrane is available in .045 mil (1.1 mm) and .060 mil (1.5mm) thicknesses and offers outstanding weathering characteris- tics and durability. Available in white, this reflective mem- brane is suitable for a variety of low slope applications. PREPARATION OF SUBSTRATES: 1. Substrates must be clean, dry, smooth, free of sharp edges, fins, loose or foreign materials, oil, grease, and other materials which may damage the membrane. 2. All rough surfaces which could damage the membrane shall be repaired prior to installing the membrane, as specified. 3. All surface voids greater than 1/4" wide shall be propy filled with an acceptable fill material. METHOD OF APPLICATION: 1. Firestone UltraPly TPO membrane is installed as a continuous roofing or waterproofing layer on the roof. Rolls are overlapped (Side Laps and End Laps) prior to the heat welding of the seam areas. 2. Install the UltraPly TPO Roofing System in accordance with current Firestone UltraPly TPO specifications, details and workmanship requirements. Please contact Firestone Technical Services for additional information. This sheet is meant only to highlight Firestone's products and specifica- tions. Information is subject to change without notice. Firestone takes responsibility for furnishing quality materials which meet Firestone's published product specifications. As neither Firestone itself nor its representatives practice architecture, Firestone offers no opinion on, and expressly disclaims any responsibility for the soundness of any structure on which its products may be applied. If questions arise as to the soundness of a structure or its ability to support a planned installation properly, the Owner should obtain opinions of competent structural engineers before proceeding. Firestone accepts no liability for any structural failure, or for resultant damages, and no Firestone Represen- tative is authorized to vary this disclaimer. Approved 'Subject to the conditions of Approval as a Roof Cover when Installed as described In the current FMRC Approval Guide. 16 Membrane For )o6ng Systems Classified By Underwdtere Laboratories Ina As to M External Fire Exposure Only Sae UL Directory of Products Certified For Canada and UL Roofing Materials anc System Directory PROOUC,T DATA:_ PHYSICAL PROPERTIES: Property MembraneThickness Breaking Strength Elongation at Break Tearing Strength Ozone Resistance Brittleness Point Properties After Heat Aging Breaking Strength Elongation at Break Tearing Strength Dimensional Stability Water- Absoro1ion PRODUCT DATA: .045" .060" PRECAUTIONS: Test Method ASTM D -751 ASTM D -751 ASTM D -751 ASTM D -5884 ASTM D -1449 ASTM D -2137 ASTM D -751 ASTM D -751 ASTM D -751 ASTM D1204 ASTM D -471 39 in (99 cm) 5ft(1.52m) 6.5ft (1.98m) 10 ft (3.04 m) 39 in (99 cm) 5ft(1.52m) 6.5ft(1.98m) 10ft(3.04m) TYalcal +/ - 10% 350Ibf/in (61 kN /m) 30% 86 Ibf (232 N) Pass -60 F ( -51 C) 366 Ibf (62 kN /m) 30 % 90 Ibf (234 N) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 100 ft (30.48 m) 1. Exercise caution when lifting, moving, transporting, storing or handling membrane rolls to avoid sources of punctures and possible physical damage. 2. Contact Firestone Contractor Services Department for specific recommendations regarding chemical or waste product compatibility with Firestone TPO Membrane. j KWILA � c MAY 022011 PERMIT CENTER FIRESTONE BUILDING PRODUCTS COMPANY 525 Congressional Blvd., Carmel, Indiana 46032 Sales: 1- 800 - 4284442 • Technical: 1-800-428-4511 Internet Address: httpi /www.firestonebpco.com 17A1---12-1 1 1 FILE COPY PA rol" CHAPTER 11 ADMINISTRATION AND ENFORCEMENT SECTION 1100 — TITLE Chapters 11 through 20 of this Code shall be known as the "Washington State Nonresidential Energy Code" and may be cited as such; and will be referred to hereafter as "this Code." SECTION 1110 — PURPOSE AND INTENT The purpose of this Code is to provide minimum standards for new o r altered buildings and structures or portions thereof to achieve efficient use and conservation of energy. It is intended that these provisions provide flexibility to permit the use of innovative approaches and techniques to achieve efficient