HomeMy WebLinkAboutPermit D11-144 - FLICK RESIDENCE - BREEZEWAYFLICK BREEZEWAY
13325 56 AV S
Di 1-144
-.% City oll,Tukwila
�sy
3 \�
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.TukwilaWA.gov
Parcel No.:
Address:
Suite No:
Project Name:
2172000115
13325 56 AV S TUKW
FLICK BREEZEWAY
DEVELOPMENT PERMIT
Permit Number:
Issue Date:
Permit Expires On:
D11 -144
10/14/2011
04/11/2012
Owner:
Name: FLICK KEITH
Address: 13325 56TH AVE S , TUKWILA WA 98178
Contact Person:
Name: KEITH FLICK
Address: 13325 56 AV S , TUKWILA WA 98178
Phone: 206 901 -0526
Contractor:
Name: OWNER AFFIDAVIT ON FILE - KEITH FLICK Phone:
Address:
Contractor License No: Expiration Date:
DESCRIPTION OF WORK:
COMPLETE THE LAST 18 FEET OF BREEZEWAY PREVIOUSLY CONSTRUCTED UNDER PERMIT D09 -020 AND TIE IT INTO
THE HOUSE. PROPOSED METHOD: A35 BEAM TO HOUSE, A35 BEAM TO TRUSS, POSITIVE NAILING END TRUSS. THE
BREEZEWAY IS 7.5 FEET WIDE AND 18 FEET LONG AMOUNTING IN A TOTAL OF 135 SF.
Value of Construction: $5,799.60
Type of Fire Protection: NO
Type of Construction: VB
Electrical Service Provided by: SEATTLE CITY LIGHT
Fees Collected:
International Building Code Edition:
Occupancy per IBC:
$289.06
2009
26
* *continued on next page **
doc: IBC -7/10
D11 -144 Printed: 10 -14 -2011
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
•
Fire Loop Hydrant: N Number: 0 Size (Inches): 0
Flood Control Zone:
Hauling: N Start Time: End Time:
Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation:
Moving Oversize Load: Start Time: End Time:
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Storm Drainage:
Street Use: Profit: N Non - Profit: N
Water Main Extension: Private: Public:
Water Meter: N
Permit Center Authorized Signature:
Date: 4/y ///
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached
to this pernut.
Signature:
Date: t o f f /2-61 l
Print Name: i� Q —H'�1 ► c
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
4: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
5: Truss shop drawings shall be provided with the shipment of trusses delivered to the job site. Truss shop drawings shall
bear the seal and signature of a Washington State Professional Engineer. Shop drawings shall be maintained on the site
and available to the building inspector for inspection purposes.
6: All wood to remain in placed concrete shall be treated wood.
doc: IBC -7/10
D11-144 Printed: 10 -14 -2011
7: All electrical work shall be inspected anaproved under a separate permit issued by t li
ity of Tukwila Building
Department (206- 431- 3670).
8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
9: ** *PLANNING DEPARTMENT CONDITIONS * **
10: Planning final required to verify the final paving area corresponds to the paving shown on plan. No additional paving
is approved or allowed on this site.
doc: IBC -7/10
D11-144 Printed: 10 -14 -2011
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
hup.//www.ci.tukwila.wa.us
Building Permit No.
Mechanical Permit No.
)1J-
Plumbing /Gas Permit No.
Public Works Permit No.
Project No.
(For office use only)
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
King Co Assessor's Tax No.: Zil 100 -c t t c, -or
Site Address: t 33 Z 5 5‘+It Ave , 5o .
Tenant Name:
Property Owners Name: 1<e ∎ t 1 E.. \.
Mailing Address: t332.5 5 ( t?^ Asie- 5�
Suite Number:
New Tenant:
Floor:
❑ Yes ❑ ..No
F
Zip
"1";)
lc vv' 1c�
City
State
CONTACT PERSON - who do we contact when your permit is ready to be issued
Name: Kei 4t rr lick.
Mailing Address: "t 33 25 5to` Awe.. 50 .
