Loading...
HomeMy WebLinkAboutPermit D11-186 - PROFESSIONAL PLASTICS - STORAGE RACKSPROFESSIONAL PLASTICS 6233 SEGALE PARK DR D EXPIRED 01 -14.12 D11-186 City (*Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 3523049112 Address: 6233 SEGALE PARK DR D TUKW Suite No: Project Name: PROFESSIONAL PLASTICS Permit Number: D11 -186 Issue Date: 07/08/2011 Permit Expires On: 01/04/2012 Owner: Name: SEGALE PROPERTIES LLC Address: PO BOX 88028 , TUICWILA WA 98138 Contact Person: Name: ROGER STUESSI Address: 9883 40 AV S , SEATTLE WA 98118 Contractor: Name: ENGINEERED PRODUCTS Address: 18271 ANDOVER PK W , TUKWILA WA 98188 Contractor License No: ENGINPC931CO Phone: 206 - 394 -3331 Phone: 206 - 394 -3300 Expiration Date: 02/20/2013 DESCRIPTION OF WORK: INSTALL PALLET STORAGE RACKS Value of Construction: $0.00 Fees Collected: $1,215.02 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: 0024 Electrical Service Provided by: PUGET SOUND ENERGY * *continued on next page ** doc: IBC -7/10 D11-186 Printed: 07 -08 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: N N • Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. End Time: Fill 0 c.y. Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: 0*t t I hereby certify that I have read and ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complies whether specified herein or not. The granting of this permit does not pre e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Date: 2 Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. doc: IBC -7/10 D11 -186 Printed: 07 -08 -2011 6: All construction shall be done in conforne with the approved plans and the require of the International Building Code or International Residential C , International Mechanical Code, Washingt ate Energy Code. 7: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. 8: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: ** *FIRE DEPARTMENT CONDITIONS * ** 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: All new sprinlder systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinlder systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2050). (THE CHANGE OUT OF THE SPRINKLER HEADS, REQUIRES A SEPARATE FIRE DEPARTMENT SPRINKLER PERMIT.) 15: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one -hour fire proofing, (b) sidewall sprinlder at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13) 16: Storage shall be maintained 2 feet or more below the ceiling in nonsprinldered areas of buildings or a minimum of 18 inches below sprinlder head deflectors in sprinklered areas of buildings. (IFC 315.2.1) 17: Flue spaces shall be provided in accordance with International Fire Code Table 2308.3. Required flue spaces shall be maintained. 18: Clearance between ignition sources, such as light fixtures, heaters and flame - producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 19: The total number of fire extinguishers required for an extra hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (4A 40 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 20: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 21: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 22: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 23: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that doc: IBC -7/10 D11 -186 Printed: 07 -08 -2011 indicates the month and year that the inspec was performed and shall identify the compa r person performing the service. Every six years stored pressure ext. shers shall be emptied and subjected to th licable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 24: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 25: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 26: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IBC -7/10 D11-186 Printed: 07 -08 -2011 ,c-43/Z4 -- 2 if--e- CITY OF TUKI�A Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Pe No. 1 Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. For office use on Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION 6-'2' 33 - Sc y/g C e King Co Assessor's Tax No.: Site Address: 6 2-33 — c--,7 4 4 e A iZ-t /%/4 -- 0 Suite Number: — Floor. Tenant Name: ,9,La-f �.ss / "Ai .,c L.- Pe-4 4 mss- New Tenant: .GT Yes I=1.. No Property Owners Name: -sew 4 Le �/y 7:2e, _ (-i �1 O O eJ X c.�d 2- �I `�i�e. 4-z-1.> , L,¢ Mailing Address: f City 1.4/Q State SF/ Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: ss ■ Mailing Address: 9Jt3 T4 ' - E -Mail Address: Pelf �2@ e 4 i- y u� r t f,p . c: a ti-i Day Telephone: .Z- d 6- 3 l y -3 3 3/ City State &/ «1 Zip Fax Number: d ( - 5-7 > -6 ? 2 GENERAL CONTRACTOR INFORMATION - (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name:i-7.7/ .1c- e2e o/ P/Lo d --r-s Mailing Address: 7C-F3 - 416 i; / . � S • Contact Person: / 4 of e-,-- T e t ( G✓� City State Zip Day Telephone: a- b - 3"7 4 -3 3 3 / E -Mail Address: / 7€ -( e-4 s 77-7 u J 4 . —o Fax Number: 2--- d (- 5-7 y - 6 r Z7 Expiration Date: X/2.- d/3 — 13 Contractor Registration Number: £/),? / N 7 C. `l 3 / G o ARCHITECT OF RECORD - All plans must be stamped by Architect of Record Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD - All plans must be stamped by Engineer of Record Company Name: Mailing Address: 7 3 6 L R ST 141.1 / i✓ S r FT / 0 Y AZ /// e 3 /44T -1/ 6 5 City State Zip Contact Person: -')-f-- / ?/ k L Day Telephone: 4v tS - 2- 5 6 - 3 6 11 E -Mail Address: Ze- H /' / &h 4 e / Api. 7 . ›, Fax Fax Number: H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: May 2011 bh Page 1 of 6 BUILDING PERMIT INFORMATIO- 206 - 431 -3670 Valuation of Project (contractor's bid price): $ 3 $ d c v • Existing Building Valuation: $ Scope of Work (please provide detailed information): Will there be new rack storage? , ....Yes ❑ ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ,,k1 Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM c� GOB z rt- �° GU E (-J7-7 ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms - Applications On Line12010 Applications \7 -2010 - Permit Application.doc Revised: May 2011 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor Z F-6 Al /9 N/9 N/Q 2nd Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ,,k1 Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM c� GOB z rt- �° GU E (-J7-7 ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Forms - Applications On Line12010 Applications \7 -2010 - Permit Application.doc Revised: May 2011 bh Page 2 of 6 PERMIT APPLICATION NOTES — Al likcable to all permits in this application • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN AU7IZED Signature: Print Name: �� Ciz J T [mil fs Mailing Address: l 3 — Z'6 1— S' IDate Application Accepted: Date: 6 7/2 / Day Telephone: or- 3 r 4( 33.3 / W/t 7fr/' /,' City State Zip Date Application Expires: (1 -,)-)- r( Staff Initials: H:\Applications\Fonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: May 2011 bh Page 6 of 6 PLUMBING AND GAS PIPING PER]' INFORMATION — 206 - 431 -3670 • PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Plumbing work (contractor's bid price): $ Valuation of Gas Piping work (contractor's bid price): $ Scope of Work (please provide detailed information): l/ Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor Drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and/or water treatment equipment Repair or alteration of drainage or vent piping Medical gas piping system serving 1 -5 inlets/outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets H•1Applications\Forms- Applications On Line12010 Applications17 -2010 - Permit Application.doc Revised: May 2011 bh Page 5 of 6 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 3523049112 Permit Number: D11 -186 Address: 6233 SEGALE PARK DR D TURIN Status: APPROVED Suite No: Applied Date: 06/22/2011 Applicant: PROFESSIONAL PLASTICS Issue Date: Receipt No.: R11 -01399 Payment Amount: $738.15 Initials: JEM Payment Date: 07/08/2011 09:32 AM User ID: 1165 Balance: $0.00 Payee: ROGER H STEUSSI TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 03511B ACCOUNT ITEM LIST: Description 738.15 Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 733.65 640.237.114 4.50 Total: $738.15 doc: Receiot -06 Printed: 07 -08 -2011 wqs City of Tukwila s� �y Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT ParcelNo.: 3523049112 Permit Number: D11 -186 Address: 6233 SEGALE PARK DR D TUKW Status: PENDING Suite No: Applied Date: 06/22/2011 Applicant: PROFESSIONAL PLASTICS Issue Date: Receipt No.: R11 -01279 Initials: User ID: Payee: WER 1655 Payment Amount: $476.87 Payment Date: 06/22/2011 01:35 PM Balance: $738.15 ROGER STUESSI TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 133434 ACCOUNT ITEM LIST: Description 476.87 Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 476.87 Total: $476.87 doc: Receiot -06 Printed: 06 -22 -2011 .,:•n +TI: .o.— ��y W� 0. qp w , , ysv 7.7".`%. T�.: ,.•,., -j— INSPECTION NO. INSPECTION RECORD 4- Retain a copy permit i — Reta py p PERMIT NO. CITY OF TUKWILA BUILDING DIVISION IP— 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Pro'ect: T Type of Inspecti n: 1)....zeotvt I_ ;‘,,Nc,V.ze-ricN \DA-1 A. PN. 2_ --- A dress: D Date Called: Special Instructions: D Date Wanted: ` `aim. Requester: `'1 r cteoNAtt.1t'o - 1.Ot.ie e Phone No: b t.L -co Lt t b R Redd. 64 t4 Approved per applicable codes. ElCorrections required prior to approval. COMMENTS:. A p 1)....zeotvt I_ ;‘,,Nc,V.ze-ricN \DA-1 A. PN. 2_ --- t- ■•.1" 1e{A,✓ V-i t W t• R1AAo(, -r-r-) I 0 $\ k C1t t \ , ,rJ .L.K �' ` �0`..J H the t- t. IAt - t.1(.6 F - `'1 r cteoNAtt.1t'o - 1.Ot.ie e A - b t.L -co Lt t b R Redd. 64 t4 —t- r, VI ak- At, id.lt, '1 ' . r Nk. •' Inspe or: An/W-7 Date: x'14`1/ E - Et SPECTION FEE REQUIRED. Prior to ext inspection, fee must be • p d at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • az INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit — fry' PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, Wa. 98188 206 - 575 -4407 Project: Prof s• /47 a i • Type of Inspection: 3)pPi4JC1c4.• 'Cis,* 7ALi / 1I Address: GZ 3 3 Se q k. Pam ae o Suite #: Contact Person: AciasaA a2° -17.,. i Special Instructions: Phone No.: Z�6. 39*— 333 1 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: 7ALi / 1I Fire Alarm: 0 i€4€ •Y.110/ C41»19 / 4.2. Monitor: spp.,i) Mi - �C°Z - -4o 101, J /,r / A) A, s¢;-- s //L49_ Qrfres 0,4"- . (% INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit .Q /1 - 186, /1- .S - /LV. /1 -5 -o83 PERMIT NUMBERS CITY_OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 Project: A 0;4 S s j.i., 4 (f)1.1-. c S . 4 Sprinklers: Type of Inspection+: 5pi f." I.P.L t".'^ a 1 Address: (, 2 33 Suite #: Se. 5 a 1 . Pr.•44 '' D. Contact Person: 4,14-11.. � y Special Instructions: .. Phone No.: 2 ( 3 - 7 2 - 7Z2-2_ Approved peapplicable codes. Corrections required prior to approval. 'COMMENTS: () 5%o, ea A- c ‘, yZ e01.44 4 ,/s ,e1- • 1 Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: 5-5, Date: 7 /iy/i1 Hrs.: / $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name:. Address: City: State: 1 Zip: Word /Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 s Fireproofing Aggregates Shotcrete Concrete M a s o n r y A s p h a l t R o o f i n g P i l i n g S t e e l S o i l s W o o d December 16, 2011 File: 11 -221 Building Official City of Tukwila Building Department 6300 Southcenter Blvd. Tukwila, WA 98188 Project: Professional Plastics Address: 6233 Segale Park Drive Permit No.: D11 -186 A.A.R. TESTING LABORATORY, INC. CONSTRUCTION INSPECTION AND MATERIAL TESTING NATIONALLY ACCEPTED LABORATORY This is to advise you that special inspections are completed on the above referenced project. The following inspection was required and a copy of our inspection report has already been sent. CITYRSAINfILA 1. Proprietary anchor installation IJkl: 2 0 7011 PERMIT CENTER To the best of our knowledge all work inspected conformed to Tukwila Building Department approved plans, specifications, IBC and related codes and /or verbal or written instructions from the Engineer of Record. Sincerely, A.A.R. TESTING LABORATORY, INC. &d,05r. Kimberle Anderson President cc: Easy Up Storage -Roger Stuessi Tel: (425) 881 -5812 Fax: (425) 881 -5441 • 7126 180th Ave. NE • P.O. Box 2523 * Redmond, WA 98073 RECEIVED JUL 2.6 20111 COMMUNITY r ELOPMEP T Field Report Report #: 52624 ATA R TestI g Laboratory; in 7126118Uth' AyijN:E Park 180 ,oltirC101; Red no d WA 98052, 'r`'.>E?�..v.. tvi '' s'�;j Fri .._+:i i. •ol a^ s5wF ne,425,881w58l2 Fax_425 881 5441 Client: Easy Up Storage 9883 40th Ave. S. Seattle, WA 98118 Contact: Roger Stuessi Project Number: 11 -221 Permit #: D11 -186 Project Name: Professional Plastics Address: 6233 Segale Park Dr. Inspection Performed: Proprietary Anchors Date: 7/14/2011 Time: Temperature: Verified anchors to be Hilti KB -TZ 1/2" x 4 1/2" wedge type. Verified hole cleanliness and minimum embedment of 3 1/4". Torque was tested with calibrated wrench #132A and found meeting or exceeding 40 ft. lbs. All work was found in conformance with approved plans, manufacturer's recommendations and ESR #1917. Areas inspected include all racking noted on sheet #1 of plans. Distribution: Distribute Client ❑ Distribute Contractor ❑ Distribute Engineer ❑ Distribute Owner Distribute Municipality ❑ Distribute Other ❑ Distribute Architect ❑ Distribute Other Inspector: Chandler, Loren Reviewed by: Mike Blackwell All reports are considered confidential and are the property of the client and A.A.R. Testing Laboratory, Inc. Reproduction except in full without the written consent of A.A.R. Testing is strictly forbidden Calculations for : PROFESSIONAL PLASTICS TU KWI LLA, WA 06/16/2011 Loading: 2400 # load levels @ 86, 120, 144 1000 # load level @ 6" Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 108 " Load Beams Uprights: 36 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 5.00x 8.00x 0.375 Base Plates with 2- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 b i H 8 (,, ECE9VE JUN 22 2011 PERMIT CENTER Conterminous 48 States 2005 ASCE 7 Standard Latitude = 47.4353 Longitude = - 122.257 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa= 1.0 ,Fv = 1.0 Data are based on a 0.05 deg grid spacing Period Sa (sec) (g) 0.2 1.385 (Ss, Site Class B) 1.0 0.473 (S1, Site Class B) Conterminous 48 States 2005 ASCE 7 Standard Latitude = 47.4353 Longitude = - 122.257 Spectral Response Accelerations SMs and SM1 SMs = Fa x Ss and SM1 = Fv x S1 Site Class D - Fa = 1.0 ,Fv = 1.527 Period Sa (sec) (g) 0.2 1.385 (SMs, Site Class D) 1.0 0.723 (SM1, Site Class D) IBC 2009 LOADING SEISMIC: Ss= 138.5 % g S1= 47.3 % g Soil Class D Modified Design spectral response parameters Sms= 138.5 % g Sds= 92.3 % g Sm1= 72.3 %g Sd1= 48.2 %g Seismic Use Group 2 Seismic Design Category D or D le = 1 R= 4 R= 6 Cs = 0.2308 W Cs = 0.1539 W Using Working Stress Design V = Cs *W11.4 V= 0.1649 W' _' 0.109? W* Depth Flange Lip Thickness R Blank = A = Ix = Iy = a a bar b b bar c c bar u gamma R' Cold Formed Channel 3.000 in 3.000 in 0.750 in 0.0750 in 0.1000 in 9.96 in 0.747 in2 1.191 in4 0.935 in4 2.6500 2.9250 2.6500 2.9250 0.5750 0.7125 0.2160 1.0000 0.1375 Fy = 55 ksi COLUMN SECTION wt = 2.5 plf Sx = 0.794 in3 Rx = 1.263 in Sy = 0.544 in3 Ry = 1.119 in Web w/t 35.3333 Flg w/t 35.3333 x bar 1.2423 m 1.6690 x0 - 2.9114 J 0.0014 x web 1.2798 x lip 1.7202 h/t 38.0000 Section Removing: 0.640 inch slot 0.375 inch hole A- = 0.152 in2 I'x = I'y = Depth Flange Lip Thickness R Blank = A = Ix = Iy = a a bar b b bar c c bar u gamma R' 0.75 inches each side of center on web 0.87 inches from web in each flange A' = 0.595 in2 x bar = 1.478 in 1.014 in4 S'x= 0.676 in3 R'x= 1.305 in 0.743 in4 S'y= 0.476 in3 R'y= 1.117 in Cold Formed Channel 1.500 in 1.500 in 0.000 in 0.0750 in 0.1000 in 4.23 in 0.31.7 in2 0.125 in4 0.075 in4 1.1500 1.4250 1.3250 1.4625 0.0000 0.0000 0.2160 0.0000 0.1375 Fy = 55 ksi BRACE SECTION wt = 1.1 plf Sx = 0.166 in3 Rx = 0.627 in Sy = 0.079 in3 Ry = 0.487 in Web w/t 15.3333 Flg w/t 17.6667 x bar 0.5060 m 0.6531 x0 - 1.1592 J 0.0006 x web 0.5435 x lip 0.9565 h/t 18.0000 Cold Formed Section HEIGHT OF BEAM MAT'L THICKNESS INSIDE RADIUS WIDTH STEEL YIELD 4.000 INCHES 0.075 INCHES 0.100 INCHES 2.750 INCHES 55.0 KSI STEP 1.625 INCHES HIGH L LONG SIDE 3.6500 TOP 1.4000 STEP SIDE 1.3500 STEP BOTT 0.7250 SHORT SID 2.0250 BOTTOM 2.4000 CORNERS 2 3 4 5 6 LOAD BEAM 1.000 INCHES WIDE ABOUT THE HORIZONTAL AXIS Y LY LY2 Ii 2.0000 7.3000 14.6000 4.0523 3.9625 5.5475 21.9820 0.0000 3.1500 4.2525 13.3954 0.2050 2.3375 1.6947 3.9613 0.0000 1.1875 2.4047 2.8556 0.6920 0.0375 0.0900 0.0034 0.0000 ABOUT THE VERTIC X LX 0.0375 0.1369 0.8750 1.2250 1.7125' 2.3119 2.2125 1.6041 2.7125 5.4928 1.3750 3.3000 0.2160 3.9125 0.8450 3.3063 0.0004 0.0875 0.0189 0.2160 3.9125 0.8450 3.3063 0.0004 1.6625 0.3591 0.2160 2.3875 0.5157 1.2311 0.0004 1.8000 0.3888 0.2160 2.2875 0.4941 1.1302 0.0004 2.6625 0.5751 0.2160 0.0875 0.0189 0.0017 0.0004 2.6625 0.5751 0.2160 0.0875 0.0189 0.0017 0.0004 0.0875 0.0189 TOTALS 12.8459 25.3500 24.0270 65.7748 AREA = CENTER GRAVITY = Ix = Sx = Rx = 0.963 IN2 1.870 INCHES TO BASE 1.934 IN4 Iy = 0.908 IN3 Sy = 1.417 IN Ry = 4.9516 17.8875 16.0064 1.246 INCHES TO LONG SIDE 1.039 IN4 0.691 IN3 1.039 IN RIVETS BEAM END CONNECTOR COLUMN MATERIAL THICKNESS = 0.075 IN LOAD BEAM DEPTH = 4 IN TOP OF BEAM TO TOP OF CONN= 0.000 IN WELD @ BTM OF BEAM = 0.000 IN LOAD = 2400 LBS PER PAIR CONNECTOR VERTICAL LOAD = 600 LBS EACH 3 RIVETS @ 2 " oc 0.4375 " DIA A502 -2 1st @ 1 "BELOW TOP OF CONNECTOR AREA = 0.150 IN2 EACH Fv = 22.0 KSI Vcap = 3.307 KIPS EACH RIVET BEARING Fb = 65.0 KSI BRG CAP= 2.133 KIPS EACH RIVET TOTAL RIVET VERTICAL CAPACITY = 6.398 KIPS 9% CONNECTOR 6 " LONG CONNECTOR ANGLE 1.625 " x WELDS 3 11 Fy = 50 KSI x 0.1875 " THICK S = 0.131 IN3 Mcap = 3.924 K -IN W/ 1/3 INCREASE = 5.232 K -IN RIVET MOMENT RESULTANT @ 1.25 IN FROM BTM OF CONN M = PL L = 0.75 IN Pmax = Mcap /L = 6.975 KIPS RIVET LOAD DIST MOMENT P1 2.844 3.750 10.664 RIVET OK P2 1.327 1.750 2.322 P3 0.000 0.000 0.000 P4 0.000 0.000 0.000 TOTAL 4.171 12.986 CONNECTOR OK 0.125 " x 4.000 " FILLET WELD UP OUTSIDE 0.125 " x 2.375 " FILLET WELD UP INSIDE 0.125 " x 1.625 " FILLET WELD UP STEP SIDE 0 " x 1.000 " FILLET WELD STEP BOTTOM 0 " x 2.750 " FILLET WELD ACROSS BOTTOM 0 " x 1.750 " FILLET WELD ACROSS TOP USE EFFECTIVE 0.075 " THICK WELD L = 8.00 IN A = 0.600 IN2 S = 0.400 IN3 Fv = 26.0 KSI Mcap = 10.40 K -IN W /1/3 INCR= 13.87 K -IN In Upright Plane Seismic Load Distribution per 2009 IBC Weight I = Sds = 0.927 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 2460 354 535 77 120 2460 295 446 54 86 2460 212 320 27 KLx = 6 in 6 1060 6 10 0 KLy = 41 in 0 0 0 0 0 A = 0.595 in 0 0 0 0 0 Pcap = 21334 lbs - - -- - - -- - - -- ==== 8440 - - -- - - -- - - -- 8440 867 1310 158 Column 43% Stress Max column load = 8611 # Min column load = -2111 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL - REQUIRED HOLD DOWN = - 3040 # MIN 9155 # MAX - 3040 # Anchors: 1 T = 3040 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 99% Stressed V = Braces: 655 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 36 " 55 " 1985 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 112 Pcap = 5111 # 39% OK 12% Stressed 102% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 2460 354 590 85 120 60 7 12 1 86 60 5 9 1 KLx = 6 in 6 60 0 1 0 KLy = 41 in 0 0 0 0 0 A= 0.595 in 0 0 0 0 0 Pcap = 21334 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 2640 367 612 87 Column 18% Stress Max column load = 3742 # Min column load = -1273 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -1642 # MIN 3754 # MAX -1642 # Anchors: 1 T = 1642 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 54% Stressed V = Braces: 306 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 36 " 55 " 927 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 112 Pcap = 5111 # 18% OK 6% Stressed 36% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:08:54 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane Type Plane Frame Number of Joints 18 Number of Supports 10 Number of Members 20 Number of Loadings 1 Joint Coordinates 1 0.0 6.0 S 2 0.0 86.0 S 3 0.0 120.0 S 4 0.0 144.0 S 5 55.5 0.0 S 6 55.5 6.0 7 55.5 86.0 8 55.5 120.0 9 55.5 144.0 10 166.5 0.0 S 11 166.5 6.0 12 166.5 86.0 13 166.5 120.0 14 166.5 144.0 15 222.0 6.0 S 16 222.0 86.0 S 17 222.0 120.0 S 18 222.0 144.0 S Joint Releases 5 Moment Z 10 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 15 Force X Moment Z 16 Force X Moment Z 17 Force X Moment Z 18 Force X Moment Z Member Incidences 1 1 6 2 2 7 3 3 8 4 4 9 5 5 6 6 6 7 7 7 8 8 8 9 9 10 11 10 11 12 11 12 13 4 Levels 4 9 3 8 2 7 1 6 5 14 13 12 11 10 18 17 16 15 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:08:54 12 13 14 13 6 11 14 11 15 15 7 12 16 12 16 17 8 13 18 13 17 19 9 14 20 14 18 Member Properties 1 Thru 4 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 5 Thru 12 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 13 Thru 20 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 ' Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 6 Force Y -0.530 7 Force Y -1.230 8 Force Y -1.230 9 Force Y -1.230 11 Force Y -0.530 12 Force Y -1.230 13 Force Y -1.230 ' 14 Force Y -1.230 6 Force X 0.002 7 Force X 0.065 8 Force X 0.091 9 Force X 0.108 11 Force X 0.002 12 Force X 0.065 13 Force X 0.091 14 Force X 0.108 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.0132 0 4 0.1 2460 0.5682 794 130 73.9 2460 0.6428 1016 182 117.0 2460 0.6621 1078 216 143.0 0 0.0000 0 0 0.0 0 0.0000 0 0 0.0 8440 2889 g = 32.2 ft /sec2 I = 1.00 Sdl = 0.480 R = 6 532 333.9 T = 0.9402 sec Cs = 0.0851 or Cs min = 0.092666 or 1.5% Cs = 0.0927 V = (Cs *I) *W *.67 V = 0.0927 W *.67 532 # 2 4 65 130 91 182 108 216 0 0 0 0 0.1544 532 100% PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:08:54 Structure Storage Rack in Load Beam Plane 4 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE 1 1 0.000 -0.108 1 6 0.000 0.108 2 2 0.000 -0.103 2 7 0.000 0.103 3 3 0.000 -0.028 3 8 0.000 0.028 4 4 0.000 -0.001 4 9 0.000 0.001 5 5 4.171 0.265 5 6 -4.171 -0.265 6 6 3.643 0.261 6 7 -3.643 -0.261 7 7 2.425 0.174 7 8 -2.425 -0.174 8 8 1.214 0.053 8 9 -1.214 -0.053 9 10 4.171 0.267 9 11 -4.171 -0.267 10 11 3.643 0.267 10 12 -3.643 -0.267 11 12 2.425 0.224 11 13 -2.425 -0.224 12 13 1.214 0.163 12 14 -1.214 -0.163 13 6 -0.002 -0.110 13 11 0.002 0.110 14 11 0.000 -0.111 14 15 0.000 0.111 15 7 -0.022 -0.115 15 12 0.022 0.115 16 12 0.000 -0.128 16 16 0.000 0.128 17 8 -0.030 -0.046 17 13 0.030 0.046 18 13 0.000 -0.065 18 17 0.000 0.065 19 9 0.055 -0.018 19 14 -0.055 0.018 20 14 0.000 -0.034 20 18 0.000 0.034 MOMENT 0.00 - 6.02 0.00 - 5.71 0.00 - 1.53 0.00 - 0.07 0.00 1.59 10.52 10.38 1.84 4.09 0.09 1.20 0.00 1.60 10.67 10.67 2.72 4.88 1.21 2.69 - 6.10 -6.10 - 6.18 0.00 - 6.50 - 6.30 x.00 - 2.64 - 2.49 -3.60 0.00 - 1.12 - 0.82 -1.87 0.00 /444-01 1 A)Ah fril c &vr PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:08:54 JOINT 6 7 8 9 `11 12 13 "14 APPLIED JOINT LOADS, FREE JOINTS FORCE X FORCE Y 0.002 -0.530 0.065 -1.230 0.091 -1.230 0.108 -1.230 0.002 -0.530 0.065 -1.230 0.091 -1.230 0.108 -1.230 MOMENT Z 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y i 1 0.000 -0.108 2 0.000 -0.103 3 0.000 -0.028 4 0.000 -0.001 5 -0.265 4.171 -0.267 4.171 0.000 0.111 0.000 0.128 0.000 0.065 0.000 0.034 10 15 16 17 18 MOMENT Z 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT ! 6 0.0132 7 0.5682 8 0.6428 9 0.6621 11 0.0132 12 0.5683 13 0.6430 14 0.6619 Y- DISPLACEMENT - 0.0015 - 0.0183 - 0.0231 - 0.0248 - 0.0015 - 0.0183 - 0.0231 - 0.0248 SUPPORT JOINT DISPLACEMENTS ROTATION - 0.0020 - 0.0022 - 0.0009 - 0.0005 - 0.0020 - 0.0020 - 0.0008 - 0.0002 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:08:54 JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.0132 0.0000 0.0010 2 0.5682 0.0000 0.0006 3 0.6428 0.0000 - 0.0002 4 0.6621 0.0000 - 0.0004 5 0.0000 0.0000 - 0.0022 10 0.0000 0.0000 - 0.0022 15 0.0132 0.0000 0.0010 16 0.5683 0.0000 0.0015 17 0.6430 0.0000 0.0010 18 0.6619 0.0000 0.0008 Point Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = Ry = ky = 55 ksi 1.117 in 1.00 P M Lx Ly Pcap Mcap Ratio 11 4.2 1.6 6.0 41.0 21.33 29.73 25% 12 3.0 10.7 80.0 41.0 18.74 29.73 52% 13 1.8 4.9 34.0 41.0 21.33 29.73 25% 14 0.6 2.7 24.0 41.0 21.33 29.73 12% 0 0.0 0.0 6.0 41.0 21.33 29.73 0% 0 0.0 0.0 6.0 41.0 21.33 29.73 0% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 108 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 1.934 in4 'Pallet Load 2400 lbs Assume 0.5 pallet load on each beam M = PL /8= 16.20 k -in fb = 17.84 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.34 in = L/ 313 54% w/ 25% added to one pallet load M = .232 PL = 15.03 k -in 50% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 6.9 kips 1500 psf basic 25.7 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1"2/3 Use 5 "square base plate w = Load factor = Shear 10.4 psi 1.67 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'cA.5) _ Beam fv = Punching fv = Base Plate Bending 1 = fb = 21 psi Fv = 35 psi Fv = 7.34 in 312 # -in 3000 psi 52 psi 178 psi 93 psi 186 psi Use 0.375 " thick 1.5 in w = 275 psi 13155 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TUKWILLA, WA 06/13/2011 Loading: 1000 # load levels 6 pallet levels @ 6,36,66,96,126,144 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 106 " Load Beams Uprights: 44 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 5.00x 8.00x 0.375 Base Plates with 2- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 2 0 In Upright Plane Seismic Load Distribution per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 300 43 126 1060 134 262 33 96 1060 102 200 19 KLx = 6 in 66 1060 70 137 9 KLy = 41 in 36 1060 38 75 3 A = 0.595 in 6 1060 6 12 0 Pcap = 21334 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 6360 502 987 107 Column 28% Stress Max column load = 5618 # Min column load = -720 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = - 1404 # MIN 6026 # MAX - 1404 # Anchors: 1 T = 1404 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 46% Stressed V = Braces: 494 # per leg Vcap = 5322 # = COMBINED = Brace height = 41 " Brace width = 44 " Length = 60 " P = 1349 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 124 Pcap = 4207 # 32% 2 1 OK 9% Stressed 29% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Weight I = Sds = 0.927 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 279 40 126 60 8 14 2 96 60 6 11 1 KLx = 6 in 66 60 4 7 0 KLy = 41 in 36 60 2 4 0 A = 0.595 in 6 60 0 1 0 Pcap = 21334 lbs - - -- =Z.= - - -- - - -- ---- - - -- - - -- - - -- 1360 172 315 44 Column 8% Stress Max column load = 1669 # Min column load = -398 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = - 600 # MIN 1688 # MAX - 600 # Anchors: 1 T = 600 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 20% Stressed V = Braces: 158 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 44 " 60 " 431 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 124 Pcap = 4207 # OK 10% 2Z 3% Stressed 7% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane Type Plane Frame Number of Joints 26 Number of Supports 14 Number of Members 30 Number of Loadings 1 Joint Coordinates 1 0.0 6.0 S 6 1 2 0.0 36.0 S 3 0.0 66.0 S 5 1 4 0.0 96.0 S 5 0.0 126.0 S 4 11 6 0.0 144.0 S 3 10 7 54.5 0.0 S 8 54.5 6.0 2 9 9 54.5 36.0 1 8 10 54.5 66.0 11 54.5 96.0 7 12 54.5 126.0 13 54.5 144.0 14 163.5 0.0 S 15 163.5 6.0 16 163.5 36.0 17 163.5 66.0 18 163.5 96.0 19 163.5 126.0 20 163.5 144.0 21 218.0 6.0 S 22 218.0 36.0 S 23 218.0 66.0 S 24 218.0 96.0 S 25 218.0 126.0 S 26 218.0 144.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 6 Levels 3 20 2 19 18 17 16 15 14 26 25 24 23 22 21 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 Constants E 29000. All G 12000. All Tabulate All • Loading Dead + Live + Seismic Joint Loads 8 Force Y -0.53 9 Force Y -0.53 10 Force Y -0.53 11 Force Y -0.53 12 Force Y -0.53 13 Force Y -0.53 15 Force Y -0.53 16 Force Y -0.53 17 Force Y -0.53 18 Force Y -0.53 19 Force Y -0.53 20 Force Y -0.53 2 Li PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 8 Force X 0.005 9 Force X 0.025 10 Force X 0.047 11 Force X 0.067 12 Force X 0.089 13 Force X 0.102 15 Force X 0.005 16 Force X 0.025 17 Force X 0.047 18 Force X 0.067 19 Force X 0.089 20 Force X 0.102 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.0085 0 10 0.1 1060 0.0765 6 50 3.8 1060 0.1450 22 94 13.6 1060 0.2032 44 134 27.2 1060 0.2444 63 178 43.5 1060 0.2543 69 204 51.9 6360 204 670 140.1 g = 32.2 ft /sec2 T = 0.3858 sec I = 1.00 Cs = 0.2073 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.1544 V = (Cs *I) *W *.67 V = 0.1544 W *.67 = 668 # 5 10 25 50 47 94 67 134 89 177 102 203 0.1544 668 100% PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.065 0.00 1 8 0.000 0.065 -3.57 2 2 0.000 -0.079 0.00 2 9 0.000 0.079 -4.30 3 3 0.000 -0.069 0.00 3 10 0.000 0.069 -3.74 4 4 0.000 -0.050 0.00 4 11 0.000 0.050 -2.75 . 