use and conservation of energy. The purpose of this Code is not to create or otherwise establish or designate any particular class or group of persons who will or should be especially protected or benefited by the terms of this Code. This Code is not intended to abridge any safety or health requirements required under any other applicable codes or ordinances. The provisions of this Code do not consider the efficiency of various energy forms as they are delivered to the building envelope. SECTION 1120 — SCOPE This Code sets forth minimum requirements for the design and commissioning of new or altered buildings and structures or portions thereof that provide facilities or shelter for public assembly, educational, business, mercantile, institutional, storage, factory, industrial, and multifamily residential occupancies by regulating their exterior envelopes and the selection of their mechanical systems, domestic water systems, electrical distribution and illuminating systems, and equipment for efficient use and conservation of energy. EXCEPTION: The provisions of this code do not apply to temporary growing structures used solely for the commercial production of horticultural plants including ornamental plants, flowers, vegetables, and fruits. "Temporary growing structure" means a structure that has the sides and roof covered with polyethylene, pq similar flexible synthetic material and is used to plants with either frost protection or increase A temporary growing structure is not conside for purposes ofthis Code. SECTION 1130 — APPLICATION TO BUILDINGS Additions, alterations or repairs, changes of o use, or historic buildings that do not comply requirements for new buildings shall comply requirements in Sections 1130 through 1134 as �DI I - gal 2009 Edition EXCEPTION: The building official may approve designs of alterations or repairs which do not fully conform with all of the requirements of Sections 1130 through 1134 where in the opinion of the building official full compliance is physically impossible and/or economically impractical and the alteration or repair improves the energy efficiency of the building. In no case shall energy code requirements be less than those requirements in effect at the time of the initial construction of the building. 1131 Additions to Existing Buildings: Additions to existing buildings or structures may be constructed without making the entire building or structure comply, provided that the new additions shall conform to the provisions of this Code. EXCEPTION: New additions which do not fully comply with the requirements of this Code and which have a floor area which is less than 750 ft2 may be approved provided that improvements are made to the existing building to compensate for any deficiencies in the new addition. Compliance shall be demonstrated by either systems analysis per Section 1141.4 or component performance calculations per Sections 1330 through 1334. The nonconforming addition and upgraded existing building shall have an energy budget or target UA and SHGC that are less than or equal to the unimproved existing building, with the addition designed to comply with this Code. These additions are also exempt from Section 1314.6. 1132 Alterations and Repairs: Alterations and repairs to buildings or portions thereof originally constructed subject to the requirements of this Code shall conform to the provisions of this Code without the use of the exception in Section 1130. Other alterations and repairs may be made to existing buildings and moved buildings without making the entire building comply with all of the requirements of this Code for new buildings, provided the following requirements are met: 1132.1 Building Envelope: Alterations or repairs shall comply with nominal R- values and glazing requirements in Table 13 -1 or 13 -2. EXCEPTIONS: 1. Storm windows installed over existing gl av i,ig VIEWEDFOR Glass replaced in existing sash and frame provided that rOMPLIA • of equal or lower U- factor. °': solar heat gain coefficient compliance, glazing with A PROVE Omar heat gain coefficient equal to or lower than that of the "'Ether existing glazing. ISTINGMAY 1 2 2011 4. Existingroof/ceiling wall or floor cavities exposed during construction provided that these cavities are insulated cupan or to full depth with insulation having a minimum nominal ith th value of R -3.0 per inch installed per Sections 1311 and 1313. rty of Tukwila 5. • Existing • walls and floors without framing cavities, !DING'® DIVIg . d that any new cavities added to existing walls and YJ V . 