E -Mail Address: -1‘'c0442-.0.4% E 5 rna- ■ l, COre,
Day Telephone: (7. a F.) c0 — O 5 2-
►C w-: lc__
City
Fax Number:
WA RRt-t8
State Zip
GENERAL CONTRACTOR INFORMATION
(Contractor Information for Mechanical (pg 4) for Plumbing; and Gas Piping (pg 5))
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
Contractor Registration Number:
City
Day Telephone:
Fax Number:
Expiration Date:
State
Zip
ARCHITECT OF RECORD - All plans must be wet stamped by- Archirki
Company Name: G v4 t7e 5 � r� Zn c
Mailing Address: TO Bo X `i`l Co
Contact Person: 31 '&c e4.
SZ e r - -c
City
Day Telephone: ('.t2.5) . 1 1 — 00 l?
E -Mail Address: Fax'Number: (L115) za 8 ' $6 €11
NV A 980 5 A
State Zip
ENGINEER OF RECORD - All pial
must be wet stamped by Engineer of Record
Company Name:
Mailing Address:
CY\,kc>.e.(l knos,Aeertni
18 -7.-1 1 b B *'^ -A.te .
i<
gea,mo nc1
City
Contact Person: in t :h oce 1 ri1 + fi the l U Day Telephone: (4 2.5) 1 "11 7 5 0 0
E -Mail Address: Fax Number:
State Zip
H:\Application9\Forms- Applications On Line\2009 Applications \1-2009 - Permit Application.doc
Revised: 1 -2009
bh
Page 1 of 6
B'UI =LDING PERMIT INFO ION . -.206- 431 =3670
Valuation of Project (contractor's bid price): $ 3o0 (Iio rtber) Existing Building Valuation: $ bo , Goo.
Scope of Work (please provide detailed information): ct ssk -the_ ia5 N l$ t -l'tie a- freed .1 eLeFrave ,1/
2x tg-ktn5 breeze usaj a-.•d -4 i . i l -tai --Ehca ho.i se, -. \35 beach -to {'1o3-,Q
A35 bectim -Eo - 4c.15- "Jo 5,}; \;n3 2nd --44-q SS - "11 /z.' ken, j1 5(•!,
Will there be new rack storage? ❑ Yes
No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in'•Square:Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)32"83
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes Er No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm
13' None
❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes !mil No
If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applications\Forms- Applications On Line12009 Applications \I -2009 - Permit Application. doc
Revised: 1 -2009
bh
Page 2 of 6
Existing
. Interior Remodel
Additionto '.
• Existing
Structure : .:
. New
: - .. -,TYPe -0f
Constriction per .
`" ' ' : IBC•': ' „' :..
.. TYPe;af .
Occupancy per,
- . ,IBC.,- `,,
;15tFloor
wood cra.“,lita
5tn5lt rnil.
21"d Eloor: _: -.
- 3`c Floor -
floors .:
'Basement -
Accessory„Structure''
"Aitached'Oarag"e '
'D,etached. Garage•
:��
i560
Attached Carport •
•Detached'Crport
. Covered Deck- '
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)32"83
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes Er No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm
13' None
❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes !mil No
If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applications\Forms- Applications On Line12009 Applications \I -2009 - Permit Application. doc
Revised: 1 -2009
bh
Page 2 of 6
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWN R OR AUTHORIZED AGENT:
Signature:
Print Name: i<e k-1- C--.1k Lk.
Mailing Address: 13 51- 5 5 G " A'e , 5 0 .