5 5 0.000 -0.022 0.00 5 12 0.000 0.022 -1.19 6 6 0.000 -0.004 0.00 6 13 0.000 0.004 -0.19 7 7 3.135 0.333 0.00 7 8 -3.135 -0.333 2.00 8 8 2.606 0.326 5.20 8 9 -2.606 -0.326 4.57 9 9 2.081 0.295 4.31 9 10 -2.081 -0.295 4.54 10 10 1.558 0.243 3.38 10 11 -1.558 -0.243 3.92 11 11 1.038 0.174 2.15 11 12 -1.038 -0.174 3.08 12 12 0.520 0.056 -0.01 12 13 -0.520 -0.056 1.03 13 14 3.135 0.337 0.00 13 15 -3.135 -0.337 2.02 14 15 2.606 0.334 5.29 14 16 -2.606 -0.334 4.74 15 16 2.081 0.315 4.59 15 17 -2.081 -0.315 4.87 16 17 1.558 0.273 3.80 16 18 -1.558 -0.273 4.38 ' 17 18 1.038 0.208 2.66 ' 17 19 -1.038 -0.208 3.57 18 19 0.520 0.148 0.69 18 20 -0.520 -0.148 1.97 19 8 -0.002 -0.067 -3.63 19 15 0.002 0.067 -3.63 20 9 -0.006 -0.083 -4.57 9 20 16 0.006 0.083 -4.53 21 10 -0.004 -0.076 -4.18 21 17 0.004 0.076 -4.11 1 (a PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 22 11 -0.002 -0.060 22 18 0.002 0.060 23 12 -0.029 -0.034 23 19 0.029 0.034 24 13 0.046 -0.014 24 20 -0.046 0.014 25 15 0.000 -0.068 25 21 0.000 0.068 26 16 0.000 -0.088 26 22 0.000 0.088 27 17 0.000 -0.084 27 23 0.000 0.084 28 18 0.000 -0.070 28 24 0.000 0.070 29 19 0.000 -0.045 29 25 0.000 0.045 30 20 0.000 -0.024 30 26 0.000 0.024 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.005 -0.530 0.00 9 0.025 -0.530 0.00 10 0.047 -0.530 0.00 11 0.067 -0.530 0.00 12 0.089 -0.530 0.00 13 0.102 -0.530 0.00 15 0.005 -0.530 0.00 16 0.025 -0.530 0.00 17 0.047 -0.530 0.00 18 0.067 -0.530 0.00 19 0.089 -0.530 0.00 20 0.102 -0.530 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.065 0.00 2 0.000 -0.079 0.00 3 0.000 -0.069 0.00 4 0.000 -0.050 0.00 5 0.000 -0.022 0.00 6 0.000 -0.004 0.00 7 -0.333 3.135 0.00 14 -0.337 3.135 0.00 21 0.000 0.068 0.00 22 0.000 0.088 0.00 23 0.000 0.084 0.00 24 0.000 0.070 0.00 25 0.000 0.045 0.00 - 3.32 -3.23 - 1.88 - 1.79 - 0.83 -0.66 -3.69 - 4.56 0.00 - 3.80 0.00 - 2.47 0.00 - 1.30 0.00 2 7 vb1 I I c - c4ertetovr PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/13/;1 - -- TIME OF DAY: 11:15:38 26 0.000 0.024 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT 8 0.0085 9 0.0765 0 0.1450 X1o11 0.2032 12 0.2444 13 0.2543 15 0.0085 16 0.0765 17 0.1450 18 0.2032 19 0.2445 0.2541 "?c) Y- DISPLACEMENT - 0.0011 - 0.0056 - 0.0092 - 0.0119 - 0.0138 - 0.0143 - 0.0011 - 0.0056 - 0.0092 - 0.0119 - 0.0138 - 0.0143 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT 1 0.0085 2 3 14 5 6 !7 14 21 22 23 24 25 26 0.0765 0.1450 0.2032 0.2444 0.2543 0.0000 0.0000 0.0085 0.0765 0.1450 0.2032 0.2445 0.2541 Y- DISPLACEMENT 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ROTATION - 0.0012 - 0.0015 - 0.0014 - 0.0011 - 0.0006 - 0.0003 - 0.0012 - 0.0015 - 0.0013 - 0.0010 - 0.0006 - 0.0002 ROTATION 0.0005 0.0006 0.0004 0.0002 - 0.0001 - 0.0002 - 0.0014 - 0.0014 0.0006 0.0009 0.0009 0.0008 0.0006 0.0005 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = 55 ksi Ry = ky = 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 15 3.2 2.0 6.0 41.0 21.33 29.73 22% 16 2.7 5.3 30.0 41.0 21.33 29.73 30% 17 2.2 4.9 30.0 41.0 21.33 29.73 27% 18 1.7 4.4 30.0 41.0 21.33 29.73 230 19 1.2 3.6 30.0 41.0 21.33 29.73 18% 20 0.7 2.0 18.0 41.0 21.33 29.73 10% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 106 inches Fy = E _ Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 1000 lbs Assume 0.5 pallet load on each beam M = PL /8= 6.63 k -in fb = 7.30 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.14 in = L/ 780 w/ 25% added to one pallet load M = .232 PL = 6.15 k -in 22% 21% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 4.5 kips 1500 psf basic 20.8 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1 "2/3 Use 5 "square base plate w = Load factor = Shear : 10.4 psi 1.67 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c ".5) = Beam fv = Punching fv = Base Plate Bending 14 psi Fir = 21 psi Fv = 4.91 in 140 # -in 3000 psi 23 psi 178 psi 93 psi 186 psi Use 0.375 " thick 1 = 1.5 in w = 181 psi fb = 8677 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TU KWI LLA, WA 06/16/2011 Loading: 2500 # load levels 6 pallet levels ® 6,56,84,108,156,186 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 108 " Load Beams Uprights: 44 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 8.00x 8.00x 0.375 Base Plates with 4- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution per 2009 IBC 3 Weight I = Sds = 0.927 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 44 " Levels Load WiHi Fi FiHi Column: ' (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2560 476 698 130 156 2560 399 586 91 108 2560 276 405 44 KLx = 6 in 84 2560 215 315 26 KLy = 43 in 56 2560 143 210 12 A = 0.595 in 6 1560 9 14 0 Pcap = 21190 lbs 14360 1520 2229 303 Column 71% Stress Max column load = 14076 # Min column load = -3016 # Uplift Overturning Anchors: (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = T = 4600 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete 4957 # 93% Stressed Tcap = - 4600 # MIN 15002 # MAX - 4600 # V = 1114 # per leg Vcap = 5322 # = COMBINED = Braces: Brace height = 43 " Brace width = 44 " Length = 62 " 'P = 3117 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 126 Pcap = 4020 # OK 78% 1 21% Stressed 96% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns Q 44 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2560 476 630 117 156 60 9 12 2 108 60 6 9 1 KLx = 6 in 84 60 5 7 1 KLy = 43 in 56 60 3 4 0 A = 0.595 in 6 60 0 0 0 Pcap = 21190 lbs 2860 501 663 121 Column 20% Stress Max column load = 4177 # Min column load = -1502 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1+0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -1907 # MIN 4195 # MAX -1907 # Anchors: 1 T = 1907 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 4957 # 38% Stressed V = Braces: 331 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 43 " 44 " 62 " 926 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 126 Pcap = 4020 # OK 23% 6% Stressed 21% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 6 Levels Type Plane Frame Number of Joints 26 Number of Supports 14 Number of Members 30 Number of Loadings 1 Joint Coordinates 1 0.0 6.0 S 2 0.0 56.0 S 3 0.0 84.0 S 4 0.0 108.0 S 5 0.0 156.0 S 6 0.0 186.0 S 7 55.5 0.0 S 8 55.5 6.0 9 55.5 56.0 10 55.5 84.0 11 55.5 108.0 12 55.5 156.0 13 55.5 186.0 14 166.5 0.0 S 15 166.5 6.0 16 166.5 56.0 17 166.5 84.0 18 166.5 108.0 19 166.5 156.0 20 166.5 186.0 21 222.0 6.0 S 22 222.0 56.0 S 23 222.0 84.0 S 24 222.0 108.0 S 25 222.0 156.0 S 26 222.0 186.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 6 5 4 3 2 1 13 20 12 19 11 18 10 17 9 16 8 7 15 1A 26 25 24 23 22 21 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 8 Force Y -0.78 9 Force Y -1.28 10 Force Y -1.28 11 Force Y -1.28 12 Force Y -1.28 13 Force Y -1.28 15 Force Y -0.78 16 Force Y -1.28 17 Force Y -1.28 18 Force Y -1.28 19 Force Y -1.28 20 Force Y -1.28 3 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 ` 8 Force X 0.003 9 Force X 0.045 10 Force X 0.067 11 Force X 0.086 12 Force X 0.124 13 Force X 0.149 15 Force X 0.003 16 Force X 0.045 17 Force X 0.067 18 Force X 0.086 19 Force X 0.124 20 Force X 0.149 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1560 0.0167 0 6 0.1 3 6 2560 0.3204 263 90 28.8 45 90 2560 0.4148 440 134 55.6 67 134 2560 0.4749 577 172 81.7 86 172 2560 0.6392 1046 248 158.5 124 248 2560 0.6802 1184 298 202.7 149 298 14360 3511 948 527.4 g = 32.2 ft /sec2 T = 0.8248 sec I = 1.00 Cs = 0.0970 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.0970 V = (Cs *I) *W *.67 V = 0.0970 W *.67 = 947 # 0.1544 947 100% PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.131 0.00 1 8 0.000 0.131 -7.27 2 2 0.000 -0.135 0.00 2 9 0.000 0.135 -7.47 3 3 0.000 -0.077 0.00 3 10 0.000 0.077 -4.29 4 4 0.000 -0.071 0.00 4 11 0.000 0.071 -3.92 5 5 0.000 -0.043 0.00 5 12 0.000 0.043 -2.37 6 6 0.000 0.000 0.00 6 13 0.000 0.000 -0.03 7 7 7.055 0.471 0.00 7 8 -7.055 - 0.471 2.83 8 8 6.278 0.464 11.84 8 9 -6.278 -0.464 11.38 9 9 5.013 0.388 4.49 9 10 -5.013 -0.388 6.39 10 10 3.756 0.300 3.57 10 11 -3.756 -0.300 3.64 11 11 2.502 0.250 5.77 11 12 -2.502 -0.250 6.25 12 12 1.253 0.074 0.39 12 13 -1.253 -0.074 1.84 13 14 7.055 0.477 0.00 13 15 -7.055 -0.477 2.86 14 15 6.278 0.478 12.06 14 16 -6.278 -0.478 11.82 15 16 5.013 0.464 5.53 15 17 -5.013 -0.464 7.44 16 17 3.756 0.418 4.87 16 18 -3.756 -0.418 5.16 17 18 2.502 0.296 6.83 17 19 -2.502 -0.296 7.36 18 19 1.253 0.224 2.41 18 20 -1.253 -0.224 4.30 19 8 -0.003 -0.133 -7.40 19 15 0.003 0.133 -7.40 20 9 -0.031 -0.150 -8.40 20 16 0.031 0.150 -8.21 21 10 - 0.021 -0.100 -5.66 21 17 0.021 0.100 -5.47 2.7 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 X22 11 0.036 -0.096 22 18 -0.036 0.096 '23 12 -0.052 -0.074 23 19 0.052 0.074 1 24 13 0.075 -0.028 :24 20 -0.075 0.028 25 15 0.000 -0.136 25 21 0.000 0.136 26 16 0.000 -0.165 26 22 0.000 0.165 '.00 27 17 0.000 -0.123 -6.84 27 23 0.000 0.123 0.00 128 18 0.000 -0.122 -6.78 '28 24 0.000 0.122 0.00 29 19 0.000 -0.105 -5.83 29 25 0.000 0.105 0.00 30 20 0.000 -0.055 -3.04 30 26 0.000 0.055 0.00 - 5.49 - 5.21 - 4.27 - 3.94 - 1.81 - 1.26 -7.53 0.00 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.003 -0.780 0.00 9 0.045 -1.280 0.00 10 0.067 -1.280 0.00 11 0.086 -1.280 0.00 12 0.124 -1.280 0.00 13 0.149 -1.280 0.00 15 0.003 -0.780 0.00 16 0.045 -1.280 0.00 17 0.067 -1.280 0.00 18 0.086 -1.280 0.00 19 0.124 -1.280 0.00 20 0.149 -1.280 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.131 0.00 2 0.000 -0.135 0.00 3 0.000 -0.077 0.00 4 0.000 -0.071 0.00 5 0.000 -0.043 0.00 °6 0.000 0.000 0.00 7 -0.471 7.055 0.00 14 -0.477 7.055 0.00 21 0.000 0.136 0.00 22 0.000 0.165 0.00 23 0.000 0.123 0.00 24 0.000 0.122 0.00 25 0.000 0.105 0.00 PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:51:13 26 0.000 0.055 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 8 0.0167 - 0.0025 - 0.0025 9 0.3204 - 0.0206 - 0.0029 10 0.4148 - 0.0288 - 0.0019 11 0.4749 - 0.0340 - 0.0019 12 0.6392 - 0.0410 - 0.0015 13 0.6802 - 0.0431 - 0.0008 15 0.0167 - 0.0025 - 0.0025 16 0.3205 - 0.0206 - 0.0027 17 0.4149 - 0.0288 - 0.0018 18 0.4747 - 0.0340 - 0.0016 19 0.6394 - 0.0410 - 0.0012 20 0.6799 - 0.0431 - 0.0002 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.0167 0.0000 0.0011 2 0.3204 0.0000 0.0008 3 0.4148 0.0000 0.0002 4 0.4749 0.0000 0.0000 5 0.6392 0.0000 - 0.0004 6 0.6802 0.0000 - 0.0008 7 0.0000 0.0000 - 0.0027 14 0.0000 0.0000 - 0.0027 21 0.0167 0.0000 0.0013 22 0.3205 0.0000 0.0019 23 0.4149 0.0000 0.0016 24 0.4747 0.0000 0.0017 25 0.6394 0.0000 0.0017 26 0.6799 0.0000 0.0013 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = 55 ksi Ry = ky = 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 15 7.2 2.9 6.0 43.0 21.19 29.73 44% 16 5.9 12.1 50.0 43.0 21.19 29.73 69% 17 4.7 7.4 28.0 43.0 21.19 29.73 47% 18 3.4 5.2 24.0 43.0 21.19 29.73 34% 19 2.2 7.4 48.0 43.0 21.19 29.73 35% 20 0.9 4.3 30.0 43.0 21.19 29.73 19% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 108 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 2500 lbs Assume 0.5 pallet load on each beam M = PL /8= 16.88 k -in fb = 18.58 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.36 in = L/ 301 56% w/ 25% added to one pallet load M = .232 PL = 15.66 k -in 52% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 11.3 kips 1500 psf basic 32.9 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1'2/3 Use 8 "square base plate w = Load factor = Shear : 10.4 psi 1.67 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c ".5) = Beam fv = Punching fv = Base Plate Bending 1 = fb = 27 psi Fv = 46 psi Fv = 9.43 in 516 # -in 3000 psi 86 psi 178 psi 93 psi 186 psi Use 0.375 " thick 2.5 in w = 176 psi 23441 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TUKWILLA, WA 06/16/2011 Loading: 1000 # load levels 6 pallet levels @ 6,48,78,98,118,144 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 106 " Load Beams Uprights: 36 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 5.00x 8.00x 0.375 Base Plates with 2- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns Q 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 289 42 118 1060 125 237 28 98 1060 104 197 19 KLx = 6 in 78 1060 83 157 12 KLy = 41 in 48 1060 51 96 5 A = 0.595 in 6 1060 6 12 0 Pcap = 21334 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 6360 522 987 106 Column 31% Stress Max column load = 6117 # Min column load = -1219 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = - 1902 # MIN 6524 # MAX - 1902 # Anchors: 1 T = 1902 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 62% Stressed V = Braces: 494 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 36 " 55 " 1496 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 112 Pcap = 5111 # 29% OK 9% Stressed 47% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY f per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 277 40 118 60 7 13 2 98 60 6 11 1 KLx = 6 in 78 60 5 8 1 KLy = 41 in 48 60 3 5 0 A = 0.595 in 6 60 0 1 0 Pcap = 21334 lbs - - -- - - -- - - -- ==== 1360 - - -- - - -- - - -- 1360 174 315 43 Column 9% Stress Max column load = 1885 # Min column load = -614 # Uplift Overturning Anchors: V = Braces: (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = T = 816 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete 3068 # 27% Stressed Tcap = - 816 # MIN 1904 # MAX - 816 # 158 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 36 " 55 " 478 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 112 Pcap = 5111 # OK 9% yd 1 3% Stressed 11% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 6 Levels Type Plane Frame Number of Joints 26 Number of Supports 14 Number of Members 30 Number of Loadings 1 Joint Coordinates 6 1 0.0 6.0 S 2 0.0 48.0 S 3 0.0 78.0 S 4 0.0 98.0 S 5 0.0 118.0 S 6 0.0 144.0 S 7 54.5 0.0 S 8 54.5 6.0 9 54.5 48.0 10 54.5 78.0 11 54.5 98.0 12 54.5 118.0 13 54.5 144.0 14 163.5 0.0 S 15 163.5 6.0 16 163.5 48.0 17 163.5 78.0 18 163.5 98.0 19 163.5 118.0 20 163.5 144.0 21 218.0 6.0 S 22 218.0 48.0 S 23 218.0 78.0 S 24 218.0 98.0 S 25 218.0 118.0 S 26 218.0 144.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 5 4 3 2 1 13 20 12 19 11 18 10 17 9 16 8 15 1.4 26 25 24 23 22 21 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 ' Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic ' Joint Loads 8 Force Y -0.53 9 Force Y -0.53 10 Force Y -0.53 11 Force Y -0.53 12 Force Y -0.53 13 Force Y -0.53 • 15 Force Y -0.53 16 Force Y -0.53 17 Force Y -0.53 18 Force Y -0.53 19 Force Y -0.53 20 Force Y -0.53 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 8 Force X 0.005 9 Force X 0.028 10 Force X 0.054 11 Force X 0.067 12 Force X 0.081 13 Force X 0.099 15 Force X 0.005 16 Force X 0.028 17 Force X 0.054 18 Force X 0.067 19 Force X 0.081 20 Force X 0.099 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.0103 0 10 0.1 1060 0.1508 24 56 8.4 1060 0.2195 51 108 23.7 1060 0.2453 64 134 32.9 1060 0.2629 73 162 42.6 1060 0.2786 82 198 55.2 6360 295 668 162.9 g = 32.2 ft /sec2 T = 0.4299 sec I = 1.00 Cs = 0.1861 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.1544 V = (Cs *I) *W *.67 V = 0.1544 W *.67 668 # 5 10 28 56 54 108 67 134 81 162 99 198 0.1544 L(1 668 100% PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.082 0.00 1 8 0.000 0.082 -4.49 2 2 0.000 -0.092 0.00 2 9 0.000 0.092 -5.01 3 3 0.000 -0.055 0.00 3 10 0.000 0.055 -2.99 4 4 0.000 -0.031 0.00 4 11 0.000 0.031 -1.66 5 5 0.000 -0.017 0.00 5 12 0.000 0.017 -0.90 6 6 0.000 -0.004 0.00 6 13 0.000 0.004 -0.24 7 7 3.131 0.332 0.00 7 8 -3.131 -0.332 1.99 8 8 2.602 0.326 7.04 8 9 -2.602 -0.326 6.64 9 9 2.078 0.288 3.74 9 10 -2.078 -0.288 4.91 10 10 1.557 0.220 1.61 10 11 -1.557 -0.220 2.79 11 11 1.038 0.151 1.18 11 12 -1.038 -0.151 1.84 12 12 0.520 0.069 0.67 12 13 -0.520 -0.069 1.13 13 14 3.131 0.336 0.00 13 15 -3.131 -0.336 2.02 14 15 2.602 0.332 7.13 14 16 -2.602 -0.332 6.82 15 16 2.078 0.314 4.12 15 17 -2.078 -0.314 5.30 16 17 1.557 0.274 2.15 16 18 -1.557 -0.274 3.33 17 18 1.038 0.209 1.75 17 19 -1.038 -0.209 2.42 18 19 0.520 0.129 1.33 18 20 -0.520 -0.129 2.02 19 8 -0.001 -0.083 -4.55 19 15 0.001 0.083 -4.55 20 9 -0.009 -0.098 -5.36 20 16 0.009 0.098 -5.29 21 10 -0.014 -0.064 -3.53 21 17 0.014 0.064 -3.45 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 22 11 -0.002 -0.042 -2.30 22 18 0.002 0.042 -2.22 23 12 -0.001 -0.029 -1.61 23 19 0.001 0.029 -1.52 24 13 0.030 -0.014 -0.88 24 20 -0.030 0.014 -0.69 25 15 0.000 -0.084 -4.60 25 21 0.000 0.084 0.00 26 16 0.000 -0.104 -.64 26 22 0.000 0.104 0.00 27 17 0.000 -0.073 -3.99 27 23 0.000 0.073 0.00 28 18 0.000 -0.053 -2.86 28 24 0.000 0.053 0.00 29 19 0.000 -0.041 -2.23 29 25 0.000 0.041 0.00 30 20 0.000 -0.024 -1.33 30 26 0.000 0.024 0.00 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.005 -0.530 0.00 9 0.028 -0.530 0.00 10 0.054 -0.530 0.00 11 0.067 -0.530 0.00 12 0.081 -0.530 0.00 13 0.099 -0.530 0.00 15 0.005 -0.530 0.00 16 0.028 -0.530 0.00 17 0.054 -0.530 0.00 18 0.067 -0.530 0.00 19 0.081 -0.530 0.00 20 0.099 -0.530 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.082 0.00 2 0.000 -0.092 0.00 3 0.000 -0.055 0.00 4 0.000 -0.031 0.00 5 0.000 -0.017 0.00 6 0.000 -0.004 0.00 7 -0.332 3.131 0.00 14 -0.336 3.131 0.00 21 0.000 0.084 0.00 22 0.000 0.104 0.00 23 0.000 0.073 0.00 24 0.000 0.053 0.00 25 0.000 0.041 0.00 P IC''-.