't „'L�1��� RECEIV CITY OFTU-' r 'Lp► MAY 0 54O44 January 1, 2011 PERMIT CENTER mply with Exception 4. LTINCOR# MPLETE DPI -i21 75 WASHINGTON STATE ENERGY CODE 6. Existing roofs where the roof membrane is being replaced and a. The roof sheathing or roof insulation is not exposed; or b. If there is existing roof insulation below the deck. In no case shall the energy efficiency of the building be decreased. 1132.2 Mechanical Systems: Those parts of systems which are altered or replaced shall comply with Chapter 14 of this Code. Additions or alterations shall not be made to an existing mechanical system that will cause the existing mechanical system to become out of compliance. All new systems in existing buildings, including packaged unitary equipment and packaged split systems, shall comply with Chapter 14. Where mechanical cooling is added to a space that was not previously cooled, the mechanical cooling system shall comply with Sections 1413 and either 1423 or 1433. Exceptions: These exceptions only apply to situations where mechanical cooling is added to a space that was not previously cooled. 1. Water - cooled refrigeration equipment provided with a water economizer meeting the requirements of Section 1413 need not comply with 1423 or 1433. This exception shall not be used for RS-29 analysis. 2. Alternate designs that are not in full compliance with this Code may be approved when the building official determines that existing building or occupancy constraints make full compliance impractical or where full compliance would be economically impractical. Alterations to existing mechanical cooling systems shall not decrease economizer capacity unless the system complies with Section 1413 and either 1423 or 1433. In addition, for existing mechanical cooling systems that do not comply with Sections 1413 and either 1423 or 1433, including both the individual unit size limits and the total building capacity limits on units without economizer, other alterations shall comply with Table 11 -1. When space cooling equipment is replaced, controls shall be installed to provide for integrated operation with economizer in accordance with Section 1413.3. Existing equipment currently in use may be relocated within the same floor or same tenant space if removed and reinstalled within the same permit. 1132.3 Lighting and Motors: Where the use in a space changes from one use in Table 15 -1 to another use in Table 15 -1, the installed lighting wattage shall comply with Section 1521 or 1531. Other tenant improvements, alterations or repairs where 60 percent or more ofthe fixtures in a space enclosed by walls or ceiling- height partitions are new shall comply with Sections 1531 and 1532. (Where this threshold is triggered, the areas of the affected spaces may be combined for lighting code compliance calculations.) Where less than 60 percent of the fixtures in a space enclosed by walls or ceiling- height partitions are new, the installed lighting wattage shall be maintained or reduced. Where 60 percent or more of the lighting fixtures in a suspended ceiling are new, and the existing insulation is on the suspended ceiling, the rooflceiling assembly shall be insulated according to the provisions of Chapter 13, Section 1311.2. Where new wiring is being installed to serve added fixtures and/or fixtures are being relocated to a new circuit, controls shall comply with Sections 1513.1 through 1513.5 and, as applicable, 1513.8. In addition, office areas less than 300 ft2 enclosed by walls or ceiling- height partitions, and all meeting and conference rooms, and all school classrooms, shall be equipped with occupancy sensors that comply with Section 1513.6 and 1513.8. Where a new lighting panel (or a moved lighting panel) with all new raceway and conductor wiring from the panel to the fixtures is being installed, controls shall also comply with the other requirements in Sections 1513.6 through 1513.8. Where new walls or ceiling- height partitions are added to an existing space and create a new enclosed space, but the lighting fixtures are not being changed, other than being relocated, the new enclosed space shall have controls that comply with Sections 1513.1 through 1513.2, 1513.4, and 1513.6 through 1513.8. Those motors which are altered or replaced shall comply with Section 1511. 