Date: 5 /7_4
Day Telephone: (2..° 6) 9 O ► — O 5 7—(o
-Tv kw; l r�
City
State Zip
Date Application Accepted:
Date Application Expires:
Staff Initials:
05417//
// /..2,/
4 et/
H:\ApplicationsWorms- Applications On Line\2009 Applications \1.2009 - Permit Application.doc
Revised: 1 -2009
bh
Page 6 of 6
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http://www.TukwilaWA.gov
Parcel No.: 2172000115
Address: 13325 56 AV S TUKW
Suite No:
Applicant: FLICK BREEZEWAY
RECEIPT
Permit Number: D11 -144
Status: APPROVED
Applied Date: 05/24/2011
Issue Date:
Receipt No.: R11 -02255
Payment Amount: $157.50
Initials: LAW Payment Date: 10/14/2011 11:24 AM
User ID: 1632 Balance: $0.00
Payee: KEITH FLICK
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd MC
RD Pmts Re -Dist OP
Authorization No. 01477B
ACCOUNT ITEM LIST:
Description
157.50
.00
Account Code Current Pmts
BUILDING - RES
PLAN CHECK - NONRES
PLAN CHECK - RES
STATE BUILDING SURCHARGE
000.322.100
000.345.830
000.345.830
640.237.114
Total: $157.50
153.00
- 131.56
131.56
4.50
doc: Receipt-06 Printed: 10 -14 -2011
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.TukwilaWA.gov
Parcel No.: 2172000115
Address: 13325 56 AV S TUKW
Suite No:
Applicant: FLICK RESIDENCE
RECEIPT
Permit Number: D11 -144
Status: PENDING
Applied Date: 05/24/2011
Issue Date:
Receipt No.: R11 -01050
Payment Amount: $131.56
Initials: LAW Payment Date: 05/24/2011 10:18 AM
User ID: 1632 Balance: $206.90
Payee: KEITH FLICK
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd MC
Authorization No. 02461B
ACCOUNT ITEM LIST:
Description
131.56
Account Code Current Pmts
PLAN CHECK - NONRES
000.345.830 131.56
Total: $131.56
doc: Receiot -06 Printed: 05 -24 -2011
•
INSPECTION RECORD
Retain a copy with permit
I:31f -i_1i(
• INSPECTION'NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
•• 6300 Southcenter Blvd., #100, Tukwila. WA 98188 tr. (206) 431 -3670
. Permit Inspection Request Line (206) 431 -2451
•
i• •
r
Project: ' .. . .• :.•
rf(1 . 2. Uz.f u.) ALi
Type of Inspection:
FINJ AL
Address: • R
. I•.uZZS•: Cs 4 4 S
Date Called:
Special Instructions: • ,
.
,
•
Date Wanted:.
3 - 2 - ' '2.
ern-.,
p:rn..
Requester:
Phone No:
2 vC. So' t •- 05P 6
r.
r"
•
•
Approved per applicable codes. a Corrections required prior to approval.
'COMMENTS:
fG 4r l r- 4- I
w
El PECTION FEE REQU RED. Prior t next inspection, fee must be
d at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
PERMIT NO.'
•CITY•O:F' TUKWILA BUILDING DIVISION
6300.5outlicenter Blvd., #100, Tukwila. WA 98188 (206) 431 -36
Permit Inspection Request Line (206) 431 -2451
Project: • . .
'
Type of Inspection:
Address: •
Date Called:
✓
Special Instructions:
.
.
•
Date Wanted:.
-2S-IZ
(a.m�
.m.
Requester:
Phone No:
2c5 t -CIS 2
.
Approved per applicable codes. a Corrections required prior to approval.
• • •
•
COMMENTS:
: P•4:› — ilt smr
[160"C ShvoTt h; — AT Pi"' •6
✓
CAP i Al; 10e, l l I,■i y►1
EINS ECTION FEE REQUIRED. Prim to next inspection. fee must be
t 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
. • INSPECTION NO • • PERMIT NO.
on-
CITY-OF'TUKWILA BUILDING DIVISION
- 6300 Southcenter glVd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
•-
Project: • .
_ Fl. 10.14 i'§ I? f...icZEt.JACI
Type of Inspection:
,
1:71,04L,
Address:
1334.5 06 Ad c
Date Called:
Special Instructions: '
• .
•
. ,
•
Date Wanted:
3- a S" - )2__
P.m.
Requester:
Phone No: •
Approved per applicable codes. 11.Corrections required prior to approval.
COMMENTS:..
Inspector:,
fiega 74,./t440--r!