-c T- PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:06:37 26 0.000 0.024 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 8 0.0103 - 0.0011 - 0.0015 9 0.1508 - 0.0074 - 0.0018 10 0.2195 - 0.0110 - 0.0012 11 0.2453 - 0.0128 - 0.0008 12 0.2629 - 0.0140 - 0.0006 13 0.2786 - 0.0148 - 0.0004 15 0.0103 - 0.0011 - 0.0015 16 0.1509 - 0.0074 - 0.0017 17 0.2196 - 0.0110 - 0.0011 18 0.2453 - 0.0128 - 0.0007 19 0.2629 - 0.0140 - 0.0005 20 0.2785 - 0.0148 - 0.0002 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.0103 0.0000 0.0007 2 0.1508 0.0000 0.0007 3 0.2195 0.0000 0.0003 4 0.2453 0.0000 0.0000 5 0.2629 0.0000 - 0.0001 6 0.2786 0.0000 - 0.0002 7 0.0000 0.0000 - 0.0017 14 0.0000 0.0000 - 0.0017 21 0.0103 0.0000 0.0008 22 0.1509 0.0000 0.0010 23 0.2196 0.0000 0.0008 24 0.2453 0.0000 0.0007 25 0.2629 0.0000 0.0006 26 0.2785 0.0000 0.0005 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = 55 ksi Ry = ky = 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 15 3.2 2.0 6.0 41.0 21.33 29.73 22% 16 2.7 7.1 42.0 41.0 21.33 29.73 36% 17 2.2 5.3 30.0 41.0 21.33 29.73 28% 18 1.7 3.3 20.0 41.0 21.33 29.73 19% 19 1.2 2.4 20.0 41.0 21.33 29.73 14% 20 0.7 2.0 26.0 41.0 21.33 29.73 10% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 106 inches Fy = E _ Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 1000 lbs Assume 0.5 pallet load on each beam M = PL /8= 6.63 k -in fb = 7.30 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.14 in = L/ 780 w/ 25% added to one pallet load M = .232 PL = 6.15 k -in 22% 21% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 4.9 kips 1500 psf basic 21.7 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w12/3 Use 5 "square base plate w = Load factor = Shear : 10.4 psi 1.67 1 M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi) (f'c'.5) = Beam fv = Punching fv = Base Plate Bending 15 psi Fv = 23 psi Fv = 5.34 in 165 # -in 3000 psi 28 psi 178 psi 93 psi 186 psi Use 0.375 " thick 1 = 1.5 in w = 196 psi fb = 9395 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TU KW I LLA, WA 06/16/2011 Loading: 2000 # load levels 6 pallet levels @ 6,61,81,108,144,186 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 106 " Load Beams Uprights: 36 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 8.00x 8.00x 0.375 Base Plates with 4- 0.500in x 3.25in Embed Anchor /Column 6.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 36 " ,Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2060 383 562 105 144 2060 297 435 63 108 2060 222 327 35 KLx = 6 in 81 2060 167 245 20 KLy = 43 in 61 2060 126 184 11 A = 0.595 in 6 1060 6 9 0 Pcap = 21190 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 11360 1201 1763 234 Column 61% Stress Max column load = 12173 # Min column load = -3424 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -4670 # MIN 12905 # MAX -4670 # Anchors: 1 T = 4670 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 4957 # 94% Stressed V = Braces: 882 # per leg Vcap = 5322 # = COMBINED = Brace height = 43 " Brace width = 36 " Length = 56 " P = 2747 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 115 Pcap = 4838 # 57% OK 5i/ 17% Stressed 96% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Weight I = Sds = 0.927 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2060 383 515 96 144 60 9 12 2 108 60 6 9 1 KLx = 6 in 81 60 5 7 1 KLy = 43 in 61 60 4 5 0 A = 0.595 in 6 60 0 0 0 Pcap = 21190 lbs 2360 407 547 99 Column 19% Stress Max column load = 3934 # Min column load = -1727 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -2064 # MIN 3952 # MAX -2064 # Anchors: 1 T = 2064 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 4957 # 42% Stressed V = Braces: 273 # per leg Vcap = 5322 # COMBINED= Brace height = Brace width = Length = P = Use : 43 " 36 " 56 " 852 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 115 Pcap = 4838 # 18% OK s5 5% Stressed 24% Stressed PAGE 1 MS�U STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 6 Levels Type Plane Frame Number of Joints 26 Number of Supports 14 ' Number of Members 30 Number of Loadings 1 Joint Coordinates 1 0.0 6.0 S 6 2 0.0 61.0 S 5 3 0.0 81.0 S 4 0.0 108.0 S 4 5 0.0 144.0 S 3 6 0.0 186.0 S 7 54.5 0.0 S 2 8 54.5 6.0 9 54.5 61.0 1 10 54.5 81.0 11 54.5 108.0 12 54.5 144.0 13 54.5 186.0 14 163.5 0.0 S 15 163.5 6.0 16 163.5 61.0 17 163.5 81.0 18 163.5 108.0 19 163.5 144.0 20 163.5 186.0 21 218.0 6.0 S 22 218.0 61.0 S 23 218.0 81.0 S 24 218.0 108.0 S 25 218.0 144.0 S 26 218.0 186.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 13 20 12 19 11 18 10 17 9 16 8 15 14 56 26 25 24 23 22 21 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 1.263 Ay 0.884 Iz 5.410 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 1.263 Ay 0.884 Iz 5.410 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 8 Force Y -0.53 9 Force Y -1.03 10 Force Y -1.03 11 Force Y -1.03 12 Force Y -1.03 13 Force Y -1.03 15 Force Y -0.53 16 Force Y -1.03 17 Force Y -1.03 18 Force Y -1.03 19 Force Y -1.03 20 Force Y -1.03 7 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 8 Force X 0.006 9 Force X 0.051 10 Force X 0.068 11 Force X 0.091 12 Force X 0.121 13 Force X 0.155 15 Force X 0.006 16 Force X 0.051 17 Force X 0.068 18 Force X 0.091 19 Force X 0.121 20 Force X 0.155 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.0078 0 12 0.1 6 12 2060 0.2983 183 102 30.4 51 102 2060 0.3266 220 136 44.4 68 136 2060 0.3655 275 182 66.5 91 182 2060 0.4237 370 242 102.5 121 242 2060 0.4725 460 310 146.5 155 310 11360 1508 984 390.5 g = 32.2 ft /sec2 T = 0.6282 sec I = 1.00 Cs = 0.1274 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.1274 V = (Cs *I) *W *.67 V = 0.1274 W *.67 = 984 # 0.1544 984 100% PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.146 0.00 1 8 0.000 0.146 -7.93 2 2 0.000 -0.127 0.00 2 9 0.000 0.127 -6.93 3 3 0.000 -0.050 0.00 3 10 0.000 0.050 -2.70 4 4 0.000 -0.044 0.00 4 11 0.000 0.044 -2.38 5 5 0.000 -0.023 0.00 5 12 0.000 0.023 -1.26 6 6 0.000 0.009 0.00 6 13 0.000 -0.009 0.52 7 7 5.466 0.482 0.00 7 8 -5.466 -0.482 2.89 8 8 4.940 0.478 13.23 8 9 -4.940 -0.478 13.04 9 9 3.940 0.342 2.82 9 10 -3.940 -0.342 4.03 10 10 2.951 0.295 4.04 10 11 -2.951 -0.295 3.93 11 11 1.968 0.221 3.93 11 12 -1.968 -0.221 4.03 12 12 0.989 0.100 1.98 12 13 -0.989 -0.100 2.21 13 14 5.466 0.502 0.00 13 15 -5.466 -0.502 3.01 14 15 4.940 0.494 13.55 14 16 -4.940 -0.494 13.64 15 16 3.940 0.528 4.65 15 17 -3.940 -0.528 5.90 16 17 2.951 0.439 5.86 16 18 -2.951 -0.439 5.98 17 18 1.968 0.331 5.84 17 19 -1.968 -0.331 6.08 18 19 0.989 0.210 4.15 18 20 -0.989 -0.210 4.68 19 8 0.001 -0.150 -8.19 19 15 -0.001 0.150 -8.15 20 9 -0.084 -0.157 -8.93 20 16 0.084 0.157 -8.15 21 10 0.021 -0.091 -5.37 21 17 -0.021 0.091 -4.55 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 22 11 0.017 -0.090 22 18 -0.017 0.090 23 12 0.000 -0.074 23 19 0.000 0.074 24 13 0.055 -0.032 24 20 -0.055 0.032 25 15 0.000 -0.154 25 21 0.000 0.154 26 16 0.000 -0.186 26 22 0.000 0.186 27 17 0.000 -0.132 27 23 0.000 0.132 28 18 0.000 -0.137 28 24 0.000 0.137 29 19 0.000 -0.126 29 25 0.000 0.126 30 20 0.000 -0.073 30 26 0.000 0.073 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.006 -0.530 0.00 9 0.051 -1.030 0.00 10 0.068 -1.030 0.00 11 0.091 -1.030 0.00 12 0.121 -1.030 0.00 13 0.155 -1.030 0.00 15 0.006 -0.530 0.00 16 0.051 -1.030 0.00 17 0.068 -1.030 0.00 18 0.091 -1.030 0.00 19 0.121 -1.030 0.00 20 0.155 -1.030 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.146 0.00 2 0.000 -0.127 0.00 3 0.000 -0.050 0.00 4 0.000 -0.044 0.00 5 0.000 -0.023 0.00 6 0.000 0.009 0.00 7 -0.482 5.466 0.00 14 -0.502 5.466 0.00 21 0.000 0.154 0.00 22 0.000 0.186 0.00 23 0.000 0.132 0.00 24 0.000 0.137 0.00 25 0.000 0.126 0.00 - 5.48 - 4.36 - 4.74 - 3.37 - 2.73 - 0.72 - 8.41 0.00 A' -10.10 -" , Ai 0.0-0 2 ,L, , ts` - 7.2 �" 0.00 - 7.46 0.00 - 6.85 0.00 -3.96 0.00 PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:59:37 26 0.000 0.073 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 8 0.0078 - 0.0019 - 0.0010 9 0.2983 - 0.0176 - 0.0011 10 0.3266 - 0.0222 - 0.0007 11 0.3655 - 0.0268 - 0.0008 12 0.4237 - 0.0309 - 0.0007 13 0.4725 - 0.0333 - 0.0006 15 0.0078 - 0.0019 - 0.0010 16 0.2985 - 0.0176 - 0.0009 17 0.3265 - 0.0222 - 0.0004 18 0.3655 - 0.0268 - 0.0004 19 0.4237 - 0.0309 - 0.0002 20 0.4723 - 0.0333 0.0001 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.0078 0.0000 0.0004 2 0.2983 0.0000 0.0001 3 0.3266 0.0000 - 0.0003 4 0.3655 0.0000 - 0.0004 5 0.4237 0.0000 - 0.0005 6 0.4725 0.0000 - 0.0006 7 0.0000 0.0000 - 0.0013 14 0.0000 0.0000 - 0.0013 21 0.0078 0.0000 0.0005 22 0.2985 0.0000 0.0009 23 0.3265 0.0000 0.0008 24 0.3655 0.0000 0.0009 25 0.4237 0.0000 0.0010 26 0.4723 0.0000 0.0008 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = Ry = ky = 55 ksi 1.117 in 1.00 t Point P M Lx Ly Pcap Mcap Ratio 15 5.7 3.0 6.0 43.0 21.19 29.73 37% 16 4.7 13.6 55.0 43.0 20.87 29.73 68% 17 3.7 5.9 20.0 43.0 21.19 29.73 37% 18 2.7 6.0 27.0 43.0 21.19 29.73 33% 19 1.7 6.1 36.0 43.0 21.19 29.73 28% 20 0.7 4.7 42.0 43.0 21.19 29.73 19% Load Beam Check 6.00x 2.750x 0.075 A = 1.263 in2 Sx = 1.742 in3 Length = 106 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 5.410 in4 Pallet Load 2000 lbs Assume 0.5 pallet load on each beam M = PL /8= 13.25 k -in fb = 7.61 ksi Fb = 33 ksi Mcap = 57.48 k -in 76.64 k -in with 1/3 increase Defl = 0.10 in = L/ 1091 23% w/ 25% added to one pallet load M = .232 PL = 12.30 k -in 21% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 9.7 kips 1500 psf basic 30.5 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1'2/3 Use 8 "square base plate w = Load factor = Shear : 10.4 psi 1.67 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c ".5) = Beam fv = Punching fv = Base Plate Bending 1 = fb = 24 psi Fv = 38 psi Fv = 8.24 in 394 # -in 3000 psi 66 psi 178 psi 93 psi 186 psi Use 0.375 " thick 2.5 in w = 151 psi 20122 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TUKWILLA, WA 06/16/2011 Loading: 2000 # load levels 6 pallet levels @ 28,56,84,108,140,186 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 120 " Load Beams Uprights: 36 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 8.00x 8.00x 0.375 Base Plates with 4- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2060 383 557 104 140 2060 288 420 59 108 2060 222 324 35 KLx = 28 in 84 2060 173 252 21 KLy = 43 in 56 2060 115 168 9 A = 0.595 in 28 1060 30 43 1 Pcap = 21190 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 11360 1212 1763 229 Column 60% Stress Max column load = 12044 # Min column load = -3295 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -4542 # MIN 12776 # MAX -4542 # Anchors: 1 T = 4542 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 4957 # 92% Stressed V = 882 # per leg Vcap = 5322 # = COMBINED = Braces: Brace height = 43 " Brace width = 36 " Length = 56 " P = 2747 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 115 Pcap = 4838 # OK 57% 17% Stressed 91% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 36 " Levels Load WiHi Fi FiHi Column: '(inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 186 2060 383 513 95 140 60 8 11 2 108 60 6 9 1 KLx = 28 in 84 60 5 7 1 KLy = 43 in 56 60 3 5 0 A = 0.595 in 28 60 2 2 0 Pcap = 21190 lbs 2360 408 547 99 Column 19% Stress Max column load = 3926 # Min column load = -1719 # Uplift Overturning 'Anchors: V = Braces: (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = T = 2057 # 4 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete 4957 # 41% Stressed Tcap = - 2057 # MIN 3945 # MAX - 2057 # 273 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 43 " 36 " 56 " 852 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 115 Pcap = 4838 # OK 18% (06 1 5% Stressed 24% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 6 Levels Type Plane Frame Number of Joints 26 Number of Supports 14 Number of Members 30 Number of Loadings 1 Joint Coordinates 1 0.0 28.0 S 2 0.0 56.0 S 3 0.0 84.0 S 4 0.0 108.0 S 5 0.0 140.0 S 6 0.0 186.0 S 7 61.5 0.0 S 8 61.5 28.0 9 61.5 56.0 10 61.5 84.0 11 61.5 108.0 12 61.5 140.0 13 61.5 186.0 14 184.5 0.0 S 15 184.5 28.0 16 184.5 56.0 17 184.5 84.0 18 184.5 108.0 19 184.5 140.0 20 184.5 186.0 21 246.0 28.0 S 22 246.0 56.0 S 23 246.0 84.0 S 24 246.0 108.0 S 25 246.0 140.0 S 26 246.0 186.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 6 5 4 3 2 13 20 12 19 11 18 10 17 9 16 8 7 15 1A 26 25 24 23 22 21 PAGE 2 MSV STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 + 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 8 Force Y -0.53 9 Force Y -1.03 10 Force Y -1.03 11 Force Y -1.03 12 Force Y -1.03 • 13 Force Y -1.03 15 Force Y -0.53 16 Force Y -1.03 17 Force Y -1.03 18 Force Y -1.03 19 Force Y -1.03 20 Force Y -1.03 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 8 Force X 0.011 9 Force X 0.040 10 Force X 0.060 11 Force X 0.078 12 Force X 0.100 13 Force X 0.133 15 Force X 0.011 16 Force X 0.040 17 Force X 0.060 18 Force X 0.078 19 Force X 0.100 20 Force X 0.133 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.1936 40 22 4.3 11 22 2060 0.2946 179 80 23.6 40 80 2060 0.3734 287 120 44.8 60 120 2060 0.4245 371 156 66.2 78 156 2060 0.4899 494 200 98.0 100 200 2060 0.5707 671 266 151.8 133 266 11360 2042 844 388.6 g = 32.2 ft /sec2 T = 0.7327 sec I = 1.00 Cs = 0.1092 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.1092 V = (Cs *I) *W *.67 V = 0.1092 W *.67 = 843 # 0.1544 843 100% PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.130 0.00 1 8 0.000 0.130 -7.97 2 2 0.000 -0.083 0.00 2 9 0.000 0.083 -5.11 3 3 0.000 -0.060 0.00 3 10 0.000 0.060 -3.66 4 4 0.000 -0.045 0.00 4 11 0.000 0.045 -2.79 5 5 0.000 -0.035 0.00 5 12 0.000 0.035 -2.17 6 6 0.000 -0.013 0.00 6 13 0.000 0.013 -0.81 7 7 5.601 0.419 0.00 7 8 -5.601 -0.419 11.72 8 8 5.076 0.395 4.56 8 9 -5.076 -0.395 6.49 9 9 4.056 0.347 4.40 9 10 -4.056 -0.347 5.30 10 10 3.040 0.272 2.96 10 11 -3.040 -0.272 3.57 11 11 2.027 0.203 3.10 11 12 -2.027 -0.203 3.40 12 12 1.015 0.106 2.16 12 13 -1.015 -0.106 2.74 13 14 5.601 0.425 0.00 13 15 -5.601 -0.425 11.91 14 15 5.076 0.427 4.97 14 16 -5.076 -0.427 6.99 15 16 4.056 0.395 5.05 15 17 -4.056 -0.395 6.02 16 17 3.040 0.350 3.85 16 18 -3.040 -0.350 4.54 17 18 2.027 0.263 4.01 17 19 -2.027 -0.263 4.40 18 19 1.015 0.160 3.22 18 20 -1.015 -0.160 4.12 19 8 -0.013 -0.135 -8.32 19 15 0.013 0.135 -8.26 20 9 -0.008 -0.093 -5.78 20 16 0.008 0.093 -5.69 21 10 -0.014 -0.074 -4.59 21 17 0.014 0.074 -4.47 -10 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 22 11 0.009 -0.062 22 18 -0.009 0.062 23 12 0.003 -0.054 23 19 -0.003 0.054 24 13 0.027 -0.028 24 20 -0.027 0.028 25 15 0.000 -0.140 25 21 0.000 0.140 26 16 0.000 -0.103 26 22 0.000 0.103 27 17 0.000 -0.088 27 23 0.000 0.088 28 18 0.000 -0.078 28 24 0.000 0.078 29 19 0.000 -0.072 29 25 0.000 0.072 30 20 0.000 -0.043 30 26 0.000 0.043 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.011 -0.530 0.00 9 0.040 -1.030 0.00 10 0.060 -1.030 0.00 11 0.078 -1.030 0.00 12 0.100 -1.030 0.00 13 0.133 -1.030 0.00 15 0.011 -0.530 0.00 16 0.040 -1.030 0.00 17 0.060 -1.030 0.00 18 0.078 -1.030 0.00 19 0.100 -1.030 0.00 20 0.133 -1.030 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.130 0.00 2 0.000 -0.083 0.00 3 0.000 -0.060 0.00 4 0.000 -0.045 0.00 5 0.000 -0.035 0.00 6 0.000 -0.013 0.00 7 -0.419 5.601 0.00 14 -0.425 5.601 0.00 21 0.000 0.140 0.00 22 0.000 0.103 0.00 23 0.000 0.088 0.00 24 0.000 0.078 0.00 25 0.000 0.072 0.00 7 - 3.88 -3.73 - 3.39 -3.20 -1.93 -1.50 