1133 Change of Occupancy or Use: Changes of occupancy or use shall comply with the following requirements: a. Any unconditioned space that is altered to become semi - heated, cooled, or fully heated, or any semi- heated space that is altered to become cooled or fully heated space shall be required to be brought into full compliance with this Code. b. Any nonresidential space which is converted to multi- family residential space shall be brought into full compliance with this Code. c. Any multi - family residential space which is converted to nonresidential space shall be required to comply with all of the provisions of Sections 1130 through 1132ofthis Code. 1134 Hlstoric Buildings: The building official may modify the specific requirements of this Code for historic buildings and require in lieu thereof alternate requirements which will result in a reasonable degree of energy efficiency. This modification may be allowed for those buildings which have been specifically designated as historically significant by the state or local goveming body, or listed in The National Register of Historic Places or which have been determined to be eligible for listing. 1135 Commissioning: Commissioning in compliance with Sections 1416 and 1513.8 shall be required for new systems or modified portions of systems, with a heating capacity of 600,000 Btu/h or a cooling capacity of 40 tons or more. 76 Effective January 1, 2011 FILE COPY be•••••...RR 6+L., UltraPlyTM TPO Roof Systems Underwriters Laboratories (UL) UL Roof Deck Constructions and "P" Assemblies Factory Mutual Approvals (FM) BUILDING:PRODUCTS: REVIEWED NC, CODE COMPL APPROVED MAY 122011 City ooTukwila BUILDING DIVISION INCOMPLETE 1)011 LTR# 1 crtvc�NNU► MAT o 5 2011 PEflRARCENTER 1 1'age March 2011 Firestone Fully Adhered Systems with UltraPly TPO XR Membrane: UltraPly TPO XR 100 (45 mil), UltraPly TPO XR 115 (60 mil) Adhesive: Firestone ISO Spray S or Firestone XR Stick Adhesive Construction: Classification: New, Retrofit or Tear -off Class A Dec T p C /NC NC NC C /NC NC nsulation Assem Thermal Barrier: Dens -Deck, Dens -Deck Prime or Dens -Deck DuraGuard Any Firestone UL Classified Insulation (Optional) Structural Concrete or Lightweight Concrete decks only Insulation: Firestone ISO 95+ GL, Resista, or ISOGard HD Dens -Deck, Dens -Deck Prime or Dens -Deck DuraGuard Any Firestone UL Classified Insulation (Optional) Structural Concrete or Lightweight Concrete decks only nsulation Minimum Thickness ya" Any Any 1/a" Any 1/2" 1/" 1/4" 1 /a" 12" bead spacing 12" bead spacing 12" bead spacing Full coverage Full coverage A, FA, 225 A, FA, 228 A, FA, 224 A, FA, 226 A, FA, 227 Classification: Class B NC Thermal Barrier: Firestone ISOGard HD or 1" 1" Any 1" 12" bead spacing B, FA, 56 Firestone Resista Insulation: Firestone ISO 95+ GL (Optional) C /NC Insulation: Firestone ISO 95+ GL Any V2" 12" bead spacing B, FA, 55 Classification: Class C NC Insulation: Firestone ISO 95+ GL Any 1/4" Full coverage C, FA, 17 Firestone Mechanically Attached Systems Membrane: UltraPly TPO (45,60 or 80 mil), UltraPly Platinum (80 mil), ReflexEON (60 or 80 mil), ReflexEON Platinum (80 mil) Construction: New, Retrofit or Tear -off Class A Classification: Dk ,TYp� -b - nsulatio in1mumM,, ickness C /NC C /NC NC nsulatiori Insulation: Firestone ISO 95+ GL or Firestone Resista (Optional) Coverboard: Dens -Deck, Dens -Deck Prime or Dens - Deck DuraGuard offset 6 in. from deck joints Insulation: Firestone ISO 95+ GL or Firestone Resista (Optional) Coverboard: Dens -Deck, Dens -Deck Prime or Dens - Deck DuraGuard Insulation: Firestone ISO 95+ GL or Firestone Resista Optional 1 /a" Any 1 /a" Any 4 3 2" ReflexEON only with batten strips A, MA,69 A,MA,97 A, MA, 68 'BUILDING PRODUCTS 9IP "ge March 2 t) 1 1 Classification: Class B C /NC Coverboard: Firestone FiberTop B, C, E, or S 1/2„ Unlimited B, MA, 22 Resista (Optional) Coverboard: Dens -Deck, Dens -Deck Prime, Dens - NC Insulation: Firestone ISO 95+ GL or Firestone Any " 1/2" 13/4 ReflexEON only with batten strips A,MA,96 Resista (Optional) Coverboard: Firestone FiberTop B, C, E, or S C /NC Two layers of "VersaShield Underlayment" or "VersaShield FB -2S --- 1" A, MA, 88 NC Insulation: Firestone ISO 95+ GL or Firestone Any ' /Z" 3/4" B, MA, 06 A,MA,99 Resista (Optional) Coverboard: Firestone ISOGARD HD NC Insulation: Firestone ISO 95+ GL Any '/2" /2 1/2" ReflexEON only with batten strips A,MA,95 Coverboard: Firestone FiberTop B, C, E, or S NC Insulation: Firestone ISO 95+ GL Any '/2" 11/2" A,MA,67 C /NC Insulation: Firestone ISO 95+ GL (Optional) Al y y2" 1" A,MA,104 Insulation (Top): Firestone Resista, offset 6 in. from deck joints C /NC Two or more layers of Atlas "FR 50 ", mechanically fastened ,/1. A, MA, 75 C/NC Two layers "VersaShield Underlayment" or "VersaShield FB -2S Insulation: Firestone ISO 95+ GL - -- Any 1/2" B, MA 15 ' A, MA, 89 C /NC Two layers "VersaShield FB -1S, preliminary attachment Insulation: Firestone ISO 95+ GL (Optional), AMY '/2" A, MA, 90 preliminary attachment Classification: Class B C /NC Insulation: Firestone ISO 95+ GL or Firestone Any '/4" Unlimited B, MA, 22 Resista (Optional) Coverboard: Dens -Deck, Dens -Deck Prime, Dens - Deck DuraGuard 1/4" One or more plies of Firestone MB Base M with: --- C, MA,1 Firestone ISO 95+ GL, or 11/2" C /NC FiberTop B, C, E, or S, or 1" 1" B, MA, 06 FiberTop C, E, or S over 'h" Firestone ISO 95+ GL 1" FiberTop B, C, E, or S, or 11/2" C /NC FiberTop B, C, E, or S over 1/2" 1" B, MA, 07 Firestone ISO 95+ GL 1'/2" C /NC One layer of " VersaShield Underlayment" or " VersaShield FB -2S, preliminary attachment 1" B, MA 15 ' Insulation: Firestone ISO 95+ GL (Optional) Any Coverboard: Firestone ISOGARD HD, offset 6" from C /NC ih„ 1/2 B, MA, 18 deck joints C /NC One or more layers of Atlas "FR 50" - -- 'h" B, MA, 05 Classification: Class C NC Firestone ISO 95+ GL Any Unlimited C, MA, 10 NC Dens -Deck, Dens -Deck Prime, Dens -Deck DuraGuard 1/4" 'h" C, MA,1 trestone BUILDING PRODUCTS 1 0IPa;.z.e a r 4 h 2 0 1 1 EINW STRUCTURAL ENGINEERS Engineers Northwest Inc., P.S. April 4, 2011 SEGALE PROPERTIES 5811 Segale Park Drive C Tukwila, WA 98188 ATTN: Steve Nelson FILE COPY Permit No. RE: Segale Building 731 Roof Membrane Replacement ENW Project No. 11- 041000 Steve: REVIEWED FOR CODE COMPLIANCE AD ROVED friW 12 2011 City of Tukwila BUILDING DIVISION It is my understanding that you are anticipating a roof repair for Segale Building 731 located at 18205 Andover Park West, Seattle, WA. As you know, this building, built in 1974, has a wood framed roof structure built -up roof system and a single ply roof membrane over the built -up roof. In addition, the building structure appears to have performed well for over 35 years. During a recent site visit, I did not notice any building distress or roof structure movement. I understand you will be removing the existing single ply roofing material and replacing it with a single ply roofing of the same weight. Section 3404.3 of the 2009 ICC allows for a 5% increase in the dead load on the roof without requiring modification to the original structural members. As you are effectively not changing the dead load on the roof, it is my opinion that the existing roof structure is adequate to support the roof membrane replacement. Please feel free to call if you have any questions. Sincerely, ENGINEERS N•' H ST, INC., Dale Kaemingk, P.E., S.E. Vice President DK:jk We get buildings built. CITie r ' ' LA MAY 0 2 2011 PERMIT CENTER PIH • 6869 Woodlawn Avenue NE • Seattle, WA 98115 206.525.7560 • fax 206.522.6698 www.engineersnw.com May 4, 2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Barry Bennett PO Box 88028 