IDate:
R INSPECTION FEE REQUIRED. Prior to next inspection. fee must be
1---1 paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 12 2011
City of Tukwila
BUILDING DIVISION
? 1 1;
ty biz b eee ▪ .r
ClVe! - ►.2 ct Mc +yell
CW Design
FILE Copy
Poor/TIN No
Pr- - . •
ti
zera-
-
4252288699
la =zd o" T
p.2
O G's
rn
rn
Cn
rn
rn
X
N
TpASSS 24~°G
\ .S.
(MM #0$ -3►'i�
SPAe-v-J4 is 201-4
loi2
RECEIV
cr OF LA
MAY -2 4 2011
PERMIT CENTER
�PII- ly�l
CW Design 4252288699 P -3
Root Beamf 2008 International Building Code (05 NDS11 Ver: 7.01.14
By: WJB . CW Design. Inc on: 01 -05 -2010: 10:50:55 Ape
Project CvrdWalkwayBeam - Location: Covered walkway beam max span 20ft
5.5 IN x 11.5 IN x 20.0 FT / #2 - Douglas -Fir -Larch - ory Use
Section Adequate By: 12.5% Controlling Factor. Section Modulus / Depth Required 10.84 In
Deflections:
Dead Load:
Live Load:
Total Load:
Reactions (Each End):
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam
Beam Data:
Span:
Maximum Unbraced Span:
Pitch Of Roof:
Live Load Deflect. Criteria:
Total Load Deflect. Criteria:
Roof Loadinw
Roof Live Load -Side One:
Roof Dead Load -Side One:
Tributary Width -Side One:
Roof Live Load -Side Two:
Roof Dead Load-Side Two:
Tributary Width -Side Two:
Roof Duration Factor.
Beam Self Weight
Slope/Fitch Adjusted Lengths and Loads:
Adjusted Beam Length:
Beam Uniform Live Load:
Beam Uniform Dead Load:
Total Uniform Load:
Properties For #2- Douglas -Fir -Larch
Bending Stress:
Shear Stress:
Modukis of Elasticity:
Adjusted Modulus of Elasticity:
Stress Perpendicular to Grain:
Ad)usted'Propertles
Fb' (Tension):
Adjustment Factors: Cd =1.15 CF =1.00
Fv'
Adjustment Factors: Cd=1.15
Design Requirements:
Controlling Moment:
10.0 ft from left support
Critical moment created by combining all dead and fire loads.
Controlling Shear. V= 1663 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Reauired Sections:
Section Modulus (Moment):
Area (Shear):
Moment of Inertia (Deflection):
only, support capacity not checked):
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 12 2011
City of Tukwila
BUILDING DIVISION
PILE
Ory
DLD= 0.32
LLD= 0.40
11.0= 0.72
IN
IN =1.1604
IN = L/334
LL -Rxn= 1000 L8
DL -Rxn= 808 LB
TL -Rxn= 1808 LB
BL= 0.53 IN
L= 20.0 FT
Lu= 0.0 FT
RP= 8. : 12
Li 240
L/ 180
LL1= 25.0 PSF
DL1= 15.0 PSF
TW1= 3.0 FT
LL2= 25.0 PSF
DL2= 15.0 PSF
1W2= 1.0 FT
Cd= 1.15
BSW= 14 PLF
Ladi= 20.0 FT
wt.= 100 PLF
wD adi= 81 PLF
wT= 181 PLF
Fb= 875 PSI
Fv= 170 PSI
E= 1300000 PSI
E -Min= 470000 PSI
Fcperp= 625 PSI
Fb'= 1006 PSI
Fit= 196 PSI
9040 FT-LB
Sreq= 107.80 1N3
S= 121.23 1N3
Areq= 12.76 IN2
A= 63.25 1N2
Irea= 375.43 1N4
I= 697.07 1N4
Or, Lz 4-574.