0-00 -6.36 0.00 - 5.40 0.00 - 4.82 0.00 -4.42 0.00 - 2.62 0.00 vYf A- 2° , (&,c),c./. PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 10:09:11 26 0.000 0.043 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 8 0.1936 - 0.0091 - 0.0031 9 0.2946 - 0.0173 - 0.0022 10 0.3734 - 0.0239 - 0.0017 11 0.4245 - 0.0281 - 0.0015 12 0.4899 - 0.0319 - 0.0013 13 0.5707 - 0.0346 - 0.0009 15 0.1937 - 0.0091 - 0.0030 16 0.2946 - 0.0173 - 0.0021 17 0.3734 - 0.0239 - 0.0016 18 0.4244 - 0.0281 - 0.0013 19 0.4899 - 0.0319 - 0.0011 20 0.5706 - 0.0346 - 0.0004 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.1936 0.0000 0.0013 2 0.2946 0.0000 0.0006 3 0.3734 0.0000 0.0003 4 0.4245 0.0000 0.0000 5 0.4899 0.0000 - 0.0001 6 0.5707 0.0000 - 0.0004 7 0.0000 0.0000 - 0.0087 14 0.0000 0.0000 - 0.0087 21 0.1937 0.0000 0.0017 22 0.2946 0.0000 0.0014 23 0.3734 0.0000 0.0014 24 0.4244 0.0000 0.0013 25 0.4899 0.0000 0.0013 26 0.5706 0.0000 0.0010 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = 55 ksi Ry = ky = 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 15 5.7 11.9 28.0 43.0 21.19 29.73 67% 16 4.7 7.0 28.0 43.0 21.19 29.73 46% 17 3.7 6.0 28.0 43.0 21.19 29.73 38% 18 2.7 4.5 24.0 43.0 21.19 29.73 28% 19 1.7 4.4 32.0 43.0 21.19 29.73 23% 20 0.7 4.1 46.0 43.0 21.19 29.73 17% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 120 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 2000 lbs Assume 0.5 pallet load on each beam M = PL /8= 15.00 k -in fb = 16.52 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.39 in = L/ 304 50% w/ 25% added to one pallet load M = .232 PL = 13.92 k -in 46% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 9.6 kips 1500 psf basic 30.3 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1'2/3 Use 8 "square base plate w = 10.4 psi Load factor = 1.67 Shear : 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c".5) = Beam fv = Punching fv = Base Plate Bending 1 = fb = 24 psi Fv = 37 psi Fv = 8.16 in 387 # -in 3000 psi 64 psi 178 psi 93 psi 186 psi Use 0.375 " thick 2.5 in w = 150 psi 19963 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TU KW I LLA, WA 06/16/2011 Loading: 1000 # load levels 8 pallet levels @ 6,24,42,60,78,96,114,144 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 108 " Load Beams Uprights: 42 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 5.00x 8.00x 0.375 Base Plates with 2- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution ' per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns Q 42 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 336 48 114 1060 121 266 30 96 1060 102 224 22 78 1060 83 182 14 60 1060 64 140 8 KLx = 6 in 42 1060 45 98 4 KLy = 41 in 24 1060 25 56 1 A = 0.595 in 6 1060 6 14 0 Pcap = 21334 lbs - - -- - - -- - - -- - - -- ---- - - -- - - -- - - -- 8480 598 1316 128 Column 37% Stress Max column load = 7297 # Min column load = -766 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -1688 # MIN 7842 # MAX -1688 # Anchors: 1 T = 1688 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 55% Stressed V = 'Braces: 658 # per leg Vcap = 5322 # = COMBINED = Brace height = 41 " Brace width = 42 " Length = 59 " P = 1839 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 121 Pcap = 4417 # ""7 42% OK 12% Stressed 40% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Weight I = Sds = 0.927 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 42 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 144 1060 153 291 42 78 60 5 9 1 60 60 4 7 0 KLx = 6 in 42 60 3 5 0 KLy = 41 in 24 60 1 3 0 A = 0.595 in 6 60 0 1 0 Pcap = 21334 lbs - - -- - - -- - - -- ==== 1360 - - -- - - -- - - -- 1360 165 315 43 Column 8% Stress Max column load = 1711 # Min column load = -439 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -641 # MIN 1729 # MAX -641 # Anchors: 1 T = 641 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 21% Stressed V = Braces: 158 # per leg Vcap = 5322 # = COMBINED = Brace height = Brace width = Length = P = Use : 41 " 42 " 59 " 440 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 121 Pcap = 4417 # 10% 7 7 OK 3% Stressed 8% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 8 Levels Type Plane Frame Number of Joints 34 Number of Supports 18 Number of Members 40 Number of Loadings 1 Joint Coordinates 8 1 0.0 6.0 S 2 0.0 24.0 S 3 0.0 42.0 S 4 0.0 60.0 S 5 0.0 78.0 S 6 0.0 96.0 S 7 0.0 114.0 S 8 0.0 144.0 S 9 55.5 0.0 S 10 55.5 6.0 11 55.5 24.0 12 55.5 42.0 13 55.5 60.0 14 55.5 78.0 15 55.5 96.0 16 55.5 114.0 17 55.5 144.0 18 166.5 0.0 S 19 166.5 6.0 20 166.5 24.0 21 166.5 42.0 22 166.5 60.0 23 166.5 78.0 24 166.5 96.0 25 166.5 114.0 26 166.5 144.0 27 222.0 6.0 S 28 222.0 24.0 S 29 222.0 42.0 S 30 222.0 60.0 S 31 222.0 78.0 S 32 222.0 96.0 S 33 222..0 114.0,S 34 222.0 144.0 S Joint Releases 9 Moment Z 18 Moment Z 1 Force X 2 Force X 3 Force X 4 Force X 7 6 5 4 3 2 1 17 26 16 25 15 24 14 23 13 22 12 21 11 20 10 0 19 8 1 34 33 32 31 30 29 28 27 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 5 Force X 6 Force X 7 Force X 8 Force X 27 Force X 28 Force X 29 Force X 30 Force X 31 Force X 32 Force X 33 Force X 34 Force X 1 Moment Z 2 Moment Z 3 Moment Z 4 Moment Z 5 Moment Z 6 Moment Z 7 Moment Z 8 Moment Z 27 Moment Z 28 Moment Z 29 Moment Z 30 Moment Z 31 Moment Z 32 Moment Z 33 Moment Z 34 Moment Z Member Incidences 1 1 10 2 2 11 3 3 12 4 4 13 5 5 14 6 6 15 7 7 16 8 8 17 9 9 10 10 10 11 11 11 12 12 12 13 13 13 14 14 14 15 15 15 16 16 16 17 17 18 19 18 19 20 19 20 21 20 21 22 21 22 23 22 23 24 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 23 24 25 24 25 26 25 10 19 26 19 27 27 11 20 28 20 28 29 12 21 30 21 29 31 13 22 32 22 30 33 14 23 34 23 31 35 15 24 36 24 32 37 16 25 38 25 33 39 17 26 40 26 34 Member Properties 1 Thru 8 Prismatic Ax 1.040 Ay 0.520 Iz 1.787 9 Thru 24 Prismatic Ax 0.748 Ay 0.249 Iz 1.193 25 Thru 40 Prismatic Ax 1.040 Ay 0.520 Iz 1.787 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 10 Force Y -0.53 11 Force Y -0.53 12 Force Y -0.53 13 Force Y -0.53 14 Force Y -0.53 15 Force Y -0.53 16 Force Y -0.53 17 Force Y -0.53 19 Force Y -0.53 20 Force Y -0.53 21 Force Y -0.53 22 Force Y -0.53 23 Force Y -0.53 24 Force Y -0.53 25 Force Y -0.53 26 Force Y -0.53 10 Force X 0.006 11 Force X 0.019 12 Force X 0.033 13 Force X 0.041 14 Force X 0.062 15 Force X 0.076 16 Force X 0.089 17 Force X 0.114 19 Force X 0.006 PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 20 Force X 0.019 21 Force X 0.033 22 Force X 0.041 23 Force X 0.062 24 Force X 0.076 25 Force X 0.089 26 Force X 0.114 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 1060 0.0091 0 12 0.1 6 12 1060 0.0406 2 38 1.5 19 38 1060 0.0722 6 66 4.8 33 66 1060 0.1017 11 92 9.4 46 92 1060 0.1279 17 124 15.9 62 124 1060 0.1495 24 152 22.7 76 152 1060 0.1665 29 178 29.6 89 178 1060 0.1901 38 228 43.3 114 228 8480 127 890 127.3 g = 32.2 ft /sec2 T = 0.3193 sec I = 1.00 Cs = 0.2506 or Sdl = 0.480 Cs min = 0.092666 or 1.596 R = 6 Cs = 0.1544 V = (Cs *I) *W *.67 V = 0.1544 W *.67 = 891 # 0.1544 891 100% PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 Structure Storage Rack in Load Beam Plane 8 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE 1 1 0.000 -0.060 1 10 0.000 0.060 2 2 0.000 -0.063 2 11 0.000 0.063 3 3 0.000 -0.058 3 12 0.000 0.058 4 4 0.000 -0.051 4 13 0.000 0.051 5 5 0.000 -0.041 5 14 0.000 0.041 6 6 0.000 -0.030 6 15 0.000 0.030 7 7 0.000 -0.022 7 16 0.000 0.022 8 8 0.000 -0.010 8 17 0.000 0.010 9 9 4.188 0.437 9 10 -4.188 -0.437 10 10 3.659 0.428 10 11 -3.659 -0.428 11 11 3.132 0.403 11 12 -3.132 -0.403 12 12 2.607 0.364 12 13 -2.607 -0.364 13 13 2.084 0.319 13 14 -2.084 -0.319 14 14 1.562 0.253 14 15 -1.562 -0.253 15 15 1.042 0.175 15 16 -1.042 -0.175 16 16 0.522 0.092 16 17 -0.522 -0.092 17 18 4.188 0.443 17 19 -4.188 -0.443 18 19 3.659 0.440 18 20 -3.659 -0.440 19 20 3.132 0.427 19 21 -3.132 -0.427 20 21 2.607 0.400 20 22 -2.607 -0.400 21 22 2.084 0.363 21 23 -2.084 -0.363 MOMENT 0.00 -3.32 0.00 - 3.49 0.00 - 3.23 0.00 - 2.82 0.00 - 2.30 0.00 - 1.69 0.00 - 1.21 0.00 - 0.55 0.00 2.62 4.08 3.63 3.54 3.71 3.07 3.49 2.56 3.17 1.91 2.65 1.28 1.88 1.12 1.64 0.00 2.66 4.14 3.77 3.74 3.96 3.37 3.83 2.95 3.59 PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 22 23 1.562 0.305 22 24 -1.562 -0.305 23 24 1.042 0.231 23 25 -1.042 -0.231 24 25 0.522 0.136 24 26 -0.522 -0.136 25 10 -0.003 -0.061 25 19 0.003 0.061 26 19 0.000 -0.062 26 27 0.000 0.062 27 11 -0.007 -0.066 27 20 0.007 0.066 28 20 0.000 -0.069 28 28 0.000 0.069 29 12 -0.005 -0.064 29 21 0.005 0.064 30 21 0.000 -0.069 30 29 0.000 0.069 31 13 -0.004 -0.058 31 22 0.004 0.058 32 22 0.000 -0.065 32 30 0.000 0.065 33 14 -0.004 -0.050 33 23 0.004 0.050 34 23 0.000 -0.058 34 31 0.000 0.058 35 15 -0.002 -0.040 35 24 0.002 0.040 36 24 0.000 -0.049 36 32 0.000 0.049 37 16 0.006 -0.032 37 25 -0.006 0.032 38 25 0.000 -0.042 38 33 0.000 0.042 39 17 0.022 -0.018 39 26 -0.022 0.018 40 26 0.000 -0.026 40 34 0.000 0.026 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 10 0.006 -0.530 0.00 11 0.019 -0.530 0.00 12 0.033 -0.530 0.00 13 0.041 -0.530 0.00 14 0.062 -0.530 0.00 15 0.076 -0.530 0.00 16 0.089 -0.530 0.00 17 0.114 -0.530 0.00 19 0.006 -0.530 0.00 20 0.019 -0.530 0.00 21 0.033 -0.530 0.00 2.36 3.13 1.77 2.38 1.67 2.41 - 3.38 - 3.37 - 3.43 0.00 - 3.68 - 3.66 - 3.85 0.00 - 3.54 - 3.51 0.00 -3.23 - 3.19 - 3.59 0.00 - 2.78 -2.73 - 3.22 0.00 -2.24 - 2.18 - 2.72 0.00 - 1.79 - 1.73 -2.32 0.00 - 1.09 - 0.94 - 1.47 0.00 t PAGE 7 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 22 0.041 -0.530 0.00 23 0.062 -0.530 0.00 24 0.076 -0.530 0.00 25 0.089 -0.530 0.00 26 0.114 -0.530 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.060 0.00 2 0.000 -0.063 0.00 3 0.000 -0.058 0.00 4 0.000 -0.051 0.00 5 0.000 -0.041 0.00 6 0.000 -0.030 0.00 7 0.000 -0.022 0.00 8 0.000 -0.010 0.00 9 -0.437 4.188 0.00 18 -0.443 4.188 0.00 27 0.000 0.062 0.00 28 0.000 0.069 0.00 29 0.000 0.069 0.00 30 0.000 0.065 0.00 31 0.000 0.058 0.00 32 0.000 0.049 0.00 33 0.000 0.042 0.00 34 0.000 0.026 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 10 0.0091 - 0.0012 - 0.0012 11 0.0406 - 0.0042 - 0.0013 12 0.0722 - 0.0068 - 0.0013 13 0.1017 - 0.0090 - 0.0012 14 0.1279 - 0.0107 - 0.0010 15 0.1495 - 0.0120 - 0.0008 16 0.1665 - 0.0128 - 0.0007 17 0.1901 - 0.0136 - 0.0004 19 0.0091 - 0.0012 - 0.0012 20 0.0406 - 0.0042 - 0.0013 21 0.0723 - 0.0068 - 0.0013 22 0.1017 - 0.0090 - 0.0011 23 0.1279 - 0.0107 - 0.0010 24 0.1496 - 0.0120 - 0.0008 25 0.1665 - 0.0128 - 0.0006 26 0.1900 - 0.0136 - 0.0003 PAGE 8 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:19:08 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.0091 0.0000 0.0006 2 0.0406 0.0000 0.0005 3 0.0722 0.0000 0.0004 4 0.1017 0.0000 0.0003 5 0.1279 0.0000 0.0002 6 0.1495 0.0000 0.0001 7 0.1665 0.0000 0.0000 8 0.1901 0.0000 - 0.0001 9 0.0000 0.0000 - 0.0014 18 0.0000 0.0000 - 0.0014 27 0.0091 0.0000 0.0006 28 0.0406 0.0000 0.0008 29 0.0723 0.0000 0.0008 30 0.1017 0.0000 0.0008 31 0.1279 0.0000 0.0008 32 0.1496 0.0000 0.0007 33 0.1665 0.0000 0.0006 34 0.1900 0.0000 0.0005 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = 55 ksi Ry = ky = 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 19 4.2 2.7 6.0 41.0 21.33 29.73 29% 20 3.7 4.1 18.0 41.0 21.33 29.73 31% 21 3.2 4.0 18.0 41.0 21.33 29.73 29 %- 22 2.7 3.8 18.0 41.0 21.33 29.73 26% 23 2.2 3.6 18.0 41.0 21.33 29.73 23% 24 1.7 3.1 66.0 41.0 20.03 29.73 19% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 108 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 1000 lbs Assume 0.5 pallet load on each beam M = PL /8= 6.75 k -in fb = 7.43 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.14 in = L/ 751 w/ 25% added to one pallet load M = .232 PL = 6.26 k -in 23% 21% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 5.9 kips 1500 psf basic 23.8 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1A2 /3 Use 5 "square base plate w = 10.4 psi Load factor = 1.67 Shear : 1 = M= 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c".5) = Beam fv = Punching fv = Base Plate Bending 1 = fb = 18 psi Fv = 29 psi Fv = 6.38 in 236 # -in 3000 psi 39 psi 178 psi 93 psi 186 psi Use 0.375 " thick 1.5 in w = 235 psi 11292 psi Fb = 37500 psi OK !! OK !! OK !! OK !! Calculations for : PROFESSIONAL PLASTICS TUKWILLA, WA 06/16/2011 Loading: 2000 # load levels 6 pallet levels @ 28,58,88,118,132,168 Seismic per IBC 2009 100% Utilization Sds = 0.927 Sdl = 0.480 I = 1.00 108 " Load Beams Uprights: 48 " wide C 3.000x 3.000x 0.075 Columns C 1.500x 1.500x 0.075 Braces 5.00x 8.00x 0.375 Base Plates with 2- 0.500in x 3.25in Embed Anchor /Column 4.00x 2.750x 0.075 Load beams w/ 3 -Pin Connector by : Ben Riehl Registered Engineer WA# 21008 In Upright Plane Seismic Load Distribution per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 *.67 60 # per level frame weight Columns @ 48 " Levels Load WiHi Fi FiHi Column: (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 168 2060 346 544 91 132 2060 272 428 56 118 2060 243 382 45 KLx = 28 in 88 2060 181 285 25 KLy = 49 in 58 2060 119 188 11 A = 0.595 in 28 2060 58 91 3 Pcap = 20715 lbs 12360 1220 1918 232 Column 57% Stress Max column load = 11005 # Min column load = -1486 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .l4Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -2845 # MIN 11802 # MAX -2845 # Anchors: 1 T = 2845 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 93% Stressed V = Braces: 959 # per leg Vcap = 5322 # = COMBINED= Brace height = 49 " Brace width = 48 " Length = 69 " P = 2742 # Use : C 1.500x 1.500x 0.075 A = 0.317 in L/r = 141 Pcap = 3234 # 85% OK 18% Stressed 94% Stressed In Upright Plane Seismic Load Distribution TOP LOAD ONLY per 2009 IBC Sds = 0.927 Weight I = 1.33 Allowable Stress Increase 1.00 R = 4.0 V = (Sds /R) *I *P1 60 # per level frame weight Columns @ 48 " Levels Load WiHi Fi FiHi Column: ' (inches) ( #) (k -in) ( #) (k -in) C 3.000x 3.000x 0.075 168 2060 346 509 86 132 60 8 12 2 118 60 7 10 1 KLx = 28 in 88 60 5 8 1 KLy = 49 in 58 60 3 5 0 A = 0.595 in 28 60 2 2 0 Pcap = 20715 lbs 2360 372 547 89 Column 15% Stress Max column load = 3042 # Min column load = -835 # Uplift Overturning (. 