Tukwila, WA 98188 RE: Incomplete Letter #1 Development Permit Application D11 -121 Segale Reroof —18205 Andover Pk W Dear Mr. Bennett, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on May 2, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached /following items from the following department(s) need(s) to be addressed: Building Department: Dave Larson at 206 431 -3678 if you have any questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, `1>ziP RD.). Bill Rambo Permit Technician Enclosures File: D11 -121 W:\Permit Center \Incomplete Letters\201 l \D11-121 Incomplete Ltr # 1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Determination of Completeness Memo Date: May 3, 2011 Project Name: Segale Reroof Permit #: D11 -121 Plan Review: Dave Larson, Senior Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Please provide the fire classification rating for the proposed roof covering assembly. 2. The State Energy Code requires uninsulated roofs over heated or semi - heated space to be insulated per current code when the existing roof membrane is removed. Please provide the roof insulation status of this project and add insulation to scope if required per code. Should there be questions concerning the above requirements, contact the Building Division at 206- 431 -3670. No further comments at this time. • Page 1 � PERMIT COORD COPY • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D11 -121 DATE: 05/05/11 PROJECT NAME: SEGALE REROOF SITE ADDRESS: 18205 ANDOVER PK W Original Plan Submittal Response to Correction Letter # X Response to Incomplete Letter # 1 Revision # after Permit Issued DEPARTMENTS: I B'dirding Divisionit Public Works Fire Prevention Structural n Planning Division nPermit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete U DUE DATE: 05/10/11 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Please Route n Structural Review Required REVIEWER'S INITIALS: No further Review Required rg DATE: 777���°°° APPROVALS OR CORRECTIONS: DUE DATE: 06/07/11 Approved Approved with Conditions Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 • PERMiT000RD COPS PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -121 DATE: 05/02/11 PROJECT NAME: SEGALE REROOF SITE ADDRESS: 18205 ANDOVER PK W X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after Permit Issued DEPA TMENTS: Ali n B Public Works ire PrevNI o Structural Planning Division Permit Coordinator EI o DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Comments: Incomplete a DUE DATE: 05/03/11 Not Applicable u Permit Center Use Only L� _ j INCOMPLETE LETTER MAILED: V �_ 6 Departments determined incomplete: Bldg' LETTER OF COMPLETENESS MAILED: Fire ❑ Ping ❑ PW ❑ Staff Initials: Ltvc TUES /THURS ROUTING: Please Route n Structural Review Required n REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DUE DATE: 05/31/11 DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: D11-121 • Response to Incomplete Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Segale Reroof Project Address: 18205 Andover Pk W Contact Person: "-BGc (.1 w ✓\e Phone Number: ate- 3%c)( oZ Summary of Revision: ?lecuse 5to t a +4 acLtme vd-s _ b,,, 4 -0110 1 V . "e-,DP 5 tlee. 4-L 11 w1(( vD+ AEC MED CITY OF TUKWILA MAY ,05 2011 PERMIT C IMI Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: 121,14,4— dEntered in Permits Plus on J'I ( I \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: Contractors or Tradespeople P.ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name SEGALE PROPERITIES LLC UBI No. 602023533 Phone 2065752000 Status Active Address Po Box 88028 License No. SEGALPL902CQ Suite /Apt. License Type Construction Contractor City Tukwila Effective Date 2/18/2010 State WA Expiration Date 4/1/2012 Zip 981382028 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LAPIALP055MZ LA PIANTA LIMITED PARTNERSHIP Construction Contractor General Unused 7/9/1995 4/1/2001 Archived SEGALBP151M55EGALE BUSINESS PARK Construction Contractor General Unused 7/25/1985 7/9/1995 Archived LAPIAL'008J8 LA PIANTA LLC Construction Contractor General Unused 4/28/2000 4/1/2010 Inactive Business Owner Information Name Role