-5 57gF= k:M
14-0 ItisA 2,2 r a 12 /7I-I ln31,715�
4a1/246
• 5,elat I722 4 71-1- (0,40(,4, _ 37Z0'.11-14
afar
D\I
RECEIVED
CrTy0F Thou
MAY Z a 2011
PERMIT Z� o
R
Gity of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
KEITH FLICK
13325 56 AV S
TUKWILA WA 98178
RE: Permit No. D11 -144
FLICK BREEZEWAY
13325 56 AV S TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 04/11/2012.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 04/11/2012, your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
----3::A
Bill Rambo
Permit Technician
File: Permit File No. D11 -144
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
10 -03 -2011
•
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
KEITH FLICK
13325 56 AV S
TUKWILA WA 98178
RE: Permit Application No. D11 -144
FLICK BREEZEWAY
13325 56 AV S TUKW
Dear Permit Applicant:
In reviewing our current application files, it appears that your permit applied for on 05/24/2011, has not been
issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code,
Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days
from the date of application shall expire and become null and void. Your permit application will expire on
11/21/2011.
If you still plan to pursue your project, a written request for extension of your application must be submitted to the
Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building
Official and state your reason(s) for the need to extend your permit application. If it is determined that an
extension is granted, your application will be extended for an addtiona190 days from the expiration date and you
will be notified by mail.
In the event that we do not receive your written request for extension or request was denied, your permit
application will expire, become null and void and your project will require a new permit application, plans and
specifications, and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File: Permit File No. D11 -144
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
•
Tue, May 24, 2011 _
Re Permit #D11 -144 •
On July 22, 2009 the City of Tukwila, Building Division, approved my permit #D09 -020. That permit included a
breezeway, connected to the garage, and "extending to the existing residence" (page A4).
The footings for the breezeway posts were inspected and passed.
But I did not have enough money to reroof the residence (my house) at that time and I did not want to cut a
hole in the roof in the winter so 1 left that last section off. I stored the trusses and beams in my garage.
But the inspector told me; in order to leave that last part of the breezeway unfinished and yet have the permit
finalized, I would have to file a "Revision ".
I filed the "Revision" as instructed.
Subsequently, the inspector inspected the nearly complete breezeway and finalized permit #D09 -020.
I assumed that I would be able to install that last section of breezeway when I could afford to reroof my house,
since the Building Department had already approved its being built, and since 1 had been charged the City's
fees and not been reimbursed the fees due for that section of breezeway.
1 feel it is wrong for the Building Department to demand that I get another permit, go through another review
process, wait, however long, for that process, and, on top of which, pay a second time for something for
which I already paid.
Enclosed are pictures of the breezeway.
Respectfully,
fie;tlr` ►c_k
(1c0 0t o62(
-Ait/r4. ,n
,u:� aO7-- aza lePawea -1/-eL
,76t, /8.4-
2,5
./0 zweatee4
6/(
RECEIVED
®ri'v OF TUKWILA
MAY 242011.
gERMIT CENTER
IpPERRE COOaD COPY •
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D11 -144 DATE: 05/24/11
PROJECT NAME: FLICK BREEZEWAY
SITE ADDRESS: 13325 56 AV S
X Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter #
Revision #
after Permit Issued
DEP RTMENTS:
(1 OS3kii ‘i
u (ding Division NE
Pub is Wor s
inn �1 I NIA I(P. ° 5Y1- M2 n 1F t1l l I
ire Prevention Planning Division
Structural
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 05/26/11
Complete
Comments:
Incomplete n
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route
Structural Review Required n
REVIEWER'S INITIALS:
No further Review Required
DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 06/23/11
Approved ❑ Approved with Conditions Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
05/24/11
•
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -367o FAX (206) 431 -3665
E -mail: tukplanaci.tukwila.wa.us
Permit Center /Building Division
206 431 -3670
Public Works Department
206 433 -0179
Planning Division
206 431 -3670
AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION
PERMIT NO: —0r
STATE OF WASHINGTON)
COUNTY OF KING )
ss.
"* Cc I `-l`^ , states as follows:
[please print name]
1. I have made application for a permit from the City of Tukwila, Washington.
2. I understand that state law requires that all building construction contractors be registered with the
State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the
Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have
read or am familiar with RCW 18.27.090.
3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the
City of Tukwila must verify either that the contractor is registered by the State of Washington, or that
one of the exemptions stated under RCW 18.27.090 applies.
4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I
hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090,
I consider the work authorized under this permit to be exempt under number 0_ , and will therefore
not be performed by a registered contractor.