6- .11Sds)DL +(0.6- .14Sds)PLapp -EL = (1 +0.11Sds)DL+ (1 +0.14Sds)PL+ EL = REQUIRED HOLD DOWN = -1172 # MIN 3060 # MAX -1172 # Anchors: 1 T = 1172 # 2 0.5 in dia HILTI TZ 3.25 "embedment in 3000 psi concrete Tcap = 3068 # 38% Stressed V = 273 # per leg Vcap = 5322 # = COMBINED = Braces: Brace height = Brace width = Length = P = Use : 49 " 48 " 69 " 781 # C 1.500x 1.500x 0.075 A = 0.317 in L/r = 141 Pcap = 3234 # 24% OK 5% Stressed 21% Stressed PAGE 1 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 INPUT DATA LISTING TO FOLLOW: Structure Storage Rack in Load Beam Plane 6 Levels Type Plane Frame Number of Joints 26 Number of Supports 14 Number of Members 30 Number of Loadings 1 Joint Coordinates 1 0.0 28.0 S 2 0.0 58.0 S 3 0.0 88.0 S 4 0.0 118.0 S 5 0.0 132.0 S 6 0.0 168.0 S 7 55.5 0.0 S 8 55.5 28.0 9 55.5 58.0 10 55.5 88.0 11 55.5 118.0 12 55.5 132.0 13 55.5 168.0 14 166.5 0.0 S 15 166.5 28.0 16 166.5 58.0 17 166.5 88.0 18 166.5 118.0 19 166.5 132.0 20 166.5 168.0 21 222.0 28.0 S 22 222.0 58.0 S 23 222.0 88.0 S 24 222.0 118.0 S 25 222.0 132.0 S 26 222.0 168.0 S Joint Releases 7 Moment Z 14 Moment Z 1 Force X Moment Z 2 Force X Moment Z 3 Force X Moment Z 4 Force X Moment Z 5 Force X Moment Z 6 Force X Moment Z 21 Force X Moment Z 22 Force X Moment Z 23 Force X Moment Z 24 Force X Moment Z 25 Force X Moment Z 26 Force X Moment Z 6 5 4 3 2 1 13 20 12 19 11 18 10 17 9 16 8 15 1A 26 25 24 23 22 21 PAGE 2 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 Member Incidences 1 1 8 2 2 9 3 3 10 4 4 11 5 5 12 6 6 13 7 7 8 8 8 9 9 9 10 10 10 11 11 11 12 12 12 13 13 14 15 14 15 16 15 16 17 16 17 18 17 18 19 18 19 20 19 8 15 20 9 16 21 10 17 22 11 18 23 12 19 24 13 20 25 15 21 26 16 22 27 17 23 28 18 24 29 19 25 30 20 26 Member Properties 1 Thru 6 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 7 Thru 18 Prismatic Ax 0.595 Ay 0.298 Iz 1.014 19 Thru 30 Prismatic Ax 0.963 Ay 0.674 Iz 1.934 Constants E 29000. All G 12000. All Tabulate All Loading Dead + Live + Seismic Joint Loads 8 Force Y -1.03 9 Force Y -1.03 10 Force Y -1.03 11 Force Y -1.03 12 Force Y -1.03 13 Force Y -1.03 15 Force Y -1.03 16 Force Y -1.03 17 Force Y -1.03 1 18 Force Y -1.03 19 Force Y -1.03 20 Force Y -1.03 2 PAGE 3 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 8 Force X 0.023 9 Force X 0.044 10 Force X 0.069 11 Force X 0.090 12 Force X 0.103 13 Force X 0.130 15 Force X 0.023 16 Force X 0.044 17 Force X 0.069 18 Force X 0.090 19 Force X 0.103 20 Force X 0.130 Solve PROBLEM CORRECTLY SPECIFIED, EXECUTION TO PROCEED Seismic Analysis per 2009 IBC wi di widi2 fi fidi # in # 2060 0.2037 85 46 9.4 23 46 2060 0.3190 210 88 28.1 44 88 2060 0.4105 347 138 56.6 69 138 2060 0.4799 474 180 86.4 90 180 2060 0.4955 506 206 102.1 103 206 2060 0.5350 590 260 139.1 130 260 12360 2212 918 421.6 g = 32.2 ft /sec2 T = 0.7321 sec I = 1.00 Cs = 0.1093 or Sdl = 0.480 Cs min = 0.092666 or 1.5% R = 6 Cs = 0.1093 V = (Cs *I) *W *.67 V = 0.1093 W *.67 = 918 # 0.1544 918 100% • PAGE 4 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 Structure Storage Rack in Load Beam Plane 6 Levels Loading Dead + Live + Seismic MEMBER FORCES MEMBER JOINT AXIAL FORCE SHEAR FORCE MOMENT 1 1 0.000 -0.159 0.00 1 8 0.000 0.159 -8.83 2 2 0.000 -0.102 0.00 2 9 0.000 0.102 -5.66 3 3 0.000 -0.074 0.00 3 10 0.000 0.074 -4.13 4 4 0.000 -0.033 0.00 4 11 0.000 0.033 -1.85 5 5 0.000 -0.013 0.00 1 5 12 0.000 0.013 -0.75 6 6 0.000 -0.003 0.00 6 13 0.000 0.003 -0.15 7 7 6.067 0.455 0.00 7 8 -6.067 -0.455 12.73 8 8 5.044 0.417 5.38 8 9 -5.044 -0.417 7.13 9 9 4.029 0.363 5.07 9 10 -4.029 -0.363 5.82 10 10 3.018 0.287 3.65 10 11 -3.018 -0.287 4.95 11 11 2.013 0.133 0.22 11 12 -2.013 -0.133 1.63 12 12 1.009 0.086 1.43 12 13 -1.009 -0.086 1.69 13 14 6.067 0.463 0.00 13 15 -6.067 -0.463 12.97 14 15 5.044 0.455 5.89 14 16 -5.044 -0.455 7.76 15 16 4.029 0.421 5.89 15 17 -4.029 -0.421 6.74 16 17 3.018 0.359 4.73 16 18 -3.018 -0.359 6.05 17 18 2.013 0.333 1.64 17 19 -2.013 -0.333 3.03 18 19 1.009 0.174 2.76 18 20 -1.009 -0.174 3.49 19 8 -0.015 -0.167 -9.28 19 15 0.015 0.167 -9.20 20 9 -0.010 -0.116 -6.53 20 16 0.010 0.116 -6.39 21 10 -0.007 -0.094 -5.33 21 17 0.007 0.094 -5.14 PAGE 5 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 22 11 -0.064 -0.058 22 18 0.064 0.058 23 12 0.057 -0.040 23 19 -0.057 0.040 24 13 0.044 -0.023 24 20 -0.044 0.023 25 15 0.000 -0.174 25 21 0.000 0.174 26 16 0.000 -0.131 26 22 0.000 0.131 27 17 0.000 -0.114 27 23 0.000 0.114 28 18 0.000 -0.083 28 24 0.000 0.083 29 19 0.000 -0.066 29 25 0.000 0.066 30 20 0.000 -0.044 30 26 0.000 0.044 APPLIED JOINT LOADS, FREE JOINTS JOINT FORCE X FORCE Y MOMENT Z 8 0.023 -1.030 0.00 9 0.044 -1.030 0.00 10 0.069 -1.030 0.00 11 0.090 -1.030 0.00 12 0.103 -1.030 0.00 13 0.130 -1.030 0.00 15 0.023 -1.030 0.00 16 0.044 -1.030 0.00 17 0.069 -1.030 0.00 18 0.090 -1.030 0.00 19 0.103 -1.030 0.00 20 0.130 -1.030 0.00 REACTIONS,APPLIED LOADS SUPPORT JOINTS JOINT FORCE X FORCE Y MOMENT Z 1 0.000 -0.159 0.00 2 0.000 -0.102 0.00 3 0.000 -0.074 0.00 4 0.000 -0.033 0.00 5 0.000 -0.013 0.00 6 0.000 -0.003 0.00 7 -0.455 6.067 0.00 14 -0.463 6.067 0.00 21 0.000 0.174 0.00 22 0.000 0.131 0.00 23 0.000 0.114 0.00 24 0.000 0.083 0.00 25 0.000 0.066 0.00 - 3.32 - 3.11 -2.31 - 2.11 - 1.54 5 0.00 - 7.26 0.00 - 6.33 0.00 - 4.58 0.00 - 3.68 0.00 - 2.44 0.00 144--70, Co..0 „J AlemKtwi- 1 PAGE 6 MSU STRESS -11 VERSION 9/89 - -- DATE: 06/16/;1 - -- TIME OF DAY: 09:32:48 26 0.000 0.044 0.00 FREE JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 8 0.2037 - 0.0098 - 0.0031 9 0.3190 - 0.0186 - 0.0022 10 0.4105 - 0.0256 - 0.0018 11 0.4799 - 0.0309 - 0.0012 12 0.4955 - 0.0325 - 0.0008 13 0.5350 - 0.0346 - 0.0007 15 0.2038 - 0.0098 - 0.0030 16 0.3190 - 0.0186 - 0.0021 17 0.4106 - 0.0256 - 0.0016 18 0.4802 - 0.0309 - 0.0010 19 0.4953 - 0.0325 - 0.0006 20 0.5348 - 0.0346 - 0.0002 SUPPORT JOINT DISPLACEMENTS JOINT X- DISPLACEMENT Y- DISPLACEMENT ROTATION 1 0.2037 0.0000 0.0013 2 0.3190 0.0000 0.0006 3 0.4105 0.0000 0.0002 4 0.4799 0.0000 - 0.0003 5 0.4955 0.0000 - 0.0005 6 0.5350 0.0000 - 0.0006 7 0.0000 0.0000 - 0.0092 14 0.0000 0.0000 - 0.0092 21 0.2038 0.0000 0.0017 22 0.3190 0.0000 0.0015 23 0.4106 0.0000 0.0015 24 0.4802 0.0000 0.0013 25 0.4953 0.0000 0.0012 26 0.5348 0.0000 0.0010 Beam - Column Check C 3.000x 3.000x 0.075 A = 0.595 in2 Sx = 0.676 in3 Rx = 1.305 in kx = 1.00 Stress Factor 1.333 Fy = Ry = ky = 55 ksi 1.117 in 1.00 Point P M Lx Ly Pcap Mcap Ratio 15 6.2 13.0 28.0 49.0 20.71 29.73 74% 16 5.2 7.8 30.0 49.0 20.71 29.73 51% 17 4.2 6.7 30.0 49.0 20.71 29.73 43% 18 3.2 6.1 30.0 49.0 20.71 29.73 36% 19 2.2 3.0 14.0 49.0 20.71 29.73 21% 20 1.2 3.5 36.0 49.0 20.71 29.73 17% Load Beam Check 4.00x 2.750x 0.075 A = 0.963 in2 Sx = 0.908 in3 Length = 108 inches Fy = E = Ix = 55 ksi 29,500 E3 ksi 1.934 in4 Pallet Load 2000 lbs Assume 0.5 pallet load on each beam M = PL /8= 13.50 k -in fb = 14.87 ksi Fb = 33 ksi Mcap = 29.97 k -in 39.96 k -in with 1/3 increase Defl = 0.29 in = L/ 376 45% w/ 25% added to one pallet load M = .232 PL = 12.53 k -in 42% Base Plate Design Column Load Allowable Soil Assume Footing Soil Pressure 8.9 kips 1500 psf basic 29.1 in square on side 1500 psf Bending: Assume the concrete slab works as a beam that is fixed against rotation at the end of the base plate and is free to deflect at the extreme edge of the assumed footing, but not free to rotate. Mmax = w1'2/3 Use 5 "square base plate w = Load factor = Shear : 10.4 psi 1.67 1 = M = 6 in thick slab f'c = s = 6.00 in3 fb = Fb = 5(phi)(f'c'.5) = Beam fv = Punching fv = Base Plate Bending 26 psi Fv = 48 psi Fv = 9.07 in 478 # -in 3000 psi 80 psi 178 psi 93 psi 186 psi Use 0.375 " thick 1 = 1.5 in w = 354 psi fb = 16994 psi Fb = 37500 psi OK !! OK !! OK !! OK !! City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director ROGER STUESSI ' 9883 40 AV S SEATTLE WA 98118 RE: Permit No. D11 -186 PROFESSIONAL PLASTICS 6233 SEGALE PARK DR D TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 01/10/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 01/10/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D11 -186 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 June 29, 2011 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Roger Stuessi Engineered Products 9883 40th Av S Seattle, WA 98118 RE: Correction Letter #1 Development Permit Application Number DI1 -186 Professional Plastics — 6233 Segale Park Dr D Dear Mr. Stuessi, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Fire Department. At this time the Building, Planning, and Public Works Departments have no comments. Fire Department: Al Metzler at 206 575 -4407 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, 9-A. R,L. Bill Rambo Permit Technician encl File No. D11 -186 W:\Permit Center \Correction Letters \2011\D11 -186 Correction Letter #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • Tukwila Fire Prevention Bureau Al Metzler, Fire Project Coordinator Fire Prevention Bureau Review Memo 0 Date: June 28, 2011 Project Name: Professional Plastics Address: 6233 Segale Park Dr D Permit #: Dl 1 -186 Plan Reviewer: Al Metzler, Fire Project Coordinator The Fire Prevention Bureau conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. 1. Per International Fire Code Table 2306.2, smoke and heat removal is required for the storage area. Please submit a smoke vent plan or provide documentation of an engineered mechanical smoke removal system. Should there be questions concerning the above requirements, contact the Fire Prevention Bureau at 206- 971 -8718. No further comments at this time. "‘"PERMIT COORD COPS" PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -186 DATE: 07/01/11 PROJECT NAME: PROFESSIONAL PLASTICS SITE ADDRESS: 6233 SEGALE PARK DR D Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 07/05/11 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: Structural Review Required No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Approved with Conditions DUE DATE: 08/02/11 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 p� tDl PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -186 PROJECT NAME: PROFESSIONAL PLASTICS SITE ADDRESS: 6233 SEGALE PARK DR D DATE: 06 -22 -11 X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: wilding 'vision Public Works n Aw\ w� f Fire Prevention Structural n Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: 14 Incomplete n DUE DATE: 06-23-11 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Please Route [54 Structural Review Required n REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions n DUE DATE: 07-21-11 Not Approved (attach comments) 5 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only VA- Departments CORRECTION LETTER MAILED: t issued corrections: Bldg ❑ Fire'' Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us REVISION SUBMITTAL submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 7//// Plan Check/Permit Number: D11-186 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner IA JUL °11011 Project Name: Professional Plastics '-`eKM/TcEivreA Project Address: 6233 Segale Park Dr D Contact Person:/;`611--' / Phone Number: _ ( 39-y -733 � Summary of Revision: G 4 ti S 114— S�i = r �- Cie7-7 Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Cen erII by: L"ytr' Entered in Permits Plus on 1 o l' \applications \forms- applications on line \revision submittal Created: 8 -13 -2004 Revised: Contractors or Tradespeople P,,, iter Friendly Page Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name ENGINEERED PRODUCTS, A PAPE CO UBI No. 602684203 Phone 2063943300 Status Active Address 9883 40Th Ave So License No. ENGINPC931C0 Suite /Apt. License Type Construction Contractor City Seattle Effective Date 2/20/2007 State WA Expiration Date 2/20/2013 Zip 98118 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status ENGINSP142RA ENGINEERED STORAGE PRODUCTS CO Construction Contractor General Unused 12/1/1986 1/1/2000 Archived GADCOMH991 K4 GADCO MATERIAL HANDLING LLC Construction Contractor General Unused 5/24/2001 1/3/2009 Expired ENGINPI013JK ENGINEERED PRODUCTS INC Construction Contractor General Unused 4/12/1999 1/6/2010 Out Of Business Business Owner Information Name Role Effective Date Expiration Date CT CORP SYSTEMS Agent 02/20/2007 Amount SALMAN, DAVID E President 02/16/2007 ZAGLB9118200 RIECKE, ROBERT J Secretary 02/16/2007 SAYLOR, THOMAS H Treasurer 02/16/2007 ARCH INS CO HOLLINGSHEAD, DANNY W Vice President 02/16/2008 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 FIDELITY Et DEPOSIT CO OF MD 08748464 02/13/2007 Until Cancelled $12,000.00 02/16/2007 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 ARCH INS CO ZAGLB9118200 09/30/2010 09/30/2011 $1,000,000.0009 /24/2010 2 ARCH INS CO ZAGLB9070400 09/30/2008 09/30/2010 $1,000,000.00 09/28/2009 1 TRANSPORTATION INS CO C2081198749 01/01/2007 01/01/2009 $1,000,000.00 12/21/2007 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions /Citations Information Infraction / Citation 1 Date 1 RCW Code 1 Type 1 Status 1 Violation Amount https://fortress.wa.gov/lni/bbip/Print. aspx 07/08/2011 C:\ Users\ BEN \Dropbox \Public \ACAD \DRAWINGS \R211140.dwg, 6/16/2011 9:54:44 AM 3' -0' z J a U BRACE 3' 3' 12' -0' z J a U UPRIGHT 14 GA THK 3/8'x 5'x 8' BASEPLATE (2) 1/2'4 ANCHORS 1/8 r 1 -1/2' EA FACE COLUMN & BASE PL I?'S" LOAD BEAM 1 -5/8'H x 1' W STEP 14 GA THICK TYPE "A" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS L ❑CATION STATING 1000# CAPACITY @ 6' 2400# CAPACITY @ 86', 120', 144' 9' -0' LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN C ❑NN 1 -5/8x 3x 3/16' THK f TYPE PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 48', 78', 98', 118', 144' 106' or 108' LOAD BEAM ZU -0' 2' -2' LOAD BEAM 10' LOAD BEAM 1' -8' 1' -8' 2' -6' 8' LOAD BEAM 5 - CONNECTOR 3 —6 LOAD BEAM z J O U BRACE CDNN o <3) AISI A502 -2 RIVETS o LOAD BEAM 7/16'0 2'oc HOOK COLUMN SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES LOAD BEAM LOAD BEAM ELEVATION 3/8x 5x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BP SE X— SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN —BEAM CONN I H RECEBVFr) JUN 22 PERMIT CENTER FILE COPY Permit No., I) W 1- ° z I I I I I I I I I I tr) 7 -05 CHAPTER REVIEWED FOR CODE COMPLIANCE APPROVED 'JUL 07 2011 City of Tukwila BUILDING DIVISION Lij 1=1 Z ° -tn— F- a�-P UJ L J --1 W W 0% LL-1 0 Cr) r1) LJ D U I—i y) J CL (/) LJJ zr 1-1 L CL 0 U) 6233 SEGALE LJ LJ CL LOAD BEAM LOAD BEAM 2' LOAD BEAM 2- UPRIGHT D cc CONNECTOR 1- = o Q' a_ D LOAD BEAM 6'- LEI LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN C ❑NN 1 -5/8x 3x 3/16' THK f TYPE PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 48', 78', 98', 118', 144' 106' or 108' LOAD BEAM ZU -0' 2' -2' LOAD BEAM 10' LOAD BEAM 1' -8' 1' -8' 2' -6' 8' LOAD BEAM 5 - CONNECTOR 3 —6 LOAD BEAM z J O U BRACE CDNN o <3) AISI A502 -2 RIVETS o LOAD BEAM 7/16'0 2'oc HOOK COLUMN SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES LOAD BEAM LOAD BEAM ELEVATION 3/8x 5x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BP SE X— SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN —BEAM CONN I H RECEBVFr) JUN 22 PERMIT CENTER FILE COPY Permit No., I) W 1- ° z I I I I I I I I I I tr) 7 -05 CHAPTER REVIEWED FOR CODE COMPLIANCE APPROVED 'JUL 07 2011 City of Tukwila BUILDING DIVISION Lij 1=1 Z ° -tn— F- a�-P UJ L J --1 W W 0% LL-1 0 Cr) r1) LJ D U I—i y) J CL (/) LJJ zr 1-1 L CL 0 U) 6233 SEGALE LJ LJ CL Q C:\ Users\ BEN \Dropbox \Public \ACAD \DRAWINGS \R211140.dwg, 6/16/2011 9:5 TYPE G IS 3' -6' DEEP 3' -8' z J 0 BRACE 3' UPRIGHT 12' -0' z J 0 0 14 GA THK 3/8'x 5'x 8' BASEPLATE <2) 1/2'0 ANCHORS t 1/8 V 1 -1/2' EA FACE COLUMN & BASE PL 2.75 LOAD BEAM 1 -5/8'H x 1' W STEP 14 GA THICK TYPE "B" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 36', 66', 96', 126', 144' 106' or 108' LOAD BEAM LOAD BEAM LOAD BEAM CONNECTOR LOAD BEAM LOAD BEAM LOAD BEAM LOAD BEAM ELEVATION C 1.5 x 1.5 —1.5 14 GA THK II 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 1 -5/8x 3x 3/16' THK -- BRACE 1/8' 1 1' -6' 2' -6' 2' -6' 2' -6' 2' -6' BRACE CONN o (3) AISI A502 -2 RIVETS o LOAD BEAM 7/16'0 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES z f J 0 0 TYPt "G" PERMANENT PLA @UE NOT LESS THAN 50 SQ INCHES It1,1 AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6 ',24',42',60',78',96',114',144' 106' .",or 108' LOAD, BEAM CONNECT❑R LOA'D' BEAM LOAD. BEAM LOAD BEAM rD m LOAD BEAM LOAD BEAM 1_ LOAD BEAM LOAD BEAM LOAD BEAN ELEVATI ❑N rQ- 2' -6' 1' -6' 1' -6' 1' -6' 1' -6' 1' -6' 1' -6' 3/8x 5x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTI ❑N SAFETY PIN TO RESIST 10004# UPLIFT LOAD COLUMN -BEAM C[]NN RECEIVED JUN 22 2011 PERMIT CENTEF In w 1- a_ U U) n (=I z _ � d U J W to w Cu A Cn Q >w Co d II � V) N w W (4 J M W 0" II W U Q wD J LIJ a F- CL W TUKWILLA, 6233 SEGALE PARK DR, C:\ Users \BEN \Dropbox \Public \ACAD \DRAWINGS \R211140.dwg, 6/16/2011 9:54:53 AM BRACE 3' 3' -8' UPRIGHT 16' -0' z J 0 U 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 1/8 ' 1 -1/2' EA FACE COLUMN & BASE PL �1 -5/8'H x 1' W STEP 14 GA THICK 2.75' LOAD BEAM TYPE "C" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN C❑NSPICU ❑US LOCATION STATING 1000# CAPACITY @ 6' 2500# CAPACITY @ 56', 84', 108', 156', 186' 106' or 108' - LOAD BEAM LOAD BEAM 2'- 03 LOAD BEAM 4'- m LOAD BEAM 2'- ED LOAD BEAM 2'- UPRIGHT m CONNECTOR = 0 0 D LOAD BEAM 4'- LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK El 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 6' 0' 0' 4' 2' z f J a (.1 BRACE CONN o <3) AISI A502 -2 RIVETS :0 o LOAD BEAM 7/16'0 2'oc \ HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES 1 -5/8x 3x 3/16' THK - z 1 J 0 U 1/8 6' 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc EA WAY FE 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION EA CORNER 3/16 P" 1' SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN ECEBVED JUN 22 2011 ITCENTER 14GA THK 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL <4) 1/2'0 ANCHORS @ 7'x 6' oc 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE W 1- p z (n N CIN w w C_ z W W CZ Nil 1- W V) P1 1- 1E z J W p -4 N J In U M W w 11 W (A .