Effective Date Expiration Date SEGALE, MARIO A Agent 02/18/2010 Amount SEGALE, MARIO A Partner /Member 02/18/2010 11DL531006 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 SAFECO INS CO OF AM 6115146 02/18/2010 Until Cancelled $12,000.00 03/28/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 Alaska National Ins Co 11DL531006 04/01/2011 04/01/2012 $1,000,000.0003 /29/2011 2 ALASKA NATIONAL INSURANCE COMP 10DLS31006 04/01/2010 04/01/2011 51,000,000.00 03/31/2010 1 ALASKA NATIONAL INSURANCE COMP 09DLS31006 02/18/2010 04/01/2010 $1,000,000.00 03/31/2009 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/Ini/bbip/Print.aspx 05/16/2011 No chancres shall be made to the scope of ttrork,without prior approval of Tukwila Building Division. N tM f zvisions will require a new plan submittal and may include additional plan review fees. LE Permit No. 11"'" ' Plan review approval is subject.to errors and omissions. Ip ,roval of construction documents does not authorize talc violation of any adopted code or ordinance, Receipt f approved Field Copy andconditians is acknowledged: Date:... TACK, IN R.R d'- / /•40'OO' R- 477.46 Ls 97.22 City Of Tukwila BUILDING DIVISION SET, BRASS CAP IN ASPHALT Water Valve Roof 'Drain SEi RATE PERMIT REQUIRED FOR: 8'Mechanical iirtlectrical Plumbing 2.6as Piping Pity of Tukwila __.4? (3 DIVISION That portion of the Southwest Quarter of the Northeast Section 35, Township 23' North,; Range 4 East, W.M., in K Washington, described as follows: BEGINNING at a monument at the Northeast corner of the west Quarter of the Northeast Quarter; thence South 07° 765,42 feet; thence North 82 °15'04" West 30.00 feet to and the T'RU POINT CT BEGINNING; thence South 07 °44'56" feet to a Point .of Curve; thence along a curve to the r a radius of12,470.00 feet thru a central angle of 05 °22 distance of 231.59 feet; thence North 69 °15'04" West 55 thence North 30 °55'15" West 52.59 feet, thence North 82 West 187.64 1 feet; thence North 07°44'56" Eas t 213.72 f E Point of Curve; thence along a curve to the right havir of 477.465 feet thru a central angle of 11 °40'00" an ar of 97.22 feet; thence North '19 °24'56" East 59.97 feet; South 82 °15'04" East 263.25 feet to the TRUE POINT OF I SUBJECT TO AND INCLUDING an easement for sidewalk and t purposes over the Easterly 15.00 feet thereof. SUBJECT TO AND INCLUDING an easement for railroad purpc cluding but not limited to, main track, lead track and over that portion thereof lying Westerly of the Wester line produced. RESERVING to lessor the right of ingress and egress to install, improve and extend utilities. TOGETHER WITH AND SUBJECT TO an easement for building purposes over a 60 foot wide strip of land surrounding jacent to the main building line, which is described a BEGINNING at the said Point "A "; thence North 82 °15 °04 feet; thence South 07 °44'56" West 30.00 feet to the T BEGINNING; thence continuing South 07 °44'56" West 336. thence North 82 °15'04" West 144.00.feet; thence North East'336.00 feet; thence South 82 °15'04" West 144.00 f TRUE POINT °OF BEGINNING. Roof; Drain 20 Encroochmnt' (WIDEST POINT) .L EGENO' Existins! Tree .C.B. Catch Basin ..........:M.H. Mon Hole SAN Sanitary Storm .....CONCConcrete Sanitary Sewer FOUND, CONC. Elec. Outlet Box. N 30 °55'/5" 52.59. i Spri(pk /er Heads Water Valve Roof Drain' oof 'Drain' Meter Electric Meter Gas'Meter re Alar ,cttic :: Storm Sewer Water Gas_ Telephone Electric SURVEYORS CERTIFICATE I hereby certify this map correctly represents a survey made by me or under my direction. This 3r—d ` Day of July 19 75 REGISTERED LAND' SURVEYOR L S 8271 FOUND a TACK IN WALK 'CONCRETE WAL:K.:•' 13 RA SS • P LAN TE R !MATE L ,_ATION Of °WATER FRET[. -„WALK. Pleads ;CONC. Ot/TTEN.4: :'. 1GA E'LOCATION OFOAS'1141M G R A S S REVIEWED FOR CODE COMPLIANCE APPROVED MAY 12 2011 I1_, t City of Tukwila BUILDING DIVISION sA N'; CONC. MON., FND. LAr MAY 02 7011 PERMIT CENTER NE COR. SW ,41 , NE %4, ,SEC. 35 - T23N - R4E DII ADDRESS: IB201 (s2EI F. lit, P,IC. TUBE NC). Andover.. Park West A. -T. A. Survey for M.A. Sf SEGALE 1 NDUSTR II TUKWILA Ni DRAWING No. 2354 REVISED APPROVED R. E. M. P Rn.I