5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to
persons making electrical installations on their own property or to regularly employed employees
working on the premises of their employer. The proposed electrical work is not for the construction
of a new building for rent, sale or lease.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision
to engage an unregistered contractor to perform construction work.
Owner /Owner's Agent*
Signed and sworn to before me this
1 e � day of �� , 20
,. Q
OTARY PUBLIC in and for the State of Washington
Residing at King , County
Name as commissioned: 4�'! f Uvr k
My commission expires: 6s'-o19 -7 (-7
18.27.090 Exemptions, The relption provisions of this chapter do not apply to
1. An authorized representative of the United States
government, the state of Washington, or any incorporated
city, town, county, township, irrigation district, reclamation
district, or other municipal or political corporation or
subdivision of this state;
2. Officers of a court when they are acting within the scope
of their office;
3. Public utilities operating under the regulations of the
utilities and transportation commission in construction,
maintenance, or development work incidental to their own
business;
4. Any construction, repair, or operation incidental to the
discovering or producing of petroleum or gas, or the
drilling, testing, abandoning, or other operation of any
petroleum or gas well or any surface or underground mine
or mineral deposit when performed by an owner or lessee;
5. The sale of any finished products, materials, or articles of
merchandise that are not fabricated into and do not become
a part of a structure under the common law of fixtures;
6. Any construction, alteration, improvement, or repair of
personal property performed by the registered or legal
owner, or by a mobile /manufactured home retail dealer or
manufacturer licensed under chapter 46.70 RCW who shall
warranty service and repairs under chapter 46.70 RCW;
7. Any construction, alteration, improvement, or repair
carried on within the limits and boundaries of any site or
reservation under the legal jurisdiction of the federal
government;
8. Any person who only furnished materials, supplies, or
equipment without fabricating them into, or consuming
them in the performance of, the work of the contractor;
9. Any work or operation on one undertaking or project by
one or more contracts, the aggregate contract price of
which for labor and materials and all other items is less
than five hundred dollars, such work or operations being
considered as of a casual, minor, or inconsequential nature.
The exemption prescribed in this subsection does not apply
in any instance wherein the work or construction is only a
part of a larger or major operation, whether undertaken by
the same or a different contractor, or in which a division of
the operation is made into contracts of amounts less than
five hundred dollars for the purpose of evasion of this
chapter or otherwise. The exemption prescribed in this
subsection does not apply to a person who advertises or
puts out any sign or card or other device which might
indicate to the public that he or she is a contractor, or that
he or she is qualified to engage in the business of
contractor;
lo. Any construction or operation incidental to the
construction and repair of irrigation and drainage ditches
of regularly constituted irrigation districts or reclamation
districts; or to farming, dairying, agriculture, viticulture,
horticulture, or stock or poultry raising; or to clearing or
other work upon land in rural districts for fire prevention
purposes; except when any of the above work is performed
by a registered contractor;
11. An owner" who contracts for a project with a registered
contractor, except that this exemption shall not deprive the
owner of the protections of this chapter against registered
and unregistered contractors. The exemption prescribed in
this subsection does not apply to a person who performs
the activities of a contractor for the purpose of leasing or
selling improved property he or she has owned for less than
twelve months;
12." Any person working on his or her own property,
whether occupied by him or her or not, and any person
working on his or her personal residence, whether owned
by him or her or not but this exemption shall not apply to
any person who performs the activities of a contractor on
his or her own property for the purpose of selling,
demolishing, or leasing the property;
13. An owner" who performs maintenance, repair, and
alteration work in or upon his or her own properties, or
who uses his or her own employees to do such work;
14. A licensed architect or civil or professional engineer
acting solely in his or her professional capacity, an
electrician certified under the laws of the state of
Washington, or a plumber certified under the laws of the
state of Washington or licensed by a political subdivision of
the state of Washington while operating within the
boundaries of such political subdivision. The exemption
provided in this subsection is applicable only when the
person certified is operating within the scope of his or her
certification;
15. Any person who engages in the activities herein
regulated as an employee of a registered contractor with
wages as his or her sole compensation or as an employee
with wages as his or her sole compensation;
16. Contractors on highway projects who have been
prequalified as required by RCW 47.28.070, with the
department of transportation to perform highway
construction, reconstruction, or maintenance work;
17. A mobile /manufactured home dealer or manufacturer
who subcontracts the installation, set -up, or repair work to
actively registered contractors. This exemption only applies
to the installation, set -up, or repair of the
mobile /manufactured homes that were manufactured or
sold by the mobile /manufactured home dealer or
manufacturer;
18. An entity who holcion/itgritAlectrical contractor's
license under chap ei` t$'_,. CW that employs a certified
journeyman electrl`cfa i,,a certified°residential specialty
electrician, or anrelecttrieal trainee Meeting the
requirements of chapter 19.28 RCW. o peiform plumbing
work that is incidentally, directly, and immediately
appropriate to the like-in-kind replaceineiit of a household
appliance or othat small household utilization equipment
that requires limited erect F oiyer' anctamited waste
and /or water connedtiersi� 3 g1eetr}t'ca1 trainee must be
supervised by a certified-electjjciari while performing
plumbing work.