� Jp LL_ izi c J ▪ (/)X g p U (AM = z W CL 'e/Li (� J Q 1E CU <'l 't 1f7 (1) '74 I TUKWILLA, SEGALE PARK DR, CO : \Users \BEN \D ro p b ox\ BRACE 3' z J 0 U 3' -0' 16' -0' z J a U UPRIGHT 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 1/8 1 -1/2' EA FACE COLUMN & BASE PL 4• L 2.75' LOAD BEAM 1 -5/8'H x 1' W STEP 14 GA THICK TYPE "E" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2000# CAPACITY @ 61', 81', 108', 144', 186' 106' or 108' LOAD BEAM ELEVATION C 1.5 x 1,5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 1 -5/8x 3x 3/16' THK - 6' -o' 3' r 7' q) BRACE C ❑NN o (3) AISI A502 -2 RIVETS o LOAD BEAM 7/16'0 2'oc \ HOOK SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES z J a 0 TYPE "F" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IR�J AREA TO BE PLACED IN CONSPICUOUS L❑CATI ❑N STATING 2000# CAPACITY @ 28', 56', 84', 108', 140', 186' 10' -0' - LOAD BEAM - m LOAD BEAM 3'- LOAD BEAM 7 3'- LOAD BEAM 2'- -1 LOAD BEAM 3' LOAD BEAM 2'- LOAD BEAM 2'- LOAD BEAM 2'- LOAD BEAM 1'- UPRIGHT ti 13\-CONNECTOR L ce a_ D LOAD BEAM 4'- ___Au n3 6 LOAD BEAM ELEVATION C 1.5 x 1,5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 1 -5/8x 3x 3/16' THK - 6' -o' 3' r 7' q) BRACE C ❑NN o (3) AISI A502 -2 RIVETS o LOAD BEAM 7/16'0 2'oc \ HOOK SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES z J a 0 TYPE "F" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IR�J AREA TO BE PLACED IN CONSPICUOUS L❑CATI ❑N STATING 2000# CAPACITY @ 28', 56', 84', 108', 140', 186' 10' -0' LOAD BEARS ELEVATI ❑N 0' 8' 0' 4' 4' 4' 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 1/8 V1 -1/2' / 6'oc EA WAY FF 6' CONCRETE SLAB ON GRADE COLUMN BASE X— SECTION E 3/16 • 1' CORNER SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN —BEAM CONN ECEIVED JUN 22 2011 PERMIT CENTER 14GA THK 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL (4) 1/2'0 ANCHORS @ 7'x 6' oc 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE W 0 1I 1I 11 11 11 In L w CL W Q a Z ¢ Ga 1=1 1=1 U CC U1, , I 1- CL - In U o d > o W o w U 1 J W W CA LT.; XQV) U1W vj XJW N> eK R1 W w 0— GQ U W ¢ • NNW5 �W �cQce wao� � W '4 3z z W 11 U W 73 W • _J J W >,Ja J N Q� LL ¢ t0 ¢ 0 o � (kJU 0 w W a- 1 W Q Z C� °W 1(-/1 A I • (U N W W Cl_ Z W W CZ IV Q W Pq _J W H F J = In U 00 W W N W • >pgMCL II W (4 7 J 0 0 Z W Q J CL ce • O U (4 J Z W w5(11 MNI- In PLASTICS Q LLJ z C4 CD C/0 F— LJJ V)a D_ >— L Q O LLJ In TUKWILLA, c 6233 SEGALE PARK LJ Q LOAD BEAM - m LOAD BEAM 3'- LOAD BEAM 2'- -1 LOAD BEAM 2'- LOAD BEAM 2'- T CONNECTOR z UP ittir—d 2'- I LOAD BEARS ELEVATI ❑N 0' 8' 0' 4' 4' 4' 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 1/8 V1 -1/2' / 6'oc EA WAY FF 6' CONCRETE SLAB ON GRADE COLUMN BASE X— SECTION E 3/16 • 1' CORNER SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN —BEAM CONN ECEIVED JUN 22 2011 PERMIT CENTER 14GA THK 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL (4) 1/2'0 ANCHORS @ 7'x 6' oc 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE W 0 1I 1I 11 11 11 In L w CL W Q a Z ¢ Ga 1=1 1=1 U CC U1, , I 1- CL - In U o d > o W o w U 1 J W W CA LT.; XQV) U1W vj XJW N> eK R1 W w 0— GQ U W ¢ • NNW5 �W �cQce wao� � W '4 3z z W 11 U W 73 W • _J J W >,Ja J N Q� LL ¢ t0 ¢ 0 o � (kJU 0 w W a- 1 W Q Z C� °W 1(-/1 A I • (U N W W Cl_ Z W W CZ IV Q W Pq _J W H F J = In U 00 W W N W • >pgMCL II W (4 7 J 0 0 Z W Q J CL ce • O U (4 J Z W w5(11 MNI- In PLASTICS Q LLJ z C4 CD C/0 F— LJJ V)a D_ >— L Q O LLJ In TUKWILLA, c 6233 SEGALE PARK LJ Q C:\ Users\ BEN \Dropbox\ Public \ACAD \DRAWINGS \R211140.dwg, 6/16/2011 9:55:03 AM BRACE 3' i z D J 0 U 4' -0' 14' -0' z J a U UPRIGHT 14 GA THK 3/8'x 5'x 8' BASEPLATE (2) 1/2'4 ANCHORS 4- L 1/8 V 1 -1/2' EA FACE COLUMN & BASE PL 2.75" LOAD BEAM 1 -5/8'H x 1' W STEP 14 GA THICK TYPE "H" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 2000# CAPACITY @ 28', 58', 88', 118', 132', 168' 106' or 108' LOAD BEAM 3' -0' LOAD BEAM ID LOAD BEAM 1' -2' LOAD BEAM LOAD BEAM r �CONNECTOR D a_ D LOAD BEAM 2' -6' 2' -6' j 2' -4' LOAD BEAM ELEVATI ❑N C 1.5 x 1.5 1.5 14 GA THK I-1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN .d 0 z x J 0 U BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16'0 2'oc HOOK THRU SLOTS IN COLUMN 1 -5/8x 3x� o \ 3/16' THK CONNECTOR 1/8 V VERT EDGES z J U 6' 3/8x 5x 8 BASEPLATE <2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTI ❑N CONNECTOR SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN JUN 22 2C ? l PERMIT CENTE► V) W H z In 01 W A O U W J LJ X X 0 W A J tri a 0 0 a 0 0 0 CO P4 J 01 W 1- L�J U z 0 U N ON x W Ce W C` c3Z L I g Ce IVA Z W V) W�� W I— W Z CA__ J In U CO W W N W O� > 0:1 mo II W (4 �J �' Cel (y D u N A = Z W Q WOZ (4 (4J PLASTICS wz L3 0 H CI! 1w ED (4 F-- w Q LI- L-3 ow CL_ (Y) (/) L -- E CD (U w4- PARK DR) TUKWILLA) SITE PLAN SEGALE BUSINESS PARK Segale: Business Park Building 781 6233 Sega[e Park ri ve D Tukwila, ,, A 98 188 • 28,699 square feet • 3,333 sf air - conditioned office • 24' clear height • 61' x 30' column spacing • 230±' deep x 123±' wide • Four 8' x 10' dock high doors with 2 dock levelers • One 16' x 10' drive -in ramped door • Electrical Service: 800 amps, 277/480 volt, 3 phase power • Rail served with one 9' x 10' rail door • Northend of building • offering excellent truck maneuvering and parking . • T8 energy efficient lighting ..EE PO BOX 88028'. 206 575-2000 PRO ,.P[.. T�_ Tukwila, WA 98138 Www,segdleproperties.com Contact 'Diane M. 206:575.2000: ddecker@segaleproperties com Decker CPM"' VICINITY MAP Res 1 It e n 5M ;Crllla'r 7 2 EXIT PLAN 49'x100" 44x104 40'x100 44N104 48'x108` 44x108' 48'x108' 48'x108' O -2 44"x 104 44 %104 110' 10 150'9" 44'x1013 44•x108' 24' -5" 34x 104 WNW WNW Q Q co W � oo65tt° a: a gcnOwAw -841:?) LL Q 1.22 57' -1" 34x104 229' 10 WNW WNW 34x 124 38 x124 34x124 34 x129' 38"x 124 94x108' 30" x 104 38"x104 PLAN VIEW SCALE: i/8• = Y -0` 0 0 JAN ,1 0 zo12 F- L) n L J LU i1 0 0a 00 on 00 (0 (0 LCD LC) C\1 >< 0 L_ ill 1~ cp � Qgg *44 9 � 41:3 Ira m.4.4 4%)8 (1) Permit No. r" L9AIP Phi review approval is subject to errors and omissions. i r:3rGvat of construction documents does not authorize tit 1:3tation of any adopted code or ordinance. Receipt 014pprov Field ►'1 , I , ,,K owledged: By City Of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. 11)71: revisions will require a new plan submittal anti may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: echanloai ectrical Plumbing OrGas Piping City of Tukwila BUILDING DIVISION C.) ■ Cti 0 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2011 PeS WIC City of Tukwila BUILDING DIVISION RECEIVED JUN 2 2 2011 PERMIT CENTER DRAWN BY CL SCALE: SEATED DATE: 6.21.2011 JOB NO: 052605-001B CHECKED BY JG T140. 1 SHEETS 3' -0' z J 0 c� BRACE 4 3" • J 0 0 12' -0' UPRIGHT 14 GA THK 3/8'x 5'x 8' BASEPLATE (2) 1 /2'0 ANCHORS TYPE "A" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2400# CAPACITY @ 86', 120 ", 144' 9' -0" LOAD BEAM ELEVATION C 14 GA THK (-1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE 1/8 1 -1/2' EA FACE COLUMN & BASE PL 1.2.75" LOAD BEAM J 0 BRACE 1-5/8'H x 1' W STEP (3) PIN CONN 14 GA THICK 3' -8" 1 -5/8x 3x 3/16' THK UPRIGHT 16' -0" z D J 0 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 3' 1/8 1 -1/2' EA FACE COLUMN & BASE PL L 2.75' LOAD BEAM 0 0 0' 0' 8' N z J U BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES TYPE "D" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 48', 78', 98', 118', 144' 106' or- 108' LOAD BEAM al C} LOAD BEAM 2'- m to LOAD BEAM 2'- UPRIGHT J \-CONNECTOR F- = _0 0. LOAD BEAM 6'- uJ Q1 k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, LOAD BEAM ELEVATION C 14 GA THK (-1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE 1/8 1 -1/2' EA FACE COLUMN & BASE PL 1.2.75" LOAD BEAM J 0 BRACE 1-5/8'H x 1' W STEP (3) PIN CONN 14 GA THICK 3' -8" 1 -5/8x 3x 3/16' THK UPRIGHT 16' -0" z D J 0 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 3' 1/8 1 -1/2' EA FACE COLUMN & BASE PL L 2.75' LOAD BEAM 0 0 0' 0' 8' N z J U BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES TYPE "D" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 48', 78', 98', 118', 144' 106' or- 108' TYPE "C" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2500# CAPACITY @ 56', 84', 108', 156', 186' 106' or 108' LOAD BEAM - ID LOAD BEAM 2'- LOAD BEAM l' LOAD BEAM 1' Q1 k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, LOAD BEAM 2'- m 4'- 1 UPRIGHT 1- CONNECTOR = c a_ LOAD BEAM = 31- ( - bJl no / TYPE "C" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2500# CAPACITY @ 56', 84', 108', 156', 186' 106' or 108' LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN . BRACE 1 -5/8'H x 1' W STEP (3) PIN CONN 14 GA THICK 1 -5/8x 3x 3/16' THK 0 0 LOAD BEAM 6' 0' 0' 4' 2' z E ❑ U LOAD BEAM ELEVATION COLUMN N 2' 8' 8' 6' 6' 3/8x 5x 8 BASEPLATE (2) 1/2'0 ANCHORS 1/8 V1 -1/2' / 6'oc ' 6I' FF 3.25' • 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN BRACE CONN <3) AISI A502 -2 RIVETS • 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES COLUMN 1/8 "1 -1/2' EA SIDE 6' • 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc EA WAY FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION EA CORNER 3/16 1' SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN BRACE 3' N z J 0 0 TYPE G IS 3' -6' DEEP 3' -8' UPRIGHT 12' -0' Z 1 J 0 0 14 GA THK 3/8'x 5'x 8' BASEPLATE <2) 1/2 '4 ANCHORS 1/8 ' 1 -1/2' EA FACE COLUMN & BASE PL 2.75" LOAD BEAM 14GA THK x 1' W STEP 14 GA THICK 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL (4) 1/2'0 ANCHORS e7'x6'oc 1/8 i 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE TYPE "B" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 36', 66', 96'; 126', 144' 106' or 108' >T LOAD BEAM LOAD BEAM 1' -6" 2' -6N LOAD BEAM 13\-CONNECTOR 2' -6" LOAD BEAM 0 Q� m 0 LOAD BEAM = 2' -6N 0 bm 0 0 2' -6' LOAD BEAM LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK 1 1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE <3) PIN CONN 0 0 BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN 1 -5/8x 3x 3/16' THK--- 1 /8V VERT EDGES CONNECTOR BRACE 3' z 1 J 0 0 3' -0' 1 J 0 0 16' -0' UPRIGHT 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL 2.75' LOAD BEAM 1 -5/8'H x 1' W STEP z z J U TYPE "G" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN C❑NSPICU ❑US LOCATION STATING 1000# CAPACITY @ 6`,24 ",42',60 ",78",96 ",114',144" 106' or 108' LOAD BEAM CONNECTOR 2' -6' LOAD BEAM 1' -6' LOAD BEAM LOAD BEAM 1' -6' LOAD BEAM 1' -6' LOAD BEAM 1' -6' LOAD BEAM 1' -6' 1/8 LOAD BEAM E__ LOAD BEAM ELEVATION 6' COLUMN �1 -1/2' EA SIDE 1'-6' 3/8x 5x 8 BASEPLATE <2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN TYPE 'E" PERMANENT PLAQUE NOT LESS THAN 50 SO INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2000# CAPACITY .. @ 61', 81', 108', 144', 186' 106' or 108' - LOAD BEAM - ID LOAD BEAM 2'- LOAD BEAM 4'- LOAD BEAM 2'- Q1 k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, LOAD BEAM 2'- m 4'- 1 UPRIGHT] CONNECTOR z 0 O 0 LOAD BEAM _ LI L1 lU 6 LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK n 2' OF 1/8' FILLET WELD EA END TO COLUMN . BRACE 1 -5/8'H x 1' W STEP (3) PIN CONN 14 GA THICK 1 -5/8x 3x 3/16' THK 0 0 LOAD BEAM 6' 0' 0' 4' 2' z E ❑ U LOAD BEAM ELEVATION COLUMN N 2' 8' 8' 6' 6' 3/8x 5x 8 BASEPLATE (2) 1/2'0 ANCHORS 1/8 V1 -1/2' / 6'oc ' 6I' FF 3.25' • 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN BRACE CONN <3) AISI A502 -2 RIVETS • 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1/8 V VERT EDGES COLUMN 1/8 "1 -1/2' EA SIDE 6' • 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc EA WAY FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION EA CORNER 3/16 1' SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN BRACE 3' N z J 0 0 TYPE G IS 3' -6' DEEP 3' -8' UPRIGHT 12' -0' Z 1 J 0 0 14 GA THK 3/8'x 5'x 8' BASEPLATE <2) 1/2 '4 ANCHORS 1/8 ' 1 -1/2' EA FACE COLUMN & BASE PL 2.75" LOAD BEAM 14GA THK x 1' W STEP 14 GA THICK 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL (4) 1/2'0 ANCHORS e7'x6'oc 1/8 i 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE TYPE "B" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6', 36', 66', 96'; 126', 144' 106' or 108' >T LOAD BEAM LOAD BEAM 1' -6" 2' -6N LOAD BEAM 13\-CONNECTOR 2' -6" LOAD BEAM 0 Q� m 0 LOAD BEAM = 2' -6N 0 bm 0 0 2' -6' LOAD BEAM LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK 1 1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE <3) PIN CONN 0 0 BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN 1 -5/8x 3x 3/16' THK--- 1 /8V VERT EDGES CONNECTOR BRACE 3' z 1 J 0 0 3' -0' 1 J 0 0 16' -0' UPRIGHT 14GA THK 3/8'x 8'x 8' BASEPLATE (4) 1/2'0 ANCHORS 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL 2.75' LOAD BEAM 1 -5/8'H x 1' W STEP z z J U TYPE "G" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN C❑NSPICU ❑US LOCATION STATING 1000# CAPACITY @ 6`,24 ",42',60 ",78",96 ",114',144" 106' or 108' LOAD BEAM CONNECTOR 2' -6' LOAD BEAM 1' -6' LOAD BEAM LOAD BEAM 1' -6' LOAD BEAM 1' -6' LOAD BEAM 1' -6' LOAD BEAM 1' -6' 1/8 LOAD BEAM E__ LOAD BEAM ELEVATION 6' COLUMN �1 -1/2' EA SIDE 1'-6' 3/8x 5x 8 BASEPLATE <2) 1/2'0 ANCHORS 6'oc FF 3.25' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN TYPE 'E" PERMANENT PLAQUE NOT LESS THAN 50 SO INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 1000# CAPACITY @ 6' 2000# CAPACITY .. @ 61', 81', 108', 144', 186' 106' or 108' LOAD BEAM ELEVATION C 1.5 x 1.5 - 1.5 14 GA THK [ 1 2. OF 1/8' FILLET WELD EA END TO COLUMN BRACE . <3) PIN CONN 6' 0' 3' N 7" z E J 0 U BRACE CONN 0 (3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1 /8V VERT EDGES 14 GA THICK o 1 -5/8x 3x 3/16' THK f J 0 BRACE 3' N z 1 J 0 0 4' -0' UPRIGHT 14' -0' z 1 J 0 0 14 GA THK 3/8'x 5'x 8' BASEPLATE (2) 1/2'0 ANCHORS 1/8 ' 1 -1/2' EA FACE COLUMN & BASE PL 1-5/8'H x 1' W STEP 14 GA T IC HICK - 2.75" LOAD BEAM TYPE "F" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 2000# CAPACITY @ 28', 56', 84', 108', 140', 186' 10, -0' - LOAD BEAM - LOAD BEAM 3'- LOAD BEAM 3'- LOAD BEAM 2'- 0] k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, LOAD BEAM 1 I 6233 SEGALE PARK DR -1) II TUKWILA, WA 98188 UPRIGHT �CONNECTOR r- 0 D LOAD BEAM 4'- L1 lU 6 LOAD BEAM ELEVATION C 1.5 x 1.5 - 1.5 14 GA THK [ 1 2. OF 1/8' FILLET WELD EA END TO COLUMN BRACE . <3) PIN CONN 6' 0' 3' N 7" z E J 0 U BRACE CONN 0 (3) AISI A502 -2 RIVETS LOAD BEAM 7/16'4 2'oc HOOK THRU SLOTS IN COLUMN CONNECTOR 1 /8V VERT EDGES 14 GA THICK o 1 -5/8x 3x 3/16' THK f J 0 BRACE 3' N z 1 J 0 0 4' -0' UPRIGHT 14' -0' z 1 J 0 0 14 GA THK 3/8'x 5'x 8' BASEPLATE (2) 1/2'0 ANCHORS 1/8 ' 1 -1/2' EA FACE COLUMN & BASE PL 1-5/8'H x 1' W STEP 14 GA T IC HICK - 2.75" LOAD BEAM TYPE "F" PERMANENT PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 2000# CAPACITY @ 28', 56', 84', 108', 140', 186' 10, -0' LOAD BEAM ELEVATION 10' 8' 0' 4" 4' 4" 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc EA WAY FF 6' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION EA CORNER 3/16 11' SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN TYPE "H" PERMANENT. PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 2000# CAPACITY @ 28', 58', 88', 118', 132', 168' 106' or 108' LOAD BEAM LOAD BEAM 3' -O" LOAD BEAM 1' -2" 2' -6' LOAD BEAM LOAD BEAM 1- O- D CONNECTOR LOAD BEAM LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK I-1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 0 0 1 -5/8x 3x� 0 3/16' THK CONNECTOR 14GA THK 2` -6" 2' -6' 2' -4" BRACE 1/8' z X J ❑ 0 BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16THRU '4 2'oc HOOK SLOTS IN COLUMN 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL <4) 1/2'0 ANCHORS @ 7'x 6' - oc 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE 1/8 V VERT NOTES EDGES z E J 0 0 3/8x 5x 8 BASEPLATE .(2) 1/2'0 ANCHORS 6'oc FF 6' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN 1.) DESIGNED PER 2009 IBC & ASCE /SEI 7 -05 CHAPTER 15 2.) MATERIAL SPECS: Fy = 55ksi ALL WELDS E70xx ELECTRODES 6" CONCRETE SLAB 3000psi ALLOW SOIL PRESSURE 1500psf 3.) SEISMIC Sds =93Xg Sd1 =487.g Design"" Cat.' "D" 4.) LOAD PER LEVEL: SEE NOTE ABOVE ELEVATIONS 5.) ANCHORS TO BE HILTI TZ MINIMUM OF 3.25" EMBEDMENT PER ESR #1917 SPECIAL INSPECTION IS REQ'd EX psi le& JAN ,1 Q :2012 REVIEWED FOR CODE COMPLIANCE APPROVED !JUL 07 2011 City of Tukwila BUILDING DIVISION RECEIVED JUN 222011 PERMIT CENTER LOAD BEAM - LOAD BEAM 3'- LOAD BEAM 2'- LOAD BEAM 2'- k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, LOAD BEAM 2'- 1 I 6233 SEGALE PARK DR -1) II TUKWILA, WA 98188 0 =CONNECTOR i 2'- 0 I 1 ______J Fo 2'- (1. D D LOAD BEAM ELEVATION 10' 8' 0' 4" 4' 4" 3/8x 8x 8 BASEPLATE (2) 1/2'0 ANCHORS 6'oc EA WAY FF 6' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION EA CORNER 3/16 11' SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN TYPE "H" PERMANENT. PLAQUE NOT LESS THAN 50 SQ INCHES IN AREA TO BE PLACED IN CONSPICUOUS LOCATION STATING 2000# CAPACITY @ 28', 58', 88', 118', 132', 168' 106' or 108' LOAD BEAM LOAD BEAM 3' -O" LOAD BEAM 1' -2" 2' -6' LOAD BEAM LOAD BEAM 1- O- D CONNECTOR LOAD BEAM LOAD BEAM ELEVATION C 1.5 x 1.5 1.5 14 GA THK I-1 2' OF 1/8' FILLET WELD EA END TO COLUMN BRACE (3) PIN CONN 0 0 1 -5/8x 3x� 0 3/16' THK CONNECTOR 14GA THK 2` -6" 2' -6' 2' -4" BRACE 1/8' z X J ❑ 0 BRACE CONN <3) AISI A502 -2 RIVETS LOAD BEAM 7/16THRU '4 2'oc HOOK SLOTS IN COLUMN 3/8'x 9'x 8' BASEPLATE UNDER 5x8 PL <4) 1/2'0 ANCHORS @ 7'x 6' - oc 1/8 " 1 -1/2' EA FACE COLUMN & BASE PL ALTERNATE BASE 1/8 V VERT NOTES EDGES z E J 0 0 3/8x 5x 8 BASEPLATE .(2) 1/2'0 ANCHORS 6'oc FF 6' 6' CONCRETE SLAB ON GRADE COLUMN BASE X- SECTION SAFETY PIN TO RESIST 1000# UPLIFT LOAD COLUMN -BEAM CONN 1.) DESIGNED PER 2009 IBC & ASCE /SEI 7 -05 CHAPTER 15 2.) MATERIAL SPECS: Fy = 55ksi ALL WELDS E70xx ELECTRODES 6" CONCRETE SLAB 3000psi ALLOW SOIL PRESSURE 1500psf 3.) SEISMIC Sds =93Xg Sd1 =487.g Design"" Cat.' "D" 4.) LOAD PER LEVEL: SEE NOTE ABOVE ELEVATIONS 5.) ANCHORS TO BE HILTI TZ MINIMUM OF 3.25" EMBEDMENT PER ESR #1917 SPECIAL INSPECTION IS REQ'd EX psi le& JAN ,1 Q :2012 REVIEWED FOR CODE COMPLIANCE APPROVED !JUL 07 2011 City of Tukwila BUILDING DIVISION RECEIVED JUN 222011 PERMIT CENTER k7M Me- W 9�. „c 40TH t'. 1 {. LlLNtJE SOUTH Sea lt: °� ti Ito A « si01 `, I 6233 SEGALE PARK DR -1) II TUKWILA, WA 98188 DRAWN BY _ CL SCALE: STATED DATE: 6.21.2011 JOB NO: 052605 -001 B CHECKED BY JG SHEET . NO. OF 1 SHEETS EXISTING UNDERGROUND 0 x 106" 24-2 3 8" 1'o -0 5 -0 M 10 -6 c- I x 108" 4E' co108" &4 "x106" 48" x 108" 00 6" 4P 1114. N ) a e HiGH TEMP UPRIGHT 200° 0 CO 58- o u) CNJ • EXISTING SPRINKLER RISER '.; 6" Elk ��i, t ��� ED JAN .10.2012 2 9 -6 10 -0 co 10 -6 36" x 0" 36" 120" I 0- 42" x 12 ! " 42" X'I 42" X'I FiRE PROTECTION PLAN SCALE: 1/8" =11-0 SCOPE OF WORK: 1. REPLACE ALL EXISTING BRASS UPRIGHT SPRINKLERS TO K =11.2 UPRIGHTS ONLY. 2. PLAN SUBMITTAL TO & APPROVAL BY CITY OF TUKWILA. 3. MATERIAL$ PER NFPA #13 STANDARDS AS SELECTED BY ARCHER CONSTRUCTION, INC. 4. TESTING PER NFPA #13 & CITY OF TUCWILA CLARIFICATIONS: 1. REPLACE ALL EXISTING BRASS UPRIGHT WITH RELIABLE 11.2 K FACTOR SPRINKLERS. 2. NO ALTERATIONS TO EXISTING FIRE SPRINKLER SYSTEM PIPING, HANGERS, E.Q. BRACING OR RISER. 3. CEILING HEIGHT @ 271-0". 4. STORAGE CLEARANCE SHALL NOT EXCEED 5' -O" TO 10' -O" FROM CEILING. EXCLUSIONS: 1. TAXES OF ANY TYPE. 2. ELECTRICAL OF ANY TYPE. 3. UNDERGROUND PIPING OF ANY TYPE 4. STRUCTURAL VERIFICATION & ABATEMENT OF ANY TYPE 5. LABELING, PREP FOR & PRIMING OR PAINTING OF ANY TYPE. 6. RELOCATION OF PIPE FOR WORK OF OTHER TRADES. iI BY - EL AMi CI..AMP W/ RETAINING STRAP - SiDE BEAM BRACKET EYE SOCKET NUT %% PLATE WASHES KWIK -F3QLT hC.I -P AREA � #1 DESIGN CRITERIA: 1) Chapter 12 (12.6.3) For general storage applications, rack storage, rubber tire storage, roll paper storage, and baled cotton storage being protected with upright and pendent spray sprinklers with required densities of greater than 0.34 gmp /ft2, standard- response spray sprinklers with a K- factor of K =11.2 or larger that are listed for storage application shall be used. - The existing sprinkler upright protection are Reliable Mod. G K =8.0 286 °. 2) Chapter 17 (17.1.2.1'1) Decision Tree. Plastics > Group A > Exposed and Unexpended > Stable. (Chapter 17 Design Criteria) Chapter 17 (17.2.1.2.1) For group A plastics commodities In cartons, encapsulated or nonencapsulated in single -, double -, and multiple -row racks, ceiling sprinkler water demand in terms of density and area of operation shall be selected from figure 17.2.1.2.1(a) through figure 17.2.1.2.1(f). - Fig. 17.2.1.2.1(d) Single- and double- row racks. (5' to 10' dearance to ceiling).SEE NOTE 2 2. Ceiling -only protection shall not be permitted for this storage configuration except where K =11.2 or larger orifice spray sprinklers listed for storage use are installed. in -rack sprinklers shall not be required, provided the ceiling sprinkler discharge criterion is increased to .60gpm /ft2 over 2000 ft2 and the ceiling height in the protected area does not exceed 27ft. After performing the.Hydragiic Calculation using the existing fire sprinkler system and K =11.2 sprinkler heads, we are able to provide a hydraulic calculation with the safety pressure required by NFPA -13. NO addition modifications to the sprinkler system piping or routing will be necessary to achieve this. HYDRAULIC DESIGN INFORMATION THIS BUILDING IS PROTECTED BY A HYDRAULICALLY DESIGNED AUTOMATIC SPRINKLER SYSTEM.. JOB NAME: PROFESSIONAL PLASTIC SYSTEM LOCATION: 8233 SEGALE PARK DR. D DATE OF CALCULATIONS: 6!812011 JOB NUMBER: S11.32 WATERFLOW INFORMATION STATIC PRESSURE: 140 PSI RESIDUAL PRESSURE: 20 PSI FLOWING (GPM): 2800 GPM GPM FLOWING 20 PSI: 2600 GPM DESIGN CRITERIA DENSITY: .40 • DESIGNED AREA OF DISCHARGE: 2000 OCCUPANCY CLASSIFICATION: GP. A PLASTIC HEADS CALCULATED: 29 K FACTOR11.2 HEAD SPACING: 84 SQ FT SPRINKLER MODEL: G XL0 TEMPERATURE RATING: 185° SYSTEM DEMAND AT BASE OF. RISER GPM DISCHARGE1597.39 GPMRESIDUAL PRESSURE: 89.52 PSI HOSE ALLOWANCE: 500 GPM ARCHER1 CONSTRUCTION, INC .PHONE: (253) 872-7222 .FAX: (253) 872 -7277 SPRINKLER SYSTEM INFORMATION PROFESSIONAL PLASTIC 6233 SEGALE PARK DR. D, KENT, WA High Pile Storage: YES Rack Storage: YES Commotilly Class: GI,. A PLASTIC Max. Storage Ht.: 20? 5'-10' Clearance to Ceiling Aisle Width: NIA Encapsulated: NO Sold Shelving: YES Flammable- Combustible Liquids: NI Haz. Materials: NO WATERFLOW INFORMATION Static Pressure: 140PSI Residual Piesstrre: 20PSI Flowing (GPM): 20)OGPM Date: xxhofboor Tnne: xxaoXPM Location: SYSTEM TYPES Wet System : YES Locaion: • 6233 Seale Park Dr. D Dry System : NO Laa6on: NIA Antifreeze System : NO Location: N/A System : Location. N/A Original Main Drain Test Results: Drain Static psi: Residual psi: ARCHER' CONSTRUCTION, INC • PHONE: (253)172 -7222 •FAX: (253) 872-7277 NFPA 13 IL4ZARD GP. A PLASTICS 2000 80 iarsios+ was N/A I O° mss 500 GPM 1„,-,r,„=,, 84 SQ. FT. ARm so, P1 SQ. FT. oPwasa. Pr. alucs wu owau� SAMNI SIDEWINDER TOTAL 1597.39 GPM 89.52 PSI cp BOR S.AMMV1k $UPERSCREW COACH SCREW ROD HYDRAULICDESIGN INFORMATION CEILING FLANGE U- MO0i•;: SHORT Si F;AP WALL BRACKET TRAPEZE AREA WARIER REMOTE CODE APT. NOSE IAL OWANCE AuLOWDBANCEE sns wa TYPE lama ma SPRINKLER TOTAL SYSTEM BTS BOD BOJ BOP BOT CTS FO N AS OTS UNO -1- FLO" - STATIC BOTTOM TO STRUCTURE RESIDUAL BOTTOM OF DECK . BOTTOM OF JOIST BOTTOM OF PURLIN BOTTOM OF TRUSS CUT TO SUIT FIELD ORDER INSIDE FACE OF WALL NO AUTO. SPRINKLERS OPEN TO STRUCTURE NOTES: UNLESS N01ED 0TIERWISE RIGID COMING FlEXIRECOUPLING GPM FLOWING DATE & TIME 140 PSI SYM MAKE MODEL SIN# 20 PSI B RELIABLE G XLO R2921 2600 GPM XXDOCJXXXX PER: LOCATION: TYPE UPRIGHT FINISH BRASS K -FAL THREAD ORIFICE TEMP CANOPY QTY K =11.2 %" " /s" 200° 388 REVIEWED FOR CODE COMPLIANCE APPROVED • JUL. 0 7 2011 City of Tukwila BUI DING DiVISi PROTECTION OF PLASTIC AND RUBBER COMMODITIES THAT ARE STORED ON RACKS Single -, double -, and multiple -row racks 0.45 gpm/ft2 per 2000 ft2 (18.3 mm/min per 186 m2) 5 ft to 10 ft (1.5 m to 3.1 m) clearance to telling See Notes 1, 2, and 5 8 ft (2.44 m maximum between . prinklers ❑❑ADEAI J I A E80'D EI 1 1 IL E i°1 Plan View MEI OMEN PIMP MUM E El E] UP A ❑o❑ A ❑FREE II ETT-I III AI Elevation View Single -, double -, and multiple -row racks 0.30 gpm/ft2 per 2000 ft2 (12.2 mm /min per 188 m2) 11 1 VI Ill 5 ft to 10 ft (1.5 m to 3.1 m) clearance to ceiling See Notes 2, 3, and 5 8 ft (2.44 m) maximum between sprinklers DE] [.:10 A E ❑ E A E2L Do ❑ ❑--+ I I I AEJ❑ARR. LD5OL RRR DECIDE A S L E Plan View E Notes: Elevation View 1. Single level of in -rack sprinklers (h in. or Was in. (12.7 mm or 13.5 mm) operating at 15 psi (1.03 bar) minimum] Installed as Indicated In the transverse flue spaces. 2. Ceiling -only protection shall not be permitted for this storage configuration except where K -11.2 or larger orifice spray sprinklers listed for storage use are Installed. In -rack sprinklers shall not be required, provided the ceiling sprinkler discharge criterion Is Increased to 0.6 gpm/ft2 (24 mm/min) over 2000 n2 (186 m2) and the ceiling height in the protected area does not exceed 27 ft (8.2 m). 3.1We levels of in -rack sprinklers ph in. or 1%2 In. (127 mm or 13.5 mm) operating at 15 pal (1.03 bar) minimum] Installed as Indicated and staggered in the transverse flue space. 4. Single level of in -rack sprinklers r2/3. in. (13.5 mm) operating at 15 psi (1.03 bar) or l//z In. (12.7 mm) operating at 30 psi (2.07 bar) minimum]. installed on 4 ft to 5 n (1.22 m to 1.52 m) spacings located, as Indicated, in the longitudinal flue space at the Intersection of every transverse flue space. 5. Each square represents a storage cube measuring 4 ft to 5 ft (1.22 m to 1.52 m) on a side. Actual load heights can vary from approximately 18 in. (0.46 m) up to 10 ft (3.05 m). Therefore, there could be as Iew as one load or as many as six or seven loads between in•redk sprinklers that are spaced 10 ft (3.05 m) apart vertically. Single -, double -, and multiple -row ranks 0.30 gprrJn2 per 200052 (12,2 mm/min per 188 m2) 5 ft to 10 ft (1.5 m to 3.1 m) clearance to ceiling See Notes 2, 3, and 6 8 ft 2.44 m) maximum between sp inklers Plan View RARj EI A l' L RREE I A E A a E mum maw pow PRIM wwww MUM ■RR■ Eleve ion View Single -, double -, and multiple -row ranks 0.30 gpm/ft2 per 2000 ft2 (12.2 mm /min per 186 m2) 5 ft to 10 ft (1.5 m to 3.1 m) clearance to ceiling See Notes 2, 4, and 5 8 ft (2;44 m) maximum between sprinklers Plan View A S L EADEA1V I IA E$❑OL 1 DEERE 1 1 Elevation View I I 1 I I 13-177 FIGURE 17.2.1.2.1(d) 20 ft (6.1 na) Storage; 5 ft to 10 ft (1.5 m to 3.1 m) Clearance to Ceiling. VICINITY MAP SCALE: N.T.S. ARCH.E.R1 CONSTRUCTION, INC PROFESSIONAL PLASTICS 6233 SEGALE PARK DR. D TUKWILA, WA 98188 • RECEIvEr FIRE SPRINKLER PLANS PERMIT NO: - JOB NO: • 811-32 AUTHORITY: CITY OF TUKWILA TOTAL PROJECT SPRINKLERS • 388 TOTAL SPRINKLERS THIS SHEET 368 FIRE SPRINKLER. DIVISION 7855 S 206TH STREET, KENT, WA 98032 PHONE 253 -872 -7222 FAX 253 -872 -7277 CONTRACTOR: Professional Plastics 6412 S. 196th St. Kent, Wa P ONE: 25.3- 872 -7430 JUN 2 2 2011 PERMIT CENTER DESIGNER: P.DELGADO SCALE: DATE: TODAY'S DATE REVISED 11 PLOTTED 1.1 FP1OF1. 400 RIPS 1 pl r".-1 n � T5-717C31-152— 39' 57 D 18' -3" 36" x 106" D 800 AMPS 20' -2" 159' -9" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" r-- 44" x 1.06" 44" x 1.06" 110' -10" 44" x 108" 44" x 108" 44" x 108 " .p __ �-- �� �-, 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" r-- 44" x 1.06" 44" x 1.06" 110' -10" 44" x 108" 44" x 108" 44" x 108 " .p x- 21' -11" 24' -5" O A 36" x 108" A F F F F 28' - 8" 36" x 120" 36" x 120" O 35,-7,, JAN .102012 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 0 7 2011 City of Tukwila BUILDING DIVISION 36" x 120" j[36" x 120" E E 36" x 1.20 " 36" x 106" 36" x 106" ( 36" x 106" 229' -10" PLA\ VHW 122 DESCRIPTION esz Cej CO ENGINEERED PRODUCTS A PAPS (3) 9883 40TH AVENUE SOUTH 206 - 394 -3300 b11 SCALE: 1/8" = 1'--0" 8 �o PLAN NORTH RECEIVED JUN 2 2 2011 PERMIT CENTER DRAWN BY CL SCALE: STATED DATE: 6.21.2011 JOB NO: 052605 -001B CHECKED BY: JG SHEET NO. 1 OF 1 SHEETS" FILE COPY permit No. .. _.1 ... It "O. I 59' „ L. 48" x 108" 48" x 108" 48" x 108" 48" x 108" 48" x 108" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 44" x 106" 48" x 108" 48" x 108" 44" x 144" -13" x 108" 48" x 108" 48" x 108" 44" x 106" 44" x 106" 44" )kl 106" 44" x 106" 44" x 106" 41' -1 " CO 32' -8" 93' 0� 44" x 108" 44" x 108" 44" x 144" cdp 0 0 0 57 „ a/ 24' -5" 44" x 106" I 44" x 108" 44" x 108" 18' 27' -4" �VJ 42" x 106" 42" x 106" 42" x 106" 42" x 108" // 0 0 144' —10" 0 0 12' -3" 24' -5" co y) 1 0 a) 9883 40TH AVENUE SOUTH EXPO`" IUD JAN 1 ;ZOiZ 32' -2" 13' Fax: 206 - 575 -6688 206 - 394 -3, ,00 0 0_ 36" x 106" 36" x 108" 36" x 120" 36" x 120" 6" x 120" 36" x 120" 36" x 120" 36" x 120" 36" x 106" 36" x 106" 36" x 106" 36" x 106" 48" x 106" 48" x 106" 48" x 106" 48" x 108" 36" x 106" 36" x 106" 36" x 108" 36" x 108" 36" x 120" 36" x 120" 36" x 120" 36" x 120" 36" x 120" 36" x 120" 36" x 120" 36" x 106" 36" x 106" 36" x 106" 36" x 106" 229' —10" PLAN V W REVIEWED FOR CODE COMPLIANCE APPROVED 'JUL 0 7 2011 I �6 SCALE: 1/8" = 1' -0" City of Tukwila BUILDING DIVISION CI OFTUKVNLA JUL 01 2011 PERMIT CENTER CORRECTION cr) 101.01-• i(lop DRAWN BY: CL SCALE: STATED DATE: 6.21.2011 JOB NO: 052605 -001 B CHECKED BY: JG SHEET NO. 10 OF 5. SHEETS