• Per Washington State Department of Labor and Industries, lessee has been
interpreted to be equivalent to owner for the purpose of these exemptions.
•
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 12 2011
City o kwila
Bl1ILDIN !VISION
sq),
EXISTING
RESIDENCE
(1,539 sf)
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE Revisions will require a new plan submittal
and may include additional plan r,.=irw fees.
Site Plan
0' 10' 20' 40'
01111161111" =20'
PLANNING APPROVED
No changes canYbe made. to these
plans without approval from the
Planning Division of DOD
Approved By:
Date:
PROJECT 1ATA
ZONING: LDR
CODE: 2006.
PARCEL NO. : 211200-0015
LEGAL
DESCRIPTION : EAST
. S.S.C. / 2006 I.R.C.
RIVERTON GARDEN TRS 2ND, LOT 23
SITE AREA:
20,150 SQ. FT.
1:3UILDING FOOTI-RIN
COVERED PORCH ('=XIST):.
COVERED 15REEZE11:
DET ACNE D G4R4G
(EXIST): 1,539 "4. FT.
2S0 0 , FT.
. ``I'' (NEW: 224 "41. . FT.
(N E U):
E 1,240 Q. FT.
STRUCTURE COVER/- CAE (EXIST +NEW): 3,283 .Q, FT,
STRUCTURE COVEi<?4GE % 15.82%
,ALLOWABLE STRUCTURE COVERAGE io: 35.00%
NOTE:
ALL PROPERTY BOUNDARY INFORMATION PROVIDED BY
KING COUNTY ASSESSORS OFFICE. CW DESIGN, INC. MAKES
NO WARRANTIES, EXPRESSED OR IMPLIED, AS TO THE
ACCURACY OF TINE PROPERTY MEASUREMENTS AND /OR
EXISTING RESIDENCE LOCATION.
SEPARATE PERMIT
REQUIRED FOR:
ti Mechanical
Electrical
Plumbing
0, Gas Pin
City of Tukwila
BUILDING DIVISION
FILE COPY
Permit Na 't
Plan review approval Is subject to snots and omissions.
Approval of construction documents does not authorize
the violation of any adopted code or ordinance. or pt
of approved Field Copy and coed dons Is aced:
By
Date , tt /
a ►ofiukwna
BUILDING DIVISION
criNfau1/4
MAY 2 4 2011
PERMIT CENTER
III - IIH
ClAt DESIGN, INC.
www.cwdesign- inc.com
P.O. Box 476
Renton, WA 98057
425- 271 -0082 (Office)
206- 948 -7094 (Office)
425- 228 -8699 (Fax)
REV. DATE
05 /I13/09
/L\ 09/02/09
A.
CD
c
o
CO
0 CO CD
CD C
�� 'f
CO
1 Gr3
C.7 N
C M
r .._
C/) !—
LL
i
gapi !PPM
IIiiijjP
Mai t
PROJECT NO.:
07115
DRAWN BY:
WJB / KRB
DATE:
SEPT 02, 2009
SHEET:
Al